WO2019093591A1 - 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법 - Google Patents

건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법 Download PDF

Info

Publication number
WO2019093591A1
WO2019093591A1 PCT/KR2018/002199 KR2018002199W WO2019093591A1 WO 2019093591 A1 WO2019093591 A1 WO 2019093591A1 KR 2018002199 W KR2018002199 W KR 2018002199W WO 2019093591 A1 WO2019093591 A1 WO 2019093591A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
construction
chat
keyword
information management
Prior art date
Application number
PCT/KR2018/002199
Other languages
English (en)
French (fr)
Inventor
이강
조재현
김원준
송태석
Original Assignee
연세대학교 산학협력단
(주)창소프트아이앤아이
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 연세대학교 산학협력단, (주)창소프트아이앤아이 filed Critical 연세대학교 산학협력단
Publication of WO2019093591A1 publication Critical patent/WO2019093591A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/20Natural language analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Definitions

  • the present invention relates to an information management system for automating construction project information management and a method of managing construction project information using a chat platform. More particularly, the chatbot participating in a chat room as a member recognizes a preset construction information keyword, Construction project information such as extracting and storing the information of the construction project automatically, thereby making it possible to efficiently utilize the chat contents and to reduce the waste of manpower required for simple repetitive work Construction management using information management system and chat platform for information management automation And a project information management method.
  • the above-mentioned prior art aims to input the results of the management tasks for realizing the construction work in real time and to provide the real time information of the construction progress information, and the results of the construction status and the management work are updated in the database according to the progress of the work.
  • the present invention has been made to solve the above problems of the related art, and it is an object of the present invention to provide a method of utilizing chat contents to be carried out between a user of a construction worker and a manager at a construction site for construction project information management.
  • the present invention also provides a method and a management system for automatically creating a recurring construction log, an operation description, a job instruction, and the like by the chatbot.
  • an information management system for automating construction project information management using a chat platform, the system comprising: A) recognizing a construction information keyword previously set in the chat message input by the chatbot in the chat room; b) extracting construction information data associated with the recognized construction information keyword by the information management server equipped with the chatbot; And c) the information management server classifies the extracted construction information data based on the construction information keyword and stores it in a construction project information DB.
  • the information management server detects missing construction information data necessary for generating the construction log; And providing, by the chatbot, a request for inputting the missing construction information data as a chat message.
  • the construction information data includes at least one of site information, personnel information, material information, equipment information, work content information, and work amount information.
  • the information management server receives a construction information display request including the construction information keyword; And providing the construction information corresponding to the construction information keyword as a chat message from the stored construction information data to the chatbot.
  • the chatbot after the step (c), the chatbot provides a construction job request, which is generated by the information management server and includes the construction information keyword, as a chat message .
  • the method further comprises: a1) after the step a), the information management server determines whether the recognized construction information keyword is a construction information keyword corresponding to a preset chat management condition; a2) performing chat management by the chatbot based on the construction information keyword when the recognized construction information keyword is a construction information keyword corresponding to a predetermined chat management condition.
  • the chat management is at least one of separation of the chat room, establishment of a chat room, and invitation of a user associated with the construction information keyword.
  • the construction information keyword when the construction information keyword is inputted based on a preset chatbutton call command in step a1), the construction information keyword is set to a construction information keyword corresponding to a preset chat management condition .
  • the extracted construction information data includes work request information
  • the construction information data includes the work request information input time, And is stored as workload information based on a preset termination approval keyword input time for the job.
  • the information management server transmits the location information, direction information And analyzing the on-site drawings based on at least one of the analysis information of the building and the analysis information of the on-site drawing.
  • the information management server classifies and stores corresponding photograph information based on the determined specific position.
  • the information management server 10 analyzes the photograph information, And stores the photo information by classifying it according to the type of work.
  • the recognition of the construction information keyword is performed based on a predetermined chatbob call command.
  • a computer readable recording medium recording a program for causing a computer to execute a construction project information management method using the chat platform.
  • an information management system for automatically managing construction project information through a chatbot participating in a chat room, the system comprising: a chat platform ; An information management server having a chatbot participating in the chat room and performing construction project information management; And a construction project information DB for storing the construction information data extracted from the chat message by the chatbot.
  • the information management server comprises: a recognition module for recognizing a preset construction information keyword in a chat message input to the chatting room; A construction information extraction module for extracting construction information data associated with the recognized construction information keyword; And a storage module for classifying the extracted construction information data based on the construction information keyword and storing the classified construction information in the construction project information DB.
  • FIG. 1 is a configuration diagram of an information management system according to an embodiment of the present invention.
  • FIG. 2 is a configuration diagram of an information management server according to an embodiment of the present invention.
  • FIG. 3 is a flowchart of a method of managing construction project information according to an embodiment of the present invention.
  • FIG. 4 is a schematic diagram of a chat room according to a method of managing construction project information according to an embodiment of the present invention.
  • 5 and 6 are flowcharts of a method of managing construction project information according to another embodiment of the present invention.
  • FIG. 7 to 9 are flowcharts of a method of managing construction project information according to another embodiment of the present invention.
  • FIG. 10 is a schematic diagram of a chat room according to another embodiment of the present invention.
  • FIG. 11 is a flowchart of a method for managing construction project information using a chat platform according to another embodiment of the present invention.
  • a method of managing construction project information using a chat platform of the present invention is performed in an information management system for automating construction project information management using a chat platform, A) recognizing a construction information keyword previously set in a chat message input by the chatbot in the chat room; b) extracting construction information data associated with the recognized construction information keyword by the information management server equipped with the chatbot; And c) the information management server classifies the extracted construction information data based on the construction information keyword and stores the classified construction information in the construction project information DB.
  • FIG. 1 is a configuration diagram of an information management system according to an embodiment of the present invention
  • FIG. 2 is a configuration diagram of an information management server 10 according to an embodiment of the present invention.
  • the information management system 1 for automating construction project information management automatically performs construction project information management through the chatbot 12 participating in the chat room 22.
  • the information management system 1 includes a chat platform 20 for allowing a chat message relating to a construction project to be transmitted from one or more chat rooms 22 to a chat platform 22, A construction project information DB 30 in which construction information data extracted from a chat message is stored by the information management server 10 and an information management server 10 in which a construction project information management is performed, .
  • the chat platform 20 can be understood as a chat server that provides chat services such as a kakao chat, a line, etc., and each user can use the chat service provided by the chat platform 20 via the user terminal 40 .
  • the information management server 10 interworking with the chat platform 20 can communicate chat messages with the respective users by accessing the chat room 22 provided by the chat platform 20 using the chatbot 12 , And is capable of obtaining information from the chat message input to the chat room (22).
  • the information management server 10 includes a recognition module 13 for recognizing a preset construction information keyword in a chat message input to the chat room 22 and a construction information extracting unit 23 for extracting construction information data inputted in association with the recognized construction information keyword A construction information extraction module 14 and a storage module 15 for classifying the extracted construction information data based on the construction information keyword and storing the classified construction information in the construction project information DB 30.
  • the information management server 10 includes a construction log generation module 16 for generating a construction log using the stored construction information data in a predetermined diary style and a chat message is provided to the chat room 22 by the chatbot 12
  • a chat module 17 for separating or creating a chat room 22 and inviting a specific user to a chat room, an operating module 18 for performing overall management of the server, And a chatbot 12 that automatically performs construction project information management through the module.
  • the chatbot 12 is provided in the information management server 10 in the form of a chatbot API (Application Programming Interface), and can communicate and learn with other users participating in the chat room 22 in a natural language. (Chat message) input through a known parser to recognize various input information (e.g., construction management information) included in the conversation information.
  • chatbot API Application Programming Interface
  • the chatbot 12 utilizes (processes) the stored construction information data through each module of the information management server 10 and links it with a construction information dashboard and a three-dimensional design model (e.g., a BIM model)
  • a construction information dashboard e.g., a BIM model
  • the visual information of the construction information data can be visualized in the chat room 22.
  • the construction project information database (DB) 30 is configured to store construction information data by the storage module 15, and can be understood as various known databases.
  • the construction project information DB 30 is provided independently of the information management server 10, but may be provided as a dependent storage medium in the information management server 10.
  • the construction project information DB 30 includes, for example, an on-site weather DB, a meteorological office DB, a schedule DB, a manpower information DB, a material information DB, a process DB, an equipment information DB, a work content information DB, , A contract, a construction plan, etc.) DB, and a workload DB.
  • the information management server 10 may be configured to operate independently for each construction company, and may be configured to operate in conjunction with a separate server provided for each construction company.
  • the information management system 1 recognizes the conversation contents by the chatbot 12 participating in the chat room 22 where the conversation is performed between the users Since the construction information data can be detected, classified and stored by each of the modules provided, the chat contents can be used for construction information management without a control element for controlling each user's user terminal 40, .
  • FIG. 3 is a flowchart of a method of managing information on a construction project according to an embodiment of the present invention
  • FIG. 4 is a schematic diagram of a chat room according to a method of managing construction project information according to an embodiment of the present invention.
  • a method for managing construction project information using a chat platform 20 is performed in an information management system 1 for automating construction project information management using a chat platform 20, And automatically manage the construction project information through the chatbot 12 participating in the project.
  • the chatbot 12 recognizes a preset construction information keyword in a chat message input in the chat room 22 (step a), and transmits the construction information to the chatbot 12
  • the information management server 10 extracts the construction information data associated with the recognized construction information keyword (step b), and the information management server 10 extracts the extracted construction information data from the construction information And stores the construction information data classified by the storage module 15 provided in the information management server 10 in the construction project information DB 30 (step c).
  • the construction information keyword may be a keyword related to construction, for example, a crack, defect, or crack, which is a keyword indicating occurrence of a problem.
  • the construction information keyword is set in advance for construction information management and can be additionally selected as a construction information keyword by learning of the chatbot 12.
  • the construction information keyword may be set to recognize similar keywords, that is, similar words, through the term extension (for example, learning, synonym input, etc.) as well as the same keywords having the same character.
  • the chatbot 12 is configured to automatically recognize a construction information keyword in conjunction with the recognition module 13 when the preset construction information keyword is input to the chat room 22 as a chat message.
  • the recognition of the construction information keyword may be performed based on a predetermined chatbob call command.
  • the chatbot call command may be made of '@', '#', etc., and is configured to recognize a chat message to be input by calling the chatbot 12.
  • Such a chatbob call command is, for example, The chatbot 12 can not be used in the case where the chatbot 12 can not participate in the chat room 22 or the chatbot 12 is not a preset construction keyword, And the chatbot 12 may learn to recognize such a word as a construction information keyword (see FIG. 4).
  • the construction information data is information associated with the construction information keyword to identify a construction situation and includes at least one of site information, personnel information, material information, equipment information, work content information, and work amount information.
  • the construction information data may be inputted simultaneously or sequentially with the construction information keyword, and if it is unclear whether the association input is uncertain, whether the construction information data is associated with the construction information keyword by the chatbot 12 can be confirmed .
  • the chatbot 12 recognizes a preset construction information keyword, and can confirm whether or not the construction information data inputted together with the construction information keyword is correct by re-displaying it in a chat message and request confirmation by the user (manager or the like)
  • the construction information data can be extracted by the extraction module 14 of the information management server 10 (refer to FIG. 4).
  • the site information includes site name, construction company, permit date, construction date, completion date, weather, temperature, precipitation, maximum wind speed, date of day, cumulative construction date, site manager, . ≪ / RTI >
  • the personnel information may include the type of construction (type of construction), personnel providing company, total number of days in the past, personnel of today's day, total number of people, total, construction site information.
  • the material information may include the name of the material, the material specification, the material unit, the planned quantity, the previous day accumulation, the daily material usage, the total accumulation, the material use, and the progress rate information.
  • the equipment information may include the equipment name, the equipment specification, the total number of days, the equipment used for the day, and the total accumulated information.
  • the work contents information includes the contents of the previous day work, the previous day disaster occurrence status (eg, disaster, disaster level, disaster contents), today's work contents, today's major management points and countermeasures, , Site supervisor (person in charge of the business), planned process rate, actual process rate, process status (actual process rate against plan), safety management focus, today's special items, name specials, night / holiday work contents, Information on intellectual matters, the status of on-site arrangement, scene photograph information, and the like.
  • the previous day disaster occurrence status eg, disaster, disaster level, disaster contents
  • today's work contents today's major management points and countermeasures
  • Site supervisor person in charge of the business
  • planned process rate actual process rate
  • process status actual process rate against plan
  • safety management focus today's special items, name specials, night / holiday work contents
  • Information on intellectual matters the status of on-site arrangement, scene photograph information, and the like.
  • the workload information may include work type, company name, work location, work contents, specification, unit, design amount (total amount), previous day total, today work amount, total accumulation, schedule plan, progress rate information.
  • 5 and 6 are flowcharts of a method of managing construction project information according to another embodiment of the present invention.
  • the information management server 10 transmits a message to the chat platform 20 using the chat platform 20 according to another embodiment of the present invention.
  • the constructed construction information data is provided to generate a construction log (step d).
  • the construction log generation is performed by the construction log generation module 16, and the log log format includes a variety of different construction log forms for each organization, and a construction log form suitable for the corresponding construction project is selected and a construction log is created do.
  • step bd1 the information management server 10 detects missing construction information data necessary for generating the construction log, prior to step d, to generate the construction log.
  • construction information data is additionally provided through the construction log generation module 16 and the chatbox 12 provided in the information management server 10 .
  • the construction log generation module 16 When the construction log generation module 16 detects a missing part (e.g., blank space) in the log format, it recognizes what missing construction information data is to fill the missing part.
  • a missing part e.g., blank space
  • the chatbot 12 provides a request for inputting the missing construction information data as a chat message (bd2), and transmits construction information data (missing construction information data) from other users participating in the chatting room 22 Message, and the chatbot 12 recognizes the construction information data (preferably the construction information keyword), and the construction information extraction module 14 extracts the construction information data to complete the construction log.
  • construction information data preferably the construction information keyword
  • FIG. 7 to 9 are flowcharts of a method of managing construction project information according to another embodiment of the present invention.
  • the construction project information management method using the chat platform 20 can be configured to mutually provide a request for construction information to a user participating in the chat room 22.
  • the user corresponds to a construction supervisor, and the user may request the chatbot 12 to store the previously stored construction information data that needs confirmation, and the chatbot 12 may be configured to provide the construction information data to the chat room 22 have.
  • the information management server 10 receives a construction information display request including the construction information keyword (step ac1) And the construction information corresponding to the construction information keyword is provided as a chat message from the stored construction information data (step ac2).
  • chatbot 12 The construction information provided by the chatbot 12 as a chat message can be visually confirmed by the user.
  • the chat message is not limited to characters but may be provided in the form of a graph, a photograph, or a voice message.
  • the information management server 10 may request the user to perform a construction work.
  • the chatbot 12 sends a construction job execution request, which is generated by the information management server 10 and includes the construction information keyword, as a chat message (step ac11).
  • the user can perform the construction work at the site in response to the construction work execution request and provide the contents of the construction work (e.g., workload, work time, etc.) performed through the user terminal 40 as a chat message.
  • the method for managing construction project information using the chat platform 20 is characterized in that the chatbot 12 performs various chat management using the chat platform 20 in cooperation with the chat module 17 .
  • the information management server 10 determines whether the recognized construction information keyword is a construction information keyword corresponding to a predetermined chat management condition (step a1) ).
  • the chat management can be understood as at least one of, for example, separation of the chat room 22, establishment of the chat room 22, and invitation of the user associated with the construction information keyword.
  • the chat management condition is a condition for performing such chat management, for example, when a new issue related to construction appears in a chat message.
  • the information management server 10 automatically determines whether the chat management conditions are satisfied.
  • the information management server 10 stores the construction information keyword as a construction information keyword corresponding to a preset chat management condition It can be judged.
  • the chatbot 12 performs chat management based on the construction information keyword (step a2).
  • the information management server 10 transmits a construction information keyword
  • the chat module 17 may assign a new job ID based on the construction information keyword 'crack', separate the chat, and create another chat room 22 '.
  • the chat module 17 can set the control of the newly installed chat room 22 'based on the assigned job ID and invites users (construction supervisors) associated with the job ID to the chat room 22' , Job report, and the like can be performed in the chat room 22 (refer to FIG. 4).
  • the new chat room 22 is managed by the chat box 12 and the chat module 17 in addition to the existing chat room 22 and two or more chat rooms 22 are managed by one or more chatbots 12 at the same time Management (e.g., waiting for construction information keyword recognition).
  • FIG. 10 is a schematic diagram of a chat room according to another embodiment of the present invention.
  • the construction project information management method using the chat platform 20 allows workload management by the chatbot 12 even if direct information on the workload is not provided through the chat message.
  • the extracted construction information data may include job request information. If the job start time and / or the job end time are not clearly displayed even though the job is completed, the information management server 10 ), It is difficult to judge the workload with only the information given.
  • the construction information data is controlled so as to be stored as the work amount information based on the request input time of the job input to the chat room 22 and the preset end approval keyword input time for the job .
  • a work request by a chatbot is performed at 10:30 am
  • a work by a user is performed at 2:30 pm
  • FIG. 11 is a flowchart of a method of managing construction project information using the chat platform 20 according to another embodiment of the present invention.
  • the photograph provided by the user in the chat room 22 may have meta values of location information and direction information using a GPS, a direction sensor, etc., and the location information, direction information, spatial information input by the user, (Eg, 3D drawings) analysis information of a construction site to determine a location where a photograph was created, that is, a specific location in a building where the construction issue occurred.
  • step c the information management server 10 can automatically classify and store corresponding photo information based on the determined specific position.
  • the information management server 10 analyzes the photographic information to determine the type of the photographic information, categorizes the photographic information according to the type of the photographic information, .
  • the chatbot 12 automatically analyzes and tags various information such as the location of the issue, the related type, the related construction information keyword, the photographing time, the photographer, etc., and automatically classifies the photograph information according to the tagged information It is possible.
  • the photo information is an important data for clearly expressing the progress of the work, it is desirable that the photo information can be classified and stored in various forms so that it is possible to efficiently check the work state suitable for each user.
  • the construction project information management method using the chat platform 20 is implemented in the form of a program command that can be executed by various computers and is recorded on a computer readable recording medium.
  • the recording medium may include a program command, a data file, a data structure, etc., alone or in combination.
  • the recording medium may be a magnetic recording medium such as a hard disk or a floppy disk, an optical recording medium such as a CD or a DVD, , A ROM, a RAM, a flash memory, and the like.
  • the program instructions recorded on the recording medium may be specially designed or configured for the present invention, and may be known and available.
  • the program instructions may include machine code or advanced language code.
  • the present invention relates to an information management system for automating construction project information management and a method for managing construction project information using a chat platform.
  • the method includes recognizing and extracting keywords of construction project information among chat conversation contents distributed for work at a construction site, Can be automatically managed. Therefore, there is a possibility of being industrially used because it can reduce the waste of manpower required for paperwork performed in a simple and repetitive manner, and can improve work productivity.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Quality & Reliability (AREA)
  • Artificial Intelligence (AREA)
  • Operations Research (AREA)
  • Computational Linguistics (AREA)
  • General Engineering & Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 챗봇(12)이 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하고 공사 정보 데이터를 추출, 저장함으로써 건설 프로젝트 정보를 자동으로 관리하는 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법에 관한 것으로, 본 발명의 바람직한 실시예에 따르면, 채팅 플랫폼(20)을 이용하여 건설 프로젝트 정보 관리를 자동화하기 위한 정보 관리시스템(1)에서 이뤄지며, 채팅방(22)에 참여한 챗봇(12)에 의해 건설 프로젝트 정보를 자동으로 관리하는 방법으로, a) 상기 채팅방(22)에 입력된 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하는 단계; b) 상기 인식된 공사 정보 키워드와 연관 입력된 공사 정보 데이터를 추출하는 단계; 및 c) 상기 추출된 공사 정보 데이터를 상기 공사 정보 키워드에 기초하여 분류하고 저장하는 단계;를 포함하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법이 제공된다.

Description

건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법
본 발명은 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법에 관한 것으로서, 상세하게는 채팅방에 구성원의 일부로서 참여한 챗봇이 미리 설정된 공사 정보 키워드를 인식하고 공사 정보 데이터를 추출, 저장하는 등 건설 프로젝트 정보를 자동으로 관리함으로써 채팅 내용을 효율적으로 이용하고 단순 반복적 업무에 소요되는 인력 낭비를 절감할 수 있는 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법에 관한 것이다.
건설(공사) 현장에서는 다수의 근로자 및 관리자가 동원되고, 엄청난 물량의 자재 및 장비를 이용하여 수많은 작업들이 이뤄진다.
이러한 건설 현장에서는 매일 발생하고 누적되는 수많은 공사 정보를 관리할 필요가 있으며, 종래 건설 장부에 수기로 기록, 관리되던 공사 정보를 컴퓨터에 구비된 일정 관리 프로그램 및 인터넷 등을 이용하여 관리하는 등 공사 정보 관리를 위해 필요한 인적, 물적 노력을 최소화하기 위한 다양한 시도가 이뤄지고 있다.
공사 정보 관리에 관한 종래 기술의 일례로, 대한민국 공개특허 제10-2007-0004162호의 "일정관리 프로그램을 이용한 건설공사현황 정보의 통합관리 데이터베이스 구축방법"이 있다.
상기 종래 기술은, 건설공사 수행을 위한 제반 관리업무의 실적입력과 공사추진 현황정보의 실시간 제공을 목적으로 하는 것으로, 작업의 진척도에 따라 공사현황 및 관리업무의 실적이 데이터베이스에 업데이트되도록 한다.
그러나 상기 종래 기술은 작업의 진척도에 따라 공사 현황을 별도의 사용자(작업자)가 인터페이스를 통해 입력해야 하며, 사용자가 공사 현황을 확인시에도 데이터 베이스에 접근하여 직접 내용을 확인해야 하므로, 공사 정보의 관리가 용이하지 않다는 문제가 있다.
또한, 상기 종래 기술은 사용자가 인터페이스를 통해 데이터 베이스에 접근이 용이하도록 하여 상세한 지식이 없는 자도 쉽게 사용할 수 있도록 구성하였으나, 여러 명의 사용자가 개별적으로 데이터 베이스에 접근하여 공사 현황을 기재하는 과정에서 오류가 발생하기 쉽다는 문제가 있다.
더욱이 공사 현황 업데이트를 위해 각각의 사용자가 작업일보(공사 일지)를 작성하는 과정은 단순 반복적 작업이므로, 효율적인 공사 관리를 위해서는 이러한 단순 반복적 작업에 따른 업무 부담을 개선할 필요가 있다.
본 발명은 상기 종래기술이 가지는 문제점을 해결하기 위한 것으로서, 건설현장에서 공사 담당자 및 관리자 등의 사용자 사이에 이뤄지는 채팅 내용을 건설 프로젝트 정보 관리를 위해 활용하는 방법을 제공하고자 한다.
또한, 본 발명은 단순 반복적으로 이뤄지는 공사 일지의 작성, 업무 내용 파악, 업무 지시 등이 챗봇에 의해 자동으로 이뤄지는 방법 및 이를 위한 관리시스템을 제공하고자 한다.
상기와 같은 과제를 해결하기 위한 본 발명의 바람직한 실시예에 따르면, 채팅 플랫폼을 이용하여 건설 프로젝트 정보 관리를 자동화하기 위한 정보 관리시스템에서 이뤄지며, 채팅방에 참여한 챗봇을 통해 건설 프로젝트 정보를 자동으로 관리하는 방법으로, a) 상기 챗봇이 상기 채팅방에 입력된 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하는 단계; b) 상기 챗봇이 구비된 정보 관리서버가 상기 인식된 공사 정보 키워드와 연관 입력된 공사 정보 데이터를 추출하는 단계; 및 c) 상기 정보 관리서버가 상기 추출된 공사 정보 데이터를 상기 공사 정보 키워드에 기초하여 분류하고 건설 프로젝트 정보 DB에 저장하는 단계;를 포함하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법이 제공된다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 c) 단계 이후에, d) 상기 정보 관리서버가 미리 설정된 일지 양식에 상기 저장된 공사 정보 데이터를 제공하여 공사 일지를 생성하는 단계;를 더 포함하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 d) 단계 이전에, 상기 정보 관리서버가 상기 공사 일지 생성을 위해 필요한 누락 공사 정보 데이터를 감지하는 단계; 및 상기 챗봇이 상기 누락 공사 정보 데이터의 입력 요청을 채팅 메시지로 제공하는 단계;를 더 포함하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 공사 정보 데이터는 현장정보, 인원정보, 자재정보, 장비정보, 작업내용정보 및 작업량정보 중 적어도 어느 하나를 포함하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 c) 단계 이후에, 상기 정보 관리서버가 상기 공사 정보 키워드가 포함된 공사 정보 표시 요청을 수신하는 단계; 및 상기 챗봇이 상기 저장된 공사 정보 데이터에서 상기 공사 정보 키워드에 해당하는 공사 정보를 채팅 메시지로 제공하는 단계;를 더 포함하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 c) 단계 이후에, 상기 챗봇이, 상기 정보 관리서버에서 생성되고 상기 공사 정보 키워드가 포함된 공사 업무 수행 요청을 채팅 메시지로 제공하는 단계;를 더 포함하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 a) 단계 이후, a1) 상기 정보 관리서버가 상기 인식된 공사 정보 키워드가 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드인지 여부를 판단하는 단계; a2) 상기 인식된 공사 정보 키워드가 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드인 경우, 상기 공사 정보 키워드에 기초하여 상기 챗봇이 채팅 관리를 수행하는 단계;를 더 포함하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 채팅 관리는 상기 채팅방의 분리, 채팅방의 신설 및 상기 공사 정보 키워드에 연관된 사용자의 초대 중 적어도 어느 하나인 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 a1) 단계에서, 상기 공사 정보 키워드가 미리 설정된 챗봇 호출 명령에 기초하여 입력되는 경우, 상기 공사 정보 키워드를 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드로 판단하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 b) 단계에서, 상기 추출되는 공사 정보 데이터는 작업 요청 정보를 포함하며, 상기 c) 단계에서, 상기 공사 정보 데이터는, 상기 작업 요청 정보 입력시간과 해당 작업에 대한 미리 설정된 종료승인 키워드 입력시간에 기초하여 작업량 정보로서 저장되는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 b) 단계에서 상기 공사 정보 데이터에 사진 정보가 포함되는 경우, 상기 정보 관리서버가, 입력된 공간 정보 또는 상기 사진 정보에 포함된 위치정보, 방향정보 및 현장도면의 분석정보 중 적어도 어느 하나에 기초하여 이슈가 발생한 건물 내 특정 위치를 판단하는 단계;를 더 포함하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 c) 단계에서, 상기 정보 관리서버가 상기 판단된 특정 위치에 기초하여 해당 사진 정보를 분류하고 저장하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 b) 단계에서 상기 공사 정보 데이터에 사진 정보가 포함되는 경우, 상기 c) 단계에서, 상기 정보 관리서버(10)가 상기 사진 정보를 분석하여 공종을 판단하고, 공종별로 분류하여 사진 정보를 저장하는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 공사 정보 키워드의 인식은 미리 설정된 챗봇 호출 명령에 기초하여 이뤄지는 것을 특징으로 한다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법이 컴퓨터에서 실행되도록 하는 프로그램을 기록한 컴퓨터 판독 가능한 기록매체가 제공된다.
또 다른 본 발명의 바람직한 실시예에 따르면, 채팅방에 참여한 챗봇을 통해 건설 프로젝트 정보 관리를 자동으로 수행하는 정보 관리시스템으로서, 하나 이상의 채팅방에서 사용자 간의 건설 프로젝트 관련 채팅 메시지 전달이 이뤄질 수 있도록 하는 채팅 플랫폼; 상기 채팅방에 참여하여 건설 프로젝트 정보 관리를 수행하는 챗봇이 구비된 정보 관리서버; 및 상기 챗봇에 의해 채팅 메시지로부터 추출된 공사 정보 데이터를 저장하는 건설 프로젝트 정보 DB;를 포함하는 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템이 제공된다.
또 다른 본 발명의 바람직한 실시예에 따르면, 상기 정보 관리서버는, 상기 채팅방에 입력된 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하는 인식모듈; 상기 인식된 공사 정보 키워드와 연관 입력된 공사 정보 데이터를 추출하는 공사 정보 추출모듈; 및 상기 추출된 공사 정보 데이터를 상기 공사 정보 키워드에 기초하여 분류하고 상기 건설 프로젝트 정보 DB에 저장하는 저장모듈;을 포함하는 것을 특징으로 한다.
본 발명에 따르면 다음과 같은 효과를 얻을 수 있다.
첫째, 건설 현장에서 업무를 위해 나누는 채팅 대화 내용을 인식, 추출하여 건설 프로젝트를 자동으로 관리할 수 있다는 효과가 있다.
둘째, 다양한 건설 현장에서 단순, 반복적으로 수행되는 서류 업무 및 업무 관리가 챗봇에 의해 자동으로 이뤄지므로, 효율적인 업무 관리 및 인력 관리가 가능하고 업무의 생산성을 향상시키는 효과가 있다.
도 1은 본 발명의 일실시예에 따른 정보 관리시스템의 구성도이다.
도 2는 본 발명의 일실시예에 따른 정보 관리서버의 구성도이다.
도 3은 본 발명의 일실시예에 따른 건설 프로젝트 정보 관리방법의 순서도이다.
도 4는 본 발명의 일실시예에 따른 건설 프로젝트 정보 관리방법에 따른 채팅방의 모식도이다.
도 5 및 도 6은 본 발명의 또 다른 실시예에 따른 건설 프로젝트 정보 관리방법의 순서도이다.
도 7 내지 도 9는 본 발명의 또 다른 실시예에 따른 건설 프로젝트 정보 관리방법의 순서도이다.
도 10은 본 발명의 또 다른 실시예에 따른 건설 프로젝트 정보 관리방법에 따른 채팅방의 모식도이다.
도 11은 본 발명의 또 다른 실시예에 따른 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법의 순서도이다.
상기와 같은 목적을 달성하기 위하여 본 발명의 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법은 채팅 플랫폼을 이용하여 건설 프로젝트 정보 관리를 자동화하기 위한 정보 관리시스템에서 이뤄지며, 채팅방에 참여한 챗봇을 통해 건설 프로젝트 정보를 자동으로 관리하는 방법으로, a) 상기 챗봇이 상기 채팅방에 입력된 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하는 단계; b) 상기 챗봇이 구비된 정보 관리서버가 상기 인식된 공사 정보 키워드와 연관 입력된 공사 정보 데이터를 추출하는 단계; 및 c) 상기 정보 관리서버가 상기 추출된 공사 정보 데이터를 상기 공사 정보 키워드에 기초하여 분류하고 건설 프로젝트 정보 DB에 저장하는 단계;를 포함하는 것을 특징으로 한다.
이하에서는 본 발명의 실시예를 첨부된 도면을 참조하여 상세히 설명한다. 그러나 본 발명을 설명함에 있어 공지의 구성을 구체적으로 설명함으로 인하여 본 발명의 기술적 사상을 흐리게 하거나 불명료하게 하는 경우에는 위 공지의 구성에 관하여는 그 설명을 생략하기로 한다.
도 1은 본 발명의 일실시예에 따른 정보 관리시스템의 구성도, 도 2는 본 발명의 일실시예에 따른 정보 관리서버(10)의 구성도이다.
본 발명의 일실시예에 따른 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템(1)은 채팅방(22)에 참여한 챗봇(12)을 통해 건설 프로젝트 정보 관리를 자동으로 수행한다.
도 1에 도시된 바와 같이, 상기 정보 관리시스템(1)은 하나 이상의 채팅방(22)에서 사용자 간의 건설 프로젝트 관련 채팅 메시지 전달이 이뤄질 수 있도록 하는 채팅 플랫폼(20)과, 상기 채팅방(22)에 참여하여 건설 프로젝트 정보 관리를 수행하는 챗봇(12)이 구비된 정보 관리서버(10) 및 상기 정보 관리서버(10)에 의해 채팅 메시지로부터 추출된 공사 정보 데이터가 저장되는 건설 프로젝트 정보 DB(30)를 포함하여 이뤄진다.
상기 채팅 플랫폼(20)은 카카오톡, 라인 등의 채팅 서비스를 제공하는 채팅 서버로 이해될 수 있으며, 각각의 사용자가 사용자 단말(40)을 통해 채팅 플랫폼(20)에서 제공하는 채팅 서비스를 이용할 수 있도록 구성된다.
상기 채팅 플랫폼(20)과 연동되는 정보 관리서버(10)는 챗봇(12)을 이용하여 상기 채팅 플랫폼(20)에서 제공하는 채팅방(22)에 접속함으로써 상기 각각의 사용자와 채팅 메시지를 전달할 수 있으며, 상기 채팅방(22)에 입력된 채팅 메시지로부터 정보를 수득할 수 있도록 구성된다.
상기 정보 관리서버(10)는, 상기 채팅방(22)에 입력된 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하는 인식모듈(13), 상기 인식된 공사 정보 키워드와 연관 입력된 공사 정보 데이터를 추출하는 공사 정보 추출모듈(14) 및 상기 추출된 공사 정보 데이터를 상기 공사 정보 키워드에 기초하여 분류하고 상기 건설 프로젝트 정보 DB(30)에 저장하는 저장모듈(15)을 포함한다.
상기 정보 관리서버(10)는, 미리 설정된 일지 양식에 상기 저장된 공사 정보 데이터를 이용하여 공사 일지를 생성하는 공사 일지 생성모듈(16), 챗봇(12)에 의해 채팅방(22)에 채팅 메시지를 제공하고 채팅방(22)을 분리 또는 신설하며 특정한 사용자를 채팅 방에 초대하는 기능을 수행하는 채팅모듈(17), 서버의 전반적인 관리를 수행하는 운영모듈(18) 및 상기 채팅방(22)에서 상기 각각의 모듈을 통해 건설 프로젝트 정보 관리를 자동으로 수행하는 챗봇(12)을 포함한다.
상기 챗봇(chatbot, 12)은 상기 정보 관리서버(10)에 챗봇 API(Application Programming Interface) 형태로 구비되고, 채팅방(22)에 참여한 다른 사용자들과 자연어로 대화, 학습할 수 있으며, 채팅방(22)에 입력된 대화 정보(채팅 메시지)를 공지의 구문분석기(parser)를 통해서 추출하여 대화 정보에 포함된 다양한 입력 정보(예, 공사 관리 정보)를 인식할 수 있도록 구성된다.
상기 챗봇(12)은 상기 정보 관리서버(10)의 각각의 모듈을 통해 상기 저장된 공사 정보 데이터를 이용(가공)하고, 건설정보 대쉬보드 및 3차원 설계모델(예, BIM 모델)과 연계함으로써 다양한 방법으로 상기 채팅방(22)에 공사 정보 데이터를 시각화하여 표현할 수 있다.
상기 건설 프로젝트 정보 DB(database, 30)는 상기 저장모듈(15)에 의해 공사 정보 데이터가 저장되도록 구성되며, 공지의 다양한 데이터베이스로 이해될 수 있다.
도 1에서는 상기 건설 프로젝트 정보 DB(30)가 상기 정보 관리서버(10)와 독립적으로 구비되는 것으로 표현하였으나, 상기 정보 관리서버(10) 내부에 종속적 저장매체로서 구비되는 것도 가능하다.
상기 건설 프로젝트 정보 DB(30)는, 예를 들어, 현장날씨 DB, 기상청 DB, 일정 DB, 인력 정보 DB, 자재 정보 DB, 공정 DB, 장비 정보 DB, 작업내용 정보 DB, 공사서류(예, 시방서, 계약서, 시공계획서 등) DB, 작업량 DB 중 적어도 어느 하나를 포함하여 이뤄진다.
상기 정보 관리서버(10)는 각각의 건설사별로 독립적으로 운용되도록 구성될 수 있으며, 하나의 메인 서버 형태로 이뤄져 각각의 건설사별로 구비되는 개별 서버와 연동되어 운용되도록 구성될 수도 있다.
본 실시예에 따른 정보 관리시스템(1)은 사용자(예, 공사 담당자) 사이에 대화가 이뤄지는 채팅방(22)에 참여한 챗봇(12)에 의해 대화 내용을 인식하고, 상기 정보 관리서버(10)에 구비된 각각의 모듈에 의해 공사 정보 데이터를 검출, 분류 및 저장할 수 있으므로, 각각의 사용자의 사용자 단말(40)을 별도로 제어하는 제어요소 없이도 채팅 내용을 공사 정보 관리에 사용할 수 있어서 효율적인 시스템 구성이 가능하게 된다.
이하, 상기 정보 관리시스템(1)을 이용한 건설 프로젝트 정보 관리 방법에 대해 도면을 기준으로 상세히 설명한다.
도 3은 본 발명의 일실시예에 따른 건설 프로젝트 정보 관리방법의 순서도, 도 4는 본 발명의 일실시예에 따른 건설 프로젝트 정보 관리방법에 따른 채팅방의 모식도이다.
본 발명의 일실시예에 따른 채팅 플랫폼(20)을 이용한 건설 프로젝트 정보 관리방법은 채팅 플랫폼(20)을 이용하여 건설 프로젝트 정보 관리를 자동화하기 위한 정보 관리시스템(1)에서 이뤄지며, 채팅방(22)에 참여한 챗봇(12)을 통해 건설 프로젝트 정보를 자동으로 관리하는 방법이다.
상기 건설 프로젝트 정보 관리방법은, 도 3에 도시된 바와 같이, 상기 챗봇(12)이 상기 채팅방(22)에 입력된 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하고(a 단계), 상기 챗봇(12)이 구비된 정보 관리서버(10)가 상기 인식된 공사 정보 키워드와 연관 입력된 공사 정보 데이터를 추출하며(b 단계), 상기 정보 관리서버(10)가 상기 추출된 공사 정보 데이터를 상기 공사 정보 키워드에 기초하여 분류하고, 상기 정보 관리서버(10)에 구비된 저장모듈(15)이 분류된 공사 정보 데이터를 건설 프로젝트 정보 DB(30)에 저장한다(c 단계).
상기 공사 정보 키워드는 공사 전반에 관련된 키워드로서, 예를 들어, 도 4에 도시된 바와 같이, 문제 발생을 의미하는 키워드인 크랙(crack), 불량, 균열 등일 수 있으며, 이외에도 현장 상황을 알려주는 키워드인 날씨, 작업인원, 업무시작 등의 다양한 키워드로 이뤄질 수 있다. 상기 공사 정보 키워드는 공사 정보 관리를 위해 미리 설정된 것으로, 챗봇(12)의 학습에 의해 추가적으로 공사 정보 키워드로 선정될 수도 있다. 또한, 상기 공사 정보 키워드는 동일한 문자로 이뤄진 동일 키워드뿐 아니라 용어 확장(예, 학습, 유의어 입력 등)을 통해 유사한 키워드, 즉 유사어에 대해서도 인식하도록 설정될 수도 있다.
일례로, 상기 챗봇(12)은 상기 미리 설정된 공사 정보 키워드가 채팅방(22)에 채팅 메시지로 입력되면, 상기 인식모듈(13)과 연동하여 공사 정보 키워드를 자동으로 인식하도록 구성된다.
다른 예로, 상기 공사 정보 키워드의 인식은 미리 설정된 챗봇 호출 명령에 기초하여 이뤄질 수도 있다. 예를 들어, 상기 챗봇 호출 명령은 '@', "#' 등으로 이뤄질 수 있으며, 챗봇(12)을 호출하여 입력하는 채팅 메시지를 인식하도록 하기 위해 구성된다. 이러한 챗봇 호출 명령은, 예를 들어, 채팅방(22)에 챗봇(12)이 미처 참여하지 못한 경우나, 미리 설정된 공사 정보 키워드가 아니어서 챗봇(12)이 아직 인식하지 못하거나 인식하기 어려운 유사어로 이뤄지는 단어로 이뤄지는 경우에 이용될 수 있으며, 챗봇(12)이 이러한 단어를 공사 정보 키워드로 인식하도록 학습하는 역할을 더불어 수행할 수 있다(도 4 참고).
상기 공사 정보 데이터는 상기 공사 정보 키워드와 연관되어 공사 상황을 파악할 수 있는 정보이며, 현장정보, 인원정보, 자재정보, 장비정보, 작업내용정보 및 작업량정보 중 적어도 어느 하나를 포함한다.
상기 공사 정보 데이터는 상기 공사 정보 키워드와 동시에 또는 순차로 입력될 수 있으며, 연관 입력 여부가 불분명한 경우 상기 챗봇(12)에 의해 상기 공사 정보 키워드와 연관 입력된 공사 정보 데이터인지가 확인될 수 있다.
예를 들어, 상기 챗봇(12)이 미리 설정된 공사 정보 키워드를 인식하고 상기 공사 정보 키워드와 함께 입력된 공사 정보 데이터가 맞는지를 채팅 메시지로 재표시하여 확인 요청할 수 있으며, 사용자(관리자 등)에 의해 긍정 키워드(예, 네, 예 등)가 입력되는 것을 인지하면 상기 정보 관리서버(10)의 추출모듈(14)에 의해 공사 정보 데이터가 추출될 수 있다(도 4 참고).
일례로, 현장정보는 현장명, 시공업체, 허가일, 착공일, 준공일, 날씨, 기온, 강수량, 최대풍속, 금일날짜, 누적공사일, 현장책임자(현장소장), 담당자사인, 작성자 정보 등을 포함할 수 있다.
일례로, 인원정보는 공종(공사 종류), 인원제공업체, 전일누계, 금일 공사인원, 누계인원, 총계, 공사부위 정보 등을 포함할 수 있다.
일례로, 자재정보는 자재명, 자재규격, 자재단위, 계획수량, 전일누계, 금일 자재사용량, 총누계, 자재용도, 진도율 정보 등을 포함할 수 있다.
일례로, 장비정보는 장비명, 장비규격, 전일누계, 금일 장비사용량, 총누계 정보 등을 포함할 수 있다.
일례로, 작업내용정보는 전일 작업내용, 전일 재해발생현황(예, 재해자, 재해정도, 재해내용), 금일 작업내용, 금일 작업 주요 관리포인트 및 대책, 명일 작업계획, 명일 작업 주요 관리포인트 및 대책, 현장책임자(업체 담당자), 계획 공정률, 실제 공정률, 공정현황(계획 대비 실공정률), 안전관리 중점사항, 금일 특기사항, 명일 특기사항, 야간/휴일 작업 내용, 민원발생/환경개선활동, 요청사항, 지적사항, 현장 정리정돈 현황, 현장사진 정보 등을 포함할 수 있다.
일례로, 작업량 정보는 공종, 업체명, 작업위치, 작업내용, 규격, 단위, 설계량(총량), 전일누계, 금일 공사량, 총누계, 명일 계획, 진도율 정보 등을 포함할 수 있다.
도 5 및 도 6은 본 발명의 또 다른 실시예에 따른 건설 프로젝트 정보 관리방법의 순서도이다.
본 발명의 또 다른 실시예에 따른 채팅 플랫폼(20)을 이용한 건설 프로젝트 정보 관리방법은, 도 5에 도시된 바와 같이, 상기 c 단계 이후에, 상기 정보 관리서버(10)가 미리 설정된 일지 양식에 상기 저장된 공사 정보 데이터를 제공하여 공사 일지를 생성한다(d 단계).
상기 공사 일지의 생성은 전술한 공사 일지 생성모듈(16)에 의해 이뤄지며, 상기 일지 양식은 기관별로 상이한 다양한 공사 일지 양식을 미리 구비하여 해당 건설 프로젝트에 적합한 공사 일지 양식을 선택, 공사 일지를 작성하게 된다.
이때, 해당 건설 현장에 대한 일지 양식이 미리 설정되지 않은 경우, 공사 일보 템플릿을 이용하여 추가적으로 생성하는 것도 가능하다.
도 6에 도시된 바와 같이, 상기 공사 일지를 생성하기 위하여 상기 d 단계 이전에, 상기 정보 관리서버(10)가 상기 공사 일지 생성을 위해 필요한 누락 공사 정보 데이터를 감지한다(bd1 단계).
즉, 공사 일지를 생성하기 위해 필요한 공사 정보 데이터가 부족한 경우, 이를 보충하기 위하여 상기 정보 관리서버(10)에 구비된 공사 일지 생성모듈(16) 및 챗봇(12)을 통해 공사 정보 데이터를 추가적으로 더 취득하도록 한다.
상기 공사 일지 생성모듈(16)이 일지 양식에서 누락된 부분(예, 공란)을 감지하면, 누락된 부분을 채우기 위한 누락 공사 정보 데이터가 무엇인지를 파악하게 된다.
다음으로, 상기 챗봇(12)이 상기 누락 공사 정보 데이터의 입력 요청을 채팅 메시지로 제공하고(bd2 단계), 채팅방(22)에 함께 참여한 다른 사용자들로부터 공사 정보 데이터(누락 공사 정보 데이터)를 채팅 메시지로 제공받으며, 상기 챗봇(12)이 공사 정보 데이터(바람직하게, 공사 정보 키워드)를 인식하고, 상기 공사 정보 추출모듈(14)이 공사 정보 데이터를 추출하여 공사 일지를 완성하게 된다.
도 7 내지 도 9는 본 발명의 또 다른 실시예에 따른 건설 프로젝트 정보 관리방법의 순서도이다.
한편, 본 발명의 또 다른 실시예에 따른 채팅 플랫폼(20)을 이용한 건설 프로젝트 정보 관리방법은 채팅방(22)에 참여중인 사용자와 공사 정보에 관한 요청을 상호 제공하도록 구성될 수 있다.
일례로, 상기 사용자는 공사 담당자에 해당하며, 사용자가 확인이 필요한 기 저장된 공사 정보 데이터를 챗봇(12)에게 요청하고 챗봇(12)이 해당 공사 정보 데이터를 채팅방(22)에 제공하도록 구성될 수 있다.
이 경우, 도 7에 도시된 바와 같이, 상기 c 단계 이후에, 상기 정보 관리서버(10)가 상기 공사 정보 키워드가 포함된 공사 정보 표시 요청을 수신하고(ac1 단계) 상기 챗봇(12)이 상기 저장된 공사 정보 데이터에서 상기 공사 정보 키워드에 해당하는 공사 정보를 채팅 메시지로 제공(ac2 단계)하도록 구성된다.
상기 챗봇(12)에 의해 채팅 메시지로 제공된 공사 정보는 사용자가 시각적으로 확인할 수 있다. 다만, 상기 채팅 메시지는 문자에 한정되는 것은 아니며, 그래프나 사진 형태로 제공될 수도 있고, 음성 메시지 형태로 제공되는 것도 가능하다.
다른 예로, 상기 정보 관리서버(10)가 사용자에게 공사 업무를 수행하도록 요청할 수도 있다.
이 경우, 도 8에 도시된 바와 같이, 상기 c 단계 이후에, 상기 챗봇(12)이, 상기 정보 관리서버(10)에서 생성되고 상기 공사 정보 키워드가 포함된 공사 업무 수행 요청을 채팅 메시지로 제공(ac11 단계)하도록 구성된다. 사용자는 상기 공사 업무 수행 요청에 따라 해당 현장에서 공사 업무를 수행하고, 수행한 공사 업무 내용(예, 작업량, 작업시간 등)을 사용자 단말(40)을 통해 채팅 메시지로 제공할 수 있다.
본 발명의 또 다른 실시예에 따른 채팅 플랫폼(20)을 이용한 건설 프로젝트 정보 관리방법은, 상기 챗봇(12)이 상기 채팅모듈(17)과 연동하여 상기 채팅 플랫폼(20)을 이용한 다양한 채팅관리를 수행하도록 한다.
일례로, 도 9에 도시된 바와 같이, 상기 a 단계 이후, 상기 정보 관리서버(10)가 상기 인식된 공사 정보 키워드가 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드인지 여부를 판단한다(a1 단계).
상기 채팅 관리는, 예를 들어, 상기 채팅방(22)의 분리, 채팅방(22)의 신설 및 상기 공사 정보 키워드에 연관된 사용자의 초대 중 적어도 어느 하나로 이해될 수 있다.
상기 채팅 관리 조건은 이러한 채팅 관리가 이뤄지도록 하는 조건으로서, 예를 들어, 공사와 관련한 신규 이슈가 채팅 메시지로 등장하는 경우일 수 있다.
일례로, 이러한 채팅 관리 조건 해당 여부의 판단은 상기 정보 관리서버(10)에 의해 자동으로 이뤄진다.
다른 예로, 상기 a1 단계에서, 상기 공사 정보 키워드가 미리 설정된 챗봇 호출 명령에 기초하여 입력되는 경우, 상기 정보 관리서버(10)는 상기 공사 정보 키워드를 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드로 판단할 수 있다.
다음으로, 상기 인식된 공사 정보 키워드가 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드인 경우, 상기 공사 정보 키워드에 기초하여 상기 챗봇(12)이 채팅 관리를 수행한다(a2 단계).
예를 들어, 도 4에 도시된 바와 같이, 공사 진행 과정에서 새로운 이슈인 ‘크랙’에 관한 공사 정보 키워드가 입력된 경우, 상기 정보 관리서버(10)가 이를 채팅 관리 조건에 해당하는 공사 정보 키워드로 판단하게 되며, 상기 채팅모듈(17)은 상기 공사 정보 키워드인 ‘크랙’에 기초하여 새로운 작업 ID를 부여하고 채팅을 분리, 다른 채팅방(22')을 신설할 수 있다.
상기 채팅모듈(17)은 신설된 채팅방(22')의 방제를 상기 부여된 작업 ID에 기초하여 설정할 수 있으며, 상기 작업 ID와 연관된 사용자(공사 담당자)들을 채팅방(22')으로 초대하여 작업지시, 작업보고 등의 작업 관리가 채팅방(22)에서 이뤄지도록 할 수 있다(도 4 참고).
상기 신설된 채팅방(22)은 기존의 채팅방(22)과 더불어 상기 챗봇(12) 및 채팅모듈(17)에 의해 관리되며, 2 이상의 다수의 채팅방(22)이 하나 이상의 챗봇(12)에 의해 동시에 관리(예, 공사 정보 키워드 인식 대기)될 수 있다.
도 10은 본 발명의 또 다른 실시예에 따른 건설 프로젝트 정보 관리방법에 따른 채팅방의 모식도이다.
본 발명의 또 다른 실시예에 따른 채팅 플랫폼(20)을 이용한 건설 프로젝트 정보 관리방법은, 작업량에 관한 직접적인 정보가 채팅 메시지를 통해 제공되지 않더라도 챗봇(12)에 의해 작업량 관리가 이뤄지도록 한다.
일례로, 상기 b 단계에서, 상기 추출되는 공사 정보 데이터는 작업 요청 정보를 포함할 수 있으며, 작업이 완료되더라도 작업 시작시간 및/또는 작업 종료시간이 명확히 표시되지 않은 경우, 상기 정보 관리서버(10)가 주어진 정보만으로는 작업량을 판단하는 것이 어렵게 된다.
본 실시예에서는, 상기 c 단계에서, 상기 공사 정보 데이터가 상기 채팅방(22)에 입력되는 작업의 요청 입력시간과 해당 작업에 대한 미리 설정된 종료승인 키워드 입력시간에 기초하여 작업량 정보로서 저장되도록 제어될 수 있다.
예를 들어, 도 10에 도시된 바와 같이, 오전 10시 30분에 챗봇(또는 관리자)에 의한 작업 요청이 이뤄지고, 사용자(공사 담당자)에 의한 작업이 오후 2시 30분에 이뤄지며, 관리자나 감독자에 의한 종료승인 키워드(예, 확인, 승인, 완료 등) 오후 3시 30분에 채팅 메시지로 입력되는 경우, 오전 10시 30분부터 오후 3시 30분까지 총 5시간의 작업량에 해당하는 작업이 이뤄졌음을 작업량에 관한 공사 정보 데이터로서 저장하게 된다.
도 11은 본 발명의 또 다른 실시예에 따른 채팅 플랫폼(20)을 이용한 건설 프로젝트 정보 관리방법의 순서도이다.
본 발명의 또 다른 실시예에 따른 채팅 플랫폼(20)을 이용한 건설 프로젝트 정보 관리방법은, 도 10 및 도 11에 도시된 바와 같이, 상기 b 단계에서 상기 공사 정보 데이터에 사진 정보가 포함되는 경우, 상기 정보 관리서버(10)가 입력된 공간 정보 또는 상기 사진 정보에 포함된 위치정보, 방향정보 및 현장도면의 분석정보 중 적어도 어느 하나에 기초하여 이슈가 발생한 건물 내 특정 위치를 자동으로 판단하는 단계(ab 단계)를 더 포함한다.
채팅방(22)에서 사용자에 의해 제공되는 사진은 GPS나 방향센서 등을 이용한 위치정보, 방향정보 등을 메타값으로 가질 수 있으며, 이러한 사진의 위치정보, 방향정보와 사용자에 의해 입력된 공간 정보 및/또는 공사 현장의 현장도면(예, 3D 도면) 분석정보를 이용하여 사진이 생성된 위치, 즉 해당 공사 이슈가 발생한 건물 내의 특정 위치를 판단하게 된다.
이때, 상기 c 단계에서는 상기 정보 관리서버(10)가 상기 판단된 특정 위치에 기초하여 해당 사진 정보를 자동으로 분류하고 저장할 수 있다.
다른 예로, b 단계에서 상기 공사 정보 데이터에 사진 정보가 포함되는 경우, 상기 c 단계에서, 상기 정보 관리서버(10)가 상기 사진 정보를 분석하여 공종을 판단하고, 공종별로 분류하여 사진 정보를 저장하도록 구성될 수 있다.
상기 챗봇(12)은 상기 이슈 발생 위치, 관련 공종, 관련 공사 정보 키워드, 촬영시간, 촬영자 등의 다양한 정보를 자동으로 분석하여 태깅(tagging)하고, 태그된 정보에 따라 사진 정보를 자동으로 분류할 수도 있다.
사진 정보는 작업의 진척 상태 등을 명확히 표현해주는 중요한 자료이므로, 각각의 사용자에게 적합한 효율적인 작업 상태 확인이 가능하도록, 사진 정보를 여러 형태로 분류하여 저장할 수 있도록 하는 것이 바람직하다.
본 발명의 일 실시예에 따른 채팅 플랫폼(20)을 이용한 건설 프로젝트 정보 관리방법은 다양한 컴퓨터에서 실행될 수 있는 프로그램 명령 형태로 구현되어 컴퓨터로 판독 가능한 기록매체에 기록된다.
상기 기록매체는 프로그램 명령, 데이터 파일, 데이터 구조 등을 단독으로 또는 조합하여 포함할 수 있으며, 일례로, 하드 디스크나 플로피 디스크 등의 자기 기록매체, CD나 DVD 등의 광기록 매체, 플롭티컬 디스크 등의 자기광 매체, 롬, 램, 플래쉬 메모리 등일 수 있다.
상기 기록매체에 기록되는 프로그램 명령은 본 발명을 위하여 특별히 설계되거나 구성될 수 있으며, 공지되어 사용 가능한 것일 수 있다. 일례로, 상기 프로그램 명령은 기계어 코드 또는 고급 언어 코드를 포함할 수 있다.
이상에서 본 발명은 구체적인 실시예를 참조하여 상세히 설명하였으나, 상기 실시예는 본 발명을 이해하기 쉽도록 하기 위한 예시에 불과한 것이므로, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 치환, 부가 및 변형된 실시 형태들 역시 하기의 청구범위에 의하여 정해지는 본 발명의 보호범위에 속한다고 할 것이다.
본 발명은 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법에 관한 것으로, 건설 현장에서 업무를 위해 나누는 채팅 대화 내용 중 건설 프로젝트 정보의 키워드를 인식하고 추출하여 건설 프로젝트의 정보를 자동으로 관리할 수 있다. 이에 단순 반복적으로 수행되는 서류 업무 등에 소요되는 인력 낭비를 절감할 수 있고, 업무의 생산성을 향상시킬 수 있다는 점에서 산업상 이용가능성이 있다.

Claims (17)

  1. 채팅 플랫폼을 이용하여 건설 프로젝트 정보 관리를 자동화하기 위한 정보 관리시스템(1)에서 이뤄지며, 채팅방(22)에 참여한 챗봇(12)을 통해 건설 프로젝트 정보를 자동으로 관리하는 방법으로,
    a) 상기 챗봇(12)이 상기 채팅방(22)에 입력된 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하는 단계;
    b) 상기 챗봇(12)이 구비된 정보 관리서버(10)가 상기 인식된 공사 정보 키워드와 연관 입력된 공사 정보 데이터를 추출하는 단계; 및
    c) 상기 정보 관리서버(10)가 상기 추출된 공사 정보 데이터를 상기 공사 정보 키워드에 기초하여 분류하고 건설 프로젝트 정보 DB(30)에 저장하는 단계;를 포함하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  2. 제1항에서,
    상기 c) 단계 이후에,
    d) 상기 정보 관리서버(10)가 미리 설정된 일지 양식에 상기 저장된 공사 정보 데이터를 제공하여 공사 일지를 생성하는 단계;를 더 포함하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  3. 제2항에서,
    상기 d) 단계 이전에,
    상기 정보 관리서버(10)가 상기 공사 일지 생성을 위해 필요한 누락 공사 정보 데이터를 감지하는 단계; 및
    상기 챗봇(12)이 상기 누락 공사 정보 데이터의 입력 요청을 채팅 메시지로 제공하는 단계;를 더 포함하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  4. 제1항에서,
    상기 공사 정보 데이터는 현장정보, 인원정보, 자재정보, 장비정보, 작업내용정보 및 작업량정보 중 적어도 어느 하나를 포함하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  5. 제1항에서,
    상기 c) 단계 이후에,
    상기 정보 관리서버(10)가 상기 공사 정보 키워드가 포함된 공사 정보 표시 요청을 수신하는 단계; 및
    상기 챗봇(12)이 상기 저장된 공사 정보 데이터에서 상기 공사 정보 키워드에 해당하는 공사 정보를 채팅 메시지로 제공하는 단계;를 더 포함하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  6. 제1항에서,
    상기 c) 단계 이후에,
    상기 챗봇(12)이, 상기 정보 관리서버(10)에서 생성되고 상기 공사 정보 키워드가 포함된 공사 업무 수행 요청을 채팅 메시지로 제공하는 단계;를 더 포함하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  7. 제1항에서,
    상기 a) 단계 이후,
    a1) 상기 정보 관리서버(10)가 상기 인식된 공사 정보 키워드가 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드인지 여부를 판단하는 단계;
    a2) 상기 인식된 공사 정보 키워드가 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드인 경우, 상기 공사 정보 키워드에 기초하여 상기 챗봇(12)이 채팅 관리를 수행하는 단계;를 더 포함하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  8. 제7항에서,
    상기 채팅 관리는 상기 채팅방(22)의 분리, 채팅방(22)의 신설 및 상기 공사 정보 키워드에 연관된 사용자의 초대 중 적어도 어느 하나인 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  9. 제7항에서,
    상기 a1) 단계에서,
    상기 공사 정보 키워드가 미리 설정된 챗봇 호출 명령에 기초하여 입력되는 경우, 상기 공사 정보 키워드를 미리 설정된 채팅 관리 조건에 해당하는 공사 정보 키워드로 판단하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  10. 제1항에서,
    상기 b) 단계에서,
    상기 추출되는 공사 정보 데이터는 작업 요청 정보를 포함하며,
    상기 c) 단계에서,
    상기 공사 정보 데이터는, 상기 작업 요청 정보 입력시간과 해당 작업에 대한 미리 설정된 종료승인 키워드 입력시간에 기초하여 작업량 정보로서 저장되는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  11. 제1항에서,
    상기 b) 단계에서 공사 정보 데이터에 사진 정보가 포함되는 경우,
    상기 정보 관리서버(10)가, 입력된 공간 정보 또는 상기 사진 정보에 포함된 위치정보, 방향정보 및 현장도면의 분석정보 중 적어도 어느 하나에 기초하여 이슈가 발생한 건물 내 특정 위치를 판단하는 단계;를 더 포함하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  12. 제11항에서,
    상기 c) 단계에서,
    상기 정보 관리서버(10)가 상기 판단된 특정 위치에 기초하여 해당 사진 정보를 분류하고 저장하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  13. 제1항에서,
    상기 b) 단계에서 공사 정보 데이터에 사진 정보가 포함되는 경우,
    상기 c) 단계에서,
    상기 정보 관리서버(10)가 상기 사진 정보를 분석하여 공종을 판단하고, 공종별로 사진 정보를 분류하여 저장하는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  14. 제1항에서,
    상기 공사 정보 키워드의 인식은 미리 설정된 챗봇 호출 명령에 기초하여 이뤄지는 것을 특징으로 하는 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법.
  15. 제1항 내지 제14항 중 어느 한 항의 건설 프로젝트 정보 관리방법이 컴퓨터에서 실행되도록 하는 프로그램을 기록한 컴퓨터 판독 가능한 기록매체.
  16. 채팅방(22)에 참여한 챗봇(12)을 통해 건설 프로젝트 정보 관리를 자동으로 수행하는 정보 관리시스템(1)으로서,
    하나 이상의 채팅방(22)에서 사용자 간의 건설 프로젝트 관련 채팅 메시지 전달이 이뤄질 수 있도록 하는 채팅 플랫폼(20);
    상기 채팅방(22)에 참여하여 건설 프로젝트 정보 관리를 수행하는 챗봇(12)이 구비된 정보 관리서버(10); 및
    상기 챗봇(12)에 의해 채팅 메시지로부터 추출된 공사 정보 데이터가 저장되는 건설 프로젝트 정보 DB(30);를 포함하는 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템.
  17. 제16항에서,
    상기 정보 관리서버(10)는,
    상기 채팅방(22)에 입력된 채팅 메시지에서 미리 설정된 공사 정보 키워드를 인식하는 인식모듈(13);
    상기 인식된 공사 정보 키워드와 연관 입력된 공사 정보 데이터를 추출하는 공사 정보 추출모듈(14); 및
    상기 추출된 공사 정보 데이터를 상기 공사 정보 키워드에 기초하여 분류하고 상기 건설 프로젝트 정보 DB에 저장하는 저장모듈(15);을 포함하는 것을 특징으로 하는 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템.
PCT/KR2018/002199 2017-11-09 2018-02-22 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법 WO2019093591A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20170148668 2017-11-09
KR10-2017-0148668 2017-11-09

Publications (1)

Publication Number Publication Date
WO2019093591A1 true WO2019093591A1 (ko) 2019-05-16

Family

ID=66437990

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2018/002199 WO2019093591A1 (ko) 2017-11-09 2018-02-22 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법

Country Status (1)

Country Link
WO (1) WO2019093591A1 (ko)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111698280A (zh) * 2020-04-24 2020-09-22 杭州传化智能制造科技有限公司 跨通信平台的运维方法、系统、计算机设备和存储介质
CN112464347A (zh) * 2020-12-04 2021-03-09 河南金途科技集团股份有限公司 建筑构件的工程量统计方法、装置、服务器及存储介质

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000030457A (ko) * 2000-03-02 2000-06-05 김헌출 인터넷을 통한 건설 프로젝트 관리 서비스 시스템과시스템의 구현방법
KR20010069224A (ko) * 2000-05-22 2001-07-25 김영희 상하수도 관리 프로그램을 이용한 상하수도 관리 방법 및그 프로그램을 기록한 기록매체
KR20060097410A (ko) * 2005-03-09 2006-09-14 (주)아이티엠 코퍼레이션 건축사사무소 인터넷을 이용한 건설공사 감리 업무 시스템 및 그 시스템의 감리 제어방법
KR20140094282A (ko) * 2013-01-22 2014-07-30 네이버비즈니스플랫폼 주식회사 다자간 메신저 서비스를 제공하는 방법 및 시스템
KR101760051B1 (ko) * 2016-05-04 2017-07-24 엔에이치엔엔터테인먼트 주식회사 업무 할당 및 협업을 제공하는 방법 및 시스템

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000030457A (ko) * 2000-03-02 2000-06-05 김헌출 인터넷을 통한 건설 프로젝트 관리 서비스 시스템과시스템의 구현방법
KR20010069224A (ko) * 2000-05-22 2001-07-25 김영희 상하수도 관리 프로그램을 이용한 상하수도 관리 방법 및그 프로그램을 기록한 기록매체
KR20060097410A (ko) * 2005-03-09 2006-09-14 (주)아이티엠 코퍼레이션 건축사사무소 인터넷을 이용한 건설공사 감리 업무 시스템 및 그 시스템의 감리 제어방법
KR20140094282A (ko) * 2013-01-22 2014-07-30 네이버비즈니스플랫폼 주식회사 다자간 메신저 서비스를 제공하는 방법 및 시스템
KR101760051B1 (ko) * 2016-05-04 2017-07-24 엔에이치엔엔터테인먼트 주식회사 업무 할당 및 협업을 제공하는 방법 및 시스템

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111698280A (zh) * 2020-04-24 2020-09-22 杭州传化智能制造科技有限公司 跨通信平台的运维方法、系统、计算机设备和存储介质
CN112464347A (zh) * 2020-12-04 2021-03-09 河南金途科技集团股份有限公司 建筑构件的工程量统计方法、装置、服务器及存储介质

Similar Documents

Publication Publication Date Title
WO2021040124A1 (ko) 인공지능 기반의 법률 문서 분석 시스템 및 방법
CN111260325A (zh) 基于bim的桥梁施工进度管理系统
WO2020000632A1 (zh) 发票开具方法、装置、设备及计算机可读存储介质
WO2020087978A1 (zh) 风控审核模型的生成方法、装置、设备及存储介质
WO2017195926A1 (ko) 원자력발전소 데이터기반 설계기준관리시스템 및 그 방법
WO2020122291A1 (ko) 인공지능 기반의 공동주택 관리업무지시 자동화 장치 및 방법
WO2020037547A1 (zh) 一种光纤网络智能维护方法和装置
CN109801416A (zh) 一种基于大数据分析的共建共维机房管理方法
WO2018074619A1 (ko) 컨테이너 터미널의 시뮬레이션 프로세스 자동화 시스템 및 방법
WO2024162573A1 (ko) 협업 툴에 연계하여 동기화된 인사 평가 관리 서비스를 제공하기 위한 장치 및 방법
WO2023003073A1 (ko) 지속가능한 시설물 관리를 위한 디지털 트윈 자동적용체계 기반의 시설정보통합관리시스템 구축 방법 및 장치
JP4859577B2 (ja) ビル設備作業報告書作成システム
WO2019093591A1 (ko) 건설 프로젝트 정보 관리 자동화를 위한 정보 관리시스템 및 채팅 플랫폼을 이용한 건설 프로젝트 정보 관리방법
WO2021133076A1 (ko) 인공지능 학습데이터 생성을 위한 크라우드소싱 기반 프로젝트의 작업단가 관리 방법 및 장치
WO2024167090A1 (ko) 공중(公衆)의 안전을 위하여 직원에 대한 철저한 교육관리가 요구되는 기업에서 법정직무교육대상자인 직원의 교육관리를 위한 사내교육용 학습관리시스템 및 그 방법
WO2021137523A1 (ko) 인공지능 학습데이터 생성을 위한 크라우드소싱 기반 프로젝트의 작업 시간 대비 검수 시간을 이용한 검수 단가 자동 업데이트 방법
WO2021261708A1 (ko) 정보시스템을 설계하여 프로그램과 데이터베이스를 자동으로 생성하고 테스트를 자동 수행하는 소프트웨어 공학플랫폼
WO2016093652A2 (ko) 전화번호를 통하여 클라우드 서버에 접속하여 가족 앨범을 이용할 수 있도록 하는 가족 앨범서비스 제공방법
CN111884336B (zh) 一种基于大数据的实时监控系统
WO2022270768A1 (ko) 지능형 약물감시 플랫폼을 제공하기 위한 방법 및 장치
CN112132300A (zh) 一种变电站检修方法、装置及系统
WO2023132425A1 (en) Apparatus, method and program for sharing information between applications
WO2016195220A1 (ko) Sns 플랫폼 기반의 업무 관리 시스템
WO2021091050A1 (ko) 크라우드 소싱 기반 프로젝트의 특성에 따른 검수자 선별 방법
WO2021132831A1 (ko) 인공지능 학습데이터 생성을 위한 크라우드소싱 기반 프로젝트의 작업자 및 검수자의 증감 운영 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18876044

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18876044

Country of ref document: EP

Kind code of ref document: A1