WO2015068242A1 - 情報処理方法、情報処理装置および情報処理プログラム - Google Patents
情報処理方法、情報処理装置および情報処理プログラム Download PDFInfo
- Publication number
- WO2015068242A1 WO2015068242A1 PCT/JP2013/080149 JP2013080149W WO2015068242A1 WO 2015068242 A1 WO2015068242 A1 WO 2015068242A1 JP 2013080149 W JP2013080149 W JP 2013080149W WO 2015068242 A1 WO2015068242 A1 WO 2015068242A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- cost
- introduction
- calculated
- ict
- unit
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
Definitions
- the present invention relates to an information processing method, an information processing apparatus, and an information processing program.
- ICT Information and Communications Technology
- the cost reduction effect due to the introduction of ICT can be calculated by comparing the ICT introduction level indicating the number of ICT users and the number of processes using ICT before and after the introduction of ICT, and the costs before and after the introduction of ICT.
- ICT Information and Communications Technology
- the environmental load evaluation due to the introduction of ICT is also evaluated before and after the introduction of ICT.
- JP 2003-58698 A Japanese Patent Laid-Open No. 2005-182451
- the present invention provides an information processing method, an information processing apparatus, and an information processing program capable of calculating an ICT introduction level necessary for a cost reduction plan.
- the computer calculates the cost of the first process based on the number of processes by the first process and the cost database storing the unit price of the cost factor. . Further, the computer calculates the cost of the second process based on the number of processes by the second process executed by the ICT device instead of the first process and the cost database. Further, the computer calculates the introduction level of the second process necessary for cost reduction based on the cost of the first process and the cost of the second process.
- FIG. 1 is a block diagram illustrating an example of the configuration of the information processing apparatus according to the embodiment.
- FIG. 2 is an explanatory diagram showing an example of a cost database.
- FIG. 3 is an explanatory diagram showing an example of the environmental load database.
- FIG. 4 is an explanatory diagram illustrating an example of the basic data storage unit.
- FIG. 5 is an explanatory diagram illustrating an example of a result storage unit.
- FIG. 6 is an explanatory diagram illustrating an example of a relationship between a cost factor, an activity amount, and a cost.
- FIG. 7 is an explanatory diagram illustrating an example of the relationship between the cost factor, the activity amount, and the environmental load.
- FIG. 8 is a flowchart illustrating an example of processing performed by the information processing apparatus according to the embodiment.
- FIG. 8 is a flowchart illustrating an example of processing performed by the information processing apparatus according to the embodiment.
- FIG. 9 is a flowchart illustrating an example of the cost calculation process.
- FIG. 10 is a flowchart illustrating an example of the environmental load calculation process.
- FIG. 11 is a graph showing an example of change of each cost factor with time.
- FIG. 12 is a graph showing an example of the cost reduction effect due to the introduction of ICT.
- FIG. 13 is a graph showing an example of the change of each CO 2 factor with time.
- FIG. 14 is a graph showing an example of the CO 2 reduction effect due to the introduction of ICT.
- FIG. 15 is a graph showing an example of the cost reduction effect by introducing the energy saving server.
- FIG. 16 is a graph showing an example of the CO 2 reduction effect due to the introduction of the energy saving server.
- FIG. 17 is an explanatory diagram illustrating an example of a computer that executes an information processing program.
- FIG. 1 is a block diagram illustrating an example of the configuration of the information processing apparatus according to the embodiment.
- An information processing apparatus 100 illustrated in FIG. 1 includes an input unit 101, an output unit 102, a storage unit 120, and a control unit 130.
- the input unit 101 includes the total number of processes X before the ICT introduction of the target business to which the ICT is introduced, the amount of activity required for performing the business, the amount of work such as the work man-hours and the power consumption, the target,
- the cost reduction rate R to be input is input.
- the input unit 101 receives a time delay coefficient related to environmental load, a calculation period, and a calculation count.
- the input unit 101 outputs the input total number of processes X, the amount of activity, the cost reduction rate R, the time delay coefficient, the calculation period, and the number of calculations to the control unit 130.
- the input unit 101 stores the basic data in a basic data storage unit 123 described later via the control unit 130.
- the input unit 101 receives an input of an instruction to start processing by the user, and inputs the instruction content to the control unit 130.
- the input unit 101 corresponds to a keyboard, a mouse, a medium reading device, and the like.
- the input unit 101 outputs the input pre-introduction unit price Bc and post-introduction unit price Ac to the control unit 130.
- the output unit 102 outputs ICT introduction level result data, effect data indicating the effects before and after the ICT introduction, and a graph based on the result data.
- the output unit 102 outputs and displays a graph based on effect data and result data calculated by an effect calculation unit 136 (to be described later) of the control unit 130 on a display unit (not shown) such as a liquid crystal display, for example.
- the output unit 102 may store the graph based on the effect data and the result data in the storage unit 120 or may store the graph on a recording medium using a medium writing device.
- the storage unit 120 is realized by, for example, a semiconductor memory element such as a RAM (Random Access Memory) or a flash memory, or a storage device such as a hard disk or an optical disk.
- the storage unit 120 includes a cost database (hereinafter referred to as cost DB) 121, an environmental load database (hereinafter referred to as environmental load DB) 122, a basic data storage unit 123, and a result storage unit 124.
- the storage unit 120 stores information used for processing in the control unit 130.
- the storage unit 120 may store the total number of processes X, the amount of activity, the cost reduction rate R, the unit price Bc before introduction, and the unit price Ac after introduction input from the input unit 101.
- the storage unit 120 may store a graph based on the effect data and the result data.
- the cost DB 121 stores a cost factor and a unit cost that is a cost per unit of the cost factor in association with each other.
- FIG. 2 is an explanatory diagram showing an example of a cost database. As shown in FIG. 2, the cost DB 121 has items such as a cost factor 121a and a unit cost 121b.
- Cost factors 121a include, for example, paper before the introduction of ICT, labor costs (without ICT) and facilities (offices), etc., and labor costs (with ICT), facilities (offices), use of PCs, the Internet, servers, etc. And facility (data center).
- the unit cost 121b indicates the cost per sheet if the paper is before ICT introduction, and indicates the cost per kWh if the server is after ICT introduction.
- the environmental load DB 122 stores cost factors and unit CO 2 emissions, which are examples of environmental loads per unit of cost factors, in association with each other.
- the environmental load DB 122 stores the cost factor and the basic unit data for converting the energy consumption into the environmental load in association with each other.
- FIG. 3 is an explanatory diagram showing an example of the environmental load database. As shown in FIG. 3, the environmental load DB 122 includes items such as a cost factor 122a and a unit CO 2 emission amount 122b.
- the cost factor 122a is the same as the cost factor 121a of the cost DB 121.
- the unit CO 2 emission amount 122b indicates, for example, the CO 2 emission amount per sheet if the paper is before ICT introduction, and indicates the CO 2 emission amount per kWh if the server is after ICT introduction.
- the basic data storage unit 123 stores the cost factor and basic data that is data serving as a basis for calculating the cost in association with each other.
- FIG. 4 is an explanatory diagram illustrating an example of the basic data storage unit. As shown in FIG. 4, the basic data storage unit 123 has items such as a cost factor 123a and basic data 123b.
- the cost factor 123 a is the same as the cost factor 121 a of the cost DB 121.
- the basic data 123b indicates, for example, the required number of sheets per process for paper before the introduction of ICT, and the power consumption per unit for servers after the introduction of ICT.
- the result storage unit 124 stores the calculation results of the first cost calculation unit 131, the second cost calculation unit 132, the introduction level calculation unit 133, and the environmental load calculation unit 135.
- the result storage unit 124 stores a calculation result for each calculation count of the ICT introduction level Le.
- FIG. 5 is an explanatory diagram illustrating an example of a result storage unit. As shown in FIG. 5, the result storage unit 124, the number of times 124a, Le124b, Bt124c, item At124d, total cost 124e, before introducing CO 2 emissions 124f, introduced after CO 2 emissions 124 g, such as the total CO 2 emissions 124h Have
- the number of times 124a indicates the number of times of calculation of the ICT introduction level Le.
- Le124b indicates the calculated ICT introduction level Le.
- Bt124c indicates the calculated ICT pre-introduction cost Bt.
- At 124 d indicates the calculated post-introduction cost At.
- the total cost 124e indicates the calculated total cost.
- the CO 2 emission amount 124f before introduction indicates the calculated CO 2 emission amount before introduction of ICT.
- the post-introduction CO 2 emission amount 124g indicates the calculated CO 2 emission amount after introduction of ICT.
- Total CO 2 emissions 124h indicates the total CO 2 emissions is the sum of the CO 2 emissions before ICT introduction and CO 2 emission amount after ICT introduction.
- control unit 130 executes, for example, a program stored in an internal storage device using a RAM as a work area by a CPU (Central Processing Unit), an MPU (Micro Processing Unit), or the like. Is realized.
- the control unit 130 may be realized by an integrated circuit such as ASIC (Application Specific Integrated Circuit) or FPGA (Field Programmable Gate Array).
- the control unit 130 includes a first cost calculation unit 131, a second cost calculation unit 132, an introduction level calculation unit 133, a determination unit 134, an environmental load calculation unit 135, and an effect calculation unit 136. Implements or executes the information processing functions and operations described in (1).
- the internal configuration of the control unit 130 is not limited to the configuration illustrated in FIG. 1, and may be another configuration as long as the information processing described below is performed.
- the first cost calculation unit 131 receives the total processing number X and the activity amount from the input unit 101.
- the first cost calculation unit 131 receives the ICT introduction level Le from the determination unit 134.
- the first cost calculation unit 131 sets an initial value of 0 as the ICT introduction level Le when the ICT introduction level Le has not yet been calculated.
- the first cost calculation unit 131 refers to the cost DB 121 and the basic data storage unit 123, and calculates the pre-introduction cost Bt based on the number of processes, the amount of activity, and the basic data obtained by subtracting the ICT introduction level Le from the total number of processes X. calculate. Note that the number of processes obtained by subtracting the ICT introduction level Le from the total number of processes X is the number of processes before ICT introduction and is the number of processes by the first process.
- the first cost calculation unit 131 calculates the pre-introduction unit price Bc of the ICT based on the calculated pre-introduction cost Bt and the number of processes used to calculate the pre-introduction cost Bt.
- the first cost calculation unit 131 may use the input pre-introduction unit price Bc as the pre-introduction unit price Bc.
- the first cost calculation unit 131 outputs the calculated pre-introduction cost Bt and pre-introduction unit price Bc to the introduction level calculation unit 133. Further, the first cost calculation unit 131 stores the calculated pre-introduction cost Bt in the result storage unit 124.
- FIG. 6 is an explanatory diagram illustrating an example of a relationship between a cost factor, an activity amount, and a cost.
- the cost factor is “use of goods”
- the cost is “activity of use (A)” “use amount of goods (weight or number of sheets)”
- cost factor unit price (B) Is calculated based on “ ⁇ / (weight or number of sheets)” ( ⁇ indicates an amount of money). That is, the cost is calculated by the amount of activity (A) ⁇ the unit price (B) of the cost factor.
- the amount of activity is input by the user, and the unit price (B) of the cost factor refers to the cost DB 121.
- the pre-introduction cost Bt is calculated by totaling the costs calculated for each cost factor.
- the cost can be calculated in consideration of a time delay indicating an effect of a change occurring at a time determined by the user. For example, if the cost calculation period is 10 years and the server is replaced with a server that saves 10% after 5 years from the introduction of ICT, the amount of activity is from 0 to 5 years.
- the cost is calculated by (A) ⁇ unit price (B) of the cost factor. For 6 to 10 years, the cost is calculated by the amount of activity (A) ⁇ the unit price of cost factor (B) ⁇ 0.9.
- the item “time delay” is device replacement
- the item “time (year)” is 5 years
- the item “cost reduction rate (%)” is 10%.
- the second cost calculation unit 132 receives an activity amount from the input unit 101. Further, the second cost calculation unit 132 receives the ICT introduction level Le from the determination unit 134. Note that, when the ICT introduction level Le has not been calculated, the second cost calculation unit 132 sets the initial value 0 as the ICT introduction level Le, as with the first cost calculation unit 131.
- the second cost calculation unit 132 refers to the cost DB 121 and the basic data storage unit 123, and calculates a post-introduction cost At based on the number of processes at the ICT introduction level Le, the amount of activity, and basic data.
- the number of processes at the ICT introduction level Le is the number of processes after the introduction of the ICT, in other words, the number of processes by the second process executed by the ICT device instead of the first process.
- the second cost calculation unit 132 calculates the post-introduction unit price Ac of the ICT based on the calculated post-introduction cost At and the number of processes used to calculate the post-introduction cost At. Note that the second cost calculation unit 132 may use the input post-introduction unit price Ac as the post-introduction unit price Ac.
- the second cost calculation unit 132 outputs the calculated post-introduction cost At and the post-introduction unit price Ac of the ICT to the introduction level calculation unit 133.
- the second cost calculation unit 132 stores the calculated post-introduction cost At in the result storage unit 124.
- the introduction level calculation unit 133 calculates the ICT introduction level Le necessary for cost reduction.
- the introduction level calculation unit 133 receives the total processing number X and the cost reduction rate R from the input unit 101.
- the introduction level calculation unit 133 receives the pre-introduction cost Bt and the pre-introduction unit price Bc from the first cost calculation unit 131.
- the introduction level calculation unit 133 receives the post-introduction cost At and the post-introduction unit price Ac from the second cost calculation unit 132.
- the introduction level calculation unit 133 receives the following equation (1). Is used to calculate the ICT introduction level Le.
- the equation (1) for calculating the ICT introduction level Le is obtained based on the following equations (2) and (3). Further, the introduction level calculation unit 133 calculates the total cost as the sum of the pre-introduction cost Bt and the post-introduction cost At. The introduction level calculation unit 133 outputs the calculated ICT introduction level Le to the determination unit 134 and the environmental load calculation unit 135. In addition, the introduction level calculation unit 133 stores the calculated ICT introduction level Le and the total cost in the result storage unit 124.
- the determination unit 134 determines whether or not the ICT introduction level Le has been calculated.
- the determination unit 134 outputs the ICT introduction level Le to the first cost calculation unit 131 and the second cost calculation unit 132. Further, the determination unit 134 stores the number of repetitions in the result storage unit 124. The determination unit 134 instructs the effect calculation unit 136 to calculate the effect when the calculation of the ICT introduction level Le is repeated a predetermined number of times.
- the environmental load calculation unit 135 calculates an environmental load according to the ICT introduction level Le.
- the environmental load calculation unit 135 receives the total processing number X, the activity amount, and the time delay coefficient from the input unit 101.
- the environmental load calculation unit 135 receives the ICT introduction level Le from the introduction level calculation unit 133.
- the environmental load calculation unit 135 introduces the ICT based on the amount of activity corresponding to the ICT introduction level Le and the time delay coefficient related to the environmental load. Calculate the energy consumption before and after.
- the environmental load calculation unit 135 Based on the calculated energy consumption before and after the introduction of ICT and the basic unit data for converting the amount of energy stored in the environmental load DB 122 into the environmental load, the environmental load calculation unit 135 introduces, for example, ICT. A pre-CO 2 emission amount and a post-introduction CO 2 emission amount are calculated. The environmental load calculation unit 135 calculates the total CO 2 emission amount as the sum of the calculated pre-introduction CO 2 emission amount and the post-introduction CO 2 emission amount. The environmental load calculation unit 135 stores the calculated pre-introduction CO 2 emission amount, post-introduction CO 2 emission amount, and total CO 2 emission amount in the result storage unit 124.
- FIG. 7 is an explanatory diagram illustrating an example of the relationship between the cost factor, the activity amount, and the environmental load.
- the environmental load is, for example, a cost factor “use of goods”
- the amount of activity (A) used is “amount of use (weight or number)”
- the unit environmental load of the cost factor (C) is calculated based on “environmental load / (weight or number of sheets)”. That is, the environmental load is calculated by the amount of activity (A) ⁇ unit environmental load (C) of the cost factor.
- CO 2 emission can be used as the environmental load.
- the activity amount is input by the user, and the environmental load (C) of the cost factor refers to the environmental load DB 122.
- the pre-introduction CO 2 emission amount and the post-introduction CO 2 emission amount are calculated by totaling the environmental loads calculated for each cost factor.
- the environmental load can be calculated in consideration of the time delay indicating the effect of the change occurring at the time determined by the user, similarly to the cost.
- Calculation of environmental load in consideration of time delay for example, when the environmental load calculation period is 10 years and the server is replaced with a server that saves 10% 5 years after the start of ICT introduction, until 0 to 5 years
- the environmental load is calculated by the amount of activity (A) ⁇ unit environmental load of cost factor (C) ⁇ 0.9.
- the item “time delay” is device replacement
- the item “time (year)” is 5 years
- the item “environmental load reduction rate (%)” is 10%.
- the frequency of use of trains has also decreased from the decrease in paper consumption until production volume decreases and the number of business trips due to the use of video conferencing. Until the number of trains decreases due to the schedule revision.
- the effect calculation unit 136 When the effect calculation unit 136 is instructed to calculate the effect from the determination unit 134, the effect calculation unit 136 generates effect data indicating the effect before and after the introduction of ICT.
- the effect calculation unit 136 calculates an effect based on the calculated cost and environmental load by comparing, for example, a case where ICT is not introduced and a case where ICT is introduced at a predetermined ICT introduction level.
- the effect calculation unit 136 receives a calculation period from the input unit 101.
- the effect calculation unit 136 reads and calculates the pre-introduction cost Bt, post-introduction cost At, total cost, pre-introduction CO 2 emission, post-introduction CO 2 emission, and total CO 2 emission from the result storage unit 124.
- Various graphs are generated based on the period.
- the effect calculation unit 136 generates, for example, each graph for 10 years as a calculation period using the pre-introduction cost Bt and the total cost.
- the effect calculation unit 136 calculates the area of the graph when the cost does not change with the pre-introduction cost Bt for the calculation period and the area of the graph of the total cost of the calculation period when ICT is introduced, for example, by integration.
- the effect calculation unit 136 calculates a cost reduction rate result indicating how much the cost can be reduced when the ICT is introduced based on each calculated area.
- the effect calculation unit 136 calculates the result of the cost reduction rate based on the ratio between the area of the cost graph when the ICT is not introduced and the area of the cost graph when the ICT is introduced, before and after the introduction of the ICT.
- the effect data indicating the effect of is generated.
- the effect calculation unit 136 calculates the pre-introduction cost Bt, the post-introduction cost At, the total cost, the pre-introduction CO 2 emission, the post-introduction CO 2 emission, and the total CO 2 emission as result data of the ICT introduction level. To the output unit 102. In addition, the effect calculation unit 136 outputs various graphs generated based on the result data and the generated effect data to the output unit 102.
- FIG. 8 is a flowchart illustrating an example of processing of the information processing apparatus according to the embodiment.
- the precondition of the paperwork support service is that 55800 application processes related to personnel, general affairs, and work are generated per year at the establishment of 1100 employees.
- paperwork Prior to the introduction of ICT, paperwork is a paperwork process, and the paperwork support service using ICT is started for the paperwork and will be used for 10 years.
- the clerks (4 people) write it on a paper slip (3 sheets / application) by hand and process it.
- the employees two persons process the data (0.5 MB) electronically applied by each employee on the PC (personal computer: power consumption 100 W).
- the data center server (operating 24 hours ⁇ 365 days, power consumption 250 W / unit) is operated, and the server data center efficiency (PUE) is 2.1.
- the target cost reduction rate R is 20%.
- the PUE can be calculated by dividing the power consumption of the entire data center by the power consumption of the server.
- the information processing apparatus 100 uses the total number of processes X, the amount of activity, the cost reduction rate R, the time delay coefficient, the basic data, the calculation period, and the calculation as the data of the target business to which ICT is introduced by the user.
- the number of times is input to the input unit 101 (step S11).
- the information processing apparatus 100 receives, for example, 55800 cases as the number of application processes as the total number of processes X.
- the information processing apparatus 100 uses, as the activity amount, activities calculated in advance based on, for example, the cost DB 121 illustrated in FIG. 2, the environmental load DB 122 illustrated in FIG. 3, and the basic data storage unit 123 illustrated in FIG. A quantity is entered.
- the activity amount may be calculated by the information processing apparatus 100 based on the cost DB 121, the environmental load DB 122, and the basic data storage unit 123 that are input in advance by the user.
- the information processing apparatus 100 receives 20% as the cost reduction rate R, “none” as the time delay coefficient, 10 years as the calculation period, and 10 times as the number of calculations. Further, the information processing apparatus 100 receives data as shown in the basic data storage unit 123 shown in FIG. 4 as basic data.
- 0 is set as the initial value for the ICT introduction level Le, and 0 is set for i that counts the number of calculations performed by the determination unit 134. It is set (step S12). Further, the determination unit 134 determines the number of times to repeat the calculation of the ICT introduction level Le based on the calculation period and the number of calculations input from the input unit 101.
- the information processing apparatus 100 executes the cost calculation process when the initial value setting is completed (step S13).
- the cost calculation process will be described with reference to FIG.
- FIG. 9 is a flowchart illustrating an example of the cost calculation process.
- the first cost calculation unit 131 of the information processing apparatus 100 receives the total processing number X and the activity amount from the input unit 101.
- the first cost calculation unit 131 receives the ICT introduction level Le from the determination unit 134.
- the first cost calculation unit 131 sets 0 as the ICT introduction level Le when the ICT introduction level Le has not been calculated, that is, when the ICT introduction level Le has been calculated for the first time.
- the first cost calculation unit 131 calculates the pre-introduction cost Bt related to the number of processes (X-Le) by the conventional process (step S131). That is, the first cost calculation unit 131 refers to the cost DB 121 and the basic data storage unit 123, and based on the number of processes obtained by subtracting the ICT introduction level Le from the total number of processes X, the amount of activity, and the basic data, Bt is calculated. Further, the first cost calculation unit 131 calculates the pre-introduction unit price Bc of the ICT based on the calculated pre-introduction cost Bt and the number of processes used to calculate the pre-introduction cost Bt.
- the first cost calculation unit 131 outputs the calculated pre-introduction cost Bt and pre-introduction unit price Bc to the introduction level calculation unit 133. Further, the first cost calculation unit 131 stores the calculated pre-introduction cost Bt in the result storage unit 124. In the example shown in FIG. 5, when the number of times is “1”, for example, the pre-introduction cost Bt is calculated as 12,795,309 yen, and the pre-introduction unit price Bc is calculated as 425 yen, for example.
- the second cost calculation unit 132 receives the amount of activity from the input unit 101 and the ICT introduction level Le from the determination unit 134.
- the second cost calculation unit 132 sets 0 as the ICT introduction level Le, as with the first cost calculation unit 131. Is done.
- the second cost calculation unit 132 calculates the post-introduction unit price Ac related to the number of processes (Le) by the ICT process (step S132). That is, the second cost calculation unit 132 refers to the cost DB 121 and the basic data storage unit 123, and calculates the post-introduction cost At based on the number of processes of the ICT introduction level Le, the activity amount, and the basic data. Further, the second cost calculation unit 132 calculates the post-introduction unit price Ac of the ICT based on the calculated post-introduction cost At and the number of processes used to calculate the post-introduction cost At.
- the second cost calculation unit 132 outputs the calculated post-introduction cost At and the post-introduction unit price Ac of the ICT to the introduction level calculation unit 133.
- the second cost calculation unit 132 stores the calculated post-introduction cost At in the result storage unit 124.
- the post-introduction cost At is calculated as 6,176,691 yen
- the post-introduction unit price Ac is calculated as 240.4 yen, for example.
- the introduction level calculation unit 133 receives the total processing number X and the cost reduction rate R from the input unit 101.
- the introduction level calculation unit 133 receives the pre-introduction cost Bt and the pre-introduction unit price Bc from the first cost calculation unit 131.
- the introduction level calculation unit 133 receives the post-introduction cost At and the post-introduction unit price Ac from the second cost calculation unit 132.
- the introduction level calculation unit 133 substitutes each input parameter into the above equation (1) to calculate the ICT introduction level Le (step S133). In the example shown in FIG. 5, when the number of times is “1”, for example, the ICT introduction level Le is calculated as 25,693.
- the introduction level calculation unit 133 calculates the total cost as the sum of the pre-introduction cost Bt and the post-introduction cost At (step S134). In the example shown in FIG. 5, when the number of times is “1”, for example, the total cost is calculated as 18,972,000 yen.
- the introduction level calculation unit 133 outputs the calculated ICT introduction level Le to the determination unit 134 and the environmental load calculation unit 135.
- the introduction level calculation unit 133 stores the calculated ICT introduction level Le and the total cost in the result storage unit 124.
- the cost calculation process is completed, the information processing apparatus 100 returns to the original process.
- the cost calculation process the cost according to the ICT introduction level Le can be calculated, and the next ICT introduction level Le can be calculated.
- FIG. 10 is a flowchart illustrating an example of the environmental load calculation process.
- the environmental load calculation unit 135 of the information processing apparatus 100 receives a time delay coefficient from the input unit 101 (step S141). In addition, the environmental load calculation unit 135 receives the total processing number X and the amount of activity from the input unit 101. The environmental load calculation unit 135 receives the ICT introduction level Le from the introduction level calculation unit 133.
- the environmental load calculation unit 135 calculates the energy consumption before and after the introduction of ICT based on the activity amount according to the ICT introduction level Le and the time delay coefficient related to the environmental load. Based on the calculated energy consumption before and after the introduction of ICT and the basic unit data for converting the amount of energy stored in the environmental load DB 122 into the environmental load, the environmental load calculation unit 135 introduces, for example, ICT. A pre-CO 2 emission amount and a post-introduction CO 2 emission amount are calculated. The environmental load calculation unit 135 calculates the total CO 2 emission amount as the sum of the calculated pre-introduction CO 2 emission amount and the post-introduction CO 2 emission amount (step S142). In the example shown in FIG.
- the environmental load calculation unit 135 stores the calculated pre-introduction CO 2 emission amount, post-introduction CO 2 emission amount, and total CO 2 emission amount in the result storage unit 124.
- the environmental load calculation process is completed, the information processing apparatus 100 returns to the original process.
- the environmental load according to the ICT introduction level Le can be calculated.
- the determination unit 134 of the information processing apparatus 100 increments i for counting the number of calculations. (Step S15). The determination unit 134 determines whether the calculation of the ICT introduction level Le has been repeated for the determined number of repetitions (step S16). The determination unit 134 outputs the ICT introduction level Le to the first cost calculation unit 131 and the second cost calculation unit 132 when the calculation of the ICT introduction level Le has not been repeated for the determined number of repetitions (No at Step S16). To do. Further, the determination unit 134 stores the number of repetitions in the result storage unit 124. Subsequently, after the output of the ICT introduction level Le, the determination unit 134 returns to step S13 and repeats the cost calculation process and the environmental load calculation process.
- step S16 When the determination unit 134 repeats the calculation of the ICT introduction level Le by the determined number of repetitions (step S16: Yes), the determination unit 134 instructs the effect calculation unit 136 to calculate the effect (step S17).
- the effect calculation unit 136 calculates the effect before and after the introduction of the ICT and generates effect data (step S18).
- the effect calculation unit 136 receives a calculation period from the input unit 101.
- the effect calculation unit 136 reads and calculates the pre-introduction cost Bt, post-introduction cost At, total cost, pre-introduction CO 2 emission, post-introduction CO 2 emission, and total CO 2 emission from the result storage unit 124.
- Various graphs are generated based on the period.
- the effect calculation unit 136 generates, for example, each graph for 10 years as a calculation period using the pre-introduction cost Bt and the total cost.
- the effect calculation unit 136 calculates the area of the graph when the cost does not change with the pre-introduction cost Bt for the calculation period and the area of the graph of the total cost of the calculation period when ICT is introduced, for example, by integration.
- the effect calculation unit 136 calculates a cost reduction rate result indicating how much the cost can be reduced when the ICT is introduced based on each calculated area.
- the effect calculation unit 136 generates the result of the cost reduction rate as effect data.
- FIG. 11 is a graph showing an example of change of each cost factor with time.
- FIG. 11 shows a change in cost related to each cost factor, which is a breakdown of costs calculated by the above-described embodiment. Note that cost factors with small values are omitted.
- a graph 11 shown in FIG. 11 shows a labor cost before the introduction of ICT, and a graph 12 shows a facility cost.
- Graph 13 shows the labor cost after the introduction of ICT, and graph 14 shows the facility cost.
- FIG. 12 is a graph showing an example of the cost reduction effect due to the introduction of ICT.
- FIG. 12 shows the result of the calculated cost reduction rate.
- a graph 15 illustrated in FIG. 12 illustrates a cost graph when the ICT is not introduced for the calculation period, that is, when the cost does not change with the pre-introduction cost Bt.
- a graph 16 shown in FIG. 12 shows a cost graph when ICT is introduced with a cost reduction rate of 20%.
- the result of the cost reduction rate can be calculated based on the ratio between the area obtained by integrating the graph 15 from 0 to 10 years and the area obtained by integrating the graph 16 from 0 to 10 years.
- the electronic application processing scenario indicates that the cumulative reduction of 41% can be achieved over 10 years as a result of the cost reduction rate with respect to the paper application processing scenario.
- FIG. 13 is a graph showing an example of the change of each CO 2 factor with time.
- FIG. 13 shows a change in the CO 2 emission amount related to each CO 2 factor, which is a breakdown of the CO 2 emission amount calculated by the above-described embodiment. Note that the CO 2 factor having a small value is omitted.
- the graph 17 shown in FIG. 13 shows the CO 2 emission amount related to the office before the introduction of the ICT, and the graph 18 shows the CO 2 emission amount related to paper manufacture.
- Graph 19 shows the CO 2 emissions related to the office after the introduction of ICT
- graph 20 shows the CO 2 emissions related to the PC
- graph 21 shows the CO 2 emissions related to the Internet.
- the graph 22 shows the CO 2 emission amount related to the server, and the graph 23 shows the CO 2 emission amount related to the air conditioning of the data center.
- FIG. 14 is a graph showing an example of the CO 2 reduction effect due to the introduction of ICT.
- Graph 25 shows a graph of CO 2 emissions when ICT is introduced with a cost reduction rate of 20%.
- the CO 2 emission reduction effect can be calculated based on the ratio of the area obtained by integrating the graph 24 from 0 to 10 years and the area obtained by integrating the graph 25 from 0 to 10 years, as in the case of cost. .
- the electronic application processing scenario shows that the cumulative reduction of 3.7% can be achieved over 10 years as the CO 2 emission reduction effect with respect to the paper application processing scenario.
- the CO 2 emission amount from the electronic application processing scenario exceeds the CO 2 emission amount from the paper application processing scenario, but it is reversed when 2.6 years have passed since the introduction of ICT.
- the payback time is when the cumulative amount of CO 2 emissions from the electronic application processing scenario is equal to the cumulative amount of CO 2 emissions from the paper application processing scenario.
- the payback time is, for example, 5.5 years in the example of FIG.
- the effect calculation unit 136 uses the pre-introduction cost Bt, the post-introduction cost At, the total cost, the pre-introduction CO 2 emission, the post-introduction CO 2 emission, and the total CO 2 emission as result data of the ICT introduction level. Output to the output unit 102. In addition, the effect calculation unit 136 outputs various graphs generated based on the result data and the generated effect data to the output unit 102. The output unit 102 outputs the result data of the ICT introduction level, the effect data indicating the effects before and after the introduction of the ICT, and the graph based on the result data, and ends the process.
- the information processing apparatus 100 repeatedly calculates the ICT introduction level Le. That is, the information processing apparatus 100 easily calculates the ICT introduction level necessary for the cost reduction plan for each introduction year, for example, by feeding back the previous ICT introduction level Le to the calculation of the next ICT introduction level Le. be able to.
- an energy saving server capable of reducing power consumption by 10% from the sixth year after five years has elapsed, for example, during the calculation period.
- the introduction of energy-saving servers from the sixth year can be expressed as “5 years” for the time delay coefficient and “10%” for the cost reduction rate.
- FIG. 15 is a graph showing an example of the cost reduction effect by introducing the energy saving server.
- a graph 26 illustrated in FIG. 15 illustrates a cost graph when the ICT is not introduced for the calculation period, that is, when the cost does not change with the pre-introduction cost Bt.
- a graph 27 shown in FIG. 15 shows a graph of the cost when ICT is introduced with a cost reduction rate of 20%, and the cost when an energy saving server is introduced in the sixth year.
- the operation cost hardly changes even if the energy saving server is introduced.
- the introduction cost of the energy saving server is not included.
- the result of the cost reduction rate shows that a cumulative reduction of 41% can be achieved in 10 years, as in the example of FIG.
- FIG. 16 is a graph showing an example of the CO 2 reduction effect due to the introduction of the energy saving server.
- a graph 28 shown in FIG. 16 shows a graph of the cost when ICT is not introduced for the calculation period, that is, when the cost does not change with the pre-introduction cost Bt.
- a graph 29 shown in FIG. 16 shows a graph of CO 2 emission when ICT is introduced with a cost reduction rate of 20% and an energy saving server is introduced in the sixth year.
- the graph 30 shows a graph of CO 2 emission when ICT is introduced with a cost reduction rate of 20% and no energy saving server is introduced in the sixth year.
- the introduction of the energy saving server causes a difference from the graph 30 for the sixth and subsequent years.
- the introduction of an energy-saving server in the sixth year has a further effect of reducing CO 2 emissions by 1.4% in total. That is, the electronic application processing scenario indicates that the cumulative reduction of 5.1% can be achieved over 10 years with respect to the paper application processing scenario.
- the information processing apparatus 100 calculates the cost of the first process based on the number of processes by the first process and the cost database in which the unit price of the cost factor is stored.
- the information processing apparatus 100 calculates the cost of the second process based on the number of processes by the second process executed by the ICT device instead of the first process and the cost database. Further, the information processing apparatus 100 calculates the introduction level of the second process necessary for cost reduction based on the cost of the first process and the cost of the second process. As a result, the ICT introduction level necessary for the cost reduction plan can be calculated.
- the information processing apparatus 100 calculates the introduction level of the second process using Equation (1) as the introduction level of the second process.
- the cost based on the pre-introduction cost Bt, post-introduction cost At, cost reduction rate R, pre-introduction unit price Bc, post-introduction unit price Ac, and the total number of processes X before the introduction of ICT.
- the ICT introduction level Le required for the reduction plan can be calculated.
- the information processing apparatus 100 calculates the introduction level of the second process from the total number of processes before the introduction of the second process as the number of processes by the first process as the process of calculating the cost of the first process. The number of processes obtained by subtracting the introduction level of the second process calculated in the calculation process is used. The information processing apparatus 100 calculates the cost of the first process using the number of processes. In addition, the information processing apparatus 100 introduces the second process calculated by the process of calculating the introduction level of the second process as the number of processes by the second process as the process of calculating the cost of the second process. The cost of the second process is calculated using the number of processes of the level.
- the information processing apparatus 100 further performs a predetermined number of times a process of calculating the cost of the first process, a process of calculating the cost of the second process, and a process of calculating the introduction level of the second process. It is determined whether or not the process has been repeated. As a result, the ICT introduction level Le for each period of the cost reduction plan can be calculated.
- the environmental load together, it is possible to grasp the environmental discharge behavior of the environmental load over time, and to implement long-term cost and environmental load reduction systematically. Judgment becomes easy.
- the information processing apparatus 100 calculates the cost of the first process based on the number of processes by the first process and the cost database in which the unit price of the cost factor is stored.
- the information processing apparatus 100 calculates the cost of the second process based on the number of processes by the second process executed by the ICT device instead of the first process and the cost database.
- the information processing apparatus 100 calculates the introduction level of the second process necessary for cost reduction based on the cost of the first process and the cost of the second process.
- the information processing apparatus 100 calculates the energy consumption based on the amount of activity corresponding to the introduction level of the second process and the time delay coefficient related to the environmental load.
- the information processing apparatus 100 calculates the environmental load based on the calculated energy consumption and an environmental load database in which basic unit data for converting the energy consumption into the environmental load is stored. As a result, the environmental load according to the ICT introduction level necessary for the cost reduction plan can be calculated.
- the number of paperwork slips is calculated as the ICT introduction level Le.
- the information processing apparatus 100 can calculate the ICT introduction level Le as long as it is an index for introducing ICT such as the number of people and the amount of traffic on the network. Thereby, the ICT introduction level required for the cost reduction plan related to the introduction of ICT for various business fields can be calculated.
- the information processing apparatus 100 may use an arbitrary item such as an office use area or tax as a cost factor. Thereby, the ICT introduction level required for the cost reduction plan can be calculated in consideration of the cost factor required by the user.
- each component of each part illustrated does not necessarily need to be physically configured as illustrated.
- the specific form of distribution / integration of each part is not limited to the one shown in the figure, and all or a part thereof may be functionally or physically distributed / integrated in arbitrary units according to various loads and usage conditions. Can be configured.
- the determination unit 134 and the effect calculation unit 136 of the above embodiment may be integrated.
- the cost DB 121, the environmental load DB 122, and the basic data storage unit 123 of the above embodiment may be integrated into one database.
- various processing functions performed in each device may be executed entirely or arbitrarily on a CPU (or a microcomputer such as an MPU or MCU (Micro Controller Unit)).
- the various processing functions may be executed entirely or arbitrarily on a program that is analyzed and executed by a CPU (or a microcomputer such as an MPU or MCU) or hardware based on wired logic. It goes without saying that it is good.
- FIG. 17 is an explanatory diagram illustrating an example of a computer that executes an information processing program.
- the computer 200 includes a CPU 201 that executes various arithmetic processes, an input device 202 that receives data input from a user, and a monitor 203.
- the computer 200 also includes a medium reading device 204 that reads a program or the like from a storage medium, an interface device 205 for connecting to another device, and a communication device 206 for connecting to another device by wire or wirelessly.
- the computer 200 also includes a RAM 207 that temporarily stores various types of information and a hard disk device 208.
- the devices 201 to 208 are connected to a bus 209.
- the hard disk device 208 includes the first cost calculation unit 131, the second cost calculation unit 132, the introduction level calculation unit 133, the determination unit 134, the environmental load calculation unit 135, and the effect calculation unit 136 shown in FIG. An information processing program having the same function is stored. Further, the hard disk device 208 stores a cost DB 121, an environmental load DB 122, a basic data storage unit 123, and a result storage unit 124. Also, the hard disk device 208 stores various data for realizing the information processing program.
- the input device 202 has the same function as the input unit 101 shown in FIG.
- the monitor 203 has the same function as the output unit 102 shown in FIG.
- the interface device 205 is integrated with the printing device and has the same function as the output unit 102 shown in FIG.
- the communication device 206 has functions similar to those of the input unit 101 and the output unit 102, for example, when the user remotely connects to the computer 200.
- the CPU 201 reads out each program stored in the hard disk device 208, develops it in the RAM 207, and executes it to perform various processes. Further, these programs serve as the first cost calculation unit 131, the second cost calculation unit 132, the introduction level calculation unit 133, the determination unit 134, the environmental load calculation unit 135, and the effect calculation unit 136 shown in FIG. Can function.
- the above information processing program is not necessarily stored in the hard disk device 208.
- the computer 200 may read and execute a program stored in a storage medium readable by the computer 200.
- the storage medium readable by the computer 200 corresponds to, for example, a portable recording medium such as a CD-ROM, a DVD disk, a USB (Universal Serial Bus) memory, a semiconductor memory such as a flash memory, and a hard disk drive.
- the information processing program may be stored in a device connected to a public line, the Internet, a LAN (Local Area Network), or the like, and the computer 200 may read out and execute the information processing program therefrom.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Finance (AREA)
- Accounting & Taxation (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Technology Law (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
コスト削減計画に必要なICT導入レベルを算出できる情報処理方法等を提供する。 コンピュータが実行する情報処理方法として、コンピュータが、第1の処理による処理数と、コスト要因の単価が記憶されたコストデータベース(121)とに基づいて、第1の処理のコストを算出する(131)。また、コンピュータが、前記第1の処理に代えてICT機器により実行される第2の処理による処理数と、前記コストデータベース(121)とに基づいて、第2の処理のコストを算出する(132)。また、コンピュータが、前記第1の処理のコストと前記第2の処理のコストとに基づいて、コスト削減に必要な前記第2の処理の導入レベルを算出する(133)。
Description
本発明は、情報処理方法、情報処理装置および情報処理プログラムに関する。
従来、コスト削減を目的の一つとして、様々な分野でICT(Information and Communications Technology)が導入されている。ICT導入によるコスト削減効果は、ICT導入前後におけるICTユーザおよびICTを用いた処理数等を示すICT導入レベル、および、ICT導入前後におけるコストを比較することで算出できる。ICT導入によって長期的なコスト削減を実施するためには、ICTユーザおよびICTを用いた処理数等を示すICT導入レベルとコスト削減の関係性とを、毎期ごとに計画および立案しながらICT導入を実施する。また、ICT導入による環境負荷の評価も、ICT導入前後の時点で評価されている。
しかしながら、コスト削減計画に必要なICT導入レベルを算出することは困難である。つまり、あるコスト削減計画を実現するため、どの程度ICTを導入すればよいか算出できない。
一つの側面では、本発明は、コスト削減計画に必要なICT導入レベルを算出できる情報処理方法、情報処理装置および情報処理プログラムを提供することにある。
一つの態様では、コンピュータが実行する情報処理方法として、コンピュータが、第1の処理による処理数と、コスト要因の単価が記憶されたコストデータベースとに基づいて、第1の処理のコストを算出する。また、コンピュータが、前記第1の処理に代えてICT機器により実行される第2の処理による処理数と、前記コストデータベースとに基づいて、第2の処理のコストを算出する。また、コンピュータが、前記第1の処理のコストと前記第2の処理のコストとに基づいて、コスト削減に必要な前記第2の処理の導入レベルを算出する。
コスト削減計画に必要なICT導入レベルを算出できる。
以下、図面に基づいて、本願の開示する情報処理方法、情報処理装置および情報処理プログラムの実施例を詳細に説明する。なお、本実施例により、開示技術が限定されるものではない。また、以下の実施例は、矛盾しない範囲で適宜組みあわせてもよい。
図1は、実施例の情報処理装置の構成の一例を示すブロック図である。図1に示す情報処理装置100は、入力部101と、出力部102と、記憶部120と、制御部130とを有する。
入力部101は、ICTを導入する対象業務のICT導入前の全処理数Xと、当該業務を遂行するにあたり必要となる物の使用量、作業工数および消費電力等である活動量と、目標とするコスト削減率Rとが入力される。また、入力部101は、環境負荷に係る時間的遅れ係数と、算出期間と、算出回数とが入力される。入力部101は、入力された全処理数X、活動量、コスト削減率R、時間的遅れ係数、算出期間および算出回数を、制御部130に出力する。また、入力部101は、コストを算出するための基礎となるデータである基礎データが入力されると、制御部130を介して後述する基礎データ記憶部123に格納する。また、入力部101は、ユーザによる処理を開始する指示の入力を受け付け、指示内容を制御部130に入力する。なお、入力部101は、キーボードやマウス、媒体読取装置などに対応する。また、入力部101は、導入前単価Bcおよび導入後単価Acが入力される場合には、入力された導入前単価Bcおよび導入後単価Acを制御部130に出力する。
出力部102は、ICT導入レベルの結果データ、ICT導入前後の効果を示す効果データ、ならびに、結果データに基づくグラフを出力する。出力部102は、制御部130の後述する効果算出部136で算出された効果データおよび結果データに基づくグラフを、例えば、液晶ディスプレイ等の図示しない表示部等に出力して表示させる。また、出力部102は、効果データおよび結果データに基づくグラフを記憶部120に記憶し、または、媒体書込装置を用いて記録媒体に記憶してもよい。
記憶部120は、例えば、RAM(Random Access Memory)、フラッシュメモリ(Flash Memory)等の半導体メモリ素子、ハードディスクや光ディスク等の記憶装置によって実現される。記憶部120は、コストデータベース(以下、コストDBという)121と、環境負荷データベース(以下、環境負荷DBという)122と、基礎データ記憶部123と、結果記憶部124とを有する。また、記憶部120は、制御部130での処理に用いる情報を記憶する。さらに、記憶部120は、入力部101から入力された全処理数X、活動量、コスト削減率R、導入前単価Bcおよび導入後単価Acを保存するようにしてもよい。また、記憶部120は、効果データおよび結果データに基づくグラフを記憶するようにしてもよい。
コストDB121は、コスト要因と、コスト要因の単位あたりのコストである単位コストとを対応付けて格納する。図2は、コストデータベースの一例を示す説明図である。図2に示すように、コストDB121は、コスト要因121a、単位コスト121bといった項目を有する。
コスト要因121aは、例えば、ICT導入前の紙、人件費(ICTなし)および施設(オフィス)等、ならびに、ICT導入後の人件費(ICTあり)、施設(オフィス)、PC使用、インターネット、サーバおよび施設(データセンタ)等を示す。単位コスト121bは、例えば、ICT導入前の紙であれば、1枚あたりのコストを示し、ICT導入後のサーバであれば、1kWhあたりのコストを示す。
環境負荷DB122は、コスト要因と、コスト要因の単位あたりの環境負荷の一例である単位CO2排出量とを対応付けて格納する。言い換えると、環境負荷DB122は、コスト要因と、エネルギー消費量を環境負荷に換算する原単位データとを対応付けて格納する。図3は、環境負荷データベースの一例を示す説明図である。図3に示すように、環境負荷DB122は、コスト要因122a、単位CO2排出量122bといった項目を有する。
コスト要因122aは、コストDB121のコスト要因121aと同一である。単位CO2排出量122bは、例えば、ICT導入前の紙であれば、1枚あたりのCO2排出量を示し、ICT導入後のサーバであれば、1kWhあたりのCO2排出量を示す。
基礎データ記憶部123は、コスト要因と、コストを算出するための基礎となるデータである基礎データとを対応付けて格納する。図4は、基礎データ記憶部の一例を示す説明図である。図4に示すように、基礎データ記憶部123は、コスト要因123a、基礎データ123bといった項目を有する。
コスト要因123aは、コストDB121のコスト要因121aと同一である。基礎データ123bは、例えば、ICT導入前の紙であれば、処理1件あたりの必要な枚数を示し、ICT導入後のサーバであれば、1台あたりの消費電力を示す。
結果記憶部124は、第1コスト算出部131、第2コスト算出部132、導入レベル算出部133、環境負荷算出部135での算出結果を格納する。結果記憶部124は、ICT導入レベルLeの計算回数ごとに算出結果を格納する。図5は、結果記憶部の一例を示す説明図である。図5に示すように、結果記憶部124は、回数124a、Le124b、Bt124c、At124d、総コスト124e、導入前CO2排出量124f、導入後CO2排出量124g、総CO2排出量124hといった項目を有する。
回数124aは、ICT導入レベルLeの算出回数を示す。Le124bは、算出されたICT導入レベルLeを示す。Bt124cは、算出されたICTの導入前コストBtを示す。At124dは、算出されたICTの導入後コストAtを示す。総コスト124eは、算出された総コストを示す。導入前CO2排出量124fは、算出されたICT導入前のCO2排出量を示す。導入後CO2排出量124gは、算出されたICT導入後のCO2排出量を示す。総CO2排出量124hは、ICT導入前のCO2排出量とICT導入後のCO2排出量との和である総CO2排出量を示す。
図1の説明に戻って、制御部130は、例えば、CPU(Central Processing Unit)やMPU(Micro Processing Unit)等によって、内部の記憶装置に記憶されているプログラムがRAMを作業領域として実行されることにより実現される。また、制御部130は、例えば、ASIC(Application Specific Integrated Circuit)やFPGA(Field Programmable Gate Array)等の集積回路により実現されるようにしてもよい。制御部130は、第1コスト算出部131と、第2コスト算出部132と、導入レベル算出部133と、判定部134と、環境負荷算出部135と、効果算出部136とを有し、以下に説明する情報処理の機能や作用を実現または実行する。なお、制御部130の内部構成は、図1に示した構成に限られず、後述する情報処理を行う構成であれば他の構成であってもよい。
第1コスト算出部131は、入力部101から全処理数Xおよび活動量が入力される。また、第1コスト算出部131は、判定部134からICT導入レベルLeが入力される。なお、第1コスト算出部131は、ICT導入レベルLeが未算出の場合には、ICT導入レベルLeとして初期値である0が設定される。第1コスト算出部131は、コストDB121および基礎データ記憶部123を参照し、全処理数XからICT導入レベルLeを引いた処理数と活動量と基礎データとに基づいて、導入前コストBtを算出する。なお、全処理数XからICT導入レベルLeを引いた処理数は、ICT導入前の処理数であり、第1の処理による処理数である。
また、第1コスト算出部131は、算出された導入前コストBtと、導入前コストBtの算出に用いた処理数とに基づいて、ICTの導入前単価Bcを算出する。なお、第1コスト算出部131は、導入前単価Bcとして、入力された導入前単価Bcを用いてもよい。第1コスト算出部131は、算出された導入前コストBtおよび導入前単価Bcを、導入レベル算出部133に出力する。また、第1コスト算出部131は、算出された導入前コストBtを結果記憶部124に格納する。
ここで、図6を用いてコスト要因ごとのコスト算出を説明する。図6は、コスト要因と活動量およびコストとの関係の一例示す説明図である。図6に示すように、コストは、例えば、コスト要因「物の使用」であれば、活動量(A)である「物の使用量(重量or枚数)」と、コスト要因の単価(B)である「¥/(重量or枚数)」(¥は金額を示す)とに基づいて算出する。つまり、コストは、活動量(A)×コスト要因の単価(B)により算出する。ここで、活動量は、ユーザによって入力され、コスト要因の単価(B)は、コストDB121を参照するものとする。導入前コストBtは、各コスト要因について算出されたコストを合計して算出する。
また、コストは、ユーザが定めた時間において変化が起きる影響を示す時間的遅れを考慮して算出することもできる。時間的遅れを考慮したコストの算出は、例えば、コスト算出期間を10年間とし、サーバについてICT導入開始の5年後に10%省エネとなるサーバに入れ替えた場合に、0~5年までは活動量(A)×コスト要因の単価(B)によりコストを算出する。また、6年~10年については、活動量(A)×コスト要因の単価(B)×0.9によりコストを算出する。この場合について、図6に当てはめると、項目「時間的遅れ」は機器入れ替えとなり、項目「時期(年)」は5年となり、項目「コスト削減率(%)」は10%となる。
図1の説明に戻って、第2コスト算出部132は、入力部101から活動量が入力される。また、第2コスト算出部132は、判定部134からICT導入レベルLeが入力される。なお、第2コスト算出部132は、ICT導入レベルLeが未算出の場合には、第1コスト算出部131と同様に、ICT導入レベルLeとして初期値である0が設定される。第2コスト算出部132は、コストDB121および基礎データ記憶部123を参照し、ICT導入レベルLeの処理数と活動量と基礎データとに基づいて、導入後コストAtを算出する。なお、ICT導入レベルLeの処理数は、ICT導入後の処理数であり、言い換えると、第1の処理に代えてICT機器により実行される第2の処理による処理数である。
また、第2コスト算出部132は、算出された導入後コストAtと、導入後コストAtの算出に用いた処理数とに基づいて、ICTの導入後単価Acを算出する。なお、第2コスト算出部132は、導入後単価Acとして、入力された導入後単価Acを用いてもよい。第2コスト算出部132は、算出された導入後コストAtおよびICTの導入後単価Acを、導入レベル算出部133に出力する。また、第2コスト算出部132は、算出された導入後コストAtを結果記憶部124に格納する。
導入レベル算出部133は、コスト削減に必要なICT導入レベルLeを算出する。導入レベル算出部133は、入力部101から全処理数Xおよびコスト削減率Rが入力される。また、導入レベル算出部133は、第1コスト算出部131から導入前コストBtおよび導入前単価Bcが入力される。また、導入レベル算出部133は、第2コスト算出部132から導入後コストAtおよび導入後単価Acが入力される。導入レベル算出部133は、全処理数X、コスト削減率R、導入前コストBt、導入前単価Bc、導入後コストAt、および、導入後単価Acが入力されると、下記の式(1)を用いてICT導入レベルLeを算出する。
ここで、ICT導入レベルLeを算出する式(1)は、下記の式(2)および式(3)に基づいて求められる。また、導入レベル算出部133は、導入前コストBtと導入後コストAtとの和として総コストを算出する。導入レベル算出部133は、算出されたICT導入レベルLeを、判定部134および環境負荷算出部135に出力する。また、導入レベル算出部133は、算出されたICT導入レベルLeおよび総コストを結果記憶部124に格納する。
判定部134は、入力部101から算出期間および算出回数が入力される。判定部134は、算出期間および算出回数に基づいて、ICT導入レベルLeの算出を繰り返す回数を決定する。判定部134は、導入レベル算出部133からICT導入レベルLeが入力されると、算出回数を計数するiをインクリメント(i=i+1)し、期間ごとのICT導入レベルLeの算出を、所定回数繰り返したか否かを判定する。つまり、判定部134は、例えば、算出期間を10年とし、期を1年とすると、ICT導入レベルLeの算出を1年ごとに行い、所定回数として、例えば10回、すなわち、10年分のICT導入レベルLeの算出を行ったか否かを判定する。判定部134は、ICT導入レベルLeの算出を所定回数繰り返していない場合には、ICT導入レベルLeを第1コスト算出部131および第2コスト算出部132に出力する。また、判定部134は、繰り返し回数を結果記憶部124に格納する。判定部134は、ICT導入レベルLeの算出を所定回数繰り返した場合には、効果算出部136に効果の算出を指示する。
環境負荷算出部135は、ICT導入レベルLeに応じた環境負荷を算出する。環境負荷算出部135は、入力部101から全処理数X、活動量および時間的遅れ係数が入力される。また、環境負荷算出部135は、導入レベル算出部133から、ICT導入レベルLeが入力される。環境負荷算出部135は、導入レベル算出部133から、ICT導入レベルLeが入力されると、ICT導入レベルLeに応じた活動量と、環境負荷に係る時間的遅れ係数とに基づいて、ICT導入前後のエネルギー消費量を算出する。環境負荷算出部135は、算出されたICT導入前後のエネルギー消費量と、環境負荷DB122に格納されたエネルギー量を環境負荷に換算する原単位データとに基づいて、環境負荷として、例えばICTの導入前CO2排出量と導入後CO2排出量とを算出する。環境負荷算出部135は、算出された導入前CO2排出量と導入後CO2排出量との和として総CO2排出量を算出する。環境負荷算出部135は、算出された導入前CO2排出量と導入後CO2排出量と総CO2排出量とを結果記憶部124に格納する。
ここで、図7を用いてコスト要因ごとの環境負荷の算出を説明する。図7は、コスト要因と活動量および環境負荷との関係の一例示す説明図である。図7に示すように、環境負荷は、例えば、コスト要因「物の使用」であれば、活動量(A)である「物の使用量(重量or枚数)」と、コスト要因の単位環境負荷(C)である「環境負荷/(重量or枚数)」とに基づいて算出する。つまり、環境負荷は、活動量(A)×コスト要因の単位環境負荷(C)により算出する。環境負荷は、例えば、CO2排出量を用いることができる。ここで、活動量は、ユーザによって入力され、コスト要因の環境負荷(C)は、環境負荷DB122を参照するものとする。導入前CO2排出量および導入後CO2排出量は、各コスト要因について算出された環境負荷を合計して算出する。
また、環境負荷は、コストと同様に、ユーザが定めた時間において変化が起きる影響を示す時間的遅れを考慮して算出することもできる。時間的遅れを考慮した環境負荷の算出は、例えば、環境負荷の算出期間を10年間とし、サーバについてICT導入開始の5年後に10%省エネとなるサーバに入れ替えた場合に、0~5年までは活動量(A)×コスト要因の単位環境負荷(C)により環境負荷を算出する。また、6年~10年については、活動量(A)×コスト要因の単位環境負荷(C)×0.9により環境負荷を算出する。この場合について、図7に当てはめると、項目「時間的遅れ」は機器入れ替えとなり、項目「時期(年)」は5年となり、項目「環境負荷削減率(%)」は10%となる。時間的遅れを考慮した環境負荷の算出としては、他にも紙の使用量が減少してから生産量が減少するまでや、テレビ会議の活用による出張回数の減少に伴う電車の利用頻度が減少してからダイヤ改正で電車の本数が減少するまで等が挙げられる。
効果算出部136は、判定部134から効果の算出を指示されると、ICT導入前後の効果を示す効果データを生成する。効果算出部136は、算出されたコストおよび環境負荷に基づいて、例えば、ICTを導入しない場合と、所定のICT導入レベルでICTを導入した場合とを比較して効果を算出する。効果算出部136は、入力部101から算出期間が入力される。効果算出部136は、結果記憶部124から導入前コストBt、導入後コストAt、総コスト、導入前CO2排出量、導入後CO2排出量、および、総CO2排出量を読み出して、算出期間に基づいて各種のグラフを生成する。効果算出部136は、例えば、導入前コストBtと総コストとを用いて、算出期間として、例えば10年間の各グラフを生成する。
効果算出部136は、算出期間についてコストが導入前コストBtで変化しない場合のグラフの面積と、ICTを導入した場合の算出期間の総コストのグラフの面積とを、例えば積分によって算出する。効果算出部136は、算出された各面積に基づいて、ICTを導入した場合にどれだけコストが削減できたかを示すコスト削減率の結果を算出する。つまり、効果算出部136は、ICTを導入しない場合のコストのグラフの面積と、ICTを導入した場合のコストのグラフの面積との比率に基づいてコスト削減率の結果を算出し、ICT導入前後の効果を示す効果データを生成する。
効果算出部136は、例えば、導入前コストBt、導入後コストAt、総コスト、導入前CO2排出量、導入後CO2排出量、および、総CO2排出量を、ICT導入レベルの結果データとして出力部102に出力する。また、効果算出部136は、結果データに基づいて生成された各種グラフと、生成された効果データとを出力部102に出力する。
次に、実施例の情報処理装置100の動作について説明する。
図8は、実施例の情報処理装置の処理の一例を示すフローチャートである。ここで、情報処理装置100で実行される処理の一例として、対象業務が事務処理支援サービスの導入事例である場合を説明する。事務処理支援サービスの前提条件は、従業員1100人の事業所における、人事、総務、勤労に関する申請処理が、1年につき55800件発生するものとする。また、ICT導入前は、紙で処理する事務処理であり、当該事務処理に対してICTを活用した事務処理支援サービスの導入を開始して10年間運用するものとする。
ICT導入前の紙申請処理シナリオでは、事務担当者(4人)が紙伝票(3枚/申請)に手書きで記載しファイルして処理する。ICT導入後の電子申請処理シナリオでは、従業員の各自がPC(パーソナルコンピュータ:消費電力100W)上で電子申請したデータ(0.5MB)を事務担当者(2人)が処理する。また、電子申請処理シナリオでは、データセンタのサーバ(24時間×365日稼働、消費電力250W/台)により運用し、サーバのデータセンタ効率(PUE)は、2.1であるとする。また、目標とするコスト削減率Rは、20%とする。なお、PUEは、データセンタ全体の電力消費量をサーバの電力消費量で除算することによって算出できる。
情報処理装置100は、ユーザによって、ICTを導入する対象業務のデータとして、全処理数Xと、活動量と、コスト削減率Rと、時間的遅れ係数と、基礎データと、算出期間と、算出回数とが入力部101に入力される(ステップS11)。情報処理装置100は、全処理数Xとして、例えば、申請処理の件数である55800件が入力される。また、情報処理装置100は、活動量として、例えば、図2に示すコストDB121と、図3に示す環境負荷DB122と、図4に示す基礎データ記憶部123とに基づいて、予め算出された活動量が入力される。なお、活動量は、ユーザによって予め入力されたコストDB121と、環境負荷DB122と、基礎データ記憶部123とに基づいて、情報処理装置100で算出するようにしてもよい。
また、情報処理装置100は、コスト削減率Rとして20%、時間的遅れ係数として「なし」、算出期間として10年、算出回数として10回が入力される。また、情報処理装置100は、基礎データとして、図4に示す基礎データ記憶部123に示すようなデータが入力される。
情報処理装置100は、入力部101にICTを導入する対象業務のデータが入力されると、初期値としてICT導入レベルLeに0が設定され、判定部134の算出回数を計数するiに0が設定される(ステップS12)。また、判定部134は、入力部101から入力された算出期間および算出回数に基づいて、ICT導入レベルLeの算出を繰り返す回数を決定する。
情報処理装置100は、初期値の設定が完了すると、コスト算出処理を実行する(ステップS13)。ここで、図9を用いてコスト算出処理を説明する。図9は、コスト算出処理の一例を示すフローチャートである。
まず、情報処理装置100の第1コスト算出部131は、入力部101から全処理数Xおよび活動量が入力される。また、第1コスト算出部131は、判定部134からICT導入レベルLeが入力される。なお、第1コスト算出部131は、ICT導入レベルLeが未算出、つまりICT導入レベルLeの算出が初回の場合には、ICT導入レベルLeとして0が設定される。
第1コスト算出部131は、従来型の処理による処理数(X-Le)に係る導入前コストBtを算出する(ステップS131)。すなわち、第1コスト算出部131は、コストDB121および基礎データ記憶部123を参照し、全処理数XからICT導入レベルLeを引いた処理数と活動量と基礎データとに基づいて、導入前コストBtを算出する。また、第1コスト算出部131は、算出された導入前コストBtと、導入前コストBtの算出に用いた処理数とに基づいて、ICTの導入前単価Bcを算出する。第1コスト算出部131は、算出された導入前コストBtおよび導入前単価Bcを、導入レベル算出部133に出力する。また、第1コスト算出部131は、算出された導入前コストBtを結果記憶部124に格納する。ここで、図5に示す例では、回数「1」のときは、例えば、導入前コストBtは、12,795,309円、例えば、導入前単価Bcは、425円と算出される。
次に、第2コスト算出部132は、入力部101から活動量が入力され、判定部134からICT導入レベルLeが入力される。なお、第2コスト算出部132は、ICT導入レベルLeが未算出、つまりICT導入レベルLeの算出が初回の場合には、第1コスト算出部131と同様に、ICT導入レベルLeとして0が設定される。
第2コスト算出部132は、ICTの処理による処理数(Le)に係る導入後単価Acを算出する(ステップS132)。すなわち、第2コスト算出部132は、コストDB121および基礎データ記憶部123を参照し、ICT導入レベルLeの処理数と活動量と基礎データとに基づいて、導入後コストAtを算出する。また、第2コスト算出部132は、算出された導入後コストAtと、導入後コストAtの算出に用いた処理数とに基づいて、ICTの導入後単価Acを算出する。第2コスト算出部132は、算出された導入後コストAtおよびICTの導入後単価Acを、導入レベル算出部133に出力する。また、第2コスト算出部132は、算出された導入後コストAtを結果記憶部124に格納する。ここで、図5に示す例では、回数「1」のときは、例えば、導入後コストAtは、6,176,691円、例えば、導入後単価Acは、240.4円と算出される。
続いて、導入レベル算出部133は、入力部101から全処理数Xおよびコスト削減率Rが入力される。また、導入レベル算出部133は、第1コスト算出部131から導入前コストBtおよび導入前単価Bcが入力される。また、導入レベル算出部133は、第2コスト算出部132から導入後コストAtおよび導入後単価Acが入力される。導入レベル算出部133は、入力された各パラメータを上述の式(1)に代入し、ICT導入レベルLeを算出する(ステップS133)。ここで、図5に示す例では、回数「1」のときは、例えば、ICT導入レベルLeは、25,693件と算出される。
また、導入レベル算出部133は、導入前コストBtと導入後コストAtとの和として総コストを算出する(ステップS134)。ここで、図5に示す例では、回数「1」のときは、例えば、総コストは、18,972,000円と算出される。導入レベル算出部133は、算出されたICT導入レベルLeを、判定部134および環境負荷算出部135に出力する。また、導入レベル算出部133は、算出されたICT導入レベルLeおよび総コストを結果記憶部124に格納する。情報処理装置100は、コスト算出処理が完了すると、元の処理に戻る。このように、コスト算出処理によれば、ICT導入レベルLeに応じたコストが算出でき、次回のICT導入レベルLeを算出することができる。
図8の説明に戻って、情報処理装置100は、コスト算出処理が完了すると、コスト算出処理に用いたICT導入レベルLeの環境負荷算出処理を実行する(ステップS14)。ここで、図10を用いて環境負荷算出処理を説明する。図10は、環境負荷算出処理の一例を示すフローチャートである。
情報処理装置100の環境負荷算出部135は、入力部101から時間的遅れ係数が入力される(ステップS141)。また、環境負荷算出部135は、入力部101から他にも全処理数Xおよび活動量が入力される。また、環境負荷算出部135は、導入レベル算出部133から、ICT導入レベルLeが入力される。
環境負荷算出部135は、ICT導入レベルLeに応じた活動量と、環境負荷に係る時間的遅れ係数とに基づいて、ICT導入前後のエネルギー消費量を算出する。環境負荷算出部135は、算出されたICT導入前後のエネルギー消費量と、環境負荷DB122に格納されたエネルギー量を環境負荷に換算する原単位データとに基づいて、環境負荷として、例えばICTの導入前CO2排出量と導入後CO2排出量とを算出する。環境負荷算出部135は、算出された導入前CO2排出量と導入後CO2排出量との和として総CO2排出量を算出する(ステップS142)。ここで、図5に示す例では、回数「1」のときは、例えば、導入前CO2排出量は、2,752kgと、例えば、導入後CO2排出量は、3431kgと、総CO2排出量は、6,183kgと算出される。環境負荷算出部135は、算出された導入前CO2排出量と導入後CO2排出量と総CO2排出量とを結果記憶部124に格納する。情報処理装置100は、環境負荷算出処理が完了すると、元の処理に戻る。このように、環境負荷算出処理によれば、ICT導入レベルLeに応じた環境負荷を算出することができる。
図8の説明に戻って、情報処理装置100の判定部134は、環境負荷算出処理が完了し、導入レベル算出部133からICT導入レベルLeが入力されると、算出回数を計数するiをインクリメントする(ステップS15)。判定部134は、ICT導入レベルLeの算出を決定された繰り返し回数分繰り返したか否かを判定する(ステップS16)。判定部134は、ICT導入レベルLeの算出を決定された繰り返し回数分繰り返していない場合は(ステップS16:否定)、ICT導入レベルLeを第1コスト算出部131および第2コスト算出部132に出力する。また、判定部134は、繰り返し回数を結果記憶部124に格納する。続いて、判定部134は、ICT導入レベルLeの出力の後、ステップS13に戻ってコスト算出処理および環境負荷算出処理を繰り返す。
判定部134は、ICT導入レベルLeの算出を決定された繰り返し回数分繰り返している場合は(ステップS16:肯定)、効果算出部136に効果の算出を指示する(ステップS17)。
効果算出部136は、判定部134から効果の算出を指示されると、ICT導入前後の効果を算出し効果データを生成する(ステップS18)。効果算出部136は、入力部101から算出期間が入力される。効果算出部136は、結果記憶部124から導入前コストBt、導入後コストAt、総コスト、導入前CO2排出量、導入後CO2排出量、および、総CO2排出量を読み出して、算出期間に基づいて各種のグラフを生成する。効果算出部136は、例えば、導入前コストBtと総コストとを用いて、算出期間として、例えば10年間の各グラフを生成する。
効果算出部136は、算出期間についてコストが導入前コストBtで変化しない場合のグラフの面積と、ICTを導入した場合の算出期間の総コストのグラフの面積とを、例えば積分によって算出する。効果算出部136は、算出された各面積に基づいて、ICTを導入した場合にどれだけコストが削減できたかを示すコスト削減率の結果を算出する。効果算出部136は、コスト削減率の結果を効果データとして生成する。
ここで、図11~図14を用いて、各グラフについて説明する。図11は、各コスト要因の時間による変化の一例を示すグラフである。図11は、上述の実施例によって算出されたコストの内訳である各コスト要因に係るコストの変化を示す。なお、値が小さいコスト要因については省略している。図11に示すグラフ11は、ICT導入前の人件費を示し、グラフ12は、施設費を示す。また、グラフ13は、ICT導入後の人件費を示し、グラフ14は、施設費を示す。
図12は、ICT導入によるコスト削減効果の一例を示すグラフである。図12は、算出されたコスト削減率の結果を示す。図12に示すグラフ15は、算出期間についてICTを導入しない場合、つまりコストが導入前コストBtで変化しない場合のコストのグラフを示す。図12に示すグラフ16は、コスト削減率20%としてICTを導入した場合のコストのグラフを示す。コスト削減率の結果は、グラフ15を0年から10年まで積分した面積と、グラフ16を0年から10年まで積分した面積との比率に基づいて算出できる。図12の例では、紙申請処理シナリオに対して電子申請処理シナリオは、コスト削減率の結果として、10年間で累計41%削減できることを示す。
図13は、各CO2要因の時間による変化の一例を示すグラフである。図13は、上述の実施例によって算出されたCO2排出量の内訳である各CO2要因に係るCO2排出量の変化を示す。なお、値が小さいCO2要因については省略している。図13に示すグラフ17は、ICT導入前のオフィスに係るCO2排出量を示し、グラフ18は、紙の製造に係るCO2排出量を示す。また、グラフ19は、ICT導入後のオフィスに係るCO2排出量を示し、グラフ20は、PCに係るCO2排出量を示し、グラフ21は、インターネットに係るCO2排出量を示す。また、グラフ22は、サーバに係るCO2排出量を示し、グラフ23は、データセンタの空調等に係るCO2排出量を示す。
図14は、ICT導入によるCO2削減効果の一例を示すグラフである。図14に示すグラフ24は、算出期間についてICTを導入しない場合、つまり環境負荷であるCO2排出量が変化しない場合のCO2排出量のグラフを示す。また、グラフ25は、コスト削減率20%としてICTを導入した場合のCO2排出量のグラフを示す。CO2排出量の削減効果は、コストの場合と同様に、グラフ24を0年から10年まで積分した面積と、グラフ25を0年から10年まで積分した面積との比率に基づいて算出できる。図14の例では、紙申請処理シナリオに対して電子申請処理シナリオは、CO2排出量の削減効果として、10年間で累計3.7%削減できることを示す。また、ICT導入当初は、グラフ25より、電子申請処理シナリオからのCO2排出量が紙申請処理シナリオからのCO2排出量を上回るがICT導入後2.6年経過時に逆転する。また、ペイバックタイムは、電子申請処理シナリオからのCO2排出量の累計と、紙申請処理シナリオからのCO2排出量の累計とが等しくなるときである。ペイバックタイムは、図14の例では、例えば5.5年となる。
効果算出部136は、例えば、導入前コストBt、導入後コストAt、総コスト、導入前CO2排出量、導入後CO2排出量、および、総CO2排出量をICT導入レベルの結果データとして出力部102に出力する。また、効果算出部136は、結果データに基づいて生成された各種グラフと、生成された効果データとを出力部102に出力する。出力部102は、ICT導入レベルの結果データ、ICT導入前後の効果を示す効果データ、ならびに、結果データに基づくグラフを出力して処理を終了する。このように、情報処理装置100は、ICT導入レベルLeを繰り返し算出する。つまり、情報処理装置100は、次のICT導入レベルLeの算出に、前回のICT導入レベルLeをフィードバックすることで、コスト削減計画に必要なICT導入レベルを、例えば導入年度ごとに容易に算出することができる。
次に、上述の実施例において、算出期間の途中、例えば5年経過して6年目から消費電力を10%削減できる省エネサーバを導入した場合について説明する。6年目からの省エネサーバの導入は、時間遅れ係数の時期は「5年」、コスト削減率「10%」として表すことができる。
図15は、省エネサーバ導入によるコスト削減効果の一例を示すグラフである。図15に示すグラフ26は、算出期間についてICTを導入しない場合、つまりコストが導入前コストBtで変化しない場合のコストのグラフを示す。図15に示すグラフ27は、コスト削減率20%としてICTを導入した場合のコスト、および、6年目に省エネサーバを導入した場合のコストのグラフを示す。図15の例では、グラフ27に示すように、運用コストは省エネサーバを導入しても変化はほぼ現れない。なお、図15では運用コストのみを表し、省エネサーバの導入コストは含んでいない。コスト削減率の結果は、図12の例と同様に、10年間で累計41%削減できることを示す。
図16は、省エネサーバ導入によるCO2削減効果の一例を示すグラフである。図16に示すグラフ28は、算出期間についてICTを導入しない場合、つまりコストが導入前コストBtで変化しない場合のコストのグラフを示す。図16に示すグラフ29は、コスト削減率20%としてICTを導入し、6年目に省エネサーバを導入した場合のCO2排出量のグラフを示す。また、グラフ30は、コスト削減率20%としてICTを導入し、6年目に省エネサーバを導入しなかった場合のCO2排出量のグラフを示す。図16の例では、グラフ29に示すように、省エネサーバを導入することによって、6年目以降についてグラフ30との差が発生する。つまり、電子申請処理シナリオでは、6年目に省エネサーバを導入することで、さらに累計で1.4%のCO2排出量の削減効果がある。すなわち、電子申請処理シナリオは、紙申請処理シナリオに対して10年間で累計5.1%削減できることを示す。
このように、情報処理装置100は、第1の処理による処理数と、コスト要因の単価が記憶されたコストデータベースとに基づいて、第1の処理のコストを算出する。また、情報処理装置100は、第1の処理に代えてICT機器により実行される第2の処理による処理数と、コストデータベースとに基づいて、第2の処理のコストを算出する。また、情報処理装置100は、第1の処理のコストと第2の処理のコストとに基づいて、コスト削減に必要な第2の処理の導入レベルを算出する。その結果、コスト削減計画に必要なICT導入レベルを算出できる。
また、情報処理装置100は、第2の処理の導入レベルを算出する処理として、第2の処理の導入レベルとして、上記の数式(1)を用いて第2の処理の導入レベルを算出する。その結果、ICTの導入前コストBtと、導入後コストAtと、コスト削減率Rと、導入前単価Bcと、導入後単価Acと、ICTの導入前の全処理数Xとに基づいて、コスト削減計画に必要なICT導入レベルLeを算出できる。
また、情報処理装置100は、第1の処理のコストを算出する処理として、第1の処理による処理数として、第2の処理の導入前の全処理数から、第2の処理の導入レベルを算出する処理で算出された第2の処理の導入レベルを引いた処理数を用いる。情報処理装置100は、当該処理数を用いて、第1の処理のコストを算出する。また、情報処理装置100は、第2の処理のコストを算出する処理として、第2の処理による処理数として、第2の処理の導入レベルを算出する処理で算出された第2の処理の導入レベルの処理数を用いて、第2の処理のコストを算出する。また、情報処理装置100は、さらに、第1の処理のコストを算出する処理と、第2の処理のコストを算出する処理と、第2の処理の導入レベルを算出する処理とを、所定回数繰り返したか否かを判定する。その結果、コスト削減計画の期ごとのICT導入レベルLeを算出できる。また、環境負荷の算出を合わせて行なうことで、経年的な環境負荷の排出挙動が把握でき、長期的なコストおよび環境負荷削減が計画的に実施できるため、ICTへの投資も含めた導入の判断が容易になる。
また、情報処理装置100は、第1の処理による処理数と、コスト要因の単価が記憶されたコストデータベースとに基づいて、第1の処理のコストを算出する。また、情報処理装置100は、第1の処理に代えてICT機器により実行される第2の処理による処理数と、コストデータベースとに基づいて、第2の処理のコストを算出する。また、情報処理装置100は、第1の処理のコストと第2の処理のコストとに基づいて、コスト削減に必要な第2の処理の導入レベルを算出する。また、情報処理装置100は、第2の処理の導入レベルに応じた活動量と、環境負荷に係る時間的遅れ係数とに基づいて、エネルギー消費量を算出する。また、情報処理装置100は、算出されたエネルギー消費量と、エネルギー消費量を環境負荷に換算する原単位データが記憶された環境負荷データベースとに基づいて、環境負荷を算出する。その結果、コスト削減計画に必要なICT導入レベルに応じた環境負荷を算出することができる。
なお、上記実施例では、ICT導入レベルLeとして、事務処理の伝票の処理数を算出したが、これに限定されない。情報処理装置100は、例えば、ICT導入レベルLeとして、人数、ネットワークのトラフィック量等のICTの導入の指標となるものであれば算出することができる。これにより、様々な業務分野に対するICTの導入に係るコスト削減計画に必要なICT導入レベルを算出できる。
なお、上記実施例では、コスト要因として、図6に示す「物の使用」等の7つを挙げたが、これに限定されない。情報処理装置100は、例えば、オフィスの使用面積や、税金等の任意の項目をコスト要因としてもよい。これにより、ユーザが必要とするコスト要因を考慮してコスト削減計画に必要なICT導入レベルを算出できる。
また、図示した各部の各構成要素は、必ずしも物理的に図示の如く構成されていることを要しない。すなわち、各部の分散・統合の具体的形態は図示のものに限られず、その全部又は一部を、各種の負荷や使用状況等に応じて、任意の単位で機能的又は物理的に分散・統合して構成することができる。例えば、上記実施例の判定部134と効果算出部136を統合してもよい。また、例えば、上記実施例のコストDB121と、環境負荷DB122と、基礎データ記憶部123とを統合して1つのデータベースとしてもよい。
さらに、各装置で行われる各種処理機能は、CPU(又はMPU、MCU(Micro Controller Unit)等のマイクロ・コンピュータ)上で、その全部又は任意の一部を実行するようにしてもよい。また、各種処理機能は、CPU(又はMPU、MCU等のマイクロ・コンピュータ)で解析実行されるプログラム上、又はワイヤードロジックによるハードウェア上で、その全部又は任意の一部を実行するようにしても良いことは言うまでもない。
ところで、上記の実施例で説明した各種の処理は、予め用意されたプログラムをコンピュータで実行することで実現できる。そこで、以下では、上記の実施例と同様の機能を有するプログラムを実行するコンピュータの一例を説明する。図17は、情報処理プログラムを実行するコンピュータの一例を示す説明図である。
図17が示すように、コンピュータ200は、各種演算処理を実行するCPU201と、ユーザからのデータ入力を受け付ける入力装置202と、モニタ203とを有する。また、コンピュータ200は、記憶媒体からプログラム等を読み取る媒体読取装置204と、他の装置と接続するためのインタフェース装置205と、他の装置と有線または無線により接続するための通信装置206とを有する。また、コンピュータ200は、各種情報を一時記憶するRAM207と、ハードディスク装置208とを有する。また、各装置201~208は、バス209に接続される。
ハードディスク装置208には、図1に示した第1コスト算出部131、第2コスト算出部132、導入レベル算出部133、判定部134、環境負荷算出部135および効果算出部136の各処理部と同様の機能を有する情報処理プログラムが記憶される。また、ハードディスク装置208には、コストDB121、環境負荷DB122、基礎データ記憶部123、結果記憶部124が記憶される。また、ハードディスク装置208には、情報処理プログラムを実現するための各種データが記憶される。入力装置202は、図1に示した入力部101と同様の機能を有する。モニタ203は、図1に示した出力部102と同様の機能を有する。インタフェース装置205は、例えば印刷装置が接続された場合には印刷装置と一体として、図1に示した出力部102と同様の機能を有する。通信装置206は、例えばユーザがコンピュータ200にリモート接続する場合に、入力部101および出力部102と同様の機能を有する。
CPU201は、ハードディスク装置208に記憶された各プログラムを読み出して、RAM207に展開して実行することで、各種の処理を行う。また、これらのプログラムは、コンピュータ200を図1に示した第1コスト算出部131、第2コスト算出部132、導入レベル算出部133、判定部134、環境負荷算出部135および効果算出部136として機能させることができる。
なお、上記の情報処理プログラムは、必ずしもハードディスク装置208に記憶されている必要はない。例えば、コンピュータ200が読み取り可能な記憶媒体に記憶されたプログラムを、コンピュータ200が読み出して実行するようにしてもよい。コンピュータ200が読み取り可能な記憶媒体は、例えば、CD-ROMやDVDディスク、USB(Universal Serial Bus)メモリ等の可搬型記録媒体、フラッシュメモリ等の半導体メモリ、ハードディスクドライブ等が対応する。また、公衆回線、インターネット、LAN(Local Area Network)等に接続された装置にこの情報処理プログラムを記憶させておき、コンピュータ200がこれらから情報処理プログラムを読み出して実行するようにしてもよい。
100 情報処理装置
101 入力部
102 出力部
120 記憶部
121 コストデータベース
122 環境負荷データベース
123 基礎データ記憶部
124 結果記憶部
130 制御部
131 第1コスト算出部
132 第2コスト算出部
133 導入レベル算出部
134 判定部
135 環境負荷算出部
136 効果算出部
101 入力部
102 出力部
120 記憶部
121 コストデータベース
122 環境負荷データベース
123 基礎データ記憶部
124 結果記憶部
130 制御部
131 第1コスト算出部
132 第2コスト算出部
133 導入レベル算出部
134 判定部
135 環境負荷算出部
136 効果算出部
Claims (8)
- コンピュータが、
第1の処理による処理数と、コスト要因の単価が記憶されたコストデータベースとに基づいて、第1の処理のコストを算出し、
前記第1の処理に代えてICT機器により実行される第2の処理による処理数と、前記コストデータベースとに基づいて、第2の処理のコストを算出し、
前記第1の処理のコストと前記第2の処理のコストとに基づいて、コスト削減に必要な前記第2の処理の導入レベルを算出する
処理を実行することを特徴とする情報処理方法。 - 前記第1の処理のコストを算出する処理は、前記第1の処理による処理数として、第2の処理の導入前の全処理数から、前記第2の処理の導入レベルを算出する処理で算出された前記第2の処理の導入レベルを引いた処理数を用いて、前記第1の処理のコストを算出し、
前記第2の処理のコストを算出する処理は、前記第2の処理による処理数として、前記第2の処理の導入レベルを算出する処理で算出された前記第2の処理の導入レベルの処理数を用いて、前記第2の処理のコストを算出し、
コンピュータが、さらに、前記第1の処理のコストを算出する処理と、前記第2の処理のコストを算出する処理と、前記第2の処理の導入レベルを算出する処理とを、所定回数繰り返したか否かを判定する
処理を実行することを特徴とする請求項2に記載の情報処理方法。 - コンピュータが、
第1の処理による処理数と、コスト要因の単価が記憶されたコストデータベースとに基づいて、第1の処理のコストを算出し、
前記第1の処理に代えてICT機器により実行される第2の処理による処理数と、前記コストデータベースとに基づいて、第2の処理のコストを算出し、
前記第1の処理のコストと前記第2の処理のコストとに基づいて、コスト削減に必要な前記第2の処理の導入レベルを算出し、
前記第2の処理の導入レベルに応じた活動量と、環境負荷に係る時間的遅れ係数とに基づいて、エネルギー消費量を算出し、算出された前記エネルギー消費量と、前記エネルギー消費量を前記環境負荷に換算する原単位データが記憶された環境負荷データベースとに基づいて、環境負荷を算出する
処理を実行することを特徴とする情報処理方法。 - コスト要因の単価を記憶するコストデータベースと、
第1の処理による処理数と、前記コストデータベースとに基づいて、第1の処理のコストを算出する第1コスト算出部と、
前記第1の処理に代えてICT機器により実行される第2の処理による処理数と、前記コストデータベースとに基づいて、第2の処理のコストを算出する第2コスト算出部と、
前記第1の処理のコストと前記第2の処理のコストとに基づいて、コスト削減に必要な前記第2の処理の導入レベルを算出する導入レベル算出部と
を有することを特徴とする情報処理装置。 - コンピュータに、
第1の処理による処理数と、コスト要因の単価が記憶されたコストデータベースとに基づいて、第1の処理のコストを算出し、
前記第1の処理に代えてICT機器により実行される第2の処理による処理数と、前記コストデータベースとに基づいて、第2の処理のコストを算出し、
前記第1の処理のコストと前記第2の処理のコストとに基づいて、コスト削減に必要な前記第2の処理の導入レベルを算出する
処理を実行させることを特徴とする情報処理プログラム。 - コスト要因の単価を記憶するコストデータベースと、
エネルギー消費量を環境負荷に換算する原単位データを記憶する環境負荷データベースと、
第1の処理による処理数と、前記コストデータベースとに基づいて、第1の処理のコストを算出する第1コスト算出部と、
前記第1の処理に代えてICT機器により実行される第2の処理による処理数と、前記コストデータベースとに基づいて、第2の処理のコストを算出する第2コスト算出部と、
前記第1の処理のコストと前記第2の処理のコストとに基づいて、コスト削減に必要な前記第2の処理の導入レベルを算出する導入レベル算出部と、
前記第2の処理の導入レベルに応じた活動量と、環境負荷に係る時間的遅れ係数とに基づいて、エネルギー消費量を算出し、算出された前記エネルギー消費量と、前記環境負荷データベースとに基づいて、環境負荷を算出する環境負荷算出部と
を有することを特徴とする情報処理装置。 - コンピュータに、
第1の処理による処理数と、コスト要因の単価が記憶されたコストデータベースとに基づいて、第1の処理のコストを算出し、
前記第1の処理に代えてICT機器により実行される第2の処理による処理数と、前記コストデータベースとに基づいて、第2の処理のコストを算出し、
前記第1の処理のコストと前記第2の処理のコストとに基づいて、コスト削減に必要な前記第2の処理の導入レベルを算出し、
前記第2の処理の導入レベルに応じた活動量と、環境負荷に係る時間的遅れ係数とに基づいて、エネルギー消費量を算出し、算出された前記エネルギー消費量と、前記エネルギー消費量を前記環境負荷に換算する原単位データが記憶された環境負荷データベースとに基づいて、環境負荷を算出する
処理を実行させることを特徴とする情報処理プログラム。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015546208A JP6187597B2 (ja) | 2013-11-07 | 2013-11-07 | 情報処理方法、情報処理装置および情報処理プログラム |
PCT/JP2013/080149 WO2015068242A1 (ja) | 2013-11-07 | 2013-11-07 | 情報処理方法、情報処理装置および情報処理プログラム |
EP13896923.3A EP3067838A4 (en) | 2013-11-07 | 2013-11-07 | INFORMATION PROCESSING, INFORMATION PROCESSING DEVICE AND INFORMATION PROCESSING PROGRAM |
US15/084,665 US20160210702A1 (en) | 2013-11-07 | 2016-03-30 | Information processing method, and information processing apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2013/080149 WO2015068242A1 (ja) | 2013-11-07 | 2013-11-07 | 情報処理方法、情報処理装置および情報処理プログラム |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/084,665 Continuation US20160210702A1 (en) | 2013-11-07 | 2016-03-30 | Information processing method, and information processing apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2015068242A1 true WO2015068242A1 (ja) | 2015-05-14 |
Family
ID=53041044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2013/080149 WO2015068242A1 (ja) | 2013-11-07 | 2013-11-07 | 情報処理方法、情報処理装置および情報処理プログラム |
Country Status (4)
Country | Link |
---|---|
US (1) | US20160210702A1 (ja) |
EP (1) | EP3067838A4 (ja) |
JP (1) | JP6187597B2 (ja) |
WO (1) | WO2015068242A1 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019101689A (ja) * | 2017-11-30 | 2019-06-24 | 日本電信電話株式会社 | 総合影響評価方法及び総合影響評価システム |
JP2020047301A (ja) * | 2016-11-30 | 2020-03-26 | パナソニックIpマネジメント株式会社 | 設備構成作成支援システムおよび設備構成作成支援方法 |
WO2023021683A1 (ja) * | 2021-08-20 | 2023-02-23 | 株式会社日立製作所 | 評価システム及び評価方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7187947B1 (en) | 2000-03-28 | 2007-03-06 | Affinity Labs, Llc | System and method for communicating selected information to an electronic device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003058698A (ja) | 2001-08-09 | 2003-02-28 | Ricoh Co Ltd | It環境最適化支援システム、該システムの機能を実現するプログラム及び記録媒体 |
JP2005182451A (ja) | 2003-12-19 | 2005-07-07 | National Institute Of Advanced Industrial & Technology | 環境対策を含む企業マネージメントの評価方法およびその評価システム |
JP2005222187A (ja) * | 2004-02-04 | 2005-08-18 | Hitachi Ltd | 業務支援システム導入による収益増分シミュレーション方法及びシステム |
JP2006178731A (ja) * | 2004-12-22 | 2006-07-06 | Nippon Telegr & Teleph Corp <Ntt> | 情報通信サービスの環境影響評価方法及びその装置 |
WO2007105698A1 (ja) * | 2006-03-14 | 2007-09-20 | Kyoto University | コスト算出システム、コストデータ入力システム、並びに、そのプログラム、データ構造、および、それらを記録した記録媒体 |
-
2013
- 2013-11-07 WO PCT/JP2013/080149 patent/WO2015068242A1/ja active Application Filing
- 2013-11-07 JP JP2015546208A patent/JP6187597B2/ja not_active Expired - Fee Related
- 2013-11-07 EP EP13896923.3A patent/EP3067838A4/en not_active Ceased
-
2016
- 2016-03-30 US US15/084,665 patent/US20160210702A1/en not_active Abandoned
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003058698A (ja) | 2001-08-09 | 2003-02-28 | Ricoh Co Ltd | It環境最適化支援システム、該システムの機能を実現するプログラム及び記録媒体 |
JP2005182451A (ja) | 2003-12-19 | 2005-07-07 | National Institute Of Advanced Industrial & Technology | 環境対策を含む企業マネージメントの評価方法およびその評価システム |
JP2005222187A (ja) * | 2004-02-04 | 2005-08-18 | Hitachi Ltd | 業務支援システム導入による収益増分シミュレーション方法及びシステム |
JP2006178731A (ja) * | 2004-12-22 | 2006-07-06 | Nippon Telegr & Teleph Corp <Ntt> | 情報通信サービスの環境影響評価方法及びその装置 |
WO2007105698A1 (ja) * | 2006-03-14 | 2007-09-20 | Kyoto University | コスト算出システム、コストデータ入力システム、並びに、そのプログラム、データ構造、および、それらを記録した記録媒体 |
Non-Patent Citations (1)
Title |
---|
See also references of EP3067838A4 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2020047301A (ja) * | 2016-11-30 | 2020-03-26 | パナソニックIpマネジメント株式会社 | 設備構成作成支援システムおよび設備構成作成支援方法 |
JP2019101689A (ja) * | 2017-11-30 | 2019-06-24 | 日本電信電話株式会社 | 総合影響評価方法及び総合影響評価システム |
WO2023021683A1 (ja) * | 2021-08-20 | 2023-02-23 | 株式会社日立製作所 | 評価システム及び評価方法 |
JP7562002B2 (ja) | 2021-08-20 | 2024-10-04 | 株式会社日立製作所 | 評価システム及び評価方法 |
Also Published As
Publication number | Publication date |
---|---|
US20160210702A1 (en) | 2016-07-21 |
JP6187597B2 (ja) | 2017-08-30 |
EP3067838A4 (en) | 2016-11-23 |
EP3067838A1 (en) | 2016-09-14 |
JPWO2015068242A1 (ja) | 2017-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6187597B2 (ja) | 情報処理方法、情報処理装置および情報処理プログラム | |
Kolker | Process modeling of emergency department patient flow: Effect of patient length of stay on ED diversion | |
Lu et al. | Robust single machine scheduling for minimizing total flow time in the presence of uncertain processing times | |
Wang et al. | Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times | |
US20110196718A1 (en) | System and method for forecasting in the presence of multiple seasonal patterns in print demand | |
Dawson et al. | Efficient design and inference for multistage randomized trials of individualized treatment policies | |
EP2342686A1 (en) | Workforce planning | |
Seo et al. | Single machine stochastic scheduling to minimize the expected number of tardy jobs using mathematical programming models | |
Villa et al. | Exploring retailers' ordering decisions under delays | |
Nguyen et al. | Capacity and lead-time management when demand for service is seasonal and lead-time sensitive | |
JP4211006B2 (ja) | 進捗管理装置 | |
Cioffi | Completing projects according to plans: an earned-value improvement index | |
JP2009289056A (ja) | 人員配置計画支援装置 | |
US8896863B2 (en) | System and method of modeling customer demand in a print production environment | |
US20150262318A1 (en) | Litigation and Court Case History Analysis and Results | |
WO2011036757A1 (ja) | エネルギー削減装置 | |
JP6729703B2 (ja) | 情報提示方法、装置、及びプログラム | |
US8559040B2 (en) | Method and system for performing statistical throughput control in a print shop | |
JP2012090502A (ja) | 消費電力量管理装置及びプログラム | |
Zhang et al. | Scheduling with compressible and stochastic release dates | |
JP2010170318A (ja) | スケジュール管理装置、方法及びコンピュータプログラム | |
Bartos et al. | An application of discrete event simulation for planning and resource allocation in a state hospital system servicing both criminal and civil commitments | |
JP5733193B2 (ja) | 業務管理サーバ、業務管理方法及び業務管理プログラム | |
JP7403400B2 (ja) | 情報処理システム及び情報処理方法 | |
Barlow | What Is the Best Healthcare Data Warehouse Model? Comparing Enterprise Data Models, Independent Data Marts, and Late-Binding™ Solutions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13896923 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2015546208 Country of ref document: JP Kind code of ref document: A |
|
REEP | Request for entry into the european phase |
Ref document number: 2013896923 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |