WO2020054418A1 - 積込機械の制御装置および制御方法 - Google Patents
積込機械の制御装置および制御方法 Download PDFInfo
- Publication number
- WO2020054418A1 WO2020054418A1 PCT/JP2019/033685 JP2019033685W WO2020054418A1 WO 2020054418 A1 WO2020054418 A1 WO 2020054418A1 JP 2019033685 W JP2019033685 W JP 2019033685W WO 2020054418 A1 WO2020054418 A1 WO 2020054418A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- loading
- bucket
- excavation
- target
- operation signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/205—Remotely operated machines, e.g. unmanned vehicles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
- E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
- E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
- E02F3/435—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
- E02F3/439—Automatic repositioning of the implement, e.g. automatic dumping, auto-return
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/2037—Coordinating the movements of the implement and of the frame
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/2041—Automatic repositioning of implements, i.e. memorising determined positions of the implement
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
- E02F9/261—Surveying the work-site to be treated
- E02F9/262—Surveying the work-site to be treated with follow-up actions to control the work tool, e.g. controller
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
- E02F9/264—Sensors and their calibration for indicating the position of the work tool
- E02F9/265—Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/30—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
- E02F3/32—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom working downwardly and towards the machine, e.g. with backhoes
Definitions
- the present invention relates to a control device and a control method for a loading machine.
- Priority is claimed on Japanese Patent Application No. 2018-170738, filed on September 12, 2018, the content of which is incorporated herein by reference.
- Patent Document 1 discloses a technique relating to automatic loading control of a loading machine.
- Automatic loading control means that a control device receives designation of a loading point from an operator of the loading machine or the like, and the control device controls the operations of the loading machine and the working machine to move the bucket to the loading point. Control.
- the control device stores the time series of the position of the work implement in advance, and operates the work implement in accordance with the time series.
- An object of the present invention is to provide a control device and a control method of a loading machine that can move a bucket to an excavation point so that a loading target does not interfere with a bucket.
- a control device for a loading machine is a control device for a loading machine that includes a revolving unit that pivots around a pivot center, and a work implement that has a bucket and is attached to the revolving unit.
- An apparatus a loading target specifying unit that specifies a position and a shape of a loading target, and an interference avoidance position that is a position outside a predetermined distance from the loading target based on the position and the shape of the loading target.
- a movement processing unit that outputs an operation signal for driving the revolving superstructure and the work implement to move the bucket to an excavation position on an excavation target after the bucket reaches the interference avoidance position.
- control device of the loading machine can move the bucket to the excavation point while preventing interference between the loading target and the bucket.
- FIG. 2 is a schematic block diagram illustrating a configuration of a control device according to the first embodiment. It is a figure showing an example of a course of a bucket before excavation in automatic excavation loading control concerning a 1st embodiment. It is a figure showing an example of a course of a bucket after excavation in automatic excavation loading control concerning a 1st embodiment. It is a flowchart which shows the automatic excavation loading control which concerns on 1st Embodiment. It is a flowchart which shows the automatic excavation loading control which concerns on 1st Embodiment. It is a flowchart which shows the automatic excavation loading control which concerns on 1st Embodiment. It is a flowchart which shows the automatic excavation loading control which concerns on 1st Embodiment.
- FIG. 1 is a schematic diagram illustrating the configuration of the loading machine according to the first embodiment.
- the loading machine 100 is a working machine that loads earth and sand to a loading point such as a transport vehicle.
- the loading machine 100 according to the first embodiment is a hydraulic shovel.
- the loading machine 100 according to another embodiment may be a loading machine other than a hydraulic shovel.
- the loading machine 100 shown in FIG. 1 is a backhoe shovel, but may be a face shovel or a rope shovel.
- the loading machine 100 includes a traveling body 110, a rotating body 120 supported by the traveling body 110, and a working machine 130 driven by hydraulic pressure and supported by the rotating body 120.
- the revolving superstructure 120 is supported so as to be pivotable about the pivot center.
- the work machine 130 includes a boom 131, an arm 132, a bucket 133, a boom cylinder 134, an arm cylinder 135, a bucket cylinder 136, a boom stroke sensor 137, an arm stroke sensor 138, and a bucket stroke sensor 139.
- the base end of the boom 131 is attached to the swing body 120 via a pin.
- the arm 132 connects the boom 131 and the bucket 133.
- the proximal end of the arm 132 is attached to the distal end of the boom 131 via a pin.
- the bucket 133 includes a blade for excavating earth and sand and the like and a container for transporting the excavated earth and sand.
- the proximal end of the bucket 133 is attached to the distal end of the arm 132 via a pin.
- the boom cylinder 134 is a hydraulic cylinder for operating the boom 131.
- the base end of the boom cylinder 134 is attached to the swing body 120.
- the tip of the boom cylinder 134 is attached to the boom 131.
- the arm cylinder 135 is a hydraulic cylinder for driving the arm 132.
- the base end of the arm cylinder 135 is attached to the boom 131.
- the tip of the arm cylinder 135 is attached to the arm 132.
- the bucket cylinder 136 is a hydraulic cylinder for driving the bucket 133.
- the base end of the bucket cylinder 136 is attached to the arm 132.
- the tip of the bucket cylinder 136 is attached to a link mechanism for rotating the bucket 133.
- the boom stroke sensor 137 measures the stroke amount of the boom cylinder 134.
- the stroke amount of the boom cylinder 134 can be converted into an inclination angle of the boom 131 with respect to the rotating body 120.
- the inclination angle with respect to the rotating body 120 is also referred to as an absolute angle. That is, the stroke amount of the boom cylinder 134 can be converted into the absolute angle of the boom 131.
- the arm stroke sensor 138 measures a stroke amount of the arm cylinder 135.
- the stroke amount of the arm cylinder 135 can be converted into a tilt angle of the arm 132 with respect to the boom 131.
- the inclination angle of the arm 132 with respect to the boom 131 is also referred to as a relative angle of the arm 132.
- the bucket stroke sensor 139 measures the stroke amount of the bucket cylinder 136.
- the stroke amount of the bucket cylinder 136 can be converted into an inclination angle of the bucket 133 with respect to the arm 132.
- the inclination angle of the bucket 133 with respect to the arm 132 is also referred to as a relative angle of the bucket 133.
- the loading machine 100 includes an angle sensor that detects an inclination angle with respect to the ground plane or an inclination angle with respect to the revolving unit 120, instead of the boom stroke sensor 137, the arm stroke sensor 138, and the bucket stroke sensor 139. May be provided.
- An operator cab 121 is provided on the revolving superstructure 120. Inside the cab 121, a driver's seat 122 for an operator to sit down, an operating device 123 for operating the loading machine 100, and a detecting device 124 for detecting a three-dimensional position of an object existing in a detecting direction. Is provided.
- the operating device 123 responds to the operation of the operator by raising and lowering the boom 131, pushing and pulling the arm 132, dumping and excavating the bucket 133, and turning the swivel body 120. Is generated and output to the control device 128.
- the operating device 123 also generates a digging / loading instruction signal for causing the work implement 130 to start automatic digging / loading control according to the operation of the operator, and outputs the signal to the control device 128.
- the automatic excavation loading control is to rotate the revolving body 120 to move the work machine 130 to the excavation point, excavate the earth and sand at the excavation point, rotate the revolving body 120 and load the sediment stored in the bucket 133. This is control for automatically executing a series of operations for loading the object 200 (for example, a transport vehicle or a hopper).
- the operation device 123 includes, for example, a lever, a switch, and a pedal.
- the excavation loading instruction signal is generated by operating an automatic control switch.
- the operation device 123 is arranged near the driver's seat 122.
- the operation device 123 is located within an operable range of the operator when the operator sits on the driver's seat 122.
- Examples of the detection device 124 include a stereo camera, a LiDAR device, and a laser scanner.
- the detection device 124 is provided, for example, so that the detection direction faces the front of the cab 121 of the loading machine 100.
- the detection device 124 specifies the three-dimensional position of the target object in a coordinate system based on the position of the detection device 124.
- the loading machine 100 according to the first embodiment operates according to the operation of the operator sitting in the driver's seat 122, but is not limited to this in other embodiments.
- the loading machine 100 according to another embodiment may operate by transmitting an operation signal or an excavation loading instruction signal by a remote operation of an operator operating the loading machine 100 outside.
- the loading machine 100 includes a position and orientation calculator 125, a tilt measuring device 126, a hydraulic device 127, and a control device 128.
- the position and orientation calculator 125 calculates the position of the revolving superstructure 120 and the direction in which the revolving superstructure 120 faces.
- the position and orientation calculator 125 includes two receivers that receive positioning signals from artificial satellites that make up the GNSS. The two receivers are installed at different positions on the revolving superstructure 120, respectively.
- the position and orientation calculator 125 detects the position of the representative point (the origin of the shovel coordinate system) of the revolving unit 120 in the site coordinate system based on the positioning signal received by the receiver.
- the position / azimuth calculator 125 uses the positioning signals received by the two receivers, calculates the azimuth of the revolving unit 120 as the relationship between the installation position of one receiver and the installation position of the other receiver.
- the azimuth that the revolving unit 120 faces is the front direction of the revolving unit 120 and is equal to the horizontal component of the straight line extending from the boom 131 of the work implement 130 to the bucket 133.
- the tilt measuring device 126 measures the acceleration and angular velocity of the revolving unit 120, and detects the attitude (for example, the roll angle and the pitch angle) of the revolving unit 120 based on the measurement result.
- the inclination measuring device 126 is installed on the lower surface of the revolving unit 120, for example.
- an inertial measurement device IMU: Inertial Measurement Unit
- IMU Inertial Measurement Unit
- the hydraulic device 127 includes a hydraulic oil tank, a hydraulic pump, and a flow control valve.
- the hydraulic pump is driven by the power of an engine (not shown), and a traveling hydraulic motor (not shown) for traveling the traveling body 110 via a flow control valve, a swing hydraulic motor (not shown) for rotating the swing body 120, a boom cylinder 134, and an arm cylinder 135. , And the bucket cylinder 136.
- the flow control valve has a rod-shaped spool, and adjusts the flow rate of hydraulic oil supplied to the traveling hydraulic motor, the swing hydraulic motor, the boom cylinder 134, the arm cylinder 135, and the bucket cylinder 136 according to the position of the spool.
- the spool is driven based on a control command received from the control device 128.
- the amount of hydraulic oil supplied to the traveling hydraulic motor, the turning hydraulic motor, the boom cylinder 134, the arm cylinder 135, and the bucket cylinder 136 is controlled by the control device 128.
- the boom cylinder 134, the arm cylinder 135, and the bucket cylinder 136 are driven by hydraulic oil supplied from the common hydraulic device 127.
- the control device 128 receives an operation signal from the operation device 123.
- Control device 128 drives work implement 130, revolving unit 120, or traveling unit 110 based on the received operation signal.
- FIG. 2 is a schematic block diagram illustrating a configuration of the control device according to the first embodiment.
- the control device 128 is a computer including a processor 1100, a main memory 1200, a storage 1300, and an interface 1400.
- the storage 1300 stores a program.
- the processor 1100 reads the program from the storage 1300, expands the program in the main memory 1200, and executes processing according to the program.
- Examples of the storage 1300 include an HDD, SSD, magnetic disk, magneto-optical disk, CD-ROM, DVD-ROM, and the like.
- the storage 1300 may be an internal medium directly connected to the common communication line of the control device 128 or an external medium connected to the control device 128 via the interface 1400.
- the storage 1300 is a non-transitory tangible storage medium.
- the processor 1100 executes the vehicle information acquisition unit 1101, the detection information acquisition unit 1102, the operation signal input unit 1103, the bucket position identification unit 1104, the map generation unit 1105, the loading target identification unit 1106, and the avoidance position identification unit 1107 by executing the program.
- the vehicle information acquisition unit 1101 acquires, for example, the turning speed, the position, and the orientation of the revolving unit 120, the inclination angles of the boom 131, the arm 132, and the bucket 133, and the posture of the revolving unit 120.
- vehicle information information on the loading machine 100 acquired by the vehicle information acquisition unit 1101 is referred to as vehicle information.
- the detection information acquisition unit 1102 acquires the depth information from the detection device 124.
- the depth information indicates a three-dimensional position of a plurality of points in the detection range R.
- Examples of the depth information include a depth image composed of a plurality of pixels representing the depth, and point cloud data composed of a plurality of points represented in a rectangular coordinate system (x, y, z).
- the operation signal input unit 1103 receives an operation signal input from the operation device 123.
- the operation signals include a raising operation signal and a lowering operation signal of the boom 131, a pushing operation signal and a pulling operation signal of the arm 132, a dump operation signal and an excavation operation signal of the bucket 133, a turning operation signal of the revolving unit 120, and a traveling of the traveling unit 110.
- An operation signal and an excavation loading instruction signal of the loading machine 100 are included.
- FIG. 3 is a diagram illustrating an example of a path of a bucket before excavation in the automatic excavation loading control according to the first embodiment.
- the bucket position identification unit 1104 determines the position P of the tip of the arm 132 in the shovel coordinate system (see FIG. 1) and the lowest passage of the bucket 133 from the tip of the arm 132.
- the height Hb to the point is specified.
- the lowermost passing point of the bucket 133 refers to a point where the cutting edge is located when the distance between the cutting edge and the ground surface becomes shortest during the dumping operation of the bucket 133.
- the height Hb from the tip of the arm 132 to the lowest passing point of the bucket 133 matches the length from the pin at the base end of the bucket 133 to the cutting edge.
- the base end of the bucket 133 is connected to the distal end of the arm 132, so that the position P of the distal end of the arm 132 is equal to the position of the base end of the bucket 133.
- the bucket position specifying unit 1104 specifies the position P of the tip of the arm 132 in the following procedure.
- the bucket position specifying unit 1104 calculates the boom based on the absolute angle of the boom 131 obtained from the stroke amount of the boom cylinder 134 and the known length of the boom 131 (the distance from the pin at the base end to the pin at the tip end).
- the position of the tip of 131 is determined.
- the bucket position specifying unit 1104 calculates the absolute angle of the arm 132 based on the absolute angle of the boom 131 and the relative angle of the arm 132 obtained from the stroke amount of the arm cylinder 135.
- the bucket position specifying unit 1104 determines the position of the distal end of the boom 131, the absolute angle of the arm 132, and the known length of the arm 132 (the distance from the pin at the proximal end to the pin at the distal end). The position P of the tip of the arm 132 is obtained.
- the map generation unit 1105 uses the site coordinate system of the loading machine 100 based on the position, orientation, and orientation of the revolving unit 120 acquired by the vehicle information acquisition unit 1101 and the depth information acquired by the detection information acquisition unit 1102. A three-dimensional map representing at least a part of the shape of the surroundings is generated.
- the map generation unit 1105 generates a three-dimensional map including the loading target 200 and the excavation target by superimposing a plurality of pieces of depth information detected by the detection device 124 on different detection ranges as the revolving structure 120 turns. .
- the map generation unit 1105 may generate a three-dimensional map related to the shovel coordinate system based on the revolving superstructure 120.
- the loading target specifying unit 1106 specifies the position and the shape of the loading target 200 based on the three-dimensional map generated by the map generating unit 1105. For example, the loading target specifying unit 1106 specifies the position and the shape of the loading target 200 by matching the three-dimensional shape indicated by the three-dimensional map with the known shape of the loading target 200.
- the avoidance position identification unit 1107 loads the work machine 130 with the loading machine 100 based on the position of the loading machine 100 acquired by the vehicle information acquisition unit 1101 and the position and shape of the loading object 200 identified by the loading object identification unit 1106.
- An interference avoiding position P02 which does not interfere with the target 200 in plan view from above is specified.
- the interference avoiding position P02 has the same height as the position P of the tip of the arm 132 at the start of the automatic excavation loading control (empty load turning start position P01), and the distance from the turning center of the turning body 120 is This is a position equal to the distance from the turning center to the unloading turning start position P01, and where the loading target 200 does not exist below.
- the avoidance position specifying unit 1107 specifies, for example, a circle centered on the turning center of the revolving unit 120 and having a radius equal to the distance between the turning center and the unloading turning start position P01.
- a position where the outer shape of 133 does not interfere with the loading target 200 in a plan view from above and is closest to the unloading turning start position P01 is specified as an interference avoidance position P02.
- the avoidance position identification unit 1107 can determine whether or not the loading target 200 and the bucket 133 interfere with each other, based on the position and shape of the loading target 200 and the known shape of the bucket 133.
- “same height” and “distance is equal” are not necessarily limited to those in which the heights or distances are completely identical, and some errors and margins are allowed.
- the excavation target specifying unit 1108 specifies the position of the excavation point P22 to be excavated based on the three-dimensional map generated by the map generation unit 1105.
- the excavation point P22 is a point at which an amount of earth and sand equivalent to the maximum capacity of the bucket 133 can be excavated by moving the cutting edge of the bucket 133 from that point in the excavation direction of the arm 132 and the bucket 133, for example.
- the excavation target specifying unit 1108 specifies the distribution of the earth and sand to be excavated from the three-dimensional shape indicated by the three-dimensional map, and specifies the excavation point P22 based on the distribution.
- the digging position specifying unit 1109 specifies, as the digging position P05, a point separated from the digging point P22 specified by the digging target specifying unit 1108 by a distance from the base end of the bucket 133 to the cutting edge. That is, when the bucket 133 is in a predetermined digging posture with the cutting edge directed in the dumping direction, and when the cutting edge of the bucket 133 is located at the digging point P22, the tip of the arm 132 is located at the digging position P05. Become. Since the digging point P22 is specified based on the three-dimensional map, it can be said that the digging position specifying unit 1109 specifies the digging position P05 based on the detection result of the detection device 124.
- the digging position specifying unit 1109 may specify the digging position P05 based on an instruction of the operator of the loading machine 100. For example, the operator may indicate the excavation position P05 by pressing the bucket 133 to the excavation position P05 and press a predetermined button, or may indicate the excavation position P05 using an input device such as a touch panel. The excavation position specifying unit 1109 determines a position above the excavation position P05 by a predetermined height as the turning end position P04.
- the lowering stop determination unit 1110 determines whether the height of the tip of the arm 132 has become the same as the turning end position P04 when the work implement 130 is being lowered simultaneously with the unloading rotation of the revolving unit 120. Is determined.
- the position of the tip of the arm 132 at this time is referred to as a lowering stop position P03.
- the loading position specifying unit 1111 specifies the loading position P07 based on the position and shape of the loading target 200 specified by the loading target specifying unit 1106. Specifically, the loading position specifying unit 1111 specifies the loading position P07 as described below.
- FIG. 4 is a diagram illustrating an example of a path of a bucket after excavation in the automatic excavation loading control according to the first embodiment.
- the loading position specifying unit 1111 specifies the loading point P21 on the loading target 200 as the plane position of the loading position P07. That is, when the tip of the arm 132 is located at the loading position P07, the tip of the arm 132 is located above the loading point P21.
- Examples of the loading point P21 include the center point of the vessel when the loading target 200 is a dump truck, and the center point of the opening when the loading target 200 is a hopper.
- the loading position specifying unit 1111 includes the height Ht of the loading target 200, the height Hb from the tip of the arm 132 specified by the bucket position specifying unit 1104 to the lowest passing point of the bucket 133, and the control margin of the bucket 133.
- the height of the loading position P07 is specified.
- the loading position specifying unit 1111 may specify the loading position P07 without adding the height of the control margin. That is, the loading position specifying unit 1111 may specify the height of the loading position P07 by adding the height Hb to the height Ht.
- the height Ht according to the first embodiment is a height from the ground to the upper surface of the vessel.
- the movement processing unit 1112 sets the digging position P05 specified by the digging position specifying unit 1109 and the interference avoiding position P02 specified by the avoiding position specifying unit 1107 to the position. Based on this, a rotation operation signal for moving the bucket 133 to the excavation position P05 is generated. That is, the movement processing unit 1112 transmits a rotation operation signal from the empty cargo turning start position P01 to the excavation position P05 via the interference avoiding position P02, the lowering stop position P03, and the turning end position P04. Generate.
- the movement processing unit 1112 generates an excavation operation signal for rotating and moving the bucket 133 in the excavation direction.
- the movement processing unit 1112 pivots to move the bucket 133 to the loading position P07 based on the loading position P07 specified by the loading position specifying unit 1111 and the interference avoiding position P02 specified by the avoiding position specifying unit 1107. Generate an operation signal. That is, the movement processing unit 1112 generates a rotation operation signal so as to reach the loading position P07 from the excavation completion position P05 ′ via the load turning start position P06 and the interference avoidance position P02. At this time, the movement processing unit 1112 generates a rotation operation signal of the bucket 133 so that the ground angle of the bucket 133 does not change even when the boom 131 and the arm 132 are driven. When the bucket 133 reaches the loading position P07, the movement processing unit 1112 generates a dump operation signal for rotating the bucket 133 in the dump direction.
- the operation signal output unit 1113 outputs the operation signal input to the operation signal input unit 1103 or the operation signal generated by the movement processing unit 1112. Specifically, the operation signal output unit 1113 outputs an operation signal related to the automatic control generated by the movement processing unit 1112 when the automatic excavation loading control is being performed, and when the automatic excavation loading control is not being performed, An operation signal related to the manual operation of the operator input to the operation signal input unit 1103 is output.
- FIGS. 5 to 7 are flowcharts showing the automatic excavation loading control according to the first embodiment.
- control device 128 Upon receiving the input of the excavation loading instruction signal from the operator, control device 128 executes the automatic excavation loading control shown in FIGS.
- the empty load turning start position P01 which is the position of the bucket 133 at the start of the automatic excavation loading control, is above the loading target 200 and does not interfere with the loading target 200 due to the turning.
- the empty load turning start position P01 matches the loading position P07.
- the vehicle information acquisition unit 1101 acquires the position and orientation of the swing body 120, the inclination angles of the boom 131, the arm 132, and the bucket 133, and the attitude of the swing body 120 (Step S1).
- the vehicle information acquisition unit 1101 specifies the position of the center of rotation of the revolving unit 120 based on the acquired position and orientation of the revolving unit 120 (step S2).
- the detection information acquisition unit 1102 acquires, from the detection device 124, depth information indicating the depth around the loading machine 100 (Step S3).
- the map generation unit 1105 is configured to control the loading machine 100 in the site coordinate system based on the position, orientation, and posture of the revolving unit 120 acquired by the vehicle information acquisition unit 1101 and the depth information acquired by the detection information acquisition unit 1102.
- a three-dimensional map representing at least a part of the surroundings is updated (step S4). That is, the map generation unit 1105 updates the three-dimensional map by superimposing the currently detected depth information on the three-dimensional map generated in the past.
- the loading target specifying unit 1106 specifies the position and the shape of the loading target 200 based on the updated map information (Step S5).
- the bucket position identification unit 1104 determines the position P of the tip of the arm 132 at the time of input of the excavation loading instruction signal as the empty cargo turning start position P01. Then, the height Hb from the tip of the arm 132 to the lowest passing point of the bucket 133 is specified (step S6).
- the digging target specifying unit 1108 specifies the digging point P22 based on the three-dimensional map generated in Step S4 (Step S7).
- the digging position specifying unit 1109 specifies the digging position P05 and the turning end position P04 based on the position of the digging point P22 specified by the digging target specifying unit 1108 (Step S8).
- the avoiding position specifying unit 1107 specifies the interference avoiding position P02 based on the empty cargo turning start position P01 determined in step S6 and the position and shape of the loading target 200 specified by the loading target specifying unit 1106 (step S9). ).
- the movement processing unit 1112 determines whether or not the position P of the distal end of the arm 132 has reached the turning end position P04 (Step S10). When the position P of the tip of the arm 132 has not reached the turning end position P04 (step S10: NO), the movement processing unit 1112 determines whether or not the position P of the tip of the arm 132 has passed the interference avoidance position P02. A determination is made (step S11). When the position P of the tip of the arm 132 does not pass through the interference avoiding position P02 (step S11: NO), the movement processing unit 1112 does not generate operation signals for the boom 131, the arm 132, and the bucket 133. That is, when the position P of the distal end of the arm 132 does not pass through the interference avoiding position P02, the movement processing unit 1112 prohibits the output of the operation signal for lowering the work implement 130.
- step S11 when the position P of the tip of the arm 132 has passed the interference avoidance position P02 (step S11: YES), the lowering / stopping determination unit 1110 determines whether the position P of the tip of the arm 132 is higher than the turning end position P04. Is determined (step S12). When the position P of the tip of the arm 132 is higher than the turning end position P04 (step S12: YES), the movement processing unit 1112 operates the boom 131 and the operation signal of the arm 132 to lower the position P of the tip of the arm 132. Is generated (step S13).
- step S13 when the height of the position P of the tip of the arm 132 is equal to or less than the height of the turning end position P04 (step S13: NO), the movement processing unit 1112 lowers the position P of the tip of the arm 132. Of the boom 131 and the arm 132 is temporarily stopped.
- Step S14 when the output of the turning operation signal is stopped from the current time, the movement processing unit 1112 determines whether or not the plane position of the tip of the arm 132 reaches the turning end position P04 (Step S14).
- Step S14 When the output of the turning operation signal is stopped from the current time and the plane position of the tip of the arm 132 does not reach the turning end position P04 (Step S14: NO), the movement processing unit 1112 generates the turning operation signal (Step S14). Step S15).
- step S14 when the output of the turning operation signal is stopped from the current time and the plane position of the tip of the arm 132 reaches the turning end position P04 (step S14: YES), the movement processing unit 1112 generates the turning operation signal. do not do. That is, when the output of the turning operation signal is stopped from the current time and the plane position of the tip of the arm 132 reaches the turning end position P04, the movement processing unit 1112 prohibits the output of the turning operation signal. As a result, the revolving structure 120 that tries to keep turning by inertia starts to decelerate.
- the operation signal output unit 1113 outputs the generated operation signal to the hydraulic device 127. (Step S16).
- the vehicle information acquisition unit 1101 acquires vehicle information (Step S17). Thereby, vehicle information acquisition section 1101 can acquire the vehicle information after being driven by the output operation signal.
- Control device 128 returns the process to step S14, and repeatedly executes the generation of the operation signal.
- step S10 when the position P of the tip of the arm 132 reaches the turning end position P04 (step S10: YES), the movement processing unit 1112 generates an operation signal for lowering the boom 131 and the arm 132, and outputs an operation signal.
- the unit 1113 outputs the generated operation signal to the hydraulic device 127 (Step S18).
- the vehicle information acquisition unit 1101 acquires the vehicle information and determines whether the position P of the tip of the arm 132 has reached the excavation position P05 (Step S19). When the position P of the distal end of the arm 132 has not reached the excavation position P05 (step S19: NO), the control device 128 returns to step S22 and continues to output the operation signal for lowering the work implement 130. Therefore, while the position P at the tip of the arm 132 moves from the turning end position P04 to the excavation position P05, the turning body 120 does not turn.
- step S19: YES) When the position P of the distal end of the arm 132 reaches the excavation position P05 (step S19: YES), the movement processing unit 1112 generates an excavation operation signal for driving the bucket 133 in the excavation direction, and the operation signal output unit 1113 , And outputs the generated operation signal to the hydraulic device 127 (Step S20). Thereby, the control device 128 can cause the bucket 133 to excavate an excavation target.
- the vehicle information acquisition unit 1101 acquires vehicle information (Step S21). Further, the detection information acquisition unit 1102 acquires, from the detection device 124, depth information indicating the depth around the loading machine 100 (Step S22).
- the map generation unit 1105 updates the three-dimensional map based on the vehicle information acquired by the vehicle information acquisition unit 1101 and the depth information acquired by the detection information acquisition unit 1102 (Step S23).
- the loading target specifying unit 1106 specifies the position and the shape of the loading target 200 based on the updated three-dimensional map (Step S24).
- the loading position specifying unit 1111 specifies the plane position of the loading position P07 based on the position and shape of the loading target 200 specified by the loading target specifying unit 1106 (Step S25).
- the loading position specifying unit 1111 adds the height Hb from the tip of the arm 132 specified in step S6 to the lowest passing point of the bucket 133 and the control margin of the bucket 133 to the height Ht of the loading target 200.
- the height of the loading position P07 is specified by adding the height (Step S26).
- the movement processing unit 1112 determines whether the position P of the tip of the arm 132 has reached the loading position P07 (step S27). If the position P of the distal end of the arm 132 has not reached the loading position P07 (step S27: NO), the movement processing unit 1112 determines whether the position P of the distal end of the arm 132 is near the interference avoidance position P02. Is determined (step S28). For example, the movement processing unit 1112 determines that the difference between the height of the tip of the arm 132 and the height of the interference avoidance position P02 is less than a predetermined threshold value, or the plane distance from the turning center of the revolving unit 120 to the tip of the arm 132 and the turning.
- step S28 It is determined whether or not the difference from the plane distance from the center to the interference avoidance position P02 is less than a predetermined threshold.
- step S28: NO the movement processing unit 1112 generates an operation signal for raising the boom 131 and the arm 132 to the height of the interference avoidance position P02.
- Step S29 the movement processing unit 1112 generates an operation signal based on the positions and speeds of the boom 131 and the arm 132.
- the movement processing unit 1112 calculates the sum of the angular velocities of the boom 131 and the arm 132 based on the generated operation signals of the boom 131 and the arm 132, and outputs an operation signal for rotating the bucket 133 at the same speed as the sum of the angular velocities. It is generated (step S30). Thereby, the movement processing unit 1112 can generate an operation signal that holds the ground angle of the bucket 133.
- step S28 If the position P of the tip of the arm 132 is near the interference avoiding position P02 (step S28: YES), the movement processing unit 1112 does not generate operation signals for the boom 131, the arm 132, and the bucket 133. That is, when the position P of the distal end of the arm 132 is near the interference avoidance position P02, the movement processing unit 1112 prohibits the output of the operation signal of the work implement 130 for moving the work implement 130 to the loading point. .
- the movement processing unit 1112 determines whether the turning speed of the turning body 120 is lower than a predetermined speed based on the vehicle information acquired by the vehicle information acquiring unit 1101 (Step S31). That is, the movement processing unit 1112 determines whether or not the revolving unit 120 is turning.
- the movement processing unit 1112 moves the height of the bucket 133 from the height of the excavation completion position P05 'to the height of the interference avoidance position P02.
- the rising time which is the time up to, is specified (step S32).
- the movement processing unit 1112 When outputting the turning operation signal from the current time based on the rising time of the bucket 133, the movement processing unit 1112 passes the tip of the arm 132 through the interference avoiding position P02 or a point higher than the interference avoiding position P02. It is determined whether or not (step S33). When the turning operation signal is output from the current time, if the tip of the arm 132 passes through the interference avoiding position P02 or a point higher than the interference avoiding position P02 (step S33: YES), the movement processing unit 1112 turns. An operation signal is generated (step S34).
- step S34: NO When the turning operation signal is output from the current time and the tip of the arm 132 passes through a point lower than the interference avoidance position P02 (step S34: NO), the movement processing unit 1112 does not generate the turning operation signal. . That is, when the tip of the arm 132 passes through a point lower than the interference avoidance position P02, the movement processing unit 1112 prohibits the output of the turning operation signal.
- Step S31 When the swing speed of the swing body 120 is equal to or higher than the predetermined speed (Step S31: NO), the movement processing unit 1112 moves the tip of the arm 132 to the loading position P07 when the output of the swing operation signal is stopped from the current time. It is determined whether or not to reach (Step S35). After the output of the swing operation signal is stopped, the swing body 120 continues to swing by inertia while decelerating, and then stops. When the output of the turning operation signal is stopped from the current time and the tip of the arm 132 reaches the loading position P07 (Step S35: YES), the movement processing unit 1112 does not generate the turning operation signal.
- step S35 when the output of the turning operation signal is stopped from the current time and the tip of the arm 132 reaches the loading position P07, the movement processing unit 1112 prohibits the output of the turning operation signal. Thereby, the revolving superstructure 120 starts to decelerate.
- step S35 when the output of the turning operation signal is stopped from the current time and the tip of the arm 132 stops before the loading position P07 (step S35: NO), the movement processing unit 1112 outputs the turning operation signal. Is generated (step S36).
- the operation signal output unit 1113 When at least one of the rotation operation signals of the boom 131, the arm 132, and the bucket 133 and the rotation operation signal of the revolving unit 120 is generated in the processing from step S27 to step S36, the operation signal output unit 1113 generates the generated operation. A signal is output to the hydraulic device 127 (Step S37).
- vehicle information acquiring section 1101 acquires vehicle information (step S38). Thereby, vehicle information acquisition section 1101 can acquire the vehicle information after the operation based on the output operation signal.
- Control device 128 returns the process to step S31, and repeatedly executes the generation of the operation signal.
- step S27 when the position P of the distal end of the arm 132 has reached the loading position P07 in step S27 (step S27: YES), the movement processing unit 1112 generates a dump operation signal, and the operation signal output unit 1113 outputs Then, a dump operation signal is output to the hydraulic device 127 (Step S39).
- the earth and sand stored in the bucket 133 is loaded on the loading target 200.
- the swing of the swing body 120 has stopped.
- control device 128 ends the automatic excavation loading control.
- control device 128 returns the process to step S1, and repeatedly executes the automatic excavation loading control within a range where the loading amount of the loading target 200 does not exceed the maximum loading amount.
- the control device 128 specifies the interference avoiding position P02 that is a position outside the loading target 200 by a predetermined distance based on the position and the shape of the loading target 200, and The bucket 133 is moved to the interference avoiding position P02 by driving only the revolving body 120 until reaches the interference avoiding position P02. After that, the control device 128 drives the swing body 120 and the work implement 130 to move the bucket 133 to the excavation position P05 on the excavation target. Accordingly, the control device 128 can move the cutting edge of the bucket 133 to the excavation point P22 while preventing interference between the loading target 200 and the bucket 133.
- control device 128 drives the revolving unit 120 and the work implement 130 after the bucket 133 reaches the interference avoiding position P02 to move the bucket 133 to the turning end position P04 above the excavation position P05. Move. After that, the control device 128 drives only the work implement 130 to move the bucket 133 to the excavation position P05. Thereby, the cutting edge of the bucket 133 can be applied to the excavation target along the direction in which the blade extends. When the bucket 133 is hit against the excavation target while turning, a lateral force is applied to the blade of the bucket 133, and the blade is worn and the working machine 130 is easily bent.
- the control device 128 according to the first embodiment specifies the loading point P21 using the depth information, but is not limited thereto.
- the control device 128 according to another embodiment provides the loading target 200 with the position and orientation calculator without using the depth information, and the loading target specifying unit 1106 outputs the position and orientation calculator of the loading target 200.
- the loading position specifying unit 1111 may specify the loading point P21.
- the control device 128 according to the first embodiment specifies the excavation point P22 using the depth information, but is not limited thereto.
- the digging position specifying unit 1109 may specify the digging point P22 so that the operator can teach the digging point P22.
- the digging position specifying unit 1109 may store the digging position when the operator performs the digging operation by manual operation, and may set the digging point P22.
- a touch panel type data input terminal device for indicating the excavation point P22 is provided in the cab 121, and the excavation position identification unit 1109 receives the data instructed from the data input terminal device and identifies the excavation point P22. May be.
- the control device 128 according to the first embodiment performs automatic excavation loading control, but is not limited thereto.
- the control device 128 performs automatic excavation control, and the loading operation may be performed by a manual operation of an operator.
- the control device 128 according to the first embodiment specifies the excavation point P22 and executes the excavation operation after the turning operation to the excavation point P22.
- the control device 128 is not limited to the excavation point P22.
- the control may be ended by executing the turning operation to the point P22, and the excavation work may be performed by a manual operation of the operator.
- the control device 128 according to the first embodiment starts the automatic excavation loading control when the bucket 133 is at the empty load turning start position P01 located above the loading target 200, but is not limited thereto. .
- the control device 128 moves the bucket 133 to the loading position P07 through the interference avoiding position P02 when the bucket 133 is at the excavation end position P05 ′ and the automatic excavation loading control is started. Then, after performing the dumping operation, the bucket 133 may be moved to the excavation point P22 through the interference avoiding position P02.
- the loading target specifying unit 1106 of the control device 128 specifies the position and the shape of the loading target 200 based on the map information generated from the depth information, but is not limited thereto. .
- the loading target specifying unit 1106 uses the inter-vehicle communication to change the position and orientation of the loading target 200 that has arrived at the loading point. By receiving such information, the position and shape of the loading target 200 may be specified.
- the loading target specifying unit 1106 receives information on the position and the orientation of the loading target 200 from the control system. Then, the position and shape of the loading target 200 may be specified.
- the loading machine 100 includes the bucket 133, but is not limited thereto.
- the loading machine 100 according to another embodiment may include a clam bucket having a backall and a clamshell that can be opened and closed.
- the loading machine 100 according to the first embodiment is a manned vehicle that is operated by an operator on board, but is not limited thereto.
- the loading machine 100 according to another embodiment is a remotely driven vehicle that is operated by an operation signal obtained by communication from a remote operation device operated by an operator at a remote office while looking at the screen of a monitor. Is also good.
- some functions of the control device 128 may be provided in the remote control device.
- the control device for a loading machine can move the bucket to the excavation point while preventing interference between the loading target and the bucket.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Operation Control Of Excavators (AREA)
Abstract
積込機械の制御装置において、積込対象特定部は、積込対象の位置および形状を特定する。回避位置特定部は、積込対象の位置および形状に基づいて積込対象より所定距離だけ外側の位置である干渉回避位置を特定する。移動処理部は、バケットが干渉回避位置に到達するまで旋回体のみを駆動させてバケットを干渉回避位置へ移動させる操作信号を出力する。移動制御部は、バケットが干渉回避位置に到達した後に旋回体および作業機を駆動させてバケットを掘削対象上の掘削位置へ移動させる操作信号を出力する。
Description
本発明は、積込機械の制御装置および制御方法に関する。
本願は、2018年9月12日に日本に出願された特願2018-170738号について優先権を主張し、その内容をここに援用する。
本願は、2018年9月12日に日本に出願された特願2018-170738号について優先権を主張し、その内容をここに援用する。
特許文献1には、積込機械の自動積込制御に関する技術が開示されている。自動積込制御とは、制御装置が積込機械のオペレータ等から積込点の指定を受け付け、制御装置が積込機械および作業機の動作を制御することで、バケットを積込点へ移動させる制御である。特許文献1に記載の技術によれば、制御装置は、予め作業機の位置の時系列を記憶しておき、当該時系列に従って作業機を作動させる。
特許文献1に記載の技術によれば、作業機は予め記憶された積込点まで自動的に移動し、積込点において排土がなされる。他方、積込点で排土した後に、自動的に掘削点まで移動させたいという要望がある。このとき、作業機は、バケットが積込対象に干渉しないように移動する必要がある。
本発明の目的は、積込対象とバケットとが干渉しないように、バケットを掘削点へ移動させることができる積込機械の制御装置および制御方法を提供することにある。
本発明の目的は、積込対象とバケットとが干渉しないように、バケットを掘削点へ移動させることができる積込機械の制御装置および制御方法を提供することにある。
本発明の第1の態様によれば、積込機械の制御装置は、旋回中心回りに旋回する旋回体と、バケットを有し前記旋回体に取り付けられた作業機とを備える積込機械の制御装置であって、積込対象の位置および形状を特定する積込対象特定部と、前記積込対象の位置および形状に基づいて前記積込対象より所定距離だけ外側の位置である干渉回避位置を特定する回避位置特定部と、前記バケットが前記積込対象上の積込位置から前記干渉回避位置に到達するまで前記旋回体のみを駆動させて前記バケットを前記干渉回避位置へ移動させる操作信号を出力し、前記バケットが前記干渉回避位置に到達した後に前記旋回体および前記作業機を駆動させて前記バケットを掘削対象上の掘削位置へ移動させる操作信号を出力する移動処理部とを備える。
上記態様のうち少なくとも1つの態様によれば、積込機械の制御装置は、積込対象とバケットとの干渉を防止しながら、バケットを掘削点へ移動させることができる。
以下、図面を参照しながら実施形態について詳しく説明する。
〈第1の実施形態〉
《積込機械の構成》
図1は、第1の実施形態に係る積込機械の構成を示す概略図である。
積込機械100は、土砂を運搬車両などの積込点へ積込を行う作業機械である。第1の実施形態に係る積込機械100は、油圧ショベルである。なお、他の実施形態に係る積込機械100は、油圧ショベル以外の積込機械であってもよい。また図1に示す積込機械100はバックホウショベルであるが、フェイスショベルやロープショベルであってもよい。
積込機械100は、走行体110と、走行体110に支持される旋回体120と、油圧により駆動し旋回体120に支持される作業機130とを備える。旋回体120は、旋回中心回りに旋回自在に支持される。
〈第1の実施形態〉
《積込機械の構成》
図1は、第1の実施形態に係る積込機械の構成を示す概略図である。
積込機械100は、土砂を運搬車両などの積込点へ積込を行う作業機械である。第1の実施形態に係る積込機械100は、油圧ショベルである。なお、他の実施形態に係る積込機械100は、油圧ショベル以外の積込機械であってもよい。また図1に示す積込機械100はバックホウショベルであるが、フェイスショベルやロープショベルであってもよい。
積込機械100は、走行体110と、走行体110に支持される旋回体120と、油圧により駆動し旋回体120に支持される作業機130とを備える。旋回体120は、旋回中心回りに旋回自在に支持される。
作業機130は、ブーム131と、アーム132と、バケット133と、ブームシリンダ134と、アームシリンダ135と、バケットシリンダ136と、ブームストロークセンサ137と、アームストロークセンサ138と、バケットストロークセンサ139とを備える。
ブーム131の基端部は、旋回体120にピンを介して取り付けられる。
アーム132は、ブーム131とバケット133とを連結する。アーム132の基端部は、ブーム131の先端部にピンを介して取り付けられる。
バケット133は、土砂などを掘削するための刃と掘削した土砂を搬送するための容器とを備える。バケット133の基端部は、アーム132の先端部にピンを介して取り付けられる。
アーム132は、ブーム131とバケット133とを連結する。アーム132の基端部は、ブーム131の先端部にピンを介して取り付けられる。
バケット133は、土砂などを掘削するための刃と掘削した土砂を搬送するための容器とを備える。バケット133の基端部は、アーム132の先端部にピンを介して取り付けられる。
ブームシリンダ134は、ブーム131を作動させるための油圧シリンダである。ブームシリンダ134の基端部は、旋回体120に取り付けられる。ブームシリンダ134の先端部は、ブーム131に取り付けられる。
アームシリンダ135は、アーム132を駆動するための油圧シリンダである。アームシリンダ135の基端部は、ブーム131に取り付けられる。アームシリンダ135の先端部は、アーム132に取り付けられる。
バケットシリンダ136は、バケット133を駆動するための油圧シリンダである。バケットシリンダ136の基端部は、アーム132に取り付けられる。バケットシリンダ136の先端部は、バケット133を回動させるリンク機構に取り付けられる。
アームシリンダ135は、アーム132を駆動するための油圧シリンダである。アームシリンダ135の基端部は、ブーム131に取り付けられる。アームシリンダ135の先端部は、アーム132に取り付けられる。
バケットシリンダ136は、バケット133を駆動するための油圧シリンダである。バケットシリンダ136の基端部は、アーム132に取り付けられる。バケットシリンダ136の先端部は、バケット133を回動させるリンク機構に取り付けられる。
ブームストロークセンサ137は、ブームシリンダ134のストローク量を計測する。ブームシリンダ134のストローク量は、旋回体120に対するブーム131の傾斜角に換算可能である。以下、旋回体120に対する傾斜角を、絶対角度ともいう。つまり、ブームシリンダ134のストローク量は、ブーム131の絶対角度に換算可能である。
アームストロークセンサ138は、アームシリンダ135のストローク量を計測する。アームシリンダ135のストローク量は、ブーム131に対するアーム132の傾斜角に換算可能である。以下、ブーム131に対するアーム132の傾斜角を、アーム132の相対角度ともいう。
バケットストロークセンサ139は、バケットシリンダ136のストローク量を計測する。バケットシリンダ136のストローク量は、アーム132に対するバケット133の傾斜角に換算可能である。以下、アーム132に対するバケット133の傾斜角をバケット133の相対角度ともいう。
なお、他の実施形態に係る積込機械100は、ブームストロークセンサ137、アームストロークセンサ138、およびバケットストロークセンサ139に代えて、地平面に対する傾斜角または旋回体120に対する傾斜角を検出する角度センサを備えてもよい。
アームストロークセンサ138は、アームシリンダ135のストローク量を計測する。アームシリンダ135のストローク量は、ブーム131に対するアーム132の傾斜角に換算可能である。以下、ブーム131に対するアーム132の傾斜角を、アーム132の相対角度ともいう。
バケットストロークセンサ139は、バケットシリンダ136のストローク量を計測する。バケットシリンダ136のストローク量は、アーム132に対するバケット133の傾斜角に換算可能である。以下、アーム132に対するバケット133の傾斜角をバケット133の相対角度ともいう。
なお、他の実施形態に係る積込機械100は、ブームストロークセンサ137、アームストロークセンサ138、およびバケットストロークセンサ139に代えて、地平面に対する傾斜角または旋回体120に対する傾斜角を検出する角度センサを備えてもよい。
旋回体120には、運転室121が設けられる。運転室121の内部には、オペレータが着座するための運転席122、積込機械100を操作するための操作装置123、検出方向に存在する対象物の3次元位置を検出するための検出装置124が設けられる。操作装置123は、オペレータの操作に応じて、ブーム131の上げ操作信号および下げ操作信号、アーム132の押し操作信号および引き操作信号、バケット133のダンプ操作信号および掘削操作信号、旋回体120の左右への旋回操作信号を生成し、制御装置128に出力する。また操作装置123は、オペレータの操作に応じて作業機130に自動掘削積込制御を開始させるための掘削積込指示信号を生成し、制御装置128に出力する。自動掘削積込制御とは、旋回体120を旋回させて掘削点へ作業機130を移動させ、掘削点の土砂を掘削し、旋回体120を旋回させてバケット133に収容された土砂を積込対象200(例えば、運搬車両やホッパ)へ積み込む一連の動作を自動的に実行する制御である。
操作装置123は、例えばレバー、スイッチおよびペダルにより構成される。掘削積込指示信号は自動制御用のスイッチの操作により生成される。例えば、スイッチがONになったときに、掘削積込指示信号が出力される。操作装置123は、運転席122の近傍に配置される。操作装置123は、オペレータが運転席122に座ったときにオペレータの操作可能な範囲内に位置する。
検出装置124の例としては、ステレオカメラ、LiDAR装置、レーザスキャナなどが挙げられる。検出装置124は、例えば検出方向が積込機械100の運転室121の前方を向くように設けられる。検出装置124は、対象物の3次元位置を、検出装置124の位置を基準とした座標系で特定する。
なお、第1の実施形態に係る積込機械100は、運転席122に着座するオペレータの操作に従って動作するが、他の実施形態においてはこれに限られない。例えば、他の実施形態に係る積込機械100は、積込機械100の外部で操作するオペレータの遠隔操作によって操作信号や掘削積込指示信号が送信され動作するものであってもよい。
操作装置123は、例えばレバー、スイッチおよびペダルにより構成される。掘削積込指示信号は自動制御用のスイッチの操作により生成される。例えば、スイッチがONになったときに、掘削積込指示信号が出力される。操作装置123は、運転席122の近傍に配置される。操作装置123は、オペレータが運転席122に座ったときにオペレータの操作可能な範囲内に位置する。
検出装置124の例としては、ステレオカメラ、LiDAR装置、レーザスキャナなどが挙げられる。検出装置124は、例えば検出方向が積込機械100の運転室121の前方を向くように設けられる。検出装置124は、対象物の3次元位置を、検出装置124の位置を基準とした座標系で特定する。
なお、第1の実施形態に係る積込機械100は、運転席122に着座するオペレータの操作に従って動作するが、他の実施形態においてはこれに限られない。例えば、他の実施形態に係る積込機械100は、積込機械100の外部で操作するオペレータの遠隔操作によって操作信号や掘削積込指示信号が送信され動作するものであってもよい。
積込機械100は、位置方位演算器125、傾斜計測器126、油圧装置127、制御装置128を備える。
位置方位演算器125は、旋回体120の位置および旋回体120が向く方位を演算する。位置方位演算器125は、GNSSを構成する人工衛星から測位信号を受信する2つの受信器を備える。2つの受信器は、それぞれ旋回体120の異なる位置に設置される。位置方位演算器125は、受信器が受信した測位信号に基づいて、現場座標系における旋回体120の代表点(ショベル座標系の原点)の位置を検出する。
位置方位演算器125は、2つの受信器が受信した各測位信号を用いて、一方の受信器の設置位置に対する他方の受信器の設置位置の関係として、旋回体120の向く方位を演算する。旋回体120が向く方位とは、旋回体120の正面方向であって、作業機130のブーム131からバケット133へ伸びる直線の延在方向の水平成分に等しい。
位置方位演算器125は、2つの受信器が受信した各測位信号を用いて、一方の受信器の設置位置に対する他方の受信器の設置位置の関係として、旋回体120の向く方位を演算する。旋回体120が向く方位とは、旋回体120の正面方向であって、作業機130のブーム131からバケット133へ伸びる直線の延在方向の水平成分に等しい。
傾斜計測器126は、旋回体120の加速度および角速度を計測し、計測結果に基づいて旋回体120の姿勢(例えば、ロール角およびピッチ角)を検出する。傾斜計測器126は、例えば旋回体120の下面に設置される。傾斜計測器126は、例えば、慣性計測装置(IMU:Inertial Measurement Unit)を用いることができる。
油圧装置127は、作動油タンク、油圧ポンプ、および流量制御弁を備える。油圧ポンプは、図示しないエンジンの動力で駆動し、流量制御弁を介して走行体110を走行させる図示しない走行油圧モータ、旋回体120を旋回させる図示しない旋回油圧モータ、ブームシリンダ134、アームシリンダ135、およびバケットシリンダ136に作動油を供給する。流量制御弁はロッド状のスプールを有し、スプールの位置によって走行油圧モータ、旋回油圧モータ、ブームシリンダ134、アームシリンダ135、およびバケットシリンダ136に供給する作動油の流量を調整する。スプールは、制御装置128から受信する制御指令に基づいて駆動される。つまり、走行油圧モータ、旋回油圧モータ、ブームシリンダ134、アームシリンダ135、およびバケットシリンダ136に供給される作動油の量は、制御装置128によって制御される。上記のとおり、ブームシリンダ134、アームシリンダ135、およびバケットシリンダ136は共通の油圧装置127から供給される作動油によって駆動する。
制御装置128は、操作装置123から操作信号を受信する。制御装置128は、受信した操作信号に基づいて、作業機130、旋回体120、または走行体110を駆動させる。
《制御装置の構成》
図2は、第1の実施形態に係る制御装置の構成を示す概略ブロック図である。
制御装置128は、プロセッサ1100、メインメモリ1200、ストレージ1300、インタフェース1400を備えるコンピュータである。ストレージ1300は、プログラムを記憶する。プロセッサ1100は、プログラムをストレージ1300から読み出してメインメモリ1200に展開し、プログラムに従った処理を実行する。
図2は、第1の実施形態に係る制御装置の構成を示す概略ブロック図である。
制御装置128は、プロセッサ1100、メインメモリ1200、ストレージ1300、インタフェース1400を備えるコンピュータである。ストレージ1300は、プログラムを記憶する。プロセッサ1100は、プログラムをストレージ1300から読み出してメインメモリ1200に展開し、プログラムに従った処理を実行する。
ストレージ1300の例としては、HDD、SSD、磁気ディスク、光磁気ディスク、CD-ROM、DVD-ROM等が挙げられる。ストレージ1300は、制御装置128の共通通信線に直接接続された内部メディアであってもよいし、インタフェース1400を介して制御装置128に接続される外部メディアであってもよい。ストレージ1300は、一時的でない有形の記憶媒体である。
プロセッサ1100は、プログラムの実行により、車両情報取得部1101、検出情報取得部1102、操作信号入力部1103、バケット位置特定部1104、マップ生成部1105、積込対象特定部1106、回避位置特定部1107、掘削対象特定部1108、掘削位置特定部1109、下げ停止判定部1110、積込位置特定部1111、移動処理部1112、操作信号出力部1113を備える。
車両情報取得部1101は、例えば旋回体120の旋回速度、位置および方位、ブーム131、アーム132およびバケット133の傾斜角、ならびに旋回体120の姿勢を取得する。以下、車両情報取得部1101が取得する積込機械100に係る情報を車両情報とよぶ。
検出情報取得部1102は、検出装置124から深度情報を取得する。深度情報は、検出範囲R内の複数の点の三次元位置を示す。深度情報の例としては、深度を表す複数の画素からなる深度画像や、直交座標系(x,y,z)で表現される複数の点からなる点群データが挙げられる。
操作信号入力部1103は、操作装置123から操作信号の入力を受け付ける。操作信号にはブーム131の上げ操作信号および下げ操作信号、アーム132の押し操作信号および引き操作信号、バケット133のダンプ操作信号および掘削操作信号、旋回体120の旋回操作信号、走行体110の走行操作信号、ならびに積込機械100の掘削積込指示信号が含まれる。
図3は、第1の実施形態に係る自動掘削積込制御における掘削前のバケットの経路の例を示す図である。
バケット位置特定部1104は、車両情報取得部1101が取得した車両情報に基づいて、ショベル座標系におけるアーム132の先端部の位置P(図1参照)およびアーム132の先端からバケット133の最下通過点までの高さHbを特定する。バケット133の最下通過点とは、バケット133のダンプ操作の間に刃先と地表面との距離が最も短くなるときに刃先が位置する点をいう。すなわち、アーム132の先端からバケット133の最下通過点までの高さHbは、バケット133の基端部のピンから刃先までの長さと一致する。なお、バケット133の基端部はアーム132の先端部に接続されているため、アーム132の先端部の位置Pは、バケット133の基端部の位置に等しい。
バケット位置特定部1104は、車両情報取得部1101が取得した車両情報に基づいて、ショベル座標系におけるアーム132の先端部の位置P(図1参照)およびアーム132の先端からバケット133の最下通過点までの高さHbを特定する。バケット133の最下通過点とは、バケット133のダンプ操作の間に刃先と地表面との距離が最も短くなるときに刃先が位置する点をいう。すなわち、アーム132の先端からバケット133の最下通過点までの高さHbは、バケット133の基端部のピンから刃先までの長さと一致する。なお、バケット133の基端部はアーム132の先端部に接続されているため、アーム132の先端部の位置Pは、バケット133の基端部の位置に等しい。
具体的には、バケット位置特定部1104は、以下の手順でアーム132の先端部の位置Pを特定する。バケット位置特定部1104は、ブームシリンダ134のストローク量から求められるブーム131の絶対角度と既知のブーム131の長さ(基端部のピンから先端部のピンまでの距離)とに基づいて、ブーム131の先端部の位置を求める。バケット位置特定部1104は、ブーム131の絶対角度と、アームシリンダ135のストローク量から求められるアーム132の相対角度とに基づいて、アーム132の絶対角度を求める。バケット位置特定部1104は、ブーム131の先端部の位置と、アーム132の絶対角度と、既知のアーム132の長さ(基端部のピンから先端部のピンまでの距離)とに基づいて、アーム132の先端部の位置Pを求める。
マップ生成部1105は、車両情報取得部1101が取得した旋回体120の位置、方位、および姿勢と、検出情報取得部1102が取得した深度情報とに基づいて、現場座標系によって積込機械100の周囲のうち少なくとも一部の形状を表す三次元マップを生成する。マップ生成部1105は、旋回体120が旋回することで、検出装置124が異なる検出範囲について検出した複数の深度情報を重ね合わせることで、積込対象200および掘削対象を含む三次元マップを生成する。なお、他の実施形態においては、マップ生成部1105は、旋回体120を基準としたショベル座標系に係る三次元マップを生成してもよい。
積込対象特定部1106は、マップ生成部1105が生成した三次元マップに基づいて、積込対象200の位置および形状を特定する。例えば、積込対象特定部1106は、三次元マップが示す三次元形状と積込対象200の既知の形状とをマッチングすることで、積込対象200の位置および形状を特定する。
回避位置特定部1107は、車両情報取得部1101が取得した積込機械100の位置と、積込対象特定部1106が特定した積込対象200の位置および形状に基づいて、作業機130と積込対象200とが上方からの平面視において干渉しない点である干渉回避位置P02を特定する。干渉回避位置P02は、自動掘削積込制御の開始時のアーム132の先端の位置P(空荷旋回開始位置P01)と同じ高さを有し、かつ旋回体120の旋回中心からの距離が、当該旋回中心から空荷旋回開始位置P01までの距離と等しく、かつ下方に積込対象200が存在しない位置である。回避位置特定部1107は、例えば、旋回体120の旋回中心を中心とし、当該旋回中心と空荷旋回開始位置P01との距離を半径とする円を特定し、当該円上の位置のうち、バケット133の外形が上方からの平面視で積込対象200と干渉せず、かつ空荷旋回開始位置P01に最も近い位置を、干渉回避位置P02と特定する。回避位置特定部1107は、積込対象200の位置および形状、ならびにバケット133の既知の形状に基づいて、積込対象200とバケット133とが干渉するか否かを判定することができる。ここで、「同じ高さ」、「距離が等しい」とは、必ずしも高さまたは距離が完全に一致するものに限られず、多少の誤差やマージンが許容されるものとする。
掘削対象特定部1108は、マップ生成部1105が生成した三次元マップに基づいて、掘削対象の掘削点P22の位置を特定する。掘削点P22は、例えばバケット133の刃先をその点からアーム132およびバケット133を掘削方向へ移動させることで、バケット133の最大容量に相当する量の土砂を掘削できる点である。例えば、掘削対象特定部1108は、三次元マップが示す三次元形状から掘削対象の土砂の分布を特定し、当該分布に基づいて掘削点P22を特定する。
掘削位置特定部1109は、掘削対象特定部1108が特定した掘削点P22から、バケット133の基端部から刃先までの距離だけ離れた点を、掘削位置P05として特定する。つまり、バケット133は、ダンプ方向に刃先を向けた所定の掘削姿勢をとっている場合において、バケット133の刃先が掘削点P22に位置するとき、アーム132の先端は掘削位置P05に位置することとなる。掘削点P22は三次元マップに基づいて特定されるため、掘削位置特定部1109は、検出装置124の検出結果に基づいて掘削位置P05を特定しているといえる。なお、他の実施形態においては、掘削位置特定部1109は、積込機械100のオペレータの指示に基づいて掘削位置P05を特定してもよい。例えば、オペレータは、バケット133を掘削位置P05に当てて所定のボタンを押下することで掘削位置P05を指示してもよいし、タッチパネルなどの入力装置によって掘削位置P05を指示してもよい。
また掘削位置特定部1109は、掘削位置P05より所定高さだけ上方の位置を、旋回終了位置P04に決定する。
また掘削位置特定部1109は、掘削位置P05より所定高さだけ上方の位置を、旋回終了位置P04に決定する。
下げ停止判定部1110は、旋回体120の空荷旋回と同時に作業機130の下げ操作をしているときに、アーム132の先端の高さが旋回終了位置P04と同じ高さになったか否かを判定する。このときのアーム132の先端の位置を、下げ停止位置P03という。
積込位置特定部1111は、積込対象特定部1106が特定した積込対象200の位置および形状に基づいて、積込位置P07を特定する。具体的には、積込位置特定部1111は、以下のように積込位置P07を特定する。
図4は、第1の実施形態に係る自動掘削積込制御における掘削後のバケットの経路の例を示す図である。
積込位置特定部1111は、積込対象200上の積込点P21を、積込位置P07の平面位置として特定する。つまり、アーム132の先端が積込位置P07に位置するとき、アーム132の先端は積込点P21の上方に位置することとなる。積込点P21の例としては、積込対象200がダンプトラックの場合におけるベッセルの中心点、および積込対象200がホッパの場合における開口の中心点が挙げられる。積込位置特定部1111は、積込対象200の高さHtに、バケット位置特定部1104が特定したアーム132の先端からバケット133最下通過点までの高さHbと、バケット133の制御余裕分の高さとを加算することで、積込位置P07の高さを特定する。なお、他の実施形態においては、積込位置特定部1111は、制御余裕分の高さを加算せずに積込位置P07を特定してもよい。すなわち、積込位置特定部1111は、高さHtに高さHbを加算することで、積込位置P07の高さを特定してもよい。なお、第1の実施形態に係る高さHtは、地面からベッセルの上面までの高さである。
図4は、第1の実施形態に係る自動掘削積込制御における掘削後のバケットの経路の例を示す図である。
積込位置特定部1111は、積込対象200上の積込点P21を、積込位置P07の平面位置として特定する。つまり、アーム132の先端が積込位置P07に位置するとき、アーム132の先端は積込点P21の上方に位置することとなる。積込点P21の例としては、積込対象200がダンプトラックの場合におけるベッセルの中心点、および積込対象200がホッパの場合における開口の中心点が挙げられる。積込位置特定部1111は、積込対象200の高さHtに、バケット位置特定部1104が特定したアーム132の先端からバケット133最下通過点までの高さHbと、バケット133の制御余裕分の高さとを加算することで、積込位置P07の高さを特定する。なお、他の実施形態においては、積込位置特定部1111は、制御余裕分の高さを加算せずに積込位置P07を特定してもよい。すなわち、積込位置特定部1111は、高さHtに高さHbを加算することで、積込位置P07の高さを特定してもよい。なお、第1の実施形態に係る高さHtは、地面からベッセルの上面までの高さである。
移動処理部1112は、操作信号入力部1103が掘削積込指示信号の入力を受け付けた場合に、掘削位置特定部1109が特定した掘削位置P05、回避位置特定部1107が特定した干渉回避位置P02に基づいて、バケット133を掘削位置P05まで移動させるための回動操作信号を生成する。すなわち、移動処理部1112は、空荷旋回開始位置P01から、干渉回避位置P02、下げ停止位置P03、および旋回終了位置P04を経由して、掘削位置P05に到達するように、回動操作信号を生成する。移動処理部1112は、バケット133が掘削位置P05に到達すると、バケット133を掘削方向へ回転させ、また移動させるための掘削操作信号を生成する。
移動処理部1112は、積込位置特定部1111が特定した積込位置P07、回避位置特定部1107が特定した干渉回避位置P02に基づいて、バケット133を積込位置P07まで移動させるための回動操作信号を生成する。すなわち、移動処理部1112は、掘削完了位置P05´から、積荷旋回開始位置P06、および干渉回避位置P02を経由して、積込位置P07に到達するように、回動操作信号を生成する。このとき、移動処理部1112は、ブーム131およびアーム132が駆動してもバケット133の対地角度が変化しないように、バケット133の回動操作信号を生成する。移動処理部1112は、バケット133が積込位置P07に到達すると、バケット133をダンプ方向へ回転させるためのダンプ操作信号を生成する。
移動処理部1112は、積込位置特定部1111が特定した積込位置P07、回避位置特定部1107が特定した干渉回避位置P02に基づいて、バケット133を積込位置P07まで移動させるための回動操作信号を生成する。すなわち、移動処理部1112は、掘削完了位置P05´から、積荷旋回開始位置P06、および干渉回避位置P02を経由して、積込位置P07に到達するように、回動操作信号を生成する。このとき、移動処理部1112は、ブーム131およびアーム132が駆動してもバケット133の対地角度が変化しないように、バケット133の回動操作信号を生成する。移動処理部1112は、バケット133が積込位置P07に到達すると、バケット133をダンプ方向へ回転させるためのダンプ操作信号を生成する。
操作信号出力部1113は、操作信号入力部1103に入力された操作信号、または移動処理部1112が生成した操作信号を出力する。具体的には、操作信号出力部1113は、自動掘削積込制御中である場合に、移動処理部1112が生成した自動制御に係る操作信号を出力し、自動掘削積込制御中でない場合に、操作信号入力部1103に入力されたオペレータの手動操作に係る操作信号を出力する。
《自動掘削積込制御》
積込機械100のオペレータは、積込機械100と積込対象200とが積込処理可能な位置関係にあると判断すると、操作装置123の自動制御用のスイッチをONにする。これにより、操作装置123は、掘削積込指示信号を生成し出力する。
積込機械100のオペレータは、積込機械100と積込対象200とが積込処理可能な位置関係にあると判断すると、操作装置123の自動制御用のスイッチをONにする。これにより、操作装置123は、掘削積込指示信号を生成し出力する。
図5-図7は、第1の実施形態に係る自動掘削積込制御を示すフローチャートである。制御装置128は、オペレータから掘削積込指示信号の入力を受け付けると、図5-図7に示す自動掘削積込制御を実行する。なお、自動掘削積込制御の開始時におけるバケット133の位置である空荷旋回開始位置P01は、積込対象200の上方であって、旋回によって積込対象200と干渉しない位置である。自動掘削積込制御を連続して実行する場合には、空荷旋回開始位置P01は、積込位置P07と一致する。
車両情報取得部1101は、旋回体120の位置および方位、ブーム131、アーム132およびバケット133の傾斜角、ならびに旋回体120の姿勢を取得する(ステップS1)。車両情報取得部1101は、取得した旋回体120の位置および方位に基づいて、旋回体120の旋回中心の位置を特定する(ステップS2)。
検出情報取得部1102は、検出装置124から、積込機械100の周囲の深度を示す深度情報を取得する(ステップS3)。マップ生成部1105は、車両情報取得部1101が取得した旋回体120の位置、方位、および姿勢と、検出情報取得部1102が取得した深度情報とに基づいて、現場座標系における積込機械100の周囲のうち少なくとも一部の形状を表す三次元マップを更新する(ステップS4)。つまり、マップ生成部1105は、過去に生成した三次元マップに、今回検出した深度情報を重ね合わせることで三次元マップを更新する。積込対象特定部1106は、更新したマップ情報に基づいて、積込対象200の位置および形状を特定する(ステップS5)。
バケット位置特定部1104は、車両情報取得部1101が取得した車両情報に基づいて、掘削積込指示信号の入力時のアーム132の先端部の位置Pを、空荷旋回開始位置P01に決定するとともに、アーム132の先端からバケット133の最下通過点までの高さHbを特定する(ステップS6)。
掘削対象特定部1108は、ステップS4で生成した三次元マップに基づいて掘削点P22を特定する(ステップS7)。掘削位置特定部1109は、掘削対象特定部1108が特定した掘削点P22の位置に基づいて、掘削位置P05および旋回終了位置P04を特定する(ステップS8)。
回避位置特定部1107は、ステップS6で決定した空荷旋回開始位置P01と、積込対象特定部1106が特定した積込対象200の位置および形状に基づいて干渉回避位置P02を特定する(ステップS9)。
回避位置特定部1107は、ステップS6で決定した空荷旋回開始位置P01と、積込対象特定部1106が特定した積込対象200の位置および形状に基づいて干渉回避位置P02を特定する(ステップS9)。
移動処理部1112は、アーム132の先端部の位置Pが旋回終了位置P04に至ったか否かを判定する(ステップS10)。アーム132の先端部の位置Pが旋回終了位置P04に至っていない場合(ステップS10:NO)、移動処理部1112は、アーム132の先端部の位置Pが干渉回避位置P02を通過したか否かを判定する(ステップS11)。アーム132の先端部の位置Pが干渉回避位置P02を通過していない場合(ステップS11:NO)、移動処理部1112は、ブーム131、アーム132およびバケット133の操作信号を生成しない。つまり、アーム132の先端部の位置Pが干渉回避位置P02を通過していない場合、移動処理部1112は、作業機130を下げる操作信号の出力を禁止する。
他方、アーム132の先端部の位置Pが干渉回避位置P02を通過した場合(ステップS11:YES)、下げ停止判定部1110は、アーム132の先端の位置Pが、旋回終了位置P04より高いか否かを判定する(ステップS12)。アーム132の先端の位置Pが、旋回終了位置P04より高い場合(ステップS12:YES)、移動処理部1112は、アーム132の先端部の位置Pを降下させるためのブーム131およびアーム132の操作信号を生成する(ステップS13)。
他方、アーム132の先端の位置Pの高さが、旋回終了位置P04の高さ以下である場合(ステップS13:NO)、移動処理部1112は、アーム132の先端部の位置Pを降下させるためのブーム131およびアーム132の操作信号の生成を一時停止する。
次に、移動処理部1112は、現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端の平面位置が旋回終了位置P04に到達するか否かを判定する(ステップS14)。現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端の平面位置が旋回終了位置P04に到達しない場合(ステップS14:NO)、移動処理部1112は、旋回操作信号を生成する(ステップS15)。
他方、現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端の平面位置が旋回終了位置P04に到達する場合(ステップS14:YES)、移動処理部1112は、旋回操作信号を生成しない。つまり、現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端の平面位置が旋回終了位置P04に到達する場合、移動処理部1112は、旋回操作信号の出力を禁止する。これにより、慣性により旋回し続けようとする旋回体120は減速を始める。
ステップS10からステップS15の処理でブーム131およびアーム132の操作信号、並びに旋回体120の旋回操作信号の少なくともいずれか1つを生成すると、操作信号出力部1113は、生成した操作信号を油圧装置127に出力する(ステップS16)。
そして、車両情報取得部1101は、車両情報を取得する(ステップS17)。これにより、車両情報取得部1101は、出力した操作信号によって駆動した後の車両情報を取得することができる。制御装置128は、処理をステップS14に戻し、操作信号の生成を繰り返し実行する。
ステップS10において、アーム132の先端部の位置Pが旋回終了位置P04に至った場合(ステップS10:YES)、移動処理部1112は、ブーム131およびアーム132を下げる操作信号を生成し、操作信号出力部1113は、生成した操作信号を油圧装置127に出力する(ステップS18)。車両情報取得部1101は、車両情報を取得し、アーム132の先端部の位置Pが掘削位置P05に至ったか否かを判定する(ステップS19)。アーム132の先端部の位置Pが掘削位置P05に至っていない場合(ステップS19:NO)、制御装置128はステップS22に処理を戻し、作業機130を下げる操作信号の出力を継続する。したがって、アーム132の先端部の位置Pが旋回終了位置P04から掘削位置P05に移動する間、旋回体120は旋回しない。
アーム132の先端部の位置Pが掘削位置P05に至った場合(ステップS19:YES)、移動処理部1112は、バケット133を掘削方向に駆動させる掘削操作信号を生成し、操作信号出力部1113は、生成した操作信号を油圧装置127に出力する(ステップS20)。これにより、制御装置128は、バケット133に掘削対象を掘削させることができる。
次に、車両情報取得部1101は、車両情報を取得する(ステップS21)。また検出情報取得部1102は、検出装置124から、積込機械100の周囲の深度を示す深度情報を取得する(ステップS22)。マップ生成部1105は、車両情報取得部1101が取得した車両情報と、検出情報取得部1102が取得した深度情報とに基づいて三次元マップを更新する(ステップS23)。積込対象特定部1106は、更新した三次元マップに基づいて積込対象200の位置および形状を特定する(ステップS24)。積込位置特定部1111は、積込対象特定部1106が特定した積込対象200の位置および形状に基づいて、積込位置P07の平面位置を特定する(ステップS25)。積込位置特定部1111は、積込対象200の高さHtに、ステップS6で特定したアーム132の先端部からバケット133の最下通過点までの高さHbと、バケット133の制御余裕分の高さとを加算することで、積込位置P07の高さを特定する(ステップS26)。
移動処理部1112は、アーム132の先端部の位置Pが積込位置P07に至ったか否かを判定する(ステップS27)。アーム132の先端部の位置Pが積込位置P07に至っていない場合(ステップS27:NO)、移動処理部1112は、アーム132の先端部の位置Pが干渉回避位置P02の近傍にあるか否かを判定する(ステップS28)。例えば、移動処理部1112は、アーム132の先端の高さと干渉回避位置P02の高さとの差が所定の閾値未満であり、または旋回体120の旋回中心からアーム132の先端までの平面距離と旋回中心から干渉回避位置P02までの平面距離との差が所定の閾値未満であるか否かを判定する(ステップS28)。アーム132の先端部の位置Pが干渉回避位置P02の近傍にない場合(ステップS28:NO)、移動処理部1112は、ブーム131およびアーム132を干渉回避位置P02の高さまで上昇させる操作信号を生成する(ステップS29)。このとき、移動処理部1112は、ブーム131およびアーム132の位置および速度に基づいて、操作信号を生成する。
また移動処理部1112は、生成したブーム131およびアーム132の操作信号に基づいてブーム131およびアーム132の角速度の和を算出し、当該角速度の和と同じ速度でバケット133を回動させる操作信号を生成する(ステップS30)。これにより、移動処理部1112は、バケット133の対地角を保持する操作信号を生成することができる。
アーム132の先端部の位置Pが干渉回避位置P02の近傍にある場合(ステップS28:YES)、移動処理部1112は、ブーム131、アーム132およびバケット133の操作信号を生成しない。つまり、アーム132の先端部の位置Pが干渉回避位置P02の近傍にある場合、移動処理部1112は、作業機130を積込点へ移動させるための作業機130の操作信号の出力を禁止する。
移動処理部1112は、車両情報取得部1101が取得した車両情報に基づいて、旋回体120の旋回速度が所定速度未満であるか否かを判定する(ステップS31)。すなわち、移動処理部1112は、旋回体120が旋回中であるか否かを判定する。
旋回体120の旋回速度が所定速度未満である場合(ステップS31:YES)、移動処理部1112は、バケット133の高さが掘削完了位置P05´の高さから干渉回避位置P02の高さに至るまでの時間である上昇時間を特定する(ステップS32)。移動処理部1112は、バケット133の上昇時間に基づいて、現在時刻から旋回操作信号を出力した場合に、アーム132の先端が干渉回避位置P02または干渉回避位置P02より高い点を通過することになるか否かを判定する(ステップS33)。現在時刻から旋回操作信号を出力した場合に、アーム132の先端が干渉回避位置P02または干渉回避位置P02より高い点を通過することになる場合(ステップS33:YES)、移動処理部1112は、旋回操作信号を生成する(ステップS34)。
旋回体120の旋回速度が所定速度未満である場合(ステップS31:YES)、移動処理部1112は、バケット133の高さが掘削完了位置P05´の高さから干渉回避位置P02の高さに至るまでの時間である上昇時間を特定する(ステップS32)。移動処理部1112は、バケット133の上昇時間に基づいて、現在時刻から旋回操作信号を出力した場合に、アーム132の先端が干渉回避位置P02または干渉回避位置P02より高い点を通過することになるか否かを判定する(ステップS33)。現在時刻から旋回操作信号を出力した場合に、アーム132の先端が干渉回避位置P02または干渉回避位置P02より高い点を通過することになる場合(ステップS33:YES)、移動処理部1112は、旋回操作信号を生成する(ステップS34)。
現在時刻から旋回操作信号を出力した場合に、アーム132の先端が干渉回避位置P02より低い点を通過することになる場合(ステップS34:NO)、移動処理部1112は、旋回操作信号を生成しない。つまり、アーム132の先端が干渉回避位置P02より低い点を通過することになる場合、移動処理部1112は、旋回操作信号の出力を禁止する。
旋回体120の旋回速度が所定速度以上である場合(ステップS31:NO)、移動処理部1112は、現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端が積込位置P07に到達するか否かを判定する(ステップS35)。なお、旋回体120は、旋回操作信号の出力の停止後、減速しながらも慣性により旋回し続け、その後停止する。現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端が積込位置P07に到達する場合(ステップS35:YES)、移動処理部1112は、旋回操作信号を生成しない。つまり、現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端が積込位置P07に到達する場合、移動処理部1112は、旋回操作信号の出力を禁止する。これにより、旋回体120は減速を始める。
他方、現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端が積込位置P07より手前で停止することになる場合(ステップS35:NO)、移動処理部1112は、旋回操作信号を生成する(ステップS36)。
他方、現在時刻から旋回操作信号の出力を停止した場合に、アーム132の先端が積込位置P07より手前で停止することになる場合(ステップS35:NO)、移動処理部1112は、旋回操作信号を生成する(ステップS36)。
ステップS27からステップS36の処理でブーム131、アーム132およびバケット133の回動操作信号、並びに旋回体120の旋回操作信号の少なくともいずれか1つを生成すると、操作信号出力部1113は、生成した操作信号を油圧装置127に出力する(ステップS37)。
そして、車両情報取得部1101は、車両情報を取得する(ステップS38)。これにより、車両情報取得部1101は、出力した操作信号によって作動した後の車両情報を取得することができる。制御装置128は、処理をステップS31に戻し、操作信号の生成を繰り返し実行する。
他方、ステップS27にて、アーム132の先端部の位置Pが積込位置P07に至った場合(ステップS27:YES)、移動処理部1112は、ダンプ操作信号を生成し、操作信号出力部1113は、ダンプ操作信号を油圧装置127に出力する(ステップS39)。これにより、バケット133に収容された土砂は、積込対象200に積み込まれる。なお、アーム132の先端部の位置Pが積込位置P07に至ったとき、旋回体120の旋回は停止している。
これにより、制御装置128は、自動掘削積込制御を終了する。または制御装置128は、処理をステップS1に戻し、積込対象200の積載量が最大積載量を超えない範囲で、自動掘削積込制御を繰り返し実行する。
《作用・効果》
このように、第1の実施形態に係る制御装置128は、積込対象200の位置および形状に基づいて積込対象200より所定距離だけ外側の位置である干渉回避位置P02を特定し、バケット133が干渉回避位置P02に到達するまで旋回体120のみを駆動させてバケット133を干渉回避位置P02へ移動させる。その後、制御装置128は、旋回体120および作業機130を駆動させてバケット133を掘削対象上の掘削位置P05へ移動させる。これにより、制御装置128は、積込対象200とバケット133との干渉を防止しながら、バケット133の刃先を掘削点P22へ移動させることができる。
このように、第1の実施形態に係る制御装置128は、積込対象200の位置および形状に基づいて積込対象200より所定距離だけ外側の位置である干渉回避位置P02を特定し、バケット133が干渉回避位置P02に到達するまで旋回体120のみを駆動させてバケット133を干渉回避位置P02へ移動させる。その後、制御装置128は、旋回体120および作業機130を駆動させてバケット133を掘削対象上の掘削位置P05へ移動させる。これにより、制御装置128は、積込対象200とバケット133との干渉を防止しながら、バケット133の刃先を掘削点P22へ移動させることができる。
また、第1の実施形態に係る制御装置128は、バケット133が干渉回避位置P02に到達した後に旋回体120および作業機130を駆動させてバケット133を掘削位置P05より上方の旋回終了位置P04へ移動させる。その後、制御装置128は、作業機130のみを駆動させてバケット133を掘削位置P05へ移動させる。これにより、バケット133の刃先を、刃の伸びる方向に沿って掘削対象に当てることができる。なお、旋回しながらバケット133を掘削対象に当てると、バケット133の刃に横方向の力が掛かり、刃の摩耗および作業機130の曲がりが生じやすくなる。
以上、図面を参照して一実施形態について詳しく説明してきたが、具体的な構成は上述のものに限られることはなく、様々な設計変更等をすることが可能である。
例えば、第1の実施形態に係る制御装置128は、積込点P21を、深度情報を用いて特定するが、これに限られない。他の実施形態に係る制御装置128は、深度情報を用いずに、積込対象200に位置方位演算器を設けて、積込対象特定部1106は積込対象200の位置方位演算器が出力する積込対象200の位置と方位と形状を受信して、積込位置特定部1111は積込点P21を特定してもよい。
また、第1の実施形態に係る制御装置128は、掘削点P22を深度情報を用いて特定するが、これに限られない。他の実施形態に係る制御装置128は、掘削位置特定部1109は掘削点P22をオペレータが教示できるようにして特定してもよい。具体的には、掘削位置特定部1109はオペレータが手動操作にて掘削操作を行ったときの掘削位置を記憶して、掘削点P22としてもよい。あるいは、運転室121内に、掘削点P22を指示するタッチパネル式のデータ入力端末装置を備えて、掘削位置特定部1109はデータ入力端末装置から指示されたデータを受信して、掘削点P22を特定してもよい。
また、第1の実施形態に係る制御装置128は、自動掘削積込制御を行うが、これに限られない。他の実施形態に係る制御装置128は自動掘削制御を行い、積込作業がオペレータの手動操作によって行われてもよい。
また、第1の実施形態に係る制御装置128は、掘削点P22を特定して、掘削点P22への旋回操作のあとに掘削操作を実行するが、これに限らず、制御装置128は、掘削点P22への旋回操作までを実行して制御を終了し掘削作業がオペレータの手動操作によって行われてもよい。
また、第1の実施形態に係る制御装置128は、バケット133は積込対象200の上方に位置する空荷旋回開始位置P01にあって自動掘削積込制御を開始するが、これに限られない。他の実施形態に係る制御装置128は、バケット133は掘削終了位置P05’にあって、自動掘削積込制御を開始すると、バケット133を干渉回避位置P02を通過して積込位置P07へ移動して、ダンプ操作をした後に、バケット133を干渉回避位置P02を通過して掘削点P22へ移動してもよい。
例えば、第1の実施形態に係る制御装置128は、積込点P21を、深度情報を用いて特定するが、これに限られない。他の実施形態に係る制御装置128は、深度情報を用いずに、積込対象200に位置方位演算器を設けて、積込対象特定部1106は積込対象200の位置方位演算器が出力する積込対象200の位置と方位と形状を受信して、積込位置特定部1111は積込点P21を特定してもよい。
また、第1の実施形態に係る制御装置128は、掘削点P22を深度情報を用いて特定するが、これに限られない。他の実施形態に係る制御装置128は、掘削位置特定部1109は掘削点P22をオペレータが教示できるようにして特定してもよい。具体的には、掘削位置特定部1109はオペレータが手動操作にて掘削操作を行ったときの掘削位置を記憶して、掘削点P22としてもよい。あるいは、運転室121内に、掘削点P22を指示するタッチパネル式のデータ入力端末装置を備えて、掘削位置特定部1109はデータ入力端末装置から指示されたデータを受信して、掘削点P22を特定してもよい。
また、第1の実施形態に係る制御装置128は、自動掘削積込制御を行うが、これに限られない。他の実施形態に係る制御装置128は自動掘削制御を行い、積込作業がオペレータの手動操作によって行われてもよい。
また、第1の実施形態に係る制御装置128は、掘削点P22を特定して、掘削点P22への旋回操作のあとに掘削操作を実行するが、これに限らず、制御装置128は、掘削点P22への旋回操作までを実行して制御を終了し掘削作業がオペレータの手動操作によって行われてもよい。
また、第1の実施形態に係る制御装置128は、バケット133は積込対象200の上方に位置する空荷旋回開始位置P01にあって自動掘削積込制御を開始するが、これに限られない。他の実施形態に係る制御装置128は、バケット133は掘削終了位置P05’にあって、自動掘削積込制御を開始すると、バケット133を干渉回避位置P02を通過して積込位置P07へ移動して、ダンプ操作をした後に、バケット133を干渉回避位置P02を通過して掘削点P22へ移動してもよい。
また、第1の実施形態に係る制御装置128の積込対象特定部1106は、深度情報から生成されたマップ情報に基づいて積込対象200の位置および形状を特定するが、これに限られない。例えば、他の実施形態において、積込対象200がGNSSなどによる測位機能を有する場合、積込対象特定部1106は、車車間通信により、ローディングポイントに到着した積込対象200からその位置および方位に係る情報を受信することで、積込対象200の位置および形状を特定してもよい。また他の実施形態において、積込対象200が管制システムによって制御される無人車両である場合、積込対象特定部1106は、管制システムから積込対象200の位置および方位に係る情報を受信することで、積込対象200の位置および形状を特定してもよい。
また、第1の実施形態に係る積込機械100はバケット133を備えるが、これに限られない。例えば、他の実施形態に係る積込機械100は、バックオールとクラムシェルとを開閉可能に備えるクラムバケットを備えるものであってもよい。
また、第1の実施形態に係る積込機械100は、オペレータが搭乗して操作する有人運転車両であるが、これに限られない。例えば、他の実施形態に係る積込機械100は、遠隔の事務所にいるオペレータがモニタの画面を見ながら操作する遠隔操作装置から、通信により取得する操作信号によって作動する遠隔運転車両であってもよい。この場合、制御装置128の一部の機能が遠隔操作装置に設けられてもよい。
本発明に係る積込機械の制御装置は、積込対象とバケットとの干渉を防止しながら、バケットを掘削点へ移動させることができる。
100…積込機械 110…走行体 120…旋回体 121…運転室 122…運転席 123…操作装置 124…検出装置 125…位置方位演算器 126…傾斜計測器 127…油圧装置 128…制御装置 130…作業機 131…ブーム 132…アーム 133…バケット 134…ブームシリンダ 135…アームシリンダ 136…バケットシリンダ 137…ブームストロークセンサ 138…アームストロークセンサ 139…バケットストロークセンサ 1100…プロセッサ 1200…メインメモリ 1300…ストレージ 1400…インタフェース 1101…車両情報取得部 1102…検出情報取得部 1103…操作信号入力部 1104…バケット位置特定部 1105…マップ生成部 1106…積込対象特定部 1107…回避位置特定部 1108…掘削対象特定部 1109…掘削位置特定部 1110…下げ停止判定部 1111…積込位置特定部 1112…移動処理部 1113…操作信号出力部 200…積込対象 P01…空荷旋回開始位置 P02…干渉回避位置 P03…下げ停止位置 P04…旋回終了位置 P05…掘削位置 P05´…掘削終了位置 P06…積荷旋回開始位置 P07…積込位置 P21…積込点 掘削点P22
Claims (6)
- 旋回中心回りに旋回する旋回体と、バケットを有し前記旋回体に取り付けられた作業機とを備える積込機械の制御装置であって、
積込対象の位置および形状を特定する積込対象特定部と、
前記積込対象の位置および形状に基づいて前記積込対象より所定距離だけ外側の位置である干渉回避位置を特定する回避位置特定部と、
前記バケットが前記積込対象上の積込位置から前記干渉回避位置に到達するまで前記旋回体のみを駆動させて前記バケットを前記干渉回避位置へ移動させる操作信号を出力し、前記バケットが前記干渉回避位置に到達した後に前記旋回体および前記作業機を駆動させて前記バケットを掘削対象上の掘削位置へ移動させる操作信号を出力する移動処理部と
を備える積込機械の制御装置。 - 前記移動処理部は、前記バケットが前記干渉回避位置に到達した後に前記旋回体および前記作業機を駆動させて前記バケットを前記掘削位置より上方の旋回終了位置へ移動させる操作信号を出力し、前記バケットが前記旋回終了位置に到達した後に前記作業機のみを駆動させて前記バケットを前記掘削位置へ移動させる操作信号を出力する
請求項1に記載の積込機械の制御装置。 - 前記積込機械は、検出方向に存在する対象物の位置を検出する検出装置を備え、
前記積込対象特定部は、前記検出装置の検出結果に基づいて前記積込対象の位置および形状を特定する
請求項1または請求項2に記載の積込機械の制御装置。 - 前記積込機械は、検出方向に存在する対象物の位置を検出する検出装置を備え、
前記検出装置の検出結果に基づいて前記掘削位置を特定する掘削位置特定部を備える
請求項1から請求項3のいずれか1項に記載の積込機械の制御装置。 - 前記積込機械は、積込機械のオペレータの指示に基づいて前記掘削位置を特定する掘削位置特定部を備える
請求項1から請求項3のいずれか1項に記載の積込機械の制御装置。 - 旋回中心回りに旋回する旋回体と、バケットを有し前記旋回体に取り付けられた作業機とを備える積込機械の制御方法であって、
積込対象の位置および形状を特定するステップと、
前記積込対象の位置および形状に基づいて前記積込対象より所定距離だけ外側の位置である干渉回避位置を特定するステップと、
前記バケットが前記積込対象上の積込位置から前記干渉回避位置に到達するまで前記旋回体のみを駆動させて前記バケットを前記干渉回避位置へ移動させる操作信号を出力するステップと、
前記バケットが前記干渉回避位置に到達した後に前記旋回体および前記作業機を駆動させて前記バケットを掘削対象上の掘削位置へ移動させる操作信号を出力するステップと
を備える積込機械の制御方法。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE112019003881.8T DE112019003881B4 (de) | 2018-09-12 | 2019-08-28 | Steuervorrichtung und steuerverfahren für lademaschinen |
| US17/267,061 US12024851B2 (en) | 2018-09-12 | 2019-08-28 | Loading machine control device and control method |
| CN201980056790.6A CN112639210B (zh) | 2018-09-12 | 2019-08-28 | 装载机械的控制装置及控制方法 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018-170738 | 2018-09-12 | ||
| JP2018170738A JP7144252B2 (ja) | 2018-09-12 | 2018-09-12 | 積込機械の制御装置および制御方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2020054418A1 true WO2020054418A1 (ja) | 2020-03-19 |
Family
ID=69777546
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2019/033685 Ceased WO2020054418A1 (ja) | 2018-09-12 | 2019-08-28 | 積込機械の制御装置および制御方法 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US12024851B2 (ja) |
| JP (2) | JP7144252B2 (ja) |
| CN (1) | CN112639210B (ja) |
| DE (1) | DE112019003881B4 (ja) |
| WO (1) | WO2020054418A1 (ja) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4198208A4 (en) * | 2020-09-25 | 2024-02-21 | Kobelco Construction Machinery Co., Ltd. | Automatic loading system |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7088691B2 (ja) * | 2018-02-28 | 2022-06-21 | 株式会社小松製作所 | 積込機械の制御装置、制御方法および遠隔操作システム |
| JP7050981B1 (ja) * | 2021-03-09 | 2022-04-08 | 日立建機株式会社 | 作業機械 |
| JP7569249B2 (ja) * | 2021-03-24 | 2024-10-17 | 日立建機株式会社 | 作業機械 |
| JP7677825B2 (ja) * | 2021-04-30 | 2025-05-15 | 株式会社小松製作所 | 積込機械の制御装置及び制御方法 |
| US12071746B2 (en) * | 2021-05-12 | 2024-08-27 | Deere & Company | System and method for assisted positioning of transport vehicles relative to a work machine during material loading |
| JP7609703B2 (ja) * | 2021-05-19 | 2025-01-07 | 株式会社小松製作所 | 積込機械の制御システム及び制御方法 |
| JP7669187B2 (ja) * | 2021-05-19 | 2025-04-28 | 株式会社小松製作所 | 積込機械の制御システム及び制御方法 |
| JP2023034980A (ja) * | 2021-08-31 | 2023-03-13 | 株式会社小松製作所 | 制御システム、制御方法および制御プログラム |
| JP2023040829A (ja) | 2021-09-10 | 2023-03-23 | 株式会社小松製作所 | 制御装置、作業機械、制御方法および制御システム |
| JP2023114782A (ja) * | 2022-02-07 | 2023-08-18 | コベルコ建機株式会社 | 作業目標設定システム、作業機械、および作業目標設定プログラム |
| JP2024018569A (ja) * | 2022-07-29 | 2024-02-08 | 株式会社小松製作所 | 積込機械の制御装置、積込機械の制御方法および制御システム |
| JP2024144797A (ja) * | 2023-03-31 | 2024-10-15 | 株式会社小松製作所 | 制御装置、制御方法および作業機械 |
| JP2024144799A (ja) | 2023-03-31 | 2024-10-15 | 株式会社小松製作所 | 制御装置、制御方法および作業機械 |
| JP2024144798A (ja) | 2023-03-31 | 2024-10-15 | 株式会社小松製作所 | 制御装置、制御方法および作業機械 |
| CN116556448B (zh) * | 2023-05-23 | 2023-10-31 | 浙江中润建筑工程有限公司 | 一种大型多功能挖机 |
| JP2025007361A (ja) * | 2023-06-30 | 2025-01-17 | 株式会社小松製作所 | 作業機械を制御するためのシステム及び方法 |
| JP2025016237A (ja) | 2023-07-21 | 2025-01-31 | 株式会社小松製作所 | 積込機械の制御装置、積込機械の制御方法および遠隔操作システム |
| JP2025034983A (ja) * | 2023-08-31 | 2025-03-13 | 株式会社小松製作所 | 積込機械の制御システム、積込機械の制御方法および積込機械の遠隔操作システム |
| JP2025056408A (ja) | 2023-09-27 | 2025-04-08 | 日立建機株式会社 | 作業機械 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09256407A (ja) * | 1996-03-22 | 1997-09-30 | Shin Caterpillar Mitsubishi Ltd | 油圧ショベルの自動制御装置 |
| JPH1088625A (ja) * | 1996-09-13 | 1998-04-07 | Komatsu Ltd | 自動掘削機、自動掘削方法および自動積み込み方法 |
| JPH11190042A (ja) * | 1997-12-26 | 1999-07-13 | Hitachi Constr Mach Co Ltd | 自動運転ショベル |
| JP2006307436A (ja) * | 2005-04-26 | 2006-11-09 | Shin Caterpillar Mitsubishi Ltd | 旋回系作業機械 |
| WO2017115809A1 (ja) * | 2015-12-28 | 2017-07-06 | 住友建機株式会社 | ショベル |
| JP2018024997A (ja) * | 2016-08-08 | 2018-02-15 | 日立建機株式会社 | 建設機械の作業機軌道修正システム |
| JP2018199989A (ja) * | 2017-05-30 | 2018-12-20 | コベルコ建機株式会社 | 作業機械 |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0699943B2 (ja) | 1986-10-09 | 1994-12-12 | 住友建機株式会社 | 油圧シヨベルの制御回路 |
| JP3313602B2 (ja) | 1997-01-27 | 2002-08-12 | 株式会社クボタ | バックホウ |
| US6363632B1 (en) * | 1998-10-09 | 2002-04-02 | Carnegie Mellon University | System for autonomous excavation and truck loading |
| JP5512311B2 (ja) * | 2010-02-03 | 2014-06-04 | 住友重機械工業株式会社 | 建設機械 |
| CN103857851B (zh) * | 2011-10-19 | 2016-03-09 | 住友重机械工业株式会社 | 回转作业机械及回转作业机械的控制方法 |
| JP5707313B2 (ja) | 2011-12-19 | 2015-04-30 | 日立建機株式会社 | 作業車両 |
| US9523180B2 (en) * | 2014-04-28 | 2016-12-20 | Deere & Company | Semi-automatic material loading |
| JP6373728B2 (ja) | 2014-11-10 | 2018-08-15 | 日立建機株式会社 | 建設機械 |
| JP6618072B2 (ja) | 2015-08-28 | 2019-12-11 | キャタピラー エス エー アール エル | 作業機械 |
| JP6716358B2 (ja) | 2016-06-21 | 2020-07-01 | 株式会社小松製作所 | 作業車両、作業管理システムおよび作業車両の制御方法 |
| CN106088178A (zh) | 2016-07-16 | 2016-11-09 | 谭琛 | 一种液压挖掘机自动智能装载系统 |
-
2018
- 2018-09-12 JP JP2018170738A patent/JP7144252B2/ja active Active
-
2019
- 2019-08-28 US US17/267,061 patent/US12024851B2/en active Active
- 2019-08-28 WO PCT/JP2019/033685 patent/WO2020054418A1/ja not_active Ceased
- 2019-08-28 DE DE112019003881.8T patent/DE112019003881B4/de active Active
- 2019-08-28 CN CN201980056790.6A patent/CN112639210B/zh active Active
-
2022
- 2022-09-15 JP JP2022147186A patent/JP7609834B2/ja active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09256407A (ja) * | 1996-03-22 | 1997-09-30 | Shin Caterpillar Mitsubishi Ltd | 油圧ショベルの自動制御装置 |
| JPH1088625A (ja) * | 1996-09-13 | 1998-04-07 | Komatsu Ltd | 自動掘削機、自動掘削方法および自動積み込み方法 |
| JPH11190042A (ja) * | 1997-12-26 | 1999-07-13 | Hitachi Constr Mach Co Ltd | 自動運転ショベル |
| JP2006307436A (ja) * | 2005-04-26 | 2006-11-09 | Shin Caterpillar Mitsubishi Ltd | 旋回系作業機械 |
| WO2017115809A1 (ja) * | 2015-12-28 | 2017-07-06 | 住友建機株式会社 | ショベル |
| JP2018024997A (ja) * | 2016-08-08 | 2018-02-15 | 日立建機株式会社 | 建設機械の作業機軌道修正システム |
| JP2018199989A (ja) * | 2017-05-30 | 2018-12-20 | コベルコ建機株式会社 | 作業機械 |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4198208A4 (en) * | 2020-09-25 | 2024-02-21 | Kobelco Construction Machinery Co., Ltd. | Automatic loading system |
| EP4528039A3 (en) * | 2020-09-25 | 2025-06-11 | Kobelco Construction Machinery Co., Ltd. | Automatic loading system |
| US20250188713A1 (en) * | 2020-09-25 | 2025-06-12 | Kobelco Construction Machinery Co., Ltd. | Automatic loading system |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2020041352A (ja) | 2020-03-19 |
| US20210164192A1 (en) | 2021-06-03 |
| JP7144252B2 (ja) | 2022-09-29 |
| JP7609834B2 (ja) | 2025-01-07 |
| JP2022168304A (ja) | 2022-11-04 |
| DE112019003881T5 (de) | 2021-04-15 |
| US12024851B2 (en) | 2024-07-02 |
| CN112639210A (zh) | 2021-04-09 |
| DE112019003881B4 (de) | 2025-05-28 |
| CN112639210B (zh) | 2022-10-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7609834B2 (ja) | 積込機械の制御装置、遠隔操作システム、および制御方法 | |
| JP7361186B2 (ja) | 制御装置、積込機械、および制御方法 | |
| JP7088691B2 (ja) | 積込機械の制御装置、制御方法および遠隔操作システム | |
| US11661725B2 (en) | Loading machine control device and control method | |
| CN112513377B (zh) | 装载机械的控制装置及控制方法 | |
| JP7311681B2 (ja) | 積込機械の制御装置、制御方法、および遠隔操作システム | |
| WO2022230980A1 (ja) | 積込機械の制御装置及び制御方法 | |
| AU2024330120A1 (en) | Control system for loading machine, control method for loading machine, and remote operation system for loading machine | |
| JP2024106574A (ja) | 積込機械の制御装置、積込機械の制御方法および積込機械の制御システム | |
| WO2025022923A1 (ja) | 積込機械の制御装置、積込機械の制御方法および遠隔操作システム | |
| AU2024331596A1 (en) | Control system for loading machine, control method for loading machine, and remote operation system for loading machine | |
| JP2024131641A (ja) | 作業機械の制御装置、遠隔操作システムおよび制御方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19860025 Country of ref document: EP Kind code of ref document: A1 |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 19860025 Country of ref document: EP Kind code of ref document: A1 |
|
| WWG | Wipo information: grant in national office |
Ref document number: 112019003881 Country of ref document: DE |