WO2017109887A1 - 給湯機及びエネルギー管理システム - Google Patents

給湯機及びエネルギー管理システム Download PDF

Info

Publication number
WO2017109887A1
WO2017109887A1 PCT/JP2015/085988 JP2015085988W WO2017109887A1 WO 2017109887 A1 WO2017109887 A1 WO 2017109887A1 JP 2015085988 W JP2015085988 W JP 2015085988W WO 2017109887 A1 WO2017109887 A1 WO 2017109887A1
Authority
WO
WIPO (PCT)
Prior art keywords
power consumption
control
target
water heater
compressor
Prior art date
Application number
PCT/JP2015/085988
Other languages
English (en)
French (fr)
Inventor
正樹 豊島
赳弘 古谷野
直己 田村
健 ▲高▼橋
風間 史郎
盟一 荻島
優 酒井
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2017557580A priority Critical patent/JP6461375B2/ja
Priority to PCT/JP2015/085988 priority patent/WO2017109887A1/ja
Publication of WO2017109887A1 publication Critical patent/WO2017109887A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters

Definitions

  • the present invention relates to a water heater and an energy management system.
  • Patent Document 1 proposes a technique for controlling a compressor in a hot water storage type hot water supply apparatus under the restriction of usable power set based on surplus power.
  • the rotation speed of the compressor is controlled by feedforward control at the start of operation, and is feedback-controlled based on available power after a predetermined time.
  • the power generation output of solar power generation is not constant. Moreover, since the total power consumption in a house also changes every moment, the surplus electric power (namely, usable electric power) by photovoltaic power generation may fluctuate greatly even during operation of the water heater.
  • This invention was made in order to solve the said subject, and it aims at providing the hot water heater etc. with high followability to the target power consumption after a change.
  • a water heater includes: A compressor for compressing the refrigerant; A heat exchanger for performing heat exchange between the refrigerant and water; A hot water storage tank for storing water from the heat exchanger; A pump for supplying water to the heat exchanger; An expansion valve for expanding the refrigerant; A receiving means for receiving the target power consumption from the outside; When the target power consumption is received, control means for performing feedforward control of the compressor, the pump, and the expansion valve so as to be within the target power consumption.
  • the compressor, the pump, and the expansion valve are feedforward controlled so as to be within the target power consumption. For this reason, the followability to the target power consumption after the change is improved.
  • FIG. 1 is a diagram showing an overall configuration of an energy management system 1 according to an embodiment of the present invention.
  • the energy management system 1 is a so-called HEMS (Home Energy Management System) that manages electric power used in a general household.
  • the energy management system 1 includes a control device 2, an operation terminal 3, a power measuring device 4, a water heater 5, and a power generation facility 6.
  • the control device 2 is installed at an appropriate location in the house H, monitors the power consumed in the house H, that is, the demand area, and displays the power consumption status via the operation terminal 3. Further, the control device 2 performs operation control of the water heater 5 and a plurality of devices 7 (devices 7-1, 7-2, etc And monitoring of the operation state. Details of the control device 2 will be described later.
  • the power measuring device 4 measures the value of power transmitted through each of the power lines D1 to D3 arranged in the house H.
  • the power line D1 is disposed between the commercial power supply 11 and the distribution board 12
  • the power line D2 is disposed between the power generation facility 6 and the distribution board 12
  • the power line D3 is disposed between the distribution board 12 and the hot water supply. It is arranged between the machine 5.
  • the power measuring device 4 is connected to each of CT (Current Transformer) 1 to 3 connected to the power lines D1 to D3 via a communication line.
  • CT1 to CT3 are sensors for measuring an alternating current.
  • the power measuring device 4 measures the power value in the power line D1, based on the measurement result of CT1, in other words, the total power consumption in the home.
  • the power measuring device 4 measures the power value in the power line D2 based on the measurement result of CT2, in other words, the power generated by the power generation facility 6, and in other words, the power value in the power line D3 based on the measurement result of CT3.
  • the power consumption of the water heater 5 is measured.
  • the power measuring device 4 includes a wireless communication interface, and is connected to the control device 2 via a wireless network (not shown) constructed in the house H so as to be communicable.
  • This wireless network is, for example, a network conforming to ECHONET Lite.
  • the power measuring device 4 may be of a specification that is connected to this wireless network via an external communication adapter (not shown).
  • the power measurement device 4 In response to the request from the control device 2, the power measurement device 4 generates measurement data storing the measured power value of the power line D ⁇ b> 1 and transmits the measurement data to the control device 2. In the measurement data, the device address of the power measurement device 4, the ID (identification) of the power line, and the measurement time are also stored. Similarly, the power measurement device 4 generates measurement data storing the measured power values of the power lines D2 and D3 in response to a request from the control device 2, and transmits the measurement data to the control device 2. Note that the power measurement device 4 may generate measurement data in which the power values of the power lines D1 to D3 are collectively stored in response to a request from the control device 2 and transmit the measurement data to the control device 2.
  • the hot water heater 5 is a hot water storage type hot water heater including a heat pump unit 8 and a tank unit 9.
  • the heat pump unit 8 and the tank unit 9 are connected by a pipe 10 through which hot water flows. Details of the water heater 5 will be described later.
  • the power generation facility 6 is a solar power generation facility including a PV (photovoltaic panel) panel 13 and a PV-PCS 14 which is a power conditioning system.
  • the power generation facility 6 converts the electricity generated by the PV panel 13 from DC power to AC power by the PV-PCS 14 and supplies it to the distribution board 12 via the power line D2.
  • the device 7 (devices 7-1, 7-2,...) Is an electric device such as an air conditioner, an illuminator, a floor heating system, a refrigerator, an IH (Induction Heating) cooker, or a television.
  • the devices 7-1, 7-2,... are installed in the house H (including the site) and connected to power lines D4, D5,.
  • Each device 7 is communicably connected to the control device 2 via the wireless network (not shown).
  • Each device 7 may have a specification that is connected to this wireless network via an external communication adapter (not shown).
  • each device 7 transmits data (operation state data) storing the device ID, the current time, and information indicating the current operation state to the control device 2.
  • the operation terminal 3 is a portable device such as a smartphone or a tablet terminal including an input device such as a push button, a touch panel, a touch pad, a display device such as an organic EL display or a liquid crystal display, and a communication interface.
  • the operation terminal 3 communicates with the control device 2 in accordance with a known communication standard such as Wi-Fi (registered trademark), Wi-SUN (registered trademark), or a wired LAN.
  • the operation terminal 3 receives an operation from the user and transmits information indicating the received operation content to the control device 2. Further, the operation terminal 3 receives the information transmitted from the control device 2 and presented to the user, and displays the received information.
  • the operation terminal 3 plays a role as an interface (user interface) with the user.
  • the control device 2 includes a CPU (Central Processing Unit) 20, a communication interface 21, a ROM (Read Only Memory) 22, a RAM (Random Access Memory) 23, and a secondary storage device 24. Is provided. These components are connected to each other via a bus 25.
  • the CPU 20 controls the control device 2 in an integrated manner. Details of functions realized by the CPU 20 will be described later.
  • the communication interface 21 performs wireless communication or wired communication with the operation terminal 3 and a NIC (Network Interface Card controller) for wireless communication with the power measuring device 4, the water heater 5, and each device 7 via the wireless network described above.
  • the NIC is configured.
  • ROM 22 stores a plurality of firmware and data used when executing these firmware.
  • the RAM 23 is used as a work area for the CPU 20.
  • the secondary storage device 24 includes an EEPROM (Electrically-Erasable-Programmable-Read-Only Memory), a readable / writable nonvolatile semiconductor memory such as a flash memory, a hard disk drive, and the like.
  • the secondary storage device 24 is a program for monitoring the power consumed in the home, a program for controlling the operation of the water heater 5 and each device 7, and data used when these programs are executed. Memorize etc.
  • FIG. 3 is a diagram showing a functional configuration of the control device 2.
  • the control device 2 includes a user interface unit 200, a power value acquisition unit 201, a device control unit 202, and a power consumption change request unit 203.
  • Each of these functional units is realized by the CPU 20 executing one or a plurality of programs stored in the secondary storage device 24.
  • the user interface unit 200 performs user interface processing via the operation terminal 3. That is, the user interface unit 200 receives an operation from the user via the operation terminal 3. Further, the user interface unit 200 transmits information to be presented to the user (for example, monitoring screen data and various operation screen data) to the operation terminal 3.
  • the power value acquisition unit 201 performs a process of acquiring the measured power value from the power measurement device 4. Specifically, the power value acquisition unit 201 requests the power measurement device 4 to transmit the above-described measurement data corresponding to each power line at certain time intervals (for example, 30 seconds). The power value acquisition unit 201 acquires measurement data for each power line transmitted from the power measurement device 4 in response to the request. The power value acquisition unit 201 stores the acquired measurement data in the secondary storage device 24.
  • the device control unit 202 performs a process of acquiring an operation state from the water heater 5 and each device 7. Specifically, the device control unit 202 requests the hot water supply device 5 and each device 7 to transmit operating state data every predetermined time (for example, 30 seconds). In response to such a request, the device control unit 202 acquires operating state data sent from the water heater 5 and each device 7, respectively. The device control unit 202 stores the acquired operation status data of the hot water heater 5 and each device 7 in the secondary storage device 24.
  • the device control unit 202 controls the operation of the water heater 5 and the device 7 in accordance with a user operation via the operation terminal 3. Furthermore, the device control unit 202 notifies the water heater 5 of the power consumption of the water heater 5, that is, the power value in the power line D3, every predetermined time (for example, 30 seconds).
  • the power consumption change request unit 203 calculates power that can be used by the water heater 5 (usable power) every certain time (for example, 10 minutes). Then, the power consumption change request unit 203 determines whether or not the target power consumption of the water heater 5 needs to be changed based on the calculated usable power and the current target power consumption of the water heater 5. When it is necessary to change the target power consumption, the power consumption change request unit 203 requests the water heater 5 to change the target power consumption.
  • Usable power is the total power consumption (power value of the power line D1), power consumption of the water heater 5 (power value of the power line D3), and generated power (power value of the power line D2) measured by the power measuring device 4.
  • the power consumption change request unit 203 first calculates in-home power consumption. The in-home power consumption is calculated by subtracting the power consumption of the water heater 5 from the total power consumption. Then, the power consumption change request unit 203 calculates usable power by subtracting the home power consumption from the generated power. Note that if the in-home power consumption is greater than the generated power, the power consumption change request unit 203 sets the available power to 0 [W].
  • the power consumption change request unit 203 compares the calculated usable power with the current target power consumption of the water heater 5, and determines whether or not the difference between the two is within a predetermined allowable value. Data indicating the current target power consumption of the water heater 5 is stored in the secondary storage device 24.
  • the power consumption change request unit 203 determines that the target power consumption needs to be changed, and requests the water heater 5 to change the target power consumption. (Change request data) is transmitted. This change request data stores information indicating the calculated available power (in other words, new target power consumption). Further, the power consumption change request unit 203 updates data indicating the target power consumption of the water heater 5 stored in the secondary storage device 24 based on the calculated usable power.
  • FIG. 4 is a block diagram showing the configuration of the water heater 5.
  • the water heater 5 includes a heat pump unit 8 and a tank unit 9.
  • the heat pump unit 8 is a heat pump using, for example, CO 2 or HFC (hydrofluorocarbon) as a refrigerant.
  • the heat pump unit 8 includes a compressor 80, a first heat exchanger 81, an expansion valve 82, a second heat exchanger 83, a blower 84, temperature sensors 85a and 85b, and a control board 86. Consists of.
  • the compressor 80, the first heat exchanger 81, the expansion valve 82, and the second heat exchanger 83 are connected in a ring shape, and a refrigeration cycle circuit (also referred to as a refrigerant circuit) for circulating the refrigerant is formed. Yes.
  • Compressor 80 compresses the refrigerant to increase temperature and pressure.
  • the compressor 80 includes an inverter circuit that can change the capacity (the delivery amount per unit) according to the drive frequency.
  • the compressor 80 changes the capacity according to the control value instructed from the control board 86.
  • the first heat exchanger 81 is a heating source for heating the city water to a target boiling temperature (also referred to as hot water storage temperature).
  • the first heat exchanger 81 is a plate-type or double-tube type heat exchanger, and performs heat exchange between the refrigerant and water (low-temperature water). By heat exchange in the first heat exchanger 81, the refrigerant dissipates heat and the temperature decreases, and water absorbs heat and the temperature increases.
  • the expansion valve 82 expands the refrigerant to lower the temperature and pressure.
  • the expansion valve 82 changes the valve opening according to the control value instructed from the control board 86.
  • the second heat exchanger 83 performs heat exchange between the outside air sent by the blower 84 and the refrigerant. The heat is absorbed by the heat exchange in the second heat exchanger 83, the outside air dissipates heat, and the temperature drops.
  • the temperature sensor 85 a is provided on the water inlet side of the first heat exchanger 81 in the pipe 10 and measures the temperature of water that enters the first heat exchanger 81 (water inlet temperature).
  • the temperature sensor 85a transmits data (incoming water temperature data) indicating the measured incoming water temperature to the control board 86 at a predetermined timing (for example, every predetermined time).
  • the temperature sensor 85b is provided in the housing in the heat pump unit 8, and measures the temperature of the outside air (outside air temperature).
  • the temperature sensor 85b transmits data indicating the measured outside air temperature (outside air temperature data) to the control board 86 at a predetermined timing (for example, every predetermined time).
  • the control board 86 includes a CPU, a ROM, a RAM, a communication interface, a readable / writable nonvolatile semiconductor memory, and the like (none of which are shown).
  • the control board 86 is communicably connected to the compressor 80, the expansion valve 82, the blower 84, and the temperature sensors 85a and 85b via communication lines (not shown).
  • the control board 86 is communicably connected to a later-described control board 92 of the tank unit 9 via a communication line (not shown).
  • the control board 86 receives the above-described incoming water temperature data and outside air temperature data from each of the temperature sensor 85a and the temperature sensor 85b, and controls the operations of the compressor 80, the expansion valve 82, and the blower 84.
  • the tank unit 9 includes a hot water storage tank 90, a pump 91, and a control board 92. These components are housed in a metal outer case.
  • the hot water storage tank 90 is made of metal such as stainless steel or resin.
  • a heat insulating material (not shown) is disposed outside the hot water storage tank 90.
  • high-temperature hot water hereinafter referred to as high-temperature water
  • the hot water storage tank 90 and the first heat exchanger 81 of the heat pump unit 8 are connected by a pipe 10, starting from the lower part of the hot water storage tank 90 and passing through the pump 91 and the first heat exchanger 81 to the upper part of the hot water storage tank 90.
  • a boiling circuit in which hot water circulates is configured by returning.
  • the pump 91 conveys the low temperature water from the lower part of the hot water storage tank 90 to the first heat exchanger 81.
  • the pump 91 includes an inverter circuit, and can change the flow rate of water at the time of conveyance by changing the driving rotational speed in accordance with a control value instructed from the control board 92.
  • the control board 92 includes a CPU, a ROM, a RAM, a communication interface, a readable / writable nonvolatile semiconductor memory, and the like (all not shown).
  • the control board 92 is communicably connected to the control board 86 via a communication line (not shown).
  • the control board 92 is communicably connected to the control device 2 via the above-described wireless network built in the house H.
  • the control board 92 controls the operation of the pump 91. In addition, the control board 92 performs feedforward control described later.
  • the temperature boundary layer approaches the lower part of the hot water storage tank 90, and the temperature of the water entering the first heat exchanger 81 (incoming water temperature) gradually increases.
  • Hot water supply operation A hot water pipe (not shown) is connected to the upper part of the hot water storage tank 90, and hot water discharged from the hot water storage tank 90 through the hot water pipe is mixed with city water by a mixing valve (not shown).
  • a hot water supply terminal for example, a shower or a faucet disposed in the bathroom.
  • city water is supplied from a water supply pipe (not shown) connected to the lower part by the volume of hot water flowing out from the upper part and the water pressure.
  • the temperature boundary layer moves upward in the hot water storage tank 90.
  • the water heater 5 performs additional boiling.
  • the energy management system 1 of the present embodiment has a feature that the hot water heater 5 performs a boiling operation using the surplus electric energy in the home (see FIG. 5).
  • FIG. 6 is a diagram showing the relationship between the drive frequency (Hz) of the compressor 80 and the power consumption (W) of the water heater 5 during the boiling operation of the water heater 5. It can be seen from FIG. 6 that there is a relationship in which the power consumption increases significantly as the drive frequency increases. Using this relationship, when a large change in the target power consumption is required, the drive frequency of the compressor 80 can be changed to bring the power consumption close to the target power consumption after the change. When the target power consumption is greatly changed in this way, the water heater 5 of the present embodiment estimates the drive frequency according to the changed target power consumption, and the pump 91 and the expansion valve based on the estimated drive frequency. Each target control value of 82 is calculated. Then, the water heater 5 performs feedforward control in which the compressor 80, the pump 91, and the expansion valve 82 are controlled in synchronization with the calculated target control values.
  • Hz the drive frequency
  • W power consumption
  • FIG. 7 is a diagram showing a functional configuration of the control board 92 of the tank unit 9.
  • the control board 92 includes a change request receiving unit 920, a drive frequency estimating unit 921, a water flow rate estimating unit 922, a control value determining unit 923, and a synchronization control unit 924.
  • the drive frequency estimation unit 921, the water flow rate estimation unit 922, the control value determination unit 923, and the synchronization control unit 924 constitute the control means of the present invention.
  • the change request receiving unit 920 receives a target power consumption change command from the outside. Specifically, the change request receiving unit 920 receives the above-described change request data from the power consumption change request unit 203 of the control device 2 and receives it and stores it in the received change request data. Information indicating available power is extracted.
  • the driving frequency estimation unit 921 estimates the driving frequency (H) corresponding to the new target power consumption (W0) obtained from the information indicating the extracted usable power. Specifically, the drive frequency estimation unit 921 uses an empirical formula or a target power consumption (W0), a target boiling temperature (Two), an outside air temperature (Ta), and an incoming water temperature (Twi) as parameters.
  • the drive frequency (H) is estimated by the following correlation equation derived using the device characteristic equation.
  • the drive frequency estimation unit 921 acquires the outside air temperature (Ta) and the incoming water temperature (Twi) from the control board 86 of the heat pump unit 8.
  • the water flow rate estimating unit 922 estimates the water flow rate (U) corresponding to the new target power consumption (W0) by the following correlation formula derived using an experimental formula, a device characteristic formula, or the like.
  • the control value determining unit 923 determines each target control value for synchronously controlling each component that is a target of feedforward control in the water heater 5. Specifically, the control value determining unit 923 determines the target control value of the compressor 80 to be the estimated driving frequency (H), and the target control value of the pump 91 is the estimated water flow rate ( It is determined so that the driving rotational speed corresponds to (U). In addition, the control value determination unit 923 sets the throttle amount (valve opening) that can maintain the high pressure and low pressure of the refrigeration cycle circuit even at the refrigerant flow rate derived from the estimated drive frequency (H), as a characteristic of the expansion valve 82. The estimated valve opening is determined as a target control value for the expansion valve 82.
  • the synchronization control unit 924 controls each component unit in synchronization with each target control value determined as described above. Specifically, the synchronization control unit 924 operates the pump 91 with the determined target control value of the pump 91, and sets the determined target control values of the compressor 80 and the expansion valve 82 to the control board of the heat pump unit 8. 86 is notified. Upon receiving such notification, the control board 86 operates the compressor 80 and the expansion valve 82 with respective target control values.
  • control board 86 and the control board 92 of the water heater 5 execute feedback control until new change request data is transmitted from the control device 2. Specifically, the control board 86 adjusts the drive frequency of the compressor 80 so that the difference between the target power consumption and the current power consumption of the water heater 5 is reduced. As described above, the current power consumption of the water heater 5 is notified from the control device 5 to the water heater 5 at regular intervals.
  • control board 86 adjusts the valve opening degree of the expansion valve 82 so that the difference between the target boiling temperature and the current boiling temperature becomes small. Then, the control board 92 adjusts the driving rotational speed of the pump 91 so that the difference between the target boiling temperature and the current boiling temperature becomes small.
  • FIG. 8 is a flowchart showing the procedure of the feedforward control process executed by the control board 92 of the water heater 5.
  • the drive frequency estimating unit 921 The drive frequency (H) corresponding to the target power consumption (W0) is estimated (step S102).
  • the water flow rate estimation unit 922 estimates the water flow rate (U) corresponding to the new target power consumption (W0) (step S103).
  • the control value determining unit 923 determines each target control value for synchronously controlling each component that is the target of feedforward control from the estimated drive frequency (H) and water flow rate (U) (step S104). ).
  • the synchronization control unit 924 controls each component (compressor 80, expansion valve 82, pump 91) in synchronization with each determined target control value (step S105).
  • the control device 2 compares the calculated usable power with the current target power consumption of the water heater 5 at regular time intervals. It is determined whether or not the difference is within a predetermined allowable value. And when it is not settled in permissible value, change of target power consumption is demanded to water heater 5.
  • the water heater 5 Upon receiving such a request, the water heater 5 estimates the drive frequency and water flow rate corresponding to the new target power consumption, determines the target control values of the compressor 80, the expansion valve 82, and the pump 91, and determines each determined value.
  • the compressor 80, the expansion valve 82, and the pump 91 are controlled in synchronization with the target control value.
  • the water heater 5 may include a power measurement unit that measures its own power consumption.
  • the control board 86 of the water heater 5 can perform feedback control of the compressor 80 without receiving power consumption notification from the control device 2.
  • blower 84 may be included as an object of feedforward control, and the blower 84 may be operated at the fan rotational speed determined as the target control value during the feedforward control.
  • the water heater 5 does not operate each constituent unit with each determined target control value in one feedforward control process
  • FIG. 9 is a diagram showing the state of overshoot and undershoot of the boiling temperature accompanying the change of the drive frequency of the compressor 80. It is known that when the drive frequency is lowered, the boiling capacity decreases, and therefore the boiling temperature rises once as shown in FIG. Further, it is known that when the driving frequency is increased, the boiling temperature once decreases and then converges. Changes in water temperature due to such overshoots and undershoots can cause discomfort to the user, especially when extreme overshoots occur, there is a risk of adverse effects on the human body such as burns, There is a concern that it may cause failure.
  • the control values of the compressor 80, the pump 91, and the expansion valve 82 are changed when it is changed in a smaller direction than when the target power consumption is increased. You may make it determine each target control value so that a width
  • control board 92 of the tank unit 9 not the control board 92 of the tank unit 9 but the control board 86 of the heat pump unit 8 includes a change request receiving unit 920, a drive frequency estimating unit 921, a water flow rate estimating unit 922, and a control value determining unit as shown in FIG. 923 and a synchronization control unit 924, and the above-described feedforward control process (see FIG. 8) may be executed.
  • one or a plurality of programs stored in the secondary storage device 24 are executed by the CPU 20, thereby realizing each functional unit (see FIG. 3) of the control device 2.
  • all or part of the functional units of the control device 2 may be realized by dedicated hardware.
  • the dedicated hardware is, for example, a single circuit, a composite circuit, a programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a combination thereof.
  • control device 2 may further include an input device for accepting an operation from the user and a display device for presenting information to the user.
  • control device 2 is installed in the house H.
  • a device having a function equivalent to that of the control device 2 may be installed outside the house H.
  • FIG. 1 An example of this case is shown in FIG.
  • a router 15 is installed in the house H instead of the control device 2.
  • a server 16 that is communicably connected to the router 15 via the Internet is installed.
  • the router 15 and the server 16 play a role of the control device 2 in cooperation.
  • the program executed by the control device 2 includes a CD-ROM (Compact Disc Read Only Memory), a DVD (Digital Versatile Disc), an MO (Magneto-Optical Disk), a USB memory, a memory card, and the like. It is also possible to store and distribute in a computer-readable recording medium. It is also possible to cause the computer to function as the control device 2 in the above-described embodiment by installing the program on a specific or general-purpose computer.
  • the above program may be stored in a disk device or the like included in a server device on a communication network such as the Internet, and may be downloaded onto a computer, for example, superimposed on a carrier wave.
  • the above-described processing can also be achieved by starting and executing a program while transferring it via a communication network.
  • the above-described processing can also be achieved by executing all or part of the program on the server device and executing the program while the computer transmits and receives information regarding the processing via the communication network.
  • the present invention can be suitably employed in a system that manages electric power used in the home.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

給湯機(5)は、冷媒を圧縮する圧縮機(80)と、圧縮された冷媒と水との熱交換を行う第1の熱交換器(81)と、第1の熱交換器(81)を通過した水を貯留する貯湯タンク(90)と、第1の熱交換器(81)に水を供給するポンプ(91)と、第1の熱交換器(81)を通過した冷媒を膨張させる膨張弁(82)と、制御基板(92)と、を備える。制御基板(92)は、外部から目標消費電力を受け付けると、受け付けた目標消費電力に収まるように、圧縮機(80)、ポンプ(91)及び膨張弁(82)をフィードフォワード制御する。

Description

給湯機及びエネルギー管理システム
 本発明は、給湯機及びエネルギー管理システムに関する。
 近年、環境や節電に対する意識の高まりから、太陽光による発電設備を設置する家庭が増加する傾向にある。太陽光発電は、時間帯や天候等によって発電出力が変動する。このため、太陽光発電による発電電力を無駄なく消費するためには、給湯機等の電気機器を発電出力の変動に応じて適切に制御する必要がある。
 この点に関し、特許文献1には、貯湯式の給湯装置において、余剰電力に基づいて設定された使用可能電力の制限の下でコンプレッサを制御する技術が提案されている。
特開2014-95501号公報
 特許文献1の技術では、コンプレッサの回転数は、運転開始時では、フィードフォワード制御により制御され、所定時間後、使用可能電力に基づきフィードバック制御される。
 ところで、上述のように、太陽光発電は、発電出力が一定ではない。また、宅内の総消費電力も刻々変化するため、太陽光発電による余剰電力(即ち、使用可能電力)は、給湯機の運転中においても大きく変動する場合があり得る。
 このような場合、給湯機に対して従来のようなフィードバック制御を行うのみでは、変更後の目標消費電力に応じた適切な運転状態になるまでに、時間がかかってしまうという問題がある。
 本発明は、上記課題を解決するためになされたものであり、変更後の目標消費電力への追従性が高い給湯機等を提供することを目的とする。
 上記目的を達成するため、本発明に係る給湯機は、
 冷媒を圧縮する圧縮機と、
 前記冷媒と水との熱交換を行う熱交換器と、
 前記熱交換器からの水を貯留する貯湯タンクと、
 前記熱交換器に水を供給するポンプと、
 前記冷媒を膨張させる膨張弁と、
 目標消費電力を外部から受け付ける受付手段と、
 前記目標消費電力を受け付けると、前記目標消費電力に収まるように、前記圧縮機、前記ポンプ及び前記膨張弁をフィードフォワード制御する制御手段と、を備える。
 本発明によれば、目標消費電力を受け付けると、この目標消費電力に収まるように、圧縮機とポンプと膨張弁とをフィードフォワード制御する。このため、変更後の目標消費電力への追従性が向上する。
本発明の実施形態に係るエネルギー管理システムの全体構成を示す図である。 制御装置のハードウェア構成を示すブロック図である。 制御装置の機能構成を示す図である。 本実施形態の給湯機の構成を示すブロック図である。 余剰電力量について説明するための図である。 給湯機の消費電力と圧縮機の駆動周波数との関係を示す図である。 タンクユニットが備える制御基板の機能構成を示す図である。 フィードフォワード制御処理の手順を示すフローチャートである。 沸上げ温度のオーバーシュート、アンダーシュートについて説明するための図である。 他の実施形態に係るエネルギー管理システムの全体構成を示す図である。
 以下、本発明の実施形態について図面を参照して詳細に説明する。
 図1は、本発明の実施形態に係るエネルギー管理システム1の全体構成を示す図である。このエネルギー管理システム1は、一般家庭で使用される電力の管理を行う、いわゆる、HEMS(Home Energy Management System)と呼ばれるシステムである。エネルギー管理システム1は、制御装置2と、操作端末3と、電力計測装置4と、給湯機5と、発電設備6とを備える。
 制御装置2は、家屋H内の適切な場所に設置され、家屋H、即ち、需要地で消費される電力の監視を行い、電力の消費状況を操作端末3を介して表示する。また、制御装置2は、給湯機5や複数の機器7(機器7-1,7-2,…)の動作制御や動作状態の監視などを行う。制御装置2の詳細については後述する。
 電力計測装置4は、家屋Hに配設された電力線D1~D3のそれぞれを送電される電力の値を計測する。電力線D1は、商用電源11と分電盤12との間に配設され、電力線D2は、発電設備6と分電盤12との間に配設され、電力線D3は、分電盤12と給湯機5との間に配設されている。
 電力計測装置4は、電力線D1~D3にそれぞれ接続されたCT(Current Transformer)1~3の各々と通信線を介して接続される。CT1~3は、交流電流を計測するセンサである。電力計測装置4は、CT1の計測結果に基づいて電力線D1における電力値、換言すると、この家庭における総消費電力を測定する。同様に、電力計測装置4は、CT2の計測結果に基づいて電力線D2における電力値、換言すると、発電設備6による発電電力を計測し、CT3の計測結果に基づいて電力線D3における電力値、換言すると、給湯機5の消費電力を計測する。
 また、電力計測装置4は、無線通信インタフェースを備え、家屋H内に構築された無線ネットワーク(図示せず)を介して、制御装置2と通信可能に接続する。この無線ネットワークは、例えば、エコーネットライト(ECHONET Lite)に準じたネットワークである。なお、電力計測装置4は、外付けの通信アダプタ(図示せず)を介して、この無線ネットワークに接続される仕様であってもよい。
 電力計測装置4は、制御装置2からの要求に応答して、計測した電力線D1の電力値を格納した計測データを生成し、制御装置2に送信する。この計測データには、電力計測装置4の機器アドレス、電力線のID(identification)、計測時刻も格納されている。同様に、電力測定装置4は、制御装置2からの要求に応答して、測定した電力線D2,D3の電力値を格納した測定データをそれぞれ生成し、制御装置2に送信する。なお、電力計測装置4は、制御装置2からの要求に応答して、電力線D1~D3の各電力値を一括して格納した計測データを生成して制御装置2に送信してもよい。
 給湯機5は、ヒートポンプユニット8と、タンクユニット9とを備える貯湯式の給湯機である。ヒートポンプユニット8とタンクユニット9とは、湯水が流れる配管10で接続されている。給湯機5の詳細については後述する。
 発電設備6は、PV(photovoltaic panel)パネル13と、パワーコンディショニングシステムであるPV-PCS14とを含んで構成される太陽光発電設備である。発電設備6は、PVパネル13が発電した電気をPV-PCS14により直流電力から交流電力に変換し、電力線D2を介して分電盤12に供給する。
 機器7(機器7-1,7-2,…)は、例えば、エアコン、照明器、床暖房システム、冷蔵庫、IH(Induction Heating)調理器、テレビ等の電気機器である。機器7-1,7-2,…は、家屋H(敷地も含む)内に設置され、分電盤12により分岐された電力線D4,D5,…にそれぞれ接続されている。各機器7は、上述の図示しない無線ネットワークを介して、制御装置2と通信可能に接続する。なお、各機器7は、外付けの通信アダプタ(図示せず)を介して、この無線ネットワークに接続される仕様であってもよい。
 各機器7は、制御装置2からの要求に応答して、機器IDと、現在時刻と、現在の運転状態を示す情報とを格納したデータ(運転状態データ)を制御装置2に送信する。
 操作端末3は、押しボタン、タッチパネル、タッチパッド等の入力デバイスと、有機ELディスプレイ、液晶ディスプレイ等の表示デバイスと、通信インタフェースとを備えた、例えば、スマートフォンやタブレット端末等の携帯機器である。操作端末3は、制御装置2と、Wi-Fi(登録商標)、Wi-SUN(登録商標)や有線LAN等の周知の通信規格に則った通信を行う。操作端末3は、ユーザからの操作を受け付け、受け付けた操作内容を示す情報を制御装置2に送信する。また、操作端末3は、制御装置2から送信された、ユーザに提示するための情報を受信し、受信した情報を表示する。このように、操作端末3は、ユーザとのインタフェース(ユーザインタフェース)としての役割を担う。
 制御装置2は、図2に示すように、CPU(Central Processing Unit)20と、通信インタフェース21と、ROM(Read Only Memory)22と、RAM(Random Access Memory)23と、二次記憶装置24とを備える。これらの構成部は、バス25を介して相互に接続される。CPU20は、この制御装置2を統括的に制御する。CPU20によって実現される機能の詳細については後述する。
 通信インタフェース21は、上述した無線ネットワークを介して電力計測装置4、給湯機5や各機器7と無線通信するためのNIC(Network Interface Card controller)と、操作端末3と無線通信又は有線通信するためのNICを含んで構成される。
 ROM22は、複数のファームウェアやこれらのファームウェアの実行時に使用されるデータ等を記憶する。RAM23は、CPU20の作業領域として使用される。
 二次記憶装置24は、EEPROM(Electrically Erasable Programmable Read-Only Memory)、フラッシュメモリ等の読み書き可能な不揮発性の半導体メモリやハードディスクドライブ等から構成される。二次記憶装置24は、この家庭で消費される電力を監視するためのプログラムや、給湯機5及び各機器7の動作を制御するためのプログラム、そして、これらのプログラムの実行時に使用されるデータ等を記憶する。
 図3は、制御装置2の機能構成を示す図である。制御装置2は、機能的には、ユーザインタフェース部200と、電力値取得部201と、機器制御部202と、消費電力変更要求部203とを備える。これらの各機能部は、CPU20が二次記憶装置24に記憶されている1又は複数のプログラムを実行することで実現される。
 ユーザインタフェース部200は、操作端末3を介したユーザインタフェース処理を行う。即ち、ユーザインタフェース部200は、ユーザからの操作を操作端末3を介して受け付ける。また、ユーザインタフェース部200は、ユーザに提示するための情報(例えば、監視画面データや各種の操作画面データ)を操作端末3に送信する。
 電力値取得部201は、電力計測装置4から、計測された電力値を取得する処理を行う。具体的には、電力値取得部201は、一定時間(例えば、30秒)毎に、電力計測装置4に対し、各電力線に対応する前述した計測データの送信を要求する。電力値取得部201は、かかる要求に応答して、電力計測装置4から送られてきた電力線毎の計測データを取得する。電力値取得部201は、取得した各計測データを二次記憶装置24に格納する。
 機器制御部202は、給湯機5及び各機器7から運転状態を取得する処理を行う。具体的には、機器制御部202は、一定時間(例えば、30秒)毎に、給湯機5及び各機器7に対し、運転状態データの送信を要求する。機器制御部202は、かかる要求に応答して、給湯機5及び各機器7からそれぞれ送られてきた運転状態データを取得する。機器制御部202は、取得した給湯機5及び各機器7の運転状態データを二次記憶装置24に格納する。
 また、機器制御部202は、操作端末3を介したユーザ操作に従って、給湯機5や機器7の動作を制御する。さらに、機器制御部202は、一定時間(例えば、30秒)毎に、給湯機5の消費電力、即ち、電力線D3における電力値を給湯機5に通知する。
 消費電力変更要求部203は、一定時間(例えば、10分)毎に、給湯機5が使用可能な電力(使用可能電力)を算出する。そして、消費電力変更要求部203は、算出した使用可能電力と現在の給湯機5の目標消費電力とから、給湯機5の目標消費電力について、変更を要するか否かを判別する。目標消費電力の変更を要する場合、消費電力変更要求部203は、目標消費電力の変更を給湯機5に要求する。
 使用可能電力は、電力計測装置4により計測された、総消費電力(電力線D1の電力値)と、給湯機5の消費電力(電力線D3の電力値)と、発電電力(電力線D2の電力値)とに基づいて算出される。より詳細には、消費電力変更要求部203は、先ず、宅内消費電力を算出する。宅内消費電力は、総消費電力から給湯機5の消費電力を差し引くことで算出される。そして、消費電力変更要求部203は、発電電力から宅内消費電力を差し引くことで使用可能電力を算出する。なお、宅内消費電力が発電電力より大きい場合、消費電力変更要求部203は、使用可能電力を0[W]に設定する。
 消費電力変更要求部203は、算出した使用可能電力と給湯機5の現在の目標消費電力とを比較し、両者の差が予め定めた許容値に収まっているか否かを判別する。給湯機5の現在の目標消費電力を示すデータは、二次記憶装置24に格納されている。
 その結果、両者の差が許容値に収まっていない場合、消費電力変更要求部203は、目標消費電力の変更を要すると判別し、給湯機5に対して、目標消費電力の変更を要求するデータ(変更要求データ)を送信する。この変更要求データには、算出された使用可能電力(換言すると、新しい目標消費電力)を示す情報が格納される。また、消費電力変更要求部203は、二次記憶装置24に格納されている給湯機5の目標消費電力を示すデータを、算出した使用可能電力に基づいて更新する。
 図4は、給湯機5の構成を示すブロック図である。給湯機5は、ヒートポンプユニット8とタンクユニット9を備える。ヒートポンプユニット8は、例えば、CO2やHFC(ハイドロフルオロカーボン)などを冷媒に用いたヒートポンプである。
<<ヒートポンプユニット8の構成>>
 ヒートポンプユニット8は、圧縮機80と、第1の熱交換器81と、膨張弁82と、第2の熱交換器83と、送風機84と、温度センサ85a,85bと、制御基板86とを含んで構成される。圧縮機80、第1の熱交換器81、膨張弁82及び第2の熱交換器83は、環状に接続され、冷媒を循環させるための冷凍サイクル回路(冷媒回路ともいう。)が形成されている。
 圧縮機80は、冷媒を圧縮して温度及び圧力を上昇させる。圧縮機80は、駆動周波数に応じて容量(単位当たりの送り出し量)を変化させることができるインバータ回路を備える。圧縮機80は、制御基板86から指示される制御値に従って容量を変更する。
 第1の熱交換器81は、市水を目標の沸上げ温度(貯湯温度ともいう。)まで昇温加熱するための加熱源である。第1の熱交換器81は、プレート式あるいは二重管式などの熱交換器であり、冷媒と水(低温水)との間の熱交換を行う。第1の熱交換器81における熱交換により、冷媒は放熱して温度が下降し、水は吸熱して温度が上昇する。
 膨張弁82は、冷媒を膨張させて温度及び圧力を下降させる。膨張弁82は、制御基板86から指示される制御値に従って弁開度を変更する。
 第2の熱交換器83は、送風機84により送られてきた外気と冷媒との間の熱交換を行う。第2の熱交換器83における熱交換により冷媒は吸熱し、外気は放熱して温度が下降する。
 温度センサ85aは、配管10における第1の熱交換器81の入水側に設けられ、第1の熱交換器81へ入水する水の温度(入水温度)を計測する。温度センサ85aは、計測した入水温度を示すデータ(入水温度データ)を予め定めたタイミング(例えば、一定時間毎)で制御基板86に送信する。
 温度センサ85bは、ヒートポンプユニット8における筐体に設けられ、外気の温度(外気温度)を計測する。温度センサ85bは、計測した外気温度を示すデータ(外気温度データ)を予め定めたタイミング(例えば、一定時間毎)で制御基板86に送信する。
 制御基板86は、CPU、ROM、RAM、通信インタフェース、読み書き可能な不揮発性の半導体メモリなど(何れも図示せず)を含んで構成される。制御基板86は、圧縮機80、膨張弁82、送風機84、温度センサ85a,85bのそれぞれと図示しない通信線を介して通信可能に接続する。また、制御基板86は、図示しない通信線を介してタンクユニット9の後述する制御基板92と通信可能に接続する。制御基板86は、温度センサ85a及び温度センサ85bのそれぞれから上述した入水温度データ及び外気温度データを受信すると共に、圧縮機80、膨張弁82、送風機84の動作を制御する。
<<タンクユニット9の構成>>
 タンクユニット9は、貯湯タンク90と、ポンプ91と、制御基板92とを備える。これらの構成部は、金属製の外装ケース内に収められている。
 貯湯タンク90は、ステンレスなどの金属又は樹脂などで形成されている。貯湯タンク90の外側には断熱材(図示せず)が配置されている。これにより、貯湯タンク90内で、高温の湯(以下、高温水という。)を長時間に渡って保温することができる。
 貯湯タンク90とヒートポンプユニット8の第1の熱交換器81とは配管10で接続され、貯湯タンク90の下部を起点に、ポンプ91、第1の熱交換器81を経て貯湯タンク90の上部に戻ることで湯水が循環する沸上げ回路が構成される。
 ポンプ91は、貯湯タンク90の下部からの低温水を第1の熱交換器81へ搬送する。ポンプ91は、インバータ回路を備え、制御基板92から指示される制御値に従って駆動回転数を変更することにより、搬送する際の水流量を変化させることができる。
 制御基板92は、CPU、ROM、RAM、通信インタフェース、読み書き可能な不揮発性の半導体メモリなど(何れも図示せず)を含んで構成される。制御基板92は、制御基板86と図示しない通信線を介して通信可能に接続する。また、制御基板92は、家屋H内に構築された前述の無線ネットワークを介して、制御装置2と通信可能に接続する。
 制御基板92は、ポンプ91の動作を制御する。加えて、制御基板92は、後述するフィードフォワード制御を行う。
 以上のように構成された給湯機5の一般的な動作について以下説明する。
<<沸上げ動作>>
 沸上げ動作の開始時には、貯湯タンク90内の高温水は消費されており、貯湯タンク90の下部には市水の温度に近い低温水が貯留している。ポンプ91を作動させることで、この低温水がヒートポンプユニット8の第1の熱交換器81へ入水され、冷媒との熱交換により昇温し、高温水となる。この高温水は貯湯タンク90の上部に戻され、貯湯タンク90内では、上部に高温水、下部に低温水が滞留して温度成層が形成され、高温水と低温水との間には温度境界層が生成される。
 沸上げ量が増えて、高温水の領域が大きくなると貯湯タンク90の下部に温度境界層が近づき、第1の熱交換器81へ入水する水の温度(入水温度)が次第に上昇する。
<<給湯動作>>
 貯湯タンク90の上部には出湯管(図示せず)が接続されており、貯湯タンク90からこの出湯管を介して出湯した高温水が、混合弁(図示せず)にて市水と混合されることで、ユーザが所望する温度(例えば、40℃)の湯水となって、給湯端末(例えば、浴室に配設されたシャワー、蛇口など)に供給される。このとき、貯湯タンク90では、上部から流出した高温水の体積分、水道圧により、下部に接続された給水管(図示せず)から市水が供給される。これにより、貯湯タンク90内では温度境界層が上方へ移動する。高温水が少なくなると、給湯機5は、追加沸上げを行う。
 本実施形態のエネルギー管理システム1では、この家庭における余剰電力量(図5参照)を使用して給湯機5が沸上げ運転を行うという特徴を有する。
 図6は、給湯機5の沸上げ運転時における圧縮機80の駆動周波数(Hz)と、給湯機5の消費電力(W)の関係を表す図である。図6から、駆動周波数が高くなると消費電力も顕著に大きくなる関係があることが判る。この関係を利用して、目標消費電力の大きな変更を要する際、圧縮機80の駆動周波数を変更して、消費電力を変更後の目標消費電力に一気に近づけることが可能となる。本実施形態の給湯機5は、このようにして目標消費電力が大きく変更される際、変更後の目標消費電力に応じた駆動周波数を推定し、推定した駆動周波数に基づいてポンプ91及び膨張弁82それぞれの目標制御値を算出する。そして、給湯機5は、圧縮機80、ポンプ91及び膨張弁82を算出したそれぞれの目標制御値で同期させて制御するフィードフォワード制御を行う。
 図7は、タンクユニット9の制御基板92の機能構成を示す図である。図7に示すように、制御基板92は、変更要求受付部920と、駆動周波数推定部921と、水流量推定部922と、制御値決定部923と、同期制御部924とを備える。駆動周波数推定部921、水流量推定部922、制御値決定部923及び同期制御部924は、本発明の制御手段を構成する。
 変更要求受付部920(受付手段)は、目標消費電力の変更指令を外部から受け付ける。具体的には、変更要求受付部920は、制御装置2の消費電力変更要求部203からの前述した変更要求データが送信されると、これを受信し、受信した変更要求データに格納されている使用可能電力を示す情報を抽出する。
 駆動周波数推定部921(推定手段)は、抽出された使用可能電力を示す情報から得られる新たな目標消費電力(W0)に対応する駆動周波数(H)を推定する。具体的には、駆動周波数推定部921は、目標消費電力(W0)と、目標沸上げ温度(Two)と、外気温度(Ta)と、入水温度(Twi)とをパラメータとした、実験式や機器特性式など用いて導出した下記の相関式によって駆動周波数(H)を推定する。なお、駆動周波数推定部921は、外気温度(Ta)及び入水温度(Twi)をヒートポンプユニット8の制御基板86から取得する。
 H=f(W0,Two,Ta,Twi)  (式1)
 水流量推定部922(推定手段)は、新たな目標消費電力(W0)に対応する水流量(U)を実験式や機器特性式など用いて導出した下記の相関式によって推定する。
 U=f(W0,Two,Ta,Twi)  (式2)
 制御値決定部923は、給湯機5におけるフィードフォワード制御の対象となる各構成部を同期制御するための各目標制御値を決定する。具体的には、制御値決定部923は、圧縮機80の目標制御値が、推定された駆動周波数(H)となるように決定し、ポンプ91の目標制御値が、推定された水流量(U)に対応する駆動回転数となるように決定する。また、制御値決定部923は、推定された駆動周波数(H)から導出される冷媒の流量においても冷凍サイクル回路の高圧と低圧が維持可能な絞り量(弁開度)を膨張弁82の特性式から推定し、推定した弁開度を膨張弁82の目標制御値として決定する。
 同期制御部924は、上記のように決定された各目標制御値で各構成部を同期させて制御する。具体的には、同期制御部924は、決定されたポンプ91の目標制御値でポンプ91を動作させると共に、決定された圧縮機80及び膨張弁82それぞれの目標制御値をヒートポンプユニット8の制御基板86に通知する。かかる通知を受けた制御基板86は、圧縮機80及び膨張弁82をそれぞれの目標制御値で動作させる。
 上記の同期制御が実行されると、制御装置2から新たな変更要求データが送信されるまで、給湯機5の制御基板86及び制御基板92は、フィードバック制御を実行する。具体的には、制御基板86は、目標消費電力と現在の給湯機5の消費電力の差分が小さくなるように圧縮機80の駆動周波数を調整する。現在の給湯機5の消費電力は、前述したように、制御装置5から一定時間毎に給湯機5に通知される。
 また、制御基板86は、目標沸上げ温度と現在の沸上げ温度の差分が小さくなるように膨張弁82の弁開度を調整する。そして、制御基板92は、目標沸上げ温度と現在の沸上げ温度の差分が小さくなるようにポンプ91の駆動回転数を調整する。
 図8は、給湯機5の制御基板92によって実行されるフィードフォワード制御処理の手順を示すフローチャートである。制御装置2から目標消費電力の変更指令があると、即ち、制御装置2からの変更要求データが変更要求受付部920によって受信されると(ステップS101;YES)、駆動周波数推定部921は、新たな目標消費電力(W0)に対応する駆動周波数(H)を推定する(ステップS102)。
 また、水流量推定部922は、新たな目標消費電力(W0)に対応する水流量(U)を推定する(ステップS103)。制御値決定部923は、推定された駆動周波数(H)と水流量(U)とから、フィードフォワード制御の対象となる各構成部を同期制御するための各目標制御値を決定する(ステップS104)。
 そして、同期制御部924は、決定された各目標制御値で各構成部(圧縮機80、膨張弁82、ポンプ91)を同期させて制御する(ステップS105)。
 以上説明したように、本発明の実施形態に係るエネルギー管理システム1では、制御装置2は、一定時間間隔で、算出した使用可能電力と現在の給湯機5の目標消費電力とを比較し、両者の差が予め定めた許容値に収まっているか否かを判別する。そして、許容値に収まっていない場合、給湯機5に対して、目標消費電力の変更を要求する。
 かかる要求を受けると、給湯機5は、新たな目標消費電力に対応する駆動周波数及び水流量を推定し、圧縮機80、膨張弁82及びポンプ91の各目標制御値を決定し、決定した各目標制御値で圧縮機80、膨張弁82及びポンプ91を同期させて制御する。
 このため、目標消費電力の大幅な変更を行った場合であっても、各構成部の動作が安定するまでの収束時間が短縮でき、変更後の目標消費電力に応じたより適切な沸上げ運転が可能となる。
 なお、本発明は、上記の実施形態に限定されず、本発明の要旨を逸脱しない範囲での種々の変更は勿論可能である。
 例えば、給湯機5が、自己の消費電力を計測する電力計測部を備えるようにしてもよい。このようにすると、制御装置2から消費電力の通知を受けることなく、給湯機5の制御基板86は、圧縮機80のフィードバック制御を行うことが可能となる。
 また、フィードフォワード制御の対象として送風機84も含めるようにして、フィードフォワード制御の際、目標制御値として決定したファン回転数で送風機84を動作させるようにしてもよい。
 また、駆動周波数(H)及び水流量(U)の推定は、様々な手法が採用され得る。以下、他の手法の一例を示す。
(1)水流量(U)を仮定して、入水温度(Twi)と目標沸上げ温度(Two)と水物性からこの場合の水側能力を算出する。
(2)算出した水側能力とバランスが取れるヒートポンプ側能力となる場合の外気温度(Ta)での駆動周波数(H)を、ヒートポンプ特性式(実験式や冷媒物性式)を用いた収束計算により求める。
(3)求めた駆動周波数(H)に対応する消費電力が目標消費電力(W0)に一致するか否かを判定し、一致するまで水流量(U)を仮定し直して再計算する。
 また、制御装置2から目標消費電力の変更要求があった際、給湯機5は、一回のフィードフォワード制御処理において、各構成部を決定した各目標制御値で動作させるのではなく、現在の各制御値から各目標制御値までの差分の50%程度で各構成部を動作させる処理を複数回繰り返すようにしてもよい。即ち、それぞれの制御値が決定した各目標制御値に除々に近づくように制御してもよい。このようにすると、運転挙動の急変を抑えながら安定動作までの時間を短縮することができる。
 図9は、圧縮機80の駆動周波数の変更に伴う、沸上げ温度のオーバーシュート、アンダーシュートの様子を示す図である。駆動周波数を低くすると沸上げ能力が低下する方向になるため、熱容量の影響などにより沸上げ温度は、図9に示すように一旦上昇してから収束することが知られている。また、駆動周波数を高くすると、沸上げ温度は一旦下降してから収束することが知られている。このようなオーバーシュート、アンダーシュートに起因した水温変化は、ユーザに不快感を与える可能性があり、特に極端なオーバーシュートが発生すると、火傷等の人体への悪影響を及ぼす危険性があり、また、故障の原因となることが懸念される。
 このため、オーバーシュート防止の観点から、目標消費電力が大きくなる方向で変更される場合よりも小さくなる方向で変更される場合に、圧縮機80とポンプ91と膨張弁82それぞれの制御値の変更幅が大きくなるように、それぞれの目標制御値を決定するようにしてもよい。
 また、タンクユニット9の制御基板92ではなく、ヒートポンプユニット8の制御基板86が、図7に示すような、変更要求受付部920、駆動周波数推定部921、水流量推定部922、制御値決定部923及び同期制御部924を備え、上述したフィードフォワード制御処理(図8参照)を実行してもよい。
 上記の実施形態では、CPU20によって二次記憶装置24に記憶されている1又は複数のプログラムが実行されることで、制御装置2の各機能部(図3参照)が実現された。しかし、制御装置2の機能部の全部又は一部が、専用のハードウェアで実現されるようにしてもよい。専用のハードウェアとは、例えば、単一回路、複合回路、プログラム化されたプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)、又は、これらの組み合わせ等である。
 また、制御装置2が、ユーザからの操作を受け付けるための入力デバイスと、ユーザに情報を提示するための表示デバイスをさらに含んで構成されるようにしてもよい。
 また、上記の実施形態では、制御装置2が家屋Hに設置された場合について説明したが、制御装置2と同等の機能を有する装置を家屋Hの外に設置するようにしてもよい。
 この場合の例を図10に示す。この例では、家屋Hには、制御装置2の代わりにルータ15が設置されている。一方、家屋Hの外には、ルータ15とインターネットを介して通信可能に接続されるサーバ16が設置されている。この場合、ルータ15とサーバ16とが協調して制御装置2の役割を果たす。
 また、上記の実施形態において、制御装置2によって実行されるプログラムは、CD-ROM(Compact Disc Read Only Memory)、DVD(Digital Versatile Disc)、MO(Magneto-Optical Disk)、USBメモリ、メモリカード等のコンピュータ読み取り可能な記録媒体に格納して配布することも可能である。そして、かかるプログラムを特定の又は汎用のコンピュータにインストールすることによって、当該コンピュータを上記の実施形態における制御装置2として機能させることも可能である。
 また、上記のプログラムをインターネット等の通信ネットワーク上のサーバ装置が有するディスク装置等に格納しておき、例えば、搬送波に重畳させて、コンピュータにダウンロードするようにしてもよい。また、通信ネットワークを介してプログラムを転送しながら起動実行することによっても、上述の処理を達成することができる。さらに、プログラムの全部又は一部をサーバ装置上で実行させ、その処理に関する情報をコンピュータが通信ネットワークを介して送受信しながらプログラムを実行することによっても、上述の処理を達成することができる。
 なお、上述の機能を、OS(Operating System)が分担して実現する場合又はOSとアプリケーションとの協働により実現する場合等には、OS以外の部分のみを上記の記録媒体に格納して配布してもよく、また、コンピュータにダウンロードしてもよい。
 本発明は、広義の精神と範囲を逸脱することなく、様々な実施形態及び変形が可能である。また、上述した実施形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。
 本発明は、家庭内で使用される電力の管理を行うシステム等に好適に採用され得る。
 1 エネルギー管理システム、2 制御装置、3 操作端末、4 電力計測装置、5 給湯機、6 発電設備、7(7-1,7-2,…) 機器、8 ヒートポンプユニット、9 タンクユニット、10 配管、11 商用電源、12 分電盤、13 PVパネル、14 PV-PCS、15 ルータ、16 サーバ、20 CPU、21 通信インタフェース、22 ROM、23 RAM、24 二次記憶装置、25 バス、80 圧縮機、81 第1の熱交換器、82 膨張弁、83 第2の熱交換器、84 送風機、85a,85b 温度センサ、86 制御基板、200 ユーザインタフェース部、201 電力値取得部、202 機器制御部、203 消費電力変更要求部、D1~D5 電力線

Claims (6)

  1.  冷媒を圧縮する圧縮機と、
     前記冷媒と水との熱交換を行う熱交換器と、
     前記熱交換器からの水を貯留する貯湯タンクと、
     前記熱交換器に水を供給するポンプと、
     前記冷媒を膨張させる膨張弁と、
     目標消費電力を外部から受け付ける受付手段と、
     前記目標消費電力を受け付けると、前記目標消費電力に収まるように、前記圧縮機、前記ポンプ及び前記膨張弁をフィードフォワード制御する制御手段と、を備える、給湯機。
  2.  前記制御手段は、
     前記目標消費電力に対応する前記圧縮機、前記ポンプ及び前記膨張弁それぞれの目標制御値を決定する制御値決定手段と、
     前記圧縮機、前記ポンプ及び前記膨張弁を前記決定されたそれぞれの目標制御値で同期させて制御する同期制御手段と、をさらに備える、請求項1に記載の給湯機。
  3.  前記制御手段は、目標沸上げ温度と、前記目標消費電力と、外気温度と、前記熱交換器に供給される水の温度とをパラメータとして、前記圧縮機の駆動周波数及び前記熱交換器に供給される水の流量を推定する推定手段をさらに備え、
     前記制御値決定手段は、前記推定された駆動周波数及び水の流量に基づいて、前記圧縮機、前記ポンプ及び前記膨張弁それぞれの目標制御値を決定する、請求項2に記載の給湯機。
  4.  前記同期制御手段は、前記圧縮機、前記ポンプ及び前記膨張弁を、それぞれの制御値が前記決定した各目標制御値に除々に近づくように制御する、請求項2又は3に記載の給湯機。
  5.  前記制御値決定手段は、前記目標消費電力が、前回の目標消費電力より大きくなる方向で変更される場合よりも小さくなる方向で変更される場合に、前記圧縮機、前記ポンプ及び前記膨張弁それぞれの制御値の変更幅が大きくなるように、それぞれの目標制御値を決定する、請求項2から4の何れか1項に記載の給湯機。
  6.  制御装置と、請求項1から5の何れか1項に記載の給湯機と、を備え、
     前記制御装置は、太陽光による発電設備から出力される発電電力と、宅内の消費電力と、前記給湯機の現在の目標消費電力と、に基づいて、前記目標消費電力の変更の要否を判別し、変更を要する場合に、前記給湯機に変更後の目標消費電力を通知する、エネルギー管理システム。
PCT/JP2015/085988 2015-12-24 2015-12-24 給湯機及びエネルギー管理システム WO2017109887A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2017557580A JP6461375B2 (ja) 2015-12-24 2015-12-24 給湯機及びエネルギー管理システム
PCT/JP2015/085988 WO2017109887A1 (ja) 2015-12-24 2015-12-24 給湯機及びエネルギー管理システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/085988 WO2017109887A1 (ja) 2015-12-24 2015-12-24 給湯機及びエネルギー管理システム

Publications (1)

Publication Number Publication Date
WO2017109887A1 true WO2017109887A1 (ja) 2017-06-29

Family

ID=59090957

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/085988 WO2017109887A1 (ja) 2015-12-24 2015-12-24 給湯機及びエネルギー管理システム

Country Status (2)

Country Link
JP (1) JP6461375B2 (ja)
WO (1) WO2017109887A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005147437A (ja) * 2003-11-12 2005-06-09 Matsushita Electric Ind Co Ltd ヒートポンプ装置
JP2005147544A (ja) * 2003-11-17 2005-06-09 Matsushita Electric Ind Co Ltd ヒートポンプ給湯機
WO2012169118A1 (ja) * 2011-06-06 2012-12-13 パナソニック株式会社 ヒートポンプの運転方法及びヒートポンプシステム

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5987647B2 (ja) * 2012-11-08 2016-09-07 株式会社デンソー 給湯装置および給湯システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005147437A (ja) * 2003-11-12 2005-06-09 Matsushita Electric Ind Co Ltd ヒートポンプ装置
JP2005147544A (ja) * 2003-11-17 2005-06-09 Matsushita Electric Ind Co Ltd ヒートポンプ給湯機
WO2012169118A1 (ja) * 2011-06-06 2012-12-13 パナソニック株式会社 ヒートポンプの運転方法及びヒートポンプシステム

Also Published As

Publication number Publication date
JPWO2017109887A1 (ja) 2018-05-31
JP6461375B2 (ja) 2019-01-30

Similar Documents

Publication Publication Date Title
US9897343B2 (en) Water heating apparatus
JP6641455B2 (ja) 給湯システム及び給湯機の制御方法
CN105299824B (zh) 空气调节器及其控制方法
JP7146035B2 (ja) 給湯システム、沸き上げスケジュール作成装置、沸き上げスケジュール作成方法及びプログラム
JP6599558B2 (ja) 給湯システム、給湯機及び給湯機の制御方法
JP6630631B2 (ja) 給湯システム
JP6494798B2 (ja) 給湯機及びエネルギー管理システム
JP2014122764A (ja) 貯湯式給湯機及びソーラーシステム
WO2017090168A1 (ja) 給湯器、及び、給湯システム
JP2014202405A (ja) ヒートポンプ給湯器
JP6701312B2 (ja) 制御装置、エネルギー管理システム、給湯機制御方法及びプログラム
JP7475508B2 (ja) 給湯システム、クラウドサーバ、沸上げスケジュール管理方法及びプログラム
JP2019039577A (ja) 貯湯式給湯機、ホームシステム、及び、制御方法
JP6461375B2 (ja) 給湯機及びエネルギー管理システム
JP6719669B2 (ja) 制御装置、電力管理システム、機器の制御方法及びプログラム
JP6895766B2 (ja) 貯湯式給湯機
JP6712505B2 (ja) 熱媒加熱装置
JP6452855B2 (ja) 制御装置、給湯機制御方法及びプログラム
WO2018066037A1 (ja) 貯湯式給湯機、給湯方法及びプログラム
JP6685135B2 (ja) 給湯機
JP6701311B2 (ja) 制御装置、エネルギー管理システム、給湯機制御方法及びプログラム
WO2017009912A1 (ja) エネルギー管理装置、エネルギー管理方法、及び、プログラム
WO2020225905A1 (ja) 貯湯式給湯システム
JP2016048151A (ja) 給湯機
JP6694757B2 (ja) 給湯システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15911325

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017557580

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15911325

Country of ref document: EP

Kind code of ref document: A1