WO2015181899A1 - 空気調和システム - Google Patents
空気調和システム Download PDFInfo
- Publication number
- WO2015181899A1 WO2015181899A1 PCT/JP2014/064027 JP2014064027W WO2015181899A1 WO 2015181899 A1 WO2015181899 A1 WO 2015181899A1 JP 2014064027 W JP2014064027 W JP 2014064027W WO 2015181899 A1 WO2015181899 A1 WO 2015181899A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- demand control
- conditioning system
- target value
- air
- centralized management
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/89—Arrangement or mounting of control or safety devices
Definitions
- the present invention relates to air conditioning management, in particular, energy consumption management type air conditioning system.
- the amount of energy that can be adjusted as an air conditioner is calculated in advance, and the amount of energy that can be adjusted is compared with the amount of energy that is required to be adjusted to implement demand control.
- a system has been proposed that can immediately meet the demand from the power supplier without impairing comfort (for example, see Patent Document 2 and Patent Document 3).
- Demand values targeted for demand control in air conditioning systems are often set from the supplier's perspective, such as contract power and requests from power suppliers.
- the main cause is that it is difficult for the user to set the target value quantitatively.
- the present invention has been made to solve the above-described problems, and a first object is to define a target amount of energy used by a user, for example, in units of months, years, and the like.
- the operation data and the amount of energy used of the air conditioner up to the present time are held in advance.
- it is in obtaining the air conditioning system which implements long-term demand control by calculating the optimal driving
- a second object is to obtain an air conditioning system in which a target value set in the first object is set for each of a plurality of arbitrary air conditioner groups such as an air conditioner unit, a user unit, or a property unit.
- the third purpose is that the demand target value for one or a plurality of air conditioners selected arbitrarily can be changed, so that the user can select the demand target value according to the weather condition or the like. It is to obtain an air conditioning system.
- the fourth objective is to develop an air conditioning system that enables the exchange of information on the operating state and energy usage between different air conditioners and systems when formulating an operation plan to achieve long-term demand control. There is to get.
- the fifth object is to provide an advance notice to the user when implementing an operation plan for achieving long-term demand control, and to select from a plurality of demand target values each time the operation plan is executed. To get a harmonious system.
- a sixth object is to obtain an air conditioning system that notifies a user in advance when implementing an operation plan for achieving long-term demand control, and allows the operation plan to be changed temporarily.
- An air conditioning system includes one or more air conditioners, one or more centralized management devices, and a transmission line that connects the air conditioner and the centralized management device. Define the energy usage for any period that the user should target, set the energy usage as the target value for demand control, and acquire and hold the operation information of the air conditioner up to the present through the transmission line The operation plan is calculated from the operation information so as to be within the target value of the demand control.
- an air conditioning system capable of managing energy consumption in the long term by calculating an operation plan for an arbitrary period in advance.
- FIG. 2 is a diagram illustrating an image of demand control in units of one month (30 days) as an example of long-term demand control in FIG. 1. It is the table
- Embodiment 3 of this invention It is a figure showing the image at the time of changing the target value of energy consumption at the time of implementing demand control in Embodiment 3 of this invention. It is a figure showing an example of the setting screen at the time of setting a different demand target value with respect to the some indoor unit group in Embodiment 4 of this invention. It is a figure showing an example of the display screen for confirming reexamination of a target value to the user in Embodiment 6 of this invention. It is a figure showing an example of the display screen for asking the user in Embodiment 7 of this invention judgment of the implementation of demand control.
- FIG. 1 to 3 are diagrams showing Embodiment 1 of the present invention.
- FIG. 1 is a block diagram of an air conditioning system that enables long-term demand control.
- the air conditioning system 100 includes air conditioner outdoor units 2A to 2E, air conditioner indoor units 3A to 3J, air conditioner outdoor units 2A to 2E, and indoor units 3A to 3A.
- Centralized management devices 1A and 1B for managing a plurality of 3J units remote controllers 4A to 4E, interfaces 5 and 6, a property manager 7, a building manager 8, a public line 9, and the like. *
- the remote controllers 4A to 4E are connected to the indoor units 3A to 3J via remote controller transmission lines 15A to 15E.
- the indoor units 3A to 3J are connected to the outdoor units 2A to 2E via the indoor / outdoor transmission lines 14A to 14J.
- the outdoor units 2A to 2E are connected to the centralized management devices 1A and 1B via the centralized transmission lines 13A to 13E.
- the centralized management devices 1A and 1B are connected to the interface 5 via transmission lines 12A and 12B.
- the interface 5 is connected to the property manager 7 via the transmission line 11B, and is connected to the public line 9 via the transmission line 11A.
- the public line 9 is connected to the interface 6, and the interface 6 is connected to the building manager 8 via the transmission line 10.
- the outdoor units 2A to 2E perform operation control of the indoor units 3A to 3J by transmitting and receiving data to and from the indoor units 3A to 3J via the indoor / outdoor transmission lines 14A to 14J.
- the central management devices 1A and 1B transmit / receive data to / from the outdoor units 2A to 2E of the air conditioner via the central transmission lines 13A to 13E, thereby controlling the air conditioner and collecting operation data. Is possible.
- the central management devices 1A and 1B are configured to communicate with the air conditioner indoor units 3A to 3J via the air conditioner outdoor units 2A to 2E. 1B and the indoor units 3A to 3J of the air conditioner may be directly connected without any problem. Communication with the indoor units 3A to 3J is also possible from the remote controllers 4A to 4E connected via the remote controller transmission lines 15A to 15E.
- the centralized management devices 1A and 1B are connected to the interface 5 via the transmission lines 12A and 12B, and the interface 5 is connected to the property manager 7 via the transmission line 11B.
- the property manager 7 can operate the centralized management devices 1A and 1B via the transmission line 11B, the interface 5, and the transmission lines 12A and 12B.
- the centralized management devices 1A and 1B can be connected to a remote place via the public line 9 by the transmission lines 12A and 12B, the interface 5, and the transmission line 11A.
- the building manager 8 is connected to the public line 9 by the transmission line 10 and the interface 6 and can communicate with the central management devices 1A and 1B and operate the central management devices 1A and 1B.
- the central management devices 1A and 1B, the indoor units 3A to 3J, and the outdoor units 2A to 2E are not limited to the numbers shown in the first embodiment and FIG. Further, the number of indoor units 3A to 3J connected to one outdoor unit 2A to 2E and the outdoor units 2A to 2E and indoor units 3A to 3J connected to the centralized management devices 1A and 1B which are one remote monitoring device.
- the number of remote controllers 4A to 4E as terminal units is not limited.
- the object manager 7 is a target that can operate the central management devices 1A and 1B via the interface 5 in the field
- the building management is a target that can operate the central management devices 1A and 1B via the public line 9.
- this operation target is not limited.
- the transmission line 10 is transmission lines. Includes the concept of wireless transmission and reception.
- the central control devices 1A and 1B collect the operation data of the outdoor units 2A to 2E and the indoor units 3A to 3J connected via the central transmission lines 13A to 13E and collect the air conditioning. Manage energy consumption for each aircraft. Further, the centralized management devices 1A and 1B can control the energy consumption in the air conditioning system 100 by performing demand control on the indoor units 3A to 3J. In the present invention, long-term demand control is performed based on the energy consumption of the air conditioner accumulated and managed by the central management devices 1A and 1B.
- FIG. 2 is a diagram showing an image of demand control in units of one month (30 days) as an example of long-term demand control.
- An example in which the centralized management apparatus 1A illustrated in FIG. 1 performs demand control on the indoor unit 3A will be described with reference to FIG.
- the indoor unit 3A has already consumed 57% of energy with respect to 100% of the target value when 15 days have elapsed, and the energy consumption is set to 100% of the target value when 30 days have elapsed. In order to keep it within%, it is necessary to keep the energy consumption for the remaining 15 days within 43% of the target value. Therefore, the central management apparatus 1A calculates an operation state that suppresses the energy consumption amount for the remaining 15 days to 43% of the target value from the past operation data and the energy consumption state of the indoor unit 3A.
- the target value for demand control is not quantitatively displayed, but this target value can be arbitrarily set by the user.
- FIG. 3 is a table exemplifying the relationship between past operation data and energy consumption necessary for the proposal of a future operation plan.
- the relationship between the operation state (set temperature) of the indoor unit 3 ⁇ / b> A for the past 15 days and the energy consumption is illustrated.
- the total energy consumption in 15 days is 57%. Therefore, in order to keep the target value of energy consumption within 100%, the energy consumption needs to be within 43% in the remaining 15 days. That is, the energy consumption consumption pace for the remaining 15 days needs to be about 75% or less of the energy consumption consumption pace for the first 15 days. Considering this, the energy consumption per day needs to be suppressed to about 2.86% (a value obtained by dividing 43% by 15 days).
- the energy consumption when the set temperature is 22 ° C. is 3%
- the energy consumption when the set temperature is 23 ° C. is 2%. From here, by controlling the average set temperature for the remaining 15 days to be within about 22.86 ° C., control is performed to achieve the target value of energy consumption within 100%. Specifically, a method of periodically setting the set temperature of the indoor unit 3A from the centralized management device 1A so that the energy consumption of the target value is within 100% can be mentioned.
- the relationship between the set temperature and the energy consumption is shown as means for past operation data and demand control.
- data used for demand control is limited to this example only. It is not a thing.
- the centralized management devices 1A and 1B hold the operation data and energy consumption of the air conditioner up to the present time in advance, and calculate an optimal operation plan for achieving the target value from the data, thereby making the long-term It is possible to obtain the air conditioning system 100 that performs the demand control.
- the outdoor units 2A to 2E and the indoor units 3A to 3J correspond to “air conditioners” in the present invention.
- the operation data and energy consumption of the air conditioner correspond to “operation information” in the present invention.
- FIG. 4 and 5 are diagrams showing Embodiment 2 of the present invention. Since the basic configuration of the air conditioning system 100 and the like in the second embodiment is the same as that of the first embodiment shown in FIG. 1, the present embodiment will be mainly described below with respect to the differences from the first embodiment. Mode 2 will be described. The basic configuration of the air conditioning system 100 is the same in the third to seventh embodiments described later.
- Embodiment 1 is a form in which long-term demand control is performed on one air conditioner, but Embodiment 2 is different in that long-term demand control is performed on a plurality of air conditioners.
- Embodiment 1 long-term demand control is performed on one air conditioner.
- demand control is performed on an air conditioner alone, there is a limit to the range in which energy consumption can be adjusted.
- a plurality of air conditioners are often used by the same user, and in this case, it is efficient to perform energy management on a user basis.
- target energy consumption is managed in units of users or properties, and long-term demand control is performed with a plurality of target air conditioners as one unit. Thereby, in the period when some air conditioners do not need to operate, it becomes possible to widen the tolerance
- FIG. 4 is a diagram illustrating an image when the operation state of each air conditioner is substantially the same when demand control is performed with a plurality of air conditioners as a group.
- FIG. 4 as an example, the case where all the air conditioners connected to the centralized management device 1A are used by the same user is taken as an example, and the demand control of the indoor units 3A to 3D is performed collectively. Show the case.
- the control amount may be averaged for each of the indoor units 3A to 3D.
- FIG. 5 is a diagram illustrating an image when the operation state of each air conditioner varies when demand control is performed with a plurality of air conditioners as a group.
- 60% of the target value of energy is consumed when 15 days have elapsed, and it is necessary to perform demand control.
- the energy consumption of the past 15 days is different from that of FIG. 4 in that the indoor unit 3D is more than the other indoor units 3A to 3C, and conversely the indoor unit 3C is less than the other indoor units 3A, 3B and 3D. To do.
- the indoor unit 3D can be handled by a method such as performing demand control independently of the group unit.
- the air conditioning system 100 that makes it possible to set the target energy consumption for each of a plurality of arbitrary air conditioner groups such as an air conditioner unit, a user unit, or a property unit. Can be obtained.
- FIG. 5 and 6 are diagrams showing Embodiment 3 of the present invention.
- the third embodiment will be described focusing on differences from the first embodiment and the second embodiment.
- the air conditioning system 100 performs demand control with respect to a target value fixed in advance. However, priority is given to comfort even if the initial target is changed depending on weather conditions. An unavoidable situation may occur. Therefore, the air conditioning system 100 according to the third embodiment can set a plurality of target values in advance, and the user can arbitrarily change the target values according to the situation.
- FIG. 6 is a diagram illustrating an image when the target value of the energy consumption when the demand control is performed is changed. As shown in FIG. 6, in the operation state shown in FIG. 5, the target value of energy consumption is changed to a target value 2 having a likelihood that is 1.5 times the preset target value 1. Yes.
- an air conditioning system that allows a user to select a demand target value according to weather conditions or the like by making it possible to change the demand target value for one or more arbitrarily selected air conditioners. 100 can be obtained.
- FIG. FIG. 7 is a diagram showing Embodiment 4 of the present invention.
- the fourth embodiment will be described with a focus on differences from the first to third embodiments.
- the air conditioning system 100 performs demand control based on the operation plan calculated by the central management devices 1A and 1B based on the target value set by the user.
- one centralized management device 1A or centralized management device 1B performs demand control on a plurality of air conditioner groups according to an operation plan based on the same target value, it is comfortable for all air conditioner groups. In some cases, it is difficult to perform demand control while maintaining the characteristics.
- the air conditioning system 100 mentioned as the fourth embodiment enables setting different target values for each air conditioner group.
- FIG. 7 is a diagram illustrating an example of a setting screen for setting different demand target values for the plurality of indoor units 3A to 3J. As shown in FIG. 7, it is possible to register a plurality of target values in advance and set target values in accordance with the purpose for each group. When the target value is set, there is no problem even if there is a target value that is not used, and it is not necessary to set the target value for all the air conditioner groups and perform demand control.
- an air conditioning system that allows a user to select a demand target value according to weather conditions or the like by making it possible to change the demand target value for one or more arbitrarily selected air conditioners. 100 can be obtained.
- Embodiment 5 FIG.
- the air conditioning system 100 according to the first to fourth embodiments has a form in which a group of air conditioners is controlled by the single centralized management device 1A or the centralized management device 1B shown in FIG.
- the air conditioning system 100 according to Embodiment 5 is different in that a group of air conditioners is controlled by the plurality of centralized management devices 1A and 1B shown in FIG.
- Embodiments 1 to 4 are forms when demand control is performed on an air conditioner group connected to one centralized management apparatus 1A or centralized management apparatus 1B. For this reason, when there are a large number of air conditioners in a large property, etc., the energy management of energy consumption can be managed with the number of air conditioners that cannot be managed by one centralized management device 1A or centralized management device 1B as the same group. May be required.
- the fifth embodiment by forming a group of air conditioners across a plurality of centralized management devices 1A and 1B, the number of units that cannot be managed by one centralized management device 1A or centralized management device 1B. By managing energy consumption in the same group of air conditioners, long-term demand control is possible.
- the transmission line 12B is connected between the centralized management device 1A and the centralized management device 1B.
- the central management device 1A and the central management device 1B perform demand control on the connected air conditioners based on the calculated operation plan.
- the demand control value may be calculated by one centralized management apparatus 1A or centralized management apparatus 1B, and the result may be transmitted to another centralized management apparatus 1A or centralized management apparatus 1B.
- the centralized management devices 1A and 1B may perform calculation with the same algorithm. In this case, since the data is exchanged, the results calculated by the same algorithm are equal.
- the air conditioning system 100 that enables the exchange of information on the operation state and energy usage between different air conditioners and systems. It can.
- the air conditioning system 100 that enables the exchange of information on the operation state and energy usage between different air conditioners and systems. It can.
- a number of air conditioners that cannot be managed by one central management device 1A or central management device 1B can be obtained.
- By managing energy consumption as the same group long-term demand control becomes possible.
- FIG. FIG. 8 shows a sixth embodiment of the present invention.
- the sixth embodiment will be described focusing on the differences from the first to fifth embodiments.
- the air conditioning system 100 calculates the amount of energy that can be used in the future from the operating state and energy consumption of the air conditioner thus far. And control of an air conditioner is implemented based on the operation plan according to the calculated energy amount. However, when the air conditioner is controlled mechanically based on the operation plan, there is a possibility of impairing the user's comfort as mentioned in the above-mentioned patent document.
- the air conditioning system 100 notifies the user of the operation plan in advance before performing the control, and if the user does not approve the operation plan, the user changes the target value for demand control. It is possible to do.
- FIG. 8 is a diagram illustrating an example of a display screen for confirming the user to review the target value.
- the advance notice of the operation plan is displayed on the screens of the central management devices 1A and 1B.
- the central management devices 1A and 1B set the target group as 1, the target air conditioners as 1, 4, and 5, the set temperature as 23 ° C., and the operation time zone from 9:00 to 16:00 as an operation plan for the user. Is notified in advance. Therefore, when the user determines that the comfort is impaired, the driving state can be reduced by reviewing the target value.
- FIG. 8 the example in which the prior notice of the operation plan is displayed on the screens of the central management devices 1A and 1B is shown, but the same screen is displayed on the remote controller connected to the air conditioner to be controlled. Also good. Moreover, you may transmit the same content to the property manager 7 and the building manager 8 by communication means, such as an email. Further, the contents to be notified in advance are not limited to the contents such as the set temperature and the operation time zone shown in FIG. 8, and the contents displayed at a time are not limited to one day. The same applies to the seventh embodiment described later.
- the user when the operation plan for achieving the long-term demand target is implemented, the user can be notified in advance, and the air conditioning system 100 that enables temporary change of the operation plan can be obtained.
- FIG. FIG. 9 is a diagram showing Embodiment 7 of the present invention.
- the seventh embodiment will be described with a focus on differences from the first to sixth embodiments.
- the air-conditioning system 100 performs demand control within a range that does not lose comfort by selecting a plurality of target values when the weather condition changes significantly. Is possible. However, there is a possibility that comfort may be lost if the weather conditions change beyond control.
- the air conditioning system 100 notifies the user of the operation plan in advance before the control is performed, and if the user does not approve the operation plan, the user changes the operation plan. Is possible.
- FIG. 9 is a diagram illustrating an example of a display screen for asking the user whether to execute demand control.
- the operation plan changing method is displayed on the screens of the central management devices 1A and 1B.
- the centralized management devices 1A and 1B operate with a target group set to 1, a target air conditioner set to 1, 4 and 5, a set temperature set to 23 ° C., and an operating time zone set from 9:00 to 16:00. Inform the plan in advance. Therefore, when the user determines that comfort is impaired, the demand control can be stopped.
- the user when the operation plan for achieving the long-term demand target is implemented, the user can be notified in advance, and the air conditioning system 100 that enables temporary change of the operation plan can be obtained.
- 1A, 1B Centralized management device, 2A-2E outdoor unit, 3A-3J indoor unit, 4A-4E remote controller, 5 interface, 6 interface, 7 property manager, 8 building manager, 9 public line, 10 transmission line, 11A , 11B transmission line, 12A, 12B transmission line, 13A-13E centralized transmission line, 14A-14J indoor / outdoor transmission line, 15A-15E remote controller transmission line, 100 air conditioning system.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Conditioning Control Device (AREA)
Abstract
長期的なデマンド制御を実施する空気調和システム(100)を得ることを目的とする。1台以上の空気調和機と、1台以上の集中管理装置と、前記空気調和機と前記集中管理装置とを接続する伝送線と、を備え、集中管理装置(1A、1B)は、ユーザが目標とするべき任意の期間のエネルギー使用量を定義し、エネルギー使用量をデマンド制御の目標値として設定し、伝送線(13A~13E、14A~14J)を介して空気調和機(2A~2E、3A~3J)の現時点までの運転情報を取得して保持し、運転情報からデマンド制御の目標値以内とするための運転計画を算出する。
Description
本発明は、空調管理、特にエネルギー消費量管理型の空気調和システムに関する。
従来の空気調和システムに対するデマンド制御として、電力需給逼迫時に、電力供給者の要求により、電力供給者のニーズ及びユーザが予め定めた設備の停止に関する優先順位に基づいて、ユーザの設備が停止され、電力調整が図られるシステムが提案されている(例えば特許文献1参照)。
しかし、特許文献1に記載のシステムでは、エネルギー量の調整が図られる時点での設備の運転状況は考慮されていない。このため、現実には設備の運転状況を踏まえると、予定したエネルギー量の調整が、迅速に実施できず、エネルギー供給者からのエネルギー量の抑制要求にユーザが直ちに応答できないという事態が発生していた。
また、特許文献1に記載のシステムでは、エネルギー量の調整が図られる時点のユーザの快適性も考慮されていないため、エネルギー量を抑制することで、ユーザの快適性を著しく損なう可能性があった。
そこで、このような問題の対策として、空気調和機として調整可能なエネルギー量を予め算出し、調整可能なエネルギー量と、調整を要求されているエネルギー量とを比較してデマンド制御を実施する。これにより、快適性が損なわれることなく、即座に電力供給者からの要望に応えることが可能となるシステムが提案されている(例えば、特許文献2及び特許文献3参照)。
また、需要調整要求にしたがって消費エネルギー量を調整した後に、消費エネルギー量が急激に増加しないように、物件の快適性を回復することが可能な制御システムが提案されている(例えば、特許文献4参照)。
しかし、特許文献2~4に記載の空気調和システムにおけるデマンド制御は、契約電力等から目標デマンド値を設定し、現在の空気調和機の運転状態を制御するものであり、短い時間単位での観点でしか制御を行えないという問題点があった。
また、空気調和システムにおけるデマンド制御で目標としているデマンド値は、契約電力や、電力供給者からの要望など、供給者の目線で設定されることが多かった。その主因としては、ユーザが主体となって目標値を定量的に設定することが難しいという問題点があった。
本発明は、上記のような問題点を解決するためになされたもので、第1の目的は、例えば月単位、年単位等でユーザが目標とするエネルギー使用量を定義し、それを目標値とする際に、予め現時点までの空気調和機の運転データと使用エネルギー量を保持しておく。そして、それらから目標値を達成するために最適な運転計画を算出することで、長期的なデマンド制御を実施する空気調和システムを得ることにある。
第2の目的は、第1の目的において設定する目標値を、空気調和機単位、ユーザ単位又は物件単位など、任意の複数の空気調和機グループ毎に設定する空気調和システムを得ることにある。
第3の目的は、任意に選択された1台もしくは複数台の空気調和機に対するデマンド目標値を変更可能とすることで、ユーザが気象状態等に合わせてデマンド目標値を選択することが可能な空気調和システムを得ることにある。
第4の目的は、長期的なデマンド制御を達成するための運転計画を策定するにあたり、異なる空気調和機間及びシステム間での運転状態とエネルギー使用量の情報を交換可能とする空気調和システムを得ることにある。
第5の目的は、長期的なデマンド制御を達成するための運転計画を実施するにあたり、ユーザに事前通知を行い、運転計画の実施の都度、デマンド目標値を複数設定されたものから選択する空気調和システムを得ることにある。
第6の目的は、長期的なデマンド制御を達成するための運転計画を実施するにあたり、ユーザに事前通知を行い、運転計画の一時的な変更を可能とする空気調和システムを得ることにある。
本発明に係る空気調和システムは、1台以上の空気調和機と、1台以上の集中管理装置と、空気調和機と集中管理装置とを接続する伝送線と、を備え、集中管理装置は、ユーザが目標とするべき任意の期間のエネルギー使用量を定義し、エネルギー使用量をデマンド制御の目標値として設定し、伝送線を介して空気調和機の現時点までの運転情報を取得して保持し、運転情報からデマンド制御の目標値以内とするための運転計画を算出するものである。
本発明によれば、任意の期間の運転計画を予め算出することで、長期的にエネルギー消費量を管理することが可能となる空気調和システムを得ることができる。
実施の形態1.
図1~図3は、本発明の実施の形態1を示す図である。
図1は、長期的なデマンド制御を可能とする空気調和システムのブロック図である。
図1~図3は、本発明の実施の形態1を示す図である。
図1は、長期的なデマンド制御を可能とする空気調和システムのブロック図である。
図1に示されるように、空気調和システム100は、空気調和機の室外機2A~2Eと、空気調和機の室内機3A~3Jと、空気調和機の室外機2A~2E及び室内機3A~3Jを複数台管理する集中管理装置1A、1Bと、リモートコントローラ4A~4Eと、インターフェース5、6と、物件管理者7と、ビル管理者8と、公衆回線9などを有する。
リモートコントローラ4A~4Eは、リモートコントローラ用伝送線15A~15Eを介して室内機3A~3Jと接続されている。室内機3A~3Jは、室内外系伝送線14A~14Jを介して室外機2A~2Eと接続されている。室外機2A~2Eは、集中系伝送線13A~13Eを介して集中管理装置1A、1Bと接続されている。集中管理装置1A、1Bは、伝送線12A、12Bを介してインターフェース5と接続されている。インターフェース5は、伝送線11Bを介して物件管理者7に接続され、伝送線11Aを介して公衆回線9と接続されている。公衆回線9は、インターフェース6と接続され、インターフェース6は、伝送線10を介してビル管理者8と接続されている。
室外機2A~2Eは、室内外系伝送線14A~14Jを介して室内機3A~3Jとのデータの送受信を行うことで、室内機3A~3Jの運転制御を行っている。
また、集中管理装置1A、1Bは、集中系伝送線13A~13Eを介して空気調和機の室外機2A~2Eとデータの送受信を行うことで、空気調和機の制御や、運転データの収集などを可能としている。
また、集中管理装置1A、1Bは、集中系伝送線13A~13Eを介して空気調和機の室外機2A~2Eとデータの送受信を行うことで、空気調和機の制御や、運転データの収集などを可能としている。
なお、図1では集中管理装置1A、1Bは、空気調和機の室外機2A~2Eを介して、空気調和機の室内機3A~3Jとの通信を実施する形態としているが、集中管理装置1A、1Bと空気調和機の室内機3A~3Jとを直接接続する形態としても問題ない。
また、室内機3A~3Jとの通信は、リモートコントローラ用伝送線15A~15Eを介して接続されるリモートコントローラ4A~4Eからも可能である。
また、室内機3A~3Jとの通信は、リモートコントローラ用伝送線15A~15Eを介して接続されるリモートコントローラ4A~4Eからも可能である。
さらに、集中管理装置1A、1Bは、伝送線12A、12Bを介してインターフェース5に接続され、インターフェース5は伝送線11Bを介して物件管理者7に接続されている。これにより、物件管理者7は伝送線11B、インターフェース5及び伝送線12A、12Bを介して、集中管理装置1A、1Bを操作することが可能である。
また、集中管理装置1A、1Bは、伝送線12A、12Bとインターフェース5と伝送線11Aによって公衆回線9を介して遠隔地と接続可能である。ビル管理者8は伝送線10とインターフェース6とにより公衆回線9に接続され、集中管理装置1A、1Bと通信を行い、集中管理装置1A、1Bを操作することが可能である。
なお、集中管理装置1A、1B、室内機3A~3J及び室外機2A~2Eはともに本実施の形態1及び図1に示した台数に制限されるものではない。
また1台の室外機2A~2Eに接続される室内機3A~3Jの台数及び1台の遠隔監視装置である集中管理装置1A、1Bに接続される室外機2A~2E及び室内機3A~3Jの台数、端末機台であるリモートコントローラ4A~4Eの数も制限するものではない。
さらに、図1では現地でインターフェース5を介して集中管理装置1A、1Bを操作可能な対象を物件管理者7とし、公衆回線9を介して集中管理装置1A、1Bを操作可能な対象をビル管理者8としているが、もちろんこの操作対象を限定するものではない。
加えて、伝送線10、伝送線11A、11B、伝送線12A、12B、集中系伝送線13A~13E、室内外系伝送線14A~14J、リモートコントローラ用伝送線15A~15Eは、伝送線としているが無線による伝送の授受の概念も含むものとする。
また1台の室外機2A~2Eに接続される室内機3A~3Jの台数及び1台の遠隔監視装置である集中管理装置1A、1Bに接続される室外機2A~2E及び室内機3A~3Jの台数、端末機台であるリモートコントローラ4A~4Eの数も制限するものではない。
さらに、図1では現地でインターフェース5を介して集中管理装置1A、1Bを操作可能な対象を物件管理者7とし、公衆回線9を介して集中管理装置1A、1Bを操作可能な対象をビル管理者8としているが、もちろんこの操作対象を限定するものではない。
加えて、伝送線10、伝送線11A、11B、伝送線12A、12B、集中系伝送線13A~13E、室内外系伝送線14A~14J、リモートコントローラ用伝送線15A~15Eは、伝送線としているが無線による伝送の授受の概念も含むものとする。
次に、空調制御のデマンド制御について説明する。集中管理装置1A、1Bは、集中系伝送線13A~13Eを介して接続された室外機2A~2E及び14A~14Jを介して接続された室内機3A~3Jの運転データを収集し、空気調和機毎のエネルギー消費量を管理する。
また、集中管理装置1A、1Bは室内機3A~3Jに対し、デマンド制御を実施することで、空気調和システム100におけるエネルギー消費量をコントロールすることが可能である。本発明では、集中管理装置1A、1Bが蓄積及び管理している空気調和機のエネルギー消費量を元に、長期的なデマンド制御を実施する。
また、集中管理装置1A、1Bは室内機3A~3Jに対し、デマンド制御を実施することで、空気調和システム100におけるエネルギー消費量をコントロールすることが可能である。本発明では、集中管理装置1A、1Bが蓄積及び管理している空気調和機のエネルギー消費量を元に、長期的なデマンド制御を実施する。
図2は、長期的なデマンド制御の一例として、1ヶ月(30日)単位でのデマンド制御のイメージを表した図である。
図2を用いて、例えば図1に示される集中管理装置1Aが、室内機3Aに対してデマンド制御を実施する例を示す。
図2を用いて、例えば図1に示される集中管理装置1Aが、室内機3Aに対してデマンド制御を実施する例を示す。
図2に示されるように、室内機3Aは、15日経過の時点で目標値の100%に対し、57%のエネルギーを既に消費しており、30日経過時にエネルギー消費量を目標値の100%以内に抑えるためには、残り15日のエネルギー消費量を目標値の43%以内に抑える必要がある。
そこで、集中管理装置1Aは室内機3Aの過去の運転データとエネルギー消費状況から、残り15日のエネルギー消費量を目標値の43%以内に抑える運転状態を算出する。
なお、図2において、デマンド制御の目標値を定量的に表示していないが、この目標値は使用者が任意に設定可能である。
そこで、集中管理装置1Aは室内機3Aの過去の運転データとエネルギー消費状況から、残り15日のエネルギー消費量を目標値の43%以内に抑える運転状態を算出する。
なお、図2において、デマンド制御の目標値を定量的に表示していないが、この目標値は使用者が任意に設定可能である。
図3は、今後の運転計画の提案のために必要となる、過去の運転データとエネルギー消費量の関係を例示した表である。図3では、図2と同様に、室内機3Aの過去15日の運転状況(設定温度)とエネルギー消費量との関係を例示する。
図3に示されるように、15日間でのエネルギー消費量の合計は57%である。このことから、エネルギー消費量の目標値を100%以内に抑えるためには、残りの15日間でエネルギーの消費量を43%以内にする必要がある。
つまり、残りの15日間におけるエネルギーの消費量の消費ペースは、最初の15日間におけるエネルギー消費量の消費ペースに対して、約75%以下にする必要がある。これを考慮すると、1日当たりのエネルギー消費量は約2.86%(43%を15日間で除した値)に抑える必要がある。
図3に示されるように、15日間でのエネルギー消費量の合計は57%である。このことから、エネルギー消費量の目標値を100%以内に抑えるためには、残りの15日間でエネルギーの消費量を43%以内にする必要がある。
つまり、残りの15日間におけるエネルギーの消費量の消費ペースは、最初の15日間におけるエネルギー消費量の消費ペースに対して、約75%以下にする必要がある。これを考慮すると、1日当たりのエネルギー消費量は約2.86%(43%を15日間で除した値)に抑える必要がある。
図3に示す例では、設定温度を22℃とした場合のエネルギー消費量は3%であり、設定温度を23℃とした場合のエネルギー消費量は2%であることがわかる。ここから、残り15日の平均設定温度を約22.86℃以内に抑えることで、目標値のエネルギー消費量100%以内を達成するための制御を実施する。具体的には、目標値のエネルギー消費量100%以内に収まるように、集中管理装置1Aから室内機3Aの設定温度を定期的に設定する方法などが挙げられる。
なお、ここでは説明の簡略化のため、過去の運転データ及びデマンド制御の手段として、設定温度とエネルギー消費量との関係を示したが、デマンド制御に用いるデータは今回の例のみに限定されるものではない。
以上により、集中管理装置1A、1Bが、予め現時点までの空気調和機の運転データとエネルギー消費量を保持し、そこから目標値を達成するために最適な運転計画を算出することで、長期的なデマンド制御を実施する空気調和システム100を得ることができる。 なお、室外機2A~2E及び室内機3A~3Jは、本発明における「空気調和機」に相当する。また、空気調和機の運転データとエネルギー消費量は、本発明における「運転情報」に相当する。
実施の形態2.
図4及び図5は、本発明の実施の形態2を示す図である。
本実施の形態2における空気調和システム100などの基本的な構成は、図1に示された実施の形態1と同様であるため、以下、実施の形態1との相違点を中心に本実施の形態2を説明する。なお、空気調和システム100の基本的な構成は後述する実施の形態3~実施の形態7でも同様である。
図4及び図5は、本発明の実施の形態2を示す図である。
本実施の形態2における空気調和システム100などの基本的な構成は、図1に示された実施の形態1と同様であるため、以下、実施の形態1との相違点を中心に本実施の形態2を説明する。なお、空気調和システム100の基本的な構成は後述する実施の形態3~実施の形態7でも同様である。
実施の形態1は、1台の空気調和機に対する長期的デマンド制御を行う形態であるが、本実施の形態2は、複数台の空気調和機に対する長期的デマンド制御を行う点で相違する。
実施の形態1においては、1台の空気調和機に対する長期的デマンド制御を行ったが、デマンド制御を空気調和機単体で実施した場合、エネルギー消費量の調整可能な範囲には限界が生じる。また、空気調和機の実運用にあたっては、複数の空気調和機を同一の使用者が使用する場合も多く、その場合にはエネルギー管理も使用者単位で行うことが効率的である。
そこで、実施の形態2においては、目標とするエネルギー消費量の管理をユーザ単位又は物件単位等で行い、対象となる複数の空気調和機を一つの単位として長期的デマンド制御を実施する。これにより、一部の空気調和機が稼働しなくても良い期間においては、残りの空気調和機の運転状態の許容範囲を広げることが可能となる。
図4は、複数の空気調和機をグループとしてデマンド制御を実施した際に、それぞれの空気調和機の運転状態がほぼ同様だった場合のイメージを表した図である。
図4では、一例として、集中管理装置1Aと接続されている空気調和機が全て同一の使用者が使用している場合を例に挙げ、室内機3A~3Dのデマンド制御を一括して実施する場合を示す。
図4では、一例として、集中管理装置1Aと接続されている空気調和機が全て同一の使用者が使用している場合を例に挙げ、室内機3A~3Dのデマンド制御を一括して実施する場合を示す。
図4に示されるように、15日経過時点で目標値の60%のエネルギーを消費しており、デマンド制御を実施する必要がある。その際、過去15日の各室内機3A~3Dにおけるエネルギー消費量は同量であるため、制御量も各室内機3A~3Dに対し平均的に実施すれば良い。
図5は、複数の空気調和機をグループとしてデマンド制御を実施した際に、それぞれの空気調和機の運転状態にバラつきがあった場合のイメージを表した図である。
図5に示されるように、図4と同様に、15日経過時点で目標値の60%のエネルギーを消費しており、デマンド制御を実施する必要がある。しかし、過去15日のエネルギー消費量は室内機3Dが他の室内機3A~3Cよりも多く、逆に室内機3Cは他の室内機3A、3B及び3Dよりも少ないという点で図4と相違する。
図5に示されるように、図4と同様に、15日経過時点で目標値の60%のエネルギーを消費しており、デマンド制御を実施する必要がある。しかし、過去15日のエネルギー消費量は室内機3Dが他の室内機3A~3Cよりも多く、逆に室内機3Cは他の室内機3A、3B及び3Dよりも少ないという点で図4と相違する。
このため、デマンド制御を実施する際には、室内機3Dを中心にデマンド制御を実施することで、効率的にエネルギー消費を抑えることが可能である。なお、この際、室内機3Dは現状の運転状態を保持する必要がある場合などは、室内機3Dについてはグループ単位ではなく、単独でデマンド制御を実施するなどの方法で対応が可能である。
以上により、長期的デマンド制御において、目標とするエネルギー消費量を、空気調和機単位、ユーザ単位又は物件単位など、任意の複数の空気調和機グループ毎に設定することを可能とする空気調和システム100を得ることができる。
実施の形態3.
図5及び図6は、本発明の実施の形態3を示す図である。
以下、実施の形態1及び実施の形態2との相違点を中心に本実施の形態3を説明する。
図5及び図6は、本発明の実施の形態3を示す図である。
以下、実施の形態1及び実施の形態2との相違点を中心に本実施の形態3を説明する。
実施の形態1及び実施の形態2は、予め固定された目標値に対し、デマンド制御を行う空気調和システム100であったが、気象状態によっては当初の目標を変更してでも快適性を優先せざるを得ない状況が発生する可能性がある。
そこで、本実施の形態3における空気調和システム100は、予め複数の目標値を設定しておき、ユーザが状況に応じて任意に目標値を変更できるものである。
そこで、本実施の形態3における空気調和システム100は、予め複数の目標値を設定しておき、ユーザが状況に応じて任意に目標値を変更できるものである。
図6は、デマンド制御を実施する際のエネルギー消費量の目標値を変更した場合のイメージを表した図である。
図6に示されるように、図5で示された運転状態において、エネルギー消費量の目標値が、予め設定された目標値1の1.5倍の尤度をもつ目標値2に変更されている。
図6に示されるように、図5で示された運転状態において、エネルギー消費量の目標値が、予め設定された目標値1の1.5倍の尤度をもつ目標値2に変更されている。
図5において、15日時点で目標値1の60%のエネルギーを消費していたため、デマンド制御を実施する必要があった。しかし、図6に示されるように、エネルギー消費量の目標値を目標値2に変更することで、15日時点のエネルギー消費量は目標値の40%に留まっていることになり、現時点でのデマンド制御は不要となる。
なお、ここではエネルギー消費量の目標値を尤度が出来る方向に変更する例を示した。しかし、尤度が減少する方向に変更することも当然可能であり、その場合は新たにデマンド制御を実施する必要が発生する場合も想定される。
以上により、任意に選択された1台もしくは複数台の空気調和機に対するデマンド目標値を変更可能とすることで、ユーザが気象状態等に合わせてデマンド目標値を選択することが可能な空気調和システム100を得ることができる。
実施の形態4.
図7は、本発明の実施の形態4を示す図である。
以下、実施の形態1~実施の形態3との相違点を中心に本実施の形態4を説明する。
図7は、本発明の実施の形態4を示す図である。
以下、実施の形態1~実施の形態3との相違点を中心に本実施の形態4を説明する。
実施の形態1~実施の形態3における空気調和システム100は、ユーザが設定した目標値を元に、集中管理装置1A、1Bが算出した運転計画に基づき、デマンド制御を行うものであった。しかし、1台の集中管理装置1A又は集中管理装置1Bが複数の空気調和機グループに対し、同一の目標値に基づく運転計画によってデマンド制御を行う場合、全ての空気調和機グループに対して、快適性を保持したままデマンド制御を行うことが難しい場合が生じる。
そこで、本実施の形態4として挙げる空気調和システム100は、空気調和機グループ毎に異なった目標値を設定可能とするものである。
図7は、複数の室内機3A~3Jグループに対し、異なったデマンド目標値を設定する際の設定画面の一例を表す図である。
図7に示されるように、予め複数の目標値を登録しておき、グループ毎に目的に即した目標値を設定することを可能とする。なお、目標値を設定した場合、使用しない目標値が存在しても問題はなく、また、全ての空気調和機グループに対し目標値を設定してデマンド制御を行う必要もない。
図7に示されるように、予め複数の目標値を登録しておき、グループ毎に目的に即した目標値を設定することを可能とする。なお、目標値を設定した場合、使用しない目標値が存在しても問題はなく、また、全ての空気調和機グループに対し目標値を設定してデマンド制御を行う必要もない。
以上により、任意に選択された1台もしくは複数台の空気調和機に対するデマンド目標値を変更可能とすることで、ユーザが気象状態等に合わせてデマンド目標値を選択することが可能な空気調和システム100を得ることができる。
実施の形態5.
実施の形態1~実施の形態4における空気調和システム100は、図1に示された1台の集中管理装置1A又は集中管理装置1Bにより空気調和機のグループを制御する形態であった。
一方、本実施の形態5における空気調和システム100は、図1に示された複数の集中管理装置1A、1Bにより空気調和機のグループを制御する点で相違する。
実施の形態1~実施の形態4における空気調和システム100は、図1に示された1台の集中管理装置1A又は集中管理装置1Bにより空気調和機のグループを制御する形態であった。
一方、本実施の形態5における空気調和システム100は、図1に示された複数の集中管理装置1A、1Bにより空気調和機のグループを制御する点で相違する。
実施の形態1~実施の形態4は、1台の集中管理装置1A又は集中管理装置1Bに接続された空気調和機グループに対してデマンド制御を行う際の形態である。このため、大型物件などで空気調和機の台数が多い場合には、1台の集中管理装置1A又は集中管理装置1Bでは管理しきれない台数の空気調和機を同一グループとして、エネルギー消費量の管理が必要となる場合がある。
そこで、本実施の形態5では、複数の集中管理装置1A、1Bにまたがって空気調和機のグループを形成することにより、1台の集中管理装置1A又は集中管理装置1Bでは管理しきれない台数の空気調和機を同一グループとしてエネルギー消費量の管理することで、長期的なデマンド制御をすることを可能にした。
図1に示されるように、集中管理装置1A及び集中管理装置1Bをまたがった空気調和機グループにおいてデマンド制御を実施する場合には、集中管理装置1A及び集中管理装置1B間で伝送線12Bを介して運転データの交換を実施する。そして、集中管理装置1A及び集中管理装置1Bは、算出された運転計画に基づき、接続された空気調和機に対しデマンド制御を実施する。
なお、この際、デマンド制御値の算出は1台の集中管理装置1A又は集中管理装置1Bが行い、結果をもう1台の集中管理装置1A又は集中管理装置1Bに伝える形でも良いし、2台の集中管理装置1A、1Bが同様のアルゴリズムでそれぞれに算出を行う形としても良い。この場合、データの交換を実施しているため、同一のアルゴリズムで算出された結果は等しくなる。
以上により、長期デマンド目標を達成するための運転計画を策定するにあたり、異なる空気調和機間及びシステム間での、運転状態及びエネルギー使用量の情報を交換可能とする空気調和システム100を得ることができる。これにより、例えば、複数の集中管理装置1A、1Bにまたがって空気調和機のグループを形成することにより、1台の集中管理装置1A又は集中管理装置1Bでは管理しきれない台数の空気調和機を同一グループとしてエネルギー消費量の管理することで、長期的なデマンド制御をすることを可能となる。
実施の形態6.
図8は、本発明の実施の形態6を示す図である。
以下、実施の形態1~実施の形態5との相違点を中心に本実施の形態6を説明する。
図8は、本発明の実施の形態6を示す図である。
以下、実施の形態1~実施の形態5との相違点を中心に本実施の形態6を説明する。
実施の形態1~実施の形態5における空気調和システム100は、これまでの空気調和機の運転状態とエネルギー消費量から、将来の使用可能エネルギー量を算出する。そして、算出したエネルギー量に即した運転計画に基づき、空気調和機の制御を実施するものである。しかし、機械的に運転計画に基づいて空気調和機の制御を実施した場合には、上述した特許文献に挙げられているようにユーザの快適性を損なう可能性がある。
そこで、本実施の形態6における空気調和システム100は、制御の実施前にユーザに対し運転計画を事前に通知し、ユーザがその運転計画を承認しない場合は、ユーザがデマンド制御の目標値を変更することを可能としたものである。
図8は、ユーザに目標値の見直しを確認するための表示画面の一例を表す図である。
図8に示されるように、運転計画の事前通知が、集中管理装置1A、1Bの画面上に表示されている。例えば、集中管理装置1A、1Bは、ユーザに対し運転計画として、対象グループを1とし、対象空調機を1、4及び5とし、設定温度を23℃とし、運転時間帯を9時から16時として、予め通知する。そこで、快適性が損なわれるとユーザが判断した場合は、目標値を見直すことにより、運転状態の緩和を可能とする。
図8に示されるように、運転計画の事前通知が、集中管理装置1A、1Bの画面上に表示されている。例えば、集中管理装置1A、1Bは、ユーザに対し運転計画として、対象グループを1とし、対象空調機を1、4及び5とし、設定温度を23℃とし、運転時間帯を9時から16時として、予め通知する。そこで、快適性が損なわれるとユーザが判断した場合は、目標値を見直すことにより、運転状態の緩和を可能とする。
なお、図8において、運転計画の事前通知が集中管理装置1A、1Bの画面に表示される例を示したが、同様の画面を制御対象とする空気調和機に接続されたリモコンに表示させても良い。また、同様の内容をメール等の通信手段で物件管理者7やビル管理者8に送信しても良い。
さらに、事前に通知する内容は図8に示した設定温度や運転時間帯といった内容に限定されるものではないし、一度に表示される内容も1日単位に限定するものではない。このことは、後述する実施の形態7についても同様である。
さらに、事前に通知する内容は図8に示した設定温度や運転時間帯といった内容に限定されるものではないし、一度に表示される内容も1日単位に限定するものではない。このことは、後述する実施の形態7についても同様である。
以上により、長期デマンド目標を達成するための運転計画を実施するにあたり、ユーザに事前通知を行い、運転計画の一時的な変更を可能とする空気調和システム100を得ることができる。
実施の形態7.
図9は、本発明の実施の形態7を示す図である。
以下、実施の形態1~実施の形態6との相違点を中心に本実施の形態7を説明する。
図9は、本発明の実施の形態7を示す図である。
以下、実施の形態1~実施の形態6との相違点を中心に本実施の形態7を説明する。
例えば、実施の形態3における空気調和システム100は、気象状態が著しく変化した場合などに、目標値を複数設定されたものから選択することで、快適性を失わない範囲でデマンド制御を実施することを可能としたものである。しかし、それでもコントロールしきれないほどに気象状態が変化した場合などには、快適性を失う可能性がある。
そこで、本実施の形態7における空気調和システム100は、制御の実施前にユーザに対して運転計画を事前に通知し、ユーザがその運転計画を承認しない場合は、ユーザが運転計画を変更することを可能としたものである。
図9は、ユーザにデマンド制御の実施可否の判断を仰ぐための表示画面の一例を表す図である。
図9に示されるように、運転計画の変更方法が集中管理装置1A、1Bの画面上に表示されている。例えば、集中管理装置1A、1Bは、ユーザに対し、対象グループを1とし、対象空調機を1、4及び5とし、設定温度を23℃とし、運転時間帯を9時から16時として、運転計画を予め通知する。そこで、快適性が損なわれるとユーザが判断した場合は、デマンド制御を中止することを可能とする。
図9に示されるように、運転計画の変更方法が集中管理装置1A、1Bの画面上に表示されている。例えば、集中管理装置1A、1Bは、ユーザに対し、対象グループを1とし、対象空調機を1、4及び5とし、設定温度を23℃とし、運転時間帯を9時から16時として、運転計画を予め通知する。そこで、快適性が損なわれるとユーザが判断した場合は、デマンド制御を中止することを可能とする。
以上により、長期デマンド目標を達成するための運転計画を実施するにあたり、ユーザに事前通知を行い、運転計画の一時的な変更を可能とする空気調和システム100を得ることができる。
1A,1B 集中管理装置、2A~2E 室外機、3A~3J 室内機、4A~4E リモートコントローラ、5 インターフェース、6 インターフェース、7 物件管理者、8 ビル管理者、9 公衆回線、10 伝送線、11A,11B 伝送線、12A,12B 伝送線、13A~13E 集中系伝送線、14A~14J 室内外系伝送線、15A~15E リモートコントローラ用伝送線、100 空気調和システム。
Claims (6)
- 1台以上の空気調和機と、
1台以上の集中管理装置と、
前記空気調和機と前記集中管理装置とを接続する伝送線と、
を備え、
前記集中管理装置は、
ユーザが目標とするべき任意の期間のエネルギー使用量を定義し、
前記エネルギー使用量をデマンド制御の目標値として設定し、
前記伝送線を介して前記空気調和機の現時点までの運転情報を取得して保持し、
前記運転情報に基づき前記デマンド制御の目標値以内とするための運転計画を算出する、
空気調和システム。 - 前記空調機は複数設けられ、
前記集中管理装置は、
前記複数の空気調和機を1以上のグループに分け、
前記デマンド制御の目標値を前記グループ毎に設定する、
請求項1に記載の空気調和システム。 - 前記集中管理装置は、
任意の1台又は複数台の前記空気調和機に対する前記デマンド制御の目標値を変更する、
請求項1又は2に記載の空気調和システム。 - 前記集中管理装置及び前記空気調和機は、
前記伝送線を介して、前記集中管理装置間及び前記空気調和機間で相互に前記空気調和機の運転情報の交換をする、
請求項1~3の何れか一項に記載の空気調和システム。 - 前記集中管理装置は、
ユーザに前記運転計画を事前に通知し、
複数の前記デマンド制御の目標値の中から、前記ユーザにより選択された目標値に基づき制御する、
請求項1~4の何れか一項に記載の空気調和システム。 - 前記集中管理装置は、
ユーザに前記運転計画を事前に通知し、
前記ユーザにより一時的な変更がされた前記空気調和機の前記運転計画に基づいて制御する、
請求項1~4の何れか一項に記載の空気調和システム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2014/064027 WO2015181899A1 (ja) | 2014-05-27 | 2014-05-27 | 空気調和システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2014/064027 WO2015181899A1 (ja) | 2014-05-27 | 2014-05-27 | 空気調和システム |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2015181899A1 true WO2015181899A1 (ja) | 2015-12-03 |
Family
ID=54698283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2014/064027 WO2015181899A1 (ja) | 2014-05-27 | 2014-05-27 | 空気調和システム |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2015181899A1 (ja) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7249043B1 (en) * | 2000-03-10 | 2007-07-24 | E.P.M., Inc. | Computer program and method for reducing HVAC demand for energy |
JP2012154563A (ja) * | 2011-01-26 | 2012-08-16 | Mitsubishi Heavy Ind Ltd | 運転パターン作成装置及びその方法並びにプログラム |
US20130035794A1 (en) * | 2011-08-03 | 2013-02-07 | Behzad Imani | Method and system for controlling building energy use |
US20130060391A1 (en) * | 2011-09-01 | 2013-03-07 | Sharp Laboratories Of America, Inc. | Energy management system |
US20130085614A1 (en) * | 2011-09-30 | 2013-04-04 | Johnson Controls Technology Company | Systems and methods for controlling energy use in a building management system using energy budgets |
US20130123992A1 (en) * | 2010-08-18 | 2013-05-16 | Mitsubishi Electric Corporation | Air conditioning control device, air conditioning control method and program |
US20130298574A1 (en) * | 2012-04-19 | 2013-11-14 | Byoungkeun CHA | Air conditioner and method for controlling the same |
US20130318217A1 (en) * | 2009-08-21 | 2013-11-28 | Kevin R. Imes | Mobile energy management system |
JP2014081123A (ja) * | 2012-10-16 | 2014-05-08 | Mitsubishi Electric Corp | 空調省エネ制御装置 |
-
2014
- 2014-05-27 WO PCT/JP2014/064027 patent/WO2015181899A1/ja active Application Filing
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7249043B1 (en) * | 2000-03-10 | 2007-07-24 | E.P.M., Inc. | Computer program and method for reducing HVAC demand for energy |
US20130318217A1 (en) * | 2009-08-21 | 2013-11-28 | Kevin R. Imes | Mobile energy management system |
US20130123992A1 (en) * | 2010-08-18 | 2013-05-16 | Mitsubishi Electric Corporation | Air conditioning control device, air conditioning control method and program |
JP2012154563A (ja) * | 2011-01-26 | 2012-08-16 | Mitsubishi Heavy Ind Ltd | 運転パターン作成装置及びその方法並びにプログラム |
US20130035794A1 (en) * | 2011-08-03 | 2013-02-07 | Behzad Imani | Method and system for controlling building energy use |
US20130060391A1 (en) * | 2011-09-01 | 2013-03-07 | Sharp Laboratories Of America, Inc. | Energy management system |
US20130085614A1 (en) * | 2011-09-30 | 2013-04-04 | Johnson Controls Technology Company | Systems and methods for controlling energy use in a building management system using energy budgets |
US20130298574A1 (en) * | 2012-04-19 | 2013-11-14 | Byoungkeun CHA | Air conditioner and method for controlling the same |
JP2014081123A (ja) * | 2012-10-16 | 2014-05-08 | Mitsubishi Electric Corp | 空調省エネ制御装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3421898B1 (en) | Remote management system | |
JP2011179722A (ja) | 空調制御システム | |
JP2016512008A (ja) | プラグ負荷の制御およびマネジメントを行うためのシステムおよび方法 | |
JP5528383B2 (ja) | 空調管理システム | |
WO2015145655A1 (ja) | 空調管理システム | |
JP5945810B2 (ja) | エネルギ管理システム | |
US20170163039A1 (en) | A method and a system for controlling energy supply to different units | |
JP5951270B2 (ja) | 空気調和機の消費電力量管理制御システム、サーバ装置、クライアント装置及び空気調和機の消費電力量管理制御方法 | |
JP6350801B2 (ja) | 空調管理システム、中央監視装置、及び空調機管理方法 | |
JP2012172945A (ja) | 空調機システム | |
WO2015181899A1 (ja) | 空気調和システム | |
JP5815314B2 (ja) | 保守作業用端末装置 | |
JP2014219152A (ja) | 空気調和装置 | |
JP2007207258A (ja) | 分散制御システム | |
CN110145841B (zh) | 一种空调组的控制方法、控制装置及电子设备 | |
US9890968B2 (en) | Air conditioning control system | |
US9852484B1 (en) | Providing demand response participation | |
WO2017018344A1 (ja) | 通信装置及び通信方法 | |
JP7551428B2 (ja) | 空調制御システムおよび空調制御方法 | |
JP5751742B2 (ja) | 空気調和設備の遠隔管理システム、遠隔管理装置、制御装置 | |
JP6825684B2 (ja) | 制御装置、パワーコンディショナー、制御方法及びプログラム | |
WO2021176594A1 (ja) | 遠隔保守管理システムにおけるサーバ及び遠隔保守管理システム | |
JP6094931B2 (ja) | エネルギ管理方法及びエネルギ管理プログラム | |
JP7032243B2 (ja) | 電力需要管理装置および方法 | |
WO2016125270A1 (ja) | 空気調和システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14893533 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
NENP | Non-entry into the national phase |
Ref country code: JP |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 14893533 Country of ref document: EP Kind code of ref document: A1 |