WO2017174050A1 - Starting crossbar for an ascension bay with ladder of a system scaffold, system scaffold having such starting crossbars, and method for mounting a system scaffold - Google Patents
Starting crossbar for an ascension bay with ladder of a system scaffold, system scaffold having such starting crossbars, and method for mounting a system scaffold Download PDFInfo
- Publication number
- WO2017174050A1 WO2017174050A1 PCT/DE2017/000085 DE2017000085W WO2017174050A1 WO 2017174050 A1 WO2017174050 A1 WO 2017174050A1 DE 2017000085 W DE2017000085 W DE 2017000085W WO 2017174050 A1 WO2017174050 A1 WO 2017174050A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- scaffold
- scaffolding
- cross bar
- crossbar
- initial
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/28—Clips or connections for securing boards
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/155—Platforms with an access hatch for getting through from one level to another
Definitions
- the present invention relates to an initial crossbar for a climbing field with ladder of a system scaffold, the scaffolding frames with parallel spaced having an upper crossbar and a lower crossbar connected scaffolding stems.
- the present invention further relates to a system framework, in particular Layher lightning scaffold system, arranged scaffold-shaped in scaffolding longitudinally spaced scaffolding frames with scaffolding posts, which are interconnected by upper cross bar and lower cross member, connected in the upper cross bars
- a rise field is present, with an upper scaffolding floor with a pass-through flap, on the underside of a ladder is connected.
- the present invention also relates to a method for assembling such a system framework.
- FIG. 8a is a perspective section of this known Layher Flash scaffold system 50 is shown.
- the system framework 50 has scaffolding frames 52, which are in framework longitudinal direction GL in a predetermined grid
- Each scaffolding 52 consists of two in
- a gusset plate 66 is welded in each case in the inner corner area between the upper cross bar 56 and the scaffold posts 53.
- the scaffolding frames 52 are designed so that they can be plugged into each other in the vertical direction.
- the upper cross bar 56 is formed as upwardly open U-profile, are suspended in the framework floors 54.
- Scaffolding frame 52 itself is attached to height adjustable foot spindles 68 with its scaffold posts 53, which in turn on a
- Floor board 78 are stored on the bottom side in the lowest level.
- the stiffening via the connection of diagonal 64 in the gusset plate area and in the opposite lower end of the adjacent scaffolding frame 52.
- Each two adjacent scaffolding frames 52 in conjunction with the scaffold floors 54 form a framework field.
- a rise field 70 is formed, the top side a scaffold floor 54.1 - mounted in the upper cross bar 56 of the adjacent scaffolding frame 52 of the climbing field 70 - a pass-through flap 60 which folds upwards
- a conductor 62 is connected or mounted.
- the lower end region of the bars of the ladder 62 is mounted on a riser floor 76 which is left and right of an initial cross bar 80 is connected, which is arranged between the foot spindles 68 and the foot spindles 68 plugged scaffolding frames 52.
- the initial transverse bar has 80 in its two end regions in each case a tube sleeve 82 which is plugged onto the spindles 68 before the scaffolding frame 52 is attached.
- Scaffolding system 50 is detected after completion of the system scaffold 50 that has been forgotten to mount the riser floor 76 and the initial cross bar 80. This results in the image shown in FIG. 7.
- the ladder 62 depends, depending on the Ausspindelung the foot spindles 68 in the air or is too steep or too uncertain on the existing terrain floor. The subsequent attachment of Togethersquerriegeln 80 for hanging a
- the task or the technical problem of specifying an initial crossbar which can be retrofitted in a simple and faster manner in an already created system framework and economically produced.
- the present invention is further based on the object of specifying a system framework in which a safe storage of the ladder in the area of the ascent field is subsequently made possible.
- the present invention has the object or the technical problem of specifying a method that allows subsequent installation of a climbing scaffold floor as a reliable storage structure for the ladder.
- the initial cross bar according to the invention is characterized in that the initial cross bar has a positive locking contour in its respective opposite end end regions.
- the length of the initial cross bar is designed so that it can be retrofitted between two scaffolding posts of a scaffolding frame and the positive locking contours in each case Outer contour of the respective scaffold handle at least partially positively surrounds and in the
- the starting transverse bolt according to the invention can subsequently be easily attached to the already assembled system framework in a simple manner
- Ascending scaffold floor can be hung in the initial cross bar and the ladder can be safely stored with the lower end of the ladder stiles on the riser scaffold floor.
- a structurally particularly simple embodiment, which allows a quick connection of the climbing scaffold floor, is characterized in that the initial cross bar is designed as an upwardly open U-profile.
- a particularly advantageous and constructive embodiment of the inventive cross bar is characterized in that the positive locking contour is formed as a concave, in particular part-circular, recess in the front end region of the web of the U-profile.
- the positive locking contour is formed as a concave, in particular part-circular, recess in the front end region of the web of the U-profile.
- the formation of a part-circular recess is the fact that the scaffolding handles are usually designed as round tube profiles.
- An alternative embodiment which has a constructionally different form-locking contour, is characterized in that the form-fitting contour is formed by projecting over the web flanges of the U-profile, wherein the clear inner spacing of the flanges substantially to the outer diameter of the scaffold post of the
- Scaffolding corresponds to. It is particularly advantageous to provide web recesses in the web of the U-profile of the starting crossbar, through which any Bortbrettbolzen be feasible, so that the connection of Bortbrettern is also possible in this area.
- the U-profile cross-sectionally corresponds to the shape of the contours contours the cross section of the upper crossbar of the scaffolding frame.
- the upper crossbars are namely manufactured as a serial component in large numbers and can be used according to the invention by simply attaching the concave form-locking contour described above as an initial cross bar.
- the initial crossbar may additionally comprise holding units which abut, for example, on the suspension structures of the scaffold floor.
- the holding units may preferably be formed as welded between the flanges of the U-profile in the upper end portion profiled rod elements.
- system framework according to the invention in particular Layher Blitz scaffold system, of the aforementioned type is given by the features of independent claim 8. Accordingly, the system frame according to the invention is characterized in that on the lower cross braces of the adjacent scaffolding frames of the ascent each between the scaffolding posts an initial cross bar is placed positively according to one or more of claims 1 to 7, is connected to the at least one riser floor respectively connected to or suspended on the upper side of the lower cross braces of the adjacent scaffolding frames of the ascent each between the scaffolding posts an initial cross bar is placed positively according to one or more of claims 1 to 7, is connected to the at least one riser floor respectively connected to or suspended on the upper side of the lower
- the inventive method for mounting a system scaffolding with retrofitting a climbing scaffold floor for supporting a ladder is given by the features of claim 9.
- the inventive method is accordingly characterized in that after creation of the system framework in the climbing field on the lower crossbar of the left and right of the ascent field arranged scaffolding frames each an initial cross bar is placed according to one or more of claims 1 to 7 and a positive connection with the scaffold stems of the respective Scaffolding is achieved, at the initial cross bar at least one climbing scaffold floor
- the conductor is preferably arranged at an angle to the horizontal of 60 ° to 80 °, in particular approximately 70 °.
- Fig. 1 is a schematic perspective view of an embodiment of an initial cross bar for retrofitting Assembly of a climbing scaffold floor with the respective present in the frontal end region form-fitting contours, schematic plan view of the initial cross bar according to Hg-1,
- Fig. 3 is a schematic side view of the starting crossbar according to
- Fig. 4 shows a schematic cross section through initial crossbar according to
- Fig. 5 is a schematic fragmentary perspective view of an assembled system scaffold with subsequently mounted initial crossbars in the ascent field and to the
- FIG. 6 is a schematic perspective view of the detail A of FIG. 5,
- Fig. 7 is a schematic perspective view of a mounted
- Fig. 8a is a schematic fragmentary perspective view of a mounted known system scaffold with a mounted to start mounting riser base using a known initial cross bar, which is connected between the foot spindles and the attached scaffolding frame and
- Fig. 8b is a schematic perspective view of the known
- Figures 8a and 8b show a perspective fragmentary view of a known system scaffold 50, namely the Layher Blitz scaffold system, in the normal structure using a known starting cross bar 80 and connected to the transverse struts 58 in the ascent box 70 ascent floor 76, on the top side a ladder 62, which leads to the access door 60 of the scaffolding floor 54.1 arranged in the floor above.
- This known system framework 50 is described in the introduction to the description.
- Fig. 7 shows the situation of the system frame 50, in which it has been forgotten to mount the known initial crossbars 80 in time, so that a connection of a riser base 76 is not possible, whereby a secure inclined storage of the ladder is not possible.
- the same components bear the same reference numerals as in Fig. 8 and will not be explained again.
- Figures 1 to 4 show an embodiment of an initial cross bar 10, which is formed as an upwardly open U-profile with a lower side web 12 and on both sides formed, upwardly facing flanges 14.
- a concave form-fitting contour 20.1 or 20.2 is formed in the web 12, each having a part-circular recess 21.
- Recess 21 corresponds to the diameter of a scaffold post 53 of a scaffolding frame 52.
- the smallest clear inner spacing of the opposing form-fitting contours 20.1 or 20.2 is designated in Fig. 1 with the distance QL. This distance QL of the form-fitting contours 20.1, 20.2 or the
- Recess 21 essentially corresponds to the clear inner spacing of the framework stems 53 of the scaffolding frame 52.
- the longitudinal direction of the starting cross bar 10 is indicated in the figures 1 to 4 with L.
- the longitudinal direction L of the starting crossbar 10 corresponds to the state of the initial state used in the system frame 50. Due to the illustrated structural design of the starting cross bar 10, this can be retrofitted to a system frame 50 and indeed in a state as shown in Fig. 7, in which has been forgotten, the connection options for a riser floor 76 to create.
- Fig. 1 is further shown that in the web 12 of the initial cross bar 10 web recesses 16 are provided, which serve that any Bortbrettbolzen may be passed, so that Bortbretter can be connected in this area.
- the initial cross bar 10 in a simple manner to the lower cross member 58 of the
- FIG. 5 This state is shown schematically in FIG. 5, for example, on a known system framework 50.
- the system framework 50 corresponds to the system framework 50 shown in FIG. 7, but with the subsequent assembly of the initial crossbar 10 and the
- Fig. 6 shows in detail the arrangement of the subsequently launched in a simple manner and positively connected initial cross bar 10 on the not visible in Fig. 6 lower cross member 58 of the scaffolding frame 52.
- the illustrated form-fitting contour 20.1 or 20.2 provides a constructive solution for generating a positive connection of the laid on the cross member 58 initial cross bar 10 with the
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE112017001868.4T DE112017001868A5 (en) | 2016-04-07 | 2017-04-03 | Starting crossbar for a climbing field with ladder of a system scaffold, system scaffold with such initial crossbars and method for assembling a system scaffold |
PL17724728T PL3440279T3 (en) | 2016-04-07 | 2017-04-03 | Starting crossbar for an ascension bay with ladder of a system scaffold, system scaffold having such starting crossbars, and method for mounting a system scaffold |
EP17724728.5A EP3440279B1 (en) | 2016-04-07 | 2017-04-03 | Starting crossbar for an ascension bay with ladder of a system scaffold, system scaffold having such starting crossbars, and method for mounting a system scaffold |
ES17724728T ES2856127T3 (en) | 2016-04-07 | 2017-04-03 | Starting cross member for a ladder access area of a scaffold system, scaffolding system with starting cross members of this type and procedure for mounting a scaffold system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102016003997.3A DE102016003997A1 (en) | 2016-04-07 | 2016-04-07 | Starting crossbar for a climbing field with ladder of a system scaffold, system scaffold with such initial crossbars and method for assembling a system scaffold |
DE102016003997.3 | 2016-04-07 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017174050A1 true WO2017174050A1 (en) | 2017-10-12 |
Family
ID=58744932
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/DE2017/000085 WO2017174050A1 (en) | 2016-04-07 | 2017-04-03 | Starting crossbar for an ascension bay with ladder of a system scaffold, system scaffold having such starting crossbars, and method for mounting a system scaffold |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP3440279B1 (en) |
DE (2) | DE102016003997A1 (en) |
ES (1) | ES2856127T3 (en) |
PL (1) | PL3440279T3 (en) |
WO (1) | WO2017174050A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040094362A1 (en) * | 2002-11-15 | 2004-05-20 | Wyse Steven J. | Walkboard ledger for scaffolding |
EP1691007A2 (en) * | 2005-01-17 | 2006-08-16 | Ingenieria de Encofrados y Servicios, S.L. | Detachable cross-piece for supporting platforms in scaffolds |
WO2014095882A1 (en) * | 2012-12-20 | 2014-06-26 | Mon.Zon Development Ab | Auto-locking scaffold profile system |
-
2016
- 2016-04-07 DE DE102016003997.3A patent/DE102016003997A1/en not_active Withdrawn
-
2017
- 2017-04-03 ES ES17724728T patent/ES2856127T3/en active Active
- 2017-04-03 EP EP17724728.5A patent/EP3440279B1/en active Active
- 2017-04-03 DE DE112017001868.4T patent/DE112017001868A5/en not_active Withdrawn
- 2017-04-03 PL PL17724728T patent/PL3440279T3/en unknown
- 2017-04-03 WO PCT/DE2017/000085 patent/WO2017174050A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040094362A1 (en) * | 2002-11-15 | 2004-05-20 | Wyse Steven J. | Walkboard ledger for scaffolding |
EP1691007A2 (en) * | 2005-01-17 | 2006-08-16 | Ingenieria de Encofrados y Servicios, S.L. | Detachable cross-piece for supporting platforms in scaffolds |
WO2014095882A1 (en) * | 2012-12-20 | 2014-06-26 | Mon.Zon Development Ab | Auto-locking scaffold profile system |
Non-Patent Citations (2)
Title |
---|
"Katalog Layher Blitz Gerüst-System Technik-Broschüre", 1 December 2010 |
LST: "Rohlaserschneiden", 1 April 2016 (2016-04-01), Internet, pages 1 - 1, XP055389332, Retrieved from the Internet <URL:http://web.archive.org/web/20160401171535/http://www.lstgmbh.de/de/leistungen-und-produkte/rohr-und-profilbearbeitung> [retrieved on 20170710] * |
Also Published As
Publication number | Publication date |
---|---|
EP3440279B1 (en) | 2020-12-09 |
DE102016003997A1 (en) | 2017-10-12 |
EP3440279A1 (en) | 2019-02-13 |
PL3440279T3 (en) | 2021-06-14 |
DE112017001868A5 (en) | 2018-12-13 |
ES2856127T3 (en) | 2021-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE19633092A1 (en) | Removable facade scaffolding | |
EP1338723B1 (en) | Mounting device for a temporary scaffolding safety rail | |
EP2216465B1 (en) | Lead rail device and method for fitting same | |
DE102021004490A1 (en) | Modular scaffolding and modular scaffolding bars for such | |
DE102010017803A1 (en) | Scaffolding support for gabion-bracket scaffold for workers, has angular shaped bearing element arranged at wire mesh of gabion, and receiver provided with connection unit and hook, which are hung into wire of gabion | |
DE3108020C2 (en) | ||
EP2557252B1 (en) | Work platform and method for securely setting up a support frame tower | |
DE102007011777B4 (en) | Dismountable scaffolding and method for its construction and dismantling | |
DE102012019902A1 (en) | Plug-in and telescopic height-expandable working scaffold for house, has plug-in frames plugged on scaffold parts, platform arranged in basic frame, and vertical displaceable driving carriage supporting platform and arranged in basic frame | |
WO2017174050A1 (en) | Starting crossbar for an ascension bay with ladder of a system scaffold, system scaffold having such starting crossbars, and method for mounting a system scaffold | |
DE820963C (en) | Scaffolding with stands made of tubes | |
EP3109395B1 (en) | Ladder, in particular a step ladder with prevention against sinking | |
DE10305158A1 (en) | Safety railings for constructing multi-level scaffolding comprise U-shaped bars with support devices at ends of support rods to fit and secure on rail of topmost scaffold stage | |
EP2299028A2 (en) | Side guard rail for a scaffold | |
DE102016118844A1 (en) | Protective and / or work scaffold and method for its construction | |
DE202012100438U1 (en) | Ladder, in particular stepladder with a snap-in protection | |
DE3401906A1 (en) | Apparatus for the suspended fastening of a scaffold element | |
EP1134331A2 (en) | Set of elements for a scaffold | |
DE102019114913A1 (en) | Mounting adapters, safety railings, kit for a scaffolding and scaffolding and methods therefor | |
DE10305145B4 (en) | Scaffold stairway module | |
EP2602402B1 (en) | Dismountable facade scaffold | |
DE19946929A1 (en) | Device to connect two adjacent parts of system scaffolding for erections with non-rectangular bases; has connection elements for scaffolding elements with connection piece having connection heads | |
EP2275625A2 (en) | Scaffolding structure for main scaffolding and secondary scaffolding, particularly a scaffolding stairway | |
EP4018057A1 (en) | Railing device, specifically a leading railing for system scaffolding | |
DE102021122288A1 (en) | Scaffolding standard for vertical installation in a scaffolding section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 2017724728 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2017724728 Country of ref document: EP Effective date: 20181107 |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17724728 Country of ref document: EP Kind code of ref document: A1 |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: R225 Ref document number: 112017001868 Country of ref document: DE |