WO2016034027A1 - Procédé et système d'adaptation de coffrage de logiciel spatial tridimensionnel - Google Patents

Procédé et système d'adaptation de coffrage de logiciel spatial tridimensionnel Download PDF

Info

Publication number
WO2016034027A1
WO2016034027A1 PCT/CN2015/086029 CN2015086029W WO2016034027A1 WO 2016034027 A1 WO2016034027 A1 WO 2016034027A1 CN 2015086029 W CN2015086029 W CN 2015086029W WO 2016034027 A1 WO2016034027 A1 WO 2016034027A1
Authority
WO
WIPO (PCT)
Prior art keywords
template
building
list
design
formwork
Prior art date
Application number
PCT/CN2015/086029
Other languages
English (en)
Chinese (zh)
Inventor
王成义
林俊天
刘顺林
张亮
Original Assignee
深圳汇林达科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳汇林达科技有限公司 filed Critical 深圳汇林达科技有限公司
Publication of WO2016034027A1 publication Critical patent/WO2016034027A1/fr

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]

Definitions

  • the invention belongs to computer aided design technology, in particular to a method and system for matching three-dimensional space software.
  • the building 3D model has a wide range of applications as an important scene model, such as game scenes, real estate display, safety preview, architectural design evaluation, etc., all of which have urgent requirements for building models.
  • the initial solution is to be manually modeled by artists, which not only consumes a lot of human and financial resources, but also has low efficiency and long model generation period.
  • the technical problem to be solved by the present invention is to provide a three-dimensional space software matching method, which aims to quickly and accurately obtain a required building model from related drawings of a building, thereby obtaining a building template for the building construction quickly and accurately. information.
  • the present invention is implemented in such a manner that a three-dimensional space software matching method includes the following steps:
  • Step A identify the building drawings to confirm whether the drawings themselves have errors
  • step B the change information of the building structure between the floors or the same floor is identified from the uncorrected drawing in step A and the remarks are made to obtain the deepened design drawing;
  • Step C dividing the flow operation area on the confirmed deep design drawing, and classifying the building structure modules required for each flow operation area; the flow operation area is used to characterize the sequence of operations for each area;
  • Step D respectively, building a building model for each building structural module according to the classification result
  • Step E receiving user-defined template design rule information, thereby establishing a corresponding standard template component library;
  • the template design rule information includes a standard template and a non-standard template included in the building structure, and a standard template Arrangement rules for non-standard templates in building structures;
  • Step F according to the established building model and the template design rule information, perform template matching on each building structure module, and number all the templates according to the classification result of step C, and generate a matching pattern to be confirmed; Contains category information to which each template belongs;
  • Step G after the proof pattern to be confirmed is confirmed, generate a formal model map and a template list, and calculate a template expansion area and a mold area of the entire building item, and materials of the template and its accessories, weight;
  • Step H according to the template list, comparing the existing inventory situation, according to the comparison result, listing a template list and a processing plan and a purchase list that require new processing, and a template processing drawing that requires a new processing, wherein
  • the list of templates that require a new process contains template information that does not exist in the existing inventory and is included in the list of templates.
  • a second technical problem to be solved by the present invention is to provide a three-dimensional space software matching system, comprising:
  • Deepen the design module to identify the building drawings to confirm whether the drawing itself has errors; identify the change information of the building structure between the floors or the same floor from the unconfirmed drawings in step A and make a remark Deepen the design drawings; then divide the flow area on the confirmed deepened design drawings, and classify the building structure modules required for each flow area; the flow area is used to characterize the sequence of operations for each area;
  • the template arranging module is configured to respectively establish a building model for each building structural module according to the classification result; and receive user-defined template design rule information, thereby establishing a corresponding standard template spare parts library;
  • the template design rule information includes There are standard templates and non-standard templates included in the structure of the building, and layout rules information of the standard templates and non-standard templates in the building structure; then, according to the established building model and the template design rule information,
  • the building structure module performs the matching template, and all the templates are numbered according to the classification result, and the matching pattern to be confirmed is generated; the number includes the category information to which each template belongs, and finally the matching pattern to be confirmed is confirmed.
  • a formal model map and template list are generated, and the template expansion area and the mold area of the entire building project, as well as the materials and weights of the template and its accessories are calculated;
  • a material management module configured to compare the existing inventory situation according to the template list, and according to the comparison result, list a template and a processing plan and a procurement list that need to be newly processed, and a template processing drawing that needs a new processing, wherein
  • the template list that needs to be newly processed contains template information that does not exist in the existing inventory but is included in the template list.
  • the invention has the following advantages:
  • the use of the present invention to carry out the mold design of the loose-fitting template greatly reduces the workload and work intensity of the designer.
  • the use of the present invention for the design of the mold greatly improving the speed of the mold.
  • the traditional manual molding about 30 buildings of about 30 floors, takes 30 days to complete, and the invention can be shortened to 1-3 days.
  • the use of the present invention for the design of the mold can greatly reduce the labor cost of the enterprise.
  • the design and configuration of a building of about 30 floors can take 5-6 people to complete.
  • the invention one person can carry out.
  • the use of the present invention for the design of the mold can provide the accuracy of the template design and reduce the error rate.
  • FIG. 1 is a flow chart showing an implementation of a method for matching a three-dimensional space software provided by the present invention
  • FIG. 2 is a schematic structural diagram of a mold matching system of the three-dimensional space software provided by the present invention.
  • molding refers to a process of matching a building structure module such as a wall, a board, a beam, a staircase, a door and a window, and the like, and the matched “template” is used for the wall, the board, the beam, and the construction during construction.
  • Building structure modules such as stairs, doors and windows, etc. are positioned, supported, and finally formed.
  • FIG. 1 shows an implementation flow of a method for modulating a three-dimensional space software provided by the present invention, which is described in detail below.
  • step A identify the building drawings to confirm that the drawings themselves are faulty.
  • the technician is prompted with the error content. After the technicians have modified the building drawings, they will be re-identified until the building drawings are identified correctly.
  • step A the error of the drawing itself is mainly recognized, for example, whether the layer is complete, whether the drawing and the structure drawing, and the corresponding parts of the remaining related drawings are consistent, and the corresponding drawing of the layer or the drawing is used as the drawing. Basis or benchmark.
  • step B the design of the building blueprint identifying the step A is deepened, and the change information of the building structure between the floors or the same floor is identified and remarked, and the deepened design drawing is obtained;
  • the detailed design of the structure of the building needs to be noted in the deepening design, including but not limited to the positional change or specific dimensional change or elevation change or thickness of the structure of the beam, column, wall, plate, door and window hole, and the like. Change or reinforcement changes, etc.
  • the design unit, the construction unit, the construction unit, and the supervision unit After deepening the design, it is necessary for the design unit, the construction unit, the construction unit, and the supervision unit to jointly confirm whether there is any error. After the error is revised, the design should be further deepened according to the revised content until the multiple parties jointly sign and confirm that the design plan is correct.
  • step C the flow area is divided on the confirmed deepened design drawings, and the building structure modules required for each flow area are classified.
  • the flow area is used to characterize the sequence of operations in each area. For example, if the operation area is divided into 1-N work areas, the work areas are flowed in the order of 1-N. In the classification, the building structure modules of each flow area are classified according to the types of walls, plates, beams, stairs, doors and windows.
  • step D building models are respectively established for each building structural module according to the classification result.
  • step E user-defined template design rule information is received, thereby establishing a corresponding standard template component library for later use.
  • the template design rule information includes standard templates and non-standard templates included in the building structure, and layout rule information of the standard templates and the non-standard templates in the building structure.
  • a wall has a length of 10 meters
  • the standard template of the wall has a length of 3 meters. In this case, it is required to design three standard templates and one non-standard template with a length of 1 meter.
  • Step F according to the established building model and the template design rule information, perform template matching on each building structure module, and number all the templates according to the classification result of step C, and generate a matching pattern to be confirmed, wherein The number contains the category information to which each template belongs.
  • the template can be configured according to the corresponding rules.
  • the configured templates are numbered according to the corresponding numbering rules, which facilitates the later material management and on-site construction management, and then outputs the first time. Matching pattern.
  • Step G after the proof pattern to be confirmed is confirmed, generate a formal model map and a template list, and calculate a template expansion area and a mold area of the entire building item, and materials of the template and its accessories, weight.
  • the designer manually checks the key and difficult parts of the building for the aforementioned pattern, such as the changed areas identified during the design. After confirmation, the formal model map and the list of templates for the project, ie the BOM table, are processed.
  • Step H according to the template list, comparing the existing inventory situation, according to the comparison result, listing a template list and a processing plan and a purchase list that require new processing, and a template processing drawing that requires a new processing, wherein
  • the list of templates that require a new process contains template information that does not exist in the existing inventory and is included in the list of templates.
  • the computer automatically compares with the inventory template data to determine how many new templates need to be newly processed, and outputs a list of templates to be newly processed, that is, a newly processed BOM.
  • a list of raw material purchases is output based on the list of new processing templates and their corresponding processing drawings.
  • Fig. 2 shows the structural principle of the mold matching system of the three-dimensional software provided by the present invention, and for the convenience of description, only the parts related to the present invention are shown.
  • the mold clamping system includes a deepening design module 21, a template arrangement module 22, and a material management module 23.
  • the deepening design module 21 is used for identifying the drawing of the building to confirm whether the drawing itself has an error; and identifying the change information of the building structure between the floors or the same floor from the unconfirmed drawing in step A and making a note And obtain the deepened design drawings; then divide the flow operation area on the confirmed deep design drawings, and classify the building structure modules required for each flow operation area; the flow operation area is used to characterize the operation of each area order.
  • the change information includes structural change information, dimensional change information, elevation change information, etc., and the building structure of each flow operation area may be specifically classified according to the type of wall, plate, beam, staircase, door and window hole. Modules are classified.
  • the template arranging module 22 respectively establishes a building model for each building structural module according to the classification result; and receives user-defined template design rule information, thereby establishing a corresponding standard template spare parts library;
  • the template design rule information includes the building Standard template and non-standard template included in the structure, and arrangement rule information of the standard template and the non-standard template in the building structure; and then according to the established building model and the template design rule information, the building structure
  • the module performs the matching template, and numbers all the templates according to the classification result, and generates a matching pattern to be confirmed; the number includes the category information of each template, and finally, after the matching pattern to be confirmed is confirmed, Generate a formal model map and template list, and calculate the template expansion area and mold area of the entire building project, as well as the material and weight of the template and its accessories.
  • the material management module 23 compares the existing inventory situation according to the template list, and lists the template list and the processing plan and the procurement list that need new processing according to the comparison result, and the template processing drawing that needs new processing, wherein
  • the template list that needs to be newly processed contains template information that does not exist in the existing inventory but is included in the template list.
  • the deepening design module 21 recognizes that there is an error content in the building drawing, the error content is prompted; and after the manually modified building drawing is received, the identification is re-identified, wherein the identified content includes whether the layer is complete or not. Whether the map and the corresponding part of the structure diagram are consistent; until the building drawings are identified correctly. Moreover, the deepening design module 21 is specifically labeled with a layer or a drawing as a basis for drawing or benchmarking.

Abstract

Appliquée à la technologie de conception assistée par ordinateur, la présente invention concerne un procédé d'adaptation de coffrage de logiciel spatial tridimensionnel, comprenant les étapes suivantes consistant à : reconnaître tous les dessins d'un projet de construction ; réaliser une conception approfondie sur les dessins reconnus correctement pour obtenir les dessins de conception approfondie ; diviser des zones de production à la chaîne sur les dessins de conception approfondie confirmée et classer les structures de construction de toutes les zones de production à la chaîne ; selon un résultat de classification, réaliser une modélisation sur chaque module de structure de construction respectivement ; entrer une règle de conception de coffrage personnalisé et établir une bibliothèque d'accessoires et de pièces de rechange de coffrage standard correspondant ; selon les modèles de construction établis et la règle de conception d'un système de coffrage, réaliser l'adaptation de coffrage et délivrer un dessin d'adaptation de coffrage ; après détermination de l'exactitude du dessin d'adaptation de coffrage, délivrer un dessin d'adaptation de coffrage officiel et une liste de coffrage, et calculer la zone étendue de coffrage et la zone d'adaptation de coffrage de l'ensemble du projet ; et dans l'étape H, selon la liste de coffrage, comparer le stock avec celle-ci, selon un résultat de comparaison, établir une liste de coffrages qui doivent être usinés, un plan d'usinage et une liste d'achat et élaborer des dessins d'usinage des coffrages qui doivent être usinés.
PCT/CN2015/086029 2014-09-01 2015-08-04 Procédé et système d'adaptation de coffrage de logiciel spatial tridimensionnel WO2016034027A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410441575.7A CN104200026B (zh) 2014-09-01 2014-09-01 三维空间软件的配模方法及系统
CN201410441575.7 2014-09-01

Publications (1)

Publication Number Publication Date
WO2016034027A1 true WO2016034027A1 (fr) 2016-03-10

Family

ID=52085319

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2015/086029 WO2016034027A1 (fr) 2014-09-01 2015-08-04 Procédé et système d'adaptation de coffrage de logiciel spatial tridimensionnel

Country Status (2)

Country Link
CN (1) CN104200026B (fr)
WO (1) WO2016034027A1 (fr)

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108829962A (zh) * 2018-06-04 2018-11-16 江红 机械加工制造信息显示方法以及装置
CN109376395A (zh) * 2018-09-26 2019-02-22 中建五局第三建设有限公司 一种建筑设计管理方法及系统
CN109472084A (zh) * 2018-11-05 2019-03-15 长沙远大住工智能科技有限公司 装配式建筑设计方法及系统、计算机设备和存储介质
CN109492251A (zh) * 2018-09-30 2019-03-19 上海宝冶集团有限公司 雪车雪橇赛道的bim参数化建模方法
CN109684662A (zh) * 2018-11-20 2019-04-26 唐炳贵 一种智能式装配式建筑的构建方法
CN109815635A (zh) * 2019-02-28 2019-05-28 杭州和利时自动化有限公司 一种锅炉mft自动设计系统及方法
CN109934894A (zh) * 2019-03-14 2019-06-25 中民筑友科技投资有限公司 一种cad出图方法、装置和计算机可读存储介质
CN109993471A (zh) * 2017-12-30 2019-07-09 浙江亚厦装饰股份有限公司 建筑装饰布线数据化处理的控制方法、控制系统及布线安装方法
CN110046364A (zh) * 2018-01-16 2019-07-23 中国建筑第八工程局有限公司 一种基于bim技术的工程量计算方法
CN110334430A (zh) * 2019-07-01 2019-10-15 上海外高桥造船有限公司 图纸中电缆托架的自动标注方法、系统、设备和存储介质
CN110457775A (zh) * 2019-07-22 2019-11-15 中冶京诚工程技术有限公司 不规则结构的三维配筋方法及装置
CN110543674A (zh) * 2019-07-31 2019-12-06 成都市建筑设计研究院 一种基于bim的装配式楼板的自动拆分方法
CN110569621A (zh) * 2019-09-18 2019-12-13 中国十七冶集团有限公司 一种基于bim技术的多维曲面玻璃幕墙设计加工及安装方法
CN110610010A (zh) * 2018-06-14 2019-12-24 江俊昇 建筑设计系统
CN110619180A (zh) * 2019-09-20 2019-12-27 深圳市科羿科技有限公司 一种装配式组合模板的设计管理方法及系统
CN110781535A (zh) * 2018-07-27 2020-02-11 西安海平方网络科技有限公司 模型的出图方法、装置、计算机设备及可读存储介质
CN110851901A (zh) * 2019-11-06 2020-02-28 广联达科技股份有限公司 模板支架排布的处理方法、装置和电子设备
CN110889229A (zh) * 2019-11-29 2020-03-17 万翼科技有限公司 Cad图纸识别方法、装置、电子设备及存储介质
CN110990925A (zh) * 2019-11-29 2020-04-10 广联达科技股份有限公司 基于几何模型处理的模板面积计算方法、装置及电子设备
CN111027115A (zh) * 2019-09-27 2020-04-17 滨州职业学院 一种基于bim技术在住宅楼装修工程中的应用方法
CN111339659A (zh) * 2020-02-25 2020-06-26 上汽通用汽车有限公司 一种三维模型中阶梯孔的快速标注方法及装置
CN111460244A (zh) * 2020-04-01 2020-07-28 上海银欣高新技术发展股份有限公司 智能建筑bim模型的制作方法、系统、介质及制作设备
CN111753344A (zh) * 2020-06-30 2020-10-09 广东天元建筑设计有限公司 装配式构件数据集的生成方法、cad平台及存储介质
CN111859506A (zh) * 2020-07-17 2020-10-30 无锡窗造软件有限公司 一种基于双向链表算法的门窗设计系统
CN111931270A (zh) * 2020-07-16 2020-11-13 中建一局集团第二建筑有限公司 基于bim技术的地铁车辆段接触网预埋件的施工方法
CN112364416A (zh) * 2020-10-28 2021-02-12 中广核工程有限公司 核电站门表的设计方法及系统
CN112528369A (zh) * 2020-12-09 2021-03-19 四川蓉信开工程设计有限公司 基于revit的CAD出图方法
CN113378282A (zh) * 2021-06-30 2021-09-10 中国二冶集团有限公司 一种基于bim的住宅楼模板配模和碰撞检查方法及系统
CN113742824A (zh) * 2021-08-26 2021-12-03 苏州筑百年建筑科技有限公司 一种轻量化钢结构智慧协同设计云平台及其操作方法
CN113836615A (zh) * 2021-08-26 2021-12-24 深圳市华阳国际工程设计股份有限公司 一种标准层中户型模块智能匹配方法及系统
CN114647885A (zh) * 2022-04-02 2022-06-21 北京梦诚科技有限公司 一种施工图设计内容展示和应用计算的方法和系统
CN114756915A (zh) * 2022-06-15 2022-07-15 青岛东山集团母线智造有限公司 一种母线槽的参数化设计方法和参数化设计平台
CN115168962A (zh) * 2022-07-20 2022-10-11 中国建筑西南设计研究院有限公司 构造柱圈梁设计方法及装置、计算机设备和存储介质
CN115329435A (zh) * 2022-08-19 2022-11-11 山东建筑大学 基于bim的保温与结构一体化外墙条板排板方法及系统
CN116561878A (zh) * 2023-07-10 2023-08-08 深圳市中港机电顾问有限公司 一种建筑机电自动化设计系统及方法
CN116823807A (zh) * 2023-08-02 2023-09-29 北京梦诚科技有限公司 一种桥梁上部结构现浇梁识别方法和系统

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104200026B (zh) * 2014-09-01 2017-05-03 深圳汇林达科技有限公司 三维空间软件的配模方法及系统
CN105956346A (zh) * 2016-06-28 2016-09-21 深圳汇林达科技有限公司 一种铝合金模板设计系统和方法
CN107766587A (zh) * 2016-08-16 2018-03-06 台湾国际物业管理顾问有限公司 用以检核建筑物设备成本的方法
CN106791630A (zh) * 2016-12-12 2017-05-31 大连文森特软件科技有限公司 一种基于ar 虚拟现实技术的楼房建造监管系统
CN108428194B (zh) * 2017-08-12 2021-12-21 中民筑友科技投资有限公司 一种基于bim的建筑物料加工配送的管理方法及装置
CN109376399A (zh) * 2018-09-05 2019-02-22 重庆创速工业有限公司 一种三维建筑的智能设计方法及其系统
CN109147013B (zh) * 2018-09-30 2022-05-24 深圳市华阳国际工程设计股份有限公司 一种构件的深化图自动生成方法、设备及存储介质
DE102018129033A1 (de) * 2018-11-19 2020-05-20 Peri Gmbh Verfahren zur Schalungsplanung für das Betonieren eines Bauwerks
CN110599596A (zh) * 2019-08-30 2019-12-20 上海宝冶集团有限公司 木模板的三维配模方法
CN110704910B (zh) * 2019-09-18 2023-06-23 山东新汉唐数据科技有限公司 铝模板配模方法、系统、计算机可读存储介质及设备
CN113870383A (zh) * 2021-11-11 2021-12-31 承德建元科技股份有限公司 建筑图纸的自动排板方法和装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100024318A1 (en) * 2007-02-15 2010-02-04 Shanghai Precision Houses Manufacturing Co., Ltd. Prefab system, structure and assembling method for all-functional framed buildings
CN104200026A (zh) * 2014-09-01 2014-12-10 深圳汇林达科技有限公司 三维空间软件的配模方法及系统

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102509314A (zh) * 2011-09-21 2012-06-20 北京农业信息技术研究中心 日光温室施工图快速生成方法
CN102609687B (zh) * 2012-01-31 2013-03-13 华中科技大学 一种地铁施工图纸及工程参数自动识别方法
CN102693334B (zh) * 2012-03-01 2015-07-29 成都鹏业软件股份有限公司 基于cad电子图纸的动态构件识别方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100024318A1 (en) * 2007-02-15 2010-02-04 Shanghai Precision Houses Manufacturing Co., Ltd. Prefab system, structure and assembling method for all-functional framed buildings
CN104200026A (zh) * 2014-09-01 2014-12-10 深圳汇林达科技有限公司 三维空间软件的配模方法及系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
DAI, YAOSHU ET AL.: "Using UC-MBCAD to Design Formwork.", ARCHITECTURE TECHNOLOGY, vol. 31, no. 8, 31 August 2000 (2000-08-31) *
MAO, JUN ET AL.: "Application of the Computer Aided Formwork Design Software.", CONSTRUCTION TECHNOLOGY, vol. 29, no. 11, 30 November 2000 (2000-11-30) *

Cited By (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109993471A (zh) * 2017-12-30 2019-07-09 浙江亚厦装饰股份有限公司 建筑装饰布线数据化处理的控制方法、控制系统及布线安装方法
CN110046364B (zh) * 2018-01-16 2022-10-25 中国建筑第八工程局有限公司 一种基于bim技术的工程量计算方法
CN110046364A (zh) * 2018-01-16 2019-07-23 中国建筑第八工程局有限公司 一种基于bim技术的工程量计算方法
CN108829962A (zh) * 2018-06-04 2018-11-16 江红 机械加工制造信息显示方法以及装置
CN110610010A (zh) * 2018-06-14 2019-12-24 江俊昇 建筑设计系统
CN110781535A (zh) * 2018-07-27 2020-02-11 西安海平方网络科技有限公司 模型的出图方法、装置、计算机设备及可读存储介质
CN109376395A (zh) * 2018-09-26 2019-02-22 中建五局第三建设有限公司 一种建筑设计管理方法及系统
CN109492251A (zh) * 2018-09-30 2019-03-19 上海宝冶集团有限公司 雪车雪橇赛道的bim参数化建模方法
CN109472084A (zh) * 2018-11-05 2019-03-15 长沙远大住工智能科技有限公司 装配式建筑设计方法及系统、计算机设备和存储介质
CN109684662A (zh) * 2018-11-20 2019-04-26 唐炳贵 一种智能式装配式建筑的构建方法
CN109815635A (zh) * 2019-02-28 2019-05-28 杭州和利时自动化有限公司 一种锅炉mft自动设计系统及方法
CN109815635B (zh) * 2019-02-28 2023-04-18 杭州和利时自动化有限公司 一种锅炉mft自动设计系统及方法
CN109934894A (zh) * 2019-03-14 2019-06-25 中民筑友科技投资有限公司 一种cad出图方法、装置和计算机可读存储介质
CN109934894B (zh) * 2019-03-14 2022-11-15 中民筑友科技投资有限公司 一种cad出图方法、装置和计算机可读存储介质
CN110334430A (zh) * 2019-07-01 2019-10-15 上海外高桥造船有限公司 图纸中电缆托架的自动标注方法、系统、设备和存储介质
CN110334430B (zh) * 2019-07-01 2022-11-22 上海外高桥造船有限公司 图纸中电缆托架的自动标注方法、系统、设备和存储介质
CN110457775A (zh) * 2019-07-22 2019-11-15 中冶京诚工程技术有限公司 不规则结构的三维配筋方法及装置
CN110457775B (zh) * 2019-07-22 2023-07-11 中冶京诚工程技术有限公司 不规则结构的三维配筋方法及装置
CN110543674A (zh) * 2019-07-31 2019-12-06 成都市建筑设计研究院 一种基于bim的装配式楼板的自动拆分方法
CN110543674B (zh) * 2019-07-31 2022-09-27 成都市建筑设计研究院有限公司 一种基于bim的装配式楼板的自动拆分方法
CN110569621A (zh) * 2019-09-18 2019-12-13 中国十七冶集团有限公司 一种基于bim技术的多维曲面玻璃幕墙设计加工及安装方法
CN110569621B (zh) * 2019-09-18 2022-09-13 中国十七冶集团有限公司 一种基于bim技术的多维曲面玻璃幕墙设计加工及安装方法
CN110619180A (zh) * 2019-09-20 2019-12-27 深圳市科羿科技有限公司 一种装配式组合模板的设计管理方法及系统
CN111027115A (zh) * 2019-09-27 2020-04-17 滨州职业学院 一种基于bim技术在住宅楼装修工程中的应用方法
CN110851901A (zh) * 2019-11-06 2020-02-28 广联达科技股份有限公司 模板支架排布的处理方法、装置和电子设备
CN110889229A (zh) * 2019-11-29 2020-03-17 万翼科技有限公司 Cad图纸识别方法、装置、电子设备及存储介质
CN110990925A (zh) * 2019-11-29 2020-04-10 广联达科技股份有限公司 基于几何模型处理的模板面积计算方法、装置及电子设备
CN111339659B (zh) * 2020-02-25 2023-06-13 上汽通用汽车有限公司 一种三维模型中阶梯孔的快速标注方法及装置
CN111339659A (zh) * 2020-02-25 2020-06-26 上汽通用汽车有限公司 一种三维模型中阶梯孔的快速标注方法及装置
CN111460244B (zh) * 2020-04-01 2023-07-28 上海银欣高新技术发展股份有限公司 智能建筑bim模型的制作方法、系统、介质及制作设备
CN111460244A (zh) * 2020-04-01 2020-07-28 上海银欣高新技术发展股份有限公司 智能建筑bim模型的制作方法、系统、介质及制作设备
CN111753344B (zh) * 2020-06-30 2024-04-12 广东天元建筑设计有限公司 装配式构件数据集的生成方法、cad平台及存储介质
CN111753344A (zh) * 2020-06-30 2020-10-09 广东天元建筑设计有限公司 装配式构件数据集的生成方法、cad平台及存储介质
CN111931270A (zh) * 2020-07-16 2020-11-13 中建一局集团第二建筑有限公司 基于bim技术的地铁车辆段接触网预埋件的施工方法
CN111859506A (zh) * 2020-07-17 2020-10-30 无锡窗造软件有限公司 一种基于双向链表算法的门窗设计系统
CN112364416B (zh) * 2020-10-28 2023-07-07 中广核工程有限公司 核电站门表的设计方法及系统
CN112364416A (zh) * 2020-10-28 2021-02-12 中广核工程有限公司 核电站门表的设计方法及系统
CN112528369A (zh) * 2020-12-09 2021-03-19 四川蓉信开工程设计有限公司 基于revit的CAD出图方法
CN113378282A (zh) * 2021-06-30 2021-09-10 中国二冶集团有限公司 一种基于bim的住宅楼模板配模和碰撞检查方法及系统
CN113742824A (zh) * 2021-08-26 2021-12-03 苏州筑百年建筑科技有限公司 一种轻量化钢结构智慧协同设计云平台及其操作方法
CN113836615B (zh) * 2021-08-26 2024-04-05 深圳市华阳国际工程设计股份有限公司 一种标准层中户型模块智能匹配方法及系统
CN113836615A (zh) * 2021-08-26 2021-12-24 深圳市华阳国际工程设计股份有限公司 一种标准层中户型模块智能匹配方法及系统
CN114647885A (zh) * 2022-04-02 2022-06-21 北京梦诚科技有限公司 一种施工图设计内容展示和应用计算的方法和系统
CN114647885B (zh) * 2022-04-02 2023-03-24 北京梦诚科技有限公司 一种施工图设计内容展示和应用计算的方法和系统
CN114756915A (zh) * 2022-06-15 2022-07-15 青岛东山集团母线智造有限公司 一种母线槽的参数化设计方法和参数化设计平台
CN115168962A (zh) * 2022-07-20 2022-10-11 中国建筑西南设计研究院有限公司 构造柱圈梁设计方法及装置、计算机设备和存储介质
CN115329435A (zh) * 2022-08-19 2022-11-11 山东建筑大学 基于bim的保温与结构一体化外墙条板排板方法及系统
CN115329435B (zh) * 2022-08-19 2023-11-24 山东建筑大学 基于bim的保温与结构一体化外墙条板排板方法及系统
CN116561878A (zh) * 2023-07-10 2023-08-08 深圳市中港机电顾问有限公司 一种建筑机电自动化设计系统及方法
CN116561878B (zh) * 2023-07-10 2023-12-12 深圳市中港机电顾问有限公司 一种建筑机电自动化设计系统及方法
CN116823807A (zh) * 2023-08-02 2023-09-29 北京梦诚科技有限公司 一种桥梁上部结构现浇梁识别方法和系统
CN116823807B (zh) * 2023-08-02 2024-04-05 北京梦诚科技有限公司 一种桥梁上部结构现浇梁识别方法和系统

Also Published As

Publication number Publication date
CN104200026B (zh) 2017-05-03
CN104200026A (zh) 2014-12-10

Similar Documents

Publication Publication Date Title
WO2016034027A1 (fr) Procédé et système d'adaptation de coffrage de logiciel spatial tridimensionnel
CN106709660B (zh) 基于bim的建筑设计方法
WO2017219921A1 (fr) Système et procédé de co-construction de bâtiments basés sur la classification et la combinaison d'éléments
US10452790B2 (en) System and method for evaluating the energy use of multiple different building massing configurations
CN106202723A (zh) 一种bim地铁施工方法
US20170076017A1 (en) System and method for realizing a building using automated building massing configuration generation
KR101393750B1 (ko) Bim을 이용하여 정보호환성을 향상시킨 건물 에너지 시뮬레이션 방법
CN110532663A (zh) 一种基于bim的协同建模工作标准化流程
CN106779620A (zh) 基于ipd体系的数字化设计平台建设方法
CN115587784A (zh) 一种应用于钢结构数字化加工制造的bim方法
CN106446448A (zh) 一种基于bim技术的模架体系参数化设计方法
CN115600298A (zh) 一种基于revit的BIM建筑正向设计标准化出图方法
WO2023272593A1 (fr) Procédé de construction de plafond suspendu de forme complexe de grande surface basé sur la technologie bim
CN107993054A (zh) 一种结合sdm、sy和bim的数据管理系统及管理方法
Nizam et al. Current state of information exchange between the two most popular BIM software: Revit and Tekla
Zhang et al. Constraints for improving information integrity in information conversion from CAD building drawings to BIM model
CN105956346A (zh) 一种铝合金模板设计系统和方法
CN113901569A (zh) 一种面向运维管理的bim中几何模型轻量化处理方法
TWM621394U (zh) 自動化逃生路徑產生裝置
Ouyang et al. Information visualization method for intelligent construction of prefabricated buildings based on P-ISOMAP algorithm
CN113268805B (zh) 一种医院管道综合排布的bim建模方法
Hongyan et al. Discussion on prefabricated concrete structure design method under BIM technology
TWI793670B (zh) 自動化逃生路徑產生方法及其系統
CN116629585B (zh) 一种运用本体的工艺管理系统及其方法
CN112699445B (zh) 基于拱坝施工知识库的施工参数分析方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15838257

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15838257

Country of ref document: EP

Kind code of ref document: A1