WO2019160043A1 - 設備状態分析装置、設備状態分析方法、及び、設備状態分析プログラムが格納された記録媒体 - Google Patents

設備状態分析装置、設備状態分析方法、及び、設備状態分析プログラムが格納された記録媒体 Download PDF

Info

Publication number
WO2019160043A1
WO2019160043A1 PCT/JP2019/005360 JP2019005360W WO2019160043A1 WO 2019160043 A1 WO2019160043 A1 WO 2019160043A1 JP 2019005360 W JP2019005360 W JP 2019005360W WO 2019160043 A1 WO2019160043 A1 WO 2019160043A1
Authority
WO
WIPO (PCT)
Prior art keywords
load
measurement
information
load information
dynamic
Prior art date
Application number
PCT/JP2019/005360
Other languages
English (en)
French (fr)
Inventor
尚武 高橋
慎 冨永
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to US16/964,379 priority Critical patent/US11946603B2/en
Priority to EP19755075.9A priority patent/EP3754321A4/en
Priority to JP2020500558A priority patent/JP6981525B2/ja
Publication of WO2019160043A1 publication Critical patent/WO2019160043A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0033Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by determining damage, crack or wear
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0025Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings of elongated objects, e.g. pipes, masts, towers or railways
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0041Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by determining deflection or stress
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0066Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by exciting or detecting vibration or acceleration
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N5/00Computing arrangements using knowledge-based models
    • G06N5/04Inference or reasoning models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Definitions

  • the present invention relates to a technique for analyzing the state of a facility by analyzing a load applied to the facility.
  • Patent Document 1 discloses an apparatus for evaluating the fatigue life of equipment.
  • This apparatus calculates
  • This apparatus obtains stress and strain at the time of loading in the constituent material based on the obtained elastic stress.
  • This apparatus obtains stress and strain during unloading based on stress and strain during loading.
  • This apparatus determines the plastic strain based on the stress and strain during loading and the stress and strain during unloading.
  • This apparatus determines, based on the obtained plastic strain, whether the fatigue mode of the member is high cycle fatigue due to only elastic deformation or low cycle fatigue accompanied by plastic deformation. And this apparatus calculates
  • Patent Document 2 confirms the safety of an existing sign post without performing an operation that damages an existing sign post or performing a complicated operation by approaching an operator to an existing post.
  • a method for evaluating the durability of an existing sign post includes an actual amplitude amount measuring step for measuring the actual amplitude amount of the column member of the existing marker column in a non-contact manner, and a stress calculating step for calculating a bending stress of the base portion of the existing marker column from the actual amplitude amount.
  • the amount of dynamic amplitude of the upper end of the column member and the dynamic bending stress of the base of the column member are obtained, and the static deflection amount and static bending stress of the column member match the dynamic amplitude amount and the dynamic bending stress.
  • a static tensile force is applied to the tip of the arm member, and a tensile angle of the static tensile force with respect to the arm member is obtained.
  • the horizontal force and the vertical force acting on the tip of the arm member are calculated from the general deflection equation based on the tension angle and the actual amplitude.
  • the bending stress acting on the base portion of the support member is calculated from the bending moment acting on the base portion of the support member calculated using the general moment calculation formula based on the horizontal force and the vertical force.
  • Patent Document 3 discloses a system that quantifies the state and value of existing assets, and supports appropriate water supply and sewerage business maintenance and renewal plans from a medium- to long-term perspective based on equipment replacement demand and financial balance information. It is disclosed. This system takes in the monitoring cycle determined for each data from the water supply and sewerage facilities or various facility information, inspection maintenance data, monitoring data, and plant data that are arbitrarily input to the computer system and stores them in the database. This system calculates the statistical useful life based on the assessment of quantitative soundness and the prediction of deterioration diagnosis from the stored inspection maintenance and monitoring data for the equipment, and determines the budget according to the risk level set for each equipment. Equip equipment upgrade demand costs in compliance with constraints and support demand planning.
  • Important social infrastructure facilities and structures such as water and sewage networks and pipelines have a long service life of several decades, and maintenance management operations in the life cycle of equipment installation, repair, and renewal are performed based on asset management methods. It is common that In the asset management method, the degree of infrastructure facilities aging in the future and the degree of impact when an accident occurs are estimated as risks. In this method, by deriving the optimal balance between the estimated result and the cost that can be invested in the maintenance of the facility, the accident probability and accident risk are kept below a certain level while leveling the maintenance cost. Perform preventive maintenance.
  • the method of updating equipment based on the degree of aging of equipment is based on the method of updating from the old one used for a certain period of time based on the year of installation, and the degree of aging based on the data collected by the sensor and information indicating equipment specifications, etc.
  • the state monitoring preventive maintenance method does not update an old facility when the soundness level is high. Accordingly, the state monitoring preventive maintenance method is advantageous in terms of maintenance costs even if its introduction cost is taken into account, and its application is spreading.
  • the equipment state analyzer measures a load on equipment and generates load information representing the measured load based on measurement conditions, and the load generated by the measurement means Based on the time transition of the dynamic load information, the extraction means for extracting the dynamic load information representing the dynamic component of the load whose degree of dynamic change over time is greater than or equal to a reference from the information, Using the measurement condition determining means for determining the measurement condition indicating the time zone in which the load information is generated, and the load information generated based on the measurement condition, the load applied to the equipment is analyzed Analyzing means.
  • the facility state analysis method measures a load on the facility by an information processing device, and calculates load information representing the measured load based on a measurement condition.
  • the measurement condition indicating a time zone in which the load information is generated is determined based on the load information generated based on the measurement condition, and the load applied to the facility is analyzed.
  • the equipment state analysis program measures a load on the equipment, and generates load information representing the measured load based on the measurement conditions.
  • An extraction process for extracting dynamic load information representing a dynamic component of the load whose degree of dynamic variation over time is greater than or equal to a reference from the load information generated by the process and the measurement process; Using measurement condition determination processing for determining the measurement condition indicating a time zone in which the load information is generated based on time transition of dynamic load information, and using the load information generated based on the measurement condition And causing the computer to execute analysis processing for analyzing the load applied to the facility.
  • the present invention can be realized by a computer-readable non-volatile recording medium in which the equipment state analysis program (computer program) is stored.
  • the present invention makes it possible to efficiently increase the accuracy of estimating the state of the equipment based on the state of the load applied to the equipment.
  • FIG. 1 is a block diagram showing a configuration of an equipment state analyzer 10 according to the first embodiment of the present invention.
  • the equipment state analysis apparatus 10 is an information processing apparatus having a function of collecting information representing the state of the water pipe 20 and analyzing the collected information in order to maintain and manage the water pipe 20 that is social infrastructure.
  • FIG. 1 for convenience of explanation, one water pipe 20 is illustrated, but the equipment state analysis apparatus 10 may use a plurality of water pipes 20 as analysis targets of the equipment state.
  • the equipment state analysis apparatus 10 includes a measurement unit 11, an extraction unit 12, a measurement condition determination unit 13, an analysis unit 14, an estimation unit 15, a prediction unit 16, a priority determination unit 17, a presentation unit 18, and a database 19. Yes.
  • the database 19 is composed of a nonvolatile storage device such as a magnetic disk, for example, and specification information 190, installation information 191, accident impact information 192, and repair work information 193 referred to when the equipment state analysis apparatus 10 operates. Is remembered. Details of these pieces of information will be described later. Note that the equipment state analysis apparatus 10 may not include the database 19.
  • the database 19 may be constructed in, for example, a storage device that can be accessed by the facility state analysis device 10 via a communication network.
  • the measurement unit 11 collects information (data) between the sensors that collect information (hereinafter referred to as load information in this application) indicating the state of the load on the water pipe 20 by wireless communication or wired communication. And the function to transmit and receive.
  • the sensor is, for example, a water pressure sensor, a flow rate sensor, a vibration sensor, or the like.
  • the measurement unit 11 is shown inside the equipment state analyzer 10, but the sensor included in the measurement unit 11 includes various sensors on the surface or inside of the water pipe 20, for example. It is assumed that it is installed in a proper place.
  • the measurement unit 11 controls the output of the load information 110 from the sensor based on a measurement condition 130 described later.
  • the measurement unit 11 inputs the load information 110 acquired (received) from the sensor to the extraction unit 12 and the analysis unit 14.
  • the extraction unit 12 separates the load information 110 input from the measurement unit 11 into dynamic load information 120 and static load information 121.
  • the dynamic load information 120 is information representing a component included in the load on the water pipeline 20 and whose degree of dynamic variation with time has exceeded a reference (dynamic variation is large).
  • the static load information 121 is information representing a component included in the load on the water pipeline 20 and having a degree of dynamic fluctuation with the passage of time that is less than or equal to a reference (dynamic fluctuation is small).
  • the extraction unit 12 separates the load information 110 into the dynamic load information 120 and the static load information 121 by performing predetermined signal processing on the signal representing the load information 110.
  • the extraction unit 12 analyzes a signal for each frequency component (for example, processing using Fourier transform or the like) or analyzes a time change of the signal (for example, a bandpass filter or the like). Can be used.
  • the extraction unit 12 may use a time series data analysis method such as an autoregressive model, a moving average model, or an autoregressive moving average model in the predetermined signal processing.
  • the load on the water pipeline 20 indicated by the dynamic load information 120 and the static load information 121 are, for example, dynamic pressure and static pressure in hydrodynamics.
  • the dynamic pressure is a pressure (force that the flow pushes) generated by the flow of the fluid (that is, water flowing through the water pipe 20), and increases as the fluid flows at a higher speed.
  • the static pressure is a pressure generated even when the fluid does not flow (that is, when the fluid is stopped).
  • the water pressure which the water pipe 20 receives becomes a pressure which combined dynamic pressure and static pressure.
  • the measurement target by the measurement unit 11 is a water pressure
  • the sensor is installed in a place where the generated water pressures are different from each other (that is, a place where the water channel system is different).
  • the load represented by the dynamic load information 120 and the static load information 121 may be a physical quantity other than the dynamic pressure and the static pressure.
  • the extraction unit 12 inputs the dynamic load information 120 and the static load information 121 generated by performing the above-described processing to the measurement condition determination unit 13.
  • the measurement condition determination unit 13 obtains dynamic load information 120 and static load information 121 from the extraction unit 12, and obtains operation information 300 from the SCADA (SupervisoryvisorControl And Data Acquisition) system 30 and stores it in the database 19. Obtained specification information 190 is obtained.
  • the specification information 190 is information representing the specifications of the water pipeline 20, such as the structure (caliber, shape, etc.) of the water pipeline 20 and the state in which the water pipeline 20 is embedded.
  • the SCADA system 30 is a system that monitors the state of the water pipe 20 and remotely controls the state.
  • the SCADA system 30 controls the state of the water pipe line 20 based on the operation information 300.
  • the operation information 300 is information representing the operation management of the water pipeline 20 such as the amount of water used via the water pipeline 20.
  • the measurement condition determination unit 13 determines an optimum measurement time zone by the measurement unit 11 that can realize the state of the water pipe 20 with high accuracy and efficiency based on at least the dynamic load information 120. To do. At this time, the measurement condition determination unit 13 may use at least one of the static load information 121, the operation information 300, and the specification information 190. That is, the measurement condition determination unit 13 may use an index obtained by adding the static load information 121 to the dynamic load information 120, for example. For example, the measurement condition determination unit 13 uses a portion of the dynamic load information 120 that matches the operation information 300 (that is, does not use a portion that does not match the operation information 300 as accidental information). Also good. For example, the measurement condition determination unit 13 may determine an optimal measurement time zone based on, for example, ease of progress of aging in the water pipe line 20 indicated by the specification information 190.
  • the measurement condition determination unit 13 uses, for example, one week based on the fact that the human life cycle is generally one week as the initial value of this measurement time zone.
  • the above continuous time zone is set.
  • the measurement condition determination unit 13 sets a continuous time zone that is longer than the operation cycle of the factory as the initial value of this measurement time zone.
  • the measurement condition determination unit 13 can efficiently avoid the occurrence of leakage in the determination of the optimal measurement time zone by the measurement unit 11.
  • the measurement condition determination unit 13 may set the initial value of the measurement time zone based on a reference different from the above.
  • the measurement condition determining unit 13 is at least a water pipe indicated by the dynamic load information 120 in a continuous time zone of one week or more set as an initial value of the measurement time zone.
  • a measurement time zone by the measurement unit 11 is determined based on the dynamic pressure fluctuation state applied to the measurement unit 11.
  • the measurement condition determination unit 13 determines a time zone in which the degree of damaging the water pipeline 20 due to an increase in the load applied to the water pipeline 20 is determined as an optimum measurement time zone by the measurement unit 11.
  • the measurement condition determination unit 13 may determine an optimal measurement time zone by the measurement unit 11 so as to include a time zone in which these values representing the load applied to the water pipeline 20 are equal to or greater than a threshold value. .
  • the measurement condition determination unit 13 analyzes the pattern in which the load applied to the water pipe 20 fluctuates using a technique such as machine learning or the like, and based on the analysis result, the optimum measurement time zone by the measurement unit 11 May be determined.
  • the measurement condition determination unit 13 inputs a measurement condition 130 indicating the optimum measurement time zone by the determined measurement unit 11 to the measurement unit 11. Thereby, the measurement unit 11 controls each sensor so that the load information 110 is generated in the optimal measurement time zone indicated by the measurement condition 130.
  • the measurement condition determination unit 13 can realize grasping the state of the water pipe 20 with high accuracy and efficiency as described above.
  • the optimal measurement location according to 11 is determined as follows.
  • the measurement condition determination unit 13 simulates the size, propagation path, reach distance, etc. of the water hammer generated in the water pipe 20 based on the structure of the water pipe 20 indicated by the specification information 190 obtained from the database 19. Calculated by However, it is assumed that the measurement condition determining unit 13 is provided with information (such as a calculation formula) necessary for simulating a water hammer occurring in the water pipe 20. Based on the simulation result, the measurement condition determination unit 13 specifies a place in the water pipe 20 having a large applied load, and determines the specified place as an optimum measurement place by the measurement unit 11.
  • the measurement condition determination unit 13 inputs a measurement condition 130 indicating an optimum measurement location by the determined measurement unit 11 to the measurement unit 11. Thereby, the measurement part 11 controls each sensor so that the load information 110 is produced
  • the measurement condition determination unit 13 inputs the measurement condition 130 determined as described above to the presentation unit 18.
  • the presentation unit 18 is a device that can present information to the user using an input / output interface, and is, for example, a monitor that presents information to the user by an image, or a speaker that presents information to the user by voice.
  • the presenting unit 18 presents the measurement condition 130 input from the measurement condition determining unit 13 to the user.
  • FIG. 2 is a diagram illustrating a mode in which the presentation unit 18 (monitor) according to the present embodiment displays the measurement conditions 130.
  • the presentation unit 18 displays the optimum measurement time zone indicated by the measurement condition 130 by day of the week and time, and the optimum measurement location indicated by the measurement condition 130 is determined by the name of the point and the space. Displayed by coordinates (XYZ coordinates). The user can install the sensor at the optimum measurement location by the measurement unit 11 indicated by the measurement condition 130 presented by the presentation unit 18.
  • the analysis unit 14 designates up to now or by the user based on the load information 110 output from the sensor installed at the optimum measurement location indicated by the measurement condition 130 in the optimum measurement time zone indicated by the measurement condition 130.
  • the load applied to the water line 20 during the specified period is analyzed.
  • the analysis unit 14 determines the water pipe line 20 based on the magnitude of the stress applied to the water pipe line 20 by the water hammer generated inside the water pipe line 20 and the number of times the water hammer has occurred.
  • the cumulative load magnitude for is calculated.
  • the analysis unit 14 may apply the concept of S (Stress) -N (Number of cycles to failure) diagram in the field of material engineering in this calculation.
  • the analysis unit 14 may estimate the magnitude of the stress by using an evaluation formula such as a hoop stress formula or by using a simulation technique such as a finite element method.
  • the analysis unit 14 inputs the result of analyzing the load applied to the water pipe 20 so far to the prediction unit 16. The analysis unit 14 also presents the analysis result to the user via the presentation unit 18.
  • the estimation unit 15 estimates the strength of the water pipeline 20 based on the specification information 190 and the installation information 191 obtained from the database 19.
  • the installation information 191 is information indicating the installation state of the water pipeline 20, for example, information indicating the time (year etc.) when the water pipeline 20 was installed, the state of the soil where the water pipeline 20 was installed, and the like. It is.
  • the estimation unit 15 for example, based on the specification information 190 and the installation information 191, the history of accidents that occurred in the past in various water pipelines, the results of experiments performed in the past on various water pipelines, etc.
  • the strength of the water pipe 20 may be estimated statistically.
  • the estimation unit 15 may use the result of the user taking out the buried water pipeline 20 and confirming its state.
  • the estimation unit 15 or the data representing the state of the water pipe 20 obtained by the measurement unit 11 is compared with the contents described in the past experimental results, technical literature, and the like. May be estimated.
  • the estimation unit 15 inputs the result of estimating the strength of the water pipe 20 to the prediction unit 16.
  • the prediction unit 16 is based on the analysis result regarding the load applied to the water pipeline 20 input from the analysis unit 14 and the estimation result regarding the strength of the water pipeline 20 input from the estimation unit 15, for example, reliability. By using engineering and statistical analysis techniques, the probability of an accident due to damage occurring in the water pipe 20 is predicted. At this time, the prediction unit 16 uses, for example, a “load-intensity” model that represents the magnitude of the possibility of damage to a facility when a certain amount of load is applied to the facility having a certain strength. Can do.
  • the prediction unit 16 also obtains accident impact information 192 from the database 19.
  • the accident impact information 192 is information representing the magnitude of the impact when an accident occurs in the water pipe 20.
  • the magnitude of the degree of influence is based on, for example, the results of damages due to accidents that have occurred in the past in the water pipe 20.
  • the predicting unit 16 calculates the probability of occurrence of an accident due to damage in the water pipeline 20 and the magnitude of the effect when an accident occurs in the water pipeline 20 represented by the accident impact information 192, as determined above. By determining the product, the degree of risk of an accident related to the water pipe 20 is predicted. The prediction unit 16 predicts the degree of accident risk described above for each of the plurality of water pipes 20 to be analyzed by the equipment state analyzer 10. The prediction unit 16 inputs the predicted accident risk level to the priority determination unit 17. The prediction unit 16 presents the prediction result to the user via the presentation unit 18.
  • the priority determination unit 17 obtains repair work information 193 from the database 19.
  • the repair work information 193 is information representing at least one of the ease of repair work and the cost of repair work regarding the plurality of water pipes 20.
  • the priority determination unit 17 determines the priority for performing the repair work on the plurality of water pipes 20 based on the obtained repair work information 193 and the prediction result on the degree of accident risk by the prediction unit 16.
  • the priority determination unit 17 increases the priority of performing repair work, for example, as the degree of accident risk is higher, repair work is easier, or repair work costs are lower.
  • the prediction unit 16 converts the amount of information represented by the repair work information 193 and the prediction result regarding the degree of accident risk by the prediction unit 16 based on a predetermined standard, and based on the total of the converted amounts Priority may be determined.
  • the priority determination unit 17 or treats the information represented by the repair work information 193 and the prediction result on the risk of accident by the prediction unit 16 as a standardized index, and uses a method such as linear programming, Priorities may be determined.
  • the priority determination unit 17 also presents the user with the priority for performing the repair work on the determined water pipeline 20 via the presentation unit 18.
  • the measurement unit 11 continuously measures the load on the water pipeline 20 for a predetermined period (for example, one week when the water pipeline 20 is installed in a residential area), and extracts load information 110 representing the measurement result. Input to the unit 12 (step S101).
  • the extraction unit 12 extracts dynamic load information 120 from the load information 110 by performing predetermined signal processing on a signal representing the load information 110 (step S102).
  • the measurement condition determination unit 13 determines the time zone and the measurement location where the load information 110 is obtained based on the time transition of the dynamic load information 120, the specification information 190 obtained from the database 19, and the operation information 300 obtained from the SCADA system 30. Is determined (step S103).
  • the measurement condition determination unit 13 presents the determined measurement condition 130 to the user via the presentation unit 18 (step S104).
  • the analysis unit 14 uses the load information 110 generated by the measurement unit 11 repeatedly one or more times based on the measurement condition 130 determined by the measurement condition determination unit 13, and has been designated up to now or by the user. During the period, the load applied to the water pipe 20 is analyzed (step S105).
  • the prediction unit 16 determines the accidents related to the water pipeline 20 based on the estimation result on the strength of the water pipeline 20 by the estimation unit 15, the analysis result by the analysis unit 14, and the accident impact information 192 obtained from the database 19. A risk level is predicted (step S106).
  • the priority determination part 17 determines the priority of the repair work regarding the plurality of water pipes 20 based on the repair work information 193 obtained from the database 19 and the prediction result by the prediction part 16 (step S107).
  • the priority determination unit 17 presents the determined priority level of the repair work to the user via the presentation unit 18 (step S108), and the entire process ends.
  • the facility state analysis apparatus 10 can efficiently increase the accuracy of estimating the state of the facility based on the state of the load applied to the facility.
  • the reason is that the equipment state analysis apparatus 10 extracts the dynamic load information 120 from the load information 110 related to the water pipeline 20, determines the measurement condition 130 based on the time transition of the extracted dynamic load information 120, and performs the measurement. This is because the load information 110 obtained based on the condition 130 is used to analyze the load applied to the water pipe 20.
  • the equipment state analysis apparatus 10 includes a measurement unit 11, an extraction unit 12, a measurement condition determination unit 13, and an analysis unit 14.
  • FIG. It operates as described above with reference to FIG. That is, the measuring unit 11 measures the load on the water pipe 20 (facility) and generates load information 110 representing the measured load based on the measurement condition 130.
  • the extraction unit 12 extracts, from the load information 110 generated by the measurement unit 11, dynamic load information 120 that represents a dynamic component of a load whose degree of dynamic change over time is greater than or equal to a reference.
  • the measurement condition determination unit 13 determines a measurement condition 130 indicating a time zone in which the load information 110 is generated based on the time transition of the dynamic load information 120.
  • the analysis part 14 analyzes the load added to the water pipe 20 using the load information 110 produced
  • the equipment state analyzer 10 efficiently and efficiently changes the state of the water pipe 20 with high accuracy based on the record that the dynamic component of the load on the water pipe 20 has changed over time.
  • a measurement condition 130 indicating an optimum measurement time zone by the measurement unit 11 that can be grasped is determined.
  • the equipment state analyzer 10 acquires the load information 110 during the optimum measurement time zone, and uses the acquired load information 110 to add to the water pipeline 20 up to the present time or during a specified period. Analyze the accumulated load.
  • the equipment state analyzer 10 according to the present embodiment can efficiently increase the accuracy of estimating the state of the equipment based on the state of the load applied to the equipment.
  • the equipment state analysis apparatus 10 when determining the measurement condition 130, has specification information 190 representing the specification of the water pipe 20 obtained from the database 19 and a water pipe obtained from the SCADA system 30.
  • the operation information 300 representing 20 operation states is also used.
  • the equipment state analyzer 10 according to the present embodiment can determine the optimum measurement time zone more accurately.
  • the equipment state analysis apparatus 10 obtains the load applied to the water pipe 20 by simulation based on the specification information 190, thereby efficiently and efficiently grasping the state of the water pipe 20.
  • the measurement condition 130 indicating the optimum measurement location by the measurement unit 11 that can be realized is determined.
  • a user can install a sensor in the optimal measurement place which the measurement conditions 130 show as needed.
  • the equipment state analysis apparatus 10 according to the present embodiment can further increase the accuracy of estimating the state of the equipment based on the state of the load applied to the equipment.
  • the equipment state analyzer 10 estimates the strength of the water pipe 20 based on the specification information 190 and the installation information 191 indicating the installation state of the water pipe 20, and the estimation result and Based on the analysis result regarding the load applied to the water pipeline 20, the magnitude of the possibility of an accident relating to the water pipeline 20 is predicted. Then, the equipment state analysis apparatus 10 predicts the degree of accident risk related to the water pipeline 20 based on the predicted possibility of occurrence of the accident and the accident influence information 192 indicating the degree of influence due to the occurrence of the accident. To do. Thereby, the equipment state analyzer 10 according to the present embodiment can realize efficient maintenance management of the water pipe 20.
  • the equipment state analysis apparatus 10 includes repair work information 193 that includes at least one of the ease of repair work and the cost of repair work for each of the plurality of water pipes 20, and the risk of accidents. Based on the prediction result regarding the degree, the priority for performing repair work on the plurality of water pipes 20 is determined. Thereby, the equipment state analyzer 10 according to the present embodiment can realize efficient maintenance management of the plurality of water pipes 20.
  • the object which the equipment state analyzer 10 according to the present embodiment analyzes the equipment state is not limited to the water pipe 20.
  • the equipment state analyzer 10 may use various equipment other than water pipes as the equipment state analysis target.
  • FIG. 4 is a block diagram showing a configuration of an equipment state analyzer 40 according to the second embodiment of the present invention.
  • the equipment state analysis device 40 includes a measurement unit 41, an extraction unit 42, a measurement condition determination unit 43, and an analysis unit 44.
  • the measuring unit 41 measures the load on the facility 50 and generates load information 410 representing the measured load based on the measurement condition 430.
  • the extraction unit 42 extracts, from the load information 410 generated by the measurement unit 41, dynamic load information 420 representing a dynamic component of a load whose degree of dynamic change with time has exceeded a reference.
  • the measurement condition determination unit 43 determines the measurement condition 430 indicating the time zone in which the load information 410 is generated based on the time transition of the dynamic load information 420.
  • the analysis unit 44 analyzes the load applied to the facility 50 using the load information 410 obtained based on the measurement condition 420.
  • the facility state analysis apparatus 40 can efficiently increase the accuracy of estimating the state of the facility based on the state of the load applied to the facility.
  • the reason is that the equipment state analyzer 40 extracts the dynamic load information 420 from the load information 410 regarding the equipment 50, determines the measurement condition 430 based on the time transition of the extracted dynamic load information 420, and the measurement condition 430 This is because the load information 410 obtained based on the above is used to analyze the load applied to the facility 50 so far.
  • each unit in the equipment state analysis apparatus shown in FIG. 1 and FIG. 4 can be realized by a dedicated HW (HardWare) (electronic circuit). 1 and 4, at least the following configuration can be regarded as a function (processing) unit (software module) of the software program.
  • FIG. 5 is a diagram illustrating an exemplary configuration of an information processing apparatus 900 (computer) that can execute the equipment state analysis apparatus according to each embodiment of the present invention. That is, FIG. 5 is a configuration of a computer (information processing apparatus) capable of realizing the equipment state analysis apparatus shown in FIGS. 1 and 4, and a hardware environment capable of realizing each function in the above-described embodiment. Represents.
  • the information processing apparatus 900 illustrated in FIG. 5 includes the following as constituent elements.
  • CPU Central_Processing_Unit
  • ROM Read_Only_Memory
  • RAM Random_Access_Memory
  • -Hard disk storage device
  • An input / output interface 909 such as an input device such as a monitor, a speaker, or a keyboard that functions as an information presentation unit.
  • the information processing apparatus 900 including the above-described components is a general computer in which these configurations are connected via a bus 906.
  • the information processing apparatus 900 may include a plurality of CPUs 901 or may include a CPU 901 configured by a multi-core.
  • the present invention described by taking the above embodiment as an example supplies a computer program capable of realizing the following functions to the information processing apparatus 900 shown in FIG.
  • the function is the above-described configuration in the block configuration diagram (FIGS. 1 and 4) referred to in the description of the embodiment, or the function of the flowchart (FIG. 3).
  • the present invention is then achieved by reading the computer program to the CPU 901 of the hardware, interpreting it and executing it.
  • the computer program supplied to the apparatus may be stored in a readable / writable volatile memory (RAM 903) or a nonvolatile storage device such as the ROM 902 or the hard disk 904.
  • a general procedure can be adopted as a method for supplying a computer program into the hardware.
  • the procedure includes, for example, a method of installing in the apparatus via various recording media 907 such as a CD-ROM, and a method of downloading from the outside via a communication line such as the Internet.
  • the present invention is configured by a code constituting the computer program or a recording medium 907 in which the code is stored.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • General Engineering & Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Software Systems (AREA)
  • Artificial Intelligence (AREA)
  • Computing Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Mathematical Physics (AREA)
  • Primary Health Care (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Computational Linguistics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

設備状態分析装置40は、設備50に対する負荷を測定し、測定した負荷を表す負荷情報410を、測定条件430に基づいて生成する測定部41と、測定部41によって生成された負荷情報410から、時間の経過とともに動的に変動する度合いが基準以上である負荷の動的成分を表す動的負荷情報420を抽出する抽出部42と、動的負荷情報420の時間推移に基づいて、負荷情報410が生成される時間帯を示す測定条件420を決定する測定条件決定部43と、測定条件430に基づいて生成された負荷情報410を使用して、設備50に加えられた負荷を分析する分析部44と、を備えることによって、設備に対して加えられた負荷の状況に基づいて当該設備の状態を推定する精度を効率的に高める。

Description

設備状態分析装置、設備状態分析方法、及び、設備状態分析プログラムが格納された記録媒体
 本願発明は、設備に加えられた負荷を分析することによって設備の状態を分析する技術に関する。
 近年、ICT(Information and Communication Technology)の進展により、電子機器によって処理あるいは蓄積される情報量は増大の一途をたどっており、IoT(Internet of Things)が実現されつつある。そして、IoTが構築された社会において、多数のセンサから事象の正確なデータを取得し、取得したデータを、正確に分析、判断、加工を施したのち、有用な情報として人が認知することは、安心安全な社会を形成する上で重要な位置づけにある。
 現代社会では、上下水道網、ガスや石油などの高圧化学パイプライン、高速鉄道、長大橋、超高層建築、大型旅客機、自動車などの設備が構築され、豊かな社会の基盤となっている。しかしながら、これらの設備が、予期せぬ震災などの自然災害や経年劣化等により破損することによって、重大事故が発生した場合、社会への影響は多大であり、経済的損失は大きい。これらの設備に用いられる部材は、使用時間とともに腐食や磨耗などの劣化が進み、やがて破損などの機能不全に至る。したがって、設備に関する安心安全を確保するために、科学、工学、社会学などの学術的領域を超えた技術開発に多大な努力が行なわれている。特に、低コストかつ操作が簡便な検査技術である非破壊検査技術等を使用した社会インフラの維持管理技術は、設備の劣化や破損による重大事故を防止するという点において、ますます重要になってきている。
 このような技術に関連する技術として、特許文献1には、機器の疲労寿命を評価する装置が開示されている。この装置は、機器の部材形状及び構成材料の情報に基づいて、その弾性応力を求める。この装置は、求めた弾性応力に基づいて、構成材料における負荷時の応力及び歪を求める。この装置は、負荷時の応力及び歪を基点とする除荷時の応力及び歪を求める。この装置は、負荷時の応力及び歪、並びに除荷時の応力及び歪に基づいて、塑性歪を求める。この装置は、求めた塑性歪に基づいて、部材の疲労様式が弾性変形のみによる高サイクル疲労であるか、又は塑性変形を伴う低サイクル疲労であるかを判定する。そしてこの装置は、判定した疲労様式に基づいて、機器の寿命を求める。
 また、特許文献2には、既設の標識柱を傷つけるような作業を行ったり、既設標識柱に作業者が近づいて煩雑な作業を行ったりすることなく、既設標識柱の安全性を確認する、既設標識柱の耐久評価方法が開示されている。この方法は、既設標識柱の支柱部材の実振幅量を非接触で測定する実振幅量測定工程と、実振幅量から既設標識柱の基部の曲げ応力を算出する応力算出工程とを備える。この方法では、支柱部材の上端の動的振幅量と支柱部材の基部の動的曲げ応力を求め、支柱部材の静的撓み量と静的曲げ応力が動的振幅量及び動的曲げ応力と一致するように、腕部材の先端に対して静的引張力を作用させ、腕部材に対する静的引張力の引張角度を求める。この方法では、その引張角度と実振幅量とを基に一般撓み式から腕部材の先端に作用する水平力と垂直力とを算出する。そしてこの方法では、水平力及び垂直力を基に一般モーメント算出式を用いて算出した支柱部材の基部に作用する曲げモーメントから、支柱部材の基部に作用する曲げ応力を算出する。
 また、特許文献3には、現有資産の状態、価値を定量化し、設備更新需要および財政収支情報から、中長期的観点で上下水道事業の適切な維持管理と更新計画の立案を支援するシステムが開示されている。このシステムは、上下水道施設からデータ毎に決められている監視周期または任意に入力されてくる各種設備情報、点検保守データ、モニタリングデータ、プラントデータを計算機システムへ取り込み、データベースに格納する。このシステムは、当該格納した、設備に関する点検保守、モニタリングデータから、定量的健全度の評価と、劣化診断予測による統計的耐用年数を算出し、設備毎に設定されたリスクレベルに応じて、予算制約を遵守した設備更新需要コストの平準化と、需要計画立案の支援とを行う。
特開2012-112787号公報 特開2007-205860号公報 特開2014-016691号公報
 上下水道網やパイプライン等の重要な社会インフラの設備や構造物は、耐用年数が数十年と長く、設備導入、修繕、更新というライフサイクルにおける維持管理業務は、アセットマネジメント手法に基づいて行われることが一般的である。アセットマネジメント手法では、将来におけるインフラ設備の老朽度合い、及び事故発生時の影響度をリスクとして推定する。そしてこの手法では、その推定結果と、設備の維持管理に投入可能な費用との最適なバランスを導出することによって、維持管理費用を平準化しつつ、事故確率、事故リスクを一定以下に保つように予防保全を行なう。
 設備の老朽度合いに基づいて設備を更新する方式には、その設置年を基準として一定期間使用した古いものから更新する方式と、センサにより収集したデータと設備仕様等を表す情報とに基づく老朽度合いに応じて更新する状態監視予防保全方式がある。一般的に状態監視予防保全方式では、古い設備であっても健全度が高い場合はその設備を更新しない。したがって状態監視予防保全方式は、その導入コストを考慮したとしても、維持管理費用において有利であることから、その適用が広がりつつある。
 ところで、設備に関する将来の事故確率を推定する場合、設備の老朽度合いだけでなく、その当該設備に加わる負荷を適切に評価することが重要である。この負荷は、年、季節、時間、場所等に応じて変動するので、例えば設備の設計時における負荷に関する情報のみに基づく評価では、満足できる推定精度が得られないことが知られている。このような問題に対応するために、センサを用いて適切な場所と適切な時間帯に、設備に関する物理的な状況を直接観測することによって、推定精度を高めることが考えられる。
 しかしながら、通常、センサによる観測条件(観測仕様)自体もまた同様に、設計時における情報に基づいているので、例えば設備が老朽化し、かつ、負荷状態が設計時とは異なる現在の設備の状態を適切に推定できず、設備を適切に維持管理することができない。特に地面に埋設されて利用されることの多い水道管路などでは、この問題が顕著である。また、現在の設備の状態をより高い精度で推定するために、例えばセンサから常時情報を収集するなど、センサから収集する情報量を多くした場合、通信基盤に大きな影響を及ぼすことになる。特許文献1乃至3は、このような問題について言及していない。本願発明の主たる目的は、この問題を解決する設備状態分析装置等を提供することである。
 本願発明の一態様に係る設備状態分析装置は、設備に対する負荷を測定し、測定した前記負荷を表す負荷情報を、測定条件に基づいて生成する測定手段と、前記測定手段によって生成された前記負荷情報から、時間の経過とともに動的に変動する度合いが基準以上である前記負荷の動的成分を表す動的負荷情報を抽出する抽出手段と、前記動的負荷情報の時間推移に基づいて、前記負荷情報が生成される時間帯を示す前記測定条件を決定する測定条件決定手段と、前記測定条件に基づいて生成された前記負荷情報を使用して、前記設備に加えられた前記負荷を分析する分析手段と、を備える。
 上記目的を達成する他の見地において、本願発明の一態様に係る設備状態分析方法は、情報処理装置によって、設備に対する負荷を測定し、測定した前記負荷を表す負荷情報を、測定条件に基づいて生成し、生成した前記負荷情報から、時間の経過とともに動的に変動する度合いが基準以上である前記負荷の動的成分を表す動的負荷情報を抽出し、前記動的負荷情報の時間推移に基づいて、前記負荷情報が生成される時間帯を示す前記測定条件を決定し、前記測定条件に基づいて生成された前記負荷情報を使用して、前記設備に加えられた前記負荷を分析する。
 また、上記目的を達成する更なる見地において、本願発明の一態様に係る設備状態分析プログラムは、設備に対する負荷を測定し、測定した前記負荷を表す負荷情報を、測定条件に基づいて生成する測定処理と、前記測定処理によって生成された前記負荷情報から、時間の経過とともに動的に変動する度合いが基準以上である前記負荷の動的成分を表す動的負荷情報を抽出する抽出処理と、前記動的負荷情報の時間推移に基づいて、前記負荷情報が生成される時間帯を示す前記測定条件を決定する測定条件決定処理と、前記測定条件に基づいて生成された前記負荷情報を使用して、前記設備に加えられた前記負荷を分析する分析処理と、をコンピュータに実行させる。
 更に、本願発明は、係る設備状態分析プログラム(コンピュータプログラム)が格納された、コンピュータ読み取り可能な、不揮発性の記録媒体によっても実現可能である。
 本願発明は、設備に対して加えられた負荷の状況に基づいて当該設備の状態を推定する精度を効率的に高めることを可能とする。
本願発明の第1の実施形態に係る設備状態分析装置10の構成を示すブロック図である。 本願発明の第1の実施形態に係る提示部18が測定条件130を表示する態様を例示する図である。 本願発明の第1の実施形態に係る設備状態分析装置10の動作を示すフローチャートである。 本願発明の第2の実施形態に係る設備状態分析装置40の構成を示すブロック図である。 本願発明の各実施形態に係る設備状態分析装置を実行可能な情報処理装置900の構成を示すブロック図である。
 以下、本願発明の実施の形態について図面を参照して詳細に説明する。
 <第1の実施形態>
 図1は、本願発明の第1の実施の形態に係る設備状態分析装置10の構成を示すブロック図である。設備状態分析装置10は、社会インフラである水道管路20を維持管理するために、水道管路20の状態を表す情報を収集し、収集した情報を分析する機能を有する情報処理装置である。尚、図1には、説明の便宜上、水道管路20を1つ記載しているが、設備状態分析装置10は、複数の水道管路20を設備状態の分析対象としてもよい。
 設備状態分析装置10は、測定部11、抽出部12、測定条件決定部13、分析部14、推定部15、予測部16、優先度決定部17、提示部18、及び、データベース19を備えている。
 データベース19は、例えば磁気ディスク等の不揮発性の記憶デバイスによって構成され、設備状態分析装置10が動作する際に参照する仕様情報190、設置情報191、事故影響度情報192、及び、補修工事情報193を記憶している。これらの情報の詳細に関しては後述する。尚、設備状態分析装置10は、データベース19を備えなくてもよい。データベース19は、例えば、設備状態分析装置10が通信ネットワークを介してアクセス可能なストレージ装置などに構築されてもよい。
 測定部11は、水道管路20に対する負荷の状態を表す情報(本願では以降、負荷情報と称する)を収集するセンサと、それらのセンサとの間で情報(データ)を無線通信あるいは有線通信により送受信する機能とを含んでいる。当該センサは、例えば、水圧センサ、流量センサ、振動センサ等である。尚、図1には説明の便宜上、測定部11を設備状態分析装置10の内部に記載しているが、測定部11に含まれる当該センサは、例えば水道管路20の表面あるいは内部等における様々な場所に設置されていることとする。測定部11は、後述する測定条件130に基づいて、当該センサからの負荷情報110の出力を制御する。測定部11は、センサから取得した(受信した)負荷情報110を、抽出部12及び分析部14へ入力する。
 抽出部12は、測定部11から入力された負荷情報110を、動的負荷情報120と静的負荷情報121とに分離する。但し、動的負荷情報120は、水道管路20に対する負荷に含まれる、時間の経過とともに動的に変動する度合いが基準以上である(動的な変動が大きい)成分を表す情報である。これに対して静的負荷情報121は、水道管路20に対する負荷に含まれる、時間の経過とともに動的に変動する度合いが基準以下である(動的な変動が小さい)成分を表す情報である。
 抽出部12は、負荷情報110を表す信号に対して、所定の信号処理を行うことによって、負荷情報110を、動的負荷情報120と静的負荷情報121とに分離する。抽出部12は、この所定の信号処理として、例えば、周波数成分ごとに信号を分析する処理(例えばフーリエ変換等を用いた処理)、あるいは、信号の時間変化を分析する処理(例えばバンドパスフィルタ等を適用する処理)などを使用することができる。抽出部12は、あるいは、この所定の信号処理において、例えば、自己回帰モデル、移動平均モデル、自己回帰移動平均モデル等による時系列データ分析手法を用いてもよい。
 動的負荷情報120及び静的負荷情報121が示す、水道管路20に対する負荷の具体例としては、例えば流体力学における動圧と静圧である。動圧は、流体(即ち水道管路20を流れる水)の流れによって生じる圧力(流れが押す力)であり、流体が流れる速度が速ければ速いほど大きくなる。一方、静圧は、流体が流れなくても(即ち流体が止まっている状態で)発生する圧力である。そして水道管路20が受ける水圧は、動圧と静圧とを合わせた圧力となる。但し、測定部11による測定対象を水圧にする場合、センサは、生じる水圧が互いに異なる場所(即ち、水路の系統が異なる場所)に設置されていることとする。尚、動的負荷情報120及び静的負荷情報121が表す負荷は、動圧及び静圧以外の物理量であってもよい。
 抽出部12は、上述した処理を行うことによって生成した動的負荷情報120と静的負荷情報121とを、測定条件決定部13に入力する。
 測定条件決定部13は、抽出部12から動的負荷情報120と静的負荷情報121とを入手する他、SCADA(Supervisory Control And Data Acquisition)システム30から運用情報300を入手し、データベース19に記憶されている仕様情報190を入手する。仕様情報190は、例えば水道管路20の構造(口径や形状等)や、水道管路20が埋設された状態等、水道管路20の仕様を表す情報である。
 SCADAシステム30は、水道管路20の状態を監視してその状態を遠隔制御するシステムである。SCADAシステム30は、運用情報300に基づいて、水道管路20の状態を制御する。運用情報300は、例えば、水道管路20を介した水使用量など、水道管路20の運用管理を表す情報である。
 測定条件決定部13は、少なくとも動的負荷情報120に基づいて、水道管路20の状態を高い精度でかつ効率的に把握することを実現可能な、測定部11による最適な測定時間帯を決定する。測定条件決定部13は、この際、静的負荷情報121、運用情報300、及び、仕様情報190の少なくともいずれかもあわせて使用するようにしてもよい。即ち、測定条件決定部13は、例えば、動的負荷情報120に静的負荷情報121を加算した指標を用いてもよい。測定条件決定部13は、あるいは例えば、動的負荷情報120のうち、運用情報300と整合する部分を用いる(即ち、運用情報300と整合しない部分を、偶発的な情報として使用しない)ようにしてもよい。測定条件決定部13は、あるいは例えば、仕様情報190が示す水道管路20における老朽化の進行のしやすさ等をふまえて、最適な測定時間帯を決定してもよい。
 測定条件決定部13は、例えば住宅街に設置された水道管路20に関しては、この測定時間帯の初期値として、人間の生活サイクルが一般的に1週間であることに基づいて、例えば1週間以上の連続する時間帯を設定する。測定条件決定部13は、あるいは、工業地域に設置された水道管路20に関しては、この測定時間帯の初期値として、工場の稼動サイクルよりも長い、連続する時間帯を設定する。測定条件決定部13は、測定時間帯の初期値を上述の通り設定することによって、測定部11による最適な測定時間帯の決定において、漏れが発生することを効率的に回避することができる。尚、測定条件決定部13は、上述とは異なる基準に基づいて、測定時間帯の初期値を設定してもよい。
 測定条件決定部13は、例えば住宅街に設置された水道管路20に関して、測定時間帯の初期値として設定した1週間以上の連続する時間帯における、少なくとも動的負荷情報120が示す水道管路20に加わる動圧の変動状況に基づいて、測定部11による測定時間帯を決定する。測定条件決定部13は、この際、水道管路20に加わる負荷が大きくなることによって水道管路20を傷める度合いが大きくなる時間帯を、測定部11による最適な測定時間帯として決定する。
 測定条件決定部13は、例えば、水道管路20に加わる負荷を表すこれらの値が閾値以上となっている時間帯を含むように、測定部11による最適な測定時間帯を決定してもよい。測定条件決定部13は、あるいは、機械学習等の技術を使用して、水道管路20に加わる負荷が変動するパターンを分析し、その分析結果に基づいて、測定部11による最適な測定時間帯を決定してもよい。
 測定条件決定部13は、決定した測定部11による最適な測定時間帯を示す測定条件130を、測定部11へ入力する。これにより、測定部11は、測定条件130が示す最適な測定時間帯に負荷情報110が生成されるように、各センサを制御する。
 測定条件決定部13は、また、上述した通り、水道管路20の状態を高い精度でかつ効率的に把握することを実現可能な、測定部11による最適な測定時間帯に加えて、測定部11による最適な測定場所を下記の通り決定する。
 測定条件決定部13は、データベース19から入手した仕様情報190が示す水道管路20の構造等に基づいて、水道管路20に生じる水撃に関して、その大きさ、伝播経路、到達距離等をシミュレーションにより算出する。但し、測定条件決定部13には、水道管路20に生じる水撃をシミュレーションするのに必要な情報(算出式等)が与えられていることとする。測定条件決定部13は、このシミュレーション結果に基づいて、加えられる負荷が大きい水道管路20における場所を特定し、特定した場所を、測定部11による最適な測定場所として決定する。
 測定条件決定部13は、決定した測定部11による最適な測定場所を示す測定条件130を、測定部11へ入力する。これにより、測定部11は、複数のセンサのうち、測定条件130が示す測定場所に位置するセンサによって負荷情報110が生成されるように、各センサを制御する。
 測定条件決定部13は、上述の通り決定した測定条件130を提示部18へ入力する。提示部18は、入出力インタフェースを用いて情報をユーザに提示可能なデバイスであり、例えば、画像により情報をユーザに提示するモニター、あるいは、音声により情報をユーザに提示するスピーカ等である。提示部18は、測定条件決定部13から入力された測定条件130をユーザに提示する。
 図2は、本実施形態に係る提示部18(モニター)が測定条件130を表示する態様を例示する図である。提示部18は、図2に例示する通り、例えば、測定条件130が示す最適な測定時間帯を、曜日と時間とにより表示し、測定条件130が示す最適な測定場所を、地点の名称と空間座標(XYZ座標)とにより表示する。ユーザは、提示部18によって提示された、測定条件130が示す測定部11による最適な測定場所に、センサを設置することが可能である。
 分析部14は、測定条件130が示す最適な測定場所に設置されたセンサから、測定条件130が示す最適な測定時間帯に出力された負荷情報110に基づいて、現在までに、あるいはユーザによって指定された期間に、水道管路20に加えられた負荷を分析する。分析部14は、例えば、負荷情報110が表す、水道管路20の内部に生じた水撃により水道管路20に加えられる応力の大きさと、水撃が発生した回数とから、水道管路20に対する累積負荷の大きさを算出する。分析部14は、この算出において、材料工学分野におけるS(Stress)-N(Number of cycles to failure)線図の考え方を適用してもよい。分析部14は、例えば、フープ応力式等の評価式を用いることによって、あるいは有限要素法等のシミュレーション技術を用いることによって、応力の大きさを推定してもよい。
 分析部14は、現在までに水道管路20に加えられた負荷について分析した結果を予測部16へ入力する。分析部14は、また、その分析結果を、提示部18を介してユーザへ提示する。
 推定部15は、データベース19から入手した仕様情報190及び設置情報191に基づいて、水道管路20の強度を推定する。但し、設置情報191は水道管路20の設置状態を表す情報であり、例えば、水道管路20が設置された時期(年など)、水道管路20が設置された土壌の状態等を表す情報である。
 推定部15は、例えば、仕様情報190及び設置情報191に基づいて、様々な水道管路において過去に発生した事故の履歴や、様々な水道管路に対して過去に行なわれた実験の結果等もふまえて、水道管路20の強度を統計的に推定してもよい。推定部15は、あるいは、水道管路20の強度を推定する際に、ユーザが埋設された水道管路20を取り出してその状態を確認した結果を用いてもよい。推定部15は、あるいは、測定部11によって得られた水道管路20の状態を表すデータと、過去の実験結果や技術文献に記載されている内容等とを比較することによって、水道管路20の強度を推定してもよい。推定部15は、水道管路20の強度を推定した結果を予測部16へ入力する。
 予測部16は、分析部14から入力された水道管路20に加えられた負荷に関する分析結果と、推定部15から入力された水道管路20の強度に関する推定結果とに基づいて、例えば信頼性工学や統計分析の手法を用いることによって、水道管路20において損傷による事故が発生する確率を予測する。予測部16は、この際、例えば、ある強度を有する設備にある大きさの負荷が加えられた場合に、その設備が損傷する可能性の大きさを表す「負荷-強度」モデルを使用することができる。
 予測部16は、また、データベース19から事故影響度情報192を入手する。事故影響度情報192は、水道管路20において事故が発生した場合における影響の大きさを表す情報である。この影響度の大きさは、例えば、水道管路20において過去に発生した事故による損害賠償金額の実績等に基づいている。
 そして予測部16は、上述の通りに求めた、水道管路20において損傷による事故が発生する確率と、事故影響度情報192が表す水道管路20において事故が発生した場合における影響の大きさとの積を求めることによって、水道管路20に関する事故の危険度合いを予測する。予測部16は、設備状態分析装置10が分析対象とする複数の水道管路20の個々について、上述した事故の危険度合いを予測する。予測部16は、予測した事故の危険度合いを優先度決定部17へ入力する。予測部16は、予測結果を、提示部18を介してユーザへ提示する。
 優先度決定部17は、データベース19から補修工事情報193を入手する。補修工事情報193は、複数の水道管路20に関する、補修工事の容易さと、補修工事の費用との少なくともいずれかを表す情報である。優先度決定部17は、入手した補修工事情報193と、予測部16による事故の危険度合いに関する予測結果とに基づいて、複数の水道管路20に関する補修工事を行う優先度を決定する。
 優先度決定部17は、例えば、事故の危険度合いが高いほど、あるいは補修工事が容易なほど、あるいは、補修工事の費用が安いほど、補修工事を行う優先度を高くする。予測部16は、この際、例えば、補修工事情報193が表す情報と、予測部16による事故の危険度合いに関する予測結果とを、所定の基準に基づいて金額換算し、換算した金額の合計に基づいて優先度を決定してもよい。優先度決定部17は、あるいは、補修工事情報193が表す情報と、予測部16による事故の危険度合いに関する予測結果とを、規格化された指標として取り扱い、線形計画法などの手法を用いて、優先度を決定してもよい。
 優先度決定部17は、また、決定した水道管路20に関する補修工事を行う優先度を、提示部18を介してユーザへ提示する。
 次に図3のフローチャートを参照して、本実施形態に係る設備状態分析装置10の動作(処理)について詳細に説明する。
 測定部11は、所定の期間(水道管路20が住宅街に設置されている場合は例えば1週間)継続して水道管路20に対する負荷を測定し、その測定結果を表す負荷情報110を抽出部12へ入力する(ステップS101)。抽出部12は、負荷情報110を表す信号に対して所定の信号処理を行うことによって、負荷情報110から動的負荷情報120を抽出する(ステップS102)。
 測定条件決定部13は、動的負荷情報120の時間推移、データベース19から入手した仕様情報190、及びSCADAシステム30から入手した運用情報300に基づいて、負荷情報110が得られる時間帯や測定場所を示す測定条件130を決定する(ステップS103)。測定条件決定部13は、決定した測定条件130を、提示部18を介してユーザに提示する(ステップS104)。
 分析部14は、測定条件決定部13により決定された測定条件130に基づいて1回以上繰り返して測定部11によって生成された負荷情報110を使用して、現在までに、あるいはユーザによって指定された期間に、水道管路20に加えられた負荷を分析する(ステップS105)。予測部16は、推定部15による水道管路20の強度に関する推定結果と、分析部14による分析結果と、データベース19から入手した事故影響度情報192とに基づいて、水道管路20に関する事故の危険度合いを予測する(ステップS106)。
 優先度決定部17は、データベース19から入手した補修工事情報193と、予測部16による予測結果とに基づいて、複数の水道管路20に関する補修工事の優先度を決定する(ステップS107)。優先度決定部17は、決定した補修工事の優先度を、提示部18を介してユーザに提示し(ステップS108)、全体の処理は終了する。
 本実施形態に係る設備状態分析装置10は、設備に対して加えられた負荷の状況に基づいて当該設備の状態を推定する精度を効率的に高めることができる。その理由は、設備状態分析装置10は、水道管路20に関する負荷情報110から動的負荷情報120を抽出し、抽出した動的負荷情報120の時間推移に基づいて測定条件130を決定し、測定条件130に基づいて得られた負荷情報110を使用して、水道管路20に加えられた負荷を分析するからである。
 以下に、本実施形態に係る設備状態分析装置10によって実現される効果について、詳細に説明する。
 設備に関する将来の事故確率を推定する場合、設備の老朽度合いだけでなく、その当該設備に印加される負荷を適切に評価することが重要である。この負荷は、時間や場所等に応じて変動するので、例えば設備の設計時における負荷に関する情報のみに基づく評価では、満足できる推定精度を期待できない。このような問題に対して、センサを用いて適切な場所と適切な時間帯に、設備に関する物理的な状況を直接観測することによって、推定精度を高めることが考えられる。しかしながら、通常、センサによる測定条件自体が、設計時における情報に基づいているので、負荷状態が設計時とは異なる現在の設備の状態を適切に推定できず、設備を適切に維持管理することができない。また、現在の設備の状態をより高い精度で推定するために、例えばセンサから常時情報を収集するなど、センサから収集する情報量を多くした場合、通信基盤に大きな影響を及ぼすことになる。即ち、これまでに設備に対して加えられた負荷の状況に基づいて当該設備の状態を推定する精度を効率的に高めることが課題である。
 このような問題に対して、本実施形態に係る設備状態分析装置10は、測定部11と、抽出部12と、測定条件決定部13と、分析部14と、を備え、例えば図1乃至図3を参照して上述する通り動作する。即ち、測定部11は、水道管路20(設備)に対する負荷を測定し、測定した負荷を表す負荷情報110を、測定条件130に基づいて生成する。抽出部12は、測定部11によって生成された負荷情報110から、時間の経過とともに動的に変動する度合いが基準以上である負荷の動的成分を表す動的負荷情報120を抽出する。測定条件決定部13は、動的負荷情報120の時間推移に基づいて、負荷情報110が生成される時間帯を示す測定条件130を決定する。そして分析部14は、測定条件130に基づいて生成された負荷情報110を使用して、水道管路20に加えられた負荷を分析する。
 即ち、本実施形態に係る設備状態分析装置10は、水道管路20に対する負荷の動的成分が時間の経過とともに変動した実績に基づいて、水道管路20の状態を高い精度でかつ効率的に把握することを実現可能な、測定部11による最適な測定時間帯を示す測定条件130を決定する。そして、設備状態分析装置10は、その最適な測定時間帯に負荷情報110を取得し、取得した負荷情報110を使用して、現在までに、あるいは指定された期間に、水道管路20に加えられた負荷の累積を分析する。これにより、本実施形態に係る設備状態分析装置10は、設備に対して加えられた負荷の状況に基づいて当該設備の状態を推定する精度を効率的に高めることができる。
 また、本実施形態に係る設備状態分析装置10は、測定条件130を決定する際に、データベース19から入手した水道管路20の仕様を表す仕様情報190と、SCADAシステム30から入手した水道管路20の運用状態を表す運用情報300と、もあわせて使用する。これにより、本実施形態に係る設備状態分析装置10は、最適な測定時間帯を、より正確に決定することができる。
 また、本実施形態に係る設備状態分析装置10は、仕様情報190に基づいて、水道管路20に加わる負荷をシミュレーションにより求めることによって、水道管路20の状態を高い精度でかつ効率的に把握することを実現可能な、測定部11による最適な測定場所を示す測定条件130を決定する。そして、ユーザは、必要に応じて、測定条件130が示す最適な測定場所にセンサを設置することができる。これにより、本実施形態に係る設備状態分析装置10は、設備に対して加えられた負荷の状況に基づいて当該設備の状態を推定する精度をさらに高めることができる。
 また、本実施形態に係る設備状態分析装置10は、仕様情報190、及び、水道管路20の設置状態を表す設置情報191に基づいて、水道管路20の強度を推定し、その推定結果と、水道管路20に加えられた負荷に関する分析結果とに基づいて、水道管路20に関する事故発生の可能性の大きさを予測する。そして設備状態分析装置10は、予測した事故発生の可能性の大きさと、事故発生による影響度の大きさを表す事故影響度情報192とに基づいて、水道管路20に関する事故の危険度合いを予測する。これにより、本実施形態に係る設備状態分析装置10は、水道管路20を効率的に維持管理することを実現できる。
 また、本実施形態に係る設備状態分析装置10は、複数の水道管路20の個々に関する、補修工事の容易さと、補修工事の費用との少なくともいずれかを含む補修工事情報193と、事故の危険度合いに関する予測結果とに基づいて、複数の水道管路20に関する補修工事を行う優先度を決定する。これにより、本実施形態に係る設備状態分析装置10は、複数の水道管路20を効率的に維持管理することを実現できる。
 尚、本実施形態に係る設備状態分析装置10が設備状態を分析する対象は、水道管路20に限定されない。設備状態分析装置10は、水道管路以外の様々な設備を、設備状態の分析対象としてもよい。
 <第2の実施形態>
 図4は、本願発明の第2の実施形態に係る設備状態分析装置40の構成を示すブロック図である。
 本実施形態に係る設備状態分析装置40は、測定部41、抽出部42、測定条件決定部43、及び、分析部44を備えている。
 測定部41は、設備50に対する負荷を測定し、測定した負荷を表す負荷情報410を、測定条件430に基づいて生成する。
 抽出部42は、測定部41によって生成された負荷情報410から、時間の経過とともに動的に変動する度合いが基準以上である負荷の動的成分を表す動的負荷情報420を抽出する。
 測定条件決定部43は、動的負荷情報420の時間推移に基づいて、負荷情報410が生成される時間帯を示す測定条件430を決定する。
 分析部44は、測定条件420に基づいて得られた負荷情報410を使用して、設備50に加えられた負荷を分析する。
 本実施形態に係る設備状態分析装置40は、設備に対して加えられた負荷の状況に基づいて当該設備の状態を推定する精度を効率的に高めることができる。その理由は、設備状態分析装置40は、設備50に関する負荷情報410から動的負荷情報420を抽出し、抽出した動的負荷情報420の時間推移に基づいて測定条件430を決定し、測定条件430に基づいて得られた負荷情報410を使用して、現在までに設備50に加えられた負荷を分析するからである。
 <ハードウェア構成例>
 上述した各実施形態において図1、及び、図4に示した設備状態分析装置における各部は、専用のHW(HardWare)(電子回路)によって実現することができる。また、図1、及び、図4において、少なくとも、下記構成は、ソフトウェアプログラムの機能(処理)単位(ソフトウェアモジュール)と捉えることができる。
・測定部11及び41における測定制御機能、
・抽出部12及び42、
・測定条件決定部13及び43、
・分析部14及び44、
・推定部15、
・予測部16、
・優先度決定部17。
 但し、これらの図面に示した各部の区分けは、説明の便宜上の構成であり、実装に際しては、様々な構成が想定され得る。この場合のハードウェア環境の一例を、図5を参照して説明する。
 図5は、本願発明の各実施形態に係る設備状態分析装置を実行可能な情報処理装置900(コンピュータ)の構成を例示的に説明する図である。即ち、図5は、図1、及び、図4に示した設備状態分析装置を実現可能なコンピュータ(情報処理装置)の構成であって、上述した実施形態における各機能を実現可能なハードウェア環境を表す。
 図5に示した情報処理装置900は、構成要素として下記を備えている。
・CPU(Central_Processing_Unit)901、
・ROM(Read_Only_Memory)902、
・RAM(Random_Access_Memory)903、
・ハードディスク(記憶装置)904、
・外部装置や図1(図4)に示す測定部11(41)との通信インタフェース905、
・バス906(通信線)、
・CD-ROM(Compact_Disc_Read_Only_Memory)等の記録媒体907に格納されたデータを読み書き可能なリーダライタ908、
・情報提示手段として機能するモニターやスピーカ、キーボード等の入力デバイス等の入出力インタフェース909。
 即ち、上記構成要素を備える情報処理装置900は、これらの構成がバス906を介して接続された一般的なコンピュータである。情報処理装置900は、CPU901を複数備える場合もあれば、マルチコアにより構成されたCPU901を備える場合もある。
 そして、上述した実施形態を例に説明した本願発明は、図5に示した情報処理装置900に対して、次の機能を実現可能なコンピュータプログラムを供給する。その機能とは、その実施形態の説明において参照したブロック構成図(図1、及び、図4)における上述した構成、或いはフローチャート(図3)の機能である。本願発明は、その後、そのコンピュータプログラムを、当該ハードウェアのCPU901に読み出して解釈し実行することによって達成される。また、当該装置内に供給されたコンピュータプログラムは、読み書き可能な揮発性のメモリ(RAM903)、または、ROM902やハードディスク904等の不揮発性の記憶デバイスに格納すれば良い。
 また、前記の場合において、当該ハードウェア内へのコンピュータプログラムの供給方法は、現在では一般的な手順を採用することができる。その手順としては、例えば、CD-ROM等の各種記録媒体907を介して当該装置内にインストールする方法や、インターネット等の通信回線を介して外部よりダウンロードする方法等がある。そして、このような場合において、本願発明は、係るコンピュータプログラムを構成するコード或いは、そのコードが格納された記録媒体907によって構成されると捉えることができる。
 以上、上述した実施形態を模範的な例として本願発明を説明した。しかしながら、本願発明は、上述した実施形態には限定されない。即ち、本願発明は、本願発明のスコープ内において、当業者が理解し得る様々な態様を適用することができる。
 この出願は、2018年2月16日に出願された日本出願特願2018-026173を基礎とする優先権を主張し、その開示の全てをここに取り込む。
 10  設備状態分析装置
 11  測定部
 110  負荷情報
 12  抽出部
 120  動的負荷情報
 121  静的負荷情報
 13  測定条件決定部
 130  測定条件
 14  分析部
 15  推定部
 16  予測部
 17  優先度決定部
 18  提示部
 19  データベース
 190  仕様情報
 191  設置情報
 192  事故影響度情報
 193  補修工事情報
 20  水道管路
 30  SCADAシステム
 300  運用情報
 40  設備状態分析装置
 41  測定部
 410  負荷情報
 42  抽出部
 420  動的負荷情報
 43  測定条件決定部
 430  測定条件
 44  分析部
 50  設備
 900  情報処理装置
 901  CPU
 902  ROM
 903  RAM
 904  ハードディスク(記憶装置)
 905  通信インタフェース
 906  バス
 907  記録媒体
 908  リーダライタ
 909  入出力インタフェース

Claims (10)

  1.  設備に対する負荷を測定し、測定した前記負荷を表す負荷情報を、測定条件に基づいて生成する測定手段と、
     前記測定手段によって生成された前記負荷情報から、時間の経過とともに動的に変動する度合いが基準以上である前記負荷の動的成分を表す動的負荷情報を抽出する抽出手段と、
     前記動的負荷情報の時間推移に基づいて、前記負荷情報が生成される時間帯を示す前記測定条件を決定する測定条件決定手段と、
     前記測定条件に基づいて生成された前記負荷情報を使用して、前記設備に加えられた前記負荷を分析する分析手段と、
     を備える設備状態分析装置。
  2.  前記抽出手段は、前記負荷情報を表す信号に含まれる前記信号の周波数成分を分析することによって、あるいは、前記信号の時間変化を分析する信号処理を行うことによって、前記動的負荷情報を抽出する、
     請求項1に記載の設備状態分析装置。
  3.  前記測定条件決定手段は、外部から入手した、前記設備の仕様を表す仕様情報と、前記設備の運用状態を表す運用情報とに基づいて、前記測定条件を決定する、
     請求項1または請求項2に記載の設備状態分析装置。
  4.  前記測定条件決定手段は、前記仕様情報に基づいて、前記負荷をシミュレーションにより求めることによって、前記測定手段による測定場所を示す前記測定条件を決定する、
     請求項3に記載の設備状態分析装置。
  5.  前記仕様情報、及び、前記設備の設置状態を表す設置情報に基づいて、前記設備の強度を推定する推定手段と、
     前記推定手段による推定結果と、前記分析手段による分析結果とに基づいて、前記設備に関する事故発生の可能性の大きさを予測し、予測した事故発生の可能性の大きさと、前記事故発生による影響度の大きさとに基づいて、事故の危険度合いを予測する予測手段と、
     さらに備える、請求項3または請求項4に記載の設備状態分析装置。
  6.  外部から入手した、複数の前記設備の個々に関する、補修工事の容易さと、前記補修工事の費用との少なくともいずれかを含む補修工事情報と、前記予測手段による前記危険度合いに関する予測結果とに基づいて、複数の前記設備に関する前記補修工事を行う優先度を決定する優先度決定手段をさらに備える、
     請求項5に記載の設備状態分析装置。
  7.  入出力インタフェースを用いて情報をユーザに提示可能な提示手段をさらに備え、
     前記測定条件決定手段は、決定した前記測定条件を前記提示手段に入力する、
     請求項1乃至請求項6のいずれか一項に記載の設備状態分析装置。
  8.  前記設備は流体が流れる管路であり、
     前記抽出手段は、前記流体による静圧及び動圧を含む前記負荷から、前記動圧を表す前記動的負荷情報を抽出する、
     請求項1乃至請求項7のいずれか一項に記載の設備状態分析装置。
  9.  情報処理装置によって、
      設備に対する負荷を測定し、測定した前記負荷を表す負荷情報を、測定条件に基づいて生成し、
      生成した前記負荷情報から、時間の経過とともに動的に変動する度合いが基準以上である前記負荷の動的成分を表す動的負荷情報を抽出し、
      前記動的負荷情報の時間推移に基づいて、前記負荷情報が生成される時間帯を示す前記測定条件を決定し、
      前記測定条件に基づいて生成された前記負荷情報を使用して、前記設備に加えられた前記負荷を分析する、
     設備状態分析方法。
  10.  設備に対する負荷を測定し、測定した前記負荷を表す負荷情報を、測定条件に基づいて生成する測定処理と、
     前記測定処理によって生成された前記負荷情報から、時間の経過とともに動的に変動する度合いが基準以上である前記負荷の動的成分を表す動的負荷情報を抽出する抽出処理と、
     前記動的負荷情報の時間推移に基づいて、前記負荷情報が生成される時間帯を示す前記測定条件を決定する測定条件決定処理と、
     前記測定条件に基づいて生成された前記負荷情報を使用して、前記設備に加えられた前記負荷を分析する分析処理と、
     をコンピュータに実行させるための設備状態分析プログラムが格納された記録媒体。
PCT/JP2019/005360 2018-02-16 2019-02-14 設備状態分析装置、設備状態分析方法、及び、設備状態分析プログラムが格納された記録媒体 WO2019160043A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US16/964,379 US11946603B2 (en) 2018-02-16 2019-02-14 Facility state analyzing device, facility state analyzing method, and recording medium storing facility state analyzing program thereon
EP19755075.9A EP3754321A4 (en) 2018-02-16 2019-02-14 SYSTEM CONDITION ANALYSIS DEVICE, SYSTEM CONDITION ANALYSIS METHOD AND RECORDING MEDIUM WITH SYSTEM CONDITION ANALYSIS PROGRAM STORED ON IT
JP2020500558A JP6981525B2 (ja) 2018-02-16 2019-02-14 設備状態分析装置、設備状態分析方法、及び、設備状態分析プログラム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018026173 2018-02-16
JP2018-026173 2018-02-16

Publications (1)

Publication Number Publication Date
WO2019160043A1 true WO2019160043A1 (ja) 2019-08-22

Family

ID=67618635

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/005360 WO2019160043A1 (ja) 2018-02-16 2019-02-14 設備状態分析装置、設備状態分析方法、及び、設備状態分析プログラムが格納された記録媒体

Country Status (4)

Country Link
US (1) US11946603B2 (ja)
EP (1) EP3754321A4 (ja)
JP (1) JP6981525B2 (ja)
WO (1) WO2019160043A1 (ja)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1114782A (ja) * 1997-06-19 1999-01-22 Shikoku Electric Power Co Inc 配管劣化評価方法及び装置
JP2002310840A (ja) * 2001-04-10 2002-10-23 Noriyuki Uto 水道管の管理システム
JP2007205860A (ja) 2006-02-01 2007-08-16 Sekisui Jushi Co Ltd 既設標識柱の耐久性評価方法、及び既設標識柱の耐久性評価を行うための基準設定方法
JP4371119B2 (ja) * 2006-05-10 2009-11-25 パナソニック電工株式会社 異常監視方法
JP2012112787A (ja) 2010-11-24 2012-06-14 Toshiba Corp 機器の疲労寿命評価装置、方法及びプログラム
JP2014016691A (ja) 2012-07-06 2014-01-30 Hitachi Ltd 設備維持管理業務支援システム、およびその方法
EP2940447A1 (en) * 2014-04-28 2015-11-04 Villeroy & Boch Gustavsberg AB A system and method for monitoring of piping systems
JP2018026173A (ja) 2012-07-10 2018-02-15 株式会社リコー システム及び方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030171879A1 (en) * 2002-03-08 2003-09-11 Pittalwala Shabbir H. System and method to accomplish pipeline reliability
US8457908B2 (en) * 2009-06-11 2013-06-04 University Of Washington Sensing events affecting liquid flow in a liquid distribution system
CN104870952B (zh) * 2012-05-22 2018-11-09 澳大利亚国家Ict有限公司 土木结构的完整性
WO2016059462A1 (en) * 2014-10-17 2016-04-21 Pieraccini Massimiliano A method and apparatus for monitoring slender elements by means of dynamic measurements of structural asymmetry
US9964468B1 (en) * 2014-12-08 2018-05-08 Bentley Systems, Incorporated Optimizing sensor placement for structural health monitoring

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1114782A (ja) * 1997-06-19 1999-01-22 Shikoku Electric Power Co Inc 配管劣化評価方法及び装置
JP2002310840A (ja) * 2001-04-10 2002-10-23 Noriyuki Uto 水道管の管理システム
JP2007205860A (ja) 2006-02-01 2007-08-16 Sekisui Jushi Co Ltd 既設標識柱の耐久性評価方法、及び既設標識柱の耐久性評価を行うための基準設定方法
JP4371119B2 (ja) * 2006-05-10 2009-11-25 パナソニック電工株式会社 異常監視方法
JP2012112787A (ja) 2010-11-24 2012-06-14 Toshiba Corp 機器の疲労寿命評価装置、方法及びプログラム
JP2014016691A (ja) 2012-07-06 2014-01-30 Hitachi Ltd 設備維持管理業務支援システム、およびその方法
JP2018026173A (ja) 2012-07-10 2018-02-15 株式会社リコー システム及び方法
EP2940447A1 (en) * 2014-04-28 2015-11-04 Villeroy & Boch Gustavsberg AB A system and method for monitoring of piping systems

Also Published As

Publication number Publication date
EP3754321A4 (en) 2021-04-14
JP6981525B2 (ja) 2021-12-15
US11946603B2 (en) 2024-04-02
EP3754321A1 (en) 2020-12-23
JPWO2019160043A1 (ja) 2020-12-17
US20200347994A1 (en) 2020-11-05

Similar Documents

Publication Publication Date Title
Gul et al. Damage assessment with ambient vibration data using a novel time series analysis methodology
Ni et al. Integrating bridge structural health monitoring and condition-based maintenance management
Giordano et al. The value of monitoring a structural health monitoring system
US10451416B1 (en) Optimizing sensor placement for structural health monitoring based on information entropy or total modal energy
Andersen et al. Ranking procedure on maintenance tasks for monitoring of embankment dams
Moravej et al. Computation-effective structural performance assessment using Gaussian process-based finite element model updating and reliability analysis
JPWO2018179727A1 (ja) 配管診断装置、資産管理装置、配管診断方法、及びプログラム
WO2019160043A1 (ja) 設備状態分析装置、設備状態分析方法、及び、設備状態分析プログラムが格納された記録媒体
JP6480305B2 (ja) 予測方法
Omenzetter et al. Quantifying the value of SHM for emergency management of bridges at-risk from seismic damage
Oliveira et al. Dynamic monitoring system for utility-scale wind turbines: damage detection and fatigue assessment
Raphael et al. Sensor data interpretation in bridge monitoring—A case study
Martakis et al. Amplitude dependency effects in the structural identification of historic masonry buildings
Monavari SHM-based structural deterioration assessment
Zhang et al. Near-real time evaluation method of seismic damage based on structural health monitoring data
Yadav et al. Dynamic PRA with component aging and degradation modeled utilizing plant risk monitoring data
Limongelli Toward the development of standardized procedures for structural health monitoring
Papadimitriou et al. Fatigue monitoring and remaining lifetime prognosis using operational vibration measurements
Limongelli Vibration-based structural health monitoring: Challenges and opportunities
Brüske et al. Fact sheet on the domains of the value of information in structural health monitoring
KR20190043823A (ko) 가상현실 환경에서의 지식기반 조업자의 안전훈련 시스템 및 방법
Inaudi et al. Integrated structural health monitoring systems for high-rise buildings
Esposito et al. Tools and strategies to incorporate stress tests into the long-term planning and life cycle management of non-nuclear Cis
Narayan et al. Instrumented health monitoring of dams based on potential failure mode analysis
Bertola et al. Selection of informative monitoring techniques for bridge-performance evaluations

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19755075

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020500558

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019755075

Country of ref document: EP

Effective date: 20200916