WO2020153747A1 - 교량상판의 교체용 신축이음장치 - Google Patents

교량상판의 교체용 신축이음장치 Download PDF

Info

Publication number
WO2020153747A1
WO2020153747A1 PCT/KR2020/001091 KR2020001091W WO2020153747A1 WO 2020153747 A1 WO2020153747 A1 WO 2020153747A1 KR 2020001091 W KR2020001091 W KR 2020001091W WO 2020153747 A1 WO2020153747 A1 WO 2020153747A1
Authority
WO
WIPO (PCT)
Prior art keywords
plate
support
support plate
hole
fixing
Prior art date
Application number
PCT/KR2020/001091
Other languages
English (en)
French (fr)
Inventor
김승락
Original Assignee
주식회사 지엠로드
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 지엠로드 filed Critical 주식회사 지엠로드
Publication of WO2020153747A1 publication Critical patent/WO2020153747A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/065Joints having sliding plates
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Definitions

  • the present invention relates to a replacement joint device for replacement of a bridge deck that can be quickly replaced without damaging the bridge deck when replacing the expansion joint of the bridge deck.
  • a bridge is composed of a plurality of bridges at the bottom and a number of top plates that are seated on top of the bridges to form a roadway, and the appropriate gap to accommodate the dynamic behavior of both top plates smoothly at the part where the top plate and the top plate are connected.
  • the width of the joint is to be provided.
  • a stretchable joint device is installed on the edge of the bridge deck.
  • the expansion joint device installed on the bridge deck includes an anchor bar 21 that extends to the installation space 11 of two bridge decks 10 adjacent to each other and is fastened to the main reinforcing bar of the bridge deck; Plates 22 are respectively located on the end surfaces of the two bridge top plates 10 and connected to the anchor bars 21; It has a telescopic portion 23 coupled to the upper end of the plates (22). An excellent guide portion 30 for guiding rainwater to the outside is installed at the lower end of the plates 22.
  • Such a bridge expansion and contraction device is damaged by repetitive loads of a vehicle passing over the bridge deck and the like, and essentially replaces or repairs the bridge expansion and contraction device.
  • the expansion and contraction device crushes all the concrete parts in the adjacent position, removes the anchor bars welded to the main reinforcing bar again, and welds the anchor bar of the new expansion and contraction unit back to the main reinforcing bar to fix the concrete. I had no choice but to.
  • the conventional bridge expansion joint replacement method removes the anchor bar welded from the main rebar and welds the new anchor bar again, thereby increasing the fatigue of the main rebar and eventually breaking the main rebar.
  • the new elastic joint device cannot be firmly supported, and thus, the replacement cycle of the elastic joint device must be accelerated.
  • An object of the present invention is to provide an expansion and contraction joint device for replacement of a bridge deck that can be quickly replaced without damaging the bridge deck when replacing the expansion joint of the bridge deck.
  • the expansion joint device for replacement of a bridge deck includes a support member 100 fixedly installed on a horizontal surface of an incision surface of a'b' shape at an edge of the bridge deck, and a stretch plate 220 protruding forward of the bridge deck ) And includes a plate member 200 located on the upper portion of the support member 100 and a fixing member 300 fixing the support member 100 and the plate member 200, wherein the support member 100 Of the support plate 110 and the mortar movement hole 120 which penetrates through the support plate 110 and moves the mortar between the support plate 110 and the horizontal surface of the bridge, and the support plate 110 located on the horizontal surface cut from the edge of the bridge top plate.
  • a horizontal adjustment that is formed on the upper surface is fixed to the fixing member 300 for fixing the plate member 200, the fastening groove 130 and the support plate 110 is formed on the horizontal adjustment bolt 141 for adjusting the horizontal is inserted
  • the plate member 200 is a front plate 210 positioned vertically at the front end of the support plate 110, and the expansion plate 220 protruding forward from the top of the front plate 210 and
  • a plurality of anchor bars 230 extending in a direction parallel to the support plate 110 from the rear of the front plate 210 to the rear, and both ends are located between neighboring anchor bars 230 and through holes in the center ( 241) includes a base plate 240 formed thereon, and the fixing member 300 is extended to the fixing groove 130 of the support plate 110 along the through hole 241 of the base plate 240 to be fastened to the plate member 200 Is fixed to the upper portion of the support member 100, but the support plate 240 of the plate member 200 is further formed with an extended plate 242 extending backward, and a reinforcing
  • the support member 100 is characterized in that the cover plate 121 surrounding the mortar movement hole 120 is fixed to the support plate 110 to block the outside when the mortar is injected into the mortar movement hole 120. .
  • the support member 100 is characterized in that the side plate 170 extending upward from the rear end of the support plate 110 is further formed to cover the vertical surface cut at the edge of the bridge top plate.
  • the expansion and contraction device of the bridge deck can quickly separate and replace the plate member corresponding to the expansion and contraction device, thereby preventing the bridge deck from being further damaged and easily installing.
  • FIG. 1 is a view showing a conventional bridge deck expansion and contraction device.
  • Figure 2 is an exploded perspective view of the expansion joint device for replacement of the bridge deck according to an embodiment of the present invention.
  • Figure 3 is a combined state of Figure 2;
  • FIG. 4 is a perspective view of a support member according to the invention.
  • FIG. 5 is a perspective view of a plate member according to the present invention.
  • FIG. 6 is a perspective view of another plate member according to another embodiment of the present invention.
  • Figure 7 is an exploded perspective view of the expansion joint for replacement of the bridge deck using the plate member of Figure 6;
  • FIG 8 and 9 is an exploded view and a fastening state of the support member according to another embodiment according to the present invention.
  • FIG. 10 is a perspective view of a support member according to another embodiment of the present invention.
  • the expansion and contraction joint device for replacement of the bridge deck according to the present invention, the support member 100 fixedly installed on the horizontal surface of the'b' shaped incision surface at the edge of the bridge deck, A plate member (200) having an elastic plate (220) protruding forward of the bridge deck and positioned on top of the support member (100), and a fixing member (300) for fixing the support member (100) and the plate member (200) ).
  • the support member 100 is a support plate 110 positioned on a horizontal surface cut out from the edge of the bridge top plate, and penetrates through the support plate 110, the support plate 110 and the mortar between the horizontal surface of the bridge
  • a fixing groove 130 is formed in which the moving mortar moving hole 120 and the fixing member 300 for fixing the plate member 200 to the upper surface of the support plate 110 are fastened.
  • a horizontal adjustment hole 140 through which a horizontal adjustment bolt 141 for adjusting the horizontality of the support plate 110 is inserted is formed in the support plate 110.
  • a plurality of mortar moving holes 120 are installed so that the mortar is injected quickly and evenly.
  • the support plate 110 is fixed to the horizontal surface of the bridge deck by welding or bolting. That is, when the main reinforcing bar of the bridge deck is exposed to the horizontal surface, the rear surface of the support plate 110 is fixed to the main reinforcing bar by welding, or the support bolt protrudes on the horizontal surface of the bridge deck and the support bolt penetrates the support plate 110.
  • the support bolt (not shown) exposed through the support hole 150 may be fastened with a support nut (not shown) to be fixed.
  • the support plate 110 is fixed by welding to the main reinforcing bar of the bridge top plate after being held horizontally using the horizontal adjustment bolt 141 or fixed through the support nut when the support bolt installed on the horizontal surface protrudes through the support hole 150 do. Then, when the support plate 110 is fixed horizontally, the mortar is moved between the support plate 110 and the horizontal surface through the mortar moving hole 120 to integrate the support plate 110 on the horizontal surface of the bridge deck.
  • the plate member 200 includes a front plate 210 positioned vertically at the front end of the support plate 110, and a stretching plate 220 protruding forward from the top of the front plate 210.
  • a plurality of anchor bars 230 extending in a direction parallel to the support plate 110 from the rear of the front plate 210 to the rear, and the support plate located between the anchor bars 230 and having a through hole 241 in the center It consists of (240).
  • a support plate 211 is formed at the rear end of the front plate 210 to support the front plate vertically.
  • the support plate 240 is preferably fixed to each of the adjacent anchor bars 230 by welding.
  • the fixing member 300 is fastened while being extended to the fixing groove 130 of the supporting plate 110 along the through hole 241 of the supporting plate 240 to fix the plate member 200 to the upper portion of the supporting member 100. It is preferable that the fixing member 300 uses a long bolt. At this time, by installing a cover 310 to cover the head portion of the fixing member 300 exposed to the top of the through hole 241 of the base plate 240, the fixing member 300 by mortar when replacing the plate member It is desirable to prevent the head portion of the damage.
  • the plate member 200 is positioned in front of the support plate 110 while the front plate 210 is aligned with the through hole 241 formed in the support plate 240 and the fixing groove 130 formed in the support plate 240.
  • the through-hole 241 is passed through the fixing member 300 and then fixed to the fixing groove 130, the plate member 200 can be firmly fixed to the supporting member 100.
  • the base plate 240 of the plate member 200 of the present invention is further formed with an extended plate 242 extending rearward, the upper surface of the extended plate 242 rebar ( 250) is preferably fixed.
  • the reinforcing bar 250 placed on the extension plate 242 it can serve as a supporting reinforcing bar, thereby improving the strength of the mortar.
  • the support member 100 of the present invention is preferably a cover plate 121 surrounding the mortar movement hole 120 is fixed to the support plate 110.
  • the support plate 110 When the mortar is moved to the mortar moving hole 120 by the support plate 110, it is prevented from being exposed to the outside of the support plate 110, and it is easy to pour mortar after installing the plate member 200 on the support member 100. Can be separated.
  • the support member 100 of the present invention is further formed with a side plate 170 extending upward from the rear end of the support plate 110 so as to cover the vertical surface cut at the edge of the bridge top plate. It is preferred. At this time, mortar is injected between the side plate 170 and the vertical surface to be integrated with the side surface. Accordingly, when replacing the plate member 200, simply removing the mortar between the support plate 110 and the side plate 170 surrounding the edge of the bridge top plate can prevent further loss of the bridge top plate.
  • the corner portions of the two bridge deck plates 10 are removed to have a vertical portion and a horizontal portion of a'b' shape, thereby securing the installation space 11 of the expansion joint member.
  • the support member 100 is positioned horizontally in the installation space of the secured expansion joint member, it is fixed.
  • the horizontal adjustment bolt 141 is fastened to the horizontal adjustment hole 140 formed in the support plate 110 and rotated to position the support plate 110 horizontally and then welded to the main rebar of the exposed bridge deck and fixed or installed.
  • the fixing anchor installed in the space is inserted into the supporting hole 150 of the supporting plate 110, it is fixed by fastening with a fixing nut.
  • the mortar is moved between the support plate 110 and the installation space through the mortar movement hole 120 formed in the support plate 110 to securely fix the support plate 110.
  • the cover plate 121 covering the mortar movement hole 120 is fixed to the support plate 110 to block it from the outside.
  • the plate member 200 is fixed to the support plate 240 of the support member 100 using a long bolt, which is a fixing member 300. That is, the long bolt is fastened to the fixing groove 130 formed in the support plate 110 of the support member 100 along the through hole 241 formed in the support plate 240 of the plate member 200.
  • the support plate 240 is formed with an extension plate 242 extending rearward
  • the reinforcing bar 250 is fixed to the upper surface of the extension plate 242, and when the plate member 200 is fixed, the upper portion of the long bolt It is preferable to install the cover 310 to prevent damage.
  • the expansion joint device of the present invention if the expansion joint device of the present invention is to be replaced, remove the exposed mortar around the fixing bolt fixing the plate member 200 and the supporting member 100, and then remove the fixing bolt and impact the mortar. It is possible to simply remove the plate member 200. And, by installing the new plate member 200, it is possible to quickly perform replacement of the expansion joint device.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명의 교량상판의 교체용 신축이음장치는 교량상판의 모서리에서 절개된 수평면에 위치하는 지지판(110)과, 지지판(110)에 관통되어 지지판(110)과 교량의 수평면 사이로 몰탈을 주입하기 위한 몰탈이동홀(120)와, 지지판(110)의 상면에 형성되어 플레이트부재(200)를 고정시키는 고정부재(300)가 체결되는 고정홈(130)과, 지지판(110)에 형성되어 수평을 조절하기 위한 수평조절볼트(141)가 삽입되는 수평조절홀(140)을 포함하는 지지부재(100)와; 지지판(110)의 전단에서 수직하게 위치하는 전면판(210)과, 전면판(210)의 상단에서 전방으로 돌출되는 신축판(220)과, 전면판(210)의 후면에서 후방으로 지지판(110)과 평행한 방향으로 연장된 다수개의 앵커바(230)와, 앵커바(230) 사이에 위치하며 중앙에 관통홀(241)이 형성된 받침판(240)을 포함하는 플레이트부재(200)와; 받침판(240)의 관통홀(241)을 따라 지지판(110)의 고정홈(130)으로 연장되면서 체결되어 플레이트부재(200)를 지지부재(100)의 상부에 고정시키는 고정부재(300)를 포함한다.

Description

교량상판의 교체용 신축이음장치
본 발명은 교량상판의 신축이음장치를 교체하는 경우에 교량상판을 손상시키지 않고 빠르게 교체할 수 있는 교량상판의 교체용 신축이음장치에 관한 것이다.
일반적으로 교량은 하부의 다수개의 교각과, 교각의 상부에 안착되어 도로를 형성하게 되는 다수개의 상판으로 구성되며, 상판과 상판이 연결되는 부분에는 양쪽 상판의 동적거동을 원활히 수용할 수 있도록 적정 유격 폭으로 이음틈새가 구비되게 된다.
그리고, 이러한 이음틈새를 수평방향으로 연결하여 폐쇄함으로써 상부에서 주행하게 되는 차량이 원활히 주행할 수 있도록 하면서, 빗물이나 각종 이물질이 해당 이음틈새를 통해 유입, 낙하하여 교량의 하부 시설물들을 오염시키거나 부식시키는 것을 방지하기 위하여 교량상판의 모서리에 신축가능한 신축이음장치가 설치된다.
교량상판에 설치되는 신축이음장치는 도 1에 도시된 것처럼 서로 인접한 두 개의 교량상판들(10)의 설치공간(11)으로 연장되어 교량상판의 주철근에 체결되는 앵커바(21)와; 두 개의 교량 상판(10)의 끝면에 각각 위치하며, 앵커바(21)과 연결되는 플레이트들(22)과; 플레이트들(22)의 상단부에 결합되는 신축부(23)를 구비하고 있다. 플레이트들(22)의 하단부에는 우수를 외부로 안내하는 우수안내부(30)가 설치된다.
이러한 교량 신축이음장치는 시간이 경과함에 따라 교량상판을 지나는 차량의 반복적인 하중 등에 의해서 손상되어 필수적으로 교량 신축이음장치를 교체하거나 수리하게 된다.
이에 따라 교량 신축이음장치를 교체하기 위해서는 신축이음장치가 인접한 위치의 콘크리트부들 전체를 파쇄하고 다시 주철근에 용접된 앵커바들 제거하고 새로운 신축이음장치의 앵커바를 다시 주철근에 용접하여 고정한 후에 콘크리트를 타설할 수밖에 없었다.
이러한 종래의 교량 신축이음장치의 교체방법은 주철근에서 용접된 앵커바를 제거하고 다시 새로운 앵커바를 용접하기 때문에 주철근의 피로도가 증가하게 되고 결국 주철근이 파손되는 문제가 있다. 주철근의 피로도가 증가되거나 파손되면 새로운 신축이음장치를 견고하게 지지하지 못하여 신축이음장치의 교체주기가 빨라질 수밖에 없는 문제가 발생된다.
본 발명의 목적은 교량상판의 신축이음장치를 교체하는 경우에 교량상판을 손상시키지 않고 빠르게 교체할 수 있는 교량상판의 교체용 신축이음장치를 제공함에 있다.
본 발명에 따른 교량상판의 교체용 신축이음장치는, 교량상판의 모서리에서 'ㄴ'형상의 절개면의 수평면에 고정 설치되는 지지부재(100)와, 교량상판의 전방으로 돌출되는 신축판(220)을 구비하고 지지부재(100)의 상부에 위치하는 플레이트부재(200)와, 지지부재(100)와 플레이트부재(200)를 고정하는 고정부재(300)를 포함하되, 지지부재(100)는 교량상판의 모서리에서 절개된 수평면에 위치하는 지지판(110)과, 지지판(110)에 관통되어 지지판(110)과 교량의 수평면 사이로 몰탈을 이동시키는 몰탈이동홀(120)와, 지지판(110)의 상면에 형성되어 플레이트부재(200)를 고정시키는 고정부재(300)가 체결되는 고정홈(130)과, 지지판(110)에 형성되어 수평을 조절하기 위한 수평조절볼트(141)가 삽입되는 수평조절홀(140)을 포함하고, 플레이트부재(200)는 지지판(110)의 전단에서 수직하게 위치하는 전면판(210)과, 전면판(210)의 상단에서 전방으로 돌출되는 신축판(220)과, 전면판(210)의 후면에서 후방으로 지지판(110)과 평행한 방향으로 연장된 다수개의 앵커바(230)와, 양 단이 이웃하는 앵커바(230) 사이에 위치하며 중앙에 관통홀(241)이 형성된 받침판(240)을 포함하며, 고정부재(300)는 받침판(240)의 관통홀(241)을 따라 지지판(110)의 고정홈(130)으로 연장되면서 체결되어 플레이트부재(200)를 지지부재(100)의 상부에 고정시키되, 플레이트부재(200)의 받침판(240)은 후방으로 연장된 연장판(242)이 더 형성되고, 연장판(242)의 상면에는 철근(250)이 고정되며, 받침판(240)의 관통홀(241) 상부에 노출되는 고정부재(300)의 머리부분을 커버할 수 있도록 덮개가 설치되고, 고정부재(300)는 장볼트를 사용하는 것을 특징으로 한다.
바람직하게, 지지부재(100)는 몰탈이동홀(120)로 몰탈이 주입되면 외부와 차단하기 위하여 몰탈이동홀(120)를 감싸는 덮개판(121)이 지지판(110)에 고정되는 것을 특징으로 한다.
바람직하게, 지지부재(100)는 교량상판의 모서리에서 절개된 수직면에 커버하도록 지지판(110)의 후단에서 상부로 연장된 측판(170)이 추가로 형성되는 것을 특징으로 한다.
본 발명에 의하면 교량상판의 신축이음장치를 신축이음장치에 해당되는 플레이트부재를 신속하게 분리하고 교체할 수 있어 교량상판이 추가로 파손되는 것을 방지하면서 간단하게 설치할 수 있는 효과가 있다.
도 1은 종래의 교량상판 신축이음장치를 보인 도면.
도 2는 본 발명의 실시예에 따른 교량상판의 교체용 신축이음장치의 분해 사시도.
도 3는 도 2의 결합상태도.
도 4는 본 발명에 따른 지지부재의 사시도.
도 5는 본 발명에 따른 플레이트부재의 사시도.
도 6는 본 발명의 다른 실시예에 따른 다른 플레이트부재의 사시도.
도 7는 도 6의 플레이트부재를 이용한 교량상판의 교체용 신축이음장치의 분해 사시도.
도 8 및 도 9는 본 발명에 따른 다른 실시예에 따른 지지부재의 분해도 및 체결상태도.
도 10은 본 발명의 또다른 실시예에 따른 지지부재의 사시도.
이하, 첨부된 도면을 참조하여 본 발명을 자세히 살펴본다.
도 2 및 도 3에 도시된 바와 같이, 본 발명에 따른 교량상판의 교체용 신축이음장치는, 교량상판의 모서리에서 'ㄴ'형상의 절개면의 수평면에 고정 설치되는 지지부재(100)와, 교량상판의 전방으로 돌출되는 신축판(220)을 구비하고 지지부재(100)의 상부에 위치하는 플레이트부재(200)와, 지지부재(100)와 플레이트부재(200)를 고정하는 고정부재(300)를 포함한다.
도 4에 도시된 바와 같이, 지지부재(100)는 교량상판의 모서리에서 절개된 수평면에 위치하는 지지판(110)과, 지지판(110)에 관통되어 있으며 지지판(110)과 교량의 수평면 사이로 몰탈을 이동시키는 몰탈이동홀(120)와, 지지판(110)의 상면에 플레이트부재(200)를 고정시키는 고정부재(300)가 체결되는 고정홈(130)이 형성된다. 그리고, 지지판(110)에는 지지판(110)의 수평을 조절하기 위한 수평조절볼트(141)가 삽입되는 수평조절홀(140)이 관통 형성된다. 이때, 몰탈이동홀(120)는 몰탈이 신속하면서도 고르게 주입되도록 다수개 설치된다.
그리고, 지지판(110)은 교량상판의 수평면에 용접 또는 볼트체결로 고정된다. 즉, 교량상판의 주철근이 수평면으로 노출된 경우에 지지판(110)의 후면을 주철근에 용접시켜 고정시키거나 또는 교량상판의 수평면에 지지볼트가 돌출되도록 설치하고 지지판(110)에 지지볼트가 관통되는 지지홀(150)을 형성한 후에 지지홀(150)을 통해 노출된 지지볼트(미도시)에 지지너트(미도시)로 체결하여 고정시킬 수 있다.
이러한 지지판(110)은 수평조절볼트(141)를 이용하여 수평하게 유지시킨 후에 교량상판의 주철근에 용접하여 고정되거나 또는 수평면에서 설치된 지지볼트가 지지홀(150)을 통해 돌출되면 지지너트를 통해 고정된다. 그리고, 지지판(110)이 수평하게 고정되면 몰탈이동홀(120)를 통해 몰탈을 지지판(110)과 수평면 사이로 이동하여 지지판(110)을 교량상판의 수평면에 일체화시키게 된다.
도 5에 도시된 바와 같이, 플레이트부재(200)는 지지판(110)의 전단에서 수직하게 위치하는 전면판(210)과, 전면판(210)의 상단에서 전방으로 돌출되는 신축판(220)과, 전면판(210)의 후면에서 후방으로 지지판(110)과 평행한 방향으로 연장된 다수개의 앵커바(230)와, 앵커바(230) 사이에 위치하며 중앙에 관통홀(241)이 형성된 받침판(240)으로 이루어진다. 이때, 전면판(210)의 후면 끝단에는 전단판이 수직하게 지지하는 지지판(211)이 형성된다. 그리고, 받침판(240)은 양 단이 이웃하는 앵커바(230)에 각각 용접으로 고정되는 것이 바람직하다.
고정부재(300)는 받침판(240)의 관통홀(241)을 따라 지지판(110)의 고정홈(130)으로 연장되면서 체결되어 플레이트부재(200)를 지지부재(100)의 상부에 고정시킨다. 고정부재(300)는 장볼트를 사용하는 것이 바람직하다. 이때, 받침판(240)의 관통홀(241) 상부에 노출되는 고정부재(300)의 머리부분을 커버할 수 있도록 덮개(310)를 설치하여 플레이트부재의 교체시에 몰탈에 의해 고정부재(300)의 머리부분이 손상되는 것을 방지하는 것이 바람직하다.
이러한 플레이트부재(200)는 전면판(210)을 지지판(110)의 전단에 위치시키면서 받침판(240)에 형성된 관통홀(241)과 받침판(240)에 형성된 고정홈(130)을 일치시킨 상태에서 고정부재(300)를 이용하여 관통홀(241)을 통과시킨 후에 고정홈(130)에 고정시키면 플레이트부재(200)를 지지부재(100)에 견고하게 고정할 수 있게 된다.
한편, 도 6 및 5b에 도시된 바와 같이, 본 발명의 플레이트부재(200)의 받침판(240)은 후방으로 연장된 연장판(242)이 더 형성되고, 연장판(242)의 상면에는 철근(250)이 고정되는 것이 바람직하다. 이러한 연장판(242)에 놓여진 철근(250)에 의해서 몰탈이 타설되면 지지철근의 역할을 수행하여 몰탈의 강도를 향상시킬 수 있게 된다.
또한, 도 8 및 도 9에 도시된 바와 같이, 본 발명의 지지부재(100)는 몰탈이동홀(120)를 감싸는 덮개판(121)이 지지판(110)에 고정되는 것이 바람직하다. 이러한 지지판(110)에 의해서 몰탈이동홀(120)로 몰탈이 이동되면 지지판(110)의 외부로 노출되는 것을 차단하여 지지부재(100)에 플레이트부재(200)를 설치한 후에 타설되는 몰탈을 용이하게 분리할 수 있게 된다.
또한, 도 10에 도시된 바와 같이, 본 발명의 지지부재(100)는 교량상판의 모서리에서 절개된 수직면에 커버하도록 지지판(110)의 후단에서 상부로 연장된 측판(170)이 추가로 형성되는 것이 바람직하다. 이때, 측판(170)과 수직면 사이에는 몰탈이 주입되어 측면과 일체화된다. 이에 따라 플레이트부재(200)를 교체하는 경우에 교량상판의 모서리를 감싸는 지지판(110)과 측판(170) 사이의 몰탈만을 간단하게 제거하면 교량상판의 추가적인 손실을 방지할 수 있게 된다.
이하, 본 발명에 따른 교량상판의 교체용 신축이음장치의 설치과정에 대하여 살펴본다.
먼저, 두 개의 교량상판들(10)의 모서리 부분을 'ㄴ'형상의 수직부분과 수평부분을 갖도록 제거하여 신축이음부재의 설치공간(11)을 확보한다.
그리고, 확보된 신축이음부재의 설치공간에 지지부재(100)를 수평하게 위치시킨 후에 고정한다. 이때, 수평조절볼트(141)를 지지판(110)에 형성된 수평조절홀(140)에 체결하고 회전시켜 지지판(110)을 수평하게 위치시킨 후에 노출된 교량상판의 주철근에 용접시켜 고정시키거나 또는 설치공간에 설치된 고정앵커를 지지판(110)의 지지홀(150)에 삽입한 후에 고정너트로 체결하여 고정시킨다.
그 후, 지지판(110)에 형성된 몰탈이동홀(120)를 통해 몰탈을 지지판(110)과 설치공간 사이에 이동시켜 지지판(110)을 견고하게 고정시킨다. 이때, 몰탈이동홀(120)로 몰탈이 이동되면 외부와 차단하기 위하여 몰탈이동홀(120)를 커버하는 덮개판(121)이 지지판(110)에 고정되는 것이 바람직하다.
이와 같이 신축이음부재의 설치공간 지지부재(100)가 설치되면 지지판(110)의 전단에서 수직하게 위치하는 전면판(210)과 전면판(210)에서 후방으로 지지판(110)과 평행한 방향으로 연장된 다수개의 앵커바(230)와 지지판(110)의 상단에서 전방으로 돌출되는 신축판(220)과, 앵커바(230) 사이에 체결되며 중앙에 관통홀(241)이 형성된 받침판(240)으로 이루어진 플레이트부재(200)를 지지판(110)의 상부에 위치시킨다.
그리고, 고정부재(300)인 장볼트를 이용하여 플레이트부재(200)를 지지부재(100)의 받침판(240)에 고정시키다. 즉, 장볼트를 플레이트부재(200)의 받침판(240)에 형성된 관통홀(241)을 따라 지지부재(100)의 지지판(110)에 형성된 고정홈(130)에 체결하여 고정하게 된다. 이때, 받침판(240)이 후방으로 연장된 연장판(242)이 형성되어 있는 경우에 연장판(242)의 상면에는 철근(250)이 고정시키고, 플레이트부재(200)가 고정되면 장볼트의 상부에 덮개(310)를 설치하여 손상되는 것을 방지하는 것이 바람직하다.
그 후, 지지부재(100)의 받침판(240) 상부와 플레이트부재(200)의 전면판(210) 사이에 몰탈을 상판의 높이와 동일하게 타설하여 양생하면 신축이음장치의 설치가 완료되게 된다.
한편, 본 발명의 신축이음장치를 교체하고자 하는 경우에 플레이트부재(200)와 지지부재(100)를 고정시키는 고정볼트의 주변의 몰탈을 제거하여 노출시킨 후에 고정볼트를 분리하고 몰탈에 충격을 주면 간단하게 플레이트부재(200)를 제거할 수 있게 된다. 그리고, 새로운 플레이트부재(200)를 설치하여 신축이음장치의 교체를 신속하게 수행할 수 있게 된다.
이상과 같이, 본 발명은 비록 한정된 실시예와 도면에 의해 설명되었으나, 본 발명은 이것에 의해 한정되지 않으며, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 본 발명의 기술사상과 아래에 기재될 청구범위의 균등범위 내에서 다양한 수정 및 변형이 가능함은 물론이다.

Claims (4)

  1. 교량상판의 모서리에서 'ㄴ'형상의 절개면의 수평면에 고정 설치되는 지지부재(100)와, 교량상판의 전방으로 돌출되는 신축판(220)을 구비하고 지지부재(100)의 상부에 위치하는 플레이트부재(200)와, 지지부재(100)와 플레이트부재(200)를 고정하는 고정부재(300)를 포함하되,
    지지부재(100)는 교량상판의 모서리에서 절개된 수평면에 위치하는 지지판(110)과, 지지판(110)에 관통되어 지지판(110)과 교량의 수평면 사이로 몰탈을 이동시키는 몰탈이동홀(120)와, 지지판(110)의 상면에 형성되어 플레이트부재(200)를 고정시키는 고정부재(300)가 체결되는 고정홈(130)과, 지지판(110)에 형성되어 수평을 조절하기 위한 수평조절볼트(141)가 삽입되는 수평조절홀(140)을 포함하고,
    플레이트부재(200)는 지지판(110)의 전단에서 수직하게 위치하는 전면판(210)과, 전면판(210)의 상단에서 전방으로 돌출되는 신축판(220)과, 전면판(210)의 후면에서 후방으로 지지판(110)과 평행한 방향으로 연장된 다수개의 앵커바(230)와, 양 단이 이웃하는 앵커바(230) 사이에 위치하며 중앙에 관통홀(241)이 형성된 받침판(240)을 포함하며,
    고정부재(300)는 받침판(240)의 관통홀(241)을 따라 지지판(110)의 고정홈(130)으로 연장되면서 체결되어 플레이트부재(200)를 지지부재(100)의 상부에 고정시키되,
    플레이트부재(200)의 받침판(240)은 후방으로 연장된 연장판(242)이 더 형성되고, 연장판(242)의 상면에는 철근(250)이 고정되며,
    받침판(240)의 관통홀(241) 상부에 노출되는 고정부재(300)의 머리부분을 커버할 수 있도록 덮개가 설치되고,
    고정부재(300)는 장볼트를 사용하는 것을 특징으로 하는 교량상판의 교체용 신축이음장치.
  2. 청구항 1에 있어서, 지지부재(100)는 몰탈이동홀(120)로 몰탈이 주입되면 외부와 차단하기 위하여 몰탈이동홀(120)를 감싸는 덮개판(121)이 지지판(110)에 고정되는 것을 특징으로 하는 교량상판의 교체용 신축이음장치.
  3. 청구항 1에 있어서, 교량상판의 주철근이 수평면으로 노출된 경우에 지지판(110)의 후면을 주철근에 용접시켜 고정시키거나 또는 교량상판의 수평면에 지지볼트가 돌출되도록 설치하고 지지판(110)에 지지볼트가 관통되는 지지홀(150)을 형성한 후에 지지홀(150)을 통해 노출된 지지볼트에 지지너트로 체결하여 고정되는 것을 특징으로 하는 교량상판의 교체용 신축이음장치.
  4. 청구항 1에 있어서, 지지부재(100)는 교량상판의 모서리에서 절개된 수직면에 커버하도록 지지판(110)의 후단에서 상부로 연장된 측판(170)이 추가로 형성되는 것을 특징으로 하는 교량상판의 교체용 신축이음장치.
PCT/KR2020/001091 2019-01-22 2020-01-22 교량상판의 교체용 신축이음장치 WO2020153747A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2019-0008273 2019-01-22
KR1020190008273A KR102071334B1 (ko) 2019-01-22 2019-01-22 교량상판의 교체용 신축이음장치

Publications (1)

Publication Number Publication Date
WO2020153747A1 true WO2020153747A1 (ko) 2020-07-30

Family

ID=69321329

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2020/001091 WO2020153747A1 (ko) 2019-01-22 2020-01-22 교량상판의 교체용 신축이음장치

Country Status (2)

Country Link
KR (1) KR102071334B1 (ko)
WO (1) WO2020153747A1 (ko)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102181539B1 (ko) 2020-04-13 2020-11-20 (주)우신건설산업 교체가 용이한 슬라브용 신축이음장치 및 이를 이용한 신축이음 교체방법
KR102181535B1 (ko) 2020-04-13 2020-11-20 (주)우신건설산업 교체가 용이한 신축이음장치 및 이를 이용한 신축이음 교체방법
CN111455879B (zh) * 2020-04-17 2020-12-04 赵春旭 智能公路混凝土桥梁伸缩缝过渡区修复结构及其施工方法
CN112853958B (zh) * 2021-02-25 2023-03-10 青岛西海岸市政工程有限公司 一种便于安装的市政桥梁伸缩缝覆盖装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100645918B1 (ko) * 2006-08-23 2006-11-15 박성만 후타설재가 필요없는 신축이음장치 및 그 시공방법
KR100798654B1 (ko) * 2007-07-27 2008-01-28 림버스산업 주식회사 하이브리드 시스템을 갖는 신축이음장치 및 이의 시공방법
KR101053485B1 (ko) * 2011-04-05 2011-08-03 이경진 ㄷ자형 플레이트를 이용한 조립식 신축이음장치 및 이를 이용한 신설/보수 시공공법
KR101407990B1 (ko) * 2013-12-11 2014-06-17 (주)유안개발 신축이음장치 후타콘크리트 교체공법 및 신축이음장치 후타부 구조체
KR101912363B1 (ko) * 2018-02-19 2018-10-26 주식회사 지엠로드 교량상판의 신축이음장치 교체방법 및 신축이음장치 교체용 어셈블리

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100645918B1 (ko) * 2006-08-23 2006-11-15 박성만 후타설재가 필요없는 신축이음장치 및 그 시공방법
KR100798654B1 (ko) * 2007-07-27 2008-01-28 림버스산업 주식회사 하이브리드 시스템을 갖는 신축이음장치 및 이의 시공방법
KR101053485B1 (ko) * 2011-04-05 2011-08-03 이경진 ㄷ자형 플레이트를 이용한 조립식 신축이음장치 및 이를 이용한 신설/보수 시공공법
KR101407990B1 (ko) * 2013-12-11 2014-06-17 (주)유안개발 신축이음장치 후타콘크리트 교체공법 및 신축이음장치 후타부 구조체
KR101912363B1 (ko) * 2018-02-19 2018-10-26 주식회사 지엠로드 교량상판의 신축이음장치 교체방법 및 신축이음장치 교체용 어셈블리

Also Published As

Publication number Publication date
KR102071334B1 (ko) 2020-01-30

Similar Documents

Publication Publication Date Title
WO2020153747A1 (ko) 교량상판의 교체용 신축이음장치
EP1766141B1 (en) Road safety barrier
KR101912363B1 (ko) 교량상판의 신축이음장치 교체방법 및 신축이음장치 교체용 어셈블리
KR20120117364A (ko) 이동식 비계공법에 사용되는 메인 거더 지지용 피어 브라켓
KR100845088B1 (ko) 스틸 교량의 외장재 설치구조
CN109235286A (zh) 一种免维护快速拼装桥墩吊篮
KR100412778B1 (ko) 교량용 신축이음장치
KR20200085573A (ko) 신축 이음 프리캐스트의 중력식 레벨링 공법
KR101126081B1 (ko) 가로보 지지 브라켓을 이용한 트러스 가설교량
KR100373783B1 (ko) 피시빔교용 가설브래킷 및 이를 이용한 피시빔교 가설방법
CN111593898A (zh) 一种可调节周转卸料平台及安装方法
KR102085928B1 (ko) 스플라이스 파일캡을 이용한 가설교량 및 그 시공방법
KR102490192B1 (ko) 변위수용형 강가로보를 갖는 교량 상부 구조체 및 이를 이용한 교량 상부 시공 방법
WO2010126250A2 (ko) 건설현장의 가림판 설치구조
CN211395393U (zh) 一种结构牢固的盖梁底挡
KR102175920B1 (ko) 교량구조물 및 그 시공방법
CN205840308U (zh) 一种组合式钢模板装置
KR20210033652A (ko) 현장에서 콘크리트를 사용하지 않는 교체가 용이한 교량상판용 신축이음장치
CN217810499U (zh) 单元式抗冲击多向变位梳齿板桥梁伸缩装置
KR20130007967A (ko) 가교 및 교량 가설용 트러스 구조물
CN216586142U (zh) 一种桥梁预制梁架设用的临时支座
CN211689941U (zh) 一种用于钢箱梁支架法拼接的挂式施工平台
KR100671239B1 (ko) 골판형 조립상판을 이용한 장경간의 교량구조
CN214613662U (zh) 一种公路板梁拆换桥台支撑装置
KR102685239B1 (ko) 수직 탈부착이 가능한 데크로드 구조물

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20744934

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20744934

Country of ref document: EP

Kind code of ref document: A1