WO2016017647A1 - 機器管理装置 - Google Patents

機器管理装置 Download PDF

Info

Publication number
WO2016017647A1
WO2016017647A1 PCT/JP2015/071395 JP2015071395W WO2016017647A1 WO 2016017647 A1 WO2016017647 A1 WO 2016017647A1 JP 2015071395 W JP2015071395 W JP 2015071395W WO 2016017647 A1 WO2016017647 A1 WO 2016017647A1
Authority
WO
WIPO (PCT)
Prior art keywords
value
time zone
control
power
energy
Prior art date
Application number
PCT/JP2015/071395
Other languages
English (en)
French (fr)
Inventor
奈々恵 新倉
Original Assignee
ダイキン工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ダイキン工業株式会社 filed Critical ダイキン工業株式会社
Priority to US15/500,003 priority Critical patent/US10380706B2/en
Priority to EP15826423.4A priority patent/EP3176746A4/en
Publication of WO2016017647A1 publication Critical patent/WO2016017647A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0205Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
    • G05B13/026Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system using a predictor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/04Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

Definitions

  • the present invention relates to a device management device, and more particularly, to a device management device that manages at least one facility device that consumes energy upon receiving a supply of energy such as electric energy.
  • Patent Document 1 Japanese Patent Laid-Open No. 2013-230051
  • a negative wattage reference value in Patent Document 1 Therefore, it is necessary to properly predict the power used (baseline power) when not reduced.
  • an object of the present invention is to provide a device management apparatus that can be used in an energy trading market and that provides a highly reliable baseline.
  • An apparatus management apparatus is an apparatus management apparatus that manages at least one facility apparatus that receives energy and consumes energy, and that is a first specific date of at least one facility apparatus. At least one based on an information storage unit that stores an actual value of energy consumption in association with the time zone of the first specific day, information on an energy adjustment control request and / or information on an energy price for at least one facility device Stored in an adjustment control execution presence / absence storage unit that stores adjustment control execution presence / absence information indicating whether or not energy adjustment control of one facility device has been performed in each time zone on the first specific day. The time period during which the energy adjustment control specified by the information on whether or not the adjustment control is being performed is performed or an error determined from the time period. Use the information about the actual value of the first specific day for the virtual value of the energy consumption of at least one facility device when the energy adjustment control is not performed for the adjustment control influence period that should consider the influence of the energy adjustment control.
  • a virtual value calculation unit Use the information about the actual value of the first specific day for the virtual value of the energy consumption of
  • the virtual value of the energy consumption amount of the facility device is calculated by the virtual value calculation unit using the actual value of the first specific day, other days other than the first specific day Compared to the case where the actual value is used, it is easier to reflect the situation of the first specific day, which is the same day, in the virtual value of the first specific day.
  • the device management apparatus is the device management apparatus according to the first aspect, wherein at least one of the actual value and the virtual value calculation unit of at least one facility device stored in the actual storage unit is calculated.
  • the apparatus further includes a baseline determination unit that determines a baseline of the second specific date when the energy adjustment control is not performed using the virtual value of the equipment.
  • the baseline is determined by the baseline determination unit using the reliable virtual value calculated by the virtual value calculation unit, it is possible to determine a highly reliable baseline. become.
  • the device management apparatus is the device management apparatus according to the second aspect, wherein at least one facility device includes the first facility device, and the baseline determination unit is configured to determine the baseline on the second specific day. Is determined using the virtual value of the first equipment device during the time period when the energy adjustment control is performed, and using the actual value of the first equipment device during the time period when the energy adjustment control is not performed. Use day data.
  • the virtual value is not used in the time period when the energy adjustment control is not performed in the data on the first specific date used by the baseline determination unit to determine the baseline.
  • the error can be reduced.
  • the device management apparatus is the device management apparatus according to the second aspect or the third aspect, wherein at least one facility device includes the second facility device, and the baseline determination unit determines the second specification.
  • the baseline of the day use the virtual value of the second equipment for the time zone when energy adjustment control was performed and the time zone of the subsequent recovery period, and out of the time zone when energy adjustment control was not performed Data on the first specific day using the actual value of the second equipment other than the recovery period is used.
  • the device management apparatus in the data on the first specific date used for the baseline determination unit to determine the baseline, there is a virtual value in the recovery period of the time zone when the energy adjustment control is not performed. Since it is used, the error can be reduced when applied when the actual value fluctuates during the recovery period under the influence of the energy adjustment control.
  • the device management apparatus is the device management apparatus according to any one of the first to fourth aspects, wherein the virtual value calculation unit uses a virtual value using information related to the actual value on the first specific day. As the calculation of, complementation is performed using the actual value in the time zone before the time zone in which the energy adjustment control is performed.
  • the virtual value of the time zone in which the energy adjustment control is performed on the first specific day is supplemented with the actual value on the first specific day before the energy adjustment control is performed.
  • the calculation of the virtual value of the first specific day can be performed soon after the energy adjustment control by a simple process of complementing performed by the virtual value calculation unit.
  • the device management apparatus is the device management apparatus according to any one of the first to fifth aspects, wherein the virtual value computing unit uses a virtual value using information relating to the actual value on the first specific day. As the calculation of, complementation is performed using the actual value in the time zone after the time zone in which the energy adjustment control is performed.
  • the virtual value of the time zone in which the energy adjustment control is performed on the first specific day is supplemented with the actual value on the first specific day after the energy adjustment control is performed.
  • the virtual value calculation unit inputs a parameter for the first specific day in a regression equation prepared in advance. To calculate a virtual value.
  • the equipment management apparatus by inputting the parameters of the first specific day in the regression equation, the operating conditions and environmental conditions of the equipment on the first specific day can be reflected in the virtual values by the parameters, It is possible to reduce an error in calculation of a virtual value caused by a change in operating conditions or environmental conditions.
  • the device management apparatus is the device management apparatus according to any one of the first to seventh aspects, wherein the virtual value calculation unit uses a virtual value using information relating to the actual value on the first specific day. As the calculation, the parameters of the first specific day are input, and the past actual values having parameters similar to the parameters of the first specific day are extracted as virtual values.
  • the past actual values having parameters similar to the parameters on the first specific day are extracted as virtual values, so that the operating conditions, environmental conditions, etc. of the equipment on the first specific day Is reflected in the virtual value by the parameter. For example, when a situation specific to the energy consumption of the equipment on the first specific day occurs, the past actual value different from the first specific date is used as the virtual value. The error in can be reduced.
  • the device management apparatus is less susceptible to changes in the environment that differ from day to day, and can improve the reliability of the virtual value of the energy consumption of the facility device. For example, if a baseline is estimated using such a virtual value, a highly reliable baseline can be provided.
  • the device management apparatus provides a highly reliable baseline that can be used in the energy trading market.
  • the reliability of the baseline can be improved.
  • the reliability of the baseline can be improved.
  • a virtual value that is not affected by the energy adjustment control can be easily obtained without going back to the past date.
  • a virtual value that is not affected by the energy adjustment control can be easily obtained without going back to the past date.
  • the reliability of the virtual value can be improved.
  • the virtual value since past performance values different from the first specific date can be used, for example, when the actual value of the first specific date becomes unique, the virtual value It is possible to suppress an increase in error in the calculation of the above and improve the reliability of the virtual value.
  • the adjustment amount considered to be obtained by energy adjustment control is defined as the amount obtained by subtracting the actual energy consumption amount from the baseline.
  • the baseline used in this definition is the amount of energy actually consumed or assumed to be consumed by the energy consumer when the energy adjustment control is not performed.
  • the energy adjustment control is, for example, demand response control.
  • Energy adjustment control is performed based on energy adjustment control requirements and energy price information from the supplier side of energy adjustment control.
  • the target of energy adjustment control is equipment that is operated by an energy consumer. Transfer of information related to energy adjustment control requests is, for example, seen between operators and consumers who have contracts for supply and demand power contracts that provide rewards and penalties to consumers who respond to the demands of suppliers who supply power. For example, the exchange of information on energy prices can be seen between a business operator and a consumer who have a contract of a time-based charge method for setting a charge for each time period.
  • energy is sent from the energy supplier 1 to the energy consumer C1, the customer C2, and the customer C3 facilities 3 from the energy supplier 1 as shown in FIG.
  • the flow of energy from the energy supply company 1 to the energy transmission / distribution company 2 is indicated by an arrow E1
  • the flow of energy from the energy transmission / distribution company 2 to each of the consumer C1, the customer C2, and the customer C3 Are indicated by arrows E2, E3, E4.
  • the equipment 20 that consumes energy is installed in each facility 3 of the consumer C1, the consumer C2, and the consumer C3.
  • the energy supply company 1 is, for example, a power generation company
  • the energy transmission / distribution company 2 is, for example, a power transmission system operator.
  • the contract for energy adjustment control is, for example, a contract AG1 directly connected between the consumer C1 and the energy supplier 1 or between the consumer C3 and the energy delivery operator 2.
  • the contract AG2 is directly connected to the energy supplier 1 or the energy supplier / distributor 2 via the aggregator 4 like the consumer C2.
  • Contracts AG3, AG4, and AG5 indicate contractual relationships that may be concluded among the consumer C2, the aggregator 4, the energy supply company 1, and the energy transmission and distribution company 2.
  • the energy supply provider 1, the energy transmission / distribution provider 2, and the aggregator 4 shown in FIG. 1 may be singular or plural.
  • FIG. 1 As shown in FIG.
  • a plurality of aggregators 4 may be hierarchically involved such as a main aggregator 4a and a sub-aggregator 4b.
  • the consumer C21, the consumer C22, and the consumer C23 directly contract with the main aggregator 4a in the same manner as the consumer C2 in FIG. 1, but the consumer C41, the consumer C42, and the consumer C43 A contract for energy adjustment control is made with the main aggregator 4a via the aggregator 4b.
  • FIG. 3 shows an example of the baseline BL and the actual value RV of the consumer C2 on a specific day.
  • the baseline BL and the actual value RV match until 13:00. That is, before 13:00, since the consumer C has not performed the energy adjustment control, the baseline BL and the actual value RV substantially coincide.
  • the customer C2 performs energy adjustment control in the section from 13:00 to 15:00.
  • the actual value RV is smaller than the baseline BL. Since the consumer C2 stopped the energy adjustment control at 15:00, the actual value RV again almost coincides with the baseline BL after 15:00.
  • the area of the portion indicated by hatching in FIG. 3 is the energy consumption amount (energy consumption value) adjusted by the consumer C2.
  • ⁇ time that is, the adjustment amount on a specific day of the consumer C2.
  • a portion indicated by a dotted line in the baseline BL, that is, a value in a section from 13:00 to 15:00 is an estimated value.
  • the reward received by the consumer C2 based on the calculation method of the estimated value and the adjustment amount is determined based on the contract AG3 between the consumer C2 and the aggregator 4. Therefore, if the estimated value of the baseline BL in FIG.
  • the adjustment amount is estimated to be large, so there is a benefit to the consumer C2 in that the reward for the consumer C2 increases. This is disadvantageous for the aggregator 4 that spends more.
  • the estimated value of the baseline BL in FIG. 3 is calculated to be small, the adjustment amount is estimated to be small, which is advantageous for the aggregator 4 with low expenditure, but the reward for the consumer C2 decreases and the consumer It is disadvantageous for C2.
  • the estimation of the baseline BL is important for the business of the aggregator 4. Such calculation of the baseline BL requires accuracy, simplicity and honesty.
  • Such estimation of the baseline BL may also be performed based on, for example, the contract AG1 between the energy supplier 1 and the consumer C1 in FIG. 1, and the energy transmission / distribution operator 2 and the consumer C3. It may also be performed based on the contract AG2.
  • a method for calculating an estimated value of the baseline BL which will be described later, and a device management apparatus incorporating such a calculation method can be applied to perform various contracts AG1 to AG5 shown in FIG. It will be.
  • the time zone of the energy adjustment control is guided according to the request of at least one of the aggregator 4, energy supplier 1, and energy transmission / distribution operator 2. .
  • the energy supplier 1 is contracted by the consumer C1, but depending on the content, for example, the consumer C1 makes a contract based on an energy fee (for example, a contract based on a time zone).
  • an incentive-based contract for example, a supply-demand power contract
  • the consumer C1 when the consumer C1 receives a notification of a change in energy rate in real time according to the supply and demand balance and performs energy adjustment control, the consumer C1 receives a request for energy adjustment control from the aggregator 4 There is a case where energy adjustment control is performed. In either case, the actual value RV is shifted by the energy adjustment control from the baseline BL when the energy adjustment control is not performed. Therefore, in this embodiment, when estimating the baseline BL of another specific day based on the energy consumption value of the specific day, the energy adjustment control of the specific day is performed as described later. The energy consumption value during the time period is supplemented using virtual values.
  • FIG. 4 shows an energy management system according to an embodiment of the present invention.
  • electric power is supplied from the power company 1a to the facility 3a of the property A and the facility 3b of the property B.
  • the facilities 3a and 3b of the properties A and B are buildings in which one or a plurality of facility devices such as office buildings, tenant buildings, factories, and general households are installed.
  • the properties A and B are subject to the same contract regarding demand response control.
  • FIG. 3 only two properties A and B and facilities 3a and 3b are shown as properties supplied by the electric power company, but the number of properties and the number of facilities are limited to two. It can be either one or more, and there can be more than two properties.
  • the power company 1 a has a power management device 10.
  • Property A includes equipment 20, power supply 6 that supplies power to equipment 20, power meter 7 that measures the amount of power supplied from power supply 6 to equipment 20, and equipment management device that controls equipment 20 30.
  • Power is supplied from the power company 1a to the facilities 3a and 3b of the property A and B through the power line 102a.
  • the facility equipment 20 in the same property is supplied with power from the power source 6 via the indoor power line 102b.
  • the power management apparatus 10 and the device management apparatus 30 are connected via, for example, the Internet 101a.
  • the equipment management apparatus 30 and the equipment 20 in the same property are connected by a dedicated control line 101b.
  • the kind of equipment 20 is not restricted to the air conditioner 20a, the illumination 20b, and the ventilation fan 20c.
  • FIG. 5 shows a schematic configuration of the power management apparatus 10.
  • the power management apparatus 10 includes a communication unit 11, a display unit 12, an input unit 13, a storage unit 14, and a control unit 15.
  • the communication unit 11 is a network interface that enables the power management apparatus 10 to be connected to the Internet 101a.
  • the display unit 12 includes a display.
  • the input unit 13 includes, for example, operation buttons, a keyboard, and a mouse.
  • the storage unit 14 includes a hard disk. In the storage unit 14, a combination of the energy suppression possible amount and the suppression possible time transmitted from the device management apparatuses 30 of the properties A and B is stored for each property.
  • the control unit 15 includes a CPU, a ROM, and a RAM. The control unit 15 reads and executes the program stored in the storage unit 14 described above, thereby determining the determination unit 15a, the selection unit 15b, the demand response control transmission unit 15c, and the transmission request unit 15d illustrated in FIG. Function as.
  • the determination unit 15a predicts the supply amount and the demand amount of power and determines that the demand amount may exceed the supply amount after a predetermined time, the power and the power amount for the properties A and B, etc. Decide to require a reduction in energy consumption. In addition, the entire energy management system 100 determines how much time and how much power demand needs to be reduced. Based on the information stored in the storage unit 14 and the time and the amount of reduction determined by the determination unit 15a, the selection unit 15b selects a time zone for performing demand response control and a power suppression amount for each property.
  • the demand response control transmission unit 15 c causes the communication unit 11 to output the time zone for executing the demand response control determined by the selection unit 15 b and the power suppression amount to the properties A and B together with the request for performing the demand response control.
  • the device management apparatus 30 can determine the baseline power. That is, in order for the device management apparatus 30 to determine the baseline power, information regarding the execution time zone of the demand response control is indispensable. However, when the device management apparatus 30 determines the baseline power, the power suppression amount is the power company 1a. It is not an essential requirement that the amount of power suppression when performing demand response control may be entrusted to the properties A and B, or may be determined in advance by a contract. .
  • FIG. 6 shows a schematic configuration of the device management apparatus 30.
  • the device management apparatus 30 includes a communication unit 31, an output unit 32, an input unit 33, a time management unit 34, a storage unit 35, and a control unit 36.
  • the communication unit 31 is a network interface that enables the device management apparatus 30 to be connected to the Internet 101a.
  • the communication unit 31 performs two-way communication between the device management apparatus 30 and the power management apparatus 10 via the Internet 101a.
  • the output unit 32 includes a display, for example. On the output unit 32, a screen showing the operation mode of the equipment device 20 is displayed.
  • the information displayed on the screen of the output unit 32 is, for example, ON / OFF of equipment, operation mode (for example, cooling mode / heating mode in the case of the air conditioner 20a), set temperature, illuminance, ventilation volume, and operation time. , Operating rate, and driving capacity during operation.
  • the current power consumption is also displayed.
  • the input unit 33 includes, for example, a touch panel that covers the operation buttons and the display of the output unit 32. Using this input unit 33, various commands to the equipment device 20 such as a start / stop signal of the equipment device 20, a change in setting, and a change in operation mode can be input.
  • the time management unit 34 includes a clock that is substantially synchronized with the power management device 10 of the power company 1 a and performs time management of various controls executed by the device management device 30.
  • the storage unit 35 includes, for example, a hard disk capable of storing information transmitted and received by the communication unit 31, the output unit 32, and the input unit 33.
  • the storage unit 35 stores a program that can be read and executed by the control unit 36 described later.
  • the storage unit 35 includes an actual power value storage unit 35a and a DR (demand response) control execution presence / absence storage unit 35b.
  • the actual power value storage unit 35 a stores the amount of power for each time zone of the equipment device 20. That is, the actual power value storage unit 35a receives data related to the power usage amount of each time zone from the power meter 7, and stores the received data.
  • the equipment management apparatus 30 collectively manages a plurality of equipment 20, that is, the air conditioner 20 a, the lighting 20 b, and the ventilation fan 20 c, but the equipment management apparatus 30 individually manages the air conditioning machine 20 a, the lighting 20 b, and the ventilation fan 20 c. It can also be configured to manage.
  • the power meter 7 is provided for each of the air conditioner 20a, the illumination 20b, and the ventilation fan 20c that are individually managed. And what is necessary is just to comprise so that the electric power usage according to the time slot
  • the actual power value storage unit 35a stores the power consumption for each time zone, but if the power usage is divided by the length of the time zone, the average power consumption in each time zone is obtained. It can be seen that the average power consumption of the belt is stored.
  • the actual power value storage unit 35a may be configured to receive and store the power consumption that changes from moment to moment from the power meter 7.
  • the DR control execution presence / absence storage unit 35b (an example of the adjustment control execution presence / absence storage unit) is data relating to the presence / absence of execution for specifying whether or not the DR control is performed for each time period stored in the actual power value storage unit 35a. (Example of adjustment control execution presence / absence information) is stored.
  • the data related to the presence / absence of execution may be, for example, the time when DR control is performed, or may be a flag indicating the presence / absence of execution performed for each time zone.
  • FIG. 7A shows whether or not DR control is performed for each time zone of a specific day in the past, which is used to determine the baseline power of the day.
  • the device management apparatus 30 can grasp the contents shown in FIG. Such data regarding whether or not DR control is performed can be created by recording in the storage unit 35 whether or not DR control performed by the device management apparatus 30 itself is performed.
  • Control unit 36 The control part 36 is comprised from CPU, ROM, and RAM, for example.
  • the control unit 36 performs the functions of the virtual power value calculation unit 36a and the baseline power determination unit 36b illustrated in FIG. 6 by reading and executing the program stored in the storage unit 35 described above. Can do.
  • the virtual power value calculation unit 36a uses the data related to the presence / absence of the DR control stored in the DR control execution presence / absence storage unit 35b to supplement the power usage amount of the facility device 20 for the time zone in which the DR control is performed. Calculate the value. As shown in FIG. 7 (a), as the past actual value for determining the baseline power of the day, the actual value from 13:00 to 13:15 one day before is used. The virtual power value calculation unit 36a calculates a complement value used for complementation from 13:00 to 13:15 the day before. The calculation of the complementary value performed by the virtual power value calculation unit 36a will be described in detail later.
  • the baseline power determination unit 36b determines the baseline power of the day using the actual value stored in the actual power value storage unit 35a and the complementary value calculated by the virtual power value calculation unit 36a.
  • a conventional general calculation method can be used as the calculation method of the baseline power. For example, regression that predicts the load of the day using an averaging method that is calculated based on the average value of data for multiple days in the same time period in the past, and many variables that affect the load (past load pattern, weather, day of the week, etc.)
  • the analysis method, the same day adoption method that finds the day most similar to the current day from the past data and adopts it as the baseline, and the weighted moving average method that calculates the baseline by increasing the weight of the data close to the current day are the baseline. Conventionally known as a method of calculating power.
  • the baseline power determination unit 36b treats the power usage in the DR control time zone supplemented with the complementary value in the same manner as the power usage without the DR control.
  • the baseline power in the case of FIG. 7 (a), it is possible to refer to the data at 13:15 from 13:00 one day before without going back to four days ago. . If it is necessary to refer to two or more, it is also possible to refer to the complement value two days ago or the complement value three days ago.
  • the virtual power value calculation unit 36a includes the influence of the DR control when there is data including the influence of the DR control in the data referred to for calculating the baseline power.
  • the data including the influence of DR control is complemented with no value.
  • a specific example of a complementing method by the virtual power value calculation unit 36a will be described.
  • the virtual power value calculation unit 36a uses the data regarding the presence / absence of the DR control stored in the DR control execution presence / absence storage unit 35b to determine the time zone during which the DR control was performed.
  • the complement target is not limited to the DR control implementation time zone, and the complement target can be extended to the vicinity of the DR control implementation time zone.
  • DR control implementation time zone and recovery period are targeted In the graph shown in FIG. 9, DR control is performed only for 60 minutes from 13:00 to 14:00. I understand.
  • the target of complementation is a time zone from 13:00 to 14:00 and a time zone from 14:00 to 14:45. This time zone from 14:00 to 14:45 is the recovery period.
  • the air conditioner 20a is included in the equipment 20, the air conditioner 20a is stopped only from 13:00 to 14:00 by DR control, or the set temperature of the air conditioner 20a is shifted to a value close to the environmental temperature. Sometimes. In such a case, when the DR period ends, the air conditioner 20a starts operation and relatively large power consumption occurs. When power rebound in which power consumption increases more than usual during such a recovery period, extending the complement target to the recovery period makes it possible to further approximate the state when there was no DR control.
  • the recovery period for example, there is a case where a certain period is set after the end of the DR control or a period until the room temperature returns to a comfortable temperature after the end of the DR control.
  • the comfortable temperature in the latter case is, for example, a temperature immediately before the start of DR control, a set temperature set in the air conditioner 20a, or a specific set value such as 28 ° C. for cooling operation.
  • the virtual power value calculation unit 36a calculates using information related to the actual value on a specific day including the time zone supplemented with the supplement value of the power usage amount of the facility device 20.
  • the complement target is not only the period in which the DR control is performed, but also the amount of power during the period affected by the DR control, here the recovery period.
  • the complement target is the power usage amount during the DR control implementation period, as shown in FIG.
  • the power consumption in the time zone from 12:45 to 13:00 immediately before the implementation time period of DR control is the time zone from 13:00 to 13:15, the time zone from 13:15 to 13:30, The amount of power used in each of the time zone from 13:30 to 13:45 and the time zone from 13:45 to 14:00.
  • the complement target also includes a recovery period, as shown in FIG. 9, a time zone from 14:00 to 14:15, a time zone from 14:15 to 14:30, and The amount of power used in each time zone from 14:30 to 14:45 is assumed.
  • the method of calculating the complementary value from the power consumption of the plurality of previous time zones is, for example, the method immediately before the DR control implementation time zone in FIG.
  • the power consumption in the time period from 12:45 to 13:00 is averaged to obtain a complementary value.
  • the number of time zones to be averaged is set as appropriate. In this example, two time zones having an interval of 15 minutes are used, but three or more time zones may be used. Although the case where the length of the time zone is 15 minutes has been described here, the length of the time zone may be other than 15 minutes.
  • the length of the time zone may be shorter than 15 minutes, for example 1 minute or 30 seconds, and the length of the time zone may be longer than 15 minutes, for example 20 minutes or 30 minutes.
  • a calculation method for obtaining a complementary value other than using the average value a method in which the minimum value among the power consumption amounts in a plurality of time zones immediately before the DR control implementation time zone is used as a complementary value may be employed.
  • a calculation method for obtaining a complementary value other than using the average value a method in which the maximum value among the power usage amounts in a plurality of time zones immediately before the DR control implementation time zone is used as a complementary value may be employed.
  • the complement target supplemented with the complement value calculated in this way is the same as that described above.
  • a power consumption amount of a predetermined period not a time period immediately before.
  • a power usage amount X1 for 10 minutes from 12:50 to 13:00 immediately before the DR control implementation time period may be used. That is, the value obtained by multiplying the power consumption amount X1 by 1.5 (X1 ⁇ 1.5) is a time zone from 13:00 to 13:15, a time zone from 13:15 to 13:30, The amount of power used in each of the time zone from 13:30 to 13:45 and the time zone from 13:45 to 14:00.
  • the power usage during the period from 11:00 to 12:00 can be used.
  • a period can be set except for a time period in which the special circumstance occurs.
  • the method of setting a minimum value, an average value, or a maximum value as a complementary value can be employ
  • the method for calculating the complementary value from the power consumption in a plurality of time zones before and after is, for example, the DR control implementation time zone of FIG.
  • the power consumption in the time zone from 12:45 to 13:00 immediately before and the power usage in the time zone from 14:45 to 15:00 immediately after are averaged to obtain a complementary value.
  • the number of time zones to be averaged is set as appropriate, and here, three time zones with an interval of 15 minutes are used, but for example, one each before and after, or any number of time zones before and after may be combined arbitrarily. Although the case where the length of the time zone is 15 minutes has been described here, the length of the time zone may be other than 15 minutes.
  • a method for obtaining a complementary value other than using the average value a method in which the minimum value among the power consumption amounts in a plurality of time zones before and after the DR control implementation time zone is used as a complementary value may be employed. . Further, as a calculation method for obtaining a complementary value other than using the average value, a method in which the maximum value among the power usage amounts in a plurality of time zones before and after the DR control implementation time zone is used as a complementary value may be employed. .
  • the complement target supplemented with the complement value calculated in this way is the same as that described above. Note that the case where the effect of the recovery period is taken into account and the case where it is not taken into consideration are the same as the method of substituting in the later time zone not including the influence of the implementation of (4-2-2) DR control. It is.
  • the complementary value in the time zone from 13:00 to 13:15 is substituted with the power usage amount in the time zone from 12:45 to 13:00.
  • the supplementary value for the time zone from 13:15 to 13:30 and the supplementary value for the time zone from 13:30 to 13:45 are also substituted with the power usage amount from the time zone of 12:45 to 13:00.
  • the supplementary value for the time zone from 14:30 to 14:45 is substituted with the power usage amount for the time zone from 14:45 to 15:00.
  • the supplementary value in the time zone from 14:15 to 13:30 and the supplementary value in the time zone from 14:00 to 14:15 are also substituted with the power usage amount from the time zone of 14:45 to 15:00.
  • the time zone from 14:30 to 14:45 is similar to both the time zone from 12:45 to 13:00 and the time zone from 14:45 to 15:00. In such a case, it suffices to determine in advance whether to use the power usage amount in the time zone before or after.
  • an average value, a minimum value, or a maximum value is obtained in a plurality of time zones before the DR control is performed, and is used as a complementary value for the first time zone of the DR control.
  • an average value, a minimum value, or a maximum value is obtained in a plurality of time zones after the time zone affected by the execution of the DR control, and is used as a complementary value for the second time zone of the DR control.
  • the calculation can be performed in the same manner as described above.
  • an average value, a minimum value, or a maximum value is obtained in a specific time zone before the DR control is performed, and is used as a complementary value in the first time zone of the DR control.
  • an average value, a minimum value, or a maximum value is obtained in a specific period after the time zone affected by the DR control, and used as a complementary value for the time zone in the second half of the DR control.
  • a regression equation for estimating power consumption from operating conditions / environmental conditions is prepared in advance from the operation information of past equipment 20.
  • the prepared regression equation is stored in the storage unit 35 of the device management apparatus 30.
  • the virtual electric power value calculating part 36a of the control part 36 substitutes the driving
  • the virtual power value calculation unit 36a calculates a complementary value for a time zone that is affected by the execution of the DR control, using the calculated power consumption.
  • the input parameters used in the regression equation are, for example, the set temperature, the outside air temperature, and the number of operating indoor units of the air conditioner 20a.
  • Previous operation information of the equipment 20 is organized and stored in the storage unit 35 in advance.
  • the virtual power value calculation unit 36a uses the operation information of the past equipment stored in the storage unit 35, and the power when the operation condition / environmental condition is the same as that of the specific day for which the complementary value is calculated. Extract the usage as a complementary value.
  • the input parameters used for this extraction are, for example, the set temperature, the outside air temperature, the operation time, and the number of indoor units operated in the air conditioner 20a.
  • the device management apparatus 30 receives power supply and manages the facility device 20 that consumes power.
  • the energy handled may be other than electricity, for example, gas.
  • the amount of power used in the time zone from 13:00 to 13:15 is affected by DR control.
  • the supplementary value for the previous day is replaced with the actual value for the previous day (an example calculated using information related to the actual value for the first specific day), so compared to the case where the actual value other than the previous day is used.
  • highly reliable baseline power can be provided.
  • the baseline power determination unit 36b (an example of the baseline determination unit) is calculated by the actual power value calculation unit 36a and the actual power value stored in the actual power value storage unit 35a (an example of the actual storage unit). Determine the baseline power (example of baseline) on the current day (example of second specific day) when demand response control (example of energy adjustment control) is not performed using the complementary value of facility equipment 20 Yes. In this way, the baseline power is determined by the baseline power determination unit 36b using the highly reliable complementary value (example of a virtual value) calculated by the virtual power value calculation unit 36a. The power can be determined.
  • the DR control is performed in order to calculate the baseline power in the time zone from 13:00 to 13:15 on that day. You must refer to the actual value from 13 o'clock to 13 o'clock 15 days before 4 days not affected.
  • the data to be referred to may be traced back to 13:15 data from 13:00 on the past day.
  • the equipment 20 that is affected by the seasons such as the air conditioner 20a, can actually give only the incentive IN2 to the incentive IN1 that should be received, and a large difference (IN1-IN2) in the incentive may occur. Absent.
  • the baseline power determination unit 36b determines the base power by using this, it is possible to determine the baseline power with high reliability.
  • the baseline power determination unit 36b calculates the baseline power of the current day (example of the second specific day).
  • the virtual value of the equipment device 20 is used for the power usage in the time zone from 13:00 to 14:00, which is the time zone in which the DR control is performed, and from 14:00 to 14:00 in which the DR control is not performed.
  • the actual value of the equipment device 20 is used for the power consumption during the 45-minute period. For example, if the equipment 20 is only the illumination 20b, there is almost no fluctuation such as power rebound during the recovery period in FIG. 8, so that the error is reduced when applied when the actual value is hardly affected by the DR control. Can do. As a result, the reliability of the baseline power can be improved.
  • the baseline power determination unit 36b calculates the baseline power on the current day (example of the second specific day).
  • the complementary value of the equipment device 20 is used, and at 14:00 in the recovery period when DR control was not performed. Therefore, the supplementary value is also used for the power consumption during the time zone of 14:45.
  • the equipment 20 is greatly affected by the air conditioner 20a, fluctuations such as power rebound increase during the recovery period in FIG. 9, and thus the actual value fluctuates during the recovery period due to the influence of DR control. When applied to, the error can be reduced. As a result, the reliability of the baseline power can be improved.
  • the virtual power value calculation unit 36 a performs, for example, from 13:00 to 14:00 as a complementary value calculation using information on the actual value on the same day (example of the first specific day). Supplementation may be performed using the actual value of the time zone before 13:00 before the time zone during which the DR control is performed. By supplementing with the actual value of the same day before the DR control is performed in this way, the calculation of the complementary value of the same day is performed soon after the DR control with a simple process of complementing performed by the virtual power value calculation unit 36a. It becomes possible. As a result, a complementary value that is not affected by the DR control can be easily obtained without going back to the past date.
  • the virtual power value calculation unit 36 a performs, for example, from 13:00 to 14:00 as a complementary value calculation using information on the actual value on the same day (example of the first specific day). Complementation may be performed using the actual value in the time zone after 14:00 after the time zone in which the DR control is performed. By supplementing with the actual value of the same day after the DR control is performed in this way, the calculation of the complementary value of the same day can be performed soon after the DR control with a simple process of complementing performed by the virtual power value calculation unit 36a. It becomes possible to do. As a result, a complementary value that is not affected by the DR control can be easily obtained without going back to the past date.
  • the virtual power value calculation unit 36a is a parameter (example of information on actual values) of a day (example of a first specific day) to which the time zone to be complemented belongs to the regression equation. May be input to calculate the complementary value. If the regression equation is used in this way, the operating conditions and environmental conditions of the equipment 20 on the day to which the time zone to be complemented belongs are reflected in the complement values by the parameters, and the complement generated by the change of the operating conditions and the environmental conditions. The error in the calculation of the value can be reduced. As a result, the reliability of the complementary value can be improved.
  • the virtual power value calculation unit 36 a inputs parameters (examples of information related to actual values) of the day (example of first specific day) to which the time zone to be complemented belongs. Alternatively, extraction may be performed with past actual values having parameters similar to the parameters of the same day as complementary values. The operating conditions, environmental conditions, etc. of the equipment device 20 of the day to which the time zone to be complemented belongs are reflected in the supplementary values by the parameters. For example, when a specific situation occurs in the power consumption of the equipment device 20 of the day, An error in calculation can be reduced by using a past actual value different from that day as a complementary value. As a result, it is possible to suppress an increase in error in the calculation of the complementary value and improve the reliability of the complementary value.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Power Engineering (AREA)
  • Tourism & Hospitality (AREA)
  • Technology Law (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Artificial Intelligence (AREA)
  • Automation & Control Theory (AREA)
  • Software Systems (AREA)
  • Medical Informatics (AREA)
  • Evolutionary Computation (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

エネルギーの取引市場で用いることのできる、信頼性の高いベースラインの得られる機器管理装置を提供する。実績電力値記憶部(35a)は、設備機器の第1特定日の時間帯別の電力使用量の実績値に関する情報を記憶する。DR制御実施有無記憶部(35b)は、実績電力記憶部(35a)に記憶されている実績値の各時間帯においてDR制御の要求に関する情報及び/又は電力使用量の価格に関する情報に基づいて設備機器のDR制御が行われたか否かを示すDR制御の実施有無に関する情報を記憶する。仮想電力値演算部(36a)は、DR制御実施有無記憶部(35b)に記憶されているDR制御が行われた時間帯又は当該時間帯を含むDR制御の影響のある期間についての実績値の代わりとなるDR制御が行われなかったとしたときの設備機器の電力使用量の補完値を第1特定日の実績値に関する情報を使って演算する。

Description

機器管理装置
 本発明は、機器管理装置、特に、電気エネルギーなどのエネルギーの供給を受けてエネルギーを消費する少なくとも一つの設備機器の管理を行う機器管理装置に関する。
 近年、世界の様々な地域で、電力供給システムは、「垂直統合型」から、発電、送電、配電及び小売を分担する形態である「構造分離型」への転換が図られ、電力市場の自由化が進む傾向が見られる。このような「構造分離型」の電力供給システムでは、特に、電力の安定供給を要求される「送電系統運用会社」が、系統の需給調整(バランシング)のために、短期的な電力消費量の変化や発電所の事故や再生可能エネルギーの発電減少などに備えて電力供給能力の予備力を確保することが必要になる。そのために、「送電系統運用会社」などによってバランシング市場(実需給の前から開始される電力取引市場)が設けられ、バランシングのためにエネルギー消費を実際に削減したときのエネルギー量に対する金銭価値だけでなく、「送電系統運用会社」からの要請に応じて削減をコントロールするエネルギーコントロール能力(予備力)に対する金銭価値も生まれている。
 例えば、特許文献1(特開2013-230051号公報)に記載されているように、削減した電力や予備力に対して対価を支払うためには、特許文献1でネガワット基準値と呼ばれている、削減しなかった場合の使用電力(ベースライン電力)を適正に予測することが必要になる。
 上述の特許文献1に記載されているようにベースライン電力に過去の実績値を使用する場合、過去の実績値にデマンドレスポンス制御の影響が含まれていると適正なベースライン電力とみなすことができない。従って、デマンドレスポンス制御が行なわれたときの実績値を除いた上でベースライン電力を算出することが考えられるが、デマンドレスポンス制御が頻発している季節には母数として必要な数の実績値を確保するのが難しくなる。また、必要母数が揃うまで過去に遡ろうとすると、季節変化の影響を大きく受けるくらい過去に遡る可能性も考えられる。設備機器が空気調和装置などの気候変化の影響を受けるものである場合に、季節変化の影響を大きく受けるほど過去に遡ってベースライン電力算出のための実績値を確保する可能性があったのでは、推定されるベースラインが大きな気候変化の影響を受けているとの疑いを招くことになり、適性を欠くものではないかと疑われることになりかねない。
 そこで、本発明の課題は、エネルギーの取引市場で用いることのできる、信頼性の高いベースラインの得られる機器管理装置を提供することである。
 本発明の第1観点に係る機器管理装置は、エネルギーの供給を受けてエネルギーを消費する少なくとも一つの設備機器の管理を行う機器管理装置であって、少なくとも一つの設備機器の第1特定日のエネルギー消費量の実績値を、第1特定日の時間帯に関連付けて記憶する実績記憶部と、少なくとも一つの設備機器についてのエネルギー調整制御の要求に関する情報及び/又はエネルギー価格に関する情報に基づく少なくとも一つの設備機器のエネルギー調整制御が、第1特定日の各時間帯において行われたか否かを示す調整制御実施有無情報を記憶する調整制御実施有無記憶部と、調整制御実施有無記憶部に記憶されている調整制御実施有無情報によって特定されるエネルギー調整制御が行われた時間帯又は当該時間帯から定められるエネルギー調整制御の影響を考慮すべき調整制御影響期間について、エネルギー調整制御が行われなかったとしたときの少なくとも一つの設備機器のエネルギー消費量の仮想値を第1特定日の実績値に関する情報を使って演算する仮想値演算部と、を備える。
 第1観点に係る機器管理装置においては、設備機器のエネルギー消費量の仮想値が第1特定日の実績値を使って仮想値演算部により演算されるので、第1特定日以外の他の日の実績値を使う場合に比べて第1特定日の仮想値に、同日である第1特定日の状況を反映させ易くなる。
 本発明の第2観点に係る機器管理装置は、第1観点に係る機器管理装置において、実績記憶部に記憶されている少なくとも一つの設備機器の実績値と仮想値演算部が演算した少なくとも一つの設備機器の仮想値とを用いてエネルギー調整制御が行なわれなかったとしたときの第2特定日のベースラインを決めるベースライン決定部をさらに備える。
 第2観点に係る機器管理装置においては、仮想値演算部で演算された信頼性の高い仮想値を使ってベースライン決定部によるベースラインが決められるので、信頼性の高いベースラインの決定が可能になる。
 本発明の第3観点に係る機器管理装置は、第2観点に係る機器管理装置において、少なくとも一つの設備機器は、第1設備機器を含み、ベースライン決定部は、第2特定日のベースラインを決定するのに、エネルギー調整制御が行われた時間帯に第1設備機器の仮想値を使い、エネルギー調整制御が行われなかった時間帯に第1設備機器の実績値を使った第1特定日のデータを用いる。
 第3観点に係る機器管理装置においては、ベースライン決定部がベースラインを決定するのに用いる第1特定日のデータにおいて、エネルギー調整制御が行なわれなかった時間帯に仮想値が用いられないので、実績値がエネルギー調整制御の影響を受け難い場合に適用すると誤差を少なくすることができる。
 本発明の第4観点に係る機器管理装置は、第2観点又は第3観点に係る機器管理装置において、少なくとも一つの設備機器は、第2設備機器を含み、ベースライン決定部は、第2特定日のベースラインを決定するのに、エネルギー調整制御が行われた時間帯及びそれに続く回復期間の時間帯に第2設備機器の仮想値を使い、エネルギー調整制御が行われなかった時間帯のうち回復期間以外の第2設備機器の実績値を使った第1特定日のデータを用いる。
 第4観点に係る機器管理装置においては、ベースライン決定部がベースラインを決定するのに用いる第1特定日のデータにおいて、エネルギー調整制御が行なわれなかった時間帯の回復期間にも仮想値が用いられるので、実績値がエネルギー調整制御の影響を受けて回復期間に変動する場合に適用すると誤差を少なくすることができる。
 本発明の第5観点に係る機器管理装置は、第1観点から第4観点のいずれかに係る機器管理装置において、仮想値演算部は、第1特定日の実績値に関する情報を使った仮想値の演算として、エネルギー調整制御が行われた時間帯の前の時間帯の実績値を用いた補完を行なう。
 第5観点に係る機器管理装置においては、第1特定日のエネルギー調整制御が行なわれた時間帯の仮想値が、エネルギー調整制御が行なわれる前の第1特定日の実績値で補完されることで、仮想値演算部により行なわれる補完という簡単な処理で第1特定日の仮想値の演算をエネルギー調整制御から間も無く行なうことが可能になる。
 本発明の第6観点に係る機器管理装置は、第1観点から第5観点のいずれかに係る機器管理装置において、仮想値演算部は、第1特定日の実績値に関する情報を使った仮想値の演算として、エネルギー調整制御が行われた時間帯の後の時間帯の実績値を用いた補完を行なう。
 第6観点に係る機器管理装置においては、第1特定日のエネルギー調整制御が行なわれた時間帯の仮想値が、エネルギー調整制御が行なわれた後の第1特定日の実績値で補完されることで、仮想値演算部により行なわれる補完という簡単な処理で第1特定日の仮想値の演算をエネルギー調整制御から間も無く行なうことが可能になる。
 本発明の第7観点に係る機器管理装置は、第1観点から第6観点のいずれかに係る機器管理装置において、仮想値演算部は、予め準備した回帰式に第1特定日のパラメータを入力して仮想値を演算する。
 第7観点に係る機器管理装置においては、回帰式に第1特定日のパラメータを入力することで、第1特定日の設備機器の運転条件や環境条件などをパラメータにより仮想値に反映させられ、運転条件や環境条件が変化することによって生じる仮想値の演算における誤差を小さくすることができる。
 本発明の第8観点に係る機器管理装置は、第1観点から第7観点のいずれかに係る機器管理装置において、仮想値演算部は、第1特定日の実績値に関する情報を使った仮想値の演算として、第1特定日のパラメータを入力して第1特定日のパラメータと類似のパラメータを持つ過去の実績値を仮想値とする抽出を行なう。
 第8観点に係る機器管理装置においては、第1特定日のパラメータと類似のパラメータを持つ過去の実績値を仮想値として抽出することで、第1特定日の設備機器の運転条件や環境条件などをパラメータにより仮想値に反映させられ、例えば第1特定日の設備機器のエネルギー消費に特異な事情が生じた場合などに、第1特定日と異なる過去の実績値を仮想値とすることで演算における誤差を小さくすることができる。
 本発明の第1観点に係る機器管理装置では、日によって異なる環境の変化などを受け難くなり、設備機器のエネルギー消費量の仮想値の信頼性の向上が図れる。例えば、このような仮想値を用いてベースラインを推定すると、信頼性の高いベースラインを提供できる。
 本発明の第2観点に係る機器管理装置では、エネルギーの取引市場で用いることのできる、信頼性の高いベースラインが得られる。
 本発明の第3観点に係る機器管理装置では、例えば実績値がエネルギー調整制御の影響を受け難い場合に適用すると、ベースラインの信頼性を向上させることができる。
 本発明の第4観点に係る機器管理装置では、例えば実績値がエネルギー調整制御の影響を受けて回復期間に変動する場合に適用すると、ベースラインの信頼性を向上させることができる。
 本発明の第5観点に係る機器管理装置では、過去日に遡らずに、エネルギー調整制御の影響を受けない仮想値を簡単に得ることができる。
 本発明の第6観点に係る機器管理装置では、過去日に遡らずに、エネルギー調整制御の影響を受けない仮想値を簡単に得ることができる。
 本発明の第7観点に係る機器管理装置では、仮想値の信頼性の向上が図れる。
 本発明の第8観点の機器管理装置では、第1特定日とは異なる過去の実績値も用いることができるので、例えば第1特定日の実績値が特異なものとなったときに、仮想値の演算における誤差の増大を抑制し、仮想値の信頼性の向上を図ることができる。
エネルギー供給事業者、エネルギー送配事業者、アグリゲータ及び需要者の関係を説明するための概念図。 アグリゲータと需要者の関係を説明するための概念図。 ベースラインと実績値との関係を説明するためのグラフ。 エネルギー管理システムの全体構成の一例を示すブロック図。 電力管理装置の一例を示すブロック図。 一実施形態に係る機器管理装置の構成を示すブロック図。 (a)一実施形態に係るベースライン電力の算出方法を説明するための図、(b)従来のベースライン電力の算出方法を説明するための図。 DR制御の時間帯の実績値と補完値の関係を説明するためのグラフ。 DR制御の時間帯及び回復期間の実績値と補完値の関係を説明するためのグラフ。 従来のベースライン電力の算出方法の問題点を説明するための概念図。
 (1)ベースラインの説明
 エネルギー調整制御によって得られたとみなされる調整量は、ベースラインから実消費エネルギー量を差し引いた量として定義される。この定義で用いられるベースラインは、エネルギー調整制御が行なわれなかった場合に、エネルギーの需要者が実際に消費したエネルギー量又は消費されたと想定されるエネルギー量である。エネルギー調整制御は、例えばデマンドレスポンス制御である。
 エネルギー調整制御は、エネルギー調整制御の供給者側からのエネルギー調整制御の要求やエネルギー価格に関する情報に基づいて行なわれる。エネルギー調整制御の対象は、エネルギーの需要者が運転する設備機器である。エネルギー調整制御の要求に関する情報の授受は、例えば電力を供給する供給者の要求に応えた需要者に報酬や罰則を設ける需給電力契約方式の契約を結んでいる事業者と需要者の間で見られ、エネルギー価格に関する情報の授受は、例えば時間帯別の料金を設定する時間帯別料金方式の契約を結んでいる事業者と需要者との間で見られる。
 一般的に、エネルギーは、図1に示されているようにエネルギー供給事業者1からエネルギー送配事業者2を経てエネルギーの需要者C1、需要者C2及び需要者C3の施設3に送られる。エネルギー供給事業者1からエネルギー送配事業者2へのエネルギーの流れが矢印E1で示されており、エネルギー送配事業者2から需要者C1、需要者C2及び需要者C3それぞれへのエネルギーの流れが矢印E2,E3,E4で示されている。エネルギーを消費する設備機器20は、需要者C1、需要者C2及び需要者C3のそれぞれの施設3に設置されている。エネルギー供給事業者1は例えば発電事業者であり、エネルギー送配事業者2は例えば送電系統運用事業者である。
 エネルギー調整制御の契約は、図1に示されているように、例えば需要者C1とエネルギー供給事業者1との間で直接結ばれる契約AG1や需要者C3とエネルギー送配事業者2との間で直接結ばれる契約AG2のようなものもあるが、需要者C2のようにアグリゲータ4を介して間接的にエネルギー供給事業者1やエネルギー送配事業者2と結ぶ場合もある。契約AG3、AG4,AG5は、需要者C2、アグリゲータ4、エネルギー供給事業者1及びエネルギー送配事業者2の間で結ばれる可能性のある契約関係を示している。なお、図1に示されているエネルギー供給事業者1、エネルギー送配事業者2及びアグリゲータ4は、それぞれ単数の場合も複数の場合もある。また、図2に示されているように、メインアグリゲータ4aとサブアグリゲータ4bのように階層的に複数のアグリゲータ4が関わっている場合もある。需要者C21、需要者C22及び需要者C23は、図1の需要者C2と同様に直接メインアグリゲータ4aとエネルギー調整制御の契約を行なうが、需要者C41、需要者C42及び需要者C43は、サブアグリゲータ4bを介してメインアグリゲータ4aとエネルギー調整制御の契約を行なうことになる。
 図3には、ある特定の日の需要者C2のベースラインBLと実績値RVの例が示されている。図3の例においては、13時までベースラインBLと実績値RVが一致している。つまり、13時以前は、需要者Cがエネルギー調整制御を行っていないため、ベースラインBLと実績値RVがほぼ一致している。図3の例では、13時から15時までの区間で需要者C2がエネルギー調整制御を行っている。その結果、13時から15時までの区間では、ベースラインBLよりも実績値RVが小さくなっている。15時に需要者C2がエネルギー調整制御を停止したため、15時以降は再び実績値RVがベースラインBLにほぼ一致する。
 図3の例では、13時から15時までエネルギー調整制御が行なわれているので、図3に斜線で示されている部分の面積が、需要者C2により調整されたエネルギー消費量(エネルギー消費値×時間)、つまり需要者C2のある特定の日の調整量になる。このベースラインBLのうちの点線で示されている部分、つまり13時から15時までの区間の値は推定値である。通常は、この推定値の算出方法、及び調整量に基づいて需要者C2が受け取る報酬は、需要者C2とアグリゲータ4との間の契約AG3に基づいて定められる。そのため、もし、図3のベースラインBLの推定値が大きく算出されるものであれば、調整量が多く見積もられるので需要者C2の報酬が多くなるという点では需要者C2に利があるが、支出が多くなるアグリゲータ4にとって不利になる。逆に、図3のベースラインBLの推定値が小さく算出されるものであれば、調整量が少なく見積もられるので支出が少ないアグリゲータ4にとって有利になるが、需要者C2の報酬が減って需要者C2にとって不利になる。このようにベースラインBLの推定は、アグリゲータ4の事業にとって重要である。このようなベースラインBLの算出には、正確性、簡潔性及び誠実性が求められる。
 このようなベースラインBLの推定は、例えば図1のエネルギー供給事業者1と需要者C1の間の契約AG1に基づいても行なわれる場合があり、エネルギー送配事業者2と需要者C3との間の契約AG2に基づいても行なわれる場合がある。言い換えると、後述するベースラインBLの推定値の算出方法やそのような算出方法が組み込まれた機器管理装置が、図1に示されている様々な契約AG1~AG5の遂行のために適用できるということになる。
 図1に示されているような場合、エネルギー調整制御の時間帯は、アグリゲータ4、エネルギー供給事業者1及びエネルギー送配事業者2のうちの少なくとも一つの事業者の要求に沿って誘導される。図1では、需要者C1が契約しているのはエネルギー供給事業者1だけであるが、内容によっては、例えば需要者C1がエネルギー料金ベースの契約(例えば時間帯別料金方式の契約など)をエネルギー供給事業者1と結ぶ一方で、需要者C1がアグリゲータ4とインセンティブベースの契約(例えば需給電力契約方式の契約など)を結ぶことも可能である。そのような場合、例えば、需要者C1が需給バランスに応じてリアルタイムにエネルギー料金の変更の通知を受けてエネルギー調整制御をする場合も、需要者C1がアグリゲータ4からエネルギー調整制御の要求を受けてエネルギー調整制御をする場合もあり得る。そのどちらの場合も、エネルギー調整制御をしなかった場合のベースラインBLからエネルギー調整制御によって実績値RVがずれる。そのため、本実施形態では、その特定の日のエネルギー消費値に基づいて他の特定の日のベースラインBLの推定をする場合には、後述するように、その特定の日のエネルギー調整制御を行った時間帯のエネルギー消費値は仮想値を使って補完する。
 (2)エネルギー管理システムの全体構成
 以下においては説明を分かり易くするために、本発明の一実施形態に係る機器管理装置が消費するエネルギーは電気エネルギーであるものとして説明する。図4には、本発明の一実施形態に係るエネルギー管理システムが示されている。図4のエネルギー管理システム100では、電力会社1aから物件Aの施設3a及び物件Bの施設3bに電力が供給される。ここで、物件A,Bの施設3a,3bは、例えば、オフィスビル、テナントビル、工場および一般家庭等の、1又は複数の設備機器が設置される建物である。物件A,Bは、デマンドレスポンス制御に関する同じ内容の契約の対象となっている。なお、図3では、電力会社が電力を供給する物件として、物件A,Bや施設3a,3bがそれぞれ2つずつしか記載されていないが、物件の数や施設の数は2つに限られるものではなく、いずれか一方でもよく、また物件が3つ以上あってもよい。
 電力会社1aは、電力管理装置10を有する。物件Aは、設備機器20と、設備機器20に電力を供給する電源6と、電源6から設備機器20に供給される電力量を計測する電力メーター7と、設備機器20を制御する機器管理装置30とを有する。図3の設備機器20には、複数の種類があり、空調機20a、照明20b及び換気扇20cが含まれる。
 電力会社1aから物件A,Bの施設3a,3bには、電源ライン102aを通して電力が供給される。また、同一物件内の設備機器20には、屋内の電源ライン102bを介して電源6から電力の供給を受けている。電力管理装置10と機器管理装置30は、例えばインターネット101aで接続されている。また、同一物件内の機器管理装置30と設備機器20とは、専用の制御線101bで接続されている。なお、設備機器20の種類は、空調機20a、照明20b、換気扇20cに限られるものではない。
 (3)各装置の構成
 以下、エネルギー管理システム100に含まれる、電力管理装置10および機器管理装置30について説明する。
 (3-1)電力管理装置10
 図5には、電力管理装置10の概略構成が示されている。電力管理装置10は、通信部11、表示部12、入力部13、記憶部14、および制御部15を備える。
 通信部11は、電力管理装置10をインターネット101aに接続可能にするネットワークインターフェースである。表示部12は、ディスプレイを含んで構成されている。入力部13は、例えば、操作ボタン、キーボード及びマウスを含んで構成されている。記憶部14は、ハードディスクを含んで構成されている。記憶部14には、物件A,Bの機器管理装置30から送信されたエネルギー抑制可能量と抑制可能時間との組合せが、物件別に記憶される。制御部15は、CPU、ROM及びRAMから構成されている。制御部15は、上述の記憶部14に記憶されているプログラムを読み出して実行することにより、図5に示されている決定部15a、選択部15b、デマンドレスポンス制御送信部15c、送信要求部15dとして機能する。
 決定部15aは、電力の供給量と需要量の予測を行い、所定時間後に需要量が供給量を上回る可能性があると判断した場合には、物件A,Bに対して電力や電力量などのエネルギー消費量の抑制を要求することを決定する。あわせて、エネルギー管理システム100全体として、どれだけの時間、どれだけの電力の需要量を削減する必要があるかを決定する。選択部15bは、記憶部14に記憶された情報と、決定部15aで決定された時間および削減量とを基に、デマンドレスポンス制御を実施する時間帯と電力抑制量とを物件別に選択する。
 デマンドレスポンス制御送信部15cは、デマンドレスポンス制御を行う要求と共に、選択部15bで決定されたデマンドレスポンス制御を実施する時間帯と電力抑制量とを、通信部11から物件A,Bに出力させる。
 なお、ここでは、デマンドレスポンス制御の要求に電力抑制量を送信する場合について説明しているが、少なくともデマンドレスポンス制御の要求とデマンドレスポンス制御を実施する時間帯が電力管理装置10から機器管理装置30に通信されれば、機器管理装置30はベースライン電力を決定することができる。つまり、機器管理装置30がベースライン電力を決定するにはデマンドレスポンス制御の実施時間帯に関する情報が必須であるが、機器管理装置30がベースライン電力を決定するのに電力抑制量が電力会社1aから送られてくることは必須の要件ではなく、デマンドレスポンス制御を行なう際の電力抑制量が物件A,Bに任されていてもよく、あるいは予め契約で決められているものであってもよい。
 (3-2)機器管理装置30
 図6には、機器管理装置30の概略構成が示されている。以下、物件Aに設置された機器管理装置30について説明するが、物件Bに設置された機器管理装置30についても同様の構成である。機器管理装置30は、通信部31、出力部32、入力部33、時間管理部34、記憶部35及び制御部36を備える。
 通信部31は、機器管理装置30をインターネット101aに接続可能にするネットワークインターフェースである。通信部31により、インターネット101aを介して、機器管理装置30と電力管理装置10との間で双方向通信が行われる。出力部32は、例えば、ディスプレイを含んで構成される。出力部32には、設備機器20の運転態様を示す画面が表示される。出力部32の画面に表示される情報は、例えば、設備機器のON/OFF、運転モード(例えば、空調機20aであれば冷房モード/暖房モードなど)、設定温度、照度、換気量、稼働時間、稼働率、および稼動時の運転能力に関するものである。また、現在の消費電力なども表示される。
 入力部33は、例えば、操作ボタン及び出力部32のディスプレイを覆うタッチパネルを含んで構成される。この入力部33を使って、設備機器20の発停信号、設定の変更及び運転モードの変更などの設備機器20に対する各種指令を入力することができる。時間管理部34は、電力会社1aの電力管理装置10と略同期する時計を有し、機器管理装置30の実行する各種制御の時間管理を行う。
 (3-2-1)記憶部35
 記憶部35は、例えば通信部31や出力部32や入力部33で送受信される情報を記憶可能なハードディスクを含んで構成される。記憶部35には、後述する制御部36が読み出して実行可能なプログラムが記憶されている。また、記憶部35は、実績電力値記憶部35a及びDR(デマンドレスポンス)制御実施有無記憶部35bを有する。
 実績電力値記憶部35aは、設備機器20の時間帯毎の電力量を記憶する。つまり、実績電力値記憶部35aは、電力メーター7から各時間帯の電力使用量に関するデータを受信し、受信したデータを記憶する。
 ここでは、複数の設備機器20、つまり空調機20a、照明20b及び換気扇20cを一括して機器管理装置30が管理しているが、機器管理装置30が空調機20a、照明20b及び換気扇20cを個別に管理するように構成することもできる。個別管理の場合には、電力メーター7が、個別に管理する対象である空調機20a、照明20b及び換気扇20cに対してそれぞれ設けられる。そして、複数の電力メーター7から機器管理装置30に、空調機20a、照明20b及び換気扇20cの時間帯別の電力使用量が個別に送信されるように構成すればよい。
 ここでは、実績電力値記憶部35aは、時間帯別の電力使用量を記憶しているが、電力使用量を時間帯の長さで割れば各時間帯の平均消費電力になるので、各時間帯の平均消費電力を記憶していると見ることもできる。もちろん、実績電力値記憶部35aは、時々刻々と変化する消費電力を電力メーター7から受け取って記憶するように構成されてもよい。
 DR制御実施有無記憶部35b(調整制御実施有無記憶部の例)は、実績電力値記憶部35aに記憶されている時間帯別にDR制御を実施したか否かを特定するための実施有無に関するデータ(調整制御実施有無情報の例)を記憶する。この実施有無に関するデータは、例えばDR制御が実施された時間であってもよく、或いは時間帯別に付された実施有無を示すフラグであってもよい。図7(a)には、当日のベースライン電力を決定するに用いられる過去の特定の日の時間帯別のDR制御の実施の有無が示されている。DR制御実施有無記憶部35bに記憶されているDR制御の実施有無に関するデータを用いれば、機器管理装置30は、図7(a)に示されている内容を把握することができる。このようなDR制御の実施有無に関するデータは、機器管理装置30が自ら行なったDR制御の実施の有無を記憶部35に記録することによって作成できる。
 (3-2-2)制御部36
 制御部36は、例えばCPU、ROMおよびRAMから構成されている。制御部36は、上述の記憶部35に記憶されているプログラムを読み出して実行することにより、図6に示されている仮想電力値演算部36a及びベースライン電力決定部36bの機能を発揮することができる。
 仮想電力値演算部36aは、DR制御実施有無記憶部35bに記憶されているDR制御の実施有無に関するデータを用いて、DR制御が実施された時間帯について、設備機器20の電力使用量の補完値の演算を行なう。図7(a)に示されているように、当日のベースライン電力を決定するための過去の実績値として、1日前の13時から13時15分までの間の実績値が使用される。この1日前の13時から13時15分までの間の補完に使用される補完値が仮想電力値演算部36aで算出される。仮想電力値演算部36aで行なわれる補完値の演算については後ほど詳細に説明する。
 ベースライン電力決定部36bは、実績電力値記憶部35aに記憶されている実績値と仮想電力値演算部36aによって算出された補完値とを用いて当日のベースライン電力を決定する。ベースライン電力の算出方法には、従来からある一般的な算出方法を用いることができる。例えば、過去の同一時間帯の複数日のデータの平均値により算出する平均化法、負荷に影響する多くの変数(過去の負荷パターン、天候、曜日など)を用いて当日の負荷を予測する回帰分析法、過去データより当日と最も似ている一日を見つけベースラインとして採用する同等日採用法、及び当日に近いデータの重みを増すことによってベースラインとして算出する加重移動平均法が、ベースライン電力の算出方法として従来から知られている。
 このベースライン電力決定部36bは、ベースライン電力の決定する際に、補完値で補完されたDR制御の時間帯の電力使用量を、DR制御がなかった電力使用量と同じに取り扱う。このように取り扱うことで、ベースライン電力を決定する際に、図7(a)の場合に、4日前まで遡らずに、1日前の13時から13時15分のデータを参照することができる。もし、2つ以上参照することが必要であれば、2日前の補完値や3日前の補完値を参照することも可能になる。
 (4)仮想電力値演算部36aによる補完
 仮想電力値演算部36aは、ベースライン電力の算出のために参照するデータの中にDR制御の影響を含むデータがある場合、DR制御の影響を含まない値でDR制御の影響を含むデータを補完する。以下、仮想電力値演算部36aによる補完の方法の具体例について説明する。
 (4-1)補完対象の特定方法
 仮想電力値演算部36aは、DR制御実施有無記憶部35bに記憶されているDR制御の実施有無に関するデータを用いて、DR制御が実施された時間帯を特定することができるが、補完対象がDR制御の実施時間帯に限られるものではなく、DR制御の実施時間帯の周辺にまで補完対象を拡張することができる。
 (4-1-1)DR制御の実施時間帯のみを対象とする場合
 図8に示されているグラフにおいては、13時から14時までの60分間だけDR制御が行なわれていることが分かる。図8の場合に補完の対象とされていのは、DR制御の実施時間帯である13時から14時までの時間帯のみである。
 (4-1-2)DR制御の実施時間帯及び回復期間を対象とする場合
 図9に示されているグラフにおいては、13時から14時までの60分間だけDR制御が行なわれていることが分かる。図9の場合に補完の対象とされていのは、13時から14時までの時間帯及び14時から14時45分までの時間帯である。この14時から14時45分までの時間帯が回復期間である。空調機20aが設備機器20に含まれていると、DR制御によって13時から14時までの間だけ、空調機20aが停止され、あるいは空調機20aの設定温度が環境温度に近い値にシフトされることがある。このような場合、DR期間が終了すると、空調機20aが運転を始めて比較的大きな電力消費が生じる。このような回復期間に通常よりも消費電力が増大する電力リバウンドが生じる場合には、補完対象を回復期間まで延長すると、DR制御がなかったときの状態に更に近づけることができる。
 回復期間の設定の仕方としては、例えば、DR制御の終了後一定期間とする場合やDR制御の終了後に室温が快適な温度に戻るまでの期間とする場合がある。後者の場合の快適な温度とは、例えば、DR制御の開始直前の温度、空調機20aに設定されている設定温度、又は冷房運転なら28℃などの特定の設定値である。
 (4-2)補完値の算出方法
 次に、仮想電力値演算部36aが行なう補完値の算出方法について、図8及び図9を用いて具体的に説明する。仮想電力値演算部36aは、設備機器20の電力使用量の補完値で補完される時間帯が含まれている特定日の実績値に関する情報を使って演算する。既に説明したように、補完対象は、DR制御が実施された期間だけでなく、DR制御の影響を受けた期間、ここでは回復期間の電力量である。
 (4-2-1)DR制御の時間帯の前の値での代用
 ここでは、DR制御の実施時間帯の電力使用量を、DR制御の実施時間帯の前又は後の値で代用するという補完値の算出方法について説明する。図8に示されている場合も、図9に示されている場合も、13時よりも前の時間帯の電力使用量を用いて補完値が算出される。
 (4-2-1-1)DR制御期間直前の一つの値で代用する方法
 補完対象がDR制御の実施時間帯の電力使用量である場合には、図8に示されているように、DR制御の実施時間帯の直前の12時45分から13時までの時間帯の電力使用量を、13時から13時15分までの時間帯、13時15分から13時30分までの時間帯、13時30分から13時45分までの時間帯、及び13時45分から14時までの時間帯のそれぞれの電力使用量とする。また、補完対象が回復期間も含む場合には、図9に示されているように、さらに14時から14時15分までの時間帯、14時15分から14時30分までの時間帯、及び14時30分から14時45分までの時間帯のそれぞれの電力使用量とする。
 (4-2-1-2)直前の複数の時間帯を用いる方法
 直前の複数の時間帯の電力使用量から補完値を算出する方法は、例えば図8のDR制御の実施時間帯の直前の12時45分から13時までの時間帯の電力使用量を平均して補完値を求める。平均する時間帯の数は適宜設定され、ここでは15分間隔の2つの時間帯を用いたが、3つ以上であってもよい。なお、ここでは時間帯の長さが15分の場合について説明したが、時間帯の長さが15分以外のものであってもよい。時間帯の長さが15分よりも短い例えば1分又は30秒であってもよく、時間帯の長さが15分よりも長い例えば20分又は30分であってもよい。また、平均値を用いる以外の補完値を求める算出方法として、DR制御の実施時間帯の直前の複数の時間帯の電力使用量のうちの最小値を補完値とする方法を採用することもできる。また、平均値を用いる以外の補完値を求める算出方法として、DR制御の実施時間帯の直前の複数の時間帯の電力使用量のうちの最大値を補完値とする方法を採用することもできる。このようにして算出した補完値で補完される補完対象は上述の場合と同様である。
 (4-2-1-3)DR制御期間の前の特定期間を用いる方法
 直前の時間帯ではなく、予め定めた特定期間の電力使用量を用いることもできる。図8に示されている場合、例えば、DR制御の実施時間帯の直前の12時50分から13時までの10分間の電力使用量X1を用いてもよい。つまり、電力使用量X1を1.5倍して得られる値(X1×1.5)を、13時から13時15分までの時間帯、13時15分から13時30分までの時間帯、13時30分から13時45分までの時間帯、及び13時45分から14時までの時間帯のそれぞれの電力使用量とする。
 また、例えば11時から12時までの期間の電力使用量を用いることもできる。12時から13時までに昼休み時間などで設備機器20の電力使用量が低下するなどの特殊な事情があるときに特殊事情の発生する時間帯を除いて期間を設定するなどすることができる。このように、特定期間を用いる場合にも、例えば最小値、平均値又は最大値を補完値とする方法を採用することができる。
 (4-2-2)DR制御の時間帯の後の値で代用する方法
 上述のDR制御の実施時間帯の前の値での代用する考え方と同様の考え方で、DR制御の実施の影響を含まない後の時間帯で代用することもできる。ただし、DR制御の実施の後の場合には、図9に示した回復期間などに無視できない程度のDR制御の実施の影響が生じる場合がある。そのような場合には、回復期間の後の時間帯の電力使用量を用いて補完値を算出する。例えば、設備機器20に照明20bのみしか含まれていないような場合には、回復期間の電力使用量の変動は無視できるほど小さいと考えられる。このような場合には、回復期間を考慮せず、DR制御の実施の前の場合と同様に、直後の時間帯を用いることもできる。
 DR制御の実施時間帯の後の値での代用する場合も、上述の(4-2-1-1)DR制御期間直前の一つの値での代用、(4-2-1-2)直前の複数の時間帯を用いる方法、及び(4-2-1-3)DR制御期間の前の特定期間を用いる方法と類似の方法を用いることができ、DR制御期間及び/又は回復期間直後の一つの値で代用する方法、DR制御期間及び/又は回復期間直後の複数の時間帯を用いる方法、及びDR制御期間及び/又は回復期間の後の特定期間を用いる方法を採用することができる。
 (4-2-3)DR制御の時間帯の前後の値で代用する方法
 前後の複数の時間帯の電力使用量から補完値を算出する方法は、例えば図8のDR制御の実施時間帯の直前の12時45分から13時までの時間帯の電力使用量と直後の14時45分から15時までの時間帯の電力使用量を平均して補完値を求める。平均する時間帯の数は適宜設定され、ここでは15分間隔の3つの時間帯を用いたが、例えば前後一つずつ、あるいは前後の時間帯の数を任意に組み合わせてもよい。なお、ここでは時間帯の長さが15分の場合について説明したが、時間帯の長さが15分以外のものであってもよい。また、平均値を用いる以外の補完値を求める算出方法として、DR制御の実施時間帯の前後の複数の時間帯の電力使用量のうちの最小値を補完値とする方法を採用することもできる。また、平均値を用いる以外の補完値を求める算出方法として、DR制御の実施時間帯の前後の複数の時間帯の電力使用量のうちの最大値を補完値とする方法を採用することもできる。このようにして算出した補完値で補完される補完対象は上述の場合と同様である。なお、回復期間の影響を考慮に入れる場合と考慮に入れない場合があるのは、上述の(4-2-2)DR制御の実施の影響を含まない後の時間帯で代用する方法と同様である。
 (4-2-4)DR制御の時間帯の前後の近い値で代用する方法
 DR制御の実施時間帯の前後の近い値で代用する方法も、回復期間の影響を考慮に入れる場合と考慮に入れない場合があるのは、上述の(4-2-2)DR制御の実施の影響を含まない後の時間帯で代用する場合と同様である。ここでは、図9を用いて、回復期間の影響を考慮に入れる場合について説明する。
 直近の一つの値を使う場合は、例えば13時から13時15分の時間帯の補完値は、12時45分から13時の時間帯の電力使用量で代用される。同様に、13時15から13時30分の時間帯の補完値及び13時30から13時45分の補完値も、12時45分から13時の時間帯の電力使用量で代用される。
 一方、14時30分から14時45分の時間帯の補完値は、14時45分から15時の時間帯の電力使用量で代用される。同様に、14時15から13時30分の時間帯の補完値及び14時から14時15分の補完値も、14時45分から15時の時間帯の電力使用量で代用される。
 ところで、14時30分から14時45分の時間帯は、12時45分から13時の時間帯と14時45分から15時の時間帯のいずれにも同じように近い。このような場合には、前後どちらの時間帯の電力使用量を用いるかを予め決めておけばよい。
 直前直後の複数の時間帯の消費電力を用いる場合も、前述の考え方と同様に演算することができる。この場合、例えば、DR制御の実施前の複数の時間帯で、平均値、最小値又は最大値を求めておき、DR制御の実施前半の時間帯の補完値に用いる。また、例えば、DR制御の実施の影響を受ける時間帯の後の複数の時間帯で、平均値、最小値又は最大値を求めておき、DR制御の実施後半の時間帯の補完値に用いる。
 直前直後の特定期間の消費電力を用いる場合も、前述の考え方と同様に演算することができる。この場合、例えば、DR制御の実施前の特定時間帯で、平均値、最小値又は最大値を求めておき、DR制御の実施前半の時間帯の補完値に用いる。また、例えば、DR制御の実施の影響を受ける時間帯の後の特定期間で、平均値、最小値又は最大値を求めておき、DR制御の実施後半の時間帯の補完値に用いる。
 (4-2-5)運用条件からの回帰分析
 予め過去の設備機器20の運転情報から、運転条件・環境条件からの消費電力を推定する回帰式を準備しておく。準備された回帰式は、機器管理装置30の記憶部35に記憶されている。そして、制御部36の仮想電力値演算部36aは、記憶部35から読み出された回帰式に当日の運転条件・環境条件を代入して、DR制御の実施された時間帯の設備機器20の消費電力を算出する。仮想電力値演算部36aは、算出された消費電力を使ってDR制御の実施の影響を受ける時間帯の補完値を計算する。回帰式に用いられる入力パラメータは、例えば、設定温度、外気温度、及び空調機20aの室内機の運転台数である。
 (4-2-6)同等日の電力使用量を採用
 予め過去の設備機器20の運転情報を整理して記憶部35に記憶させておく。そして、仮想電力値演算部36aは、記憶部35に記憶されている過去の設備機器の運転情報を使って、補完値の計算対象の特定の日と同等の運転条件・環境条件のときの電力使用量を補完値として抽出する。この場合、計算対象の特定の日と一致する過去の運転条件・環境条件が記憶部35に記憶されている運転情報の中にない場合には、最も近い過去の運転条件・環境条件のときの電力使用量を補完値として抽出する。この抽出に用いられる入力パラメータは、例えば、設定温度、外気温度、運転時間、及び空調機20aの室内機の運転台数である。
 (5)特徴
 (5-1)
 以上説明したように、本発明の一実施形態に係る機器管理装置30は、電力供給を受けて、電力を消費する設備機器20の管理を行なうものである。上述の機器管理装置30では、エネルギーとして電気を取り扱う場合について説明したが、取り扱うエネルギーは、電気以外のもの例えばガスであってもよい。
 機器管理装置30では、設備機器20の電力使用量(エネルギー消費量の例)の補完値(仮想値の例)、例えば図7(a)に示された1日前(第1特定日の例)の13時から13時15分の時間帯の電力使用量は、図8及び図9に示されているようにDR制御の影響を受けるので、例えば1日前の12時45分から13時の時間帯の電力使用量で補完される。このように1日前の補完値が1日前の実績値に置き換えられる(第1特定日の実績値に関する情報を使って演算される例)ので、過去の1日前以外の実績値を使う場合に比べて、1日前の13時から13時15分の補完値に、同日である1日前の状態を反映させ易くなる。その結果、このような補完値を用いてベースライン電力が推定されると、信頼性の高いベースライン電力を提供することができる。
 (5-2)
 ベースライン電力決定部36b(ベースライン決定部の例)は、実績電力値記憶部35a(実績記憶部の例)に記憶されている設備機器20の実績値と仮想電力値演算部36aが演算した設備機器20の補完値とを用いてデマンドレスポンス制御(エネルギー調整制御の例)が行なわれなかったとしたときの当日(第2特定日の例)のベースライン電力(ベースラインの例)を決めている。このように、仮想電力値演算部36aで演算された信頼性の高い補完値(仮想値の例)を使ってベースライン電力決定部36bによるベースライン電力が決められるので、信頼性の高いベースライン電力の決定が可能になる。
 例えば、従来は図7(b)に示されているような従来のベースライン電力算出方法では、当日の13時から13時15分の時間帯のベースライン電力の算出のために、DR制御の影響を受けていない4日前の13時から13時15分の実績値を参照しなければならない。このような従来のベースライン電力の算出方法では、図10に示されているように、7月中旬にDR制御が行なわれた日が継続する場合に、参照されるデータは、7月上旬の過去日の13時から13時15分のデータにまで遡ることもあり得る。そうすると、空調機20aのように季節影響を受ける設備機器20では、本来もらえるべきインセンティブIN1に対して実際にはインセンティブIN2しか貰えず、インセンティブに大きな差(IN1-IN2)が生じることにもなりかねない。
 それに対して、図7(a)に示されているように、1日前の13時から13時15分の消費電力がDR制御の影響のない補完値に置き換えられて、1日前の補完値を使ってベースライン電力決定部36bがベース電力を決定するので、信頼性の高いベースライン電力の決定が可能になる。
 (5-3)
 図8に示されているデータが図7(a)の一日前の参照されるべきデータであるとすると、ベースライン電力決定部36bは、当日(第2特定日の例)のベースライン電力を決定するのに、DR制御が行われた時間帯である13時から14時の時間帯の電力使用量には設備機器20の仮想値を使い、DR制御が行われなかった14時から14時45分の時間帯の電力使用量には設備機器20の実績値を用いることになる。例えば設備機器20が照明20bのみであれば、図8の回復期間に電力リバウンドなどの変動はほとんどないので、そのように実績値がDR制御の影響を受け難い場合に適用すると誤差を少なくすることができる。その結果、ベースライン電力の信頼性を向上させることができる。
 (5-4)
 図9に示されているデータが図7(a)の一日前の参照されるべきデータであるとすると、ベースライン電力決定部36bは、当日(第2特定日の例)のベースライン電力を決定するのに、DR制御が行われた時間帯である13時から14時の時間帯の電力使用量には設備機器20の補完値を使い、DR制御が行われなかった回復期間の14時から14時45分の時間帯の電力使用量にも補完値を用いることになる。例えば設備機器20が空調機20aの影響を大きく受ける場合であれば、図9の回復期間に電力リバウンドなどの変動が大きくなるので、実績値がDR制御の影響を受けて回復期間に変動する場合に適用すると誤差を少なくすることができる。その結果、ベースライン電力の信頼性を向上させることができる。
 (5-5)
 仮想電力値演算部36aは、図8及び図9を用いて説明したように、同日(第1特定日の例)の実績値に関する情報を使った補完値の演算として、例えば13時から14時までのDR制御が行われた時間帯の前の13時以前の時間帯の実績値を用いた補完を行なってもよい。このようにDR制御が行なわれる前の同日の実績値で補完されることで、仮想電力値演算部36aにより行なわれる補完という簡単な処理で同日の補完値の演算をDR制御から間も無く行なうことが可能になる。その結果、過去日に遡らずに、DR制御の影響を受けない補完値を簡単に得ることができる。
 (5-6)
 仮想電力値演算部36aは、図8及び図9を用いて説明したように、同日(第1特定日の例)の実績値に関する情報を使った補完値の演算として、例えば13時から14時までのDR制御が行われた時間帯の後の14時以降の時間帯の実績値を用いた補完を行なってもよい。このようにDR制御が行なわれた後の同日の実績値で補完されることで、仮想電力値演算部36aにより行なわれる補完という簡単な処理で同日の補完値の演算をDR制御から間も無く行なうことが可能になる。その結果、過去日に遡らずに、DR制御の影響を受けない補完値を簡単に得ることができる。
 (5-7)
 仮想電力値演算部36aは、図8及び図9を用いて説明したように、回帰式に補完対象の時間帯が属する日(第1特定日の例)のパラメータ(実績値に関する情報の例)を入力して補完値を算出してもよい。このように回帰式を用いれば、補完対象の時間帯が属する日の設備機器20の運転条件や環境条件などをパラメータにより補完値に反映させられ、運転条件や環境条件が変化することによって生じる補完値の演算における誤差を小さくすることができる。その結果、補完値の信頼性の向上が図れる。
 (5-8)
 仮想電力値演算部36aは、図8及び図9を用いて説明したように、補完対象の時間帯が属する日(第1特定日の例)のパラメータ(実績値に関する情報の例)を入力して同日のパラメータと類似のパラメータを持つ過去の実績値を補完値とする抽出を行ってもよい。補完対象の時間帯が属する日の設備機器20の運転条件や環境条件などをパラメータにより補完値に反映させられ、例えばその日の設備機器20の電力使用量に特異な事情が生じた場合などに、その日と異なる過去の実績値を補完値とすることで演算における誤差を小さくすることができる。その結果、補完値の演算における誤差の増大を抑制し、補完値の信頼性の向上を図ることができる。
 (6)変形例
 (6-1)変形例1A
 上記実施形態では、電力会社1aからDR制御の要求を受ける機器管理装置30について説明したが、本発明に係る機器管理装置30は、エネルギー送配事業者2やアグリゲータ4からDR制御の要求やエネルギー価格に関する情報を受ける場合にも適用できる。
 (6-2)変形例1B
 上記実施形態では、設備機器20が空調機20a、照明20b及び換気扇20cという複数の種類の設備機器を含む場合について説明したが、設備機器が一つの場合でもよく、単一の種類のものを複数含むものであってもよい。
 (6-2)変形例1C
 上記実施形態において補完値を求める回帰分析や類似のパラメータを持つ過去の実績値の抽出の対象には、同一物件だけでなく、同等の他物件を用いてもよい。
20 設備機器
20a 空調機
20b 照明
30 機器管理装置
35a 実績電力値記憶部 (実績記憶部)
35b DR制御実施有無記憶部 (調整制御実施有無記憶部)
36a 仮想電力値演算部 (仮想値演算部)
36b ベースライン電力決定部 (ベースライン決定部)
特開2013-230051号公報

Claims (8)

  1.  エネルギーの供給を受けてエネルギーを消費する少なくとも一つの設備機器の管理を行う機器管理装置であって、
     前記少なくとも一つの設備機器の第1特定日のエネルギー消費量の実績値を、前記第1特定日の時間帯に関連付けて記憶する実績記憶部(35a)と、
     前記少なくとも一つの設備機器についてのエネルギー調整制御の要求に関する情報及び/又はエネルギー価格に関する情報に基づくエネルギー調整制御が、前記第1特定日の各時間帯において行われたか否かを示す調整制御実施有無情報を記憶する調整制御実施有無記憶部(35b)と、
     前記調整制御実施有無記憶部に記憶されている前記調整制御実施有無情報によって特定されるエネルギー調整制御が行われた時間帯又は当該時間帯から定められるエネルギー調整制御の影響を考慮すべき調整制御影響期間について、エネルギー調整制御が行われなかったとしたときの前記少なくとも一つの設備機器のエネルギー消費量の仮想値を前記第1特定日の実績値に関する情報を使って演算する仮想値演算部(36a)と、
    を備える機器管理装置。
  2.  前記実績記憶部に記憶されている前記少なくとも一つの設備機器の実績値と前記仮想値演算部が演算した前記少なくとも一つの設備機器の仮想値とを用いてエネルギー調整制御が行なわれなかったとしたときの第2特定日のベースラインを決めるベースライン決定部(36b)をさらに備える、
    請求項1に記載の機器管理装置。
  3.  前記少なくとも一つの設備機器は、第1設備機器(20b)を含み、
     前記ベースライン決定部は、前記第2特定日のベースラインを決定するのに、エネルギー調整制御が行われた時間帯に前記第1設備機器の仮想値を使い、エネルギー調整制御が行われなかった時間帯に前記第1設備機器の実績値を使った前記第1特定日のデータを用いる、
    請求項2に記載の機器管理装置。
  4.  前記少なくとも一つの設備機器は、第2設備機器(20a)を含み、
     前記ベースライン決定部は、前記第2特定日のベースラインを決定するのに、エネルギー調整制御が行われた時間帯及びそれに続く回復期間の時間帯に前記第2設備機器の仮想値を使い、エネルギー調整制御が行われなかった時間帯のうち前記回復期間以外の前記第2設備機器の実績値を使った前記第1特定日のデータを用いる、
    請求項2又は請求項3に記載の機器管理装置。
  5.  前記仮想値演算部は、前記第1特定日の実績値に関する情報を使った仮想値の演算として、エネルギー調整制御が行われた時間帯の前の時間帯の実績値を用いた補完を行なう、
    請求項1から4のいずれか一項に記載の機器管理装置。
  6.  前記仮想値演算部は、前記第1特定日の実績値に関する情報を使った仮想値の演算として、エネルギー調整制御が行われた時間帯の後の時間帯の実績値を用いた補完を行なう、
    請求項1から5のいずれか一項に記載の機器管理装置。
  7.  前記仮想値演算部は、予め準備した回帰式に前記第1特定日のパラメータを入力して仮想値を演算する、
    請求項1から6のいずれか一項に記載の機器管理装置。
  8.  前記仮想値演算部は、前記第1特定日の実績値に関する情報を使った仮想値の演算として、前記第1特定日のパラメータを入力して前記第1特定日のパラメータと類似のパラメータを持つ過去の実績値を仮想値とする抽出を行なう、
    請求項1から7のいずれか一項に記載の機器管理装置。
PCT/JP2015/071395 2014-07-31 2015-07-28 機器管理装置 WO2016017647A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US15/500,003 US10380706B2 (en) 2014-07-31 2015-07-28 Equipment management apparatus
EP15826423.4A EP3176746A4 (en) 2014-07-31 2015-07-28 Apparatus management device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-156194 2014-07-31
JP2014156194A JP5954370B2 (ja) 2014-07-31 2014-07-31 機器管理装置

Publications (1)

Publication Number Publication Date
WO2016017647A1 true WO2016017647A1 (ja) 2016-02-04

Family

ID=55217547

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/071395 WO2016017647A1 (ja) 2014-07-31 2015-07-28 機器管理装置

Country Status (4)

Country Link
US (1) US10380706B2 (ja)
EP (1) EP3176746A4 (ja)
JP (1) JP5954370B2 (ja)
WO (1) WO2016017647A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018061314A (ja) * 2016-10-03 2018-04-12 株式会社東芝 デマンドレスポンス計画システム、デマンドレスポンス計画方法、及びデマンドレスポンス計画プログラム
JP2018157649A (ja) * 2017-03-16 2018-10-04 東邦瓦斯株式会社 ネガワット算出方法およびネガワット算出プログラム
JP2021040437A (ja) * 2019-09-04 2021-03-11 積水化学工業株式会社 代替ベースライン計算装置、学習済みモデル、機械学習装置、代替ベースライン計算方法およびプログラム

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018021101A1 (ja) * 2016-07-27 2018-02-01 京セラ株式会社 電力管理装置、電力管理方法及び電力管理システム
CN108009938B (zh) * 2016-11-02 2021-12-03 中国电力科学研究院 一种基于形状的系统负荷聚类及负荷周期的模式识别方法
CN108075465A (zh) * 2016-11-18 2018-05-25 松下电器产业株式会社 节电控制方法以及节电控制系统
JP7348925B2 (ja) 2021-03-25 2023-09-21 トヨタ自動車株式会社 電力調整システム及びアグリゲーション装置
EP4152892A1 (en) * 2021-09-21 2023-03-22 Helvar Oy Ab Lighting system management

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000092705A (ja) * 1998-09-11 2000-03-31 Chubu Electric Power Co Inc 電力系統潮流監視装置
JP2008077345A (ja) * 2006-09-20 2008-04-03 Osaka Gas Co Ltd 省エネルギ支援システム
JP2013038958A (ja) * 2011-08-09 2013-02-21 Chugoku Electric Power Co Inc:The 電力需給バランスチェック方法及び電力需給バランスチェック装置
JP2013118727A (ja) * 2011-12-01 2013-06-13 Osaka Gas Co Ltd 電力調整量導出装置
JP2013176276A (ja) * 2012-02-27 2013-09-05 Daikin Ind Ltd ヒートポンプ機器エネルギー管理装置
JP2014021555A (ja) * 2012-07-12 2014-02-03 Toyota Motor Corp 自然エネルギー量予測装置

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6785592B1 (en) 1999-07-16 2004-08-31 Perot Systems Corporation System and method for energy management
US8135631B2 (en) 2006-10-03 2012-03-13 Computer Associates Think, Inc. Systems, methods, and software arrangements for improving uniformity of assets within an entity
US7941296B2 (en) 2007-04-27 2011-05-10 Hsb Solomon Associates, Llc Benchmarking and gap analysis system and method
US20100250440A1 (en) * 2009-03-30 2010-09-30 Eugene Wang Web based monitoring, management and contest based on collected power consumption data
US8437882B2 (en) * 2010-02-17 2013-05-07 Inscope Energy, Llc Managing power utilized within a local power network
JP5126308B2 (ja) * 2010-07-09 2013-01-23 ソニー株式会社 電力コントロール装置
US9172245B1 (en) * 2010-12-06 2015-10-27 Sandia Corporation Intelligent electrical outlet for collective load control
JP2013230051A (ja) 2012-04-26 2013-11-07 Ntt Facilities Inc 節電支援処理システム、節電支援処理装置、電力管理端末、電力管理サーバ、節電支援方法、及びプログラム
US9946286B2 (en) 2012-09-27 2018-04-17 Nec Corporation Information processing apparatus, power-consuming body, information processing method, and program
US9057746B1 (en) * 2014-11-26 2015-06-16 Sense Labs, Inc. Determining information about devices in a building using different sets of features

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000092705A (ja) * 1998-09-11 2000-03-31 Chubu Electric Power Co Inc 電力系統潮流監視装置
JP2008077345A (ja) * 2006-09-20 2008-04-03 Osaka Gas Co Ltd 省エネルギ支援システム
JP2013038958A (ja) * 2011-08-09 2013-02-21 Chugoku Electric Power Co Inc:The 電力需給バランスチェック方法及び電力需給バランスチェック装置
JP2013118727A (ja) * 2011-12-01 2013-06-13 Osaka Gas Co Ltd 電力調整量導出装置
JP2013176276A (ja) * 2012-02-27 2013-09-05 Daikin Ind Ltd ヒートポンプ機器エネルギー管理装置
JP2014021555A (ja) * 2012-07-12 2014-02-03 Toyota Motor Corp 自然エネルギー量予測装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3176746A4 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018061314A (ja) * 2016-10-03 2018-04-12 株式会社東芝 デマンドレスポンス計画システム、デマンドレスポンス計画方法、及びデマンドレスポンス計画プログラム
WO2018066260A1 (ja) * 2016-10-03 2018-04-12 株式会社東芝 デマンドレスポンス計画システム、デマンドレスポンス計画方法、及びデマンドレスポンス計画プログラム
JP2018157649A (ja) * 2017-03-16 2018-10-04 東邦瓦斯株式会社 ネガワット算出方法およびネガワット算出プログラム
JP2021040437A (ja) * 2019-09-04 2021-03-11 積水化学工業株式会社 代替ベースライン計算装置、学習済みモデル、機械学習装置、代替ベースライン計算方法およびプログラム
JP7303707B2 (ja) 2019-09-04 2023-07-05 積水化学工業株式会社 代替ベースライン計算装置、学習済みモデル、機械学習装置、代替ベースライン計算方法およびプログラム

Also Published As

Publication number Publication date
JP5954370B2 (ja) 2016-07-20
JP2016033732A (ja) 2016-03-10
EP3176746A4 (en) 2017-12-13
EP3176746A1 (en) 2017-06-07
US10380706B2 (en) 2019-08-13
US20170262945A1 (en) 2017-09-14

Similar Documents

Publication Publication Date Title
JP5954370B2 (ja) 機器管理装置
Steriotis et al. A novel behavioral real time pricing scheme for the active energy consumers’ participation in emerging flexibility markets
Boßmann et al. Model-based assessment of demand-response measures—A comprehensive literature review
Faria et al. Demand response in electrical energy supply: An optimal real time pricing approach
Yaqub et al. Smart energy‐consumption management system considering consumers' spending goals (SEMS‐CCSG)
Olmos et al. Energy efficiency actions related to the rollout of smart meters for small consumers, application to the Austrian system
Bushnell et al. When it comes to demand response, is FERC its own worst enemy?
US20140222225A1 (en) Energy management system and method
Sun et al. Inventory control for peak electricity demand reduction of manufacturing systems considering the tradeoff between production loss and energy savings
US20100114799A1 (en) Optimal dispatch of demand side electricity resources
US10447035B2 (en) Electric power creation control system and method
Vasirani et al. Smart consumer load balancing: state of the art and an empirical evaluation in the Spanish electricity market
JP5967265B2 (ja) 機器制御装置
US20160197474A1 (en) Power demand and supply control apparatus and method thereof
EP2728694B1 (en) Equipment control device
Oprea et al. Optimizing the electricity consumption with a high degree of flexibility using a dynamic tariff and stackelberg game
US10268171B2 (en) Demand response control result presentation apparatus
JP7470832B2 (ja) 需要調整システム、需要調整方法及びプログラム
WO2018066260A1 (ja) デマンドレスポンス計画システム、デマンドレスポンス計画方法、及びデマンドレスポンス計画プログラム
JP2016034191A (ja) 機器制御装置
JP2013062800A (ja) メータボードの通信活動の検出のための方法およびシステム
WO2016186069A1 (ja) インセンティブ予測量提示装置
US11899431B2 (en) Generating device, system, and program for controlling use by facility equipment of purchased power
Arlt et al. Impact of real-time pricing and residential load automation on distribution systems

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15826423

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15500003

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2015826423

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2015826423

Country of ref document: EP