WO2018108175A1 - Task plan adjustment method for wearable device, and device - Google Patents

Task plan adjustment method for wearable device, and device Download PDF

Info

Publication number
WO2018108175A1
WO2018108175A1 PCT/CN2017/116673 CN2017116673W WO2018108175A1 WO 2018108175 A1 WO2018108175 A1 WO 2018108175A1 CN 2017116673 W CN2017116673 W CN 2017116673W WO 2018108175 A1 WO2018108175 A1 WO 2018108175A1
Authority
WO
WIPO (PCT)
Prior art keywords
task
data
wearable device
schedule
execution
Prior art date
Application number
PCT/CN2017/116673
Other languages
French (fr)
Chinese (zh)
Inventor
唐惠忠
Original Assignee
北京奇虎科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京奇虎科技有限公司 filed Critical 北京奇虎科技有限公司
Publication of WO2018108175A1 publication Critical patent/WO2018108175A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • G06F1/1613Constructional details or arrangements for portable computers
    • G06F1/163Wearable computers, e.g. on a belt
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting

Definitions

  • the present invention relates to the technical field of smart devices, and in particular, to a wearable device task plan adjustment method and device.
  • wearable devices With the development of wearable devices, the variety of wearable devices is becoming more and more abundant, and the application population is more and more extensive, from adult mobile phones, smart bracelets, smart glasses, etc. to wearable devices that are gradually popularized among children. Children's smart watches, etc.
  • the function development of today's children's smart watches has made great progress. It has the ability to analyze children's behaviors through the heart rate sensors, accelerometers and other components set in the watch, so parents or teachers can learn about children through such children's smart watches. Acting and then guiding the child's behavior makes it a powerful tool for children to develop good behavioral habits.
  • the primary object of the present invention is to solve at least one of the above problems, and to provide a wearable device task plan adjustment method and a corresponding device thereof, wherein the device includes a wearable device task plan adjustment device, a server, and a Wearable device to run the method described in the previous goal.
  • a method for adjusting a wearable device task plan of the present invention includes the following steps: receiving user activity data uploaded by a wearable device, where the user activity data is acquired according to each corresponding task unit in an original task schedule; Performing mathematical processing on the related user activity data in units of the task unit to determine execution result data of each task unit; and executing result data corresponding to each task unit according to the evaluation reference data corresponding to each corresponding task unit Performing an evaluation, determining evaluation result data corresponding to the evaluation reference data; adjusting a setting of a task unit corresponding to the evaluation result data in the original task schedule according to a preset condition corresponding to the task unit, generating a new A task schedule; push the new task schedule to the wearable device.
  • another wearable device task plan adjustment method of the present invention includes the steps of: setting a local task plan according to each task unit in an original task schedule received from a cloud server; specified in each task unit Timely executing the planning instruction specified by the task unit, acquiring corresponding user activity data; uploading the user activity data to the cloud server; acquiring the evaluation result information and/or the new task schedule table of the cloud server according to the user activity data, The result information is displayed accordingly and/or the original task schedule is replaced.
  • the present invention provides a wearable device task plan adjustment apparatus comprising: at least one processor; and at least one memory communicatively coupled to the at least one processor; the at least one memory comprising The processor-executable instructions, when executed by the at least one processor, cause the apparatus to perform at least the following: receiving each of the wearable devices acquired and uploaded according to an original task schedule User activity data corresponding to the task unit; performing mathematical processing on the related user activity data in units of the task unit to determine execution result data of each task unit; according to the evaluation reference data corresponding to each corresponding task unit, Performing evaluation result data corresponding to each task unit, determining evaluation result data corresponding to the evaluation reference data; adjusting the original task schedule to correspond to the evaluation result data according to a preset condition corresponding to the task unit The setting of the task unit to generate a new task schedule; The wearable device to push the new task schedule.
  • the present invention provides another wearable device task plan adjusting apparatus, comprising: at least one processor; and at least one memory communicably connected to the at least one processor; the at least one memory Included by the processor executable instructions, when executed by the at least one processor, causing the apparatus to perform at least the following: according to tasks in an original task schedule received from a cloud server
  • the unit sets the local task plan; executes the plan instruction specified by the task unit at the time specified by each task unit, acquires corresponding user activity data; uploads the user activity data to the cloud server; and obtains the cloud server according to the user activity
  • the evaluation result information of the data and/or the new task schedule table respectively displays the result information and/or replaces the original task schedule.
  • the present invention also provides a wearable device task plan adjustment server, including a first processor, wherein the first processor is configured to perform a wearable device task plan adjustment method of the first aspect.
  • the present invention further provides a wearable device, comprising a second processor, wherein the second processor is configured to perform another wearable device task plan adjustment method of the second aspect.
  • a computer program in an embodiment of the present invention, comprising computer readable code, when the server runs the computer readable code, causing the method described in the first aspect to be performed.
  • a computer program in an embodiment of the present invention, comprising computer readable code, when the wearable device runs the computer readable code, causing the method described in the second aspect to be performed.
  • a ninth aspect the embodiment of the present invention provides a computer readable medium, wherein the computer program according to the seventh aspect or the eighth aspect is stored.
  • the method and the device can realize the adaptive modification of the established task plan according to the actual result obtained by correspondingly analyzing the data collected by the plan execution after the terminal device downloads and executes the scheduled task plan, and proposes a more reasonable and more reasonable. Personalize new mission plans and push them to users.
  • This method changes the drawbacks of the original static execution of the original task plan, and rationally utilizes the user's actual execution data and combines the big data formed by relevant data from many other users, so that the task plan selected by the user is continuously changed according to the actual situation, and the combination is By controlling the control of the baseline data, it is possible to adjust the difficulty level of the task plan as needed, to achieve the effect of step-by-step habit cultivation, and finally to achieve the purpose of allowing the user to develop good habits in a healthy and effective manner.
  • FIG. 1 is a flowchart of a method for adjusting a task plan of a wearable device according to an embodiment of the present invention
  • step S130 is a specific flowchart of step S130 of a method for adjusting a task plan of a wearable device according to an embodiment of the present invention
  • FIG. 3 is a specific flowchart of step S160 of a method for adjusting a task plan of a wearable device according to another embodiment of the present invention
  • FIG. 4 is a schematic structural diagram of a device for adjusting a task plan of a wearable device according to an embodiment of the present invention
  • FIG. 5 is a schematic structural diagram of a sending module 150 in a device planning adjustment apparatus for a wearable device according to an embodiment of the present invention
  • FIG. 6 is a flowchart of a method for adjusting a task plan of a wearable device according to still another embodiment of the present invention.
  • FIG. 7 is a specific flowchart of step S210 of a method for adjusting a task plan of a wearable device according to still another embodiment of the present invention.
  • FIG. 8 is a schematic structural diagram of a device for adjusting a task plan of a wearable device according to still another embodiment of the present invention.
  • Figure 9 shows a block diagram of a server or wearable device for performing the method according to the invention.
  • Figure 10 shows a schematic diagram of a memory unit for holding or carrying program code implementing a method in accordance with the present invention.
  • terminal and “terminal device” as used herein include both a wireless signal receiver device, a device having only a wireless signal receiver without a transmitting capability, and receiving and transmitting hardware.
  • Such devices may include cellular or other communication devices having a single line display or a multi-line display or a cellular or other communication device without a multi-line display; PCS (Personal Communications Service), which may combine voice, data Processing, fax, and/or data communication capabilities; PDA (Personal Digital Assistant), which can include radio frequency receivers, pagers, Internet/Intranet access, web browsers, notepads, calendars, and/or GPS (Global Positioning System (Global Positioning System) receiver; conventional laptop and/or palmtop computer or other device having a conventional laptop and/or palmtop computer or other device that includes and/or includes a radio frequency receiver.
  • PCS Personal Communications Service
  • PDA Personal Digital Assistant
  • terminal may be portable, transportable, installed in a vehicle (aviation, sea and/or land), or adapted and/or configured to operate locally, and/or Run in any other location on the Earth and/or space in a distributed form.
  • the "terminal” and “terminal device” used herein may also be a communication terminal, an internet terminal, a music/video playing terminal, and may be, for example, a PDA, a MID (Mobile Internet Device), and/or have a music/video playback.
  • Functional mobile phones can also be smart TVs, set-top boxes and other devices.
  • the wearable device here can be a portable device that is directly worn on the body or integrated into the user's clothes or accessories, not only a single function hardware device, but also through software support and data interaction, cloud interaction.
  • Hardware devices that implement communication and information processing functions can be watches, bracelets, mobile phones, necklaces, and the like.
  • the wearable device task plan adjustment method in an embodiment of the present invention is as shown in FIG. 1.
  • the task plan adjustment method includes the following steps:
  • S110 Receive user activity data uploaded by the wearable device, where the user activity data is acquired according to each corresponding task unit in the original task schedule.
  • each task schedule can include A task unit, such as "getting up plan”, can also contain multiple task units, such as “getting up plan”, “breakfast plan”, “morning reading plan” and so on.
  • the user activates the task schedule execution unit on the wearable device, and then the wearable device collects user activity data corresponding to each task unit according to the data instruction on the task schedule, and uploads to the cloud server through setting manner.
  • the cloud server obtains and performs subsequent data processing.
  • the task unit includes a task destination content, a task execution detection start time, and a task execution detection end time, wherein the task execution detection start time is a time at which the execution of the task destination content is started, and the task execution detection end time is a stop detection.
  • the time at which the task purpose content is executed when the time reaches the task execution detection start time, the sensor related to the task purpose content is started and the data is recorded, and when the time reaches the task execution detection end time, the sensor is turned off and the data is stopped, and the recorded data is recorded.
  • the data is the user activity data.
  • the task unit is the basis on which the user wearable device performs, the user can understand the purpose effect of the task, and the time of the start and end of the specified detection task, or the number of times the task needs to be repeatedly executed and the total time required. Wait.
  • the user activity data includes execution time of the user activity, execution location and/or sensor data corresponding to the user activity, mathematically processing the execution time of the user activity to obtain a time data portion of the execution result data, and/or placing the user
  • the execution location of the activity is mathematically processed to obtain a geographic location data portion of the execution result data
  • the sensor data corresponding to the user activity is mathematically processed to obtain an active content data portion of the execution result data.
  • the execution time and execution location are used to calibrate the basic element data obtained by the user when executing the task unit, and the sensor data is used to identify the execution time and execution location specified by the task unit therein.
  • the execution time of the user activity is used to determine the time when the user actually performs a specific action of a task unit on the task schedule, and may also be used to determine the execution time period of a task unit (specifically according to the type of the task unit), the execution location It can then be used to determine whether the user is in the set position when performing the task unit, such as sleeping on the bed in the bedroom, and if it is detected that the execution place is on the classroom desk, it is not conducive to the development of healthy sleep behavior, then The later revision plan provides a data reference.
  • the sensor data corresponding to the user activity is used to implement monitoring of the supervised data collection and more complex functions related to the above parameters, such as heart rate sensor data, acceleration sensor data, etc., and these sensors can conveniently detect what the user is in. Physical state to reflect the user's performance of a task unit.
  • the execution time of the user activity data is included between the task execution detection start time of the task unit and the task execution detection end time, and the user does not necessarily start to execute the task unit according to the task execution detection start time of the task unit, and often It is later than the detection start time, and in order to ensure sufficient detection of the actual execution of the task by the user, the task unit will arrange sufficient detection time, and even if the task specified detection end time is later than the time when the user actually ends the execution task, it is too early. Or it will be meaningless to perform the task too late. If the sensor data that the task has been executed is not detected within the detection start time and the detection end time, it indicates that the user did not perform the task this time, and will eventually get a corresponding Task sensor data is not executed.
  • the uploading manner of the user activity data is real-time uploading or uploading at a predetermined time after the user activity data is formed.
  • the real-time upload is uploaded to the server immediately after collecting a user activity data.
  • the memory of the user equipment required by this method is small, and the task of data storage is performed by the server, but this method needs to be in a region with better network coverage, otherwise it may be Causes data loss.
  • Another way to upload is to collect the user activity data and upload it in a certain set time. For example, upload it 4 hours after collecting the data. This method has high requirements on the user's equipment, but has low network requirements. After the user's activity data is collected, it is stored in the device, and is uploaded in a centralized time, for example, through a home WIFI.
  • S120 Perform mathematical processing on the related user activity data in units of task units to determine execution result data of each task unit.
  • the user activity data obtained by the cloud server is the original activity data collected by the sensor related to the task unit on the wearable device, such as the pulsation frequency, the pulse power degree, the change start time, the duration and the like time data acquired by the heart rate sensor, and the acceleration.
  • the direction, rate, rate change and corresponding time and time acquired by the sensor, as well as the longitude and latitude of the positioning sensor and the time data corresponding to the latitude and longitude, etc. it can be seen that these data often contain the type of task that can be judged.
  • the feature data and the time data corresponding to the feature data, etc., the specific data collection can be judged by a person skilled in the art according to actual needs.
  • the wearable device collects and uploads the raw data in the easiest way, and the data processing work is done by the cloud server, which makes the wearable device hardware lower and easier to implement.
  • the mathematical processing is to apply different preset rules or preset algorithms to the original data from different sensors in the user activity data for data processing, thereby obtaining the execution result data. Since the processing of the above raw data is carried out in a targeted manner, the data collected by different sensors needs to be subjected to different mathematical processing, that is, the data is processed using different data processing rules or algorithms, such as data obtained from the heart rate sensor.
  • the collected pulsation frequency, pulse kinetics and other data are compared with the data sheets under different physical conditions obtained in advance, and it is found that the data shows the state of the user at a certain time, and is sleeping.
  • the state of the walk, or the state of the walk, or the state of the run, etc., and the data obtained by the position sensor is calculated according to the set function to calculate the user's stop position, dwell time, etc., for the mathematical processing of the sensor data.
  • the specific functions or algorithms that arrive can be flexibly selected or programmed by those skilled in the art.
  • Different raw preset data or preset algorithms are applied to the original data of the user activity data for data processing, so as to obtain data processing results corresponding to each sensor, and then according to the needs of each task unit, from a sensor or
  • the data processing results of the plurality of sensors are comprehensively determined, thereby obtaining different execution result data corresponding to each task unit, where the execution result data includes the task unit completion status, the completion time, the completed location, and the like, such as
  • the execution result data of the "get up plan” may be "get up 7:20 bedroom” or fail to detect that the user gets up in the sensor detection interval, that is, "not getting up the bedroom”.
  • the execution result data content of each task unit is different, the size is different, and the data format may be different.
  • the execution result data obtained, but ultimately processed, must have a data format corresponding to the task unit on the standard data table, and is suitable for comparison with a standard data table, which can also be pre-programmed by those skilled in the art.
  • Each task schedule stored in the server contains various corresponding task units.
  • each task unit In order to facilitate the evaluation of the execution level of these task units, such as whether execution, degree of completion, quality of completion, etc., it is necessary to pre-define each task unit.
  • By setting one evaluation reference data comparing the execution result data corresponding to each task unit of the user with the corresponding evaluation reference data, it is possible to determine the evaluation result data corresponding to the selected evaluation reference data.
  • a certain task unit is "getting up plan"
  • the wake-up time as one of the execution result data is "7:20”
  • the evaluation reference data corresponding to "getting up plan” in the selected task schedule is "7" :00”
  • the information corresponding to the evaluation result data obtained by the comparison is "20 minutes late”
  • the digital display form of the information can be "-20min” or other prescribed formats. The form of the data.
  • S140 Adjust a setting of the task unit corresponding to the evaluation result data in the original task schedule according to a preset condition corresponding to the task unit, and generate a new task schedule.
  • the evaluation result data obtained through the previous steps will be a data table corresponding to the original task schedule, which can only display the user's execution of the original mission plan, including the degree of completion of the task, The quality of the completion, etc., but it is not yet possible to determine how the user should select a new mission plan after performing the original mission plan.
  • the server will further analyze the evaluation result data and compare it with the preset conditions corresponding to each task unit.
  • the original schedule includes only the early task unit; there may be multiple A task unit, such as an original task schedule, is used to develop a child's work habits, including an early task unit, a nap task unit, and a night sleep task unit. In either case, at least one evaluation result data is obtained for the execution of the original task schedule.
  • the preset condition corresponding to the task unit is stored in the cloud server, and the preset condition has different hypothetical situations, and the evaluation result data falls within one of the hypothetical situations, and each hypothetical situation Corresponding to a processing result, that is, adjusting the task unit corresponding to the evaluation result data in the original task schedule, adjusting to a more appropriate content specified in advance, and adjusting at least one task unit in the original task schedule.
  • a new task schedule is obtained, so that a more appropriate new task schedule can be determined based on the actual execution of the original task schedule by the user.
  • the specific manner of adjusting the setting of the task unit corresponding to the evaluation result data in the original task schedule according to the preset condition corresponding to the task unit is such that the preset condition includes one or more expressions, each The expression includes a set value range and a mapping of the adjustment task unit corresponding to the set value range, when the evaluation result data obtained by executing a task unit in the original task schedule falls within the numerical range of one of the expressions And adjusting the task unit corresponding to the evaluation result data according to the mapping, that is, the hypothetical situation and the related processing manner are included in an expression, wherein the hypothetical situation is specifically set to include the set value range, and the processing manner And a mapping of the adjustment task unit corresponding to the set value range, the mapping points to a specific scheme for modifying the corresponding task unit, when the evaluation result data is within one of the set value ranges , adjusting the task unit corresponding to the evaluation result data according to the mapping corresponding to the set value range
  • the form of the numerical range includes a time range, a time period range,
  • the content of the expression A in the preset condition means “an execution time period of 10 days from the night 20 More than 7 minutes or more, the evaluation reference data for changing the wake-up plan is 7:30", or the content means “more than 7 times in 20 days or more from 10 days in an execution time period, and the evaluation reference data for changing the wake-up plan is 7: 30.
  • the reminder time for changing the wake-up plan is 6:50”;
  • the meaning of the expression B in the preset condition means “the execution time period of the wake-up plan is changed from no more than 20 minutes in the 10 days after the execution time period of 10 days.
  • the meaning of the expression C in the preset condition is "one execution time period is 10 minutes or more from the night within 10 days, 3 to 7 times, and the evaluation reference data for changing the wake-up plan is 7:15"; the preset condition is also More similar hypothetical situations can be included. If the data content of the evaluation result data obtained within 10 days of an execution time period means "8 times more than 20 minutes later", it can be judged that the evaluation result data falls within the numerical range of the expression A, and should be expressed according to the expression.
  • the mapping in Equation A adjusts the corresponding part of the task unit "Get Up Plan", that is, the evaluation reference data of the wake-up plan is changed to "7:30" or the adjustment reminder time is "6:50"; and if it is obtained in one cycle
  • the data content of the evaluation result data shows that the meaning of the data content is "2 times longer than 20 minutes later", and the task schedule is adjusted according to the expression B; if the evaluation result data obtained in one execution period shows the data content, the meaning is "late” If it is 4 times more than 20 minutes", the value range in C is satisfied, so the task schedule is re-established according to the scheme mapped in Expression C.
  • Some task units do not need to have an execution time period, and the preset conditions corresponding to the task unit do not include data of the execution time period; some task units only need to detect execution without the need for execution time, then The content of the execution time is not included in the preset condition corresponding to the task unit.
  • the preset condition is set as the preset evaluation cumulative number interval, and the mapping of the corresponding task unit is performed.
  • the setting of the task unit corresponding to the evaluation result data is adjusted in the original task schedule table, Generate a new task schedule.
  • the step of evaluating the execution result data corresponding to each task unit in step S130 includes:
  • S131 Compare the execution result data and the evaluation reference data according to data block correspondences of each other to obtain comparison amplitude data.
  • There are different task units in the task schedule and the user obtains different execution result data after execution, and presents different data blocks in the data information, and compares the corresponding data blocks in the evaluation reference data to obtain corresponding The comparison amplitude data, such as the length of time, morning and evening, or the number of executions of the task unit.
  • S132 Convert the comparison amplitude data into evaluation result data according to the evaluation rule in the evaluation reference data.
  • a certain comparison amplitude data is specified corresponding to a certain evaluation result. For example, when the comparison amplitude data is “late 20 minutes”, the evaluation result data “deduct 1 data unit” is given, and the data unit can take different forms. Such as scores, virtual items, cumulative time, cumulative times, etc.
  • the specific method is to set the evaluation result data into a form of a score
  • the evaluation rule is: when the comparison amplitude data satisfies the preset data range, that is, an evaluation score corresponding to the specific preset data range is given, for example, evaluation
  • the default data range in the corresponding data block in the reference data is “15 to 30 minutes late, deduct 1 point; 30 minutes later, deduct 2 points”, then for the comparison amplitude data is “20 minutes late”, you will get "Deduction of 1 point” evaluation score.
  • setting the preset condition to the evaluation score for measuring the evaluation result data satisfies the preset score, that is, when the evaluation score corresponding to the at least one task unit satisfies the preset corresponding to the task unit
  • the setting of the task unit corresponding to the evaluation score is adjusted to generate a new task schedule. Specifically, the degree of the user completing the task unit is measured by the score.
  • the evaluation result data meets the corresponding item in the preset condition
  • the corresponding score is added or subtracted from the task result, and the preset condition is obtained.
  • the cumulative result of the request the total score obtained by a task unit within a certain period of time.
  • the new task schedule is modified accordingly.
  • the introduction of scores as a medium makes the data processing logic clearer.
  • the number of scores can also be displayed by the virtual appearance of the image, such as safflower, fruit or red flag, which can be selectively displayed on the user wearable device to increase the interest.
  • the cumulative number of preset conditions and the score system preset conditions can be used alone or in combination.
  • the server When the execution result data is judged according to the preset condition to obtain a new task schedule that satisfies the preset condition, the server immediately pushes the new task schedule to the wearable device.
  • a modify authority verification step S160 which specifically includes:
  • the new task schedule should be sent to the user, so that the user can know the content of the task schedule sent.
  • the user chooses to execute directly, modify the execution or select other task schedules according to his or her own situation.
  • S162 Acquire a modified task schedule obtained by modifying the new task schedule submitted by the client, and parsing the permission information in the modified task schedule.
  • the server obtains the modified result obtained by modifying the obtained new task schedule submitted by the client.
  • the task schedule, and parsing the modified permission information included in the modified task schedule, the permission information is a password or a real-time verification code (a dedicated link is provided by the server, and after the user clicks the selection, the server sends the corresponding digital code to the user, the user After being acquired, it is input into the modification request, and then the server performs the matching degree verification. It can also be verified by using specific biometrics, such as fingerprint information, iris features, and the like.
  • the client generates a modified task schedule.
  • the task schedule is uploaded to the server on the user side, so that the server further updates the new task schedule before the modification, so that the client adopts the task.
  • the schedule matches the server-side task schedule.
  • the server receives the modified task schedule table and correspondingly updates the stored new task schedule.
  • the task schedule execution interface is more interesting, and the task schedule may include the content of the user interface skin theme information, and the user interface is specifically used to perform the corresponding task.
  • the user interface associated with the scheduled tasks in the schedule For example, in the evening time, choose the appearance of the starry sky, and choose the appearance of the city landscape or the sports field with sunlight during the day.
  • an embodiment of the present invention provides a device for adjusting a task plan of a wearable device, as shown in FIG. 4, including:
  • the receiving module 110 is configured to receive user activity data uploaded by the wearable device, where the user activity data is acquired according to each corresponding task unit in the original task schedule.
  • the user activates the task schedule execution unit on the wearable device, and then the wearable device collects user activity data corresponding to each task unit according to the data instruction on the task schedule, and uploads to the cloud server through setting manner.
  • the receiving module 110 of the cloud server acquires and provides the other module for corresponding subsequent data processing.
  • the user activity data includes the execution time of the user activity, the execution location, and/or the sensor data corresponding to the user activity.
  • the user data may further include basic information such as user ID information and device hardware version information.
  • the conversion module 120 is configured to perform mathematical processing on the related user activity data in units of the task unit to determine execution result data of each task unit.
  • the user activity data acquired by the cloud server receiving module 110 is often simple time data, task unit type data, and the like. However, only these simple raw data cannot be used as the cloud server for analysis and judgment, so mathematical processing is required, and the conversion module 120 is required. These processes are expanded according to different task units, and the conversion is determined as the execution result data of each task unit.
  • the execution result data has a fixed data format and is suitable for comparison with the standard data table.
  • the evaluation module 130 is configured to evaluate execution result data corresponding to each task unit according to the evaluation reference data corresponding to each corresponding task unit, and determine evaluation result data corresponding to the evaluation reference data.
  • Each task schedule stored in the server contains various corresponding task units.
  • each task unit In order to facilitate the evaluation of the execution level of these task units, such as: whether to execute, how complete, how to complete the quality, etc., each task unit must be An evaluation reference data is set in advance, and the evaluation module 130 compares the execution result data corresponding to each task unit of the user with the corresponding evaluation reference data, and determines that the corresponding evaluation reference data is corresponding. Evaluation result data.
  • the update module 140 is configured to adjust a setting of the task unit corresponding to the evaluation result data in the original task schedule according to a preset condition corresponding to the task unit, to generate a new task schedule.
  • the update module 140 of the server further analyzes the evaluation result data, compares with the preset conditions corresponding to each task unit, and corresponds to the evaluation result data in the original task schedule table when the assumptions in the corresponding preset conditions are met.
  • the task unit is adjusted and adjusted to a more appropriate content specified in advance, and different hypothetical situations correspond to different adjustment contents, so that a more appropriate new task schedule can be determined according to the actual execution of the original task schedule by the user.
  • the sending module 150 is configured to push the new task schedule to the wearable device.
  • the sending module 150 of the server When the execution result data is judged according to the preset condition to obtain a new task schedule that satisfies the preset condition, the sending module 150 of the server immediately pushes the new task schedule to the wearable device.
  • the sending module 150 in an embodiment of the present invention includes:
  • the sending unit 151 is configured to send the new task schedule to the client. First, the sending unit 151 sends a new task schedule to the user, so that the user knows the content of the sent task schedule, and the user selects to execute directly, modify the execution, or select another task schedule to execute according to his or her own situation.
  • the parsing unit 152 is configured to obtain a task schedule modification request submitted by the client, and parse the modification authority information included in the modification request.
  • the server obtains a task schedule modification request submitted by the client, and the modification request includes the modification authority information.
  • the parsing unit 152 parses, for example, a verification password, a real-time verification code, or a specific biometric.
  • the determining unit 153 sends the permission modification confirmation information to the client if the modification authority information matches the pre-stored authority information.
  • the server develops a task schedule modification authority to the user, and sends the permission modification confirmation information to the client.
  • the updating unit 154 acquires the modified task schedule of the client, and updates the stored new task schedule correspondingly.
  • the user enters the modification interface of the task schedule, and makes corresponding changes to the task schedule to obtain a modified task schedule.
  • the task schedule is uploaded to the server for the update in the server.
  • the unit 154 further updates the new task schedule table before the modification, so that the task schedule adopted by the client matches the task schedule of the server.
  • the present invention also provides a wearable device task plan adjustment server, including a first processor, which is used to execute the wearable device task plan adjustment method of the above embodiment. If the user activity data uploaded by the wearable device is received by the receiving module 110, the user activity data is acquired according to each corresponding task unit in the original task schedule. The user activity data obtained by the receiving module 110 is mathematically processed by the conversion module 120 in units of the task unit to determine execution result data of each task unit. Further, based on the evaluation reference data corresponding to each corresponding task unit, the evaluation result data obtained by the conversion module 120 is evaluated by the evaluation module 130, and the evaluation result data corresponding to the evaluation reference data is determined.
  • the setting of the task unit corresponding to the evaluation result data is adjusted in the original task schedule by the update module 140 according to a preset condition corresponding to each task unit, and a new task schedule is generated. Finally, the new task schedule is pushed to the wearable device by the sending module 150.
  • the wearable device task plan adjustment method provided in still another embodiment of the present invention, as shown in FIG. 6, includes the following steps:
  • the user selects the task schedule provided on the cloud server at the user end, and after determining and downloading from the above, there is an original task schedule, and the user sets the unit to be executed according to the task units in the original task schedule.
  • Mission planning such as controlling alarm clocks, related sensors, etc.
  • S220 execute a planning instruction specified by the task unit at a time specified by each task unit, and acquire corresponding user activity data.
  • the related component is controlled, the planning instruction specified by the task unit is executed at the specified time, and the corresponding user activity data is acquired.
  • the alarm starts to sound the alarm at the "7:00" specified by the "Get Up Program", and records the time when the alarm is turned off.
  • the geographical location sensor obtains the position of the local machine, the heart rate sensor and the acceleration sensor determine the user's activity status (the state of getting up, or Is a sleep state).
  • the task unit includes a task purpose content, a task execution detection start instruction, and a task execution detection end instruction, the task execution detection start instruction is an instruction to start the detection task purpose content execution, and the task execution detection end instruction is to stop detecting the task purpose content.
  • the task execution prompt instruction is added to the task unit, so that the prompt function module of the device is turned on to remind the user to perform the task purpose content, for example, the time for the task execution detection start instruction is “7:00”, at “6: 55” sets a corresponding task execution prompt instruction to let the device reminder function work to remind the user to prepare to execute the content of the task unit, and more fully guarantee the completion of the task.
  • the local task plan includes a task prompt time, a sensor open time, and a sensor close time, wherein the task prompt time is set according to the task purpose content in advance, and the sensor open time is set according to the task execution detection start instruction.
  • the sensor off time is set according to the task execution detection end command.
  • the user activity data is obtained by a sensor specified by the planning instruction, including the execution time of the user activity, the execution location, and/or sensor data corresponding to the user activity, to determine that the corresponding task unit is executed and The resulting result data.
  • the machine uploads the collected user activity data to the cloud server, and the server analyzes and processes the user activity data and formulates the evaluation result information, or obtains a new task schedule.
  • the contents of these user activity data have been mentioned above and will not be described here.
  • One method is to upload to a server immediately after collecting a user activity data.
  • the user equipment required by this method has small memory, and the task of data storage is performed by the server, but this method needs to be Areas with good network coverage may cause data loss.
  • Another way to upload user activity data is to upload the data in a centralized manner after a certain set time. This method has high requirements on the user's device, but has low network requirements, and stores the user's activity data after collecting it. In the device, the time to be set is to be uploaded in a centralized manner, for example, through a home WIFI.
  • the uploading is performed when the device detects that the network signal meets the preset signal strength. Whether it is a network signal provided by a mobile communication network provider or an indoor WIFI signal, there is a problem of signal strength.
  • the mobile communication device is often in a mobile state, and the signal strength is different in different places. If the signal is weak, the upload data may fail, so Select the network signal detected by the system to meet a certain signal strength, so as to further ensure the smooth progress of the uploaded data.
  • S240 Acquire the evaluation result information and/or the new task schedule of the cloud server according to the user activity data, and display the result information and/or replace the original task schedule table accordingly.
  • the user can know the user's completion status of the activity task. If some evaluation media such as a score is used, the user's score can be known, or a more vivid representation manner can be used. For example, get a virtual gift as a reward (small red flower, small red flag, etc.). Or get a new task schedule that is more in line with the actual implementation, and appropriately improve or reduce the difficulty of the mission plan according to the actual performance of the user, and try to carry out the customary training step by step.
  • the display result information and the replacement original task schedule can be performed separately or in combination.
  • the step of displaying the result information comprises: matching the evaluation result information with a specific virtual item; displaying the virtual item.
  • the virtual items are small red flowers, small red flags, small goldfish, etc., and different levels of evaluation result information correspond to different numbers of virtual items, so that the device interface is more beautiful, and the task execution is more interesting.
  • the step of setting the local task plan further includes:
  • S212 Modify a specific task unit in the original task schedule. Modifying the task schedule downloaded from the server according to the user's own needs, you can modify the parameters in some of the task units, or delete the task unit or add task details.
  • S213 Set a local task plan according to each task unit in the modified task schedule, and upload the modified task schedule to the server.
  • the device After modifying the task schedule, you need to confirm the execution.
  • the device is equipped with the task plan that the machine needs to perform according to the settings of each task unit in the task schedule.
  • the modified task schedule needs to be uploaded to the server to make the server and the machine.
  • the task schedules used by the user are consistent so as to correspondingly display the evaluation result information obtained by the user performing the task unit and/or the replacement of the updated version of the task schedule.
  • another embodiment of the present invention provides a device for adjusting a task plan of a wearable device, as shown in FIG.
  • the receiving module 210 is configured to set a local task plan according to each task unit in the original task schedule received from the cloud server.
  • the user selects the task schedule provided on the cloud server at the user end, and after the receiving module 210 determines and downloads from the above, the original task schedule is obtained, and the user sets the local machine according to each task unit in the original task schedule.
  • the mission plan to be executed such as controlling the alarm clock, related sensors, etc.
  • the execution module 220 executes the planning instruction specified by the task unit at a time specified by each task unit, and acquires corresponding user activity data.
  • the execution module 220 controls the related components according to the time node assigned to each task unit by the local machine, executes the planning instruction specified by the task unit at a specified time, and acquires corresponding user activity data.
  • the uploading module 230 uploads the user activity data to the cloud server.
  • the user uploads the collected user activity data to the cloud server through the uploading module 230.
  • There are two methods for uploading and one is uploaded to the server immediately after collecting a user activity data, and the user equipment required by the method is small. The task of data storage is left to the server, but this method needs to be in a region with good network coverage, otherwise data loss may occur.
  • Another way to upload user activity data is to upload the data in a centralized manner after a certain set time. This method has high requirements on the user's device, but has low network requirements, and stores the user's activity data after collecting it. In the device, the time to be set is to be uploaded in a centralized manner, for example, through a home WIFI.
  • the obtaining module 240 is configured to obtain the evaluation result information and/or the new task schedule of the cloud server according to the user activity data, and display the result information and/or replace the original task schedule table accordingly. After the cloud server completes the data processing, the evaluation result is obtained, and the user can know the completion status of the activity task by the user through the obtaining module 240. If some evaluation media such as a score is used, the user's score can be known, or the user can be used. The representation of the image, such as obtaining a virtual gift as a reward (small red flower, small red flag, etc.).
  • the acquisition module 240 replaces the original task schedule table, and appropriately raises or reduces the difficulty of the task plan according to the actual performance of the user, and tries to perform the step-by-step habit cultivation.
  • the display result information and the replacement original task schedule can be performed separately or in combination.
  • the present invention provides a wearable device according to the method described in another embodiment, including a second processor, which is configured to perform a wearable device task plan adjustment method according to another embodiment.
  • the receiving module 210 sets a local task plan according to each task unit in the original task schedule received from the cloud server.
  • the execution module 220 executes the planning instruction specified by the task unit at the time specified by each task unit, acquires corresponding user activity data, and uploads the user activity data to the cloud server through the uploading module 230.
  • the server processes the data to obtain a result
  • the obtaining module 240 acquires the evaluation result information of the cloud server according to the user activity data and/or a new task schedule, and displays the result information and/or replaces the original task plan. table.
  • the final implementation of the task schedule is a step-by-step update.
  • the wearable device task plan adjustment server provides a variety of habit development task plans based on various age groups, various family situations or psychological research results on a certain interface, such as “getting up plan”, “napping” Plan, “Good Night Plan”, “Reading Plan” and / or "Sport Plan” and so on.
  • the server detects that a certain user determines to select a certain task plan, and then detects that the user wishes to modify the application of the task plan and submits the modified task schedule, and the server verifies that the user's modification permission is passed, and is received and updated as The revised mission schedule.
  • the user modifies the task plan selected by the user on the wearable device or other client, and submits it to the server after completion.
  • the server confirms that the task plan performed by the user on the wearable device includes three task units such as “get up plan”, “napping plan” and “night plan”, the training plan has a time period of 10 days, and the execution place is at home, In the kindergarten and at home, the detection time of each task unit in the training plan is “7:30”, “13:00” and “21:00” respectively. Parents can inform their children in advance at this time or The task unit is executed at a certain time before this time point, and the reminder can also be set on the wearable device, for example, the reminder time option is added to the task schedule table, and the reminder time corresponding to the previous text is “7:20” respectively. , “12:50” and "20:50".
  • the server obtains the user activity data transmitted on the wearable device. For example, the execution time of the above three task units in a certain day is "8:00", “13:10", “21:30”.
  • the server converts it into execution result data according to certain rules.
  • the result data summary statistics are executed and compared with the predetermined preset conditions, and the task unit "gets up plan" For example, the user has 7 wake-up times exceeding the evaluation baseline data in the task schedule for 20 minutes, which is equivalent to modifying the evaluation reference data in the task unit to "7:40" or modifying the reminder time in the task unit to "7:10".
  • the condition so the server launches a new task schedule that is appropriate for the actual execution of the user and pushes the new task schedule to the appropriate user.
  • a user first selects the task schedule that is closest to the user of the browsing (the parent's child) and downloads it to the wearable device that the user is using by browsing the task plan provided on the server.
  • the user wants to make more adaptive changes to certain information in the task schedule. Click on the modify option.
  • the parent enters the password and password. Linking and modifying a task schedule, and modifying to form a new task schedule, the user executes according to the new task schedule, and the server also displays the new task being executed under the user account.
  • Schedules There are three habits in the mission plan, namely “Getting Up Program”, “Healthy Napping” and “Good Night Plan”.
  • the training period is 10 days, and the execution place is at home, kindergarten and home.
  • the start detection time of each task unit execution is “7:30”, “13:00” and “21:00” (parents can inform their children in advance at this point in time or before this point in time)
  • the task unit can be executed at a certain time, and the reminder can also be set on the wearable device.
  • the reminder time option is added to each task unit of the task schedule, and the reminder time corresponding to the previous text is “7:20”, respectively. 12:50" and "20:50"), the end detection time is "8:30", "14:00", "22:00”.
  • the wearable device starts to collect data according to the above-mentioned time points, and selects to automatically upload the collected data to the server at 22:00 every day.
  • the wearable device After a planned time period, that is, 10 days later, the wearable device receives the data.
  • the evaluation information sent by the server shows the execution result of the user's selected task plan and provides the updated task schedule. If the user finishes very well, the extended training plan period can be used to continue the execution. You can modify the options and choose a more scientific and more scientific development plan to continue. If the user can not achieve the content specified in each task unit and reach the certain standard set by the original, such as more than 7 times of getting up in the morning and evening for 20 minutes, the detection time of each task unit execution is updated to "7:40". Or update the reminder time in the task schedule to "7:10", and update the relevant content to the wearable device and execute it in the new execution cycle.
  • FIG. 9 illustrates a server or a wearable device (hereinafter referred to as a server or a wearable device as a device) in a wearable device task plan adjustment method according to the present invention.
  • the device conventionally includes a processor 1010 and a computer program product or computer readable medium in the form of a memory 1020.
  • the memory 1020 may be an electronic memory such as a flash memory, an EEPROM (Electrically Erasable Programmable Read Only Memory), an EPROM, a hard disk, or a ROM.
  • the memory 1020 has a memory space 1030 for executing program code 1031 of any of the above method steps.
  • storage space 1030 for program code may include various program code 1031 for implementing various steps in the above methods, respectively.
  • the program code can be read from or written to one or more computer program products.
  • These computer program products include program code carriers such as hard disks, compact disks (CDs), memory cards or floppy disks.
  • Such a computer program product is typically a portable or fixed storage unit as described with reference to FIG.
  • the storage unit may have a storage section or a storage space or the like arranged similarly to the storage 1020 in FIG.
  • the program code can be compressed, for example, in an appropriate form.
  • the storage unit comprises program code 1031' for performing the steps of the method according to the invention, ie code that can be read by, for example, a processor such as 1010, which when executed by the device causes the device to perform the above Each step in the described method.
  • each block of the block diagrams and/or block diagrams and/or flow diagrams and combinations of blocks in the block diagrams and/or block diagrams and/or flow diagrams can be implemented by computer program instructions. .
  • these computer program instructions can be implemented by a general purpose computer, a professional computer, or a processor of other programmable data processing methods, such that the processor is executed by a computer or other programmable data processing method.
  • steps, measures, and solutions in the various operations, methods, and processes that have been discussed in the present invention may be alternated, changed, combined, or deleted. Further, other steps, measures, and schemes of the various operations, methods, and processes that have been discussed in the present invention may be alternated, modified, rearranged, decomposed, combined, or deleted. Further, the steps, measures, and solutions in the prior art having various operations, methods, and processes disclosed in the present invention may also be alternated, changed, rearranged, decomposed, combined, or deleted.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Human Computer Interaction (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A task plan adjustment method for a wearable device, and a related device. The method comprises: receiving user activity data corresponding to task units that is obtained and uploaded by a wearable device according to an original task plan table (S110); performing mathematic processing on related user activity data by using the task units as units, so as to determine executive result data of the task units (S120); evaluating the executive result data corresponding to the task units according to evaluation reference data corresponding to the corresponding task units, and determining evaluation result data corresponding to the evaluation reference data (S130); adjusting settings of the task units corresponding to the evaluation result data in the original task plan table according to preset conditions corresponding to the task units, and generating a new task plan table (S140); and pushing the new task plan table to the wearable device (S150). By means of the method, a task plan selected by a user is properly changed according to an actual condition, and accordingly, the objective for healthily and effectively developing a habit is achieved.

Description

可穿戴设备任务计划调整方法及设备Wearable device task plan adjustment method and device 技术领域Technical field
本发明涉及智能设备的技术领域,特别是涉及可穿戴设备任务计划调整方法及设备。The present invention relates to the technical field of smart devices, and in particular, to a wearable device task plan adjustment method and device.
背景技术Background technique
随着可穿戴设备的日益发展,可穿戴设备的种类越来越丰富,应用人群越来越广泛,从成年人的手机、智能手环、智能眼镜等到目前在儿童中逐渐推广的可穿戴设备如儿童智能手表等。现今的儿童智能手表的功能发展有了长足进步,已经具备通过设置在手表中的心率传感器、加速度传感器等元器件分析儿童行为方式的能力,于是家长或老师可以通过此类儿童智能手表了解儿童的行为并且进而指导儿童的行为,使其成为让儿童养成良好行为习惯的有力工具。With the development of wearable devices, the variety of wearable devices is becoming more and more abundant, and the application population is more and more extensive, from adult mobile phones, smart bracelets, smart glasses, etc. to wearable devices that are gradually popularized among children. Children's smart watches, etc. The function development of today's children's smart watches has made great progress. It has the ability to analyze children's behaviors through the heart rate sensors, accelerometers and other components set in the watch, so parents or teachers can learn about children through such children's smart watches. Acting and then guiding the child's behavior makes it a powerful tool for children to develop good behavioral habits.
为了实现让儿童智能手表督促儿童养成良好的生活学习习惯的目的,现有技术中常通过设置闹钟来提醒完成某项任务,进一步地,通过设置预先制定好的日程表规划一天、一周或其它时间周期的任务。然而,通过这些技术手段得到的任务计划要么功能单一,要么处于静态无法适应实际形势变化,更无法将实际得到的数据与儿童习惯培养的大数据相结合以制定更加科学合理并且个性化的习惯培养计划。In order to realize the purpose of let children's smart watches urge children to develop good living and learning habits, in the prior art, alarms are often used to remind a certain task, and further, by setting a pre-established schedule, one day, one week or other time is planned. The task of the cycle. However, the mission plan obtained through these technical means is either single-function or static, unable to adapt to changes in the actual situation, and it is impossible to combine the actual data with the big data that children are used to cultivate to develop more scientific and individualized habits. plan.
发明内容Summary of the invention
基于此,对于本发明的首要目的旨在解决上述至少一个问题,提供一种可穿戴设备任务计划调整方法及其相应的设备,其中设备包括可穿戴设备任务计划调整装置、一种服务器和一种可穿戴设备,以运行前一目标所述的方法。Based on this, the primary object of the present invention is to solve at least one of the above problems, and to provide a wearable device task plan adjustment method and a corresponding device thereof, wherein the device includes a wearable device task plan adjustment device, a server, and a Wearable device to run the method described in the previous goal.
为实现本发明的上述目的,采取如下技术方案:In order to achieve the above object of the present invention, the following technical solutions are adopted:
第一方面,本发明的一种可穿戴设备任务计划调整方法,包括下列步骤: 接收可穿戴设备上传的用户活动数据,所述用户活动数据根据原始任务计划表中各相对应的任务单元获取;以所述任务单元为单位对其相关的用户活动数据进行数学处理,以确定各任务单元的执行结果数据;依据各相应任务单元相对应的评价基准数据,对各任务单元相对应的执行结果数据进行评价,确定与所述评价基准数据相对应的评价结果数据;依据与任务单元对应的预设条件,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,生成新的任务计划表;向该可穿戴设备推送该新的任务计划表。In a first aspect, a method for adjusting a wearable device task plan of the present invention includes the following steps: receiving user activity data uploaded by a wearable device, where the user activity data is acquired according to each corresponding task unit in an original task schedule; Performing mathematical processing on the related user activity data in units of the task unit to determine execution result data of each task unit; and executing result data corresponding to each task unit according to the evaluation reference data corresponding to each corresponding task unit Performing an evaluation, determining evaluation result data corresponding to the evaluation reference data; adjusting a setting of a task unit corresponding to the evaluation result data in the original task schedule according to a preset condition corresponding to the task unit, generating a new A task schedule; push the new task schedule to the wearable device.
第二方面,本发明的另一种可穿戴设备任务计划调整方法,包括下列步骤:根据从云端服务器接收的原始任务计划表中的各任务单元设置本机任务计划;在各任务单元所指定的时间执行该任务单元所指定的计划指令,获取相应的用户活动数据;向云端服务器上传所述用户活动数据;获取云端服务器依据所述用户活动数据的评价结果信息和/或新的任务计划表,相应显示所述结果信息和/或替换所述原始任务计划表。In a second aspect, another wearable device task plan adjustment method of the present invention includes the steps of: setting a local task plan according to each task unit in an original task schedule received from a cloud server; specified in each task unit Timely executing the planning instruction specified by the task unit, acquiring corresponding user activity data; uploading the user activity data to the cloud server; acquiring the evaluation result information and/or the new task schedule table of the cloud server according to the user activity data, The result information is displayed accordingly and/or the original task schedule is replaced.
第三方面,本发明提供了一种可穿戴设备任务计划调整装置,包括:至少一个处理器;以及,至少一个存储器,其与所述至少一个处理器可通信地连接;所述至少一个存储器包括处理器可执行的指令,当所述处理器可执行的指令由所述至少一个处理器执行时,致使所述装置执行至少以下操作:接收可穿戴设备根据原始任务计划表获取并上传的其中各任务单元相对应的用户活动数据;以所述任务单元为单位对其相关的用户活动数据进行数学处理,以确定各任务单元的执行结果数据;依据各相应任务单元相对应的评价基准数据,对各任务单元相对应的执行结果数据进行评价,确定与所述评价基准数据相对应的评价结果数据;依据与任务单元对应的预设条件,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,生成新的任务计划表;向该可穿戴设备推送该新的任务计划表。In a third aspect, the present invention provides a wearable device task plan adjustment apparatus comprising: at least one processor; and at least one memory communicatively coupled to the at least one processor; the at least one memory comprising The processor-executable instructions, when executed by the at least one processor, cause the apparatus to perform at least the following: receiving each of the wearable devices acquired and uploaded according to an original task schedule User activity data corresponding to the task unit; performing mathematical processing on the related user activity data in units of the task unit to determine execution result data of each task unit; according to the evaluation reference data corresponding to each corresponding task unit, Performing evaluation result data corresponding to each task unit, determining evaluation result data corresponding to the evaluation reference data; adjusting the original task schedule to correspond to the evaluation result data according to a preset condition corresponding to the task unit The setting of the task unit to generate a new task schedule; The wearable device to push the new task schedule.
第四方面,本发明提供了另一种可穿戴设备任务计划调整装置,包括:至少一个处理器;以及,至少一个存储器,其与所述至少一个处理器可通信地连接;所述至少一个存储器包括处理器可执行的指令,当所述处理器可执行的指令由所述至少一个处理器执行时,致使所述装置执行至少以下操作:根据从云端服务器接收的原始任务计划表中的各任务单元设置本机任务计划;在各任务单元所指定的时间执行该任务单元所指定的计划指令,获取相应的用户 活动数据;向云端服务器上传所述用户活动数据;获取云端服务器依据所述用户活动数据的评价结果信息和/或新的任务计划表,相应显示所述结果信息和/或替换所述原始任务计划表。In a fourth aspect, the present invention provides another wearable device task plan adjusting apparatus, comprising: at least one processor; and at least one memory communicably connected to the at least one processor; the at least one memory Included by the processor executable instructions, when executed by the at least one processor, causing the apparatus to perform at least the following: according to tasks in an original task schedule received from a cloud server The unit sets the local task plan; executes the plan instruction specified by the task unit at the time specified by each task unit, acquires corresponding user activity data; uploads the user activity data to the cloud server; and obtains the cloud server according to the user activity The evaluation result information of the data and/or the new task schedule table respectively displays the result information and/or replaces the original task schedule.
第五方面,本发明同时提供了一种可穿戴设备任务计划调整服务器,包括第一处理器,所述第一处理器用于执行第一方面的一种可穿戴设备任务计划调整方法。In a fifth aspect, the present invention also provides a wearable device task plan adjustment server, including a first processor, wherein the first processor is configured to perform a wearable device task plan adjustment method of the first aspect.
第六方面,本发明还提供了一种可穿戴设备,包括第二处理器,所述第二处理器用于执行第二方面的另一种可穿戴设备任务计划调整方法。In a sixth aspect, the present invention further provides a wearable device, comprising a second processor, wherein the second processor is configured to perform another wearable device task plan adjustment method of the second aspect.
第七方面,本发明实施例中提供了一种计算机程序,包括计算机可读代码,当服务器运行所述计算机可读代码时,导致第一方面中所述的方法被执行。In a seventh aspect, a computer program is provided in an embodiment of the present invention, comprising computer readable code, when the server runs the computer readable code, causing the method described in the first aspect to be performed.
第八方面,本发明实施例中提供了一种计算机程序,包括计算机可读代码,当可穿戴设备运行所述计算机可读代码时,导致第二方面中所述的方法被执行。In an eighth aspect, a computer program is provided in an embodiment of the present invention, comprising computer readable code, when the wearable device runs the computer readable code, causing the method described in the second aspect to be performed.
第九方面,本发明实施例中提供了一种计算机可读介质,其中存储了如第七方面或第八方面所述的计算机程序。A ninth aspect, the embodiment of the present invention provides a computer readable medium, wherein the computer program according to the seventh aspect or the eighth aspect is stored.
该方法及设备能够实现在终端设备下载并执行既定任务计划后,根据对计划执行收集到的数据进行相应分析得出的实际结果,对既定任务计划进行适应性修改,提出更合理的、更具个性化的新任务计划并向用户推送。此方法改变了原本静态执行原始既定任务计划的弊端,合理利用用户实际执行数据并结合来自其他众多用户的相关数据形成的大数据,使用户选择的任务计划不断根据实际情况进行合理变化,结合对评价基准数据的控制,能够根据需要调整任务计划的难易程度,达成循序渐进式习惯培养的效果,最终实现让使用者健康有效地培养良好习惯的目的。The method and the device can realize the adaptive modification of the established task plan according to the actual result obtained by correspondingly analyzing the data collected by the plan execution after the terminal device downloads and executes the scheduled task plan, and proposes a more reasonable and more reasonable. Personalize new mission plans and push them to users. This method changes the drawbacks of the original static execution of the original task plan, and rationally utilizes the user's actual execution data and combines the big data formed by relevant data from many other users, so that the task plan selected by the user is continuously changed according to the actual situation, and the combination is By controlling the control of the baseline data, it is possible to adjust the difficulty level of the task plan as needed, to achieve the effect of step-by-step habit cultivation, and finally to achieve the purpose of allowing the user to develop good habits in a healthy and effective manner.
附图说明DRAWINGS
图1为本发明一实施例可穿戴设备任务计划调整方法流程图;1 is a flowchart of a method for adjusting a task plan of a wearable device according to an embodiment of the present invention;
图2为本发明一实施例可穿戴设备任务计划调整方法的步骤S130的具体流程图;2 is a specific flowchart of step S130 of a method for adjusting a task plan of a wearable device according to an embodiment of the present invention;
图3为本发明另一实施例可穿戴设备任务计划调整方法的步骤S160的具体流程图;FIG. 3 is a specific flowchart of step S160 of a method for adjusting a task plan of a wearable device according to another embodiment of the present invention;
图4为本发明一实施例可穿戴设备任务计划调整装置结构示意图;4 is a schematic structural diagram of a device for adjusting a task plan of a wearable device according to an embodiment of the present invention;
图5为本发明一实施例可穿戴设备任务计划调整装置中发送模块150结构示意图;FIG. 5 is a schematic structural diagram of a sending module 150 in a device planning adjustment apparatus for a wearable device according to an embodiment of the present invention;
图6为本发明又一实施例可穿戴设备任务计划调整方法流程图;6 is a flowchart of a method for adjusting a task plan of a wearable device according to still another embodiment of the present invention;
图7为本发明又一实施例可穿戴设备任务计划调整方法的步骤S210的具体流程图;FIG. 7 is a specific flowchart of step S210 of a method for adjusting a task plan of a wearable device according to still another embodiment of the present invention;
图8为本发明又一实施例可穿戴设备任务计划调整装置结构示意图;FIG. 8 is a schematic structural diagram of a device for adjusting a task plan of a wearable device according to still another embodiment of the present invention; FIG.
图9示出了用于执行根据本发明的方法的服务器或可穿戴设备的框图;Figure 9 shows a block diagram of a server or wearable device for performing the method according to the invention;
图10示出了用于保持或者携带实现根据本发明的方法的程序代码的存储单元示意图。Figure 10 shows a schematic diagram of a memory unit for holding or carrying program code implementing a method in accordance with the present invention.
具体实施方式detailed description
下面详细描述本发明的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本发明,而不能解释为对本发明的限制。The embodiments of the present invention are described in detail below, and the examples of the embodiments are illustrated in the drawings, wherein the same or similar reference numerals are used to refer to the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the drawings are intended to be illustrative of the invention and are not to be construed as limiting.
本技术领域技术人员可以理解,除非特意声明,这里使用的单数形式“一”、“一个”、“所述”和“该”也可包括复数形式。应该进一步理解的是,本发明的说明书中使用的措辞“包括”是指存在所述特征、整数、步骤、操作、元件和/或组件,但是并不排除存在或添加一个或多个其他特征、整数、步骤、操作、元件、组件和/或它们的组。应该理解,当我们称元件被“连接”或“耦接”到另一元件时,它可以直接连接或耦接到其他元件,或者也可以存在中间元件。此外,这里使用的“连接”或“耦接”可以包括无线连接或无线耦接。这里使用的措辞“和/或”包括一个或更多个相关联的列出项的全部或任一单元和全部组合。The singular forms "a", "an", "the" It is to be understood that the phrase "comprise" or "an" Integers, steps, operations, components, components, and/or groups thereof. It will be understood that when an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element. Further, "connected" or "coupled" as used herein may include either a wireless connection or a wireless coupling. The phrase "and/or" used herein includes all or any one and all combinations of one or more of the associated listed.
本技术领域技术人员可以理解,除非另外定义,这里使用的所有术语(包括技术术语和科学术语),具有与本发明所属领域中的普通技术人员的一般理解相同的意义。还应该理解的是,诸如通用字典中定义的那些术语,应该被理解为具有与现有技术的上下文中的意义一致的意义,并且除非像这里一样被特定定义,否则不会用理想化或过于正式的含义来解释。Those skilled in the art will appreciate that all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the invention belongs, unless otherwise defined. It should also be understood that terms such as those defined in a general dictionary should be understood to have meaning consistent with the meaning in the context of the prior art, and will not be idealized or excessive unless specifically defined as here. The formal meaning is explained.
本技术领域技术人员可以理解,这里所使用的“终端”、“终端设备”既包括无线信号接收器的设备,其仅具备无发射能力的无线信号接收器的设备, 又包括接收和发射硬件的设备,其具有能够在双向通信链路上,进行双向通信的接收和发射硬件的设备。这种设备可以包括:蜂窝或其他通信设备,其具有单线路显示器或多线路显示器或没有多线路显示器的蜂窝或其他通信设备;PCS(Personal Communications Service,个人通信系统),其可以组合语音、数据处理、传真和/或数据通信能力;PDA(Personal Digital Assistant,个人数字助理),其可以包括射频接收器、寻呼机、互联网/内联网访问、网络浏览器、记事本、日历和/或GPS(Global Positioning System,全球定位系统)接收器;常规膝上型和/或掌上型计算机或其他设备,其具有和/或包括射频接收器的常规膝上型和/或掌上型计算机或其他设备。这里所使用的“终端”、“终端设备”可以是便携式、可运输、安装在交通工具(航空、海运和/或陆地)中的,或者适合于和/或配置为在本地运行,和/或以分布形式,运行在地球和/或空间的任何其他位置运行。这里所使用的“终端”、“终端设备”还可以是通信终端、上网终端、音乐/视频播放终端,例如可以是PDA、MID(Mobile Internet Device,移动互联网设备)和/或具有音乐/视频播放功能的移动电话,也可以是智能电视、机顶盒等设备。It will be understood by those skilled in the art that "terminal" and "terminal device" as used herein include both a wireless signal receiver device, a device having only a wireless signal receiver without a transmitting capability, and receiving and transmitting hardware. A device having a receiving and transmitting hardware capable of two-way communication over a two-way communication link. Such devices may include cellular or other communication devices having a single line display or a multi-line display or a cellular or other communication device without a multi-line display; PCS (Personal Communications Service), which may combine voice, data Processing, fax, and/or data communication capabilities; PDA (Personal Digital Assistant), which can include radio frequency receivers, pagers, Internet/Intranet access, web browsers, notepads, calendars, and/or GPS (Global Positioning System (Global Positioning System) receiver; conventional laptop and/or palmtop computer or other device having a conventional laptop and/or palmtop computer or other device that includes and/or includes a radio frequency receiver. As used herein, "terminal", "terminal device" may be portable, transportable, installed in a vehicle (aviation, sea and/or land), or adapted and/or configured to operate locally, and/or Run in any other location on the Earth and/or space in a distributed form. The "terminal" and "terminal device" used herein may also be a communication terminal, an internet terminal, a music/video playing terminal, and may be, for example, a PDA, a MID (Mobile Internet Device), and/or have a music/video playback. Functional mobile phones can also be smart TVs, set-top boxes and other devices.
这里的可穿戴设备可以是直接穿在身上,或是整合到用户的衣服或配件中的一种便携式设备,不仅仅是一种单一功能硬件设备,更是通过软件支持以及数据交互、云端交互来实现通信及信息处理功能的硬件设备,可以是手表、手环、手机、项链等等。The wearable device here can be a portable device that is directly worn on the body or integrated into the user's clothes or accessories, not only a single function hardware device, but also through software support and data interaction, cloud interaction. Hardware devices that implement communication and information processing functions can be watches, bracelets, mobile phones, necklaces, and the like.
本发明一种实施例中的可穿戴设备任务计划调整方法,如图1所示,该任务计划调整方法包括下列步骤:The wearable device task plan adjustment method in an embodiment of the present invention is as shown in FIG. 1. The task plan adjustment method includes the following steps:
S110:接收可穿戴设备上传的用户活动数据,所述用户活动数据根据原始任务计划表中各相对应的任务单元获取。S110: Receive user activity data uploaded by the wearable device, where the user activity data is acquired according to each corresponding task unit in the original task schedule.
为向可穿戴设备的用户提供更加优质方便的服务,在可穿戴设备提供者的云端服务器上通常会提供有预先制定好的习惯培养任务计划,这些任务计划会根据多个角度的问题进行不同种类和侧重点的内容设计,用户端根据初步的实际情况可以直接从云端服务器上选择一份习惯培养任务计划,这也就是可穿戴设备上的原始任务计划表,每一份任务计划表中可以包含一个任务单元,比如“起床计划”,也可以包含多个任务单元,比如“起床计划”、“早餐计划”、“晨读计划”等。使用者启动可穿戴设备上的任务计划表执行单元,然后,可穿戴设备会根据任务计划表上的数据指令收集与各任务单元相对应的用户活动数据,并且通过设定的方式上传到云端服务器上,由云端服务器 获取到并进行相应的后续数据处理。优选的,任务单元包括任务目的内容、任务执行检测开始时间、任务执行检测结束时间,其中任务执行检测开始时间为开始检测所述任务目的内容执行的时刻,任务执行检测结束时间为停止检测所述任务目的内容执行的时刻,当时间到达任务执行检测开始时间,启动与所述任务目的内容相关的传感器并记录数据,当时间到达任务执行检测结束时间,关闭该传感器并停止记录数据,记录到的数据即为用户活动数据。任务单元是用户可穿戴设备上据以执行的根据,用户可以了解到任务所需要达到的目的效果,以及所规定的检测任务开始和结束的时间,或者任务需要反复执行的次数和总共需要的时间等。优选的,用户活动数据包括用户活动的执行时间、执行地点和/或与用户活动相对应的传感器数据,将用户活动的执行时间进行数学处理得到执行结果数据的时间数据部分,和/或将用户活动的执行地点进行数学处理得到执行结果数据的地理位置数据部分,和/或将与用户活动相对应的传感器数据进行数学处理得到执行结果数据的活动内容数据部分。其中执行时间和执行地点用于标定用户在执行任务单元时得到的基本要素数据,而传感器数据用于识别任务单元在其中规定的执行时间和执行地点执行。用户活动的执行时间用于确定使用者实际执行任务计划表上某一任务单元具体动作的时间,也可以用于确定某一任务单元的执行时间周期(具体根据任务单元的种类制定),执行地点则可以用于确定使用者执行任务单元时是否在设定的位置,比如睡觉应当在卧室的床上,而如果检测到执行地点在教室的课桌上则不利于健康睡觉行为的养成,则为后期修改计划提供数据参考。另外,用户活动相对应的传感器数据作为实现对与上述参数相关的监督数据收集以及更复杂功能的监测,比如有心率传感器数据、加速度传感器数据等,这些传感器可以方便检测到使用者是处于何种身体状态,以反映使用者对某项任务单元的执行情况。可以知道,用户活动数据的执行时间是包含在任务单元的任务执行检测开始时间和任务执行检测结束时间之间的,用户并不一定按照任务单元的任务执行检测开始时间开始执行任务单元,往往会晚于该检测开始时间,并且为了保证充分检测用户对任务的实际执行情况,任务单元会安排充分的检测时间,也即使任务规定的检测结束时间晚于用户实际结束执行任务的时间,否则太早或太晚执行任务都会变得没有意义,如果在检测开始时间和检测结束时间之内没有检测到任务有被执行的传感器数 据,则表明用户此次没有执行该任务,也将最终得到一个相应的未执行任务传感器数据。In order to provide better and more convenient services to users of wearable devices, pre-defined custom training task plans are usually provided on the wearable device provider's cloud server. These task plans are based on different angles. And the focus of the content design, the user can directly select a habit training task plan from the cloud server according to the initial situation, which is the original task schedule on the wearable device, each task schedule can include A task unit, such as "getting up plan", can also contain multiple task units, such as "getting up plan", "breakfast plan", "morning reading plan" and so on. The user activates the task schedule execution unit on the wearable device, and then the wearable device collects user activity data corresponding to each task unit according to the data instruction on the task schedule, and uploads to the cloud server through setting manner. On the top, the cloud server obtains and performs subsequent data processing. Preferably, the task unit includes a task destination content, a task execution detection start time, and a task execution detection end time, wherein the task execution detection start time is a time at which the execution of the task destination content is started, and the task execution detection end time is a stop detection. The time at which the task purpose content is executed, when the time reaches the task execution detection start time, the sensor related to the task purpose content is started and the data is recorded, and when the time reaches the task execution detection end time, the sensor is turned off and the data is stopped, and the recorded data is recorded. The data is the user activity data. The task unit is the basis on which the user wearable device performs, the user can understand the purpose effect of the task, and the time of the start and end of the specified detection task, or the number of times the task needs to be repeatedly executed and the total time required. Wait. Preferably, the user activity data includes execution time of the user activity, execution location and/or sensor data corresponding to the user activity, mathematically processing the execution time of the user activity to obtain a time data portion of the execution result data, and/or placing the user The execution location of the activity is mathematically processed to obtain a geographic location data portion of the execution result data, and/or the sensor data corresponding to the user activity is mathematically processed to obtain an active content data portion of the execution result data. The execution time and execution location are used to calibrate the basic element data obtained by the user when executing the task unit, and the sensor data is used to identify the execution time and execution location specified by the task unit therein. The execution time of the user activity is used to determine the time when the user actually performs a specific action of a task unit on the task schedule, and may also be used to determine the execution time period of a task unit (specifically according to the type of the task unit), the execution location It can then be used to determine whether the user is in the set position when performing the task unit, such as sleeping on the bed in the bedroom, and if it is detected that the execution place is on the classroom desk, it is not conducive to the development of healthy sleep behavior, then The later revision plan provides a data reference. In addition, the sensor data corresponding to the user activity is used to implement monitoring of the supervised data collection and more complex functions related to the above parameters, such as heart rate sensor data, acceleration sensor data, etc., and these sensors can conveniently detect what the user is in. Physical state to reflect the user's performance of a task unit. It can be known that the execution time of the user activity data is included between the task execution detection start time of the task unit and the task execution detection end time, and the user does not necessarily start to execute the task unit according to the task execution detection start time of the task unit, and often It is later than the detection start time, and in order to ensure sufficient detection of the actual execution of the task by the user, the task unit will arrange sufficient detection time, and even if the task specified detection end time is later than the time when the user actually ends the execution task, it is too early. Or it will be meaningless to perform the task too late. If the sensor data that the task has been executed is not detected within the detection start time and the detection end time, it indicates that the user did not perform the task this time, and will eventually get a corresponding Task sensor data is not executed.
优选的,用户活动数据的上传方式为实时上传或者在用户活动数据形成后的预定时间上传。实时上传为采集到一项用户活动数据后立即向服务器上传,此方法要求的用户设备内存小,对数据存储的任务交由服务器进行,但此方法需要在网络覆盖情况比较好的地区,否则可能造成数据丢失。另外一种上传的方式是将该用户活动数据收集到之后在一定的设定时间集中上传,如在采集到数据后4小时上传,这一方式对用户的设备要求高,但对网络要求低,在收集到用户的活动数据之后将其存储在设备中,待经过设定的时间集中上传,例如通过家庭WIFI上传。Preferably, the uploading manner of the user activity data is real-time uploading or uploading at a predetermined time after the user activity data is formed. The real-time upload is uploaded to the server immediately after collecting a user activity data. The memory of the user equipment required by this method is small, and the task of data storage is performed by the server, but this method needs to be in a region with better network coverage, otherwise it may be Causes data loss. Another way to upload is to collect the user activity data and upload it in a certain set time. For example, upload it 4 hours after collecting the data. This method has high requirements on the user's equipment, but has low network requirements. After the user's activity data is collected, it is stored in the device, and is uploaded in a centralized time, for example, through a home WIFI.
S120:以任务单元为单位对其相关的用户活动数据进行数学处理,以确定各任务单元的执行结果数据。S120: Perform mathematical processing on the related user activity data in units of task units to determine execution result data of each task unit.
云端服务器获取到的用户活动数据是来自可穿戴设备上与任务单元相关的传感器收集到的原始活动数据,如心率传感器获取到的脉动频率、脉动力度及变化起始时刻、时长等时间数据,加速度传感器获取到的方向、速率、速率变化及相对应的时刻与时间等,还有定位传感器中的经度、纬度以及这些经纬度对应的时间数据等,可见,这些数据中往往包含着可判断任务种类的特征数据及与这些特征数据相对应的时间数据等,具体的数据收集本领域技术人员可以根据实际需要进行判断。可穿戴设备以最简单的方式收集并上传这些原始数据,而将数据处理工作交由云端服务器完成,这样可以使得可穿戴设备硬件要求更低,更容易实现。其中数学处理是对所述用户活动数据中来源于不同传感器的原始数据分别适用不同的预设规则或预设算法进行数据加工处理,从而获得所述执行结果数据。由于处理上述原始数据是有针对性地进行的,不同传感器收集到的数据需要进行不同的数学处理,也即对数据运用不同的数据处理规则或者算法进行加工整理,如针对心率传感器得来的数据,将其收集到的脉动频率、脉动力度等数据与预先研究得出的不同身体状况下的数据表相比对,得出某一时间内该数据显示出使用者所处的状态,是处于睡觉的状态,或是行走的状态,或是跑动的状态等,而针对定位传感器得来的数据按照设定函数计算出使用者的停留地理位置、停留时间等,针对这些传感器数据的数学处理用到的具体函数或者算法可由本领域技术人员灵活选择或者编程实现。对用户活动数据中来源于不同传感器的原始数据分别适用不同的预设规则或预设算法进行数据加工处理,从而获得各传感器对 应的数据处理结果,再根据各任务单元的需要对来自一个传感器或多个传感器的数据处理结果进行综合判断,从而获取到不同的但与各任务单元相对应的执行结果数据,该执行结果数据中包含有任务单元完成状态、完成的时间、完成的地点等,如“起床计划”的执行结果数据可以是“起床7:20卧室”或者在传感器检测时间间隔内未能检测到用户起床那么就是“未起床卧室”等。每个任务单元的执行结果数据内容不同、大小不同,数据格式也可能不同,比如起床只需要心率传感器即可判断完成与否,而进食和行走可能需要心率传感器和加速度传感器的配合才能确认和区别出来,但是最终处理得到的这些执行结果数据必须具有与标准数据表上任务单元相对应的数据格式,适用于与标准数据表进行比对,该数据格式也可由本领域技术人员预先编程设定。The user activity data obtained by the cloud server is the original activity data collected by the sensor related to the task unit on the wearable device, such as the pulsation frequency, the pulse power degree, the change start time, the duration and the like time data acquired by the heart rate sensor, and the acceleration. The direction, rate, rate change and corresponding time and time acquired by the sensor, as well as the longitude and latitude of the positioning sensor and the time data corresponding to the latitude and longitude, etc., it can be seen that these data often contain the type of task that can be judged. The feature data and the time data corresponding to the feature data, etc., the specific data collection can be judged by a person skilled in the art according to actual needs. The wearable device collects and uploads the raw data in the easiest way, and the data processing work is done by the cloud server, which makes the wearable device hardware lower and easier to implement. The mathematical processing is to apply different preset rules or preset algorithms to the original data from different sensors in the user activity data for data processing, thereby obtaining the execution result data. Since the processing of the above raw data is carried out in a targeted manner, the data collected by different sensors needs to be subjected to different mathematical processing, that is, the data is processed using different data processing rules or algorithms, such as data obtained from the heart rate sensor. The collected pulsation frequency, pulse kinetics and other data are compared with the data sheets under different physical conditions obtained in advance, and it is found that the data shows the state of the user at a certain time, and is sleeping. The state of the walk, or the state of the walk, or the state of the run, etc., and the data obtained by the position sensor is calculated according to the set function to calculate the user's stop position, dwell time, etc., for the mathematical processing of the sensor data. The specific functions or algorithms that arrive can be flexibly selected or programmed by those skilled in the art. Different raw preset data or preset algorithms are applied to the original data of the user activity data for data processing, so as to obtain data processing results corresponding to each sensor, and then according to the needs of each task unit, from a sensor or The data processing results of the plurality of sensors are comprehensively determined, thereby obtaining different execution result data corresponding to each task unit, where the execution result data includes the task unit completion status, the completion time, the completed location, and the like, such as The execution result data of the "get up plan" may be "get up 7:20 bedroom" or fail to detect that the user gets up in the sensor detection interval, that is, "not getting up the bedroom". The execution result data content of each task unit is different, the size is different, and the data format may be different. For example, only the heart rate sensor can be used to get up to judge whether the completion or not, and the feeding and walking may require the cooperation of the heart rate sensor and the acceleration sensor to confirm and distinguish. The execution result data obtained, but ultimately processed, must have a data format corresponding to the task unit on the standard data table, and is suitable for comparison with a standard data table, which can also be pre-programmed by those skilled in the art.
S130:依据各相应任务单元相对应的评价基准数据,对各任务单元相对应的执行结果数据进行评价,确定与所述评价基准数据相对应的评价结果数据。S130: The execution result data corresponding to each task unit is evaluated according to the evaluation reference data corresponding to each corresponding task unit, and the evaluation result data corresponding to the evaluation reference data is determined.
服务器中存储的每一个任务计划表中包含有各种相应的任务单元,为便于评价这些任务单元的执行程度,如是否执行,完成程度如何,完成质量如何等,就必须为每一个任务单元预先设定一个评价基准数据,将来自于使用者的各任务单元相对应的执行结果数据与其相对应的评价基准数据对比,就可以确定得出与所选择的评价基准数据相对应的评价结果数据。例如,某一任务单元为“起床计划”,作为执行结果数据之一的起床时间是“7:20”,而在该被选择的任务计划表中“起床计划”对应的评价基准数据是“7:00”,二者对比得出的评价结果数据对应的信息是“晚起20分钟”,当然本领域技术人员能够理解的是,该信息的数字显示形式可以为“-20min”或者其他规定格式的数据形式。Each task schedule stored in the server contains various corresponding task units. In order to facilitate the evaluation of the execution level of these task units, such as whether execution, degree of completion, quality of completion, etc., it is necessary to pre-define each task unit. By setting one evaluation reference data, comparing the execution result data corresponding to each task unit of the user with the corresponding evaluation reference data, it is possible to determine the evaluation result data corresponding to the selected evaluation reference data. For example, a certain task unit is "getting up plan", the wake-up time as one of the execution result data is "7:20", and the evaluation reference data corresponding to "getting up plan" in the selected task schedule is "7" :00", the information corresponding to the evaluation result data obtained by the comparison is "20 minutes late", of course, those skilled in the art can understand that the digital display form of the information can be "-20min" or other prescribed formats. The form of the data.
S140:依据与任务单元对应的预设条件,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,生成新的任务计划表。S140: Adjust a setting of the task unit corresponding to the evaluation result data in the original task schedule according to a preset condition corresponding to the task unit, and generate a new task schedule.
通过前面步骤得到的评价结果数据将是一份与原始任务计划表对应的数据表,这份数据表只能显示使用者对这份原始任务计划的执行情况,这些执行情况包括任务完成的程度、完成的质量等,但还不能判断使用者在执行完这份原始任务计划之后该如何选择新的任务计划。此时服务器会将评价结果数据进行进一步的分析,与各任务单元对应的预设条件相比较。由于用户选择的原始任务计划表中可能只存在一项任务单元,例如某原始任务计划表是 用于专门培养儿童早晨起床习惯的,该原始计划表中只包括早起任务单元;也可能存在多项任务单元,例如某原始任务计划表用于培养儿童作息习惯的,该原始计划表中包括早起任务单元、午睡任务单元和晚上睡觉任务单元等。无论哪种情况,针对原始任务计划表的执行对应会得到至少一个评价结果数据。在云端服务器中存储有与任务单元对应的预设条件,预设条件存在不同的假设情形,并且使得无论是哪种评价结果数据都会落在其中的一种假设情形范围内,而每种假设情形对应一种处理结果,也就是对原始任务计划表中与评价结果数据相对应的任务单元进行调整,调整为预先指定的更为合适的内容,对原始任务计划表中至少一个任务单元进行调整后就得到新任务计划表,因此能够根据使用者对原始任务计划表的实际执行情况确定更加合适的新任务计划表。优选的,依据与任务单元对应的预设条件,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置的具体方式为,使预设条件包括一个或多个表达式,每个表达式包括设定数值范围以及与设定数值范围相对应的调整任务单元的映射,当由执行原始任务计划表中某一任务单元得到的评价结果数据落在其中一个表达式的数值范围内时,则依据该映射来调整与评价结果数据对应的任务单元,即是使假设情形及其相关的处理方式包括在一个表达式中,其中假设情形具体设置为包括设定数值范围,而处理方式则为与所述设定数值范围相对应的调整任务单元的映射,该映射指向对所述相对应的任务单元进行修改的具体方案,当所述评价结果数据在其中一个设定数值范围内时,就根据这一设定数值范围相对应的映射调整评价结果数据对应的任务单元。数值范围的形式包括有时间范围、时间周期范围、次数等,例如但不限于,对于任务单元“起床计划”,预设条件中表达式A的内容含义为“一个执行时间周期10天内晚起20分钟以上超过7次,变更起床计划的评价基准数据为7:30”,或者其内容含义为“一个执行时间周期10天内晚起20分钟以上超过7次,变更起床计划的评价基准数据为7:30,同时变更起床计划的提醒时间为6:50”;预设条件中表达式B的内容含义为“一个执行时间周期10天内晚起20分钟以上不超过2次,变更起床计划的执行时间周期为20天”;预设条件中表达式C的内容含义为“一个执行时间周期10天内晚起20分钟以上3~7次,变更起床计划的评价基准数据为7:15”;预设条件还可以包括更多类似的假设情形。而如果一个执行时间周期10天内得到的评价结果数据显示的数据内容含义是“晚起超过20分钟8次”,则可以判断到该评价结果数据落在表达式A的数值范围中,应该根据表达式A中 的映射调整任务单元“起床计划”的相应部分,即将其中起床计划的评价基准数据变更为“7:30”或者同时调整提醒时间为“6:50”;而如果在一个周期内得到的评价结果数据显示的数据内容其含义为“晚起超过20分钟2次”则按照表达式B调整任务计划表;若一个执行周期内得到的评价结果数据显示的数据内容其含义为“晚起超过20分钟4次”,则满足C中的数值范围,故依据表达式C中所映射的方案重新制定任务计划表。有的任务单元中不需要有执行时间周期,该任务单元对应的预设条件中就不包含执行时间周期的数据;有的任务单元只需要检测到执行即可而不需要有执行时间长短,那么与该任务单元对应的预设条件中就不包含执行时间的内容。The evaluation result data obtained through the previous steps will be a data table corresponding to the original task schedule, which can only display the user's execution of the original mission plan, including the degree of completion of the task, The quality of the completion, etc., but it is not yet possible to determine how the user should select a new mission plan after performing the original mission plan. At this point, the server will further analyze the evaluation result data and compare it with the preset conditions corresponding to each task unit. Since there may be only one task unit in the original task schedule selected by the user, for example, an original task schedule is used to specifically train children to get up in the morning, the original schedule includes only the early task unit; there may be multiple A task unit, such as an original task schedule, is used to develop a child's work habits, including an early task unit, a nap task unit, and a night sleep task unit. In either case, at least one evaluation result data is obtained for the execution of the original task schedule. The preset condition corresponding to the task unit is stored in the cloud server, and the preset condition has different hypothetical situations, and the evaluation result data falls within one of the hypothetical situations, and each hypothetical situation Corresponding to a processing result, that is, adjusting the task unit corresponding to the evaluation result data in the original task schedule, adjusting to a more appropriate content specified in advance, and adjusting at least one task unit in the original task schedule. A new task schedule is obtained, so that a more appropriate new task schedule can be determined based on the actual execution of the original task schedule by the user. Preferably, the specific manner of adjusting the setting of the task unit corresponding to the evaluation result data in the original task schedule according to the preset condition corresponding to the task unit is such that the preset condition includes one or more expressions, each The expression includes a set value range and a mapping of the adjustment task unit corresponding to the set value range, when the evaluation result data obtained by executing a task unit in the original task schedule falls within the numerical range of one of the expressions And adjusting the task unit corresponding to the evaluation result data according to the mapping, that is, the hypothetical situation and the related processing manner are included in an expression, wherein the hypothetical situation is specifically set to include the set value range, and the processing manner And a mapping of the adjustment task unit corresponding to the set value range, the mapping points to a specific scheme for modifying the corresponding task unit, when the evaluation result data is within one of the set value ranges , adjusting the task unit corresponding to the evaluation result data according to the mapping corresponding to the set value rangeThe form of the numerical range includes a time range, a time period range, a number of times, and the like. For example, but not limited to, for the task unit "getting up plan", the content of the expression A in the preset condition means "an execution time period of 10 days from the night 20 More than 7 minutes or more, the evaluation reference data for changing the wake-up plan is 7:30", or the content means "more than 7 times in 20 days or more from 10 days in an execution time period, and the evaluation reference data for changing the wake-up plan is 7: 30. At the same time, the reminder time for changing the wake-up plan is 6:50”; the meaning of the expression B in the preset condition means “the execution time period of the wake-up plan is changed from no more than 20 minutes in the 10 days after the execution time period of 10 days. It is 20 days"; the meaning of the expression C in the preset condition is "one execution time period is 10 minutes or more from the night within 10 days, 3 to 7 times, and the evaluation reference data for changing the wake-up plan is 7:15"; the preset condition is also More similar hypothetical situations can be included. If the data content of the evaluation result data obtained within 10 days of an execution time period means "8 times more than 20 minutes later", it can be judged that the evaluation result data falls within the numerical range of the expression A, and should be expressed according to the expression. The mapping in Equation A adjusts the corresponding part of the task unit "Get Up Plan", that is, the evaluation reference data of the wake-up plan is changed to "7:30" or the adjustment reminder time is "6:50"; and if it is obtained in one cycle The data content of the evaluation result data shows that the meaning of the data content is "2 times longer than 20 minutes later", and the task schedule is adjusted according to the expression B; if the evaluation result data obtained in one execution period shows the data content, the meaning is "late" If it is 4 times more than 20 minutes", the value range in C is satisfied, so the task schedule is re-established according to the scheme mapped in Expression C. Some task units do not need to have an execution time period, and the preset conditions corresponding to the task unit do not include data of the execution time period; some task units only need to detect execution without the need for execution time, then The content of the execution time is not included in the preset condition corresponding to the task unit.
优选的,当任务单元并不通过任务完成的时间表达其完成程度时,存在一旦执行就完成目标的特性,因此将预设条件设定为预设评价累积次数区间,相对应的任务单元的映射为:当对各任务单元相对应的执行结果数据进行评价的累积评价次数在所述预设评价累积次数区间内,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,生成新的任务计划表。Preferably, when the task unit does not express the degree of completion by the time when the task is completed, there is a characteristic that the target is completed once executed, so the preset condition is set as the preset evaluation cumulative number interval, and the mapping of the corresponding task unit is performed. When the cumulative evaluation number for evaluating the execution result data corresponding to each task unit is within the preset evaluation cumulative number interval, the setting of the task unit corresponding to the evaluation result data is adjusted in the original task schedule table, Generate a new task schedule.
优选的,如图2所示,步骤S130中对各任务单元相对应的执行结果数据进行评价的步骤包括:Preferably, as shown in FIG. 2, the step of evaluating the execution result data corresponding to each task unit in step S130 includes:
S131:将所述执行结果数据与所述评价基准数据按照彼此的数据区块对应进行比较,得出比较幅度数据。任务计划表中存在不同的任务单元,用户执行后得到不同的执行结果数据,在数据信息中表现为不同的数据区块,在评价基准数据中将相对应的数据区块进行对比,得出相应的比较幅度数据,比如时间长短、早晚或者任务单元的执行次数多少等。S131: Compare the execution result data and the evaluation reference data according to data block correspondences of each other to obtain comparison amplitude data. There are different task units in the task schedule, and the user obtains different execution result data after execution, and presents different data blocks in the data information, and compares the corresponding data blocks in the evaluation reference data to obtain corresponding The comparison amplitude data, such as the length of time, morning and evening, or the number of executions of the task unit.
S132:依据所述评价基准数据中的评价规则,将所述比较幅度数据转化为评价结果数据。在评价规则中会规定某一比较幅度数据对应某一评价结果,比如比较幅度数据为“晚20分钟”时给出评价结果数据“扣除1份数据单元”,其中的数据单元可以采取不同的形式,如分数、虚拟物品、累积时间、累积次数等。S132: Convert the comparison amplitude data into evaluation result data according to the evaluation rule in the evaluation reference data. In the evaluation rules, a certain comparison amplitude data is specified corresponding to a certain evaluation result. For example, when the comparison amplitude data is “late 20 minutes”, the evaluation result data “deduct 1 data unit” is given, and the data unit can take different forms. Such as scores, virtual items, cumulative time, cumulative times, etc.
优选的,具体的做法是将评价结果数据设置为分数的形式,评价规则为:当比较幅度数据满足预设数据范围,即给出与所述特定预设数据范围相对应的评价分数,比如评价基准数据中对应数据区块内的预设数据范围为“晚15~30分钟,扣1分;晚30分钟以上,扣2分”,那么对于比较幅度数据为“晚20分钟”的,就得到“扣1分”的评价分数。得到相对应的评价分数后,将预设条件设置为用于衡量所述评价结果数据的评价分数满足预设分数,即 当至少一个任务单元所对应的评价分数满足与该任务单元相应的预设条件中设置的特定分数时,调整与该评价分数相对应的任务单元的设置,生成新的任务计划表。具体地是,以分数为媒介衡量使用者完成任务单元的程度,当评价结果数据满足预设条件中的相应项时,给该项任务结果增加或减除相应分数,并且得出预设条件中要求的累积结果——某项任务单元在一定时间周期内获得的总分数,当所得到的总分数达到预设分数,则相应修改得到新的任务计划表。引入分数为媒介,使数据处理逻辑更加清晰,分数数量还可以通过形象的虚拟外观来显示,比如红花、水果或红旗等,可选择性地在用户可穿戴设备上显示,增加趣味性。Preferably, the specific method is to set the evaluation result data into a form of a score, and the evaluation rule is: when the comparison amplitude data satisfies the preset data range, that is, an evaluation score corresponding to the specific preset data range is given, for example, evaluation The default data range in the corresponding data block in the reference data is “15 to 30 minutes late, deduct 1 point; 30 minutes later, deduct 2 points”, then for the comparison amplitude data is “20 minutes late”, you will get "Deduction of 1 point" evaluation score. After obtaining the corresponding evaluation score, setting the preset condition to the evaluation score for measuring the evaluation result data satisfies the preset score, that is, when the evaluation score corresponding to the at least one task unit satisfies the preset corresponding to the task unit When a specific score is set in the condition, the setting of the task unit corresponding to the evaluation score is adjusted to generate a new task schedule. Specifically, the degree of the user completing the task unit is measured by the score. When the evaluation result data meets the corresponding item in the preset condition, the corresponding score is added or subtracted from the task result, and the preset condition is obtained. The cumulative result of the request—the total score obtained by a task unit within a certain period of time. When the total score obtained reaches the preset score, the new task schedule is modified accordingly. The introduction of scores as a medium makes the data processing logic clearer. The number of scores can also be displayed by the virtual appearance of the image, such as safflower, fruit or red flag, which can be selectively displayed on the user wearable device to increase the interest.
累积次数制预设条件和分数制预设条件可以单独使用,也可以将两种方案结合起来使用。The cumulative number of preset conditions and the score system preset conditions can be used alone or in combination.
S150:向该可穿戴设备推送该新的任务计划表。S150: Push the new task schedule to the wearable device.
当根据预设条件对执行结果数据进行判断之后得到满足预设条件的新的任务计划表,服务器就立刻向该可穿戴设备推送该新的任务计划表。When the execution result data is judged according to the preset condition to obtain a new task schedule that satisfies the preset condition, the server immediately pushes the new task schedule to the wearable device.
优选的,本发明所示另一实施例如图3所示,在服务器向可穿戴设备推送新的任务计划表之后,还包括修改权限验证步骤S160,具体包括:Preferably, another embodiment of the present invention, as shown in FIG. 3, after the server pushes the new task schedule to the wearable device, further includes a modify authority verification step S160, which specifically includes:
S161:发送所述新的任务计划表到用户端。S161: Send the new task schedule to the client.
首先要将新的任务计划表发送到用户端,让用户获知到发送过来的任务计划表的内容,用户根据自身情况选择直接执行、修改执行或者选择其他任务计划表执行。First, the new task schedule should be sent to the user, so that the user can know the content of the task schedule sent. The user chooses to execute directly, modify the execution or select other task schedules according to his or her own situation.
S162:获取到用户端提交的针对所述新的任务计划表进行修改后得到的修改后任务计划表,解析所述修改后任务计划表中的权限信息。S162: Acquire a modified task schedule obtained by modifying the new task schedule submitted by the client, and parsing the permission information in the modified task schedule.
当用户根据自身情况决定部分采纳任务计划表中的内容,而需要对另外一些内容进行修改时,服务器就获取到用户端提交上来的针对获取到的新的任务计划表进行修改后得到的修改后任务计划表,并解析出该修改后任务计划表中包含的修改权限信息,权限信息采用密码或者实时验证码(由服务器提供专用链路,用户点击选择后,服务器发送给用户相应数字编码,用户获取后输入到修改请求中,再由服务器进行匹配度验证),也可以采用特定生物特征来验证,如指纹信息、虹膜特征等。When the user decides to partially adopt the content in the task schedule according to his own situation and needs to modify other content, the server obtains the modified result obtained by modifying the obtained new task schedule submitted by the client. The task schedule, and parsing the modified permission information included in the modified task schedule, the permission information is a password or a real-time verification code (a dedicated link is provided by the server, and after the user clicks the selection, the server sends the corresponding digital code to the user, the user After being acquired, it is input into the modification request, and then the server performs the matching degree verification. It can also be verified by using specific biometrics, such as fingerprint information, iris features, and the like.
S163:若所述权限信息与预存权限信息匹配,以所述修改后任务计划表对应更新已储存的所述新的任务计划表。S163: If the rights information matches the pre-stored rights information, update the stored new task plan table corresponding to the modified task plan table.
用户端产生修改后的任务计划表,此时该任务计划表在用户端,需要将 其上传到服务器上,以便服务器对修改之前的所述新的任务计划表进一步更新,使用户端采纳的任务计划表和服务器端的任务计划表相匹配。当上述的修改权限信息符合服务器上预存在该用户账号上的权限信息时,服务器接收修改后任务计划表并对应更新已储存的所述新的任务计划表。The client generates a modified task schedule. At this time, the task schedule is uploaded to the server on the user side, so that the server further updates the new task schedule before the modification, so that the client adopts the task. The schedule matches the server-side task schedule. When the modified permission information meets the permission information pre-existing on the user account on the server, the server receives the modified task schedule table and correspondingly updates the stored new task schedule.
优选的,为了满足不同年龄段、不同生活背景的用户需求,让任务计划表执行界面更加有趣,可以使任务计划表包括用户界面皮肤主题信息的内容,这样的用户界面专门用于为执行相应任务计划表中的计划任务相关的用户界面。比如,晚上的时间选择星空外观,白天选择有阳光的城市风景或者运动场等外观。Preferably, in order to meet the user requirements of different age groups and different living backgrounds, the task schedule execution interface is more interesting, and the task schedule may include the content of the user interface skin theme information, and the user interface is specifically used to perform the corresponding task. The user interface associated with the scheduled tasks in the schedule. For example, in the evening time, choose the appearance of the starry sky, and choose the appearance of the city landscape or the sports field with sunlight during the day.
适应前述的方法,基于计算机系统模块化思维,本发明的一实施例提供一种可穿戴设备任务计划调整装置,如图4所示,包括:In accordance with the foregoing method, based on the modular thinking of the computer system, an embodiment of the present invention provides a device for adjusting a task plan of a wearable device, as shown in FIG. 4, including:
接收模块110,用于接收可穿戴设备上传的用户活动数据,所述用户活动数据根据原始任务计划表中各相对应的任务单元获取。The receiving module 110 is configured to receive user activity data uploaded by the wearable device, where the user activity data is acquired according to each corresponding task unit in the original task schedule.
使用者启动可穿戴设备上的任务计划表执行单元,然后,可穿戴设备会根据任务计划表上的数据指令收集与各任务单元相对应的用户活动数据,并且通过设定的方式上传到云端服务器上,由云端服务器的接收模块110获取到并提供给其他模块进行相应的后续数据处理。其中的用户活动数据包括用户活动的执行时间、执行地点和/或与用户活动相对应的传感器数据,本领域技术人员能够了解,用户数据还可以包括用户ID信息、设备硬件版本信息等基本信息。The user activates the task schedule execution unit on the wearable device, and then the wearable device collects user activity data corresponding to each task unit according to the data instruction on the task schedule, and uploads to the cloud server through setting manner. The receiving module 110 of the cloud server acquires and provides the other module for corresponding subsequent data processing. The user activity data includes the execution time of the user activity, the execution location, and/or the sensor data corresponding to the user activity. Those skilled in the art can understand that the user data may further include basic information such as user ID information and device hardware version information.
转化模块120,用于以所述任务单元为单位对其相关的用户活动数据进行数学处理,以确定各任务单元的执行结果数据。The conversion module 120 is configured to perform mathematical processing on the related user activity data in units of the task unit to determine execution result data of each task unit.
云端服务器接收模块110获取到的用户活动数据往往是简单的时间数据、任务单元类型数据等,然而仅仅这些简单原始数据是无法作为云端服务器作为分析判断使用的,因此需要进行数学处理,转化模块120根据不同任务单元展开这些处理,转化确定为各任务单元的执行结果数据,这些执行结果数据具有固定的数据格式,适用于与标准数据表进行对比。The user activity data acquired by the cloud server receiving module 110 is often simple time data, task unit type data, and the like. However, only these simple raw data cannot be used as the cloud server for analysis and judgment, so mathematical processing is required, and the conversion module 120 is required. These processes are expanded according to different task units, and the conversion is determined as the execution result data of each task unit. The execution result data has a fixed data format and is suitable for comparison with the standard data table.
评价模块130,用于依据各相应任务单元相对应的评价基准数据,对各任务单元相对应的执行结果数据进行评价,确定与所述评价基准数据相对应的评价结果数据。The evaluation module 130 is configured to evaluate execution result data corresponding to each task unit according to the evaluation reference data corresponding to each corresponding task unit, and determine evaluation result data corresponding to the evaluation reference data.
服务器中存储的每一个任务计划表中包含有各种相应的任务单元,为便 于评价这些任务单元的执行程度,如:是否执行,完成程度如何,完成质量如何等,就必须为每一个任务单元预先设定一个评价基准数据,评价模块130将来自于使用者的各任务单元相对应的执行结果数据与其相对应的评价基准数据对比,就可以确定得出与所选择的评价基准数据相对应的评价结果数据。Each task schedule stored in the server contains various corresponding task units. In order to facilitate the evaluation of the execution level of these task units, such as: whether to execute, how complete, how to complete the quality, etc., each task unit must be An evaluation reference data is set in advance, and the evaluation module 130 compares the execution result data corresponding to each task unit of the user with the corresponding evaluation reference data, and determines that the corresponding evaluation reference data is corresponding. Evaluation result data.
更新模块140,用于依据与任务单元对应的预设条件,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,生成新的任务计划表。The update module 140 is configured to adjust a setting of the task unit corresponding to the evaluation result data in the original task schedule according to a preset condition corresponding to the task unit, to generate a new task schedule.
服务器的更新模块140将评价结果数据进一步分析,与各任务单元对应的预设条件相比较,在满足相应的预设条件中的假设情形时,对原始任务计划表中与评价结果数据相对应的任务单元进行调整,调整为预先指定的更为合适的内容,不同的假设情形对应不同的调整内容,因此能够根据使用者对原始任务计划表的实际执行情况确定更加合适的新任务计划表。The update module 140 of the server further analyzes the evaluation result data, compares with the preset conditions corresponding to each task unit, and corresponds to the evaluation result data in the original task schedule table when the assumptions in the corresponding preset conditions are met. The task unit is adjusted and adjusted to a more appropriate content specified in advance, and different hypothetical situations correspond to different adjustment contents, so that a more appropriate new task schedule can be determined according to the actual execution of the original task schedule by the user.
发送模块150,用于向该可穿戴设备推送该新的任务计划表。The sending module 150 is configured to push the new task schedule to the wearable device.
当根据预设条件对执行结果数据进行判断之后得到满足预设条件的新的任务计划表,服务器的发送模块150就立刻向该可穿戴设备推送该新的任务计划表。When the execution result data is judged according to the preset condition to obtain a new task schedule that satisfies the preset condition, the sending module 150 of the server immediately pushes the new task schedule to the wearable device.
优选的,如图5所示,本发明一实施例中的发送模块150包括:Preferably, as shown in FIG. 5, the sending module 150 in an embodiment of the present invention includes:
发送单元151,用于发送所述新任务计划表到用户端。首先发送单元151要将新的任务计划表发送到用户端,让用户获知到发送过来的任务计划表的内容,用户根据自身情况选择直接执行、修改执行或者选择其他任务计划表执行.The sending unit 151 is configured to send the new task schedule to the client. First, the sending unit 151 sends a new task schedule to the user, so that the user knows the content of the sent task schedule, and the user selects to execute directly, modify the execution, or select another task schedule to execute according to his or her own situation.
解析单元152,用于获取到用户端提交的任务计划表修改请求,解析所述修改请求中包含的修改权限信息。当用户根据自身情况决定部分采纳任务计划表中的内容,而需要对另外一些内容进行修改时,服务器就获取到用户端提交上来的任务计划表修改请求,该修改请求包含有修改权限信息,由该解析单元152解析得到,比如验证密码、实时验证码或者特定生物特征等。The parsing unit 152 is configured to obtain a task schedule modification request submitted by the client, and parse the modification authority information included in the modification request. When the user decides to partially adopt the content in the task schedule according to his own situation and needs to modify other content, the server obtains a task schedule modification request submitted by the client, and the modification request includes the modification authority information, The parsing unit 152 parses, for example, a verification password, a real-time verification code, or a specific biometric.
判断单元153,若所述修改权限信息与预存权限信息匹配,向用户端发送允许修改确认信息。当判断单元153判断到上述的修改权限信息符合服务器上预存在该用户账号上的权限信息时,服务器向该用户开发任务计划表修改权限,向该用户端发送允许修改确认信息。The determining unit 153 sends the permission modification confirmation information to the client if the modification authority information matches the pre-stored authority information. When the determining unit 153 determines that the modified authority information meets the authority information pre-existing on the user account on the server, the server develops a task schedule modification authority to the user, and sends the permission modification confirmation information to the client.
更新单元154,获取用户端修改后的任务计划表,并对应更新已储存的所述新的任务计划表。用户进入任务计划表的修改界面,对任务计划表进行相应的更改,得出修改后的任务计划表,此时该任务计划表在用户端,需要 将其上传到服务器上,以便服务器中的更新单元154对修改之前的所述新的任务计划表进一步更新,使用户端采纳的任务计划表和服务器端的任务计划表相匹配。The updating unit 154 acquires the modified task schedule of the client, and updates the stored new task schedule correspondingly. The user enters the modification interface of the task schedule, and makes corresponding changes to the task schedule to obtain a modified task schedule. At this time, the task schedule is uploaded to the server for the update in the server. The unit 154 further updates the new task schedule table before the modification, so that the task schedule adopted by the client matches the task schedule of the server.
本发明还提供了一种可穿戴设备任务计划调整服务器,包括第一处理器,该第一处理器用于执行上述实施例的可穿戴设备任务计划调整方法。如用接收模块110接收可穿戴设备上传的用户活动数据,该用户活动数据根据原始任务计划表中各相对应的任务单元获取。以所述任务单元为单位,利用转化模块120对接收模块110得到的用户活动数据进行数学处理,以确定各任务单元的执行结果数据。再依据各相应任务单元相对应的评价基准数据,通过评价模块130对转化模块120得到的执行结果数据进行评价,确定与评价基准数据相对应的评价结果数据。根据与各任务单元对应的预设条件,通过更新模块140在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,并生成新的任务计划表。最后通过发送模块150向该可穿戴设备推送该新的任务计划表。The present invention also provides a wearable device task plan adjustment server, including a first processor, which is used to execute the wearable device task plan adjustment method of the above embodiment. If the user activity data uploaded by the wearable device is received by the receiving module 110, the user activity data is acquired according to each corresponding task unit in the original task schedule. The user activity data obtained by the receiving module 110 is mathematically processed by the conversion module 120 in units of the task unit to determine execution result data of each task unit. Further, based on the evaluation reference data corresponding to each corresponding task unit, the evaluation result data obtained by the conversion module 120 is evaluated by the evaluation module 130, and the evaluation result data corresponding to the evaluation reference data is determined. The setting of the task unit corresponding to the evaluation result data is adjusted in the original task schedule by the update module 140 according to a preset condition corresponding to each task unit, and a new task schedule is generated. Finally, the new task schedule is pushed to the wearable device by the sending module 150.
本发明又一种实施例中提供的可穿戴设备任务计划调整方法,如图6所示,包括下列步骤:The wearable device task plan adjustment method provided in still another embodiment of the present invention, as shown in FIG. 6, includes the following steps:
S210:根据从云端服务器接收的原始任务计划表中的各任务单元设置本机任务计划。S210: Set a local task plan according to each task unit in the original task schedule received from the cloud server.
用户在用户端选择云端服务器上提供的任务计划表,从上面确定并下载下来之后就有了原始任务计划表,用户端根据这一原始任务计划表中的个任务单元设置好本机即将执行的任务计划,比如控制好闹钟、相关传感器等。The user selects the task schedule provided on the cloud server at the user end, and after determining and downloading from the above, there is an original task schedule, and the user sets the unit to be executed according to the task units in the original task schedule. Mission planning, such as controlling alarm clocks, related sensors, etc.
S220:在各任务单元所指定的时间执行该任务单元所指定的计划指令,获取相应的用户活动数据。S220: execute a planning instruction specified by the task unit at a time specified by each task unit, and acquire corresponding user activity data.
根据本机给各任务单元分配的时间节点,控制相关的元件,在指定的时间执行任务单元所指定的计划指令,并且获取到相对应的用户活动数据。比如闹钟在“起床计划”指定的“7:00”开始发声提醒,并记录闹钟关闭的时间,地理位置传感器获取本机所处位置,心率传感器和加速度传感器判断用户活动状态(起床活动状态,或是睡眠状态)。优选的,任务单元包括任务目的内容、任务执行检测开始指令、任务执行检测结束指令,任务执行检测开始指令为开始检测任务目的内容执行的指令,任务执行检测结束指令为停止检测所述任务目的内容执行的指令。进一步优选的,在任务单元中加入任务执行提示指令,以便在开启设备的提示功能模块提醒用户执行所述任务目的 内容,例如任务执行检测开始指令的时间为“7:00”,在“6:55”设置一个对应的任务执行提示指令让设备提醒功能工作提醒用户准备执行任务单元的内容,更充分地保证任务的完成。According to the time node assigned to each task unit by the local machine, the related component is controlled, the planning instruction specified by the task unit is executed at the specified time, and the corresponding user activity data is acquired. For example, the alarm starts to sound the alarm at the "7:00" specified by the "Get Up Program", and records the time when the alarm is turned off. The geographical location sensor obtains the position of the local machine, the heart rate sensor and the acceleration sensor determine the user's activity status (the state of getting up, or Is a sleep state). Preferably, the task unit includes a task purpose content, a task execution detection start instruction, and a task execution detection end instruction, the task execution detection start instruction is an instruction to start the detection task purpose content execution, and the task execution detection end instruction is to stop detecting the task purpose content. Executed instructions. Further preferably, the task execution prompt instruction is added to the task unit, so that the prompt function module of the device is turned on to remind the user to perform the task purpose content, for example, the time for the task execution detection start instruction is “7:00”, at “6: 55" sets a corresponding task execution prompt instruction to let the device reminder function work to remind the user to prepare to execute the content of the task unit, and more fully guarantee the completion of the task.
优选的,本机任务计划包括任务提示时间、传感器开启时间和传感器关闭时间,所述任务提示时间根据所述任务目的内容提前预定时间设置,所述传感器开启时间根据任务执行检测开始指令设置,所述传感器关闭时间根据所述任务执行检测结束指令设置。上文所述的指令提供给设备执行,而此处所述本机任务计划内容可提供给用户阅读,供以为执行指导和修改参考。Preferably, the local task plan includes a task prompt time, a sensor open time, and a sensor close time, wherein the task prompt time is set according to the task purpose content in advance, and the sensor open time is set according to the task execution detection start instruction. The sensor off time is set according to the task execution detection end command. The instructions described above are provided for execution by the device, and the native task plan content described herein can be provided to the user for reading, for the purpose of performing the guidance and modifying the reference.
优选的,用户活动数据由计划指令指定的传感器获得,包括用户活动的执行时间、执行地点和/或与用户活动相对应的传感器数据,用以确定相对应的所述任务单元得以执行并据以得到的执行结果数据。Preferably, the user activity data is obtained by a sensor specified by the planning instruction, including the execution time of the user activity, the execution location, and/or sensor data corresponding to the user activity, to determine that the corresponding task unit is executed and The resulting result data.
S230:向云端服务器上传所述用户活动数据以供制定相应的评价结果信息和/或新的任务计划表。S230: Upload the user activity data to the cloud server for formulating corresponding evaluation result information and/or a new task schedule.
本机将采集到的用户活动数据上传到云端服务器上,服务器对这些用户活动数据进行分析处理并制定出评价结果信息,或者得出新的任务计划表。这些用户活动数据的内容上文已经提及,在此不再赘述。上传用户活动数据的方式有两种,一种为采集到一项用户活动数据后立即向服务器上传,此方法要求的用户设备内存小,对数据存储的任务交由服务器进行,但此方法需要在网络覆盖情况比较好的地区,否则可能造成数据丢失。另外一种用户活动数据上传的方式是将该数据在一定的设定时间后集中上传,这一方式对用户的设备要求高,但对网络要求低,在收集到用户的活动数据之后将其存储在设备中,待经过设定的时间集中上传,例如通过家庭WIFI上传。The machine uploads the collected user activity data to the cloud server, and the server analyzes and processes the user activity data and formulates the evaluation result information, or obtains a new task schedule. The contents of these user activity data have been mentioned above and will not be described here. There are two ways to upload user activity data. One method is to upload to a server immediately after collecting a user activity data. The user equipment required by this method has small memory, and the task of data storage is performed by the server, but this method needs to be Areas with good network coverage may cause data loss. Another way to upload user activity data is to upload the data in a centralized manner after a certain set time. This method has high requirements on the user's device, but has low network requirements, and stores the user's activity data after collecting it. In the device, the time to be set is to be uploaded in a centralized manner, for example, through a home WIFI.
优选的,上传在设备检测到网络信号满足预设信号强度时进行。无论是移动通信网络供应商提供的网络信号还是室内WIFI信号,都存在信号强弱的问题,移动通信设备往往处于移动状态,不同地点信号强弱不同,如果信号较弱可能造成上传数据失败,因此选择在系统检测到的网络信号满足一定的信号强度时再进行,以此进一步保证上传数据的顺利进行。Preferably, the uploading is performed when the device detects that the network signal meets the preset signal strength. Whether it is a network signal provided by a mobile communication network provider or an indoor WIFI signal, there is a problem of signal strength. The mobile communication device is often in a mobile state, and the signal strength is different in different places. If the signal is weak, the upload data may fail, so Select the network signal detected by the system to meet a certain signal strength, so as to further ensure the smooth progress of the uploaded data.
S240:获取云端服务器依据用户活动数据的评价结果信息和/或新的任务计划表,相应显示结果信息和/或替换原始任务计划表。S240: Acquire the evaluation result information and/or the new task schedule of the cloud server according to the user activity data, and display the result information and/or replace the original task schedule table accordingly.
待云端服务器将数据处理完成后得出评价结果,用户可以得知使用者对活动任务的完成状况,如果用某些评价媒介如分数,可以得知使用者的得分,或者用更形象的表示方式,例如获得某项虚拟礼物作为奖励(小红花,小红 旗等)。或者得出更加符合执行实际的新的任务计划表,根据使用者的实际表现适当提高或者降低任务计划的难度,力图做到循序渐进式进行习惯培养。显示结果信息和替换原始任务计划表可以分别单独进行,也可以合并执行。After the cloud server completes the data processing and obtains the evaluation result, the user can know the user's completion status of the activity task. If some evaluation media such as a score is used, the user's score can be known, or a more vivid representation manner can be used. For example, get a virtual gift as a reward (small red flower, small red flag, etc.). Or get a new task schedule that is more in line with the actual implementation, and appropriately improve or reduce the difficulty of the mission plan according to the actual performance of the user, and try to carry out the customary training step by step. The display result information and the replacement original task schedule can be performed separately or in combination.
优选的,显示所述结果信息的步骤包括:将评价结果信息与特定虚拟物品相对应;显示所述虚拟物品。虚拟物品为小红花、小红旗、小金鱼等等,不同程度的评价结果信息对应不同数量的虚拟物品,使得设备界面更加美观,也使任务执行更加有趣。Preferably, the step of displaying the result information comprises: matching the evaluation result information with a specific virtual item; displaying the virtual item. The virtual items are small red flowers, small red flags, small goldfish, etc., and different levels of evaluation result information correspond to different numbers of virtual items, so that the device interface is more beautiful, and the task execution is more interesting.
优选的,如图7,对于步骤S210,设置本机任务计划的步骤还包括:Preferably, as shown in FIG. 7, for step S210, the step of setting the local task plan further includes:
S211:确认任务计划表修改权限验证信息。S211: Confirm the task schedule to modify the authority verification information.
当需要对获取到的任务计划表进行修改时,编辑之前先输入修改权限验证信息,以便修改完成后与服务器上的对应账户相匹配。When you need to modify the acquired task schedule, enter the edit permission verification information before editing, so that the modification matches the corresponding account on the server.
S212:对原始任务计划表中的特定任务单元进行修改。根据用户自身需要对从服务器端下载得到的任务计划表进行修改,可以修改其中某些任务单元中的参数,也可以对任务单元进行删除或增加任务细节。S212: Modify a specific task unit in the original task schedule. Modifying the task schedule downloaded from the server according to the user's own needs, you can modify the parameters in some of the task units, or delete the task unit or add task details.
S213:根据修改后的任务计划表中各任务单元设置本机任务计划,并将所述修改后的任务计划表上传到服务器。S213: Set a local task plan according to each task unit in the modified task schedule, and upload the modified task schedule to the server.
修改完成任务计划表之后需要确认执行,设备依据任务计划表中各任务单元的设置来配备本机需要执行的任务计划,同时,需要将修改后的任务计划表上传到服务器,使服务器与本机用户使用的任务计划表相一致,以便于相应显示用户执行任务单元获得的评价结果信息和/或对任务计划表进行更新版本的替换。After modifying the task schedule, you need to confirm the execution. The device is equipped with the task plan that the machine needs to perform according to the settings of each task unit in the task schedule. At the same time, the modified task schedule needs to be uploaded to the server to make the server and the machine. The task schedules used by the user are consistent so as to correspondingly display the evaluation result information obtained by the user performing the task unit and/or the replacement of the updated version of the task schedule.
适应前述的方法,基于计算机模块化思维,本发明的又一实施例提供一种可穿戴设备任务计划调整装置,如图8所示,包括:In accordance with the foregoing method, another embodiment of the present invention provides a device for adjusting a task plan of a wearable device, as shown in FIG.
接收模块210,用于根据从云端服务器接收的原始任务计划表中的各任务单元设置本机任务计划。用户在用户端选择云端服务器上提供的任务计划表,接收模块210从上面确定并下载下来之后就有了原始任务计划表,用户端根据这一原始任务计划表中的各任务单元设置好本机即将执行的任务计划,比如控制好闹钟、相关传感器等。The receiving module 210 is configured to set a local task plan according to each task unit in the original task schedule received from the cloud server. The user selects the task schedule provided on the cloud server at the user end, and after the receiving module 210 determines and downloads from the above, the original task schedule is obtained, and the user sets the local machine according to each task unit in the original task schedule. The mission plan to be executed, such as controlling the alarm clock, related sensors, etc.
执行模块220,在各任务单元所指定的时间执行该任务单元所指定的计划指令,获取相应的用户活动数据。执行模块220根据本机给各任务单元分配的时间节点,控制相关的元件,在指定的时间执行任务单元所指定的计划 指令,并且获取到相对应的用户活动数据。The execution module 220 executes the planning instruction specified by the task unit at a time specified by each task unit, and acquires corresponding user activity data. The execution module 220 controls the related components according to the time node assigned to each task unit by the local machine, executes the planning instruction specified by the task unit at a specified time, and acquires corresponding user activity data.
上传模块230,向云端服务器上传所述用户活动数据。本机将采集到的用户活动数据通过上传模块230上传到云端服务器上,上传的方式有两种,一种为采集到一项用户活动数据后立即向服务器上传,此方法要求的用户设备内存小,对数据存储的任务交由服务器进行,但此方法需要在网络覆盖情况比较好的地区,否则可能造成数据丢失。另外一种用户活动数据上传的方式是将该数据在一定的设定时间后集中上传,这一方式对用户的设备要求高,但对网络要求低,在收集到用户的活动数据之后将其存储在设备中,待经过设定的时间集中上传,例如通过家庭WIFI上传。The uploading module 230 uploads the user activity data to the cloud server. The user uploads the collected user activity data to the cloud server through the uploading module 230. There are two methods for uploading, and one is uploaded to the server immediately after collecting a user activity data, and the user equipment required by the method is small. The task of data storage is left to the server, but this method needs to be in a region with good network coverage, otherwise data loss may occur. Another way to upload user activity data is to upload the data in a centralized manner after a certain set time. This method has high requirements on the user's device, but has low network requirements, and stores the user's activity data after collecting it. In the device, the time to be set is to be uploaded in a centralized manner, for example, through a home WIFI.
获取模块240,用于获取云端服务器依据所述用户活动数据的评价结果信息和/或新的任务计划表,相应显示所述结果信息和/或替换所述原始任务计划表。待云端服务器将数据处理完成后得出评价结果,用户通过获取模块240可以得知使用者对活动任务的完成状况,如果用某些评价媒介如分数,可以得知使用者的得分,或者用更形象的表示方式,例如获得某项虚拟礼物作为奖励(小红花,小红旗等)。或者得出更加符合执行实际的新的任务计划表后,获取模块240将其替换原始任务计划表,根据使用者的实际表现适当提高或者降低任务计划的难度,力图做到进行循序渐进式习惯培养。显示结果信息和替换原始任务计划表可以分别单独进行,也可以合并执行。The obtaining module 240 is configured to obtain the evaluation result information and/or the new task schedule of the cloud server according to the user activity data, and display the result information and/or replace the original task schedule table accordingly. After the cloud server completes the data processing, the evaluation result is obtained, and the user can know the completion status of the activity task by the user through the obtaining module 240. If some evaluation media such as a score is used, the user's score can be known, or the user can be used. The representation of the image, such as obtaining a virtual gift as a reward (small red flower, small red flag, etc.). Or, after obtaining a new task schedule that is more in line with the actual implementation, the acquisition module 240 replaces the original task schedule table, and appropriately raises or reduces the difficulty of the task plan according to the actual performance of the user, and tries to perform the step-by-step habit cultivation. The display result information and the replacement original task schedule can be performed separately or in combination.
本发明同时根据上述另一实施例所述的方法提供一种可穿戴设备,包括第二处理器,该第二处理器用于执行如另一实施例所述的可穿戴设备任务计划调整方法。接收模块210根据从云端服务器接收的原始任务计划表中的各任务单元设置本机任务计划。执行模块220在各任务单元所指定的时间执行该任务单元所指定的计划指令,获取相应的用户活动数据,再通过上传模块230向云端服务器上传所述用户活动数据。待服务器将数据处理后得到结果,通过获取模块240获取云端服务器依据所述用户活动数据的评价结果信息和/或新的任务计划表,相应显示所述结果信息和/或替换所述原始任务计划表。最终实现对任务计划表循序渐进式的更新。The present invention provides a wearable device according to the method described in another embodiment, including a second processor, which is configured to perform a wearable device task plan adjustment method according to another embodiment. The receiving module 210 sets a local task plan according to each task unit in the original task schedule received from the cloud server. The execution module 220 executes the planning instruction specified by the task unit at the time specified by each task unit, acquires corresponding user activity data, and uploads the user activity data to the cloud server through the uploading module 230. After the server processes the data to obtain a result, the obtaining module 240 acquires the evaluation result information of the cloud server according to the user activity data and/or a new task schedule, and displays the result information and/or replaces the original task plan. table. The final implementation of the task schedule is a step-by-step update.
为便于本领域技术人员更容易理解本发明的实现方式,以下示例叙述实际场景中如何完成可穿戴设备任务计划的调整。To facilitate an understanding of the implementation of the present invention by those skilled in the art, the following examples describe how to complete the adjustment of the wearable device mission plan in an actual scenario.
可穿戴设备任务计划调整服务器在某一界面上提供根据各种年龄段,各种家庭情况或者心理学研究成果制定出的各种方面的习惯养成任务计划,比 如有“起床计划”、“午睡计划”、“晚安计划”、“朗读计划”和/或“运动计划”等等。该服务器检测到某一用户确定选择某一任务计划,之后又检测到该用户希望修改该任务计划的申请并提交修改后的任务计划表,服务器验证通过了该用户的修改权限,接收并更新为修改后的任务计划表。用户在可穿戴设备上,或者其他用户端上对其选择的任务计划进行修改,完成后提交给服务器。当服务器确认该用户在可穿戴设备上执行的任务计划包含三个任务单元如“起床计划”、“午睡计划”和“晚安计划”,培养计划的时间周期为10天,执行地点分别在家中、幼儿园中和家中,培养计划中各任务单元执行情况的检测时间分别为“7:30”、“13:00”和“21:00”,家长可以提前告知自己的孩子要在这一时间点或者这一时间点之前的某一时刻执行各项任务单元,也可在可穿戴设备上设置提醒,比如在任务计划表中增加提醒时间选项,与前文相对应的提醒时间分别为“7:20”、“12:50”和“20:50”。按照提前约定的方式,服务器获取到可穿戴设备上传输过来的用户活动数据,比如某一天中上述三个任务单元的执行时间为“8:00”、“13:10”、“21:30”,服务器按照一定规则将其转化为执行结果数据,经过任务计划表中该任务的执行周期之后,将执行结果数据汇总统计并将其与既定的预设条件相比较,以任务单元“起床计划”为例,用户有7次起床时间超过任务计划表中评价基准数据20分钟,符合将该任务单元中评价基准数据修改为“7:40”或者将任务单元中提醒时间修改为“7:10”的条件,因此服务器推出跟该用户实际执行结果相适应的新的任务计划表,并将该新的任务计划表推送给相应的用户。The wearable device task plan adjustment server provides a variety of habit development task plans based on various age groups, various family situations or psychological research results on a certain interface, such as "getting up plan", "napping" Plan, "Good Night Plan", "Reading Plan" and / or "Sport Plan" and so on. The server detects that a certain user determines to select a certain task plan, and then detects that the user wishes to modify the application of the task plan and submits the modified task schedule, and the server verifies that the user's modification permission is passed, and is received and updated as The revised mission schedule. The user modifies the task plan selected by the user on the wearable device or other client, and submits it to the server after completion. When the server confirms that the task plan performed by the user on the wearable device includes three task units such as "get up plan", "napping plan" and "night plan", the training plan has a time period of 10 days, and the execution place is at home, In the kindergarten and at home, the detection time of each task unit in the training plan is “7:30”, “13:00” and “21:00” respectively. Parents can inform their children in advance at this time or The task unit is executed at a certain time before this time point, and the reminder can also be set on the wearable device, for example, the reminder time option is added to the task schedule table, and the reminder time corresponding to the previous text is “7:20” respectively. , "12:50" and "20:50". According to the method agreed in advance, the server obtains the user activity data transmitted on the wearable device. For example, the execution time of the above three task units in a certain day is "8:00", "13:10", "21:30". The server converts it into execution result data according to certain rules. After the execution period of the task in the task schedule, the result data summary statistics are executed and compared with the predetermined preset conditions, and the task unit "gets up plan" For example, the user has 7 wake-up times exceeding the evaluation baseline data in the task schedule for 20 minutes, which is equivalent to modifying the evaluation reference data in the task unit to "7:40" or modifying the reminder time in the task unit to "7:10". The condition, so the server launches a new task schedule that is appropriate for the actual execution of the user and pushes the new task schedule to the appropriate user.
当然,也可以是这样的过程:Of course, it can also be a process like this:
某一用户(某家长)首先通过浏览服务器上提供的任务计划,选择其中最接近浏览时使用者(该家长的孩子)实际情况的任务计划表并将其下载到使用者正在使用的可穿戴设备上,在有需要的情况下,用户希望对任务计划表中某些信息进行更加具有适应性的更改,就点击修改选项,打开后会有修改权限验证的环节,家长输入密码口令,通过权限验证环节并对某一任务计划表进行修改,修改后形成一份新的任务计划表,使用者依据该新的任务计划表执行,同时服务器上也同时显示出该用户账户下正在执行的新的任务计划表。该任务计划表上有三项习惯培养计划,分别为“起床计划”、“健康午睡”和“晚安计划”,培养计划的时间周期为10天,执行地点分别在家中、 幼儿园中和家中,培养计划中各任务单元执行情况的开始检测时间分别为“7:30”、“13:00”和“21:00”(家长可以提前告知自己的孩子要在这一时间点或者这一时间点之前的某一时刻执行各项任务单元,也可在可穿戴设备上设置提醒,比如在任务计划表的各任务单元中增加提醒时间选项,与前文相对应的提醒时间分别为“7:20”、“12:50”和“20:50”),结束检测时间分别为“8:30”、“14:00”、“22:00”。可穿戴设备按照上述时间点开启相关传感器或者元器件开始采集数据,并选择在每天的22:00向服务器自动上传这些采集到的数据,一个计划时间周期也即10天过后,可穿戴设备收到服务器发送过来的评价信息,上面显示出使用者对之前选择的任务计划的执行结果如何,并提供更新后的任务计划表,如果使用者完成非常好,可以采用延长培养计划时间周期继续执行,也可以修改相应选项,选择难度大一些的更科学的培养计划继续执行。如果使用者不能够做到各任务单元规定的内容,达到原先设置的一定标准,比如早晨晚起床20分钟的次数超过7次,则将各任务单元执行情况的检测时间更新到“7:40”,或是将任务计划表中的提醒时间更新为“7:10”,将这些相关内容更新后可穿戴设备接收到并加以在新的执行周期中执行。A user (a parent) first selects the task schedule that is closest to the user of the browsing (the parent's child) and downloads it to the wearable device that the user is using by browsing the task plan provided on the server. On the other hand, if there is a need, the user wants to make more adaptive changes to certain information in the task schedule. Click on the modify option. After opening, there will be a link to verify the permission. The parent enters the password and password. Linking and modifying a task schedule, and modifying to form a new task schedule, the user executes according to the new task schedule, and the server also displays the new task being executed under the user account. Schedules. There are three habits in the mission plan, namely “Getting Up Program”, “Healthy Napping” and “Good Night Plan”. The training period is 10 days, and the execution place is at home, kindergarten and home. The start detection time of each task unit execution is “7:30”, “13:00” and “21:00” (parents can inform their children in advance at this point in time or before this point in time) The task unit can be executed at a certain time, and the reminder can also be set on the wearable device. For example, the reminder time option is added to each task unit of the task schedule, and the reminder time corresponding to the previous text is “7:20”, respectively. 12:50" and "20:50"), the end detection time is "8:30", "14:00", "22:00". The wearable device starts to collect data according to the above-mentioned time points, and selects to automatically upload the collected data to the server at 22:00 every day. After a planned time period, that is, 10 days later, the wearable device receives the data. The evaluation information sent by the server shows the execution result of the user's selected task plan and provides the updated task schedule. If the user finishes very well, the extended training plan period can be used to continue the execution. You can modify the options and choose a more scientific and more scientific development plan to continue. If the user can not achieve the content specified in each task unit and reach the certain standard set by the original, such as more than 7 times of getting up in the morning and evening for 20 minutes, the detection time of each task unit execution is updated to "7:40". Or update the reminder time in the task schedule to "7:10", and update the relevant content to the wearable device and execute it in the new execution cycle.
图9示出了可以实现根据本发明的一种可穿戴设备任务计划调整方法中的服务器或可穿戴设备(下述将服务器或可穿戴设备称为设备)。该设备传统上包括处理器1010和以存储器1020形式的计算机程序产品或者计算机可读介质。存储器1020可以是诸如闪存、EEPROM(电可擦除可编程只读存储器)、EPROM、硬盘或者ROM之类的电子存储器。存储器1020具有用于执行上述方法中的任何方法步骤的程序代码1031的存储空间1030。例如,用于程序代码的存储空间1030可以包括分别用于实现上面的方法中的各种步骤的各个程序代码1031。这些程序代码可以从一个或者多个计算机程序产品中读出或者写入到这一个或者多个计算机程序产品中。这些计算机程序产品包括诸如硬盘,紧致盘(CD)、存储卡或者软盘之类的程序代码载体。这样的计算机程序产品通常为如参考图10所述的便携式或者固定存储单元。该存储单元可以具有与图9中的存储器1020类似布置的存储段或者存储空间等。程序代码可以例如以适当形式进行压缩。通常,存储单元包括用于执行根据本发明的方法步骤的程序代码1031’,即可以由例如诸如1010之类的处理器读取的代码,这些代码当由设备运行时,导致该 设备执行上面所描述的方法中的各个步骤。FIG. 9 illustrates a server or a wearable device (hereinafter referred to as a server or a wearable device as a device) in a wearable device task plan adjustment method according to the present invention. The device conventionally includes a processor 1010 and a computer program product or computer readable medium in the form of a memory 1020. The memory 1020 may be an electronic memory such as a flash memory, an EEPROM (Electrically Erasable Programmable Read Only Memory), an EPROM, a hard disk, or a ROM. The memory 1020 has a memory space 1030 for executing program code 1031 of any of the above method steps. For example, storage space 1030 for program code may include various program code 1031 for implementing various steps in the above methods, respectively. The program code can be read from or written to one or more computer program products. These computer program products include program code carriers such as hard disks, compact disks (CDs), memory cards or floppy disks. Such a computer program product is typically a portable or fixed storage unit as described with reference to FIG. The storage unit may have a storage section or a storage space or the like arranged similarly to the storage 1020 in FIG. The program code can be compressed, for example, in an appropriate form. Typically, the storage unit comprises program code 1031' for performing the steps of the method according to the invention, ie code that can be read by, for example, a processor such as 1010, which when executed by the device causes the device to perform the above Each step in the described method.
本技术领域技术人员可以理解,可以用计算机程序指令来实现这些结构图和/或框图和/或流图中的每个框以及这些结构图和/或框图和/或流图中的框的组合。本技术领域技术人员可以理解,可以将这些计算机程序指令提供给通用计算机、专业计算机或其他可编程数据处理方法的处理器来实现,从而通过计算机或其他可编程数据处理方法的处理器来执行本发明公开的结构图和/或框图和/或流图的框或多个框中指定的方案。Those skilled in the art will appreciate that each block of the block diagrams and/or block diagrams and/or flow diagrams and combinations of blocks in the block diagrams and/or block diagrams and/or flow diagrams can be implemented by computer program instructions. . Those skilled in the art will appreciate that these computer program instructions can be implemented by a general purpose computer, a professional computer, or a processor of other programmable data processing methods, such that the processor is executed by a computer or other programmable data processing method. The blocks of the disclosed structure and/or block diagrams and/or flow diagrams or blocks specified in the various blocks.
本技术领域技术人员可以理解,本发明中已经讨论过的各种操作、方法、流程中的步骤、措施、方案可以被交替、更改、组合或删除。进一步地,具有本发明中已经讨论过的各种操作、方法、流程中的其他步骤、措施、方案也可以被交替、更改、重排、分解、组合或删除。进一步地,现有技术中的具有与本发明中公开的各种操作、方法、流程中的步骤、措施、方案也可以被交替、更改、重排、分解、组合或删除。Those skilled in the art can understand that the steps, measures, and solutions in the various operations, methods, and processes that have been discussed in the present invention may be alternated, changed, combined, or deleted. Further, other steps, measures, and schemes of the various operations, methods, and processes that have been discussed in the present invention may be alternated, modified, rearranged, decomposed, combined, or deleted. Further, the steps, measures, and solutions in the prior art having various operations, methods, and processes disclosed in the present invention may also be alternated, changed, rearranged, decomposed, combined, or deleted.
以上所述仅是本发明的部分实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a part of the embodiments of the present invention, and it should be noted that those skilled in the art can also make several improvements and retouchings without departing from the principles of the present invention. It should be considered as the scope of protection of the present invention.

Claims (30)

  1. 一种可穿戴设备任务计划调整方法,包括下列步骤:A method for adjusting a wearable device task plan, comprising the following steps:
    接收可穿戴设备上传的用户活动数据,所述用户活动数据根据原始任务计划表中各相对应的任务单元获取;Receiving user activity data uploaded by the wearable device, where the user activity data is acquired according to each corresponding task unit in the original task schedule;
    以所述任务单元为单位对其相关的用户活动数据进行数学处理,以确定各任务单元的执行结果数据;Performing mathematical processing on the relevant user activity data in units of the task unit to determine execution result data of each task unit;
    依据各相应任务单元相对应的评价基准数据,对各任务单元相对应的执行结果数据进行评价,确定与所述评价基准数据相对应的评价结果数据;Performing evaluation result data corresponding to each task unit according to the evaluation reference data corresponding to each corresponding task unit, and determining evaluation result data corresponding to the evaluation reference data;
    依据与任务单元对应的预设条件,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,生成新的任务计划表;Adjusting a setting of a task unit corresponding to the evaluation result data in the original task schedule according to a preset condition corresponding to the task unit, and generating a new task schedule;
    向该可穿戴设备推送该新的任务计划表。Push the new task schedule to the wearable device.
  2. 根据权利要求1所述的可穿戴设备任务计划调整方法,其特征在于,所述依据与任务单元对应的预设条件,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置的步骤具体包括:The wearable device task plan adjustment method according to claim 1, wherein the setting of the task unit corresponding to the evaluation result data is adjusted in the original task schedule according to the preset condition corresponding to the task unit The steps specifically include:
    所述预设条件包括一个或多个表达式,每个表达式包括设定数值范围及与设定数值范围相对应的调整任务单元的映射,当所述评价结果数据在所述预设条件中的一个表达式的设定数值范围内,依据所述映射调整与所述评价结果数据对应的任务单元。The preset condition includes one or more expressions, each expression including a set value range and a mapping of an adjustment task unit corresponding to the set value range, when the evaluation result data is in the preset condition Within the set value range of one of the expressions, the task unit corresponding to the evaluation result data is adjusted in accordance with the map.
  3. 根据权利要求2所述的可穿戴设备任务计划调整方法,其特征在于,所述设定数值范围为预设评价累积次数区间,所述相对应的任务单元的映射为当对各任务单元相对应的执行结果数据进行评价的累积评价次数在所述预设评价累积次数区间内,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,生成新的任务计划表。The wearable device task plan adjustment method according to claim 2, wherein the set value range is a preset evaluation cumulative number interval, and the mapping of the corresponding task unit is corresponding to each task unit. The cumulative evaluation number of the execution result data evaluation is within the preset evaluation cumulative number interval, and the setting of the task unit corresponding to the evaluation result data is adjusted in the original task schedule to generate a new task schedule.
  4. 根据权利要求2所述的可穿戴设备任务计划调整方法,其特征在于,所述对各任务单元相对应的执行结果数据进行评价的步骤包括:The method of claim 2, wherein the step of evaluating the execution result data corresponding to each task unit comprises:
    将所述执行结果数据与所述评价基准数据按照彼此的数据区块对应进行比较,得出比较幅度数据;Comparing the execution result data and the evaluation reference data according to each other's data block correspondence to obtain comparison amplitude data;
    依据所述评价基准数据中的评价规则,将所述比较幅度数据转化为评价结果数据。The comparison amplitude data is converted into evaluation result data according to an evaluation rule in the evaluation reference data.
  5. 根据权利要求4所述的可穿戴设备任务计划调整方法,其特征在于,所述评价规则如下:当所述比较幅度数据满足特定预设数据范围,即给出与所述特定预设数据范围相对应的评价分数;The wearable device task plan adjustment method according to claim 4, wherein the evaluation rule is as follows: when the comparison amplitude data satisfies a specific preset data range, that is, the specific preset data range is given Corresponding evaluation score;
    当至少一个所述任务单元所对应的评价分数满足与该任务单元相应的预设条件中设置的特定分数时,调整与该评价分数相对应的任务单元的设置,生成新的任务计划表。When the evaluation score corresponding to the at least one of the task units satisfies the specific score set in the preset condition corresponding to the task unit, the setting of the task unit corresponding to the evaluation score is adjusted to generate a new task schedule.
  6. 根据权利要求1所述的可穿戴设备任务计划调整方法,其特征在于,所述任务单元包括任务目的内容、任务执行检测开始时间、任务执行检测结束时间,所述任务执行检测开始时间为开始检测所述任务目的内容执行的时刻,所述任务执行检测结束时间为停止检测所述任务目的内容执行的时刻;所述用户活动数据获取的步骤如下:The wearable device task plan adjustment method according to claim 1, wherein the task unit includes task purpose content, task execution detection start time, task execution detection end time, and the task execution detection start time is start detection. The time at which the content of the task object is executed, the task execution detection end time is a time at which the execution of the content of the task object is stopped; the steps of acquiring the user activity data are as follows:
    到达任务执行检测开始时间,启动与所述任务目的内容相关的传感器并记录数据;Reaching the task execution detection start time, starting the sensor related to the task purpose content and recording the data;
    到达任务执行检测结束时间,关闭该传感器并停止记录数据,记录到的数据即为用户活动数据。When the task execution detection end time is reached, the sensor is turned off and the data is stopped, and the recorded data is the user activity data.
  7. 根据权利要求6所述的可穿戴设备任务计划调整方法,其特征在于,所述用户活动数据包括用户活动的执行时间、执行地点和/或与用户活动相对应的传感器数据,将所述用户活动的执行时间进行数学处理得到执行结果数据的时间数据部分,和/或The wearable device task plan adjustment method according to claim 6, wherein the user activity data includes an execution time of a user activity, an execution location, and/or sensor data corresponding to the user activity, and the user activity is performed. The execution time is mathematically processed to obtain the time data portion of the execution result data, and/or
    将所述用户活动的执行地点进行数学处理得到执行结果数据的地理位置数据部分,和/或Performing mathematical processing on the execution location of the user activity to obtain a geographic location data portion of the execution result data, and/or
    将所述与用户活动相对应的传感器数据进行数学处理得到执行结果数据的活动内容数据部分。The sensor data corresponding to the user activity is mathematically processed to obtain an active content data portion of the execution result data.
  8. 根据权利要求7所述的可穿戴设备任务计划调整方法,其特征在于,所述用户活动数据的执行时间包含于所述任务单元的任务执行检测开始时间与任务执行检测结束时间之间。The wearable device task plan adjustment method according to claim 7, wherein the execution time of the user activity data is included between a task execution detection start time of the task unit and a task execution detection end time.
  9. 根据权利要求1所述的可穿戴设备任务计划调整方法,其特征在于,实施所述数学处理的过程中,对所述用户活动数据中来源于不同传感器的原始数据分别适用不同的预设规则或预设算法进行数据加工处理,从而获得所述执行结果数据。The wearable device task plan adjustment method according to claim 1, wherein in the process of performing the mathematical process, different preset rules are applied to the original data derived from different sensors in the user activity data or The preset algorithm performs data processing processing to obtain the execution result data.
  10. 根据权利要求1所述的可穿戴设备任务计划调整方法,其特征在于,向该可穿戴设备推送该新的任务计划表的步骤之后还包括:The wearable device task plan adjustment method according to claim 1, wherein the step of pushing the new task schedule to the wearable device further comprises:
    发送所述新的任务计划表到用户端;Sending the new task schedule to the client;
    获取到用户端提交的针对所述新的任务计划表进行修改后得到的修改后任务计划表,解析所述修改后任务计划表中的权限信息;Obtaining a modified task schedule obtained by modifying the new task schedule submitted by the client, and parsing the permission information in the modified task schedule;
    若所述权限信息与预存权限信息匹配,以所述修改后任务计划表对应更新已储存的所述新的任务计划表。If the rights information matches the pre-stored rights information, the saved new task plan table is updated corresponding to the modified task plan table.
  11. 根据权利要求10所述的可穿戴设备任务计划调整方法,其特征在于,所述权限信息为密码、实时验证码或特定生物特征中的至少一种。The wearable device task plan adjustment method according to claim 10, wherein the authority information is at least one of a password, a real-time verification code, or a specific biometric.
  12. 根据权利要求1所述的可穿戴设备任务计划调整方法,其特征在于,所述用户活动数据的上传方式为实时上传,或The method for adjusting a task plan of a wearable device according to claim 1, wherein the uploading method of the user activity data is real-time uploading, or
    在所述用户活动数据形成后的预定时间上传。Uploaded at a predetermined time after the user activity data is formed.
  13. 根据权利要求1所述的可穿戴设备任务计划调整方法,其特征在于,所述任务计划表还包括用户界面皮肤主题信息,该用户界面为用于执行所述任务计划表中的计划任务相关的用户界面。The wearable device task plan adjustment method according to claim 1, wherein the task schedule further includes user interface skin theme information, wherein the user interface is related to executing a scheduled task in the task schedule User Interface.
  14. 一种可穿戴设备任务计划调整方法,包括下列步骤:A method for adjusting a wearable device task plan, comprising the following steps:
    根据从云端服务器接收的原始任务计划表中的各任务单元设置本机任务计划;Setting a local task plan based on each task unit in the original task schedule received from the cloud server;
    在各任务单元所指定的时间执行该任务单元所指定的计划指令,获取相应的用户活动数据;Execute the planning instruction specified by the task unit at a time specified by each task unit, and obtain corresponding user activity data;
    向云端服务器上传所述用户活动数据以供制定相应的评价结果信息和/或新的任务计划表;Uploading the user activity data to the cloud server for formulating corresponding evaluation result information and/or a new task schedule;
    获取云端服务器依据所述用户活动数据的评价结果信息和/或新的任务计划表,相应显示所述评价结果信息和/或替换所述原始任务计划表。Obtaining the evaluation result information and/or the new task schedule of the cloud server according to the user activity data, respectively displaying the evaluation result information and/or replacing the original task schedule.
  15. 根据权利要求14所述的可穿戴设备任务计划调整方法,其特征在于,所述任务单元包括任务目的内容、任务执行检测开始指令、任务执行检测结束指令,所述任务执行检测开始指令为开始检测所述任务目的内容执行的指令,所述任务执行检测结束指令为停止检测所述任务目的内容执行的指令。The wearable device task plan adjustment method according to claim 14, wherein the task unit includes a task purpose content, a task execution detection start instruction, and a task execution detection end instruction, and the task execution detection start instruction is to start detection. And the task execution detection end instruction is an instruction to stop detecting the execution of the task destination content.
  16. 根据权利要求15所述的可穿戴设备任务计划调整方法,其特征在 于,所述任务单元还包括任务执行提示指令,在所述任务执行提示指令开启设备的提示功能模块提醒用户执行所述任务目的内容。The method of claim 15 , wherein the task unit further comprises a task execution prompt instruction, wherein the prompt function of the task execution prompting instruction turns on the prompt function module of the device to remind the user to perform the task purpose. content.
  17. 根据权利要求15所述的可穿戴设备任务计划调整方法,其特征在于,所述本机任务计划包括任务提示时间、传感器开启时间和传感器关闭时间,所述任务提示时间根据所述任务目的内容提前预定时间设置,所述传感器开启时间根据任务执行检测开始指令设置,所述传感器关闭时间根据所述任务执行检测结束指令设置。The wearable device task plan adjustment method according to claim 15, wherein the local task plan includes a task prompt time, a sensor open time, and a sensor close time, and the task prompt time is advanced according to the task purpose content. The predetermined time setting, the sensor on time is set according to a task execution detection start command, and the sensor off time is set according to the task execution detection end instruction.
  18. 根据权利要求14所述的可穿戴设备任务计划调整方法,其特征在于,所述用户活动数据由所述计划指令指定的传感器获得,包括用户活动的执行时间、执行地点和/或与用户活动相对应的传感器数据,用以确定相对应的所述任务单元得以执行并据以得到的执行结果数据。The wearable device task plan adjustment method according to claim 14, wherein the user activity data is obtained by a sensor specified by the planning instruction, including an execution time of a user activity, an execution location, and/or a user activity Corresponding sensor data is used to determine corresponding execution result data that the task unit is executed and obtained accordingly.
  19. 根据权利要求14所述的可穿戴设备任务计划调整方法,其特征在于,所述用户活动数据的上传方式为实时上传,或The method for adjusting a task plan of a wearable device according to claim 14, wherein the uploading method of the user activity data is real-time uploading, or
    在所述用户活动数据形成后的预定时间上传。Uploaded at a predetermined time after the user activity data is formed.
  20. 根据权利要求19所述的可穿戴设备任务计划调整方法,其特征在于,所述上传在检测到网络信号满足预设信号强度时进行。The wearable device task plan adjustment method according to claim 19, wherein the uploading is performed when detecting that the network signal satisfies a preset signal strength.
  21. 根据权利要求14所述的可穿戴设备任务计划调整方法,其特征在于,所述显示所述结果信息的步骤包括:The wearable device task plan adjustment method according to claim 14, wherein the displaying the result information comprises:
    将评价结果信息与特定虚拟物品相对应;Corresponding to the evaluation result information and the specific virtual item;
    显示所述虚拟物品。The virtual item is displayed.
  22. 根据权利要求14所述的可穿戴设备任务计划调整方法,其特征在于,The wearable device task plan adjustment method according to claim 14, wherein
    所述根据从云端服务器接收的原始任务计划表中的各任务单元设置本机任务计划的步骤还包括:The step of setting a local task plan according to each task unit in the original task schedule received from the cloud server further includes:
    确认任务计划表修改权限验证信息;Confirm the task schedule to modify the authority verification information;
    对所述原始任务计划表中的特定任务单元进行修改;Modifying specific task units in the original task schedule;
    根据修改后的任务计划表中各任务单元设置本机任务计划,并将所述修改后的任务计划表上传到服务器。The local task plan is set according to each task unit in the modified task schedule, and the modified task schedule is uploaded to the server.
  23. 一种可穿戴设备任务计划调整装置,包括:A wearable device mission planning adjustment device includes:
    至少一个处理器;At least one processor;
    以及,至少一个存储器,其与所述至少一个处理器可通信地连接;所述至少一个存储器包括处理器可执行的指令,当所述处理器可执行的指令由所述至少一个处理器执行时,致使所述装置执行至少以下操作:And at least one memory communicatively coupled to the at least one processor; the at least one memory comprising processor-executable instructions when the processor-executable instructions are executed by the at least one processor Causing the device to perform at least the following operations:
    接收可穿戴设备根据原始任务计划表获取并上传的其中各任务单元相对应的用户活动数据;Receiving user activity data corresponding to each task unit acquired and uploaded by the wearable device according to the original task schedule;
    以所述任务单元为单位对其相关的用户活动数据进行数学处理,以确定各任务单元的执行结果数据;Performing mathematical processing on the relevant user activity data in units of the task unit to determine execution result data of each task unit;
    依据各相应任务单元相对应的评价基准数据,对各任务单元相对应的执行结果数据进行评价,确定与所述评价基准数据相对应的评价结果数据;Performing evaluation result data corresponding to each task unit according to the evaluation reference data corresponding to each corresponding task unit, and determining evaluation result data corresponding to the evaluation reference data;
    依据与任务单元对应的预设条件,在原始任务计划表中调整与该评价结果数据相对应的任务单元的设置,生成新的任务计划表;Adjusting a setting of a task unit corresponding to the evaluation result data in the original task schedule according to a preset condition corresponding to the task unit, and generating a new task schedule;
    向该可穿戴设备推送该新的任务计划表。Push the new task schedule to the wearable device.
  24. 根据权利要求23所述的可穿戴设备任务计划调整装置,其特征在于,所述向该可穿戴设备推送该新的任务计划表的操作具体包括:The device of claim 23, wherein the operation of pushing the new task schedule to the wearable device comprises:
    发送所述新任务计划表到用户端;Sending the new task schedule to the client;
    获取到用户端提交的针对所述新的任务计划表进行修改后得到的修改后任务计划表,解析所述修改后任务计划表中的权限信息;Obtaining a modified task schedule obtained by modifying the new task schedule submitted by the client, and parsing the permission information in the modified task schedule;
    若所述权限信息与预存权限信息匹配,以所述修改后任务计划表对应更新已储存的所述新的任务计划表。If the rights information matches the pre-stored rights information, the saved new task plan table is updated corresponding to the modified task plan table.
  25. 一种可穿戴设备任务计划调整装置,包括:A wearable device mission planning adjustment device includes:
    至少一个处理器;At least one processor;
    以及,至少一个存储器,其与所述至少一个处理器可通信地连接;所述至少一个存储器包括处理器可执行的指令,当所述处理器可执行的指令由所述至少一个处理器执行时,致使所述装置执行至少以下操作:And at least one memory communicatively coupled to the at least one processor; the at least one memory comprising processor-executable instructions when the processor-executable instructions are executed by the at least one processor Causing the device to perform at least the following operations:
    根据从云端服务器接收的原始任务计划表中的各任务单元设置本机任务计划;Setting a local task plan based on each task unit in the original task schedule received from the cloud server;
    在各任务单元所指定的时间执行该任务单元所指定的计划指令,获取相应的用户活动数据;Execute the planning instruction specified by the task unit at a time specified by each task unit, and obtain corresponding user activity data;
    向云端服务器上传所述用户活动数据;Uploading the user activity data to the cloud server;
    获取云端服务器依据所述用户活动数据的评价结果信息和/或新的任务 计划表,相应显示所述结果信息和/或替换所述原始任务计划表。Acquiring the cloud server to display the result information and/or replace the original task schedule table according to the evaluation result information of the user activity data and/or the new task schedule.
  26. 一种服务器,包括第一处理器,所述第一处理器用于执行如权利要求1~13任一所述的可穿戴设备任务计划调整方法。A server includes a first processor, and the first processor is configured to perform the wearable device task plan adjustment method according to any one of claims 1 to 13.
  27. 一种可穿戴设备,包括第二处理器,所述第二处理器用于执行如权利要求14~22所述的可穿戴设备任务计划调整方法。A wearable device comprising a second processor, the second processor for performing the wearable device task plan adjustment method according to claims 14-22.
  28. 一种计算机程序,包括计算机可读代码,当服务器运行所述计算机可读代码时,导致权利要求1-13中的任一项权利要求所述的方法被执行。A computer program comprising computer readable code, when the server runs the computer readable code, causing the method of any of claims 1-13 to be performed.
  29. 一种计算机程序,包括计算机可读代码,当可穿戴设备运行所述计算机可读代码时,导致权利要求14-22中的任一项权利要求所述的方法被执行。A computer program comprising computer readable code, when the wearable device runs the computer readable code, causing the method of any one of claims 14-22 to be performed.
  30. 一种计算机可读介质,其中存储了如权利要求28或29所述的计算机程序。A computer readable medium storing the computer program of claim 28 or 29.
PCT/CN2017/116673 2016-12-15 2017-12-15 Task plan adjustment method for wearable device, and device WO2018108175A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201611160689.XA CN106647945A (en) 2016-12-15 2016-12-15 Task plan adjustment method of wearable device, and device
CN201611160689.X 2016-12-15

Publications (1)

Publication Number Publication Date
WO2018108175A1 true WO2018108175A1 (en) 2018-06-21

Family

ID=58823742

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/116673 WO2018108175A1 (en) 2016-12-15 2017-12-15 Task plan adjustment method for wearable device, and device

Country Status (2)

Country Link
CN (1) CN106647945A (en)
WO (1) WO2018108175A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111983929A (en) * 2019-05-23 2020-11-24 江苏美的清洁电器股份有限公司 Household appliance, control method thereof and computer-readable storage medium
CN113031282A (en) * 2021-04-27 2021-06-25 歌尔股份有限公司 Method for adjusting size of binding band of head-mounted display equipment and related device
CN113269454A (en) * 2021-06-02 2021-08-17 南京海必思科技有限公司 Learning habit training system and method based on wearable equipment

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106647945A (en) * 2016-12-15 2017-05-10 北京奇虎科技有限公司 Task plan adjustment method of wearable device, and device
CN107239578A (en) * 2017-06-30 2017-10-10 江西博瑞彤芸科技有限公司 The processing method of mission bit stream
CN107679826A (en) * 2017-09-20 2018-02-09 广东乐心医疗电子股份有限公司 Intelligent feeding method and device
CN107785078B (en) * 2017-10-23 2022-06-03 杭州吉吉知识产权运营有限公司 Method for giving up protracted illness based on intelligent device, intelligent device and system
US11653845B2 (en) 2017-10-26 2023-05-23 International Business Machines Corporation Continuous physiological sensing in energy-constrained wearables
CN107887006A (en) * 2017-10-27 2018-04-06 上海京颐科技股份有限公司 Rehabilitation programme based reminding method and device, storage medium, server
CN108734503A (en) * 2018-03-06 2018-11-02 北京猎户星空科技有限公司 A kind of method for information display, device and smart machine
CN108986903A (en) * 2018-06-29 2018-12-11 拉卡拉支付股份有限公司 Monitoring method, device, electronic equipment and storage medium based on wearable device
CN109040450A (en) * 2018-08-07 2018-12-18 广东小天才科技有限公司 Task reminders method, apparatus, equipment and storage medium based on wearable device
CN109634589A (en) * 2018-12-07 2019-04-16 上海上实龙创智慧能源科技股份有限公司 A kind of processing method for the automatic Realtime Alerts task of sewage treatment process
CN109636175A (en) * 2018-12-07 2019-04-16 上海上实龙创智慧能源科技股份有限公司 A kind of automatic processing method of business system timed task
CN110889715A (en) * 2019-01-10 2020-03-17 广东乐心医疗电子股份有限公司 Gift box unlocking method, gift box, device, electronic equipment and storage medium
EP4063995A4 (en) * 2019-11-25 2023-01-25 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Method and apparatus for controlling wearable device, and electronic device
CN111599134A (en) * 2020-05-18 2020-08-28 广东小天才科技有限公司 State reminding method, state setting method, state reminding system, intelligent wearable device and mobile terminal
CN114386878A (en) * 2022-03-04 2022-04-22 中铁第一勘察设计院集团有限公司 Method and system for generating maintenance schedule of railway communication equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1855056A (en) * 2005-04-21 2006-11-01 国际商业机器公司 Workload scheduling method
CN101980228A (en) * 2010-09-01 2011-02-23 张辉 Human body information monitoring and processing system and method
CN104616120A (en) * 2015-02-27 2015-05-13 广东小天才科技有限公司 Method and system for drawing up learning plan based on curriculum schedule
CN104656891A (en) * 2015-01-15 2015-05-27 广东小天才科技有限公司 Device communication method and device communication apparatus
CN105808915A (en) * 2014-12-30 2016-07-27 环达电脑(上海)有限公司 Automatic adjustment method for exercise plan
CN106647945A (en) * 2016-12-15 2017-05-10 北京奇虎科技有限公司 Task plan adjustment method of wearable device, and device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102567638B (en) * 2011-12-29 2018-08-24 无锡微感科技有限公司 A kind of interactive upper limb healing system based on microsensor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1855056A (en) * 2005-04-21 2006-11-01 国际商业机器公司 Workload scheduling method
CN101980228A (en) * 2010-09-01 2011-02-23 张辉 Human body information monitoring and processing system and method
CN105808915A (en) * 2014-12-30 2016-07-27 环达电脑(上海)有限公司 Automatic adjustment method for exercise plan
CN104656891A (en) * 2015-01-15 2015-05-27 广东小天才科技有限公司 Device communication method and device communication apparatus
CN104616120A (en) * 2015-02-27 2015-05-13 广东小天才科技有限公司 Method and system for drawing up learning plan based on curriculum schedule
CN106647945A (en) * 2016-12-15 2017-05-10 北京奇虎科技有限公司 Task plan adjustment method of wearable device, and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111983929A (en) * 2019-05-23 2020-11-24 江苏美的清洁电器股份有限公司 Household appliance, control method thereof and computer-readable storage medium
CN111983929B (en) * 2019-05-23 2024-03-12 美智纵横科技有限责任公司 Household appliance, control method thereof and computer readable storage medium
CN113031282A (en) * 2021-04-27 2021-06-25 歌尔股份有限公司 Method for adjusting size of binding band of head-mounted display equipment and related device
CN113269454A (en) * 2021-06-02 2021-08-17 南京海必思科技有限公司 Learning habit training system and method based on wearable equipment

Also Published As

Publication number Publication date
CN106647945A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
WO2018108175A1 (en) Task plan adjustment method for wearable device, and device
US11626031B2 (en) Systems and techniques for tracking sleep consistency and sleep goals
US20220018567A1 (en) Data learning server and method for generating and using learning model thereof
US11137161B2 (en) Data learning server and method for generating and using learning model thereof
US8494507B1 (en) Adaptive, portable, multi-sensory aid for the disabled
US10991462B2 (en) System and method of controlling external apparatus connected with device
CN107817891B (en) Screen control method, device, equipment and storage medium
AU2015101639A4 (en) Digital Clock
US20170010663A1 (en) Smart wearable devices and methods for optimizing output
US20150137994A1 (en) Data-capable band management in an autonomous advisory application and network communication data environment
US20140038489A1 (en) Interactive plush toy
US20140240144A1 (en) Data-capable band management in an integrated application and network communication data environment
EP3221863A1 (en) Automated audio adjustment
CN105259948B (en) Mattress temprature control method and device
US20140223165A1 (en) Data-capable band management in an integrated application and network communication data environment
US20200368488A1 (en) Information processing apparatus and method, and program
CN105847574A (en) Method for controlling loudspeaker volume and terminal device
CN106024016A (en) Children's guarding robot and method for identifying crying of children
CN110275737A (en) A kind of control method and device for Intelligent water cup
CN106779601A (en) Wearable device task scheduling method of adjustment and equipment
CN110741404A (en) Program and child care support method
CN105373697B (en) Sleep pattern open method and device
US20230107712A1 (en) System, Method And Computer Program Product Which Uses Biometrics As A Feedback For Home Control Monitoring To Enhance Wellbeing
CN117785353A (en) Self-adaptive watch dial generation method, device and storage medium
CN108596805A (en) Application process, device, system and the computer storage media of hypnopaedia

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17881251

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17881251

Country of ref document: EP

Kind code of ref document: A1