WO2018116675A1 - 合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法 - Google Patents

合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法 Download PDF

Info

Publication number
WO2018116675A1
WO2018116675A1 PCT/JP2017/040191 JP2017040191W WO2018116675A1 WO 2018116675 A1 WO2018116675 A1 WO 2018116675A1 JP 2017040191 W JP2017040191 W JP 2017040191W WO 2018116675 A1 WO2018116675 A1 WO 2018116675A1
Authority
WO
WIPO (PCT)
Prior art keywords
cooling
zone
steel sheet
galvanized steel
heat
Prior art date
Application number
PCT/JP2017/040191
Other languages
English (en)
French (fr)
Inventor
秀行 小亀
格 橋本
睦雄 白神
Original Assignee
新日鉄住金エンジニアリング株式会社
Nsプラント設計株式会社
新日鐵住金株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 新日鉄住金エンジニアリング株式会社, Nsプラント設計株式会社, 新日鐵住金株式会社 filed Critical 新日鉄住金エンジニアリング株式会社
Publication of WO2018116675A1 publication Critical patent/WO2018116675A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/04Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
    • C23C2/06Zinc or cadmium or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/26After-treatment
    • C23C2/28Thermal after-treatment, e.g. treatment in oil bath
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/26After-treatment
    • C23C2/28Thermal after-treatment, e.g. treatment in oil bath
    • C23C2/29Cooling or quenching
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/34Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the shape of the material to be treated
    • C23C2/36Elongated material
    • C23C2/40Plates; Strips

Definitions

  • the present invention relates to an alloyed galvanized steel sheet manufacturing facility for producing a galvanized steel sheet by heating, heat retaining and cooling the steel sheet after hot dip galvanizing and gas wiping, and alloying using this manufacturing facility.
  • the present invention relates to a method for producing a galvanized steel sheet.
  • gas wiping is performed by disposing a gas wiping device having gas wiping nozzles on both sides of a continuously conveyed steel plate and blowing out gas on both sides of the steel plate.
  • the gas-wiped steel sheet is transported to an alloyed galvanized steel sheet manufacturing facility, where heat treatment, heat retention (retaining treatment) and cooling treatment are performed to produce an alloyed galvanized steel sheet.
  • the alloyed galvanized steel sheet manufacturing equipment includes a temperature raising zone, a heat retaining zone, and a cooling zone in this order.
  • Patent Document 1 discloses the production of an alloyed hot-dip galvanized steel sheet provided with a heat-retaining and cooling furnace that performs at least one of heat-retention and cooling on a steel sheet that leaves and passes through the rapid heating furnace.
  • Equipment is disclosed.
  • This production facility consists of a heat-retaining and cooling furnace, a heat-retaining area that keeps the steel sheet at a heat-retaining temperature of 500 ° C or higher and 650 ° C or lower with heat-retaining means, and an average cooling of the steel plate with a spray nozzle at 5 ° C / sec or higher
  • the cooling area is cooled at a speed, the ratio of the lengths of both areas in the furnace can be arbitrarily set, and the arrangement of the heat retaining area and the cooling area can be arbitrarily set.
  • the alloyed galvanized steel sheet manufacturing equipment manufactures steel sheets of various steel types while appropriately selecting heat retention mode operation and cooling mode operation. Among these, especially in the cooling mode operation, the temperature of the steel sheet is lowered to a predetermined temperature by operating a large number of cooling blowers in the heat retaining zone, and the steel sheet is conveyed to the cooling zone.
  • blowers such as a cooling blower, a circulation blower, and an exhaust blower for supplying cold air to the heat retaining zone during the cooling mode operation are required.
  • the present invention has been made in view of the above-mentioned problems, and can reduce the equipment manufacturing cost by eliminating the cooling blower from the heat retaining zone, and can realize a large number of heat patterns, thereby manufacturing steel sheets of various steel types.
  • An object of the present invention is to provide an alloyed galvanized steel sheet manufacturing facility and an alloyed galvanized steel sheet manufacturing method.
  • the galvannealed steel sheet manufacturing equipment comprises a temperature rising zone, a heat retaining zone, and a cooling zone in this order, and the steel sheet immersed in the plating bath is a temperature rising zone, a heat retaining zone, And galvanized steel sheet manufacturing equipment configured to be conveyed in the order of the cooling zone, wherein the cooling zone is provided with first and second cooling blowers, and the steel sheet conveying direction downstream side in the heat retaining zone Between the position of the first cooling blower and the suction side of the first cooling blower is provided with a connecting duct in which the first control valve is interposed, and the second control valve is interposed in the position of the blowout side of the first cooling blower.
  • a diffusion duct leading to the outside is provided, and an opening / closing gate for sucking outside air is provided at a position upstream of the steel sheet conveyance direction in the heat retention zone, and a control unit that operates the facility in the heat retention mode and the cooling mode is provided.
  • the galvanized steel sheet manufacturing facility of the present invention includes two cooling blowers (first and second cooling blowers) in the cooling zone, and is located between the heat retaining zone and the suction side position of the first cooling blower.
  • a connecting duct with a first control valve interposed is provided.
  • a dissipating duct that communicates with the outside through a second control valve is provided at a position on the blow-out side of the first cooling blower, and an open / close gate that sucks outside air at a position upstream in the steel sheet conveyance direction in the heat retaining zone It has. It is possible to eliminate the cooling blower in the heat retention zone by applying the outside air introduced through the open / close gate when the steel plate is cooled in the heat retention zone.
  • the amount of heat required when alloying steel sheets and the amount of cooling heat required after alloying are generally in a proportional relationship, and in the case of steel types with a small amount of heat required for alloying, there is room for cooling performance of the cooling equipment after alloying. Is born.
  • the present inventors pay attention to this relationship, eliminate cooling equipment such as a cooling blower from the heat retention zone, and enable a steel plate to be quickly transferred to an appropriate set temperature under a reasonable equipment configuration. is there.
  • the alloyed galvanized steel sheet manufacturing facility of the present invention is suitable for a manufacturing facility that does not require a large number of heat patterns, for example.
  • the alloyed galvanized steel sheet manufacturing equipment of the present invention is suitable for manufacturing equipment that does not require a large number of heat patterns, for example, but even when a large number of heat patterns are required, the manufacturing equipment of the present invention can be applied. It is possible to manufacture steel sheets of various steel types.
  • the first control valve and the second control valve are closed, and cooling air is supplied from the first and second cooling blowers to the cooling zone. Control is executed by the control unit.
  • the temperature of the steel plate raised in the temperature raising zone is also maintained in the heat retention zone, and cooling air is supplied to the steel plate from the first and second cooling blowers in the cooling zone to The temperature is lowered to a predetermined temperature.
  • the first control valve, the second control valve, and the open / close gate are opened, and the cooling air is supplied from the first and second cooling blowers to the cooling zone.
  • the control unit executes control in which outside air is supplied to the heat retaining zone through the open / close gate.
  • the temperature of the steel plate heated in the temperature raising zone is lowered to a predetermined temperature by the outside air in the heat retaining zone, and cooling air is supplied to the steel plate from the first and second cooling blowers in the cooling zone.
  • the temperature of the steel plate is lowered to a predetermined temperature.
  • the heat pattern in both the heat retaining mode and the cooling mode can be realized only by the switching operation of the first control valve, the second control valve, and the open / close gate by the control unit.
  • the equipment manufacturing cost can be greatly reduced by completely eliminating the cooling blower from the heat retaining zone. And while eliminating the cooling blower from the heat retention zone in this way, the heat pattern of both the heat retention mode and the cooling mode can be changed only by the switching operation of the first control valve, the second control valve and the open / close gate by the control unit. Since it is realizable and can respond to many heat patterns, the steel plate of various steel types can be manufactured.
  • the present invention extends to a method for producing an alloyed galvanized steel sheet
  • this production method is a method for producing an alloyed galvanized steel sheet using the galvanized steel sheet production equipment described above.
  • the first control valve and the second control valve are closed, and cooling air is supplied from the first and second cooling blowers to the cooling zone.
  • the first control valve, the second control valve, and the open / close gate are opened, cooling air is supplied from the first and second cooling blowers to the cooling zone, and the open / close gate is opened.
  • This is a method for manufacturing an alloyed galvanized steel sheet using a manufacturing facility in which control for supplying outside air to the heat-retaining zone through the control unit is executed.
  • the equipment manufacturing cost can be greatly reduced, and both the heat retention mode and the cooling mode can be achieved only by the switching operation of the first control valve, the second control valve, and the open / close gate by the control unit.
  • the heat pattern can be realized, and a large number of heat patterns can be handled.
  • the alloyed galvanized steel sheet manufacturing facility and the alloyed galvanized steel sheet manufacturing method of the present invention include two cooling blowers (first and second cooling blowers) in the cooling zone, A connecting duct in which a first control valve is interposed between the heat retaining zone and a position on the suction side of the first cooling blower is provided.
  • a dissipating duct that communicates with the outside through a second control valve is provided at a position on the blow-out side of the first cooling blower, and an open / close gate that sucks outside air at a position upstream in the steel sheet conveyance direction in the heat retaining zone When the steel sheet is cooled in the heat retention zone, the outside air introduced through the open / close gate is applied.
  • the cooling blower can be completely abolished from the heat retaining zone, which can greatly reduce the equipment manufacturing cost.
  • a large number of heat patterns can be realized while eliminating the cooling blower from the heat retaining zone, and steel plates of various steel types can be manufactured.
  • FIG. 1 is a block diagram of the galvanized steel sheet manufacturing equipment of the present invention. As shown in FIG. 1, the steel plate K is continuously dipped in the molten metal plating bath M in the plating tank B (in the X1 direction) and subjected to the molten metal plating treatment, and then pulled up from the plating tank B.
  • gas is sprayed from the gas wiping device W onto the unsolidified plated surface of the steel plate K, and the amount of molten metal deposited is adjusted.
  • the steel plate K in which the adhesion amount of the molten metal is adjusted is conveyed to the alloyed galvanized steel sheet manufacturing facility 100.
  • the alloyed galvanized steel sheet manufacturing facility 100 includes a temperature raising zone Z1, a heat retaining zone Z2, and a cooling zone Z3 in this order. And the steel plate K immersed in the plating bath M and the adhesion amount of the molten metal adjusted by the gas wiping apparatus W is conveyed in the order of the temperature raising zone Z1, the heat retaining zone Z2, and the cooling zone Z3. (The conveyance in the heat retention zone Z2 is the X2 direction, and the conveyance in the cooling zone Z3 is the X3 direction).
  • An induction heater 10 is disposed in the temperature raising zone Z1, and the steel plate K conveyed into the manufacturing facility 100 is heated up to a predetermined temperature by the induction heater 10 at once.
  • the heat retention zone Z2 is composed of a heat retention furnace 20 having a predetermined length, a retention heater 21 is disposed on the uppermost stream side of the heat retention furnace 20, and an open / close gate 22 for sucking outside air is further provided. .
  • a hot air supply pipe for supplying hot air into the heat retaining furnace 20 is disposed downstream of the retaining heater 21 through a pilot valve 23 and a combustion blower 24.
  • a hot air exhaust pipe for exhausting hot air in the heat insulating furnace 20 is disposed on the most downstream side of the heat insulating furnace 20 through a pilot valve 25 and an exhaust blower 26.
  • the cooling zone Z3 is composed of a cooling furnace 30 having a predetermined length, and a first cooling blower 32 is disposed in the middle of the cooling furnace 30 via a cooling blower control valve 31, and further a second cooling blower 33. Is arranged.
  • a connecting duct 40 in which the first control valve 41 is interposed is provided between the position on the downstream side in the steel sheet conveying direction in the heat retaining zone Z2 and the position on the suction side of the first cooling blower 32.
  • a diffusion duct 50 communicating with the outside through the second control valve 51 is provided.
  • the manufacturing facility 100 includes a control unit 60.
  • the control unit 60 in addition to the operation and stop of the induction heater 10, the operation and stop of the combustion blower 24 and the exhaust blower 26, the operation and stop of the first cooling blower 32 and the second cooling blower 33, the first Switching control of the control valve 41, the second control valve 51, and the open / close gate 22 is performed.
  • the heat pattern in both the heat retaining mode and the cooling mode is realized only by the switching operation of the first control valve 41, the second control valve 51, and the open / close gate 22 by the control unit 60. To do.
  • the manufacturing facility 100 does not include any cooling blower in the heat retaining zone Z2
  • the facility manufacturing cost is significantly higher than that of a conventional manufacturing facility including a large number of cooling blowers in the heat retaining zone. Inexpensive.
  • FIG. 2 is a view showing both the configuration diagram of the alloyed galvanized steel sheet manufacturing facility and the heat cycle in the heat retention mode.
  • the first control valve 41 and the second control valve 51 are closed, and cooling air is supplied from the first cooling blower 32 and the second cooling blower 33 to the cooling zone Z3.
  • the control to be performed is executed by the control unit 60.
  • the temperature of the steel plate K heated to 550 ° C. in the temperature increase zone Z1 is maintained also in the heat retention zone Z2, and the first cooling blower 32 and the second cooling blower 2 are maintained in the cooling zone Z3.
  • the cooling air is supplied from the cooling blower 33 to the steel plate K, and the temperature of the steel plate K is lowered to a predetermined temperature (300 ° C.).
  • FIG. 3 is a view showing both the configuration diagram of the galvanized steel sheet manufacturing equipment and the heat cycle in the cooling mode.
  • the first control valve 41, the second control valve 51, and the open / close gate 22 are all opened. By opening these, the cooling air is supplied from the first cooling blower 32 and the second cooling blower 33 to the cooling zone Z3, and the outside air is supplied to the heat retaining zone Z2 via the open / close gate 22.
  • the control unit 60 executes (outside air introduction direction: Z1 direction).
  • the amount of convection heat transfer is increased by the updraft caused by the introduction of outside air, so that the temperature of the steel plate K heated up to 520 ° C. in the temperature raising zone Z1 is set to a predetermined temperature (460 ° C. In the cooling mode 2, the temperature can be decreased to 435 ° C.
  • the cooling air is supplied from the first cooling blower 32 and the second cooling blower 33 to the steel plate K in the cooling zone Z3, thereby setting the temperature of the steel plate K to a predetermined temperature (300 ° C. ).
  • the first control valve 41, the second control valve 51, and the opening / closing by the controller 60 without using any cooling blower specific to the heat retention zone Z2 when cooling the steel plate K in the heat retention zone Z2. Only in the switching operation of the gate 22, both heat retention mode and cooling mode heat patterns are realized.
  • the equipment manufacturing cost can be greatly reduced by completely eliminating the cooling blower from the heat retaining zone Z2. And while a cooling blower is abolished from the heat retention zone Z2 in this way, only the switching operation of the first control valve 41, the second control valve 51, and the open / close gate 22 by the control unit 60 is performed in the heat retention mode and the cooling mode. Since both heat patterns can be realized and it is possible to cope with a large number of heat patterns, steel plates of various steel types can be manufactured.
  • the manufacturing equipment 100 is suitable for manufacturing equipment that does not require a large number of heat patterns, but even when a large number of heat patterns are required, it is possible to manufacture steel sheets of various steel types by applying the manufacturing equipment 100. Is possible.

Abstract

保熱ゾーンから冷却ブロワを廃して設備製造コストを削減しながらも、多数のヒートパターンを実現でき、もって様々な鋼種の鋼板を製造することのできる合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法を提供する。 昇温ゾーンZ1、保熱ゾーンZ2、冷却ゾーンZ3を順に備えた合金化亜鉛めっき鋼板製造設備100であって、冷却ゾーンZ3には第1、第2の冷却ブロワ32,33が配設され、保熱ゾーンZ2と第1の冷却ブロワ32の吸い込み側の位置の間には第1の制御弁41が介在する連結ダクト40が設けられ、第1の冷却ブロワ32の吹き出し側の位置には第2の制御弁51が介在して外部に通じる放散ダクト50が設けられ、保熱ゾーンZ2における鋼板搬送方向上流側の位置には外気を吸引する開閉ゲート22が設けられ、設備内を保熱モードと冷却モードで運転する制御部60を備えている。

Description

合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法
 本発明は、溶融亜鉛めっき処理およびガスワイピング処理後の鋼板を、加熱、保熱および冷却して合金化亜鉛めっき鋼板を製造する、合金化亜鉛めっき鋼板製造設備とこの製造設備を使用する合金化亜鉛めっき鋼板製造方法に関するものである。
 溶融金属のめっき浴中に鋼板(鋼帯)を連続的に浸漬させて溶融金属めっき処理をおこなった後、浸漬後の鋼板の未凝固めっき面にガスを吹き付けて溶融金属の付着量を調整するガスワイピング処理が一般におこなわれている。このガスワイピング処理は、連続搬送される鋼板の両側にガスワイピングノズルを備えたガスワイピング装置を配置しておき、鋼板の両側にガスを吹き出すことによってガスワイピングがおこなわれる。
 ガスワイピング処理された鋼板は、合金化亜鉛めっき鋼板製造設備に搬送され、ここで、加熱処理、保熱処理(保定処理)および冷却処理が施されて合金化亜鉛めっき鋼板が製造される。
 ところで、合金化亜鉛めっき鋼板製造設備は、昇温ゾーン、保熱ゾーン、および冷却ゾーンを順に備えている。
 従来の合金化亜鉛めっき鋼板製造設備は、様々な鋼種の鋼板を製造することを可能とするべく多数のヒートパターンを実現するようになっており、そのために、冷却ゾーンのみならず、保熱ゾーンにも鋼板を冷却する多数の冷却ブロワを備えたものが一般に適用されている。
 ここで、特許文献1には、急速加熱炉を退出して通板する鋼板に対し、保熱及び冷却の少なくともいずれか一方をおこなう保熱冷却兼用炉を備えた合金化溶融亜鉛めっき鋼板の製造設備が開示されている。この製造設備は、保熱冷却兼用炉を、鋼板を保熱手段で保熱温度500℃以上かつ650℃以下に保熱する保熱領域と、鋼板を吹付ノズルで5℃/sec以上の平均冷却速度で冷却する冷却領域とから構成し、炉内における両領域の長さの比率を任意に設定可能とし、保熱領域と冷却領域の配置構成を任意に設定可能に構成している。
特開2008-115462号公報
 特許文献1に記載の製造設備によれば、鋼種、めっき付着量、及びその他の外的要因の急な変化に対応して、常に最適な製造条件で合金化溶融亜鉛めっき鋼板を製造できるとしている。
 しかしながら、特許文献1の図3等にも記載がある通り、ここで開示される製造設備でも、保熱ゾーンにおいて多数の冷却ブロワが配設されていることから、設備の製造コストの高騰が否めない。
 合金化亜鉛めっき鋼板製造設備では、保熱モード運転と冷却モード運転を適宜選定しながら様々な鋼種の鋼板を製造している。このうち、特に冷却モード運転では、保熱ゾーンにおける多数の冷却ブロワを稼働させることで鋼板の温度を所定温度まで低下させ、鋼板を冷却ゾーンに搬送している。
 すなわち、従来の製造設備では、冷却モード運転の際に保熱ゾーンに冷気を提供する冷却ブロワや循環ブロワ、排気ブロワなど、多数のブロワを必要としていた。
 ところで、様々な鋼種の鋼板を製造することを目的としながらも、多数のヒートパターンを必要としない製造設備においては、保熱ゾーンにおいて多数の冷却ブロワを不要とすることで設備の製造コストを削減することが可能になる。
 本発明は上記する問題に鑑みてなされたものであり、保熱ゾーンから冷却ブロワを廃して設備製造コストを削減しながらも、多数のヒートパターンを実現でき、もって様々な鋼種の鋼板を製造することのできる合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法を提供することを目的としている。
 前記目的を達成すべく、本発明による合金化亜鉛めっき鋼板製造設備は、昇温ゾーン、保熱ゾーン、および冷却ゾーンを順に備え、めっき浴に浸漬された鋼板が昇温ゾーン、保熱ゾーン、および冷却ゾーンの順に搬送されるように構成された合金化亜鉛めっき鋼板製造設備であって、冷却ゾーンには第1、第2の冷却ブロワが配設され、保熱ゾーンにおける鋼板搬送方向下流側の位置と第1の冷却ブロワの吸い込み側の位置の間には第1の制御弁が介在する連結ダクトが設けられ、第1の冷却ブロワの吹き出し側の位置には第2の制御弁が介在して外部に通じる放散ダクトが設けられ、保熱ゾーンにおける鋼板搬送方向上流側の位置には外気を吸引する開閉ゲートが設けられ、設備内を保熱モードと冷却モードで運転する制御部を備えているものである。
 本発明の合金化亜鉛めっき鋼板製造設備は、冷却ゾーンにおいて2基の冷却ブロワ(第1、第2の冷却ブロワ)を備え、保熱ゾーンと第1の冷却ブロワの吸い込み側の位置の間に第1の制御弁が介在する連結ダクトを備えている。さらに、第1の冷却ブロワの吹き出し側の位置には第2の制御弁が介在して外部に通じる放散ダクトを備え、保熱ゾーンにおける鋼板搬送方向上流側の位置には外気を吸引する開閉ゲートを備えている。保熱ゾーンにおいて鋼板を冷却する際に開閉ゲートを介して導入された外気を適用することにより、保熱ゾーンにおける冷却ブロワを廃することを可能としている。
 鋼板を合金化する際に必要な熱量と合金化後に必要な冷却熱量は一般に比例関係にあり、合金化処理における必要熱量が少ない鋼種の場合には合金化処理後の冷却設備の冷却性能に余力が生まれる。本発明者等はこの関係に着目し、保熱ゾーンから冷却ブロワ等の冷却設備を廃し、合理的な設備構成の下で鋼板を適宜の設定温度に速やかに移行させることを可能としたものである。本発明の合金化亜鉛めっき鋼板製造設備は、たとえば多数のヒートパターンを必要としない製造設備に好適である。
 本発明の合金化亜鉛めっき鋼板製造設備は、たとえば多数のヒートパターンを必要としない製造設備に好適であるが、多数のヒートパターンを必要とする場合でも、本発明の製造設備を適用することで様々な鋼種の鋼板を製造することが可能である。
 本発明の製造設備が保熱モードで運転される際には、第1の制御弁と第2の制御弁が閉じられ、第1、第2の冷却ブロワから冷却エアが冷却ゾーンに供給される制御が制御部にて実行される。
 保熱モード運転の際には、昇温ゾーンにおいて昇温された鋼板の温度が保熱ゾーンでも維持され、冷却ゾーンで第1、第2の冷却ブロワから冷却エアが鋼板に供給されて鋼板の温度を所定温度まで低下させる。
 一方、本発明の製造設備が冷却モードで運転される際には、第1の制御弁と第2の制御弁と開閉ゲートが開かれ、第1、第2の冷却ブロワから冷却エアが冷却ゾーンに供給され、開閉ゲートを介して外気が保熱ゾーンに供給される制御が制御部にて実行される。
 冷却モード運転の際には、第1の制御弁と第2の制御弁と開閉ゲートを開くことにより、特に第1の冷却ブロワの吸引力によって外気が保熱ゾーンに取り込まれ、保熱ゾーンでは上昇気流によって対流伝熱量が増加することにより、保熱ゾーンにある鋼板の温度を所定温度まで低下させることができる(対流伝熱効果の向上)。
 すなわち、保熱ゾーンにある鋼板の冷却を外気にておこなうことから、保熱ゾーンにある鋼板の冷却に際して当該保熱ゾーンに固有の冷却ブロワ等は不要となる。
 冷却モード運転においては、昇温ゾーンにおいて昇温された鋼板の温度を保熱ゾーンで外気にて所定温度まで低下させ、冷却ゾーンで第1、第2の冷却ブロワから冷却エアが鋼板に供給されて鋼板の温度を所定温度まで低下させる。
 このように、制御部による、第1の制御弁、第2の制御弁および開閉ゲートの切り替え運転のみで保熱モードと冷却モードの双方のヒートパターンを実現することができる。
 本発明の製造設備によれば、保熱ゾーンから冷却ブロワを完全に廃することで、設備製造コストを大幅に削減することができる。そして、このように保熱ゾーンから冷却ブロワを廃しながらも、制御部による第1の制御弁、第2の制御弁および開閉ゲートの切り替え運転のみで保熱モードと冷却モードの双方のヒートパターンを実現することができ、多数のヒートパターンに対応可能であることから、様々な鋼種の鋼板を製造することができる。
 また、本発明は合金化亜鉛めっき鋼板製造方法にも及ぶものであり、この製造方法は、既述する合金化亜鉛めっき鋼板製造設備を使用して合金化亜鉛めっき鋼板を製造する方法である。具体的には、保熱モードで運転される際には、第1の制御弁と第2の制御弁が閉じられ、第1、第2の冷却ブロワから冷却エアが冷却ゾーンに供給される制御が制御部にて実行される製造設備を使用して、合金化亜鉛めっき鋼板を製造する方法である。あるいは、冷却モードで運転される際には、第1の制御弁と第2の制御弁と開閉ゲートが開かれ、第1、第2の冷却ブロワから冷却エアが冷却ゾーンに供給され、開閉ゲートを介して外気が保熱ゾーンに供給される制御が制御部にて実行される製造設備を使用して、合金化亜鉛めっき鋼板を製造する方法である。
 本発明の製造方法によっても、設備製造コストを大幅に削減することができ、制御部による第1の制御弁、第2の制御弁および開閉ゲートの切り替え運転のみで保熱モードと冷却モードの双方のヒートパターンを実現することができ、多数のヒートパターンに対応することが可能となる。
 以上の説明から理解できるように、本発明の合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法は、冷却ゾーンにおいて2基の冷却ブロワ(第1、第2の冷却ブロワ)を備え、保熱ゾーンと第1の冷却ブロワの吸い込み側の位置の間に第1の制御弁が介在する連結ダクトを備えている。さらに、第1の冷却ブロワの吹き出し側の位置には第2の制御弁が介在して外部に通じる放散ダクトを備え、保熱ゾーンにおける鋼板搬送方向上流側の位置には外気を吸引する開閉ゲートを備え、保熱ゾーンにおいて、鋼板を冷却する際には開閉ゲートを介して導入された外気を適用する。この構成および制御により、保熱ゾーンから冷却ブロワを完全に廃すことができ、このことによって設備製造コストを大幅に削減することができる。さらに、保熱ゾーンから冷却ブロワを廃しながらも多数のヒートパターンを実現することができ、もって様々な鋼種の鋼板を製造することができる。
本発明の合金化亜鉛めっき鋼板製造設備の構成図である。 合金化亜鉛めっき鋼板製造設備の構成図と保熱モードのヒートサイクルをともに示した図である。 合金化亜鉛めっき鋼板製造設備の構成図と冷却モードのヒートサイクルをともに示した図である。
 以下、図面を参照して合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法の実施の形態を説明する。
(合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法の実施の形態)
 図1は本発明の合金化亜鉛めっき鋼板製造設備の構成図である。図1で示すように、鋼板Kは、めっき槽B内にある溶融金属のめっき浴M内を連続的に浸漬されて(X1方向)溶融金属めっき処理がおこなわれた後、めっき槽Bから引き上げられ、次いでガスワイピング装置Wから鋼板Kの未凝固めっき面にガスが吹き付けられて溶融金属の付着量が調整される。このように溶融金属の付着量が調整された鋼板Kは、合金化亜鉛めっき鋼板製造設備100へ搬送される。
 合金化亜鉛めっき鋼板製造設備100は、昇温ゾーンZ1、保熱ゾーンZ2、および冷却ゾーンZ3を順に備えている。そして、めっき浴Mに浸漬されて、ガスワイピング装置Wにて溶融金属の付着量が調整された鋼板Kが、昇温ゾーンZ1、保熱ゾーンZ2、および冷却ゾーンZ3の順に搬送されるように構成されている(保熱ゾーンZ2での搬送はX2方向、冷却ゾーンZ3での搬送はX3方向)。
 昇温ゾーンZ1にはインダクションヒータ10が配設されており、製造設備100内に搬送されてきた鋼板Kはインダクションヒータ10にて所定温度まで一気に昇温される。
 保熱ゾーンZ2は所定長さの保熱炉20から構成され、保熱炉20の最上流側には保定用ヒータ21が配設され、さらに、外気を吸引する開閉ゲート22が設けられている。
 保定用ヒータ21の下流側には、パイロット弁23と燃焼ブロワ24が介在して保熱炉20内に熱風を提供する熱風提供管路が配設されている。
 保熱炉20の最下流側には、パイロット弁25と排気ブロワ26が介在して保熱炉20内の熱風を排気する熱風排気管路が配設されている。
 冷却ゾーンZ3は所定長さの冷却炉30から構成され、冷却炉30の途中位置には、冷却ブロワ制御弁31を介して第1の冷却ブロワ32が配設され、さらに第2の冷却ブロワ33が配設されている。
 また、保熱ゾーンZ2における鋼板搬送方向下流側の位置と、第1の冷却ブロワ32の吸い込み側の位置の間には、第1の制御弁41が介在する連結ダクト40が設けられている。
 また、第1の冷却ブロワ32の吹き出し側の位置には、第2の制御弁51が介在して外部に通じる放散ダクト50が設けられている。
 さらに、製造設備100は、制御部60を備えている。この制御部60において、インダクションヒータ10の稼働とその停止、燃焼ブロワ24や排気ブロワ26の稼働と停止、第1の冷却ブロワ32、第2の冷却ブロワ33の稼働と停止のほか、第1の制御弁41、第2の制御弁51および開閉ゲート22の切り替え制御等が実行されるようになっている。
 製造設備100では、後述するように、制御部60による第1の制御弁41、第2の制御弁51および開閉ゲート22の切り替え運転のみで、保熱モードと冷却モードの双方のヒートパターンを実現する。
 このように、製造設備100は、保熱ゾーンZ2において冷却ブロワを一切備えていないことから、保熱ゾーンに多数の冷却ブロワを備えている従来の製造設備に比して設備製造コストが格段に廉価となる。
 次に、図2,3を参照して、製造設備の保熱モードと冷却モードにおける制御形態とヒートサイクルを説明し、もって本発明の合金化亜鉛めっき鋼板製造方法を説明する。
 図2は合金化亜鉛めっき鋼板製造設備の構成図と保熱モードのヒートサイクルをともに示した図である。
 保熱モードで運転される際には、第1の制御弁41と第2の制御弁51が閉じられ、第1の冷却ブロワ32と第2の冷却ブロワ33から冷却エアが冷却ゾーンZ3に供給される制御が制御部60にて実行される。
 保熱モード運転の際には、まず、昇温ゾーンZ1において550℃まで昇温された鋼板Kの温度が保熱ゾーンZ2でも維持され、冷却ゾーンZ3にて第1の冷却ブロワ32と第2の冷却ブロワ33から冷却エアが鋼板Kに供給され、鋼板Kの温度を所定温度(300℃)まで低下させる。
 一方、図3は合金化亜鉛めっき鋼板製造設備の構成図と冷却モードのヒートサイクルをともに示した図である。
 冷却モードで運転される際には、第1の制御弁41と、第2の制御弁51と、開閉ゲート22とがともに開かれる。これらが開かれることにより、第1の冷却ブロワ32と第2の冷却ブロワ33とから冷却エアが冷却ゾーンZ3に供給され、開閉ゲート22を介して外気が保熱ゾーンZ2に供給される制御が、制御部60にて実行される(外気の導入方向:Z1方向)。
 冷却モード運転の際には、第1の制御弁41と第2の制御弁51と開閉ゲート22を開くことにより、中でも第1の冷却ブロワ32の吸引力によって外気が保熱ゾーンZ2に取り込まれることになる。
 保熱ゾーンZ2では、外気導入に起因した上昇気流によって対流伝熱量が増加することにより、昇温ゾーンZ1において520℃まで昇温された鋼板Kの温度を所定温度(冷却モード1では460℃、冷却モード2では435℃)まで低下させることができる。
 冷却モード1、冷却モード2ともに、冷却ゾーンZ3にて第1の冷却ブロワ32と第2の冷却ブロワ33から冷却エアが鋼板Kに供給されることにより、鋼板Kの温度を所定温度(300℃)まで低下させる。
 このように、保熱ゾーンZ2にある鋼板Kの冷却に際して保熱ゾーンZ2に固有の冷却ブロワを一切用いることなく、制御部60による、第1の制御弁41、第2の制御弁51および開閉ゲート22の切り替え運転のみで保熱モードと冷却モードの双方のヒートパターンが実現される。
 図示する製造設備100と製造方法によれば、保熱ゾーンZ2から冷却ブロワを完全に廃することで、設備製造コストを大幅に削減することができる。そして、このように保熱ゾーンZ2から冷却ブロワを廃しながらも、制御部60による第1の制御弁41、第2の制御弁51および開閉ゲート22の切り替え運転のみで保熱モードと冷却モードの双方のヒートパターンを実現することができ、多数のヒートパターンに対応可能であることから、様々な鋼種の鋼板を製造することができる。
 製造設備100は、多数のヒートパターンを必要としない製造設備に好適であるが、多数のヒートパターンを必要とする場合でも、製造設備100を適用することで様々な鋼種の鋼板を製造することが可能である。
 以上、本発明の実施の形態を図面を用いて詳述してきたが、具体的な構成はこの実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲における設計変更等があっても、それらは本発明に含まれるものである。
10    インダクションヒータ
20    保熱炉
21    保定用ヒータ
22    開閉ゲート
24    燃焼ブロワ
26    排気ブロワ
30    冷却炉
31    冷却ブロワ制御弁
32    第1の冷却ブロワ
33    第2の冷却ブロワ
40    連結ダクト
41    第1の制御弁
50    放散ダクト
51    第2の制御弁
60    制御部
100   合金化亜鉛めっき鋼板製造設備(製造設備)
Z1    昇温ゾーン
Z2    保熱ゾーン
Z3    冷却ゾーン
K     鋼板
B     めっき槽
M     めっき浴
W     ガスワイピング装置

Claims (4)

  1.  昇温ゾーン、保熱ゾーン、および冷却ゾーンを順に備え、めっき浴に浸漬された鋼板が昇温ゾーン、保熱ゾーン、および冷却ゾーンの順に搬送されるように構成された合金化亜鉛めっき鋼板製造設備であって、
     冷却ゾーンには第1、第2の冷却ブロワが配設され、
     保熱ゾーンにおける鋼板搬送方向下流側の位置と第1の冷却ブロワの吸い込み側の位置の間には第1の制御弁が介在する連結ダクトが設けられ、
     第1の冷却ブロワの吹き出し側の位置には第2の制御弁が介在して外部に通じる放散ダクトが設けられ、
     保熱ゾーンにおける鋼板搬送方向上流側の位置には外気を吸引する開閉ゲートが設けられ、
     設備内を保熱モードと冷却モードで運転する制御部を備えている、合金化亜鉛めっき鋼板製造設備。
  2.  保熱モードで運転される際には、第1の制御弁と第2の制御弁が閉じられ、第1、第2の冷却ブロワから冷却エアが冷却ゾーンに供給される制御が制御部にて実行される、請求項1に記載の合金化亜鉛めっき鋼板製造設備。
  3.  冷却モードで運転される際には、第1の制御弁と第2の制御弁と開閉ゲートが開かれ、第1、第2の冷却ブロワから冷却エアが冷却ゾーンに供給され、開閉ゲートを介して外気が保熱ゾーンに供給される制御が制御部にて実行される、請求項1に記載の合金化亜鉛めっき鋼板製造設備。
  4.  請求項2または3に記載の合金化亜鉛めっき鋼板製造設備を使用して合金化亜鉛めっき鋼板を製造する、合金化亜鉛めっき鋼板製造方法。
PCT/JP2017/040191 2016-12-21 2017-11-08 合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法 WO2018116675A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016248361A JP6727113B2 (ja) 2016-12-21 2016-12-21 合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法
JP2016-248361 2016-12-21

Publications (1)

Publication Number Publication Date
WO2018116675A1 true WO2018116675A1 (ja) 2018-06-28

Family

ID=62626045

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/040191 WO2018116675A1 (ja) 2016-12-21 2017-11-08 合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法

Country Status (2)

Country Link
JP (1) JP6727113B2 (ja)
WO (1) WO2018116675A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150247B (zh) * 2021-11-10 2023-08-15 湖南利钢金属制品有限公司 一种改善锌锅局部过热的装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5822371A (ja) * 1981-08-04 1983-02-09 Chugai Ro Kogyo Kaisha Ltd 片面溶融メッキ設備
JPS63121644A (ja) * 1986-11-10 1988-05-25 Kawasaki Steel Corp 加熱炉
JPH02122058A (ja) * 1988-10-28 1990-05-09 Kawasaki Steel Corp 冷却機能付き保持帯を有する合金化炉
JP2000297357A (ja) * 1999-04-09 2000-10-24 Nippon Steel Corp 熱処理炉の冷却装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5822371A (ja) * 1981-08-04 1983-02-09 Chugai Ro Kogyo Kaisha Ltd 片面溶融メッキ設備
JPS63121644A (ja) * 1986-11-10 1988-05-25 Kawasaki Steel Corp 加熱炉
JPH02122058A (ja) * 1988-10-28 1990-05-09 Kawasaki Steel Corp 冷却機能付き保持帯を有する合金化炉
JP2000297357A (ja) * 1999-04-09 2000-10-24 Nippon Steel Corp 熱処理炉の冷却装置

Also Published As

Publication number Publication date
JP2018100441A (ja) 2018-06-28
JP6727113B2 (ja) 2020-07-22

Similar Documents

Publication Publication Date Title
EP2062992B1 (en) Apparatus and process for producing steel sheet plated by hot dipping with alloyed zinc
BRPI0617390B1 (pt) METHOD OF CONTINUOUS CUTTING AND COATING BY HOT IMMERSION AND CONTINUOUS CUTTING AND COATING SYSTEM BY HOT IMMERSION OF STEEL PLATES CONTAINING Si
US20150167138A1 (en) Method and device for avoiding surface defects caused by zinc dust in a continuous strip galvanising process
US8202471B2 (en) Furnace configured for use in both the galvannealing and galvanizing of a metal strip
WO2018116675A1 (ja) 合金化亜鉛めっき鋼板製造設備と合金化亜鉛めっき鋼板製造方法
TWI812854B (zh) 乾燥系統及塗裝金屬板的製造方法
KR101048167B1 (ko) 우수한 표면품질을 제공하는 연속용융도금장치 및 이를 이용한 제조방법
JP4044888B2 (ja) 合金化溶融亜鉛メッキ鋼板あるいは冷延鋼板の製造方法
JP2006307296A (ja) 金属帯の連続熱処理方法および横型連続熱処理炉
CN220149622U (zh) 一种实现带钢快速加热的系统
JP5226965B2 (ja) 鋼板冷却方法及び鋼板連続熱処理設備
JP2970920B2 (ja) 合金化炉およびその運転方法
JPS61207564A (ja) ガルバニ−ル装置
JP4990699B2 (ja) 合金化炉設備
KR102255908B1 (ko) Ga/gi 양면강판 제조장치 및 제조방법
JP2002266060A (ja) 竪型合金化炉及びその操業方法
JP4426886B2 (ja) 連続式溶融めっきラインにおける焼鈍設備
JPS6259175B2 (ja)
JP2617592B2 (ja) 溶融亜鉛めっきの合金化装置
JPS6259174B2 (ja)
CN116065015A (zh) 一种实现带钢快速加热的系统
JPH06145941A (ja) 鋼板の加熱乾燥設備
JP2001133155A (ja) 被処理物への気体供給装置
JP2016073936A (ja) 焼付炉および焼付炉内雰囲気の制御方法
JPH0817990B2 (ja) 塗装用焼付炉

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17883254

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17883254

Country of ref document: EP

Kind code of ref document: A1