WO2017094822A1 - 油圧建設機械の制御装置 - Google Patents

油圧建設機械の制御装置 Download PDF

Info

Publication number
WO2017094822A1
WO2017094822A1 PCT/JP2016/085685 JP2016085685W WO2017094822A1 WO 2017094822 A1 WO2017094822 A1 WO 2017094822A1 JP 2016085685 W JP2016085685 W JP 2016085685W WO 2017094822 A1 WO2017094822 A1 WO 2017094822A1
Authority
WO
WIPO (PCT)
Prior art keywords
signal
horsepower
boom
hydraulic
pump
Prior art date
Application number
PCT/JP2016/085685
Other languages
English (en)
French (fr)
Inventor
秀一 森木
理優 成川
田中 宏明
坂本 博史
釣賀 靖貴
Original Assignee
日立建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立建機株式会社 filed Critical 日立建機株式会社
Priority to EP16870759.4A priority Critical patent/EP3385455B1/en
Priority to CN201680070801.2A priority patent/CN108368689B/zh
Priority to KR1020187012507A priority patent/KR102084986B1/ko
Priority to US15/780,313 priority patent/US10604914B2/en
Publication of WO2017094822A1 publication Critical patent/WO2017094822A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2232Control of flow rate; Load sensing arrangements using one or more variable displacement pumps
    • E02F9/2235Control of flow rate; Load sensing arrangements using one or more variable displacement pumps including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E02F3/437Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2004Control mechanisms, e.g. control levers
    • E02F9/2012Setting the functions of the control levers, e.g. changing assigned functions among operations levers, setting functions dependent on the operator or seat orientation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2029Controlling the position of implements in function of its load, e.g. modifying the attitude of implements in accordance to vehicle speed
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2045Guiding machines along a predetermined path
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2271Actuators and supports therefor and protection therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2296Systems with a variable displacement pump

Definitions

  • the present invention relates to a control device for a hydraulic construction machine.
  • a hydraulic construction machine includes a hydraulic actuator such as a hydraulic cylinder that drives a mounted front working device, an operating device operated by an operator, a hydraulic pump that adjusts a discharge flow rate according to an operation amount of the operating device, An internal directional control valve is driven with an operation pilot pressure corresponding to the operation amount of the operation device, and a control valve for controlling the flow rate and direction of the pressure oil supplied from the hydraulic pump to the hydraulic actuator is provided.
  • a hydraulic actuator such as a hydraulic cylinder that drives a mounted front working device, an operating device operated by an operator, a hydraulic pump that adjusts a discharge flow rate according to an operation amount of the operating device.
  • An internal directional control valve is driven with an operation pilot pressure corresponding to the operation amount of the operation device, and a control valve for controlling the flow rate and direction of the pressure oil supplied from the hydraulic pump to the hydraulic actuator is provided.
  • pump horsepower control is employed in the hydraulic construction machine to reduce the hydraulic power of the hydraulic pump by decreasing the volume (discharge flow rate) of the hydraulic pump as the discharge pressure of the hydraulic pump increases.
  • the pump horsepower control suppresses deterioration in efficiency due to an excessive load applied to the engine driving the hydraulic pump, an excessive increase in the discharge pressure of the hydraulic pump, and an increase in the leak flow rate.
  • a trajectory control device for a construction machine that always converges the front end of the front device to a target trajectory through a good trajectory that matches human feeling regardless of the operation amount of the operator (for example, patents) Reference 1).
  • the trajectory control device calculates the position and orientation of the front device based on the signal from the angle detector, and calculates the target speed vector of the front device based on the signal from the operation lever device.
  • the target speed vector is corrected so as to go to a point that has advanced a predetermined distance forward from a point on the target locus that is the shortest distance from the front end of the front device, and hydraulic pressure so as to correspond to the corrected target speed vector.
  • a target pilot pressure for driving the control valve is calculated.
  • the proportional solenoid valve is controlled to generate the calculated target pilot pressure.
  • the work machine control device for construction machines is intended to improve the position followability of the work machine operating cylinder and to ensure a predetermined finishing accuracy even when the excavation load increases in water leveling work and slope shaping work.
  • This work implement control device is designed to eliminate the error between the target position and target speed of each cylinder based on the signal from the operation lever and the actual position and speed of each cylinder based on the information obtained from the angle sensor.
  • a position follow-up feedback control system that controls the pilot pressure with a valve is configured, and the feedback gain and the feed forward gain are increased and adjusted by a look-up table according to an increase in cylinder load pressure.
  • the construction machine trajectory control device described in Patent Document 1 and the construction machine work machine control device described in Patent Document 2 ultimately have an operation pilot pressure for driving and controlling a control valve constituting the conventional construction machine. Each objective is achieved through control. For this reason, when the excavation load increases, the pump horsepower control described above acts on both to reduce the discharge flow rate of the hydraulic pump, which may reduce the drive speed of the hydraulic actuator.
  • the speed of the hydraulic actuator in particular, the speed of the arm cylinder that mainly receives the excavation load decreases, and a plurality of hydraulic actuators (for example, arm cylinders, boom cylinders) , Bucket cylinder) may deviate from the target value, and the trajectory may not be controlled as intended.
  • a plurality of hydraulic actuators for example, arm cylinders, boom cylinders
  • Bucket cylinder may deviate from the target value, and the trajectory may not be controlled as intended.
  • the present invention has been made in view of the above-described problems, and its purpose is to provide a hydraulic construction machine that can obtain a predetermined finishing accuracy even when the excavation load increases during water averaging work or slope shaping work. It is to provide a control device.
  • the present application includes a plurality of means for solving the above-described problems.
  • a hydraulic actuator a work machine including a boom, an arm, and a bucket driven by the hydraulic actuator, and the hydraulic actuator are provided.
  • a hydraulic pump that supplies pressure oil
  • a pump flow rate control unit that controls the discharge flow rate of the hydraulic pump
  • a pump horsepower control unit that controls the horsepower of the hydraulic pump
  • a construction target surface on which the work machine works and the work
  • the pump flow rate control unit decreases the discharge flow rate as the target surface distance decreases.
  • the pump horsepower control unit performs control to increase the horsepower of the hydraulic pump.
  • the pump horsepower is corrected and controlled according to the distance between the work machine and the construction target surface, when the work machine excavates at a position close to the construction target surface, it is predetermined even if the excavation load increases.
  • the finishing accuracy can be obtained.
  • FIG. 1 is a perspective view showing a hydraulic excavator provided with a first embodiment of a control device for a hydraulic construction machine according to the present invention.
  • the excavator includes a lower traveling body 9, an upper swing body 10, and a work machine 15.
  • the lower traveling body 9 has left and right crawler traveling devices and is driven by left and right traveling hydraulic motors 3b and 3a (only the left side 3b is shown).
  • the upper swing body 10 is mounted on the lower traveling body 9 so as to be swingable and is driven to swing by the swing hydraulic motor 4.
  • the upper swing body 10 includes an engine 14 as a prime mover and a hydraulic pump device 2 driven by the engine 14.
  • the work machine 15 is attached to the front part of the upper swing body 10 so as to be able to be lifted.
  • the upper swing body 10 is provided with a driver's cab.
  • the right operating lever device 1a for traveling, the left operating lever device 1b for traveling, the right operating lever device 1c for instructing the operation and turning operation of the work implement 15 are provided.
  • An operation device such as the left operation lever device 1d is disposed.
  • the work machine 15 has an articulated structure including a boom 11, an arm 12, and a bucket 8, and the boom 11 is rotated up and down with respect to the upper swing body 10 by expansion and contraction of the boom cylinder 5.
  • the bucket 8 pivots up and down and back and forth with respect to the boom 11 by expansion and contraction, and the bucket 8 rotates up and down and front and back with respect to the arm 12 by expansion and contraction of the bucket cylinder 7.
  • an angle detector 13a that is provided in the vicinity of the connecting portion between the upper swing body 10 and the boom 11 and detects the angle of the boom 11 with respect to the horizontal plane, the boom 11 and the arm 12, And an angle detector 13b that detects the angle of the arm 12 and an angle detector 13c that is provided in the vicinity of the arm 12 and the bucket 8 and detects the angle of the bucket 8.
  • the angle signals detected by these angle detectors 13a to 13c are input to the main controller 100 described later.
  • the control valve 20 is a flow of pressure oil (flow rate and direction) supplied from the hydraulic pump device 2 to each of the hydraulic actuators such as the boom cylinder 5, the arm cylinder 6, the bucket cylinder 7 and the left and right traveling hydraulic motors 3b and 3a. ).
  • FIG. 2 is a configuration diagram showing a hydraulic drive device for a hydraulic construction machine provided with an embodiment of a control device for a hydraulic construction machine provided with an embodiment of a control device for a hydraulic construction machine according to the present invention.
  • the hydraulic actuator includes only the boom cylinder 5 and the arm cylinder 6, and a main relief valve, a load check valve, and a return circuit that are not directly related to the embodiment of the present invention. Illustration and description of the drain circuit and the like are omitted.
  • the hydraulic drive device includes a hydraulic pump device 2, a boom cylinder 5, an arm cylinder 6, a right operation lever device 1c, a left operation lever device 1d, a control valve 20, a main controller 100, information And a controller 200.
  • the hydraulic pump device 2 includes a first hydraulic pump 21 and a second hydraulic pump 22.
  • the first hydraulic pump 21 and the second hydraulic pump 22 are driven by the engine 14 and discharge pressure oil to the first pump line L1 and the second pump line L2, respectively.
  • the first hydraulic pump 21 and the second hydraulic pump 22 are variable displacement hydraulic pumps, and are respectively provided with a first regulator 27 and a second regulator 28, and these regulators 27, 28 use the first hydraulic pump 21 and the second hydraulic pump 22.
  • the tilt position of the swash plate which is a capacity variable mechanism of the hydraulic pump 22, is controlled to control the pump discharge flow rate.
  • the first regulator 27 and the second regulator 28 are positively tilted by pilot pressure oil supplied via electromagnetic proportional valves 27a and 28a, respectively.
  • the first regulator 27 and the second regulator 28 are fed back with the discharge pressure of the first hydraulic pump 21 and the discharge pressure of the second hydraulic pump 22, respectively, and are supplied via the discharge pressure and the electromagnetic proportional valves 27b and 28b.
  • the absorption horsepower of these hydraulic pumps is controlled by the pilot pressure oil. This horsepower control is to control the hydraulic pump tilt so that the load determined by the hydraulic pump discharge pressure and the hydraulic pump tilt does not exceed the engine output.
  • the control valve 20 includes two pump lines including a first pump line L1 and a second pump line L2.
  • a boom one-way control valve 23 and an arm two-way control valve 26 are connected to the first pump line L1, and the pressure oil discharged from the first hydraulic pump 21 is supplied to the boom cylinder 5 and the arm cylinder 6.
  • the arm 1 direction control valve 25 and the boom 2 direction control valve 24 are connected to the second pump line L2, and the pressure oil discharged from the second hydraulic pump 22 is sent to the arm cylinder 6 and the boom cylinder 5. Supplied.
  • the boom one-way control valve 23 is driven and operated by pilot pressure oil supplied to the operation unit via the electromagnetic proportional valves 23a and 23b.
  • the boom two-way control valve 24 passes through electromagnetic proportional valves 24a and 24b
  • the arm one-way control valve 25 passes through electromagnetic proportional valves 25a and 25b
  • the arm two-way control valve 26 passes through electromagnetic proportional valves 26a and 26b, respectively.
  • pilot pressure oil is supplied to the operation portion of each valve to drive and operate.
  • These electromagnetic proportional valves 23a to 28b use the pilot pressure oil supplied from the pilot hydraulic power source 29 as a base pressure, and reduce the secondary pilot pressure oil that has been reduced according to the command current from the main controller 100 to each direction control valve 23. To 26 and the regulators 27 and 28.
  • the right operation lever device 1c outputs a voltage signal to the main controller 100 as a boom operation signal and a bucket operation signal according to the operation amount and operation direction of the operation lever.
  • the left operation lever device 1d outputs a voltage signal to the main controller 100 as a turning operation signal and an arm operation signal according to the operation amount and operation direction of the operation lever.
  • the main controller 100 includes a dial signal from the engine control dial 31, a boom operation amount signal transmitted from the right operation lever device 1c, an arm operation amount signal transmitted from the right operation lever device 1c, and a mode setting switch 32 as a setting device.
  • Mode setting signal transmitted from the same a horsepower adjustment signal transmitted from the horsepower adjustment dial 33 as a setting device, a construction target surface position signal transmitted from the information controller 200, and from angle detectors 13a and 13b as position acquisition means
  • the transmitted boom angle signal and arm angle signal are input, and in response to these input signals, an engine speed command is transmitted to an engine controller (not shown) that controls the engine 14, and the electromagnetic proportional valves 23a to 28b.
  • a command signal for driving is output to each.
  • the description thereof is omitted.
  • the engine control dial 31, the mode setting switch 32, and the horsepower adjustment dial 33 are arranged in the cab.
  • the mode setting switch 32 can select which one of energy saving and speed followability is prioritized in the operation of the hydraulic construction machine.
  • the mode setting switch 32 can be selected from, for example, 1: normal mode, 2: horsepower up mode, 3 : Trajectory control mode, 4: Increased horsepower + Trajectory control mode can be selected.
  • the horsepower adjustment dial 33 which will be described in detail later, allows the calculated target horsepower signal to be further adjusted.
  • FIG. 3 is a conceptual diagram showing the configuration of a main controller constituting one embodiment of a control apparatus for a hydraulic construction machine according to the present invention
  • FIG. 4 is a main diagram constituting one embodiment of the control apparatus for a hydraulic construction machine according to the present invention. It is a control block diagram which shows an example of the calculation content of the target speed correction
  • the main controller 100 includes a target engine speed calculation unit 110, a target speed calculation unit 120, a hydraulic pressure control unit 130, a work implement position acquisition unit 140, a target surface distance acquisition unit 150, And a target speed correction unit 170.
  • the target engine speed calculation unit 110 receives a dial signal from the engine control dial 31, calculates a target engine speed corresponding to the input signal, and sends the target engine speed to the target speed calculation unit 120 and the hydraulic control unit 130. Is output.
  • the target speed calculation unit 120 inputs a boom operation amount signal from the right operation lever device 1c, an arm operation amount signal from the left operation lever device 1d, and a target engine rotation number signal from the target engine rotation number calculation unit 110. Then, the boom target speed and the arm target speed are calculated according to the input signal and output to the target speed correction unit 170.
  • the boom target speed increases in the positive direction as the boom operation amount increases in the boom raising direction
  • the boom target speed increases in the negative direction as the boom operation amount increases in the boom lowering direction.
  • the arm target speed increases in the positive direction as the arm operation amount increases in the arm cloud direction
  • the arm target speed increases in the negative direction as the arm operation amount increases in the arm dump direction.
  • the work machine position acquisition unit 140 receives the boom angle signal and the arm angle signal from the angle detectors 13a and 13b, and uses the geometric information of the boom 11 and the arm 12 that is set in advance according to the input signal. 8 is calculated and output to the target surface distance acquisition unit 150 as a work implement position signal.
  • the work machine position is calculated as one point of a coordinate system fixed to the hydraulic construction machine, for example.
  • the work machine position is not limited to this, and may be calculated as a plurality of point groups in consideration of the shape of the work machine 15. Moreover, you may perform the calculation similar to the locus
  • the target surface distance acquisition unit 150 inputs the construction target surface position signal transmitted from the information controller 200 and the work machine position signal from the work machine position acquisition unit 140, and the work machine 15 and the construction work based on the input signal.
  • a distance to the target surface (hereinafter referred to as a target surface distance) is calculated and output to the hydraulic pressure control unit 130 and the target speed correction unit 170.
  • the construction target surface position is given as, for example, two points in a coordinate system fixed to the hydraulic construction machine.
  • the construction target surface position is not limited to this, but may be given as two points in the global coordinate system. In this case, it is necessary to perform coordinate conversion to the same coordinate system as the work machine position.
  • the target surface distance acquisition part 150 outputs a target surface distance as 0, when a construction target surface position signal is not transmitted from the information controller 200.
  • the target speed correction unit 170 receives a mode setting signal transmitted from the mode setting switch 32, a boom target speed signal and arm target speed signal from the target speed calculation unit 120, and a target surface distance signal from the target surface distance acquisition unit 150. , The corrected boom target speed signal obtained by correcting the target speed signal and the arm target speed signal are calculated and output to the hydraulic pressure control unit 130. Details of the calculation performed by the target speed correction unit 170 will be described later.
  • the hydraulic pressure control unit 130 receives a mode setting signal transmitted from the mode setting switch 32, a target engine speed signal from the target engine speed calculation unit 110, a corrected boom target speed signal from the target speed correction unit 170, The corrected arm target speed signal, the target surface distance signal from the target surface distance acquisition unit 150, the boom angle signal with respect to the horizontal plane from the angle detector 13a, and the horsepower adjustment signal from the horsepower adjustment dial 33 are input.
  • boom 1 direction control valve raising drive signal Based on the input signal, boom 1 direction control valve raising drive signal, boom 1 direction control valve lowering drive signal, boom 2 direction control valve raising drive signal, boom 2 direction control valve lowering drive signal, arm 1 direction control valve lowering drive signal, Arm 1 direction control valve dump drive signal, Arm 2 direction control valve cloud drive signal, Arm 2 direction control valve dump drive signal, Pump 1 flow rate
  • the control signal, the pump 1 horsepower control signal, the pump 2 flow rate control signal, and the pump 2 horsepower control signal are calculated, and the electromagnetic proportional valves 23a, 23b, 24a, 24b, 25a, 25b, 26a, 26b, 27a corresponding to the respective signals are calculated.
  • 27b, 28a, and 28b are output.
  • the target speed correction unit 170 includes a boom speed correction value table 171, a conditional connector 172, an adder 173, an arm speed limit value table 174, a conditional connector 175, and a limiter 176.
  • the boom speed correction value table 171 inputs a target surface distance signal, calculates a boom speed correction value signal corresponding to the target surface distance signal, and outputs it to the conditional connector 172 using a preset table.
  • Conditional connector 172 switches the connector on condition of a mode setting signal transmitted from mode setting switch 32, and an input signal is output when in a connected state. Specifically, when the mode setting is 3: trajectory control mode or 4: horsepower up + trajectory control mode, the connecting device is set in the connected state, and the boom speed correction value signal is output to the adder 173.
  • the adder 173 inputs the boom speed correction value signal and the uncorrected boom target speed signal, and outputs the added value as the corrected boom target speed.
  • the boom speed correction value table 171 is set such that the target surface distance is 0 or less and the boom speed correction value is positive. As a result, since the boom raising speed is increased when the work machine 15 tries to enter the construction target surface deeply, the work machine 15 can be prevented from entering the construction target surface too deeply.
  • the boom target speed may be corrected by the vector direction correction described in Patent Document 1.
  • the arm speed limit value table 174 inputs a target surface distance signal, calculates an arm speed limit value signal corresponding to the target surface distance signal according to a preset table, and outputs it to the conditional connector 175.
  • Conditional connector 175 switches the connector on the condition of the mode setting signal transmitted from mode setting switch 32, and an input signal is output when in the connected state. Specifically, when the mode setting is 3: trajectory control mode or 4: horsepower up + trajectory control mode, the connection speed is set to the connected state, and the arm speed limit value signal is output to the limiter 176.
  • the limiter 176 receives the arm speed limit value signal and the arm target speed signal before correction, performs limit correction so that the absolute value of the arm target speed signal before correction is equal to or less than the arm speed limit value, and the corrected arm Output as the target speed.
  • the arm speed limit value table 174 is such that the target surface distance is B or more and the arm speed limit value is the maximum speed of the arm cloud (or arm dump), and the target surface distance is A or less and the arm speed limit value is the minimum value.
  • the target surface distance A is an index for determining that finishing accuracy has the highest priority over work speed and work efficiency, and is desirably set to a distance greater than the work accuracy required for work.
  • the target surface distance B is an index for determining the intervention of the trajectory control of the work machine 15, and is set based on the time until the work machine 15 reaches the construction target surface by the arm operation. For example, it is set to be equal to or greater than the distance obtained by multiplying the maximum speed of the work machine 15 by the arm cloud by the control cycle of the main controller 100. As a result, the arm speed is limited in the vicinity of the construction target surface, and the trajectory of the work implement 15 can be easily controlled.
  • FIG. 5 is a conceptual diagram showing a configuration of a hydraulic control unit of a main controller constituting one embodiment of a control apparatus for a hydraulic construction machine according to the present invention
  • FIG. 6 is an embodiment of a control apparatus for a hydraulic construction machine according to the present invention
  • FIG. 7 is a control block diagram showing an example of the calculation contents of the directional control valve control unit of the main controller constituting the control system
  • FIG. 7 is a diagram showing the distribution rate calculation unit of the main controller constituting one embodiment of the control device for the hydraulic construction machine of the present invention.
  • FIG. 8 is a control block diagram showing an example of the calculation contents of the pump flow rate control unit of the main controller constituting one embodiment of the control device for the hydraulic construction machine of the present invention.
  • These are control block diagrams which show an example of the calculation content of the pump horsepower control part of the main controller which comprises one Embodiment of the control apparatus of the hydraulic construction machine of this invention.
  • the hydraulic control unit 130 of the main controller 100 includes a target flow rate calculation unit 131, a directional control valve control unit 132, a distribution rate calculation unit 133, a pump flow rate control unit 134, and a pump horsepower control unit. 135.
  • the target flow rate calculation unit 131 receives the corrected boom target speed signal and the corrected arm target speed signal from the target speed correction unit 170, and applies the effective area of the boom cylinder 5 to the corrected boom target speed signal to raise the boom.
  • a target flow rate signal and a boom lowering target flow rate signal are calculated.
  • the corrected boom target speed signal is positive, only the boom raising target flow signal is calculated, and when the boom target speed signal is negative, only the boom lowering target flow signal is calculated.
  • the arm cloud target flow rate signal and the arm dump target flow rate signal are calculated by multiplying the corrected arm target speed signal by the effective area of the arm cylinder 6.
  • the arm target speed signal is positive, only the arm cloud target flow signal is calculated, and when the arm target speed signal is negative, only the arm dump target flow signal is calculated.
  • the direction control valve control unit 132 inputs the boom raising target flow signal, the boom lowering target flow signal, the arm cloud target flow signal, and the arm dump target flow signal from the target flow calculation unit 131, and the boom 1 direction control valve 23, Drive signals for the boom two-way control valve 24, the arm one-way control valve 25, and the arm two-way control valve 26 are calculated.
  • An example of calculation performed by the directional control valve control unit 132 will be described with reference to FIG. In any of the operations of raising the boom, lowering the boom, arm crowding, and arm dumping, the calculation means are similar. Therefore, only the raising of the boom will be described here, and the description of the other operations will be omitted.
  • the direction control valve control unit 132 includes a boom 1 direction control valve raising drive signal table 1321, a boom 2 direction control valve raising drive signal table 1322, a maximum value selector 1323, a boom 2 direction control valve raising drive limit table 1324, and a minimum value selection. And a container 1325.
  • the boom one-way control valve raising drive signal table 1321 and the boom two-way control valve raising drive signal table 1322 are input with the boost target flow rate signal calculated by the target flow rate calculation unit 131, and are set according to a preset table.
  • a boom 1 direction control valve raising drive signal and a boom 2 direction control valve raising drive signal corresponding to the flow rate signal are calculated. From the boom 1 direction control valve raising drive signal table 1321, a drive signal is output to the electromagnetic proportional valve 23a.
  • the maximum value selector 1323 receives the arm cloud target flow rate signal and the arm dump target flow rate signal calculated by the target flow rate calculation unit 131, selects either maximum value, and controls the boom two-way control valve raising drive restriction table 1324. Output to.
  • the boom two-way control valve raising drive restriction table 1324 calculates a boom two-way control valve raising drive restriction signal in accordance with the input arm target flow rate signal and outputs it to the minimum value selector 1325 according to a preset table.
  • the minimum value selector 1325 includes a boom two-way control valve raising drive signal calculated by the boom two-way control valve raising drive signal table 1322 and a boom two-way control valve raising calculated by the boom two-way control valve raising drive restriction table 1324.
  • the boom two-way control valve raising drive signal is limited to be equal to or less than the boom two-way control valve raising drive limit value.
  • a drive signal is output from the minimum value selector 1325 to the electromagnetic proportional valve 24a.
  • the calculation is performed for the boom lowering and the arm crowding and the arm dumping in the same manner as described above. For example, when the arm crowding and the boom raising are performed, the minimum value selector 1325 The arm two-way control valve raising drive signal is output to the electromagnetic proportional valve 26a. As a result, the arm two-way control valve 26 remains closed, and pressure oil is supplied to the arm cylinder 6 only from the second hydraulic pump 22.
  • the distribution ratio calculation unit 133 is configured to output the boom two-way control valve raising drive signal, the boom two-way control valve lowering drive signal, the arm two-way control valve cloud driving signal, and the arm two-way from the direction control valve control unit 132.
  • the control valve dump drive signal is input, the boom 1 distribution ratio signal, the boom 2 distribution ratio signal, the arm 1 distribution ratio signal, and the arm 2 distribution ratio signal are calculated, and these signals are used as the pump flow rate control unit 134 and the pump horsepower.
  • An example of the calculation performed by the distribution rate calculation unit 133 will be described with reference to FIG. In addition, since the calculation method is similar in both the boom and the arm, only the boom is described here, and the description for the arm is omitted.
  • the distribution rate calculation unit 133 includes a maximum value selector 1331, a boom distribution rate table 1332, and a subtracter 1333.
  • the maximum value selector 1331 receives the boom two-way control valve raising drive signal and the boom two-way control valve lowering drive signal calculated by the direction control flight control unit 132, selects either maximum value, and selects the boom distribution rate. Output to the table 1332.
  • the distribution rate table 1332 calculates the boom 2 distribution rate according to the input drive signal according to a preset table, and outputs it to the subtracter 1333, the pump flow rate control unit 134, and the pump horsepower control unit 135.
  • the subtracter 1333 receives the fixed value 100% signal and the boom 2 distribution rate signal, and subtracts the boom 2 distribution rate signal from the fixed value 100% signal as the boom 1 distribution rate signal, and the pump flow rate control unit 134 and the pump. Output to the horsepower controller 135.
  • the pump flow rate control unit 134 includes a boom raising target flow rate signal, a boom lowering target flow rate signal, an arm cloud target flow rate signal, an arm dump target flow rate signal, and a target engine speed calculation unit from the target flow rate calculation unit 131.
  • the target engine speed signal from 110, the boom 1 distribution rate signal, the boom 2 distribution rate signal, the arm 1 distribution rate signal, and the arm 2 distribution rate signal from the distribution rate calculation unit 133 are input, and the pump 1 flow rate control signal And the pump 2 flow rate control signal are calculated, and the first proportional regulator 27 and the second regulator 28 are controlled by driving the electromagnetic proportional valves 27a and 28a for positive tilt control.
  • An example of calculation performed by the pump flow rate control unit 134 will be described with reference to FIG.
  • the pump flow rate control unit 134 includes a maximum value selector 1341a, a first multiplier 1342a, a second multiplier 1343a, a first adder 1344a, a first divider 1345a, and a pump 1 flow rate control signal table 1346a.
  • the pump flow rate control unit 134 includes a maximum value selector 1341b, a third multiplier 1342b, a fourth multiplier 1343b, a second adder 1344b, a second divider 1345b, and a pump 2 flow rate control signal table 1346b. Yes.
  • the maximum value selector 1341a receives the boom raising target flow rate signal and the boom lowering target flow rate signal, selects one of the maximum values, and outputs the selected maximum value to the first multiplier 1342a and the second multiplier 1343a.
  • the first multiplier 1342a multiplies the boom 1 distribution ratio signal and the boom target flow rate signal, calculates the boom 1 target flow rate signal, and outputs it to the first adder 1344a.
  • the second multiplier 1343a multiplies the boom 2 distribution ratio signal and the boom target flow rate signal, calculates the boom 2 target flow rate signal, and outputs it to the second adder 1344b.
  • the maximum value selector 1341b receives the arm cloud target flow rate signal and the arm dump target flow rate signal, selects one of the maximum values, and outputs it to the third multiplier 1342b and the fourth multiplier 1343b.
  • the third multiplier 1342b multiplies the arm 2 distribution ratio signal by the arm target flow rate signal, calculates the arm 2 target flow rate signal, and outputs it to the first adder 1344a.
  • the fourth multiplier 1343b multiplies the arm 1 distribution ratio signal by the arm target flow rate signal, calculates the arm 1 target flow rate signal, and outputs it to the second adder 1344b.
  • the first adder 1344a adds the boom 1 target flow rate signal and the arm 2 target flow rate signal to calculate the pump 1 target flow rate signal, and outputs it to the first divider 1345a.
  • the first divider 1345a calculates the flow rate signal by dividing the pump 1 target flow rate signal by the input target engine speed signal and outputs it to the pump 1 flow rate control signal table 1346a.
  • the pump 1 flow rate control signal table 1346a calculates a pump 1 flow rate control signal corresponding to the input flow rate signal according to a preset table, and drives the electromagnetic proportional valve 27a for positive tilt control.
  • the second adder 1344b adds the arm 1 target flow rate signal and the boom 2 target flow rate signal to calculate the pump 2 target flow rate signal, and outputs it to the second divider 1345b.
  • the second divider 1345b divides the pump 2 target flow rate signal by the input target engine speed signal to calculate the flow rate signal and outputs it to the pump 2 flow rate control signal table 1346b.
  • the pump 2 flow rate control signal table 1346b calculates a pump 2 flow rate control signal corresponding to the input flow rate signal according to a preset table, and drives the electromagnetic proportional valve 28a for positive tilt control.
  • the boom 1 distribution ratio and the arm 1 distribution ratio are approximately 100%, and the boom 2 distribution ratio and the arm 2 distribution ratio are approximately 0%.
  • the target flow rate of the boom is supplied from the first hydraulic pump 21, and the target flow rate of the arm is supplied from the second hydraulic pump 22.
  • the pump horsepower control unit 135 includes a boom target speed signal and an arm target speed signal from the target speed correction unit 170, a target surface distance signal from the target surface distance acquisition unit 150, and an angle detector 13 a.
  • the arm 1 distribution ratio signal and the arm 2 distribution ratio signal are input, the pump 1 horsepower control signal and the pump 2 horsepower control signal are calculated, and the electromagnetic proportional valves 27b and 28b for horsepower control are driven to drive the first regulator 27. And the second regulator 28 is controlled.
  • An example of calculation performed by the pump horsepower control unit 135 will be described with reference to FIG.
  • the pump horsepower controller 135 includes a boom raising target horsepower table 1351a, a boom lowering target horsepower table 1351b, a maximum value selector 1352a, a boom maximum horsepower ratio table 1353, a first multiplier 1354, and a signal generator 1355 in which a maximum horsepower signal is set.
  • the pump horsepower control unit 135 includes an arm cloud target horsepower table 1351c, an arm dump target horsepower table 1351d, a maximum value selector 1352b, a second minimum value selector 1356b, a fourth multiplier 1358c, a fifth multiplier 1358d, 2 adder 1359b and pump 2 horsepower control signal table 135Ab.
  • the boom raising target horsepower table 1351a receives a horsepower adjustment signal, a boom target speed signal, and a mode setting signal, calculates a boom raising target horsepower signal corresponding to the boom target speed signal by a preset table, and selects a maximum value selector. Output to 1352a.
  • the boom lowering target horsepower table 1351b receives the boom target speed signal, calculates a boom lowering target horsepower signal corresponding to the boom target speed signal, and outputs it to the maximum value selector 1352a.
  • the maximum value selector 1352a selects any one of the input signals and outputs it as a boom target horsepower signal to the first minimum value selector 1356a.
  • the arm cloud target horsepower signal and the arm dump target horsepower signal are calculated from the arm target speed signal using the arm cloud target horsepower table 1351c and the arm dump target horsepower table 1351d, respectively, and the maximum value selector 1352b selects the maximum value. And output to the second minimum value selector 1356b as an arm target horsepower signal.
  • the boom raising target horsepower table 1351a, the arm cloud target horsepower table 1351c, and the arm dump target horsepower table 1351d are the targets calculated from the target speed signal according to the horsepower adjustment signal (or mode setting) and the target surface distance.
  • the horsepower signal is corrected and output. Details of the target horsepower correction method performed in accordance with the horsepower adjustment signal (or mode setting) and the target surface distance signal will be described later.
  • the boom maximum horsepower ratio table 1353 receives a boom angle signal with respect to a horizontal plane, calculates a boom maximum horsepower ratio signal according to the boom angle signal, and outputs the boom maximum signal to the first multiplier 1354.
  • the first multiplier 1354 multiplies the signal from the signal generator 1355, which sets the maximum horsepower supplied from the hydraulic pump, with the boom maximum horsepower ratio signal to calculate the boom maximum horsepower signal, and the first minimum value selector 1356a. Output to.
  • the first minimum value selector 1356a corrects the boom target horsepower, which is an input signal, to be equal to or less than the boom maximum horsepower signal and outputs the corrected signal to the subtracter 1357, the second multiplier 1358a, and the third multiplier 1358b.
  • the subtracter 1357 subtracts the corrected boom target horsepower signal from the signal of the signal generator 1355 in which the maximum horsepower is set, and outputs this to the second minimum value selector 1356b as the arm maximum horsepower signal.
  • the second minimum value selector 1356b corrects the arm target horsepower signal, which is an input signal, to be equal to or lower than the arm maximum horsepower signal, and outputs it to the fourth multiplier 1358c and the fifth multiplier 1358d.
  • the boom maximum horsepower ratio table 1353 is set so that the boom maximum horsepower ratio signal increases as the boom angle signal relative to the horizontal plane decreases. For this reason, when the boom angle (and boom cylinder stroke) is small and the excavation reaction force acts in a direction that prevents the boom from being raised as in the case of the slope up operation, the horsepower can be preferentially distributed to the boom. When the boom angle (and boom cylinder stroke) is large and the excavation reaction force acts in the direction of promoting the boom raising as in the case of the slope down operation, the horsepower can be preferentially distributed to the arm. .
  • the second multiplier 1358a multiplies the boom 1 distribution ratio signal and the boom target horsepower signal to calculate the boom 1 target horsepower and outputs it to the first adder 1359a.
  • the third multiplier 1358b calculates the boom 2 target horsepower by multiplying the boom 2 distribution ratio signal and the boom target horsepower signal, and outputs them to the second adder 1359b.
  • the fourth multiplier 1358c multiplies the arm 2 distribution ratio signal and the arm target horsepower signal to calculate the arm 2 target horsepower signal and outputs the arm 2 target horsepower signal to the first adder 1359a.
  • the fifth multiplier 1358d calculates the arm 1 target horsepower signal by multiplying the arm 1 distribution ratio signal by the arm target horsepower signal, and outputs it to the second adder 1359b.
  • the first adder 1359a adds the boom 1 target horsepower signal and the arm 2 target horsepower signal, calculates the pump 1 target horsepower signal, and outputs it to the pump 1 horsepower control signal table 135Aa.
  • the second adder 1359b adds the arm 1 target horsepower signal and the boom 2 target horsepower signal to calculate the pump 2 target horsepower signal, and outputs it to the pump 2 horsepower control signal table 135Ab.
  • the pump 1 horsepower control signal table 135Aa calculates a pump 1 horsepower control signal corresponding to the input pump 1 target horsepower signal according to a preset table, and drives the electromagnetic proportional valve 27b for horsepower control.
  • the pump 2 horsepower control signal table 135Ab calculates a pump 2 horsepower control signal corresponding to the input pump 2 target horsepower signal according to a preset table, and drives the electromagnetic proportional valve 28b for horsepower control.
  • FIG. 10 is a control block diagram showing an example of calculation contents of the boom raising target horsepower table of the main controller constituting one embodiment of the control apparatus for the hydraulic construction machine of the present invention
  • FIG. 11 is a control of the hydraulic construction machine of the present invention. It is a control block diagram which shows the other example of the calculation content of the boom raising target horsepower table of the main controller which comprises one embodiment of an apparatus.
  • FIG. 10 illustrates a target horsepower correction method according to the horsepower adjustment signal and the target surface distance signal.
  • the boom raising target horsepower table 1351a includes a boom raising target horsepower table 1361, a boom raising increase horsepower table 1362, a horsepower increase coefficient table 1363, a multiplier 1364, an adder 1366, and a variable gain multiplier 1367. .
  • the boom raising target horsepower table 1361 receives the boom target speed signal, calculates a boom raising target horsepower signal according to the boom target speed signal, and outputs the boom raising target horsepower signal to the adder 1366.
  • the boom raising increase horsepower table 1362 receives a boom target speed signal, calculates a boom raising increase horsepower signal according to the boom target speed signal, and outputs the boom raising horsepower signal to the multiplier 1364.
  • the horsepower increase coefficient table 1363 receives a target surface distance signal, calculates a horsepower increase coefficient signal corresponding to the target surface distance signal, and outputs the signal to the multiplier 1364 according to a preset table.
  • the multiplier 1364 multiplies the boom raising increase horsepower signal and the horsepower increase coefficient signal to calculate a boom horsepower correction value signal and outputs it to the variable gain multiplier 1367.
  • the variable gain multiplier 1367 receives the horsepower adjustment signal and the boom horsepower correction value signal and inputs a correction signal obtained by multiplying the boom horsepower correction value signal by a horsepower adjustment gain of 0 to 1 according to the horsepower adjustment signal to the adder 1366. Output.
  • the adder 1366 adds the uncorrected boom raising target horsepower signal and the correction value signal, and outputs the result to the maximum value selector 1352a as a new boom raising target horsepower signal.
  • the horsepower increase coefficient table 1363 increases the horsepower increase coefficient signal when the target surface distance signal is equal to or less than the target surface distance B, so that the horsepower increase coefficient signal becomes the maximum value when the target surface distance signal is the target surface distance A. Is set. As a result, the target horsepower signal is enlarged and corrected more greatly as the target surface distance signal becomes smaller.
  • target surface distance A it is desirable to set to the distance more than the construction precision requested
  • the target surface distance B is set based on the time until the work machine 15 reaches the construction target surface by the arm operation. For example, the maximum speed of the work machine 15 by the arm cloud is set. The value is set to be equal to or larger than the distance obtained by multiplying the value by the control cycle of the main controller 100.
  • the increase horsepower table 1362 becomes smaller as the target speed signal becomes larger so that the corrected boom target horsepower signal monotonously increases with respect to the target speed signal even when the horsepower increase coefficient signal becomes the maximum value. Is set to However, when the target speed is 0, the boom target horsepower signal is set to 0, and at least when the target speed signal is 0, the boom raising increase horsepower signal is also set to 0.
  • the boom horsepower correction value signal is output to the connector 1365 instead of the variable gain multiplier 1367.
  • the connector 1365 inputs the boom horsepower correction value signal and the mode setting signal and sets the connector to the connected state only when the mode setting signal is 2: horsepower up mode or 4: horsepower up + trajectory control mode.
  • the boom horsepower correction value signal is output to the adder 1366.
  • the adder 1366 adds the boom raising target horsepower signal and the boom horsepower correction value signal before correction when the mode setting signal is 2: horsepower up mode or 4: horsepower up + trajectory control mode, and a new boom is added. For example, it is output to the maximum value selector 1352a as the target horsepower signal to be raised.
  • the horsepower increase coefficient table 1363 is used. Output signal is 0, and the boom horsepower correction value signal, which is the output of the multiplier 1364, is 0. Therefore, energy saving performance equivalent to that of the prior art can be obtained.
  • the boom horsepower correction value signal which is the output of the multiplier 1364, is added, so that only the pump horsepower signal is corrected to increase. . Thereby, even if the excavation load increases, a predetermined finishing accuracy can be obtained.
  • the input of the horsepower increase coefficient table 1363 is regarded as 0, so that the boom horsepower which is the output of the multiplier 1364 is assumed. Since the correction value signal is added, only the pump horsepower signal is corrected to be increased. Thereby, even if the excavation load increases, a predetermined finishing accuracy can be obtained.
  • FIG. 12A is a characteristic diagram showing an example of time-series operations of the hydraulic construction machine according to the embodiment of the control apparatus for the hydraulic construction machine of the present invention
  • FIG. 12B is an embodiment of the control apparatus for the hydraulic construction machine of the present invention. It is a characteristic view which shows the other example of the time-sequential operation
  • FIG. 12A shows an example when the horsepower adjustment signal is minimum and the mode setting is 3: trajectory control mode
  • FIG. 12B shows the case where horsepower adjustment signal is maximum and the mode setting is 4: horsepower up + trajectory control mode.
  • An example is shown.
  • FIG. 12A shows a case where the horsepower correction of the hydraulic pump is hardly performed
  • FIG. 12B shows a case where the horsepower increase correction of the hydraulic pump is made.
  • the horizontal axis indicates time, and the vertical axis indicates (a) arm cylinder bottom pressure, (b) discharge flow rate of the second hydraulic pump, (c) arm cylinder stroke and boom cylinder stroke, (D) Each target surface distance is shown.
  • the target surface distance refers to the distance between the work machine 15 and the target construction surface.
  • Time T1 indicates the time when the bottom pressure of the arm cylinder 6 suddenly increases due to an increase in excavation load.
  • the target speed correction unit 170 adjusts the boom target speed and the arm target speed, and the target surface distance is maintained near 0 as shown in (d). .
  • FIG. 12B the same operation is performed until time T1. Even when the arm cylinder bottom pressure suddenly increases due to an increase in excavation load or the like as shown in (a) at time T1, as shown in (b), the second regulator 28 responds to the second hydraulic pressure. The discharge flow rate of the pump 22 is not greatly reduced. This is because the horsepower adjustment signal is maximum and the mode setting is 4: horsepower up + trajectory control mode, and the pump horsepower is corrected to increase in advance.
  • the pump horsepower is corrected and controlled according to the distance between the work machine 15 and the work target surface, so that the work machine 15 is close to the work target surface.
  • a predetermined finishing accuracy can be obtained even when the excavation load increases.
  • the setting device capable of selecting or adjusting which of energy saving and speed followability is prioritized is provided. Since the pump horsepower is corrected and controlled in accordance with the mode setting, when the work machine 15 excavates at a position close to the construction target surface, a predetermined finishing accuracy can be obtained even if the excavation load increases.
  • the present invention is not limited to the above-described embodiment, and includes various modifications.
  • the present invention has been described by taking the boom cylinder 5 and the arm cylinder 6 as an example, but the present invention is not limited thereto.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

水平均し作業や法面整形作業などにおいて掘削負荷が上昇しても、所定の仕上げ精度を得られる油圧建設機械の制御装置を提供する。 油圧アクチュエータと、油圧アクチュエータにより駆動する作業機と、油圧ポンプと、油圧ポンプの吐出流量を制御するポンプ流量制御部と、油圧ポンプの馬力を制御するポンプ馬力制御部と、作業機が作業する施工目標面と作業機との距離である目標面距離を計測または演算する目標面距離取得部とを備えた油圧建設機械の制御装置において、目標面距離が小さくなるほど、ポンプ流量制御部は吐出流量を小さくする制御を行い、ポンプ馬力制御部は油圧ポンプの馬力を大きくする制御を行なう。

Description

油圧建設機械の制御装置
 本発明は、油圧建設機械の制御装置に関する。
 一般に、油圧建設機械は、搭載されているフロント作業装置を駆動する油圧シリンダ等の油圧アクチュエータと、オペレータが操作する操作装置と、操作装置の操作量に応じて吐出流量を調整する油圧ポンプと、操作装置の操作量に応じた操作パイロット圧で内部の方向制御弁を駆動して、油圧ポンプから油圧アクチュエータへ供給する圧油の流量と方向を制御するコントロールバルブとを備えている。
 油圧建設機械が掘削などの作業を行うと、フロント作業装置を駆動する油圧アクチュエータの内部には、掘削反力(掘削負荷)に応じた負荷圧力が生じ、油圧ポンプの吐出圧はこの負荷圧力と油路の圧損とを加算した値になる。このため、油圧建設機械には、油圧ポンプの吐出圧が高くなるほど、油圧ポンプの容積(吐出流量)を減少させて、油圧ポンプの馬力を下げるポンプ馬力制御が採用されている。ポンプ馬力制御は、油圧ポンプを駆動するエンジンに過大な負荷がかかること、油圧ポンプの吐出圧力の過大な上昇、及びリーク流量の増大などによる効率の悪化を抑制する。
 このような油圧建設機械において、オペレータの操作量に関係なくフロント装置先端を、常に人間のフィーリングに合致した良好な軌道を経て目標軌跡に収束させる建設機械の軌跡制御装置がある(例えば、特許文献1参照)。この軌跡制御装置は、角度検出器からの信号に基づきフロント装置の位置と姿勢を演算し、操作レバー装置からの信号に基づきフロント装置の目標速度ベクトルを演算する。目標速度ベクトルは、フロント装置先端から最短距離にある目標軌跡上の点から所定の距離だけ掘削進行方向前方に進んだ点に向かうように補正され、補正された目標速度ベクトルに対応するように油圧制御弁を駆動するための目標パイロット圧が演算される。演算された目標パイロット圧を生成するように比例電磁弁を制御する。
 また、作業機作動シリンダの位置追従性を向上させ、水平均し作業や法面整形作業において掘削負荷が上昇しても所定の仕上げ精度を確保することを目的とした建設機械の作業機制御装置がある(例えば、特許文献2参照)。この作業機制御装置は、操作レバーからの信号に基づく各シリンダの目標位置及び目標速度と、角度センサから得られる情報に基づく各シリンダの実際の位置及び速度との誤差をなくすように、電磁比例弁でパイロット圧を制御する位置追従用フィードバック制御系を構成し、シリンダ負荷圧の増大に応じてルックアップテーブルにより、フィードバックゲイン及びフィードフォワードゲインを増大調整する。
特開平9-291560号公報 特開平9-228426号公報
 特許文献1に記載の建設機械の軌跡制御装置と特許文献2に記載の建設機械の作業機制御装置は、最終的には、従来の建設機械を構成するコントロールバルブを駆動制御する操作パイロット圧を制御することで、それぞれの目的を達成する。このため、掘削負荷が上昇した場合には、両者ともに、上述したポンプ馬力制御が作用し油圧ポンプの吐出流量を減少させるので、油圧アクチュエータの駆動速度を低下させる可能性が生じる。
 このことにより、特許文献1に記載の建設機械の軌跡制御装置では、油圧アクチュエータの速度、特に掘削負荷を主として受けるアームシリンダの速度が低下して、複数の油圧アクチュエータ(例えば、アームシリンダ、ブームシリンダ、バケットシリンダ)間の速度バランスが目標値と乖離し、意図した通りに軌跡を制御できなくなる可能性が生じる。例えば、ブーム上げとアームクラウドの複合操作で掘削作業を行っている場合に、掘削負荷が増加すると、この負荷は主にアームにかかるため、アームクラウド速度が低下し、ブーム上げ速度はそのままとなり、両者の速度バランスが崩れ、仕上げ精度を悪化させる。
 また、特許文献2に記載の建設機械の作業機制御装置では、シリンダ負荷圧の増大に応じて位置追従用フィードバック制御ゲインを増大調整するが、油圧ポンプの吐出流量の減少に伴う油圧アクチュエータの動作の遅れまでは、必ずしも十分に考慮されていない。このため、特に作業速度が速い場合には、土質の変化などにより生じる掘削負荷の上昇速度(変化率)に対して操作パイロット圧が増大調整されたとしても、油圧アクチュエータの動作の速度低下は回避できない。このため、水平均し作業や法面整形作業などにおいて所定の仕上げ精度を得られない可能性が生じる。
 本発明は、上記の課題に鑑みてなされたものであり、その目的は、水平均し作業や法面整形作業などにおいて掘削負荷が上昇しても、所定の仕上げ精度を得られる油圧建設機械の制御装置を提供することにある。
 上記課題を解決するために、例えば特許請求の範囲に記載の構成を採用する。本願は、上記課題を解決する手段を複数含んでいるが、その一例を挙げるならば、油圧アクチュエータと、前記油圧アクチュエータにより駆動されるブーム、アーム、及びバケットからなる作業機と、前記油圧アクチュエータへ圧油を供給する油圧ポンプと、前記油圧ポンプの吐出流量を制御するポンプ流量制御部と、前記油圧ポンプの馬力を制御するポンプ馬力制御部と、前記作業機が作業する施工目標面と前記作業機との距離である目標面距離を計測または演算する目標面距離取得部とを備えた油圧建設機械の制御装置において、前記目標面距離が小さくなるほど、前記ポンプ流量制御部は前記吐出流量を小さくする制御を行い、前記ポンプ馬力制御部は前記油圧ポンプの馬力を大きくする制御を行なうことを特徴とする。
 本発明によれば、作業機と施工目標面との距離に応じてポンプ馬力を補正制御するので、作業機が施工目標面から近い位置で掘削した場合には、掘削負荷が上昇しても所定の仕上げ精度を得られる。
本発明の油圧建設機械の制御装置の一実施の形態を備えた油圧ショベルを示す斜視図である。 本発明の油圧建設機械の制御装置の一実施の形態を備えた油圧建設機械の油圧駆動装置を示す構成図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの構成を示す概念図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの目標速度補正部の演算内容の一例を示す制御ブロック図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの油圧制御部の構成を示す概念図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの方向制御弁制御部の演算内容の一例を示す制御ブロック図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの配分率演算部の演算内容の一例を示す制御ブロック図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラのポンプ流量制御部の演算内容の一例を示す制御ブロック図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラのポンプ馬力制御部の演算内容の一例を示す制御ブロック図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラのブーム上げ目標馬力テーブルの演算内容の一例を示す制御ブロック図である。 本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラのブーム上げ目標馬力テーブルの演算内容の他の例を示す制御ブロック図である。 本発明の油圧建設機械の制御装置の一実施の形態における油圧建設機械の時系列の動作の一例示す特性図である。 本発明の油圧建設機械の制御装置の一実施の形態における油圧建設機械の時系列の動作の他の例示す特性図である。
 以下、本発明の油圧建設機械の制御装置の実施の形態を図面を用いて説明する。
図1は本発明の油圧建設機械の制御装置の第1の実施の形態を備えた油圧ショベルを示す斜視図である。図1に示すように、油圧ショベルは下部走行体9と上部旋回体10と作業機15を備えている。下部走行体9は左右のクローラ式走行装置を有し、左右の走行油圧モータ3b,3a(左側3bのみ図示)により駆動される。上部旋回体10は下部走行体9上に旋回可能に搭載され、旋回油圧モータ4により旋回駆動される。上部旋回体10には、原動機としてのエンジン14と、エンジン14により駆動される油圧ポンプ装置2とを備えている。
 作業機15は上部旋回体10の前部に俯仰可能に取り付けられている。上部旋回体10には運転室が備えられ、運転室内には走行用右操作レバー装置1a、走行用左操作レバー装置1b、作業機15の動作及び旋回動作を指示するための右操作レバー装置1c、左操作レバー装置1d等の操作装置が配置されている。
 作業機15はブーム11、アーム12、バケット8を有する多関節構造であり、ブーム11はブームシリンダ5の伸縮により上部旋回体10に対して上下方向に回動し、アーム12はアームシリンダ6の伸縮によりブーム11に対して上下及び前後方向に回動し、バケット8はバケットシリンダ7の伸縮によりアーム12に対して上下及び前後方向に回動する。
 また、作業機15の位置を算出するために、上部旋回体10とブーム11との連結部近傍に設けられ、ブーム11の水平面に対する角度を検出する角度検出器13aと、ブーム11とアーム12との連結部近傍に設けられ、アーム12の角度を検出する角度検出器13bと、アーム12とバケット8との近傍に設けられ、バケット8の角度を検出する角度検出器13cとを備えている。これらの角度検出器13a~cが検出した角度信号は、後述するメインコントローラ100に入力されている。
 コントロールバルブ20は、油圧ポンプ装置2から上述したブームシリンダ5、アームシリンダ6、バケットシリンダ7、左右の走行油圧モータ3b,3a等の油圧アクチュエータのそれぞれに供給される圧油の流れ(流量と方向)を制御するものである。
 図2は本発明の油圧建設機械の制御装置の一実施の形態を備えた油圧建設機械の制御装置の一実施の形態を備えた油圧建設機械の油圧駆動装置を示す構成図である。なお、説明の簡略化のため、油圧アクチュエータとしてブームシリンダ5とアームシリンダ6のみを備えた構成として説明し、本発明の実施の形態と直接的に関係しないメインリリーフ弁、ロードチェック弁、リターン回路、ドレーン回路等の図示と説明は省略する。
 図2において、油圧駆動装置は、油圧ポンプ装置2と、ブームシリンダ5と、アームシリンダ6と、右操作レバー装置1cと、左操作レバー装置1dと、コントロールバルブ20と、メインコントローラ100と、情報コントローラ200とを備えている。
 油圧ポンプ装置2は、第1油圧ポンプ21と第2油圧ポンプ22とを備えている。第1油圧ポンプ21と第2油圧ポンプ22は、エンジン14によって駆動され、それぞれ第1ポンプラインL1と第2ポンプラインL2に圧油を吐出する。第1油圧ポンプ21及び第2油圧ポンプ22は可変容量型の油圧ポンプであり、それぞれ第1レギュレータ27,第2レギュレータ28が備えられ、これらのレギュレータ27,28で第1油圧ポンプ21と第2油圧ポンプ22の容量可変機構である斜板の傾転位置を制御し、ポンプ吐出流量を制御する。
 第1レギュレータ27と第2レギュレータ28は、それぞれ電磁比例弁27a、28aを介して供給されるパイロット圧油によって、ポジティブ傾転制御がなされる。また、第1レギュレータ27と第2レギュレータ28には、第1油圧ポンプ21の吐出圧力と第2油圧ポンプ22の吐出圧力がそれぞれフィードバックされ、これら吐出圧力と電磁比例弁27b、28bを介して供給されるパイロット圧油によって、これらの油圧ポンプの吸収馬力が制御される。この馬力制御は、油圧ポンプ吐出圧力と油圧ポンプ傾転とで決定される負荷がエンジン出力を上回らないように油圧ポンプ傾転を制御するものである。
 コントロールバルブ20は、第1ポンプラインL1と第2ポンプラインL2からなる2系統のポンプラインから構成されている。第1ポンプラインL1にはブーム1方向制御弁23とアーム2方向制御弁26とが接続されていて、第1油圧ポンプ21が吐出した圧油は、ブームシリンダ5とアームシリンダ6へ供給される。同様に、第2ポンプラインL2にはアーム1方向制御弁25とブーム2方向制御弁24とが接続されていて、第2油圧ポンプ22が吐出した圧油は、アームシリンダ6とブームシリンダ5へ供給される。
 ブーム1方向制御弁23は、電磁比例弁23a、23bを介して操作部へ供給されるパイロット圧油によって駆動されて動作する。同様に、ブーム2方向制御弁24は電磁比例弁24a、24bを、アーム1方向制御弁25は電磁比例弁25a、25bを、アーム2方向制御弁26は電磁比例弁26a、26bを、それぞれ介して、各弁の操作部にパイロット圧油が供給されて駆動し動作する。
 これらの電磁比例弁23a~28bは、パイロット油圧源29から供給されるパイロット圧油を元圧として、メインコントローラ100からの指令電流に応じて減圧した2次パイロット圧油を、各方向制御弁23~26及び各レギュレータ27、28へ出力する。
 右操作レバー装置1cは、操作レバーの操作量と操作方向に応じて電圧信号を、ブーム操作信号、バケット操作信号としてメインコントローラ100に出力する。同様に、左操作レバー装置1dは、操作レバーの操作量と操作方向に応じて電圧信号を、旋回操作信号、アーム操作信号としてメインコントローラ100に出力する。
 メインコントローラ100は、エンジンコントロールダイヤル31からのダイヤル信号、右操作レバー装置1cから送信されるブーム操作量信号、右操作レバー装置1cから送信されるアーム操作量信号、設定装置としてのモード設定スイッチ32から送信されるモード設定信号、同じく設定装置としての馬力調整ダイヤル33から送信される馬力調整信号、情報コントローラ200から送信される施工目標面位置信号、位置取得手段である角度検出器13a、13bから送信されるブーム角度信号、アーム角度信号を入力し、これら入力信号に応じて、エンジン14を制御するエンジンコントローラ(図示せず)へエンジン回転数指令を送信するともに、各電磁比例弁23a~28bを駆動する指令信号をそれぞれへ出力する。なお、情報コントローラ200で行う演算は、本発明と直接的に関係しないため、その説明を省略する。
 なお、エンジンコントロールダイヤル31、モード設定スイッチ32、及び馬力調整ダイヤル33は、運転室内に配置されている。モード設定スイッチ32は、油圧建設機械の作業において、省エネルギ性と速度追従性のいずれを優先するかを選択可能とするものであって、例えば、1:通常モード、2:馬力アップモード、3:軌跡制御モード、4:馬力アップ+軌跡制御モードのいずれかを選択可能とする。また、馬力調整ダイヤル33は、詳細は後述するが、演算した目標馬力信号をさらに調整可能とするものである。
 次に、本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラ100について図を用いて説明する。図3は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの構成を示す概念図、図4は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの目標速度補正部の演算内容の一例を示す制御ブロック図である。
 図3に示すように、メインコントローラ100は、目標エンジン回転数演算部110と、目標速度演算部120と、油圧制御部130と、作業機位置取得部140と、目標面距離取得部150と、目標速度補正部170とを備えている。
 目標エンジン回転数演算部110は、エンジンコントロールダイヤル31からのダイヤル信号を入力し、入力信号に応じた目標エンジン回転数を演算して、目標速度演算部120と油圧制御部130へ目標エンジン回転数を出力する。
 目標速度演算部120は、右操作レバー装置1cからのブーム操作量信号と、左操作レバー装置1dからのアーム操作量信号と、目標エンジン回転数演算部110からの目標エンジン回転数信号を入力し、入力信号に応じてブーム目標速度とアーム目標速度を演算して、目標速度補正部170へ出力する。なお、ブーム操作量がブーム上げ方向に大きいほど、ブーム目標速度を正の方向に大きくし、ブーム操作量がブーム下げ方向に大きいほど、ブーム目標速度を負の方向に大きくする。同様に、アーム操作量がアームクラウド方向に大きいほど、アーム目標速度を正の方向に大きくし、アーム操作量がアームダンプ方向に大きいほど、アーム目標速度を負の方向に大きくする。
 作業機位置取得部140は、角度検出器13a、13bからのブーム角度信号とアーム角度信号を入力し、入力信号に応じて予め設定されているブーム11とアーム12の幾何学情報を用いてバケット8の先端位置を演算して、作業機位置信号として目標面距離取得部150へ出力する。ここで、作業機位置は、例えば油圧建設機械に固定された座標系の1点として演算される。ただし、作業機位置はこれに限らず、作業機15の形状を考慮した複数の点群として演算されてもよい。また、特許文献1に記載されている建設機械の軌跡制御装置と同様の演算を行ってもよい。
 目標面距離取得部150は、情報コントローラ200から送信される施工目標面位置信号と、作業機位置取得部140からの作業機位置信号とを入力し、入力信号を基に、作業機15と施工目標面との距離(以下、目標面距離という)を演算し、油圧制御部130と目標速度補正部170へ出力する。ここで施工目標面位置は、例えば油圧建設機械に固定された座標系の2点として与えられる。ただし、施工目標面位置はこれに限らず、グローバル座標系の2点として与えられてもよいが、この場合は作業機位置と同じ座標系へ座標変換を行う必要がある。また、作業機位置が点群として演算された場合は、施工目標面位置に最も近い点を用いて目標面距離を演算してもよい。また、特許文献1に記載されている建設機械の軌跡制御装置の最短距離Δhと同様の演算を行ってもよい。また、目標面距離取得部150は、情報コントローラ200から施工目標面位置信号が送信されない場合には、目標面距離を0として出力する。
 目標速度補正部170は、モード設定スイッチ32から送信されるモード設定信号と、目標速度演算部120からのブーム目標速度信号とアーム目標速度信号と、目標面距離取得部150からの目標面距離信号とを入力し、目標速度信号を補正した補正後のブーム目標速度信号とアーム目標速度信号とを演算して、油圧制御部130へ出力する。目標速度補正部170で行う演算の詳細は後述する。
 油圧制御部130は、モード設定スイッチ32から送信されるモード設定信号と、目標エンジン回転数演算部110からの目標エンジン回転数信号と、目標速度補正部170からの補正後のブーム目標速度信号と補正後のアーム目標速度信号と、目標面距離取得部150からの目標面距離信号と、角度検出器13aからの水平面に対するブーム角度信号と、馬力調整ダイヤル33からの馬力調整信号とを入力し、入力信号を基にブーム1方向制御弁上げ駆動信号、ブーム1方向制御弁下げ駆動信号、ブーム2方向制御弁上げ駆動信号、ブーム2方向制御弁下げ駆動信号、アーム1方向制御弁クラウド駆動信号、アーム1方向制御弁ダンプ駆動信号、アーム2方向制御弁クラウド駆動信号、アーム2方向制御弁ダンプ駆動信号、ポンプ1流量制御信号、ポンプ1馬力制御信号、ポンプ2流量制御信号、ポンプ2馬力制御信号を演算し、それぞれの信号に対応する電磁比例弁23a、23b、24a、24b、25a、25b、26a、26b、27a、27b、28a、28bを駆動する駆動信号を出力する。
 目標速度補正部170で行う演算の一例を図4を用いて説明する。目標速度補正部170は、ブーム速度補正値テーブル171と条件付き接続器172と加算器173とアーム速度制限値テーブル174と条件付き接続器175と制限器176とを備えている。
 ブーム速度補正値テーブル171は、目標面距離信号を入力し、予め設定したテーブルによって、目標面距離信号に応じたブーム速度補正値信号を演算し、条件付き接続器172へ出力する。条件付き接続器172は、モード設定スイッチ32から送信されるモード設定信号を条件として接続器の切換を行い、接続状態のときに、入力信号が出力される。具体的には、モード設定が3:軌跡制御モードまたは4:馬力アップ+軌跡制御モードである場合には、接続器を接続状態として、ブーム速度補正値信号を加算器173へ出力する。
 加算器173は、ブーム速度補正値信号と補正前のブーム目標速度信号とを入力し、加算した値を補正後ブーム目標速度として出力する。ブーム速度補正値テーブル171は、目標面距離が0以下でブーム速度補正値が正となるように設定されている。この結果、作業機15が施工目標面に深く入り込もうとするとブーム上げ速度が増速されるので、作業機15が施工目標面に深く入りこみ過ぎるのを防止できる。ただし、特許文献1に記載されているベクトル方向補正によりブーム目標速度を補正してもよい。
 アーム速度制限値テーブル174は、目標面距離信号を入力し、予め設定したテーブルによって、目標面距離信号に応じたアーム速度制限値信号を演算し、条件付き接続器175へ出力する。条件付き接続器175は、モード設定スイッチ32から送信されるモード設定信号を条件として接続器の切換を行い、接続状態のときに、入力信号が出力される。具体的には、モード設定が3:軌跡制御モードまたは4:馬力アップ+軌跡制御モードである場合には、接続器を接続状態として、アーム速度制限値信号を制限器176へ出力する。
 制限器176は、アーム速度制限値信号と補正前のアーム目標速度信号とを入力し、補正前のアーム目標速度信号の絶対値がアーム速度制限値以下となるように制限補正し、補正後アーム目標速度として出力する。アーム速度制限値テーブル174は、目標面距離がB以上でアーム速度制限値をアームクラウド(またはアームダンプ)の最大速度とし、目標面距離がA以下でアーム速度制限値を最小値となるように設定する。ここで、目標面距離Aは、作業速度や作業効率よりも仕上げ精度を最優先するよう判断するための指標であり、作業上要求される施工精度以上の距離に設定されることが望まれる。
 目標面距離Bは、作業機15の軌跡制御の介入を判断するための指標であり、アーム動作により作業機15が施工目標面に到達するまでの時間を基に設定する。例えばアームクラウドによる作業機15の速度の最大値にメインコントローラ100の制御周期をかけて得られる距離以上に設定する。この結果、施工目標面近傍でアーム速度が制限され、作業機15の軌跡を制御し易くなる。
 次に、油圧制御部130について図を用いて詳細説明する。図5は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの油圧制御部の構成を示す概念図、図6は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの方向制御弁制御部の演算内容の一例を示す制御ブロック図、図7は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラの配分率演算部の演算内容の一例を示す制御ブロック図、図8は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラのポンプ流量制御部の演算内容の一例を示す制御ブロック図、図9は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラのポンプ馬力制御部の演算内容の一例を示す制御ブロック図である。
 図5に示すように、メインコントローラ100の油圧制御部130は、目標流量演算部131と、方向制御弁制御部132と、配分率演算部133と、ポンプ流量制御部134と、ポンプ馬力制御部135とを備えている。
 目標流量演算部131は、目標速度補正部170からの補正後ブーム目標速度信号と補正後アーム目標速度信号とを入力し、補正後ブーム目標速度信号にブームシリンダ5の有効面積をかけてブーム上げ目標流量信号とブーム下げ目標流量信号とを演算する。補正後ブーム目標速度信号が正の場合は、ブーム上げ目標流量信号のみが演算され、ブーム目標速度信号が負の場合はブーム下げ目標流量信号のみが演算される。同様に、補正後アーム目標速度信号にアームシリンダ6の有効面積をかけてアームクラウド目標流量信号とアームダンプ目標流量信号とを演算する。アーム目標速度信号が正の場合は、アームクラウド目標流量信号のみが演算され、アーム目標速度信号が負の場合はアームダンプ目標流量信号のみが演算される。
 方向制御弁制御部132は、目標流量演算部131からのブーム上げ目標流量信号とブーム下げ目標流量信号とアームクラウド目標流量信号とアームダンプ目標流量信号とを入力し、ブーム1方向制御弁23、ブーム2方向制御弁24、アーム1方向制御弁25、アーム2方向制御弁26の駆動信号を演算する。方向制御弁制御部132で行う演算の一例を図6を用いて説明する。なお、ブーム上げ、ブーム下げ、アームクラウド、アームダンプのいずれの動作においても、演算手段は類似しているため、ここではブーム上げについてのみ説明し、その他の動作の説明を省略する。
 方向制御弁制御部132は、ブーム1方向制御弁上げ駆動信号テーブル1321とブーム2方向制御弁上げ駆動信号テーブル1322と最大値選択器1323とブーム2方向制御弁上げ駆動制限テーブル1324と最小値選択器1325とを備えている。
 ブーム1方向制御弁上げ駆動信号テーブル1321とブーム2方向制御弁上げ駆動信号テーブル1322は、目標流量演算部131で算出されたブー上げ目標流量信号を入力し、予め設定したテーブルによって、ブー上げ目標流量信号に応じたブーム1方向制御弁上げ駆動信号とブーム2方向制御弁上げ駆動信号を演算する。ブーム1方向制御弁上げ駆動信号テーブル1321からは、駆動信号が電磁比例弁23aに出力される。
 最大値選択器1323は、目標流量演算部131で算出されたアームクラウド目標流量信号とアームダンプ目標流量信号とを入力し、いずれか最大値を選択してブーム2方向制御弁上げ駆動制限テーブル1324へ出力する。ブーム2方向制御弁上げ駆動制限テーブル1324は、予め設定したテーブルによって、入力されたアーム目標流量信号に応じたブーム2方向制御弁上げ駆動制限信号を演算し、最小値選択器1325へ出力する。
 最小値選択器1325は、ブーム2方向制御弁上げ駆動信号テーブル1322で算出されたブーム2方向制御弁上げ駆動信号とブーム2方向制御弁上げ駆動制限テーブル1324で算出されたブーム2方向制御弁上げ駆動制限信号とを入力し、いずれか最小値を選択することで、ブーム2方向制御弁上げ駆動信号をブーム2方向制御弁上げ駆動制限値以下に制限する。最小値選択器1325からは、駆動信号が電磁比例弁24aに出力される。この結果、例えばブーム上げとアームクラウドとの複合が行われた場合、ブーム2方向制御弁24は閉じたままとなり、第1油圧ポンプ21からのみブームシリンダ5へ圧油が供給される。
 方向制御弁制御部132では、上述したものと同様に演算をブーム下げ、アームクラウド、アームダンプについても行うため、例えばアームクラウドとブーム上げとの複合が行われた場合、最小値選択器1325からは、アーム2方向制御弁上げ駆動信号が電磁比例弁26aに出力される。このことにより、アーム2方向制御弁26は閉じたままとなり、第2油圧ポンプ22からのみアームシリンダ6へ圧油が供給される。
 図5に戻り、配分率演算部133は、方向制御弁制御部132からのブーム2方向制御弁上げ駆動信号とブーム2方向制御弁下げ駆動信号とアーム2方向制御弁クラウド駆動信号とアーム2方向制御弁ダンプ駆動信号とを入力し、ブーム1配分率信号とブーム2配分率信号とアーム1配分率信号とアーム2配分率信号とを演算し、これらの信号をポンプ流量制御部134とポンプ馬力制御部135へ出力する。配分率演算部133で行う演算の一例を図7を用いて説明する。なお、ブーム、アームのいずれにおいても、演算方法は類似しているため、ここではブームのみを対象に説明し、アームを対象とした説明を省略する。
 配分率演算部133は、最大値選択器1331とブーム配分率テーブル1332と減算器1333とを備えている。
 最大値選択器1331は、方向制御便制御部132で算出されたブーム2方向制御弁上げ駆動信号とブーム2方向制御弁下げ駆動信号とを入力し、いずれか最大値を選択してブーム配分率テーブル1332へ出力する。配分率テーブル1332は、予め設定したテーブルによって、入力された駆動信号に応じたブーム2配分率を演算し、減算器1333とポンプ流量制御部134とポンプ馬力制御部135へ出力する。
 減算器1333は、固定値100%信号とブーム2配分率信号とを入力し、固定値100%信号からブーム2配分率信号を減算した値をブーム1配分率信号としてポンプ流量制御部134とポンプ馬力制御部135へ出力する。
 図5に戻り、ポンプ流量制御部134は、目標流量演算部131からのブーム上げ目標流量信号とブーム下げ目標流量信号とアームクラウド目標流量信号とアームダンプ目標流量信号と、目標エンジン回転数演算部110からの目標エンジン回転数信号と、配分率演算部133からのブーム1配分率信号とブーム2配分率信号とアーム1配分率信号とアーム2配分率信号とを入力し、ポンプ1流量制御信号とポンプ2流量制御信号とを演算し、ポジティブ傾転制御用の電磁比例弁27a、28aを駆動して第1レギュレータ27と第2レギュレータ28を制御する。ポンプ流量制御部134で行う演算の一例を図8を用いて説明する。
 ポンプ流量制御部134は、最大値選択器1341aと第1乗算器1342aと第2乗算器1343aと第1加算器1344aと第1除算器1345aとポンプ1流量制御信号テーブル1346aとを備えている。また、ポンプ流量制御部134は、最大値選択器1341bと第3乗算器1342bと第4乗算器1343bと第2加算器1344bと第2除算器1345bとポンプ2流量制御信号テーブル1346bとを備えている。
 最大値選択器1341aは、ブーム上げ目標流量信号とブーム下げ目標流量信号とを入力し、いずれか最大値を選択して第1乗算器1342aと第2乗算器1343aとへ出力する。第1乗算器1342aはブーム1配分率信号とブーム目標流量信号とを乗算し、ブーム1目標流量信号を算出し、第1加算器1344aへ出力する。同様に、第2乗算器1343aはブーム2配分率信号とブーム目標流量信号とを乗算し、ブーム2目標流量信号を算出し、第2加算器1344bへ出力する。
 最大値選択器1341bは、アームクラウド目標流量信号とアームダンプ目標流量信号とを入力し、いずれか最大値を選択して第3乗算器1342bと第4乗算器1343bとへ出力する。第3乗算器1342bはアーム2配分率信号とアーム目標流量信号とを乗算し、アーム2目標流量信号を算出し、第1加算器1344aへ出力する。同様に、第4乗算器1343bはアーム1配分率信号とアーム目標流量信号とを乗算し、アーム1目標流量信号を算出し、第2加算器1344bへ出力する。
 第1加算器1344aは、ブーム1目標流量信号とアーム2目標流量信号とを加算してポンプ1目標流量信号を算出し、第1除算器1345aへ出力する。第1除算器1345aは、ポンプ1目標流量信号を入力した目標エンジン回転数信号で除算して流量信号を算出しポンプ1流量制御信号テーブル1346aへ出力する。ポンプ1流量制御信号テーブル1346aは、予め設定したテーブルによって、入力された流量信号に応じたポンプ1流量制御信号を演算し、ポジティブ傾転制御用の電磁比例弁27aを駆動する。
 第2加算器1344bは、アーム1目標流量信号とブーム2目標流量信号とを加算してポンプ2目標流量信号を算出し、第2除算器1345bへ出力する。第2除算器1345bは、ポンプ2目標流量信号を入力した目標エンジン回転数信号で除算して流量信号を算出しポンプ2流量制御信号テーブル1346bへ出力する。ポンプ2流量制御信号テーブル1346bは、予め設定したテーブルによって、入力された流量信号に応じたポンプ2流量制御信号を演算し、ポジティブ傾転制御用の電磁比例弁28aを駆動する。
 ここまでの演算で、ブームとアームを複合操作した場合、ブーム1配分率とアーム1配分率とが概ね100%、ブーム2配分率とアーム2配分率とが概ね0%となっているため、ブームの目標流量を第1油圧ポンプ21から、アームの目標流量を第2油圧ポンプ22から供給することになる。
 図5に戻り、ポンプ馬力制御部135は、目標速度補正部170からのブーム目標速度信号とアーム目標速度信号と、目標面距離取得部150からの目標面距離信号と、角度検出器13aからの水平面に対するブーム角度信号と、モード設定スイッチ32から送信されるモード設定信号と、馬力調整ダイヤル33からの馬力調整信号と、配分率演算部133からのブーム1配分率信号とブーム2配分率信号とアーム1配分率信号とアーム2配分率信号とを入力し、ポンプ1馬力制御信号とポンプ2馬力制御信号とを演算し、馬力制御用の電磁比例弁27b、28bを駆動して第1レギュレータ27と第2レギュレータ28を制御する。ポンプ馬力制御部135で行う演算の一例を図9を用いて説明する。
 ポンプ馬力制御部135は、ブーム上げ目標馬力テーブル1351aとブーム下げ目標馬力テーブル1351bと最大値選択器1352aとブーム最大馬力比率テーブル1353と第1乗算器1354と最大馬力信号を設定した信号発生器1355と第1最小値選択器1356aと減算器1357と第2乗算器1358aと第3乗算器1358bと第1加算器1359aとポンプ1馬力制御信号テーブル135Aaとを備えている。また、ポンプ馬力制御部135は、アームクラウド目標馬力テーブル1351cとアームダンプ目標馬力テーブル1351dと最大値選択器1352bと第2最小値選択器1356bと第4乗算器1358cと第5乗算器1358dと第2加算器1359bとポンプ2馬力制御信号テーブル135Abとを備えている。
 ブーム上げ目標馬力テーブル1351aは、馬力調整信号とブーム目標速度信号とモード設定信号とを入力し、予め設定したテーブルによって、ブーム目標速度信号に応じたブーム上げ目標馬力信号を演算し最大値選択器1352aへ出力する。ブーム下げ目標馬力テーブル1351bは、ブーム目標速度信号を入力し、予め設定したテーブルによって、ブーム目標速度信号に応じたブーム下げ目標馬力信号を演算し最大値選択器1352aへ出力する。最大値選択器1352aは、入力信号のいずれか最大値を選択してブーム目標馬力信号として第1最小値選択器1356aへ出力する。
 同様に、アームクラウド目標馬力テーブル1351c、アームダンプ目標馬力テーブル1351dを用いてアーム目標速度信号からそれぞれアームクラウド目標馬力信号、アームダンプ目標馬力信号を演算し、最大値選択器1352bで最大値を選択してアーム目標馬力信号として第2最小値選択器1356bへ出力する。
 ここで、ブーム上げ目標馬力テーブル1351a、アームクラウド目標馬力テーブル1351c、アームダンプ目標馬力テーブル1351dは、馬力調整信号(またはモード設定)と目標面距離とに応じて、目標速度信号から算出された目標馬力信号を補正して出力する。馬力調整信号(またはモード設定)と目標面距離信号に応じてなされる目標馬力の補正方法の詳細は後述する。
 ブーム最大馬力比率テーブル1353は、水平面に対するブーム角度信号を入力し、予め設定したテーブルによって、ブーム角度信号に応じたブーム最大馬力比率信号を演算し第1乗算器1354へ出力する。第1乗算器1354は、油圧ポンプから供給する最大馬力を設定した信号発生器1355からの信号とブーム最大馬力比率信号とを乗算してブーム最大馬力信号を算出して第1最小値選択器1356aへ出力する。第1最小値選択器1356aでは、入力信号であるブーム目標馬力をブーム最大馬力信号以下に補正して、減算器1357と第2乗算器1358aと第3乗算器1358bとへ出力する。
 減算器1357は、最大馬力を設定した信号発生器1355の信号から補正されたブーム目標馬力信号を減算して、これをアーム最大馬力信号として第2最小値選択器1356bへ出力する。第2最小値選択器1356bでは、入力信号であるアーム目標馬力信号をアーム最大馬力信号以下に補正して、第4乗算器1358cと第5乗算器1358dとへ出力する。
 ここで、ブーム最大馬力比率テーブル1353は、水平面に対するブーム角度信号が小さいほどブーム最大馬力比率信号が大きくなるように設定されている。そのため、法面切り上げ作業のようにブーム角度(およびブームシリンダストローク)が小さく、掘削反力がブーム上げを妨げる方向に作用する場合には、ブームへ優先的に馬力を配分することが可能になり、法面切り下げ作業のようにブーム角度(およびブームシリンダストローク)が大きく、掘削反力がブーム上げを助長する方向に作用する場合には、アームへ優先的に馬力を配分することが可能になる。
 第2乗算器1358aは、ブーム1配分率の信号とブーム目標馬力信号とを乗算してブーム1目標馬力を算出して第1加算器1359aへ出力する。第3乗算器1358bは、ブーム2配分率の信号とブーム目標馬力信号とを乗算してブーム2目標馬力を算出して第2加算器1359bへ出力する。同様に、第4乗算器1358cは、アーム2配分率の信号とアーム目標馬力信号とを乗算してアーム2目標馬力信号を算出して第1加算器1359aへ出力する。第5乗算器1358dは、アーム1配分率の信号とアーム目標馬力信号とを乗算してアーム1目標馬力信号を算出して第2加算器1359bへ出力する。
 第1加算器1359aは、ブーム1目標馬力信号とアーム2目標馬力信号を加算してポンプ1目標馬力信号を算出し、ポンプ1馬力制御信号テーブル135Aaへ出力する。同様に、第2加算器1359bは、アーム1目標馬力信号とブーム2目標馬力信号を加算してポンプ2目標馬力信号を算出し、ポンプ2馬力制御信号テーブル135Abへ出力する。
 ポンプ1馬力制御信号テーブル135Aaは、予め設定したテーブルによって、入力されたポンプ1目標馬力信号に応じたポンプ1馬力制御信号を演算し、馬力制御用の電磁比例弁27bを駆動する。同様に、ポンプ2馬力制御信号テーブル135Abは、予め設定したテーブルによって、入力されたポンプ2目標馬力信号に応じたポンプ2馬力制御信号を演算し、馬力制御用の電磁比例弁28bを駆動する。
 次に、ブーム上げ目標馬力テーブル1351a、アームクラウド目標馬力テーブル1351c、アームダンプ目標馬力テーブル1351dで行われる馬力調整信号と目標面距離信号に応じた目標馬力の補正方法の一例を、図を用いて詳細に説明する。図10は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラのブーム上げ目標馬力テーブルの演算内容の一例を示す制御ブロック図、図11は本発明の油圧建設機械の制御装置の一実施の形態を構成するメインコントローラのブーム上げ目標馬力テーブルの演算内容の他の例を示す制御ブロック図である。
 なお、ブーム上げ目標馬力テーブル1351a、アームクラウド目標馬力テーブル1351c、アームダンプ目標馬力テーブル1351dで行われる補正方法は類似であるため、ブーム上げ目標馬力テーブル1351aで行われる補正方法のみを説明し、アームクラウド目標馬力テーブル1351c、アームダンプ目標馬力テーブル1351dで行われる補正方法の説明は省略する。
 図10は、馬力調整信号と目標面距離信号に応じた目標馬力の補正方法を説明するものである。図10において、ブーム上げ目標馬力テーブル1351aは、ブーム上げ目標馬力テーブル1361とブーム上げ増加馬力テーブル1362と馬力増加係数テーブル1363と乗算器1364と加算器1366と可変ゲイン乗算器1367とを備えている。
 ブーム上げ目標馬力テーブル1361は、ブーム目標速度信号を入力し、予め設定したテーブルによって、ブーム目標速度信号に応じたブーム上げ目標馬力信号を演算し加算器1366へ出力する。同様に、ブーム上げ増加馬力テーブル1362は、ブーム目標速度信号を入力し、予め設定したテーブルによって、ブーム目標速度信号に応じたブーム上げ増加馬力信号を演算し乗算器1364へ出力する。
 馬力増加係数テーブル1363は、目標面距離信号を入力し、予め設定したテーブルによって、目標面距離信号に応じた馬力増加係数信号を演算し乗算器1364へ出力する。乗算器1364は、ブーム上げ増加馬力信号と馬力増加係数信号とを乗算してブーム馬力補正値信号を算出して可変ゲイン乗算器1367へ出力する。
 可変ゲイン乗算器1367は、馬力調整信号とブーム馬力補正値信号とを入力し、馬力調整信号に応じた0~1の馬力調整ゲインをブーム馬力補正値信号と乗算した補正信号を加算器1366へ出力する。加算器1366は、補正前のブーム上げ目標馬力信号と補正値信号とを加算して、新たなブーム上げ目標馬力信号として例えば最大値選択器1352aへ出力する。
 ここで、馬力増加係数テーブル1363は、目標面距離信号が目標面距離B以下で馬力増加係数信号を増加させ、目標面距離信号が目標面距離Aで馬力増加係数信号が最大値となるように設定される。この結果、目標面距離信号が小さくなるほど、目標馬力信号が大きく拡大補正される。なお、目標面距離Aは、上述したように作業上要求される施工精度以上の距離に設定されることが望まれる。また、目標面距離Bは、上述したように、アーム動作により作業機15が施工目標面に到達するまでの時間を基に設定するものであって、例えばアームクラウドによる作業機15の速度の最大値にメインコントローラ100の制御周期をかけて得られる距離以上に設定する。
 また、増加馬力テーブル1362は、馬力増加係数信号が最大値となった場合においても、補正後のブーム目標馬力信号が目標速度信号に対して単調増加するように、目標速度信号が大きくなるほど小さくなるように設定されている。ただし、目標速度が0の場合はブーム目標馬力信号が0となるように、少なくとも目標速度信号が0のときブーム上げ増加馬力信号も0となるように設定される。
 次に、モード設定信号と目標面距離信号に応じた目標馬力の補正方法を図11を用いて説明する。なお、馬力調整信号を用いる場合と同様である部分には同じ符号を付してその説明を省略し、異なる部分のみを説明する。
 図10に示す馬力調整信号を用いる場合と同様に、乗算器1364でブーム馬力補正値信号を演算した後、可変ゲイン乗算器1367ではなく接続器1365へブーム馬力補正値信号を出力する。接続器1365は、ブーム馬力補正値信号とモード設定信号を入力していて、モード設定信号が2:馬力アップモードまたは4:馬力アップ+軌跡制御モードである場合にのみ、接続器を接続状態として、ブーム馬力補正値信号を加算器1366へ出力する。
 加算器1366は、モード設定信号が2:馬力アップモードまたは4:馬力アップ+軌跡制御モードである場合に補正前のブーム上げ目標馬力信号とブーム馬力補正値信号とを加算して、新たなブーム上げ目標馬力信号として例えば最大値選択器1352aへ出力する。
 以上の演算を行うことにより、モード設定が1:通常モードである場合には、図11に示す馬力補正値信号が加算されず、操作量に応じたポンプ流量とポンプ馬力が得られるため、従来と同等の省エネ性を得ることができる。
 また、モード設定が2:馬力アップモードまたは4:馬力アップ+軌跡制御モードであって、作業機15が施工目標面から比較的離れた位置で掘削をした場合には、馬力増加係数テーブル1363からの出力信号が0となり、乗算器1364の出力であるブーム馬力補正値信号が0となるため、従来と同等の省エネ性を得ることができる。一方、作業機15が施工目標面から比較的近い位置で掘削をした場合には、乗算器1364の出力であるブーム馬力補正値信号が加算されることから、ポンプ馬力信号のみが増加補正される。このことにより、掘削負荷が上昇しても所定の仕上げ精度を得ることができる。
 また、モード設定が2:馬力アップモードであって、情報コントローラ200から施工目標面が送信されない場合には、馬力増加係数テーブル1363の入力を0とみなすため、乗算器1364の出力であるブーム馬力補正値信号が加算されることから、ポンプ馬力信号のみが増加補正される。このことにより、掘削負荷が上昇しても所定の仕上げ精度を得ることができる。
 次に、本発明の油圧建設機械の制御装置の一実施の形態の動作について図を用いて説明する。図12Aは本発明の油圧建設機械の制御装置の一実施の形態における油圧建設機械の時系列の動作の一例示す特性図、図12Bは本発明の油圧建設機械の制御装置の一実施の形態における油圧建設機械の時系列の動作の他の例示す特性図である。
 図12Aは、馬力調整信号が最小およびモード設定が3:軌跡制御モードである場合の例を示し、図12Bは馬力調整信号が最大およびモード設定が4:馬力アップ+軌跡制御モードである場合の例を示す。換言すると、図12Aでは油圧ポンプの増馬力補正が殆どなされない場合を示し、図12Bでは油圧ポンプの増馬力補正がなされた場合を示す。
 図12A及び図12Bにおいて、横軸は時間を示していて、縦軸は、(a)アームシリンダボトム圧力、(b)第2油圧ポンプの吐出流量、(c)アームシリンダストロークとブームシリンダストローク、(d)目標面距離をそれぞれ示している。なお、目標面距離とは作業機15と目標施工面までの距離をいう。また、時刻T1は、掘削負荷の増加によりアームシリンダ6のボトム圧が急増した時刻を示している。
 図12Aにおいて、時刻0から水平均し運転を開始すると、(b)に示すようにアームシリンダ6へ圧油を供給する第2油圧ポンプ22の吐出流量が増加する。同時に第1油圧ポンプ21からブームシリンダ5へ圧油が供給されるので、(C)に示すように、ブームシリンダ5とアームシリンダ6とのシリンダストロークが増加する。
 また、モード設定が3:軌跡制御モードであるため、目標速度補正部170によってブーム目標速度とアーム目標速度が調整され、(d)に示すように、目標面距離が0付近に保たれている。
 時刻T1において、(a)に示すように掘削負荷の増加などによりアームシリンダボトム圧が急増すると、(b)に示すように、これに応じて第2レギュレータ28が第2油圧ポンプ22の吐出流量を減少させる。このことにより(C)に示すように、アームシリンダ6のシリンダストロークが停滞し、ブーム速度とアーム速度のバランスが崩れる。この結果、(d)に示すように、目標面距離が増加する。換言すると、作業機15が目標施工面から浮き上がってしまう。
 次に、図12Bの場合を説明する。図12Bにおいても、時刻T1までは、同様に動作する。時刻T1において、(a)に示すように掘削負荷の増加などによりアームシリンダボトム圧が急増した場合であっても、(b)に示すように、これに応じて第2レギュレータ28が第2油圧ポンプ22の吐出流量を大きく減少させない。これは、馬力調整信号が最大およびモード設定が4:馬力アップ+軌跡制御モードであり、予めポンプ馬力が増加補正されているためである。
 この結果、(C)に示すように、アームシリンダ6のシリンダストロークが停滞することなく、ブーム速度とアーム速度のバランスが保たれる。この結果、(d)に示すように、目標面距離が0近傍に制御され、作業機15が目標施工面から浮き上がらない。
 上述した本発明の油圧建設機械の制御装置の一実施の形態によれば、作業機15と施工目標面との距離に応じてポンプ馬力を補正制御するので、作業機15が施工目標面から近い位置で掘削した場合には、掘削負荷が上昇しても所定の仕上げ精度を得られる。
 また、上述した本発明の油圧建設機械の制御装置の一実施の形態によれば、省エネルギ性と速度追従性とのいずれを優先するかを選択または調整可能な設定装置を備え、設定装置のモード設定に応じてポンプ馬力を補正制御するので、作業機15が施工目標面から近い位置で掘削した場合には、掘削負荷が上昇しても所定の仕上げ精度を得られる。
 なお、本発明は上記した実施形態に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施形態では、ブームシリンダ5及びアームシリンダ6を例に本発明を説明したが、これに限るものではない。
 さらに、上記した実施形態は本発明を分かり易く説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。
5:ブームシリンダ、6:アームシリンダ、21:第1油圧ポンプ、22:第2油圧ポンプ、27:第1レギュレータ、28:第2レギュレータ、32:モード設定スイッチ、100:メインコントローラ、150目標面距離取得部、134:ポンプ流量制御部、135:ポンプ馬力制御部

Claims (4)

  1.  油圧アクチュエータと、前記油圧アクチュエータにより駆動されるブーム、アーム、及びバケットからなる作業機と、前記油圧アクチュエータへ圧油を供給する油圧ポンプと、前記油圧ポンプの吐出流量を制御するポンプ流量制御部と、前記油圧ポンプの馬力を制御するポンプ馬力制御部と、前記作業機が作業する施工目標面と前記作業機との距離である目標面距離を計測または演算する目標面距離取得部とを備えた油圧建設機械の制御装置において、
     前記目標面距離が小さくなるほど、前記ポンプ流量制御部は前記吐出流量を小さくする制御を行い、前記ポンプ馬力制御部は前記油圧ポンプの馬力を大きくする制御を行なう
     ことを特徴とする油圧建設機械の制御装置。
  2.  請求項1に記載の油圧建設機械の制御装置において、
     前記作業機の速度追従性を優先させるモードを選択可能なモード選択装置を備え、
     前記ポンプ馬力制御部は、前記モード選択装置により前記作業機の速度追従性を優先させるモードが選択された場合に、前記油圧ポンプの馬力を大きくする制御を行う
     ことを特徴とする油圧建設機械の制御装置。
  3.  請求項1に記載の油圧建設機械の制御装置において、
     前記油圧アクチュエータが前記ブームを駆動するブーム駆動用アクチュエータを含む複数の油圧アクチュエータであり、
     水平面に対するブームの角度を取得するブーム角度取得装置を備え、
     前記ポンプ馬力制御部は、前記ブーム角度取得装置が取得した水平面に対する前記ブームの角度が小さいほど、前記ブーム駆動用アクチュエータへ配分する馬力を前記ブーム駆動用アクチュエータ以外の油圧アクチュエータへ配分する馬力より大きくする
     ことを特徴とする油圧建設機械の制御装置。
  4.  請求項1に記載の油圧建設機械の制御装置において、
     前記目標面距離が要求される施工精度以上の値である閾値以下のときに、前記油圧ポンプの馬力補正量を最大として出力する補正テーブルを備え、
     前記ポンプ馬力制御部は、前記補正テーブルの出力に応じて、前記油圧ポンプの馬力を補正する
     ことを特徴とする油圧建設機械の制御装置。
PCT/JP2016/085685 2015-12-04 2016-12-01 油圧建設機械の制御装置 WO2017094822A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP16870759.4A EP3385455B1 (en) 2015-12-04 2016-12-01 Control device for hydraulic construction machinery
CN201680070801.2A CN108368689B (zh) 2015-12-04 2016-12-01 液压工程机械的控制装置
KR1020187012507A KR102084986B1 (ko) 2015-12-04 2016-12-01 유압 건설 기계의 제어 장치
US15/780,313 US10604914B2 (en) 2015-12-04 2016-12-01 Control system for hydraulic construction machine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-237847 2015-12-04
JP2015237847A JP6545609B2 (ja) 2015-12-04 2015-12-04 油圧建設機械の制御装置

Publications (1)

Publication Number Publication Date
WO2017094822A1 true WO2017094822A1 (ja) 2017-06-08

Family

ID=58796991

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/085685 WO2017094822A1 (ja) 2015-12-04 2016-12-01 油圧建設機械の制御装置

Country Status (6)

Country Link
US (1) US10604914B2 (ja)
EP (1) EP3385455B1 (ja)
JP (1) JP6545609B2 (ja)
KR (1) KR102084986B1 (ja)
CN (1) CN108368689B (ja)
WO (1) WO2017094822A1 (ja)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6633464B2 (ja) * 2016-07-06 2020-01-22 日立建機株式会社 作業機械
US10731322B2 (en) * 2017-01-13 2020-08-04 Komatsu Ltd. Work machine control system and work machine control method
JP6707064B2 (ja) * 2017-08-24 2020-06-10 日立建機株式会社 油圧式作業機械
US11591768B2 (en) * 2017-08-31 2023-02-28 Komatsu Ltd. Control system of work machine and method for controlling work machine
JP6782851B2 (ja) * 2018-03-19 2020-11-11 日立建機株式会社 建設機械
JP6917941B2 (ja) * 2018-03-29 2021-08-11 日立建機株式会社 油圧式作業機械
JP7283910B2 (ja) * 2019-02-01 2023-05-30 株式会社小松製作所 建設機械の制御システム、建設機械、及び建設機械の制御方法
KR20220066278A (ko) 2019-09-24 2022-05-24 클라크 이큅먼트 컴파니 사이클 시간 관리를 위한 시스템 및 방법

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09228426A (ja) 1996-02-21 1997-09-02 Shin Caterpillar Mitsubishi Ltd 建設機械の作業機制御装置
JPH09291560A (ja) 1996-04-26 1997-11-11 Hitachi Constr Mach Co Ltd 建設機械の軌跡制御装置
JP2001248186A (ja) * 2000-03-03 2001-09-14 Shin Caterpillar Mitsubishi Ltd 建設機械の制御装置
JP2010203109A (ja) * 2009-03-02 2010-09-16 Komatsu Ltd 建設機械
JP2014012515A (ja) * 2013-07-29 2014-01-23 Toyota Motor Corp 車両の制御装置
JP5791827B2 (ja) * 2014-09-10 2015-10-07 株式会社小松製作所 作業車両

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6336067B1 (en) * 1998-08-12 2002-01-01 Hitachi Construction Machinery Co., Ltd. Electronic control system and control device for construction machine
US7441404B2 (en) * 2004-11-30 2008-10-28 Caterpillar Inc. Configurable hydraulic control system
JP5237408B2 (ja) * 2011-03-24 2013-07-17 株式会社小松製作所 油圧ショベルの較正システム及び較正方法
WO2014073541A1 (ja) * 2012-11-07 2014-05-15 日立建機株式会社 作業機械の油圧制御装置
JP6053714B2 (ja) * 2014-03-31 2016-12-27 日立建機株式会社 油圧ショベル
DE112014000106B4 (de) * 2014-06-02 2017-04-06 Komatsu Ltd. Baumaschinen-Steuersystem, Baumaschine und Verfahren zum Steuern einer Baumaschine
WO2015129930A1 (ja) * 2014-06-04 2015-09-03 株式会社小松製作所 建設機械の制御システム、建設機械、及び建設機械の制御方法
KR102389935B1 (ko) * 2014-06-20 2022-04-21 스미도모쥬기가이고교 가부시키가이샤 쇼벨 및 그 제어방법

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09228426A (ja) 1996-02-21 1997-09-02 Shin Caterpillar Mitsubishi Ltd 建設機械の作業機制御装置
JPH09291560A (ja) 1996-04-26 1997-11-11 Hitachi Constr Mach Co Ltd 建設機械の軌跡制御装置
JP2001248186A (ja) * 2000-03-03 2001-09-14 Shin Caterpillar Mitsubishi Ltd 建設機械の制御装置
JP2010203109A (ja) * 2009-03-02 2010-09-16 Komatsu Ltd 建設機械
JP2014012515A (ja) * 2013-07-29 2014-01-23 Toyota Motor Corp 車両の制御装置
JP5791827B2 (ja) * 2014-09-10 2015-10-07 株式会社小松製作所 作業車両

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3385455A4

Also Published As

Publication number Publication date
CN108368689A (zh) 2018-08-03
US10604914B2 (en) 2020-03-31
US20180355583A1 (en) 2018-12-13
KR102084986B1 (ko) 2020-03-05
JP2017101519A (ja) 2017-06-08
CN108368689B (zh) 2021-03-26
EP3385455A1 (en) 2018-10-10
KR20180064460A (ko) 2018-06-14
EP3385455A4 (en) 2019-08-14
JP6545609B2 (ja) 2019-07-17
EP3385455B1 (en) 2023-02-08

Similar Documents

Publication Publication Date Title
WO2017094822A1 (ja) 油圧建設機械の制御装置
EP3438468B1 (en) Construction machine with speed-up control section
CN110392755B (zh) 液压式作业机械
US10227997B2 (en) Hydraulic drive system for work machine
US10563378B2 (en) Hydraulic system for work machines
US20170276155A1 (en) Hydraulic Drive System for Work Machine
JP6807290B2 (ja) 作業機械
KR102582826B1 (ko) 건설기계의 제어 시스템 및 건설기계의 제어 방법
JP5816216B2 (ja) 建設機械のポンプ制御装置
JP2016125284A (ja) 建設機械
US11111650B2 (en) Hydraulic drive system for construction machine
US20220127823A1 (en) Work Machine
US11230819B2 (en) Construction machine
KR102478297B1 (ko) 건설기계의 제어장치 및 제어방법
US11946226B2 (en) Work machine
WO2022209920A1 (ja) 作業機械
WO2023053502A1 (ja) 作業機械
JP2013249900A (ja) 油圧駆動回路
JP2021195797A (ja) 作業機械
JP2016125243A (ja) ショベル

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16870759

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20187012507

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2016870759

Country of ref document: EP