WO2019031156A1 - 管理システム、管理装置、管理方法および管理プログラム - Google Patents

管理システム、管理装置、管理方法および管理プログラム Download PDF

Info

Publication number
WO2019031156A1
WO2019031156A1 PCT/JP2018/026450 JP2018026450W WO2019031156A1 WO 2019031156 A1 WO2019031156 A1 WO 2019031156A1 JP 2018026450 W JP2018026450 W JP 2018026450W WO 2019031156 A1 WO2019031156 A1 WO 2019031156A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
facility
measurement
management
wireless terminal
Prior art date
Application number
PCT/JP2018/026450
Other languages
English (en)
French (fr)
Inventor
村田大后
Original Assignee
住友電気工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住友電気工業株式会社 filed Critical 住友電気工業株式会社
Priority to CN201880051173.2A priority Critical patent/CN111033410B/zh
Priority to JP2019514850A priority patent/JP6638864B2/ja
Priority to US16/636,393 priority patent/US20200173888A1/en
Publication of WO2019031156A1 publication Critical patent/WO2019031156A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/14Relay systems
    • H04B7/15Active relay systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/02Terminal devices

Definitions

  • the present invention relates to a management system, a management apparatus, a management method, and a management program.
  • This application claims priority based on Japanese Patent Application No. 2017-153236 filed on Aug. 8, 2017, the entire disclosure of which is incorporated herein.
  • the abnormality detection apparatus is an abnormality detection apparatus having detection means provided to a monitoring target, and calculation means for diagnosing a state of the monitoring target by a neural network based on detection data from the detection means,
  • the calculation means forms a model of the neural network using predetermined model creation data, diagnoses the state of the monitoring target based on the detected data, using the model of the neural network, and detects data at a predetermined time point
  • the input vector according to is added as an intermediate layer, the model of the neural network is updated, and after the update, the state of the monitoring target is diagnosed using the updated model of the neural network.
  • the management system of the present disclosure acquires and transmits a first wireless terminal device that acquires and transmits measurement information indicating a result of measuring the target equipment, and acquires and transmits equipment information on the operation of the target equipment. And a management device that acquires the measurement information and the equipment information and extracts a part of the measurement information based on the equipment information.
  • the management apparatus of the present disclosure is based on measurement information indicating a result of measuring a target facility, an acquisition unit that acquires facility information related to the operation of the target facility, and the facility information acquired by the acquisition unit. And a processing unit configured to extract a part of the measurement information acquired by the acquisition unit.
  • a management method is a management method in a management system including a first wireless terminal device, a second wireless terminal device, and a management device, wherein the first wireless terminal device is a target.
  • the steps of acquiring and transmitting measurement information indicating the result of measuring equipment, the step of acquiring and transmitting equipment information on the operation of the target equipment by the second wireless terminal device, and the management device Performing a process of acquiring measurement information and the equipment information, and extracting a part of the received measurement information based on the acquired equipment information.
  • the management program according to the present disclosure is a management program used in a management apparatus, which includes: a computer, measurement information indicating a result of measuring a target facility, and an acquisition unit acquiring facility information related to the operation of the target facility It is a program for functioning as a processing part which performs processing which extracts a part of the measurement information acquired by the acquisition part based on the equipment information acquired by the acquisition part.
  • One aspect of the present disclosure can be realized not only as a management system including such a characteristic processing unit, but also as a program for causing a computer to execute such characteristic processing.
  • one aspect of the present disclosure can be realized not only as a management apparatus including such a characteristic processing unit, but also as a management method in which such characteristic processing is performed as a step.
  • the present invention can be realized as a semiconductor integrated circuit that realizes part or all.
  • FIG. 1 is a diagram showing the configuration of a management system according to an embodiment of the present invention.
  • FIG. 2 is a diagram showing the configuration of a management apparatus according to the embodiment of the present invention.
  • FIG. 3 is a diagram showing measurement results based on a plurality of measurement information received by the management apparatus shown in FIG.
  • FIG. 4 is a diagram showing an example of a state change of equipment information in the management apparatus shown in FIG.
  • FIG. 5 is a diagram showing measurement results based on one or more measurement information extracted by the management apparatus shown in FIG.
  • FIG. 6 is a diagram for explaining an example (No. 1) of a method of detecting an abnormality by the management device according to the embodiment of the present invention.
  • FIG. 7 is a diagram for explaining an example (No.
  • FIG. 8 is a sequence diagram showing an example of an operation flow of the management system according to the embodiment of the present invention.
  • FIG. 9 is a diagram showing a configuration of a management system according to a first modification of the embodiment of the present invention.
  • FIG. 10 is a diagram showing a measurement result based on the facility information received by the management apparatus shown in FIG.
  • the measurement of the target equipment is performed not only in the period in which the target equipment is operating, but also in the period in which the operation is stopped. And when the data used for detection of abnormality includes both the measurement result in the period in which the target facility is operating and the measurement result in the period in which the target facility is not in operation, detection of abnormality is accurately performed. It may not be possible. Also, in this case, arithmetic processing is performed on unnecessary data.
  • the present disclosure has been made to solve the above-described problems, and an object thereof is to provide a management system, a management apparatus, a management method, and a management program capable of better processing measurement information on a target facility. It is.
  • the management system acquires the first wireless terminal device that acquires and transmits measurement information indicating the result of measuring the target installation, and acquires the installation information related to the operation of the target installation And a management device for acquiring the measurement information and the equipment information and performing a process of extracting a part of the measurement information based on the equipment information.
  • the period in which the target facility is operating can be grasped based on the facility information, and the measurement information including the measurement result in the period can be selectively extracted.
  • Information can be used to detect abnormalities in the target equipment with higher accuracy.
  • processing load can be reduced. Therefore, the process of the measurement information which shows the measurement result regarding object installation can be performed more favorably.
  • the second wireless terminal device includes a contact point, and the contact point includes, as the facility information, information capable of recognizing an operation start and an operation stop of the target facility as the second wireless terminal. It is given from the outside of the device.
  • the management apparatus is based on the time when the facility information capable of recognizing the operation start of the target facility is acquired and the time when the facility information capable of recognizing the operation stop of the target facility is acquired Then, a process of extracting a part of the measurement information is performed.
  • the operation start timing of the target facility in the management device without measuring the time in the second wireless terminal device or a relay device relaying information between the second wireless terminal device and the management device. And the operation stop timing can be detected.
  • the management system further includes one or more relays relaying information between the second wireless terminal device and the management device, the relay including the second wireless terminal.
  • the equipment information is received from the terminal device, time information is added to the received equipment information, and the information is transmitted to another device, and the management device is included in the equipment information that can recognize the operation start of the target equipment A process of extracting part of the measurement information is performed based on the time information and the time information included in the facility information that can recognize an operation stop of the target facility.
  • the operation start timing and operation stop timing of the target equipment are detected using the reception time of the equipment information in the management apparatus
  • detection by the management apparatus The error between the operation start timing and the operation stop timing, and the actual operation start timing and the operation stop timing becomes large.
  • the error can be reduced and the operation start timing and the operation stop timing of the target equipment can be detected with higher accuracy by the configuration using the reception time of the equipment information in the relay as described above.
  • the facility information indicates a result of performing measurement of the type different from the measurement indicated by the measurement information on the target facility
  • the management apparatus determines the measurement result indicated by the facility information and a predetermined threshold. A process of extracting a part of the measurement information is performed based on the comparison result with.
  • certain types of measurement information can be used for timing setting for extraction processing of target measurement information.
  • the management device detects an abnormality of the target facility based on the extracted information.
  • the management apparatus detects an abnormality of the target facility, it is not necessary to separately provide another apparatus for detecting an abnormality.
  • the management apparatus is an acquisition unit that acquires measurement information indicating a result of measuring a target installation, and installation information on an operation of the target installation, and the acquisition unit acquires the acquisition unit And a processing unit that performs a process of extracting a part of the measurement information acquired by the acquisition unit based on facility information.
  • the period in which the target facility is operating can be grasped based on the facility information, and the measurement information including the measurement result in the period can be selectively extracted.
  • Information can be used to detect abnormalities in the target equipment with higher accuracy.
  • processing load can be reduced. Therefore, the process of the measurement information which shows the measurement result regarding object installation can be performed more favorably.
  • a management method is a management method in a management system including a first wireless terminal device, a second wireless terminal device, and a management device, the first wireless A step of the terminal device acquiring and transmitting measurement information indicating a result of measuring the target facility; and a step of the second wireless terminal device acquiring and transmitting facility information on the operation of the target facility;
  • the management apparatus acquires the measurement information and the equipment information, and performs a process of extracting a part of the received measurement information based on the acquired equipment information.
  • the management apparatus can grasp the period in which the target facility is operating based on the facility information and selectively extract the measurement information including the measurement result in the period, so the extracted measurement Information can be used to detect abnormalities in the target equipment with higher accuracy.
  • processing on unnecessary data can be avoided, processing load can be reduced. Therefore, the process of the measurement information which shows the measurement result regarding object installation can be performed more favorably.
  • the management program according to the embodiment of the present invention is a management program used in the management apparatus, and the computer includes measurement information indicating the result of measuring the target facility and facility information on the operation of the target facility.
  • the period in which the target facility is operating can be grasped based on the facility information, and the measurement information including the measurement result in the period can be selectively extracted.
  • Information can be used to detect abnormalities in the target equipment with higher accuracy.
  • processing load can be reduced. Therefore, the process of the measurement information which shows the measurement result regarding object installation can be performed more favorably.
  • FIG. 1 is a diagram showing the configuration of a management system according to an embodiment of the present invention.
  • the management system 201 includes a management device 101, a first wireless terminal device 151, a second wireless terminal device 152, and a receiver (relayer) 161.
  • the first wireless terminal device 151 is, for example, a battery-operated device, and is attached to a target facility X provided in a target facility such as a factory.
  • the target facility X is a device such as a motor.
  • the first wireless terminal device 151 constantly measures the target facility X, and transmits measurement information indicating the measurement result to the receiver 161 by wireless communication.
  • the first wireless terminal device 151 includes a detection element 11 attached to the target facility X and a main body 12.
  • the detection element 11 constantly measures the vibration of the target facility X and outputs the measurement result to the main body 12.
  • the main body 12 transmits measurement information indicating the measurement result received from the detection element 11 to the receiver 161.
  • the first wireless terminal device 151 may not include the detection element 11. In this case, the first wireless terminal device 151 acquires the measurement result of the target facility X performed by another device, and transmits measurement information indicating the acquired measurement result to the receiver 161.
  • the second wireless terminal device 152 is, for example, a battery-operated device, and is connected to a control device Y that controls the operation of the target facility X by wire.
  • the second wireless terminal device 152 acquires facility information on the operation of the target facility X, and transmits the acquired facility information to the receiver 161 by wireless communication.
  • the second wireless terminal device 152 is a contact point measurement device that includes the main body 21 and the contact point P and measures the opening or closing of the contact point P.
  • the control device Y when the control device Y is operated by the administrator, the control device Y transmits to the target equipment X an operation start instruction for starting the operation of the target equipment X or an operation stop instruction for stopping the operation of the target equipment X.
  • the target facility X starts operation when receiving an operation start instruction from the control device Y, and stops operation when receiving an operation stop instruction from the control device Y.
  • control device Y when the control device Y transmits an operation start command to the target equipment X, for example, a signal for switching the contact P in the second wireless terminal 152 from the open state to the closed state is the contact point P Output to Further, when transmitting the operation stop instruction to the target equipment X, the control device Y outputs, for example, a signal for switching the contact point P from the closed state to the open state to the contact point P.
  • the main body 21 of the second wireless terminal device 152 transmits information indicating the state of the contact point P to the receiver 161 as facility information.
  • the main body 21 transmits contact information of “1” to the receiver 161 as facility information. Further, when the target facility X stops operating, that is, when the contact point P is switched to the open state, the main body 21 transmits contact information of “0” as the facility information to the receiver 161.
  • the receiver 161 is connected to the management apparatus 101 by wire, for example.
  • the receiver 161 transmits the measurement information from the first wireless terminal device 151 and the facility information from the second wireless terminal device 152 to the management device 101.
  • the management apparatus 101 When the management apparatus 101 receives the measurement information and the equipment information transmitted from the receiver 161, the management apparatus 101 filters the measurement information based on the equipment information. That is, the management apparatus 101 performs a process of extracting a part of the received measurement information based on the received equipment information. Then, the management apparatus 101 detects an abnormality of the target facility X based on the extracted information.
  • the management apparatus 101 may have the following configuration for acquiring measurement information and facility information. That is, the receiver 161 holds the measurement information from the first wireless terminal device 151 and the facility information from the second wireless terminal device 152. Then, the management device 101 periodically or irregularly reads the measurement information and the facility information stored in the storage unit or the like of the receiver 161.
  • FIG. 2 is a diagram showing the configuration of a management apparatus according to the embodiment of the present invention.
  • management device 101 includes an acquisition unit 41, a processing unit 42, a storage unit 43, and a detection unit 44.
  • the acquisition unit 41 When receiving the measurement information transmitted from the receiver 161, the acquisition unit 41 stores the received measurement information and the current time in the storage unit 43. In addition, when receiving the equipment information transmitted from the receiver 161, the acquisition unit 41 stores the received equipment information and the current time in the storage unit 43. As a result, in the storage unit 43, a set of measurement information and time, and a set of facility information and time are accumulated.
  • the processing unit 42 performs processing of extracting a part of the plurality of pieces of measurement information stored in the storage unit 43 at timing based on the facility information received by the acquisition unit 41.
  • FIG. 3 is a diagram showing measurement results based on a plurality of measurement information received by the management apparatus shown in FIG.
  • FIG. 4 is a diagram showing an example of a state change of equipment information in the management apparatus shown in FIG.
  • FIG. 5 is a diagram showing measurement results based on one or more measurement information extracted by the management apparatus shown in FIG.
  • the horizontal axes of the graphs shown in FIG. 3 and FIG. 5 indicate time, and the vertical axes indicate the vibration intensity of the target facility X.
  • the horizontal axis of the graph shown in FIG. 4 shows time, and the vertical axis shows the voltage level of the installation information.
  • processing unit 42 detects the operation start timing and the operation stop timing of target facility X based on, for example, a plurality of pieces of facility information stored in storage unit 43.
  • the acquisition unit 41 receives the contact information of “1” transmitted from the receiver 161, and at time t2, the acquisition unit 41 transmits from the receiver 161 It is assumed that the received “0” contact information is received.
  • the processing unit 42 detects time t1 as the operation start timing of the target facility X, and detects time t2 as the operation stop timing of the target facility X.
  • the processing unit 42 selects one or more measurement information items corresponding to the time included in the period from time t1 to time t2 among the plurality of measurement information stored in the storage unit 43. Extract That is, each of the measurement information extracted by the processing unit 42 indicates the measurement result of the target facility X in the period in which the target facility X is operating.
  • the processing unit 42 stores extraction information including the extracted one or more pieces of measurement information in the storage unit 43.
  • the detection unit 44 periodically or irregularly acquires the extraction information stored in the storage unit 43, and detects an abnormality of the target facility X based on the acquired extraction information.
  • the detection unit 44 can detect a failure, deterioration, or the like of the target facility X as detection of an abnormality of the target facility X.
  • FIG. 6 is a diagram for explaining an example (No. 1) of a method of detecting an abnormality by the management device according to the embodiment of the present invention.
  • the horizontal axis of the graph shown in FIG. 6 indicates the frequency, and the vertical axis indicates the signal strength at the corresponding frequency.
  • detection unit 44 performs component analysis of the measurement result indicated by the extraction information. That is, based on the frequency distribution characteristic of the waveform shown in FIG. 5, the detection unit 44 determines whether or not an abnormality has occurred in the target facility X.
  • the storage unit 43 stores, as reference data, results of frequency analysis of a waveform indicating the vibration intensity of the target facility X in a state where the target facility X is operating normally.
  • the detection unit 44 compares the singular point of the graph of the reference data with the singular point of the graph obtained by frequency analysis of the measurement result indicated by the extraction information, thereby causing an abnormality in the target facility X. It can be determined whether or not it is present.
  • FIG. 7 is a diagram for explaining an example (No. 2) of a method of detecting an abnormality by the management device according to the embodiment of the present invention.
  • the horizontal axis of the graph shown in FIG. 7 indicates the date, and the vertical axis indicates the vibration intensity of the target facility X.
  • detection unit 44 acquires a graph showing the vibration intensity for each date, for example, based on the measurement result indicated by the extraction information, and based on the graph, the target It may be configured to determine whether or not an abnormality has occurred in the facility X.
  • the detection unit 44 acquires extraction information for one day from the storage unit 43, and calculates an average value of vibration intensity per unit time based on the acquired extraction information. Then, the detection unit 44 stores the calculated average value in the storage unit 43 in association with the date.
  • the detection unit 44 creates a graph showing the average value of the vibration intensity for each date, and an abnormality occurs in the target facility X by using the value of the graph and the absolute reference value. Determine if there is. For example, the detection unit 44 determines whether an abnormality occurs in the target equipment X, using the change amount of the vibration intensity when the target equipment X is operating normally as a reference value.
  • the detection unit 44 sets, for example, the reference value to zero.
  • the difference between the average value of the vibration intensity of the previous day and the average value of the vibration intensity of the next day and the reference value is a predetermined value or more Suppose that things happen once in a few days.
  • the detection unit 44 determines that the target facility X is in a state requiring attention, that is, a state in which the target facility X is highly likely to have an abnormality during the period.
  • the detection unit 44 determines, for example, that an abnormality has occurred in the target facility X.
  • the detection unit 44 may be configured to determine whether or not an abnormality occurs in the target equipment X by comparing the average value of the vibration intensity of the target equipment with the relative reference value.
  • the detection unit 44 detects the target facility It is determined that there is no abnormality in X. Further, for example, when the inclination of the graph is equal to or more than a first predetermined value and less than a second predetermined value, the detection unit 44 determines that the target facility X is in a state requiring attention. Further, for example, when the inclination of the graph is equal to or greater than the second predetermined value, the detection unit 44 determines that the target facility X has an abnormality.
  • the management apparatus 101 may not include the detection unit 44. In this case, the management device 101 transmits the extraction information stored in the storage unit 43 to another abnormality detection device.
  • the abnormality detection device receives the extraction information transmitted from the management device 101, and detects an abnormality of the target equipment X based on the received extraction information.
  • Each device in the management system 201 includes a computer, and an arithmetic processing unit such as a CPU in the computer reads and executes a program including part or all of each step of the following sequence diagram from a memory (not shown).
  • the programs of the plurality of devices can be installed from the outside.
  • the programs of the plurality of apparatuses are distributed as stored in the recording medium.
  • FIG. 8 is a sequence diagram showing an example of an operation flow of the management system according to the embodiment of the present invention.
  • first wireless terminal device 151 constantly measures the vibration of target facility X (step S 11), and transmits measurement information indicating the measurement result to management device 101 via receiver 161. (Step S12).
  • the second wireless terminal device 152 transmits facility information indicating the state of the contact point P to the management device 101 via the receiver 161 (step 14). .
  • the management apparatus 101 receives the measurement information transmitted from the first wireless terminal device 151 and the facility information transmitted from the second wireless terminal device 152, and holds the received measurement information and facility information. (Step S15).
  • the management apparatus 101 detects the operation start timing and the operation stop timing of the target facility X based on the plurality of facility information held (step S16).
  • the management apparatus 101 selects one or more measurement information indicating measurement results in a period in which the target facility X is operating, among a plurality of measurement information. It extracts (Step S17).
  • the management apparatus 101 detects an abnormality of the target equipment X based on the extracted information including the extracted one or more pieces of measurement information (step S18).
  • the switching of the state of the contact point P (step S13) and the transmission of the facility information by the second wireless terminal device 152 (step S14) are the measurement by the first wireless terminal device 151 (step S11) and the transmission of the measurement information. It may be performed before (step S12).
  • the measurement of the target equipment is performed not only in the period in which the target equipment is operating, but also in the period in which the operation is stopped. And when the data used for detection of abnormality includes both the measurement result in the period in which the target facility is operating and the measurement result in the period in which the target facility is not in operation, detection of abnormality is accurately performed. It may not be possible. Also, in this case, arithmetic processing is performed on unnecessary data.
  • a configuration may be considered in which transmission of the measurement result is stopped by controlling a transmitter that wirelessly transmits the measurement result of the target facility.
  • the first wireless terminal device 151 acquires and transmits measurement information indicating the result of measuring the target facility X.
  • the second wireless terminal device 152 acquires facility information regarding the operation of the target facility X and transmits it.
  • the management apparatus 101 acquires measurement information and equipment information, and performs processing of extracting a part of the acquired measurement information based on the acquired equipment information.
  • the period in which the target facility X is operating can be grasped based on the facility information, and measurement information including the measurement result in that period can be selectively extracted. Detection of an abnormality in the target facility X can be performed with higher accuracy using the acquired measurement information. In addition, since processing on unnecessary data can be avoided, processing load can be reduced. Therefore, the process of the measurement information which shows the measurement result regarding the object installation X can be performed more favorably.
  • the second wireless terminal device 152 includes the contact point P.
  • Information capable of recognizing the operation start and the operation stop of the target facility X is given to the contact point P as facility information from the control device Y which is the outside of the second wireless terminal device 152.
  • the operation start timing and the operation stop timing of the target equipment X can be easily detected based on the state of the contact point P according to the information given from the control device Y.
  • the management apparatus 101 can recognize the time when facility information capable of recognizing the start of the operation of the target facility X is acquired, and the facility information which can recognize the operation stop of the target facility X The processing of extracting a part of the measurement information is performed based on the time when the
  • the target in the management apparatus 101 without measuring the time in the second wireless terminal apparatus 152 or the receiver 161 that relays information between the second wireless terminal apparatus 152 and the management apparatus 101, etc.
  • the operation start timing and the operation stop timing of the facility X can be detected.
  • the management apparatus 101 detects an abnormality of the target facility X based on the extracted information.
  • the configuration in which the management apparatus 101 detects an abnormality of the target facility X it is not necessary to separately provide another apparatus for detecting an abnormality.
  • the acquisition unit 41 acquires measurement information indicating the result of measuring the target facility X and facility information on the operation of the target facility X.
  • the processing unit 42 performs a process of extracting a part of the measurement information acquired by the acquisition unit 41 based on the equipment information acquired by the acquisition unit 41.
  • the period in which the target facility X is operating can be grasped based on the facility information, and measurement information including the measurement result in that period can be selectively extracted. Detection of an abnormality in the target facility X can be performed with higher accuracy using the acquired measurement information. In addition, since processing on unnecessary data can be avoided, processing load can be reduced. Therefore, the process of the measurement information which shows the measurement result regarding the object installation X can be performed more favorably.
  • the first wireless terminal device 151 acquires and transmits measurement information indicating the result of measuring the target facility X.
  • the second wireless terminal device 152 acquires facility information regarding the operation of the target facility X and transmits it.
  • the management apparatus 101 acquires measurement information and equipment information, and performs processing of extracting a part of the measurement information based on the equipment information.
  • the period in which the target facility X is operating can be grasped based on the facility information, and the measurement information including the measurement result in the period can be selectively extracted. Detection of an abnormality in the target facility X can be performed with higher accuracy using the acquired measurement information. In addition, since processing on unnecessary data can be avoided, processing load can be reduced. Therefore, the process of the measurement information which shows the measurement result regarding the object installation X can be performed more favorably.
  • the second wireless terminal device 152 in the management system 201 transmits a signal indicating the state of the contact point P as facility information.
  • the present invention is not limited to such a configuration, and the second wireless terminal device may be configured to transmit information indicating the result of measuring the target facility X as facility information. In this case, the second wireless terminal device performs measurement of a type different from the measurement by the first wireless terminal device 151.
  • FIG. 9 is a diagram showing a configuration of a management system according to a first modification of the embodiment of the present invention.
  • management system 202 includes second wireless terminal device 153 instead of second wireless terminal device 152 shown in FIG. 1.
  • the second wireless terminal device 153 is, for example, a clamp-type current sensor, and includes a core unit 51 and a main body 52.
  • the core 51 sandwiches an electric wire connecting the target facility X and the power plug PS, for example.
  • the main body 52 measures the current value flowing to the target facility X by measuring the current generated in the coil wound around the core unit 51, and the management device 101 via the receiver 161 via the receiver 161 as information indicating the measurement result.
  • the second wireless terminal device 153 may be a current sensor or the like directly connected to a wire connecting the target facility X and the power plug PS instead of the clamp type current sensor.
  • a current sensor for example, it is possible to measure a minute current value output in the range of 4 mA to 20 mA flowing through the wire.
  • the second wireless terminal device 153 may be a temperature sensor that measures the temperature of the target facility X, or a humidity sensor that measures the humidity of the target facility X, or the like.
  • the second wireless terminal device 153 acquires the measurement result of the target facility X performed by another device, and transmits the facility information indicating the acquired measurement result to the management device 101 via the receiver 161. It may be.
  • the acquisition unit 41 in the management apparatus 101 stores the received measurement information and the current time in the storage unit 43.
  • the acquisition unit 41 stores the received equipment information and the current time in the storage unit 43.
  • the processing unit 42 performs processing of extracting a part of the plurality of pieces of measurement information stored in the storage unit 43 at timing based on the facility information received by the acquisition unit 41.
  • FIG. 10 is a diagram showing a measurement result based on the facility information received by the management apparatus shown in FIG.
  • the horizontal axis of the graph shown in FIG. 10 indicates time, and the vertical axis indicates current value.
  • the processing unit 42 detects time t1 as the operation start timing of the target facility X, and detects time t2 as the operation stop timing of the target facility X.
  • the processing unit 42 extracts one or more measurement information corresponding to the time included in the period from the time t1 to the time t2 from the plurality of measurement information stored in the storage unit 43. Then, the processing unit 42 stores extraction information including the extracted one or more pieces of measurement information in the storage unit 43.
  • the detection unit 44 periodically or irregularly acquires the extraction information stored in the storage unit 43, and detects an abnormality of the target facility X based on the acquired extraction information.
  • the facility information indicates the result of performing measurement of the type different from the measurement indicated by the measurement information on the target facility X.
  • the management apparatus 101 performs a process of extracting part of the measurement information based on the comparison result of the measurement result indicated by the facility information and the predetermined threshold value Th.
  • certain types of measurement information can be used for timing setting for extraction processing of target measurement information.
  • the management apparatus 101 in the management system 201 performs a process of extracting a part of the measurement information based on the time when the facility information transmitted from the receiver 161 is received.
  • the management system 201 is not limited to such a configuration, and may have the following configuration.
  • the receiver 161 When the receiver 161 receives the measurement information transmitted from the first wireless terminal device 151, the receiver 161 adds, for example, time information which is the current time and the number of relays to the received measurement information. Then, the receiver 161 transmits, to the management apparatus 101, measurement information after the current time and the number of relays have been added.
  • the number of relays is the number of times measurement information is relayed between the first wireless terminal device 151 and the management device 101. That is, the receiver 161 that has received the measurement information transmitted from the first wireless terminal device 151 adds “1” to the measurement information as the number of relays.
  • one or more relays may be provided between the first wireless terminal device 151 and the receiver 161.
  • the relay device that directly receives the measurement information transmitted from the first wireless terminal device 151 adds the current time and the number of relays “1” to the measurement information, and performs measurement after adding the time information and the number of relays.
  • the information is sent to another relay or receiver 161.
  • the other relay transmits the measurement information after counting up the number of relays to the other relay or receiver 161 without adding time information to the measurement information.
  • the receiver 161 transmits measurement information after counting up the number of relays to the management apparatus 101 without adding time information to the measurement information.
  • the facility information may, for example, be the same as when the measurement information from the first wireless terminal device 151 is received. Add time information, which is time, and the number of relays. Then, the receiver 161 transmits, to the management apparatus 101, the facility information after the current time and the number of relays have been added.
  • the relay when one or more relays are provided between the second wireless terminal 152 and the receiver 161, the relay directly received the facility information transmitted from the second wireless terminal 152.
  • the time information and the number of relays “1” are added to the equipment information, and the time information and the equipment information after the addition of the number of relays are transmitted to the other relay device or receiver 161.
  • the other relay does not add time information to the installation information, and transmits the installation information after counting up the number of relays to the other relay or receiver 161.
  • the receiver 161 transmits the facility information after counting up the number of relays to the management apparatus 101 without adding time information to the facility information.
  • the management device 101 detects the operation start timing and the operation stop timing of the target equipment X based on time information included in the equipment information received from the receiver 161.
  • the processing unit 42 in the management apparatus 101 checks, for example, a plurality of pieces of equipment information stored in the storage unit 43, and the first equipment in the case where the contact information is switched from “0" to "1". Time information included in the information is detected as the operation start timing of the target facility X. Further, for example, the processing unit 42 detects, as the operation stop timing of the target facility X, time information included in the first facility information when the contact point information is switched from “1” to “0”.
  • the processing unit 42 extracts measurement information corresponding to a period from the operation start timing of the target facility X to the operation stop timing among the plurality of pieces of measurement information stored in the storage unit 43.
  • the receiver 161 may not have the functions of adding time information and the number of relays to measurement information and adding time information and the number of relays to the facility information.
  • the management apparatus 101 includes the time information and the number of relays in the equipment information from the receiver 161, that is, when the equipment information from the relay device is received, the management apparatus 101 receives the time information included in the equipment information as described above. Based on the operation start timing and the operation stop timing of the target facility X are detected.
  • the management apparatus 101 is based on the time when the facility information is received.
  • the operation start timing and the operation stop timing of the target facility X are detected.
  • the management apparatus 101 is included in the time information included in the measurement information. Based on the measurement information corresponding to the period from the operation start timing of the target equipment X to the operation stop timing is extracted.
  • the management device 101 when the management information from the receiver 161 does not include the time information and the number of relays, that is, when the management device 101 receives the measurement information not passing through the relay, the management device 101 receives the measurement information from the receiver 161. Based on the received time, measurement information corresponding to a period from the operation start timing of the target equipment X to the operation stop timing is extracted.
  • the management apparatus 101 may be configured to directly receive the measurement information transmitted from the first wireless terminal device 151 and the facility information transmitted from the second wireless terminal device 152.
  • the management apparatus 101 since the management apparatus 101 does not include time information and the number of relays in the received equipment information, the management apparatus 101 starts the operation of the target equipment X based on the time when the equipment information from the second wireless terminal device 152 is received. Detect timing and operation stop timing. Then, the management device 101 extracts measurement information corresponding to a period from the operation start timing of the target facility X to the operation stop timing based on the time when the measurement information from the first wireless terminal device 151 is received.
  • the receiver 161 receives facility information from the second wireless terminal device 152, and adds time information to the received facility information. Then, it transmits to the management apparatus 101.
  • the management apparatus 101 is a part of measurement information based on time information included in facility information capable of recognizing the start of operation of the target facility X and time information included in facility information capable of recognizing the operation stop of the target facility X. Process to extract
  • the management apparatus 101 according to the embodiment of the present invention may be provided by cloud computing. That is, the management apparatus 101 according to the embodiment of the present invention may be configured by a plurality of cloud enterprise servers and the like.
  • a first wireless terminal device that acquires and transmits measurement information indicating a result of measuring a target facility;
  • a second wireless terminal device that acquires and transmits facility information related to the operation of the target facility;
  • a management device that acquires the measurement information and the equipment information and extracts a part of the measurement information based on the equipment information.
  • the second wireless terminal device comprises a contact. The contact point is switched to a closed state when the target facility starts operation, and is switched to an open state when the target facility stops operating.
  • the second wireless terminal device transmits information indicating the state of the contact as the facility information.
  • the management device detects an operation start timing and an operation stop timing of the target equipment based on the facility information transmitted from the second wireless terminal device, and detects the operation start timing detected from the acquired measurement information.
  • the management system which extracts the information corresponding to the period from to the said operation stop timing.
  • An acquisition unit that acquires measurement information indicating a result of measuring a target facility, and facility information on an operation of the target facility; And a processing unit that performs processing of extracting a part of the measurement information acquired by the acquisition unit based on the facility information acquired by the acquisition unit.
  • the facility information indicates a state of a contact in a second wireless terminal connected to the target facility, The contact point is switched to a closed state when the target facility starts operation, and is switched to an open state when the target facility stops operating.
  • the processing unit detects an operation start timing and an operation stop timing of the target equipment based on the facility information, and from the detected operation start timing to the operation stop timing from the measurement information acquired by the acquisition unit.
  • a management device that extracts information corresponding to a period of time.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Automation & Control Theory (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Selective Calling Equipment (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

管理システムは、対象設備を計測した結果を示す計測情報を取得して送信する第1の無線端末装置と、前記対象設備の動作に関する設備情報を取得して送信する第2の無線端末装置と、前記計測情報および前記設備情報を取得し、前記設備情報に基づいて、前記計測情報の一部を抽出する処理を行う管理装置とを備える。

Description

管理システム、管理装置、管理方法および管理プログラム
 本発明は、管理システム、管理装置、管理方法および管理プログラムに関する。
 この出願は、2017年8月8日に出願された日本出願特願2017-153236号を基礎とする優先権を主張し、その開示のすべてをここに取り込む。
 特開2006-163517号公報(特許文献1)には、以下のような異常検知装置が記載されている。すなわち、異常検知装置は、監視対象に設けられた検出手段と、前記検出手段からの検出データに基づいてニューラルネットワークにより前記監視対象の状態を診断する演算手段とを有する異常検知装置であって、前記演算手段は、所定のモデル作成データを用いて前記ニューラルネットワークのモデルを形成し、前記ニューラルネットワークのモデルを用い、検出データに基づいて前記監視対象の状態を診断し、所定時点での検出データによる入力ベクトルを中間層として加えて、前記ニューラルネットワークのモデルを更新し、更新後は、前記ニューラルネットワークの更新したモデルを用いて前記監視対象の状態を診断する。
特開2006-163517号公報
 (1)本開示の管理システムは、対象設備を計測した結果を示す計測情報を取得して送信する第1の無線端末装置と、前記対象設備の動作に関する設備情報を取得して送信する第2の無線端末装置と、前記計測情報および前記設備情報を取得し、前記設備情報に基づいて、前記計測情報の一部を抽出する処理を行う管理装置とを備える。
 (7)本開示の管理装置は、対象設備を計測した結果を示す計測情報、および前記対象設備の動作に関する設備情報を取得する取得部と、前記取得部により取得された前記設備情報に基づいて、前記取得部により取得された前記計測情報の一部を抽出する処理を行う処理部とを備える。
 (8)本開示の管理方法は、第1の無線端末装置と、第2の無線端末装置と、管理装置とを備える管理システムにおける管理方法であって、前記第1の無線端末装置が、対象設備を計測した結果を示す計測情報を取得して送信するステップと、前記第2の無線端末装置が、前記対象設備の動作に関する設備情報を取得して送信するステップと、前記管理装置が、前記計測情報および前記設備情報を取得し、取得した前記設備情報に基づいて、受信した前記計測情報の一部を抽出する処理を行うステップとを含む。
 (9)本開示の管理プログラムは、管理装置において用いられる管理プログラムであって、コンピュータを、対象設備を計測した結果を示す計測情報、および前記対象設備の動作に関する設備情報を取得する取得部と、前記取得部により取得された前記設備情報に基づいて、前記取得部により取得された前記計測情報の一部を抽出する処理を行う処理部、として機能させるためのプログラムである。
 本開示の一態様は、このような特徴的な処理部を備える管理システムとして実現され得るだけでなく、かかる特徴的な処理をコンピュータに実行させるためのプログラムとして実現され得る。
 また、本開示の一態様は、このような特徴的な処理部を備える管理装置として実現され得るだけでなく、かかる特徴的な処理をステップとする管理方法として実現され得たり、管理装置の一部または全部を実現する半導体集積回路として実現され得る。
図1は、本発明の実施の形態に係る管理システムの構成を示す図である。 図2は、本発明の実施の形態に係る管理装置の構成を示す図である。 図3は、図2に示す管理装置が受信した複数の計測情報に基づく計測結果を示す図である。 図4は、図2に示す管理装置における設備情報の状態変化の一例を示す図である。 図5は、図2に示す管理装置により抽出された1または複数の計測情報に基づく計測結果を示す図である。 図6は、本発明の実施の形態に係る管理装置による異常の検知方法の一例(その1)を説明するための図である。 図7は、本発明の実施の形態に係る管理装置による異常の検知方法の一例(その2)を説明するための図である。 図8は、本発明の実施の形態に係る管理システムの動作の流れの一例を示すシーケンス図である。 図9は、本発明の実施の形態の変形例1に係る管理システムの構成を示す図である。 図10は、図9に示す管理装置が受信した設備情報に基づく計測結果を示す図である。
 従来、工場に設けられた対象設備などを監視するための装置が開発されている。
 [本開示が解決しようとする課題]
 上述した特許文献1に記載のような装置によれば、対象設備を計測した結果に基づいて、人手を介さずに当該対象設備において生じた異常の検知を行うことができる。
 しかしながら、対象設備の計測は、当該対象設備が動作している期間に限らず、動作を停止している期間においても行われる。そして、異常の検知に用いられるデータに、対象設備が動作している期間における計測結果、および対象設備が動作を停止している期間における計測結果の両方が含まれる場合、異常の検知を精度よく行うことができない可能性がある。また、この場合、不要なデータに対して演算処理を行うことになる。
 本開示は、上述の課題を解決するためになされたもので、その目的は、対象設備に関する計測情報の処理をより良好に行うことのできる管理システム、管理装置、管理方法および管理プログラムを提供することである。
 [本開示の効果]
 本開示によれば、対象設備に関する計測情報の処理をより良好に行うことができる。
 [本願発明の実施形態の説明]
 最初に、本発明の実施形態の内容を列記して説明する。
 (1)本発明の実施の形態に係る管理システムは、対象設備を計測した結果を示す計測情報を取得して送信する第1の無線端末装置と、前記対象設備の動作に関する設備情報を取得して送信する第2の無線端末装置と、前記計測情報および前記設備情報を取得し、前記設備情報に基づいて、前記計測情報の一部を抽出する処理を行う管理装置とを備える。
 このような構成により、管理装置において、設備情報に基づいて対象設備が動作している期間を把握し、当該期間における計測結果を含む計測情報を選択的に抽出することができるため、抽出した計測情報を用いて、対象設備における異常の検知をより高い精度で行うことができる。また、不要なデータに対する演算処理を避けることができるため、処理負荷の低減を実現することができる。したがって、対象設備に関する計測結果を示す計測情報の処理をより良好に行うことができる。
 (2)好ましくは、前記第2の無線端末装置は、接点を備え、前記接点には、前記設備情報として、前記対象設備の動作開始および動作停止を認識可能な情報が前記第2の無線端末装置の外部から与えられる。
 このような構成により、外部から与えられる情報による接点の状態に基づいて、対象設備の動作開始タイミングおよび動作停止タイミングを容易に検出することができる。
 (3)より好ましくは、前記管理装置は、前記対象設備の動作開始を認識可能な前記設備情報を取得した時刻、および前記対象設備の動作停止を認識可能な前記設備情報を取得した時刻に基づいて、前記計測情報の一部を抽出する処理を行う。
 このような構成により、第2の無線端末装置、または第2の無線端末装置および管理装置間の情報を中継する中継機などにおいて時刻の計測を行うことなく、管理装置において対象設備の動作開始タイミングおよび動作停止タイミングを検出することができる。
 (4)より好ましくは、前記管理システムは、さらに、前記第2の無線端末装置および前記管理装置間の情報を中継する1または複数の中継機を備え、前記中継機は、前記第2の無線端末装置から前記設備情報を受信し、受信した前記設備情報に時刻情報を追加して他の装置へ送信し、前記管理装置は、前記対象設備の動作開始を認識可能な前記設備情報に含まれる前記時刻情報、および前記対象設備の動作停止を認識可能な前記設備情報に含まれる前記時刻情報に基づいて、前記計測情報の一部を抽出する処理を行う。
 たとえば、管理装置における設備情報の受信時刻を用いて対象設備の動作開始タイミングおよび動作停止タイミングを検出する構成では、設備情報が管理装置に到着するまでに多くの時間を要する場合、管理装置により検出される動作開始タイミングおよび動作停止タイミングと、実際の動作開始タイミングおよび動作停止タイミングとの間の誤差が大きくなる。これに対して、上記のように、中継機における設備情報の受信時刻を用いる構成により、誤差を小さくし、対象設備の動作開始タイミングおよび動作停止タイミングをより高い精度で検出することができる。
 (5)好ましくは、前記設備情報は、前記計測情報の示す計測とは異なる種類の計測を前記対象設備について行った結果を示し、前記管理装置は、前記設備情報の示す計測結果と所定の閾値との比較結果に基づいて、前記計測情報の一部を抽出する処理を行う。
 このような構成により、ある種類の計測情報を、対象の計測情報の抽出処理のためのタイミング設定に用いることができる。
 (6)好ましくは、前記管理装置は、抽出した情報に基づいて前記対象設備の異常を検知する。
 このように、管理装置が対象設備の異常を検知する構成により、異常の検知を行うための他の装置を別途設ける必要がない。
 (7)本発明の実施の形態に係る管理装置は、対象設備を計測した結果を示す計測情報、および前記対象設備の動作に関する設備情報を取得する取得部と、前記取得部により取得された前記設備情報に基づいて、前記取得部により取得された前記計測情報の一部を抽出する処理を行う処理部とを備える。
 このような構成により、管理装置において、設備情報に基づいて対象設備が動作している期間を把握し、当該期間における計測結果を含む計測情報を選択的に抽出することができるため、抽出した計測情報を用いて、対象設備における異常の検知をより高い精度で行うことができる。また、不要なデータに対する演算処理を避けることができるため、処理負荷の低減を実現することができる。したがって、対象設備に関する計測結果を示す計測情報の処理をより良好に行うことができる。
 (8)本発明の実施の形態に係る管理方法は、第1の無線端末装置と、第2の無線端末装置と、管理装置とを備える管理システムにおける管理方法であって、前記第1の無線端末装置が、対象設備を計測した結果を示す計測情報を取得して送信するステップと、前記第2の無線端末装置が、前記対象設備の動作に関する設備情報を取得して送信するステップと、前記管理装置が、前記計測情報および前記設備情報を取得し、取得した前記設備情報に基づいて、受信した前記計測情報の一部を抽出する処理を行うステップとを含む。
 このような方法により、管理装置において、設備情報に基づいて対象設備が動作している期間を把握し、当該期間における計測結果を含む計測情報を選択的に抽出することができるため、抽出した計測情報を用いて、対象設備における異常の検知をより高い精度で行うことができる。また、不要なデータに対する演算処理を避けることができるため、処理負荷の低減を実現することができる。したがって、対象設備に関する計測結果を示す計測情報の処理をより良好に行うことができる。
 (9)本発明の実施の形態に係る管理プログラムは、管理装置において用いられる管理プログラムであって、コンピュータを、対象設備を計測した結果を示す計測情報、および前記対象設備の動作に関する設備情報を取得する取得部と、前記取得部により取得された前記設備情報に基づいて、前記取得部により取図得された前記計測情報の一部を抽出する処理を行う処理部、として機能させるためのプログラムである。
 このような構成により、管理装置において、設備情報に基づいて対象設備が動作している期間を把握し、当該期間における計測結果を含む計測情報を選択的に抽出することができるため、抽出した計測情報を用いて、対象設備における異常の検知をより高い精度で行うことができる。また、不要なデータに対する演算処理を避けることができるため、処理負荷の低減を実現することができる。したがって、対象設備に関する計測結果を示す計測情報の処理をより良好に行うことができる。
 以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施の形態の少なくとも一部を任意に組み合わせてもよい。
<構成および基本動作>
[全体構成]
 図1は、本発明の実施の形態に係る管理システムの構成を示す図である。
 図1を参照して、管理システム201は、管理装置101と、第1の無線端末装置151と、第2の無線端末装置152と、受信機(中継機)161とを備える。
 第1の無線端末装置151は、たとえば、電池式で動作する装置であり、工場などの対象施設に設けられた対象設備Xに取り付けられている。対象設備Xは、モータなどの機器である。第1の無線端末装置151は、対象設備Xの計測を常時行い、計測結果を示す計測情報を無線通信により受信機161へ送信する。
 より詳細には、第1の無線端末装置151は、対象設備Xに取り付けられた検出素子11と、本体12とを含む。検出素子11は、たとえば、対象設備Xの振動を常時計測し、計測結果を本体12へ出力する。本体12は、検出素子11から受けた計測結果を示す計測情報を受信機161へ送信する。
 なお、第1の無線端末装置151は、検出素子11を含まない構成であってもよい。この場合、第1の無線端末装置151は、別の装置により行われた対象設備Xの計測結果を取得し、取得した計測結果を示す計測情報を受信機161へ送信する。
 第2の無線端末装置152は、たとえば、電池式で動作する装置であり、対象設備Xの動作を制御する制御装置Yと有線により接続されている。第2の無線端末装置152は、対象設備Xの動作に関する設備情報を取得し、取得した設備情報を無線通信により受信機161へ送信する。
 具体的には、第2の無線端末装置152は、本体21と、接点Pとを含み、接点Pのオープンまたはクローズを計測する接点計測装置である。
 制御装置Yは、たとえば管理者により操作されると、対象設備Xの動作を開始させるための動作開始命令、または対象設備Xの動作を停止させるための動作停止命令を対象設備Xへ送信する。対象設備Xは、制御装置Yから動作開始命令を受信すると動作を開始し、制御装置Yから動作停止命令を受信すると動作を停止する。
 接点Pには、設備情報として、対象設備Xの動作開始および動作停止を認識可能な情報が、制御装置Yから与えられる。
 より詳細には、制御装置Yは、対象設備Xへ動作開始命令を送信する際、たとえば、第2の無線端末装置152における接点Pをオープンの状態からクローズの状態へ切り替えるための信号を接点Pへ出力する。また、制御装置Yは、対象設備Xへ動作停止命令を送信する際、たとえば、接点Pをクローズの状態からオープンの状態へ切り替えるための信号を接点Pへ出力する。
 第2の無線端末装置152における本体21は、接点Pの状態が切り替わると、接点Pの状態を示す情報を設備情報として受信機161へ送信する。
 具体的には、本体21は、対象設備Xが動作を開始した際、すなわち接点Pがクローズの状態に切り替わった際、設備情報として「1」の接点情報を受信機161へ送信する。また、本体21は、対象設備Xが動作を停止した際、すなわち接点Pがオープンの状態に切り替わった際、設備情報として「0」の接点情報を受信機161へ送信する。
 受信機161は、たとえば管理装置101と有線により接続されている。受信機161は、第1の無線端末装置151からの計測情報、および第2の無線端末装置152からの設備情報を、管理装置101へ送信する。
 管理装置101は、受信機161から送信された計測情報および設備情報を受信すると、当該設備情報に基づいて、当該計測情報のフィルタリングを行う。すなわち、管理装置101は、受信した設備情報に基づいて、受信した計測情報の一部を抽出する処理を行う。そして、管理装置101は、抽出した情報に基づいて対象設備Xの異常を検知する。
 なお、管理装置101は、計測情報および設備情報の取得について以下のような構成であってもよい。すなわち、受信機161が、第1の無線端末装置151からの計測情報、および第2の無線端末装置152からの設備情報を保持する。そして、管理装置101は、受信機161の記憶部等に保存されている計測情報および設備情報を、定期的または不定期に読み出す。
[管理装置]
 図2は、本発明の実施の形態に係る管理装置の構成を示す図である。
 図2を参照して、管理装置101は、取得部41と、処理部42と、記憶部43と、検知部44とを含む。
 取得部41は、受信機161から送信された計測情報を受信すると、受信した計測情報および現在時刻を記憶部43に保存する。また、取得部41は、受信機161から送信された設備情報を受信すると、受信した設備情報および現在時刻を記憶部43に保存する。これにより、記憶部43には、計測情報と時刻との組、および設備情報と時刻との組が蓄積される。
 処理部42は、取得部41により受信された設備情報に基づくタイミングで、記憶部43に保存されている複数の計測情報のうちの一部を抽出する処理を行う。
 図3は、図2に示す管理装置が受信した複数の計測情報に基づく計測結果を示す図である。図4は、図2に示す管理装置における設備情報の状態変化の一例を示す図である。図5は、図2に示す管理装置により抽出された1または複数の計測情報に基づく計測結果を示す図である。
 図3および図5に示すグラフの横軸は時間を示し、縦軸は対象設備Xの振動強度を示す。図4に示すグラフの横軸は時間を示し、縦軸は設備情報の電圧レベルを示す。
 図3~図5を参照して、処理部42は、たとえば、記憶部43に保存されている複数の設備情報に基づいて、対象設備Xの動作開始タイミングおよび動作停止タイミングを検出する。
 具体的には、図4に示すように、時刻t1において、取得部41が受信機161から送信された「1」の接点情報を受信し、時刻t2において、取得部41が受信機161から送信された「0」の接点情報を受信したとする。この場合、処理部42は、時刻t1を対象設備Xの動作開始タイミングとして検出し、時刻t2を対象設備Xの動作停止タイミングとして検出する。
 また、処理部42は、図5に示すように、記憶部43に保存されている複数の計測情報の中から、時刻t1から時刻t2の期間に含まれる時刻に対応する1または複数の計測情報を抽出する。すなわち、処理部42により抽出される計測情報の各々は、対象設備Xが動作している期間における、対象設備Xの計測結果を示す。
 そして、処理部42は、抽出した1または複数の計測情報を含む抽出情報を、記憶部43に保存する。
 再び図2を参照して、検知部44は、定期的または不定期に、記憶部43に保存されている抽出情報を取得し、取得した抽出情報に基づいて対象設備Xの異常を検知する。検知部44は、対象設備Xの異常の検知として、対象設備Xの故障および劣化などを検知することができる。
 (異常検知の具体例1)
 図6は、本発明の実施の形態に係る管理装置による異常の検知方法の一例(その1)を説明するための図である。図6に示すグラフの横軸は周波数を示し、縦軸は対応する周波数における信号強度を示す。
 図6を参照して、たとえば、検知部44は、抽出情報の示す計測結果の成分分析を行う。すなわち、検知部44は、図5に示す波形の周波数分布特性に基づいて、対象設備Xに異常が生じているか否かを判断する。
 より詳細には、たとえば、記憶部43には、対象設備Xが正常に動作している状態における、当該対象設備Xの振動強度を示す波形の周波数分析の結果が基準データとして保存されている。検知部44は、たとえば、基準データのグラフの特異点と、抽出情報の示す計測結果を周波数分析することにより得られたグラフの特異点とを比較することにより、対象設備Xに異常が生じているか否かを判断することができる。
 (異常検知の具体例2)
 図7は、本発明の実施の形態に係る管理装置による異常の検知方法の一例(その2)を説明するための図である。図7に示すグラフの横軸は日付を示し、縦軸は対象設備Xの振動強度を示す。
 図7を参照して、検知部44は、周波数分析を行う代わりに、たとえば、抽出情報の示す計測結果に基づいて、日付ごとの振動強度を示すグラフを取得し、当該グラフに基づいて、対象設備Xに異常が生じているか否かを判断する構成であってもよい。
 より詳細には、たとえば、検知部44は、記憶部43から、1日分の抽出情報を取得し、取得した抽出情報に基づいて、単位時間当たりの振動強度の平均値を算出する。そして、検知部44は、算出した平均値を日付と対応付けて記憶部43に保存する。
 また、検知部44は、たとえば図7に示すように、日付ごとの振動強度の平均値を示すグラフを作成し、グラフの値および絶対基準値を用いることにより、対象設備Xに異常が生じているか否かを判断する。たとえば、検知部44は、対象設備Xが正常に動作している場合における振動強度の変化量を基準値として、対象設備Xに異常が生じているか否かを判断する。
 具体的には、10月1日から10月13日までの期間において、対象設備Xが正常に動作しており、当該期間において振動強度の平均値の変化量が約ゼロであるとする。この場合、検知部44は、たとえば、基準値をゼロとする。
 そして、たとえば、10月13日から10月26日までの期間において、前日の振動強度の平均値から翌日の振動強度の平均値への変化量と、基準値との差が所定値以上であることが数日に1回あるとする。この場合、検知部44は、たとえば、当該期間において、対象設備Xが注意の必要な状態、すなわち対象設備Xに異常が生じる可能性の高い状態であると判断する。
 また、たとえば、10月26日から10月29日までの期間において、前日の振動強度の平均値から翌日の振動強度の平均値への変化量と、基準値との差が所定値以上であることが複数回連続したとする。この場合、検知部44は、たとえば、対象設備Xに異常が生じていると判断する。
 なお、検知部44は、対象設備の振動強度の平均値と相対基準値とを比較することにより、対象設備Xに異常が生じているか否かを判断する構成であってもよい。
 具体的には、検知部44は、たとえば、10月1日における振動強度の平均値と、ある日の振動強度の平均値とを結ぶグラフの傾きが第1所定値未満である場合、対象設備Xに異常が生じていないと判断する。また、検知部44は、たとえば、当該グラフの傾きが第1所定値以上、かつ第2所定値未満である場合、対象設備Xが注意の必要な状態であると判断する。また、検知部44は、たとえば、当該グラフの傾きが第2所定値以上である場合、対象設備Xに異常が生じていると判断する。
 なお、管理装置101は、検知部44を含まない構成であってもよい。この場合、管理装置101は、記憶部43に保存されている抽出情報を他の異常検知装置へ送信する。異常検知装置は、管理装置101から送信された抽出情報を受信し、受信した抽出情報に基づいて対象設備Xの異常を検知する。
<動作の流れ>
 管理システム201における各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のシーケンス図の各ステップの一部または全部を含むプログラムを図示しないメモリから読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。
 図8は、本発明の実施の形態に係る管理システムの動作の流れの一例を示すシーケンス図である。
 図8を参照して、まず、第1の無線端末装置151は、対象設備Xの振動を常時計測し(ステップS11)、計測結果を示す計測情報を受信機161経由で管理装置101へ送信する(ステップS12)。
 次に、第2の無線端末装置152は、自己の接点Pの状態が切り替わると(ステップS13)、接点Pの状態を示す設備情報を受信機161経由で管理装置101へ送信する(ステップ14)。
 次に、管理装置101は、第1の無線端末装置151から送信された計測情報、および第2の無線端末装置152から送信された設備情報を受信し、受信した計測情報および設備情報を保持する(ステップS15)。
 次に、管理装置101は、保持している複数の設備情報に基づいて、対象設備Xの動作開始タイミングおよび動作停止タイミングを検出する(ステップS16)。
 次に、管理装置101は、検出した動作開始タイミングおよび動作停止タイミングに基づいて、複数の計測情報の中から、対象設備Xが動作している期間における計測結果を示す1または複数の計測情報を抽出する(ステップS17)。
 そして、管理装置101は、抽出した1または複数の計測情報を含む抽出情報に基づいて、対象設備Xの異常を検知する(ステップS18)。
 なお、接点Pの状態の切り替え(ステップS13)、および第2の無線端末装置152による設備情報の送信(ステップS14)は、第1の無線端末装置151による計測(ステップS11)および計測情報の送信(ステップS12)より前に行われてもよい。
 ところで、上述した特許文献1に記載のような装置によれば、対象設備を計測した結果に基づいて、人手を介さずに当該対象設備において生じた異常の検知を行うことができる。
 しかしながら、対象設備の計測は、当該対象設備が動作している期間に限らず、動作を停止している期間においても行われる。そして、異常の検知に用いられるデータに、対象設備が動作している期間における計測結果、および対象設備が動作を停止している期間における計測結果の両方が含まれる場合、異常の検知を精度よく行うことができない可能性がある。また、この場合、不要なデータに対して演算処理を行うことになる。
 そこで、たとえば、制御装置が、対象設備の動作を停止させる際、当該対象設備の計測結果を無線送信する送信機を制御することにより、当該計測結果の送信を停止させる構成が考えられる。しかしながら、この場合、制御装置と送信機との間を配線する必要があり、コストの増加などの問題がある。
 これに対して、本発明の実施の形態に係る管理システム201では、第1の無線端末装置151が、対象設備Xを計測した結果を示す計測情報を取得して送信する。また、第2の無線端末装置152が、対象設備Xの動作に関する設備情報を取得して送信する。また、管理装置101が、計測情報および設備情報を取得し、取得した設備情報に基づいて、取得した計測情報の一部を抽出する処理を行う。
 このような構成により、管理装置101において、設備情報に基づいて対象設備Xが動作している期間を把握し、当該期間における計測結果を含む計測情報を選択的に抽出することができるため、抽出した計測情報を用いて、対象設備Xにおける異常の検知をより高い精度で行うことができる。また、不要なデータに対する演算処理を避けることができるため、処理負荷の低減を実現することができる。したがって、対象設備Xに関する計測結果を示す計測情報の処理をより良好に行うことができる。
 また、本発明の実施の形態に係る管理システム201では、第2の無線端末装置152は、接点Pを備える。接点Pには、設備情報として、対象設備Xの動作開始および動作停止を認識可能な情報が第2の無線端末装置152の外部である制御装置Yから与えられる。
 このような構成により、制御装置Yから与えられる情報による接点Pの状態に基づいて、対象設備Xの動作開始タイミングおよび動作停止タイミングを容易に検出することができる。
 また、本発明の実施の形態に係る管理システム201では、管理装置101は、対象設備Xの動作開始を認識可能な設備情報を取得した時刻、および対象設備Xの動作停止を認識可能な設備情報を取得した時刻に基づいて、計測情報の一部を抽出する処理を行う。
 このような構成により、第2の無線端末装置152、または第2の無線端末装置152および管理装置101間の情報を中継する受信機161などにおいて時刻の計測を行うことなく、管理装置101において対象設備Xの動作開始タイミングおよび動作停止タイミングを検出することができる。
 また、本発明の実施の形態に係る管理システム201では、管理装置101は、抽出した情報に基づいて対象設備Xの異常を検知する。
 このように、管理装置101が対象設備Xの異常を検知する構成により、異常の検知を行うための他の装置を別途設ける必要がない。
 また、本発明の実施の形態に係る管理装置101では、取得部41が、対象設備Xを計測した結果を示す計測情報、および対象設備Xの動作に関する設備情報を取得する。また、処理部42が、取得部41により取得された設備情報に基づいて、取得部41により取得された計測情報の一部を抽出する処理を行う。
 このような構成により、管理装置101において、設備情報に基づいて対象設備Xが動作している期間を把握し、当該期間における計測結果を含む計測情報を選択的に抽出することができるため、抽出した計測情報を用いて、対象設備Xにおける異常の検知をより高い精度で行うことができる。また、不要なデータに対する演算処理を避けることができるため、処理負荷の低減を実現することができる。したがって、対象設備Xに関する計測結果を示す計測情報の処理をより良好に行うことができる。
 また、本発明の実施の形態に係る管理システム201では、まず、第1の無線端末装置151が、対象設備Xを計測した結果を示す計測情報を取得して送信する。次に、第2の無線端末装置152が、対象設備Xの動作に関する設備情報を取得して送信する。次に、管理装置101が、計測情報および設備情報を取得し、当該設備情報に基づいて、当該計測情報の一部を抽出する処理を行う。
 このような方法により、管理装置101において、設備情報に基づいて対象設備Xが動作している期間を把握し、当該期間における計測結果を含む計測情報を選択的に抽出することができるため、抽出した計測情報を用いて、対象設備Xにおける異常の検知をより高い精度で行うことができる。また、不要なデータに対する演算処理を避けることができるため、処理負荷の低減を実現することができる。したがって、対象設備Xに関する計測結果を示す計測情報の処理をより良好に行うことができる。
<変形例1>
 図1に示す例では、管理システム201における第2の無線端末装置152は、設備情報として、接点Pの状態を示す信号を送信する。しかしながら、このような構成に限らず、第2の無線端末装置は、対象設備Xを計測した結果を示す情報を設備情報として送信する構成であってもよい。この場合、第2の無線端末装置は、第1の無線端末装置151による計測とは異なる種類の計測を行う。
 図9は、本発明の実施の形態の変形例1に係る管理システムの構成を示す図である。
 図9を参照して、管理システム202は、図1に示す第2の無線端末装置152の代わりに、第2の無線端末装置153を備える。
 第2の無線端末装置153は、たとえば、クランプ式の電流センサであり、コア部51と、本体52とを含む。コア部51は、たとえば、対象設備Xと電源プラグPSとをつなぐ電線を挟む。本体52は、コア部51に巻かれたコイルに発生する電流を計測することにより、対象設備Xに流れる電流値を計測し、計測結果を示す情報を設備情報として受信機161経由で管理装置101へ送信する。
 なお、第2の無線端末装置153は、クランプ式の電流センサの代わりに、対象設備Xと電源プラグPSとをつなぐ電線に直接結線される電流センサなどであってもよい。このような電流センサを用いる場合、たとえば、当該電線に流れる4mA~20mAの範囲で出力される微小な電流値を計測することが可能である。
 また、第2の無線端末装置153は、対象設備Xの温度を計測する温度センサ、または対象設備Xの湿度を計測する湿度センサなどであってもよい。
 なお、第2の無線端末装置153は、別の装置により行われた対象設備Xの計測結果を取得し、取得した計測結果を示す設備情報を受信機161経由で管理装置101へ送信する構成であってもよい。
 再び図2を参照して、管理装置101における取得部41は、受信機161から送信された計測情報を受信すると、受信した計測情報および現在時刻を記憶部43に保存する。また、取得部41は、受信機161から送信された設備情報を受信すると、受信した設備情報および現在時刻を記憶部43に保存する。
 処理部42は、取得部41により受信された設備情報に基づくタイミングで、記憶部43に保存されている複数の計測情報のうちの一部を抽出する処理を行う。
 図10は、図9に示す管理装置が受信した設備情報に基づく計測結果を示す図である。図10に示すグラフの横軸は時間を示し、縦軸は電流値を示す。
 図10を参照して、具体的には、時刻t1から時刻t2の期間に含まれる複数の時刻にそれぞれ対応する複数の設備情報の示す電流値が閾値Thを超えているとする。この場合、処理部42は、時刻t1を対象設備Xの動作開始タイミングとして検出し、時刻t2を対象設備Xの動作停止タイミングとして検出する。
 また、処理部42は、記憶部43に保存されている複数の計測情報の中から、時刻t1から時刻t2の期間に含まれる時刻に対応する1または複数の計測情報を抽出する。そして、処理部42は、抽出した1または複数の計測情報を含む抽出情報を、記憶部43に保存する。
 検知部44は、定期的または不定期に、記憶部43に保存されている抽出情報を取得し、取得した抽出情報に基づいて対象設備Xの異常を検知する。
 その他の構成および動作は、図1に示す管理システム201と同様であるため、ここでは詳細な説明を繰り返さない。
 上記のように、本発明の実施の形態の変形例1に係る管理システム201において、設備情報は、計測情報の示す計測とは異なる種類の計測を対象設備Xについて行った結果を示す。管理装置101は、設備情報の示す計測結果と所定の閾値Thとの比較結果に基づいて、計測情報の一部を抽出する処理を行う。
 このような構成により、ある種類の計測情報を、対象の計測情報の抽出処理のためのタイミング設定に用いることができる。
<変形例2>
 図1に示す例では、管理システム201における管理装置101は、受信機161から送信された設備情報を受信した時刻に基づいて、計測情報の一部を抽出する処理を行う。しかしながら、管理システム201は、このような構成に限らず、以下のような構成であってもよい。
 受信機161は、第1の無線端末装置151から送信された計測情報を受信すると、受信した計測情報に、たとえば現在時刻である時刻情報および中継回数を追加する。そして、受信機161は、現在時刻および中継回数が追加された後の計測情報を管理装置101へ送信する。
 中継回数は、第1の無線端末装置151と管理装置101との間において、計測情報が中継された回数である。すなわち、第1の無線端末装置151から送信された計測情報を受信した受信機161は、中継回数として「1」を計測情報に追加する。
 なお、第1の無線端末装置151と受信機161との間において、図示しない1または複数の中継機が設けられてもよい。この場合、第1の無線端末装置151から送信された計測情報を直接受信した中継機は、計測情報に現在時刻および中継回数「1」を追加し、時刻情報および中継回数を追加した後の計測情報を、他の中継機または受信機161へ送信する。
 他の中継機は、計測情報に時刻情報を追加せず、中継回数のカウントアップを行った後の計測情報を、他の中継機または受信機161へ送信する。受信機161は、計測情報に時刻情報を追加せず、中継回数のカウントアップを行った後の計測情報を管理装置101へ送信する。
 また、受信機161は、第2の無線端末装置152から送信された設備情報を受信すると、第1の無線端末装置151からの計測情報を受信した場合と同様に、当該設備情報に、たとえば現在時刻である時刻情報および中継回数を追加する。そして、受信機161は、現在時刻および中継回数が追加された後の設備情報を管理装置101へ送信する。
 また、第2の無線端末装置152と受信機161との間において、1または複数の中継機が設けられている場合、第2の無線端末装置152から送信された設備情報を直接受信した中継機は、設備情報に時刻情報および中継回数「1」を追加し、時刻情報および中継回数を追加した後の設備情報を、他の中継機または受信機161へ送信する。
 他の中継機は、設備情報に時刻情報を追加せず、中継回数のカウントアップを行った後の設備情報を、他の中継機または受信機161へ送信する。受信機161は、設備情報に時刻情報を追加せず、中継回数のカウントアップを行った後の設備情報を管理装置101へ送信する。
 管理装置101は、受信機161から受信した設備情報に含まれる時刻情報に基づいて、対象設備Xの動作開始タイミングおよび動作停止タイミングを検出する。
 より詳細には、管理装置101における処理部42は、たとえば、記憶部43に保存されている複数の設備情報を確認し、接点情報が「0」から「1」に切り替わった場合における最初の設備情報に含まれる時刻情報を、対象設備Xの動作開始タイミングとして検出する。また、処理部42は、たとえば、接点情報が「1」から「0」に切り替わった場合における最初の設備情報に含まれる時刻情報を、対象設備Xの動作停止タイミングとして検出する。
 そして、処理部42は、記憶部43に保存されている複数の計測情報のうち、対象設備Xの動作開始タイミングから動作停止タイミングまでの期間に対応する計測情報を抽出する。
 なお、受信機161は、計測情報への時刻情報および中継回数の追加、ならびに設備情報への時刻情報および中継回数の追加を行う機能を有さなくてもよい。管理装置101は、受信機161からの設備情報に時刻情報および中継回数が含まれている場合、すなわち中継機を経由した設備情報を受信した場合、上述のとおり、設備情報に含まれる時刻情報に基づいて、対象設備Xの動作開始タイミングおよび動作停止タイミングを検出する。
 一方、管理装置101は、受信機161からの設備情報に時刻情報および中継回数が含まれていない場合、すなわち中継機を経由していない設備情報を受信した場合、設備情報を受信した時刻に基づいて、対象設備Xの動作開始タイミングおよび動作停止タイミングを検出する。
 また、管理装置101は、受信機161からの計測情報に時刻情報および中継回数が含まれている場合、すなわち中継機を経由した計測情報を受信した場合、計測情報に含まれている時刻情報に基づいて、対象設備Xの動作開始タイミングから動作停止タイミングまでの期間に対応する計測情報を抽出する。
 一方、管理装置101は、受信機161からの計測情報に時刻情報および中継回数が含まれていない場合、すなわち中継機を経由していない計測情報を受信した場合、受信機161からの計測情報を受信した時刻に基づいて、対象設備Xの動作開始タイミングから動作停止タイミングまでの期間に対応する計測情報を抽出する。
 また、管理装置101が、第1の無線端末装置151から送信された計測情報、および第2の無線端末装置152から送信された設備情報を直接受信する構成であってもよい。
 この場合、管理装置101は、受信した設備情報に時刻情報および中継回数が含まれていないため、第2の無線端末装置152からの設備情報を受信した時刻に基づいて、対象設備Xの動作開始タイミングおよび動作停止タイミングを検出する。そして、管理装置101は、第1の無線端末装置151からの計測情報を受信した時刻に基づいて、対象設備Xの動作開始タイミングから動作停止タイミングまでの期間に対応する計測情報を抽出する。
 その他の構成および動作は、図1に示す管理システム201と同様であるため、ここでは詳細な説明を繰り返さない。
 上記のように、本発明の実施の形態の変形例2に係る管理システム201において、受信機161は、第2の無線端末装置152から設備情報を受信し、受信した設備情報に時刻情報を追加して管理装置101へ送信する。管理装置101は、対象設備Xの動作開始を認識可能な設備情報に含まれる時刻情報、および対象設備Xの動作停止を認識可能な設備情報に含まれる時刻情報に基づいて、計測情報の一部を抽出する処理を行う。
 たとえば、管理装置101における設備情報の受信時刻を用いて対象設備Xの動作開始タイミングおよび動作停止タイミングを検出する構成では、設備情報が管理装置101に到着するまでに多くの時間を要する場合、管理装置101により検出される動作開始タイミングおよび動作停止タイミングと、実際の動作開始タイミングおよび動作停止タイミングとの間の誤差が大きくなる。これに対して、上記のように、受信機161における設備情報の受信時刻を用いる構成により、誤差を小さくし、対象設備Xの動作開始タイミングおよび動作停止タイミングをより高い精度で検出することができる。
 なお、本発明の実施の形態に係る管理装置101の機能の一部または全部が、クラウドコンピューティングによって提供されてもよい。すなわち、本発明の実施の形態に係る管理装置101が、複数のクラウド事業者サーバ等によって構成されてもよい。
 上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。
 以上の説明は、以下に付記する特徴を含む。
 [付記1]
 対象設備を計測した結果を示す計測情報を取得して送信する第1の無線端末装置と、
 前記対象設備の動作に関する設備情報を取得して送信する第2の無線端末装置と、
 前記計測情報および前記設備情報を取得し、前記設備情報に基づいて、前記計測情報の一部を抽出する処理を行う管理装置とを備え、
 前記第2の無線端末装置は、接点を備え、
 前記接点は、前記対象設備が動作を開始する際にクローズの状態に切り替えられ、前記対象設備が動作を停止する際にオープンの状態に切り替えられ、
 前記第2の無線端末装置は、前記接点の状態を示す情報を前記設備情報として送信し、
 前記管理装置は、前記第2の無線端末装置から送信された前記設備情報に基づいて前記対象設備の動作開始タイミングおよび動作停止タイミングを検出し、取得した前記計測情報から、検出した前記動作開始タイミングから前記動作停止タイミングまでの期間に対応する情報を抽出する、管理システム。
 [付記2]
 対象設備を計測した結果を示す計測情報、および前記対象設備の動作に関する設備情報を取得する取得部と、
 前記取得部により取得された前記設備情報に基づいて、前記取得部により取得された前記計測情報の一部を抽出する処理を行う処理部とを備え、
 前記設備情報は、前記対象設備に接続された第2の無線端末装置における接点の状態を示し、
 前記接点は、前記対象設備が動作を開始する際にクローズの状態に切り替えられ、前記対象設備が動作を停止する際にオープンの状態に切り替えられ、
 前記処理部は、前記設備情報に基づいて前記対象設備の動作開始タイミングおよび動作停止タイミングを検出し、前記取得部により取得された前記計測情報から、検出した前記動作開始タイミングから前記動作停止タイミングまでの期間に対応する情報を抽出する、管理装置。
 11 検出素子
 12 本体
 21,52 本体
 41 取得部
 42 処理部
 43 記憶部
 44 検知部
 51 コア部
 101 管理装置
 151 第1の無線端末装置
 152,153 第2の無線端末装置
 161 受信機(中継機)
 201,202 管理システム
 P 接点
 PS 電源プラグ
 X 対象設備
 Y 制御装置

Claims (9)

  1.  対象設備を計測した結果を示す計測情報を取得して送信する第1の無線端末装置と、
     前記対象設備の動作に関する設備情報を取得して送信する第2の無線端末装置と、
     前記計測情報および前記設備情報を取得し、前記設備情報に基づいて、前記計測情報の一部を抽出する処理を行う管理装置とを備える、管理システム。
  2.  前記第2の無線端末装置は、接点を備え、
     前記接点には、前記設備情報として、前記対象設備の動作開始および動作停止を認識可能な情報が前記第2の無線端末装置の外部から与えられる、請求項1に記載の管理システム。
  3.  前記管理装置は、前記対象設備の動作開始を認識可能な前記設備情報を取得した時刻、および前記対象設備の動作停止を認識可能な前記設備情報を取得した時刻に基づいて、前記計測情報の一部を抽出する処理を行う、請求項2に記載の管理システム。
  4.  前記管理システムは、さらに、
     前記第2の無線端末装置および前記管理装置間の情報を中継する1または複数の中継機を備え、
     前記中継機は、前記第2の無線端末装置から前記設備情報を受信し、受信した前記設備情報に時刻情報を追加して他の装置へ送信し、
     前記管理装置は、前記対象設備の動作開始を認識可能な前記設備情報に含まれる前記時刻情報、および前記対象設備の動作停止を認識可能な前記設備情報に含まれる前記時刻情報に基づいて、前記計測情報の一部を抽出する処理を行う、請求項2または請求項3に記載の管理システム。
  5.  前記設備情報は、前記計測情報の示す計測とは異なる種類の計測を前記対象設備について行った結果を示し、
     前記管理装置は、前記設備情報の示す計測結果と所定の閾値との比較結果に基づいて、前記計測情報の一部を抽出する処理を行う、請求項1に記載の管理システム。
  6.  前記管理装置は、抽出した情報に基づいて前記対象設備の異常を検知する、請求項1から請求項5のいずれか1項に記載の管理システム。
  7.  対象設備を計測した結果を示す計測情報、および前記対象設備の動作に関する設備情報を取得する取得部と、
     前記取得部により取得された前記設備情報に基づいて、前記取得部により取得された前記計測情報の一部を抽出する処理を行う処理部とを備える、管理装置。
  8.  第1の無線端末装置と、第2の無線端末装置と、管理装置とを備える管理システムにおける管理方法であって、
     前記第1の無線端末装置が、対象設備を計測した結果を示す計測情報を取得して送信するステップと、
     前記第2の無線端末装置が、前記対象設備の動作に関する設備情報を取得して送信するステップと、
     前記管理装置が、前記計測情報および前記設備情報を取得し、取得した前記設備情報に基づいて、受信した前記計測情報の一部を抽出する処理を行うステップとを含む、管理方法。
  9.  管理装置において用いられる管理プログラムであって、
     コンピュータを、
     対象設備を計測した結果を示す計測情報、および前記対象設備の動作に関する設備情報を取得する取得部と、
     前記取得部により取得された前記設備情報に基づいて、前記取得部により取図得された前記計測情報の一部を抽出する処理を行う処理部、
    として機能させるための、管理プログラム。
PCT/JP2018/026450 2017-08-08 2018-07-13 管理システム、管理装置、管理方法および管理プログラム WO2019031156A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201880051173.2A CN111033410B (zh) 2017-08-08 2018-07-13 管理系统、管理装置、管理方法以及管理程序
JP2019514850A JP6638864B2 (ja) 2017-08-08 2018-07-13 管理システム、管理装置、管理方法および管理プログラム
US16/636,393 US20200173888A1 (en) 2017-08-08 2018-07-13 Management system, management device, management method, and management program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-153236 2017-08-08
JP2017153236 2017-08-08

Publications (1)

Publication Number Publication Date
WO2019031156A1 true WO2019031156A1 (ja) 2019-02-14

Family

ID=65270982

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/026450 WO2019031156A1 (ja) 2017-08-08 2018-07-13 管理システム、管理装置、管理方法および管理プログラム

Country Status (4)

Country Link
US (1) US20200173888A1 (ja)
JP (1) JP6638864B2 (ja)
CN (1) CN111033410B (ja)
WO (1) WO2019031156A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015228612A (ja) * 2014-06-02 2015-12-17 住友電気工業株式会社 センサ情報管理装置、センサ情報管理方法およびセンサ情報管理プログラム
JP2016076062A (ja) * 2014-10-06 2016-05-12 株式会社東芝 表示装置、表示方法及び監視制御システム
WO2016132513A1 (ja) * 2015-02-19 2016-08-25 三菱電機株式会社 管理装置、管理方法、及び、プログラム
JP2016162388A (ja) * 2015-03-05 2016-09-05 株式会社東芝 情報処理装置、監視制御システム及びプログラム
JP2017091348A (ja) * 2015-11-13 2017-05-25 住友電気工業株式会社 使用管理システム、使用管理装置および使用管理プログラム

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6260004B1 (en) * 1997-12-31 2001-07-10 Innovation Management Group, Inc. Method and apparatus for diagnosing a pump system
JP4446786B2 (ja) * 2004-04-16 2010-04-07 新日本製鐵株式会社 携帯センサシステム
JP2008178626A (ja) * 2007-01-26 2008-08-07 Seiko Epson Corp 生体情報管理システム、中継装置、生体情報計測装置、中継装置の制御方法、生体情報計測装置の制御方法、中継装置の制御プログラム、及び、生体情報計測装置の制御プログラム
JP2008234066A (ja) * 2007-03-16 2008-10-02 Fujitsu Ltd ソフトウェア管理システム及び管理方法及び管理制御プログラム
EP2258985A4 (en) * 2008-03-06 2011-05-25 Panasonic Corp INSTRUMENT HANDLING SYSTEM AND GAS SUPPLY SYSTEM
JP5223592B2 (ja) * 2008-10-28 2013-06-26 アイコム株式会社 無線通信システム、無線通信方法、無線通信端末装置、中継装置、並びに、中継システム
JP5187138B2 (ja) * 2008-10-28 2013-04-24 アイコム株式会社 無線通信システム、その無線通信方法、中継装置及び無線端末装置
JP5099044B2 (ja) * 2009-02-27 2012-12-12 アイコム株式会社 中継装置、無線通信システム及び無線通信方法
JP5388337B2 (ja) * 2009-03-02 2014-01-15 株式会社テイエルブイ 機器監視システム
JP5218453B2 (ja) * 2009-04-10 2013-06-26 オムロン株式会社 設備運転状態計測装置、設備運転状態計測方法、および制御プログラム
CA2710269C (en) * 2009-08-11 2012-05-22 Certusview Technologies, Llc Locating equipment communicatively coupled to or equipped with a mobile/portable device
JP5740459B2 (ja) * 2009-08-28 2015-06-24 株式会社日立製作所 設備状態監視方法
JP2014052974A (ja) * 2012-09-10 2014-03-20 Toshiba Corp 情報端末装置、制御方法及び制御プログラム
IN2015DN02253A (ja) * 2012-09-20 2015-08-21 Steel Corporation Jfe
US10659322B2 (en) * 2013-05-22 2020-05-19 Mitsubishi Electric Corporation Monitoring system, facility management device, monitoring method, and program

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015228612A (ja) * 2014-06-02 2015-12-17 住友電気工業株式会社 センサ情報管理装置、センサ情報管理方法およびセンサ情報管理プログラム
JP2016076062A (ja) * 2014-10-06 2016-05-12 株式会社東芝 表示装置、表示方法及び監視制御システム
WO2016132513A1 (ja) * 2015-02-19 2016-08-25 三菱電機株式会社 管理装置、管理方法、及び、プログラム
JP2016162388A (ja) * 2015-03-05 2016-09-05 株式会社東芝 情報処理装置、監視制御システム及びプログラム
JP2017091348A (ja) * 2015-11-13 2017-05-25 住友電気工業株式会社 使用管理システム、使用管理装置および使用管理プログラム

Also Published As

Publication number Publication date
JP6638864B2 (ja) 2020-01-29
CN111033410B (zh) 2023-06-23
CN111033410A (zh) 2020-04-17
US20200173888A1 (en) 2020-06-04
JPWO2019031156A1 (ja) 2019-11-07

Similar Documents

Publication Publication Date Title
KR102003576B1 (ko) 엘리베이터 시스템용 시험 방법 및 이 시험 방법을 실행하는 모니터링 장치
KR101874286B1 (ko) 전력설비 모니터링 및 진단 시스템
EP3617826B1 (en) Monitoring system
AU2008277777B2 (en) Method for monitoring a lift system
CN111858111A (zh) 数据分析的方法、设备和计算机程序产品
EP2613163A1 (en) Self-diagnostic apparatus and method for electric device
CN113167832A (zh) 用于识别机电切换机构磨损的装置和方法
JP2009300173A (ja) 蓄電池監視システム
CN111137773B (zh) 用于检测电梯系统的故障的方法和系统
US9590882B2 (en) Fault diagnostic system, fault diagnostic device, and fault diagnostic method
KR20210084094A (ko) 무선 진동 센서의 배터리 상태 감시 시스템 및 방법
US20180038895A1 (en) Metering System Tamper Detection
JP6638864B2 (ja) 管理システム、管理装置、管理方法および管理プログラム
CN112655156B (zh) 信息处理装置以及控制方法
KR101796841B1 (ko) 빌딩 관제 시스템 및 그 구동 방법
US10564204B2 (en) Method and system for diagnostics and monitoring of electric machines
US20200292596A1 (en) Monitoring system
CN111696336B (zh) 两极输入端的配置
US11676477B2 (en) Fire alarm system
KR102108529B1 (ko) Plc 원격 진단 장치 및 방법
EP4331785A1 (en) Diagnosis system
JP2018082548A (ja) リモート監視システム
CN106059784B (zh) 通信系统及其操作方法
JP2007334491A (ja) 4線式フィールド機器
KR102639218B1 (ko) 개폐장치 동작특성 통합분석 시스템, 개폐장치 데이터 현장수집 장치 및 개폐장치 동작특성 통합분석 방법

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2019514850

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18844577

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18844577

Country of ref document: EP

Kind code of ref document: A1