WO2017115575A1 - 観測制御装置 - Google Patents

観測制御装置 Download PDF

Info

Publication number
WO2017115575A1
WO2017115575A1 PCT/JP2016/083922 JP2016083922W WO2017115575A1 WO 2017115575 A1 WO2017115575 A1 WO 2017115575A1 JP 2016083922 W JP2016083922 W JP 2016083922W WO 2017115575 A1 WO2017115575 A1 WO 2017115575A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
observation
accident
unit
observation target
Prior art date
Application number
PCT/JP2016/083922
Other languages
English (en)
French (fr)
Inventor
邦夫 高木
Original Assignee
東京電力ホールディングス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東京電力ホールディングス株式会社 filed Critical 東京電力ホールディングス株式会社
Publication of WO2017115575A1 publication Critical patent/WO2017115575A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64CAEROPLANES; HELICOPTERS
    • B64C13/00Control systems or transmitting systems for actuating flying-control surfaces, lift-increasing flaps, air brakes, or spoilers
    • B64C13/02Initiating means
    • B64C13/16Initiating means actuated automatically, e.g. responsive to gust detectors
    • B64C13/18Initiating means actuated automatically, e.g. responsive to gust detectors using automatic pilot
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64DEQUIPMENT FOR FITTING IN OR TO AIRCRAFT; FLIGHT SUITS; PARACHUTES; ARRANGEMENT OR MOUNTING OF POWER PLANTS OR PROPULSION TRANSMISSIONS IN AIRCRAFT
    • B64D27/00Arrangement or mounting of power plants in aircraft; Aircraft characterised by the type or position of power plants
    • B64D27/02Aircraft characterised by the type or position of power plants
    • B64D27/24Aircraft characterised by the type or position of power plants using steam or spring force
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64UUNMANNED AERIAL VEHICLES [UAV]; EQUIPMENT THEREFOR
    • B64U10/00Type of UAV
    • B64U10/10Rotorcrafts
    • B64U10/13Flying platforms
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T50/00Aeronautics or air transport
    • Y02T50/60Efficient propulsion technologies, e.g. for aircraft

Definitions

  • the present invention relates to an observation control device.
  • Patent Document 1 discloses a technique for teaching a moving route of a vehicle on which a worker rides to move to an accident site.
  • the moving means is preferably a flying object that flies over the sky rather than a vehicle that travels on the ground.
  • the moving means is based on manned control that requires a pilot, it is required to always keep the pilot in preparation for an accident. If the pilot is not always on standby, the pilot must be arranged after the accident occurs, and it may take time to prepare for moving the moving means.
  • the moving means is based on autonomous control that does not require a pilot, rather than one that requires a pilot.
  • the observation procedure may differ depending on the type of equipment to be observed at the accident site. In this case, work for identifying the observation procedure for grasping the current state of the accident may occur after the accident occurs. In other words, work after an accident may take time, and in this case, it may be difficult to shorten the time required from the occurrence of the accident until the moving means arrives at the destination. That is, with the prior art described in Patent Document 1, it is not possible to shorten the time required from the occurrence of an accident until the moving means arrives at the destination.
  • One aspect of the present invention has been made in view of the above points, and provides an observation control apparatus that can shorten the time required from the occurrence of an accident until the moving means arrives at the destination.
  • a plurality of pieces of equipment information including information indicating a position of equipment for supplying power to a consumer, information indicating the equipment, a power feeding end connected to a power supply source, and a customer.
  • An unmanned flight that observes the accident based on the acquisition unit that acquires accident information including information indicating a section in which the accident has occurred in the electric wire, the accident information acquired by the acquisition unit, and the facility information
  • a destination judging unit for judging a destination of the body, and the destination Based on the destination determined by the determination unit, a flight control information generation unit that generates flight control information used for controlling the flight of the unmanned air vehicle, the accident
  • the observation control information generation unit is based on the observation target equipment selected by the observation target selection unit and past accident information including information on past accidents.
  • Observation control information used for controlling the observation operation of the unmanned air vehicle is generated based on the priority determined and further based on the priority of the observation of the observation target facility.
  • the unmanned air vehicle consumes based on the observation target equipment selected by the observation target selection unit and the destination determined by the destination determination unit.
  • a power consumption estimator for estimating power; and the observation control information generator generates observation control information used for controlling the observation of the unmanned air vehicle based on the estimation result estimated by the power consumption estimator. Generate.
  • an image acquisition unit that acquires an image of the observation target facility at the destination captured by the imaging unit included in the unmanned air vehicle, and the image acquisition unit that acquires the image
  • An observation result information generation unit that generates observation result information including an image and information about the accident other than the image is further provided.
  • FIG. 1 is a schematic diagram showing an overview of the observation control device 1 of the first embodiment.
  • the electric wire WR supported by the steel tower ST may cause an accident such as a ground fault, a short circuit, and a disconnection due to the effects of deterioration with time, natural disasters, obstacles, and the like.
  • the steel tower ST is, for example, a power transmission line steel tower and a distribution pole. Therefore, the electric wire WR is a power transmission line or a distribution line laid between a power supply source such as a substation and a customer CS that receives power supply.
  • a plurality of switches SW are connected in series to the electric wire WR.
  • the switch SW is, for example, a circuit breaker, a disconnector, a relay, or the like.
  • the electric wire WR is divided into a plurality of sections SCT by these switches SW.
  • the section SCT is a range between the power supply end of the power supply source and the switch SW adjacent to the power supply end.
  • the section SCT is a range between two adjacent switches SW.
  • the section SCT is a range between the customer CS and the switch SW adjacent to the customer CS.
  • the switching state of the switch SW is switched by manual operation, remote operation, or automatic control at the installation location where the switch SW is installed. Thereby, switch SW controls supply of electric power to section SCT to be connected.
  • the electric wire WR2 supported by the steel tower ST1, the steel tower ST2, the electric wire WR1 supported by the steel tower ST2, and the steel tower ST3 are the same section SCT1. That is, the section SCT1 is a range from the position of the steel tower ST1 to the position of the steel tower ST3. Further, in the following description, when the electric wire WR1 and the electric wire WR2 are not particularly distinguished, they are described as the electric wire WR. Further, in the following description, the steel tower ST1, the steel tower ST2, and the steel tower ST3 are described as the steel tower ST when not particularly distinguished.
  • FIG. 1 shows a ground fault state.
  • the position where the accident has occurred is described as the accident point ACP.
  • the position where the electric wire WR2 is grounded is the accident point ACP.
  • the observation control apparatus 1 of this embodiment is provided in a building BD that is a facility of a power supply company.
  • the unmanned air vehicle D is arranged in the building BD as in the observation control device 1.
  • the unmanned air vehicle D flies by autonomous flight to the accident point ACP, which is the destination P, or to a facility for supplying electric power around the accident point ACP according to the occurrence of the accident.
  • the observation control apparatus 1 according to the present embodiment provides flight control information FPG used for controlling an autonomous flight in which the unmanned air vehicle D flies up to the accident point ACP that is the destination P or equipment around the accident point ACP.
  • the unmanned air vehicle D after the unmanned air vehicle D arrives at the destination P, it observes the situation of the accident by autonomous flight.
  • the unmanned air vehicle D includes an imaging unit C, and after arrival at the destination P, the imaging unit C images the situation of the accident.
  • the observation control device 1 of the present embodiment provides observation control information OPG used for controlling an observation operation for observing the situation of an accident after the unmanned air vehicle D arrives at the destination P.
  • FIG. 2 is a configuration diagram illustrating an example of the configuration of the observation control apparatus 1 of the present embodiment.
  • the observation control device 1 is connected with an accident section verification device ASA and an equipment information storage device EID.
  • the accident section verification device ASA is a device that generates the accident information A by a known method when an accident occurs in the electric wire WR of the section SCT that is the observation target of the accident section verification apparatus ASA.
  • FIG. 3 is a table showing an example of the accident information A of the present embodiment.
  • the accident information A includes accident occurrence information AO, accident form information AF, and accident section information AS.
  • the accident occurrence information AO is information indicating whether or not an accident has occurred in the electric wire WR included in the verification target section SCT for which the accident section verification device ASA verifies the presence or absence of an accident. That is, the accident occurrence information AO is information indicating the presence or absence of an accident.
  • the section SCT to be verified for which the accident section verification device ASA verifies the presence or absence of an accident is the section SCT1 including the electric wire WR1 and the electric wire WR2.
  • the electric wire WR2 is disconnected by a fallen tree and causes a ground fault.
  • the accident occurrence information AO indicates that an accident has occurred in the electric wire WR to be verified.
  • the accident form information AF is information indicating the form of an accident occurring in the electric wire WR included in the section SCT to be verified by the accident section verification apparatus ASA. As shown in FIG. 1, in this example, the electric wire WR2 included in the section SCT1 is disconnected and causes a ground fault. Returning to FIG. 3, this example shows that the accident form information AF indicates that the accident occurring in the electric wire WR included in the section SCT to be verified is a ground fault.
  • the accident section information AS is information indicating a section SCT in which an accident has occurred in the electric wire WR among the sections SCT to be verified by the accident section verification apparatus ASA.
  • the accident section information AS is information indicating a section SCT1 including the grounded electric wire WR2.
  • the accident section information AS indicates the section SCT1. More specifically, the accident section information AS is a range from the position of the tower ST1 that is the section SCT1 to the position of the tower ST3.
  • the accident section verification apparatus ASA supplies accident information A including accident occurrence information AO, accident form information AF, and accident section information AS to the observation control apparatus 1.
  • the accident section verification apparatus ASA supplies the accident control information 1 including the presence / absence of an accident, the form of the accident, and the section of the accident to the observation control apparatus 1.
  • the facility information storage device EID is a device that stores facility information EI.
  • FIG. 4 is a table showing an example of the facility information EI of the present embodiment.
  • the facility information EI is information indicating details of a facility that supplies power to the customer CS.
  • the facility information EI includes facility name information EN that is information regarding facilities that supply power to the customer CS, and facility position information EP.
  • FIG. 4 shows an example of the details of the facilities existing in the range of the section SCT1 among the details of the facilities included in the facility information EI.
  • the facility name information EN is information indicating the name of the facility that supplies power to the customer CS.
  • the equipment name information EN includes a tower ST1 (equipment name information EN1), a tower ST2 (equipment name information EN6), and a tower ST3 (equipment name information EN11) as the equipment names. included.
  • the steel tower ST when the steel tower ST supports the electric wire WR, the steel tower ST is provided with a suspension clamp SC, a long insulator LI, and an arc horn AH.
  • the equipment name information EN includes a suspension clamp SC1 (equipment name information EN2), a long insulator LI1 (equipment name information EN3), and an arc horn AH1 (equipment name information EN4) as names of equipment associated with the tower ST1. And are included.
  • the facility name information EN includes the suspension clamp SC2 (equipment name information EN7), the long insulator LI2 (equipment name information EN8), and the arc horn AH2 (equipment name information EN9) as the names of facilities associated with the tower ST2.
  • the suspension clamp SC3 (equipment name information EN12), the long insulator LI3 (equipment name information EN13), and the arc horn AH3 (equipment name information EN14) are listed as the names of the facilities associated with the tower ST3.
  • the facility name information EN includes an electric wire WR2 (equipment name information EN5) and an electric wire WR1 (equipment name information EN10) as names of the electric wires WR supported by the steel tower ST.
  • the equipment location information EP is information indicating the location of equipment that supplies power to the customer CS.
  • the equipment position information EP is indicated by coordinates. Further, in this example, the equipment position information EP indicates coordinates for each equipment indicated by the equipment name information EN.
  • the coordinates indicating the position of the steel tower ST1 are the equipment position information EP1 (35.00,000, 135.000000). Further, since the suspension clamp SC1, the long insulator LI1, and the arc horn AH1 are facilities attached to the steel tower ST1, they are all located at the same coordinates as the steel tower ST1. That is, the suspension clamp SC1, the long insulator LI1, and the arc horn AH1 are all located at the coordinates indicated by the facility position information EP1. Moreover, in this example, the coordinate which shows the position of steel tower ST2 is equipment position information EP3 (35.00200, 135.00200).
  • the suspension clamp SC2, the long insulator LI2, and the arc horn AH2 are facilities attached to the steel tower ST2, all are located at the same coordinates as the steel tower ST2. That is, the suspension clamp SC2, the long insulator LI2, and the arc horn AH2 are all located at the coordinates indicated by the equipment position information EP3. Moreover, in this example, the coordinate which shows the position of steel tower ST3 is equipment position information EP5 (35.00400, 135.00400). Moreover, since the suspension clamp SC3, the long insulator LI3, and the arc horn AH3 are facilities attached to the steel tower ST3, all are located at the same coordinates as the steel tower ST3. That is, the suspension clamp SC3, the long insulator LI3, and the arc horn AH3 are all located at the coordinates indicated by the facility position information EP5.
  • the facility information EI includes facility position information EP of a support point that supports the electric wire WR among positions on the route where the electric wire WR is laid as the facility position information EP of the electric wire WR.
  • the electric wire WR is supported by two steel towers ST. That is, there are two support points for the electric wire WR.
  • the equipment position information EP of the electric wire WR is the coordinates of the two steel towers ST that support the electric wire WR.
  • the facility position information EP of the electric wire WR2 supported by the tower ST1 and the tower ST2 is the facility position information EP1 (35.00,000, 135.000000), and the coordinates are the facility position information EP3 (35.00200, 135.135). 00200).
  • the equipment position information EP of the electric wire WR1 supported by the steel tower ST2 and the steel tower ST3 has the coordinates of equipment position information EP3 (35.00200, 135.00200) and equipment position information EP5 (35.35). 00400, 135.00400).
  • the equipment information storage device EID supplies equipment information EI including equipment name information EN and equipment position information EP to the observation control device 1.
  • the accident section verification device ASA and the facility information storage device EID may not be directly connected to the observation control device 1 but may be connected via a network capable of transmitting and receiving information.
  • the observation control apparatus 1 includes a control unit 100.
  • the control unit 100 includes a CPU (Central Processing Unit), an acquisition unit 110, a destination determination unit 120, a flight control information generation unit 130, an observation target selection unit 140, and an observation control information generation unit 150. Is provided as a functional part thereof.
  • CPU Central Processing Unit
  • the control unit 100 includes a CPU (Central Processing Unit), an acquisition unit 110, a destination determination unit 120, a flight control information generation unit 130, an observation target selection unit 140, and an observation control information generation unit 150. Is provided as a functional part thereof.
  • FIG. 5 is a flowchart showing an example of the operation of the observation control apparatus 1 of the present embodiment.
  • the acquisition unit 110 acquires the accident information A from the accident section verification device ASA (step S110). Further, the acquisition unit 110 acquires the facility information EI from the facility information storage device EID (step S120). The acquisition unit 110 supplies the accident information A and the facility information EI to the destination determination unit 120 and the observation target selection unit 140 (step S130).
  • the destination determination unit 120 acquires the accident information A and the facility information EI from the acquisition unit 110.
  • the destination determination unit 120 determines the destination P based on the accident information A and the facility information EI.
  • the destination P is a destination where the unmanned air vehicle D reaches by autonomous flight.
  • the destination P is the electric wire WR laid in the section SCT that is the accident section information AS and the equipment accompanying the electric wire WR.
  • the accident section information AS is the section SCT1.
  • the destination determination unit 120 determines a facility in which the facility position information EP included in the facility information EI matches the range of the section SCT1 indicated by the accident section information AS.
  • the destination determination unit 120 sets the facility closest to the position of the building BD as the destination P among the facilities existing in the range of the section SCT indicated by the accident section information AS.
  • the equipment position information EP1 of the equipment closest to the position of the building BD is the equipment position information EP1.
  • the destination determination unit 120 determines that the facility existing in the facility position information EP1 is the destination P.
  • the destination determination unit 120 supplies the facility position information EP1 to the flight control information generation unit 130 as information indicating the destination P.
  • the destination determination unit 120 acquires the accident information A and the facility information EI from the acquisition unit 110 (step S140). The destination determination unit 120 determines the destination P based on the acquired accident information A and facility information EI (step 150). The destination determination unit 120 supplies information indicating the determined destination P to the flight control information generation unit 130 (step S160).
  • the flight control information generation unit 130 acquires information indicating the destination P from the destination determination unit 120. Based on the acquired information indicating the destination P, the flight control information generation unit 130 generates flight control information FPG used for controlling the flight of the unmanned air vehicle D autonomously flying to the destination P by a known method. Specifically, as described above, in this example, the unmanned air vehicle D is arranged in the building BD. Further, in this example, the flight control information generation unit 130 acquires the facility position information EP1 as information indicating the destination P. The flight control information generation unit 130 controls the flight in which the unmanned air vehicle D autonomously flies to the facility position information EP1 that is the destination P based on the coordinates of the building BD and the coordinates indicated in the acquired facility position information EP1. The flight control information FPG used in the above is generated by a known method.
  • the flight control information generation unit 130 acquires information indicating the destination P from the destination determination unit 120 (step 170).
  • the flight control information generation unit 130 generates flight control information FPG used for controlling the flight of the unmanned air vehicle D to the destination P based on the acquired information indicating the destination P by a known method (Step S1). S180).
  • the unmanned air vehicle D autonomously flies to the destination P by being controlled based on the flight control information FPG generated by the flight control information generator 130. That is, the flight control information FPG is information used for controlling the flight of the unmanned air vehicle D when the unmanned air vehicle D autonomously flies.
  • the unmanned air vehicle D may be arranged at a place other than the building BD in which the observation control device 1 is provided. That is, the flight control information generation unit 130 may generate the flight control information FPG by a known method based on the coordinates of the place where the unmanned air vehicle D is arranged and the information indicating the destination P.
  • the observation target selection unit 140 acquires the accident information A and the facility information EI from the acquisition unit 110.
  • the observation target selection unit 140 selects an observation target facility OE that is a target facility to be observed by the unmanned air vehicle D based on the accident information A and the facility information EI.
  • the observation target facility OE is a facility in which an accident has occurred and a facility in which failure or breakage may occur due to the occurrence of the accident.
  • the observation target equipment OE is an electric wire WR in which an accident has occurred and equipment in which failure or breakage may occur due to the occurrence of the accident.
  • the observation target selecting unit 140 exists in the section SCT indicated by the accident section information AS and the electric wire WR laid in the section SCT indicated by the accident section information AS based on the accident information A and the facility information EI.
  • the facility to be selected is selected as the observation target facility OE.
  • the observation target selection unit 140 supplies observation target selection information OES including the selected observation target facility OE to the observation control information generation unit 150.
  • the observation target selection information OES includes the equipment name information EN of the equipment that is the observation target equipment OE and the equipment position information EP.
  • FIG. 6 is a table showing an example of the observation target selection information OES of the present embodiment.
  • the observation target selection unit 140 selects, as the observation target equipment OE, equipment existing in the range of the section SCT indicated by the accident section information AS based on the accident information A and the equipment information EI.
  • the observation target selection unit 140 selects the equipment existing in the range of the section SCT1, the electric wire WR1 laid in the range of the section SCT1, and the electric wire WR2 as the observation target equipment OE.
  • the observation target selection unit 140 selects the steel tower ST1 that supports the electric wire WR2 and the equipment that accompanies the steel tower ST1 as the observation target equipment OE. Specifically, as illustrated in FIG. 6, the observation target selection unit 140 selects the steel tower ST1, the suspension clamp SC1, the long insulator LI1, and the arc horn AH1 as the observation target equipment OE. In addition, the observation target selection unit 140 selects the tower ST2 that supports the electric wires WR1 and WR2 and the equipment that accompanies the steel tower ST2 as the observation target equipment OE. Specifically, as illustrated in FIG.
  • the observation target selection unit 140 selects the steel tower ST2, the suspension clamp SC2, the long insulator LI2, and the arc horn AH2 as the observation target equipment OE.
  • the observation target selection unit 140 selects a steel tower ST3 that supports the electric wire WR1 and a facility associated with the steel tower ST3 as the observation target equipment OE.
  • the observation target selection unit 140 selects the tower ST3, the suspension clamp SC3, the long insulator LI3, and the arc horn AH3 as the observation target equipment OE.
  • the observation target selection information OES includes the facility name information EN of the facility selected as the observation target facility OE and the facility position information EP. Therefore, as shown in FIG. 6, the observation target selection information OES includes the tower ST1 and the facility position information EP1 of the facility associated with the tower ST1.
  • the observation target selection information OES includes equipment position information EP1 that is equipment position information EP of the electric wire WR2 and equipment position information EP3.
  • the observation target selection information OES includes the tower ST2 and the facility position information EP3 of the facility associated with the tower ST2.
  • the observation target selection information OES includes equipment position information EP3 that is equipment position information EP of the electric wire WR1 and equipment position information EP5.
  • observation target selection information OES includes the tower ST3 and the facility position information EP5 of the facility associated with the tower ST3.
  • the observation target selection unit 140 supplies the observation control information generation unit 150 with observation target selection information OES including the observation target facility OE selected based on the accident information A and the facility information EI.
  • the observation target selection unit 140 acquires the accident information A and the facility information EI from the acquisition unit 110 (step S190).
  • the observation target selection unit 140 selects the observation target facility OE based on the acquired accident information A and facility information EI (step S200).
  • the observation target selection unit 140 supplies observation target selection information OES including the selected observation target facility OE to the observation control information generation unit 150 (step S210).
  • the observation control information generation unit 150 acquires the observation target selection information OES including the observation target facility OE selected by the observation target selection unit 140 from the observation target selection unit 140. Based on the acquired observation target selection information OES, the observation control information generation unit 150 uses the observation control information OPG used for controlling the observation operation in which the unmanned air vehicle D observes the observation target facility OE included in the observation target selection information OES. Is generated by a known method.
  • the observation control information generation unit 150 generates the observation control information OPG based on the facility position information EP1 of the destination P and the facility position information EP for each observation target facility OE included in the observation target selection information OES. To do. Specifically, the observation control information generation unit 150, after arriving at the destination P, obtains the observation control information OPG that flies from the equipment position information EP1 that is the destination P to the equipment position information EP5 via the equipment position information EP3. Generate. More specifically, the observation control information generation unit 150 generates observation control information OPG for observing equipment existing at the coordinates of the equipment position information EP1 after arrival at the destination P.
  • observation control information generation unit 150 generates observation control information OPG for observing the electric wire WR2 by flying from the equipment position information EP1 to the equipment position information EP3 after observing the equipment in the equipment position information EP1. Moreover, the observation control information generation part 150 produces
  • the observation control information OPG includes a control of the operation in which the unmanned air vehicle D is hovering for the time for observing the observation target equipment OE at the coordinates indicated by the equipment position information EP1 based on the observation target selection information OES. It is. Specifically, the observation control information OPG includes only the time for observing the steel tower ST1, the suspension clamp SC1, which is equipment attached to the steel tower ST1, the long insulator LI1, and the arc horn AH1 in the equipment position information EP1. Control of the operation of the unmanned air vehicle D hovering is included.
  • the unmanned air vehicle D images the steel tower ST1 and the equipment associated with the steel tower ST1 in the equipment position information EP1 by the imaging unit C included in the unmanned air vehicle D, and generates an image AP.
  • the image AP is an image generated by imaging the observation target facility OE by the imaging unit C included in the unmanned air vehicle D.
  • the observation control information OPG includes control of the operation of flying to the facility position information EP3 after observing the observation target facility OE in the facility position information EP1 based on the observation target selection information OES.
  • the observation control information OPG includes control of an operation in which the unmanned air vehicle D observes the electric wire WR2 while observing the equipment in the equipment position information EP1 and then flying to the equipment position information EP3.
  • the unmanned air vehicle D images the electric wire WR2 from the equipment position information EP1 to the equipment position information EP3 by the imaging unit C included in the unmanned air vehicle D, and generates an image AP.
  • the observation control information OPG includes control of the operation of the unmanned air vehicle D hovering for the time for observing the observation target equipment OE at the coordinates indicated by the equipment position information EP3 based on the observation target selection information OES.
  • the observation control information OPG includes only the time for observing the tower ST2, the suspension clamp SC2, which is the equipment attached to the tower ST2, the long insulator LI2, and the arc horn AH2 in the equipment position information EP3.
  • Control of the operation of the unmanned air vehicle D hovering is included.
  • the unmanned air vehicle D images the steel tower ST2 and the equipment associated with the steel tower ST2 in the equipment position information EP3 by the imaging unit C included in the unmanned air vehicle D, and generates an image AP.
  • the observation control information OPG includes control of the operation of flying to the facility position information EP5 after observing the observation target facility OE in the facility position information EP3 based on the observation target selection information OES.
  • the observation control information OPG includes control of an operation in which the unmanned air vehicle D observes the electric wire WR1 while observing the equipment in the equipment position information EP3 and then flying to the equipment position information EP5.
  • the unmanned air vehicle D images the electric wire WR1 from the equipment position information EP3 to the equipment position information EP5 by the imaging unit C included in the unmanned air vehicle D, and generates an image AP.
  • the observation control information OPG includes a control of an operation in which the unmanned air vehicle D is hovering for the time for observing the observation target equipment OE at the coordinates indicated by the equipment position information EP5 based on the observation target selection information OES.
  • the observation control information OPG includes only the time for observing the steel tower ST3, the suspension clamp SC3, which is equipment attached to the steel tower ST3, the long insulator LI3, and the arc horn AH3 in the equipment position information EP5.
  • Control of the operation of the unmanned air vehicle D hovering is included.
  • the unmanned air vehicle D images the steel tower ST3 and the equipment associated with the steel tower ST3 in the equipment position information EP5 by the imaging unit C included in the unmanned air vehicle D, and generates an image AP.
  • the observation control information generation unit 150 acquires the observation target selection information OES from the observation target selection unit 140 (step S220).
  • the observation control information generation unit 150 generates observation control information OPG based on the acquired observation target selection information OES (step S230).
  • the observation control information generation unit 150 generates the observation control information OPG based on the facility position indicated in the facility position information EP included in the observation target selection information OES. I can't.
  • the observation target equipment OE included in the observation target selection information OES an observation method corresponding to the observation target equipment OE may be defined for each observation target equipment OE. That is, the observation control information generation unit 150 may generate the observation control information OPG for controlling the observation operation of the unmanned air vehicle D based on the observation method determined according to the observation target facility OE.
  • the observation target facility OE is a steel tower ST, it may be determined in advance that the unmanned air vehicle D observes the entire steel tower ST.
  • the observation control information generation unit 150 may generate observation control information OPG for controlling the observation operation of the observation in which the imaging unit C included in the unmanned air vehicle D images the entire tower ST.
  • the observation target facility OE is a long insulator LI
  • the observation control information generation unit 150 may generate the observation control information OPG that controls the observation operation of the observation in which the imaging unit C included in the unmanned air vehicle D approaches the long stem LI and images the LI.
  • the accident section verification device ASA and the facility information storage device EID are connected to the observation control device 1 of the present embodiment.
  • the accident section verification device ASA supplies accident information A including the accident occurrence information AO, the accident form information AF, and the accident section information AS to the observation control apparatus 1.
  • the accident occurrence information AO is information indicating the occurrence of an accident in the electric wire WR.
  • the accident form information AF is information indicating the form of the accident.
  • the accident section information AS is information indicating a section SCT in which an accident has occurred in the electric wire WR.
  • the section SCT is a range between the power supply end of the power supply source and the switch SW adjacent to the power supply end.
  • the section SCT is a range between two adjacent switches SW.
  • the section SCT is a range between the customer CS and the switch SW adjacent to the customer CS.
  • the facility information storage device EID supplies facility information EI including facility name information EN indicating the name of the facility that supplies power to the customer CS and facility position information EP indicating the location of the facility to the observation control device 1. To do.
  • the observation control device 1 of this embodiment includes a control unit 100.
  • the control unit 100 includes a CPU, and the acquisition unit 110, the destination determination unit 120, the flight control information generation unit 130, the observation target selection unit 140, and the observation control information generation unit 150 serve as functional units.
  • the acquisition unit 110 acquires accident information A from the accident section verification device ASA. Further, the acquisition unit 110 acquires the facility information EI from the facility information storage device EID. The acquisition unit 110 supplies the acquired accident information A and facility information EI to the destination determination unit 120 and the observation target selection unit 140.
  • the destination determination unit 120 determines the destination P of the unmanned air vehicle D that observes the accident based on the accident information A and the facility information EI acquired from the acquisition unit 110.
  • the destination determination unit 120 supplies the determined destination P to the flight control information generation unit 130.
  • the flight control information generation unit 130 generates flight control information FPG used for controlling the flight of the unmanned air vehicle D based on the destination P determined by the destination determination unit 120.
  • the observation target selection unit 140 selects an observation target facility OE that is an observation target facility of the unmanned air vehicle D based on the accident information A and the facility information EI acquired by the acquisition unit 110.
  • the observation target selection unit 140 supplies observation target selection information OES including the selected observation target facility OE to the observation control information generation unit 150.
  • the observation control information generation unit 150 uses the observation control at the destination P of the unmanned air vehicle D based on the observation target selection information OES including the observation target facility OE selected by the observation target selection unit 140.
  • Information OPG is generated.
  • the worker when observing the situation of the accident that occurred in the electric wire WR, the worker may move to the accident point using the vehicle. In this case, depending on road conditions such as traffic jams, it may be difficult to shorten the time required until the worker arrives.
  • the destination P can be determined based on the accident section information AS included in the accident information A and the facility position information EP of the electric wire WR included in the facility information EI. it can.
  • the observation control apparatus 1 of this embodiment can generate the flight control information FPG used for flight control when the unmanned air vehicle D performs autonomous flight up to the destination P.
  • the unmanned air vehicle D can fly autonomously to the accident point ACP, which is the destination P, by flying based on the flight control information FPG generated by the observation control device 1. That is, according to the observation control device 1 of the present embodiment, the unmanned air vehicle D can move in the air to the accident point ACP which is the destination P by autonomous flight.
  • the observation control device 1 of the present embodiment when the unmanned air vehicle D moves by autonomous flight to the accident point ACP, which is the destination P, compared to the case of moving on the ground by a vehicle or the like, You can arrive as soon as possible.
  • the unmanned air vehicle D flies autonomously to the destination P by flying based on the flight control information FPG generated by the observation control device 1.
  • the unmanned air vehicle D can move without using manned control by autonomously flying to the destination P.
  • the moving means is manned control that requires a pilot and it is required to arrange a pilot in response to the occurrence of an accident. In comparison, the time required for the moving means to arrive at the destination can be shortened.
  • the observation control device 1 of the present embodiment when observing the situation of an accident that has occurred in the electric wire WR, it is a facility that is an observation target of the unmanned air vehicle D based on the accident information A and the facility information EI.
  • the observation target equipment OE can be selected. That is, according to the observation control device 1 of the present embodiment, it is possible to reduce the trouble of specifying the observation target equipment OE provided at the accident site.
  • the observation control device 1 of the present embodiment generates the observation control information OPG used for controlling the observation operation of the unmanned air vehicle D when the unmanned air vehicle D observes the selected observation target equipment OE. Can do.
  • the unmanned air vehicle D can observe the observation target facility OE selected as the observation target facility based on the observation control information OPG generated by the observation control device 1. That is, according to the observation control device 1 of the present embodiment, it is possible to reduce the trouble of specifying the observation procedure for grasping the accident situation. That is, according to the observation control device 1 of the present embodiment, the time required for work after the occurrence of the accident can be shortened. Thereby, according to the observation control apparatus 1 of this embodiment, the time required from the occurrence of the accident to the unmanned air vehicle D moving to the accident point ACP which is the destination P can be shortened. That is, according to the observation control apparatus 1 of the present embodiment, it is possible to reduce the time required from the occurrence of an accident until the moving means arrives at the destination.
  • FIG. 7 is a configuration diagram illustrating an example of the configuration of the observation control device 2 of the second embodiment.
  • symbol is attached
  • the observation control device 2 of the present embodiment is connected to the accident section verification device ASA and the equipment information storage device EID.
  • the observation control device 2 includes a control unit 200 and a storage unit 250.
  • the storage unit 250 stores past accident information PA.
  • the past accident information PA includes failure facility information FE, failure history information FH, and failure location information FP.
  • FIG. 8 is a table showing an example of past accident information PA of the present embodiment.
  • the past accident information PA is information including information on failures that have occurred in the facility in the past.
  • the past accident information PA includes information on equipment having a history of failures in the past.
  • Failure equipment information FE is information indicating equipment having a history of trouble in the past. As shown in FIG. 8, in this example, the suspension clamp SC2 (failure equipment information FE1), the long insulator LI2 (failure equipment information FE2), the arc horn AH3 (failure equipment information FE3), and the electric wire WR2 (failure equipment information). FE4) indicates that there was a failure in the past.
  • the failure history information FH is information indicating the number of times the facility indicated by the failure facility information FE has failed in the past.
  • the failure history information FH of the failure facility information FE1 is once.
  • the failure history information FH of the failure facility information FE2 is 3 times.
  • the failure history information FH of the failure facility information FE3 is twice.
  • the failure history information FH of the failure facility information FE4 is 3 times.
  • the failure location information FP is information indicating a failure location where the facility indicated by the failure facility information FE has failed in the past.
  • the failure location information FP of the failure facility information FE1 is a connection portion with the power transmission line.
  • the failure location information FP of the failure facility information FE2 is a central connection portion of the long insulator LI in which a plurality of insulators are connected.
  • the failure location information FP of the failure facility information FE3 is a bolt portion to which the long insulator LI and the arc horn AH are connected.
  • the failure location information FP of the failure facility information FE4 is the central portion where the electric wire WR2 and the obstacle are close to each other.
  • control unit 200 includes a CPU, and includes an acquisition unit 110, a destination determination unit 120, a flight control information generation unit 130, an observation target selection unit 140, a priority addition unit 210, The observation control information generation unit 150 and its function unit are provided.
  • the priority adding unit 210 acquires the observation target selection information OES from the observation target selection unit 140.
  • the priority adding unit 210 reads past accident information PA from the storage unit 250.
  • the priority adding unit 210 adds the observation priority PR of the observation target equipment OE included in the observation target selection information OES based on the observation target selection information OES and the past accident information PA.
  • observation target priority information OEP information in which the priority PR is added to the observation target selection information OES is referred to as observation target priority information OEP.
  • FIG. 9 is a table showing an example of the observation target priority information OEP of the present embodiment.
  • the priority adding unit 210 adds a priority PR for each observation target equipment OE based on the past accident information PA and the observation target selection information OES.
  • the priority adding unit 210 adds a high priority PR to the equipment included in the observation target selection information OES and included in the past accident information PA.
  • the priority adding unit 210 is a facility included in the observation target selection information OES, which is a facility included in the past accident information PA, a suspension clamp SC2, a long insulator LI2, and an arc horn AH3.
  • the priority addition unit 210 generates observation control information OEP that is information including the observation target equipment OE to which the priority PR is added based on the observation target selection information OES and the past accident information PA. To the unit 150.
  • the priority adding unit 210 may add the priority PR to the observation target equipment OE based on a standard other than the failure history information FH.
  • the past accident information PA may include information on serious accidents in addition to the failure facility information FE, failure history information FH, and failure location information FP. If a certain facility is included in the observation target facility OE, a high priority PR may be added to a facility having a history of serious accidents.
  • the observation control information generation unit 150 acquires the observation target priority information OEP from the priority addition unit 210.
  • the observation control information generation unit 150 generates observation control information OPG based on the observation target priority information OEP acquired from the priority addition unit 210.
  • the observation control information generation unit 150 is an observation in which the unmanned air vehicle D is the observation target facility OE indicated in the observation target priority information OEP and preferentially observes the observation target facility OE having a high priority PR.
  • Observation control information OPG used for operation is generated.
  • the observation control information generation unit 150 uses the observation control information OPG used for the observation operation in which the unmanned air vehicle D observes the suspension clamp SC2, the long insulator LI2, the arc horn AH3, and the electric wire WR2. Is generated.
  • the priority adding unit 210 included in the control unit 200 generates the observation target priority information OEP.
  • the observation target priority information OEP may be generated in advance based on the observation target selection information OES and the past accident information PA, and the observation control information generation unit 150 adds the observation target priority information OEP to the previously generated observation target priority information OEP. Based on this, the observation control information OPG may be generated.
  • the observation control device 2 of this embodiment includes a control unit 200 and a storage unit 250.
  • the storage unit 250 stores past accident information PA including information on past accidents.
  • the past accident information PA includes failure facility information FE, failure history information FH, and failure location information FP.
  • the control unit 200 includes a CPU, and acquires an acquisition unit 110, a destination determination unit 120, a flight control information generation unit 130, an observation target selection unit 140, an observation control information generation unit 150, and a priority.
  • An adding unit 210 is provided as a functional unit.
  • the priority adding unit 210 acquires the observation target selection information OES from the observation target selection unit 140.
  • the priority adding unit 210 reads past accident information PA from the storage unit 250.
  • the priority adding unit 210 is a priority PR determined based on observation target selection information OES including the observation target facility OE selected by the observation target selection unit 140 and past accident information PA including information on past accidents. Then, the observation priority PR of the observation target equipment OE is added.
  • the priority adding unit 210 supplies the observation control information generation unit 150 with the observation target priority information OEP obtained by adding the priority PR to the observation target selection information OES.
  • the observation control information generation unit 150 acquires the observation target priority information OEP from the priority addition unit 210. Based on the observation target priority information OEP to which the observation priority PR of the observation target facility OE is added, the observation control information generation unit 150 generates the observation control information OPG used for controlling the observation operation of the unmanned air vehicle D. Generate.
  • the unmanned air vehicle D when the unmanned air vehicle D operates based on the flight control information FPG and the observation control information OPG, the amount of power of the power supply source that supplies power used for the operation of the unmanned air vehicle D is insufficient. There is. In this case, it may be difficult for the unmanned air vehicle D to observe a part of the observation target equipment OE included in the observation target selection information OES. For example, among the observation target facilities OE included in the observation target selection information OES by the unmanned air vehicle D, the power used for the operation of observing the tower ST may be larger than that of the other observation target facilities OE.
  • a high priority PR can be added to the observation target equipment OE that performs observation preferentially based on the observation target selection information OES and the past accident information PA. That is, according to the observation control device 2 of the present embodiment, it is possible to generate the observation control information OPG used for the observation operation for preferentially observing the observation target facility OE to which the high priority PR is added. Thereby, the unmanned air vehicle D observes the observation target equipment OE based on the observation control information OPG generated by the observation control device 2, thereby giving priority to the observation target equipment OE having a high priority PR. It is possible to observe an observation target facility OE for which is required.
  • the observation control information OPG is generated based on the observation target priority information OEP to which the priority PR is added. This is a case where only a part of the observation target equipment OE included in the observation control information OPG is observed due to a shortage of the power amount of the power supply source that supplies power used for the operation of the unmanned air vehicle D. However, it is possible to observe the observation target facility OE having the higher observation priority PR.
  • FIG. 10 is a configuration diagram illustrating an example of the configuration of the observation control device 3 according to the third embodiment.
  • symbol is attached
  • an accident section verification device ASA and an equipment information storage device EID are connected to the observation control device 3 of the present embodiment.
  • the observation control device 3 includes a control unit 300 and a storage unit 350.
  • the storage unit 350 stores power capacity information BT.
  • the power capacity information BT is information indicating the capacity of a power supply source that supplies power used for the operation of the unmanned air vehicle D.
  • the control unit 300 includes an acquisition unit 110, a destination determination unit 120, a flight control information generation unit 130, an observation target selection unit 140, an observation control information generation unit 150, and a power consumption estimation unit 310.
  • the power consumption estimation unit 310 acquires the observation target selection information OES from the observation target selection unit 140. Further, the power consumption estimation unit 310 acquires information indicating the destination P from the destination determination unit 120.
  • the power consumption estimation unit 310 is a flight that is the amount of power consumed by the operation of the unmanned air vehicle D indicated by the flight control information FPG and the observation control information OPG based on the destination P and the observation target selection information OES.
  • the power consumption amount FCP is estimated by a known method.
  • the power consumption estimation unit 310 supplies information indicating the estimated flight power consumption FCP to the observation control information generation unit 150.
  • the observation control information generation unit 150 acquires the observation target selection information OES from the observation target selection unit 140. Further, the observation control information generation unit 150 acquires information indicating the flight power consumption FCP from the power consumption estimation unit 310. In addition, the observation control information generation unit 150 reads the power capacity information BT from the storage unit 350.
  • the unmanned air vehicle D when the power amount indicated by the acquired power consumption amount FCP is larger than the power amount indicated by the power capacity information BT, the unmanned air vehicle D observes the observation target equipment OE included in the observation target selection information OES.
  • the electric power used for the operation of the unmanned air vehicle D may be insufficient. In this case, the unmanned air vehicle D may have difficulty in continuing the flight.
  • the observation control information generation unit 150 when the power amount indicated by the acquired flight power consumption amount FCP is smaller than the power capacity indicated by the power capacity information BT, the observation target included in the observation target selection information OES Observation control information OPG for observing the facility OE is generated.
  • the observation control information generation unit 150 when the power amount indicated by the acquired flight power consumption amount FCP is larger than the power capacity indicated by the power capacity information BT, the observation target equipment OE included in the observation target selection information OES. Among them, the observation control information OPG for observing some of the observation target facilities OE is generated. More specifically, the observation control information generation unit 150 determines that the unmanned air vehicle D observes the observation target equipment OE when the power amount indicated by the flight power consumption amount FCP is larger than the power amount indicated by the power capacity information BT. The observation control information OPG for observing a part of the observation target equipment OE is generated based on the amount of power consumed in the current period.
  • the electric wire WR may be grounded as an example of an accident that occurs in the electric wire WR.
  • Factors that cause the ground fault of the electric wire WR include the breakage of the electric wire, the fallen tree, and the dirt of the insulator.
  • the observation control information generation unit 150 adds the observation target information to the observation target selection information OES.
  • the observation control information OPG for performing only the observation of the electric wire WR is generated.
  • the observation control information generation unit 150 when the power amount indicated by the flight power consumption amount FCP is larger than the power capacity indicated by the power capacity information BT, the observation target equipment OE included in the observation target selection information OES. Among them, the observation control information OPG for performing only the observation of the electric wire WR1 and the electric wire WR2 is generated.
  • the observation control information generation unit 150 when the power amount indicated by the flight power consumption amount FCP is larger than the power amount indicated by the power capacity information BT, the observation control information generation unit 150 observes the electric wire WR laid at the destination P.
  • the observation control information generation unit 150 may select the observation target facility OE based on the flight power consumption FCP, the observation target selection information OES, and the power capacity information BT.
  • the observation control information generation unit 150 may generate the observation control information OPG by selecting the observation target equipment OE within a range where the flight power consumption FCP is lower than the power capacity information BT.
  • the observation control device 3 of this embodiment includes a control unit 300 and a storage unit 350.
  • the storage unit 350 stores power capacity information BT.
  • the control unit 300 includes a CPU, and acquires an acquisition unit 110, a destination determination unit 120, a flight control information generation unit 130, an observation target selection unit 140, an observation control information generation unit 150, and power consumption.
  • the estimation part 310 is provided as the function part.
  • the power consumption estimation unit 310 acquires the observation target selection information OES from the observation target selection unit 140. Further, the power consumption estimation unit 310 acquires information indicating the destination P from the destination determination unit 120.
  • the power consumption estimation unit 310 determines whether the unmanned air vehicle D is The flight power consumption FCP, which is the power consumption, is estimated.
  • the power consumption estimation unit 310 supplies the estimated flight power consumption FCP to the observation control information generation unit 150.
  • the observation control information generation unit 150 acquires the flight power consumption amount FCP from the power consumption estimation unit 310. In addition, the observation control information generation unit 150 reads the power capacity information BT from the storage unit 350. When the power amount indicated by the acquired flight power consumption amount FCP is larger than the power amount indicated by the power capacity information BT, the observation control information generation unit 150 includes the observation target equipment OE included in the observation target selection information OES. The observation control information OPG for observing a part is generated. That is, the observation control information generation unit 150 selects a part of the observation target selection information OES when the power amount indicated by the acquired flight power consumption amount FCP is larger than the power capacity indicated by the power capacity information BT.
  • the observation control information OPG in which the flight power consumption FCP is lower than the power capacity information BT is generated. Thereby, the observation control information generation unit 150 generates the observation control information OPG used for controlling the observation of the unmanned air vehicle D based on the flight power consumption FCP estimated by the power consumption estimation unit 310.
  • the unmanned air vehicle D operates based on the flight control information FPG and the observation control information OPG, the amount of power of the power supply source that supplies power used for the operation of the unmanned air vehicle D is insufficient. There is. In this case, as in the example shown in the second embodiment, it may be difficult for the unmanned air vehicle D to observe a part of the observation target equipment OE included in the observation target selection information OES.
  • the unmanned air vehicle D observes the observation target equipment OE and then returns from the destination P to the unmanned air vehicle D In some cases, it was difficult to fly to the building BD.
  • the power supply source that supplies power used for the operation of the unmanned air vehicle D is insufficient based on the flight power consumption FCP and the power capacity information BT. It can be estimated whether or not. That is, according to the observation control device 3 of the present embodiment, the observation control information OPG for observing a part of the observation target equipment OE can be generated based on the flight power consumption FCP estimated by the power consumption estimation unit 310. it can. That is, according to the observation control device 3 of the present embodiment, the observation control information OPG can be generated based on the flight power consumption FCP. That is, the unmanned air vehicle D observes the observation target equipment OE based on the observation control information OPG generated by the observation control device 3 of the present embodiment. Thereby, the unmanned air vehicle D can suppress that the electric power supply source which supplies the electric power used for operation
  • the observation control device 3 is connected to the acquisition unit 110, the destination determination unit 120, the flight control information generation unit 130, the observation target selection unit 140, the observation control information generation unit 150, and the consumption.
  • the control unit 300 may include a priority adding unit 210, and the observation control information generating unit 150 includes the flight power consumption FCP estimated by the power consumption estimating unit 310 and the observation target generated by the priority adding unit 210.
  • the observation control information OPG may be generated based on the priority information OEP.
  • the observation control information generation unit 150 has a higher priority among the observation target facilities OE included in the observation target priority information OEP.
  • the observation control information OPG for observing the observation target equipment OE having the degree PR may be generated.
  • FIG. 11 is a configuration diagram illustrating an example of a configuration of the observation control device 4 according to a modification.
  • symbol is attached
  • the accident section verification device ASA, the equipment information storage device EID, and the unmanned air vehicle D after the equipment is observed at the destination P are connected to the observation control device 4 of the modification.
  • the unmanned air vehicle D supplies the observation controller 4 with the image AP of the observation target equipment OE at the destination P imaged by the imaging unit C included in the unmanned air vehicle D.
  • the observation control device 4 according to the modification includes a control unit 400.
  • the control unit 400 includes a CPU, and the acquisition unit 110, the destination determination unit 120, the flight control information generation unit 130, the observation target selection unit 140, the observation control information generation unit 150, and the image acquisition unit 410. And an observation result information generation unit 420 as functional units.
  • the image acquisition unit 410 acquires the image AP from the unmanned air vehicle D.
  • the image acquisition unit 410 supplies the image AP acquired from the unmanned air vehicle D to the observation result information generation unit 420.
  • the observation result information generation unit 420 acquires the image AP from the image acquisition unit 410.
  • the observation result information generation unit 420 generates the observation result information RP including the acquired image AP and information about the accident other than the image AP by a known method.
  • the information about the accident other than the image AP includes, for example, the date and time when the accident occurred, the accident section information AS, the accident form information AF, and the facility name information EN of the equipment imaged in the image AP.
  • the observation result information RP is, for example, an accident report.
  • the observation result information generation unit 420 includes an image AP that is an observation result observed by the unmanned air vehicle D, the date and time when the accident occurred, the accident section information AS, the accident form information AF, and the facility name information EN.
  • Observation result information RP which is a report is generated.
  • the observation control device 4 includes a control unit 400.
  • the control unit 400 includes a CPU, and the acquisition unit 110, the destination determination unit 120, the flight control information generation unit 130, the observation target selection unit 140, the observation control information generation unit 150, and the image acquisition unit 410.
  • an observation result information generation unit 420 as functional units.
  • the image acquisition unit 410 acquires the image AP of the observation target equipment OE at the destination P captured by the imaging unit C included in the unmanned air vehicle D.
  • the observation result information generation unit 420 generates observation result information RP that includes the image AP acquired by the image acquisition unit 410 and information about an accident other than the image AP.
  • the worker who grasps the situation of the accident may be required to prepare a report showing information on the accident for the purpose of sharing the information on the accident.
  • the conventional technique there are cases where an operator creates a report indicating information on an accident depending on the human system. In other words, with the conventional technology, it may be difficult for the operator to reduce the trouble of creating a report showing information related to the accident.
  • the imaging unit C included in the unmanned air vehicle D acquires the image AP captured along with the facility observation.
  • the observation control device 4 generates observation result information RP including the acquired image AP and information related to an accident other than the image AP.
  • the observation control device 4 of the modification it is possible to generate the observation result information RP indicating the information related to the accident. That is, according to the observation control device 4 of the modified example, it is possible to reduce the trouble of creating a report by generating the observation result information RP indicating information related to the accident.
  • the observation control device 4 includes the acquisition unit 110, the destination determination unit 120, the flight control information generation unit 130, the observation target selection unit 140, the observation control information generation unit 150, the image, Although the case where the acquisition part 410 and the observation result information generation part 420 are provided was demonstrated, it is not restricted to this.
  • the control unit 100, the control unit 200, and the control unit 300 may include an image acquisition unit 410 and an observation result information generation unit 420. That is, the observation control device 1, the observation control device 2, and the observation control device 3 generate the observation result information RP by the image capturing unit C included in the unmanned air vehicle D acquiring the image AP captured along with the facility observation. May be.
  • each unit included in the observation control device 1, the observation control device 2, the observation control device 3, and the observation control device 4 in each of the above embodiments may be realized by dedicated hardware, or a memory. It may also be realized by a microprocessor.
  • each unit included in the observation control device 1, the observation control device 2, the observation control device 3, and the observation control device 4 includes a memory and a CPU (central processing unit), and the observation control device 1, the observation control device 2, and the observation control.
  • a program for realizing the functions of each unit included in the observation control device 1, the observation control device 2, the observation control device 3, and the observation control device 4 is recorded on a computer-readable recording medium, and recorded on the recording medium.
  • the program may be read by a computer system and executed.
  • the “computer system” includes an OS and hardware such as peripheral devices.
  • the “computer system” includes a homepage providing environment (or display environment) if a WWW system is used.
  • the “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM or a CD-ROM, and a hard disk incorporated in a computer system.
  • the “computer-readable recording medium” dynamically holds a program for a short time like a communication line when transmitting a program via a network such as the Internet or a communication line such as a telephone line.
  • a volatile memory in a computer system serving as a server or a client in that case, and a program that holds a program for a certain period of time are also included.
  • the program may be a program for realizing a part of the functions described above, and may be a program capable of realizing the functions described above in combination with a program already recorded in a computer system.
  • observation control information ASA ... Accident section verification device, A ... Accident information, AO ... Accident occurrence information, AF ... Accident form information, AS ... Accident section information, EI ... Equipment information, EID ... Equipment information storage device, EN ... Equipment name information, AH, AH1, AH2, A 3 ... Arc horn, SC, SC1, SC2, SC3 ... Suspension clamp, ST, ST1, ST2, ST3 ... Tower, WR, WR1, WR2 ... Electric wire, EP, EP1, EP3, EP5 ... Equipment position information, OES ... Observation target Selection information, FCP: Flight power consumption, BT: Power capacity information, PA: Past accident information, FE, FE1, FE2, FE3, FE4 ... Fault facility information, FH ... Fault history information, FP ... Fault location information, OEP ... Observation target priority information, PR ... priority, RP ... observation result information

Landscapes

  • Engineering & Computer Science (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Power Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Electric Cable Installation (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

観測制御装置は、需要家に電力を供給する設備の位置を示す情報と、設備を示す情報とを含む設備情報と、電力供給源から供給される電力を需要家に供給する電線の事故の発生を示す情報と、事故の形態を示す情報と、電線に事故が発生した区間を示す情報とを含む事故情報とを取得する取得部と、取得部が取得した事故情報と、設備情報とに基づいて、事故を観測する無人飛行体の目的地を判定する目的地判定部と、目的地判定部が判定した目的地に基づいて無人飛行体の飛行の制御に用いられる飛行制御情報を生成する飛行制御情報生成部と、無人飛行体の観測対象の設備である観測対象設備を選択する観測対象選択部と、観測対象選択部が選択した観測対象設備に基づいて無人飛行体の目的地における観測動作の制御に用いられる観測制御情報を生成する観測制御情報生成部とを備える。

Description

観測制御装置
 本発明は、観測制御装置に関する。
 従来、配電系統の事故が発生した場合に、事故現場での事故状況の観測のために、作業員が車両によって派遣される場合がある。特許文献1には、事故現場に移動するために作業員が乗る車両の移動経路を教示する技術が知られている。
特開平9-154243号公報
 ところで、事故発生から事故現場に作業員が到着するまでの所要時間は、短い方が望ましい。しかしながら、車両は地上を走行するため、渋滞などの道路状況によっては、目的地に迅速に到着できない場合がある。すなわち、目的地に迅速に到着するためには、移動手段は、地上を走行する車両よりも、上空を飛行する飛行体の方が好ましい。
 また、移動手段が操縦者を必要とする有人制御によるものであると、事故発生に備えて操縦者を常に待機させておくことが求められる。操縦者を常に待機させていない場合には、事故発生後に操縦者の手配を行わなければならず、移動手段を出動させるための準備作業に時間がかかる場合がある。したがって、移動手段は、操縦者を必要とするものよりも、操縦者を必要としない自律制御によるものの方が好ましい。
 また、事故現場にある観測対象の機器の種類によって観測手順が異なる場合があり、この場合には、事故現状を把握するための観測手順を特定する作業が事故発生後に生じることがある。つまり、事故発生後の作業に時間を要する場合があり、この場合には、事故発生から、目的地に移動手段が到着するまでの所要時間を短縮することが困難である場合がある。
 すなわち、特許文献1に記載される従来技術では、事故発生から、目的地に移動手段が到着するまでの所要時間を短縮することまではできない。
 本発明の一態様は、上記の点に鑑みて為されたものであり、事故発生から、目的地に移動手段が到着するまでの所要時間を短縮することができる観測制御装置を提供する。
 本発明の一態様は、需要家に電力を供給する設備の位置を示す情報と、前記設備を示す情報とを含む設備情報と、電力供給源に接続される給電端と需要家とを複数の開閉器SWを介して接続して前記電力供給源から供給される電力を前記需要家に供給する電線の事故の発生を示す情報と、前記事故の形態を示す情報と、前記給電端と当該給電端に隣接する前記開閉器SWとの間の区間、隣接する2つの前記開閉器SWの間の区間、又は、前記需要家と当該需要家に隣接する前記開閉器SWとの間の区間のうち前記電線に事故が発生した区間を示す情報とを含む事故情報とを取得する取得部と、前記取得部が取得した前記事故情報と、前記設備情報とに基づいて、前記事故を観測する無人飛行体の目的地を判定する目的地判定部と、前記目的地判定部が判定した前記目的地に基づいて、前記無人飛行体の飛行の制御に用いられる飛行制御情報を生成する飛行制御情報生成部と、前記取得部が取得した前記事故情報と、前記設備情報とに基づいて、前記無人飛行体の観測対象の設備である観測対象設備を選択する観測対象選択部と、前記観測対象選択部が選択した前記観測対象設備に基づいて、前記無人飛行体の前記目的地における観測動作の制御に用いられる観測制御情報を生成する観測制御情報生成部とを備える観測制御装置である。
 また、本発明の一態様の観測制御装置において、前記観測制御情報生成部は、前記観測対象選択部が選択した前記観測対象設備と、過去の事故に関する情報が含まれる過去事故情報とに基づいて定められる優先度であって、前記観測対象設備の観測の前記優先度に更に基づいて、前記無人飛行体の観測の動作の制御に用いられる観測制御情報を生成する。
 また、本発明の一態様の観測制御装置において、前記観測対象選択部が選択した前記観測対象設備と、前記目的地判定部が判定した前記目的地とに基づいて、前記無人飛行体が消費する電力を推定する消費電力推定部を更に備え、前記観測制御情報生成部は、前記消費電力推定部が推定した推定結果に更に基づいて、前記無人飛行体の観測の制御に用いられる観測制御情報を生成する。
 また、本発明の一態様の観測制御装置において、前記無人飛行体が備える撮像部が撮像した前記目的地における前記観測対象設備の画像を取得する画像取得部と、前記画像取得部が取得した前記画像と、前記画像以外の前記事故に関する情報とが含まれる観測結果情報を生成する観測結果情報生成部とを更に備える。
 本発明によれば、事故発生から、目的地に移動手段が到着するまでの所要時間を短縮することができる観測制御装置を提供することができる。
第1実施形態の観測制御装置の概要を示す概要図である。 本実施形態の観測制御装置の構成の一例を示す構成図である。 本実施形態の事故情報の一例を示す表である。 本実施形態の設備情報の一例を示す表である。 本実施形態の観測制御装置の動作の一例を示す流れ図である。 本実施形態の観測対象選択情報の一例を示す表である。 第2実施形態の観測制御装置の構成の一例を示す構成図である。 本実施形態の過去事故情報の一例を示す表である。 本実施形態の観測対象優先度情報の一例を示す表である。 第3実施形態の観測制御装置の構成の一例を示す構成図である。 変形例の観測制御装置の構成の一例を示す構成図である。
[第1実施形態]
 以下、図を参照して本発明の第1実施形態について説明する。まず、図1を参照して送配電線に生じる事故の概要について説明する。図1は、第1実施形態の観測制御装置1の概要を示す概要図である。
 図1に示す通り、鉄塔STが支持する電線WRは、経時劣化、自然災害および支障物等の影響により、地絡、短絡および断線等の事故が発生する場合がある。ここで、鉄塔STとは、例えば、送電線鉄塔および配電柱である。したがって、電線WRとは、変電所等の電力供給源と、電力の供給を受ける需要家CSとの間に敷設される送電線や配電線である。
 ここで、電線WRには、複数の開閉器SW(図示せず)が直列に接続される。開閉器SWとは、例えば、遮断機、断路器およびリレー等である。電線WRは、これらの開閉器SWによって複数の区間SCTに区分される。区間SCTとは、電力供給源の給電端と、当該給電端に隣接する開閉器SWとの間の範囲である。また、区間SCTとは、隣接する2つの開閉器SWの間の範囲である。また、区間SCTとは、需要家CSと当該需要家CSに隣接する開閉器SWとの間の範囲である。
 開閉器SWは、開閉器SWが設置されている設置場所での手動操作、遠隔操作、または自動制御によって開閉状態が切り換えられる。これにより、開閉器SWは、接続される区間SCTへの電力の供給を制御する。
 図1に示す通り、この一例では、電線WRのうち、鉄塔ST1と、鉄塔ST2とが支持する電線WR2と、鉄塔ST2と、鉄塔ST3とが支持する電線WR1とが同一の区間SCT1である。すなわち、区間SCT1とは、鉄塔ST1の位置から鉄塔ST3の位置までの範囲である。
 また、以降の説明において、電線WR1と、電線WR2とを特に区別しない場合には、電線WRと記載する。また、以降の説明において、鉄塔ST1と、鉄塔ST2と、鉄塔ST3とを特に区別しない場合には、鉄塔STと記載する。
 また、一例として、鉄塔ST2と、鉄塔ST3とが支持する電線WR1と、鉄塔ST1と、鉄塔ST2とが支持する電線WR2とのうち、鉄塔ST1と、鉄塔ST2とが支持する電線WR2が断線し、地絡している状態を図1に示す。以降の説明において、事故が発生している位置を事故点ACPと記載する。図1に示す通り、この一例では、電線WR2が地絡している位置が事故点ACPである。
 上述したように、電線WR2が断線することにより、電線WR2から電力の供給を受ける需要家CSは、電力の供給を受けることができない。
 この場合、電力を供給する電力供給会社は、事故を早急に復旧することが求められる。
すなわち、電力供給会社は、事故の状況を早急に把握することが求められる。
 図1に示す通り、本実施形態の観測制御装置1は、電力供給会社の施設である建物BDに備えられる。
 この一例では、無人飛行体Dは、観測制御装置1と同様に建物BD内に配置される。また、無人飛行体Dは、事故が発生したことに応じて目的地Pである事故点ACPまたは事故点ACP周辺の電力を供給する設備まで自律飛行によって飛行する。
 本実施形態の観測制御装置1は、目的地Pである事故点ACPまたは事故点ACP周辺の設備まで無人飛行体Dが飛行する自律飛行の制御に用いられる飛行制御情報FPGを提供する。
 また、この一例では、無人飛行体Dは、目的地Pに到着した後、自律飛行によって事故の状況を観測する。具体的には、無人飛行体Dは、撮像部Cを備えており、目的地Pに到着後、事故の状況を撮像部Cによって撮像する。
 本実施形態の観測制御装置1は、無人飛行体Dが目的地Pに到着後、事故の状況を観測する観測動作の制御に用いられる観測制御情報OPGを提供する。
 以下、図2を参照して観測制御装置1の構成について説明する。図2は、本実施形態の観測制御装置1の構成の一例を示す構成図である。
 図2に示す通り、観測制御装置1には、事故区間検定装置ASAと、設備情報記憶装置EIDとが接続される。
 事故区間検定装置ASAとは、事故区間検定装置ASAの観測対象である区間SCTの電線WRに事故が発生した場合、既知の方法によって事故情報Aを生成する装置である。
 以下、図3を参照して事故情報Aの詳細について説明する。図3は、本実施形態の事故情報Aの一例を示す表である。図3に示す通り、事故情報Aには、事故発生情報AOと、事故形態情報AFと、事故区間情報ASとが含まれる。
 事故発生情報AOとは、事故区間検定装置ASAが事故の有無を検定する検定対象の区間SCTに含まれる電線WRに事故が発生しているか否かを示す情報である。すなわち、事故発生情報AOとは、事故の有無を示す情報である。この一例では、事故区間検定装置ASAが事故の有無を検定する検定対象の区間SCTが電線WR1と、電線WR2とを含む区間SCT1である。また、図1に示す通り、この一例では、電線WR2が倒木によって断線し、地絡する。図3に戻り、この一例では、事故発生情報AOが検定対象の電線WRに事故が発生していることを示す。
 事故形態情報AFとは、事故区間検定装置ASAの検定対象の区間SCTに含まれる電線WRに発生している事故の形態を示す情報である。図1に示す通り、この一例では、区間SCT1に含まれる電線WR2が断線し、地絡する。図3に戻り、この一例は、事故形態情報AFが、検定対象の区間SCTに含まれる電線WRに発生している事故が地絡であることを示す。
 事故区間情報ASとは、事故区間検定装置ASAの検定対象の区間SCTのうち、電線WRに事故が生じている区間SCTを示す情報である。この一例では、事故区間情報ASとは、地絡した電線WR2を含む区間SCT1を示す情報である。具体的には、図3に示す通り、事故区間情報ASが、区間SCT1であることを示す。より具体的には、事故区間情報ASとは、区間SCT1である鉄塔ST1の位置から鉄塔ST3の位置までの範囲である。
 事故区間検定装置ASAは、事故発生情報AOと、事故形態情報AFと、事故区間情報ASとが含まれる事故情報Aを観測制御装置1へ供給する。すなわち、事故区間検定装置ASAは、事故の有無と、事故の形態と、事故の区間とが含まれる事故情報Aを観測制御装置1へ供給する。
 図2に戻り、設備情報記憶装置EIDについて説明する。設備情報記憶装置EIDとは、設備情報EIを記憶する装置である。
 以下、図4を参照して設備情報EIの詳細について説明する。図4は、本実施形態の設備情報EIの一例を示す表である。設備情報EIとは、需要家CSへ電力を供給する設備の詳細を示す情報である。具体的には、図4に示す通り、設備情報EIには、需要家CSへ電力を供給する設備に関する情報である設備名情報ENと、設備位置情報EPとが含まれる。この一例では、設備情報EIに含まれる設備の詳細のうち、区間SCT1の範囲に存在する設備の詳細の一例を図4に示す。
 設備名情報ENとは、需要家CSに電力の供給を行う設備の名称を示す情報である。
 図4に示す通り、この一例では、設備名情報ENには、設備の名称として鉄塔ST1(設備名情報EN1)と、鉄塔ST2(設備名情報EN6)と、鉄塔ST3(設備名情報EN11)が含まれる。
 この一例では、鉄塔STが電線WRを支持する際に、鉄塔STには、懸垂クランプSCと、長幹がいしLIと、アークホーンAHとの設備がそれぞれの鉄塔STに付属する。
 すなわち、設備名情報ENには、鉄塔ST1に付随する設備の名称として懸垂クランプSC1(設備名情報EN2)と、長幹がいしLI1(設備名情報EN3)と、アークホーンAH1(設備名情報EN4)とが含まれる。また、設備名情報ENには、鉄塔ST2に付随する設備の名称として、懸垂クランプSC2(設備名情報EN7)と、長幹がいしLI2(設備名情報EN8)と、アークホーンAH2(設備名情報EN9)とが含まれる。また、設備名情報ENには、鉄塔ST3に付随する設備の名称として、懸垂クランプSC3(設備名情報EN12)と、長幹がいしLI3(設備名情報EN13)と、アークホーンAH3(設備名情報EN14)とが含まれる。
 また、設備名情報ENには、鉄塔STが支持する電線WRの名称として電線WR2(設備名情報EN5)と、電線WR1(設備名情報EN10)とが含まれる。
 設備位置情報EPとは、需要家CSに電力の供給を行う設備の位置を示す情報である。
この一例では、設備位置情報EPが、座標によって示される場合について説明する。また、この一例では、設備位置情報EPは、設備名情報ENが示す設備毎に座標を示す。
 図4に示す通り、この一例では、鉄塔ST1の位置を示す座標が設備位置情報EP1(35.00000,135.00000)である。また、懸垂クランプSC1、長幹がいしLI1およびアークホーンAH1は、鉄塔ST1に付属する設備であるため、いずれも鉄塔ST1と同一の座標に位置する。つまり、懸垂クランプSC1、長幹がいしLI1およびアークホーンAH1は、いずれも設備位置情報EP1が示す座標に位置する。
 また、この一例では、鉄塔ST2の位置を示す座標が設備位置情報EP3(35.00200,135.00200)である。また、懸垂クランプSC2、長幹がいしLI2およびアークホーンAH2は、鉄塔ST2に付随する設備であるため、いずれも鉄塔ST2と同一の座標に位置する。つまり、懸垂クランプSC2、長幹がいしLI2およびアークホーンAH2は、いずれも設備位置情報EP3が示す座標に位置する。
 また、この一例では、鉄塔ST3の位置を示す座標が設備位置情報EP5(35.00400,135.00400)である。また、懸垂クランプSC3、長幹がいしLI3およびアークホーンAH3は、鉄塔ST3に付随する設備であるため、いずれも鉄塔ST3と同一の座標に位置する。つまり、懸垂クランプSC3、長幹がいしLI3およびアークホーンAH3は、いずれも設備位置情報EP5が示す座標に位置する。
 また、設備情報EIには、電線WRの設備位置情報EPとして電線WRが敷設される経路上の位置のうち、電線WRを支持する支持点の設備位置情報EPが含まれる。図1に示す通り、この一例では、電線WRが2つの鉄塔STによって支持される。すなわち、電線WRの支持点は2点である。これにより、電線WRの設備位置情報EPとは、電線WRを支持する2つの鉄塔STの座標である。したがって、鉄塔ST1と、鉄塔ST2とに支持される電線WR2の設備位置情報EPは、設備位置情報EP1(35.00000,135.00000)と、座標が設備位置情報EP3(35.00200,135.00200)とである。また、この一例では、鉄塔ST2と、鉄塔ST3とに支持される電線WR1の設備位置情報EPは、座標が設備位置情報EP3(35.00200,135.00200)と、設備位置情報EP5(35.00400,135.00400)とである。
 設備情報記憶装置EIDは、設備名情報ENと、設備位置情報EPとが含まれる設備情報EIを観測制御装置1へ供給する。
 なお、上述では、事故区間検定装置ASAと、設備情報記憶装置EIDとが観測制御装置1に直接接続される場合について説明したが、これに限られない。事故区間検定装置ASAと、設備情報記憶装置EIDとは、観測制御装置1に直接接続されていなくてもよく、情報の送受が可能なネットワークを介して接続されていてもよい。
 図2に戻り、観測制御装置1は、制御部100を備える。
 制御部100は、CPU(Central Processing Unit)を備えており、取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150とをその機能部として備える。
 以下、図2と、図5を参照して観測制御装置1が備える各部の詳細および動作について説明する。図5は、本実施形態の観測制御装置1の動作の一例を示す流れ図である。
 図5に示す通り、取得部110は、事故区間検定装置ASAから事故情報Aを取得する(ステップS110)。また、取得部110は、設備情報記憶装置EIDから設備情報EIを取得する(ステップS120)。取得部110は、事故情報Aと、設備情報EIとを目的地判定部120と、観測対象選択部140とへ供給する(ステップS130)。
 図2に戻り、目的地判定部120は、取得部110から事故情報Aと、設備情報EIとを取得する。目的地判定部120は、事故情報Aと、設備情報EIとに基づいて、目的地Pを判定する。目的地Pとは、無人飛行体Dが自律飛行によって到達する行先である。具体的には、目的地Pとは、事故区間情報ASである区間SCTに敷設される電線WRと、当該電線WRに付随する設備である。上述したとおり、この一例では、事故区間情報ASとは、区間SCT1である。目的地判定部120は、設備情報EIに含まれる設備位置情報EPと、事故区間情報ASが示す区間SCT1の範囲とが一致する設備を判定する。
 例えば、目的地判定部120は、事故区間情報ASが示す区間SCTの範囲に存在する設備のうち、建物BDの位置から最も近い設備を目的地Pとする。この一例では、建物BDの位置から最も近い設備の設備位置情報EPが設備位置情報EP1である。これにより、目的地判定部120は、設備位置情報EP1に存在する設備を目的地Pであると判定する。目的地判定部120は、設備位置情報EP1を目的地Pを示す情報として飛行制御情報生成部130へ供給する。
 具体的には、図5に示す通り、目的地判定部120は、取得部110から事故情報Aと、設備情報EIとを取得する(ステップS140)。目的地判定部120は、取得した事故情報Aと、設備情報EIとに基づいて、目的地Pを判定する(ステップ150)。目的地判定部120は、判定した目的地Pを示す情報を飛行制御情報生成部130へ供給する(ステップS160)。
 図2に戻り、飛行制御情報生成部130は、目的地判定部120から目的地Pを示す情報を取得する。飛行制御情報生成部130は、取得した目的地Pを示す情報に基づいて、無人飛行体Dが目的地Pまで自律飛行する飛行の制御に用いられる飛行制御情報FPGを既知の方法によって生成する。
 具体的には、上述した通り、この一例では、無人飛行体Dが建物BD内に配置される。
また、この一例では、飛行制御情報生成部130は、目的地Pを示す情報として設備位置情報EP1を取得する。飛行制御情報生成部130は、建物BDの座標と、取得した設備位置情報EP1に示される座標とに基づいて、無人飛行体Dが目的地Pである設備位置情報EP1まで自律飛行する飛行の制御に用いられる飛行制御情報FPGを既知の方法によって生成する。
 具体的には、図5に示す通り、飛行制御情報生成部130は、目的地判定部120から目的地Pを示す情報を取得する(ステップ170)。飛行制御情報生成部130は、取得した目的地Pを示す情報に基づいて、無人飛行体Dが目的地Pまで飛行する飛行の制御に用いられる飛行制御情報FPGを既知の方法によって生成する(ステップS180)。
 無人飛行体Dは、飛行制御情報生成部130が生成した飛行制御情報FPGに基づいて制御されることにより、目的地Pまで自律飛行する。すなわち、飛行制御情報FPGは、無人飛行体Dが自律飛行する際に、無人飛行体Dの飛行の制御に用いられる情報である。
 なお、上述では、無人飛行体Dが観測制御装置1と同様に建物BD内に配置される場合について説明したが、これに限られない。無人飛行体Dは、観測制御装置1が備えられる建物BD以外の場所に配置されていてもよい。すなわち、飛行制御情報生成部130は、無人飛行体Dが配置されている場所の座標と、目的地Pを示す情報とに基づいて、飛行制御情報FPGを既知の方法によって生成してもよい。
 図2に戻り、観測対象選択部140は、取得部110から事故情報Aと、設備情報EIとを取得する。観測対象選択部140は、事故情報Aと、設備情報EIとに基づいて、無人飛行体Dが観測する対象の設備である観測対象設備OEを選択する。観測対象設備OEとは、事故が発生している設備および事故が発生することにより故障や破損が生じる可能性がある設備である。この一例では、観測対象設備OEとは、事故が発生している電線WRと、事故が発生することにより故障や破損が生じる可能性がある設備である。
 この一例では、観測対象選択部140は、事故情報Aと、設備情報EIとに基づいて、事故区間情報ASが示す区間SCTに敷設される電線WRと、事故区間情報ASが示す区間SCTに存在する設備とを観測対象設備OEとして選択する。観測対象選択部140は、選択した観測対象設備OEが含まれる観測対象選択情報OESを観測制御情報生成部150へ供給する。この一例では、観測対象選択情報OESには、観測対象設備OEである設備の設備名情報ENと、設備位置情報EPとが含まれる。
 以下、図6を参照して観測対象選択情報OESについて説明する。図6は、本実施形態の観測対象選択情報OESの一例を示す表である。
 上述したように、観測対象選択部140は、事故情報Aと、設備情報EIに基づいて、事故区間情報ASが示す区間SCTの範囲に存在する設備を観測対象設備OEとして選択する。この一例では、観測対象選択部140は、区間SCT1の範囲に存在する設備と、区間SCT1の範囲に敷設される電線WR1と、電線WR2とを観測対象設備OEとして選択する。
 したがって、観測対象選択部140は、電線WR2を支持する鉄塔ST1と、鉄塔ST1に付随する設備とを観測対象設備OEとして選択する。具体的には、図6に示す通り、観測対象選択部140は、鉄塔ST1と、懸垂クランプSC1と、長幹がいしLI1と、アークホーンAH1とを観測対象設備OEとして選択する。
 また、観測対象選択部140は、電線WR1および電線WR2を支持する鉄塔ST2と、鉄塔ST2に付随する設備とを観測対象設備OEとして選択する。具体的には、図6に示す通り、観測対象選択部140は、鉄塔ST2と、懸垂クランプSC2と、長幹がいしLI2と、アークホーンAH2とを観測対象設備OEとして選択する。
 また、観測対象選択部140は、電線WR1を支持する鉄塔ST3と、鉄塔ST3に付随する設備とを観測対象設備OEとして選択する。具体的には、図6に示す通り、観測対象選択部140は、鉄塔ST3と、懸垂クランプSC3と、長幹がいしLI3と、アークホーンAH3とを観測対象設備OEとして選択する。
 上述したように、観測対象選択情報OESには、観測対象設備OEとして選択された設備の設備名情報ENと、設備位置情報EPとが含まれる。
 したがって、図6に示すとおり、観測対象選択情報OESには、鉄塔ST1と、鉄塔ST1に付随する設備の設備位置情報EP1が含まれる。また、観測対象選択情報OESには、電線WR2の設備位置情報EPである設備位置情報EP1と、設備位置情報EP3とが含まれる。また、観測対象選択情報OESには、鉄塔ST2と、鉄塔ST2に付随する設備の設備位置情報EP3が含まれる。また、観測対象選択情報OESには、電線WR1の設備位置情報EPである設備位置情報EP3と、設備位置情報EP5とが含まれる。また、観測対象選択情報OESには、鉄塔ST3と、鉄塔ST3に付随する設備の設備位置情報EP5が含まれる。
 観測対象選択部140は、事故情報Aと、設備情報EIとに基づいて選択した観測対象設備OEが含まれる観測対象選択情報OESを観測制御情報生成部150に供給する。
 具体的には、図5に示す通り、観測対象選択部140は、取得部110から事故情報Aと、設備情報EIとを取得する(ステップS190)。観測対象選択部140は、取得した事故情報Aと、設備情報EIとに基づいて、観測対象設備OEを選択する(ステップS200)。観測対象選択部140は、選択した観測対象設備OEが含まれる観測対象選択情報OESを観測制御情報生成部150へ供給する(ステップS210)。
 図2に戻り、観測制御情報生成部150は、観測対象選択部140から観測対象選択部140が選択した観測対象設備OEが含まれる観測対象選択情報OESを取得する。
 観測制御情報生成部150は、取得した観測対象選択情報OESに基づいて、無人飛行体Dが観測対象選択情報OESに含まれる観測対象設備OEを観測する観測動作の制御に用いられる観測制御情報OPGを既知の方法によって生成する。
 この一例では、観測制御情報生成部150は、目的地Pの設備位置情報EP1と、観測対象選択情報OESに含まれる観測対象設備OE毎の設備位置情報EPとに基づいて観測制御情報OPGを生成する。具体的には、観測制御情報生成部150は、目的地Pに到着後、目的地Pである設備位置情報EP1から設備位置情報EP3を経由して設備位置情報EP5へ飛行する観測制御情報OPGを生成する。
 より具体的には、観測制御情報生成部150は、目的地Pに到着後、設備位置情報EP1の座標に存在する設備を観測する観測制御情報OPGを生成する。また、観測制御情報生成部150は、設備位置情報EP1において設備を観測後、設備位置情報EP1から設備位置情報EP3まで飛行し電線WR2を観測する観測制御情報OPGを生成する。また、観測制御情報生成部150は、設備位置情報EP3に到着後、設備位置情報EP3の座標に存在する設備を観測する観測制御情報OPGを生成する。また、観測制御情報生成部150は、設備位置情報EP3において設備を観測後、設備位置情報EP3から設備位置情報EP5まで飛行し、電線WR1を観測する観測制御情報OPGを生成する。また、観測制御情報生成部150は、設備位置情報EP5に到着後、設備位置情報EP5の座標に存在する設備を観測する観測制御情報OPGを生成する。
 以下、観測制御情報OPGの詳細について説明する。この一例において、観測制御情報OPGには、観測対象選択情報OESに基づいて、設備位置情報EP1が示す座標において、観測対象設備OEを観測する時間だけ無人飛行体Dがホバリングする動作の制御が含まれる。具体的には、観測制御情報OPGには、設備位置情報EP1において、鉄塔ST1と、鉄塔ST1に付随する設備である懸垂クランプSC1と、長幹がいしLI1と、アークホーンAH1とを観測する時間だけ無人飛行体Dがホバリングする動作の制御が含まれる。これにより、無人飛行体Dは、無人飛行体Dが備える撮像部Cによって、設備位置情報EP1において鉄塔ST1と、鉄塔ST1に付随する設備とを撮像し、画像APを生成する。ここで、画像APとは、無人飛行体Dが備える撮像部Cによって観測対象設備OEを撮像し、生成された画像である。
 また、観測制御情報OPGには、観測対象選択情報OESに基づいて、設備位置情報EP1において観測対象設備OEを観測した後、設備位置情報EP3まで飛行する動作の制御が含まれる。具体的には、観測制御情報OPGには、設備位置情報EP1において設備を観測した後、設備位置情報EP3まで飛行しながら無人飛行体Dが電線WR2を観測する動作の制御が含まれる。これにより、無人飛行体Dは、無人飛行体Dが備える撮像部Cによって、設備位置情報EP1から設備位置情報EP3まで電線WR2を撮像し、画像APを生成する。
 また、観測制御情報OPGには、観測対象選択情報OESに基づいて、設備位置情報EP3が示す座標において、観測対象設備OEを観測する時間だけ無人飛行体Dがホバリングする動作の制御が含まれる。具体的には、観測制御情報OPGには、設備位置情報EP3において、鉄塔ST2と、鉄塔ST2に付随する設備である懸垂クランプSC2と、長幹がいしLI2と、アークホーンAH2とを観測する時間だけ無人飛行体Dがホバリングする動作の制御が含まれる。これにより、無人飛行体Dは、無人飛行体Dが備える撮像部Cによって、設備位置情報EP3において鉄塔ST2と、鉄塔ST2に付随する設備とを撮像し、画像APを生成する。
 また、観測制御情報OPGには、観測対象選択情報OESに基づいて、設備位置情報EP3において観測対象設備OEを観測した後、設備位置情報EP5まで飛行する動作の制御が含まれる。具体的には、観測制御情報OPGには、設備位置情報EP3において設備を観測した後、設備位置情報EP5まで飛行しながら無人飛行体Dが電線WR1を観測する動作の制御が含まれる。これにより、無人飛行体Dは、無人飛行体Dが備える撮像部Cによって、設備位置情報EP3から設備位置情報EP5まで電線WR1を撮像し、画像APを生成する。
 また、観測制御情報OPGには、観測対象選択情報OESに基づいて、設備位置情報EP5が示す座標において、観測対象設備OEを観測する時間だけ無人飛行体Dがホバリングする動作の制御が含まれる。具体的には、観測制御情報OPGには、設備位置情報EP5において、鉄塔ST3と、鉄塔ST3に付随する設備である懸垂クランプSC3と、長幹がいしLI3と、アークホーンAH3とを観測する時間だけ無人飛行体Dがホバリングする動作の制御が含まれる。これにより、無人飛行体Dは、無人飛行体Dが備える撮像部Cによって、設備位置情報EP5において鉄塔ST3と、鉄塔ST3に付随する設備とを撮像し、画像APを生成する。
 図5に示す通り、観測制御情報生成部150は、観測対象選択部140から観測対象選択情報OESを取得する(ステップS220)。観測制御情報生成部150は、取得した観測対象選択情報OESに基づいて、観測制御情報OPGを生成する(ステップS230)。
 なお、上述では、観測制御情報生成部150は、観測対象選択情報OESに含まれる設備位置情報EPに示される設備の位置に基づいて観測制御情報OPGを生成する場合について説明したが、これに限られない。例えば、観測対象選択情報OESに含まれる観測対象設備OEには、観測対象設備OE毎に観測対象設備OEに応じた観測の方法が定められていてもよい。すなわち、観測制御情報生成部150は、観測対象設備OEに応じて定められた観測の方法に基づいて、無人飛行体Dの観測の観測動作を制御する観測制御情報OPGを生成してもよい。
 例えば、観測対象設備OEが鉄塔STである場合には、無人飛行体Dは、鉄塔STの全体を観測することが予め定められている場合がある。この場合、観測制御情報生成部150は、無人飛行体Dが備える撮像部Cが鉄塔STの全体を撮像する観測の観測動作を制御する観測制御情報OPGを生成してもよい。また、観測対象設備OEが長幹がいしLIである場合には、無人飛行体Dは、長幹がいしLIに接近して観測することが予め定められている場合がある。この場合、観測制御情報生成部150は、無人飛行体Dが備える撮像部Cが長幹がいしLIを接近して撮像する観測の観測動作を制御する観測制御情報OPGを生成してもよい。
 以上説明したように、本実施系形態の観測制御装置1には、事故区間検定装置ASAと、設備情報記憶装置EIDとが接続される。事故区間検定装置ASAは、事故発生情報AOと、事故形態情報AFと、事故区間情報ASとが含まれる事故情報Aを観測制御装置1に供給する。事故発生情報AOとは、電線WRの事故の発生を示す情報である。また、事故形態情報AFとは、事故の形態を示す情報である。また、事故区間情報ASとは、電線WRに事故が発生した区間SCTを示す情報である。区間SCTとは、電力供給源の給電端と当該給電端に隣接する開閉器SWとの間の範囲である。また、区間SCTとは、隣接する2つの開閉器SWの間の範囲である。また、区間SCTとは、需要家CSと当該需要家CSに隣接する開閉器SWとの間の範囲である。
 また、設備情報記憶装置EIDは、需要家CSに電力を供給する設備の名称を示す設備名情報ENと、設備の位置を示す設備位置情報EPとを含む設備情報EIを観測制御装置1へ供給する。
 本実施形態の観測制御装置1は、制御部100を備える。制御部100は、CPUを備えており、取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150とをその機能部として備える。
 取得部110は、事故区間検定装置ASAから事故情報Aを取得する。また、取得部110は、設備情報記憶装置EIDから設備情報EIを取得する。取得部110は、取得した事故情報Aと、設備情報EIとを目的地判定部120と、観測対象選択部140とへ供給する。目的地判定部120は、取得部110から取得した事故情報Aと、設備情報EIとに基づいて、事故を観測する無人飛行体Dの目的地Pを判定する。目的地判定部120は、判定した目的地Pを飛行制御情報生成部130へ供給する。飛行制御情報生成部130は、目的地判定部120が判定した目的地Pに基づいて、無人飛行体Dの飛行の制御に用いられる飛行制御情報FPGを生成する。
 観測対象選択部140は、取得部110が取得した事故情報Aと、設備情報EIとに基づいて、無人飛行体Dの観測対象の設備である観測対象設備OEを選択する。観測対象選択部140は、選択した観測対象設備OEが含まれる観測対象選択情報OESを観測制御情報生成部150へ供給する。観測制御情報生成部150は、観測対象選択部140が選択した観測対象設備OEが含まれる観測対象選択情報OESに基づいて、無人飛行体Dの目的地Pにおける観測動作の制御に用いられる観測制御情報OPGを生成する。
 ここで、従来の技術では、電線WRに生じた事故の状況を観測する際に、作業者が事故点まで車両を用いて移動する場合があった。この場合、渋滞などの道路状況によっては、作業者が到着するまでの所要時間を短縮することが困難である場合があった。
 本実施形態の観測制御装置1によれば、事故情報Aに含まれる事故区間情報ASと、設備情報EIに含まれる電線WRの設備位置情報EPとに基づいて、目的地Pを判定することができる。これにより、本実施形態の観測制御装置1は、目的地Pまで無人飛行体Dが自律飛行を行う際に、飛行の制御に用いられる飛行制御情報FPGを生成することができる。無人飛行体Dは、観測制御装置1が生成した飛行制御情報FPGに基づいて飛行することにより、目的地Pである事故点ACPまで自律飛行することができる。
 すなわち、本実施形態の観測制御装置1によれば、無人飛行体Dが自律飛行によって目的地Pである事故点ACPまで空中を移動することができる。これにより、本実施形態の観測制御装置1によれば、無人飛行体Dが目的地Pである事故点ACPまで自律飛行によって移動する際に、車両等によって地上を移動する場合と比較して、早急に到着することができる。
 また、従来の技術では、事故点まで車両を用いて移動することにより、車両の操縦者を常に待機させていない場合には、事故が発生したことに応じて、車両の操縦者を手配することが求められる場合があった。この場合には、車両の操縦者を手配するまでに時間がかかる場合があった。すなわち、従来の技術では、事故点まで移動する移動手段が有人制御によるものであることに伴い、移動手段が目的地に到着するまでの所要時間を短縮することが困難である場合があった。
 上述したように、本実施形態の観測制御装置1によれば、無人飛行体Dは、観測制御装置1が生成した飛行制御情報FPGに基づいて飛行することにより、目的地Pまで自律飛行することができる。
 すなわち、本実施形態の観測制御装置1によれば、無人飛行体Dが目的地Pまで自律飛行することによって、有人制御を用いることなく移動することができる。
 これにより、本実施形態の観測制御装置1によれば、移動手段が操縦者を必要とする有人制御であって、かつ事故が発生したことに応じて操縦者を手配することが求められる場合と比較して、移動手段が目的地に到着するまでの所要時間を短縮することができる。
 また、従来の技術では、事故の発生に伴い、事故現場に備えられる観測対象設備の特定や、当該観測対象設備の観測手順を特定する作業が生じる場合がある。これにより、従来の技術では、事故発生後の作業に時間を要する場合があった。すなわち、従来の技術では、事故の発生から、目的地に移動手段が到着するまでの所要時間を短縮することが困難である場合があった。
 本実施形態の観測制御装置1によれば、電線WRに生じた事故の状況を観測する際に、事故情報Aと、設備情報EIとに基づいて、無人飛行体Dの観測対象の設備である観測対象設備OEを選択することができる。すなわち、本実施形態の観測制御装置1によれば、事故現場に備えられる観測対象設備OEを特定する手間を低減することができる。
 また、本実施形態の観測制御装置1は、選択された観測対象設備OEを無人飛行体Dが観測する際に、無人飛行体Dの観測動作の制御に用いられる観測制御情報OPGを生成することができる。これにより、無人飛行体Dは、観測制御装置1が生成した観測制御情報OPGに基づいて、観測対象の設備として選択された観測対象設備OEを観測することができる。
 すなわち、本実施形態の観測制御装置1によれば、事故状況を把握するための観測手順を特定する手間を低減することができる。つまり、本実施形態の観測制御装置1によれば、事故発生後の作業に要する時間を短縮することができる。これにより、本実施形態の観測制御装置1によれば、事故の発生から、無人飛行体Dが目的地Pである事故点ACPまで移動するまでの所要時間を短縮することができる。
 すなわち、本実施形態の観測制御装置1によれば、事故の発生から移動手段が目的地に到着するまでの所要時間を短縮することができる。
[第2実施形態]
 以下、図を参照して本発明の第2実施形態について説明する。図7は、第2実施形態の観測制御装置2の構成の一例を示す構成図である。
 なお、上述した第1実施形態と同様の構成および動作については、同一の符号を付してその説明を省略する。
 また、図7に示す通り、本実施形態の観測制御装置2には、事故区間検定装置ASAと、設備情報記憶装置EIDとが接続される。
 図7に示す通り、観測制御装置2は、制御部200と、記憶部250とを備える。記憶部250には、過去事故情報PAが記憶される。過去事故情報PAには、故障設備情報FEと、故障履歴情報FHと、故障箇所情報FPとが含まれる。
 以下、図8を参照して、過去事故情報PAについて説明する。図8は、本実施形態の過去事故情報PAの一例を示す表である。図8に示す通り、過去事故情報PAとは、過去に設備に発生した故障に関する情報が含まれる情報である。この一例では、過去事故情報PAには、過去に故障した履歴がある設備に関する情報が含まれる。
 故障設備情報FEとは、過去に故障した履歴がある設備を示す情報である。図8に示す通り、この一例では、懸垂クランプSC2(故障設備情報FE1)と、長幹がいしLI2(故障設備情報FE2)と、アークホーンAH3(故障設備情報FE3)と、電線WR2(故障設備情報FE4)とが過去に故障したことを示す。
 故障履歴情報FHとは、故障設備情報FEが示す設備が過去に故障した回数を示す情報である。この一例では、図8に示す通り、故障設備情報FE1の故障履歴情報FHが1回である。また、故障設備情報FE2の故障履歴情報FHが3回である。また、故障設備情報FE3の故障履歴情報FHが2回である。また、故障設備情報FE4の故障履歴情報FHが3回である。
 故障箇所情報FPとは、故障設備情報FEが示す設備が過去に故障した故障箇所を示す情報である。この一例では、図8に示す通り、故障設備情報FE1の故障箇所情報FPが送電線との接続部である。また、故障設備情報FE2の故障箇所情報FPが複数のがいしが連結された長幹がいしLIの中央連結部である。また、故障設備情報FE3の故障箇所情報FPが長幹がいしLIと、アークホーンAHとが接続されるボルト部分である。また、故障設備情報FE4の故障箇所情報FPが電線WR2と、支障物とが近接する中央部である。
 図7に戻り、制御部200は、CPUを備えており、取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、優先度付加部210と、観測制御情報生成部150とその機能部として備える。
 図7に示す通り、優先度付加部210は、観測対象選択部140から観測対象選択情報OESを取得する。また、優先度付加部210は、記憶部250から過去事故情報PAを読み出す。優先度付加部210は、観測対象選択情報OESと、過去事故情報PAとに基づいて、観測対象選択情報OESに含まれる観測対象設備OEの観測の優先度PRを付加する。この一例では、優先度PRが、観測対象選択情報OESに含まれる観測対象設備OE毎に付加される場合について説明する。以降の説明において観測対象選択情報OESに優先度PRが付加された情報を観測対象優先度情報OEPと記載する。
 以下、図9を参照して観測対象優先度情報OEPについて説明する。図9は、本実施形態の観測対象優先度情報OEPの一例を示す表である。
 図9に示す通り、優先度付加部210は、過去事故情報PAと、観測対象選択情報OESとに基づいて、観測対象設備OE毎に優先度PRを付加する。この一例では、優先度付加部210は、観測対象選択情報OESに含まれる設備であって、過去事故情報PAに含まれる設備には、高い優先度PRを付加する。
 図9に示す通り、優先度付加部210は、観測対象選択情報OESに含まれる設備であって、過去事故情報PAに含まれる設備である懸垂クランプSC2と、長幹がいしLI2と、アークホーンAH3と、電線WR2とに高い優先度PRを付加する。優先度付加部210は、観測対象選択情報OESと、過去事故情報PAとに基づいて優先度PRが付加された観測対象設備OEが含まれる情報である観測対象優先度情報OEPを観測制御情報生成部150へ供給する。
 なお、上述では、優先度付加部210が故障履歴情報FHに基づいて観測対象設備OEに優先度PRを付加する場合について説明したが、これに限られない。優先度付加部210は、故障履歴情報FH以外の基準に基づいて観測対象設備OEに優先度PRを付加してもよい。
 例えば、過去事故情報PAには、故障設備情報FE、故障履歴情報FH、故障箇所情報FPの他、重大事故に関する情報が含まれてもよく、優先度付加部210は、重大事故が発生した履歴のある設備が観測対象設備OEに含まれる場合、重大事故が発生した履歴のある設備に高い優先度PRを付加してもよい。
 図7に戻り、観測制御情報生成部150は、優先度付加部210から観測対象優先度情報OEPを取得する。観測制御情報生成部150は、優先度付加部210から取得した観測対象優先度情報OEPに基づいて、観測制御情報OPGを生成する。
 この一例では、観測制御情報生成部150は、無人飛行体Dが観測対象優先度情報OEPに示される観測対象設備OEであって、優先度PRが高い観測対象設備OEを優先して観測する観測動作に用いられる観測制御情報OPGを生成する。
 すなわち、この一例では、観測制御情報生成部150は、無人飛行体Dが懸垂クランプSC2と、長幹がいしLI2と、アークホーンAH3と、電線WR2とを観測する観測動作に用いられる観測制御情報OPGを生成する。
 なお、上述では、制御部200が備える優先度付加部210が観測対象優先度情報OEPを生成する場合について説明したが、これに限られない。観測対象優先度情報OEPは、観測対象選択情報OESと、過去事故情報PAとに基づいて予め生成されていてもよく、観測制御情報生成部150は、予め生成された観測対象優先度情報OEPに基づいて観測制御情報OPGを生成してもよい。
 以上説明したように、本実施形態の観測制御装置2には、事故区間検定装置ASAと、設備情報記憶装置EIDとが接続される。
 本実施形態の観測制御装置2は、制御部200と、記憶部250とを備える。記憶部250には、過去の事故に関する情報が含まれる過去事故情報PAが記憶される。具体的には、過去事故情報PAには、故障設備情報FEと、故障履歴情報FHと、故障箇所情報FPとが含まれる。
 また、制御部200は、CPUを備えており、取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150と、優先度付加部210とをその機能部として備える。
 優先度付加部210は、観測対象選択部140から観測対象選択情報OESを取得する。また、優先度付加部210は、記憶部250から過去事故情報PAを読み出す。
 優先度付加部210は、観測対象選択部140が選択した観測対象設備OEが含まれる観測対象選択情報OESと、過去の事故に関する情報が含まれる過去事故情報PAとに基づいて定められる優先度PRであって、観測対象設備OEの観測の優先度PRを付加する。優先度付加部210は、観測対象選択情報OESに優先度PRを付加した観測対象優先度情報OEPを観測制御情報生成部150へ供給する。
 観測制御情報生成部150は、優先度付加部210から観測対象優先度情報OEPを取得する。観測制御情報生成部150は、観測対象設備OEの観測の優先度PRが付加された観測対象優先度情報OEPに基づいて、無人飛行体Dの観測の動作の制御に用いられる観測制御情報OPGを生成する。
 ここで、無人飛行体Dが飛行制御情報FPGと、観測制御情報OPGとに基づいて動作する際に、無人飛行体Dの動作に用いられる電力を供給する電力供給源の電力量が不足する場合がある。この場合、無人飛行体Dが観測対象選択情報OESに含まれる観測対象設備OEのうち、一部を観測することが困難である場合があった。
 例えば、無人飛行体Dが観測対象選択情報OESに含まれる観測対象設備OEのうち、鉄塔STを観測する動作に用いられる電力は、他の観測対象設備OEと比較して多い場合がある。この場合、無人飛行体Dの動作に用いられる電力供給源の電力量が観測対象選択情報OESのうち、鉄塔ST以外の観測対象設備OEを観測することが可能であっても、鉄塔STを観測することが困難である場合があった。
 本実施形態の観測制御装置2によれば、観測対象選択情報OESと、過去事故情報PAとに基づいて、優先的に観測を行う観測対象設備OEに高い優先度PRを付加することができる。すなわち、本実施形態の観測制御装置2によれば、高い優先度PRが付加された観測対象設備OEを優先して観測する観測の動作に用いられる観測制御情報OPGを生成することができる。これにより、無人飛行体Dは、観測制御装置2が生成した観測制御情報OPGに基づいて観測対象設備OEを観測することにより、優先度PRが高い観測対象設備OEを優先して観測を行うことが求められる観測対象設備OEを観測することができる。
 すなわち、本実施形態の観測制御装置2によれば、優先度PRが付加された観測対象優先度情報OEPに基づいて観測制御情報OPGを生成する。これにより、無人飛行体Dの動作に用いられる電力を供給する電力供給源の電力量が不足することに伴い、観測制御情報OPGに含まれる観測対象設備OEの一部のみを観測する場合であっても、観測の優先度PRがより高い観測対象設備OEを観測することができる。
[第3実施形態]
 以下、図を参照して本発明の第3実施形態について説明する。図10は、第3実施形態の観測制御装置3の構成の一例を示す構成図である。
 なお、上述した第1実施形態および第2実施形態と同様の構成および動作については、同一の符号を付してその説明を省略する。
 図10に示す通り、本実施形態の観測制御装置3には、事故区間検定装置ASAと、設備情報記憶装置EIDとが接続される。
 図10に示す通り、観測制御装置3は、制御部300と、記憶部350とを備える。
 記憶部350には、電力容量情報BTが記憶される。電力容量情報BTとは、無人飛行体Dの動作に用いられる電力を供給する電力供給源の容量を示す情報である。
 制御部300は、取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150と、消費電力推定部310とをその機能部として備える。
 図10に示す通り、消費電力推定部310は、観測対象選択部140から観測対象選択情報OESを取得する。また、消費電力推定部310は、目的地判定部120から目的地Pを示す情報を取得する。
 消費電力推定部310は、目的地Pと、観測対象選択情報OESとに基づいて、飛行制御情報FPGと、観測制御情報OPGとが示す無人飛行体Dの動作によって消費される電力量である飛行消費電力量FCPを既知の方法によって推定する。
 消費電力推定部310は、推定した飛行消費電力量FCPを示す情報を観測制御情報生成部150へ供給する。
 図10に示す通り、観測制御情報生成部150は、観測対象選択部140から観測対象選択情報OESを取得する。また、観測制御情報生成部150は、消費電力推定部310から飛行消費電力量FCPを示す情報を取得する。また、観測制御情報生成部150は、記憶部350から電力容量情報BTを読み出す。
 例えば、取得した飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より大きい場合、無人飛行体Dが観測対象選択情報OESに含まれる観測対象設備OEを観測することにより、無人飛行体Dの動作に用いられる電力が不足する場合がある。この場合、無人飛行体Dは、飛行を継続することが困難である場合がある。
 これに伴い、観測制御情報生成部150は、取得した飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より小さい場合には、観測対象選択情報OESに含まれる観測対象設備OEを観測する観測制御情報OPGを生成する。
 また、観測制御情報生成部150は、取得した飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より大きい場合には、観測対象選択情報OESに含まれる観測対象設備OEのうち、一部の観測対象設備OEを観測する観測制御情報OPGを生成する。具体的には、観測制御情報生成部150は、飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より大きい場合、無人飛行体Dが観測対象設備OEを観測する際に消費する電力量に基づいて、一部の観測対象設備OEを観測する観測制御情報OPGを生成する。
 例えば、電線WRに生じる事故の一例として、電線WRが地絡する場合がある。電線WRが地絡する要因には、電線の破断、倒木およびがいしの汚れ等が含まれる。電線WRが地絡している場合、事故の状況を把握するに際して、少なくとも地絡の要因を観測することが求められる場合がある。
 これに伴い、この一例では、観測制御情報生成部150は、取得した飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より大きい場合には、観測対象選択情報OESに含まれる観測対象設備OEのうち、電線WRの観測のみを行う観測制御情報OPGを生成する。
 すなわち、この一例では、観測制御情報生成部150は、飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より大きい場合、観測対象選択情報OESに含まれる観測対象設備OEのうち、電線WR1と、電線WR2との観測のみを行う観測制御情報OPGを生成する。
 なお、上述では、飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より大きい場合には、観測制御情報生成部150は、目的地Pに敷設される電線WRの観測のみを行う観測制御情報OPGを生成する場合について説明したが、これに限られない。
 例えば、観測制御情報生成部150は、飛行消費電力量FCPと、観測対象選択情報OESと、電力容量情報BTとに基づいて観測対象設備OEを選択してもよい。具体的には、観測制御情報生成部150は、飛行消費電力量FCPが電力容量情報BTを下回る範囲において観測対象設備OEを選択し、観測制御情報OPGを生成してもよい。
 以上説明したように、本実施形態の観測制御装置3には、事故区間検定装置ASAと、設備情報記憶装置EIDとが接続される。
 本実施形態の観測制御装置3は、制御部300と、記憶部350とを備える。記憶部350には、電力容量情報BTが記憶される。
 また、制御部300は、CPUを備えており、取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150と、消費電力推定部310とをその機能部として備える。
 消費電力推定部310は、観測対象選択部140から観測対象選択情報OESを取得する。また、消費電力推定部310は、目的地判定部120から目的地Pを示す情報を取得する。
 消費電力推定部310は、観測対象選択部140が選択した観測対象設備OEが含まれる観測対象選択情報OESと、目的地判定部120が判定した目的地Pとに基づいて、無人飛行体Dが消費する電力量である飛行消費電力量FCPを推定する。消費電力推定部310は、推定した飛行消費電力量FCPを観測制御情報生成部150へ供給する。
 観測制御情報生成部150は、消費電力推定部310から飛行消費電力量FCPを取得する。また、観測制御情報生成部150は、記憶部350から電力容量情報BTを読み出す。観測制御情報生成部150は、取得した飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より大きい場合には、観測対象選択情報OESに含まれる観測対象設備OEのうち、一部を観測する観測制御情報OPGを生成する。すなわち、観測制御情報生成部150は、取得した飛行消費電力量FCPが示す電力量が、電力容量情報BTが示す電力の容量より大きい場合には、観測対象選択情報OESの一部を選択し、飛行消費電力量FCPが電力容量情報BTを下回る観測制御情報OPGを生成する。
 これにより、観測制御情報生成部150は、消費電力推定部310が推定した飛行消費電力量FCPに基づいて、無人飛行体Dの観測の制御に用いられる観測制御情報OPGを生成する。
 ここで、無人飛行体Dが飛行制御情報FPGと、観測制御情報OPGとに基づいて動作する際に、無人飛行体Dの動作に用いられる電力を供給する電力供給源の電力量が不足する場合がある。この場合、第2実施形態に示す一例と同様に、無人飛行体Dが観測対象選択情報OESに含まれる観測対象設備OEのうち、一部を観測することが困難である場合があった。
 また、無人飛行体Dの動作に用いられる電力を供給する電力供給源の電力量が不足する場合、無人飛行体Dが観測対象設備OEを観測後、目的地Pから無人飛行体Dの帰還場所である建物BDまで飛行することが困難である場合があった。
 本実施形態の観測制御装置3によれば、飛行消費電力量FCPと、電力容量情報BTとに基づいて、無人飛行体Dの動作に用いられる電力を供給する電力供給源の電力量が不足しているか否かを推定することができる。すなわち、本実施形態の観測制御装置3によれば、消費電力推定部310が推定した飛行消費電力量FCPに基づいて、観測対象設備OEの一部を観測する観測制御情報OPGを生成することができる。つまり、本実施形態の観測制御装置3によれば、飛行消費電力量FCPに基づいて、観測制御情報OPGを生成することができる。
 すなわち、無人飛行体Dは、本実施形態の観測制御装置3が生成した観測制御情報OPGに基づいて観測対象設備OEを観測する。これにより、無人飛行体Dは、無人飛行体Dの動作に用いられる電力を供給する電力供給源の電力量が不足することを抑制することができる。
 なお、上述では、観測制御装置3が制御部300に取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150と、消費電力推定部310とを備える場合について説明したが、これに限られない。
 制御部300は、優先度付加部210を備えていてもよく、観測制御情報生成部150は、消費電力推定部310が推定した飛行消費電力量FCPと、優先度付加部210が生成した観測対象優先度情報OEPとに基づいて観測制御情報OPGを生成してもよい。
 例えば、観測制御情報生成部150は、消費電力推定部310が推定した飛行消費電力量FCPが電力容量情報BTより大きい場合、観測対象優先度情報OEPに含まれる観測対象設備OEのうち、高い優先度PRの観測対象設備OEを観測する観測制御情報OPGを生成してもよい。
[変形例]
 以下、図を参照して本発明の第1実施形態、第2実施形態および第3実施形態に係る変形例について説明する。図11は、変形例の観測制御装置4の構成の一例を示す構成図である。
 なお、上述した第1実施形態、第2実施形態および第3実施形態と同様の構成および動作については、同一の符号を付してその説明を省略する。
 図11に示す通り、変形例の観測制御装置4には、事故区間検定装置ASAと、設備情報記憶装置EIDと、目的地Pにおいて設備の観測を行った後の無人飛行体Dとが接続される。
 無人飛行体Dは、無人飛行体Dが備える撮像部Cが観測に伴い撮像した目的地Pにおける観測対象設備OEの画像APを観測制御装置4へ供給する。
 図11に示す通り、変形例の観測制御装置4は、制御部400を備える。制御部400は、CPUを備えており、取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150と、画像取得部410と、観測結果情報生成部420とをその機能部として備える。
 画像取得部410は、無人飛行体Dから画像APを取得する。また、画像取得部410は、無人飛行体Dから取得した画像APを観測結果情報生成部420へ供給する。
 観測結果情報生成部420は、画像取得部410から画像APを取得する。観測結果情報生成部420は、取得した画像APと、画像AP以外の事故に関する情報とが含まれる観測結果情報RPを既知の方法によって生成する。画像AP以外の事故に関する情報とは、例えば、事故が発生した日時、事故区間情報AS、事故形態情報AFおよび画像APに撮像される設備の設備名情報EN等である。観測結果情報RPとは、例えば、事故の報告書である。すなわち、観測結果情報生成部420は、無人飛行体Dが観測した観測結果である画像APと、事故が発生した日時、事故区間情報AS、事故形態情報AFおよび設備名情報ENが含まれる事故の報告書である観測結果情報RPを生成する。
 以上説明したように、変形例の観測制御装置4には、事故区間検定装置ASAと、設備情報記憶装置EIDと、設備の観測を行った後の無人飛行体Dが接続される。
 変形例の観測制御装置4は、制御部400を備える。制御部400は、CPUを備えており、取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150と、画像取得部410と、観測結果情報生成部420とをその機能部として備える。
 画像取得部410は、無人飛行体Dが備える撮像部Cが撮像した目的地Pにおける観測対象設備OEの画像APを取得する。観測結果情報生成部420は、画像取得部410が取得した画像APと、画像AP以外の事故に関する情報とが含まれる観測結果情報RPを生成する。
 ここで、事故が生じた場合、事故の状況を把握する作業者は、事故に関する情報を共有することを目的として、事故に関する情報が示される報告書の作成を求められる場合がある。従来の技術では、作業者が、人系によって事故に関する情報を示す報告書を作成する場合があった。すなわち、従来の技術では、作業者が事故に関する情報が示される報告書を作成する手間を低減することが困難である場合があった。
 変形例の観測制御装置4によれば、無人飛行体Dが備える撮像部Cが、設備の観測に伴い撮像した画像APを取得する。また、観測制御装置4は、取得した画像APと、画像AP以外の事故に関する情報とが含まれる観測結果情報RPを生成する。
 これにより、変形例の観測制御装置4によれば、事故に関する情報を示す観測結果情報RPを生成することができる。すなわち、変形例の観測制御装置4によれば、事故に関する情報を示す観測結果情報RPを生成することにより、報告書を作成する手間を低減することができる。
 なお、上述では、観測制御装置4が制御部400に取得部110と、目的地判定部120と、飛行制御情報生成部130と、観測対象選択部140と、観測制御情報生成部150と、画像取得部410と、観測結果情報生成部420とを備える場合について説明したが、これに限られない。
 例えば、制御部100、制御部200および制御部300が画像取得部410と、観測結果情報生成部420とを備えていてもよい。すなわち、観測制御装置1、観測制御装置2および観測制御装置3は、無人飛行体Dが備える撮像部Cが、設備の観測に伴い撮像した画像APを取得して、観測結果情報RPを生成してもよい。
 なお、上記の各実施形態における観測制御装置1、観測制御装置2、観測制御装置3および観測制御装置4が備える各部は、専用のハードウェアにより実現されるものであってもよく、また、メモリおよびマイクロプロセッサにより実現させるものであってもよい。
 なお、観測制御装置1、観測制御装置2、観測制御装置3および観測制御装置4が備える各部は、メモリおよびCPU(中央演算装置)により構成され、観測制御装置1、観測制御装置2、観測制御装置3および観測制御装置4が備える各部の機能を実現するためのプログラムをメモリにロードして実行することによりその機能を実現させるものであってもよい。
 また、観測制御装置1、観測制御装置2、観測制御装置3および観測制御装置4が備える各部の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより処理を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。
 また、「コンピュータシステム」は、WWWシステムを利用している場合であれば、ホームページ提供環境(あるいは表示環境)も含むものとする。
 また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD-ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信線のように、短時間の間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含むものとする。また上記プログラムは、前述した機能の一部を実現するためのものであってもよく、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。
 以上、本発明の実施形態を、図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、本発明の趣旨を逸脱しない範囲で適宜変更を加えることができる。上述した各実施形態に記載の構成を組み合わせてもよい。
1、2、3、4…観測制御装置、100、200、300、400…制御部、250、350…記憶部、110…取得部、120…目的地判定部、130…飛行制御情報生成部、140…観測対象選択部、150…観測制御情報生成部、210…優先度付加部、310…消費電力推定部、410…画像取得部、420…観測結果情報生成部、ACP…事故点、BD…建物、CS…需要家、D…無人飛行体、C…撮像部、AP…画像、P…目的地、SCT、SCT1…区間、SW…開閉器、FPG…飛行制御情報、OPG…観測制御情報、ASA…事故区間検定装置、A…事故情報、AO…事故発生情報、AF…事故形態情報、AS…事故区間情報、EI…設備情報、EID…設備情報記憶装置、EN…設備名情報、AH、AH1、AH2、AH3…アークホーン、SC、SC1、SC2、SC3…懸垂クランプ、ST、ST1、ST2、ST3…鉄塔、WR、WR1、WR2…電線、EP、EP1、EP3、EP5…設備位置情報、OES…観測対象選択情報、FCP…飛行消費電力量、BT…電力容量情報、PA…過去事故情報、FE、FE1、FE2、FE3、FE4…故障設備情報、FH…故障履歴情報、FP…故障箇所情報、OEP…観測対象優先度情報、PR…優先度、RP…観測結果情報

Claims (4)

  1.  需要家に電力を供給する設備の位置を示す情報と、前記設備を示す情報とを含む設備情報と、電力供給源に接続される給電端と需要家とを複数の開閉器SWを介して接続して前記電力供給源から供給される電力を前記需要家に供給する電線の事故の発生を示す情報と、前記事故の形態を示す情報と、前記給電端と当該給電端に隣接する前記開閉器SWとの間の区間、隣接する2つの前記開閉器SWの間の区間、又は、前記需要家と当該需要家に隣接する前記開閉器SWとの間の区間のうち前記電線に事故が発生した区間を示す情報とを含む事故情報とを取得する取得部と、
     前記取得部が取得した前記事故情報と、前記設備情報とに基づいて、前記事故を観測する無人飛行体の目的地を判定する目的地判定部と、
     前記目的地判定部が判定した前記目的地に基づいて、前記無人飛行体の飛行の制御に用いられる飛行制御情報を生成する飛行制御情報生成部と、
     前記取得部が取得した前記事故情報と、前記設備情報とに基づいて、前記無人飛行体の観測対象の設備である観測対象設備を選択する観測対象選択部と、
     前記観測対象選択部が選択した前記観測対象設備に基づいて、前記無人飛行体の前記目的地における観測動作の制御に用いられる観測制御情報を生成する観測制御情報生成部と
     を備えることを特徴とする観測制御装置。
  2.  前記観測制御情報生成部は、
     前記観測対象選択部が選択した前記観測対象設備と、過去の事故に関する情報が含まれる過去事故情報とに基づいて定められる優先度であって、前記観測対象設備の観測の前記優先度に更に基づいて、前記無人飛行体の観測の動作の制御に用いられる観測制御情報を生成する
     ことを特徴とする請求項1に記載の観測制御装置。
  3.  前記観測対象選択部が選択した前記観測対象設備と、前記目的地判定部が判定した前記目的地とに基づいて、前記無人飛行体が消費する電力を推定する消費電力推定部
     を更に備え、
     前記観測制御情報生成部は、
     前記消費電力推定部が推定した前記無人飛行体が消費する電力に更に基づいて、前記無人飛行体の観測の制御に用いられる観測制御情報を生成する
     ことを特徴とする請求項1または請求項2に記載の観測制御装置。
  4.  前記無人飛行体が備える撮像部が撮像した前記目的地における前記観測対象設備の画像を取得する画像取得部と、
     前記画像取得部が取得した前記画像と、前記画像以外の前記事故に関する情報とが含まれる観測結果情報を生成する観測結果情報生成部と
     を更に備える
     ことを特徴とする請求項1から請求項3のいずれか一項に記載の観測制御装置。
PCT/JP2016/083922 2015-12-28 2016-11-16 観測制御装置 WO2017115575A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015256643A JP2017121127A (ja) 2015-12-28 2015-12-28 観測制御装置
JP2015-256643 2015-12-28

Publications (1)

Publication Number Publication Date
WO2017115575A1 true WO2017115575A1 (ja) 2017-07-06

Family

ID=59225110

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/083922 WO2017115575A1 (ja) 2015-12-28 2016-11-16 観測制御装置

Country Status (2)

Country Link
JP (1) JP2017121127A (ja)
WO (1) WO2017115575A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019106061A (ja) * 2017-12-13 2019-06-27 株式会社エスエイピー 指令管制システム
JP7424006B2 (ja) 2019-11-25 2024-01-30 中国電力株式会社 倒木監視装置及びプログラム

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005253189A (ja) * 2004-03-03 2005-09-15 Chugoku Electric Power Co Inc:The 配電線巡視システムおよび方法
JP2006027448A (ja) * 2004-07-16 2006-02-02 Chugoku Electric Power Co Inc:The 無人飛行体を利用した空撮方法及びその装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005253189A (ja) * 2004-03-03 2005-09-15 Chugoku Electric Power Co Inc:The 配電線巡視システムおよび方法
JP2006027448A (ja) * 2004-07-16 2006-02-02 Chugoku Electric Power Co Inc:The 無人飛行体を利用した空撮方法及びその装置

Also Published As

Publication number Publication date
JP2017121127A (ja) 2017-07-06

Similar Documents

Publication Publication Date Title
WO2017115575A1 (ja) 観測制御装置
CN102474429B (zh) 用于以太网线性保护倒换的状态转变的方法和装置
US9964044B2 (en) Auxiliary power unit starting system for an aircraft
US6988023B2 (en) Monitoring and control system
Katayama et al. Evacuation guidance support using cooperative agent-based IoT devices
US8189311B2 (en) Circuit breaker control
CN108351215A (zh) 导航系统中切换路侧导航单元的方法和设备
CN105691244B (zh) 一种电气化铁路贯通供电的系统空载监控方法
EP3242212B1 (en) Automatic switching method and system
CN112073287B (zh) 数据传输装置、控制方法、传输方法和tcp服务装置
EP2347943A2 (en) Signalling system
CN109991995B (zh) 一种无人机返航方法及装置
JP4601488B2 (ja) 電力系統の監視制御システム
WO2021035641A1 (zh) 控制方法、远程服务器、控制站及存储介质
KR101587852B1 (ko) 교통 신호 제어기를 위한 관리 시스템 및 이에 포함되는 서버
JP2012040955A (ja) 電気鉄道用電力システム
JP5978052B2 (ja) 配電管理システム及び方法
CN103595628A (zh) 一种节约frr保护资源的方法及装置
WO2017119194A1 (ja) 修正情報蓄積装置および修正情報蓄積システム
EP3893350A1 (en) Reconnection of electrically powered train units
CN114384933B (zh) 架空线路无人机带电水冲洗控制系统、方法及存储介质
JP2002101555A (ja) 監視制御システム及び自動送電方法
JP5539431B2 (ja) 変圧器設備、及び外部電力供給方法
JP2018016124A (ja) 無線式列車制御システム
JP2007237884A (ja) 移動体の電源操作システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16881555

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16881555

Country of ref document: EP

Kind code of ref document: A1