- WO2018084709A1 WO2018084709A1 PCT/NL2017/050715 NL2017050715W WO2018084709A1 WO 2018084709 A1 WO2018084709 A1 WO 2018084709A1 NL 2017050715 W NL2017050715 W NL 2017050715W WO 2018084709 A1 WO2018084709 A1 WO 2018084709A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- hoisting device
- load
- connection point
- hoisting
- connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
- B63B27/32—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using cableways
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/36—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
- B66C23/52—Floating cranes
Definitions
- the present invention relates to an offshore method to hand over a load, in particular a submerged load, from a first hoisting device to a second hoisting device.
- a load from a first hoisting device to a second hoisting device, for example from a first crane on a first vessel to a second crane on a second vessel.
- a deep sea lowering system it may be desirable to hold a load by a deep sea lowering system in order to enable the deep sea lowering system to lower the load to a deep sea level.
- the hoisting element for example a hoisting wire
- the load has to be handed over to the deep sea lowering system, while the load is submerged.
- the load may for example be held below sea level by a crane arranged on the same or another vessel, with the hoisting element, for example a hoisting wire running at the side of the vessel into the sea.
- the load is also connected, for example using a triangle plate, to the hoisting element of the deep sea lowering system so that the load force can be taken over by lifting the hoisting element of the deep sea lowering system and/or by lowering the hoisting element of the crane.
- a drawback of the known method is therefore that to hand over a load from a first hoisting device to a second hoisting device, the load may have to be brought to a relatively large depth in order to enable transfer of a load from a first hoisting device to the second hoisting device.
- One of the hoisting devices may not be suitable to be lowered to such a large depth, for instance, a reeving of the crane wires over a large number of sheaves/falls will allow a large load to be lifted, but at the same time will limit the depth that can be reached as the length of the crane wire will become governing for this.
- lowering a hoisting element that is reeved in a large number of falls is a relatively slow and time consuming process. Thereby, at larger depth, the position and/or orientation of the load may be more difficult to control.
- the invention provides a method as claimed in claim 1.
- a rigid intermediate device is used that may improve control of the transfer of the load from the first hoisting device to the second hoisting device. Also, the transfer of the load may be carried out at a smaller depth below sea level.
- the intermediate device comprises a first connection point connected or to be connected with a flexible elongate hoisting element of the first hoisting device and a second connection point connected or to be connected to a flexible elongate hoisting element of the second hoisting device.
- the hoisting element may for example comprise one or more hoisting wires, lines, pipes, chains, etc.
- the first connection point and the second connection point are spaced with respect to each other.
- the distance between the first connection point and the second connection point may be at least 5 meters, preferably at least 10 meters, more preferably at least 15 meters.
- the load Before transfer of the load, the load is sub merged and completely suspended from the first hoisting device, and connected with a slack hoisting element, such as a wire, to the second hoisting device.
- a slack hoisting element such as a wire
- the first connection point may be lowered with the first hoisting device and/or the second connection point may be lifted with the second hoisting device until the load is completely suspended from the second hoisting device.
- the second connection point is lifted until the second connection point is at substantially the same height as the first connection point, and thereafter the first connection point is lowered to transfer the load completely to the second hoisting device.
- the intermediate device will tilt due to the relative movement of the first connection point with respect to the second connection point. This tilting of the intermediate device causes a lateral shift of the load from a position below a lifting location of the first hoisting device to a position below a lifting location of the second hoisting device.
- the lifting location of the first or second hoisting device is the location where the flexible hoisting element of the respective hoisting device is connected to the rigid construction of the hoisting device.
- the term lifting location is used to indicate a vertical line along which a flexible hoisting element of a hoisting device will hang when only a gravity force is exerted on the hoisting element.
- the flexibility of the rigid intermediate device is substantially smaller with respect to the hoisting elements of the first and second hoisting devices.
- the hoisting elements are for example hoisting wires, lines, pipes, chains, etc.
- the method comprises the step of adjusting a horizontal distance between a lifting location of the first hoisting device and a lifting location of the second hoisting device to substantially correspond to a distance between the first connection point and the second connection point of the intermediate device, before the step of transferring the load from the first hoisting device to the second hoisting device.
- This can for instance be achieved by adjusting the position of one or both of the hoisting devices.
- connection between the load and the intermediate device is designed such that a load force of the load is approximately equally distributed over the first hoisting device and the second hoisting device, when the first connection point and the second connection point are arranged at the same height.
- the load is approximately equally distributed over the first hoisting device and the second hoisting device, when the load force held by the first hoisting device is 40-60% of the complete load force and the rest of the load force is held by the second hoisting device.
- connection between the load and the intermediate device such that a load force of the load is approximately equally distributed over the first hoisting device and the second hoisting device, when the first connection point and the second connection point are arranged at the same height, such gradual lateral shift of the load may be obtained.
- the connection may for example comprise one connection element connected to a third connection point in the middle between the first connection point and the second
- the load is connected by a first connection element to the first connection point and by a second connection element the second connection point.
- the load may be connected by connection elements, such as wires, lines, or chains to both the first connection point and the second connection point.
- first connection element and the second connection element have approximately the same length. Further, the length of each of the first and second connection element can be 0,5 - 3 times, preferaby 1 - 2 times the distance between the first connection point and the second connection point.
- the actual connection device to connect the first connection element to the intermediate device may be different than the actual connection device for the first hoisting device.
- the same first connection point here means that the connection of the first hoisting device and the first connection element are relatively close to each other on the intermediate device compared to the distance to the second connection point.
- the first connection point may be one end of a spreader bar, where both the first hoisting device and the first connection element are connected.
- the actual connection device to connect the second connection element to the intermediate device may be different than the actual connection device for the second hoisting device, but, in that case, the connection of the second hoisting device and the second connection element to the intermediate device are relatively close to each other compared to the distance to the first connection point.
- the first connection point may also comprise a single connection device to connect both the first hoisting device and the first connection element
- the second connection point may be a single connection device to connect both the second hoisting device and the second connection element.
- the first connection element is flexible and/or the second connection element is flexible.
- Flexible connection elements are for example wires, lines or chains.
- first connection element and/or the second connection element each comprises two or more rigid bars or beams that are pivotably and serially linked to each other.
- the step of connecting the second hoisting device to the second connection point is carried out during the step of suspending the load completely from the first hoisting device.
- the method comprises the step of submerging the load into water, before the step of transferring the load from the first hoisting device to the second hoisting device are arranged on two separate vessels.
- the method of the invention is designed for offshore applications in which a load is transferred from a first hoisting device to a second hoisting device, when this load is submerged in the sea.
- the method may start while the load is still above sea level, for instance arranged on a deck of a vessel.
- the steps of providing a rigid intermediate device, connecting the load to the intermediate device, and connecting the first hoisting device to the first connection point may be carried out before the load is submerged into the sea.
- the method of the invention may be used to transfer a load suspended from a first hoisting device, for example a first crane, arranged on a first vessel and a second hoisting device, for example, a second crane arranged on a second vessel.
- a first hoisting device for example a first crane
- a second hoisting device for example, a second crane arranged on a second vessel.
- the method is in particular suitable when during hand over of the load a lateral shift of the load is required. This may be the case when it is not possible to bring the lifting location of the first hoisting device and the lifting location of the second hoisting device close to each other, for example since the first and second vessel cannot be arranged sufficiently close to each other.
- the length of the lateral shift may for example be at least 5 meters, preferably at least 10 meters, more preferably at least 15 meters.
- the first hoisting device is arranged on a vessel having a moon pool, wherein an elongate hoisting element of the first hoisting device runs through the moon pool, and wherein an elongate hoisting element of the second hoisting device is arranged at a location horizontally spaced from the moon pool.
- the intermediate device is a spreader bar.
- a spreader bar having an elongate shape may advantageously be used as an intermediate device.
- One end of the spreader bar may be provided with the first connection point and the other opposite end of the spreader bar may be provided with the second connection point.
- any object providing a rigid connection between a first and second connection point that are spaced with respect to each other may be used as the intermediate device.
- the intermediate device may for example be a beam or a plate.
- the invention further provides a load transfer arrangement to hand over a load, when submerged, comprising a first hoisting device, a second hoisting device, and a rigid intermediate device, wherein the intermediate device comprises a first connection point and a second connection point, wherein the first connection point and the second connection point are spaced with respect to each other, wherein the first hoisting device is connected to the first connection point, wherein the second hoisting device is connected to the second connection point, and wherein the load is connected to the intermediate device, wherein the load transfer arrangement is configured to carry out the method of any of the claims 1-13.
- a horizontal distance between a lifting location of the first hoisting device and a lifting location of the second hoisting device substantially corresponds to a distance between the first connection point and the second connection point.
- the horizontal distance is at least 5 meters, preferably at least 15 meters.
- the load is connected with a first connection element to the first connection point and with a second connection element to the second connection point.
- first connection element and/or the second connection element each comprises two or more rigid bars or beams that are pivotably and serially linked to each other.
- Figure 3 shows a second embodiment of a load transfer arrangement.
- Figure 1 shows a load transfer arrangement, generally denoted by reference numeral
- the arrangement 1 comprises a first hoisting device 2 and a second hoisting device 3.
- the first hoisting device 2 and the second hoisting device 3 are both arranged on a vessel 4, in particular a deep dead construction vessel.
- the arrangement 1 is configured to transfer a load 20 from the first hoisting device 2 to the second hoisting device 3.
- the first hoisting device 2 is a crane having a flexible elongate hoisting arrangement 5 formed by a number of lifting wires, a crane hook, and rigging suspended from the hook. From a lifting location 6, the hoisting element 5 is suspended from a crane boom 7.
- the crane shown in Figure 2 is a revolving mast type crane, but may also be any other suitable type of crane. The position of the lifting location 6 of the crane may be adjusted by rotation of the crane.
- the second hoisting device 3 is a deep sea lowering system arranged on the vessel 4.
- the deep sea lowering system is for example a deep water lowering system with one or more wires that are routed through a pipelay tower.
- the deep sea lowering system also comprises a flexible elongate hoisting element 8 that runs through a moon pool 9 in the vessel 4.
- the lifting location 10 of the second hoisting device 3 is the location where the hoisting element is connected to the rigid construction of the second hoisting device 3.
- the load transfer arrangement 1 further comprises an elongate spreader bar 11 having a first connection point 12 at a first end of the spreader bar 11 and a second connection point 13 at the opposite end of the spreader bar 11.
- first connection point 12 and the second connection point 13 are spaced with respect to each other over almost the entire length of the spreader bar 11.
- the hoisting element 5 of the first hoisting device 2 is connected to the first connection point 12 of the spreader bar 1 1 and the hoisting element 8 of the second hoisting device 3 is connected to the second connection point 13 of the spreader bar 10.
- the load 20 is connected to the spreader bar 10, whereby a first flexible connection element 14, for example a wire, chain or line, is connected to the first connection point 12 and a second flexible connection element 15, for example a wire, chain or line, connected to the second connection point 13.
- the first flexible connection element 14 and the second flexible connection element 15 are of substantially the same length.
- a load force of the load 20 is approximately equally distributed over the first hoisting device 2 and the second hoisting device 3 when the first connection point 12 and the second connection point 13 are arranged at the same height.
- the arrangement 1 may be used to transfer a load 20 from the first hoisting device 2 to the second hoisting device 3, whereby the lifting location 6 of the first hoisting device 2 and the lifting location 10 of the second hoisting device 3 are at a horizontal distance from each other. Due to the horizontal distance, the load has to make a lateral shift to be transferred from a position below the lifting location 6 of the first hoisting device 2 to a position below the lifting location 10 of the second hoisting device 3.
- the load 20 is to be suspended from the second hoisting device 3 in order to make it possible to lower the load 20 to a deep sea location. Since the load 20 comprises a package that cannot be moved or at least not easily be moved through the moon pool 9, the load 20 first has to be submerged next to the vessel into the sea S using a different hoisting device, in this case the first hoisting device 2. When the load 20 is submerged into the sea the above-mentioned lateral shift should be carried out in order to hold the load by the second hoisting device 3and below the lifting location 10 of the second hoisting device 3.
- FIG. 2a corresponds to the state of the load transfer arrangement shown in Figure
- the hoisting element 8 of the second hoisting device 3 is already connected to the second connection point 13, but no substantial lifting force is exerted by the second hoisting device 3 on the load 20. As a result, the load 20 is arranged at a position below the lifting location 6 of the first hoisting device 2.
- Figure 2b shows the arrangement 1 during the first part of the transfer of the load from the first hoisting device 2 to the second hoisting device 3.
- the second connection point 13 of the spreader bar 11 is pulled upwards by a lifting action of the second hoisting device 3. This results in a tilting of the spreader beam 1 1 from a vertical position towards a horizontal position.
- the second flexible connection element 15 is however still slack and the load 20 is completely suspended from the first hoisting device 2.
- the load 20 is still arranged at a position substantially below the lifting location 6 of the first hoisting device 2.
- the distance between the first connection point 12 and the second connection point 13 of the spreader bar 11 substantially corresponds to a horizontal distance between the lifting location 6 of the first hoisting device 2 and the lifting location 10 of the second hoisting device 3.
- the first connection point 12 is arranged at a position below the lifting location 6 of the first hoisting device 2 and the second connection point 13 is arranged at a position below the lifting location 10 of the second hoisting device 3.
- the first connection point 12 of the spreader bar 11 is lowered by the first hoisting device 2 to continue hand over of the load 20 from the first hoisting device 2 to the second hoisting device 3.
- the second connection point 13 could be lifted by the second hoisting device 3 to achieve the same result.
- the load or at least part thereof may be transferred back to the first hoisting device 2, for example after a certain operation has been carried out. It will be clear that when the first hoisting device 2 was released from the spreader bar 11 , the first hoisting device 2 first has to be reconnected at the first connection point 12, before transfer of the load from the third hoisting device 3 to the first hoisting device 2 may be carried out. The transfer may then be realized by lifting of the first connection point 12 up to the same level as the second connection point 13 and subsequent lowering of the second connection point 13, until the load is completely suspended from the first hoisting device 2.
- Figure 3 shows an alternative embodiment of a load transfer arrangement.
- the same part of parts having the same function are denoted by the same reference numerals.
- the main difference with the embodiment of Figures 1 and 2a-2d is that the first connection element 14 and the second connection element 15 are not provided as flexible elements.
- the first connection element 14 comprises two connection sub-elements 14a, 4b that are pivotably and serially linked to each other.
- the second connection element 15 also comprises two connection sub-elements 15a, 15b that are pivotably and serially linked to each other.
- the load 20 is completely suspended from the second hoisting device 3, similar to the state of Figure 2d.
- the two connection sub-elements 15a, 15b are pulled vertically in line by the load 20.
- the two connection sub-elements 14a, 14b of the first connection element 14 are hinged at an angle instead of being slack. It is remarked that the two connection sub-elements 14a, 14b may be folded further towards each other until the two connection sub-elements 14a, 14b are substantially parallel.
- connection sub-elements 14a, 14b being pulled straight, similar to the flexible connection 14 of the embodiment of Figure 1 and 2a-2d. Thereafter, the load 20 will make a lateral shift from a position below lifting location 10 to a position below lifting location 6 and the load will completely be suspended from the first hoisting device 2.
- the second connection element 15 may be folded by hinging of the two connection sub-elements 15a, 15b with respect to each other.
- connection sub-elements 15a, 15b may be folded together until the two connection sub-elements 15a, 15b are substantially parallel. This results in an elongate collapsed configuration of the combination of the spreader bar 11 , first connection element 14 and second connection element 15, that for example can easily be stored on the deck of the vessel 4.
- first hoisting device 2 and the second hoisting device 3 are arranged on the same vessel.
- a similar method may be used to transfer a load from a first hoisting device arranged on a first vessel to a second hoisting device arranged on a second vessel, in particular when such transfer requires a lateral shift of the load from a position under a lifting location of the first hoisting device to a position under a lifting location of the second hoisting device.
- Such situation may for instance occur when the first and second vessel are not able to approach each other sufficiently close in order to transfer the load without such lateral shift.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Input Circuits Of Receivers And Coupling Of Receivers And Audio Equipment (AREA)
- Supplying Of Containers To The Packaging Station (AREA)
- Forklifts And Lifting Vehicles (AREA)
Abstract
Description
Claims
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB1907577.9A GB2572872B (en) | 2016-11-07 | 2017-11-06 | A method of handing over a load, and an arrangement to hand over a load |
| US16/346,193 US10710845B2 (en) | 2016-11-07 | 2017-11-06 | Method of handing over a load, and an arrangement to hand over a load |
| BR112019009322-2A BR112019009322B1 (en) | 2016-11-07 | 2017-11-06 | A METHOD OF DELIVERING A CARGO, AND AN ARRANGEMENT FOR DELIVERING A CARGO |
| NO20190695A NO346359B1 (en) | 2016-11-07 | 2019-06-04 | A method of handing over a load, and an arrangement to hand over a load |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NL2017736A NL2017736B1 (en) | 2016-11-07 | 2016-11-07 | A method of handing over a load, and an arrangement to hand over a load. |
| NL2017736 | 2016-11-07 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2018084709A1 true WO2018084709A1 (en) | 2018-05-11 |
Family
ID=57737939
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/NL2017/050715 Ceased WO2018084709A1 (en) | 2016-11-07 | 2017-11-06 | A method of handing over a load, and an arrangement to hand over a load |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US10710845B2 (en) |
| GB (1) | GB2572872B (en) |
| NL (1) | NL2017736B1 (en) |
| NO (1) | NO346359B1 (en) |
| WO (1) | WO2018084709A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7506452B2 (en) * | 2021-06-30 | 2024-06-26 | 株式会社キトー | TRANSPORT SYSTEM AND CONTROL METHOD FOR TRANSPORT SYSTEM |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102128311B (en) * | 2010-12-09 | 2012-10-24 | 中国海洋石油总公司 | Method and device for installing typical underwater manifold in swing mode |
| EP2907786A1 (en) * | 2014-02-17 | 2015-08-19 | Terex Cranes Germany GmbH | Connector and combination crane and connecting method using the same |
| KR20160085609A (en) * | 2015-01-08 | 2016-07-18 | 대우조선해양 주식회사 | Dual crane spreader beam system for module lifting fpso and the ship or offshore platform including the same |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2852917B1 (en) * | 2003-03-26 | 2005-06-24 | Saipem Sa | SEALED COMPARTMENT RECEPTACLE AND METHOD OF PLACING IT TO RECOVER POLLUTANT EFFLUENTS FROM A EPAVE |
| GB2434627B (en) * | 2006-01-31 | 2010-10-20 | Subsea 7 Ltd | Apparatus and method for laying down, abandoning and recovering a pipe on the sea floor |
| NO330923B1 (en) * | 2007-07-05 | 2011-08-15 | Nat Oilwell Norway As | Procedure for hoisting a package at sea |
| BRPI0901003A2 (en) * | 2008-04-22 | 2010-04-06 | Aker Marine Contractors As | method of extending a seabed object in very deep water from a boat with a compensated rocking crane, and apparatus for supporting the loading of a submerged object suspended from a boat |
| DE102008059805A1 (en) * | 2008-12-01 | 2010-06-02 | Liebherr-Werk Nenzing Gmbh | Device for lifting and lowering of load in water, has lifting unit with hoist rope and storage drum with another hoist rope, which are particularly arranged on floating unit |
| GB2466983B (en) * | 2009-01-16 | 2013-10-30 | Subsea 7 Ltd | A method and apparatus for supporting a load |
| IT1396585B1 (en) * | 2009-10-23 | 2012-12-14 | Saipem Spa | METHOD TO LEAVE A UNDERWATER PIPE ON A BED OF A WATER BODY |
-
2016
- 2016-11-07 NL NL2017736A patent/NL2017736B1/en not_active IP Right Cessation
-
2017
- 2017-11-06 GB GB1907577.9A patent/GB2572872B/en not_active Expired - Fee Related
- 2017-11-06 US US16/346,193 patent/US10710845B2/en active Active
- 2017-11-06 WO PCT/NL2017/050715 patent/WO2018084709A1/en not_active Ceased
-
2019
- 2019-06-04 NO NO20190695A patent/NO346359B1/en unknown
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102128311B (en) * | 2010-12-09 | 2012-10-24 | 中国海洋石油总公司 | Method and device for installing typical underwater manifold in swing mode |
| EP2907786A1 (en) * | 2014-02-17 | 2015-08-19 | Terex Cranes Germany GmbH | Connector and combination crane and connecting method using the same |
| KR20160085609A (en) * | 2015-01-08 | 2016-07-18 | 대우조선해양 주식회사 | Dual crane spreader beam system for module lifting fpso and the ship or offshore platform including the same |
Also Published As
| Publication number | Publication date |
|---|---|
| GB2572872A (en) | 2019-10-16 |
| BR112019009322A2 (en) | 2019-07-30 |
| NL2017736B1 (en) | 2018-05-23 |
| US20190292019A1 (en) | 2019-09-26 |
| GB2572872B (en) | 2021-12-08 |
| GB201907577D0 (en) | 2019-07-10 |
| NO346359B1 (en) | 2022-06-27 |
| NO20190695A1 (en) | 2019-06-04 |
| US10710845B2 (en) | 2020-07-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112770995B (en) | Device and method for erecting a tubular element having a longitudinal direction at the outer end | |
| EP3992140B1 (en) | Crane, vessel comprising such a crane, and a method for up-ending a longitudinal structure | |
| EP2379404B1 (en) | A method and apparatus for supporting a load | |
| BE1026086B1 (en) | Lifting block for a crane | |
| JP5878392B2 (en) | Detachable mooring system and method for disconnecting or reconnecting the mooring system | |
| US12195305B2 (en) | Vessel and method for installation of a pile adapted to support an offshore wind turbine | |
| US7624882B2 (en) | Tie-back system for cranes, in particular heavy load offshore cranes | |
| NL2016371B1 (en) | Method, vessel and lifting device for use in an upending procedure for off shore piles. | |
| EP4114778B1 (en) | Combination of an elongate structure and a lifting arrangement for upending the structure, and a method of upending an elongate structure to an upright orientation. | |
| US10710845B2 (en) | Method of handing over a load, and an arrangement to hand over a load | |
| CN105398944B (en) | Steel structure component bikini lifts by crane erecting device | |
| NO20160941A1 (en) | Hinged cable termination | |
| KR102854148B1 (en) | Lifting system and method for lifting elongated objects | |
| NO320257B1 (en) | Device for protection of an elongated element on the seabed and method of installation of the same. | |
| KR101643893B1 (en) | Flying jib applying method of floating crane | |
| EP3105161B1 (en) | A device for handling and storage of a traveling unit of an offshore crane | |
| RU2219093C2 (en) | Device for raising objects from deep depths | |
| KR20260036314A (en) | Hoisting device and method for erecting slender loads | |
| BR112019009322B1 (en) | A METHOD OF DELIVERING A CARGO, AND AN ARRANGEMENT FOR DELIVERING A CARGO | |
| KR20260035944A (en) | Hoisting tool and method for erecting slender loads |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17817220 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112019009322 Country of ref document: BR |
|
| ENP | Entry into the national phase |
Ref document number: 201907577 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20171106 |
|
| ENP | Entry into the national phase |
Ref document number: 112019009322 Country of ref document: BR Kind code of ref document: A2 Effective date: 20190507 |
|
| 122 | Ep: pct application non-entry in european phase |