WO2015109536A1 - Procédé, appareil et système de commande d'optimisation de route - Google Patents

Procédé, appareil et système de commande d'optimisation de route Download PDF

Info

Publication number
WO2015109536A1
WO2015109536A1 PCT/CN2014/071393 CN2014071393W WO2015109536A1 WO 2015109536 A1 WO2015109536 A1 WO 2015109536A1 CN 2014071393 W CN2014071393 W CN 2014071393W WO 2015109536 A1 WO2015109536 A1 WO 2015109536A1
Authority
WO
WIPO (PCT)
Prior art keywords
cmr
attached
routing control
channel
control information
Prior art date
Application number
PCT/CN2014/071393
Other languages
English (en)
Chinese (zh)
Inventor
熊春山
刘建宁
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to PCT/CN2014/071393 priority Critical patent/WO2015109536A1/fr
Priority to CN201480000644.9A priority patent/CN105122854B/zh
Publication of WO2015109536A1 publication Critical patent/WO2015109536A1/fr

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W40/00Communication routing or communication path finding
    • H04W40/02Communication route or path selection, e.g. power-based or shortest path routing

Definitions

  • the present invention relates to the field of communications, and in particular, to a method, apparatus, and system for controlling route optimization.
  • MN mobile router
  • MR mobile router
  • RO route optimization
  • the shortest possible routing path between the MRs of the correspondent node (CN) ie, the route optimization channel
  • CN correspondent node
  • the remaining problem can also avoid the problem that the packet forwarding point is easy to single point failure because the MN's data packet always passes through a certain packet forwarding point.
  • the route optimization function in the above-mentioned DMM system is automatically performed when the path of the data packet is redundant, and cannot be used in certain specific communication scenarios, such as lawful interception and service charging.
  • Embodiments of the present invention provide a method, apparatus, and system for controlling route optimization, which can be used to control a route optimization channel of distributed mobility management in real time.
  • a method for controlling route optimization is provided, where the method is used in a distributed mobility management DMM system, and the DMM system uses a route optimization RO function to establish a CMR attached to a mobile node MN and a CN peer of a communication peer node CN.
  • the RO channel between the CMRs includes:
  • the first device acquires the first routing control information, where the first device is the home location manager HLM of the MN or the home mobile router HMR of the MN, and the first routing control information is used to indicate that the RO channel is removed. ; The first device sends the first routing control information to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN is removed from the RO channel.
  • the method further includes:
  • the first device acquires second routing control information, where the second routing control information is used to indicate that the RO channel is established;
  • the first device sends the second routing control information to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN establishes the RO channel.
  • the method further includes:
  • the first device determines an HLM of the CN from a target address corresponding to the data packet sent by the MN.
  • the method further includes:
  • the first device acquires an address of the CN attached CMR from the HLM of the CN.
  • a method for controlling route optimization is provided, where the method is used in a distributed mobility management DMM system, and the DMM system uses a route optimization RO function to establish a current mobile router CMR and a communication peer attached to the mobile node MN.
  • the RO channel between the CMRs attached to the node CN including:
  • the CMR attached to the MN or the CMR attached to the CN receives the first routing control information sent by the first device, where the first device is the home location manager HLM of the MN or the home mobile router HMR of the MN,
  • the first routing control information is used to indicate that the RO channel is removed;
  • the CMR to which the MN is attached or the CMR to which the CN is attached removes the RO channel according to the first routing control information.
  • the method further includes:
  • the CMR to which the MN is attached or the CMR to which the CN is attached receives the second routing control information sent by the first device, where the second routing control information is used to indicate that the RO channel is established;
  • the CMR attached to the MN or the CMR attached to the CN establishes the RO channel according to the second routing control information.
  • an information forwarding apparatus is provided.
  • the information forwarding apparatus is used in a distributed mobility management DMM system, and the DMM system uses a route optimization RO function to establish a CMR attached to a mobile node MN and a CN peer of a communication peer node.
  • a sending unit configured to send the first routing control information received by the receiving unit to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN is removed. Said RO channel.
  • the receiving unit of the device is further configured to:
  • the transmitting unit of the device is further configured to:
  • the apparatus further includes: And a searching unit, configured to determine an HLM of the CN from a target address corresponding to the data packet sent by the MN.
  • the apparatus further includes:
  • an obtaining unit configured to acquire, by the HLM of the CN determined by the searching unit, an address of the CMR to which the CN is attached.
  • a routing control apparatus is provided, where the routing control apparatus is used in a distributed mobility management DMM system, and the DMM system uses a route optimization RO function to establish a current mobile router CMR and a communication peer attached to the mobile node MN.
  • a processing unit configured to remove the RO channel according to the first routing control information received by the receiving unit.
  • the receiving unit of the device is further configured to:
  • the processing unit of the device is further configured to:
  • a system for controlling route optimization including:
  • At least one information forwarding device and at least one routing control device wherein the information forwarding device and the routing control device are capable of information interaction;
  • the information forwarding device is the information forwarding device according to any one of the third aspect or the third aspect, wherein the routing control device is a fourth party The routing control device of any of the possible implementations of the fourth aspect.
  • the first device acquires the first routing control information, and the first device sends the first routing control information to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN is removed.
  • RO channel Due to certain specific scenarios, such as lawful interception, service charging, etc., the use of the RO channel may result in inaccurate path of the interception or large error in the service billing, and the data of the MN may be performed on the original channel without the RO.
  • the control of the route optimization channel of the distributed mobility management can be realized by closing the RO channel in real time to meet the requirements of certain specific scenarios.
  • FIG. 1 is a schematic structural diagram of a DDM network system according to an embodiment of the present invention
  • FIG. 2 is a schematic flowchart of a method for controlling route optimization according to an embodiment of the present invention
  • FIG. 3 is a schematic flowchart of a method for controlling route optimization according to another embodiment of the present invention.
  • FIG. 4 is a signaling interaction diagram of a method for controlling route optimization according to an embodiment of the present invention.
  • FIG. 5 is a schematic diagram of a signaling interaction of a method for controlling route optimization according to another embodiment of the present invention.
  • FIG. 6 is a schematic diagram of a signaling interaction of a method for controlling route optimization according to another embodiment of the present invention.
  • FIG. 7 is a signaling interaction diagram of a method for controlling route optimization according to still another embodiment of the present invention
  • FIG. 8 is a signaling interaction diagram of a method for controlling route optimization according to another embodiment of the present invention.
  • FIG. 9 is a schematic diagram of a signaling interaction of a method for controlling route optimization according to another embodiment of the present invention.
  • FIG. 10 is a signaling interaction diagram of a method for controlling route optimization according to another embodiment of the present invention.
  • FIG. 11 is a schematic structural diagram of an information forwarding apparatus according to an embodiment of the present invention.
  • FIG. 12 is a schematic structural diagram of an information forwarding apparatus according to another embodiment of the present invention.
  • FIG. 13 is a schematic structural diagram of a route control apparatus according to an embodiment of the present invention.
  • FIG. 14 is a schematic structural diagram of an information forwarding apparatus according to still another embodiment of the present invention.
  • FIG. 15 is a schematic structural diagram of a route control apparatus according to another embodiment of the present invention.
  • FIG. 16 is a schematic diagram of a control route optimization system according to an embodiment of the present invention.
  • the DDM network system is mainly composed of a home location management (HLM) of a mobile device MN and a home mobile router of the MN.
  • HMR home Mobility Router
  • CMR Current Mobility Router
  • CMR mobile path attached to CN It consists of a device and a location manager.
  • the HLM of the MN is used to store and monitor the location information and status information of the MN.
  • the HLM of the MN assigns a home address (Home of Address, ⁇ ) to the MN, and the ⁇ is the session address of the data route; the HRM of the MN is responsible for intercepting the data. Packet, and route the intercepted packet to the MN.
  • the DMM system uses the route optimization RO function to establish an RO channel between the CMR attached to the mobile node MN and the CMR attached to the communication peer node CN, wherein each RO channel corresponds to one HoA.
  • the present invention provides a method for controlling route optimization.
  • the method is used in a distributed mobility management DMM system.
  • the DMM system uses a route optimization RO function to establish a CMR and a communication peer node attached to the mobile node MN.
  • the RO channel between the CN attached CMRs includes the following steps:
  • the first device acquires first routing control information.
  • the first device is the HLM of the MN or the HRM of the MN, and the first routing control information is used to indicate that the RO channel is removed.
  • the first routing control information is used by the Operation Administration and Maintenance (OAM) and the listening server. , billing server or other network element to send.
  • OAM Operation Administration and Maintenance
  • the first routing control information may be an event for indicating the removal of the R0 channel, for example, lawful interception, service charging, and the like.
  • the first routing control information is ignored, that is, the R0 channel is not controlled. That is, if the first device obtains the first routing control information, it determines whether the route optimization state information indicates that the R0 channel has been removed. If the route optimization status information indicates that the R0 channel has been removed, the first device does not need to remove the R0 channel after receiving the first routing control information. If the routing optimization status information indicates that the R0 channel is not removed, the first device receives the first routing control information and then removes the R0 channel. Further, the first device may report that the 0AM of the first routing control information, the monitoring server, the accounting server, or other network element reports that the R0 channel has been removed or successfully removed.
  • the first device sends the first routing control information to the CMR attached to the MN or the CMR attached to the CN.
  • the RO channel is removed by a CMR to which the MN is attached or a CMR to which the CN is attached.
  • the CMR attached to the MN or the CMR attached to the CN receives the first routing control information sent by the first device.
  • the first device is an HLM of the MN or an HMR of the MN, and the first routing control information is used to indicate that the RO channel is removed.
  • the CMR attached to the MN or the CMR attached to the CN removes the RO channel according to the first routing control information.
  • the first device acquires the first routing control information, and the first device sends the first routing control information to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN is removed.
  • the RO channel It can realize the demolition control of the route optimization channel for distributed mobility management.
  • the RO channel is first established before the RO channel is removed, and the method includes:
  • the first device acquires second routing control information.
  • the second routing control information is used to indicate that an RO channel is established.
  • the second routing control information is sent by the OAM, the listening server, the accounting server, or other network elements.
  • the second routing control information is ignored, that is, the RO is not controlled. If the parameters in the second routing control information are different from the corresponding parameters in the route optimization state information stored in the first device, the parameters in the stored route optimization state information are changed to be the same, and the RO is further controlled. .
  • the first device determines whether the route optimization state information indicates that the RO channel has been removed. If the route optimization status information indicates that the RO channel has been removed, the first device receives the first route control information, and then establishes an RO channel. If the route optimization status information indicates that the RO channel is not removed After the first device receives the first routing control information, the R0 channel does not need to be established. Further, the first device may report whether the R0 channel is successfully established by transmitting the 0AM of the first routing control information, the monitoring server, the accounting server, or other network element.
  • the first device sends the second routing control information to the CMR to which the MN is attached or the CMR to which the CN is attached.
  • the RO channel is established by a CMR to which the MN is attached or a CMR to which the CN is attached.
  • the CMR attached to the MN or the CMR attached to the CN receives the second routing control information sent by the first device.
  • the second routing control information is used to indicate that the RO channel is established
  • the CMR attached to the MN or the CMR attached to the CN establishes the RO channel according to the second routing control information.
  • the first device acquires the second routing control information, and the first device sends the second routing control information to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN is established.
  • the RO channel It can realize the establishment control of the route optimization channel for distributed mobility management.
  • the embodiment of the present invention provides a method for controlling route optimization, which is shown in FIG. 4 (of course, only the key features in the steps are given in the drawings, which are specifically described in the embodiments), including The following steps:
  • the HLM of the MN acquires the first/second routing control information of the granularity of the Internet Protocol (IP).
  • IP Internet Protocol
  • the first/second routing control information refers to the first routing control information or the second routing control information, which is not described in the following embodiments.
  • the parameter of the first routing control information of the IP granularity at least includes: a mobile device identifier (Mobile Node Identity, MNID for short), the MNID can identify the identity of the MN in the network, and the status information of the MN (MN- Status), the status information of the MN includes establishing a route optimization channel (MN_Status_Open) between the CMR attached to the MN and the CMR attached to the CN or removing the route optimization channel between the CMR attached to the MN and the CMR attached to the CN ( MN—Status— Close ); at least one MN's home IP address HoAx, X represents the HoA number; HoAx status letter Ho Ax—Status, Ho Ax status information includes the removal of the HoAx-Status-Close channel corresponding to Ho Ax.
  • MN_Status_Open route optimization channel
  • MN—Status— Close at least one MN's home IP address HoAx,
  • the parameter of the second routing control information of the IP granularity at least includes: a mobile device identity (Mobile Node Identity, MNID for short), the MNID can identify the identity of the MN in the network, and the MN status information (MN_Status),
  • the status information of the MN includes establishing a route optimization channel (MN_Status_Open) between the CMR attached to the MN and the CMR attached to the CN or removing the route optimization channel between the CMR attached to the MN and the CMR attached to the CN (MN_Status) — Close );
  • At least one MN's home IP address HoAx, X represents the HoA number;
  • HoAx status information (Ho Ax—Status), HoAx status information includes the HoAx-Status-Open corresponding to the HoAx.
  • the first/second routing control information of the IP granularity can control the route optimization channel corresponding to the IP address (HoAx), wherein the IP address has at least one, that is, the first routing control information can control multiple IP granularity routes. Optimize the channel.
  • the parameter of the first/second routing control information may further include: an identity of the home mobile router (identity, referred to as ID), and the specific form of the ID is an IP address or a Domain Name System (DNS). Domain name; the ID of the current mobile router.
  • identity identity, referred to as ID
  • DNS Domain Name System
  • the first/second routing control information is IP granularity, it needs to be determined: the MN identity MNID, the MN state information, the MN's home IP address HoAx and HoAx state information, and the route optimization state information stored in the MN's HLM. Whether the corresponding parameters are consistent and the inconsistent parameters are updated consistently. If the parameters are consistent, the first routing control information is ignored, that is, the RO is not controlled.
  • the HLM of the MN sends the first/second routing control information information to the CMR attached to the MN.
  • the MN's HLM may also send the first/second routing control information to the MN attached CMR through the MN's HRM, which is indicated by a dashed arrow in the figure.
  • the CMR attached to the MN removes/establishes the RO channel according to the first/second routing control information.
  • the RO channel is removed/established according to the first/second routing control information.
  • the RO channel is removed according to the first routing control information, and the RO channel is established according to the second routing control information, which is not described in the following embodiments.
  • the first/second routing control information may be IP granularity control information.
  • the status information of the MN is MN_Status_Open
  • the status information of the HoAx is HoAx—Status—Close represents the route optimization channel corresponding to the removal of the HoAx.
  • the status information of the MN is MN—Status—Close
  • the status information of the HoAx is HoAx—Status—Open cannot establish the route optimization channel. That is, HoAx—Status—Open is an empty command, and the status information of HoAx is HoAx—Status—Close represents the route optimization channel corresponding to the removal of HoAx.
  • the CN-attached CMR that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached by the MN, thereby implementing route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR cannot be received from the CMR attached to the MN, and the data of the CMR attached to the CN via the MN attached to the CN will flow back.
  • the HMR of the MN is transmitted to the CMR attached to the CN through the HMR of the MN, and the data is transmitted to the CN by the CMR attached to the CN.
  • a method for controlling route optimization includes the following steps:
  • the HLM of the MN acquires first/second routing control information of the MN granularity.
  • the first/second routing control information refers to the first routing control information or the second routing control information.
  • the parameter of the first routing control information of the MN granularity includes at least: an identifier of the MN, a MNID, and status information of the MN, and the status information of the MN includes: a route optimization channel (MN_Status_Close) for removing the CMR attached to the MN.
  • MN_Status_Close route optimization channel
  • the parameter of the first routing control information of the MN granularity includes at least: the identifier MNID of the MN; the status information of the MN, and the status information of the MN includes: establishing a route optimization channel (MN_Status_Open) of the CMR mobile device to which the MN is attached.
  • the first routing control information of the MN granularity controls all routing optimization channels of the designated mobile device.
  • the parameters of the first/second routing control information may further include: a home mobile router ID, where the ID is specifically an IP address or a DNS domain name; and an ID of the current mobile router.
  • the first/second routing control information is MN granularity, it is required to determine whether the MN's identity MNID, the MN's state information, and the corresponding parameter in the route optimization state information stored in the MN's HLM are consistent, and the inconsistent parameter is updated. Consistently, if the parameters are consistent, the first routing control information is ignored, that is, the RO is not controlled.
  • the HLM of the MN sends the first/second routing control information information to the CMR attached to the MN.
  • the MN's HLM may also send the first/second routing control information to the MN attached CMR through the MN's HRM, which is indicated by a dashed arrow in the figure.
  • the CMR attached to the MN removes/establishes the RO channel according to the first/second routing control information.
  • Deleting/establishing the RO channel according to the first/second routing control information removing the RO channel according to the first routing control information, and establishing an RO channel according to the second routing control information,
  • the first/second routing control information may be the control control of the MN granularity
  • the status information of the MN is MN_Status-Open
  • all HoAx (HoA l , ⁇ 2, ..., ⁇ ) corresponding to the MN are established.
  • Route optimization channel When the status information of the ⁇ is MN_Status_Close, all the route optimization channels corresponding to Ho Ax ( HoA l , ⁇ 2 , ... , ⁇ ) in the MN are removed.
  • the RO channel corresponding to all HoAx ( HoA l , ⁇ 2 , ... , ⁇ ) in the MN is all RO channels of the CMR attached to the MN.
  • the MN's HLM After the RO is established or removed, the MN's HLM sends the parameters in the first/second routing control information to the other HLMs and HRMs of the MN.
  • the CMR attached to the CMN that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached to the MN, thereby implementing route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR cannot be received from the CMR attached to the MN, and the data of the CMR attached to the CN via the MN attached to the CN will flow back.
  • the HMR of the MN is transmitted to the CMR attached to the CN through the HMR of the MN, and the data is transmitted to the CN by the CMR attached to the CN.
  • a method for controlling route optimization includes the following steps:
  • the HRM of the MN obtains the first/second routing control information of the IP granularity.
  • the first/second routing control information of the IP granularity is specifically described in step 301, and will not be described herein.
  • the first/second routing control information is IP granularity, it needs to be determined: the MN identity MNID, the MN state information, the MN's home IP address HoAx and HoAx state information, and the route optimization state information stored in the MN's HRM. Whether the corresponding parameters are consistent and the inconsistent parameters are updated consistently. If the parameters are consistent, the first routing control information is ignored, that is, the RO is not controlled.
  • the HRM of the MN also needs to report the parameters in the first/second routing control information to the HLM of the MN, so that the HLM of the MN updates the stored route optimization status information according to the parameters in the first/second routing control information.
  • the HRM of the MN sends the first/second routing control information information to the CMR attached to the MN.
  • the CMR attached to the MN removes/establishes the RO channel according to the first/second routing control information.
  • step 303 The specific manner of removing/establishing the RO channel of the first/second routing control information of the IP granularity is specifically described in step 303, and details are not described herein again.
  • the CMR attached to the CMN that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached to the MN, thereby implementing route optimization.
  • the CMR attached to the MN Neither the CN attached to the route optimization channel can receive data from the CMR attached to the MN.
  • the data of the CMR attached to the CN via the MMN attached to the CN will flow back to the HMR of the MN, and then transmitted to the CMR attached to the CN through the HMR of the MN. , the CMR attached by the CN transmits the data to the CN.
  • a method for controlling route optimization includes the following steps:
  • the HRM of the MN acquires the first/second routing control information of the MN granularity. Specifically, the first/second routing control information of the MN granularity is specifically described in step 401, and details are not described herein again.
  • the first/second routing control information is MN granularity, it is required to determine whether the MN's identity MNID, the MN's state information, and the corresponding parameter in the route optimization state information stored in the MN's HLM are consistent, and the inconsistent parameter is updated. Consistently, if the parameters are consistent, the first routing control information is ignored, that is, the RO is not controlled.
  • the HRM of the MN also needs to report the parameters in the first/second routing control information to the HLM of the MN, so that the HLM of the MN updates the stored route optimization status information according to the parameters in the first/second routing control information.
  • the HRM of the MN sends the first/second routing control information information to the CMR attached to the MN.
  • the CMR attached to the MN removes/establishes the RO channel according to the first/second routing control information.
  • step 403 The specific manner of dismantling/establishing the RO channel of the first/second routing control information of the MN granularity is specifically described in step 403, and details are not described herein again.
  • the HRM of the MN sends the parameters in the first/second routing control information to the other HLMs and HRMs of the MN.
  • the CMR attached to the CMN that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached to the MN, thereby implementing route optimization.
  • the CMR attached to the MN Neither the CN attached to the route optimization channel can receive data from the CMR attached to the MN.
  • the data of the CMR attached to the CN via the MMN attached to the CN will flow back to the HMR of the MN, and then transmitted to the CMR attached to the CN through the HMR of the MN. , the CMR attached by the CN transmits the data to the CN.
  • a method for controlling route optimization includes the following steps:
  • the HRM of the MN obtains the first/second routing control information of the IP granularity.
  • the first/second routing control information of the IP granularity refers to the specific description in step 301, and details are not described herein again.
  • the first/second routing control information is IP granularity, it needs to be determined: the MN identity MNID, the MN state information, the MN's home IP address HoAx and HoAx state information, and the route optimization state information stored in the MN's HRM. Whether the corresponding parameters are consistent and the inconsistent parameters are updated consistently. If the parameters are consistent, the first routing control information is ignored, that is, the RO is not controlled.
  • the HRM of the MN also needs to report the parameters in the first/second routing control information to the HLM of the MN, so that the HLM of the MN updates the stored route optimization status information according to the parameters in the first/second routing control information.
  • the HRM of the MN determines the HLM of the CN from the target address corresponding to the data packet sent by the MN.
  • the HRM of the MN obtains the address of the CMR attached to the CN from the HLM of the CN.
  • the MN's HRM gets the address of the CN attached CMR.
  • the HRM of the MN sends the first/second routing control information information to the CMR attached to the CN.
  • the CN attached CMR removes/establishes the RO channel according to the first/second routing control information.
  • step 303 The specific manner of removing/establishing the RO channel of the first/second routing control information of the IP granularity is specifically described in step 303, and details are not described herein again.
  • the CMR attached to the CMN that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached to the MN. And achieve route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR cannot be received from the CMR attached to the MN, and the data of the CMR attached to the CN via the MN attached to the CN will flow back.
  • the HMR of the MN is transmitted to the CMR attached to the CN through the HMR of the MN, and the data is transmitted to the CN by the CMR attached to the CN.
  • a method for controlling route optimization includes the following steps:
  • the HLM of the MN obtains the first/second routing control information of the IP granularity.
  • the first/second routing control information of the IP granularity refers to the specific description in step 301, and details are not described herein again.
  • the first/second routing control information is IP granularity, it needs to be determined: the MN identity MNID, the MN state information, the MN's home IP address HoAx and HoAx state information, and the route optimization state information stored in the MN's HRM. Whether the corresponding parameters are consistent and the inconsistent parameters are updated consistently. If the parameters are consistent, the first routing control information is ignored, that is, the RO is not controlled.
  • the HRM of the MN also needs to report the parameters in the first/second routing control information to the HLM of the MN, so that the HLM of the MN updates the stored route optimization status information according to the parameters in the first/second routing control information.
  • the MN's HLM sends the first/second routing control information to the MN's HRM.
  • the HRM of the MN determines the HLM of the CN from the target address corresponding to the data packet sent by the MN.
  • the HRM of the MN obtains the address of the CMR attached to the CN from the HLM of the CN.
  • the MN's HRM gets the address of the CN attached CMR.
  • the HRM of the MN sends the first/second routing control information information to the CMR attached to the CN.
  • the CMR attached to the CN removes/establishes the RO channel according to the first/second routing control information.
  • the first/second routing control information of the IP granularity is removed/established by the RO channel.
  • the specific manner is specifically described in step 303, and details are not described herein again.
  • the CN-attached CMR that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached by the MN, thereby implementing route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR cannot be received from the CMR attached to the MN, and the data of the CMR attached to the CN via the MN attached to the CN will flow back.
  • the HMR of the MN is transmitted to the CMR attached to the CN through the HMR of the MN, and the data is transmitted to the CN by the CMR attached to the CN.
  • a method for controlling route optimization includes the following steps:
  • the HLM of the MN acquires the first/second routing control information of the IP granularity.
  • the first/second routing control information of the IP granularity refers to the specific description in step 301, and details are not described herein again.
  • the first/second routing control information is IP granularity, it needs to be determined: the MN identity MNID, the MN state information, the MN's home IP address HoAx and HoAx state information, and the route optimization state information stored in the MN's HRM. Whether the corresponding parameters are consistent and the inconsistent parameters are updated consistently. If the parameters are consistent, the first routing control information is ignored, that is, the RO is not controlled.
  • the HRM of the MN also needs to report the parameters in the first/second routing control information to the HLM of the MN, so that the HLM of the MN updates the stored route optimization status information according to the parameters in the first/second routing control information.
  • the HRM of the MN determines the HLM of the CN from the target address corresponding to the data packet sent by the MN.
  • the HRM of the MN obtains the address of the CMR to which the CN is attached from the HLM of the CN.
  • the HRM of the MN sends the address of the CMR attached to the CN to the HLM of the MN.
  • the MN's HLM gets the address of the CN attached CMR.
  • the HLM of the MN sends the first/second routing control information information to the CMR attached to the CN.
  • the CMR attached to the CN is removed according to the first/second routing control information. Establish an RO channel.
  • step 303 The specific manner of removing/establishing the RO channel of the first/second routing control information of the IP granularity is specifically described in step 303, and details are not described herein again.
  • the CN-attached CMR that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached by the MN, thereby implementing route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR cannot be received from the CMR attached to the MN, and the data of the CMR attached to the CN via the MN attached to the CN will flow back.
  • the HMR of the MN is transmitted to the CMR attached to the CN through the HMR of the MN, and the data is transmitted to the CN by the CMR attached to the CN.
  • the first device acquires the first or second routing control information, and the first device sends the first or second routing control information to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN is described.
  • the CN attached CMR removes or establishes the RO channel. It can realize the control of the route optimization channel for distributed mobility management.
  • the present invention provides an information forwarding device 1000.
  • the information forwarding device 1000 is used in a distributed mobility management DMM system.
  • the DMM system uses the route optimization RO function to establish a CMR and communication pair attached to the mobile node MN.
  • the receiving unit 1001 is further configured to:
  • the first/second routing control information is sent by the OAM or the interception server, the accounting server, or other network elements.
  • the first/ignorance is omitted.
  • the second routing control information that is, does not control the RO.
  • the parameters in the first/second routing control information are different from the corresponding parameters in the route optimization state information stored in the information forwarding device 1000, the parameters in the stored route optimization state information are changed to be the same, and the parameters are continued. Control the RO.
  • the sending unit 1002 is configured to send the first routing control information received by the receiving unit 1001 to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN removes the RO channel.
  • the transmitting unit 1002 is further configured to:
  • the second routing control information received by the receiving unit 1001 is sent to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN establishes an RO channel.
  • the first/second routing control information may also be sent to the CMR attached to the MN or the CMR attached to the CN through the HRM of the MN.
  • the information forwarding apparatus 1000 further includes: a searching unit 1003, configured to determine an HLM of the CN from a target address corresponding to the data packet sent by the MN.
  • the obtaining unit 1004 is configured to obtain an address of the CN attached to the CN from the HLM of the CN determined by the searching unit 1003.
  • the HRM of the MN can also send the address of the CMR attached to the CN to the HLM of the MN.
  • the CMR attached to the CMN that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached to the MN, thereby implementing route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR cannot be received from the CMR attached to the MN, and the data of the CMR attached to the CN via the MN attached to the CN will flow back.
  • the HMR of the MN is transmitted to the CMR attached to the CN through the HMR of the MN, by the CN.
  • the attached CMR transmits the data to the CN.
  • the first/second routing control information is obtained, and the first/second routing control information is sent to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN
  • the RO channel is removed/established. It can realize the control of the route optimization channel for distributed mobility management.
  • the present invention provides a routing control apparatus 1 100.
  • the information forwarding apparatus 1 100 is used in a distributed mobility management DMM system, and the DMM system uses the route optimization RO function to establish a CMR and communication attached to the mobile node MN.
  • the RO channel between the CMRs to which the end node CN is attached, where the routing control device is the CMR to which the MN is attached or the CMR to which the CN is attached, and the routing control device 1 100 includes:
  • the receiving unit 1 101 is configured to receive first routing control information sent by the information forwarding device 1100, where the information forwarding device is the home location manager HLM of the MN or the home mobile router HMR of the MN, and the first routing control information is used to indicate that the RO is removed. aisle.
  • the receiving unit 1 101 is further configured to:
  • processing unit 1102 is configured to remove the RO channel according to the first routing control information received by the receiving unit 1101.
  • the processing unit 1102 is further configured to:
  • the CMR attached to the CMN that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached to the MN, thereby implementing route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR can not receive data from the CMR attached to the MN, and the data of the CMR attached to the CN through the CMR attached to the MN will flow.
  • the HMR back to the MN is transmitted to the CMR attached to the CN through the HMR of the MN, and the CMR attached by the CN transmits the data to the CN.
  • the CMR attached to the MN or the CMR attached to the CN receives the first/second routing control information sent by the information forwarding device, and the CMR attached to the MN or the CMR attached to the CN is removed according to the first/second routing control information/ Establish the RO channel. It can realize the control of the route optimization channel for distributed mobility management.
  • the embodiment of the present invention provides an information forwarding apparatus 1200. Referring to FIG. 14, the information forwarding apparatus 1200 is used in a distributed mobility management DMM system, and the DMM system uses the route optimization RO function to establish a CMR and communication attached to the mobile node MN.
  • the bus 1205 may be an ISA (Industry Standard Architecture) bus, a PCI (Peripheral Component) bus, or an EISA (Extended Industry Standard Architecture) bus.
  • the bus 1205 can be divided into an address bus, a data bus, a control bus, and the like. For ease of representation, only one thick line is shown in Figure 14, but it does not mean that there is only one bus or one type of bus. Its towel:
  • Memory 1204 is for storing executable program code, the program code including computer operating instructions.
  • Memory 1204 may include high speed RAM memory and may also include non-volatile memory, such as at least one disk storage device.
  • the processor 1201 may be a central processing unit (CPU), or an application specific integrated circuit (ASIC), or one or more configured to implement the embodiments of the present invention. integrated circuit.
  • CPU central processing unit
  • ASIC application specific integrated circuit
  • the receiver 1202 is configured to obtain first routing control information, where the first routing control information is used to indicate that the RO channel is removed.
  • the receiver 1202 is further configured to: Obtaining second routing control information, where the second routing control information is used to indicate establishment
  • the first/second routing control information is sent by the OAM or the interception server, the accounting server, or other network elements.
  • the first/second routing control information is ignored, that is, the RO is not controlled.
  • the parameters in the first/second routing control information are different from the corresponding parameters in the route optimization state information stored in the information forwarding device 1200, the parameters in the stored route optimization state information are changed to be the same, and the parameters are continued. Control the RO.
  • the transmitter 1203 is configured to send the received first routing control information to the MN attached CMR or the CN attached CMR, so that the MN attached CMR or the CN attached CMR removes the RO channel.
  • the transmitter 1203 is further configured to:
  • the second routing control information received by the receiver 1202 is sent to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN establishes an RO channel.
  • the first/second routing control information may also be sent to the CMR attached to the MN or the CMR attached to the CN through the HRM of the MN.
  • the processor 1201 of the information forwarding device 1200 is configured to:
  • the HLM of the CN is determined from the destination address corresponding to the data packet sent by the MN.
  • the HRM of the MN can also send the address of the CMR attached to the CN to the HLM of the MN.
  • the CMR attached to the CMN that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached to the MN. And achieve route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR cannot be received from the CMR attached to the MN, and the data of the CMR attached to the CN via the MN attached to the CN will flow back.
  • the HMR of the MN is transmitted to the CMR attached to the CN through the HMR of the MN, and the data is transmitted to the CN by the CMR attached to the CN.
  • the first/second routing control information is obtained, and the first/second routing control information is sent to the CMR attached to the MN or the CMR attached to the CN, so that the CMR attached to the MN or the CMR attached to the CN
  • the RO channel is removed/established. It can realize the control of the route optimization channel for distributed mobility management.
  • the present invention provides a routing control apparatus 1300.
  • the routing control apparatus 1300 is used in a distributed mobility management DMM system.
  • the DMM system uses the route optimization RO function to establish a CMR and a communication peer attached to the mobile node MN.
  • the bus 1305 can be an ISA (Industry Standard Architecture) bus, a PCI (Peripheral Component) bus, or an EISA (Extended Industry Standard Architecture) bus.
  • the bus 1305 can be divided into an address bus, a data bus, a control bus, and the like. For ease of representation, only one thick line is shown in Figure 15, but it does not mean that there is only one bus or one type of bus. among them:
  • Memory 1304 is for storing executable program code, the program code including computer operating instructions.
  • Memory 1304 may include high speed RAM memory and may also include non-volatile memory, such as at least one disk memory.
  • the processor 1301 may be a central processing unit (CPU), or an application specific integrated circuit (ASIC), or one configured to implement an embodiment of the present invention.
  • the receiver 1302 is configured to receive the first routing control information sent by the information forwarding device, where the information forwarding device is the home location manager HLM of the MN or the home mobile router HMR of the MN, and the first routing control information is used to indicate that the RO channel is removed.
  • the receiver 1302 is further configured to:
  • the processor 1301 is configured to remove the RO channel according to the first routing control information received by the receiver 1302.
  • the processor 1301 is further configured to:
  • the RO channel is established based on the second routing control information received by the receiver 1302.
  • the CN-attached CMR that establishes the route optimization channel with the CMR attached to the MN can receive the data sent by the CMR attached by the MN, thereby implementing route optimization.
  • the CMR attached to the MN to the route-optimized channel of the CMR cannot be received from the CMR attached to the MN, and the data of the CMR attached to the CN via the MN attached to the CN will flow back.
  • the HMR of the MN is transmitted to the CMR attached to the CN through the HMR of the MN, and the data is transmitted to the CN by the CMR attached to the CN.
  • the CMR attached to the MN or the CMR attached to the CN receives the first/second routing control information sent by the information forwarding device, and the CMR attached to the MN or the CMR attached to the CN is removed according to the first/second routing control information/ Establish the RO channel. It can realize the control of the route optimization channel for distributed mobility management.
  • the present invention provides a system 1400 for controlling route optimization.
  • the system for controlling route optimization may be a DDM network system for distributed mobility management.
  • DDM network system for distributed mobility management.
  • At least one information forwarding device (1401 - 1 , ..., 1401 -n ) and at least one a routing control device (1402-1, ..., 1402-n), wherein the information forwarding device and the routing control device are capable of information interaction;
  • the information forwarding device (1401-1, ..., 1401 - ⁇ ) is the information forwarding device 1000 corresponding to FIG. 11 and FIG. 12, and the routing control device (1402-1, ..., 1402-n) is FIG. 13 corresponds to the current mobile router 1100.
  • the information forwarding device (1401-1, ..., 1401-n) is the information forwarding device 1200 corresponding to FIG. 14, and the routing control device (1402-1, ..., 1402-n) corresponds to FIG. Current mobile router 1300.
  • Each routing control device (1402-1, . . . , 1402-n) is connected to the mobile device to implement information interaction between the mobile devices.
  • the specific functions of each device in the system are implemented by referring to the foregoing method and apparatus.
  • the mobile device is a mobile node or a peer mobile node (not shown).
  • the information forwarding device acquires the first routing control information, the routing control device receives the first/second routing control information sent by the information forwarding device, and the routing control device tears down/establishes the R according to the first/second routing control information. 0 channel. It enables control of route optimization channels for distributed mobility management.
  • Computer readable media includes both computer storage media and communication media including any medium that facilitates transfer of a computer program from one location to another.
  • a storage medium may be any available media that can be accessed by a computer.
  • the computer readable medium may include RAM (Random Access Memory), ROM (Read Only Memory), and EEPROM (Electrically Erasable Programmable Read Only Memory).
  • CD-ROM Compact Disc Read Only Memory
  • CD-ROM Compact Disc Read Only Memory
  • disk storage media or other magnetic storage device, or can be used to carry or store in the form of instructions or data structures.
  • Any connection may suitably be a computer readable medium.
  • the software is using coaxial cable, fiber optic cable, twisted pair,
  • DSL Digital Subscriber Line
  • wireless technology such as infrared, radio and microwave transmission from a website, server or other remote source
  • Wireless technologies such as wireless and microwaves are included in the fixing of the associated medium.
  • Disks and discs as used in the present invention include CD (Compact Disc), laser disc, optical disc, DVD disc (Digital Versatile Disc), floppy disc and Blu-ray disc, wherein the disc is usually magnetically copied data, and The disc uses a laser to optically replicate the data. Combinations of the above should also be included within the scope of the computer readable media.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

La présente invention concerne, selon des modes de réalisation, le domaine des communications. L'invention concerne un procédé, un appareil et un système de commande d'optimisation de route qui peuvent mettre en œuvre une commande d'un canal d'optimisation de route de gestion de mobilité distribuée. Un schéma précis comprend : un premier appareil obtenant les premières informations de commande de route, le premier appareil étant un registre des abonnés locaux (HLM) d'un MN ou d'un routeur mobile local (HMR) du MN, les premières informations de commande de route étant utilisées pour ordonner l'élimination d'un canal d'optimisation de route (RO); le premier appareil envoyant les premières informations de commande de route à un CMR auquel est rattaché le MN ou à un CMR auquel est rattaché un CN, de telle sorte que le CMR auquel est rattaché le MN ou le CMR auquel est rattaché le CN élimine le canal d'optimisation de route. La présente invention est utilisée pour commander un canal d'optimisation de route de gestion de mobilité distribuée.
PCT/CN2014/071393 2014-01-24 2014-01-24 Procédé, appareil et système de commande d'optimisation de route WO2015109536A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/CN2014/071393 WO2015109536A1 (fr) 2014-01-24 2014-01-24 Procédé, appareil et système de commande d'optimisation de route
CN201480000644.9A CN105122854B (zh) 2014-01-24 2014-01-24 一种控制路由优化的方法、装置及系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2014/071393 WO2015109536A1 (fr) 2014-01-24 2014-01-24 Procédé, appareil et système de commande d'optimisation de route

Publications (1)

Publication Number Publication Date
WO2015109536A1 true WO2015109536A1 (fr) 2015-07-30

Family

ID=53680643

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/071393 WO2015109536A1 (fr) 2014-01-24 2014-01-24 Procédé, appareil et système de commande d'optimisation de route

Country Status (2)

Country Link
CN (1) CN105122854B (fr)
WO (1) WO2015109536A1 (fr)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101136847A (zh) * 2006-08-31 2008-03-05 华为技术有限公司 一种本地移动性管理网络的报文路由方法和系统
CN101179457A (zh) * 2006-11-09 2008-05-14 华为技术有限公司 一种基于本地移动管理域中路由优化的切换方法
WO2009041022A2 (fr) * 2007-09-28 2009-04-02 Panasonic Corporation Système, procédé et appareil pour communications à routage optimisé pour noeud mobile imbriqué dans un réseau mobile
CN103108299A (zh) * 2011-11-10 2013-05-15 中兴通讯股份有限公司 数据通信方法、接入服务路由器、身份位置寄存器及系统
CN103517262A (zh) * 2012-06-21 2014-01-15 中兴通讯股份有限公司 一种数据交换的方法、接入路由器及位置管理服务器

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050232286A1 (en) * 2004-04-20 2005-10-20 Samsung Electronics Co., Ltd. System and method for route optimization using piggybacking in a mobile network
ES2679668T3 (es) * 2005-03-31 2018-08-30 Sun Patent Trust Procedimiento de control de comunicación, nodo de comunicación y nodo móvil
ATE522065T1 (de) * 2006-05-29 2011-09-15 Panasonic Corp Verfahren und vorrichtung zur routen-optimierung in mobile ipv6 ohne bekanntgabe des aufenthaltsortes
US8171120B1 (en) * 2006-11-22 2012-05-01 Rockstar Bidco Lp Mobile IPv6 route optimization authorization

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101136847A (zh) * 2006-08-31 2008-03-05 华为技术有限公司 一种本地移动性管理网络的报文路由方法和系统
CN101179457A (zh) * 2006-11-09 2008-05-14 华为技术有限公司 一种基于本地移动管理域中路由优化的切换方法
WO2009041022A2 (fr) * 2007-09-28 2009-04-02 Panasonic Corporation Système, procédé et appareil pour communications à routage optimisé pour noeud mobile imbriqué dans un réseau mobile
CN103108299A (zh) * 2011-11-10 2013-05-15 中兴通讯股份有限公司 数据通信方法、接入服务路由器、身份位置寄存器及系统
CN103517262A (zh) * 2012-06-21 2014-01-15 中兴通讯股份有限公司 一种数据交换的方法、接入路由器及位置管理服务器

Also Published As

Publication number Publication date
CN105122854B (zh) 2019-09-13
CN105122854A (zh) 2015-12-02

Similar Documents

Publication Publication Date Title
EP3664370B1 (fr) Procédé de gestion d'informations de fonction de réseau et dispositif associé
JP6926317B2 (ja) セッション処理方法およびデバイス
US8897134B2 (en) Notifying a controller of a change to a packet forwarding configuration of a network element over a communication channel
US9210646B2 (en) Back-up path for in-home diagnostics and other communications
US8726068B2 (en) Intra-realm AAA fallback mechanism
JP2014511581A (ja) 分散型メッセージプロセッサアーキテクチャを有するDiameter信号伝達ルータ(DSR)内のDiameterメッセージをスクリーニングするための方法、システム、およびコンピュータ読取り可能媒体
JP6573717B2 (ja) サービスフロー処理ポリシーのための処理方法、装置、およびシステム
WO2020011152A1 (fr) Procédé et appareil de traitement de connexion pfcp, élément de réseau, système et support d'informations
JP7294578B2 (ja) ユーザプレーンのリルーティング方法および装置
WO2019157968A1 (fr) Procédé, appareil, et système de communication
JP2018531550A6 (ja) サービスフロー処理ポリシーのための処理方法、装置、およびシステム
CN106302638B (zh) 一种数据管理方法、转发设备及系统
WO2015127736A1 (fr) Procédé, dispositif et système de protection de confidentialité d'utilisateur
US11849351B2 (en) Removal of application identifier
US10798195B2 (en) Fast roaming with shared services in enterprise fabric based networks
WO2018177003A1 (fr) Procédé de facturation, et dispositif et système associés
WO2015109536A1 (fr) Procédé, appareil et système de commande d'optimisation de route
JP2016034116A (ja) 経路設定装置、経路設定方法、経路設定プログラムおよび通信システム
KR101492417B1 (ko) 다이어미터 프로토콜 기반 시스템에서의 대체 동작 방법 및 다이어미터 프로토콜 기반의 시스템
JP6610907B2 (ja) 通信システム
JP2008206028A (ja) 機能分散型通信装置、構成要素結合制御方法、およびプログラム
JP4477318B2 (ja) 経路制御方法、そのデータ集約装置および経路制御システム
WO2015109514A1 (fr) Procédé d'envoi de paquets de données, routeur mobile et dispositif de réseau
CN118075331A (en) Method, device, equipment and storage medium for establishing network access channel
WO2017000759A1 (fr) Procédé de gestion de mobilité et dispositif réseau

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14879363

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14879363

Country of ref document: EP

Kind code of ref document: A1