WO2016099253A1 - Construction de terrain de sport - Google Patents

Construction de terrain de sport Download PDF

Info

Publication number
WO2016099253A1
WO2016099253A1 PCT/NL2014/050896 NL2014050896W WO2016099253A1 WO 2016099253 A1 WO2016099253 A1 WO 2016099253A1 NL 2014050896 W NL2014050896 W NL 2014050896W WO 2016099253 A1 WO2016099253 A1 WO 2016099253A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
sports field
layer
water distributing
distributing layer
Prior art date
Application number
PCT/NL2014/050896
Other languages
English (en)
Inventor
Robin John CRAVEN
Original Assignee
Ten Cate Thiolon B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ten Cate Thiolon B.V. filed Critical Ten Cate Thiolon B.V.
Priority to CN201480084557.6A priority Critical patent/CN107208384A/zh
Priority to US15/537,469 priority patent/US10385520B2/en
Priority to AU2014414156A priority patent/AU2014414156B2/en
Priority to ES14825195T priority patent/ES2767374T3/es
Priority to NZ733868A priority patent/NZ733868B2/en
Priority to EP14825195.2A priority patent/EP3234262B1/fr
Priority to DK14825195.2T priority patent/DK3234262T3/da
Priority to PCT/NL2014/050896 priority patent/WO2016099253A1/fr
Publication of WO2016099253A1 publication Critical patent/WO2016099253A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/02Foundations, e.g. with drainage or heating arrangements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details
    • E01C2201/202Horizontal drainage channels

Definitions

  • the present invention relates to sport fields and in particular, to artificial sports fields comprising artificial turf.
  • the invention further relates to methods of construction for such sports fields and to water management and cooling thereof.
  • Semi-artificial pitches usually involve integrating artificial grass blades into a soil base in which regular turf is allowed to grow.
  • the soil base and its drainage arrangements may be otherwise similar to conventional natural grass pitches in order to ensure correct growth of the natural grass.
  • Fully artificial pitches have developed from first generation AstroturfTM to the present fourth generation systems, which attempt to combine all of the functions and characteristics of natural turf into a single product.
  • AstroturfTM first generation AstroturfTM
  • the present fourth generation systems which attempt to combine all of the functions and characteristics of natural turf into a single product.
  • one fundamental requirement is an adequate base onto which the technical layers can be laid.
  • a significant part of the overall cost of a new installation may lie in the preparation of the base. This should provide a guaranteed level of stability and drainage despite the fact that the underlying earth may vary considerably from one location or region to another.
  • water management refers to four main areas, these being; drainage, irrigation, storage and attenuation. • Drainage may be defined as the removal of water from the pitch area to an exit point away from the field construction. Excessive water or surface flooding will adversely affect the play performance and can cause movement of infill materials.
  • ⁇ Irrigation may be defined as the delivery of water onto the turf surface, by a system of pumps, pop-up sprinklers and water cannons.
  • the purpose of adding water to the surface may be either as part of the playing characteristics of the surface, or to cool the turf surface. In hot, sunny condition, artificial turf systems may heat up, to the point that the surface becomes uncomfortable and energy depleting to the players.
  • Storage may be defined as providing a holding facility which allows water, drained from the pitch, to be used e.g. in the irrigation of the pitch. This may be in an underground reservoir or an above-ground lake. Storage is also linked to water attenuation. ⁇ Attenuation may be defined as the temporary storage of surface water in a
  • This reservoir or lake needs to be of sufficient size to accommodate the calculated run-off during peak periods of rainfall.
  • the stored water may subsequently be gradually released in a controlled manner into a combined drainage system or
  • Vertical Method There are many variations and systems which come under the heading of vertical drainage, but the basic principal remains the same, that being a matrix or pattern of inter-connecting porous pipes, situated at the bottom of a porous rock base construction.
  • the porous base construction is designed to remove water permeating down from the artificial turf system above, through the upper layers of the porous rock sub-base. These pipes lead the water off the playing area into ring main land drains or similar water drainage control systems.
  • These pitches may have a profile which assists water movement; this is known as slope or fall.
  • CBR Californian Bearing Ratio
  • porous base construction In order to achieve this value for a porous base construction a greater depth must be considered. This is because porous stone constructions contain void spaces in order to allow water to pass through the structure. As a result, the overall strength of the structure is not as high and the stone has more mobility, as compared to an equivalent non-porous base construction.
  • porous stone bases typically have a minimum depth of 300mm.
  • Another issue is the requirement for expensive, specially graded rock types in order to create a porous base layer. This rock comes from virgin materials transported in by truck. For a standard porous pitch construction of 7500m 2 and a minimum stone depth of 300mm it would require 2475m 3 of stone or 4200tonnes. Given a standard truck can carry 20 tonnes this will require approx. 200 truckloads.
  • the vertical drainage method relies on creating a porous base construction which allows water to percolate down through the various stone grades to the field drains below.
  • the horizontal method uses a limited porosity or non-porous stone sub-base construction with no field drains below.
  • the basic principal is that the water flows across the surface of the artificial turf, through the infill and in some cases, within a shock pad/substrate which allows water to flow horizontally, above the stone sub-base construction.
  • the pitches are designed with a slope or fall, (as explained above) in order to ensure adequate water flow.
  • the water flowing off the sports field surface is then captured by drainage troughs or pipes installed around the perimeter of the turf installation. These pipes, themselves have a slope or fall in order to remove the water to main land drains or similar water drainage control systems.
  • This slope can be constructed in a variety of ways, either in one direction or in multiple directions.
  • the construction of such a slope requires skill from the pitch builder and influences ball behaviour of the finished turf surface.
  • a layer must be installed between the turf and the base construction in order for water to move freely down the slope to the perimeter drains. This layer can be provided by certain types of shock pads and /or geo-technical fabrics.
  • WO2012138216 uses a porous sub-grade course laid on an impermeable surface to transport water to the edge of the pitch, where it can be drained away by conventional drains. It is also proposed to use the sub-grade course as a containment e.g. for re-circulation to the playing surface as described below.
  • Standard irrigation systems rely on water from the mains supply which is pumped to water cannons or pop-up sprinklers located on or around the pitch.
  • water captured from the pitch's drainage system is piped into storage facilities and recirculated back on to the pitch by means of water cannons or pop-up sprinklers.
  • a filtration facility may also be required in this case.
  • the use of the water is either as part of the turf system performance or for use as cooling during hot weather. For a full-sized hockey pitch from 12000 to 18000 litres may be required to wet the pitch prior to play.
  • SUDS Sustainable urban drainage systems
  • LID low impact drainage systems
  • SUDS systems are designed to act as collection, storage and gradual release of rain water during and after large storm events.
  • urban systems in existence; from soak away pits, multiple sub-terrain chambers to open storage lakes etc. all of which are designed to ensure rainwater being collected from non-porous surfaces such as roads, roofs and car parks is directed, stored and then slowly released into the drainage system at a controlled, manageable flow rate.
  • the major drawback with these systems is the fact they need to be built in urban locations where space is at a premium.
  • Systems which rely on soak away pits or areas of graded rock to hold water and then slowly disperse it by natural ground seepage are also prone to silting up due to sands, clays and fine dirt etc. slowly penetrating the formation.
  • a sports field comprising: a stable, impermeable substrate; a water distributing layer provided over the substrate; an artificial turf layer over the water distributing layer; a bund defining a perimeter of the sports field and extending from the substrate to at least the height of the artificial turf layer; and a drain channel having inlets at a height to communicate with the water distributing layer such that water can flow from the water distributing layer into the drain channel and vice versa.
  • a containment defined by the bund surrounding the field and by the substrate. Water can be held within the containment in the water distributing layer.
  • water can be allowed to flow out of the containment into the drain channel if the level of water in the drain channel is below that of the water distributing layer.
  • water can be allowed to flow from the drain channel into the containment if the level of water in the drain channel is higher than that of the water distributing layer.
  • the containment and the drain channel may thus form a common system between which there is no opportunity for water to leak or seep away.
  • inlets it will be understood that the water may flow in both directions through them. It is also not excluded that water may flow into the containment through one set of openings and out of the containment to the drain channel through a second set of openings.
  • references to a sports field is intended to include any area of artificial turf, including but not limited to pitches, games areas, play areas and the like.
  • the invention is applicable to sports areas on which humans play and run although it is not excluded that it may also be applicable to animal sports or motor sports.
  • artificial turf is not intended to be limiting on any particular kind of turf, including turf with artificial infill, sand or without infill.
  • the bund may be an upstanding edge of the stable impervious substrate.
  • the bund may be a separate kerb installed for the purpose.
  • the bund may comprise a plurality of kerb elements such as concrete kerbing, linked together.
  • the height of the bund should extend above the top of the water distributing layer, whereby at least part of the turf is within the containment.
  • the bund may extend to the full height of the turf such that the water level may be raised to completely flood the sports field.
  • the bund may also slope upwards from the water distributing layer to the height of the turf and may be surrounded by ground at the higher level.
  • the top of the bund may also be rounded or any other convenient shape.
  • the bund may be manufactured from plastics materials such as recycled plastics and may be at least partially resilient to prevent player injuries.
  • the drain channel may be at any position such that it can communicate via the inlets with the water distributing layer.
  • the drain channel surrounds the sports field and is at the same level as the water distributing layer.
  • the drain channel may be integrally formed with the bund.
  • the bund may comprise hollow kerb elements that can be assembled together to define the drain channel.
  • the sports field may comprise a water management facility arranged to control the height of the water within the drain channel. In this way, it may be determined whether water flows from the water distributing layer into the drain channel or vice versa. Any appropriate arrangement for controlling the water within the drain channel may be used, including pumps, valves, buffer reservoirs and the like.
  • an outlet from the drain channel may be connected to the water management facility although again, it is emphasised that the construction may allow flow in both directions through this outlet.
  • the drain channel may extend both below and above the water distributing layer.
  • the water management facility may have an overflow arrangement to ensure that excess water cannot overflow the bund. This may be important in the case of infill provided in the artificial turf which may otherwise be washed away.
  • the stable impermeable substrate may be constructed in any appropriate manner to achieve the required stability for the intended sport.
  • aggregates used can be either from virgin or recycled sources and have a particle size of from 20mm to dust.
  • the inclusion of cement and or similar agents within the aggregates can be used in order to increase the strength, non-porosity and compaction values.
  • the stable impermeable substrate may comprise a stabilised in-situ soil substrate.
  • Soil stabilisation techniques are generally well known in various contexts but because of the non-porous nature of the technique, soil stabilisation has not been utilised in the construction of artificial turf pitches. This combination and the ability to use the existing on site soil, represents a major cost and environmental saving on a construction project as material on the job site is not required to be excavated and removed or new graded material shipped to site to build the pitch foundation.
  • the soil is stabilised to a depth of at least 100 mm, optionally to a depth of more than 200 mm and in a preferred embodiment to around 300 mm.
  • an ideal load bearing capacity of the finished base construction may be CBR 30%.
  • some sub-soil modification may be required (i.e. below the base construction). For example subsoils with a value of 4.5% CBR or below may require lime modification, whereas sub-soils of 5% CBR or above need not require such modification. In some construction projects a CBR of 15% may suffice.
  • the stabilised in-situ soil substrate may be lime-modified.
  • the lime modification process involves the addition of small amounts of binder (quicklime) to the host material to substantially reduce moisture content transforming the wet/unsuitable material into a useable and compactable construction material with a 5% CBR.
  • it may comprise a capping replacement layer or a sub-base replacement layer, whereby binders (quicklime and cement) are incorporated into the host material along with the addition of water. The material may then be compacted and trimmed leaving a layer with the required CBR.
  • binders quicklime and cement
  • the material may then be compacted and trimmed leaving a layer with the required CBR.
  • lime and cement-based stabilisation techniques may be preferred, the skilled person will be well aware of other soil stabilisation techniques that may be applied depending on local soil conditions and locally available stabilisation agents.
  • Such agents may include enzymes, surfactants, natural and synthetic polymers, resins, salts and fibre reinforcement.
  • the stable impermeable substrate may comprise an impervious membrane or coating.
  • the membrane may comprise a geotextile liner.
  • Suitable coatings include bitumen, polymer, resins and cement. This is particularly applicable in cases where the base is not itself impermeable.
  • the water distributing layer has a depth of between 10 mm and 100 mm, optionally around 40 mm.
  • the total depth chosen for the water distributing layer may be dependent on a number of factors. In general, the deeper the water distributing layer, the greater the volume of the containment below the artificial turf and the greater will be the through-flow area for drainage purposes. If the sports field is constructed without gradient or run-off, the effectively available gradient between the upper side of the water distributing layer in the middle of the pitch and the underside of the water distributing layer at the edge of the pitch will depend on the distance between these two points and the thickness of the water distributing layer. For a football pitch having a distance from centre line to the bund of around 35 m, a depth of around 100 mm may give improved drainage.
  • the sports field may be formed to be completely level.
  • the bund will generally be completely level, since its upper edge will define the limit to which water may rise without overflowing the bund.
  • the upper surface of the water distributing layer may be substantially horizontal too. In this context, horizontal is intended to denote that it has no appreciable run-off at its surface. It will nevertheless be understood that its absolute level and evenness will be largely dictated by the accuracy and care of placement.
  • the upper surface of the water distributing layer may have no gradient greater than 1 in 100 and optionally less than 1 in 300. It may also exhibit no variation in height of more than 10mm over a 3 metre straight edge.
  • the substrate may also be substantially level.
  • the thickness of the water distributing layer may be constant over the whole sports field. Producing a level substrate is significantly easier than accurately providing a desired slope in one or more directions. It also simplifies the laying of the following water distributing layer to be horizontal and makes possible the construction of the water distributing layer using prefabricated elements.
  • the water distributing layer comprises recycled plastic granules and a binder.
  • WO2012/138216 the contents of which is included herein by reference in its entirety, and can conveniently be applied using specialist paving equipment used in sport pitch and running track installation.
  • Preferred granule sizes may range from 0.5 - 20 mm although granules in the range from 3 mm to 8 mm have given good results. It is also not excluded that flakes, rods, pellets and elongated extrudates may also be used.
  • the binder may be any binder appropriate to the granules used and to the intended use and location.
  • Preferred binders include bitumen, polyurethane or polyolefin based binders and they may be present at between 5% and 40% by weight of the granules, preferably between 15% and 25% and in one embodiment at around 20%.
  • the water distributing layer may also be formed according to the method described in EP1603725, whereby partially melted particles of waste plastic material are welded together to form a porous layer. This method may be particularly applicable to preformed layers although it is not excluded that it may also be used in-situ.
  • the water distributing layer may also comprise other components, in particular other granules. In particular, rubber or stone granules may be included at up to 50% by weight or even up to 70% by weight in the final mixture in order to adjust the technical properties of the layer.
  • the water distributing layer may comprise a number of sub-layers having different properties. This may particularly be the case where the uppermost portion of the water distributing layer serves as a performance layer having required shock absorbing and energy restitution values.
  • the water distributing layer may be constructed to have a void ratio of between 20% and 70%, optionally around 45%.
  • a layer thickness of 40mm equates to 18 Its per m 2 or 135,000 Its water storage capacity for the entire pitch, excluding the additional capacity of the drain channel.
  • the void ratio may be adjusted by varying the size and shape of granules or particles forming the layer and by varying the pressure applied during manufacture.
  • the water distributing layer may have a specific density of between 300 Kg/m3 and 700 Kg/m3, preferably between 400 Kg/m3 and 600 Kg/m3 and most preferably around 500 Kg/m3.
  • the water distributing layer may be provided to have engineering properties of strength and modulus according to the intended sport or activity. This will also depend on the nature of the artificial turf layer above and any other performance layers. In certain embodiments, the water distributing layer will be effectively rigid, whereby primary shock absorption for the players is provided by performance layers above the water distributing layer. According to one embodiment of the invention, the water distributing layer may have a Young's modulus in compression of greater than 0.1 MPa, alternatively greater than lMPa and in an embodiment, greater than 2MPa. In general, the Young's modulus in compression will be less than 50 MPa, alternatively less than 10 MPa and in an embodiment, less than 5 MPa. In other embodiments, the sports field may further comprise a resilient layer provided between the water distributing layer and the artificial turf layer.
  • a stable, impermeable substrate providing a water distributing layer over the substrate; installing an artificial turf layer over the water distributing layer; forming a bund defining a perimeter of the sports field and extending from the substrate to at least the height of the artificial turf layer; and providing a drain channel communicating with the water distributing layer such that water can flow from the water distributing layer into the drain channel and vice- versa.
  • the substrate may be an existing substrate that meets the requirements of stability and permeability.
  • Such substrates may include brown-field sites, including concrete and asphalted surfaces.
  • the substrate may be formed by any conventional procedure using either materials imported to the site or soil stabilisation of the existing on-site soil as described further above.
  • the stability of the substrate may be at least CBR 15% and if stabilised using soil stabilisation of existing soil may preferably be carried out to a depth of at least 100 mm.
  • the invention may comprise providing an impermeable membrane or coating over the stable base to ensure the required permeability.
  • absolute impermeability of the substrate may be non-critical and merely for the avoidance of water seeping away from the containment. In certain situations, such as rooftop playing fields, absolute impermeability may be a
  • the method of providing the water distributing layer may in one embodiment comprise in-situ laying of a semi-fluid mass comprising recycled plastic granules and a binder, levelling the semi-fluid mass and allowing the semi-fluid mass to solidify to form a rigid porous layer.
  • the process can be carried out using a conventional paving machine of the type used for road or sports surfaces.
  • providing the water distributing layer may comprise paving the substrate with pre-formed porous slabs of recycled plastic granules.
  • the slabs may be made off-site in a controlled process whereby carefully determined performance characteristics may be achieved.
  • the slabs may be provided with interlocking elements and may also be adhered or otherwise affixed to the substrate.
  • the method of forming the bund may comprise installation of hollow curb-stones, joined end-to-end to form an integral drain channel. It is also contemplated that a continuous length of drain channel may be installed around the field to form the bund.
  • the invention also relates to a method of cooling a sports field comprising an artificial turf layer on a porous water distributing layer within an impervious containment, the method comprising filling the containment with water to a depth sufficient to immerse at least part of the artificial turf layer over the full area of the sports field and subsequently draining the water from the containment.
  • the water may be partially drained, to a level whereby the sports field can be used, while retaining water within the containment. Alternatively, the water may be completely drained.
  • the turf may be wetted from below, whereby the water level in the water distributing layer rises until the turf is either partially or completely immersed. Additional wicking provisions may be included within the water distributing layer or in the turf layer or therebetween to encourage the transport of water to the surface. Irrigation from below in this manner avoids the use of sprays and nozzles, which are often only partially effective and require a higher level of microbial cleanliness than is the case for ground water.
  • the water may be introduced and removed via inlets communicating between the water distributing layer and a drain channel.
  • the invention further relates to a method of attenuating water in a sports field comprising an artificial turf layer on a porous water distributing layer within an impervious containment, the method comprising collecting rainfall within the containment during periods of rain and controlling discharge from the containment during periods of little or no rain.
  • the water collected may be rain falling on the sports field but may also be water falling on surrounding areas that can be supplied to the containment via a drain channel communicating with the water distributing layer.
  • Figure 1 shows a sectional view of a portion of a sports field according to the invention.
  • Figure 2 shows a cross-section through the sports field of Fig. 1 along line II-II showing the water management system.
  • FIG 1 shows a perspective sectioned view of a portion of a sports field 1 according to an example of the present invention.
  • the sports field 1 comprises three main layers, namely a substrate 2, a water distributing layer 4 and an artificial turf layer 6. The whole is enclosed by a bund 8.
  • the substrate 2 is a soil stabilised layer having a depth of 300 mm as will be described in further below. Underneath the substrate 2 is the natural soil layer 10, which is also present behind the bund 8.
  • a bitumen coating 12 On the upper surface of the substrate 2 is provided a bitumen coating 12, which imperviously seals the substrate 2 up to the bund 8.
  • the water distributing layer 4 is a 40 mm thick layer of a 50 % by weight mixture of recycled plastic granules and rubber granules bound together with a polyurethane binder present at 14 % by weight of the total.
  • the resulting layer has a void ratio of around 45%.
  • the artificial turf 6 is a premier tufted third generation turf having a pile height of 60 mm and a rubber and sand infill available from Tiger TurfTM as Total Turf 60XQ.
  • the bund 8 is formed by interlocked hollow kerbstones 14 provided with a drain channel 16 and inlets 18.
  • the kerbstones 14 are of 600 mm depth and the inlets 18 are slots of 50 mm length, extending to a level 100 mm below the top of the bund 8.
  • the kerbstones 14 are set in a concrete haunch 20 and are sealed to each other by a mastic bead 22.
  • the substrate 2, and the bund 8, together with the drain channel 16 form a containment 24 which is largely impervious and can retain water for a significant period.
  • the drain channel 16 is connected to a water management facility 26, which controls inflow to and outflow from the containment 24
  • Figure 2 shows a cross-section through the sports field 1 along the line II-II in Figure 1 showing the substrate 2, the water distributing layer 4, the artificial turf layer 6 and the kerbstones 14.
  • Figure 2 also illustrates the water management facility 26, which comprises a chamber 28, connected to an outlet 30 from the drain channel 16. It will be understood that although a single outlet 30 is shown, there may be a plurality of such outlets 30 around the periphery of the sports field 1, connected to the chamber 28 by a ring drain or the like.
  • Chamber 28 is further connected through a valve flow gate 32 to the storm water drainage system 34.
  • a water supply pipe 36 is attached to the top side of the chamber 28.
  • this water supply pipe 36 is connected to the mains or another source of water such as a recycled water by a stop cock 38. It will be understood that the water supply pipe 36 may be connected to any suitable source of water such as a recycled water and that a pump arrangement may be provided rather than a stop cock.
  • a controller 40 ensures control of the valve flow gate 32 and the stop cock 38, which may be automated or manually controlled.
  • the soil was a relatively heavy clay soil.
  • the process was carried out using a Wirtgen WR2500 SK integrated mixer to ensure that the mixed layer was consistent both in mix quality and also in the depth of the mixed layer.
  • the area was levelled by a laser levelling bulldozer and then rolled with a 20 tonne roller. The area was then left overnight so that the chemical reaction between the lime and the soil could take effect.
  • cement and water were introduced in amounts determined by the analysis in order to create a hydraulically bonded material.
  • Wirtgen mixer was again used whereby the machine controlled the precise amount of water and cement required. Cement was delivered from tanks inside the machine while water was fed from a browser in front of the machine. Again the soil was treated to a depth of 300mm. During the process, samples of the mixed material were periodically tested to check that the material was behaving as predicted. Following soil mixing, the laser levelling bulldozer again graded and levelled the materials to a surface tolerance of +-10mm over a 3 metre straight edge, while the 20 tonnes roller compacted the surface. After completion, in order to seal the finished surface of the substrate 2, it was sprayed with bitumen coating 12.
  • the substrate 2 was exceptionally stable, would carry heavy equipment and could be trafficked without any effect.
  • CBR levels of around 60% were estimated over the whole surface.
  • a circular saw was used to cut the substrate 2 cleanly with a 75 mm gap to the front of the bund 8.
  • the kerbstones 14 were then joined to each other with a mastic bead 22 to ensure a watertight seal.
  • the water distributing layer 4 was laid. First, the plastic and the rubber granulates were metered in equal amounts using a SMG
  • the turf 6 was installed in a conventional manner, and filled with a mixture of rubber granules and sand. The turf 6 was laid up to the bund 8 at all sides and to the same level.
  • a sample of water distributing layer 4 manufactured to the same specification as the example described above was laboratory strain tested in compression to determine its Young's modulus.
  • the sample size was 250 mm square, having a nominal thickness of 40 mm.
  • the nominal density of the sample was 520 kg/m3.
  • An Instron compression machine was utilised, with a load cell of 10 kN capacity.
  • the loading plates were: 100 mm top compression plate, 300 mm bottom compression plate.
  • test protocol was as follows;
  • the sample was compressed up to the pre-set load of 2500N. The load was then removed and the sample examined for any signs of damage.
  • the sample was compressed up to the pre-set load of 5000N. The load was then removed and the sample examined for any signs of damage.
  • c The sample was compressed to the pre-set load of 2500N and the load maintained for a period of 7 hours.
  • the vertical strain at 2500N was estimated at approximately 10%.
  • the gradient of the force versus deformation graphs permitted an estimate of the sample (spring) stiffness to be in the range of 600 kN/m.
  • the stress/strain data suggests an (elastic) stiffness modulus of approximately 3.2 MPa.
  • the test was repeated with a 24 mm thick sample having the same composition as that of the previous sample. This had a nominal density of 490 Kg/m3.
  • the vertical strain at 2500N was approximately 17% and the gradient of the force versus deformation graph permitted an estimate of the sample (spring) stiffness to be in the range 570 kN/m.
  • the stress/strain data suggests an (elastic) stiffness modulus of approximately 2MPa.
  • the valve flow gate 32 may be controlled to keep the level of water at a predetermined level within the water distributing layer 4 or may be set to slowly release it into the storm water drainage system 34 to allow for attenuation.
  • additional water may be introduced into the water management facility 26 through the water supply pipe 36 to cause the water level in the containment 24 to rise above the level of the water distributing layer 4.
  • the sports field 1 can be quickly cooled. Subsequently draining the water from the containment 24 allows the designated sport to be practiced, while the artificial turf layer 6 may continue to evaporate moisture thereby keeping the sports field 1 cool.
  • the water management facility 26 may be provided with a buffer reservoir having a capacity equal to the size of the containment or at least the part of the containment above the water distributing layer 4, allowing this portion of the sports field 1 to be filled and emptied prior to play commencing.
  • the arrangement of sub-base construction and its design may be based on local geological conditions and materials available. Thicknesses and ratios of granulated materials of the water distributing layer, kerb size and shape, drainage hole frequency, size and shape water inlet and outlet points attenuation and water flow rates, and water input and extraction facilities may all be dependent on performance requirements and may be distinct from the schematically illustrated design.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

L'invention concerne un terrain de sport qui comprend un substrat stable, imperméable, une couche de distribution d'eau disposée sur le substrat et une couche de gazon artificiel sur la couche de distribution d'eau. Une digue définit le périmètre du terrain de sport et s'étend depuis le substrat jusqu'à au moins la hauteur de la couche de gazon artificiel. Un canal d'évacuation comportant des orifices d'entrée à une hauteur permettant au canal de communiquer avec la couche de distribution d'eau est disposé de telle sorte que l'eau puisse s'écouler à partir de la couche de distribution d'eau dans le canal d'écoulement et vice versa. Grâce à cette construction, il est formé une enceinte de confinement définie par la digue entourant le terrain et par le substrat. L'eau peut être maintenue à l'intérieur de l'enceinte de confinement dans la couche de distribution d'eau, ce qui permet l'atténuation des eaux et le refroidissement du terrain de sport.
PCT/NL2014/050896 2014-12-19 2014-12-19 Construction de terrain de sport WO2016099253A1 (fr)

Priority Applications (8)

Application Number Priority Date Filing Date Title
CN201480084557.6A CN107208384A (zh) 2014-12-19 2014-12-19 运动场构造
US15/537,469 US10385520B2 (en) 2014-12-19 2014-12-19 Sports field construction
AU2014414156A AU2014414156B2 (en) 2014-12-19 2014-12-19 Sports field construction
ES14825195T ES2767374T3 (es) 2014-12-19 2014-12-19 Método para enfriar un campo deportivo
NZ733868A NZ733868B2 (en) 2014-12-19 Sports field construction
EP14825195.2A EP3234262B1 (fr) 2014-12-19 2014-12-19 Méthode de refroidissement d'un terrain de sport
DK14825195.2T DK3234262T3 (da) 2014-12-19 2014-12-19 Fremgangsmåde til afkøling af en sportsplads
PCT/NL2014/050896 WO2016099253A1 (fr) 2014-12-19 2014-12-19 Construction de terrain de sport

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/NL2014/050896 WO2016099253A1 (fr) 2014-12-19 2014-12-19 Construction de terrain de sport

Publications (1)

Publication Number Publication Date
WO2016099253A1 true WO2016099253A1 (fr) 2016-06-23

Family

ID=52339260

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NL2014/050896 WO2016099253A1 (fr) 2014-12-19 2014-12-19 Construction de terrain de sport

Country Status (7)

Country Link
US (1) US10385520B2 (fr)
EP (1) EP3234262B1 (fr)
CN (1) CN107208384A (fr)
AU (1) AU2014414156B2 (fr)
DK (1) DK3234262T3 (fr)
ES (1) ES2767374T3 (fr)
WO (1) WO2016099253A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10316473B2 (en) 2015-04-13 2019-06-11 Ten Cate Thiolon B.V. Modular structure for installing an artificial playing field
CN111424495A (zh) * 2020-04-21 2020-07-17 中国电建集团成都勘测设计研究院有限公司 一种一体化路缘石双过滤排水装置及施工方法
EP3256645B1 (fr) * 2015-02-10 2020-08-26 Desso Sports B.V. Gazon artificiel

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10130089B2 (en) 2014-07-24 2018-11-20 Live Holdings LLC Fishing caddy system and method
EP3495555B1 (fr) * 2017-12-07 2020-12-16 Advanced Polymer Technology Corp. Procédé de fabrication d'un système de gazon artificiel et système associé
CN109183555A (zh) * 2018-10-29 2019-01-11 林敦玉 一种预制型塑胶场地面层及其施工方法
DK3656919T3 (da) * 2018-11-20 2023-08-14 Dutchblue World B V Sportsplads og fremgangsmåder til dannelse og anvendelse af samme
GB202308158D0 (en) * 2023-05-31 2023-07-12 Flushu Ltd Water management system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0373282A1 (fr) * 1988-12-13 1990-06-20 "H.R.B. Chemie Hiroba Belgium" Procédé pour la réalisation et l'entretien d'un terrain, en particulier d'un terrain de sport, et terrain obtenu par ce procédé
GB2352954A (en) * 1999-08-04 2001-02-14 Charles Lawrence Surfaces Plc Playing field with integrated drainage and recycled water irrigation system
EP1603725A1 (fr) 2003-03-19 2005-12-14 Econoplas Limited Elements de drainage/d'irrigation issus de plastiques recycles
WO2012138216A1 (fr) 2011-04-05 2012-10-11 Ten Cate Thiolon B.V. Procédé de formage d'un substrat pour une surface de sport d'un terrain de sport, substrat ainsi que terrain de sport pourvu dudit substrat
US20120321389A1 (en) * 2011-06-20 2012-12-20 Kreikemeier John E Surface and sub-serface drain system
NL2009968C2 (nl) * 2012-12-12 2014-06-16 Oranjewoud Realisatie B V Onderbouwconstructie voor een kunstgrasveld, sportveld voorzien daarvan en werkwijze daarvoor.

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3418897A (en) * 1967-06-12 1968-12-31 Robert A.R. Humalainen Artificial playing surface
US20030092531A1 (en) * 2001-11-09 2003-05-15 Daluise Daniel A. Vertical to horizontal draining synthetic turf
CN2635719Y (zh) * 2003-06-02 2004-08-25 谢昌德 具渗透性和弹性的人工草坪运动场地结构
US7758749B2 (en) * 2006-06-21 2010-07-20 General Sports Venue Llc Drainage filtration system for synthetic turf field
KR101675109B1 (ko) * 2010-08-06 2016-11-11 삼성전자주식회사 표면 플라즈몬 공명을 이용하여 발광 특성이 향상된 발광 소자 및 그 제조 방법
CZ22210U1 (cs) 2010-12-27 2011-05-16 TENNIS Zlín, a. s. Stavební systém povrchu externího sportoviště krytého syntetickou trávou
FR2971797B1 (fr) 2011-02-21 2014-03-28 Travaux Et D Amenagements Regionaux Soc D Dispositif de stabilisation d'un sol poreux
CN202925421U (zh) * 2012-10-29 2013-05-08 国家体育总局体育科学研究所 一种运动场草坪通气、温控与水循环系统
CN103924497A (zh) * 2014-04-17 2014-07-16 大连德合东马市政工程有限公司 具有透水、保水、保肥团粒结构土的足球场地

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0373282A1 (fr) * 1988-12-13 1990-06-20 "H.R.B. Chemie Hiroba Belgium" Procédé pour la réalisation et l'entretien d'un terrain, en particulier d'un terrain de sport, et terrain obtenu par ce procédé
GB2352954A (en) * 1999-08-04 2001-02-14 Charles Lawrence Surfaces Plc Playing field with integrated drainage and recycled water irrigation system
EP1603725A1 (fr) 2003-03-19 2005-12-14 Econoplas Limited Elements de drainage/d'irrigation issus de plastiques recycles
WO2012138216A1 (fr) 2011-04-05 2012-10-11 Ten Cate Thiolon B.V. Procédé de formage d'un substrat pour une surface de sport d'un terrain de sport, substrat ainsi que terrain de sport pourvu dudit substrat
US20120321389A1 (en) * 2011-06-20 2012-12-20 Kreikemeier John E Surface and sub-serface drain system
NL2009968C2 (nl) * 2012-12-12 2014-06-16 Oranjewoud Realisatie B V Onderbouwconstructie voor een kunstgrasveld, sportveld voorzien daarvan en werkwijze daarvoor.

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3256645B1 (fr) * 2015-02-10 2020-08-26 Desso Sports B.V. Gazon artificiel
US10316473B2 (en) 2015-04-13 2019-06-11 Ten Cate Thiolon B.V. Modular structure for installing an artificial playing field
CN111424495A (zh) * 2020-04-21 2020-07-17 中国电建集团成都勘测设计研究院有限公司 一种一体化路缘石双过滤排水装置及施工方法

Also Published As

Publication number Publication date
EP3234262B1 (fr) 2019-11-06
US20170328017A1 (en) 2017-11-16
AU2014414156B2 (en) 2020-07-23
US10385520B2 (en) 2019-08-20
CN107208384A (zh) 2017-09-26
AU2014414156A1 (en) 2017-08-10
NZ733868A (en) 2021-09-24
DK3234262T3 (da) 2020-02-03
ES2767374T3 (es) 2020-06-17
EP3234262A1 (fr) 2017-10-25

Similar Documents

Publication Publication Date Title
AU2014414156B2 (en) Sports field construction
US3446122A (en) Elastic surfaces for sportsgrounds,playgrounds and footpaths
CN103669145A (zh) 一种透水路面结构的铺装方法
KR100500957B1 (ko) 투수성 포장재를 가진 도로 경계용 측구 및 그의 시공 방법
CN106284495B (zh) 集雨型屋顶雨水花园
KR101206728B1 (ko) 빗물 활용이 가능한 친환경 인조잔디 구조체 및 그 시공방법
CN207130558U (zh) 一种路基填筑结构
JP6076055B2 (ja) 人工芝の敷設構造
KR100966468B1 (ko) 보강매트와 유공관이 결합된 무 배수로 투수 기층구조 의 시공방법.
JP4997482B2 (ja) 人工芝グラウンドの施工方法
CN111549603A (zh) 一种考虑水荷载耦合的人行道路面及其施工方法
CN207793792U (zh) 一种路面透水铺装结构
KR100966473B1 (ko) 비노출 배수로의 기층구조 및 유공관을 포함하는 비노출 배수로의 시공방법
JP4589700B2 (ja) 保水性舗装構造の施工方法
NZ733868B2 (en) Sports field construction
CN208136657U (zh) 一种用于海绵城市建设的路面结构
CN209082278U (zh) 一种海绵城市生态道路路基结构
Bradford et al. Rainwater management to mitigate the effects of development on the urban hydrologic cycle
CN206360052U (zh) 一种海绵式雨水渗透收排系统
JP2003147716A (ja) 透・排水性及び保水性を備えた舗装及びその施工方法
CN111395098B (zh) 优先流通道集水结构
JP2003160906A (ja) 透・排水性及び保水性を兼ね備えた舗装及びその施工方法
US10597830B1 (en) Apparatus, system, and method for providing drainage of a surface layer
Chen Maintenance and improvement in the ecological environment of the island: The design and application in high bearing structure pervious pavement
CN207919280U (zh) 适于户外体育场的透水型运动地面

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14825195

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 15537469

Country of ref document: US

REEP Request for entry into the european phase

Ref document number: 2014825195

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2014414156

Country of ref document: AU

Date of ref document: 20141219

Kind code of ref document: A