WO2017009955A1 - Système de réfrigération - Google Patents

Système de réfrigération Download PDF

Info

Publication number
WO2017009955A1
WO2017009955A1 PCT/JP2015/070184 JP2015070184W WO2017009955A1 WO 2017009955 A1 WO2017009955 A1 WO 2017009955A1 JP 2015070184 W JP2015070184 W JP 2015070184W WO 2017009955 A1 WO2017009955 A1 WO 2017009955A1
Authority
WO
WIPO (PCT)
Prior art keywords
load
heat
heat medium
temperature
hot water
Prior art date
Application number
PCT/JP2015/070184
Other languages
English (en)
Japanese (ja)
Inventor
善生 山野
靖 大越
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to GB1800132.1A priority Critical patent/GB2555064B/en
Priority to PCT/JP2015/070184 priority patent/WO2017009955A1/fr
Priority to JP2017528058A priority patent/JP6681896B2/ja
Publication of WO2017009955A1 publication Critical patent/WO2017009955A1/fr

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F12/00Use of energy recovery systems in air conditioning, ventilation or screening
    • F24F12/001Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air
    • F24F12/002Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air using an intermediate heat-transfer fluid
    • F24F12/003Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air using an intermediate heat-transfer fluid using a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/20Humidity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/10Pressure
    • F24F2140/12Heat-exchange fluid pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/50Load
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0007Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater cooling apparatus specially adapted for use in air-conditioning
    • F24F5/0017Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater cooling apparatus specially adapted for use in air-conditioning using cold storage bodies, e.g. ice
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/56Heat recovery units

Definitions

  • the present invention relates to a refrigeration system using a heat pump chiller as a heat source.
  • an air conditioning system equipped with a water circuit that circulates water as a heat medium in a building such as a building or a large-scale commercial facility.
  • water in the water circuit is passed through a fan coil unit or an air handling unit, which is a load side device, and air conditioning is performed with the heat of the water.
  • Patent Document 1 discloses an air conditioning system that measures the temperature of water in a header and controls only a minimum number of units to operate.
  • the conventional air conditioning system described in Patent Document 1 controls the number of heat pump chillers based only on the water temperature in the header, and the water temperature in the header alone is insufficient as circulating water information for the load side device. . For this reason, it is impossible to accurately grasp the current heat amount of the load side device, that is, the current heat amount that can be supplied from the load side device to the air conditioning load. Therefore, there is a possibility that the heat pump chiller is operated so as to supply an excess amount of heat to the load side device, which causes a reduction in efficiency of the entire air conditioning system.
  • the present invention has been made to solve the above-described problems, and provides a refrigeration system capable of accurately grasping the current heat amount of a load side device and improving the efficiency of the refrigeration system. With the goal.
  • a heat source device including a heat source side heat exchanger and a compressor that exchange heat between a refrigerant and a heat medium, a load side device, a heat source side heat exchanger, and a load side device are pipes.
  • a heat medium circuit connected to circulate the heat medium by a pump and conveys the amount of heat supplied by the heat source device to the load side device, a temperature sensor that detects the temperature of the heat medium, and a pressure sensor that detects the pressure of the heat medium
  • a load index sensor for detecting a load index for determining a load in the load side device, and controlling each operation of the compressor and the pump based on values obtained from the temperature sensor, the pressure sensor, and the load index sensor, respectively.
  • a control device including a heat source side heat exchanger and a compressor that exchange heat between a refrigerant and a heat medium, a load side device, a heat source side heat exchanger, and a load side device are pipes.
  • a heat medium circuit connected to circulate the heat medium by a
  • Embodiment 1 As an example of the refrigeration system, the first embodiment will be described here using an air conditioning system.
  • FIG. 1 is a block diagram showing a configuration of an air conditioning system according to Embodiment 1 of the present invention.
  • the air conditioning system includes a heat pump chiller 1 that is a heat source device installed outdoors, a load-side device 2 that is an indoor unit installed indoors, and a pump 3, and a heat medium in which water as a heat medium circulates.
  • the water circuit 4 which is a circuit is provided.
  • the water circuit 4 is a circuit that transports the heat supplied by the heat pump chiller 1 to the load side device 2 by connecting the heat pump chiller 1 and the load side device 2 with piping and circulating water by the pump 3.
  • FIG. 1 although the case where the heat pump chiller 1 and the load side apparatus 2 were each installed 2 each was illustrated, the number of installation is not limited.
  • the heat pump chiller 1 includes a compressor 11 having an operation capacity variable by an inverter, and a water-refrigerant heat exchanger 12 as a heat source side heat exchanger for heating or cooling circulating water to a target temperature by heat of a refrigerant such as Freon. And.
  • the heat pump chiller 1 has a refrigerant circuit (not shown) including a compressor 11, a decompression device, and a heat exchanger, and the refrigerant in the refrigerant circuit in which the refrigerant circulates and the circulating water in the water circuit 4 are water refrigerant.
  • the heat exchanger 12 functions as a heat source device that supplies the heat of the refrigerant to the load side device 2.
  • the water circuit 4 is configured such that water circulates between a water refrigerant heat exchanger 12 of the heat pump chiller 1 and a load side heat exchanger 21 a of a fan coil 21 (to be described later) of the load side device 2.
  • the load side device 2 includes a fan coil 21 and an electric valve 22.
  • the fan coil 21 includes a load side heat exchanger 21a and a fan 21b that allows air to pass through the load side heat exchanger 21a.
  • the fan coil 21 cools the load side air by cooling it by exchanging heat with the circulating water of the water circuit 4 and the load side heat exchanger 21a, and supplying the load side air after cooling into the room. Heating is performed by exchanging heat between the circulating water of the water circuit 4 and the load-side heat exchanger 21a and heating the heated load-side air into the room.
  • the motor-operated valve 22 adjusts the amount of circulating water flowing into the load-side heat exchanger 21a in the water circuit 4.
  • the load side device 2 further includes a temperature sensor 23 (23a, 23b) that is a heat medium temperature sensor, a pressure sensor 24 (24a, 24b) that is a heat medium pressure sensor, and a suction temperature sensor 25 that is a load index sensor. And a humidity sensor 26.
  • the temperature sensor 23a is disposed in the water inlet pipe of the load side heat exchanger 21a and detects the temperature of the circulating water at the inlet of the load side heat exchanger 21a.
  • the temperature sensor 23b is disposed in the water outlet pipe of the load side heat exchanger 21a, and detects the temperature of the circulating water at the outlet of the load side heat exchanger 21a.
  • the pressure sensor 24a is disposed in the water inlet pipe of the load side heat exchanger 21a, and detects the pressure of the circulating water at the inlet of the load side heat exchanger 21a.
  • the pressure sensor 24b is disposed in the water outlet pipe of the load side heat exchanger 21a, and detects the pressure of the circulating water at the outlet of the load side heat exchanger 21a.
  • the suction temperature sensor 25 is arranged on the windward side of the fan 21b of the fan coil 21, and detects the temperature of the suction air that is load side air.
  • the humidity sensor 26 is also arranged on the windward side of the fan 21b of the fan coil 21, and detects the humidity of the intake air.
  • the detection signals of these sensors 23 to 26 are output to a load side control device 27 described later.
  • the load side device 2 further includes a load side control device 27 that receives detection signals of the sensors 23 to 26, and a central control device 50 that controls the entire air conditioning system.
  • the load-side control device 27 transmits signals of the sensors 23 to 26 in the load-side device 2 to the central control device 30 described later via the control signal line 31, and calculates the amount of heat necessary for the load-side device 2. To do.
  • the load-side control device 27 can be configured by hardware such as a circuit device that realizes the function, or can be configured by an arithmetic device such as a microcomputer or a CPU, and software executed thereon. it can.
  • the central control device 30 calculates optimum operating conditions based on information obtained from the heat pump chiller 1, the pump 3, and the load side device 2 connected by the control signal line 31, and the heat pump chiller 1, the pump 3, A driving instruction is output to and controlled.
  • the central control device 30 can be configured by hardware such as a circuit device that realizes the function, or can be configured by an arithmetic device such as a microcomputer or a CPU, and software executed thereon. .
  • the load side control apparatus is shown in the central control apparatus 30.
  • the central control device 30 may be configured to perform operation control of the entire air conditioning system.
  • the load side control device 27 and the central control device 30 constitute a control device according to the present invention.
  • FIG. 2 is a flowchart showing the operation of the air conditioning system according to Embodiment 1 of the present invention.
  • the temperature and humidity of the intake air are detected using the intake temperature sensor 25 and the humidity sensor 26 (S1).
  • the load-side control device 27 determines whether the intake air temperature detected by the intake temperature sensor 25 matches the target temperature (S2).
  • the intake air temperature detected by the intake temperature sensor 25 corresponds to a load index for determining the current load on the load side.
  • the load-side control device 27 calculates the amount of heat necessary for making the intake air temperature the target temperature by using the intake air temperature sensor 25 and the humidity sensor 26. Calculation is performed based on the temperature and humidity (S3).
  • the heat quantity can be calculated more accurately by using the suction air humidity in addition to the suction air temperature. That is, for example, when cooling a place where the temperature and humidity are high, it is necessary to take heat including latent heat in order to cool the air while changing the water vapor in the air to water. For this reason, when the humidity is high, more cooling capacity is required than when the humidity is low. Thus, more accurate “necessary amount of heat” can be calculated by considering latent heat. From the above viewpoint, it is preferable to use the intake air humidity in calculating the “necessary heat amount”, but at least the intake air temperature may be used.
  • the load-side control device 27 uses the temperature sensor 23 and the pressure sensor 24 to detect the water temperature and water pressure of the circulating water, and the “current heat amount that can be supplied from the load-side heat exchanger 21a to the air conditioning load”. Calculate (S4).
  • the water temperature and water pressure information of the circulating water may be referred to as load-side control information.
  • the load-side control device 27 determines whether the “necessary amount of heat” can be obtained by adjusting the opening degree of the motor-operated valve 22 and changing the flow rate of the circulating water flowing to the load-side heat exchanger 21a. (S5). Specifically, this determination is made by comparing the difference between the “necessary heat amount” and the “current heat amount that can be supplied from the load-side heat exchanger 21a to the air conditioning load” with a preset heat amount.
  • the opening degree of the motor-operated valve 22 is adjusted and the load-side heat is adjusted. It is determined that the “necessary amount of heat” can be obtained by changing the flow rate flowing through the exchanger 21a.
  • the load-side control device 27 opens the opening degree of the motor-operated valve 22. It is judged that “necessary heat quantity” cannot be obtained by adjustment.
  • the load-side control device 27 determines that the “necessary heat amount” can be obtained by adjusting the opening degree of the motor-operated valve 22, the load-side control device 27 adjusts the opening degree of the motor-operated valve 22 according to the “necessary heat amount” (S6). Return to step S4.
  • the load-side control device 27 determines that the “necessary amount of heat” cannot be obtained by adjusting the opening degree of the motor-operated valve 22, the load-side control device 27 controls the information indicating that the operating condition needs to be changed.
  • the signal is transmitted to the central controller 30 via the signal line 31.
  • the current load-side control obtained by the load-side device 2 is added to this information.
  • the information (including circulating water temperature and pressure) is also transmitted.
  • steps S1 to S6 are performed by each load side control device 27. Therefore, according to the amount of heat in each load-side control device 27, the information (including load-side control information) that the operation condition needs to be changed from a part or all of each load-side control device 27 is central. It will be collected in the control device 30.
  • the central control device 30 is based on the operation information obtained from the heat pump chiller 1 and the pump 3 and the load side control information (water temperature and water pressure of the circulating water) obtained from each load side control device 27 of the load side device 2.
  • the operation of each heat pump chiller 1 and pump 3 is controlled. That is, an optimal operation condition is calculated based on the operation information and the load side control information, and an operation instruction is output to each of the heat pump chillers 1 and the pump 3 (S7).
  • the operation information obtained from the heat pump chiller 1 and the pump 3 specifically corresponds to the current operation capacity, for example.
  • the central control device 30 determines the operation instruction so that the plurality of compressors 11 are operated at an efficient load factor. To do. FIG. 3 shows the load factor of the compressor 11.
  • FIG. 3 is a diagram showing the relationship between the compressor load factor and the compressor efficiency.
  • the efficiency around 50% is good.
  • 10 heat pump chillers 1 are installed, and when all 10 units are operated at a load factor of 100%, assuming that the operation request is 100%, 5 units are loaded to realize the operation request 50%. This can be done by driving at a rate of 100%.
  • the compressor 11 has better compression efficiency when operated at a load factor of 50% than when operated at a load factor of 100%, ten compressors 11 are operated at a load factor of 50%.
  • the eight compressors may be operated at a load factor of 50%.
  • the operation request rate is obtained by calculating the operation information obtained from the heat pump chiller 1 and the pump 3 and the load side control information (water temperature and water pressure of the circulating water) obtained from the load side device 2 in the central control device 30.
  • the compressor 11 is controlled so that the load factor of the compressor 11 is optimized based on the required operation amount.
  • the compressor 11 of the heat pump chiller 1 is operated with the operation number and the operation capacity optimized based on the above concept.
  • the central controller 30 is configured to operate the compressor 11 under the optimum operating conditions (operation of the compressor 11) so that the compressor 11 is operated within a set load factor range including a load factor (50% here) at which the compressor efficiency is maximum. Number and operating capacity of the compressor 11).
  • the central control device 30 maintains the minimum water circulation amount for operation in the water circuit 4 based on the water pressure obtained from the pressure sensor 10 of the load side device 2, and the outlet water temperature of the heat pump chiller 1 becomes the set water temperature.
  • the operation capacity of the pump 3 is controlled so as to obtain a water circulation amount optimized so as to be maintained.
  • the amount of heat on the load side that is, the “current amount of heat that can be supplied from the load-side heat exchanger 21a to the air conditioning load” can be grasped using the water temperature and the water pressure of the circulating water. Therefore, it is possible to accurately grasp the temperature compared with the conventional method using only the circulating water temperature.
  • the operation information of the heat pump chiller 1 and the pump 3 and the load side control information water temperature and water pressure of the circulating water
  • the operating capacity of the compressor 11 and the amount of circulating water are optimized. Therefore, the effect of improving the efficiency of the entire air conditioning system can be obtained.
  • the amount of heat can be calculated more accurately by using the suction air humidity detected by the humidity sensor 26 in addition to the suction air temperature detected by the suction temperature sensor 25.
  • the “necessary heat amount” and the “current heat amount that can be supplied from the load-side heat exchanger 21a to the air conditioning load” are smaller than the set heat amount, the operating conditions of the compressor 11 and the pump 3 are changed. At least, the “necessary amount of heat” can be obtained by controlling the motor-operated valve 22.
  • a pump is provided so that the outlet water temperature of the load-side heat exchanger 21a is maintained at the set water temperature while maintaining the minimum circulation amount required for operation in the water circuit 4. 3 can be controlled.
  • the heat medium circulating in the water circuit 4 is water, but it can be replaced with water or the like mixed with an additive that lowers the freezing point.
  • Embodiment 2 demonstrates the example of a hot-water supply system.
  • FIG. 4 is a schematic configuration diagram of a hot water supply system according to Embodiment 2 of the present invention.
  • the hot water supply system includes a heat pump chiller 41 that is a heat source functioning as a hot water supply device, a sealed tank 42 that is a hot water storage tank for storing water heated by the heat pump chiller 41, and water heated by the heat pump chiller 41. Is stored in the sealed tank 42, and a water circuit 44 that is a hot water supply circuit that supplies the hot water supply terminal 43 is provided.
  • the sealed tank 42 corresponds to the load side device of the present invention.
  • the water circuit 44 includes a water circuit 44a and a water circuit 44b.
  • the water circuit 44 a is a circuit that transports heat supplied from the heat pump chiller 1 to the sealed tank 42 by connecting the heat pump chiller 41 and the sealed tank 42 with piping and circulating water by the pump 49.
  • the water circuit 44b is a circuit in which the sealed tank 42 and the hot water supply terminal 43 are connected by piping and water is circulated by a pump 45 that is a hot water supply terminal side pump.
  • the hot water supply terminal 43 is, for example, a shower or a currant.
  • FIG. 4 shows a case where three heat pump chillers 1 are installed and one sealed tank 42 is installed, the number of installed units is not limited.
  • the structure of the heat pump chiller 41 is the same as that of the heat pump chiller 1 of the first embodiment shown in FIG. 1, and the water is heated to a target temperature by the compressor 11 whose operating capacity is variable by an inverter and the heat of a refrigerant such as flon. And a water-refrigerant heat exchanger 12.
  • the heat pump chiller 41 includes a refrigerant circuit (not shown) including the compressor 11, a decompression device, and a heat exchanger, and the refrigerant in the refrigerant circuit in which the refrigerant circulates and the water in the water circuit 44a are water refrigerant heat. By exchanging heat with the exchanger 12, it functions as a heat source device that supplies the heat of the refrigerant to the sealed tank 42.
  • the water circuit 44b is provided with a temperature sensor 46 (46a, 46b) which is a heat medium temperature sensor and a pressure sensor 47 (47a, 47b) which is a heat medium pressure sensor.
  • the temperature sensor 46 a is disposed in the water inlet pipe of the sealed tank 42 and detects the temperature of the circulating water at the inlet of the sealed tank 42.
  • the temperature sensor 46 b is disposed in the water outlet pipe of the sealed tank 42 and detects the temperature of the circulating water at the outlet of the sealed tank 42.
  • the temperature sensor 46b constitutes a load index sensor of the present invention.
  • the pressure sensor 47 a is disposed in the water inlet pipe of the sealed tank 42 and detects the pressure of the circulating water at the inlet of the sealed tank 42.
  • the pressure sensor 47 b is disposed in the water outlet pipe of the sealed tank 42 and detects the pressure of the circulating water at the outlet of the sealed tank 42.
  • the detection signals of these sensors 46 and 47 are output to a load side control device 48 described later.
  • the hot water supply system further includes a load-side control device 48 that receives detection signals from the sensors 46 and 47, and a central control device 50 that controls the entire hot water supply system.
  • the load-side control device 48 transmits the signals of the sensors 46 and 47 to the central control device 50 via the control signal line 51, and the amount of heat necessary for maintaining the temperature in the sealed tank 42 at the target water temperature. Or calculate.
  • a pump 45 is connected to the load side control device 48.
  • the load-side control device 48 can be configured by hardware such as a circuit device that realizes the function, or can be configured by an arithmetic device such as a microcomputer or a CPU, and software executed thereon. it can.
  • the central control device 50 is connected to the heat pump chiller 41 and the load side control device 48 by a control signal line 51, and is optimal based on information obtained from each of the heat pump chiller 41, the pump 45, and the load side control device 48. An operation condition is calculated and an operation instruction is output to the heat pump chiller 41 and the pump 45.
  • the central control device 50 can be configured by hardware such as a circuit device that realizes the function, or can be configured by an arithmetic device such as a microcomputer or a CPU and software executed on the arithmetic device. .
  • the load side control apparatus 48 and the central control apparatus 50 constitute a control device according to the present invention.
  • FIG. 5 is a flowchart showing the operation of the hot water supply system according to Embodiment 2 of the present invention.
  • the temperature and water pressure of the circulating water are detected using the temperature sensor 46 and the pressure sensor 47 (S11).
  • the load side control device 48 determines whether or not the outlet water temperature of the closed tank 42 detected by the temperature sensor 46b matches the target water temperature (S12).
  • the outlet water temperature detected by the temperature sensor 46b corresponds to a load index for determining the current load on the load side.
  • the load-side control device 48 determines the “necessary heat amount” necessary for maintaining the outlet water temperature at the target temperature based on the detection results of the temperature sensor 46 and the pressure sensor 47. Calculate (S13). The “necessary heat amount” is calculated based on “the current heat amount that can be supplied from the sealed tank 42 to the hot water supply load”. Specifically, the load-side control device 48 calculates based on the temperature difference between the outlet water temperature and the target water temperature and the detection results of the temperature sensor 46 and the pressure sensor 47.
  • the amount of heat required to maintain the water temperature in the sealed tank 42 at the target water temperature is also affected by the amount of heat flowing out of the hot water supply terminal 43, but the effect appears in the values of the temperature sensor 46 and the pressure sensor 47. For this reason, by using the values of the temperature sensor 46 and the pressure sensor 47, the amount of heat necessary to maintain the water temperature in the sealed tank 42 at the target water temperature, taking into consideration the amount of heat flowing out of the hot water supply terminal 43, can be obtained. Can be calculated.
  • the load-side control device 48 transmits the calculated “necessary heat amount” information to the central control device 50 via the control signal line 51.
  • the central controller 50 calculates the optimum operating conditions based on the “necessary amount of heat” transmitted from the load-side controller 48 and the operation information of the heat pump chiller 41, and the compressor 11 and the pump 49 of each heat pump chiller 41.
  • An operation instruction is output to (S14), and each operation capacity is controlled.
  • the concept for determining the number of operating compressors 11 of each heat pump chiller 41 and the operating capacities of the compressors 11 and the pumps 49 is the same as in the first embodiment.
  • the load side control device 48 detects a pressure drop in the water circuit 44b due to the use of the hot water supply terminal 43 by a pressure sensor 47 disposed in the water circuit 44b. Then, the load-side control device 48 controls the operating capacity of the pump 45 based on the detected water pressure so that a water circulation amount optimized to maintain the water pressure of the hot water supply terminal 43 at the set water pressure is obtained.
  • the load-side control device 48 operates the pump 45 at a necessary minimum so as to keep the temperature difference of the temperature sensor 46 at the inlet / outlet of the sealed tank 42 constant.
  • the current amount of heat and the necessary amount of heat that can be supplied from the sealed tank 42 to the hot water supply load are calculated using the water temperature and pressure of the circulating water and the load index. Compared to the conventional method using only the water temperature, it is possible to accurately grasp the amount of heat. As a result, since the operating capacity and the amount of circulating water can be adjusted optimally, the effect of increasing the efficiency of the entire air conditioning system can be obtained.
  • a hot water supply system that can maintain the water pressure of the hot water supply terminal 43 can be realized by arranging the pressure sensor 47 in the water inlet pipe and the water outlet pipe of the sealed tank 42 and issuing an operation instruction to the pump 45.
  • the temperature sensor 46 is disposed in the water inlet pipe and the water outlet pipe of the sealed tank 42, and the pump 45 is operated at the minimum necessary, so that the water circuit 44b is kept warm. Power saving can be realized.
  • the system described in the first embodiment and the second embodiment uses a heat pump chiller having a heat exchanger for heating or cooling water to a target temperature with the heat of a refrigerant such as chlorofluorocarbon as a heat source device.
  • a refrigerant such as chlorofluorocarbon
  • the refrigeration system of the present invention is not limited to one using the heat pump chiller as a heat source device.
  • the present invention can be applied to a system using other chillers, boilers, and electric water heaters as heat sources.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

La présente invention permet l'amélioration de l'efficacité d'un système de réfrigération par la détermination précise de la quantité de chaleur actuellement dans un appareil côté charge. La présente invention comprend : un refroidisseur (1) de pompe à chaleur, contenant un échangeur de chaleur (12) eau-fluide frigorigène, dans lequel la chaleur est échangée entre un fluide frigorigène et un milieu de chaleur, ainsi qu'un compresseur (11); un appareil côté charge (2); un circuit d'eau (4), dans lequel l'échangeur de chaleur eau-fluide frigorigène et l'appareil côté charge sont reliés l'un à l'autre par une conduite et de l'eau est amenée à circuler par une pompe (3) de manière à transporter la quantité de chaleur fournie par le refroidisseur de pompe à chaleur vers l'appareil côté charge; des capteurs de température (23a, 23b) qui détectent la température de l'eau; des capteurs de pression (24a, 24b) qui détectent la pression de l'eau; un capteur de température d'aspiration (25) qui détecte un indicateur de charge afin de déterminer la charge dans l'appareil côté charge; et un dispositif de commande (30) qui commande les opérations respectives du compresseur et de la pompe sur la base des valeurs obtenues respectivement par les capteurs de température, les capteurs de pression et le capteur de température d'aspiration.
PCT/JP2015/070184 2015-07-14 2015-07-14 Système de réfrigération WO2017009955A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
GB1800132.1A GB2555064B (en) 2015-07-14 2015-07-14 Refrigeration system
PCT/JP2015/070184 WO2017009955A1 (fr) 2015-07-14 2015-07-14 Système de réfrigération
JP2017528058A JP6681896B2 (ja) 2015-07-14 2015-07-14 冷凍システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/070184 WO2017009955A1 (fr) 2015-07-14 2015-07-14 Système de réfrigération

Publications (1)

Publication Number Publication Date
WO2017009955A1 true WO2017009955A1 (fr) 2017-01-19

Family

ID=57757911

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/070184 WO2017009955A1 (fr) 2015-07-14 2015-07-14 Système de réfrigération

Country Status (3)

Country Link
JP (1) JP6681896B2 (fr)
GB (1) GB2555064B (fr)
WO (1) WO2017009955A1 (fr)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357555A (zh) * 2018-10-31 2019-02-19 河南省建筑科学研究院有限公司 一种基于热源提供的换热器及其控制系统
JP2019049390A (ja) * 2017-09-11 2019-03-28 東芝キヤリア株式会社 熱源水制御方法及び熱源水制御装置
WO2020062598A1 (fr) * 2018-09-25 2020-04-02 珠海格力电器股份有限公司 Appareil et procédé de commande de fonctionnement pour unité à division multiple d'eau et support et système de climatisation à division multiple d'eau
WO2023181374A1 (fr) * 2022-03-25 2023-09-28 三菱電機株式会社 Système de climatisation
JP7378685B1 (ja) 2023-01-20 2023-11-13 三菱電機株式会社 冷凍サイクル装置

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112082238B (zh) * 2020-09-30 2021-08-13 美的集团股份有限公司 移动空调器的控制方法、移动空调器及存储介质

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1163631A (ja) * 1997-08-28 1999-03-05 Yamatake Honeywell Co Ltd 送水温度制御装置
JP2004293844A (ja) * 2003-03-26 2004-10-21 Hitachi Plant Eng & Constr Co Ltd 空調設備
JP2009192186A (ja) * 2008-02-18 2009-08-27 Hitachi Appliances Inc 冷凍システム
JP2009198088A (ja) * 2008-02-21 2009-09-03 Takasago Thermal Eng Co Ltd 空調制御システム、空調制御用プログラムおよび空調制御方法
JP2009204251A (ja) * 2008-02-28 2009-09-10 Denso Corp ヒートポンプ式給湯装置およびその制御方法
JP2012032034A (ja) * 2010-07-29 2012-02-16 Hitachi Appliances Inc 液体供給装置
JP2014145514A (ja) * 2013-01-29 2014-08-14 Daikin Ind Ltd 二次冷媒空気調和システム
JP2014202410A (ja) * 2013-04-04 2014-10-27 清水建設株式会社 熱源運転ナビゲーションシステム及びその方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1163631A (ja) * 1997-08-28 1999-03-05 Yamatake Honeywell Co Ltd 送水温度制御装置
JP2004293844A (ja) * 2003-03-26 2004-10-21 Hitachi Plant Eng & Constr Co Ltd 空調設備
JP2009192186A (ja) * 2008-02-18 2009-08-27 Hitachi Appliances Inc 冷凍システム
JP2009198088A (ja) * 2008-02-21 2009-09-03 Takasago Thermal Eng Co Ltd 空調制御システム、空調制御用プログラムおよび空調制御方法
JP2009204251A (ja) * 2008-02-28 2009-09-10 Denso Corp ヒートポンプ式給湯装置およびその制御方法
JP2012032034A (ja) * 2010-07-29 2012-02-16 Hitachi Appliances Inc 液体供給装置
JP2014145514A (ja) * 2013-01-29 2014-08-14 Daikin Ind Ltd 二次冷媒空気調和システム
JP2014202410A (ja) * 2013-04-04 2014-10-27 清水建設株式会社 熱源運転ナビゲーションシステム及びその方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019049390A (ja) * 2017-09-11 2019-03-28 東芝キヤリア株式会社 熱源水制御方法及び熱源水制御装置
WO2020062598A1 (fr) * 2018-09-25 2020-04-02 珠海格力电器股份有限公司 Appareil et procédé de commande de fonctionnement pour unité à division multiple d'eau et support et système de climatisation à division multiple d'eau
CN109357555A (zh) * 2018-10-31 2019-02-19 河南省建筑科学研究院有限公司 一种基于热源提供的换热器及其控制系统
WO2023181374A1 (fr) * 2022-03-25 2023-09-28 三菱電機株式会社 Système de climatisation
JP7378685B1 (ja) 2023-01-20 2023-11-13 三菱電機株式会社 冷凍サイクル装置

Also Published As

Publication number Publication date
JPWO2017009955A1 (ja) 2018-01-25
GB2555064A (en) 2018-04-18
GB201800132D0 (en) 2018-02-21
GB2555064B (en) 2020-09-23
JP6681896B2 (ja) 2020-04-15

Similar Documents

Publication Publication Date Title
WO2017009955A1 (fr) Système de réfrigération
US8660702B2 (en) Central cooling and circulation energy management control system
US11262092B2 (en) Air conditioning system including a ventilator that supplies humidified outdoor air
JP6570746B2 (ja) 熱媒体循環システム
US9562701B2 (en) Temperature control system and air conditioning system
US10203128B2 (en) Cold water circulation system with control of supply of cold water based on degree of air handler surplus
CN102770718A (zh) 空调系统及空调系统的控制方法
US11959652B2 (en) Machine learning apparatus, air conditioning system, and machine learning method
TW201736790A (zh) 用以控制冷凍系統之系統及方法
JP6644559B2 (ja) 熱源制御システム、制御方法および制御装置
WO2016077559A1 (fr) Calcul de capacité de refroidisseur embarqué
EP3370005B1 (fr) Système de climatisation
WO2020016959A1 (fr) Dispositif et procédé de climatisation
JP6095360B2 (ja) 熱負荷処理システム
WO2018087810A1 (fr) Système de commande de chauffage et système de chauffage d'eau chaude de pompe à chaleur
WO2013175890A1 (fr) Système de climatisation, système de climatisation intégré et dispositif de commande
JP2001241735A (ja) 空気調和システムおよびその制御方法
JP2004132610A (ja) 暖房システム及び暖房システム付き住宅
US11313577B2 (en) Air-conditioning system, machine learning apparatus, and machine learning method
JP2014126234A (ja) 熱負荷処理システム
KR20120124721A (ko) 냉각수를 이용한 냉방장치 및 그 제어방법
JP5285925B2 (ja) 空調システム
JP2006046839A (ja) 冷温水搬送システム
JP7399321B2 (ja) チラーシステム及びチラーシステムを有する空気調和装置
US20230069910A1 (en) Air conditioning system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15898267

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017528058

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 201800132

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20150714

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15898267

Country of ref document: EP

Kind code of ref document: A1