EP1691007A2 - Detachable cross-piece for supporting platforms in scaffolds - Google Patents
Detachable cross-piece for supporting platforms in scaffolds Download PDFInfo
- Publication number
- EP1691007A2 EP1691007A2 EP06380010A EP06380010A EP1691007A2 EP 1691007 A2 EP1691007 A2 EP 1691007A2 EP 06380010 A EP06380010 A EP 06380010A EP 06380010 A EP06380010 A EP 06380010A EP 1691007 A2 EP1691007 A2 EP 1691007A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- piece
- cross
- scaffolding
- uprights
- elements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000000284 resting effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
- E04G1/20—Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/302—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
- E04G7/306—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect
- E04G7/308—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect without tying means for connecting the bars or members
Definitions
- the present invention relates to a detachable cross-piece for supporting platforms in scaffolding, preferably facade scaffolding, in which a relatively light structure is attached to the facade of a building to be repaired and/or refurbished.
- Said scaffolding has, in addition to its strong structure, a large number of platforms for the passage of operators, who are protected by the necessary railings.
- the height between platforms is substantially standardised, as it is the height of the upright sections or uprights used, of approximately 2 metres, which is why, once the facade scaffolding has been formed, the access platforms for operators are separated in height by approximately 2 metres.
- the object of the present invention is to disclose means for mounting additional platforms at an intermediate height, every half metre above the conventional platforms, so as to allow the provision of additional platforms which will facilitate the work of operators on certain occasions.
- the present invention provides the use of pins for connecting the railings to the uprights or vertical sides of the facade scaffolding framework for positioning a few special cross-pieces which are centred in said scaffolding uprights and rest on the transverse pins for connecting the scaffolding uprights or framework, the pins also comprising security means for preventing the detachment thereof.
- Said cross-pieces therefore allow easy connection of new platform elements thereon, thus producing the auxiliary platforms according to the invention.
- the cross-pieces according to the present invention comprise a tubular element, of which the length substantially corresponds to the interval between the front and back upright elements of facade scaffolding, and have at each end elements for centring and support on the assembly rods of the railing elements, which is why said tubular elements comprise substantially U-shaped ends, the arm interval of which allows the connection thereof to the vertical elements of the facade scaffolding for the centring thereof therein and the intermediate web or bridge of which comprises a recess which allows them to be supported on the connecting pins of the aforementioned uprights or framework.
- the ends of the cross-pieces also comprise rocking hoops which embrace the aforementioned pins of the uprights at the bottom, preventing the accidental disconnection of the cross-pieces. Once the cross-pieces are in position, it is very easy to dispose on the cross-pieces new platform elements which are supported thereon and form the desired auxiliary platforms.
- Fig. 1 is a perspective view of facade scaffolding in which elements according to the present invention have been connected.
- Fig. 2 is a perspective view on a larger scale of a detail of the elements according to the invention.
- Fig. 3 is a perspective view of a cross-piece according to the invention.
- Fig. 4 is an elevation showing the method of positioning a cross-piece, according to the invention, in facade scaffolding.
- facade scaffolding is conventionally formed by two rows of uprights, of which one, adjacent to the building facade, is indicated by reference numerals 1, 1', 1", etc. and the other, parallel to the first, is indicated by reference numerals 2, 2', 2", etc., both rows resting on the ground 3 which is the street pavement.
- the scaffolding assembly is fixed to the facade and receives horizontal platforms, one element 4 of which is shown, for the passage of personnel. Railings, such as those designated by reference numerals 5 and 6, protect the platforms so that operators can work safely thereon.
- the railing elements are connected to the uprights by pins which are welded thereto and which pass through orifices in said railing elements, the pins comprising mechanisms which prevent the accidental disconnection thereof.
- Fig. 2 shows a detail of a railing element 7 which is connected to an upright 8 by a pin 10 integral therewith, which passes through the planar head end 9 of said element 7.
- the pin 10 comprises anti-retraction means for preventing the accidental disconnection of the railing element.
- a cross-piece 11 of tubular shape is fitted between the front uprights 8 and the back uprights 12 of the scaffolding, and is centred between said elements and supported on the corresponding pins of said uprights.
- the cross-piece 11, Fig. 3 comprises at its ends respective centring terminals, each of which comprises a pair of wings, only those corresponding to one end being shown for the sake of simplicity, it being understood that identical wings, only one of which is designated by reference numeral 14, are provided at the other end.
- Said cross-piece terminals have, in particular, a general U-shaped structure, of which the arms are separated by a width which allows the connection thereof to the uprights and of which the intermediate bridge or web 15 comprises a recess 16 at the bottom intended to mate with a connecting pin of the upright.
- the intermediate bridge or web 15 comprises a recess 16 at the bottom intended to mate with a connecting pin of the upright.
- hoops 17 and 18 of the rocking type intended to engage below the pins for connecting the uprights, to prevent the accidental disconnection of said cross-pieces 11.
- Fig. 1 also shows a plurality of cross-pieces according to the invention, such as 11', 11", 11'''.
- cross-pieces 11 Once the cross-pieces 11 have been connected, they can receive platform elements such as those designated by reference numeral 19 in Fig. 2. Auxiliary walkway platforms of any height corresponding to the railings 7 can be formed in this way.
- Fig. 4 illustrates a cross-piece 20 introduced at an inclination between the uprights 21 and 22 of the facade scaffolding, the connecting pins such as those designated by reference numerals 23, 24 and 23', 24' being welded to the uprights.
- the descent of the cross-piece 20 will end at the position shown in Fig. 2, in other words with the cross-piece 20 resting on the pins 23 and 24 and with the hoops 25 and 26 pivoted down to secure the cross-piece against accidental disconnection thereof and allow the assembly of new platforms for the passage of operators.
- auxiliary walkway platforms in the facade scaffolding will substantially increase the usefulness of said scaffolding for the operators who, according to the type of work to be done, can better adapt the working position.
Abstract
Description
- The present invention relates to a detachable cross-piece for supporting platforms in scaffolding, preferably facade scaffolding, in which a relatively light structure is attached to the facade of a building to be repaired and/or refurbished. Said scaffolding has, in addition to its strong structure, a large number of platforms for the passage of operators, who are protected by the necessary railings.
- The height between platforms is substantially standardised, as it is the height of the upright sections or uprights used, of approximately 2 metres, which is why, once the facade scaffolding has been formed, the access platforms for operators are separated in height by approximately 2 metres. However, it has frequently been found in practice, especially when it is necessary to carry out work in specific regions of the facade, that the operators find their work easier if they have platforms situated at a height different from that indicated. In practice, however, this gives rise to a significant constructional problem since the elements currently used for the construction of facade scaffolding do not allow easy provision of said additional platforms.
- The object of the present invention is to disclose means for mounting additional platforms at an intermediate height, every half metre above the conventional platforms, so as to allow the provision of additional platforms which will facilitate the work of operators on certain occasions.
- For this purpose, the present invention provides the use of pins for connecting the railings to the uprights or vertical sides of the facade scaffolding framework for positioning a few special cross-pieces which are centred in said scaffolding uprights and rest on the transverse pins for connecting the scaffolding uprights or framework, the pins also comprising security means for preventing the detachment thereof. Said cross-pieces therefore allow easy connection of new platform elements thereon, thus producing the auxiliary platforms according to the invention.
- Specifically, the cross-pieces according to the present invention comprise a tubular element, of which the length substantially corresponds to the interval between the front and back upright elements of facade scaffolding, and have at each end elements for centring and support on the assembly rods of the railing elements, which is why said tubular elements comprise substantially U-shaped ends, the arm interval of which allows the connection thereof to the vertical elements of the facade scaffolding for the centring thereof therein and the intermediate web or bridge of which comprises a recess which allows them to be supported on the connecting pins of the aforementioned uprights or framework. The ends of the cross-pieces also comprise rocking hoops which embrace the aforementioned pins of the uprights at the bottom, preventing the accidental disconnection of the cross-pieces. Once the cross-pieces are in position, it is very easy to dispose on the cross-pieces new platform elements which are supported thereon and form the desired auxiliary platforms.
- The accompanying drawings of a preferred embodiment of the present invention, given as a non-limiting example, will assist the understanding thereof.
- Fig. 1 is a perspective view of facade scaffolding in which elements according to the present invention have been connected.
- Fig. 2 is a perspective view on a larger scale of a detail of the elements according to the invention.
- Fig. 3 is a perspective view of a cross-piece according to the invention.
- Fig. 4 is an elevation showing the method of positioning a cross-piece, according to the invention, in facade scaffolding.
- Referring to the figures, facade scaffolding is conventionally formed by two rows of uprights, of which one, adjacent to the building facade, is indicated by
reference numerals reference numerals element 4 of which is shown, for the passage of personnel. Railings, such as those designated byreference numerals 5 and 6, protect the platforms so that operators can work safely thereon. - The railing elements are connected to the uprights by pins which are welded thereto and which pass through orifices in said railing elements, the pins comprising mechanisms which prevent the accidental disconnection thereof. Fig. 2 shows a detail of a
railing element 7 which is connected to an upright 8 by apin 10 integral therewith, which passes through theplanar head end 9 of saidelement 7. Thepin 10 comprises anti-retraction means for preventing the accidental disconnection of the railing element. - According to the present invention, a
cross-piece 11 of tubular shape is fitted between thefront uprights 8 and theback uprights 12 of the scaffolding, and is centred between said elements and supported on the corresponding pins of said uprights. For this purpose, thecross-piece 11, Fig. 3, comprises at its ends respective centring terminals, each of which comprises a pair of wings, only those corresponding to one end being shown for the sake of simplicity, it being understood that identical wings, only one of which is designated byreference numeral 14, are provided at the other end. Said cross-piece terminals have, in particular, a general U-shaped structure, of which the arms are separated by a width which allows the connection thereof to the uprights and of which the intermediate bridge orweb 15 comprises arecess 16 at the bottom intended to mate with a connecting pin of the upright. At each end of thecross-piece 11 there arerespective hoops cross-pieces 11. Fig. 1 also shows a plurality of cross-pieces according to the invention, such as 11', 11", 11'''. - Once the
cross-pieces 11 have been connected, they can receive platform elements such as those designated byreference numeral 19 in Fig. 2. Auxiliary walkway platforms of any height corresponding to therailings 7 can be formed in this way. - The positioning of the cross-pieces according to the invention is shown in Fig. 4, which illustrates a
cross-piece 20 introduced at an inclination between theuprights reference numerals cross-piece 20 will end at the position shown in Fig. 2, in other words with thecross-piece 20 resting on thepins hoops - The possibility of mounting auxiliary walkway platforms in the facade scaffolding will substantially increase the usefulness of said scaffolding for the operators who, according to the type of work to be done, can better adapt the working position.
Claims (3)
- Detachable cross-piece for supporting platforms in scaffolds, characterised in that it comprises a cross-piece of a length corresponding to the interval between the front and back uprights, which determine the depth of facade scaffolding, the detachable cross-piece comprising at the ends means for guidance on the scaffolding uprights and for support on the fastening pins of said uprights and allowing the positioning of new walkway platform elements which mate with the connecting points of the railings in the scaffolding.
- Detachable cross-piece for supporting platforms in scaffolds according to claim 1, characterised in that the elements for centring and supporting the ends of the cross-piece comprise U-shaped parts of which the arms are separated by a width which allows the connection thereof to the upright elements of the scaffolding, while the intermediate bridge or web comprises a recess which is capable of resting on the corresponding pin for a railing element.
- Detachable cross-piece for supporting platforms in scaffolds according to the preceding claims, characterised in that it comprises at each ends a rocking hoop which is capable of being pivoted below the corresponding pin of a scaffolding upright, in order to prevent the possible accidental detachment of the cross-piece.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL06380010T PL1691007T3 (en) | 2005-01-17 | 2006-01-13 | Detachable cross-piece for supporting platforms in scaffolds |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES200500069A ES2246732B1 (en) | 2005-01-17 | 2005-01-17 | REMOVABLE CROSSBODY FOR PLATFORM SUPPORT IN ANDAMIOS. |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1691007A2 true EP1691007A2 (en) | 2006-08-16 |
EP1691007A3 EP1691007A3 (en) | 2009-12-02 |
EP1691007B1 EP1691007B1 (en) | 2011-07-06 |
Family
ID=35892401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP06380010A Active EP1691007B1 (en) | 2005-01-17 | 2006-01-13 | Detachable cross-piece for supporting platforms in scaffolds |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP1691007B1 (en) |
ES (1) | ES2246732B1 (en) |
PL (1) | PL1691007T3 (en) |
PT (1) | PT1691007E (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014125308A1 (en) * | 2013-02-18 | 2014-08-21 | Ischebeck Titan Limited | Climbing screen |
US8978822B2 (en) | 2006-10-11 | 2015-03-17 | Wilhelm Layher Verwaltungs-Gmbh | Vertical frame of metal |
WO2017174050A1 (en) * | 2016-04-07 | 2017-10-12 | Wilhelm Layher Verwaltungs-Gmbh | Starting crossbar for an ascension bay with ladder of a system scaffold, system scaffold having such starting crossbars, and method for mounting a system scaffold |
DE102021122288A1 (en) | 2021-08-27 | 2023-03-02 | Peri Se | Scaffolding standard for vertical installation in a scaffolding section |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2530315B1 (en) * | 2013-08-27 | 2016-01-13 | Inveral, S.A. | Support crossbar of a work platform. |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU473918B2 (en) | 1972-11-30 | 1974-05-09 | Acrow Pty. Limited | Frame |
US3938290A (en) | 1974-02-04 | 1976-02-17 | Tower Scaffolding (Bristol) Limited | Scaffolding |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1229330A (en) * | 1958-07-03 | 1960-09-06 | prefabricated metal elements intended for the erection of temporary constructions | |
GB1204328A (en) * | 1966-12-15 | 1970-09-03 | Sterling Foundry Specialties | Scaffolding |
FR2097704A5 (en) * | 1970-07-20 | 1972-03-03 | Elevator | |
DD123540A1 (en) * | 1975-12-18 | 1977-01-05 | ||
FR2516141B1 (en) * | 1981-11-10 | 1987-11-27 | Philippe Robert | METHOD OF ASSEMBLING A SCAFFOLDING AND ASSEMBLY DEVICE |
DE9410743U1 (en) * | 1994-07-08 | 1995-01-12 | Krause Werk Gmbh & Co Kg | Frame element |
-
2005
- 2005-01-17 ES ES200500069A patent/ES2246732B1/en active Active
-
2006
- 2006-01-13 PT PT06380010T patent/PT1691007E/en unknown
- 2006-01-13 EP EP06380010A patent/EP1691007B1/en active Active
- 2006-01-13 PL PL06380010T patent/PL1691007T3/en unknown
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU473918B2 (en) | 1972-11-30 | 1974-05-09 | Acrow Pty. Limited | Frame |
US3938290A (en) | 1974-02-04 | 1976-02-17 | Tower Scaffolding (Bristol) Limited | Scaffolding |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8978822B2 (en) | 2006-10-11 | 2015-03-17 | Wilhelm Layher Verwaltungs-Gmbh | Vertical frame of metal |
WO2014125308A1 (en) * | 2013-02-18 | 2014-08-21 | Ischebeck Titan Limited | Climbing screen |
WO2017174050A1 (en) * | 2016-04-07 | 2017-10-12 | Wilhelm Layher Verwaltungs-Gmbh | Starting crossbar for an ascension bay with ladder of a system scaffold, system scaffold having such starting crossbars, and method for mounting a system scaffold |
DE102021122288A1 (en) | 2021-08-27 | 2023-03-02 | Peri Se | Scaffolding standard for vertical installation in a scaffolding section |
Also Published As
Publication number | Publication date |
---|---|
EP1691007A3 (en) | 2009-12-02 |
PT1691007E (en) | 2011-09-07 |
ES2246732A1 (en) | 2006-02-16 |
PL1691007T3 (en) | 2011-11-30 |
ES2246732B1 (en) | 2006-11-16 |
EP1691007B1 (en) | 2011-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2010346421B2 (en) | Scaffold and methods for installing or removing such a scaffold | |
US7735606B1 (en) | Scaffold support platform | |
EP1233122B1 (en) | Facade scaffolding | |
RU2400609C2 (en) | Complex system of accident prevention support in construction | |
US9546489B2 (en) | Formwork support scaffold structure | |
KR200490153Y1 (en) | Hanger type check equipment for bridge | |
EP1691007A2 (en) | Detachable cross-piece for supporting platforms in scaffolds | |
US20180119435A1 (en) | Support member for joinable scaffolding planks | |
KR100989111B1 (en) | Tilting access stairway structure for approaching bridge inspection passage | |
JP3181041U (en) | Mounting member for scaffolding for bridge | |
JP6021604B2 (en) | Temporary scaffolding and its assembly method | |
JP4704766B2 (en) | Method for forming leading handrail frame and frame scaffold | |
WO2012046049A2 (en) | Scaffold safety rail and method of assembly | |
US20080264725A1 (en) | Hook-On Scaffold | |
KR100862737B1 (en) | Cage apparatus of gang form system for a building | |
KR200409977Y1 (en) | Hanger way bridge checking supporter | |
JP2017040113A (en) | Overhanging passage of steel structure | |
KR101895535B1 (en) | Safety work table | |
JP6590512B2 (en) | Staircase temporary scaffolding | |
US20040200668A1 (en) | Scaffolding system | |
JP2010090633A (en) | Prefabricated work platform for cylindrical concrete structure | |
EP3006648B1 (en) | Guard rail | |
JP3732888B2 (en) | Temporary staircase with landing | |
KR20100023403A (en) | Knockdown length direction a bridge inspection passage and the establishment method | |
GB2428729A (en) | A scaffold stair unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SISTEMAS TECNICOS DE ENCOFRADOS, S.A. |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
17P | Request for examination filed |
Effective date: 20100602 |
|
AKX | Designation fees paid |
Designated state(s): PL PT |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8566 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): PL PT |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20110831 |
|
REG | Reference to a national code |
Ref country code: PL Ref legal event code: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20120411 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20221114 Year of fee payment: 18 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230417 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PT Payment date: 20231113 Year of fee payment: 19 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |