WO2020021794A1 - プラント管理方法、プラント管理装置、および、プラント管理プログラム - Google Patents

プラント管理方法、プラント管理装置、および、プラント管理プログラム Download PDF

Info

Publication number
WO2020021794A1
WO2020021794A1 PCT/JP2019/016791 JP2019016791W WO2020021794A1 WO 2020021794 A1 WO2020021794 A1 WO 2020021794A1 JP 2019016791 W JP2019016791 W JP 2019016791W WO 2020021794 A1 WO2020021794 A1 WO 2020021794A1
Authority
WO
WIPO (PCT)
Prior art keywords
steam trap
blockage
failure
steam
prevention operation
Prior art date
Application number
PCT/JP2019/016791
Other languages
English (en)
French (fr)
Inventor
藤原良康
小田和則
Original Assignee
株式会社テイエルブイ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社テイエルブイ filed Critical 株式会社テイエルブイ
Priority to JP2019545374A priority Critical patent/JP6664559B1/ja
Publication of WO2020021794A1 publication Critical patent/WO2020021794A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16TSTEAM TRAPS OR LIKE APPARATUS FOR DRAINING-OFF LIQUIDS FROM ENCLOSURES PREDOMINANTLY CONTAINING GASES OR VAPOURS
    • F16T1/00Steam traps or like apparatus for draining-off liquids from enclosures predominantly containing gases or vapours, e.g. gas lines, steam lines, containers
    • F16T1/20Steam traps or like apparatus for draining-off liquids from enclosures predominantly containing gases or vapours, e.g. gas lines, steam lines, containers with valves controlled by floats
    • F16T1/22Steam traps or like apparatus for draining-off liquids from enclosures predominantly containing gases or vapours, e.g. gas lines, steam lines, containers with valves controlled by floats of closed-hollow-body type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16TSTEAM TRAPS OR LIKE APPARATUS FOR DRAINING-OFF LIQUIDS FROM ENCLOSURES PREDOMINANTLY CONTAINING GASES OR VAPOURS
    • F16T1/00Steam traps or like apparatus for draining-off liquids from enclosures predominantly containing gases or vapours, e.g. gas lines, steam lines, containers
    • F16T1/38Component parts; Accessories
    • F16T1/48Monitoring arrangements for inspecting, e.g. flow of steam and steam condensate

Definitions

  • the present invention relates to a plant management method, a plant management device, and a plant management program.
  • Patent Document 1 discloses a steam plant on a risk matrix in which a failure occurrence probability and a failure occurrence degree are set on two axes. Discloses that a plot diagram in which a set of a failure occurrence probability and an influence degree for each process device in the above is plotted is created, and a risk evaluation of a target plant is performed from the plot diagram.
  • the risk evaluation means as disclosed in Patent Document 1 can evaluate the risk in the event of a failure before the failure occurs, but can execute an appropriate countermeasure for the failure that actually occurred. I wouldn't do it. That is, the risk evaluation means as disclosed in Patent Document 1 is effective in terms of preventive maintenance and predictive maintenance, but cannot be said to be effective in situations where post-maintenance is required.
  • a plant management method includes a steam trap, a temperature sensor for detecting a temperature of the steam trap, and detecting that a failure has occurred in the steam trap based on the temperature of the steam trap detected by the temperature sensor.
  • a steam trap control unit comprising: a steam plant including a steam trap control unit, wherein the steam trap control unit detects a malfunction for the first time during a predetermined period of time, and detects the malfunction by a clogging phenomenon of the steam trap. And performing a blockage elimination operation, which is an operation to resolve the blockage phenomenon, on the steam trap that has detected the defect, and after performing the blockage elimination operation, the steam trap control unit When the period until the failure is detected again is equal to or less than the first threshold which is a predetermined threshold.
  • the recurrence prevention operation which is an operation for preventing recurrence of the blocking phenomenon
  • the air binding prevention operation which is an operation for preventing the air binding phenomenon
  • the plant management device may include a steam trap, a temperature sensor for detecting a temperature of the steam trap, and a problem occurring in the steam trap based on the temperature of the steam trap detected by the temperature sensor.
  • a steam trap control unit for detecting a steam plant, wherein the plant management device is used for managing a steam plant, wherein the plant management device includes a management device control unit that controls an operation of the plant management device, and information for a user.
  • An output device for transmitting, and when the steam trap control unit detects a failure for the first time during a predetermined period, the management device control unit determines that the failure is a blocking phenomenon of the steam trap.
  • the output device operates to remove the blockage phenomenon with respect to the steam trap that has detected the defect.
  • the output device is an operation for preventing the recurrence of the blockage phenomenon and an operation for preventing the air binding phenomenon, which is an operation for preventing the recurrence of the blockage phenomenon.
  • the first failure prevention operation which is the operation with the higher priority determined in advance, should be performed, and the management device control unit controls the first device.
  • the period from when the steam trap control unit detects the failure three times is a second predetermined threshold value. If the value is equal to or less than the value, the output device should perform a second failure prevention operation, which is an operation not selected as the first failure prevention operation, of the blockage recurrence prevention operation and the air binding prevention operation. Is output to the user.
  • the plant management program includes a steam trap, a temperature sensor for detecting a temperature of the steam trap, and a problem occurring in the steam trap based on the temperature of the steam trap detected by the temperature sensor.
  • a steam trap control unit for detecting a steam plant comprising: a plant management program for causing a computer to execute a management function used for managing a steam plant including the steam plant control unit. Is detected, the malfunction is determined to be a clogging phenomenon of the steam trap, and a clogging elimination operation that is an operation for eliminating the clogging phenomenon is performed on the steam trap that has detected the malfunction. To the user, and a message indicating that the blockage clearing operation has been executed.
  • a first threshold value which is a predetermined threshold value
  • an operation for preventing the recurrence of the blockage phenomenon If the period until the steam trap control unit detects the problem again after the recognition by the computer is equal to or less than a first threshold value which is a predetermined threshold value, an operation for preventing the recurrence of the blockage phenomenon.
  • the user is informed that the first failure prevention operation, which is the operation with the higher priority determined in advance, should be performed among the operation for preventing the recurrence of the blockage and the operation for preventing the air binding phenomenon, which is the operation for preventing the air binding phenomenon.
  • a period from when the computer recognizes that the first failure prevention operation has been performed to when the steam trap control unit detects the failure three times is a predetermined predetermined value. If it is equal to or less than the second threshold value, which is the threshold value of
  • the effect to be executed a second failure prevention operation is not selected operation as if prevention operation, characterized in that it comprises a function of outputting to the user
  • an appropriate countermeasure can be executed according to the interval between the defect and the previous failure and the content of the countermeasure executed at the time of the previous failure.
  • the first failure prevention operation is the blockage recurrence prevention operation
  • the second failure prevention operation is the air binding prevention operation
  • the recurrence of the blockage phenomenon is given priority over the countermeasure for the more probable cause of the defect in the equipment that is more likely to occur than the occurrence of the air binding phenomenon
  • the clog elimination operation includes an operation for removing a clog generated at an orifice portion of the steam trap.
  • the obstruction phenomenon of the steam trap can be eliminated by removing the obstruction generated in the orifice portion.
  • the blockage elimination operation is performed without dismantling the steam trap.
  • the blockage recurrence prevention operation includes changing a cleaning agent added to steam flowing through the steam plant.
  • the operation for preventing blockage recurrence includes changing the cleaning agent to an amine compound.
  • the air binding preventing operation includes installing an air vent upstream of the steam trap or integrally with the steam trap.
  • the steam plant 2 to be managed in the plant management method includes a steam-using device that uses steam such as a turbine, a compressor, and a heat exchanger, a transport pipe that transports steam to the steam-using device, and a steam-using device.
  • a piping system such as a drain pipe for discharging the generated drain, and a process device such as a steam trap 22, a control valve, a pump, a filter, and a separator provided in the piping system, and a steam supply device such as a water supply tank, a deaerator, and a boiler. , Etc.
  • These components are formed of a material selected from cast iron, stainless steel, chromium molybdenum steel, carbon steel, alloy steel, copper-based alloy, or the like, which is selected according to the structure and required performance of each component.
  • the plant management method, the plant management apparatus, and the plant management program according to the present embodiment are applied as one of the asset management methods. It is possible.
  • a cleaning agent is added to the water supplied to the boiler, and the cleaning agent flows through the steam plant 2 with the steam.
  • Phosphates, sodium sulfite, hydrazine, ammonia, amine compounds and the like are used as the cleaning agent.
  • ammonia is used as a cleaning agent.
  • a monitoring server 3 collects data from various steam plants 2 to be monitored via a network 5, The collected data is cumulatively recorded in the external database server 4.
  • the monitoring server 3 performs analysis and determination based on the collected data and the data recorded in the database server 4 periodically or in response to an instruction from a user or an administrator.
  • the result is displayed on a user terminal 1 (an example of an output device) such as a PC or a smartphone.
  • the results of the analysis and the judgment are recorded in the database server 4, and are used for further analysis and judgment. There are cases where these analysis results are periodically transmitted to the user terminal 1 by the monitoring server 3 and cases where they are transmitted to the user terminal 1 in response to an instruction from a user or an administrator.
  • FIG. 2 shows an example of a specific structure of the steam trap 22.
  • a float steam trap is employed as the steam trap 22.
  • the steam trap 22 has a float 221 as a valve body.
  • the float 221 normally sits on the valve seat 222 and closes an orifice 222a (an example of an orifice portion) provided at the center of the valve seat 222. Since the orifice 222a has an opening diameter smaller than the nominal diameter of each component through which steam flows, such as the piping system and the steam trap 22, the orifice 222a is more likely to be closed than other portions of the steam trap 22.
  • a cleaning mechanism 225 used for a cleaning operation described later is provided on the outlet 224 side of the orifice 222a.
  • the trouble that occurs in the steam trap 22 refers to a state where the above function is not performed, and specifically, a state where the drain is not discharged.
  • the root cause (root cause) of such a defect includes a clogging phenomenon and an air binding phenomenon.
  • the steam flowing through the steam plant may be accompanied by substances such as impurities, foreign substances, and sludge and elution from components such as piping. Such materials tend to deposit and precipitate in a steam trap 22 located at the end of the piping system. At this time, if the opening of the orifice 222a is completely closed by the obstruction caused by deposition and deposition, the drain cannot flow even if the float 221 rises. This is the closing phenomenon of the steam trap 22.
  • a cleaning operation (an example of a blockage elimination operation) for removing a blockage formed in the orifice 222a is the first operation to be performed.
  • the deposit formed on the orifice 222a is removed without removing the steam trap 22 from the piping system or dismantling the steam trap 22.
  • a cleaning mechanism 225 is provided in the steam trap 22.
  • the cleaning mechanism 225 is a rod-shaped member having a pointed tip end facing the orifice 222a, and is fixed to the main body of the steam trap 22 by screwing.
  • the cleaning mechanism 225 When the cleaning mechanism 225 is rotated around its axis in a clockwise direction as viewed from the outside of the steam trap 22, the cleaning mechanism 225 advances toward the inside of the steam trap 22, and the tip reaches the orifice 222a. . At this time, the tip portion penetrates the deposit formed on the orifice 222a, and the deposit can be removed.
  • the cleaning agent is changed from, for example, ammonia to an amine compound (an example of an operation to prevent recurrence of clogging). Etc. are effective.
  • the vapor trap 22 is an automatic valve that operates so as to discharge liquid but not gas.
  • the steam When steam flows into the steam trap 22, the steam is condensed due to a decrease in temperature and becomes drain, and is eventually discharged.
  • air non-condensable gas
  • the air does not condense in a general temperature environment in which the steam trap 22 is used.
  • the air does not discharge from the steam trap 22 and stays in the steam trap 22.
  • the amount of drain in the steam trap 22 does not increase, and the condition for opening the steam trap 22 is not satisfied.
  • a phenomenon in which the steam trap 22 does not operate in a closed state by the above mechanism is called an air binding phenomenon.
  • an air vent may be provided upstream of the steam trap 22 or integrally with the steam trap 22 (an example of an operation for preventing air binding).
  • the steam trap control unit 21 obtains a temperature obtained from each steam trap 22 installed in the steam plant 2 by a temperature sensor 23 provided in each steam trap 22. Data and event data related to an event generated in each steam trap 22 are collected, and the collected data is transmitted to the monitoring server 3 periodically or continuously.
  • the steam trap control unit 21 continuously monitors the temperature of the steam trap 22 detected by the temperature sensor 23 (S11).
  • the temperature of the specific steam trap 22 is reduced by 50 ° C. or more with respect to the average value of the immediately preceding fixed period (for example, the latest three times measured in a cycle of 30 minutes).
  • the monitoring server 3 When the monitoring server 3 receives the event data indicating that a failure has occurred in the steam trap 22, the monitoring server 3 acquires the history of the event data related to the steam trap 22 from the database server 4. Here, if 30 days or more (an example of a predetermined period) has elapsed since the last occurrence of the failure in the steam trap 22, the failure related to the event data received this time is regarded as the first failure in the period. It recognizes that there is, and determines that the cause of the trouble is the blockage of the steam trap 22. At this time, the monitoring server 3 records event data indicating that the steam trap 22 has been blocked in the database server 4.
  • the monitoring server 3 causes the user terminal 1 to display a message indicating that a cleaning operation should be performed on the steam trap 22. This is because the most typical problem in the steam trap 22 is a clogging phenomenon, which is solved by removing the blockage.
  • the user of the user terminal 1 executes the cleaning operation of the steam trap 22 according to the message (S13), and inputs to the user terminal 1 that the cleaning operation has been completed. Thereafter, the user terminal 1 transmits event data indicating that the cleaning operation has been completed to the monitoring server 3.
  • the monitoring server 3 recognizes that the cleaning operation has been performed, and transmits the event data indicating that the cleaning operation of the steam trap 22 has been performed to the database server 4. To record.
  • the steam trap control unit 21 continuously monitors the temperature of the steam trap 22 detected by the temperature sensor 23 (S21). Eventually, when it is determined that the trouble condition has been satisfied and the trouble has occurred in the steam trap 22 again (S22), the steam trap control unit 21 transmits event data indicating that the trouble has occurred in the steam trap 22 to the monitoring server 3. I do.
  • the monitoring server 3 When the monitoring server 3 receives the event data indicating that a failure has occurred in the steam trap 22, the monitoring server 3 acquires the history of the event data related to the steam trap 22 from the database server 4. Here, from the recording of the event data indicating that the cleaning operation for the steam trap 22 has been executed, if it is within 20 days (an example of the first threshold value) (S23), the fault related to the event data received this time is recurred. And the cause of the problem is determined to be recurrence of the blockage of the steam trap 22. At this time, the monitoring server 3 records event data to the effect that recurrence of the blockage has occurred in the steam trap 22 in the database server 4.
  • the monitoring server 3 causes the user terminal 1 to display a message indicating that a cleaning operation should be performed on the steam trap 22 and a message indicating that the cleaning agent should be changed to an amine compound. It is suspected that the copper eluted from the copper-based alloy is deposited and deposited on the orifice part as a cause of the recurrence of the defect within a short period of time within 20 days from the execution of the cleaning operation. This is to solve this by changing to an amine compound.
  • the user of the user terminal 1 executes the cleaning operation of the steam trap 22 according to the message, and further changes the cleaning agent to an amine compound (S24). When the above operation is completed, the user inputs to the user terminal 1 that the cleaning operation and the change of the cleaning agent have been completed.
  • the user terminal 1 transmits event data indicating that the cleaning operation and the change of the cleaning agent have been completed to the monitoring server 3.
  • the monitoring server 3 recognizes that the cleaning operation and the change of the cleaning agent have been performed, and performs the cleaning operation of the steam trap 22 and the cleaning agent.
  • Event data indicating that the change has been executed is recorded in the database server 4.
  • the monitoring server 3 causes the user terminal 1 to display a message indicating that a cleaning operation should be performed on the steam trap 22, and the user of the user terminal 1 performs the cleaning operation on the steam trap 22 according to the message. Execute (S13), and input to the user terminal 1 that the cleaning operation has been completed.
  • the steam trap control unit 21 continuously monitors the temperature of the steam trap 22 detected by the temperature sensor 23. (S31). Eventually, when it is determined that the malfunction condition is satisfied and the steam trap 22 has malfunctioned three times (S32), the steam trap control unit 21 sends event data indicating that the steam trap 22 malfunctions to the monitoring server 3. Send.
  • the monitoring server 3 When the monitoring server 3 receives the event data indicating that a failure has occurred in the steam trap 22, the monitoring server 3 acquires the history of the event data related to the steam trap 22 from the database server 4. Here, if it is within 10 days (an example of the second threshold) from the recording of the event data indicating that the change of the cleansing agent has been executed (S33), the failure relating to the event data received this time is determined as the third failure. It is determined that the cause of the problem is the air binding phenomenon. At this time, the monitoring server 3 records, in the database server 4, event data indicating that the air binding phenomenon has occurred in the steam trap 22.
  • the monitoring server 3 causes the user terminal 1 to display a message indicating that an air vent should be installed in the steam trap 22. This is because the occurrence of the air binding phenomenon rather than the clogging phenomenon is suspected to be the cause of the recurrence of the defect within a short period of time within 10 days even after the cleaning agent is changed.
  • the user of the user terminal 1 executes the installation of the air vent according to the message (S34), and inputs to the user terminal 1 that the air vent has been installed. After that, the user terminal 1 transmits event data to the effect that the installation of the air vent has been completed to the monitoring server 3.
  • the monitoring server 3 recognizes that an air vent has been installed, and records event data indicating that an air vent has been installed in the steam trap 22 in the database server 4. I do.
  • the monitoring server 3 causes the user terminal 1 to display a message indicating that a cleaning operation should be performed on the steam trap 22, and the user of the user terminal 1 performs the cleaning operation on the steam trap 22 according to the message. Execute (S13), and input to the user terminal 1 that the cleaning operation has been completed.
  • the blockage recurrence prevention operation is executed as a first failure prevention operation to be performed first, and then, when the failure recurs.
  • an air binding prevention operation is performed as a second failure prevention operation to be performed. If the defect recurs shortly after performing the cleaning operation for the first defect, it is necessary to suspect that a clogging phenomenon due to the eluted substance or an air binding phenomenon will occur. In such a plant management method, based on empirical rules, the concept that the clogging phenomenon due to the eluted matter among these phenomena has a higher occurrence probability is adopted.
  • the blocking recurrence preventing operation is regarded as an operation having a higher priority than the air binding preventing operation. Based on this priority, the monitoring server 3 is set in advance so as to select the blockage recurrence prevention operation as the first trouble prevention operation when recognizing a trouble related to recurrence.
  • a root cause (root cause) in the entire plant can be specified and solved. Solving the root cause in the whole plant enables the plant to be quickly and accurately optimized, and thus contributes to an increase in plant operation efficiency and energy saving.
  • the first malfunction preventing operation is to change the cleaning agent which is an example of the blockage recurrence preventing operation to the amine compound
  • the second malfunction preventing operation is to install an air vent which is an example of the air binding preventing operation.
  • the configuration to be performed has been described as an example.
  • the first malfunction prevention operation may be an air binding prevention operation
  • the second malfunction prevention operation may be a blockage recurrence prevention operation.
  • the operation for preventing recurrence of blockage is not limited to changing the cleaning agent to an amine compound, but changing the cleaning agent to phosphate, sodium sulfite, hydrazine, saccharides, etc.
  • the operation of preventing air binding is not limited to installing an air vent. Changing the steam trap to a steam trap with a built-in air vent function, a solution to the cause of air mixing (for example, tightening instructions for flange nuts, (Inspection and repair instructions, etc.).
  • the priority and specific content of the first failure prevention operation and the second failure prevention operation are as follows: The structure of the steam plant to be monitored, operating conditions, past failure history, failure history of similar plants, boiler structure and type And the operating pressure, and the structure, type and operating pressure of the steam trap, etc., can be arbitrarily determined by the user or the administrator.
  • the vapor trap 22 has the cleaning mechanism 225, and by performing a manual operation of rotating the cleaning mechanism 225, the deposit formed on the orifice 222a can be removed without disassembling the vapor trap 22.
  • the possible configuration has been described as an example.
  • the clog elimination operation according to the present invention may be performed by a method that requires disassembly of a steam trap or a method that automatically removes deposits without requiring manual operation (for example, Or a method of installing a steam trap having a mechanism for automatically cleaning the orifice when a temperature drop is detected.
  • the monitoring server 3 recognizes the completion of the cleaning operation, the change of the cleaning agent, and the installation of the air vent by inputting the user to the user terminal 1 is described. explained.
  • completion of each operation of the blockage elimination operation, the blockage recurrence prevention operation, and the air binding prevention operation is determined by a sensor provided in each component of the steam plant. You may comprise so that a management apparatus control part can recognize automatically. Further, a configuration may be adopted in which some operations are recognized by a user's input and other operations are automatically recognized.
  • the present invention may be a program that causes a computer to execute the same functions as those of the above-described embodiment.
  • the present invention can be used, for example, in a plant monitoring system that monitors a steam plant using steam.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

蒸気トラップ制御部が所定の期間中に初めて不具合を検出した場合(S12)は、閉塞現象を解消する動作である閉塞解消動作を実行し(S13)、閉塞解消動作を実行した後再び不具合を検出した時点までの期間が第一閾値以下である場合(S22、S23)は、閉塞再発防止動作およびエアバインディング防止動作のうち優先順位が高い方の動作である第一不具合防止動作を実行し(S24)、第一不具合防止動作を実行した後三たび不具合を検出した時点までの期間が第二閾値以下である場合(S32、S33)は、閉塞再発防止動作およびエアバインディング防止動作のうち第一不具合防止動作として選択されなかった動作である第二不具合防止動作を実行する(S34)。

Description

プラント管理方法、プラント管理装置、および、プラント管理プログラム
 本発明は、プラント管理方法、プラント管理装置、および、プラント管理プログラムに関する。
 近年、石油化学プラントや火力発電プラントなどの大型設備において、リスクを考慮したいわゆるRBI(Risk-Based Inspection)の手法を用いたリスク評価が行われている(なお、RBIに基づく評価手法はAPI(American Petroleum Institute)においてAPI581として標準化されている)。そして、この種のリスク評価手段として、日本国特許第5884000号公報(特許文献1)には、故障発生確率および故障が生じたときの影響度を2軸に設定したリスクマトリクス上に、蒸気プラントにおける各プロセス機器に関する故障発生確率と影響度との組をプロットしたプロット図を作成し、かかるプロット図から対象のプラントのリスク評価を行うことが開示されている。
日本国特許第5884000号公報
 しかし、特許文献1のようなリスク評価手段は、不具合が発生する前において、不具合が発生した場合のリスクを評価することはできるが、実際に発生した不具合に対する適切な対応策を実行することができるものではなかった。すなわち、特許文献1のようなリスク評価手段は、予防保全および予知保全の観点においては有効なものであるが、事後保全が必要な場面においては有効なものとは言えなかった。
 そこで、事後保全が必要な場面において適切な対応策を実行することが可能な、プラント管理方法、プラント管理装置、および、プラント管理プログラムの実現が望まれる。
 本発明に係るプラント管理方法は、蒸気トラップと、前記蒸気トラップの温度を検知する温度センサと、前記温度センサによって検知した前記蒸気トラップの温度に基づいて前記蒸気トラップに不具合が生じたことを検出する蒸気トラップ制御部と、を備える蒸気プラント、を管理するプラント管理方法であって、前記蒸気トラップ制御部が所定の期間中に初めて不具合を検出した場合は、当該不具合を前記蒸気トラップの閉塞現象であると判断するとともに、当該不具合を検出した前記蒸気トラップに対して、前記閉塞現象を解消する動作である閉塞解消動作を実行し、前記閉塞解消動作を実行した後、前記蒸気トラップ制御部が再び不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第一閾値以下である場合は、前記閉塞現象の再発を防止する動作である閉塞再発防止動作およびエアバインディング現象を防止する動作であるエアバインディング防止動作のうち、あらかじめ定められた優先順位が高い方の動作である第一不具合防止動作を実行し、前記第一不具合防止動作を実行した後、前記蒸気トラップ制御部が三たび不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第二閾値以下である場合は、前記閉塞再発防止動作および前記エアバインディング防止動作のうち、前記第一不具合防止動作として選択されなかった動作である第二不具合防止動作を実行することを特徴とする。
 また、本発明に係るプラント管理装置は、蒸気トラップと、前記蒸気トラップの温度を検知する温度センサと、前記温度センサによって検知した前記蒸気トラップの温度に基づいて前記蒸気トラップに不具合が生じたことを検出する蒸気トラップ制御部と、を備える蒸気プラント、の管理に用いるプラント管理装置であって、前記プラント管理装置は、前記プラント管理装置の動作を制御する管理装置制御部と、使用者に対する情報伝達を行う出力装置と、を有し、前記蒸気トラップ制御部が所定の期間中に初めて不具合を検出した場合は、前記管理装置制御部は、当該不具合を前記蒸気トラップの閉塞現象であると判断し、前記出力装置は、当該不具合を検出した前記蒸気トラップに対して前記閉塞現象を解消する動作である閉塞解消動作を実行するべき旨を、使用者に対して出力し、前記管理装置制御部が、前記閉塞解消動作が完了した旨を認識した後、前記蒸気トラップ制御部が再び不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第一閾値以下である場合は、前記出力装置は、前記閉塞現象の再発を防止する動作である閉塞再発防止動作およびエアバインディング現象を防止する動作であるエアバインディング防止動作のうち、あらかじめ定められた優先順位が高い方の動作である第一不具合防止動作を実行するべき旨を、使用者に対して出力し、前記管理装置制御部が、前記第一不具合防止動作が完了した旨を認識した後、前記蒸気トラップ制御部が三たび不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第二閾値以下である場合は、前記出力装置は、前記閉塞再発防止動作および前記エアバインディング防止動作のうち、前記第一不具合防止動作として選択されなかった動作である第二不具合防止動作を実行するべき旨を、使用者に対して出力することを特徴とする。
 また、本発明に係るプラント管理プログラムは、蒸気トラップと、前記蒸気トラップの温度を検知する温度センサと、前記温度センサによって検知した前記蒸気トラップの温度に基づいて前記蒸気トラップに不具合が生じたことを検出する蒸気トラップ制御部と、を備える蒸気プラント、の管理に用いる管理機能をコンピュータに実行させるプラント管理プログラムであって、前記管理機能は、前記蒸気トラップ制御部が所定の期間中に初めて不具合を検出した場合は、当該不具合を前記蒸気トラップの閉塞現象であると判断するとともに、当該不具合を検出した前記蒸気トラップに対して前記閉塞現象を解消する動作である閉塞解消動作を実行するべき旨を、使用者に対して出力する機能と、前記閉塞解消動作が実行された旨を前記コンピュータが認識した後、前記蒸気トラップ制御部が再び不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第一閾値以下である場合は、前記閉塞現象の再発を防止する動作である閉塞再発防止動作およびエアバインディング現象を防止する動作であるエアバインディング防止動作のうち、あらかじめ定められた優先順位が高い方の動作である第一不具合防止動作を実行するべき旨を、使用者に対して出力する機能と、前記第一不具合防止動作が実行された旨を前記コンピュータが認識した後、前記蒸気トラップ制御部が三たび不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第二閾値以下である場合は、前記閉塞再発防止動作および前記エアバインディング防止動作のうち、前記第一不具合防止動作として選択されなかった動作である第二不具合防止動作を実行するべき旨を、使用者に対して出力する機能と、を含むことを特徴とする。
 これらの構成によれば、不具合の発生に際して、当該不具合と前回の不具合との間隔および前回の不具合の際に実行された対応策の内容に応じて適切な対応策を実行することができる。
 以下、本発明の好適な態様について説明する。ただし、以下に記載する好適な態様例によって、本発明の範囲が限定されるわけではない。
 本発明に係るプラント管理方法は、一態様として、前記第一不具合防止動作は前記閉塞再発防止動作であり、前記第二不具合防止動作は前記エアバインディング防止動作であることが好ましい。
 この構成によれば、不具合が再発する原因として、エアバインディング現象の発生よりも、閉塞現象の再発の方が、発生の可能性が高い設備において、より可能性が高い不具合原因に対する対応策を優先的に実行することができる。
 本発明に係るプラント管理方法は、一態様として、前記閉塞解消動作は、前記蒸気トラップが有するオリフィス部に生じた閉塞物を除去する動作を含むことが好ましい。
 この構成によれば、オリフィス部に生じた閉塞物を除去することにより、蒸気トラップの閉塞現象を解消することができる。
 本発明に係るプラント管理方法は、一態様として、前記閉塞解消動作は、前記蒸気トラップの解体を伴わずに実行されることが好ましい。
 この構成によれば、蒸気プラントの停止を伴わずに、または、蒸気プラントの停止期間を最低限の期間に抑制して、閉塞解消動作を実行することができる。
 本発明に係るプラント管理方法は、一態様として、前記閉塞再発防止動作は、前記蒸気プラントを流通する蒸気に添加される清缶剤を変更することを含むが好ましい。
 この構成によれば、配管などの構成要素からの溶出物を原因とする閉塞現象の発生を抑制することができる。
 本発明に係るプラント管理方法は、一態様として、前記閉塞再発防止動作は、前記清缶剤をアミン化合物に変更することを含むことが好ましい。
 この構成によれば、銅系合金から溶出した銅の析出および堆積による閉塞現象の発生を抑制することができる。
 本発明に係るプラント管理方法は、一態様として、前記エアバインディング防止動作は、前記蒸気トラップの上流に、または、前記蒸気トラップと一体に、エアベントを設置することを含むことが好ましい。
 この構成によれば、エアバインディングの発生を有効に抑制することができる。
 本発明のさらなる特徴と利点は、図面を参照して記述する以下の例示的かつ非限定的な実施形態の説明によってより明確になるであろう。
本実施形態に係るプラント監視システムの概略構成図 蒸気トラップの閉止状態の例を示す断面図 蒸気トラップの開放状態の例を示す断面図 本発明に係るプラント管理方法の手順を示すフロー図
 本発明に係るプラント管理方法、プラント管理装置、および、プラント管理プログラムの実施形態について、図面を参照して説明する。以下では、石油化学プラントや火力発電プラントなどの、蒸気を利用する蒸気プラント2を監視するプラント監視システムにおいて、本発明に係るプラント管理装置を用いて、本発明に係るプラント管理方法を実行した例について説明する。
〔設備構成およびシステム構成〕
 本実施形態に係るプラント管理方法において管理対象とする蒸気プラント2は、タービン、コンプレッサ、熱交換器などの蒸気を利用する蒸気利用機器、蒸気利用機器に蒸気を輸送する輸送管、蒸気利用機器から生じたドレンを排出するドレン管などの配管系、および、配管系に設けられる蒸気トラップ22、制御バルブ、ポンプ、フィルタ、セパレータなどのプロセス機器、給水タンク、脱気器、ボイラなどの蒸気供給機器、などの構成要素を有する。これらの構成要素は、各構成要素の構造や要求性能などに応じて選択される鋳鉄、ステンレス鋼、クロムモリブデン鋼、炭素鋼、合金鋼、銅系合金などの材料で形成されている。また、蒸気プラント2のような蒸気システム全体を重要なアセットの1つとして捉えると、本実施形態に係るプラント管理方法、プラント管理装置、および、プラント管理プログラムは、アセットマネジメント手法の1つとして適用可能である。
 また、配管内部におけるスケールや腐食の発生を防止するため、ボイラに供給される水には、清缶剤が添加されており、かかる清缶剤は蒸気に同伴して蒸気プラント2を流通する。清缶剤としては、リン酸塩、亜硫酸ナトリウム、ヒドラジン、アンモニア、アミン化合物などが用いられる。なお、本実施形態においては、清缶剤としてアンモニアが用いられている。
 図1に示すように、本実施形態に係るプラント監視システムでは、監視サーバ3(管理装置制御部の例)が監視対象とする種々の蒸気プラント2からのデータをネットワーク5を介して収集し、収集したデータを外部のデータベースサーバ4に蓄積的に記録する。そして、監視サーバ3は、定期的に、または、ユーザや管理者からの指示に応じて、収集したデータおよびデータベースサーバ4に記録したデータに基づいて分析および判定を行うようになっており、その結果はPCやスマートフォンなどのユーザ端末1(出力装置の例)に表示される。また、分析および判定の結果はデータベースサーバ4に記録して、さらなる分析および判定に供されるようになっている。これらの分析結果は、監視サーバ3が定期的にユーザ端末1に送信する場合と、ユーザや管理者からの指示に応じてユーザ端末1に送信する場合と、がある。
〔蒸気トラップの機能と不具合〕
 ここで、蒸気トラップ22に生じうる不具合を説明するが、まず、その前提となる蒸気トラップ22の機能および基本構造について説明する。蒸気プラントを流通する蒸気は、温度低下により凝縮してドレンを生ずる。かかるドレンは蒸気としての機能を果たさないため蒸気プラント系外へ排出する必要があるが、ドレンに同伴して蒸気が蒸気プラント系外に排出されるとエネルギーの損失となるため、これを防止する必要がある。このような機能を果たすため、蒸気トラップ22は、液体を排出するが気体を排出しないように動作する自動弁として構成されている。
 蒸気トラップ22の具体的な構造の例を図2に示す。なお、本実施形態では、蒸気トラップ22としてフロート式蒸気トラップを採用している。蒸気トラップ22は、弁体としてフロート221を有する。フロート221は、通常時は弁座222に着座しており、弁座222の中央部に設けられたオリフィス222a(オリフィス部の例)を塞いでいる。
なお、オリフィス222aは、配管系や蒸気トラップ22などの蒸気が流通する各構成要素の呼び径よりも小さい開口径を有するため、蒸気トラップ22の他の箇所に比べて閉塞しやすい。また、後述するクリーニング動作に用いるクリーニング機構225が、オリフィス222aの出口224側に設けられている。
 ここで、蒸気トラップ22に入口223からドレンが流入すると、やがてフロート221が浮力により浮上する(図3)。このとき、フロート221がオリフィス222aから離れるため、オリフィス222aが開放され、ドレンが出口224側へ流通し蒸気プラント系外に排出される。ドレンの排出に伴い蒸気トラップ22の内部のドレンの液位が下がると、フロート221が低下して弁座222に着座し、やがてオリフィス222aが閉止される。
 ここで、蒸気トラップ22に生ずる不具合とは上記の機能が果たされない状態になることを言い、具体的には、ドレンが排出されない状態になることを言う。かかる不具合の根本原因(ルートコーズ)としては、閉塞現象およびエアバインディング現象が挙げられる。それぞれの現象の詳細は後述するが、いずれの現象が生じた場合も、蒸気トラップ22に新たな蒸気が流入することができないため蒸気トラップ22の温度が低下する。したがって、蒸気トラップ22の温度を継続的に監視することで、蒸気トラップ22に不具合が生じたことを、蒸気トラップ22の温度の低下として検出することができる。ただし、閉塞現象およびエアバインディング現象のうち、いずれの現象が生じたのかは、温度の監視からは判断することができない。
 まず、閉塞現象について説明する。蒸気プラントを流通する蒸気は、不純物、異物、ならびに、配管などの構成要素からの脱落物および溶出物、などの物質を同伴する場合がある。このような物質は、配管系の末端部に配置される蒸気トラップ22において堆積および析出しやすい。このとき、オリフィス222aの開口部が堆積および析出による閉塞物で完全に塞がれると、フロート221が上昇してもドレンが流通できない状態になる。これが、蒸気トラップ22の閉塞現象である。
 かかる閉塞現象を解消するためには、オリフィス222aに形成した閉塞物を除去するクリーニング動作(閉塞解消動作の例)が、第一に実行するべき動作である。本実施形態に係るプラント管理方法において管理対象とする蒸気プラント2では、蒸気トラップ22を配管系から取り外したり、蒸気トラップ22を解体したりすることなく、オリフィス222aに形成した堆積物を除去することができるクリーニング機構225が、蒸気トラップ22に設けられている。クリーニング機構225は、オリフィス222aに対向する先端部が尖った形状に形成された棒状の部材であり、蒸気トラップ22の本体に螺合する態様で固定されている。クリーニング機構225を、その軸心まわりに、蒸気トラップ22の外側から見て時計回りの方向に回転させると、クリーニング機構225が蒸気トラップ22の内部方向に前進し、やがて先端部がオリフィス222aに達する。このとき、当該先端部がオリフィス222aに形成した堆積物を貫通し、当該堆積物を除去することができる。
 上記に列挙した堆積物の諸原因のうち、不純物、異物、脱落物を原因とする閉塞は、再発性が低い。この場合、クリーニング動作を実行して閉塞を解消すると、当分の間は蒸気トラップ22が正常に動作する場合が多い。しかし、上記に列挙した堆積物の諸原因のうち、配管などの構成要素からの溶出物が原因である場合は、クリーニング動作を実行して閉塞を解消したとしても、溶出物が生じる原因を取り除いたわけではないので、再び堆積物が生じ、すぐに閉塞が再発する可能性が高い。特に、構成要素に銅系合金が使用される場合は、使用される清缶剤や蒸気のpHなどの諸条件によっては、溶出物が生じやすい場合があることが知られている。
 そのため、溶出物を原因とする閉塞の発生が疑われる場合には、クリーニング動作を行うだけでなく、併せて、溶出物が生じにくい環境に改善することが望まれる。溶出物の発生による閉塞現象の再発を防止する方法としては、構成要素に使用される材料の変更、清缶剤の変更、などが挙げられる(いずれも閉塞再発防止動作の例)。特に、清缶剤の変更は、簡便に行うことができるため、閉塞再発防止動作として好ましい。具体的には、銅系合金から溶出した銅がオリフィス部に析出および堆積していることが疑われる場合は、清缶剤をたとえばアンモニアからアミン化合物に変更すること(閉塞再発防止動作の例)などが有効である。
 次に、エアバインディング現象について説明する。前述の通り、蒸気トラップ22は、液体を排出するが気体を排出しないように動作する自動弁である。蒸気トラップ22に蒸気が流入した場合、この蒸気は温度低下により凝縮してドレンとなるため、やがて排出される。一方、何らかの理由で蒸気プラント2に空気(不凝縮ガス)が流入し、この空気が蒸気トラップ22に流入した場合、蒸気トラップ22が使用される一般的な温度環境において空気は凝縮しないため、当該空気は蒸気トラップ22から排出されることなく、蒸気トラップ22内にとどまり続ける。また、かかる空気が存在することで、新たな蒸気が蒸気トラップ22に流入できないため、蒸気トラップ22内のドレンの量が増えず、蒸気トラップ22が開放状態となる条件が満たされることがない。以上の機構により、蒸気トラップ22が閉止した状態で動作しなくなる現象を、エアバインディング現象という。
 かかるエアバインディング現象を防止するためには、蒸気プラントまたは蒸気トラップ22に流入した空気を排出する必要がある。具体的な方法として、蒸気トラップ22の上流に、または、蒸気トラップ22と一体に、エアベントを設置すること(エアバインディング防止動作の例)が挙げられる。
〔プラント管理方法〕
 続いて、本実施形態に係るプラント管理方法の具体的な手順を説明する(図4)。まず、監視サーバ3に収集されるデータの一例について説明すると、蒸気トラップ制御部21が、蒸気プラント2に設置された各蒸気トラップ22から、各蒸気トラップ22に備え付けた温度センサ23により得た温度データや、各蒸気トラップ22に生じたイベントに関するイベントデータなどを収集し、収集したデータを定期的にまたは連続的に監視サーバ3側に送信するようになっている。
(1)初回の不具合
 蒸気トラップ制御部21は、温度センサ23により検知される蒸気トラップ22の温度を継続的に監視する(S11)。ここで、ある特定の蒸気トラップ22の温度が、直前の一定期間(たとえば、30分周期で測定した直近3回)の平均値に対して50℃以上低下する、当該平均値に対して50℃以上低下する状態が1時間以上継続する、当該平均値に対して50℃以上低下する状態を12時間以内に10回以上検知する、の少なくともいずれか1つの条件(以下、「不具合条件」とする。)が満たされた場合は、蒸気トラップ制御部21は、当該蒸気トラップ22に不具合が生じていると判断する(S12)。そして、蒸気トラップ制御部21は、当該蒸気トラップ22に不具合が生じた旨のイベントデータを監視サーバ3に送信する。
 監視サーバ3は、蒸気トラップ22に不具合が生じた旨のイベントデータを受信すると、当該蒸気トラップ22に関するイベントデータの履歴をデータベースサーバ4から取得する。ここで、当該蒸気トラップ22についての前回の不具合発生から、30日(所定の期間の例)以上が経過しているときは、今回受信したイベントデータに係る不具合を当該期間内における初回の不具合であると認識し、当該不具合の原因を蒸気トラップ22の閉塞であると判断する。また、このとき、監視サーバ3は、当該蒸気トラップ22に閉塞が生じた旨のイベントデータをデータベースサーバ4に記録する。
 そこで、監視サーバ3は、当該蒸気トラップ22に対してクリーニング動作を実行するべき旨のメッセージを、ユーザ端末1に表示させる。蒸気トラップ22において最も典型的な不具合は閉塞現象であり、閉塞物を取り除くことでこれが解消するからである。当該ユーザ端末1のユーザは、メッセージに従って当該蒸気トラップ22のクリーニング動作を実行し(S13)、クリーニング動作が完了した旨をユーザ端末1に入力する。その後、ユーザ端末1は、クリーニング動作が完了した旨のイベントデータを監視サーバ3に送信する。監視サーバ3は、ユーザ端末1から送信された当該イベントデータを受信することによって、クリーニング動作を実行した旨を認識するとともに、当該蒸気トラップ22のクリーニング動作を実行した旨のイベントデータをデータベースサーバ4に記録する。
(2)再発に係る不具合
 初回の不具合を解消した後、蒸気トラップ制御部21は、引き続き温度センサ23により検知される蒸気トラップ22の温度を継続的に監視する(S21)。やがて、不具合条件が満たされ、再び蒸気トラップ22に不具合が生じたと判断したとき(S22)、蒸気トラップ制御部21は、当該蒸気トラップ22に不具合が生じた旨のイベントデータを監視サーバ3に送信する。
 監視サーバ3は、蒸気トラップ22に不具合が生じた旨のイベントデータを受信すると、当該蒸気トラップ22に関するイベントデータの履歴をデータベースサーバ4から取得する。ここで、当該蒸気トラップ22についてのクリーニング動作を実行した旨のイベントデータの記録から、20日(第一閾値の例)以内であるときは(S23)、今回受信したイベントデータに係る不具合を再発に係る不具合と認識し、当該不具合の原因を蒸気トラップ22の閉塞の再発であると判断する。また、このとき、監視サーバ3は、当該蒸気トラップ22に閉塞の再発が生じた旨のイベントデータをデータベースサーバ4に記録する。
 そこで、監視サーバ3は、当該蒸気トラップ22に対してクリーニング動作を実行するべき旨のメッセージ、および、清缶剤をアミン化合物に変更するべき旨のメッセージ、をユーザ端末1に表示させる。クリーニング動作の実行から20日以内という短期間に不具合が再発したことの原因として、銅系合金から溶出した銅がオリフィス部に析出および堆積していることが疑われるので、清缶剤をアンモニアからアミン化合物に変更することでこれを解消するためである。当該ユーザ端末1のユーザは、メッセージに従って当該蒸気トラップ22のクリーニング動作を実行し、さらに、清缶剤をアミン化合物に変更する(S24)。以上の動作が完了すると、ユーザは、クリーニング動作および清缶剤の変更が完了した旨をユーザ端末1に入力する。その後、ユーザ端末1は、クリーニング動作および清缶剤の変更が完了した旨のイベントデータを監視サーバ3に送信する。監視サーバ3は、ユーザ端末1から送信された当該イベントデータを受信することによって、クリーニング動作および清缶剤の変更を実行した旨を認識するとともに、当該蒸気トラップ22のクリーニング動作および清缶剤の変更を実行した旨のイベントデータをデータベースサーバ4に記録する。
 なお、再発に係る不具合が前回の不具合から20日を超えて発生したときは、初回の不具合と同様の対処を行う。すなわち、監視サーバ3は、当該蒸気トラップ22に対してクリーニング動作を実行するべき旨のメッセージを、ユーザ端末1に表示させ、当該ユーザ端末1のユーザは、メッセージに従って当該蒸気トラップ22のクリーニング動作を実行し(S13)、クリーニング動作が完了した旨をユーザ端末1に入力する。
(3)三度目の不具合
 再発に係る不具合を解消し、さらに清缶剤を変更した後、蒸気トラップ制御部21は、引き続き温度センサ23により検知される蒸気トラップ22の温度を継続的に監視する(S31)。やがて、不具合条件が満たされ、三たび蒸気トラップ22に不具合が生じたと判断したとき(S32)、蒸気トラップ制御部21は、当該蒸気トラップ22に不具合が生じた旨のイベントデータを監視サーバ3に送信する。
 監視サーバ3は、蒸気トラップ22に不具合が生じた旨のイベントデータを受信すると、当該蒸気トラップ22に関するイベントデータの履歴をデータベースサーバ4から取得する。ここで、清缶剤の変更を実行した旨のイベントデータの記録から、10日(第二閾値の例)以内であるとき(S33)は、今回受信したイベントデータに係る不具合を三度目の不具合と認識し、当該不具合の原因をエアバインディング現象であると判断する。また、このとき、監視サーバ3は、当該蒸気トラップ22にエアバインディング現象が生じた旨のイベントデータをデータベースサーバ4に記録する。
 そこで、監視サーバ3は、当該蒸気トラップ22に対してエアベントを設置するべき旨のメッセージをユーザ端末1に表示させる。清缶剤を変更してもなお、10日以内という短期間に不具合が再発したことの原因として、閉塞現象ではなく、エアバインディング現象の発生が疑われるからである。当該ユーザ端末1のユーザは、メッセージに従ってエアベントの設置を実行し(S34)、エアベントを設置した旨をユーザ端末1に入力する。
その後、ユーザ端末1は、エアベントの設置が完了した旨のイベントデータを監視サーバ3に送信する。監視サーバ3は、ユーザ端末1から送信された当該イベントデータを受信することによって、エアベントを設置した旨を認識するとともに、当該蒸気トラップ22にエアベントを設置した旨のイベントデータをデータベースサーバ4に記録する。
 なお、三度目の不具合が前回の不具合から10日を超えて発生したときは、初回の不具合と同様の対処を行う。すなわち、監視サーバ3は、当該蒸気トラップ22に対してクリーニング動作を実行するべき旨のメッセージを、ユーザ端末1に表示させ、当該ユーザ端末1のユーザは、メッセージに従って当該蒸気トラップ22のクリーニング動作を実行し(S13)、クリーニング動作が完了した旨をユーザ端末1に入力する。
 本実施形態に係るプラント管理方法においては、蒸気トラップ22に不具合が再発した場合において、第一に実行すべき第一不具合防止動作として閉塞再発防止動作を実行し、その後さらに不具合が再発した場合に、第二に実行すべき第二不具合防止動作としてエアバインディング防止動作を実行する、という手順を採用している。一度目の不具合に対してクリーニング動作を実行したにもかかわらず、その後間もなく不具合が再発した場合は、溶出物による閉塞現象、または、エアバインディング現象の発生を疑うべきであるが、本実施形態に係るプラント管理方法においては、経験則により、これらの現象のうち溶出物による閉塞現象の方が発生確率が高いという考え方を採用する。そして、この考え方に基づき、閉塞再発防止動作をエアバインディング防止動作より優先順位の高い動作であるとみなしている。なお、この優先順位に基づき、監視サーバ3は、再発に係る不具合を認識したときに、第一不具合防止動作として閉塞再発防止動作を選択するように、あらかじめ設定されている。
 また、本実施形態に係るプラント管理方法においては、蒸気トラップ22の不具合に基づいて、蒸気トラップ22以外の不具合についての防止動作を実行する。これにより、蒸気トラップ22の監視状態に基づいて、プラント全体における根本原因(ルートコーズ)を特定し解決することができる。プラント全体における根本原因を解決することにより、プラントを迅速かつ的確に最適化することができ、ひいてはプラントの稼働効率を高め省エネルギー化にも貢献することができる。
〔その他の実施形態〕
 次に、本実施形態に係るプラント管理方法のその他の実施形態について説明する。なお、以下のそれぞれの実施形態で開示される構成は、矛盾が生じない限り、他の実施形態で開示される構成と組み合わせて適用することも可能である。
 上記の実施形態では、第一不具合防止動作が閉塞再発防止動作の一例である清缶剤をアミン化合物に変更することであり、第二不具合防止動作がエアバインディング防止動作の一例であるエアベントを設置することである構成を例として説明した。しかし、そのような構成に限定されることなく、第一不具合防止動作がエアバインディング防止動作であり、第二不具合防止動作が閉塞再発防止動作であるように構成してもよい。また、閉塞再発防止動作は清缶剤をアミン化合物に変更することに限定されず、清缶剤をリン酸塩、亜硫酸ナトリウム、ヒドラジン、糖類などに変更することや、銅系合金製部材を他の材料製の部材に交換すること、蒸気トラップの上流側にストレーナーを設置すること、などであってもよい。同様に、エアバインディング防止動作もエアベントを設置することに限定されず、蒸気トラップをエアベント機能内蔵の蒸気トラップに変更すること、エア混入原因の解決策(たとえば、フランジナットの締付け指示や配管穴あきの点検および補修指示など)を提示すること、などであってもよい。第一不具合防止動作および第二不具合防止動作の優先順位および具体的な内容は、監視対象とする蒸気プラントの構造、運転条件、過去の不具合履歴、類似するプラントの不具合履歴、ボイラの構造、種類および使用圧力、ならびに、蒸気トラップの構造、種類および使用圧力、などに基づいて、ユーザや管理者が任意に定めることができる。
 上記の実施形態では、蒸気トラップ22がクリーニング機構225を有し、これを回転させる手動操作を行うことで、蒸気トラップ22の分解を要さずにオリフィス222aに形成した堆積物を除去することができる構成を例として説明した。しかし、そのような構成に限定されることなく、本発明に係る閉塞解消動作は、蒸気トラップの分解を要する方法や、人為操作を要さずに自動的に堆積物が除去される方法(たとえば、温度低下を検知するとオリフィスを自動的にクリーニングする機構を有する蒸気トラップを設置する方法)であってもよい。
 上記の実施形態では、クリーニング動作、清缶剤の変更、および、エアベントの設置、の各動作が完了したことを、ユーザがユーザ端末1に入力することで監視サーバ3が認識する構成を例として説明した。しかし、そのような構成に限定されることなく、閉塞解消動作、閉塞再発防止動作、および、エアバインディング防止動作、の各動作が完了したことは、蒸気プラントの各構成要素に設けられたセンサによって管理装置制御部が自動的に認識できるように構成してもよい。また、一部の動作を使用者の入力により認識し、その他の動作を自動的に認識するように構成してもよい。
 上記の実施形態では、本発明に係るプラント管理装置を用いて、本発明に係るプラント管理方法を実行した場合を例として説明した。しかし、本発明は、上記の実施形態と同様の機能をコンピュータに実行させるプログラムであってもよい。
 その他の構成に関しても、本明細書において開示された実施形態は全ての点で例示であって、本発明の範囲はそれらによって限定されることはないと理解されるべきである。当業者であれば、本発明の趣旨を逸脱しない範囲で、適宜改変が可能であることを容易に理解できるであろう。したがって、本発明の趣旨を逸脱しない範囲で改変された別の実施形態も、当然、本発明の範囲に含まれる。
 本発明は、たとえば、蒸気を利用する蒸気プラントを監視するプラント監視システムに利用することができる。
 1    :ユーザ端末
 2    :蒸気プラント
 21   :蒸気トラップ制御部
 22   :蒸気トラップ
 221  :フロート
 222  :弁座
 222a :オリフィス
 223  :入口
 224  :出口
 225  :クリーニング機構
 23   :温度センサ
 3    :監視サーバ
 4    :データベースサーバ
 5    :ネットワーク

Claims (9)

  1.  蒸気トラップと、
     前記蒸気トラップの温度を検知する温度センサと、
     前記温度センサによって検知した前記蒸気トラップの温度に基づいて前記蒸気トラップに不具合が生じたことを検出する蒸気トラップ制御部と、を備える蒸気プラント、を管理するプラント管理方法であって、
     前記蒸気トラップ制御部が所定の期間中に初めて不具合を検出した場合は、当該不具合を前記蒸気トラップの閉塞現象であると判断するとともに、当該不具合を検出した前記蒸気トラップに対して、前記閉塞現象を解消する動作である閉塞解消動作を実行し、
     前記閉塞解消動作を実行した後、前記蒸気トラップ制御部が再び不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第一閾値以下である場合は、前記閉塞現象の再発を防止する動作である閉塞再発防止動作およびエアバインディング現象を防止する動作であるエアバインディング防止動作のうち、あらかじめ定められた優先順位が高い方の動作である第一不具合防止動作を実行し、
     前記第一不具合防止動作を実行した後、前記蒸気トラップ制御部が三たび不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第二閾値以下である場合は、前記閉塞再発防止動作および前記エアバインディング防止動作のうち、前記第一不具合防止動作として選択されなかった動作である第二不具合防止動作を実行するプラント管理方法。
  2.  前記第一不具合防止動作は前記閉塞再発防止動作であり、前記第二不具合防止動作は前記エアバインディング防止動作である請求項1に記載のプラント管理方法。
  3.  前記閉塞解消動作は、前記蒸気トラップが有するオリフィス部に生じた閉塞物を除去する動作を含む請求項1または2に記載のプラント管理方法。
  4.  前記閉塞解消動作は、前記蒸気トラップの解体を伴わずに実行される請求項1~3のいずれか1項に記載のプラント管理方法。
  5.  前記閉塞再発防止動作は、前記蒸気プラントを流通する蒸気に添加される清缶剤を変更することを含む請求項1~4のいずれか1項に記載のプラント管理方法。
  6.  前記閉塞再発防止動作は、前記清缶剤をアミン化合物に変更することを含む請求項5に記載のプラント管理方法。
  7.  前記エアバインディング防止動作は、前記蒸気トラップの上流に、または、前記蒸気トラップと一体に、エアベントを設置することを含む請求項1~6のいずれか1項に記載のプラント管理方法。
  8.  蒸気トラップと、
     前記蒸気トラップの温度を検知する温度センサと、
     前記温度センサによって検知した前記蒸気トラップの温度に基づいて前記蒸気トラップに不具合が生じたことを検出する蒸気トラップ制御部と、を備える蒸気プラント、の管理に用いるプラント管理装置であって、
     前記プラント管理装置は、前記プラント管理装置の動作を制御する管理装置制御部と、使用者に対する情報伝達を行う出力装置と、を有し、
     前記蒸気トラップ制御部が所定の期間中に初めて不具合を検出した場合は、前記管理装置制御部は、当該不具合を前記蒸気トラップの閉塞現象であると判断し、前記出力装置は、当該不具合を検出した前記蒸気トラップに対して前記閉塞現象を解消する動作である閉塞解消動作を実行するべき旨を、使用者に対して出力し、
     前記管理装置制御部が、前記閉塞解消動作が完了した旨を認識した後、前記蒸気トラップ制御部が再び不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第一閾値以下である場合は、前記出力装置は、前記閉塞現象の再発を防止する動作である閉塞再発防止動作およびエアバインディング現象を防止する動作であるエアバインディング防止動作のうち、あらかじめ定められた優先順位が高い方の動作である第一不具合防止動作を実行するべき旨を、使用者に対して出力し、
     前記管理装置制御部が、前記第一不具合防止動作が完了した旨を認識した後、前記蒸気トラップ制御部が三たび不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第二閾値以下である場合は、前記出力装置は、前記閉塞再発防止動作および前記エアバインディング防止動作のうち、前記第一不具合防止動作として選択されなかった動作である第二不具合防止動作を実行するべき旨を、使用者に対して出力するプラント管理装置。
  9.  蒸気トラップと、
     前記蒸気トラップの温度を検知する温度センサと、
     前記温度センサによって検知した前記蒸気トラップの温度に基づいて前記蒸気トラップに不具合が生じたことを検出する蒸気トラップ制御部と、を備える蒸気プラント、の管理に用いる管理機能をコンピュータに実行させるプラント管理プログラムであって、
     前記管理機能は、
     前記蒸気トラップ制御部が所定の期間中に初めて不具合を検出した場合は、当該不具合を前記蒸気トラップの閉塞現象であると判断するとともに、当該不具合を検出した前記蒸気トラップに対して前記閉塞現象を解消する動作である閉塞解消動作を実行するべき旨を、使用者に対して出力する機能と、
     前記閉塞解消動作が実行された旨を前記コンピュータが認識した後、前記蒸気トラップ制御部が再び不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第一閾値以下である場合は、前記閉塞現象の再発を防止する動作である閉塞再発防止動作およびエアバインディング現象を防止する動作であるエアバインディング防止動作のうち、あらかじめ定められた優先順位が高い方の動作である第一不具合防止動作を実行するべき旨を、使用者に対して出力する機能と、
     前記第一不具合防止動作が実行された旨を前記コンピュータが認識した後、前記蒸気トラップ制御部が三たび不具合を検出した時点までの期間が、あらかじめ定められた所定の閾値である第二閾値以下である場合は、前記閉塞再発防止動作および前記エアバインディング防止動作のうち、前記第一不具合防止動作として選択されなかった動作である第二不具合防止動作を実行するべき旨を、使用者に対して出力する機能と、を含むプラント管理プログラム。
PCT/JP2019/016791 2018-07-27 2019-04-19 プラント管理方法、プラント管理装置、および、プラント管理プログラム WO2020021794A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019545374A JP6664559B1 (ja) 2018-07-27 2019-04-19 プラント管理方法、プラント管理装置、および、プラント管理プログラム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018141472 2018-07-27
JP2018-141472 2018-07-27

Publications (1)

Publication Number Publication Date
WO2020021794A1 true WO2020021794A1 (ja) 2020-01-30

Family

ID=69182025

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/016791 WO2020021794A1 (ja) 2018-07-27 2019-04-19 プラント管理方法、プラント管理装置、および、プラント管理プログラム

Country Status (2)

Country Link
JP (1) JP6664559B1 (ja)
WO (1) WO2020021794A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021095975A (ja) * 2019-12-19 2021-06-24 株式会社テイエルブイ クリーニング機構を有するバルブ

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0893995A (ja) * 1994-09-20 1996-04-12 Toshiba Corp 蒸気系配管用ドレントラップの監視装置
JP2005299867A (ja) * 2004-04-15 2005-10-27 Tlv Co Ltd 蒸気トラップ
JP2010065832A (ja) * 2008-09-12 2010-03-25 Tlv Co Ltd フロート式スチームトラップ
WO2017051620A1 (ja) * 2015-09-24 2017-03-30 株式会社テイエルブイ 保守支援装置、及び、保守支援方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0893995A (ja) * 1994-09-20 1996-04-12 Toshiba Corp 蒸気系配管用ドレントラップの監視装置
JP2005299867A (ja) * 2004-04-15 2005-10-27 Tlv Co Ltd 蒸気トラップ
JP2010065832A (ja) * 2008-09-12 2010-03-25 Tlv Co Ltd フロート式スチームトラップ
WO2017051620A1 (ja) * 2015-09-24 2017-03-30 株式会社テイエルブイ 保守支援装置、及び、保守支援方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021095975A (ja) * 2019-12-19 2021-06-24 株式会社テイエルブイ クリーニング機構を有するバルブ
JP7495711B2 (ja) 2019-12-19 2024-06-05 株式会社テイエルブイ クリーニング機構を有するバルブ

Also Published As

Publication number Publication date
JPWO2020021794A1 (ja) 2020-08-06
JP6664559B1 (ja) 2020-03-13

Similar Documents

Publication Publication Date Title
US8407027B2 (en) Online diagnostic method and online diagnostic system for geothermal generation facility
JP5301573B2 (ja) 復水回収システムとその蒸気損失の監視方法
US20100102835A1 (en) Method and system for detecting a corrosive deposit in a compressor
JP2015532397A (ja) 診断器具を備えた蒸気トラップ監視装置及び蒸気トラップの動作監視方法
JP6664559B1 (ja) プラント管理方法、プラント管理装置、および、プラント管理プログラム
KR102377203B1 (ko) 증기 사용 설비의 감시 시스템, 감시 방법 및 감시 프로그램
CN111167771B (zh) 一种用于阻火器的在线密闭清洗及检测的系统及工艺方法
CN110821849B (zh) 一种消防泵汽蚀监控方法
CN104785001A (zh) 一种液体过滤装置
WO2015178487A1 (ja) 蒸気使用設備の監視システム
CN114001346B (zh) 一种锅炉排污检测系统及其检测方法
JP2016205781A (ja) 水処理管理装置及び水処理管理方法
JP2008039224A (ja) 定圧貫流ボイラ構成とその運用方法
US9334758B2 (en) Steam turbine moisture removal system
JP5818337B1 (ja) 蒸気使用設備の監視システム
KR102615625B1 (ko) 상수도관의 스마트 이물질 제거시스템
CN218982573U (zh) 一种吹气仪表管管口的疏通装置
Ifezue Root cause failure analysis of corrosion in wet gas piping
JPH06331104A (ja) 蒸気ドレン排出装置
CN118001791A (zh) 一种污油沉降罐以及泄漏量监测方法
Kutbi et al. Operational data analysis of MSF desalination plants. A case study of Jeddah I
Watson et al. Cleaning Turbomachinery Without Disassembly, Online And Offline.
CN118274311A (zh) 余热锅炉省煤器防汽堵系统及方法
Wafula et al. Steam purity challenges in geothermal power plants: a case of Olkaria IAU power plant
JP2022024587A (ja) ストレーナ洗浄システム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2019545374

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19839903

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19839903

Country of ref document: EP

Kind code of ref document: A1