CN106647945A - Task plan adjustment method of wearable device, and device - Google Patents
Task plan adjustment method of wearable device, and device Download PDFInfo
- Publication number
- CN106647945A CN106647945A CN201611160689.XA CN201611160689A CN106647945A CN 106647945 A CN106647945 A CN 106647945A CN 201611160689 A CN201611160689 A CN 201611160689A CN 106647945 A CN106647945 A CN 106647945A
- Authority
- CN
- China
- Prior art keywords
- task
- data
- wearable device
- unit
- task scheduling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/16—Constructional details or arrangements
- G06F1/1613—Constructional details or arrangements for portable computers
- G06F1/163—Wearable computers, e.g. on a belt
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Economics (AREA)
- Data Mining & Analysis (AREA)
- Human Computer Interaction (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a task plan adjustment method of a wearable device, and the related device. The method comprises the steps of receiving user activity data corresponding to task units and obtained and uploaded by the wearable device according to an original task plan table; performing mathematic processing on related user activity data by taking the task units as units to determine executive result data of the task units; evaluating the executive result data corresponding to the task units according to evaluation reference data corresponding to the corresponding task units, and determining evaluation result data corresponding to the evaluation reference data; adjusting settings of the task units corresponding to the evaluation result data in the original task plan table according to preset conditions corresponding to the task units, and generating a new task plan table; and pushing the new task plan table to the wearable device. According to the method and the device, a task plan selected by a user is reasonably changed according to an actual condition, so that the purpose of healthily and effectively developing a habit is achieved.
Description
Technical field
The present invention relates to the technical field of smart machine, more particularly to wearable device task scheduling method of adjustment and set
It is standby.
Background technology
Growing with wearable device, the species of wearable device is increasingly enriched, more and more wider using crowd
It is general, the wearable device that mobile phone, Intelligent bracelet, intelligent glasses from adult etc. are gradually promoted up till now in children such as children
Intelligent watch etc..The function development of child intelligence wrist-watch now has rapid progress, in having been provided with by being arranged on wrist-watch
The components and parts such as heart rate sensor, acceleration transducer analyze the ability of child behavior mode, then the head of a family or teacher can lead to
Cross such child intelligence wrist-watch understand children behavior and and then guiding children behavior so as to become and allow children to form well
The powerful of behavioural habits.
In order to realize allowing child intelligence wrist-watch to supervise children to form the purpose of good life study habit, in prior art
A certain task is completed to remind usually through alarm clock is arranged, further, by arranging the schedule for pre-establishing one day is planned,
One week or the task in cycle other time.Or however, the task scheduling single function obtained by these technological means, or
Actual situation change cannot be adapted in static state, more the big data that the data for actually obtaining are accustomed to culture with children cannot mutually be tied
Close to formulate more scientific and reasonable and personalized custom training plan.
The content of the invention
Based on this, for the primary and foremost purpose of the present invention aims to solve the problem that above-mentioned at least one problem, there is provided one kind is wearable to be set
Standby task scheduling method of adjustment and its corresponding equipment, wherein equipment include wearable device task scheduling adjusting apparatus, one kind
Server and a kind of wearable device, to run the method described in previous target.
To realize the above-mentioned purpose of the present invention, adopt the following technical scheme that:
A kind of wearable device task scheduling method of adjustment of the present invention, comprises the following steps:
The user activity data that wearable device is uploaded is received, the user activity data is according in ancestral task planning chart
Each corresponding TU task unit is obtained;
Mathematical treatment is carried out to its related user activity data in units of the TU task unit, to determine each job order
The implementing result data of unit;
According to the corresponding metewand data of each corresponding task unit, the implementing result number corresponding to each TU task unit
According to being evaluated, it is determined that the evaluation result data corresponding with the metewand data;
According to corresponding with TU task unit pre-conditioned, adjustment and the evaluation result data phase in ancestral task planning chart
The setting of corresponding TU task unit, generates new task scheduling table;
The new task scheduling table is pushed to the wearable device.
Wherein in one embodiment, the foundation is corresponding with TU task unit pre-conditioned, in ancestral task planning chart
The step of setting of the middle adjustment TU task unit corresponding with the evaluation result data, specifically includes:It is described it is pre-conditioned including to
The mapping of a few setting number range and the TU task unit corresponding with each setting number range, when the evaluation result number
According to it is described it is pre-conditioned in one setting number range in, according to it is described setting number range it is corresponding mapping adjustment
The TU task unit.
Further, the number range that sets is interval as default cumulative frequency of evaluating, the corresponding TU task unit
The accumulation for being mapped as being evaluated when the implementing result data corresponding to each TU task unit evaluate number of times and default comment described
In valency cumulative frequency is interval, setting for the TU task unit corresponding with the evaluation result data is adjusted in ancestral task planning chart
Put, generate new task scheduling table.
Wherein in one embodiment, the step of the implementing result data corresponding to each TU task unit are evaluated
Including:
The implementing result data are compared with the metewand data according to mutual data block is corresponding, are obtained
Go out to compare amplitude data;
According to the evaluation rule in the metewand data, the amplitude data that compares is converted into evaluation result number
According to.
Further, the evaluation rule is as follows:When the amplitude data that compares meets particular preset data area, that is, give
Go out the evaluation score corresponding with the particular preset data area;When the evaluation corresponding to TU task unit described at least one point
When number meets the particular fraction of pre-conditioned middle setting corresponding with the TU task unit, corresponding with the evaluation score appointing is adjusted
The setting of business unit, generates new task scheduling table.The amount of causing by way of being used as weighing evaluation result with evaluation score
Change mode is more succinct and allows people to be easy to receive.
Further, the TU task unit includes task objective content, tasks carrying detection time started, tasks carrying inspection
Survey the end time, the tasks carrying detection time started is the moment for starting to detect that the task objective content is performed, described
The tasks carrying detection end time is to stop the moment that the detection task objective content is performed;The user activity data is obtained
The step of it is as follows:
The tasks carrying detection time started is reached, is started the sensor related to the task objective content and is recorded number
According to;
The tasks carrying detection end time is reached, the sensor and stop recording data are closed, the data that recorded are
User activity data.
Further, the user activity data includes the execution time of User Activity, performs place and/or live with user
Dynamic corresponding sensing data,
The execution time of the User Activity is carried out into the time data part that Mathematical treatment obtains implementing result data,
And/or
The place that performs of the User Activity is carried out into the geographic position data portion that Mathematical treatment obtains implementing result data
Point, and/or
The sensing data corresponding with User Activity is carried out into the activity that Mathematical treatment obtains implementing result data
Content data part.
Further, the execution time of the user activity data be contained in the TU task unit tasks carrying detection open
Between time beginning and tasks carrying detection end time.
Wherein in one embodiment, during implementing the Mathematical treatment, to originating in the user activity data
Being suitable for different preset rules or preset algorithm respectively in the initial data of different sensors carries out data mart modeling process, so as to obtain
Obtain the implementing result data.
Wherein in one embodiment, the step of push the new task scheduling table to the wearable device after also wrap
Include:
The new task scheduling table is sent to user side;Get user side submission for the new task scheduling
Task planning chart after the modification that table is obtained after modifying, parses the authority information in task planning chart after the modification;If institute
State authority information to match with the authority information that prestores, stored described new is updated with task planning chart correspondence after the modification and is appointed
Business planning chart.User side receiving server push or after downloading from a server the task scheduling table for obtaining, according to
Actual conditions may need tentatively to be changed before execution, and the people to prevent children or other lacks of competence changes these will
The task scheduling table of execution, server should carry out control of authority to modification.After by the Authority Verification of server, user
The suitably modified task scheduling table and storage is ready to carry out on wearable device, at the same the amended task scheduling table simultaneously on
Server is passed to, correspondence updates the task scheduling table.
Further, the authority information is at least one in password, real-time verification code or particular organisms feature.
Wherein in one embodiment, the upload mode of the user activity data is for upload in real time or on the scheduled time
Pass.This scheme allows user that the side of data upload is selected according to the hardware capabilities situation of real network situation or wearable device
Formula, the efficiency and validity for making user activity data upload reaches balance.
Wherein in one embodiment, the task scheduling table also includes user interface skins subject information, user circle
Face be for performing the task scheduling table in the related user interface of plan target.Wearable device is according to different use
Family, different task schedulings can cause the execution of task scheduling with more aesthetic feeling setting corresponding user interface skins theme,
Strengthen interesting.
Another kind of wearable device task scheduling method of adjustment of the present invention, comprises the following steps:
Each TU task unit in the ancestral task planning chart received from cloud server arranges the machine task scheduling;
The Planning Directive specified by the TU task unit is performed in the time specified by each TU task unit, corresponding user is obtained
Activity data;
The user activity data is uploaded to cloud server;
Evaluation result information and/or new task scheduling table of the cloud server according to the user activity data is obtained,
Accordingly show the object information and/or replace the ancestral task planning chart.
Wherein in one embodiment, the TU task unit include task objective content, tasks carrying detection sign on,
Tasks carrying detects END instruction, and the tasks carrying detection sign on is to start to detect what the task objective content was performed
Instruction, the tasks carrying detection END instruction is to stop the instruction that the detection task objective content is performed.
Further, the TU task unit also includes tasks carrying hint instructions, opens in the tasks carrying hint instructions
The prompt facility module for opening equipment reminds user to perform the task objective content.
Further, the machine task scheduling includes that briefing time, sensor opening time and sensor are closed
Time, the briefing time shifts to an earlier date scheduled time setting, the sensor opening time according to the task objective content
Detect that sign on is arranged according to tasks carrying, the sensor shut-in time detects that END instruction sets according to the tasks carrying
Put.
Wherein in one embodiment, the user activity data is obtained by the sensor that the Planning Directive is specified, bag
Include the execution time of User Activity, perform place and/or the sensing data corresponding with User Activity, it is corresponding to determine
The TU task unit implementing result data that are carried out and obtain according to this.
Wherein in one embodiment, the upload mode of the user activity data is upload in real time, or
The scheduled time after the user activity data is formed uploads.
Further, described upload carry out when network signal meets preset signal strength detecting.
Wherein in one embodiment, it is described display the object information the step of include:
Evaluation result information is corresponding with specific virtual objects;
Show the virtual objects.
Each task wherein in one embodiment, in the ancestral task planning chart that the basis is received from cloud server
The step of unit arranges the machine task scheduling also includes:
Confirm task scheduling table modification authority checking information;
Particular task unit in the ancestral task planning chart is modified;
The machine task scheduling is arranged according to each TU task unit in amended task scheduling table, and by described amended
Business planning chart is uploaded onto the server.
The invention provides a kind of wearable device task scheduling adjusting apparatus, including:
Receiver module, for receiving wherein each job order that wearable device is obtained according to ancestral task planning chart and uploaded
The corresponding user activity data of unit;
Conversion module, for carrying out Mathematical treatment to its related user activity data in units of the TU task unit,
To determine the implementing result data of each TU task unit;
Evaluation module is relative to each TU task unit for according to the corresponding metewand data of each corresponding task unit
The implementing result data answered are evaluated, it is determined that the evaluation result data corresponding with the metewand data;
Update module, it is corresponding with TU task unit pre-conditioned for foundation, adjust in ancestral task planning chart and be somebody's turn to do
The setting of the corresponding TU task unit of evaluation result data, generates new task scheduling table;
Sending module, for pushing the new task scheduling table to the wearable device.
Wherein in one embodiment, the sending module includes:
Transmitting element, for sending the new task planning chart to user side;
Resolution unit, for getting the modifying for the new task scheduling table of user side submission after obtain
Task planning chart after modification, parses the authority information in task planning chart after the modification;
Updating block, if matching with the authority information that prestores for the authority information, with task planning chart after the modification
Correspondingly update the described new task scheduling table for having stored.
The invention provides another kind of wearable device task scheduling adjusting apparatus, including:
Receiver module, each TU task unit in the ancestral task planning chart received from cloud server for basis arranges this
Machine task scheduling;
Performing module, in the time specified by each TU task unit the Planning Directive specified by the TU task unit is performed, and is obtained
Corresponding user activity data;
Upper transmission module, to cloud server the user activity data is uploaded;
Acquisition module, for obtaining cloud server according to the evaluation result information of the user activity data and/or new
Task scheduling table, accordingly show the object information and/or replace the ancestral task planning chart.
Invention also provides a kind of wearable device task scheduling adjusts server, including first processor, it is described
First processor is used to perform a kind of above-mentioned wearable device task scheduling method of adjustment.
Present invention also offers a kind of wearable device, including second processing device, the second processing device is for execution
Another kind of wearable device task scheduling method of adjustment stated.
The method and equipment can be realized after terminal device is downloaded and performs assigned tasks plan, according to performing to plan
The data collected carry out the actual result that corresponding analysis draw, adaptation is carried out to assigned tasks plan, and proposition is more closed
Reason, more personalized new task plan is simultaneously pushed to user.The method changes the original assigned tasks of static execution originally
The drawbacks of plan, rationally perform data and combine the big number formed from the related data of other numerous users using user is actual
According to, make the task scheduling that user selects constantly carry out reasonable change according to actual conditions, with reference to the control to metewand data,
The complexity of task scheduling can be as needed adjusted, the effect of incremental formula custom culture is reached, it is final to realize allowing making
User's health effectively cultivates the purpose of good habit.
Description of the drawings
Fig. 1 is one embodiment of the invention wearable device task scheduling method of adjustment flow chart;
The particular flow sheet of the step of Fig. 2 is one embodiment of the invention wearable device task scheduling method of adjustment S130;
The idiographic flow of the step of Fig. 3 is another embodiment of the present invention wearable device task scheduling method of adjustment S160
Figure;
Fig. 4 is one embodiment of the invention wearable device task scheduling adjusting apparatus structural representation;
Fig. 5 is the structural representation of sending module 150 in one embodiment of the invention wearable device task scheduling adjusting apparatus;
Fig. 6 is further embodiment of this invention wearable device task scheduling method of adjustment flow chart;
The idiographic flow of the step of Fig. 7 is further embodiment of this invention wearable device task scheduling method of adjustment S210
Figure;
Fig. 8 is further embodiment of this invention wearable device task scheduling adjusting apparatus structural representation.
Specific embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from start to finish
Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached
The embodiment of figure description is exemplary, is only used for explaining the present invention, and is not construed as limiting the claims.
Those skilled in the art of the present technique are appreciated that unless expressly stated, singulative " " used herein, "
It is individual ", " described " and " being somebody's turn to do " may also comprise plural form.It is to be further understood that arranging used in the specification of the present invention
Diction " including " refers to there is the feature, integer, step, operation, element and/or component, but it is not excluded that existing or adding
One or more other features, integer, step, operation, element, component and/or their group.It should be understood that when we claim unit
Part is " connected " or during " coupled " to another element, and it can be directly connected or coupled to other elements, or can also exist
Intermediary element.Additionally, " connection " used herein or " coupling " can include wireless connection or wireless coupling.It is used herein to arrange
Diction "and/or" includes the one or more associated wholes or any cell of listing item and all combination.
Those skilled in the art of the present technique are appreciated that unless otherwise defined all terms used herein are (including technology art
Language and scientific terminology), with art of the present invention in those of ordinary skill general understanding identical meaning.Should also
It is understood by, those terms defined in such as general dictionary, it should be understood that with the context with prior art
The consistent meaning of meaning, and unless by specific definitions as here, will not otherwise use idealization or excessively formal implication
To explain.
Those skilled in the art of the present technique are appreciated that " terminal " used herein above, " terminal device " had both included wireless communication
The equipment of number receiver, it only possesses the equipment of the wireless signal receiver of non-emissive ability, and including receiving and launch hardware
Equipment, its equipment with reception that two-way communication on bidirectional communication link, can be carried out and transmitting hardware.This equipment
Can include:Honeycomb or other communication equipments, it has single line display or multi-line display or shows without multi-line
The honeycomb of device or other communication equipments;PCS (Personal Communications Service, PCS Personal Communications System), it can
With combine voice, data processing, fax and/or its communication ability;PDA (Personal Digital Assistant, it is personal
Digital assistants), it can include radio frequency receiver, pager, the Internet/intranet access, web browser, notepad, day
Go through and/or GPS (Global Positioning System, global positioning system) receiver;Conventional laptop and/or palm
Type computer or other equipment, its have and/or conventional laptop and/or palmtop computer including radio frequency receiver or its
His equipment." terminal " used herein above, " terminal device " they can be portable, can transport, installed in the vehicles (aviation,
Sea-freight and/or land) in, or be suitable for and/or be configured in local runtime, and/or with distribution form, operate in the earth
And/or any other position operation in space." terminal " used herein above, " terminal device " can also be communication terminal, on
Network termination, music/video playback terminal, for example, can be PDA, MID (Mobile Internet Device, mobile Internet
Equipment) and/or the equipment such as mobile phone, or intelligent television, Set Top Box with music/video playing function.
Here wearable device can directly be worn, or the one kind in being incorporated into the clothes of user or accessory
Portable set, not exclusively a kind of simple function hardware device, even more by software support and data interaction, high in the clouds interaction
Can be wrist-watch, bracelet, mobile phone, necklace etc. to realize the hardware device of communication and the information processing function.
Wearable device task scheduling method of adjustment in an embodiment of the present invention, as shown in figure 1, the task scheduling is adjusted
Adjusting method comprises the following steps:
S110:The user activity data that wearable device is uploaded is received, the user activity data is according to ancestral task meter
Draw each corresponding TU task unit in table to obtain.
Easily service to provide more high-quality to the user of wearable device, take in the high in the clouds of wearable device supplier
The custom culture task scheduling for pre-establishing would generally be provided with business device, these task schedulings can asking according to multiple angles
Topic carries out the content design of variety classes and emphasis, and user side can be directly from cloud server according to preliminary actual conditions
It is upper to select a custom culture task scheduling, this ancestral task planning chart namely on wearable device, per portion task meter
Drawing a TU task unit, such as " plan of getting up ", it is also possible to comprising multiple tasks unit, such as " meter of getting up of can include in table
Draw ", " breakfast plan ", " morning read plan " etc..User starts the task scheduling table performance element on wearable device, then,
Wearable device can collect the user activity data corresponding with each TU task unit according to the data command on task scheduling table, and
And uploaded on cloud server by way of setting, got by cloud server and carried out corresponding follow-up data
Reason.Preferably, TU task unit includes task objective content, tasks carrying detection time started, tasks carrying detection end time,
The wherein tasks carrying detection time started is the moment for starting to detect that the task objective content is performed, and tasks carrying detection terminates
Time is to stop the moment that the detection task objective content is performed, and when the time tasks carrying detection time started is reached, and is started
The sensor related to the task objective content and record data, when the time tasks carrying detection end time is reached, and is closed
The sensor and stop recording data, the data that recorded are user activity data.TU task unit is user's wearable device
On the basis that performs according to this, user is recognized that the required by task purpose effect to be reached, and the Detection task of defined
The time of beginning and end, or task needs the number of times for performing repeatedly and time for needing altogether etc..Preferably, User Activity
Data include performing the time, performing place and/or the sensing data corresponding with User Activity for User Activity, and user is lived
The dynamic execution time carries out the time data part that Mathematical treatment obtains implementing result data, and/or by the execution of User Activity
Place carries out the geographic position data part that Mathematical treatment obtains implementing result data, and/or will be corresponding with User Activity
Sensing data carries out the activity description data division that Mathematical treatment obtains implementing result data.Wherein perform the time and perform ground
Point is for demarcating the fundamental data that user obtains when TU task unit is performed, and sensing data is used for identification mission unit
The execution time and execution place for specifying wherein performs.The execution time of User Activity is used to determine that actual execution of user is appointed
The time of the concrete action of a certain TU task unit on business planning chart, it is also possible to for determining the execution time cycle of a certain TU task unit
Whether (formulating with specific reference to the species of TU task unit), perform place and be then determined for existing when user performs TU task unit
The position of setting, such as sleep should on the bed in bedroom, and if detect perform place on the desk in classroom if it is unfavorable
In forming for healthy sleep behavior, then data reference is provided for later stage modification plan.In addition, the corresponding sensor of User Activity
Data such as have sensing heart rate as pair monitoring data related to above-mentioned parameter collection and the monitoring of more complicated function is realized
Device data, acceleration transducer data etc., these sensors can easily detect user is which kind of condition be in, with
Implementation status of the reflection user to a certain TU task unit.It is recognised that the execution time of user activity data is included in appointing
Between the tasks carrying detection time started and tasks carrying detection end time of business unit, user might not be according to task
The tasks carrying detection time started of unit starts to perform TU task unit, is often later than the detection time started, and in order to
Ensure fully actual implementation status of the detection user to task, TU task unit can arrange sufficient detection time, even if also task
The detection end time of regulation is later than the time that user's physical end performs task, and otherwise too early or too late execution task all can become
Obtain nonsensical, if task is not detected by within detection time started and detection end time the sensor being performed
Data, then show that user is this time not carried out the task, will also finally give one and be not carried out task sensing data accordingly.
Preferably, the upload mode of user activity data is to upload in real time or predetermined after user activity data is formed
Time uploads.Upload in real time to collect after a user activity data immediately to server upload, the user that the method is required
Device memory is little, transfers to server to carry out the task of data storage, but the method needs are reasonable in network coverage situation
Area, is otherwise likely to result in loss of data.Another upload mode be the user activity data is collected after one
Fixed setting time is concentrated and uploaded, and is such as uploaded within 4 hours after collecting the data, and this mode is high to the equipment requirement of user, but
It is low to network requirement, store it in equipment after the activity data for collecting user, treat that the time through setting concentrates
Upload, for example, uploaded by family WIFI.
S120:Mathematical treatment is carried out to its related user activity data in units of TU task unit, to determine each task
The implementing result data of unit.
The user activity data that cloud server gets is related to TU task unit sensing on wearable device
The original active data that device is collected, ripple frequency that such as heart rate sensor gets, pulsation dynamics and change initial time, when
Long Equal-time Data, direction, speed, speed change and corresponding moment and time that acceleration transducer gets etc., also
There are longitude in alignment sensor, latitude and the corresponding time data of these longitudes and latitudes etc., it is seen then that often wrap in these data
Contain the characteristic that can determine whether task species and time data corresponding with these characteristics etc., specific Data Collection
Those skilled in the art can be judged according to actual needs.Wearable device is collected in its simplest form and uploads these
Initial data, and transfer to cloud server to complete data processing work, so can cause wearable device hardware requirement more
It is low, it is easier to realize.Wherein Mathematical treatment is to the initial data point in the user activity data from different sensors
Not being suitable for different preset rules or preset algorithm carries out data mart modeling process, so as to obtain the implementing result data.Due to
Processing above-mentioned initial data is targetedly carried out, and the data that different sensors are collected need to carry out at different mathematics
Manage, namely the data processing rule different to data application or algorithm are processed arrangement, such as get for heart rate sensor
Data, the number under the different healths that the data such as the ripple frequency collected, pulsation dynamics draw from pre research
Mutually compare according to table, show that sometime the interior data display goes out user's state in which, be the state in sleep, or go
The state walked, or the state run etc., and be directed to the data that alignment sensor gets and calculate user according to setting function
Stop geographical position, the time of staying etc., the concrete function used for the Mathematical treatment of these sensing datas or algorithm
Can flexibly be selected by those skilled in the art or programming realization.To deriving from the original of different sensors in user activity data
Data are suitable for respectively different preset rules or preset algorithm and carry out data mart modeling process, so as to obtain the corresponding number of each sensor
According to result, the data processed result from a sensor or multiple sensors is entered further according to the needs of each TU task unit
Row comprehensive descision, so as to get different but corresponding with each TU task unit implementing result data, the implementing result data
In include TU task unit completion status, time for completing, the place that completes etc., the implementing result data of such as " plan of getting up " can
" 7 are got up being:20 bedrooms " or to fail detect user to get up so be exactly " not get up in sensor detection time interval
Bedroom " etc..The implementing result data content of each TU task unit is different, of different sizes, and data form is likely to difference, such as rise
Bed only needs to heart rate sensor and can determine whether whether to complete, and feed and walking may need heart rate sensor and acceleration sensing
The cooperation of device just can confirm that and distinguish, but these implementing result data that final process is obtained must have and criterion numeral
According to the corresponding data form of TU task unit on table, it is adaptable to compare with normal data table, the data form also can be by this
Art personnel preprogramming sets.
S130:According to the corresponding metewand data of each corresponding task unit, the execution corresponding to each TU task unit
Result data is evaluated, it is determined that the evaluation result data corresponding with the metewand data.
Include various corresponding TU task units in each the task scheduling table stored in server, for ease of evaluating this
The level of enforcement of a little TU task units, such as whether performing, how is performance level, and difficulty action accomplishment is just necessary for each as how
Business unit presets a metewand data, by the corresponding implementing result data of each TU task unit for coming from user
Metewand Data Comparison corresponding thereto, it is possible to it is determined that drawing the evaluation corresponding with selected metewand data
Result data.For example, a certain TU task unit is " plan of getting up ", is " 7 as the time of getting up of one of implementing result data:
20 ", and " plan of getting up " corresponding metewand data are " 7 in the selected task scheduling table:00 ", the two is contrasted
The corresponding information of evaluation result data for going out is " evening rises 20 minutes ", certainly it will be appreciated to those of skill in the art that the letter
The numerical monitor form of breath can be the data mode of " -20min " or miscellaneous stipulations form.
S140:According to corresponding with TU task unit pre-conditioned, adjustment and the evaluation result in ancestral task planning chart
The setting of the corresponding TU task unit of data, generates new task scheduling table.
The evaluation result data obtained by preceding step will be a tables of data corresponding with ancestral task planning chart, this
Part tables of data is only able to display implementation status of the user to this part of ancestral task plan, what these implementation status were completed including task
Degree, the quality for completing etc., but can't judge user after this part of ancestral task plan has been performed this how to select newly
Task scheduling.Now server can be further analyzed evaluation result data, corresponding with each TU task unit default
Condition compares.A TU task unit may be only existed in the ancestral task planning chart selected due to user, such as certain original
Business planning chart is got up in the morning custom for special culture children, and in the original scheme table getting up early TU task unit is only included;
The multi-task unit is there may be, such as certain ancestral task planning chart is used to cultivate children's work and rest custom, the original scheme table
Include getting up early TU task unit, afternoon nap TU task unit and evening sleep TU task unit etc..No matter which kind of situation, for ancestral task
The execution correspondence of planning chart can obtain at least one evaluation result data.It is stored with server beyond the clouds corresponding with TU task unit
It is pre-conditioned, pre-conditioned have a different hypothesis situations, and causes that either which kind of evaluation result data all can fall
In the range of a kind of hypothesis situation therein, and a kind of result of every kind of hypothesis situation correspondence, that is, to ancestral task plan
The TU task unit corresponding with evaluation result data is adjusted in table, is adjusted to preassigned more particularly suitable content, right
New task planning chart is just obtained after at least one TU task unit is adjusted in ancestral task planning chart, therefore, it is possible to according to using
Person determines more suitable new task planning chart to the actual implementation status of ancestral task planning chart.Preferably, foundation and task
Unit is corresponding pre-conditioned, and setting for the TU task unit corresponding with the evaluation result data is adjusted in ancestral task planning chart
The concrete mode put be make it is pre-conditioned including one or more expression formulas, each expression formula include setting number range and
The mapping of the adjustment TU task unit corresponding with setting number range, a certain TU task unit in by execution ancestral task planning chart
When the evaluation result data for obtaining fall in the number range of wherein individual expression formula, then adjust according to the mapping and evaluate knot
The corresponding TU task unit of fruit data, is that the processing mode for making hypothesis situation and its correlation is included in an expression formula, wherein
Assume that situation is specifically configured to include setting number range, and processing mode is then the tune corresponding with the setting number range
The concrete scheme modified to the corresponding TU task unit is pointed in the mapping of whole TU task unit, the mapping, when institute's commentary
When valency result data is in wherein individual setting number range, just commented according to the corresponding mapping adjustment of this setting number range
The corresponding TU task unit of valency result data.The form of number range includes time range, time cycle scope, number of times etc., example
Such as, but not limited to, for TU task unit " plan of getting up ", the content implication of pre-conditioned middle expression formula A is " the execution time
Evening plays more than 20 minutes more than 7 times in 10 days cycles, and the metewand data for changing plan of getting up are 7:, or its content 30 "
Implication is for " evening plays more than 20 minutes more than 7 times in 10 days time cycle of execution, changes the metewand data of plan of getting up
For 7:30, while change is got up, the reminder time of plan is 6:50”;The content implication of pre-conditioned middle expression formula B is for " one is held
Evening rises more than 20 minutes and is less than 2 times in 10 days row time cycles, and the execution time cycle for changing plan of getting up is 20 days ";In advance
If the content implication of expression formula C is for " one performs evening more than 20 minutes 3~7 times in 10 days time cycles, changes in condition
The metewand data of bed plan are 7:15”;It is pre-conditioned to include more similar hypothesis situations.And if one is held
The data content of the evaluation result data display obtained in 10 days row time cycles is meant that " evening is risen more than 20 minutes 8 times ", then
May determine that the evaluation result data fall in the number range of expression formula A, it should which the mapping adjustment in expression formula A is appointed
The appropriate section of business unit " plan of getting up ", the metewand data of the plan that will wherein get up are changed to " 7:30 " or while
Adjustment reminder time is " 6:50”;And if the data content of the evaluation result data display obtained in a cycle its implication
Then task scheduling table is adjusted for " evening is risen more than 20 minutes 2 times " according to expression formula B;If the evaluation knot obtained in an execution cycle
Its implication of the data content of fruit data display is " evening is risen more than 20 minutes 4 times ", then meet the number range in C, therefore according to table
The scheme mapped up in formula C reformulates task scheduling table.There need not be the execution time cycle in some TU task units, this
Business unit it is corresponding it is pre-conditioned in just not comprising the data for performing the time cycle;Some TU task units only need to detect execution
Can without there is execution time length, then it is corresponding with the TU task unit it is pre-conditioned in just not comprising the execution time
Content.
Preferably, when its performance level of temporal expressions that TU task unit is completed not by task, exist and once perform
Just complete the characteristic of target, thus by it is pre-conditioned be set as it is default evaluate that cumulative frequency is interval, corresponding TU task unit
It is mapped as:When the accumulation that the implementing result data corresponding to each TU task unit are evaluated evaluates number of times in the default evaluation
In cumulative frequency is interval, the setting of the TU task unit corresponding with the evaluation result data is adjusted in ancestral task planning chart,
Generate new task scheduling table.
Preferably, as shown in Fig. 2 what implementing result data corresponding to each TU task unit in step S130 were evaluated
Step includes:
S131:The implementing result data are compared with the metewand data according to mutual data block is corresponding
Compared with drawing and compare amplitude data.There are different TU task units in task scheduling table, user obtains different performing knot after performing
Fruit data, show as different data blocks in data message, enter corresponding data block in metewand data
Row contrast, draws and compare accordingly amplitude data, such as the execution number of times of time length, morning and evening or TU task unit is how many etc..
S132:According to the evaluation rule in the metewand data, the amplitude data that compares is converted into evaluation knot
Fruit data.Can specify that a certain amplitude data that compares corresponds to a certain evaluation result in evaluation rule, such as comparing amplitude data is
Evaluation result data " deducting 1 part of data cell " are provided when " 20 minutes evenings ", data cell therein can take different shapes
Formula, such as fraction, virtual objects, accumulated time, cumulative frequency.
Preferably, specific way is the form that evaluation result data are set to fraction, and evaluation rule is:When comparing width
Degrees of data meets preset data scope, that is, provide the evaluation score corresponding with the particular preset data area, such as evaluate
Preset data scope in reference data in corresponding data block is for " 15~30 minutes evenings detained 1 point;More than 30 minutes evening, button 2
Point ", then for amplitude data is compared for " evening 20 minutes ", just obtain the evaluation score of " 1 point of button ".Obtain corresponding commenting
After valency fraction, the pre-conditioned evaluation score for being provided for weighing the evaluation result data is met into preset fraction, i.e., when
Evaluation score corresponding at least one TU task unit meets specific point of pre-conditioned middle setting corresponding with the TU task unit
During number, the setting of the TU task unit corresponding with the evaluation score is adjusted, generate new task scheduling table.Specifically, with point
Number weighs user and completes the degree of TU task unit for medium, when evaluation result data meet it is pre-conditioned in corresponding entry when,
Increase to the task result or reduce corresponding scores, and draw the accumulation results of pre-conditioned middle requirement --- a certain task
The gross score that unit is obtained within the certain hour cycle, when resulting gross score reaches preset fraction, then corresponding modification is obtained
New task scheduling table.Introducing fraction is medium, becomes apparent from data process method, and fraction quantity can also pass through image
Virtual outward appearance is showing that such as safflower, fruit or red flag etc. optionally show on user's wearable device, increase interest
Taste.
Cumulative frequency system is pre-conditioned to can be used alone with fraction system is pre-conditioned, it is also possible to combine two schemes
To use.
S150:The new task scheduling table is pushed to the wearable device.
When according to it is pre-conditioned implementing result data are judged after be met pre-conditioned new task meter
Table is drawn, server just to the wearable device pushes the new task scheduling table at once.
Preferably, another embodiment shown in the present invention to wearable device in server as shown in figure 3, push new task
After planning chart, also including modification authority verification step S160, specifically include:
S161:The new task scheduling table is sent to user side.
First have to for new task scheduling table to be sent to user side, allow user to learn the task scheduling table that sends over
Content, user selects directly to perform, change execution or select other task scheduling tables to perform according to own situation.
S162:Get the modification successor that obtains after the modifying for the new task scheduling table of user side submission
Business planning chart, parses the authority information in task planning chart after the modification.
The content in task scheduling table is adopted according to own situation deciding section as user, and is needed to other content
When modifying, server is just got after user side submits to the new task scheduling table for getting that comes up to modify
Task planning chart after the modification for obtaining, and the modification authority information included in task planning chart after the modification is parsed, authority letter
Breath (provides dedicated link, user is clicked on after selecting, and server is sent to user using password or real-time verification code by server
Respective digital is encoded, and user is input in modification request after obtaining, then carries out matching degree checking by server), it would however also be possible to employ
Particular organisms feature verifying, such as finger print information, iris feature.
S163:If the authority information is matched with the authority information that prestores, updated with task planning chart correspondence after the modification
The described new task scheduling table for having stored.
User side produces amended task scheduling table, and now the task scheduling table needs to be uploaded in user side
On server, so as to server to modification before described new task scheduling table further update, make what user side adopted to appoint
The task scheduling table of business planning chart and server end matches.Be pre-stored in this on server when above-mentioned modification authority information meets
During authority information on user account, server receives task planning chart after modification and correspondence updates described new for having stored
Business planning chart.
Preferably, in order to meet the user's request of different age group, different life background, task scheduling table is allowed to perform interface
It is more interesting, task scheduling table can be made to include the content of user interface skins subject information, such user interface is specially used
The user interface of the plan target correlation in perform corresponding task planning chart.Such as, the selection of time starry sky outward appearance in evening,
Daytime, selection had the outward appearances such as the townscape or sports ground of sunlight.
Aforesaid method is adapted to, based on computer system modularized thoughts, one embodiment of the invention provides one kind and can wear
Equipment task Plan rescheduling device is worn, as shown in figure 4, including:
Receiver module 110, for receive wearable device upload user activity data, the user activity data according to
Each corresponding TU task unit is obtained in ancestral task planning chart.
User starts the task scheduling table performance element on wearable device, and then, wearable device can be according to task
Data command on planning chart collects the user activity data corresponding with each TU task unit, and is uploaded by way of setting
To on cloud server, got by the receiver module 110 of cloud server and be supplied to other modules to carry out corresponding follow-up
Data processing.The execution time of user activity data therein including User Activity, perform place and/or relative with User Activity
The sensing data answered, those skilled in the art will appreciate that user data can also include user's id information, device hardware version
The essential informations such as this information.
Conversion module 120, for being carried out at mathematics to its related user activity data in units of the TU task unit
Reason, to determine the implementing result data of each TU task unit.
The user activity data that cloud server receiver module 110 gets is often simple time data, job order
Element type data etc., but only these simple initial data cannot judge to use as cloud server as analysis,
Therefore need to carry out Mathematical treatment, conversion module 120 launches these process according to different task unit, and conversion is defined as each task
The implementing result data of unit, these implementing result data have fixed data form, it is adaptable to carry out with normal data table
Contrast.
Evaluation module 130, for according to the corresponding metewand data of each corresponding task unit, to each TU task unit phase
Corresponding implementing result data are evaluated, it is determined that the evaluation result data corresponding with the metewand data.
Include various corresponding TU task units in each the task scheduling table stored in server, for ease of evaluating this
The level of enforcement of a little TU task units, such as:Whether perform, how is performance level, difficulty action accomplishment is just necessary for each as how
Business unit presets a metewand data, and evaluation module 130 is corresponding by each TU task unit for coming from user
Implementing result data metewand Data Comparison corresponding thereto, it is possible to it is determined that drawing and selected metewand data
Corresponding evaluation result data.
Update module 140, it is corresponding with TU task unit pre-conditioned for foundation, in ancestral task planning chart adjustment with
The setting of the corresponding TU task unit of the evaluation result data, generates new task scheduling table.
The update module 140 of server further analyzes evaluation result data, default bar corresponding with each TU task unit
Part compares, meet it is corresponding it is pre-conditioned in hypothesis situation when, in ancestral task planning chart with evaluation result data
Corresponding TU task unit is adjusted, and is adjusted to preassigned more particularly suitable content, and different hypothesis situation correspondences are not
Same Suitable content is more suitable new therefore, it is possible to be determined to the actual implementation status of ancestral task planning chart according to user
Task scheduling table.
Sending module 150, for pushing the new task scheduling table to the wearable device.
When according to it is pre-conditioned implementing result data are judged after be met pre-conditioned new task meter
Draw table, the sending module 150 of server just to the wearable device pushes the new task scheduling table at once.
Preferably, as shown in figure 5, the sending module 150 in one embodiment of the invention includes:
Transmitting element 151, for sending the new task planning chart to user side.First transmitting element 151 will be new
Task scheduling table is sent to user side, allows user to learn the content of the task scheduling table for sending over, and user is according to itself feelings
Condition selects directly to perform, change execution or select other task scheduling tables to perform.
Resolution unit 152, for getting the task scheduling table modification request of user side submission, parses the modification request
In the modification authority information that includes.The content in task scheduling table is adopted according to own situation deciding section as user, and is needed
When modifying to other content, server just gets user side and submits the task scheduling table modification request for coming up to, should
Modification request bag contains modification authority information, is obtained by the resolution unit 152 parsing, such as verify password, real-time verification code or
Person's particular organisms feature etc..
Judging unit 153, if the modification authority information is matched with the authority information that prestores, sending to user side allows modification
Confirmation.Be pre-stored on server on the user account when judging unit 153 determines above-mentioned modification authority information and meets
Authority information when, to the User Exploitation task scheduling table modification authority, send to the user side allows modification to confirm to server
Information.
Updating block 154, obtains the amended task scheduling table of user side, and correspondence updates stored described new and appoints
Business planning chart.User enters the modification interface of task scheduling table, and task scheduling table is changed accordingly, draws amended
Task scheduling table, now the task scheduling table is in user side, need to be uploaded onto the server on, so as to the renewal in server
Described new task scheduling table before 154 pairs of modifications of unit further updates, and makes the task scheduling table kimonos that user side is adopted
The task scheduling table at business device end matches.
Present invention also offers a kind of wearable device task scheduling adjusts server, including first processor, this first
Processor is used to perform the wearable device task scheduling method of adjustment of above-described embodiment.Such as received and can be worn with receiver module 110
The user activity data of equipment upload is worn, the user activity data is according to each corresponding TU task unit in ancestral task planning chart
Obtain.In units of the TU task unit, the user activity data that receiver module 110 is obtained is carried out using conversion module 120
Mathematical treatment, to determine the implementing result data of each TU task unit.Again according to the metewand that each corresponding task unit is corresponding
The implementing result data that conversion module 120 is obtained are evaluated by data by evaluation module 130, it is determined that with metewand number
According to corresponding evaluation result data.According to corresponding with each TU task unit pre-conditioned, by update module 140 at original
The setting of the TU task unit corresponding with the evaluation result data is adjusted in business planning chart, and generates new task scheduling table.Most
Afterwards the new task scheduling table is pushed to the wearable device by sending module 150.
The wearable device task scheduling method of adjustment provided in another embodiment of the invention, as shown in fig. 6, including under
Row step:
S210:Each TU task unit in the ancestral task planning chart received from cloud server arranges the machine task meter
Draw.
The task scheduling table that user selects to be provided on cloud server in user side, from after being determined above and download
Just there is ancestral task planning chart, individual TU task unit of the user side in this ancestral task planning chart sets the machine will
The task scheduling of execution, such as control alarm clock, related sensor etc..
S220:The Planning Directive specified by the TU task unit is performed in the time specified by each TU task unit, obtains corresponding
User activity data.
According to the machine to the timing node of each TU task unit distribution, related element is controlled, perform in the specified time and appoint
Planning Directive specified by business unit, and get corresponding user activity data.Such as alarm clock refers in " plan of getting up "
Fixed " 7:00 " start sounding reminding, and record the time of alarm clock closing, geographic position sensors obtain the machine present position, the heart
Rate sensor and acceleration transducer judge User Activity state (active state of getting up, or sleep state).Preferably, task
Unit includes task objective content, tasks carrying detection sign on, tasks carrying detection END instruction, and tasks carrying detection is opened
Begin to instruct to start the instruction that Detection task purpose content is performed, tasks carrying detection END instruction is to stop the detection task
The instruction that purpose content is performed.It is further preferred that tasks carrying hint instructions are added in TU task unit, to set in unlatching
Standby prompt facility module reminds user to perform the task objective content, and such as tasks carrying detects that the time of sign on is
“7:00 ", " 6:55 " arrange a corresponding tasks carrying hint instructions reminds user to prepare to hold by the work of equipment prompting function
The content of row TU task unit, more fully ensures completing for task.
Preferably, the machine task scheduling includes briefing time, sensor opening time and sensor shut-in time, institute
State the briefing time according to the task objective content shift to an earlier date the scheduled time arrange, the sensor opening time is according to task
Perform detection sign on is arranged, and the sensor shut-in time detects that END instruction is arranged according to the tasks carrying.Above
Described instruction is supplied to equipment to perform, and the machine task scheduling content described herein is provided to user's reading, holds for thinking
Row instructs and changes reference.
Preferably, the sensor that user activity data is specified by Planning Directive is obtained, including User Activity the execution time,
Place and/or the sensing data corresponding with User Activity are performed, is held to the TU task unit for determining corresponding
Row and the implementing result data for obtaining according to this.
S230:To cloud server upload the user activity data for formulate corresponding evaluation result information and/or
New task scheduling table.
The machine uploads to the user activity data for collecting on cloud server, and server is to these user activity datas
It is analyzed and processes and make evaluation result information, or draws new task scheduling table.These user activity datas it is interior
Appearance has been mentioned above, and will not be described here.The mode of upload user activity data has two kinds, and one kind is to collect a user
Immediately to server upload after activity data, the user equipment internal memory that the method is required is little, and to the task of data storage clothes are transferred to
Business device is carried out, but the method is needed in the reasonable area of network coverage situation, is otherwise likely to result in loss of data.Another
The mode that user activity data is uploaded is to concentrate upload, this mode to set user after certain setting time the data
It is standby to have high demands but low to network requirement, store it in equipment after the activity data for collecting user, treat through setting
Time concentrate upload, for example uploaded by family WIFI.
Preferably, upload to be detected in equipment and carry out when network signal meets preset signal strength.Either mobile communication
, all there is signal strength in network signal or indoor WIFI signal that Network Provider is provided, mobile communication equipment is past
Toward mobile status is in, different location signal strength is different, if signal is weaker to be likely to result in upload data failure, therefore selects
System detectio to network signal meet certain signal strength signal intensity when carry out again, with this be further ensured that upload data it is smooth
Carry out.
S240:Evaluation result information and/or new task scheduling table of the cloud server according to user activity data is obtained,
It is corresponding to show object information and/or replace ancestral task planning chart.
Treat that cloud server will draw evaluation result after the completion of data processing, user can learn user to active task
Complete situation, if with some evaluation medium such as fractions, the score of user can be learnt, or with the vivider side of expression
Formula, for example, obtain a certain virtual present as reward (american sage herb, little red flag etc.).Or draw more conform to perform it is actual new
Task scheduling table, the difficulty of task scheduling is properly increased or reduced according to the practical manifestation of user, try hard to accomplish in proper order
It is gradual to carry out custom culture.Showing object information and replacing ancestral task planning chart individually to be carried out, it is also possible to closed
And perform.
Preferably, the step of showing the object information includes:Evaluation result information is corresponding with specific virtual objects;
Show the virtual objects.Virtual objects are american sage herb, little red flag, small goldfish etc., different degrees of evaluation result information pair
Answer the virtual objects of varying number so that equipment interface is more attractive in appearance, also make tasks carrying more interesting.
Preferably, such as Fig. 7, for step S210, also include the step of the machine task scheduling is set:
S211:Confirm task scheduling table modification authority checking information.
When needing the task scheduling table to getting to modify, modification authority checking information is first input into before editor,
To match with the corresponding account on server after the completion of changing.
S212:Particular task unit in ancestral task planning chart is modified.Needed to from clothes according to user itself
Business device end is downloaded the task scheduling table for obtaining and is modified, and can change the parameter in some of which TU task unit, it is also possible to right
Task details is deleted or increased to TU task unit.
S213:The machine task scheduling is arranged according to each TU task unit in amended task scheduling table, and by the modification
Task scheduling table afterwards is uploaded onto the server.
Modification completes to need to confirm to perform after task scheduling table, and each TU task unit sets in equipment foundation task scheduling table
The task scheduling performed to be equipped with the machine to need is put, meanwhile, need that amended task scheduling table is uploaded onto the server, make clothes
Business device is consistent with the task scheduling table that local user is used, and shows that user performs the evaluation that TU task unit is obtained in order to corresponding
Object information and/or the replacement of version is updated to task scheduling table.
Aforesaid method is adapted to, based on computer modularized thinking, another embodiment of the present invention provides a kind of wearable
Equipment task Plan rescheduling device, as shown in figure 8, including:
Receiver module 210, each TU task unit in the ancestral task planning chart received from cloud server for basis sets
Put the machine task scheduling.The task scheduling table that user selects to be provided on cloud server in user side, receiver module 210 is from above
It is determined that and just having ancestral task planning chart, each task of the user side in this ancestral task planning chart after downloading
Unit sets the task scheduling that the machine will be performed, such as control alarm clock, related sensor etc..
Performing module 220, in the time specified by each TU task unit the Planning Directive specified by the TU task unit is performed, and is obtained
Take corresponding user activity data.Performing module 220, to the timing node of each TU task unit distribution, controls correlation according to the machine
Element, in the specified time Planning Directive specified by TU task unit is performed, and gets corresponding user activity data.
Upper transmission module 230, to cloud server the user activity data is uploaded.The machine is by the User Activity number for collecting
According to being uploaded on cloud server by upper transmission module 230, the mode of upload has two kinds, and one kind is to collect a User Activity
Immediately to server upload after data, the user equipment internal memory that the method is required is little, and to the task of data storage server is transferred to
Carry out, but the method is needed in the reasonable area of network coverage situation, is otherwise likely to result in loss of data.Another user
The mode that activity data is uploaded is that the data are concentrated into upload after certain setting time, and this mode will to the equipment of user
Ask high, but low to network requirement, store it in after the activity data for collecting user in equipment, whne through setting when
Between concentrate upload, for example uploaded by family WIFI.
Acquisition module 240, for obtaining cloud server according to the evaluation result information of the user activity data and/or
New task scheduling table, accordingly shows the object information and/or replaces the ancestral task planning chart.Treat that cloud server will
Evaluation result is drawn after the completion of data processing, user can learn that user completes to active task by acquisition module 240
Situation, if with some evaluation medium such as fractions, the score of user can be learnt, or with vivider representation, example
A certain virtual present is such as obtained as reward (american sage herb, little red flag etc.).Or show that more conforming to the new of execution reality appoints
Business planning chart after, acquisition module 240 is replaced ancestral task planning chart, properly increased according to the practical manifestation of user or
The difficulty of task scheduling is reduced, tries hard to accomplish to carry out incremental formula custom culture.Show object information and replace ancestral task
Planning chart can be carried out individually, it is also possible to merged and performed.
Present invention method simultaneously according to above-mentioned another embodiment provides a kind of wearable device, including second processing
Device, the second processing device is used to perform the wearable device task scheduling method of adjustment as described in another embodiment.Receiver module
The 210 each TU task units in the ancestral task planning chart received from cloud server arrange the machine task scheduling.Perform mould
Block 220 performs the Planning Directive specified by the TU task unit in the time specified by each TU task unit, obtains corresponding user and lives
Dynamic data, then the user activity data is uploaded to cloud server by upper transmission module 230.Device to be serviced is by after data processing
Obtain result, by acquisition module 240 obtain cloud server according to the user activity data evaluation result information and/or
New task scheduling table, accordingly shows the object information and/or replaces the ancestral task planning chart.Finally realize to task
The renewal of the incremental formula of planning chart.
For ease of the implementation that those skilled in the art are easier to understand the present invention, in the example below narration actual scene
How the adjustment of wearable device task scheduling is completed.
Wearable device task scheduling adjustment server is provided according to various age brackets, various family's feelings on a certain interface
The habit formation task scheduling of the various aspects that condition or psychological study achievement are made, than if any " plan of getting up ", " afternoon nap
Plan ", " good night plan ", " plan of reading aloud " and/or " exercise program " etc..The server detects a certain user and determines selection
A certain task scheduling, detects afterwards the application of user's desired modifications task schedulings and submits amended task scheduling to again
Table, server authentication has passed through the modification authority of the user, receives and be updated to amended task scheduling table.User can wear
Wear on equipment, or the task scheduling that it is selected is modified on other users end, after the completion of submit to server.Work as service
Device confirms that the task scheduling that the user performs on wearable device includes three TU task units such as " plan of getting up ", " afternoon nap meter
Draw " and " good night plan ", the time cycle of training plan is 10 days, performs place respectively at home, in kindergarten and in family, train
The detection time for supporting TU task unit implementation status each in the works is respectively " 7:30”、“13:00 " and " 21:00 ", the head of a family can carry
Before inform the child of oneself will a certain moment before this time point or this time point perform each task unit,
Prompting can be set on wearable device, such as increase reminder time option in task planning chart, carry with corresponding above
The awake time is respectively " 7:20”、“12:50 " and " 20:50”.According to the mode arranged in advance, server gets wearable device
On the user activity data that transmits, such as the execution time of above three TU task unit is " 8 in some day:00”、“13:
10”、“21:30 ", server is translated into implementing result data according to certain rule, the task in task scheduling table
After the execution cycle, by implementing result data summarization statistics and by its with it is set it is pre-conditioned compare, " risen with TU task unit
As a example by bed plan ", user has 7 times of getting up to exceed metewand data 20 minutes in task scheduling table, meets the task
Metewand data modification is " 7 in unit:40 " or by reminder time in TU task unit " 7 are revised as:10 " condition, therefore
Server releases the new task scheduling table being adapted with the actual implementing result of the user, and the new task scheduling table is pushed
To corresponding user.
It is of course also possible to be such process:
A certain user (certain head of a family) selects wherein closest browsing first by the task scheduling provided on browser server
When user (child of the head of a family) actual conditions task scheduling table and download it to that user is currently in use it is wearable
On equipment, in case there is a need, user wish to carry out some information in task scheduling table more to have it is adaptive more
Change, click on modification option, the link of modification authority checking, head of a family's input password password, by Authority Verification are had after opening
Link is simultaneously modified to a certain task scheduling table, and a new task scheduling table is formed after modification, and user is new according to this
Task scheduling table is performed, while also showing the new task scheduling table being carrying out under the user account simultaneously on server.
There are three custom training plans, respectively " plan of getting up ", " health afternoon nap " and " good night plans ", culture on the task scheduling table
The time cycle of plan is 10 days, perform place respectively at home, in kindergarten and in family, each TU task unit is held in training plan
The beginning detection time of market condition is respectively " 7:30”、“13:00 " and " 21:00 " (head of a family can be with the child of advance notice oneself
Each task unit is performed at a certain moment before this time point or this time point, also can be on wearable device
Arrange and remind, such as increase reminder time option in each TU task unit of task planning chart, and during prompting corresponding above
Between be respectively " 7:20”、“12:50 " and " 20:50 "), detection of end time respectively " 8:30”、“14:00”、“22:00”.Can
Wearable device opens related sensor according to above-mentioned time point or components and parts start gathered data, and selects daily 22:
00 to server uploads these data for collecting automatically, and a planned time cycle namely 10 days, later wearable device was received
To the evaluation information that server is sended over, it is shown above go out user to the implementing result of task scheduling that selects before such as
What, and the task scheduling table after updating is provided, if user completes very good, the Extending culture planned time cycle can be adopted
Continue executing with, it is also possible to change respective selection, the more scientific training plan for selecting difficulty larger is continued executing with.If used
Person can not accomplish the content that each TU task unit specifies, reach the certain standard of original setting, such as gets up 20 minutes in evening in the morning
Number of times more than 7 times, then the detection time of each TU task unit implementation status is updated to " 7:40 ", or by task scheduling table
Reminder time be updated to " 7:10 ", wearable device is received and performs week in new after these related contents are updated
Interim execution.
Those skilled in the art of the present technique be appreciated that can be realized with computer program instructions these structure charts and/or
The combination of each frame and these structure charts and/or block diagram and/or the frame in flow graph in block diagram and/or flow graph.This technology is led
Field technique personnel be appreciated that can by these computer program instructions be supplied to all-purpose computer, special purpose computer or other
The processor of programmable data processing method realizing, so as to pass through the process of computer or other programmable data processing methods
Device is come the scheme specified in the frame or multiple frames that perform structure chart disclosed by the invention and/or block diagram and/or flow graph.
Those skilled in the art of the present technique are appreciated that in various operations, method, the flow process discussed in the present invention
Step, measure, scheme can be replaced, changed, combined or deleted.Further, it is each with what is discussed in the present invention
Other steps, measure in kind operation, method, flow process, scheme can also be replaced, changed, reset, decomposed, combined or deleted.
Further, it is of the prior art with various operations, method, the flow process disclosed in the present invention in step, measure, scheme
Can also be replaced, changed, reset, decomposed, combined or deleted.
The above is only some embodiments of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.In sum, technical scheme provided by the present invention is as described below:
A1, a kind of wearable device task scheduling method of adjustment, comprise the following steps:
The user activity data that wearable device is uploaded is received, the user activity data is according in ancestral task planning chart
Each corresponding TU task unit is obtained;
Mathematical treatment is carried out to its related user activity data in units of the TU task unit, to determine each job order
The implementing result data of unit;
According to the corresponding metewand data of each corresponding task unit, the implementing result number corresponding to each TU task unit
According to being evaluated, it is determined that the evaluation result data corresponding with the metewand data;
According to corresponding with TU task unit pre-conditioned, adjustment and the evaluation result data phase in ancestral task planning chart
The setting of corresponding TU task unit, generates new task scheduling table;
The new task scheduling table is pushed to the wearable device.
A2, the wearable device task scheduling method of adjustment according to A1, the foundation is corresponding with TU task unit pre-
It is concrete the step of the setting of the adjustment TU task unit corresponding with the evaluation result data in ancestral task planning chart if condition
Including:
It is described pre-conditioned including one or more expression formulas, each expression formula include setting number range and with setting number
Value scope it is corresponding adjustment TU task unit mapping, when the evaluation result data it is described it is pre-conditioned in one expression
In the setting number range of formula, according to the mapping TU task unit corresponding with the evaluation result data is adjusted.
A3, the wearable device task scheduling method of adjustment according to A2, the number range that sets is as default evaluation
Cumulative frequency is interval, and the corresponding TU task unit is mapped as when the implementing result data corresponding to each TU task unit are entered
The accumulation that row is evaluated evaluates number of times in the default evaluation cumulative frequency is interval, adjusts in ancestral task planning chart and is commented with this
The setting of the corresponding TU task unit of valency result data, generates new task scheduling table.
A4, the wearable device task scheduling method of adjustment according to A2, described corresponding to each TU task unit holds
The step of row result data is evaluated includes:
The implementing result data are compared with the metewand data according to mutual data block is corresponding, are obtained
Go out to compare amplitude data;
According to the evaluation rule in the metewand data, the amplitude data that compares is converted into evaluation result number
According to.
A5, the wearable device task scheduling method of adjustment according to A4, the evaluation rule is as follows:When the comparison
Amplitude data meets particular preset data area, that is, provide the evaluation score corresponding with the particular preset data area;
When the evaluation score corresponding to TU task unit described at least one meets corresponding with the TU task unit pre-conditioned
During the particular fraction of middle setting, the setting of the TU task unit corresponding with the evaluation score is adjusted, generate new task scheduling table.
A6, the wearable device task scheduling method of adjustment according to A1, the TU task unit is included in task objective
Hold, tasks carrying detects the time started, the tasks carrying detection end time, the tasks carrying detection time started is to start inspection
Survey the moment that the task objective content is performed, the tasks carrying detection end time is in the stopping detection task objective
Hold the moment for performing;The step of user activity data is obtained is as follows:
The tasks carrying detection time started is reached, is started the sensor related to the task objective content and is recorded number
According to;
The tasks carrying detection end time is reached, the sensor and stop recording data are closed, the data that recorded are
User activity data.
A7, the wearable device task scheduling method of adjustment according to A6, the user activity data is lived including user
It is dynamic to perform the time, perform place and/or the sensing data corresponding with User Activity, by during the execution of the User Activity
Between carry out the time data part that Mathematical treatment obtains implementing result data, and/or
The place that performs of the User Activity is carried out into the geographic position data portion that Mathematical treatment obtains implementing result data
Point, and/or
The sensing data corresponding with User Activity is carried out into the activity that Mathematical treatment obtains implementing result data
Content data part.
A8, the wearable device task scheduling method of adjustment according to A7, the execution time of the user activity data
It is contained between the tasks carrying of TU task unit detection time started and tasks carrying detection end time.
A9, the wearable device task scheduling method of adjustment according to A1 are right during implementing the Mathematical treatment
Initial data in the user activity data from different sensors is suitable for respectively different preset rules or preset algorithm
Data mart modeling process is carried out, so as to obtain the implementing result data.
A10, the wearable device task scheduling method of adjustment according to A1, push this and new appoint to the wearable device
Also include after the step of business planning chart:
The new task scheduling table is sent to user side;
Get after the modifying for the new task scheduling table of user side submission task meter after the modification that obtains
Table is drawn, the authority information in task planning chart after the modification is parsed;
If the authority information is matched with the authority information that prestores, updated with task planning chart correspondence after the modification and stored
Described new task scheduling table.
A11, the wearable device task scheduling method of adjustment according to A10, the authority information is password, tests in real time
At least one in card code or particular organisms feature.
A12, the wearable device task scheduling method of adjustment according to A1, the upload mode of the user activity data
To upload in real time, or
The scheduled time after the user activity data is formed uploads.
A13, the wearable device task scheduling method of adjustment according to A1, the task scheduling table also includes user circle
Surface skin subject information, the user interface be for performing the task scheduling table in the related user interface of plan target.
B14, a kind of wearable device task scheduling method of adjustment, comprise the following steps:
Each TU task unit in the ancestral task planning chart received from cloud server arranges the machine task scheduling;
The Planning Directive specified by the TU task unit is performed in the time specified by each TU task unit, corresponding user is obtained
Activity data;
To cloud server the user activity data is uploaded for formulating corresponding evaluation result information and/or new appointing
Business planning chart;
Evaluation result information and/or new task scheduling table of the cloud server according to the user activity data is obtained,
Accordingly show the evaluation result information and/or replace the ancestral task planning chart.
B15, the wearable device task scheduling method of adjustment according to B14, the TU task unit includes task objective
Content, tasks carrying detection sign on, tasks carrying detection END instruction, the tasks carrying detection sign on is beginning
The instruction that the task objective content is performed is detected, the tasks carrying detection END instruction is the stopping detection task objective
The instruction that content is performed.
B16, the wearable device task scheduling method of adjustment according to B15, the TU task unit is also held including task
Row hint instructions, the prompt facility module for opening equipment in the tasks carrying hint instructions reminds user to perform the task mesh
Content.
B17, the wearable device task scheduling method of adjustment according to B15, the machine task scheduling includes task
Prompt time, sensor opening time and sensor shut-in time, the briefing time is according to the task objective content
Scheduled time setting in advance, the sensor opening time detects that sign on is arranged according to tasks carrying, and the sensor is closed
Close the time and detect that END instruction is arranged according to the tasks carrying.
B18, the wearable device task scheduling method of adjustment according to B14, the user activity data is by the meter
Draw the sensor specified to obtain, including User Activity performs time, execution place and/or corresponding with User Activity
Sensing data, to determine the implementing result data that the corresponding TU task unit is carried out and obtains according to this.
B19, the wearable device task scheduling method of adjustment according to B14, the upload side of the user activity data
Formula is upload in real time, or
The scheduled time after the user activity data is formed uploads.
B20, the wearable device task scheduling method of adjustment according to B19, the upload is detecting network signal
Carry out when meeting preset signal strength.
B21, the wearable device task scheduling method of adjustment according to B14, the step of the display object information
Suddenly include:
Evaluation result information is corresponding with specific virtual objects;
Show the virtual objects.
B22, the wearable device task scheduling method of adjustment according to B14, the basis is received from cloud server
Ancestral task planning chart in each TU task unit also include the step of the machine task scheduling is set:
Confirm task scheduling table modification authority checking information;
Particular task unit in the ancestral task planning chart is modified;
The machine task scheduling is arranged according to each TU task unit in amended task scheduling table, and by described amended
Business planning chart is uploaded onto the server.
C23, a kind of wearable device task scheduling adjusting apparatus, including:
Receiver module, for receiving wherein each job order that wearable device is obtained according to ancestral task planning chart and uploaded
The corresponding user activity data of unit;
Conversion module, for carrying out Mathematical treatment to its related user activity data in units of the TU task unit,
To determine the implementing result data of each TU task unit;
Evaluation module is relative to each TU task unit for according to the corresponding metewand data of each corresponding task unit
The implementing result data answered are evaluated, it is determined that the evaluation result data corresponding with the metewand data;
Update module, it is corresponding with TU task unit pre-conditioned for foundation, adjust in ancestral task planning chart and be somebody's turn to do
The setting of the corresponding TU task unit of evaluation result data, generates new task scheduling table;
Sending module, for pushing the new task scheduling table to the wearable device.
C24, the wearable device task scheduling adjusting apparatus according to C23, the sending module includes:
Transmitting element, for sending the new task planning chart to user side;
Resolution unit, for getting the modifying for the new task scheduling table of user side submission after obtain
Task planning chart after modification, parses the authority information in task planning chart after the modification;
Updating block, if matching with the authority information that prestores for the authority information, with task planning chart after the modification
Correspondingly update the described new task scheduling table for having stored.
D25, a kind of wearable device task scheduling adjusting apparatus, including:
Receiver module, each TU task unit in the ancestral task planning chart received from cloud server for basis arranges this
Machine task scheduling;
Performing module, in the time specified by each TU task unit the Planning Directive specified by the TU task unit is performed, and is obtained
Corresponding user activity data;
Upper transmission module, to cloud server the user activity data is uploaded;
Acquisition module, for obtaining cloud server according to the evaluation result information of the user activity data and/or new
Task scheduling table, accordingly show the object information and/or replace the ancestral task planning chart.
A kind of E26, server, including first processor, the first processor is used to perform as described in A1~A13 is arbitrary
Wearable device task scheduling method of adjustment.
A kind of F27, wearable device, including second processing device, the second processing device is used to perform such as B14~B22 institutes
The wearable device task scheduling method of adjustment stated.
Claims (10)
1. a kind of wearable device task scheduling method of adjustment, it is characterised in that comprise the following steps:
The user activity data that wearable device is uploaded is received, the user activity data is according to each phase in ancestral task planning chart
Corresponding TU task unit is obtained;
Mathematical treatment is carried out to its related user activity data in units of the TU task unit, to determine each TU task unit
Implementing result data;
According to the corresponding metewand data of each corresponding task unit, the implementing result data corresponding to each TU task unit are entered
Row is evaluated, it is determined that the evaluation result data corresponding with the metewand data;
According to corresponding with TU task unit pre-conditioned, adjust corresponding with the evaluation result data in ancestral task planning chart
TU task unit setting, generate new task scheduling table;
The new task scheduling table is pushed to the wearable device.
2. wearable device task scheduling method of adjustment according to claim 1, it is characterised in that the foundation and task
Unit is corresponding pre-conditioned, and setting for the TU task unit corresponding with the evaluation result data is adjusted in ancestral task planning chart
The step of putting specifically includes:
It is described pre-conditioned including one or more expression formulas, each expression formula include setting number range and with setting numerical value model
Enclose the mapping of corresponding adjustment TU task unit, when the evaluation result data it is described it is pre-conditioned in an expression formula
In setting number range, according to the mapping TU task unit corresponding with the evaluation result data is adjusted.
3. wearable device task scheduling method of adjustment according to claim 1, it is characterised in that the TU task unit bag
Task objective content, tasks carrying detection time started, tasks carrying detection end time are included, the tasks carrying detection starts
Time is the moment for starting to detect that the task objective content is performed, and the tasks carrying detection end time detects institute for stopping
State the moment of task objective content execution;The step of user activity data is obtained is as follows:
The tasks carrying detection time started is reached, starts the sensor related to the task objective content and record data;
The tasks carrying detection end time is reached, the sensor and stop recording data are closed, the data that recorded are user
Activity data.
4. wearable device task scheduling method of adjustment according to claim 1, it is characterised in that implement at the mathematics
During reason, different default rule are suitable for respectively to the initial data in the user activity data from different sensors
Then or preset algorithm carries out data mart modeling process, so as to obtain the implementing result data.
5. wearable device task scheduling method of adjustment according to claim 1, it is characterised in that to the wearable device
Also include after the step of pushing the new task scheduling table:
The new task scheduling table is sent to user side;
Task planning chart after the modification that obtains is got after the modifying for the new task scheduling table of user side submission,
Parse the authority information in task planning chart after the modification;
If the authority information is matched with the authority information that prestores, the institute for having stored is correspondingly updated with task planning chart after the modification
State new task scheduling table.
6. a kind of wearable device task scheduling method of adjustment, it is characterised in that comprise the following steps:
Each TU task unit in the ancestral task planning chart received from cloud server arranges the machine task scheduling;
The Planning Directive specified by the TU task unit is performed in the time specified by each TU task unit, corresponding User Activity is obtained
Data;
To cloud server the user activity data is uploaded for formulating corresponding evaluation result information and/or new task meter
Draw table;
Evaluation result information and/or new task scheduling table of the cloud server according to the user activity data is obtained, accordingly
Show the evaluation result information and/or replace the ancestral task planning chart.
7. a kind of wearable device task scheduling adjusting apparatus, it is characterised in that include:
Receiver module, for receiving wherein each TU task unit phase that wearable device is obtained according to ancestral task planning chart and uploaded
Corresponding user activity data;
Conversion module, for carrying out Mathematical treatment to its related user activity data in units of the TU task unit, with true
The implementing result data of fixed each TU task unit;
Evaluation module, it is corresponding to each TU task unit for according to the corresponding metewand data of each corresponding task unit
Implementing result data are evaluated, it is determined that the evaluation result data corresponding with the metewand data;
Update module, in ancestral task planning chart adjustment and the evaluation corresponding with TU task unit pre-conditioned for foundation
The setting of the corresponding TU task unit of result data, generates new task scheduling table;
Sending module, for pushing the new task scheduling table to the wearable device.
8. a kind of wearable device task scheduling adjusting apparatus, it is characterised in that include:
Receiver module, each TU task unit in the ancestral task planning chart received from cloud server for basis arranges the machine and appoints
Business plan;
Performing module, in the time specified by each TU task unit the Planning Directive specified by the TU task unit is performed, and obtains corresponding
User activity data;
Upper transmission module, to cloud server the user activity data is uploaded;
Acquisition module, for obtaining cloud server according to the evaluation result information of the user activity data and/or new appointing
Business planning chart, accordingly shows the object information and/or replaces the ancestral task planning chart.
9. a kind of server, including first processor, it is characterised in that the first processor is used to perform such as claim 1
~5 arbitrary described wearable device task scheduling methods of adjustment.
10. a kind of wearable device, including second processing device, it is characterised in that the second processing device is used to perform such as right
Require the wearable device task scheduling method of adjustment described in 6.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611160689.XA CN106647945A (en) | 2016-12-15 | 2016-12-15 | Task plan adjustment method of wearable device, and device |
PCT/CN2017/116673 WO2018108175A1 (en) | 2016-12-15 | 2017-12-15 | Task plan adjustment method for wearable device, and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611160689.XA CN106647945A (en) | 2016-12-15 | 2016-12-15 | Task plan adjustment method of wearable device, and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106647945A true CN106647945A (en) | 2017-05-10 |
Family
ID=58823742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611160689.XA Pending CN106647945A (en) | 2016-12-15 | 2016-12-15 | Task plan adjustment method of wearable device, and device |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106647945A (en) |
WO (1) | WO2018108175A1 (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107239578A (en) * | 2017-06-30 | 2017-10-10 | 江西博瑞彤芸科技有限公司 | The processing method of mission bit stream |
CN107679826A (en) * | 2017-09-20 | 2018-02-09 | 广东乐心医疗电子股份有限公司 | Intelligent feeding method and device |
CN107785078A (en) * | 2017-10-23 | 2018-03-09 | 上海斐讯数据通信技术有限公司 | It is a kind of that method, intelligent apparatus and the system for delaying disease are given up based on intelligent apparatus |
CN107887006A (en) * | 2017-10-27 | 2018-04-06 | 上海京颐科技股份有限公司 | Rehabilitation programme based reminding method and device, storage medium, server |
WO2018108175A1 (en) * | 2016-12-15 | 2018-06-21 | 北京奇虎科技有限公司 | Task plan adjustment method for wearable device, and device |
CN108734503A (en) * | 2018-03-06 | 2018-11-02 | 北京猎户星空科技有限公司 | A kind of method for information display, device and smart machine |
CN108986903A (en) * | 2018-06-29 | 2018-12-11 | 拉卡拉支付股份有限公司 | Monitoring method, device, electronic equipment and storage medium based on wearable device |
CN109040450A (en) * | 2018-08-07 | 2018-12-18 | 广东小天才科技有限公司 | Task reminding method, device, equipment and storage medium based on wearable equipment |
CN109634589A (en) * | 2018-12-07 | 2019-04-16 | 上海上实龙创智慧能源科技股份有限公司 | A kind of processing method for the automatic Realtime Alerts task of sewage treatment process |
CN109636175A (en) * | 2018-12-07 | 2019-04-16 | 上海上实龙创智慧能源科技股份有限公司 | A kind of automatic processing method of business system timed task |
WO2019082064A1 (en) * | 2017-10-26 | 2019-05-02 | International Business Machines Corporation | Physiological sensing in energy-constrained wearables |
CN110889715A (en) * | 2019-01-10 | 2020-03-17 | 广东乐心医疗电子股份有限公司 | Gift box unlocking method, gift box, device, electronic equipment and storage medium |
CN111599134A (en) * | 2020-05-18 | 2020-08-28 | 广东小天才科技有限公司 | State reminding method, state setting method, state reminding system, intelligent wearable device and mobile terminal |
CN112835413A (en) * | 2019-11-25 | 2021-05-25 | Oppo广东移动通信有限公司 | Control method and device of wearable device and electronic device |
CN114386878A (en) * | 2022-03-04 | 2022-04-22 | 中铁第一勘察设计院集团有限公司 | Method and system for generating maintenance schedule of railway communication equipment and storage medium |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111983929B (en) * | 2019-05-23 | 2024-03-12 | 美智纵横科技有限责任公司 | Household appliance, control method thereof and computer readable storage medium |
CN113031282A (en) * | 2021-04-27 | 2021-06-25 | 歌尔股份有限公司 | Method for adjusting size of binding band of head-mounted display equipment and related device |
CN113269454A (en) * | 2021-06-02 | 2021-08-17 | 南京海必思科技有限公司 | Learning habit training system and method based on wearable equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1855056A (en) * | 2005-04-21 | 2006-11-01 | 国际商业机器公司 | Workload scheduling method |
CN101980228A (en) * | 2010-09-01 | 2011-02-23 | 张辉 | Human body information monitoring and processing system and method |
CN102567638A (en) * | 2011-12-29 | 2012-07-11 | 无锡微感科技有限公司 | Interactive upper limb rehabilitation system based on micro-sensor |
CN104616120A (en) * | 2015-02-27 | 2015-05-13 | 广东小天才科技有限公司 | Method and system for customizing learning plan based on curriculum schedule |
CN104656891A (en) * | 2015-01-15 | 2015-05-27 | 广东小天才科技有限公司 | Equipment communication method and device |
CN105808915A (en) * | 2014-12-30 | 2016-07-27 | 环达电脑(上海)有限公司 | Automatic adjustment method for exercise plan |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106647945A (en) * | 2016-12-15 | 2017-05-10 | 北京奇虎科技有限公司 | Task plan adjustment method of wearable device, and device |
-
2016
- 2016-12-15 CN CN201611160689.XA patent/CN106647945A/en active Pending
-
2017
- 2017-12-15 WO PCT/CN2017/116673 patent/WO2018108175A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1855056A (en) * | 2005-04-21 | 2006-11-01 | 国际商业机器公司 | Workload scheduling method |
CN101980228A (en) * | 2010-09-01 | 2011-02-23 | 张辉 | Human body information monitoring and processing system and method |
CN102567638A (en) * | 2011-12-29 | 2012-07-11 | 无锡微感科技有限公司 | Interactive upper limb rehabilitation system based on micro-sensor |
CN105808915A (en) * | 2014-12-30 | 2016-07-27 | 环达电脑(上海)有限公司 | Automatic adjustment method for exercise plan |
CN104656891A (en) * | 2015-01-15 | 2015-05-27 | 广东小天才科技有限公司 | Equipment communication method and device |
CN104616120A (en) * | 2015-02-27 | 2015-05-13 | 广东小天才科技有限公司 | Method and system for customizing learning plan based on curriculum schedule |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018108175A1 (en) * | 2016-12-15 | 2018-06-21 | 北京奇虎科技有限公司 | Task plan adjustment method for wearable device, and device |
CN107239578A (en) * | 2017-06-30 | 2017-10-10 | 江西博瑞彤芸科技有限公司 | The processing method of mission bit stream |
CN107679826A (en) * | 2017-09-20 | 2018-02-09 | 广东乐心医疗电子股份有限公司 | Intelligent feeding method and device |
CN107785078B (en) * | 2017-10-23 | 2022-06-03 | 杭州吉吉知识产权运营有限公司 | Method for giving up protracted illness based on intelligent device, intelligent device and system |
CN107785078A (en) * | 2017-10-23 | 2018-03-09 | 上海斐讯数据通信技术有限公司 | It is a kind of that method, intelligent apparatus and the system for delaying disease are given up based on intelligent apparatus |
CN111263923B (en) * | 2017-10-26 | 2024-06-11 | 国际商业机器公司 | Physiological sensing of energy-constrained wearable devices |
US11653845B2 (en) | 2017-10-26 | 2023-05-23 | International Business Machines Corporation | Continuous physiological sensing in energy-constrained wearables |
GB2581733A (en) * | 2017-10-26 | 2020-08-26 | Ibm | Physiological sensing in energy-constrained wearables |
WO2019082064A1 (en) * | 2017-10-26 | 2019-05-02 | International Business Machines Corporation | Physiological sensing in energy-constrained wearables |
GB2581733B (en) * | 2017-10-26 | 2022-03-09 | Ibm | Physiological sensing in energy-constrained wearables |
CN111263923A (en) * | 2017-10-26 | 2020-06-09 | 国际商业机器公司 | Physiological sensing of energy-constrained wearable devices |
CN107887006A (en) * | 2017-10-27 | 2018-04-06 | 上海京颐科技股份有限公司 | Rehabilitation programme based reminding method and device, storage medium, server |
CN108734503A (en) * | 2018-03-06 | 2018-11-02 | 北京猎户星空科技有限公司 | A kind of method for information display, device and smart machine |
CN108986903A (en) * | 2018-06-29 | 2018-12-11 | 拉卡拉支付股份有限公司 | Monitoring method, device, electronic equipment and storage medium based on wearable device |
CN109040450A (en) * | 2018-08-07 | 2018-12-18 | 广东小天才科技有限公司 | Task reminding method, device, equipment and storage medium based on wearable equipment |
CN109636175A (en) * | 2018-12-07 | 2019-04-16 | 上海上实龙创智慧能源科技股份有限公司 | A kind of automatic processing method of business system timed task |
CN109634589A (en) * | 2018-12-07 | 2019-04-16 | 上海上实龙创智慧能源科技股份有限公司 | A kind of processing method for the automatic Realtime Alerts task of sewage treatment process |
CN110889715A (en) * | 2019-01-10 | 2020-03-17 | 广东乐心医疗电子股份有限公司 | Gift box unlocking method, gift box, device, electronic equipment and storage medium |
CN112835413A (en) * | 2019-11-25 | 2021-05-25 | Oppo广东移动通信有限公司 | Control method and device of wearable device and electronic device |
WO2021103971A1 (en) * | 2019-11-25 | 2021-06-03 | Oppo广东移动通信有限公司 | Method and apparatus for controlling wearable device, and electronic device |
CN112835413B (en) * | 2019-11-25 | 2024-05-31 | Oppo广东移动通信有限公司 | Control method and device of wearable device and electronic device |
CN111599134A (en) * | 2020-05-18 | 2020-08-28 | 广东小天才科技有限公司 | State reminding method, state setting method, state reminding system, intelligent wearable device and mobile terminal |
CN114386878A (en) * | 2022-03-04 | 2022-04-22 | 中铁第一勘察设计院集团有限公司 | Method and system for generating maintenance schedule of railway communication equipment and storage medium |
CN114386878B (en) * | 2022-03-04 | 2024-07-16 | 中铁第一勘察设计院集团有限公司 | Railway communication equipment maintenance schedule generation method, system and storage medium |
Also Published As
Publication number | Publication date |
---|---|
WO2018108175A1 (en) | 2018-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106647945A (en) | Task plan adjustment method of wearable device, and device | |
US10325514B2 (en) | Systems and techniques for tracking sleep consistency and sleep goals | |
EP3841960A1 (en) | Optimizing sleep onset based on personalized exercise timing to adjust the circadian rhythm | |
US20220125375A1 (en) | Method and System for Measuring, Predicting, and Optimizing Human Cognitive Performance | |
US20170329933A1 (en) | Adaptive therapy and health monitoring using personal electronic devices | |
KR102571069B1 (en) | User knowledge tracking device, system and operation method thereof based on artificial intelligence learning | |
CN109479110A (en) | The system and method that dynamic creation individualizes exercise videos | |
US11120326B2 (en) | Systems and methods for a context aware conversational agent for journaling based on machine learning | |
US20140099614A1 (en) | Method for delivering behavior change directives to a user | |
US20140363797A1 (en) | Method for providing wellness-related directives to a user | |
US11663400B2 (en) | Configuration and deployment of extensible templates | |
JP4192127B2 (en) | Sleep state management device and sleep state management method | |
Birth | Time blind | |
US20110256521A1 (en) | Method and apparatus for customizing lesson plans | |
CN103190902A (en) | Methods and systems for determining, monitoring, and analyzing personalized response variables using brain wave frequency data and interactive multimedia display | |
US20150170531A1 (en) | Method for communicating wellness-related communications to a user | |
CN106231993B (en) | System and method for predicting circadian rhythm phase | |
CN106875118A (en) | Task scheduling in group performs control method, device and server | |
CN106776073A (en) | Wearable device and its task execution control method and device | |
CN112071138A (en) | Companion processing method and device, and electronic device | |
Williams et al. | The UCD perspective: Before and after agile | |
CN111009318A (en) | Virtual reality technology-based autism training system, method and device | |
Son | Toward a proposed framework for mood recognition using LSTM recurrent neuron network | |
Nunn et al. | Errorless, errorful, and retrieval practice for naming treatment in aphasia: A scoping review of learning mechanisms and treatment ingredients | |
Ozenc et al. | Reverse alarm clock: a research through design example of designing for the self |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |