WO2019218236A1 - Method for construction of suspended ceiling system - Google Patents

Method for construction of suspended ceiling system Download PDF

Info

Publication number
WO2019218236A1
WO2019218236A1 PCT/CN2018/087005 CN2018087005W WO2019218236A1 WO 2019218236 A1 WO2019218236 A1 WO 2019218236A1 CN 2018087005 W CN2018087005 W CN 2018087005W WO 2019218236 A1 WO2019218236 A1 WO 2019218236A1
Authority
WO
WIPO (PCT)
Prior art keywords
ceiling
dragon skeleton
groove
panel
water pipe
Prior art date
Application number
PCT/CN2018/087005
Other languages
French (fr)
Chinese (zh)
Inventor
杨泓斌
李缙
陈祥祥
颜旺龙
刘博�
Original Assignee
增城市碧桂园物业发展有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 增城市碧桂园物业发展有限公司 filed Critical 增城市碧桂园物业发展有限公司
Priority to CN201880000559.0A priority Critical patent/CN112154241A/en
Priority to PCT/CN2018/087005 priority patent/WO2019218236A1/en
Publication of WO2019218236A1 publication Critical patent/WO2019218236A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L27/00Compositions of homopolymers or copolymers of compounds having one or more unsaturated aliphatic radicals, each having only one carbon-to-carbon double bond, and at least one being terminated by a halogen; Compositions of derivatives of such polymers
    • C08L27/02Compositions of homopolymers or copolymers of compounds having one or more unsaturated aliphatic radicals, each having only one carbon-to-carbon double bond, and at least one being terminated by a halogen; Compositions of derivatives of such polymers not modified by chemical after-treatment
    • C08L27/04Compositions of homopolymers or copolymers of compounds having one or more unsaturated aliphatic radicals, each having only one carbon-to-carbon double bond, and at least one being terminated by a halogen; Compositions of derivatives of such polymers not modified by chemical after-treatment containing chlorine atoms
    • C08L27/06Homopolymers or copolymers of vinyl chloride
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs

Abstract

The present invention is applicable to the technical field of building construction. Provided is a method for construction of a suspended ceiling system, comprising: installing a water pipe holding member at a wall within a suspended ceiling; and installing a cable routing member at a bottom portion of a first sub-frame. The suspended ceiling system solves problems in the prior art caused by embedding water pipes and electrical cables in the main structure of a building, and realizes separation of a supporting member from an installed component, thereby reducing difficulty and costs relating to inspection and repair of water pipes and high-voltage cables. In the present invention, an electrical cable and a water pipe can be revealed after a suspended ceiling base panel has been removed, and so only one operation is required before conducting inspection and repair of water pipes and electrical cables, thereby increasing inspection and repair efficiency.

Description

一种天花吊顶系统的施工方法Construction method of ceiling ceiling system
本发明属于建筑技术领域,尤其涉及一种天花吊顶系统的施工方法。The invention belongs to the technical field of construction, and in particular relates to a construction method of a ceiling system.
推动建筑产业现代化最重要的是要促进建设发展方式的转变,必须要摆脱传统建造的模式,寻求一种建筑产业现代化为目标的发展路径。The most important thing to promote the modernization of the construction industry is to promote the transformation of the construction mode. It is necessary to get rid of the traditional construction model and seek a development path aiming at the modernization of the construction industry.
目前,国内水电施工多采用预埋方式,设备管线,如弱电电线与强电电线多预埋于主体结构墙板和楼板中,然而设备及管线使用年限一般在10-20年左右,在房屋使用年限内需要多次更换,导致多次破坏主体结构,降低房屋使用寿命。另外,在进行内装修改时,也需要破坏主体结构,重新铺设管线,降低了房屋耐久性。At present, domestic hydropower construction mostly adopts the pre-buried method. Equipment pipelines, such as weak electric wires and strong electric wires, are pre-buried in the main structural wall panels and floors. However, the service life of equipment and pipelines is generally around 10-20 years, and it is used in houses. Multiple replacements are required within the period, resulting in multiple damage to the main structure and reducing the service life of the house. In addition, when the interior modification is carried out, it is also necessary to destroy the main structure and re-lay the pipeline to reduce the durability of the house.
可见,传统水电预埋方法,维修时需要破坏主体结构,且维修难度较大,成本高,维修效率较低;同时,维修时产生大量建筑垃圾及噪音污染,会对楼下用户影响较大。由于主体结构受到损害,不利于后期内装修改,改修成本及耗时较长,此外,由于管线采用预埋方式,管线与主体结构形成一体,管线与结构主体不便分离,不利于后期户型修改,难以满足居住者多样化及灵活化的需求。It can be seen that the traditional hydropower pre-buried method needs to destroy the main structure during maintenance, and the maintenance is difficult, the cost is high, and the maintenance efficiency is low. At the same time, a large amount of construction waste and noise pollution are generated during maintenance, which will greatly affect the downstairs users. Because the main structure is damaged, it is not conducive to the modification of the internal decoration, the cost of repairing and the time-consuming is long. In addition, because the pipeline adopts the pre-buried mode, the pipeline and the main structure are integrated, and the pipeline and the structure main body are inconvenient to be separated, which is not conducive to the modification of the later household type. Meet the needs of residents' diverse and flexible.
天花吊顶在现在家装中,根据装修位置来区分,可以分为厨卫吊顶,客厅卧室吊顶,走廊吊顶等类型,按材质来分可以分为石膏天花吊顶,塑钢天花吊顶,玻璃天花吊顶,金属天花吊顶等。天花吊顶的功用从最开始的遮丑,发展到现今的美观、隔音等众多功能,如今天的花吊顶线条简洁流畅,造型美观,色泽优雅,并且有古铜、黄金、红、蓝、奶白等颜色;规格恰好与住宅的宽度相吻合,与大理石、铝合金门窗等材料连接浑然一体,高雅华丽,为适静的居室环境锦上添花。然而,现有的天花吊顶并没有排布水管及布线功能。同时,也没有相关的工艺及方法。Ceiling ceiling in the current home decoration, according to the decoration location to distinguish, can be divided into kitchen and bathroom ceiling, living room bedroom ceiling, corridor ceiling and other types, according to the material can be divided into gypsum ceiling, plastic ceiling, glass ceiling, metal ceiling Ceiling and so on. The function of the ceiling is from the beginning of the ugly development to the current beauty, sound insulation and many other functions, such as today's flower ceiling line is simple and smooth, beautiful in appearance, elegant in color, and has bronze, gold, red, blue, milk white, etc. Color; the specification is exactly the same as the width of the house, and it is seamlessly connected with marble, aluminum alloy doors and windows, etc. It is elegant and gorgeous, and it is a perfect addition to the quiet living room environment. However, the existing ceilings do not have water pipes and wiring functions. At the same time, there are no related processes and methods.
发明内容Summary of the invention
本发明所要解决的技术问题为提供一种天花吊顶系统的施工方法,旨在解决现有技术中将水管、电线埋在房屋的主体结构中,从而在维修管线时会损害主体结构的问题。The technical problem to be solved by the present invention is to provide a construction method for a ceiling system, which aims to solve the problem that the water pipe and the electric wire are buried in the main structure of the house in the prior art, thereby damaging the main structure when the pipeline is repaired.
为解决上述技术问题,本发明是这样实现的,一种天花吊顶系统的施工方法,包括:In order to solve the above technical problems, the present invention is achieved in this way, a construction method of a ceiling system, comprising:
S10、制备龙骨架、吊顶底板及吊顶侧板,其中,所述龙骨架包括第一子龙骨架及龙骨架横杆,所述第一子龙骨架在竖直方向的截面为L型,所述吊顶侧板的底端设有向上弯折的弯钩状卡件,所述吊顶底板远离墙板的一端设有向下弯折的弯钩状卡件;S10, preparing a dragon skeleton, a ceiling bottom plate, and a ceiling side panel, wherein the dragon skeleton includes a first sub-dragon skeleton and a dragon skeleton crossbar, and the first sub-dragon skeleton has an L-shaped cross section in a vertical direction, The bottom end of the ceiling side panel is provided with an upwardly bent hook-shaped card member, and the end of the ceiling bottom plate away from the wall panel is provided with a downwardly bent hook-shaped card member;
S11、制备布线件,于所述布线件上开设或形成贯穿其长度方向的线槽,所述线槽的槽口宽度小于槽内宽度,且槽壁具有弹性,所述线槽的槽壁沿强电电线的长度方向设有若干间隔;S11, preparing a wiring member, opening or forming a wire groove extending through the length direction of the wiring member, the groove width of the wire groove is smaller than the inner width of the groove, and the groove wall has elasticity, and the groove wall edge of the wire groove The length of the strong electric wire is provided with a plurality of intervals;
S12、制备水管安置件,于所述水管安置件上开设或形成贯穿其长度方向的槽体,所述槽体的槽口宽度小于槽内宽度,且槽壁具有弹性;S12, preparing a water pipe installation member, opening or forming a groove body extending through the longitudinal direction of the water pipe installation member, the groove width of the groove body is smaller than the width of the groove, and the groove wall has elasticity;
S13、确定需要的电线、水管及照明装置的类型及型号,并制备或购买电线、水管及照明装置;S13. Determine the type and model of the required wires, water pipes and lighting devices, and prepare or purchase wires, water pipes and lighting devices;
S14、将龙骨架、吊顶底板、吊顶侧板、布线件、水管安置件、电线、水管及照明装置运输至施工现场;S14. Transporting the dragon skeleton, the suspended ceiling, the ceiling side panels, the wiring parts, the water pipe fittings, the electric wires, the water pipes and the lighting device to the construction site;
S15、将电线从所述线槽的槽口压入线槽内,或者,从所述线槽两端的端口穿入所述线槽内;S15, pressing the electric wire into the slot from the slot of the slot, or penetrating into the slot from the port at both ends of the slot;
S16、将第一子龙骨架拼装在墙板与楼层板的拐角处,所述L型的一端与楼层板固定连接,另一端与墙板固定连接,将装有电线的布线件安装在第一子龙骨架的底部,将水管安置件安装在第一子龙骨架与龙骨架横杆之间的墙板上,将水管嵌置于水管安置件内,将吊顶侧板安装在第一子龙骨架的侧面,将吊顶底板靠近墙板的一端与龙骨架横杆连接,远离墙板的一端通过向下弯折的弯钩状卡件与所述吊顶侧板底端的向上弯折的弯钩状卡件卡接,将照明装置安装于吊顶侧板与吊顶底板的遮挡件之间。S16. The first sub-dragon skeleton is assembled at a corner of the wall panel and the floor panel, and one end of the L-shaped is fixedly connected with the floor panel, and the other end is fixedly connected with the wall panel, and the wiring component with the electric wire is installed at the first position. At the bottom of the sub-dragon skeleton, the water pipe installation member is installed on the wall plate between the first sub-dragon skeleton and the dragon skeleton cross bar, the water pipe is embedded in the water pipe installation member, and the ceiling side plate is installed on the first sub-dragon skeleton. The side of the ceiling floor is adjacent to the wall panel and is connected to the dragon skeleton crossbar, and the end of the wall panel is bent away from the bent hook-shaped card member and the upwardly bent hook-shaped card at the bottom end of the ceiling panel. The components are snapped together, and the lighting device is installed between the ceiling side panel and the shielding member of the ceiling panel.
进一步地,步骤S13中,所述电线为强电电线。Further, in step S13, the electric wire is a strong electric wire.
进一步地,所述的步骤S10中,制备龙骨架、吊顶底板及吊顶侧板包括以下步骤:Further, in the step S10, the preparation of the dragon skeleton, the ceiling floor and the ceiling side panel comprises the following steps:
预先制备出与所述龙骨架、吊顶底板及吊顶侧板的形状相配合的金属模具,然后采用塑料材料并结合所述金属模具注塑出所述龙骨架、吊顶底板及吊顶侧板。A metal mold matching the shape of the dragon skeleton, the ceiling bottom plate and the ceiling side plate is prepared in advance, and then the dragon skeleton, the ceiling plate and the ceiling side plate are injection molded by using a plastic material in combination with the metal mold.
进一步地,所述的步骤S10中,制备龙骨架、吊顶底板及吊顶侧板包括以下步骤:Further, in the step S10, the preparation of the dragon skeleton, the ceiling floor and the ceiling side panel comprises the following steps:
对板状的型材进行切割,得到龙骨架、吊顶底板及吊顶侧板。The plate-shaped profile is cut to obtain a dragon skeleton, a ceiling plate and a ceiling side plate.
进一步地,所述吊顶底板及所述吊顶侧板采用PVC发泡木塑材料制成,所述PVC发泡木塑材料通过如下重量配比的原料生产加工而成:聚氯乙烯(PVC):100份;木质化植物纤维:15-20份;活性轻钙:10-20份;锌钙复合稳定剂:7-10份,复配型发泡剂:1-3份,润滑剂OPE蜡:1.5-2份;复合润滑剂:0.5-1份,发泡调节剂:3-8份。Further, the ceiling bottom plate and the ceiling side plate are made of PVC foamed wood plastic material, and the PVC foamed wood plastic material is produced by processing the following weight ratio raw materials: polyvinyl chloride (PVC): 100 parts; lignified plant fiber: 15-20 parts; active light calcium: 10-20 parts; zinc-calcium composite stabilizer: 7-10 parts, compound type foaming agent: 1-3 parts, lubricant OPE wax: 1.5-2 parts; composite lubricant: 0.5-1 part, foaming regulator: 3-8 parts.
本发明与现有技术相比,有益效果在于:本发明的天花吊顶系统的施工方法,将水管安置件安装在天花吊顶内的墙板上,将布线件安装在第一子龙骨架的底部,克服了现有技术中将水管、电线埋在房屋的主体结构中的问题,实现了支撑体与填充体的分离,降低了水管电线检修的难度和成本。并且,本发明在拆除吊顶底板后就能看到电线和水管,只需一步操作后就能开始对水管及电线进行检修,提高了检修的效率。Compared with the prior art, the present invention has the beneficial effects that the construction method of the ceiling system of the present invention installs the water pipe installation component on the wall panel in the ceiling of the ceiling, and installs the wiring component on the bottom of the first sub-dragon skeleton. The utility model overcomes the problem that the water pipe and the electric wire are buried in the main structure of the house in the prior art, realizes the separation of the support body and the filler body, and reduces the difficulty and cost of the maintenance of the water pipe wire. Moreover, the present invention can see the electric wires and the water pipes after the ceiling plate is removed, and the water pipes and the wires can be repaired in one step, thereby improving the efficiency of maintenance.
通过水管、线路与主体结构采用分离式设计,为内装及设备更新提供更大空间,水管、线路及设备可在不破坏主体结构情况下进行更新,大大节约后期维修及改装成本。极大减少了后期维修及改造时产生的建筑垃圾及噪音污染,减少对自然环境的破坏。减少维修时对楼下用户影响,可极大提升居住者满足度。另外,居住者可根据各人需求对户型进行改造,最大化满足住宅使用要求。The water pipe, the line and the main structure adopt a separate design to provide more space for interior installation and equipment renewal. The water pipes, lines and equipment can be updated without destroying the main structure, which greatly saves the cost of later maintenance and modification. It greatly reduces the construction waste and noise pollution generated during the later maintenance and renovation, and reduces the damage to the natural environment. Reducing the impact on the downstairs users during maintenance can greatly improve the satisfaction of the occupants. In addition, the occupants can modify the unit according to the needs of each individual to maximize the satisfaction of residential use requirements.
附图说明DRAWINGS
图1是本发明实施例提供的天花吊顶系统的施工方法的流程图;1 is a flow chart of a construction method of a ceiling system according to an embodiment of the present invention;
图2是图1施工方法对应的天花吊顶系统的结构示意图;2 is a schematic structural view of a ceiling ceiling system corresponding to the construction method of FIG. 1;
图3是图2中强电布线件的结构示意图。3 is a schematic structural view of the high-voltage wiring member of FIG. 2.
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。The present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It is understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
如图1所示,为本发明实施例提供的一种天花吊顶系统的施工方法,包括以下步骤:As shown in FIG. 1 , a construction method of a ceiling system for a ceiling according to an embodiment of the present invention includes the following steps:
S10、制备龙骨架1、吊顶底板2及吊顶侧板3;S10, preparing a dragon skeleton 1, a ceiling floor 2 and a ceiling side panel 3;
其中,龙骨架1包括第一子龙骨架11及龙骨架横杆12,第一子龙骨架11在竖直方向的截面为L型,吊顶侧板3的底端设有向上弯折的弯钩状卡件31,吊顶底板2远离墙板的一端设有向下弯折的弯钩状卡件21;The dragon skeleton 1 includes a first sub-dragon skeleton 11 and a dragon skeleton crossbar 12, and the first sub-dragon skeleton 11 has an L-shaped cross section in the vertical direction, and the bottom end of the ceiling side panel 3 is provided with an upwardly bent hook. a card member 31, the end of the ceiling plate 2 away from the wall plate is provided with a downwardly bent hook-shaped card member 21;
具体地,步骤S10中,制备龙骨架1、吊顶底板2及吊顶侧板3的方法可以采用以下两种方法,其中,方法一:预先制备出与龙骨架1、吊顶底板2及吊顶侧板3的形状相配合的金属模具,然后采用塑料材料并结合金属模具注塑出龙骨架1、吊顶底板2及吊顶侧板3。方法二:对板状的型材进行切割,得到龙骨架1、吊顶底板2及吊顶侧板3。Specifically, in the step S10, the method for preparing the dragon skeleton 1, the ceiling bottom plate 2 and the ceiling side panel 3 can adopt the following two methods, wherein the method 1: preparing the dragon skeleton 1, the ceiling bottom plate 2 and the ceiling side plate 3 in advance. The metal mold of the shape is matched, and then the plastic skeleton is combined with the metal mold to mold the dragon skeleton 1, the ceiling bottom plate 2 and the ceiling side plate 3. Method 2: Cutting the plate-shaped profile to obtain a dragon skeleton 1, a ceiling bottom plate 2 and a ceiling side plate 3.
S11、制备布线件6,于布线件6上开设或形成贯穿其长度方向的线槽,线槽的槽口宽度小于槽内宽度,且槽壁具有弹性;S11, preparing the wiring member 6, opening or forming a wire groove extending through the longitudinal direction of the wiring member 6, the width of the groove of the wire groove is smaller than the width of the groove, and the groove wall has elasticity;
进一步地,为了节省材料,强电线槽的槽壁61可沿强电电线的长度方向开设若干间隔。Further, in order to save material, the groove wall 61 of the strong wire slot may be spaced apart along the length of the strong electric wire.
S12、制备水管安置件4,于水管安置件4上开设或形成贯穿其长度方向的槽体,槽体的槽口宽度小于槽内宽度,且槽壁具有弹性;S12, preparing a water pipe fitting 4, opening or forming a groove body extending through the longitudinal direction of the water pipe setting member 4, the groove width of the groove body is smaller than the inner width of the groove, and the groove wall has elasticity;
S13、确定需要的电线7、水管5及照明装置8的类型及型号,并制备或购买电线7、水管5及照明装置8;S13, determining the type and type of the required electric wire 7, the water pipe 5 and the lighting device 8, and preparing or purchasing the electric wire 7, the water pipe 5 and the lighting device 8;
本实施例中的电线可以选用强电电线。工作电压在交流24V以上为强电,以下为弱电。强电电线一般指交流电电压在 24V以上的输电导线。The electric wire in this embodiment can be selected from a strong electric wire. The working voltage is strong under 24V AC, and the following is weak. A strong electric wire generally refers to a transmission line with an AC voltage of 24V or more.
S14、将龙骨架1、吊顶底板2、吊顶侧板3、布线件6、水管安置件4、电线7、水管5及照明装置8运输至施工现场;S14, transporting the dragon skeleton 1, the ceiling floor 2, the ceiling side panel 3, the wiring member 6, the water pipe fitting 4, the electric wire 7, the water pipe 5, and the lighting device 8 to the construction site;
S15、将电线7从线槽的槽口压入线槽内,或者,从线槽两端的端口穿入线槽内;S15, pressing the wire 7 into the wire slot from the slot of the wire slot, or penetrating into the wire slot from the port at both ends of the wire slot;
S16、将第一子龙骨架11拼装在墙板100与楼层板200的拐角处, L型的一端与楼层板200固定连接,另一端与墙板100固定连接,将装有电线7的布线件6安装在第一子龙骨架11的底部,将水管安置件4安装在第一子龙骨架11与龙骨架横杆12之间的墙板100上,将水管5嵌置于水管安置件4内,将吊顶侧板3安装在第一子龙骨架11的侧面,将吊顶底板2靠近墙板100的一端与龙骨架横杆12连接,远离墙板12的一端通过向下弯折的弯钩状卡件21与吊顶侧板3底端的向上弯折的弯钩状卡件31卡接,将照明装置8安装于吊顶侧板3与吊顶底板2的遮挡件22之间。S16. The first sub-dragon skeleton 11 is assembled at the corner of the wall panel 100 and the floor panel 200. One end of the L-shape is fixedly connected with the floor panel 200, and the other end is fixedly connected with the wall panel 100, and the wiring member with the electric wire 7 is installed. 6 is installed at the bottom of the first sub-dragon skeleton 11, and the water pipe installation member 4 is installed on the wall panel 100 between the first sub-dragon skeleton 11 and the dragon skeleton cross-bar 12, and the water pipe 5 is embedded in the water pipe fitting 4 The ceiling side panel 3 is mounted on the side of the first sub-dragon skeleton 11, and the end of the ceiling bottom panel 2 adjacent to the wall panel 100 is connected to the dragon skeleton crossbar 12, and one end away from the wall panel 12 is bent downwardly. The card member 21 is engaged with the upwardly bent hook-shaped card member 31 at the bottom end of the ceiling side panel 3, and the lighting device 8 is mounted between the ceiling side panel 3 and the shutter member 22 of the ceiling panel 2.
可以理解的,上述水管安置件4不仅可以安装在第一子龙骨架11与龙骨架横杆12之间的墙板100上,也可以安装在天花吊顶内的其它位置,并通过螺钉、粘接或卡扣的方式进行固定,只需满足稳定、不易脱落即可。需要说明的是,水管安置件4安装在墙板100上时,水管安置件4安放水管5的槽体的槽口需要小于槽内宽度,并且槽壁具有弹性,水管5通过按压的方式嵌入槽体内,这样的设计起到防止水管脱落的作用。It can be understood that the above-mentioned water pipe fitting 4 can be installed not only on the wall panel 100 between the first sub-dragon skeleton 11 and the dragon skeleton crossbar 12, but also in other positions in the ceiling of the ceiling, and by screws and bonding. Or the way of the buckle is fixed, just need to be stable and not easy to fall off. It should be noted that when the water pipe mounting member 4 is mounted on the wall panel 100, the notch of the tank body of the water pipe fitting 4 for placing the water pipe 5 needs to be smaller than the inner width of the groove, and the groove wall has elasticity, and the water pipe 5 is inserted into the groove by pressing. In the body, such a design serves to prevent the water pipe from falling off.
可以理解的,上述强电布线件6不仅可以安装在第一子龙骨架11的底部,也可以安装在天花吊顶内的其它位置,并通过螺钉、粘接或卡扣的方式进行固定,只需满足稳定、不易脱落即可。需要说明的是,强电布线件6安装在第一子龙骨架11底部时,强电布线件6用于嵌置强电电线7的线槽的槽口需要小于槽内宽度,并且槽壁具有弹性,强电电线7通过按压的方式嵌入线槽内,这样的设计起到防止强电电线7脱落的作用。It can be understood that the above-mentioned strong electric wiring member 6 can be installed not only at the bottom of the first sub-dragon skeleton 11, but also at other positions in the ceiling of the ceiling, and is fixed by screws, bonding or snapping. Satisfy stability, not easy to fall off. It should be noted that when the strong electric wiring member 6 is installed at the bottom of the first sub-dragon skeleton 11, the slot of the strong electric wiring member 6 for embedding the strong electric wire 7 needs to be smaller than the inner groove width, and the groove wall has The elastic, strong electric wire 7 is embedded in the wire groove by pressing, and this design serves to prevent the strong electric wire 7 from falling off.
优选的,本发明中的吊顶底板2及吊顶侧板3可选用PVC发泡木塑材料,该PVC发泡木塑材料通过如下重量配比的原料生产加工而成:聚氯乙烯(PVC):100份;木质化植物纤维:15-20份;活性轻钙:10-20份;锌钙复合稳定剂:7-10份,复配型发泡剂:1-3份,润滑剂OPE蜡:1.5-2份;复合润滑剂:0.5-1份,发泡调节剂:3-8份,将上述的混合物通过混合机混合均匀后直接加入到螺杆挤出机中,在160~170℃挤出成型即可。Preferably, the ceiling bottom plate 2 and the ceiling side plate 3 of the present invention may be made of PVC foamed wood plastic material, which is produced by processing the following weight ratio raw materials: polyvinyl chloride (PVC): 100 parts; lignified plant fiber: 15-20 parts; active light calcium: 10-20 parts; zinc-calcium composite stabilizer: 7-10 parts, compound type foaming agent: 1-3 parts, lubricant OPE wax: 1.5-2 parts; compound lubricant: 0.5-1 part, foaming regulator: 3-8 parts, the above mixture is uniformly mixed by a mixer and directly added to a screw extruder, and extruded at 160 to 170 ° C Form it.
本实施例中的天花吊顶系统的施工方法,将水管安置件安装在天花吊顶内的墙板上,将布线件安装在第一子龙骨架的底部,克服了现有技术中将水管、电线埋在房屋的主体结构中的问题,实现了支撑体与填充体的分离,降低了水管、强电电线检修的难度和成本。并且,本发明在拆除吊顶底板后就能看到电线和水管,只需一步操作后就能开始对水管及电线进行检修,提高了检修的效率。In the construction method of the ceiling system of the embodiment, the water pipe installation component is installed on the wall panel in the ceiling of the ceiling, and the wiring component is installed at the bottom of the first sub-dragon skeleton, thereby overcoming the water pipe and the electric wire buried in the prior art. In the main structure of the house, the separation of the support body and the filler body is realized, and the difficulty and cost of overhauling the water pipe and the strong electric wire are reduced. Moreover, the present invention can see the electric wires and the water pipes after the ceiling plate is removed, and the water pipes and the wires can be repaired in one step, thereby improving the efficiency of maintenance.
通过水管、线路与主体结构采用分离式设计,为内装及设备更新提供更大空间,水管、线路及设备可在不破坏主体结构情况下进行更新,大大节约后期维修及改装成本。极大减少了后期维修及改造时产生的建筑垃圾及噪音污染,减少对自然环境的破坏。减少维修时对楼下用户影响,可极大提升居住者满足度。另外,居住者可根据各人需求对户型进行改造,最大化满足住宅使用要求。The water pipe, the line and the main structure adopt a separate design to provide more space for interior installation and equipment renewal. The water pipes, lines and equipment can be updated without destroying the main structure, which greatly saves the cost of later maintenance and modification. It greatly reduces the construction waste and noise pollution generated during the later maintenance and renovation, and reduces the damage to the natural environment. Reducing the impact on the downstairs users during maintenance can greatly improve the satisfaction of the occupants. In addition, the occupants can modify the unit according to the needs of each individual to maximize the satisfaction of residential use requirements.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above is only the preferred embodiment of the present invention, and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. Within the scope.

Claims (5)

  1. 一种天花吊顶系统的施工方法,其特征在于,包括以下步骤:
    S10、制备龙骨架、吊顶底板及吊顶侧板,其中,所述龙骨架包括第一子龙骨架及龙骨架横杆,所述第一子龙骨架在竖直方向的截面为L型,所述吊顶侧板的底端设有向上弯折的弯钩状卡件,所述吊顶底板远离墙板的一端设有向下弯折的弯钩状卡件;
    S11、制备布线件,于所述布线件上开设或形成贯穿其长度方向的线槽,所述线槽的槽口宽度小于槽内宽度,且槽壁具有弹性,所述线槽的槽壁沿强电电线的长度方向设有若干间隔;
    S12、制备水管安置件,于所述水管安置件上开设或形成贯穿其长度方向的槽体,所述槽体的槽口宽度小于槽内宽度,且槽壁具有弹性;
    S13、确定需要的电线、水管及照明装置的类型及型号,并制备或购买电线、水管及照明装置;
    S14、将龙骨架、吊顶底板、吊顶侧板、布线件、水管安置件、电线、水管及照明装置运输至施工现场;
    S15、将电线从所述线槽的槽口压入线槽内,或者,从所述线槽两端的端口穿入所述线槽内;
    S16、将第一子龙骨架拼装在墙板与楼层板的拐角处,所述L型的一端与楼层板固定连接,另一端与墙板固定连接,将装有电线的布线件安装在第一子龙骨架的底部,将水管安置件安装在第一子龙骨架与龙骨架横杆之间的墙板上,将水管嵌置于水管安置件内,将吊顶侧板安装在第一子龙骨架的侧面,将吊顶底板靠近墙板的一端与龙骨架横杆连接,远离墙板的一端通过向下弯折的弯钩状卡件与所述吊顶侧板底端的向上弯折的弯钩状卡件卡接,将照明装置安装于吊顶侧板与吊顶底板的遮挡件之间。
    A method for constructing a ceiling system, characterized in that it comprises the following steps:
    S10, preparing a dragon skeleton, a ceiling bottom plate, and a ceiling side panel, wherein the dragon skeleton includes a first sub-dragon skeleton and a dragon skeleton crossbar, and the first sub-dragon skeleton has an L-shaped cross section in a vertical direction, The bottom end of the ceiling side panel is provided with an upwardly bent hook-shaped card member, and the end of the ceiling bottom plate away from the wall panel is provided with a downwardly bent hook-shaped card member;
    S11, preparing a wiring member, opening or forming a wire groove extending through the length direction of the wiring member, the groove width of the wire groove is smaller than the inner width of the groove, and the groove wall has elasticity, and the groove wall edge of the wire groove The length of the strong electric wire is provided with a plurality of intervals;
    S12, preparing a water pipe installation member, opening or forming a groove body extending through the longitudinal direction of the water pipe installation member, the groove width of the groove body is smaller than the width of the groove, and the groove wall has elasticity;
    S13. Determine the type and model of the required wires, water pipes and lighting devices, and prepare or purchase wires, water pipes and lighting devices;
    S14. Transporting the dragon skeleton, the suspended ceiling, the ceiling side panels, the wiring parts, the water pipe fittings, the electric wires, the water pipes and the lighting device to the construction site;
    S15, pressing the electric wire into the slot from the slot of the slot, or penetrating into the slot from the port at both ends of the slot;
    S16. The first sub-dragon skeleton is assembled at a corner of the wall panel and the floor panel, and one end of the L-shaped is fixedly connected with the floor panel, and the other end is fixedly connected with the wall panel, and the wiring component with the electric wire is installed at the first position. At the bottom of the sub-dragon skeleton, the water pipe installation member is installed on the wall plate between the first sub-dragon skeleton and the dragon skeleton cross bar, the water pipe is embedded in the water pipe installation member, and the ceiling side plate is installed on the first sub-dragon skeleton. The side of the ceiling floor is adjacent to the wall panel and is connected to the dragon skeleton crossbar, and the end of the wall panel is bent away from the bent hook-shaped card member and the upwardly bent hook-shaped card at the bottom end of the ceiling panel. The components are snapped together, and the lighting device is installed between the ceiling side panel and the shielding member of the ceiling panel.
  2. 如权利要求1所述的天花吊顶系统的施工方法,其特征在于,步骤S13中,所述电线为强电电线。The method of constructing a ceiling system according to claim 1, wherein in the step S13, the electric wire is a strong electric wire.
  3. 如权利要求1所述的天花吊顶系统的施工方法,其特征在于,所述的步骤S10中,制备龙骨架、吊顶底板及吊顶侧板包括以下步骤:
    预先制备出与所述龙骨架、吊顶底板及吊顶侧板的形状相配合的金属模具,然后采用塑料材料并结合所述金属模具注塑出所述龙骨架、吊顶底板及吊顶侧板。
    The method for constructing a ceiling system according to claim 1, wherein in the step S10, preparing the dragon skeleton, the ceiling floor and the ceiling side panel comprises the following steps:
    A metal mold matching the shape of the dragon skeleton, the ceiling bottom plate and the ceiling side plate is prepared in advance, and then the dragon skeleton, the ceiling plate and the ceiling side plate are injection molded by using a plastic material in combination with the metal mold.
  4. 如权利要求1所述的天花吊顶系统的施工方法,其特征在于,所述的步骤S10中,制备龙骨架、吊顶底板及吊顶侧板包括以下步骤:
    对板状的型材进行切割,得到龙骨架、吊顶底板及吊顶侧板。
    The method for constructing a ceiling system according to claim 1, wherein in the step S10, preparing the dragon skeleton, the ceiling floor and the ceiling side panel comprises the following steps:
    The plate-shaped profile is cut to obtain a dragon skeleton, a ceiling plate and a ceiling side plate.
  5. 如权利要求1至4任一项所述的天花吊顶系统的施工方法,其特征在于,所述吊顶底板及所述吊顶侧板采用PVC发泡木塑材料制成,所述PVC发泡木塑材料通过如下重量配比的原料生产加工而成:聚氯乙烯(PVC):100份;木质化植物纤维:15-20份;活性轻钙:10-20份;锌钙复合稳定剂:7-10份,复配型发泡剂:1-3份,润滑剂OPE蜡:1.5-2份;复合润滑剂:0.5-1份,发泡调节剂:3-8份。The method for constructing a ceiling system according to any one of claims 1 to 4, wherein the ceiling floor and the ceiling side panel are made of PVC foamed wood plastic material, and the PVC foam wood plastic The material is produced by the following weight ratio raw materials: polyvinyl chloride (PVC): 100 parts; lignified plant fiber: 15-20 parts; active light calcium: 10-20 parts; zinc-calcium composite stabilizer: 7- 10 parts, compound type foaming agent: 1-3 parts, lubricant OPE wax: 1.5-2 parts; compound lubricant: 0.5-1 part, foaming regulator: 3-8 parts.
PCT/CN2018/087005 2018-05-16 2018-05-16 Method for construction of suspended ceiling system WO2019218236A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201880000559.0A CN112154241A (en) 2018-05-16 2018-05-16 Construction method of suspended ceiling system
PCT/CN2018/087005 WO2019218236A1 (en) 2018-05-16 2018-05-16 Method for construction of suspended ceiling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/087005 WO2019218236A1 (en) 2018-05-16 2018-05-16 Method for construction of suspended ceiling system

Publications (1)

Publication Number Publication Date
WO2019218236A1 true WO2019218236A1 (en) 2019-11-21

Family

ID=68539224

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/087005 WO2019218236A1 (en) 2018-05-16 2018-05-16 Method for construction of suspended ceiling system

Country Status (2)

Country Link
CN (1) CN112154241A (en)
WO (1) WO2019218236A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1146428A (en) * 1997-07-25 1999-02-16 Sekisui Chem Co Ltd Wiring structure for building
CN101613509A (en) * 2009-06-03 2009-12-30 石河子天露节水设备有限责任公司 The PVC foaming wood plastic composite material
CN203023646U (en) * 2012-10-23 2013-06-26 韦明凡 Wire clamp
CN105649256A (en) * 2016-01-10 2016-06-08 胡崇亮 Installing structure for suspended ceiling vertical decorating plate and corner suspended ceiling layer
CN106013732A (en) * 2016-06-30 2016-10-12 张健 Installation wire pipeline bottom plate corner line
CN106786235A (en) * 2016-12-14 2017-05-31 浙江亚厦装饰股份有限公司 A kind of spool or wire casing fastener and installation method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6115002B2 (en) * 2011-03-14 2017-04-19 Dic株式会社 Use of unmodified calcium silicate powder as antibacterial agent
CN204590382U (en) * 2015-04-24 2015-08-26 谢凯 A kind of mounting structure of furred ceiling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1146428A (en) * 1997-07-25 1999-02-16 Sekisui Chem Co Ltd Wiring structure for building
CN101613509A (en) * 2009-06-03 2009-12-30 石河子天露节水设备有限责任公司 The PVC foaming wood plastic composite material
CN203023646U (en) * 2012-10-23 2013-06-26 韦明凡 Wire clamp
CN105649256A (en) * 2016-01-10 2016-06-08 胡崇亮 Installing structure for suspended ceiling vertical decorating plate and corner suspended ceiling layer
CN106013732A (en) * 2016-06-30 2016-10-12 张健 Installation wire pipeline bottom plate corner line
CN106786235A (en) * 2016-12-14 2017-05-31 浙江亚厦装饰股份有限公司 A kind of spool or wire casing fastener and installation method

Also Published As

Publication number Publication date
CN112154241A (en) 2020-12-29

Similar Documents

Publication Publication Date Title
WO2019218200A1 (en) Suspended ceiling system having high-voltage cable installed therein
WO2019218201A1 (en) Suspended ceiling system having water pipe installed therein
WO2019218229A1 (en) Method for construction of suspended ceiling system
WO2019218236A1 (en) Method for construction of suspended ceiling system
WO2019218177A1 (en) Construction method for house having pipe and wire separate from main structure
WO2019218208A1 (en) Suspended ceiling
WO2019218170A1 (en) Method for construction of suspended ceiling system
WO2019218238A1 (en) Suspended ceiling system having water pipe and high-voltage cable installed therein
WO2019218226A1 (en) Suspended ceiling system having water pipe and high-voltage cable installed therein
WO2019218227A1 (en) Suspended ceiling system having water pipe and low-voltage cable installed therein
WO2019218220A1 (en) Suspended ceiling
WO2019218253A1 (en) Suspended ceiling system having separated water pipe and electrical cable
WO2019218210A1 (en) Suspended ceiling system having water pipe and low-voltage cable installed therein
WO2019218184A1 (en) Suspended ceiling system having low-voltage cable installed therein
WO2019218212A1 (en) Suspended ceiling system having separated water pipe and electrical cable
WO2019218209A1 (en) Suspended ceiling system having water pipe and high-voltage cable installed therein
WO2019218228A1 (en) Suspended ceiling system having high-voltage and low-voltage cables installed therein
WO2019218182A1 (en) Suspended ceiling system having high-voltage cable installed therein
WO2019218183A1 (en) Suspended ceiling system having water pipe installed therein
WO2019218211A1 (en) Suspended ceiling system having high-voltage and low-voltage cables installed therein
WO2019218245A1 (en) Decorative wall system mounted with water pipe and high-voltage wire
WO2019218233A1 (en) Construction method for house having water pipe separate from main structure
WO2019218250A1 (en) Decorative wall system mounted with water pipe and low-voltage wire
WO2019218255A1 (en) Decorative wall system having separate plumbing and electrical components
WO2019218179A1 (en) Construction method for house having water pipe and high-voltage wire separate from main structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18918892

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18918892

Country of ref document: EP

Kind code of ref document: A1