WO2014189320A1 - 가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법 - Google Patents

가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법 Download PDF

Info

Publication number
WO2014189320A1
WO2014189320A1 PCT/KR2014/004619 KR2014004619W WO2014189320A1 WO 2014189320 A1 WO2014189320 A1 WO 2014189320A1 KR 2014004619 W KR2014004619 W KR 2014004619W WO 2014189320 A1 WO2014189320 A1 WO 2014189320A1
Authority
WO
WIPO (PCT)
Prior art keywords
floating body
guide
support structure
large floating
guide file
Prior art date
Application number
PCT/KR2014/004619
Other languages
English (en)
French (fr)
Inventor
장대준
베르간폴
Original Assignee
주식회사래티스테크놀로지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사래티스테크놀로지 filed Critical 주식회사래티스테크놀로지
Priority to SG11201509633WA priority Critical patent/SG11201509633WA/en
Publication of WO2014189320A1 publication Critical patent/WO2014189320A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/24Buoys container type, i.e. having provision for the storage of material

Definitions

  • the present invention relates to a support structure for a large floating body located at sea and a method of installing the same. More specifically, the support structure of a large floating body using a guide file for installing a large floating object on the sea using a guide file to store, supply, and unload a liquefied gas such as liquefied natural gas or a crude oil and It is about how to install it.
  • a liquefied gas such as liquefied natural gas or a crude oil
  • liquefied gas such as LNG (Liquefied Natural Gas) has attracted much attention for its clean energy.
  • Natural gas a raw material of LNG, a representative liquefied gas, is a fossil fuel buried underground in a gaseous state, and methane is a main component, and is gas energy that can be used immediately after a little pretreatment in a state directly collected from a gas field.
  • gas energy is similar to petroleum in that it is a chemical fuel produced by variation of organic matter deposited in the ground.
  • Natural gas like oil mining, is driven by drilling a borehole deep under the sea or in the ground.
  • natural gas is a pollution-free clean fuel that generates little pollution during combustion because dust, sulfur, nitrogen, etc. are removed during pretreatment and liquefaction.
  • Natural gas is transported in gaseous form through onshore or offshore gas pipelines, or liquefied liquefied natural gas in LNG carriers to remote consumers.
  • Liquefied natural gas is obtained by cooling natural gas to cryogenic temperature (approximately -163 °C), and its volume is reduced to about 1/600 than natural gas in gas state, so it is very suitable for long distance transportation through sea.
  • LNG-FPSO floating liquefied terminal
  • GBS Gravity Based Structures
  • an object of the present invention is to provide a guide file that can absorb the impact caused by various waves, the structure is simple, and can greatly reduce the cost
  • the present invention provides a support structure and a mooring method for a large floating body used.
  • the large floating body floating in the sea, inserted into the vertical direction in the vertical direction, allowing the vertical movement of the large floating body, but in the horizontal direction
  • At least one guide file for limiting movement and the base portion is coupled to the lower portion of the guide file, the base portion is installed on the bottom surface, the large floating body is inserted into the guide file, and provided with at least one impact relief member It characterized in that it further comprises a plurality of pile sleeves characterized in that.
  • the large floating body may include at least one of a storage unit, a system for producing, storing, and unloading a liquefied gas, a system for producing, storing, and unloading a hydrocarbon, and a system for storing or loading a cargo. do.
  • the liquefied gas is characterized in that it comprises at least one material of liquefied natural gas, liquid petroleum gas, natural gas liquefied, crude oil and natural gas.
  • the large floating body is characterized in that made of at least one material of metal, high-strength concrete, and watertight coated lightweight concrete.
  • the base portion is fixed to the sea bottom surface by at least one or more base fixing file, characterized in that it comprises at least one guide pile tube is fixed to the lower portion of the guide file.
  • the large floating body is characterized in that it comprises at least one ballast tank.
  • the guide file is characterized in that it further comprises an outermost reinforcing member made of a stainless material on the outer peripheral surface.
  • the pile sleeve may include a sleeve fixing portion fixed to the large floating body and a pile fixing portion into which a guide file is inserted.
  • the pile fixing portion may include a pile hole into which the pile sleeve is inserted and fixed, an inner guide member positioned at a portion at which an outer circumferential surface of the guide pile is joined, an outer guide member forming an outer shape of the pile fixing portion and positioned at an outer side thereof.
  • the shock absorbing member is characterized in that it is made of a material having an elastic force.
  • the support structure of the large floating body using the guide file is characterized in that it further comprises a fender located on the outer peripheral surface of the large floating body, to mitigate external shock and vibration.
  • the panda is characterized in that it comprises at least one material of steel, high-strength concrete, and watertight coated lightweight concrete.
  • the base installation step (S10) for fixing the base portion to the sea bottom, the large sub-fluid and the guide file produced on land, and transported It is characterized in that it comprises a floating body conveying step (S20) for transferring to the sea where the base portion is located by using a line and a floating body fixing step (S30) for fixing the guide file to the base portion.
  • the base structure is fixed to the sea bottom in advance, and the guide file combines the large floating body and the base structure of the sea bottom. Because large floaters float on the surface, they have both the technical advantages of fixed and floating terminals.
  • the present invention is convenient to install and move a large floating body, it can be used even in areas where there is a large tidal difference.
  • areas where tsunamis can occur provide special protection members, such as wave damping walls.
  • it is easy to install there is no horizontal movement there is an advantage that can safely ship the liquefied gas on the ship.
  • FIG. 1 is a cross-sectional view of a support structure of a large floating body using a guide file according to an embodiment of the present invention.
  • FIG. 2 is a plan view of a large floating body according to an embodiment of the present invention.
  • Figure 3 is a side view of a large floating body according to an embodiment of the present invention.
  • Figure 4 is a cross-sectional view of the base portion according to an embodiment of the present invention.
  • FIG. 5 is a cross-sectional view of the pile sleeve according to an embodiment of the present invention.
  • FIG. 6 is a cross-sectional view of the guide file according to an embodiment of the present invention.
  • Figure 7 is a step showing a method for installing a large floating fluid using a guide file according to an embodiment of the present invention.
  • the support structure 10 for a large float using the guide file of the present nickname is a large float 100 floating on the sea, a guide file 400 for fixing the large float 100, and the guide file 400 ) Includes a base portion 500 for fixing the bottom surface.
  • Figure 1 is a cross-sectional view of a support structure 10 of a large floating body according to an embodiment of the present invention
  • Figure 2 is a plan view of a large floating body 100 according to an embodiment of the present invention.
  • the large floating body 100 includes a storage tank 200 that forms an overall appearance and can store liquefied gas.
  • the large floating body 100 may be mounted on a ship carrying liquefied gas, or may be installed on a gas supply device for carrying a liquefied gas.
  • a liquefied storage unit a system for producing, storing, and unloading a liquefied gas, a system for producing, storing, and unloading a hydrocarbon, and a system for storing or loading a cargo. It includes one or more.
  • the liquefied gas includes at least one material of liquefied natural gas, liquid petroleum gas, natural gas liquefied, crude oil and natural gas.
  • the storage tank 200 is not limited to a reservoir storing a liquefied gas, but may be used as a reservoir capable of storing a liquid or solid substance.
  • the large floating body 100 may be installed and used at the sea where the storage tank 200 is located.
  • the large float 100 may be used in places such as LNG bunkering terminal, LNG-FSRU, FPSO.
  • the large floating body 100 is installed with a desalination system, it can be used for seawater desalination system.
  • the large floating body 100 may be used in a mobile harbor equipped with a storage facility or an unloading system. As described above, the large floating body 100 may be used in various systems.
  • the large floating body 100 is formed to float on the sea. In this case, the large floating body 100 can be towed by a tug boat.
  • the large floating body 100 is made of at least one material of steel, high-strength concrete, and watertight coated lightweight concrete.
  • the large floating body 100 is formed by placing a water-tight coated lightweight concrete between sandwich panels in order to be waterproof. That is, the large floating body is produced by the sandwich panel is made of a metal material, the concrete is cast between the sandwich panel.
  • the watertight coating may use a polymer coating that is coated on both sides of the light concrete using a polymer such as epoxy.
  • the storage tank 200 is installed in the large floating body (100).
  • the storage tank 200 may be manufactured together with the large floating body 100 or separately manufactured to be combined with each other.
  • the large floating body 100 may include a plurality of storage tanks 200.
  • the large floating body 100 according to an embodiment of the present invention can be seen that five storage tanks 200 are installed. However, the number of the storage tanks 200 is not limited and may be five or less or more.
  • the storage tank 200 When the liquefied gas stored in the storage tank 200 is a low temperature, the storage tank 200 is preferably provided with an insulation system. In addition, when the liquefied gas is a cryogenic liquefied gas, the storage tank 200 is provided with a thermal insulation device. For example, when liquefied natural gas is stored in the storage tank 200, the storage tank 200 is installed with a barrier wall made of INVAR or stainless steel, and a thermal insulation material made of polywood board or polyurethane foam. Can be.
  • the guide file 400 is installed to allow movement of the large floating body 100 in the vertical direction but limit movement in the horizontal direction. More specifically, the guide file 400 is extended in the vertical direction, the lower portion is fixed to the sea bottom, or fixed to the sea bottom through the base portion 500, the large floating fluid 100 is the guide It is characterized by moving only in the vertical direction by the pile 400.
  • the base portion 500 is fixed to the bottom of the sea, and is safely installed, the restoring force and stress associated with the vertical force applied from the airflow, waves, ships is increased.
  • the guide file 400 is installed so that the large floating body 100 can move vertically in the sea, the lower portion is fixed to the bottom or the base 500.
  • the guide file 400 is provided in plurality in the large floating body (100). A total of 14 guide files according to an embodiment of the present invention are installed on the outer circumferential surface of the large floating body 100. The number of the guide files 400 may be less than or greater than 14 depending on the size and the sea state of the large floating body 100.
  • the guide file 400 is disposed at a predetermined distance in the longitudinal direction of the large floating body (100).
  • six guide files 400 are respectively provided on one side in the longitudinal direction of the large floating body 100, and one is installed on the one side in the width direction, but this is only one embodiment, and the number is more. It may be more or less, the surface on which the guide file 400 is installed is not limited to the four sides of the large floating body (100).
  • the large floating body 100 includes a plurality of pile sleeves 300 for installing the guide pile 400.
  • FIG. 2 six pile sleeves 300 are installed in the lengthwise surface of the large floating fluid 100, and one pile is installed on each side surface of the pile sleeve 300, but the present invention is not limited thereto, and the pile sleeve 300 corresponds to the guide pile 400. It is preferable to install.
  • the pile sleeve 300 serves to fix the large float 100 to a vertical surface along the guide pile 400.
  • the inner surface of the pilesley 300 that is, the portion in which the guide pile 400 is in contact with each other easily wearable. It is desirable to be attached so that. Therefore, the pile sleeve 300 is preferably welded to the large floating body 100, but is coupled using a coupling member that is easy to disassemble, such as a bolt.
  • the large floating body 100 may further include a fender 600 that can protect the outer surface.
  • the fender 600 is formed on the outer circumferential surface of the large floating body 100 and serves to mitigate external shock and vibration.
  • the fender 600 is made of at least one material of steel, high strength concrete, and watertight coated lightweight concrete.
  • the base unit 500 according to an embodiment of the present invention will be described with reference to FIG. 4.
  • the base 500 may be lowered to the seabed, and then fixed by driving the base fixing file 520 on the seabed.
  • the base fixing file 520 may fix the base frame 510 using a clapping device.
  • the base fixing file 520 is to have a horizontal fixed resistance and sufficient strength without the base frame 510 is moved.
  • the base frame 510 includes a plurality of guide pile tubes 511.
  • the guide pile tube 511 is formed extending in the vertical direction, the lower portion of the guide pile 400 is inserted into the guide pile tube 511 is fixedly installed.
  • the guide pile tube 511 is formed to correspond to the guide pile 400 installed in the large floating body (100).
  • the large floating body 100 may further include at least one ballast tank (not shown).
  • the ballast tank can adjust the balance of the large floating body 100 by using the inflow and outflow of sea water. For example, the ballast tank balances the horizontal or vertical direction of the large floating body 100 when the amount of material stored in the storage tank 200 is different.
  • the pile sleeve 300 includes a sleeve fixing portion 310 fixed to the large floating body 100 and a pile fixing portion 320 into which the guide file 400 is inserted.
  • the pile fixing part 320 includes a pile hole 321, an inner guide member 322, an impact alleviating member 323, and an outer guide member 324.
  • the pile hole 321 is a hole into which the guide file 400 is inserted, and preferably has a diameter larger than that of the guide file 400.
  • the pile hole 321 when the guide file 400 is inserted into the pile hole 321, in order to minimize the friction force between the outer surface of the guide file 400 and the inner surface of the pile hole 321, the pile hole The inner side of 321 may be applied with a material that can reduce friction.
  • the pile fixing part 320 has a plurality of shock absorbing member 323 is located between the inner guide member 322 and the outer guide member 323 in order to mitigate the impact transmitted through the guide pile 400. Is formed.
  • the inner guide member 322 and the outer guide member 324 is made of a metal material, a plurality of shock absorbing members 323 between the inner guide member 322 and the outer guide member 324
  • the pile fixing part 320 is inserted into the pile fixing part 320.
  • the impact mitigating member 323 is made of a material having an elastic force, such as rubber, a plurality are located.
  • the elastic material described above means a material comprising a material selected from the group consisting of polysiloxanes, polyurethanes, polyesters, polyfluorosiloxanes, polyolefins, fluoroelastomers, synthetic rubbers, natural rubbers and mixtures thereof.
  • the shock absorbing member 323 is spaced apart by a predetermined distance, it is preferable that the shock absorbing member 323 is expanded to absorb the shock to the space spaced apart when the impact is expanded.
  • the guide pile 400 is made of at least one material of steel, high strength concrete, and watertight coated lightweight concrete.
  • the watertight-coated lightweight concrete is formed by placing lightweight concrete coated on both sides between sandwich panels to be waterproof. That is, as shown in Figure 6, the outer reinforcing member 420 and the inner reinforcing member 440 is made of a metal material, concrete is cast between the outer reinforcing member 420 and the inner reinforcing member 440. The concrete portion 430 is formed.
  • the watertight coating may use a polymer coating that is coated on both sides of the light concrete using a polymer such as epoxy.
  • the guide pile 400 may further include an outermost reinforcing member 410 made of stainless material to prevent corrosion because the outer surface is in contact with the sea water.
  • the method of installing a support structure for a large floating body using the guide file of the present invention includes a base installation step (S10), a floating body conveying step (S20), and a floating body fixing step (S30).
  • the base installation step (S10) is a step of fixing the base portion 500 to the bottom, more specifically, the base frame 510 is located on the bottom of the sea, using the base fixing file 520 By fixing the base frame 510 to the sea bottom.
  • the floating body transfer step (S20) is a step of manufacturing the large floating body 100 and the guide pile 400 on land, and transporting to the sea where the base portion 500 is installed by using a transfer line. .
  • the large floating body 100 and the guide pile 400 may be transported in combination with each other on land, each may be transported and assembled at sea.
  • the floating body fixing step (S30) is a step of fixing the guide file 400 to the base portion 500, more specifically, the guide file 400 is inserted into the pile sleeve 300, the upper portion The lower part is fixed to the guide pile tube 511 formed on the base frame 510.
  • the guide pile 400 is manufactured in a hollow shape, it can be easily assembled while the seawater is introduced into the hollow portion.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Revetment (AREA)

Abstract

본 발명의 가이드 파일을 이용한 대형 부유체의 지지구조는 바다 위에 떠 있는 대형 부유체, 상기 대형 부유체에 수직방향으로 삽입되어, 상기 대형 부유체를 수직방향으로 움직일 수 있도록 지지하는 적어도 하나 이상의 가이드파일, 및 상기 가이드 파일의 하부가 결속되고, 해저면에 설치되는 베이스 구조물을 포함하되, 상기 대형 부유체는 상기 가이드파일이 삽입되고, 적어도 하나 이상의 충격완화부재를 구비하는 것을 특징으로 하는 복수개의 파일슬리브를 더 포함하는 것을 특징으로 한다.

Description

가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법
본 발명은 해상에 위치하는 대형 부유체의 지지구조 및 이를 설치하는 방법에 대한 것이다. 좀 더 상세하게는 가이드 파일을 이용하여 대형 부유체를 해상에 설치하여 액화천연가스와 같은 액화가스나 원유와 같은 액체물질을 저장, 공급, 및 하역하는 가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법에 관한 것이다.
석유 가격의 증가와 환경문제 때문에 LNG(Liquefied Natural Gas)와 같은 액화가스는 청정에너지로 많은 주목을 받고 있다. 대표적인 액화가스인 LNG의 원료 물질인 천연가스는 지하에 기체상태로 매장된 화석연료로서 메탄이 주성분이며, 가스전에서 천연적으로 직접 채취한 상태에서 약간의 전처리 후에 바로 사용할 수 있는 가스에너지이다. 또한, 가스에너지는 땅속에 퇴적한 유기물이 변동되어 생긴 화학연료라는 점에서는 석유와 유사하다.
천연가스도 석유를 채굴하는 것과 마찬가지로 시추공을 바다 밑이나 땅 속 깊이 박아 채굴한다.
또한, 천연가스는 전처리 및 액화 과정에서 분진, 황, 질소 등이 제거되어 연소 시 공해물질을 거의 발생하지 않는 무공해 청정연료이다.
천연가스는, 육상 또는 해상의 가스배관을 통해 가스 상태로 운반되거나, 액화된 액화천연가스의 상태로 LNG 운반선에 저장된 채 원거리의 소비처로 운반된다. 액화천연가스는 천연가스를 극저온(대략 -163℃)으로 냉각하여 얻어지는 것으로 가스 상태의 천연가스일 때보다 그 부피가 대략 1/600로 줄어들므로 해상을 통한 원거리 운반에 매우 적합하다.
최근 들어, 천연가스는 셰일(sedimentary rock)에서도 생산된다. 일반적으로, 상기 천연가스는 가공과 액화가 가능하게 제작된 육지 터미널에서 진행되지만, 최근에는 부유식 액화 터미널(LNG-FPSO)이 발전되고 많이 사용되고 있다. 액화천연가스는 육지 터미널, FSRU (Floating Storage & Offloading Unit), 또는 고정된 해안 터미널에서 변환된다.
액화 천연가스의 선적은 수입과 수출 터미널에 저장부가 필요하다. 이와 같은 많이 이유로 큰 선적 터미널은 해안가에 건축하는 경향이 있다. 게다가, 미래에는 배의 엔진에 LNG와 같은 청정연료를 공급할 수 있는 터미널이 필요하다. 이와 같은 이유로, 주요 항구에 LNG 공급 터미널과 LNG 연료를 개인의 선박에 공급할 수 있는 전용선에 LNG를 공급하기 위한 새로운 시설물이 요구된다.
지금까지 해양 LNG 터미널은 GBS(Gravity Based Structures) 구조로 제작되었다. 명칭에서 볼 수 있듯이 GBS 구조로 된 터미널은 해양 바닥의 자중력에 의해서 고정된다. GBS 구조는 일반적으로 무거운 콘크리트로 제작되고, 밸러스트수 또는 중량물에 의해 고정되어야 한다. 이와 같은 것은 매우 자주 변경되는 다양한 파도에 의해서 해안지역에 매우 큰 문제점이 발생하게 된다. 또한, GBS 구조물은 해수면의 깊이에 따라서 비용이 크게 증가하며, 다양한 파도에 따라서 복잡한 구조물을 설치해야 하는 문제점이 있다.
본 발명은 상기한 바와 같은 종래 기술의 문제점을 해결하기 위하여 안출된 것으로, 본 발명의 목적은 다양한 파도에 의한 충격을 흡수할 수 있으며, 구조가 간단하고, 비용을 크게 절감할 수 있는 가이드 파일을 이용한 대형 부유체의 지지구조 및 계류 방법을 제공함에 있다.
본 발명의 가이드 파일을 이용한 대형 부유체의 지지구조에 있어서, 해상에 부유하는 대형 부유체, 상기 대형 부유체에 수직방향으로 삽입되어, 상기 대형 부유체의 수직방향의 움직임을 허용하지만 수평방향의 움직임을 제한하는 적어도 하나 이상의 가이드 파일, 및 상기 가이드 파일의 하부가 결속되고, 해저면에 설치되는 베이스부를 포함하되, 상기 대형 부유체는 상기 가이드파일이 삽입되고, 적어도 하나 이상의 충격완화부재를 구비하는 것을 특징으로 하는 복수 개의 파일슬리브를 더 포함하는 것을 특징으로 한다.
또한, 상기 대형 부유체는 저장부, 액화가스 생산, 저장, 및 하역하는 시스템, 탄화수소를 생산, 저장, 및 하역하는 시스템, 및 화물을 저장하거나 적재하는 시스템 중 적어도 하나 이상을 포함하는 것을 특징으로 한다.
또한, 상기 액화가스는 액화천연가스, 액체석유가스, 천연가스액화물, 원유 및 천연가스 중 적어도 하나 이상의 물질이 포함하는 것을 특징으로 한다.
또한, 상기 대형 부유체는 금속, 고강도 콘크리트, 및 수밀코팅된 경량콘크리트 중 적어도 하나 이상의 물질로 된 것을 특징으로 한다.
또한, 상기 베이스부는 적어도 하나 이상의 베이스고정파일에 의해서 해저면에 고정되어 설치되고, 상기 가이드 파일의 하부가 고정되는 적어도 하나 이상의 가이드파일튜브를 포함하는 것을 특징으로 한다.
또한, 상기 대형 부유체는 적어도 하나 이상의 밸라스트 탱크를 포함하는 것을 특징으로 한다.
또한, 상기 가이드 파일은 외주면에 스테인리스재질로 제작되는 최외측보강부재를 더 포함하는 것을 특징으로 한다.
또한, 상기 파일 슬리브는 상기 대형 부유체에 고정되는 슬리브고정부와 가이드파일이 삽입되는 파일고정부를 포함하는 것을 특징으로 한다.
또한, 상기 파일고정부는 상기 파일슬리브가 삽입되어 고정되는 파일홀, 상기 가이드파일의 외주면이 접합되는 부분에 위치하는 내측가이드부재, 상기 파일고정부의 외형을 형성하고 외측에 위치하는 외측가이드부재 및 상기 내측가이드부재와 상기 외측가이드부재 사이에 위치하고, 서로 일정거리 이격되어 위치하는 복수개의 충격완화부재를 포함하는 것을 특징으로 한다.
또한, 상기 충격완화부재는 탄성력이 있는 재질로 제작되는 것을 특징으로 한다.
또한, 상기 가이드 파일을 이용한 대형 부유체의 지지구조는 상기 대형 부유체의 외주면에 위치하고, 외부의 충격과 진동을 완화시키는 펜더를 더 포함하는 것을 특징으로 한다.
또한, 상기 팬더는 스틸, 고강도 콘크리트, 및 수밀코팅된 경량콘크리트 중 적어도 하나 이상의 물질을 포함하는 것을 특징으로 한다.
본 발명의 가이드 파일을 이용한 대형부유체의 지지구조를 설치하는 방법에 있어서, 상기 베이스부를 해저면에 고정하는 베이스설치 단계(S10), 상기 대형부유체와 상기 가이드파일을 육지에서 제작하여, 이송선을 이용하여 상기 베이스부가 위치하는 해상까지 이송하는 부유체 이송 단계(S20) 및 상기 가이드파일을 상기 베이스부에 고정하는 부유체 고정 단계(S30)를 포함하는 것을 특징으로 한다.
본 발명의 가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법은 해저 면에 베이스 구조물이 사전에 고정되고, 가이드 파일이 대형 부유체와 해저면의 베이스 구조물을 결합한다. 대형 부유체가 수면에 떠 있기 때문에, 고정된 터미널과 부유식 터미널의 기술적 장점을 모두 가진다.
즉, 본 발명은 대형 부유체의 설치와 움직임이 편리하고, 큰 조수 차이가 있는 지역에서도 사용될 수 있다. 또한, 쓰나미가 발생할 수 있는 지역에서는 파도 댐핑 벽과 같은 특별한 보호 부재를 제공한다. 게다가, 설치가 용이하며, 수평으로의 움직임이 없기 때문에 배에 안전하게 액화가스를 선적할 수 있는 장점이 있다.
도 1은 본 발명의 일실시예에 따른 가이드 파일을 이용한 대형 부유체의 지지구조의 단면도.
도 2는 본 발명의 일실시예에 따른 대형 부유체의 평면도.
도 3은 본 발명의 일실시예에 따른 대형 부유체의 측면도.
도 4는 본 발명의 일실시예에 따른 베이스부의 단면도.
도 5는 본 발명의 일실시예에 따른 파일슬리브의 단면도.
도 6은 본 발명의 일실시예에 따른 가이드파일의 단면도.
도 7은 본 발명의 일실시예에 따른 가이드 파일을 이용한 대형부유체 설치하는 방법을 나타내는 단계도.
이하, 상기한 바와 같은 구성을 가지는 본 발명에 의한 가이드 파일을 이용한 대형 부유체의 지지구조(10)를 첨부된 도면을 참고하여 상세하게 설명한다.
도 1과 도 2를 이용하여, 본 발명의 가이드 파일을 이용한 대형 부유체의 지지구조(10)의 구성과 형태에 대해서 설명한다.
본 별명의 가이드 파일을 이용한 대형 부유체의 지지구조(10)는 해상에 부유하는 대형 부유체(100), 상기 대형 부유체(100)를 고정하는 가이드 파일(400), 및 상기 가이드 파일(400)을 해저면에 고정하는 베이스부(500)를 포함한다.
도 1은 본 발명의 일실시예에 따른 대형 부유체의 지지구조(10)의 단면도이고, 도 2는 본 발명의 일실시예에 따른 대형 부유체(100)의 평면도이다.
상기 대형 부유체(100)는 전체적인 외형을 형성하고, 액화된 가스를 저장할 수 있는 저장탱크(200)를 포함한다. 또한, 상기 대형 부유체(100)는 액화가스를 운반하는 배에 장착되거나, 액화 가스를 운반하기 위한 가스 공급장치에 설치될 수 도 있다. 또한, 상기 대형 부유체(100)는 도시화 하지 않았지만 액화물 저장부, 액화가스 생산, 저장, 및 하역하는 시스템, 탄화수소를 생산, 저장, 및 하역하는 시스템, 및 화물을 저장하거나 적재하는 시스템 중 적어도 하나 이상을 포함한다.
이때, 상기 액화가스는 액화천연가스, 액체석유가스, 천연가스액화물, 원유 및 천연가스 중 적어도 하나 이상의 물질이 포함한다.
상기 저장탱크(200)는 액화된 가스를 저장하는 저장고에 한정되는 것이 아니라, 액체 또는 고체 상태의 물질을 저장할 수 있는 저장고로 사용될 수 있다. 또한, 상기 대형 부유체(100)는 상기 저장탱크(200)가 위치하는 곳에 해상에서 필요한 시스템이 설치되어 사용될 수 있다.
예를 들어, 상기 대형 부유체(100)는LNG 벙커링 터미널, LNG-FSRU, FPSO와 같은 곳에 사용될 수 있다. 또한, 상기 대형 부유체(100)는 담수화 시스템이 설치되어, 해수 담수화 시스템에 사용될 수 있다. 뿐만 아니라, 상기 대형 부유체(100)는 저장설비 또는 하역시스템이 장착되어 모바일 하버에 사용될 수 있다. 상술한 바와 같이, 상기 대형 부유체(100)는 다양한 시스템에 확장되어 사용될 수 있다.
상기 대형 부유체(100)는 해상에 부유하도록 형성된다. 이와 같은 경우, 상기 대형 부유체(100)는 터그보트에 의해 예인될 수 있다.
상기 대형 부유체(100)는 스틸, 고강도 콘크리트, 및 수밀 코팅된 경량콘크리트 중 적어도 하나 이상의 물질로 만들어 진다.
일 예로, 상기 대형 부유체(100)는 방수되기 위해서 샌드위치 패널 사이에 수밀 코팅된 경량콘크리트가 위치하여 형성된다. 즉, 상기 대형부유체는 상기 샌드위치패널이 금속재질로 제작되고, 상기 샌드위치패널 사이에 콘크리트가 캐스팅되어 제작된다.
상기 수밀코팅은 에폭시와 같은 폴리머를 이용하여 경량콘크리트 양측면에 코팅하는 폴리머코팅을 이용할 수 있다.
상기 저장탱크(200)는 상기 대형 부유체(100)에 설치된다. 상기 저장탱크(200)는 상기 대형 부유체(100)과 함께 제작되거나 따로 제작하여 서로 결합할 수 있다. 상기 대형 부유체(100)는 복수 개의 저장탱크(200)를 포함할 수 있다. 본 발명의 일 실시예에 따른 상기 대형 부유체(100)는 5개의 저장탱크(200)가 설치된 것을 볼 수 있다. 그러나, 상기 저장탱크(200)의 개수는 제한되지 않고, 5개 이하 또는 이상일 수 있다.
상기 저장탱크(200)에 저장되는 액화가스가 저온인 경우, 상기 저장탱크(200)는 단열시스템이 구비되는 것이 바람직하다. 또한, 상기 액화가스가 극저온 액화 가스일 경우, 상기 저장탱크(200)는 열절연장치가 설치된다. 예를 들어, 상기 저장탱크(200)에 액화천연가스가 저장될 경우, 상기 저장탱크(200)는 INVAR에서 만든 차단벽 또는 스테인레스 스틸, 및 폴리우드보드 또는 폴리우레탄 폼으로 제작되는 열절연재가 설치될 수 있다.
상기 가이드 파일(400)은 상기 대형 부유체(100)의 수직방향의 움직임을 허용하지만 수평방향의 움직임을 제한하도록 설치된다. 좀 더 상세하게는, 상기 가이드 파일(400)은 수직방향으로 연장되고, 하부는 해저면에 고정되거나, 베이스부(500)를 통해서 해저면에 고정되어, 상기 대형부유체(100)는 상기 가이드 파일(400)에 의해서 수직방향으로만 움직이는 것을 특징으로 한다.
상기 베이스부(500)는 해저면에 고정되고, 안전하게 설치되어, 기류, 파도, 배로부터 인가되는 수직력과 관련된 복원력과 응력이 증가된다.
상기 가이드 파일(400)은 해상에서 상기 대형 부유체(100)가 수직으로 움직일 수 있도록 설치되고, 하부가 해저면 또는 베이스부(500)에 고정된다.
상기 가이드 파일(400)은 상기 대형 부유체(100)에 복수 개가 설치된다. 본 발명의 일 실시예에 따른 총 14개의 가이드 파일이 상기 대형 부유체(100)의 외주면에 설치된다. 상기 가이드 파일(400)의 개수는 상기 대형 부유체(100)의 크기와 해상의 상태에 따라서 14개보다 적거나 많을 수 있다.
상기 가이드 파일(400)은 상기 대형 부유체(100)의 길이방향으로 일정거리를 두고 배치된다. 또한, 상기 가이드 파일(400)은 상기 대형 부유체(100)의 길이방향 한쪽 면에 각각 6개가 설치되고, 폭방향 한뽁 면에 각각 1개가 설치되어 있지만 이는 일실시예에 불과하며, 개수는 더 많거나 적을 수 있으며, 상기 가이드 파일(400)이 설치되는 면은 상기 대형 부유체(100)의 4면에 한정되지 않는다.
상기 대형 부유체(100)는 상기 가이드 파일(400)을 설치하기 위해, 복수개의 파일슬리브(300)를 포함한다.
도 2에서는 상기 파일슬리브(300)는 상기 대형부유체(100)의 길이방향 면으로 각각 6개가 설치되고, 양측면에 각각 1개가 설치되었지만 이에 한정되는 것은 아니고, 상기 가이드파일(400)와 대응되게 설치되는 것이 바람직하다.
상기 파일슬리브(300)는 상기 대형 부유체(100)가 상기 가이드 파일(400)을 따라 수직면에 고정되는 역할을 한다. 또한, 상기 대형 부유체(100)는 조수와 파도에 따라 수직운동하기 때문에, 상기 파일슬리부(300)의 내측면, 즉 상기 가이드파일(400)이 접하는 부분이 마모가 쉽게 되기 때문에 쉽게 교체될 수 있도록 부착되는 것이 바람직하다. 따라서, 상기 파일슬리브(300)는 상기 대형 부유체(100)에 용접되어 고정되는 것이 아니라, 볼트와 같은 분해가 용이한 결합부재를 이용하여 결합되는 것이 바람직하다.
상기 대형 부유체(100)는 외측면을 보호할 수 있는 펜더(600)를 더 포함할 수 있다. 상기 펜더(600)는 상기 대형 부유체(100)의 외주면에 형성되어, 외부의 충격과 진동을 완화시키는 역할을 한다.
상기 펜더(600)는 스틸, 고강도 콘크리트, 및 수밀코팅된 경량콘크리트 중 적어도 하나 이상의 물질로 만들어 진다.
도 4를 이용하여 본 발명의 일실시예에 따른 베이스부(500)에 대해서 설명한다.
상기 베이스부(500)는 해저로 인하한 후, 해저면에 베이스고정파일(520)을 박아 고정할 수 있다. 상기 베이스고정파일(520)은 클래핑 장치를 이용하여 베이스프레임(510)을 고정할 수 있다. 상기 베이스고정파일(520)은 베이스프레임(510)이 움직이지 않고 수평 고정 저항 과 충분한 강도를 가지기 위한 것이다.
상기 베이스프레임(510)은 복수개의 가이드파일튜브(511)을 포함한다. 상기 가이드파일튜브(511)는 수직방향으로 연장되어 형성되고, 상기 가이드파일튜브(511)에 상기 가이드파일(400)의 하부가 삽입되어 고정 설치된다. 또한, 상기 가이드파일튜브(511)는 상기 대형 부유체(100)에 설치되는 가이드 파일(400)과 대응되게 형성된다.
상기 대형 부유체(100)는 적어도 하나 이상의 밸라스트 탱크(미도시)를 더 포함할 수 있다.
상기 밸라스트탱크는 바닷물의 유입과 유출을 이용하여 상기 대형 부유체(100)의 균형을 조절할 수 있다. 예를 들어서, 상기 밸라스트 탱크는 상기 저장탱크(200)에 저장되어 있는 물질의 양이 각각 상이할 경우, 상기 대형 부유체(100)의 가로 또는 세로방향의 균형을 잡아준다.
도 5을 이용하여, 본 발명의 일실시예에 따른 파일슬리브(300)에 대해서 설명한다.
본 발명의 일실시예에 따른 파일슬리브(300)는 상기 대형 부유체(100)에 고정되는 슬리브고정부(310)와 상기 가이드파일(400)이 삽입되는 파일고정부(320)를 포함한다.
상기 파일고정부(320)는 파일홀(321), 내측가이드부재(322), 충격완화부재(323), 및 외측가이드부재(324)를 포함한다.
상기 파일홀(321)은 상기 가이드파일(400)이 삽입되는 홀로서, 상기 가이드파일(400)보다 큰 직경으로 형성되는 것이 바람직하다.
또한, 상기 가이드파일(400)이 상기 파일홀(321)에 삽입되었을 경우, 상기 가이드파일(400)의 외측면과 상기 파일홀(321)의 내측면 사이에 마찰력을 최소화하기 위해서, 상기 파일홀(321)의 내측면에 마찰을 감소할 수 있는 물질로 도포될 수도 있다.
상기 파일고정부(320)는 상기 가이드파일(400)을 통해 전해지는 충격을 완화시키기 위해서 상기 내측가이드부재(322)와 상기 외측가이드부재(323) 사이에 복수개의 충격완화부재(323)가 위치하여 형성된다.
즉, 상기 내측가이드부재(322)와 상기 외측가이드부재(324)는 금속재질로 제작되고, 상기 내측가이드부재(322)와 상기 외측가이드부재(324) 사이에 복수개의 충격완화부재(323)가 삽입되어 상기 파일고정부(320)가 제작된다.
이때, 상기 충격완화부재(323)는 고무와 같은 탄성력이 있는 재질로 제작되며, 복수개가 위치한다. 상술한 탄성력이 있는 재질은 폴리실록산, 폴리우레탄, 폴리에스테르, 폴리플루오로실록산, 폴리올레핀, 플루오로엘라스토머, 합성 고무, 천연 고무 및 그 혼합물로 이루어진 군으로부터 선택되는 재료를 포함하는 재질을 뜻한다.
상기 충격완화부재(323)는 일정거리 이격되어 위치하여, 충격이 가해져 팽창할 경우 이격된 공간으로 상기 충격완화부재(323)가 팽창하여 충격을 흡수할 수 있도록 제작되는 것이 바람직하다.
도 6을 이용하여, 본 발명의 일실시예에 따른 가이드파일(400)에 대해서 설명한다.
상기 가이드파일(400)은 스틸, 고강도 콘크리트, 및 수밀코팅된 경량콘크리트 중 적어도 하나 이상의 물질로 만들어 진다.
상기 수밀코팅된 경량콘크리트는 방수되기 위해서 샌드위치 패널 사이에 양측면이 코팅된 경량콘크리트가 위치하여 형성된다. 즉, 도 6에 도시된 바와 같이, 금속재질로 된 외측보강부재(420)와 내측보강부재(440)가 설치되고, 상기 외측보강부재(420)와 내측보강부재(440) 사이에 콘크리트가 캐스팅되어 콘크리트부(430)가 형성된다.
상기 수밀코팅은 에폭시와 같은 폴리머를 이용하여 경량콘크리트 양측면에 코팅하는 폴리머코팅을 이용할 수 있다.
또한, 상기 가이드파일(400)은 외측면이 해수에 닿기 때문에 부식을 방지하기 위해서 스테인레스 재질로 제작되는 최외측보강부재(410)를 더 포함할 수 있다.
도 7을 이용하여, 본 발명의 가이드 파일을 이용한 대형부유체의 지지구조를 설치하는 방법에 대해서 설명한다.
본 발명의 가이드 파일을 이용한 대형 부유체의 지지구조를 설치하는 방법은 베이스설치단계(S10), 부유체 이송단계(S20), 및 부유체 고정단계(S30)를 포함한다.
상기 베이스설치단계(S10)는 상기 베이스부(500)를 해저면에 고정하는 단계로서, 좀 더 상세하게는 상기 베이스프레임(510)을 해저면에 위치시키고, 상기 베이스고정파일(520)을 이용하여 상기 베이스프레임(510)을 해저면에 고정 설치하는 단계이다.
상기 부유체 이송단계(S20)는 상기 대형 부유체(100)와 상기 가이드파일(400)을 육지에서 제작하여, 이송선을 이용하여 상기 베이스부(500)가 설치되어 있는 해상으로 이송하는 단계이다.
이때, 상기 대형 부유체(100)와 상기 가이드파일(400)은 육지에서 서로 결합하여 이송할 수도 있고, 각각 이송하여 해상에서 각각 조립할 수도 있다.
상기 부유체 고정단계(S30)는 상기 가이드파일(400)을 상기 베이스부(500)에 고정하는 단계로서, 좀 더 상세하게는 상기 가이드파일(400)은 상부가 상기 파일슬리브(300)에 삽입되고, 하부가 상기 베이스프레임(510)에 형성되어 있는 상기 가이드파일튜브(511)에 고정되는 단계이다.
이때, 상기 가이드파일(400)은 중공형으로 제작되기 때문에 중공된 부분으로 해수가 유입되면서 쉽게 조립할 수 있다.
본 발명은 상기한 실시예에 한정되지 아니하며, 적용범위가 다양함은 물론이고, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이다.
[부호의 설명]
10 : 가이드 파일을 이용한 대형 부유체의 지지구조
100 : 대형 부유체
200 : 저장탱크
300 : 파일슬리브
310 : 슬리브고정부
320 : 파일고정부
321 : 파일홀
322 : 내측가이드부재
323 : 충격완화부재
324 : 외측가이드부재
400 : 가이드파일
410 : 최외측보강부재
420 : 외측보강부재
430 : 콘크리트부
440 : 내측보강부재
500 : 베이스부
510 : 베이스프레임
511 : 가이드파일튜브
520 : 베이스고정파일
600 : 펜더
S10~S30 : 가이드 파일을 이용한 대형 부유체의 지지구조를 설치하는 방법

Claims (13)

  1. 가이드 파일을 이용한 대형 부유체의 지지구조에 있어서,
    해상에 부유하는 대형 부유체, 상기 대형 부유체에 수직방향으로 삽입되어, 상기 대형 부유체의 수직방향의 움직임을 허용하지만 수평방향의 움직임을 제한하는 적어도 하나 이상의 가이드 파일, 및 상기 가이드 파일의 하부가 결속되고, 해저면에 설치되는 베이스부를 포함하되,
    상기 대형 부유체는 상기 가이드파일이 삽입되고, 적어도 하나 이상의 충격완화부재를 구비하는 것을 특징으로 하는 복수 개의 파일슬리브를 더 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  2. 제 1항에 있어서,
    상기 대형 부유체는 저장부, 액화가스 생산, 저장, 및 하역하는 시스템, 탄화수소를 생산, 저장, 및 하역하는 시스템, 및 화물을 저장하거나 적재하는 시스템 중 적어도 하나 이상을 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  3. 제 2항에 있어서,
    상기 액화가스는 액화천연가스, 액체석유가스, 천연가스액화물, 원유 및 천연가스 중 적어도 하나 이상의 물질이 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  4. 제 2항에 있어서,
    상기 대형 부유체는 금속, 고강도 콘크리트, 및 수밀코팅된 경량콘크리트 중 적어도 하나 이상의 물질로 된 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  5. 제 1항에 있어서
    상기 베이스부는 적어도 하나 이상의 베이스고정파일에 의해서 해저면에 고정되어 설치되고, 상기 가이드 파일의 하부가 고정되는 적어도 하나 이상의 가이드파일튜브를 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  6. 제 2항에 있어서
    상기 대형 부유체는 적어도 하나 이상의 밸라스트 탱크를 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  7. 제 1항에 있어서
    상기 가이드 파일은 외주면에 스테인리스재질로 제작되는 최외측보강부재를 더 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  8. 제 1항에 있어서, 상기 파일 슬리브는
    상기 대형 부유체에 고정되는 슬리브고정부와 가이드파일이 삽입되는 파일고정부를 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  9. 제 8항에 있어서,
    상기 파일고정부는
    상기 파일슬리브가 삽입되어 고정되는 파일홀;
    상기 가이드파일의 외주면이 접합되는 부분에 위치하는 내측가이드부재;
    상기 파일고정부의 외형을 형성하고 외측에 위치하는 외측가이드부재; 및
    상기 내측가이드부재와 상기 외측가이드부재 사이에 위치하고, 서로 일정거리 이격되어 위치하는 복수개의 충격완화부재;
    를 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  10. 제 9항에 있어서,
    상기 충격완화부재는 탄성력이 있는 재질로 제작되는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  11. 제 1항에 있어서, 상기 가이드 파일을 이용한 대형 부유체의 지지구조는
    상기 대형 부유체의 외주면에 위치하고, 외부의 충격과 진동을 완화시키는 펜더를 더 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  12. 제 11항에 있어서,
    상기 팬더는 스틸, 고강도 콘크리트, 및 수밀코팅된 경량콘크리트 중 적어도 하나 이상의 물질을 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형 부유체의 지지구조.
  13. 제 1항 내지 제 12항 중 어느 한 항의 가이드 파일을 이용한 대형부유체의 지지구조를 설치하는 방법에 있어서,
    상기 베이스부를 해저면에 고정하는 베이스설치 단계(S10);
    상기 대형부유체와 상기 가이드파일을 육지에서 제작하여, 이송선을 이용하여 상기 베이스부가 위치하는 해상까지 이송하는 부유체 이송 단계(S20); 및
    상기 가이드파일을 상기 베이스부에 고정하는 부유체 고정 단계(S30);
    를 포함하는 것을 특징으로 하는 가이드 파일을 이용한 대형부유체의 지지구조를 설치하는 방법
PCT/KR2014/004619 2013-05-24 2014-05-23 가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법 WO2014189320A1 (ko)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SG11201509633WA SG11201509633WA (en) 2013-05-24 2014-05-23 Support structure of large floater using guide pile and method for installing same

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020130058809A KR101718902B1 (ko) 2013-05-24 2013-05-24 가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법
KR10-2013-0058809 2013-05-24

Publications (1)

Publication Number Publication Date
WO2014189320A1 true WO2014189320A1 (ko) 2014-11-27

Family

ID=51933811

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2014/004619 WO2014189320A1 (ko) 2013-05-24 2014-05-23 가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법

Country Status (3)

Country Link
KR (1) KR101718902B1 (ko)
SG (1) SG11201509633WA (ko)
WO (1) WO2014189320A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116039837A (zh) * 2023-03-30 2023-05-02 南通市海洋水建工程有限公司 一种海上风电浮式稳桩平台

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102640039B1 (ko) 2019-10-25 2024-02-22 삼성중공업 주식회사 부유식 구조물
KR102640037B1 (ko) 2019-10-31 2024-02-22 삼성중공업 주식회사 부유식 구조물
KR20210069470A (ko) 2019-12-03 2021-06-11 삼성중공업 주식회사 부유식 구조물

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07132880A (ja) * 1993-11-12 1995-05-23 Sekisui Plastics Co Ltd 浮き桟橋及びその造設方法
KR20100131722A (ko) * 2009-06-08 2010-12-16 에스티엑스조선해양 주식회사 플로팅 안벽
KR101018742B1 (ko) * 2010-12-30 2011-03-04 삼성물산 주식회사 해상 잭업 플랫폼을 이용한 엘엔지 재기화 설비
WO2011138195A1 (de) * 2010-05-04 2011-11-10 Siemens Aktiengesellschaft Grundrahmen für eine selbstaufstellende meeresplattform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120040552A (ko) 2010-10-19 2012-04-27 한국해양연구원 부유식 lng 터미널의 시운전 시스템

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07132880A (ja) * 1993-11-12 1995-05-23 Sekisui Plastics Co Ltd 浮き桟橋及びその造設方法
KR20100131722A (ko) * 2009-06-08 2010-12-16 에스티엑스조선해양 주식회사 플로팅 안벽
WO2011138195A1 (de) * 2010-05-04 2011-11-10 Siemens Aktiengesellschaft Grundrahmen für eine selbstaufstellende meeresplattform
KR101018742B1 (ko) * 2010-12-30 2011-03-04 삼성물산 주식회사 해상 잭업 플랫폼을 이용한 엘엔지 재기화 설비

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116039837A (zh) * 2023-03-30 2023-05-02 南通市海洋水建工程有限公司 一种海上风电浮式稳桩平台
CN116039837B (zh) * 2023-03-30 2023-07-14 南通市海洋水建工程有限公司 一种海上风电浮式稳桩平台

Also Published As

Publication number Publication date
KR20140137799A (ko) 2014-12-03
SG11201509633WA (en) 2015-12-30
KR101718902B1 (ko) 2017-03-23

Similar Documents

Publication Publication Date Title
WO2014042293A1 (en) Offshore platform using guide pile and method of installing the same
WO2014189320A1 (ko) 가이드 파일을 이용한 대형 부유체의 지지구조 및 이를 설치하는 방법
US6848863B2 (en) Engineered material buoyancy system and device
CN101939215B (zh) 用于运作自固定隔水管的坞站和钻孔站
CN1906087A (zh) 海底低温流体传输系统
GB1593014A (en) Underwater production riser systems
CN103314246A (zh) 低温流体输送通道组件及其应用
JP2017506301A (ja) 船搭載海洋熱エネルギー変換システム
US20220099253A1 (en) Gas storage system
GB2470122A (en) Subsea storage for high-pressure liquid carbon dioxide
KR101260994B1 (ko) 발전플랜트가 탑재된 부유식 구조물
CN102202963A (zh) 用于海洋结构物的浮力设备
KR101260992B1 (ko) 발전플랜트가 탑재된 부유식 구조물
WO2021235941A1 (en) Shuttle loading system
KR101260993B1 (ko) 발전플랜트가 탑재된 부유식 구조물
ITMI20131753A1 (it) Procedimento per trasportare fluidi di estrazione quali per esempio gas naturale, petrolio o acqua, e veicolo sommergibile per attuare tale metodo.
GB2191229A (en) Offshore hydrocarbon production system
CN115243970A (zh) 浮体构造物及海上设施
CN102288541B (zh) 缆索水阻尼测试系统夹持装置
CN213954992U (zh) 一种船岸连接装置、船岸连接组件及进出料系统
JP7340894B2 (ja) 単一直立柱係留型坑口生産作業プラットフォーム
KR102640039B1 (ko) 부유식 구조물
US20150037103A1 (en) Cellular tendons for tlp
US20060251477A1 (en) Contained oil production facility
Garmage et al. Marine Production Riser-A Subsystem of the Submerged Production System

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14800359

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14800359

Country of ref document: EP

Kind code of ref document: A1