WO2015040268A1 - Novel arrangement of access to lng fuel storage compartment - Google Patents

Novel arrangement of access to lng fuel storage compartment Download PDF

Info

Publication number
WO2015040268A1
WO2015040268A1 PCT/FI2013/050910 FI2013050910W WO2015040268A1 WO 2015040268 A1 WO2015040268 A1 WO 2015040268A1 FI 2013050910 W FI2013050910 W FI 2013050910W WO 2015040268 A1 WO2015040268 A1 WO 2015040268A1
Authority
WO
WIPO (PCT)
Prior art keywords
tank
gas
room
tank room
fuel storage
Prior art date
Application number
PCT/FI2013/050910
Other languages
French (fr)
Inventor
Mathias Jansson
Sören KARLSSON
Martin RÅHOLM
Kenneth Isaksson
Lars VESTBØSTAD
Kazimierz KOTERWA
Tomasz MALINOWSKI
Piotr SZCZEKLIK
Original Assignee
Wärtsilä Finland Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wärtsilä Finland Oy filed Critical Wärtsilä Finland Oy
Priority to PCT/FI2013/050910 priority Critical patent/WO2015040268A1/en
Publication of WO2015040268A1 publication Critical patent/WO2015040268A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • B63B17/0027Tanks for fuel or the like ; Accessories therefor, e.g. tank filler caps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B11/00Interior subdivision of hulls
    • B63B11/04Constructional features of bunkers, e.g. structural fuel tanks, or ballast tanks, e.g. with elastic walls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/08Mounting arrangements for vessels
    • F17C13/082Mounting arrangements for vessels for large sea-borne storage vessels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for
    • B63B43/24Arrangements of watertight doors in bulkheads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J99/00Subject matter not provided for in other groups of this subclass
    • B63J2099/001Burning of transported goods, e.g. fuel, boil-off or refuse
    • B63J2099/003Burning of transported goods, e.g. fuel, boil-off or refuse of cargo oil or fuel, or of boil-off gases, e.g. for propulsive purposes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/01Mounting arrangements
    • F17C2205/0103Exterior arrangements
    • F17C2205/0111Boxes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0379Manholes or access openings for human beings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/04Reducing risks and environmental impact
    • F17C2260/042Reducing risk of explosion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T70/00Maritime or waterways transport
    • Y02T70/50Measures to reduce greenhouse gas emissions related to the propulsion system

Definitions

  • the invention concerns in general the structural solutions of sea-going vessels that use gaseous fuel in at least one of their own engines. Especially the invention concerns the structural solutions with which the proper division into hazard zones of different classification is ensured.
  • Natural gas or in general mixtures of hydrocarbons that are volatile enough to make the mixture appear in gaseous form in room temperature, constitutes an advantageous alternative to fuel oil as the fuel of internal combustion engines.
  • the natural gas is typically stored onboard in liquid form, giving rise to the commonly used acronym LNG (Liquefied Natural Gas).
  • LNG Liquefied Natural Gas
  • Natural gas can be kept in liquid form by maintaining its temperature below a boiling point, which is approximately -162 degrees centigrade (-260 degrees Fahrenheit).
  • Natural gas can be also stored for use as fuel by keeping it compressed to a sufficiently high pressure, in which case the acronym CNG (Compressed Natural Gas) is used.
  • CNG Compressed Natural Gas
  • Classification societies maintain and publish regulations and guidelines that place certain requirements to the structure and operation of gas-fuelled vessels.
  • classification regulations of Germanischer Lloyd Aktiengesellschaft comprises a volume VI, Part 3 (Machinery Installa- tions), Chapter 1 : Guidelines for the Use of Gas as Fuel for Ships, published in 2010.
  • zone 0 an area in which an explosive gas atmosphere or a flammable gas with a flash point below 60 °C is present continuously or is present for long periods
  • zone 1 an area in which an explosive gas atmosphere or a flammable gas with a flash point below 60 °C is likely to occur in normal operation
  • zone 2 an area in which an explosive gas atmosphere or a flammable gas with a flash point below 60 °C is not likely to occur in normal operation and, if it does occur, is likely to do so only infrequently and will exist for a short period only. Anything beyond zone 2 is considered a safe zone from the viewpoint of gas- originated hazards (fire, explosion, poisoning, suffocation).
  • the regulations mentioned above are referred to in the following as the Lloyd regulations.
  • Fig. 1 is a simplified illustration of the storage and use of gas as fuel onboard a sea-going vessel.
  • LNG is stored in a double-walled tank 101 , which is located in a tank hold 102.
  • An evaporator 103 is used to vaporize the gas, after which it is delivered to the engine 104 through a gas pipeline 105.
  • the evaporator 103 and other process equipment are located inside an enclosure known as the tank room 106, which in this case directly adjoins the tank 101 so that the outer wall of the tank 101 and the walls of the tank room 106 constitute a sin- gle, integral, gastight entity.
  • the gas pipeline 105 goes inside an outer shell 107, the inside of which is constantly ventilated to open air (not shown).
  • One or more bulkheads 108 separate the tank hold 102 from the engine room 109, in which the engine 104 is located.
  • the tank 101 and the tank room 106 with all the equipment inside it can be de- livered to a shipyard as an integral, separately assembled package such as the solutions marketed under the trade mark LNGpac by Wartsila Corporation, Helsinki, Finland.
  • Figs. 2a and 2b show schematically how some of the spaces illustrated in fig. 1 belong to the zones defined by the Lloyd regulations.
  • the inside of the tank 101 belongs undoubtedly to zone 0.
  • the inside of the tank room 106 belongs to zone 1 .
  • whether or not the tank hold 102 belongs to zone 2 depends on whether the access hatch or door 201 to the tank room 106 is open. In fig. 2a it is closed, so the tank hold 102 counts as a safe zone.
  • the tank hold 102 belongs to zone 2.
  • the tank room needs to be accessed every now and then, so the shipbuilder must prepare for the situation of 2b, and build the tank hold 102 so that it conforms with zone 2 regulations.
  • ATEX means the directive 94/9/EC for apparatus intended for use in explosive environments, and is an example of an applicable safety regulation.
  • Another consequence of the tank hold belonging to zone 2 is the mandatory use of an airlock 202 at its entrance. Classification requirements could also require that all electric equipment in the tank hold must be de-energized in the case of a ventilation failure, but that will lead to a contradiction with other regulations; for example (electric) emergency lighting must be available for operation at any times.
  • the tank hold may be large, and it may comprise a large number of electric in- stallations. Electric apparatus certified for explosive environments are expensive, which may mean a significant additional cost to the shipbuilder. If a previously oil-fuelled ship is converted to use gaseous fuel, and some existing space onboard is rebuilt as a tank hold, the requirement for conformity with ATEX and Lloyd regulations may necessitate scrapping large numbers of oth- erwise completely usable previous installations.
  • a fuel storage and de- livery system for a gas-fuelled sea-going vessel which fuel storage and delivery system enables using cost-effective solutions in the construction of the vessel.
  • a fuel storage and delivery system of the described kind that can be easily used in retrofitting projects.
  • a fuel storage and delivery system that can be separately assembled and delivered to a shipyard to that its inclusion to a ship under construction is fast and easy.
  • a fuel storage and delivery system for a gas-fuelled sea-going vessel is characterized by the features recited in the characterising part of the independent claim directed to a fuel storage and delivery system.
  • An integrated fuel storage and delivery system with an airlock at the entrance to the tank room is very advantageous in retrofit projects where a space that was previously used for something else is converted into a tank hold as a part of making a previously oil-fuelled vessel utilize gase- ous fuel, because it places very few additional requirements to such a space.
  • Fig. 1 illustrates a prior art fuel storage and delivery system
  • fig. 2a illustrates a division into zones of a prior art fuel storage and delivery system
  • fig. 2b illustrates a different division into zones of the system of fig. 2a
  • fig. 3 illustrates a division into zones of a fuel storage and delivery system according to an embodiment of the invention
  • fig. 4 illustrates a division into zones of a fuel storage and delivery system according to another embodiment of the invention
  • fig. 5 illustrates a division into zones of a fuel storage and delivery system according to another embodiment of the invention.
  • fig. 6 illustrates a division into zones of a fuel storage and delivery system according to another embodiment of the invention.
  • a tank room means a gas-tight space surrounding the parts of the bunker tank containing all tank connections and all tank valves.
  • the tank room is the gastight enclosure in which there is located the evaporator that is used to vaporize liquid gas for delivery to at least one gas-fuelled engine of a sea-going vessel. If compressed gas is used instead of liquefied gas, the role of an evaporator is taken by a pressure reducing valve.
  • the inside of a tank room belongs to zone 1 in the classification of gas-hazardous zones.
  • Fig. 3 is a schematic illustration from above of parts of a fuel storage and delivery system for a gas-fuelled sea-going vessel. It comprises a tank room 106, so - although not separately shown - in accordance with the definition above there is an evaporator for vaporizing liquid gas or pressure reducing valve for reducing the pressure of compressed gas located in the tank room 106.
  • the gas to be evaporated or the pressure of which is to be reduced comes from a gas tank 101 .
  • An airlock 301 constitutes the sole access to the tank room 106.
  • the tank hold 102 which is the at least mostly closed space in which the tank 101 and the tank room 106 are located, does not become a zone 2 gas-hazardous area at any times, so it can be constructed and equipped following normal standards instead of those that concern explosive areas.
  • the process of building a ship at a shipyard, or a process of converting a pre- viously oil-fuelled vessel into at least partial operation with gaseous fuel can be made faster and more straightforward by assembling parts of the fuel storage and delivery system separately and bringing them as a more or less completed structural module into place in the ship to be built or converted.
  • the gas tank (or gas tanks, of there are two or more) can be integrat- ed into a common mechanical entity with the tank room. In the embodiment shown in fig. 3 this has been accomplished by welding the edges of walls of the tank room 106 to an outer wall of the tank 101 . In other words, an outer wall of the tank (or tanks) and walls of the tank room together delimit a single, integral, gastight entity.
  • a common support base 302 ends of which are seen to protrude from under the tank 101 and the airlock 301 , is arranged to support the weight of the tank (or tanks) and the tank room and to form the mechanical installation interface of the tank (or tanks) and the tank room to the tank hold 102.
  • Fig. 4 is a schematic illustration from above of an embodiment in which the tank 101 and the tank room 106 do not constitute a single mechanical entity.
  • the tank room 106 and the tank 101 (or tanks, if there are two or more) are delimited as separate entities by walls of the tank room and an outer wall of the tank or tanks.
  • Double-walled piping 401 connects the tank 106 (or tanks) to the tank room 106.
  • the requirement of a second barrier could be fulfilled also by enclosing two or more single-walled pipes inside a common gastight outer cover.
  • the fixed, gastight lead-ins of the double-walled piping 401 to the tank room 106 do not count as accesses, so the sole access to the tank room 106 is again through the airlock 301 .
  • the tank 101 can be integrated into a common mechanical entity as a whole with the tank room for example by using a common support base 302 that is arranged to support the weight of the tank (or tanks) and the tank room.
  • Fig. 5 is a schematic illustration from above of an embodiment in which the gas tank 101 (or gas tanks, if there are two or more) is completely enclosed inside the tank room 106.
  • the airlock 301 at the access to the tank room 106 ensures that there is no need to classify the surrounding tank hold 102 as a gas-hazardous area.
  • the common support base 302, if one is used, can be arranged to support the weight of both the tank (or tanks) and the tank room 106, although it naturally supports the weight of the tank 106 only indirectly through the structures of the tank room 106.
  • FIG. 6 is a schematic illustration from above of an embodiment in which there is an access to the tank hold 102 through a door 601 , but the passage from the tank room 106 through the airlock 301 leads to some other, at least partly closed space onboard the vessel. This other space is assumedly not the open deck, because if the access to and from the tank room would be directly from open deck, there would be no need for any airlock according to the Lloyd regulations at least in the form they have at the time of writing this description.
  • an engine-specific fuel input subsystem of a gas-fuelled diesel engine is sometimes referred to as the GVU, or Gas Valve Unit. It comprises typically at least a manual cutoff valve, a pressure regulation valve, a gas filter, and the block and bleed valves needed to enable safely and reliably isolating and emptying the gas pipelines upstream of the engine for example in the case of maintenance or overhaul of the engine.
  • the invention does not in any way limit the number of gas tanks that are included in the system. If there are two or more gas tanks, there can be two or more tank rooms respectively; in that case each tank room should be equipped with an airlock of its own, or there should be an access to a first tank room through an airlock, and access to the other tank rooms only through said first tank room.
  • a common support base or other means for integrating the tank(s) and the tank room together are no necessary parts of the invention. All parts of the descrip- tion that are related to liquefied gas can be generalized to also cover com- pressed gas, with the natural consequence that evaporators are replaced with pressure reducing valves.

Abstract

A fuel storage and delivery system for a gas-fuelled sea-going vessel comprises an evaporator for vaporizing liquid gas. A tank room constitutes a gas-tight enclosure, in which said evaporator is located. An airlock constitutes an access to said tank room.

Description

Novel arrangement of access to LNG fuel storage compartment
TECHNICAL FIELD
The invention concerns in general the structural solutions of sea-going vessels that use gaseous fuel in at least one of their own engines. Especially the invention concerns the structural solutions with which the proper division into hazard zones of different classification is ensured.
BACKGROUND OF THE INVENTION
Natural gas, or in general mixtures of hydrocarbons that are volatile enough to make the mixture appear in gaseous form in room temperature, constitutes an advantageous alternative to fuel oil as the fuel of internal combustion engines. In sea-going vessels that use natural gas as fuel, the natural gas is typically stored onboard in liquid form, giving rise to the commonly used acronym LNG (Liquefied Natural Gas). Natural gas can be kept in liquid form by maintaining its temperature below a boiling point, which is approximately -162 degrees centigrade (-260 degrees Fahrenheit). Natural gas can be also stored for use as fuel by keeping it compressed to a sufficiently high pressure, in which case the acronym CNG (Compressed Natural Gas) is used. This description refers mainly to LNG because liquefying is considered more economical than com- pressing at the time of writing this text.
Classification societies maintain and publish regulations and guidelines that place certain requirements to the structure and operation of gas-fuelled vessels. As a prominent example the classification regulations of Germanischer Lloyd Aktiengesellschaft comprises a volume VI, Part 3 (Machinery Installa- tions), Chapter 1 : Guidelines for the Use of Gas as Fuel for Ships, published in 2010. Among others, it defines three classes of hazardous areas in the following way:
- zone 0: an area in which an explosive gas atmosphere or a flammable gas with a flash point below 60 °C is present continuously or is present for long periods
- zone 1 : an area in which an explosive gas atmosphere or a flammable gas with a flash point below 60 °C is likely to occur in normal operation - zone 2: an area in which an explosive gas atmosphere or a flammable gas with a flash point below 60 °C is not likely to occur in normal operation and, if it does occur, is likely to do so only infrequently and will exist for a short period only. Anything beyond zone 2 is considered a safe zone from the viewpoint of gas- originated hazards (fire, explosion, poisoning, suffocation). The regulations mentioned above are referred to in the following as the Lloyd regulations.
Fig. 1 is a simplified illustration of the storage and use of gas as fuel onboard a sea-going vessel. LNG is stored in a double-walled tank 101 , which is located in a tank hold 102. An evaporator 103 is used to vaporize the gas, after which it is delivered to the engine 104 through a gas pipeline 105. The evaporator 103 and other process equipment are located inside an enclosure known as the tank room 106, which in this case directly adjoins the tank 101 so that the outer wall of the tank 101 and the walls of the tank room 106 constitute a sin- gle, integral, gastight entity. From the tank room 106 to the engine 104 the gas pipeline 105 goes inside an outer shell 107, the inside of which is constantly ventilated to open air (not shown). One or more bulkheads 108 separate the tank hold 102 from the engine room 109, in which the engine 104 is located. The tank 101 and the tank room 106 with all the equipment inside it can be de- livered to a shipyard as an integral, separately assembled package such as the solutions marketed under the trade mark LNGpac by Wartsila Corporation, Helsinki, Finland.
Figs. 2a and 2b show schematically how some of the spaces illustrated in fig. 1 belong to the zones defined by the Lloyd regulations. The inside of the tank 101 belongs undoubtedly to zone 0. The inside of the tank room 106 belongs to zone 1 . However, whether or not the tank hold 102 belongs to zone 2 depends on whether the access hatch or door 201 to the tank room 106 is open. In fig. 2a it is closed, so the tank hold 102 counts as a safe zone. However, if the access hatch or door 201 to the tank room 106 is open, as in fig. 2b, the tank hold 102 belongs to zone 2.
The tank room needs to be accessed every now and then, so the shipbuilder must prepare for the situation of 2b, and build the tank hold 102 so that it conforms with zone 2 regulations. This means, among others, choosing only ATEX-certified electrical devices for installation and use in the tank hold 102. ATEX means the directive 94/9/EC for apparatus intended for use in explosive environments, and is an example of an applicable safety regulation. Other corresponding regulations exist outside Europe. Another consequence of the tank hold belonging to zone 2 is the mandatory use of an airlock 202 at its entrance. Classification requirements could also require that all electric equipment in the tank hold must be de-energized in the case of a ventilation failure, but that will lead to a contradiction with other regulations; for example (electric) emergency lighting must be available for operation at any times.
The tank hold may be large, and it may comprise a large number of electric in- stallations. Electric apparatus certified for explosive environments are expensive, which may mean a significant additional cost to the shipbuilder. If a previously oil-fuelled ship is converted to use gaseous fuel, and some existing space onboard is rebuilt as a tank hold, the requirement for conformity with ATEX and Lloyd regulations may necessitate scrapping large numbers of oth- erwise completely usable previous installations.
SUMMARY OF THE INVENTION
The following presents a simplified summary in order to provide a basic understanding of some aspects of various invention embodiments. The summary is not an extensive overview of the invention. It is neither intended to identify key or critical elements of the invention nor to delineate the scope of the invention. The following summary merely presents some concepts of the invention in a simplified form as a prelude to a more detailed description of exemplifying embodiments of the invention.
According to an aspect of the invention there is provided a fuel storage and de- livery system for a gas-fuelled sea-going vessel, which fuel storage and delivery system enables using cost-effective solutions in the construction of the vessel. According to another aspect of the invention there is provided a fuel storage and delivery system of the described kind that can be easily used in retrofitting projects. According to an additional aspect of the invention there is provided a fuel storage and delivery system that can be separately assembled and delivered to a shipyard to that its inclusion to a ship under construction is fast and easy.
Advantageous objectives of the invention are achieved by placing an airlock at the access hatch or door of the tank room. A fuel storage and delivery system for a gas-fuelled sea-going vessel according to the invention is characterized by the features recited in the characterising part of the independent claim directed to a fuel storage and delivery system. An airlock at the entrance to the tank room, together with the proper ventilation of the tank room, ensures that not even the characteristics of zone 2 need to be fulfilled by the tank hold. This means that the tank hold can be equipped with electric devices that do not need to be certified for explosive environments. It also makes it simpler for members of the crew to access other places in the tank hold than the tank room, because they do not need to go through an airlock every time. An integrated fuel storage and delivery system with an airlock at the entrance to the tank room is very advantageous in retrofit projects where a space that was previously used for something else is converted into a tank hold as a part of making a previously oil-fuelled vessel utilize gase- ous fuel, because it places very few additional requirements to such a space.
The exemplary embodiments of the invention presented in this patent application are not to be interpreted to pose limitations to the applicability of the appended claims. The verb "to comprise" is used in this patent application as an open limitation that does not exclude the existence of also unrecited features. The features recited in depending claims are mutually freely combinable unless otherwise explicitly stated.
The novel features which are considered as characteristic of the invention are set forth in particular in the appended claims. The invention itself, however, both as to its construction and its method of operation, together with additional objects and advantages thereof, will be best understood from the following description of specific embodiments when read in connection with the accompanying drawings.
BRIEF DESCRIPTION OF DRAWINGS
Fig. 1 illustrates a prior art fuel storage and delivery system,
fig. 2a illustrates a division into zones of a prior art fuel storage and delivery system,
fig. 2b illustrates a different division into zones of the system of fig. 2a, fig. 3 illustrates a division into zones of a fuel storage and delivery system according to an embodiment of the invention, fig. 4 illustrates a division into zones of a fuel storage and delivery system according to another embodiment of the invention,
fig. 5 illustrates a division into zones of a fuel storage and delivery system according to another embodiment of the invention, and
fig. 6 illustrates a division into zones of a fuel storage and delivery system according to another embodiment of the invention.
DETAILED DESCRIPTION OF EMBODIMENTS OF THE INVENTION
According to the Lloyd regulations a tank room means a gas-tight space surrounding the parts of the bunker tank containing all tank connections and all tank valves. For the purposes of the present invention we may present a slightly different definition, according to which the tank room is the gastight enclosure in which there is located the evaporator that is used to vaporize liquid gas for delivery to at least one gas-fuelled engine of a sea-going vessel. If compressed gas is used instead of liquefied gas, the role of an evaporator is taken by a pressure reducing valve. As a consequence of the definition the inside of a tank room belongs to zone 1 in the classification of gas-hazardous zones.
Fig. 3 is a schematic illustration from above of parts of a fuel storage and delivery system for a gas-fuelled sea-going vessel. It comprises a tank room 106, so - although not separately shown - in accordance with the definition above there is an evaporator for vaporizing liquid gas or pressure reducing valve for reducing the pressure of compressed gas located in the tank room 106. The gas to be evaporated or the pressure of which is to be reduced comes from a gas tank 101 . An airlock 301 constitutes the sole access to the tank room 106. As a consequence the tank hold 102, which is the at least mostly closed space in which the tank 101 and the tank room 106 are located, does not become a zone 2 gas-hazardous area at any times, so it can be constructed and equipped following normal standards instead of those that concern explosive areas.
The process of building a ship at a shipyard, or a process of converting a pre- viously oil-fuelled vessel into at least partial operation with gaseous fuel, can be made faster and more straightforward by assembling parts of the fuel storage and delivery system separately and bringing them as a more or less completed structural module into place in the ship to be built or converted. For this purpose the gas tank (or gas tanks, of there are two or more) can be integrat- ed into a common mechanical entity with the tank room. In the embodiment shown in fig. 3 this has been accomplished by welding the edges of walls of the tank room 106 to an outer wall of the tank 101 . In other words, an outer wall of the tank (or tanks) and walls of the tank room together delimit a single, integral, gastight entity. A common support base 302, ends of which are seen to protrude from under the tank 101 and the airlock 301 , is arranged to support the weight of the tank (or tanks) and the tank room and to form the mechanical installation interface of the tank (or tanks) and the tank room to the tank hold 102. Fig. 4 is a schematic illustration from above of an embodiment in which the tank 101 and the tank room 106 do not constitute a single mechanical entity. The tank room 106 and the tank 101 (or tanks, if there are two or more) are delimited as separate entities by walls of the tank room and an outer wall of the tank or tanks. Double-walled piping 401 connects the tank 106 (or tanks) to the tank room 106. The requirement of a second barrier could be fulfilled also by enclosing two or more single-walled pipes inside a common gastight outer cover. The fixed, gastight lead-ins of the double-walled piping 401 to the tank room 106 do not count as accesses, so the sole access to the tank room 106 is again through the airlock 301 . Even if the walls of the tank room 106 and the tank 101 are separate from each other, the tank 101 can be integrated into a common mechanical entity as a whole with the tank room for example by using a common support base 302 that is arranged to support the weight of the tank (or tanks) and the tank room.
Fig. 5 is a schematic illustration from above of an embodiment in which the gas tank 101 (or gas tanks, if there are two or more) is completely enclosed inside the tank room 106. Again the airlock 301 at the access to the tank room 106 ensures that there is no need to classify the surrounding tank hold 102 as a gas-hazardous area. Also in this case the common support base 302, if one is used, can be arranged to support the weight of both the tank (or tanks) and the tank room 106, although it naturally supports the weight of the tank 106 only indirectly through the structures of the tank room 106.
The invention does not require that the airlock at the access to the tank room provides a passage between the tank room and the surrounding tank hold; the access to the tank room can be from some other space. Fig. 6 is a schematic illustration from above of an embodiment in which there is an access to the tank hold 102 through a door 601 , but the passage from the tank room 106 through the airlock 301 leads to some other, at least partly closed space onboard the vessel. This other space is assumedly not the open deck, because if the access to and from the tank room would be directly from open deck, there would be no need for any airlock according to the Lloyd regulations at least in the form they have at the time of writing this description.
According to one embodiment of the invention, not only the tank valves and evaporators but even the engine-specific fuel input subsystem(s) are located inside the tank room. An engine-specific fuel input subsystem of a gas-fuelled diesel engine is sometimes referred to as the GVU, or Gas Valve Unit. It comprises typically at least a manual cutoff valve, a pressure regulation valve, a gas filter, and the block and bleed valves needed to enable safely and reliably isolating and emptying the gas pipelines upstream of the engine for example in the case of maintenance or overhaul of the engine. In conventional configura- tions it has been customary to place the GVU close to the engine in the engine room, which - together with the classification requirements about double barriers around gas piping - has necessitated building a particular, gastight enclosure around each GVU. If, however, the GVU(s) is/are located inside the tank room, which by definition constitutes a gastight enclosure, no separate GVU enclosure(s) is/are needed. This may necessitate making the tank room slightly larger than in prior art solutions, but that in turn may have the advantageous side effect of making it easier to equip the tank room with an airlock-equipped access.
Variations and modifications to the embodiments illustrated above are possible without departing from the scope of protection of the appended claims. For example even if the illustrated embodiments all have only one gas tank for the sake of graphical simplicity, the invention does not in any way limit the number of gas tanks that are included in the system. If there are two or more gas tanks, there can be two or more tank rooms respectively; in that case each tank room should be equipped with an airlock of its own, or there should be an access to a first tank room through an airlock, and access to the other tank rooms only through said first tank room. Although advantageous, the use of a common support base or other means for integrating the tank(s) and the tank room together are no necessary parts of the invention. All parts of the descrip- tion that are related to liquefied gas can be generalized to also cover com- pressed gas, with the natural consequence that evaporators are replaced with pressure reducing valves.
Even if some classification regulations would not allow the airlock at the access to the tank room to lift all binding (and potentially highly cost-incurring) regulations concerning electric equipment in the tank room, the provision of an airlock as explained above will in any case add a buffering step in the chain of decreasingly gas-hazardous spaces including the tank room, the tank hold, and the cargo room. The smaller the space in which strict regulations apply concerning explosion-proof equipment, the less additional costs will be in- curred.

Claims

Claims
1 . A fuel storage and delivery system for a gas-fuelled sea-going vessel, comprising:
- a tank room that constitutes a gastight space enclosing tank connections and valves associated with them, and
- an airlock that constitutes an access to said tank room.
2. A fuel storage and delivery system according to claim 1 , comprising one or more gas tanks for storing liquefied gas fuel, said gas tank or tanks being integrated into a common mechanical entity with said tank room.
3. A fuel storage and delivery system according to claim 2, wherein an outer wall of the tank or tanks and walls of the tank room together delimit a single, integral, gastight entity.
4. A fuel storage and delivery system according to claim 2, wherein said gas tank or tanks are completely enclosed inside said tank room.
5. A fuel storage and delivery system according to claim 1 or 2, wherein:
- said tank room and said tank or tanks are delimited as separate entities by walls of the tank room and an outer wall of the tank or tanks, and
- double-walled piping connects said tank or tanks to said tank room.
6. A fuel storage and delivery system according to any of the preceding claims, comprising a common support base arranged to support the weight of said tank or tanks and said tank room.
PCT/FI2013/050910 2013-09-20 2013-09-20 Novel arrangement of access to lng fuel storage compartment WO2015040268A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/FI2013/050910 WO2015040268A1 (en) 2013-09-20 2013-09-20 Novel arrangement of access to lng fuel storage compartment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/FI2013/050910 WO2015040268A1 (en) 2013-09-20 2013-09-20 Novel arrangement of access to lng fuel storage compartment

Publications (1)

Publication Number Publication Date
WO2015040268A1 true WO2015040268A1 (en) 2015-03-26

Family

ID=49448196

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI2013/050910 WO2015040268A1 (en) 2013-09-20 2013-09-20 Novel arrangement of access to lng fuel storage compartment

Country Status (1)

Country Link
WO (1) WO2015040268A1 (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016192809A1 (en) * 2015-06-05 2016-12-08 Gva Consultants Ab Lg module and a marine vessel comprising a lg module
EP3213988A1 (en) * 2016-03-02 2017-09-06 BV Scheepswerf Damen Gorinchem Ship with gas fueled engine
WO2018150904A1 (en) * 2017-02-17 2018-08-23 三井E&S造船株式会社 Traffic route formation structure for liquefied gas fuel ship
FR3070673A1 (en) * 2017-09-07 2019-03-08 Gaztransport Et Technigaz FLOATING WORK COMPRISING A TANK CAPABLE OF CONTAINING LIQUEFIED COMBUSTIBLE GAS
IT201700122714A1 (en) * 2017-10-27 2019-04-27 Gas And Heat S P A SHIP WITH IMPROVED CRYOGENIC TANK
WO2019185968A1 (en) * 2018-03-26 2019-10-03 Wärtsilä Finland Oy A fuel tank arrangement in a marine vessel and a method of switching between inert and air atmosphere in a tank connection space of an lng-fuel tank
CN110371244A (en) * 2019-07-31 2019-10-25 广船国际有限公司 A kind of bypassing method of tanker danger zone
WO2020052730A1 (en) * 2018-09-11 2020-03-19 Wärtsilä Finland Oy A fuel tank arrangement for a gas fuelled marine vessel
WO2020188194A1 (en) * 2019-03-21 2020-09-24 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Device and method for storing and for supplying fluid fuel
CN113574308A (en) * 2019-03-14 2021-10-29 瓦锡兰芬兰有限公司 Fuel tank arrangement in a marine vessel and method of releasing hydrogen from a liquid hydrogen fuel tank arrangement
EP4219282A1 (en) * 2022-01-27 2023-08-02 HB Hunte Engineering GmbH Fuel gas supply system, in particular based on liquid gas, for a ship with at least one gas-operated consumer and ship with the same
CN117799758A (en) * 2024-02-29 2024-04-02 中海油能源发展股份有限公司采油服务分公司 Working cabin for floating production oil storage ship
FR3141228A1 (en) * 2022-10-25 2024-04-26 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Cryogenic fluid storage device
CN117799758B (en) * 2024-02-29 2024-05-10 中海油能源发展股份有限公司采油服务分公司 Working cabin for floating production oil storage ship

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"Guidelines for the Use of Gas as Fuel for Ships", vol. VI, 2010, article "Machinery Installa- tions"
DET NORSKE VERITAS: "RULES FOR CLASSIFICATION OF SHIPS / HIGH SPEED, LIGHT CRAFT AND NAVAL SURFACE CRAFT GAS FUELLED ENGINE INSTALLATIONS", 30 January 2011 (2011-01-30), pages 1 - 33, XP055121501, Retrieved from the Internet <URL:https://exchange.dnv.com/publishing/rulesship/2011-01/ts613.pdf> [retrieved on 20140604] *

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO20172034A1 (en) * 2015-06-05 2017-12-22 Gva Consultants Ab LG module and a marine vessel comprising a LG module
WO2016192809A1 (en) * 2015-06-05 2016-12-08 Gva Consultants Ab Lg module and a marine vessel comprising a lg module
NO343737B1 (en) * 2015-06-05 2019-05-27 Gva Consultants Ab LG module and a marine vessel comprising a LG module
EP3213988A1 (en) * 2016-03-02 2017-09-06 BV Scheepswerf Damen Gorinchem Ship with gas fueled engine
WO2018150904A1 (en) * 2017-02-17 2018-08-23 三井E&S造船株式会社 Traffic route formation structure for liquefied gas fuel ship
CN110121461A (en) * 2017-02-17 2019-08-13 三井易艾斯造船有限公司 The traffic route of liquefied gas as fuel ship forms structure
CN110121461B (en) * 2017-02-17 2021-11-30 三井易艾斯造船有限公司 Traffic route forming structure of liquefied gas fuel carrier
CN111212780A (en) * 2017-09-07 2020-05-29 气体运输技术公司 Floating structure comprising a tank suitable for containing a liquefied combustible gas
FR3070673A1 (en) * 2017-09-07 2019-03-08 Gaztransport Et Technigaz FLOATING WORK COMPRISING A TANK CAPABLE OF CONTAINING LIQUEFIED COMBUSTIBLE GAS
WO2019048788A1 (en) * 2017-09-07 2019-03-14 Gaztransport Et Technigaz Floating structure comprising a tank suitable for containing liquefied combustible gas
RU2759454C2 (en) * 2017-09-07 2021-11-15 Газтранспорт Эт Технигаз Floating structure containing a tank suitable for storage of liquefied combustible gas
IT201700122714A1 (en) * 2017-10-27 2019-04-27 Gas And Heat S P A SHIP WITH IMPROVED CRYOGENIC TANK
WO2019185968A1 (en) * 2018-03-26 2019-10-03 Wärtsilä Finland Oy A fuel tank arrangement in a marine vessel and a method of switching between inert and air atmosphere in a tank connection space of an lng-fuel tank
WO2020052730A1 (en) * 2018-09-11 2020-03-19 Wärtsilä Finland Oy A fuel tank arrangement for a gas fuelled marine vessel
CN113574308A (en) * 2019-03-14 2021-10-29 瓦锡兰芬兰有限公司 Fuel tank arrangement in a marine vessel and method of releasing hydrogen from a liquid hydrogen fuel tank arrangement
WO2020188193A1 (en) * 2019-03-21 2020-09-24 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Device and method for storing and supplying fluid fuel
FR3094070A1 (en) * 2019-03-21 2020-09-25 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude A device and method for storing and supplying fluid fuel.
CN113614443A (en) * 2019-03-21 2021-11-05 乔治洛德方法研究和开发液化空气有限公司 Device and method for storing and supplying fluid fuel
WO2020188194A1 (en) * 2019-03-21 2020-09-24 L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Device and method for storing and for supplying fluid fuel
CN113614443B (en) * 2019-03-21 2023-09-22 乔治洛德方法研究和开发液化空气有限公司 Device and method for storing and supplying fluid fuel
US11920737B2 (en) 2019-03-21 2024-03-05 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Device and method for storing and for supplying fluid fuel
CN110371244B (en) * 2019-07-31 2021-08-03 广船国际有限公司 Method for avoiding dangerous area of liquid cargo ship
CN110371244A (en) * 2019-07-31 2019-10-25 广船国际有限公司 A kind of bypassing method of tanker danger zone
EP4219282A1 (en) * 2022-01-27 2023-08-02 HB Hunte Engineering GmbH Fuel gas supply system, in particular based on liquid gas, for a ship with at least one gas-operated consumer and ship with the same
FR3141228A1 (en) * 2022-10-25 2024-04-26 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Cryogenic fluid storage device
EP4361492A1 (en) * 2022-10-25 2024-05-01 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Cryogenic fluid storage device
CN117799758A (en) * 2024-02-29 2024-04-02 中海油能源发展股份有限公司采油服务分公司 Working cabin for floating production oil storage ship
CN117799758B (en) * 2024-02-29 2024-05-10 中海油能源发展股份有限公司采油服务分公司 Working cabin for floating production oil storage ship

Similar Documents

Publication Publication Date Title
WO2015040268A1 (en) Novel arrangement of access to lng fuel storage compartment
KR101532895B1 (en) Lng tank
WO2015040267A1 (en) Integrated fuel storage system and gas valve unit
EP3938697B1 (en) A fuel tank arrangement in a marine vessel and a method of relieving hydrogen from a liquid hydrogen fuel tank arrangement
CN203161377U (en) Gas fuel supply system of marine power plant
KR20130114105A (en) Arrangement for connecting a pipe to a lng tank
KR102327407B1 (en) Fuel gas supply system of container ship
CN111356873B (en) Device for inerting a liquefied gas storage tank of a ship for transporting liquefied gas
EP3601871B1 (en) System for storing a gas in several tanks
Krzysiak et al. Analysis of tank safety with propane-butane on LPG distribution station
KR20200077837A (en) Arrangement of lfs system on container ship
AU2014255682B2 (en) Storage tank for liquefied flammable gases
CN112673205B (en) Fuel tank device for gas-fueled ship
RU2678159C2 (en) Storage tank for liquefied flammable gases
Theotokatos et al. Design of LNG storage and feeding system for an open type ferry
Ou et al. A discussion of the using of pressure relief devices for on-board high-pressure hydrogen storage tanks
Karlsson et al. Enabling the safe storage of gas onboard ships with the Wärtsilä LNGPac
Dimitrellou et al. Retrofit of Ro-Ro Passenger Ferry to Operate on LNG Fuel: A Greener and Safe Solution for Short Sea Transportation
KR102327406B1 (en) Fuel gas supply system of container ship
WO2023274559A1 (en) Arrangement and method in liquid hydrogen fuel supply system
EP4219282A1 (en) Fuel gas supply system, in particular based on liquid gas, for a ship with at least one gas-operated consumer and ship with the same
WO2023172675A1 (en) Inerting tank system
WO2015105344A1 (en) Fuel gas supply apparatus
Sitinjak Concept for a LNG Gas Handling System for a Dual Fuel Engine
Forsythe et al. Background on Facilities Modification for Natural Gas Fueled Bus Use

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13779898

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13779898

Country of ref document: EP

Kind code of ref document: A1