WO2014204101A1 - 조력 발전장치의 시공방법 - Google Patents
조력 발전장치의 시공방법 Download PDFInfo
- Publication number
- WO2014204101A1 WO2014204101A1 PCT/KR2014/004520 KR2014004520W WO2014204101A1 WO 2014204101 A1 WO2014204101 A1 WO 2014204101A1 KR 2014004520 W KR2014004520 W KR 2014004520W WO 2014204101 A1 WO2014204101 A1 WO 2014204101A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- waterway
- water
- power generation
- tunnel
- tidal power
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
- E02B9/08—Tide or wave power plants
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/30—Energy from the sea, e.g. using wave energy or salinity gradient
Definitions
- the present invention relates to a construction method of tidal power generation device, and more specifically, as a beam-type dam, the tunnel from the base to the waterway is installed with reinforced concrete and stepped if necessary to adjust the size of the water gate to be convenient to use. It relates to a construction method of tidal power generators to enable.
- Common power generation methods include hydro, thermal and nuclear.
- tidal power generation has been made by making an embedded dam with a waterway that can generate water at the entrance to the lake.
- Such a conventional landfill dam has a wider width as the water gets deeper to be filled with soil, which inevitably increases the length of the tunnel, which requires a lot of construction costs, and it is impossible to install enough tunnel channels so that water can be filled in the dam at high tide.
- the water level in the dam is lower than the height of the seawater, which causes water to dry up where the tidal flat is exposed.
- the construction method of the tidal power generation device has no problem in constructing the tidal power generation device by blocking the beam-type dam in the shallow or deep water, but it is difficult to manage because the height of the floodgate is too high even in the deep or deep water. There was this.
- the water gate of the conventional tidal power dam is lifted by an elevator to open and close the water gate, and in the case of a three-stage beam type tunnel channel instead of a cascade, for example, a water gate 20 m wide x 30 m to 40 m high or more is lifted. It was very hard to open and close.
- the present invention has been made to solve the above-described problems, the one-shaped dam in the sea with tidal wave difference or install a tunnel-type waterway by reinforced concrete, and install the water gate in the tunnel-type waterway
- the purpose of this study is to provide a construction method of tidal power generation system that can be installed to manage the height of the gate by dividing it into steps that are difficult to manage.
- a rotary shaft capable of sufficiently supporting the weight and water pressure of the gate is installed at the upper and lower middle of the channel width 20m, and fixed bearings are installed on both the upper and lower ends of the rotary shaft to support the bottom of the channel and the ceiling of the channel.
- the purpose of the present invention is to provide a construction method of the tidal power generation device that can be easily opened and closed by rotating a water gate of 90 meters horizontally by 90 degrees by fixing it.
- the existing landfill tunnel can be changed to a beam-type tunnel to reduce the installation cost of the channel as much as possible.
- the water is deep or the ground is weak, it is difficult to calculate the structure when digging the ground and installing the tunnel. If you cut it to a no length and build it up in a cascade, you can complete several tunnels on one foundation, reducing the construction cost of the foundation length and making the waterway cross section more than three times wider (in case of three stages) to prevent any damage and normal flow.
- the purpose of the present invention is to provide a method of constructing an tidal power generator that also enables power generation.
- an object of the present invention is to provide a construction method of tidal power generation apparatus to reduce the damage to the environment or fishermen by increasing the waterway and the floodgate area, and to increase the power production through bidirectional power generation.
- the water wheel is installed in any one or more of the waterways formed in the beam-type dam built on the reinforced concrete foundation, and the generator is connected to the water wheel to produce electricity.
- the tidal power generator In the construction method of the tidal power generator;
- the remaining waterway except the waterway in which the aberration is installed is formed in multiple stages with reinforced concrete, and is formed in a stepped manner so as to retreat from the bottom to the upper side, and installs a water gate for opening and closing the waterway to fit the stepped waterway. .
- the stepped waterway is characterized in that the one-way waterway formed by a plurality of intercession horizontally installed at a predetermined height interval, and a bogie vertically erected to support the intermediary.
- the stepped waterway is characterized in that the mime ( ⁇ ) shaped tunnel-type waterway formed by a beam-type tunnel type by reinforced concrete.
- the dam is formed of reinforced concrete walls in order to confine water to the upper portion of the one-shaped channel 21 or the sound-shaped tunnel type channel.
- the construction method of the tidal power generation apparatus after clogging with a steel structure in the sea with the difference between the tidal tide to any one or more of the channels formed in the beam-type dam erected on the reinforced concrete foundation Install aberration, and connect the generator to the aberration to produce electricity;
- the rotating shaft When not installing the waterway and the water gate for opening and closing the waterway in multiple stages, the rotating shaft is installed in the upper and lower middle widths of the left and right widths of the water gate, and the bearings are mounted so as to rotate on both upper and lower ends of the rotating shaft to fix the waterway to the bottom and the ceiling of the waterway. It is characterized in that the water gate is opened and closed by the horizontal rotation by 90 degrees.
- the general type of dams are blocked in the sea with tidal wave, and the tunnel type waterway is installed by reinforced concrete, and the waterway is installed in the tunnel waterway, but the size of the waterway is too large to manage. Difficult areas can be divided by cascading tunnels and water gates, which can easily manage the height of flood gates even in large or deep areas.
- the installation of a large number of auxiliary gates can quickly drain or fill the remaining water after the end of the power generation can be bi-directional power generation and produce more electricity.
- the length of the beam tunnel can be shortened, the construction cost is greatly reduced, and the structure can be calculated and installed firmly.
- the beam-type tunnel can be installed at a low cost due to the low cost of installation.
- the basement can be installed from the basement of the basement to the basement. Since it is the same as the natural state, all damage can be prevented, and normal upstream development can be performed, which can solve all the causes of damage caused by insufficient channel area.
- FIG. 1 is a schematic front view of the tidal power generation apparatus according to an embodiment of the present invention.
- FIG. 2 is an internal plan view of the power generation chamber shown in FIG. 1.
- FIG 3 is a schematic front view of a dam excluding a power generation chamber in an tidal power generator according to another embodiment of the present invention.
- FIG. 4 is a side view of FIG. 3.
- FIG. 5 is a perspective view showing a channel of the tidal power generation apparatus according to another embodiment of the present invention.
- FIG. 6 is a view showing the installation state of the channel and the water gate of the tidal power generation apparatus according to another embodiment of the present invention.
- FIG. 1 is a schematic front view of a tidal power generation apparatus according to an embodiment of the present invention
- Figure 2 is an internal plan view of the power generation chamber shown in FIG.
- the tidal power generation apparatus can be installed in a region where the drop is not large or shallow depth, pier (11), bridge (12), boulder (17), It is comprised including the water channel 21, the water gate 14, the wire 16, the crane 15, the crane installation beam 13, and the power generation room 20.
- a tent is made of steel structures in the sea with the difference between tides. Then, a foundation is formed on the bottom surface of the sea with reinforced concrete, and a predetermined interval in the transverse direction (in the direction perpendicular to the flow direction of the water) is seen on the top thereof.
- the bridge 11 is formed to protrude vertically, and the bridge 12 is installed on the upper portion of the bridge 11 so that a vehicle or a person can carry it.
- a plurality of bollards 17 are installed between the piers 11 to form a channel 21 at a lower height than the piers, and form sidewalls of the channel, which flows in front of or behind the channel 21.
- the water gate 14 is installed to control the water.
- a crane mounting beam 13 is installed in a horizontal direction between the upper portion of the bore 17 and the lower portion of the bridge 12 so as to connect a neighboring piers 11, and the crane mounting beam 13 has the water gate ( A crane 15 for elevating 14 is provided.
- the crane 15 and the sluice 14 are connected to the wire 16 so that the sluice 14 is raised or lowered by the operation of the crane 15 so that the waterway 21 is opened or closed.
- At least one of the bridges 11 is provided with a power generation chamber 20 to generate power by assistance.
- a crane mounting beam 13 is installed in a horizontal direction to connect a neighboring piers 11 to the upper portion of the power generation chamber 20, and the water gate 22 of the power generation chamber 20 is installed in the crane mounting beam 13.
- the elevating crane 15 is installed.
- a plurality of waterways 21 are formed in the power generation chamber 20 in the longitudinal direction, and a water gate 22 is installed in front of or behind the waterways 21 to control water flowing in the waterways 21.
- each of the waterways 21 is provided with an aberration 24 that rotates according to the direction of water flowing in the waterway, and one side of the aberration 24 is provided with a generator 25 which is connected to the rotary shaft of the aberration to generate electricity.
- the power generation chamber 20 is installed inside the dam 100, and the water is discharged between the walls of the power generation chamber 20 and the bridge 11 by reinforced concrete. Allow it to pass.
- the dam-type of the beam type is installed to open all of the sluice gates 14 and 22 during high tide by using the difference between tides, and close the sluice gates 14 and 22 when the dam is filled with water.
- the water gate 22 of the water wheel 24 is opened, for example, 70% of the power is generated, and 30% of the remaining water opens the water gates (14, 22) to remove all the water.
- FIG. 3 is a schematic front view of a dam excluding a power generation chamber in the tidal power generator according to another embodiment of the present invention
- FIG. 4 is a side view of FIG. 3.
- the tidal power generation apparatus may be installed even in a large or deep water.
- the stepped water channel 19 and the sluice 14 may be installed. Shows.
- the foundation is formed on the bottom surface of the sea, etc., not shown, and the pier 11 is formed to protrude vertically at a predetermined interval in the transverse direction (in the direction perpendicular to the flow direction of the water) as shown in the drawing.
- the bridge 12 is provided in the upper part of 11 so that a vehicle or a person can carry it.
- a plurality of jungbo 18 is installed in the horizontal direction at regular height intervals so as to connect the adjacent piers 11 with each other, the piers 11 partitioned up and down by the intermediary 18
- a plurality of bollards 17 are installed vertically to form sidewalls of the waterway 19, and a stepped one-shaped waterway 19 is formed by the intermediary 18 and the bore 17.
- the boulder 17 and the intermediary 18 is installed retreating from the bottom to the upper portion, and accordingly, the water gate 14 for adjusting the water flowing in the waterway 19 is also installed retreating from the lower portion to the upper portion.
- a crane mounting beam 13 is installed in a horizontal direction between the upper beams 18 and the lower portion of the bridge 12 so as to connect neighboring piers 11, and the crane mounting beam 13 has the water gate 14.
- the crane 15 which raises and lowers) is installed.
- the crane 15 and the sluice 14 are each connected by a wire 16 so that the sluice 14 is raised or lowered by the operation of the crane 15 so that the waterway 19 is opened or closed.
- any one or more between the adjacent piers 11 is installed in the power generation chamber is provided with a water channel, aberration, generator so as to generate power by the help.
- FIG. 3 the opening and closing of the water gate 14 using the crane 15 and the wire 16 have been described as an example. However, this is just one example, and the present invention can be opened and closed in the most convenient way. It is not limited.
- a rotating shaft is installed in the upper and lower middle widths of the sluice, and fixed bearings that support rotation at upper and lower ends of the rotating shaft are fixed to the bottom of the channel and the ceiling of the channel.
- bearings are installed at both the upper and lower ends of the rotating shaft of the gate to support the weight and water pressure of the gate, and the gate is built up inside the dam.
- the waterway 19 and the water gate 14 are installed in the deep water depth, and the horizontal intermediary 18 is stepped between the longitudinal bore 17 and the bore 17 in a stepwise manner.
- the water gate 14 suitably, the height of the water gate 14 is high, and it can make it easy to manage what is difficult to manage.
- the remaining water can be quickly drained or filled to the lowest level after the power generation is completed, thereby enabling normal bidirectional power generation and producing more electricity.
- FIG. 5 is a perspective view showing a channel of the tidal power generation apparatus according to another embodiment of the present invention.
- the tidal power generation apparatus may be installed in a large drop or a deep water, and shows a stepped mesmerizing tunnel type channel 19 and a sluice 14. .
- a plurality of waterways 19 are installed vertically and horizontally between the piers and the piers constituting the dam, which are not shown, and are installed in a stepwise manner to retreat from the bottom to the top.
- the water gate 14 to control the water flowing in the waterway 19 is also installed retreating from the lower portion to the upper portion.
- a power generation chamber provided with a water channel, aberrations, and a generator is installed in one or more of the neighboring piers constituting the dam so as to generate power by tidal power.
- the width of the water becomes wider in order to fill the soil with soil, so the tunnel length becomes long, and the tunnel type channel of the landfill type cannot be shortened, but the beam type tunnel channel of the present invention is suitable for structural calculation. As long as there is no abnormality, it can be made as short as possible to reduce the construction cost.
- the existing landfill dam construction method is changed to the beam type dam construction method, that is, when the water is deep or the ground is weak, when digging the ground and installing the underground channel type tunnel channel, Furnace width 20m x height 45m x length 70m Dividing one tunnel channel into lengths that are not abnormal by structural calculation (for example, cutting 27m, 23m, 20m each) One tunnel can be completed with 45m height x 27m length and the existing foundation length 70m is reduced to 27m and construction cost of 43m is reduced.
- the construction cost of the foundation length 140m is further reduced by not constructing the 2nd and 3rd foundations, and the channel section area is more than three times higher than the existing one, thus eliminating the channel passing through the landfill in the existing aberration channel, and the exterior wall of the power plant If a water gate is installed in the waterway, a sufficient waterway and water gate can be installed through the existing landfill and the water gate installation cost, which can reduce the cost of water works, prevent all damages, and allow for normal power generation.
- the above has been described, for example, by installing a bridge 11 and a bridge 12 to install a lane in the upper portion, but in some cases, the water gate is installed in a state where a tunnel-type waterway and a water gate are installed without installing a bridge and a bridge. It is also possible to install a crane beam that can be elevated.
- the waterway 19 can be cascaded to facilitate the management of the water gate 14.
- the water level is less than 3m after the development is completed, so the height of the water gate to drain off the remaining water and the area of the water gate can fill the water less cold, so the waterway to the waterway to the height of the remaining water and the basement of the basement below the lowest water level Install it.
- the foundation works and the waterway and water gates are installed in the basement.
- the area of the water gate can be expanded to the basement, so that water can be drained and filled quickly after the power generation is completed.
- FIG. 6 is a view showing the installation of the waterway and the water gate of the tidal power generation apparatus according to another embodiment of the present invention, in order to maximize the area of the waterway to excavate the soil in the shallow basement near the lowest water surface and on the base Indicates the installation of waterways and floodgates underground.
- the existing waterway and the hydrologic structure are installed at a lower portion of 7m or more, and the waterway 120 is installed at the top of the foundation 110, and the reinforced concrete wall 150 is disposed at the top of the waterway to trap water in the dam. ) Is installed, and the tunnel wall 130 is installed with the waterway 120 interposed therebetween.
- the height of the foundation 110 is 2m or 3m
- the width of the tunnel wall 130 is also 2m or 3m
- the height of the waterway 120 is 20m, 30m, 40m
- the width of the waterway is 10m, 20m, in FIG.
- Reference numeral 140 denotes a tunnel top plate.
- the entrance of the huge lake is a bottleneck section, and the narrow ground is weak and deep, and the waterway and the floodgate are installed to the underground where the soil is dug up, thereby increasing the waterway and the floodgate area, causing damage to the environment or fishermen.
- the mime ( ⁇ ) -shaped tunnel channel (19) and the sluice (14) can be seen to be almost the same as the existing buried tunnel-type waterway, but the existing buried tunnel-type waterway to form a dam in order to trap water in the dam on the waterway. And because the tunnel can not be shortened the construction cost is high.
- the one-shaped waterway 21, the sluice 22, and the sine-shaped tunnel waterway and the sluice form a dam with reinforced concrete to trap water in the dam at the top of the waterway. It can be installed as short as possible for the calculation, which has the advantage of low construction cost.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
Abstract
본 발명은 조력 발전장치의 시공방법에 관한 것으로서, 더욱 상세하게는 보 형식의 댐으로서 기초에서부터 수로를 이루는 터널을 철근콘크리트로 설치하고 필요에 따라 계단식으로 설치하여 수문의 크기를 사용하기 편리하게 조정할 수 있게 하는 조력 발전장치의 시공방법에 관한 것이다. 본 발명의 실시예에 따른 조력 발전장치의 시공방법은 조수 간만의 차가 있는 바다에 철구조물로 가물막이를 한 후 철근콘크리트 기초에 세워진 보 형식 댐에 형성된 다수의 수로 중 어느 하나 이상의 수로에 수차를 설치하고, 상기 수차에 발전기를 연결하여 전기를 생산하는 조력 발전장치의 시공방법에 있어서; 상기 수차가 설치된 수로를 제외한 나머지 수로를 철근콘크리트로 다단으로 형성하되, 하부에서 상부로 갈수록 후퇴되게 계단식으로 형성하고, 상기 계단식 수로에 맞도록 수로를 개폐하는 수문을 후퇴되게 설치하는 것을 특징으로 한다.
Description
본 발명은 조력 발전장치의 시공방법에 관한 것으로서, 더욱 상세하게는 보 형식의 댐으로서 기초에서부터 수로를 이루는 터널을 철근콘크리트로 설치하고 필요에 따라 계단식으로 설치하여 수문의 크기를 사용하기 편리하도록 조정할 수 있게 하는 조력 발전장치의 시공방법에 관한 것이다.
일반적인 발전방법으로 수력 발전, 화력 발전, 원자력 발전 등을 들 수 있다.
화력 발전의 경우 발전설비를 가동시키기 위해 엄청난 양의 석유 또는 석탄에너지가 필수적으로 공급되어야 하므로 석유, 석탄자원이 고갈되고 있는 현시점에서는 많은 어려움이 예견되고 공해도 큰 문제가 되고 있으며, 원자력 발전의 경우 방사능 유출과 핵폐기물 처리가 심각한 문제점이다.
따라서 이러한 일반적인 발전방법보다 저렴하고 안전하고 획기적인 발전방법이 요구된다.
석유나 석탄자원이 필요 없고 방사능이나 핵폐기물 문제가 없는 발전방법으로는 태양열 발전, 파력 발전, 조력 발전, 풍력 발전 등 다양하며, 이중 가장 쉽게 적용할 수 있는 게 바로 바람의 힘을 이용한 풍력 발전과 조수간만의 차이에 따라 낙차의 힘을 이용한 조력 발전이다.
이중 조력 발전은 간조에서 만조로 갈수록 점차 해수면이 차오르게 되고, 이에 따라 조수가 연안 쪽으로 수평 이동하게 되는데, 이러한 조수의 유입방향 쪽에 댐을 막아 수차를 설치하여 수차가 조수의 낙차에 의해 회전되면 그 회전력에 의해 발전기를 구동하여 이로부터 전력을 생산하는 방식으로서, 지구와 달이 존재하는 한 항상 균일한 조수의 수평 이동이 이루어지게 되므로 조력발전에 대한 많은 연구가 이루어지고 있다.
즉, 바닷물이 호수로 들어가는 입구에 발전할 수 있는 수로를 놓은 매립형 댐을 만들어 조력 발전을 해왔다.
이와 같은 종래의 매립형 댐은 흙으로 매립하기 위하여 물이 깊어질수록 폭이 넓어지므로 터널길이가 길어질 수밖에 없어 공사비가 많이 소요되고, 터널수로를 충분히 설치할 수 없어 만조때 물을 댐 안에 가득 채우려 해도 수로가 짧아 바닷물 높이보다 댐 안의 물 높이가 낮으며, 이로 인해 갯벌이 드러난 곳은 물이 말라 황폐화된다.
또한, 수로와 수문이 적어 발전이 끝나고 물을 빼려고 해도 최저수면까지 완전히 뺄 수 없어 물이 남아있게 되고 이로 인해 갯벌이 묻혀 어민들의 생활터전을 잃게 되며, 4~5시간 동안 발전이 끝나고 1시간 내에 물을 가득 채운 후 다시 최저수면까지 완전히 뺄 수 없으므로 정상적인 복류발전을 못하게 되는 원인이 된다.
이와 같이 수로와 수문이 적어 여러 피해가 발생하고 전세계적으로 복류발전을 한다고 복류발전기만 설치하였을 뿐 정상적인 복류발전을 못하게 되며, 친환경에너지이며 자원이 풍부한 조력 발전이 활성화되지 못하였다.
한편, 국내 선행기술 공개특허 제10-2010-0004089호에는 바닷가나 강가에 인접한 육지에 일정한 폭과 깊이로 흙을 파내어 홈 부를 형성하는 제1공정과; 상기 홈 부에 횡 방향으로 복수의 수로가 형성되게 하고, 일정한 폭과 높이로 보를 형성하는 제2공정과; 상기 보로 둘러싼 육지에 일정한 깊이로 흙을 파내어 저수조를 형성하는 제3공정과; 상기 수로에 수차를 장착하는 제4공정과; 상기 수차와 연동되는 발전기를 장착하는 제5공정; 및 상기 보의 외부에 잔존하는 흙을 제거하여 물이 수로를 통하여 상기 저수조로 유입되게 하는 제6공정을 포함하는 조력 발전 장치의 시공 방법을 개시하고 있다.
이와 같은 방법에 의하여 필요한 장소에 대형이나 소형으로 장착할 수 있고. 조석 간만의 차이에 의하여 작업공정이 영향을 받지 않으며, 언제라도 간편하게 시공할 수 있으므로 제작원가를 절감할 수 있다.
그런데 이 조력 발전 장치의 시공 방법은 수심이 얕은 곳이나 깊은 곳에 보 형식의 댐을 막아 조력 발전 장치를 시공하는데 문제가 없으나, 조차가 크거나 수심이 깊은 지역은 수문 높이가 너무 높아 관리하기 어려운 문제점이 있었다.
또한, 종래 조력 발전 댐의 수문은 승강기로 들어올려 수문을 열고 닫는 방법으로, 계단식이 아닌 수직 3단의 보 형식 터널수로인 경우 예를 들어 폭 20m x 높이 30m~40m 이상인 1개의 수문을 들어올려 개폐하기가 매우 어려웠다.
또한, 광범위한 호수지역에서 병목 구간의 입구를 막을 경우 물의 소통이 잘 되지 않아서 댐 안의 물 높이보다 바다 쪽의 물 높이가 더 높게 되어 갯벌이 드러나서 황폐화되고, 물을 완전히 뺄 수 없어 물이 늘 차여 있으므로 갯벌이 묻히는 환경피해로 인해 어민들의 소득 감소와 같은 피해로 이어진다.
그리고 발전이 끝나고 남은 물을 최저 수면까지 완전히 빼고 가득 채울 수 있는 수로와 수문 단면적을 설치하려면 매립식 댐 건설방법으로는 물이 깊을수록 터널수로 길이가 길어질 수밖에 없어, 과다한 공사비 때문에 수로와 수문 단면적을 적게 설치하므로 갯벌 황폐화와 환경피해로 인한 어민피해 등 양방향 발전을 하기 어려운 문제점이 있었다.
본 발명은 상술한 문제점을 해결하기 위하여 안출된 것으로서, 조수 간만의 차가 있는 바다에 일(一)자형 형식의 댐을 막거나 철근콘크리트에 의해 터널식 수로를 설치하고, 상기 터널식 수로에 수문을 설치하되, 수문의 높이가 너무 높아 관리하기 어려운 곳은 계단식으로 나누어 터널식 수로와 수문을 설치하여 수문 높이를 관리하기 좋게 설치할 수 있도록 하는 조력 발전장치의 시공방법을 제공하는데 그 목적이 있다.
또한, 예를 들어 폭 20m x 높이 30m인 수로인 경우 수로 폭 20m 중간의 상하에 수문의 중량과 수압을 충분히 지탱할 수 있는 회전축을 설치하고 회전축 상하 양단부에 고정 베어링을 설치하여 수로 바닥과 수로 천정에 고정함으로써, 30m 높이의 1개의 수문을 수평으로 90도 회전하여 쉽게 개폐할 수 있어 높은 수문을 이용할 수 있게 하는 조력 발전장치의 시공방법을 제공하는데 그 목적이 있다.
또한, 기존의 매립식 터널수로를 보 형식 터널수로로 변경하여 수로 설치공사비를 최대한 줄일 수 있는 것으로, 물이 깊은 곳이나 지반이 약한 경우 땅을 파고 지하로 터널수로를 설치할 때 구조계산에 이상이 없는 길이로 잘라 계단식으로 쌓아 올리면 1개의 기초 위에 터널수로 여러 개를 완성할 수 있어 기초길이의 공사비가 줄게 되고 수로단면적은 기존보다 3배(3단인 경우) 이상 넓게 하여 모든 피해를 막고 정상적인 복류발전도 할 수 있게 하는 조력 발전장치의 시공방법을 제공하는데 그 목적이 있다.
또한, 본 발명은 수로와 수문 면적을 늘림에 따라 환경피해나 어민들의 피해를 감소시키고, 양방향 발전을 통해 전력 생산이 증가되도록 하는 조력 발전장치의 시공방법을 제공하는데 그 목적이 있다.
또한, 본 발명은 수문의 면적을 지하까지 넓혀서 발전이 끝난 후에 물을 빨리 빼고 채우는 것이 가능한 조력 발전장치의 시공방법을 제공하는데 그 목적이 있다.
상술한 목적을 달성하기 위한 본 발명의 일 실시예에 따른 조력 발전장치의 시공방법은,
조수 간만의 차가 있는 바다에 철구조물로 가물막이를 한 후 철근콘크리트 기초에 세워진 보 형식 댐에 형성된 다수의 수로 중 어느 하나 이상의 수로에 수차를 설치하고, 상기 수차에 발전기를 연결하여 전기를 생산하는 조력 발전장치의 시공방법에 있어서;
상기 수차가 설치된 수로를 제외한 나머지 수로를 철근콘크리트로 다단으로 형성하되, 하부에서 상부로 갈수록 후퇴되게 계단식으로 형성하고, 상기 계단식 수로에 맞도록 수로를 개폐하는 수문을 후퇴되게 설치하는 것을 특징으로 한다.
상기 계단식 수로는 일정 높이 간격을 갖고 수평으로 다수 설치되는 중보와, 상기 중보를 받칠 수 있도록 수직으로 다수 세워지는 보기둥에 의해 형성된 일(一)자형 수로인 것을 특징으로 한다.
상기 계단식 수로는 철근콘크리트에 의해 보 형식 터널식으로 형성된 미음(ㅁ)자형 터널식 수로인 것을 특징으로 한다.
상기 미음(ㅁ)자형 수로를 구조계산에 의해 짧은 길이로 설치하는 것을 특징으로 한다.
상기 일(一)자형 수로(21)나 미음(ㅁ)자형 터널식 수로의 상부에 물을 가두기 위해 철근콘크리트벽체로 댐을 형성하는 것을 특징으로 한다.
또한, 물이 깊은 곳이나 지반이 약한 경우 땅을 파고 지하로 보 형식의 터널식 수로를 형성하되, 지하로 다단의 보 형식 터널수로를 구조계산에 의해 이상이 없는 길이로 나누어 계단식으로 높게 설치하는 것을 특징으로 한다.
본 발명의 다른 실시예에 따른 조력 발전장치의 시공방법은, 조수 간만의 차가 있는 바다에 철구조물로 가물막이를 한 후 철근콘크리트 기초에 세워진 보 형식 댐에 형성된 다수의 수로 중 어느 하나 이상의 수로에 수차를 설치하고, 상기 수차에 발전기를 연결하여 전기를 생산하되;
상기 수로와 수로를 개폐하는 수문을 다단으로 설치하지 않는 경우, 상기 수문의 좌우 폭 중간 상하에 회전축을 설치하고 그 회전축 상하 양단부에 회전할 수 있도록 베어링을 장착하여 수로 바닥과 수로 천정에 고정하는 것에 의해 90도 수평 회전으로 수문이 개폐되는 것을 특징으로 한다.
상술한 과제의 해결 수단에 의하면, 조수 간만의 차가 있는 바다에 일반 보 형식의 댐을 막아서 철근콘크리트에 의해 터널식 수로를 설치하고, 상기 터널식 수로에 수문을 설치하되, 수문의 크기가 너무 커 관리하기 어려운 곳은 계단식으로 나누어 터널식 수로와 수문을 설치함으로써, 조차가 크거나 수심이 깊은 지역에서 수문 높이를 용이하게 관리할 수 있고, 보 형식으로 댐을 막으므로 토사가 많이 필요치 않는다.
또한, 수심이 깊고 지반이 약한 곳을 암반이 나올 때까지 파고 지하로 다단의 보 형식 터널수로를 설치하므로 수로 길이를 구조계산에 의해 튼튼하고 최대한 짧게 할 수 있어 기초길이가 짧아 공사비를 최대한 줄일 수 있으며 2층 이상의 수로에 기초공사를 하지 않아 더욱 공사비를 줄일 수 있다.
또한, 보조수문을 많이 설치하므로 발전이 끝나고 남는 물을 빨리 최저수면까지 빼내거나 가득 채울 수 있어 양방향 발전을 할 수 있고 그만큼 더 많은 전기를 생산할 수 있다.
또한, 보 형식 터널수로는 그 길이를 짧게 할 수 있어 공사비가 많이 절감되고 구조를 계산하여 튼튼하게 설치할 수 있다.
또한, 흙을 파낸 지하까지 수로와 수문을 설치하여 수로와 수문 면적을 늘림에 따라 환경피해나 어민들의 피해를 감소시키고, 양방향 발전을 통해 전력 생산이 증가되는 장점이 있다.
또한, 보 형식 터널수로는 설치비가 저렴하여 수로를 충분히 설치할 수 있어 지하 밑바닥 기초 위에서부터 지하로 수로와 수문을 설치하여 수문의 면적을 지하까지 넓혀서 발전이 끝난 후에 물을 빨리 빼고 채울 수 있고, 바닷물이 자연 상태와 똑같이 들고나므로 모든 피해를 막을 수 있으며 정상적인 복류발전도 할 수 있어 수로단면적이 부족하여 발생하는 모든 피해의 원인을 해결할 수 있다.
또한, 수로 폭 중간의 상하에 수문의 중량과 수압을 충분히 지탱할 수 있는 회전축을 설치하고 회전축 상하 양단부에 고정 베어링을 설치하여 수로 바닥과 수로 천정에 고정함으로써, 높은 높이의 1개의 수문을 수평으로 90도 회전하여 쉽게 개폐할 수 있어 높은 수문을 이용하게 할 수 있다.
도 1은 본 발명의 일 실시예에 따른 조력 발전장치 개략적인 정면도이다.
도 2는 도 1에 나타낸 발전실의 내부 평면도이다.
도 3은 본 발명의 다른 실시예에 따른 조력 발전장치에서 발전실을 제외한 댐의 개략적인 정면도이다.
도 4는 도 3의 측면도이다.
도 5는 본 발명의 또 다른 실시예에 따른 조력 발전장치의 수로를 보여주는 사시도이다.
도 6은 본 발명의 또 다른 실시예에 따른 조력 발전장치의 수로와 수문의 설치 상태를 보여주는 도면이다.
이하 본 발명의 실시예에 대하여 첨부된 도면을 참고로 그 구성 및 작용을 설명하기로 한다.
도면들 중 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 참조번호 및 부호들로 나타내고 있음에 유의해야 한다.
하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략할 것이다.
또한, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.
도 1은 본 발명의 일 실시예에 따른 조력 발전장치의 개략적인 정면도이고, 도 2는 도 1에 나타낸 발전실의 내부 평면도이다.
도 1 및 도 2에 나타낸 본 발명의 일 실시예에 따른 조력 발전장치는 낙차가 크지 않거나 수심이 얕은 지역에 설치될 수 있는 것으로, 교각(11), 교량(12), 보기둥(17), 수로(21), 수문(14), 와이어(16), 크레인(15), 크레인 설치보(13) 및 발전실(20)을 포함하여 구성된다.
먼저 조수 간만의 차가 있는 바다에 철구조물로 가물막이를 한 후, 철근콘크리트로 바다 등의 바닥면에 기초가 형성되고 그 상부에 도면에서 보아 횡방향으로(물의 흐름 방향과 직각방향으로) 소정간격을 두고 교각(11)이 수직으로 돌출 형성되며, 상기 교각(11)의 상부에는 차량이나 사람이 다닐 수 있도록 교량(12)이 설치된다.
상기 교각(11) 사이에는 교각보다 낮은 높이로 수로(21)를 형성할 수 있도록 다수의 보기둥(17)이 설치되어 수로의 측벽을 이루되, 그 수로(21)의 앞이나 뒤에는 수로에 흐르는 물을 조절할 수 있도록 수문(14)이 설치된다.
상기 보기둥(17)의 상부와 교량(12) 하부 사이에 크레인 설치보(13)가 이웃된 교각(11)을 연결할 수 있도록 수평방향으로 설치되고, 상기 크레인 설치보(13)에는 상기 수문(14)을 승강하는 크레인(15)이 설치된다.
상기 크레인(15)과 수문(14)은 와이어(16)로 연결되어 크레인(15)의 작동에 의해 수문(14)이 상승하거나 하강하여 수로(21)가 열리거나 닫히게 된다.
또한, 상기 교각(11) 사이의 어느 하나 이상에는 조력에 의해 발전할 수 있도록 발전실(20)이 구비된다.
상기 발전실(20)의 상부에도 이웃된 교각(11)을 연결할 수 있도록 수평방향으로 크레인 설치보(13)가 설치되고, 크레인 설치보(13)에는 발전실(20)의 수문(22)을 승강하는 크레인(15)이 설치된다.
상기 발전실(20)에는 종방향으로 다수의 수로(21)가 형성되고, 이 수로(21)의 앞이나 뒤에는 수로(21)에 흐르는 물을 조절할 수 있도록 수문(22)이 설치된다.
이때 각 수로(21)에는 수로에 흐르는 물의 방향에 따라 회전하는 수차(24)가 설치되고, 상기 수차(24)의 일측에는 수차의 회전축에 연결되어 전기를 발생하는 발전기(25)가 설치된다.
이와 같이 교량(22) 위로 차가 다닐 수 있게 할 때는 발전실(20)을 댐(100) 내부에 설치하고 발전실(20) 벽체와 교각(11) 사이를 철근콘크리트로 연결하여 그 교각 사이로 물이 통과할 수 있도록 한다.
상술한 구성에서 보 형식의 댐(100)을 설치하여 조수 간만의 차이를 이용하여 만조때 수문(14,22)을 전부 열어 댐 안에 바닷물이 가득 차이게 되면 수문(14,22)을 닫고, 간조때 바닷물이 빠져나가면 수차(24)의 수문(22)을 열어 예를 들어 70% 발전하고, 30% 남은 물은 수문(14,22)을 전부 열어 전부 빼준다.
이와 마찬가지로 만조때 바닷물이 들어와 발전할 수 있는 낙차가 생겼을 경우 수차(24)의 수문(22)을 열어 70% 물로 발전하고, 수문(14,22)을 전부 열어 30% 덜 차인 물을 채우는 것을 반복적으로 진행한다.
도 3은 본 발명의 다른 실시예에 따른 조력 발전장치에서 발전실을 제외한 댐의 개략적인 정면도이고, 도 4는 도 3의 측면도이다.
도 3 및 도 4에 나타낸 본 발명의 다른 실시예에 따른 조력 발전장치는 조차가 크거나 수심이 깊은 지역에 설치될 수 있는 것으로, 계단식 일(一)자형 수로(19)와 수문(14)을 보여준다.
도 3 및 도 4에 도시된 바와 같이 교각(11), 교량(12), 보기둥(17), 수로(19), 수문(14), 와이어(16), 크레인(15), 크레인 설치보(13) 및 중보(18)를 포함하여 구성된다.
미도시된 철근콘크리트로 바다 등의 바닥면에 기초가 형성되고 그 상부에 도면에서 보아 횡방향으로(물의 흐름 방향과 직각방향으로) 소정간격을 두고 교각(11)이 수직으로 돌출 형성되며, 교각(11)의 상부에는 차량이나 사람이 다닐 수 있도록 교량(12)이 설치된다.
또한, 이웃된 교각(11) 사이에는 이웃된 교각(11)을 서로 연결할 수 있도록 중보(18)가 일정높이 간격으로 수평방향으로 다수 설치되고, 중보(18)에 의해 상하로 구획된 교각(11) 사이에는 다수의 보기둥(17)이 수직으로 설치되어 수로(19)의 측벽을 이루며 상기 중보(18)와 보기둥(17)에 의해 계단식 일(一)자형 수로(19)가 형성된다.
이때, 보기둥(17)과 중보(18)는 하부에서 상부로 갈수록 후퇴 설치되며, 이에 맞추어 수로(19)에 흐르는 물을 조절하는 수문(14) 역시 하부에서 상부로 갈수록 후퇴 설치된다.
상기 최상층의 중보(18)와 교량(12) 하부 사이에 크레인 설치보(13)가 이웃된 교각(11)을 연결할 수 있도록 수평방향으로 설치되고, 상기 크레인 설치보(13)에는 상기 수문(14)을 승강하는 크레인(15)이 설치된다.
상기 크레인(15)과 수문(14)은 각각 와이어(16)로 연결되어 크레인(15)의 작동에 의해 수문(14)이 상승하거나 하강하여 수로(19)가 열리거나 닫히게 된다.
물론 도 3의 실시예에서도 이웃된 교각(11) 사이의 어느 하나 이상에 조력에 의해 발전할 수 있도록 수로, 수차, 발전기가 구비되는 발전실이 설치됨은 물론이다.
도 3에서는 크레인(15)과 와이어(16)를 이용하여 수문(14)을 열고 닫는 것을 예를 들어 설명하였으나, 이는 단지 하나의 예일 뿐 최대한 편리한 방법으로 수문을 개폐할 수 있는 것으로 본 발명이 이에 한정되는 것은 아니다.
예를 들어 30m 이상 높은 1개의 수문을 이용할 때 상기 수문의 좌우 폭 중간 상하에 회전축을 설치하고 회전축 상하 양단부에 회전을 지지하는 고정 베어링을 장착하여 수로 바닥과 수로 천정에 고정한다.
이때 수문의 중량과 수압을 지탱하고 움직일 수 있게 수문의 회전축 상하 양쪽 끝에 베어링이 설치되고, 댐 안쪽에 수문이 세워 설치된다.
이에 의해 수문을 90도 수평 방향으로 회전시켜 수문을 쉽게 개폐할 수 있다.
상기 수문이 열린 상태에서 수문 반쪽이 밖으로 돌출되고 나머지 반쪽은 수로 내부에 위치되며, 이 경우 바다 쪽에서 연상해 보면 물속으로 다단의 터널수로가 되고 댐 안쪽에 보면 일(-)자형의 높은 수로에 높은 수문이 설치된 것으로 연상해 볼 수 있다.
이와 같이 수심이 깊은 곳에 철근콘크리트로 수로(19)와 수문(14)을 설치하되, 세로의 보기둥(17)과 보기둥(17) 사이에 가로의 중보(18)를 계단식으로 설치하여 거기에 맞게 수문(14)을 설치함으로써 수문(14)의 높이가 높아 관리하기 어려운 것을 관리하기 좋게 할 수 있다.
예를 들어 조차가 높고 물이 깊어 수문 1개의 높이가 40m로 관리하기 어려운 경우 본 발명에서와 같이 계단식으로 해서 10m 높이 수문 4개로 나누어 관리하기 좋게 할 수 있다.
또한, 발전실을 제외한 수문을 보 형식으로 많이 설치하므로 발전이 끝나고 남는 물을 빨리 최저수면까지 빼내거나 가득 채울 수 있어 정상적인 양방향 발전을 할 수 있고 그만큼 더 많은 전기를 생산할 수 있다.
도 5는 본 발명의 또 다른 실시예에 따른 조력 발전장치의 수로를 보여주는 사시도이다.
도 5에 나타낸 본 발명의 또 다른 실시예에 따른 조력 발전장치는 낙차가 크거나 수심이 깊은 지역에 설치될 수 있는 것으로, 계단식 미음(ㅁ)자형 터널식 수로(19)와 수문(14)을 보여준다.
도 5에 도시된 바와 같이, 미도시된 댐을 구성하는 교각과 교각 사이에 철근콘크리트로 수로(19)를 상하와 좌우로 다수 설치하되, 하부에서 상부로 갈수록 후퇴 설치하는 계단식으로 설치하며, 이에 맞추어 수로(19)에 흐르는 물을 조절하는 수문(14) 역시 하부에서 상부로 갈수록 후퇴 설치된다.
물론 도 5의 실시예에서도 댐을 구성하는 이웃된 교각 사이의 어느 하나 이상에 조력에 의해 발전할 수 있도록 수로, 수차, 발전기가 구비되는 발전실이 설치됨은 물론이다.
종래의 매립형은 흙으로 매립하기 위하여 물이 깊어질수록 폭이 넓어지므로 터널길이가 길어질 수밖에 없어, 매립형의 터널식 수로는 짧게 할 수가 없으나, 본 발명의 보 형식 터널수로는 구조계산에 맞는 한(구조상 이상이 없는 한) 최대한 짧게 할 수 있어 공사비를 절감할 수 있다.
이와 같이 기존의 매립식 댐 건설방법을 보 형식 댐 건설방법으로 바꾸어 건설시 즉, 물이 깊은 곳이나 지반이 약한 경우 땅을 파고 지하로 보 형식의 터널수로를 설치시, 기존의 매립식 터널수로 폭 20m x 높이 45m x 길이 70m 1개의 터널수로를 구조계산에 의해 이상이 없는 길이로 나누어(예를 들어 27m, 23m, 20m씩 잘라) 계단식으로 3단을 쌓아 올리면 1개의 기초 위에 수로 폭 20m x 높이 45m x 길이 27m의 터널수로 1개를 완성할 수 있어 기존의 기초길이 70m가 27m로 줄어 기초길이 43m의 공사비가 줄게 된다.
또한, 2단, 3단의 기초공사를 하지 않아 기초길이 140m의 공사비가 더욱 줄게 되고, 수로단면적은 기존보다 3배 이상 증가하여 기존의 수차 수로에서 매립지를 통과하는 수로를 없게 하며, 발전실 외벽에 수문을 설치하면 기존의 매립지를 통과하는 수로와 수문 설치비로 충분한 수로와 수문을 설치할 수 있어 수로공사비를 줄이고 모든 피해를 막을 수 있고 복류발전을 정상적으로 할 수 있다.
또한 이상에서는 교각(11)과 교량(12)을 설치하여 상부에 차로를 설치하는 것을 예를 들어 설명하였으나, 경우에 따라 교각과 교량을 설치하지 않고 터널식 수로와 수문을 설치한 상태에서 이 수문을 승강할 수 있는 크레인 설치보를 설치할 수도 있다.
이와 같이 수심이 깊거나 조차가 너무 높아서 수문이 너무 커 관리하기 어려울 때 수로(19)를 계단식으로 설치하여 수문(14) 관리를 용이하게 할 수 있다.
한편, 상기 일(一)자형 수로(21)나 미음(ㅁ)자형 터널식 수로(19)의 상부에 물을 가두기 위해 철근콘크리트로 댐을 형성하는 것이 바람직하다.
또한, 발전이 끝나고 덜 차인 물높이도 역시 3m 이므로 남는 물을 뺄 수 있는 수문의 높이와 수문의 면적이면 덜 차인 물도 채울 수 있으므로 3m 남는 물 높이와 최저수면 아래 지하 밑바닥 기초 상단까지 수로 높이로 수문을 설치한다.
예를 들어, 최저수면 가까이 퇴적물이 쌓여 지반이 약한 갯벌이나 모래가 쌓여 있으면 암반층이나 단단한 지반이 나올 때까지 흙을 파낸 후 기초공사를 하고 지하에 수로와 수문을 설치하므로 지하 밑바닥 기초 상단까지 30m 깊이이면, 수문 높이는 발전이 끝나고 남은 물 높이 3m + 30m = 33m의 수로와 수문 높이가 되고, 댐의 형성시 수로(19)(21)와 수문(22)(14)을 최대한 낮게 설치하는 것이 수로단면적을 계산할 때 적용되나, 최고조차의 물을 가둘 수 있게 설치하는 것이 바람직하다.
이와 같이 지하 밑바닥 기초 위에서부터 지하로 수로와 수문을 설치하여 수문의 면적을 지하까지 넓힐 수 있으므로 발전이 끝난 후에 물을 빨리 빼고 채울 수 있다.
도 6은 본 발명의 또 다른 실시예에 따른 조력 발전장치의 수로와 수문의 설치 상태를 보여주는 도면으로서, 수로의 면적을 최대한 늘이기 위해 최저수면에 가깝게 있는 얕은 곳의 지하에 흙을 파내고 기초 위에서부터 지하에 수로와 수문을 설치하는 상태를 나타낸다.
도 6에 도시된 바와 같이, 기존의 수로와 수문 구조물이 7m 이상 낮게 설치된 곳에서 기초(110) 상단에 수로(120)가 설치되고, 수로의 상단에는 댐 안에 물을 가두기 위해 철근콘크리트벽체(150)가 설치되며, 수로(120)를 사이에 두고 터널벽체(130)가 입설된다.
이때, 기초(110)의 높이는 2m 또는 3m, 터널벽체(130)의 폭 또한 2m 또는 3m이고, 수로(120)의 높이는 20m, 30m, 40m, 수로의 폭은 10m, 20m이며, 도 6 중 미설명 부호 140은 터널상판이다.
상기 표시된 숫자는 한 예를 들었을 뿐 꼭 이와 같은 것은 아니다.
도 6에 나타난 실시예는 거대한 호수의 입구가 병목 구간으로 좁은 곳의 지반이 약하고 깊은 곳을, 흙을 파낸 지하까지 수로와 수문을 설치하여 수로와 수문 면적을 늘림에 따라 환경피해나 어민들의 피해를 감소시키고, 양방향 발전을 통해 전력 생산을 늘릴 수 있다.
상기 미음(ㅁ)자형 터널식 수로(19)와 수문(14)은 기존 매립형 터널식 수로와 수문이 거의 같은 것으로 볼 수 있으나, 기존 매립형 터널식 수로는 수로 위에 물을 댐 안에 가두기 위해 사토를 쌓아 댐을 형성하고 터널 길이를 짧게 할 수 없는 관계로 공사비가 많이 드는 단점이 있다.
이에 비해 일(一)자형 수로(21)나 수문(22)과 미음(ㅁ)자형 터널식 수로와 수문은 수로 상단에 물을 댐 안에 가두기 위해 철근콘크리트로 댐을 형성하는 것으로서, 수로의 길이 또한 구조계산에 맞는 한 최대한 짧게 설치할 수 있어 공사비가 저렴한 장점이 있다.
이상에서 본 발명에 대한 기술 사상을 첨부 도면과 함께 서술하였지만, 이는 본 발명의 바람직한 실시예를 예시적으로 설명한 것이지 본 발명을 한정하는 것은 아니다. 또한, 이 기술 분야의 통상의 지식을 가진 자라면 누구나 본 발명의 기술 사상의 범주를 이탈하지 않는 범위 내에서 다양한 변형 및 모방이 가능함은 명백한 사실이다.
Claims (7)
- 조수 간만의 차가 있는 바다에 철구조물로 가물막이를 한 후 철근콘크리트 기초에 세워진 보 형식 댐에 형성된 다수의 수로 중 어느 하나 이상의 수로에 수차를 설치하고, 상기 수차에 발전기를 연결하여 전기를 생산하되;상기 수차가 설치된 수로를 제외한 나머지 수로를 철근콘크리트로 다단으로 형성하여, 하부에서 상부로 갈수록 후퇴되게 계단식으로 형성하고, 상기 계단식 수로에 맞도록 수로를 개폐하는 수문을 후퇴되게 설치하는 것을 특징으로 하는 조력 발전장치의 시공방법.
- 제1항에 있어서,상기 계단식 수로는 일정 높이 간격을 갖고 수평으로 다수 설치되는 중보와, 상기 중보를 받칠 수 있도록 수직으로 다수 세워지는 보기둥에 의해 형성된 일(一)자형 수로인 것을 특징으로 하는 조력 발전장치의 시공방법.
- 제1항에 있어서,상기 계단식 수로는 철근콘크리트에 의해 터널식으로 형성된 미음(ㅁ)자형 터널식 수로인 것을 특징으로 하는 조력 발전장치의 시공방법.
- 제3항에 있어서,상기 미음(ㅁ)자형 터널식 수로를 구조계산에 의해 짧게 설치하는 것을 특징으로 하는 조력 발전장치의 시공방법.
- 제2항 또는 제3항에 있어서,상기 일(一)자형 수로나 미음(ㅁ)자형 터널식 수로의 상부에 물을 가두기 위해 철근콘크리트벽체로 댐을 형성하는 것을 특징으로 하는 조력 발전장치의 시공방법.
- 제1항에 있어서,물이 깊은 곳이나 지반이 약한 경우 땅을 파고 지하로 보 형식의 터널식 수로를 형성하되, 지하로 다단의 보 형식 터널수로를 구조계산에 의해 이상이 없는 길이로 나누어 계단식으로 높게 설치하는 것을 특징으로 하는 조력 발전장치의 시공방법.
- 조수 간만의 차가 있는 바다에 철구조물로 가물막이를 한 후 철근콘크리트 기초에 세워진 보 형식 댐에 형성된 다수의 수로 중 어느 하나 이상의 수로에 수차를 설치하고, 상기 수차에 발전기를 연결하여 전기를 생산하되;상기 수로와 수로를 개폐하는 수문을 다단으로 설치하지 않는 경우, 상기 수문의 좌우 폭 중간 상하에 회전축을 설치하고 그 회전축 상하 양단부에 회전할 수 있도록 베어링을 장착하여 수로 바닥과 수로 천정에 고정하는 것에 의해 90도 수평 회전으로 수문이 개폐되는 것을 특징으로 하는 조력 발전장치의 시공방법.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2013-0070158 | 2013-06-19 | ||
KR20130070158 | 2013-06-19 | ||
KR10-2014-0055467 | 2014-05-09 | ||
KR1020140055467A KR20140147673A (ko) | 2013-06-19 | 2014-05-09 | 조력 발전장치의 시공방법 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014204101A1 true WO2014204101A1 (ko) | 2014-12-24 |
Family
ID=52104792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2014/004520 WO2014204101A1 (ko) | 2013-06-19 | 2014-05-21 | 조력 발전장치의 시공방법 |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2014204101A1 (ko) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0589523U (ja) * | 1992-05-12 | 1993-12-07 | 日立造船株式会社 | 多段式シリンダーゲート |
KR20010025670A (ko) * | 2001-01-16 | 2001-04-06 | 한상관 | 회전식 자동수문 의 구성방법 |
KR20040086969A (ko) * | 2003-04-03 | 2004-10-13 | 계병식 | 조력발전장치 |
KR20120001971A (ko) * | 2010-06-30 | 2012-01-05 | 한국해양연구원 | 가물막이댐을 이용한 소규모 조력발전 시스템 및 그 시공방법 |
KR20120021348A (ko) * | 2010-07-28 | 2012-03-09 | 홍문표 | 다단계 수문 |
-
2014
- 2014-05-21 WO PCT/KR2014/004520 patent/WO2014204101A1/ko active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0589523U (ja) * | 1992-05-12 | 1993-12-07 | 日立造船株式会社 | 多段式シリンダーゲート |
KR20010025670A (ko) * | 2001-01-16 | 2001-04-06 | 한상관 | 회전식 자동수문 의 구성방법 |
KR20040086969A (ko) * | 2003-04-03 | 2004-10-13 | 계병식 | 조력발전장치 |
KR20120001971A (ko) * | 2010-06-30 | 2012-01-05 | 한국해양연구원 | 가물막이댐을 이용한 소규모 조력발전 시스템 및 그 시공방법 |
KR20120021348A (ko) * | 2010-07-28 | 2012-03-09 | 홍문표 | 다단계 수문 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012030115A1 (ko) | 저수용량 증대 및 에너지 순환형 저수지 시공방법 | |
CN210636383U (zh) | 一种带清渣排水通道的泥石流拦挡坝 | |
CN109853621B (zh) | 一种地下车站出入口结构及其施工方法 | |
WO2014204101A1 (ko) | 조력 발전장치의 시공방법 | |
CN115613480A (zh) | 新旧进水箱涵的连接节点及施工方法 | |
CN211472426U (zh) | 一种大水深戽式消力池的检修系统 | |
CN210264760U (zh) | 隧道防水结构 | |
Bisnett et al. | Red Rock Hydroelectric Project–New hydro development at an existing flood control dam | |
US10876265B2 (en) | Modular hydropower unit | |
CN102518093A (zh) | 一种投资少工期短的水电站布局结构及其施工方法 | |
JP2013053503A (ja) | 潮位差海水流発電装置 | |
CN117431892B (zh) | 弯曲河道船闸水闸并行的同步快速施工方法 | |
CN214613953U (zh) | 一种与导流洞结合的溢洪道排水系统 | |
CN213538833U (zh) | 一种带有观光交通廊道的景观坝 | |
WO2010071340A2 (ko) | 조력 발전 장치의 시공 방법 | |
CN217733908U (zh) | 一种河道生态护坡 | |
CN219410738U (zh) | 一种水利工程设计护坡结构 | |
Ojha | Rehabilitation of sunkoshi small hydropower plant (2.6 mk), nepal after sequences of natural disaster | |
CN111270658B (zh) | 一种多砂石河流上的水电站枢纽拦石透水导砂方法及装置 | |
CN219386189U (zh) | 一种防洪水利护坡 | |
JP2540078B2 (ja) | 深層地下河川オ―バ―フロ―マンホ―ル発電構造 | |
CN216950475U (zh) | 一种用于地下水集中引排的隧道环向导流系统 | |
CN202440804U (zh) | 厂坝分离式水电站 | |
CN115595942A (zh) | 低水头地下式引水构筑物及其施工方法 | |
CN104213545A (zh) | 悬挂底流式梯级消力池消能系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14813169 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 14813169 Country of ref document: EP Kind code of ref document: A1 |