WO2014130366A1 - A system and method for inferring schematic and topological properties of an electrical distribution grid - Google Patents
A system and method for inferring schematic and topological properties of an electrical distribution grid Download PDFInfo
- Publication number
- WO2014130366A1 WO2014130366A1 PCT/US2014/016540 US2014016540W WO2014130366A1 WO 2014130366 A1 WO2014130366 A1 WO 2014130366A1 US 2014016540 W US2014016540 W US 2014016540W WO 2014130366 A1 WO2014130366 A1 WO 2014130366A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- message
- substation
- data
- grid
- remote
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 177
- 238000009826 distribution Methods 0.000 title claims abstract description 71
- 238000012545 processing Methods 0.000 claims abstract description 9
- 230000005540 biological transmission Effects 0.000 claims description 102
- 238000004891 communication Methods 0.000 claims description 36
- 230000008569 process Effects 0.000 claims description 22
- 238000001228 spectrum Methods 0.000 claims description 18
- 238000005259 measurement Methods 0.000 claims description 14
- 239000000523 sample Substances 0.000 claims description 12
- 238000002955 isolation Methods 0.000 claims description 11
- 238000012937 correction Methods 0.000 claims description 7
- 230000006870 function Effects 0.000 claims description 7
- 238000013480 data collection Methods 0.000 claims description 6
- 238000001514 detection method Methods 0.000 claims description 6
- 239000000872 buffer Substances 0.000 claims description 5
- 238000004458 analytical method Methods 0.000 claims description 4
- 238000005070 sampling Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 2
- 238000012544 monitoring process Methods 0.000 claims description 2
- 238000007493 shaping process Methods 0.000 claims description 2
- 230000002708 enhancing effect Effects 0.000 claims 1
- 230000011664 signaling Effects 0.000 claims 1
- 238000010408 sweeping Methods 0.000 claims 1
- 238000000638 solvent extraction Methods 0.000 description 19
- 238000007726 management method Methods 0.000 description 17
- 230000004044 response Effects 0.000 description 16
- 239000003990 capacitor Substances 0.000 description 12
- 238000010168 coupling process Methods 0.000 description 12
- 230000000694 effects Effects 0.000 description 11
- 230000008878 coupling Effects 0.000 description 10
- 238000005859 coupling reaction Methods 0.000 description 10
- 238000005516 engineering process Methods 0.000 description 10
- 238000004364 calculation method Methods 0.000 description 9
- 230000007246 mechanism Effects 0.000 description 9
- 230000008859 change Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- 230000008520 organization Effects 0.000 description 6
- 238000001914 filtration Methods 0.000 description 5
- 238000013507 mapping Methods 0.000 description 5
- 230000010363 phase shift Effects 0.000 description 5
- 238000013461 design Methods 0.000 description 4
- 239000012634 fragment Substances 0.000 description 4
- 230000001965 increasing effect Effects 0.000 description 4
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 238000011084 recovery Methods 0.000 description 4
- 230000002238 attenuated effect Effects 0.000 description 3
- 230000003190 augmentative effect Effects 0.000 description 3
- 230000006399 behavior Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 3
- 230000001413 cellular effect Effects 0.000 description 3
- 239000004020 conductor Substances 0.000 description 3
- 238000004134 energy conservation Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000008439 repair process Effects 0.000 description 3
- 230000007480 spreading Effects 0.000 description 3
- 238000003892 spreading Methods 0.000 description 3
- 238000007792 addition Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000013523 data management Methods 0.000 description 2
- 230000004907 flux Effects 0.000 description 2
- 230000002452 interceptive effect Effects 0.000 description 2
- 238000003973 irrigation Methods 0.000 description 2
- 230000002262 irrigation Effects 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 238000012935 Averaging Methods 0.000 description 1
- 206010010904 Convulsion Diseases 0.000 description 1
- 230000005355 Hall effect Effects 0.000 description 1
- 229920005479 Lucite® Polymers 0.000 description 1
- 241000932075 Priacanthus hamrur Species 0.000 description 1
- 208000012886 Vertigo Diseases 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000010835 comparative analysis Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000009429 distress Effects 0.000 description 1
- 230000006353 environmental stress Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000002803 fossil fuel Substances 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 229940052961 longrange Drugs 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000010355 oscillation Effects 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 239000004926 polymethyl methacrylate Substances 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
- 230000000135 prohibitive effect Effects 0.000 description 1
- 230000002829 reductive effect Effects 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 239000000344 soap Substances 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
- 230000002889 sympathetic effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
- 239000013598 vector Substances 0.000 description 1
- 231100000889 vertigo Toxicity 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B3/00—Line transmission systems
- H04B3/54—Systems for transmission via power distribution lines
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/18—Indicating phase sequence; Indicating synchronism
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00007—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00034—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B3/00—Line transmission systems
- H04B3/54—Systems for transmission via power distribution lines
- H04B3/542—Systems for transmission via power distribution lines the information being in digital form
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B3/00—Line transmission systems
- H04B3/54—Systems for transmission via power distribution lines
- H04B3/546—Combination of signalling, telemetering, protection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
- H04L41/0823—Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability
- H04L41/083—Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability for increasing network speed
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/12—Discovery or management of network topologies
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0823—Errors, e.g. transmission errors
- H04L43/0847—Transmission error
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B2203/00—Indexing scheme relating to line transmission systems
- H04B2203/54—Aspects of powerline communications not already covered by H04B3/54 and its subgroups
- H04B2203/5429—Applications for powerline communications
- H04B2203/5433—Remote metering
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B2203/00—Indexing scheme relating to line transmission systems
- H04B2203/54—Aspects of powerline communications not already covered by H04B3/54 and its subgroups
- H04B2203/5462—Systems for power line communications
- H04B2203/5466—Systems for power line communications using three phases conductors
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/0001—Systems modifying transmission characteristics according to link quality, e.g. power backoff
- H04L1/0009—Systems modifying transmission characteristics according to link quality, e.g. power backoff by adapting the channel coding
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/18—Automatic repetition systems, e.g. Van Duuren systems
- H04L1/1867—Arrangements specially adapted for the transmitter end
- H04L1/188—Time-out mechanisms
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/121—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission
Definitions
- the present invention is directed toward employing the electrical distribution grid as a short and long-range transmission medium and data-bearing network, and further toward the use of signals and messages on the network for the purpose of inferring schematic and topological properties of the distribution grid, which vary over time.
- the power grid is generally considered to be composed of two logical regions, the Transmission Grid(s) and the Distribution Grid(s).
- the Transmission Grid originates at large generation points such as hydroelectric dams, nuclear reactors, wind farms, and coal-fired or gas-fired power plants. Power from the generation point is transmitted as high- voltage alternating current (AC) over a loosely connected network of long, high- voltage lines to points where demand for power exists, such as factories, farms, and population centers.
- AC high- voltage alternating current
- Distribution Substations contain one or more Substation Transformers, which step down the voltage from high transmission line levels (typically 130kV to 700kV) to the medium voltage levels (typically from 4kV to about 35kV) at which power is distributed to consumers within a distribution service area.
- Substation Transformers At the edge of the Distribution Grid are a number of Service Transformers, which transform the medium voltage of the distribution grid to the low voltages (in the US, typically 120V, 208V, 240V, 277V, or 480V). Other voltages in addition to some of these can be used elsewhere in the world.
- a tier of one or more transformers lying schematically between the Substation Transformers and the Service Transformers, create intermediate voltage reductions between the Substation and the Service Transformers.
- Each Service Transformer powers one or more metered loads.
- a load can be a dwelling, a commercial or industrial building, an element of municipal infrastructure such as a series of street lamps, or agricultural apparatus such as irrigation systems.
- a typical distribution grid includes other elements used to balance and regulate the flow of power. Examples of such elements are capacitor banks, voltage regulators, switches, and reclosers.
- Figure 1 illustrates a typical segment of the power grid.
- Distribution grids have been designed and deployed in a variety of topological configurations. In the United States, distribution grid types are typically characterized as radial, loop, or networked. Other emerging cases are the campus grid and the microgrid. Additional topologies, not described, are used elsewhere in the world.
- Figure 2a is a topological schematic of a typical radial grid.
- a substation has one or more substation transformers.
- Each substation transformer has one or more substation busses.
- One or more three-phase feeders "radiate" outward from each substation bus, with single-phase, double-phase, or three-phase lateral lines branching off from the feeders, and tap-off points (or simply "taps") in turn branching from the laterals.
- Radial grids are inexpensive to design and build because they are simple, but they are most vulnerable to outages because they lack redundant power paths, so that any break causes at least one load to lose power.
- FIG. 2b is a topological schematic of a typical loop distribution grid.
- a power source such as a bus of a substation transformer. If the loop is undamaged, then power is available at all loads if either substation transformer is operational. If there is a break in the loop, then power is available at all loads assuming that both transformers are operational. In normal circumstances, a system of switches is used to ensure that only one substation transformer at a time is delivering power to each segment of the grid.
- Figure 2c is a topological schematic of a typical networked grid. This topology has maximum redundancy. In addition to employing multiple power sources, all the service transformers are linked to one another on the secondary side in a mesh
- Networked grids are most expensive to build and maintain, and are typically used in major urban areas such as Manhattan or Washington, DC where high- value, high- criticality loads are concentrated together.
- FIG. 2d shows a microgrid or campus network.
- Microgrids are not traditional in electrical distribution technology, but are emerging as a response to increased focus on energy conservation and on distributed generation of energy from renewable sources. Many variations are possible.
- This type of grid is typically attached to, but severable from, a wider distribution grid, and may contain its own power sources such as windmills, solar panels, or rechargeable storage batteries as well as loads.
- the entire network may employ low- voltage lines.
- a distribution substation receives high-voltage power from the transmission grid into one or more large power transformers.
- a distribution transformer may incorporate a type of regulator called a load-tap changer, which alters the voltage the transformer delivers to a power distribution bus (the substation bus) by including or excluding some turns of the secondary winding circuit of the transformer, thereby changing the ratio of input to output voltage.
- One or more feeders depend from the substation bus. If too many feeders are required, additional transformers and busses are used.
- CTs current transformers
- SCAD A Supervisory Control and Data Acquisition
- the distribution grid contains numerous other devices intended to regulate, isolate, stabilize, and divert the flow of power. These devices include switches, reclosers, capacitor banks (usually for power factor correction), and secondary voltage regulators. All these devices affect the behavior of the distribution grid when considered as a data-bearing network, as do the various loads and secondary power sources on the grid. Devices that have abrupt state changes will introduce impulse noise on the grid, as can loads turning on and off. Some devices, such as transformers and capacitor banks, filter and attenuate signals at certain frequencies.
- the service transformer is the outermost element of the distribution grid before the power is actually delivered to a consumer.
- the meter is attached at the point where the power from the service transformer is delivered to the consumer.
- Service transformers can be three-phase, dual-phase, or single phase, as can meters.
- reading meters was one of the largest operational costs incurred by electrical utilities.
- Original electric meters were analog devices with an optical read-out that had to be manually examined monthly to drive the utility billing process.
- mechanisms for digitizing meter data and automating its collection began to be deployed. These mechanisms evolved from walk-by or drive-by systems where the meter would broadcast its current reading using a short-range radio signal, which was received by a device carried by the meter reader. These early systems were known as Automated Meter Reading systems or AMRs.
- AMRs Automated Meter Reading systems
- AMRs Automated Meter Reading systems
- AMIs can collect and store readings frequently, typically as often as every 15 minutes, and can report them nearly that often. They can read any meter on demand provided that this feature is used sparingly, and can connect or disconnect any meter on demand as well.
- AMI meters can pass signals to consumer devices for the purpose of energy conservation, demand management, and variable-rate billing. Because the AMI network is separate from the power distribution grid, AMI meters are neither aware of nor sensitive to changes in the grid topology or certain conditions on the grid. Nonetheless, the introduction of AMI is generally considered to be the beginning of the Smart Grid.
- the grid is a noisy environment.
- state changes in loads on the grid as well as control and regulation artifacts on the grid itself cause impulse noise on the power line.
- Normal operation of loads like electrical motors, simple variations in the overall load, and ambient RF noise (chiefly from lightening and other weather-related causes) add up to significant Gaussian noise.
- the measured noise floor at a typical substation in the United States sits at about 80-90dB below the maximum amplitude of the 60 Hz fundamental.
- the complex impedance of the grid varies across both the frequency and time domains.
- Capacitor banks sited at points along the grid for the purpose of optimizing the power factor can cause signal attenuation.
- transformers act as low-pass filters, dramatically attenuating signals above a certain frequency.
- the threshold frequency is not the same on every distribution grid, because different arrangements and types of transformers are employed and because the transformers themselves are not deliberately tuned to filter at a specified frequency. All these variables impact the frequency response of the medium.
- injecting modulated current signals on the grid may cause interference between the injected signals themselves.
- One problematic phenomenon is crosstalk, where a signal injected on one power line is detectable on another line. When crosstalk occurs on two or more phases of the same feeder, it can be caused by inductive and capacitive coupling, as the phase lines run alongside one another for most of the length of the feeder. Crosstalk may also be due to multiple phase windings on the same transformer core. Feeder-to-feeder crosstalk has also been measured, and may be caused by reflection of the injected signal off the power bus at the substation. Given the complexity, diversity, and age of the distribution grids in the United States and the world, less is known about these phenomena than might be expected.
- ANSI/IEEE standard 519 requires that no noise be added to the odd harmonics of the fundamental at or below the eleventh harmonic.
- PRIME uses orthogonal frequency-division multiplexing (OFDM) at the physical layer, with 512 differential phase-shift keyed channels (DPSK). PRIME achieves data rates as high as 128.6kbps, but is most reliable at 21.4kbps. Its frequency range is 42-89 kHz.
- OFDM orthogonal frequency-division multiplexing
- DPSK differential phase-shift keyed channels
- G3 uses a similar physical-layer combination of OFDM and DPSK, offering 256 channels between 35 and 91k Hz with a data rate of 33.4kbps. Both G3 and PRIME are still sharply attenuated by transformers, though in most cases a receiver located on the medium-voltage side of a service transformer can successfully read meter transmissions from low-voltage sites served by that transformer, provided that the receiver is sited close enough to the service transformer. For these reasons, Smart Grid technologies based on these protocols are common in Europe and Asia. PLC protocols are also well-adapted to short-range power- line applications such as arbitrating the charging of electric vehicles.
- Audio Frequency Ripple Control (AFRC) systems are used mostly in rural areas for load management: to turn off high-consumption devices such as electric heaters and air conditioners during peak load times, or to control use of other constrained resources, such as automated farm irrigation systems.
- An AFRC transmitter sits on the high-voltage side of a substation or transmission transformer and may service multiple substations. AFRC data rates vary from 2 to 10 bits per second, and the maximum message length is about 100 bits. After such a transmission, the transmitter requires a long idle period before it can transmit again, with a maximum duty cycle on the order of 10%.
- AFRC systems cause obvious flicker, but not at a dangerous frequency. Because they are typically used in areas of low population density and transmissions are infrequent, the side effects are tolerated. AFRC is a broadcast technology operable from high voltage to low voltage and thus cannot be used for collecting meter data or other data about edge conditions, because that requires transmitting from low voltage to higher voltage.
- Aclara®'s TWACS® technology operates by injecting pulses onto the power line when the fundamental power carrier crosses the zero point - twice per 50Hz or 60Hz cycle. This method operates either from substation to edge or edge to substation, and uses a polling protocol to avoid having one edge transmission interfere with another. It is slow because it is tied to the fundamental, and because of the polling architecture. It has been criticized by consumer groups for the amount of impulse and broadband noise it introduces onto the grid.
- Landis+Gyr employs a low-cost, low-frequency edge transmitter originally developed by Hunt technologies, intended to operate in conjunction with AFRC to provide two-way communication over long distances on the grid.
- the data transmission method using this transmitter is cheap and reliable, but limited. It induces sympathetic current oscillations by connecting variable impedance to the power line.
- the data rate is low because the transmitter is dependent on a voltage relative to the power carrier, so that only a few pulses can be injected per 50Hz or 60Hz cycle. To achieve enough redundancy for detection at the receiver, the same signal must be repeated for several cycles, resulting in a data rate measurable in cycles per bit rather than bits per cycle.
- the method is also very noisy, in that each pulse resonates across a broad frequency band.
- Grid Map This information, together with the geospatial locations of the same assets, is called the Grid Map.
- Utilities typically maintain two maps or models of the Grid.
- a Physical Network Model aggregates the geospatial location of the assets on the grid.
- PNMs thanks to modern GPS technology, are reasonably accurate with respect to point assets such as substations, capacitor banks, transformers, and even individual meters. Inaccuracies stem from failure to update the maps when repairs or changes are made. For example, a service transformer may move from one side of a street to the other as a result of street widening. Longitudinal assets, especially buried cables, are less well represented in the PNM.
- the PNM can contain as-designed data, but since in many places the cable was laid before global positioning technology had matured, the designs were based on ground-level survey, and the original maps may or may not have been updated to reflect changes. Subsequent surface changes complicate the problem of verifying the geographic path taken by medium-voltage distribution lines.
- the second model is the Logical Network Model, or LNM.
- LNMs describe how grid components are connected, without reference to their geospatial location.
- the LNM changes frequently. During the course of repairs, the way transformers attach to taps and laterals, and meters attach to transformers, may be altered. Such changes affect both the LNM and the PNM.
- changes are recorded manually by field agents. The manual reports may or may not be updated in the LNM and PNM, and when updates are made the time lag between maintenance occurring and its being recorded is variable. Additionally, many grid components, especially regulators, switches and reclosers, change state automatically.
- Examples of significant but not reliably known aspects of the (actual) Grid Map are the feeder and phase by which each meter is currently powered, the relative load on each phase of each feeder, especially on subordinate branches (laterals) of the grid, the actual voltage supplied to each meter, the power factor along the edges of the grid, whether all the power drawn at a transformer is metered, and the state of switch sets, especially after a weather event that has caused outages. If this information were reliably known, utilities could conserve energy, much of the savings from which would pass on to consumers, save maintenance costs, prolong the life of equipment in the field, improve the efficiency and life of utility and consumer equipment, avoid outages, and reduce recovery times after unavoidable outages.
- Smart meters can measure and record current, voltage and power factor (or phase angle) at the meter, but because they have limitations on how much data they can store and how much data capacity is available for transmission, utilities may choose not to program the meters to report these data.
- the other data elements described cannot be detected by most modern AMI systems.
- the goal of a well-instrumented fine-grained conservation voltage regulation system might be to reduce the typical effective voltage at a single- phase meter to 114vAC as measured from one leg of the typical 240vAC service to neutral.
- 114vAC effective at the meter is as low as it is reasonable to go without risking under-powering some outlets in the building, (i.e. not less than HOvAC at any outlet) due to additional losses which are typical inside the home or office.
- PRIME uses FDMA with DPSK.
- CDMA Code Division Multiple Access
- WCDMA Wideband Code Division Multiple Access
- CDMA2000 Code Division Multiple Access
- Multiple access means that more than one transmitter can use the same channel (here, a power line) without the signal from one transmitter destructively interfering with the signal of another transmitter.
- each transmitter which uses the same band is assigned a distinct reference code or chip.
- the transmitted signal equals the exclusive OR (XOR) of the chip with the data signal. If the chips (treated as binary vectors) are mathematically orthogonal, then the receiver can separate out the several data signals from the additive received waveform.
- a requirement of standard CDMA as used in a wireless application is that there is a dynamic feedback loop from receiver to transmitter to ensure that the power of the several signals received from the different transmitters is the same or nearly the same at the receiver.
- the feedback loop permits the transmitters to rapidly and dynamically adjust their
- Frequency Division Multiple Access means that multiple channels in a medium are created by having different transmitters use different frequencies (or different frequency bands). A signal injected on the power line creates harmonic signals of different amplitudes. If the frequency-division bands are incorrectly chosen, then the harmonics from different bands can coincide and create false signals that interfere destructively with the intended signals. The obvious means of eliminating this effect is to place the channels far apart on the frequency spectrum. This, however, reduces the overall data bearing capability of the medium by "wasting" spectrum.
- a third channel access method is Time Division Multiple Access, or TDMA.
- TDMA Time Division Multiple Access
- the channel is divided cyclically over time, with each transmitter sharing the channel assigned a specific time slot in the cycle where that transmitter uniquely has permission to transmit.
- TDMA requires that all the transmitters have system clocks which are synchronized with one another within a close enough tolerance that one channel accessor does not overlap its transmission with that of another channel accessor.
- the present invention includes a system comprising at least one intelligent edge transmitter called a Remote Hub Edge Transmitter, each small enough to reside inside a Smart Meter.
- a Smart Meter that contains a Remote Hub Edge Transmitter is called a Remote Hub GLA Smart Meter, or simply a Remote Hub.
- the Remote Hub transmits by injecting a modulated current into a power main that supplies an electric meter.
- the system also includes at least one receiver sited at at least one electrical distribution substation operable to receive transmissions from the intelligent transmitters. No additions or alterations to the distribution grid between the Smart Meters and the substation are required to allow the receiver to reliably detect and decode transmissions from the edge transmitters.
- the system further comprises one Computing Platform for each substation that contains at least one receiver, the Computing Platform having access to a conventional high speed network such as the Internet for transmitting data acquired from the at least one receivers to a data center at which the received data is used by a Concentrating Computer System, or Concentrator, to update other utility systems such as, but not limited to, the LNM and PNM.
- a Concentrating Computer System or Concentrator
- the Computing Platform and the Concentrator may be the same server, with the data center sited inside the service area of the microgrid.
- the system may additionally comprise Smart Meters or other devices, such as field-deployed switches and voltage regulators, which are not Remote Hubs, augmented by intelligent platforms operable to employ short-range PLC transmissions using a well-known protocol such as G3 or PRIME to communicate with at least one Remote Hub.
- Smart Meters or other devices such as field-deployed switches and voltage regulators, which are not Remote Hubs, augmented by intelligent platforms operable to employ short-range PLC transmissions using a well-known protocol such as G3 or PRIME to communicate with at least one Remote Hub.
- Such augmented devices which are not Remote Hubs are designated as Subordinate Remotes, and any augmented device, without regard for whether it is a Subordinate Remote or a Remote Hub, may be referred to generally as a Remote.
- Each Remote Hub manages only Remotes powered by the same service transformer as the Remote Hub.
- a short range on-grid network consisting of a collection of Remotes comprising at least one Remote Hub and zero or more Subordinate Remotes is called a Transformer Area Network
- Subordinate Remotes, Remote Hubs, the Substation Receiver, and the associated Computing Platform and Concentrator all contain stored programs on non-volatile computer-readable memory on which are stored instructions for operating a Grid Location AwareTM (GLA) network.
- the Subordinate Remotes, Remote Hubs, the Substation Receiver, and the associated Computing Platform and Concentrator also contain processing units (CPUs) which execute the stored instructions allowing each node in the network to implement methods for organizing the on-grid network and transmitting and receiving messages on the network in order to permit other methods embodied as stored programs and executing on the at least one Substation Receiver, Computing Platform and Concentrator to detect and infer schematic grid location attributes of the network and publish the detected and inferred attributes to other application systems including geospatial information systems maintaining the logical and physical network model.
- CPUs processing units
- One method implemented by the Remote Hubs and the Substation Receiver provides for channelizing and modulating current signals transmitted from the at least one Remote Hub in the service area of an electrical distribution substation such that the signals are received at the Substation Receiver and the Substation Receiver is able to infer the electrical phase of the specific feeder upon which the signal was transmitted.
- the signal is transmitted on a broad band of the frequency spectrum called a channel, but the frequency bands of channels are selected so that the frequency is lower than the low- pass threshold of the service transformer that powers the Edge Transmitter.
- modulation techniques have been used in this context, including frequency spread modulation, Binary Phase-Shift Keying (BPSK), and Quadrature Phase-Shift Keying (QPSK).
- an Edge Transmitter is capable of encoding at least 80 bits per second of post-FEC (forward error correction) data in a burst transmission at low but adequate current so that the signal is not so significantly attenuated by intermediate transformers, capacitors, long lines, underground wiring, and the like to prevent reception by the Substation Receiver.
- post-FEC forward error correction
- an Edge Transmitter may be capable of encoding at lower bit rates. Encoding at lower bit rates improves reliability, but limits the amount of data transmitted.
- the method requires little power to inject the signal, so that the signals as modulated do not radiate energy in the RF spectrum or cause flicker or hum on devices in proximity to the transmissions or exhibit any of the other undesirable characteristics of prior art methods of on-grid messaging.
- the method works on all the grid topologies described herein above, and can support a sufficient number of Remote Hubs per substation transformer that even the largest substations can be fully covered by the resulting Grid Location AwareTM network.
- the Substation Receiver may also implement a variety of methods of sampling the ambient waveforms at a multiplicity of frequency bands on the power lines, filtering out the high-energy harmonics of the fundamental power wave, detecting the signal on one or more of a plurality of power lines (comprising each of the three phase lines of each feeder emanating from each bus of a given substation transformer), inferring the phase and feeder combination on which the signal was transmitted based upon a comparative analysis of each of the power lines, ranking them based on the signal quality, error performance, and/or amplitude versus frequency at a multiplicity of points throughout the spectrum of interest.
- the Substation Receiver When the Substation Receiver has completely processed a transmission, it packages the decoded transmission together with any additional information about the message inferred by the receiver logic, such as the phase and feeder on which the message was transmitted, the channel on which the message was transmitted, and an indication of the parameters of the modulation method used for that transmission.
- the Substation Receiver forwards the entire message package to the substation Computing Platform using a normal TCP/IP-based protocol such as HTTP.
- Another aspect of the invention is a method of identifying which frequency bands are the best data carriers at each substation transformer, defining at least one data- bearing channel on the candidate frequency bands, optionally defining a series of time slots on each channel in which edge devices may transmit, selecting a modulation technique, and, if frequency spreading is the chosen modulation technique, defining a set of at least one orthogonal codes or "chips" per channel to be used for modulating transmissions.
- the combined channelization model is then employed by the method to provision the collection of GLA Smart Meters, including both Remote Hubs and Subordinate Remotes, supplied with power by a substation to assign to each of the at least one Remote Hubs a policy describing on which frequency-based data-bearing channel(s) the Remote Hub may transmit, and under what circumstances the Remote Hub must transmit.
- the policy describes multiple aspects of the channels, including modulation method, frequency bands, chip selection algorithm if chips are used, and message preamble pattern. Frequency-based channels and chips must be assigned in such a way that transmissions are not destructive when segments of the grid are, for example, switched from one substation transformer to another.
- the provisioning scheme anticipates and minimizes the problem of crosstalk, and provides means for logic on the Substation Receivers, the substation Computing Platforms and the Concentrator to hierarchically process the messages received from each Remote Hub and use them to infer the state of stateful non-edge features of the grid, such as switches, reclosers, and breaks in the power lines.
- Other properties of the transmission are determined dynamically by firmware and instrumentation on the Remote Hub.
- the power used when transmitting may be related to the impedance of the line as measured immediately prior to transmitting.
- a number of techniques may be employed for managing channel quality, depending on the availability of Substation-to-Edge broadcast capability from adjacent networks, such as an AMI, AMR, and/or radio broadcast transmitter.
- Software on the Substation Receivers and Computing Platform may monitor aspects of the channel quality and take measures to ensure that messages from the Remote Hubs experience an acceptably high success rate.
- an acceptably high success rate may be ensured by rotating the responsibilities of the several channels, except that at least one non-structured channel is not rotated but remains dedicated to provisioning and alerting.
- the network may be provisioned to have Remote Hubs alternate between transmitting on the better channel and the other channel. This reduces the overall probability of a given Remote Hub experiencing an unacceptably high message failure rate.
- channel management may be to alter the definition of a channel so that the channel has a wider frequency spread, and/or uses more FEC bits per burst. Still another option is to move a channel to a different place in the spectrum, either permanently, or at different times of the day based on an observed cycle in impedance, impulse noise, or some other characteristic of the channel relevant to message success rate. None of these mechanisms require a fast feedback loop between the Edge Transmitters and the substations, as is the rule with some modulation techniques such as CDMA. Rather, the apparatus at the substation conducts a time-duration analysis of the behavior of the network, and then broadcasts new provisioning policy based on the analysis. Many characteristics of the network may be taken into account when making a policy change, such as observed patterns of crosstalk, variations in impedance, harmonic mixing, and the like. A policy change may impact multiple substations which may be interconnected by switching systems or other forms of redundancy.
- Yet another aspect of the invention is a method employed by the stored programs at each of the at least one Remote Hubs to integrate the Edge-to-Substation GLA network with adjacent networks, such as the AMI (regardless of the AMI architecture) and the higher-frequency PLC based Transformer Area Network, as well as with the native intelligence of the Smart Meter platforms themselves.
- the Remote Hub whose high-frequency PLC protocol stack (e.g. PRIME) enables it to act as the master node in the TAN, carries out the TAN-management activities.
- TAN management activities include, but are not limited to, polling the PLC protocol stack to detect newly discovered Subordinate Remotes.
- the Remote Hub also polls the local native Smart Meter intelligence to obtain local data such as current, voltage, and phase angle, and polls the reachable population of Subordinate Remotes to obtain similar data from the native Smart Meter intelligence at the Subordinate Remotes.
- the Remote Hub stores, compresses, and/or processes the gathered data according to the policies and application algorithms on the Remote Hub until the operable policy dictates that the gathered data and/or derived results of the gathered data may be transmitted to the Substation Receiver by the Edge Transmitter module of the Remote Hub.
- the Remote Hub is further responsible for using its provisioned policy and discovered TAN configuration data to determine when it is appropriate to format, encode, and transmit an alert message on an edge-to-substation channel.
- Such messages may include pairing messages, which report the discovery of a new Subordinate Remote, pairing alerts, which report the loss of communication with a known Subordinate Remote, other alerts which report changes in the TAN or at meters (such as power surges, sags, and spikes), and scheduled data reports which transmit the data collected from the native Smart Meter intelligence in the TAN to the apparatus at the substation.
- channels are not time-slotted, and Remote Hubs may transmit only exception reports or computed data reports on a randomized posting schedule in which an adequate number of transmissions are performed to provide an acceptable probability of achieving at least one successful transmission at the desired rate.
- the Remote Hub may require a method of synchronizing its system clock to a known tolerance with other Remote Hubs in the same service area.
- Each Remote Hub may poll the local meter or AMI network to obtain the AMI network time, which the Remote Hub uses to determine when scheduled transmissions must occur, and to obtain data blocks received via the AMI which are intended for the Grid Location AwareTM intelligence on the Remote Hub or on the Subordinate Hubs.
- data blocks may include firmware updates and changes in network policy or provisioning which will affect the subsequent behavior of the Subordinate Remote.
- the Remote Hub distributes firmware updates and policy changes to the Subordinate Remotes as necessary via the local PLC channel of the TAN. Additionally, Remote Hubs may synchronize based on a wireless broadcast signal.
- Remote Hubs and/or Subordinate Remotes may contain a Global Positioning System (GPS) receiver.
- GPS Global Positioning System
- the GPS signal may be used for synchronizing the Remote Hubs in addition to providing means to associate the logical network model with the physical network model.
- Concentrator maintain two master data tables which can be initially extracted from the utility's PNM and/or LNM, or which can be entirely accumulated from reports from the Remote Hubs. These data tables are the Inventory, which is a table of all the Remote Hubs and Subordinate Remotes which have been detected, and the Grid Map, which is a schematic representation of the grid's topology and state, similar to an LNM.
- the Grid Map and Inventory at substation Computing Platforms may be partial, representing only the portion of the grid accessible to the substation at least at certain times.
- the Grid Map and Inventory at the Concentrator generally represent the entire utility service area, although gaps in the Grid Map may exist if instrumentation of the service area with Remote Hubs and Subordinate Remotes is incomplete.
- the Computing Platform at a substation When the Computing Platform at a substation receives any message from a Subordinate Remote, it compares the data in the message and the message enhancements inferred by the Substation Receiver with the data in the Inventory and Grid Map. The logic and policy on the Computing Platform are used to determine if the local copy of the Grid Map and Inventory need to be updated, and whether the update must be sent on to the Concentrator to update the master Grid Map and Inventory. If the policy in effect at the Computing Platform so dictates, the data collected from the edge is also forwarded to the Concentrator. The Concentrator in turn carries out policies dictating which events and scheduled reports must be published out to other data center applications.
- Figure 1 is a simplified illustration of the power path from a generation point to a distribution substation to a consumer, showing the high voltage, medium voltage, and low voltage regions of the distribution grid and depicting some of the major features of an electrical distribution grid.
- Figure 2a is a simplified fragment of a radial-architecture distribution grid showing the lack of cycles in the grid topology.
- Figure 2b is a simplified fragment of a looped-architecture distribution grid depicting two substations each able to deliver power to the service transformer delivering low-voltage power to the group of residences shown.
- the substation at left is currently powering the residential group.
- Figure 2c is a simplified fragment of a networked architecture distribution grid.
- the four feeders shown could originate at a single substation (typical) or at multiple substations.
- the rectangular grid connects service transformers peer-to-peer on the low- voltage side so that all feeders deliver power to the loads below the substations concurrently.
- Figure 2d is an exemplary simplified fragment of a campus network.
- a three- phase transformer powers a 480 Volt Bus from which depend a number of three-phase laterals which run through the campus powering individual electrical outlets. Adding low-voltage generation points to the bus and providing means to isolate the bus from the distribution line converts the campus network into a self-sufficient micro grid.
- Figure 3 is a high-level software deployment model of a Grid Location AwareTM network including back office features, substation apparatus, and transformer area networks (one expanded) including intelligence at remote hubs and subordinate remotes.
- FIG 4 is a simplified block diagram of the substation apparatus in a Grid Location AwareTM network, illustrating how the Grid Location Aware(tm) network apparatus couples to the existing SCADA lines in the substation and how the data from the Substation Receiver is backhauled to a data center.
- FIG. 5 is a block diagram of the multi-threaded software architecture in the
- Substation Receiver showing how Edge-to-Substation signals are acquired, channelized, detected, demodulated, decoded, and stored for processing and backhaul.
- Figure 6 is an elevation of a Remote Hub GLA Smart Meter.
- Figure 7a is a top view of an accurate 3-dimensional model of one embodiment of the Edge Transmitter module of the Remote Hub GLA Smart Meter for a Form 2S residential meter.
- Figure 7b is a bottom view of the same model of the Edge Transmitter module.
- Figure 7c is a schematic block diagram of the electronic components of the Edge Transmitter module of the Remote Hub GLA.
- Figure 7d is a detail of the isolation circuit of the Remote Hub.
- Figure 8 is an elevation of a Subordinate Remote GLA Smart Meter.
- Figure 9 is a schematic block diagram of the electronic components of the PLC communication module of a Subordinate Remote.
- Figure 10a is a graph (not to scale) of a snapshot of the AC waveforms on a distribution grid at a meter connection point. The power fundamental and its odd harmonics are highlighted, and three CDMA-like broadband frequency-divided Edge-to- Substation channels are shown, one extended over time to illustrate time divisions.
- Figure 10b provides a time-domain view of three Edge-to-Substation channels showing two scheduled and one unscheduled channel.
- Figure 10c illustrates a typical structure of a single Edge-to-Substation message burst in one embodiment of the invention.
- Figure lOd illustrates an alternative structure of an Edge-to-Substation message burst in another embodiment of the invention.
- Figure lOe illustrates how using multiple chips on the same frequency band may prevent collisions.
- Figure 11 illustrates communication paths local to the Transformer Area Network, both within a GLA Smart Meter and between the Remote Hub and a Subordinate Hub. Note that in Figure 11 the elevations of the Remotes depict embodiments where a secondary communication module is not employed.
- Figure 12a illustrates a three-phase service transformer with three TANs.
- Figure 12b illustrates a three-phase service transformer with one TAN and Proxy Remotes.
- the present invention comprises a system and methods for constructing and operating an on-grid data collection network in such a way as to integrate the network with other adjacent networks and devices present at the edge, substations, and features of an electrical distribution network, wherein the other networks and devices may include Smart Meters and the AMI and a conventional network such as the Internet.
- the system and methods further integrate the data collected by the on-grid data collection network at a data center and may publish the collected data to other applications.
- the system and methods may also employ the capabilities of the integrated networks to infer otherwise unknown static and transient attributes of the electrical distribution grid and report them via the integrated networks for the purpose of improving the physical and logical network models of the Smart Grid. This leads to the ability of the models to support Smart Grid applications such as conservation voltage reduction, volt/Var optimization, load balancing, fault isolation, and recovery management.
- FIG. 3 is a logical block diagram of the intelligent platforms of one embodiment of the invention showing where the different intelligence resides with respect to a converged network comprising a conventional wide area network such as the Internet, an Advanced Metering Infrastructure, the medium voltage electrical distribution grid, and the at least one Transformer Area Network connected at the edge of the medium voltage electrical distribution grid via at least one service transformer.
- Figure 3 shows that the system may be divided into three regions or tiers.
- the edge tier 301 comprises at least one Transformer Area Network (TAN) 302.
- Each TAN comprises a Service Transformer 303, at least one Remote Hub 304, and zero or more Subordinate Hubs 305.
- the Remote Hub communicates with the Subordinate Hubs via a standard short range, PLC protocol, such as PRIME.
- the Remote Hubs 305 may be operable to transmit current-modulated signals.
- the installation procedure may provide a mechanism to allow a newly installed Remote of either type to detect whether Remote Hub is already present on the local TAN.
- the invention does not require the installation of communication devices or other modifications between the edge tier and the substation tier. However, if it is desirable to collect data from a feature of the medium- voltage grid such as a capacitor bank, a variation of the Remote Hub device may be installed there.
- the substation tier 306 comprises at least one Substation Receiver 307 operable to receive transmissions from the Remote Hubs in the edge tier without recourse to any signal amplifiers, bypass mechanisms, or bridges installed on the medium voltage infrastructure of the electrical distribution grid.
- Receiver(s) connect via a local area network to a Computing Platform 308 containing non-volatile computer-readable memory and a CPU for storing and executing the software 309 which maintains the Inventory and Grid Map databases and carries out the tasks of provisioning and managing the converged data network. Additionally the Computing Platform stores and executes software 310 which processes the Inventory and Grid Map data in combination with messages received from the Substation Receiver 307 to infer information about the state of the Grid over and above what the Substation Receiver alone can detect based only on incoming transmissions.
- the computer-based components of the Substation Receiver and the Computing Platform components are hosted on the same server.
- the communications protocol such as HTTP used to transfer data between the
- Substation Receiver and the Computing Platform software components need not change, even though there is no physical local area network required.
- Computing Platform 308 connects to a conventional wide area network 311, such as the Internet, for the purpose of communicating with a Concentrator 312 in the data center tier 313.
- a conventional wide area network 311 such as the Internet
- the servers may be configured in a redundant cluster to ensure continuous operation of the system.
- the Concentrator 312 hosts software with an analogous architecture to the software in the substation(s), comprising a network and data management component 314 providing software services to one or more applications 315 for Grid Location Awareness.
- the applications use conventional network-based messaging protocols such as but not limited to JMS, SOAP, and REST to publish information to subscriber applications such as a Geospatial Information System 316.
- the data and network management component 314 may integrate with AMI head-end 317 for the purpose of causing the AMI network to broadcast data blocks to the Remote Hubs in the edge tier 301.
- Data and network management component 314 may integrate with AMI head end 317 using a standard protocol and/or a proprietary interface defined by the AMI vendor.
- Substation-to-Edge broadcast capability and/or time synchronization from the substations to the Remote Hubs may be provided by medium-voltage PLC transmitters attached to the feeders at the substation rather than using an AMI for this purpose.
- a separate radio transmitter broadcasting messages originating at the substation may be employed.
- the radio transmitter does not need to be physically located at the substation as long as there is a low-latency network connection from the Computing Platform at the substation to the transmitter.
- the same radio transmitter may serve as the Substation-to-Edge channel for a multiplicity of substations.
- synchronization of the Remote Hub clocks may be provided as described in US Patent Application No.
- FIG. 4 details how in one embodiment the Substation Receiver 401, here shown co-hosted on a single server with the other software components of the Computing Platform, monitors the feeder lines 402 on the low- voltage side of the substation transformer 403 by attaching secondary current sensors 404 to the SCADA loops 405 already in place.
- the secondary current sensors provide inputs to the Substation Receiver.
- This coupling method allows a Substation Receiver to be installed on a substation transformer without disrupting the operation of the substation.
- Other coupling methods such as hot-stick clamp-on current transformers are well known in the art, and may be equivalently employed in lieu of the secondary coupling to SCADA loops method described herein.
- Some substations may lack SCADA loops, or they may be inaccessible due to physical placement or due to utility regulations.
- Figure 5 details the software architecture and method used by one embodiment of Substation Receiver logic 501 to capture, detect, differentiate, and decode the multiplicity of signals being received from the Remote Hubs at the edge of the portion of the distribution grid supplied by the substation transformer associated with this Substation Receiver.
- Inputs from the GLA CT lines 504 arrive at data acquisition module (DAQ) 502 in real-time as raw digitized signals where they are then buffered and recorded on ramdisk 503.
- DAQ data acquisition module
- Channelizer 505 reads the raw signals and reorganizes them by frequency band of interest into channelized signals stored on ramdisk 506.
- Preamble Detector 507 samples the channelized signals received on every feeder-phase attempting to recognize the one or more preamble patterns which precede every transmission.
- the Preamble Detector looks for all legitimate preambles, thereby allowing for the receipt of transmissions that are outside their allocated time slots or which were transmitted on a non-slotted channel.
- the Preamble Detector may also use its knowledge of the channel time slots in order to minimize the amount of channelized recordings it must sample.
- the Preamble Detector finds a preamble, it determines and marks the point or points in the data stream at which the Demodulator 509 should start processing. Multiple copies of the same message may be detected due to crosstalk.
- Preamble Detector 507 provides the marker information and Channelized signal data to the Demodulator through ramdisk 508.
- Demodulator 509 reads all copies of the messages from ramdisk 506, uses the frequency bands and possibly time slots in which the messages were found and the known policies of the Remote Hubs to determine how to decode the message.
- Policy elements may include the modulation technique in use on the channel, the time based access policy in use, and, if frequency- spread modulation is used, which chips could have been used in modulation. Sometimes there may be more than one possible choice of chip. If the demodulator attempts to apply the wrong chip, this will be indicated by a demodulation error and/or FEC failure.
- This parallelized embodiment of the receiver logic permits multiple processor cores to operate on each message stream, with the modules early in the data flow operating on later transmissions, while modules late in the data flow operate on earlier transmissions.
- Data Manager 514 may be responsible for
- the Data Manager also can copy data from the ramdisks to a large archive disk 513 for later study and post-processing. By the time the messages have been demodulated and written to ramdisk 510, they have been enhanced with enough information to identify the transmitter and infer the feeder and phase on which the message was transmitted, as described in more detail below.
- the message bundle for each feeder-phase on which the message was received may include, but is not limited to, the signal amplitude at characteristic frequencies within the frequency band, the signal quality as determined by Demodulator figure of merit measurements, the time the signal was received, and the chip, if any, with which the message was encoded.
- These message bundles are passed to the Network Management and Grid Location Awareness software via interface 511. These software components, not shown in Figure 5, but shown as 309 and 310
- the software components 309 and 310 on the Computing Platform 308 decode the demodulated, error-corrected message received from the Substation Receiver at the semantic level.
- the semantic decoding may include decryption and a CRC check on the decrypted message. This helps preclude the introduction of false data, for example due to tampering with the firmware on the Remote Hubs, or installation of a meter from a different service area on the network for malicious purposes.
- the data payload in the message may yield additional grid awareness information.
- a pairing message indicates that a new meter has been installed successfully, or that a known meter is now connected to a different service transformer or a different phase of a multi-phase transformer.
- Scheduled data messages may provide information about voltage levels, demand, and power factor at the edge, as well as any other data or results computed from data available from the instruments at the Remotes, limited only by the data-bearing capacity of the channels. Even the failure of a scheduled message to arrive is informative, indicating that there may be an outage. Any copy of the message may be used to extract data, not only the copy from the feeder and phase on which the message was determined to have been transmitted. Sometimes the main copy may contain bit errors while crossover copies do not.
- Computing Platform 308 may analyze the archived raw and enhanced signal quality data in order to determine whether beneficial changes in channel management ought to be made. When such changes are identified, Computing Platform 308 may forward recommendations to the Concentrator to ensure that the impact of all contemplated policy changes is understood at every substation that may be affected before the policy is put into effect.
- FIG. 6 shows an elevation of a single-phase form 2s GLA Smart Meter 601 which is operable to act as a Remote Hub in a Grid Location Aware network.
- Form 2s is standard format for a residential single -phase meter in the United States.
- Other embodiments of the Remote Hub device may integrate with three-phase meters, or not be associated with a meter at all, but plug into a 120V or 240V or other voltage outlet located at a building, especially in a microgrid setting where the edge of the network is defined with a higher resolution than in a typical utility service area.
- the Remote Hub device may be integrated with other devices and instruments on the distribution grid, such as voltage regulators, capacitor banks, step-down transformers, and the like.
- a typical Smart Meter has a layered design of circuit boards conformal to the meter housing, such as a cylindrical transparent dome constructed of glass or Lucite.
- the dome may be approximately 1.5" taller than usual to accommodate the height of the Edge Transmitter module 604.
- the height of the meter housing varies from one manufacturer and model to another and does not place the meter in violation of the form standard.
- Nearest the top of the housing is the Calculation and Display Board 602, which is part of every Smart Meter.
- the display features on the Calculation and Display board such as indicator lights and a digital readout may be accessed by other components in the housing via interface 606.
- the Communications module 603 contains the AMI transceiver circuitry and intelligence.
- the components of the Communications module 603 are contained on the Calculation and Display Board, but other smart meters can accommodate multiple types of Communications Modules by placing the communication components on a separate board as shown. Both configurations are common. If on a separate board, Communications Module 603 communicates with logic on the Calculation and Display board 602 via an interface and cable 606. Other types of component- to-component interfaces are possible internal to the Smart Meter.
- the Edge Transmitter module 604 contains the long-range GLA edge transmitter and also the short-range PLC transceiver for the TAN communications. Module 604 also has a CPU/microcontroller with nonvolatile memory that hosts and executes the stored programs of the Remote Hub control logic, controlling the Edge Transmitter and the PLC transceiver, and the interface 606 to the other logic boards 602 and 603.
- FIGs 7a, 7b, and 7c show top, bottom, and schematic views of one embodiment of the Edge Transmitter module.
- the Edge Transmitter Module communicates with other components of the meter 701 via UART (Universal Asynchronous Receiver/Transmitter) 712. Power is delivered to power supply 703 from AC mains 702. Power supply 703 provides appropriate low voltage DC power to computing unit 717, Amplifier Circuit 705, and Class D Amplifier 707.
- Computing unit 717 is a microcontroller processing unit with on-board volatile and non-volatile memory, and is used for both short range and long range digital signal processing and protocols 704, scaling and filtering 713, and to drive amplifiers 707 and 705.
- PLC Amplifier Circuit 705 and PLC Coupling Circuit 706 are adjusted so that the medium-frequency signal emitted does not propagate outside the TAN, relying on the service transformer' s filtering properties at this frequency, as described in more detail below.
- the coupling circuit 708 for long range transmissions is much more powerful, requiring a special isolation circuit 711 which prevents coupling circuit 708 from resonating with other long- range transmissions and grid noise at the frequencies to which it is sensitive, when the Remote Hub is not transmitting on a long-range channel.
- the main components of the coupling circuit 708 are transformer 709 and capacitor 710.
- the Edge Transmitter module may contain a GPS receiver, such as GPS receiver 718 shown in Figure 7c.
- the Edge Transmitter module may have access to the GPS signal from a GPS receiver located on another component of the Remote Hub, such as the Calculation and Display board, or on a mobile computing device used by an Installer.
- the Remote Hub may use the GPS signal to record its geospatial coordinates, and/or for synchronizing transmissions on a slotted channel so as not to collide with transmissions from other Remote Hubs.
- a Remote Hub may be programmed to report its geospatial coordinates, or a function of its geospatial coordinates, on an Edge-to-Substation channel or to permit them to be read by a mobile computing device.
- FIGs 7a and 7b illustrate how the components of Figure 7a may be arranged to conform to the shape of a form 2S electrical meter.
- transformer 709 and capacitor 710 may be large components. Shown here removed from the assembly to reveal the transformer, flux shield 715 normally covers transformer 709 to prevent magnetic flux from the large transformer from interfering with the metrology unit below it.
- the components of Power Supply 703 occupy a region of the Remote Hub module at the upper left, and the components of Class D amplifier 707 are shown at the upper right.
- a single microcontroller 717 contains circuitry, a processor, and nonvolatile memory for firmware protocol stacks and network management logic 704, 705, and 713 (from Figure 7c).
- PLC coupling circuit 706, isolation circuit 711, and an amplifier capacitor 716 for the long-range edge transmitter are components at the lower right.
- Connector 712 is the connector for interfacing with the other logic boards in the meter housing.
- Figure 7d details the isolation circuit 711.
- This circuit provides the ability to disconnect the coupling circuit of the Edge-to-Substation transmitter from the power line. It is desirable that the Remote Hub be isolated from the power line except when it is transmitting. This is because the coupling circuit represents a substantial load when connected to the power line.
- the isolation circuit consists of a Triac 718 and a relay 719. The purpose of the Triac is to allow connecting to the power line at the time of a zero crossing of the line voltage. This prevents the generation of large transients that can damage components in the Remote Hub. Additionally, making the connection with the Triac removes the concern of arcing on the relay contacts that reduces the life of the relay.
- the sequence of events when a Remote Hub interacts with the power line is:
- the Triac is closed at a zero crossing of the power line
- the desired action (generally a transmission) is performed
- the Triac is opened at a zero crossing of the power line.
- Figure 8 is an elevation of a standard Smart Meter 801 with a standard
- Meter 801 becomes a Subordinate Remote GLA Smart Meter with the addition of PLC
- All three modules (if three are present) communicate via an interface, here, a serial interface or UART 805.
- Other embodiments may employ a different, functionally equivalent internal inter-component interface.
- FIG 9 is a schematic diagram of the PLC communications components on the Communications Module of one embodiment of a Subordinate Remote.
- the communications module of a Subordinate Remote comprises the basic meter 901, power input from AC mains 902, interface to the basic meter 907, power supply 903, microcontroller unit 904, amplifier circuit 905, and PLC coupling circuit 906.
- the transmitter may be tuned to ensure that the signals are sufficiently attenuated by the service transformer not to be received above the service transformer or below adjacent service transformers.
- Subordinate Remote may also contain a GPS receiver.
- a Subordinate Remote may be programmed with its geospatial coordinates by means of a GPS receiver in a mobile device used by an Installer.
- a Subordinate Remote which knows its geospatial coordinates may report them over a Transformer Area Network to a Remote Hub. This allows the Remote Hub to compute extended geospatial information such as the area and extent of the TAN.
- the Remote Hub may report this extended geospatial information on an Edge-to-Substation channel, or the information may be read from the Remote Hub by a mobile device used by an Installer or other field engineer.
- Figure 10a illustrates both the characteristics of the low end of the frequency spectrum on a feeder-phase line of a typical distribution grid and the method employed by a Remote Hub's Edge Transmitter to inject current modulated signals onto the grid in such a way to allow all the TANs served by one substation transformer to be able to transmit scheduled Grid Location Awareness reports at least twice in each 24 hour period, and to additionally transmit alerts as necessary, without creating any of the difficulties described herein above which have been observed with prior art methods of on-grid transmissions.
- Important characteristics of the spectrum are the 50Hz or 60Hz power fundamental 1001, its harmonics 1002, and the noise floor 1003. It should be noted that from time to time a spike of impulse noise may exceed the usual noise floor.
- Transmitter occupy a broad candidate spectrum lying between the 50 or 60 Hz power fundamental and the low-pass threshold of the service transmitters on the host power grid.
- the candidate spectrum for a particular substation is determined by measurement and set by policy and subject to regulatory constraints. Measurements determine which band or bands of the candidate spectrum are reliably received at each substation transformer. If a usable band is wider than the bandwidth needed for a reliable transmission, then the channel band may be defined to be variable. In such cases, the Remote Hub conducts measurements, described herein below, prior to transmitting to determine at present conditions which part of the wider channel is currently most favorable for transmitting. Conversely, at the Substation Receiver, the preamble detector samples the entire wide usable band, determining the actual band used by the transmitter based on where the preamble was detected.
- Figure 10a shows three frequency bands 1004, 1005, and 1006 which have been defined as channels for the long range Edge Transmitters
- the number of bands used as channels is not limited to three, nor are three channels always required. Transmissions on each channel are spread across a defined frequency band as shown using a broadband modulation technique such as the ones identified herein above. Additionally,
- transmission bursts may be constrained to occur in time slots such as 1007. Details of the slotting protocols are explained herein below.
- a typical frequency based channel of the present invention may span a wide enough area of the spectrum that several harmonics of the power fundamental occur within the channel. Because it is important to keep the amplitude of the injected, modulated current as near as possible to the noise floor and to minimize the amount of power used to transmit, in some embodiments of the present invention no signal is added to the spectrum at harmonics of the power fundamental.
- a shaping filter may be beneficially applied by the Edge Transmitter to avoid injecting current over the harmonics. This technique is also beneficial at the Substation Receiver, which may apply comb filtering so that the preamble detector and demodulator are not required to process the signal on the harmonics. This saves valuable processor capacity in the compute-intensive demodulation process.
- each frequency band (such as 1004, 1005, and 1006) which is used as a channel is assigned at least one patterned code, or chip.
- the rate of frequency variation of the chip is much higher than the rate of variation of the data signal.
- the actual frequency- spread transmission injected as current on the channel is the exclusive or (XOR) of the channel's chip and the data signal.
- Adjacent and nearby channels are assigned mathematically orthogonal chips.
- the amplitude of the frequency spread current signals is as close as possible to the noise floor of the power line. This is beneficial in eliminating the problems associated with prior art PLC methods.
- the different encoding chips used causes the receiver to interpret the "stray" signal as noise, allowing the receiver to still extract the correct signal. Additionally, and regardless of the modulation technique, any harmonics from one channel which extend into adjacent channels will also be interpreted as noise.
- the result of this combination of channel access restrictions and modulation techniques is one or more low-frequency, high-quality current-modulated channels which can bear (in individual bursts) a raw data rate of 120 bits per second or more, or, by example, 80 bps after forward error correction, using interleaving techniques to distribute data bits and FEC bits to minimize the probability of loss of related bits due to impulse noise.
- Time- duration testing on a radial distribution grid transmitting an average distance of 3.5 miles line of sight from the substation, yielded a frame error rate of 1.6e-6 using an FEC rate of 2/3 with frequency spread modulation. It is recognized that the method and apparatus described may additionally be operated at lower data rates than cited.
- Figure 10b illustrates one method of organizing a group of three reliable channels to support grid mapping. All three channels are organized into time slots 1007, within which Remote Hubs are provisioned to transmit around a 5-second burst 1008 with around 1 second of silence prior to the burst and around 1 second of silence after the burst. This yields an inter-burst interval 1009 averaging 2 seconds long. Different time intervals may also be used.
- the reason for the long inter-burst interval in the illustrated embodiment is that the mechanism for synchronizing the transmitter clocks may be an AMI network, and the AMI synchronization mechanism, being typically based on a mesh or cellular wireless architecture, is no more precise than plus or minus one second.
- each data-bearing frequency- spread channel is assigned a plurality of chips instead of one. For example, if the number of chips per channel is two, then transmissions on even-numbered time slots use one chip, and transmissions on odd-numbered time slots use another, mathematically orthogonal chip. Using multiple chips may allow data-bearing capacity of the channel to be increased by reducing the inter-burst interval, as overlaps of adjacent transmissions may still be decoded.
- the ordinal number of a time slot is determined with respect to a Master Frame Origin, which may be defined as beginning at midnight local time of each day, or may be established by a variety of methods as described in US Patent Application No. 13/566,481 already referenced and incorporated herein.
- channels 1011 in Figure 10b have a scheduled organization. This means that each Remote Hub is assigned specific time slots in which it may transmit on the channel. A third channel 1012 is still organized into slots, but any Remote Hub with an exceptional condition to report may attempt to transmit in any time slot, provided that it has not alerted recently. Specifically, channel 1012 is organized by the method known as slotted aloha. Alerts, when received at the substation, are typically acknowledged via a Substation-to-Edge channel such as a wireless AMI network. If available, other methods for acknowledging alerts may be employed. If no mechanism for
- each alert can simply be transmitted multiple times, with a randomly selected number of slots having elapsed between the
- the rate of message failure will be the frame error rate of the channel (already disclosed to be very low) plus the rate of collisions.
- the rate of collisions in turn depends on the offered load, which is based on the probability that more than one Remote Hub will attempt to transmit in a given slot.
- the optimum number of unacknowledged retransmissions to maximize message success rate is likely to be a small number such as two or three, because with higher transmission rates channel saturation may occur.
- the organization of an unscheduled channel may also use an un-slotted protocol similar to pure aloha, wherein the channel is not divided into time slots, but wherein a transmitter may attempt to transmit at any time, given that it has not already transmitted within a predefined recent interval.
- alerts may preferably be retransmitted only if not acknowledged within a predetermined period of elapsed time, or they may routinely be transmitted a multiplicity of times if acknowledging alerts is impossible or undesirable.
- the number and organization of channels described is by example only. On some substations, only one reliable channel may be available. When only one channel is used, either because of conditions or by design, a plurality of time slots may be reserved for alerting, while other time slots are scheduled. On some substations, a plurality of reliable channels will be identifiable. The number of scheduled channels needed depends on the number of Remote Hubs and the number of scheduled messages each Remote Hub must send in a 24-hour period. In one embodiment, two channels are sufficient to permit 12,000 hubs to transmit twice daily.
- Figure 10b shows four alerts transmitted in the time interval shown. Two of the alerts 1010 have a high probability of being detected at the substation receiver. The alerts 1013 have collided in Figure 10b and will not be received correctly.
- Figure lOe conversely, illustrates how the use of chips selected by means of the modulus of the time slot prevents some collisions.
- message 1014 transmitted in an even- numbered slot of random slotted channel 1012, has overlapped with message 1015, transmitted on the same channel in the subsequent odd-numbered slot. Both messages are decipherable at the substation because they were encoded using orthogonal chips. This is in contrast with the situation in Figure 10b, where the intent of the two
- transmitters of messages 1013 was clearly to attempt to transmit in the same slot. These messages would still collide even if multiple chips were in use.
- an unscheduled, unslotted channel might use frequency spread modulation and be assigned a plurality of orthogonal chips.
- a transmitter offering a message would select a chip from the plurality of chips at random, thereby reducing the probability that the message would collide with another transmission on the same channel at an overlapping time.
- Figure 10c illustrates the detailed organization of a typical single transmission burst, whether it occurs on a scheduled channel or a slotted alerting channel according to one embodiment.
- the message is comprised of preamble 1014, interleaved data bits 1015 and FEC bits 1016.
- the preamble is the same for all messages on the channel.
- the FEC rate is not drawn to scale, and may be varied as needed from substation to substation based on the quality of the available channels. In some grid locations and/or with some modulations, FEC may not be required.
- Figure 10c without further elaboration may appear to imply that the bandwidth is the same for all transmissions in the same channel, and that the pattern used for preamble detection is also suitable for use by a Substation Receiver when sampling and comparing signals on several inputs representing different phases of different feeders to infer the line on which the signal was actually transmitted. Some embodiments of the invention may require greater bandwidth for preamble detection than the data-bearing segment of a message requires. Additionally, in some embodiments, the grid location of a Remote Hub transmitter may be better inferred from a special transmission, called a probe
- the probe transmission may consist of known modulated signal, or it may consist of pure tones.
- the pure tones may be transmitted as a sequence of single tones, or one or more groups of pure tones may be transmitted simultaneously.
- the frequency range of the probe transmission may be different from that of the other message sections.
- Figure lOd illustrates this bandwidth variation, showing one bandwidth for the preamble 1018, another bandwidth for data-bearing message 1019, and a third bandwidth for GLA trailer 1020.
- GLA trailer 1020 is not present in all embodiments of the invention, because the probe transmission may be present within preamble 1018.
- the probe transmission may precede the preamble rather than following the message.
- the segments of a message may be transmitted in any order as long as the order is known by the receiver.
- Figure 11 shows a Remote Hub 1101 and a Subordinate Remote 1102 illustrating the local communication paths within a TAN according to one aspect of the invention.
- This figure shows an embodiment where the Communications Module is not separate from the Calculation and Display Module.
- the Remote Hub 1101 may poll each known Subordinate Remote, via a PLC protocol such as PRIME or G3 using request path 1103. (To allow for the use of different PLC protocols, the specific language of these standards is not used herein.
- a polled Subordinate Remote 1102 retrieves the requested data from the Smart Meter and formats it into a response which is transmitted as a response 1104.
- the Remote Hub's Edge Transmitter Module communicates with the Communications Module and Calculation and Display Board components via UART 1107, using a simple request/response protocol 1105 which may vary from one Smart Meter vendor to another.
- Data path 1106 illustrates that both the Remote Hub and the Subordinate Remote are members of the AMI and will be transmitting meter data to the AMI head end in addition to performing TAN-related activities.
- the Remote Hub in its role as TAN manager, may make use of the AMI or other alternative, integrated channels in ways that Subordinate Remotes may not. Only the Remote Hub is capable of sending out messages on the Edge-to-Substation channel. A Remote Hub may also send messages on alternative, integrated outgoing channels such as the AMI. The Remote Hub may additionally receive data blocks from a Substation-to-Edge channel, whether the Substation-to-Edge channel is provided by the AMI or other means. Such data blocks may contain, but are not limited to, alert acknowledgements, firmware update broadcasts, and policy changes. Meter clock synchronization messages are part of the native AMI protocol, but the Remote Hub may obtain the synchronized clock time from the
- Remote Hub 1101 has the capability to function in multiple operating modes.
- the Remote Hub may function as a Subordinate Remote.
- the Remote Hub may also function as a hybrid of Remote Hub and Subordinate Remote, called a Proxy Hub.
- Proxy Hub When a Remote Hub 1101 is first installed, it monitors the PLC frequencies on the TAN for a period of time sufficient to determine whether another Remote Hub is already present.
- the wait time consists of a fixed period of time plus an additional period of time computed by a randomization function when the device is powered on.
- the fixed period of time is sufficient to ensure that a Remote Hub operating in the master mode would have executed its discovery algorithm, which would be detected by the newly installed Remote Hub if another Remote Hub is operating within range.
- "within range” means powered by the same service transformer, but exceptions occur. The means of handling the exceptions are described herein below.
- Remote Hub 1101 indicates by means of a light or digital display on the face of the Smart Meter that another Remote Hub is present. At this point, an installer may elect to leave redundant Remote Hub 1101 in place, or replace it with a Subordinate Remote unit. If left in place as a "spare," Remote Hub 1101 continues to function as a Subordinate Remote, and the first Remote Hub continues to act as the Remote Hub and master node in the TAN. If no other Remote Hub is present, Remote Hub 1101 begins to operate as a master PLC node on the TAN, discovering and storing a list of any Subordinate Remotes 1102 in the same TAN. A Remote Hub may also enter a third mode, Proxy Hub, as described below.
- Remote Hub 1101 obtains the network system time if available, for example by querying the AMI logic in the Smart Meter, and formats, encodes, and transmits a provisioning request on an Edge-to-Substation channel reserved for provisioning requests and alerts.
- Provisioning request it may cause a provisioning response to be sent, either via the AMI, or via an available on-grid or wireless Substation-to-Edge channel.
- Provisioning data may also be supplied to a Remote Hub by means of a handheld device or drive-by transmitter employed by the installer.
- the handheld device uses a personal-area wired or wireless protocol, such as Bluetooth, infrared, USB, or RS232 to program the Remote Hub.
- the Remote Hub may be provisioned via handheld without knowledge of the inferred grid location of the Remote Hub.
- the same short-range protocol in a handheld or drive-by device, may be used to distribute firmware or policy updates to Remote Hubs that lack a permanent Substation-to-Edge channel. It is sometimes desirable to activate a policy or program change simultaneously on a collection of Remote Hubs. If the Remote Hubs must be updated by means of a personal-area protocol, the programming device converts the desired future activation time to a relative wait time as each Remote Hub is programmed, so that even though the Remote Hubs were programmed at different times, they will activate the updated programming at approximately the same future time.
- Remote Hubs may be manufactured with a default policy, or pre-loaded with a default policy after manufacturing but before installation, so that if no policy is provided at or subsequent to installation, the Remote Hub still has a rule for operating.
- the provisioning data provides the Remote Hub with the information it needs to manage the TAN, including the location of, and organization of, other channels on the Edge-to-Substation network, and the ordinal or sequence number of slots on scheduled channels on which this Remote Hub has permission to transmit.
- the Remote Hub discovers Subordinate Remotes, it transmits pairing messages on the Edge- to-Substation channel to inform the Computing Platform that it is in communication with the newly discovered Subordinate Remotes. Pairing messages may be transmitted on an alerting channel or on a scheduled channel depending on a policy established by the network.
- the resulting pairing message indicates this.
- Including the presence of "spare" Remote Hubs in the Grid Map may provide a cost savings and more rapid recovery, in that if the master Remote Hub should fail, the TAN may be reconstructed by allowing the spare Remote Hub to assume the master role.
- the master Remote Hub may cache its policy
- the PLC transceivers in the Remotes may be able to discover Subordinate Remotes and Remote Hubs on other phases of the same service transformer, or even on adjacent or nearby service transformers.
- the detectable remotes may be partitioned wherever possible so that each TAN comprises exactly one master Remote Hub and all Subordinate Remotes, or Remote Hubs acting as Subordinate Remotes, on the same phase of the same service transformer, and no Remotes of any type which are on a different phase or a different service transformer.
- a Remote Hub's PLC protocol stack executes its discovery process, which involves transmitting a beacon tone or message that causes other nodes in the vicinity to respond. The first time this is executed, a standard initial power level is used. The TAN management layer of the Remote Hub, operating above the PLC protocol stack, obtains the list of discovered Remotes of any type. The Edge Transmitter of the Remote Hub is then employed to send a pilot signal at sufficiently low amplitude and high frequency that the pilot signal will not be detectable on the high- voltage side of the service transformer. (This pilot tone is not the same as a PLC discovery beacon.) The pilot signal begins on a zero crossing of the power fundamental of the phase on which the transmitter resides.
- Remotes which detect the pilot signal test to determine if the received signal began on the zero crossing of the phase on which the receiving Remote resides. If so, the receiving Remote sends a positive response on the PLC channel and records the identity of the Hub Remote that sent the pilot tone.
- Another Remote Hub on the same phase as the pilot transmitter enters Subordinate Remote mode and will be considered a spare.
- Subordinate Remotes on other phases do not respond to the pilot tone.
- a Remote Hub that detects the pilot tone but is on a different phase sends a negative response.
- the transmitting Remote Hub uses the responses to update its inventory of TAN devices discovered automatically by the PLC discovery process, recording the list of Subordinate Remotes and spares on its home phase, and the list of Remote Hubs on other phases of the same service transformer.
- the first Remote Hub that transmitted the pilot tone examines the list of negative responders, that is, of Remote Hubs on a different phase. It selects one such second Remote Hub and orders it via the PLC protocol to transmit a pilot tone of its own.
- the first Remote Hub still the master node of at least all the nodes on the service transformer, collects the resulting positive and negative responses and updates its inventory and partitioning data.
- any spare Remote Hubs on the same phase as the second Remote Hub have also entered Subordinate Remote mode, and the first Remote Hub now has a complete partitioning of Remote Hubs according to phases, the Remote Hubs on the third phase, if present, being the intersection of the Remote Hubs sending negative responses to the first Remote Hub with the Remote Hubs sending negative responses to the second Remote Hub.
- the first Remote Hub now selects a third Remote Hub from the third phase, and orders it via the PLC protocol to transmit a pilot tone and return the list of negative and positive responses it received.
- a positive response will have been received from every Subordinate Remote on the service transformer, the phase and mode of every device on the service transformer is known, and a potential master Remote Hub for each single-phase TAN has been identified. Additionally, any node which responded to the original PLC discovery process from outside the transformer area has been identified.
- the first Remote Hub sets its PLC transmission amplitude to a very low level and polls each remote. This first amplitude should be so low that no remotes respond.
- the first Remote Hub increases its transmission amplitude until, ideally, all remotes on the same phase and no remotes on another phase respond.
- the first Remote Hub records this low threshold level and then continues to increase the amplitude until a remote on another phase responds.
- the first Remote Hub records this as its high threshold level.
- the first Remote Hub commands the second Remote Hub via PLC to attempt to take on the role of PLC master node for its phase, sending in the command the low and high threshold amplitudes. This is called the partitioning command.
- the second Remote Hub sets the PLC transmission amplitude to the low threshold amplitude, and restarts its PLC stack as a master node, conducting a PLC discovery process of its own. If the second Remote Hub discovers all the Subordinate Remotes and spares on its own phase and no nodes on any other phase, then has become the master of a single-phase TAN and the partitioning step has succeeded. Otherwise, it raises its PLC transmission amplitude and repeats the process until the partitioning step succeeds.
- the partitioning command has failed.
- the second Remote Hub signals the failure of the partitioning command to the first Remote Hub by using its Edge Transmitter to transmit a status beacon detectable by the First Remote Hub, since the first and second Remote Hubs can no longer communicate via PLC.
- the first Remote Hub detects no failure beacon from the second Remote Hub, and a third phase is present, the first Remote Hub sends a partitioning command to the third Remote Hub, which carries out the partitioning step as described.
- the first Remote Hub When the first Remote Hub has partitioned the other phases present without having received a failure beacon, then it carries out the partitioning step itself. If the first Remote Hub's partitioning step succeeds, then the service transformer is successfully partitioned into three single-phase TANs, as shown in Figure 12a.
- the second and third Remote Hubs may employ a failure beacon and a success beacon. Use of the success beacon may shorten the time required to complete the partitioning steps.
- FIG 12a is a simplified schematic drawing of a three-phase service transformer and the meters that it supplies with power.
- This service area contains three TANs 1204, 1205, and 1206, one for each phase of the service transformer.
- Each TAN contains a Remote Hub 1202 and zero or more Subordinate Remotes 1203. Any Subordinate Remote may actually be a spare Remote Hub.
- Figure 12a illustrates a proper partitioning of the Remotes powered by a three-phase transformer following the discovery and partitioning algorithm described herein above.
- the first Remote Hub initiates a PLC discovery process. If any Remotes are discovered which are on a different service transformer, the first Remote Hub lowers the PLC transmission amplitude, superseding the old value of the "initial" amplitude, and restarts the discovery process, repeating this until all and only the Remotes known to be on the service transformer are discovered. If a new Remote never before detected is found, the pilot beacon method above is used to determine the phase of the new Remote and whether it is on the same service transformer as the first Remote.
- the first Remote Hub transmits a distress alert on an Edge-to-Substation channel and organizes the TAN at the highest amplitude which does not discover any nodes outside the service transformer, even if some nodes on the service transformer are unresponsive.
- Remote Hub 1202 carries out all the TAN management activities, such as polling the Subordinate Remotes, distributing updates, and computing derived results, for the Remotes, including Proxy Hubs, on all phases present.
- the first Remote Hub 1202 formats the appropriate message and sends it to the Proxy Hub over the TAN.
- the Proxy Hub then retransmits the message on the Edge- to-Substation channel. In this way, Edge-to-Substation transmissions are always transmitted on the correct phase, even though the TAN master is on a different phase.
- the Remote-hub may pre-modulate and store certain messages which do not contain variable data and may be sent repeatedly.
- Examples of pre -recordable messages include messages sent on the provisioning channel, such as the provisioning request and standard alerts on conditions such as sags, over- voltages, and the like. This strategy saves computing power at the Remote Hub.
- policy changes such as changes in chip, channel placement, baud rate, FEC rate, and bandwidth occur, pre-modulated recordings may need to be discarded and re-computed. This may be done during idle periods when the Edge Transmitter's microcontroller CPU is not busy with preparing scheduled messages. To accommodate this, such policy changes may be announced in advance to take effect at a known future time as opposed to becoming effective immediately.
- a Remote Hub may not be integrated into a GLA Smart Meter, but instead may be associated with another feature of a medium voltage distribution grid, such as a capacitor bank, step-down transformer, voltage regulator, storage battery, local generator, or switch set.
- the Remote Hub may be integrated with local or remotely controlled SCADA systems associated with the feature.
- the SCADA system may provide an Edge-to-Substation channel for provisioning Remote Hubs used in this manner, or the Edge-to-Substation channel associated with Remote Hubs in Smart Meters may also be operable to communicate with such feature-based Remote Hubs.
- Such Remote Hubs may incorporate a version of a Substation Receiver and be operable to send Pairing Messages associating the grid feature with other Remote Hubs electrically and schematically subordinate to the grid feature.
- a Remote Hub may also be embodied as a standalone device plugged into an electrical outlet.
- a form of Substation Receiver may additionally be associated with such medium voltage grid features, or any intermediate point on the medium voltage distribution grid.
- Such an intermediate Receiver may collect information regarding which Transformer Area Networks are impacted by an associated medium-voltage grid feature.
- the combination of such a secondary Receiver and Remote Hub may be employed to control intermediate grid features, such as using a switch or relay to isolate a microgrid or balance the load on a plurality of substations, or to alter the set-point on a voltage regulator.
- a Remote Hub may carry out line measurements to determine locally optimum conditions for transmitting.
- the Remote Hub always has the option to vary the amplitude of the injected signal, and may additionally have the option to vary the frequency band of the data bearing segment of the transmission.
- the Remote Hub transmits a sequence or simultaneous combination of pure tones. These tones may be independent of an actual message transmission, or they may be incorporated in the message preamble. Recall that the bandwidth of the preamble may be different than the bandwidth of the data-bearing segment of the transmission. If there is an opportunity to choose the frequency band of the data bearing segment, then the tones must span the entire available spectrum.
- the tones When the tones are transmitted, the current generated at the requested voltage is measured. The relationship between the requested voltage and the generated current is calculated at each frequency. The result will be proportional to the line impedance of the grid at the Remote Hub for each frequency.
- the Remote Hub may from time to time send feedback from the
- Substation Receiver about the messages as received. This may allow the Remote Hub to refine and calibrate its measurement process. Outcomes of this feedback may include changing the slot assignments and/or modulation methods of individual Remote Hubs and/or an entire channel to improve message success rate.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Artificial Intelligence (AREA)
- Health & Medical Sciences (AREA)
- Automation & Control Theory (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Quality & Reliability (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Description
Claims
Priority Applications (12)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015558889A JP2016519555A (en) | 2013-02-19 | 2014-02-14 | System and method for inferring schematic and topological characteristics of a distribution grid |
MX2015010689A MX2015010689A (en) | 2013-02-19 | 2014-02-14 | A system and method for inferring schematic and topological properties of an electrical distribution grid. |
BR112015019855A BR112015019855A2 (en) | 2013-02-19 | 2014-02-14 | SYSTEM FOR SENDING AND RECEIVING MESSAGES IN AN ELECTRICAL DISTRIBUTION NETWORK, AND METHOD FOR INFERRING SCHEMATIC AND TOPOLOGICAL PROPERTIES OF AN ELECTRICAL DISTRIBUTION NETWORK |
KR1020157025873A KR20160006160A (en) | 2013-02-19 | 2014-02-14 | A system and method for inferring schematic and topological properties of an electrical distribution grid |
AU2014219247A AU2014219247B2 (en) | 2013-02-19 | 2014-02-14 | A system and method for inferring schematic and topological properties of an electrical distribution grid |
EP17173049.2A EP3229201B1 (en) | 2013-02-19 | 2014-02-14 | A system and method for inferring schematic and topological properties of an electrical distribution grid |
EP14754343.3A EP2959559B1 (en) | 2013-02-19 | 2014-02-14 | A system and method for inferring schematic and topological properties of an electrical distribution grid |
CN201480009551.2A CN105229886A (en) | 2013-02-19 | 2014-02-14 | About the system and method for the principle and topological performance of inferring electrical power distribution electrical network |
CA2909483A CA2909483A1 (en) | 2013-02-19 | 2014-02-14 | A system and method for inferring schematic and topological properties of an electrical distribution grid |
IL240610A IL240610A0 (en) | 2013-02-19 | 2015-08-17 | A system and method for inferring schematic and topological properties of an electrical distribution grid |
CUP2015000087A CU20150087A7 (en) | 2013-02-19 | 2015-08-19 | A SYSTEM AND METHOD FOR INFRING SCHEMATIC AND TOPOLOGICAL PROPERTIES OF AN ELECTRIC DISTRIBUTION GRILLE |
ZA2015/06111A ZA201506111B (en) | 2013-02-19 | 2015-08-21 | A system and method for inferring schematic and topological properties of an electrical distribution grid |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201361766551P | 2013-02-19 | 2013-02-19 | |
US61/766,551 | 2013-02-19 | ||
US201361779222P | 2013-03-13 | 2013-03-13 | |
US61/779,222 | 2013-03-13 | ||
US13/871,944 | 2013-04-26 | ||
US13/871,944 US10097240B2 (en) | 2013-02-19 | 2013-04-26 | System and method for inferring schematic and topological properties of an electrical distribution grid |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014130366A1 true WO2014130366A1 (en) | 2014-08-28 |
Family
ID=51351139
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2014/016540 WO2014130366A1 (en) | 2013-02-19 | 2014-02-14 | A system and method for inferring schematic and topological properties of an electrical distribution grid |
PCT/US2014/016535 WO2014130363A1 (en) | 2013-02-19 | 2014-02-14 | Methods for discovering, partitioning, organizing, and administering communication devices in a transformer area network |
PCT/US2014/016538 WO2014130365A1 (en) | 2013-02-19 | 2014-02-14 | Methods for analyzing and optimizing the performance of a data collection network of an electrical distribution grid |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2014/016535 WO2014130363A1 (en) | 2013-02-19 | 2014-02-14 | Methods for discovering, partitioning, organizing, and administering communication devices in a transformer area network |
PCT/US2014/016538 WO2014130365A1 (en) | 2013-02-19 | 2014-02-14 | Methods for analyzing and optimizing the performance of a data collection network of an electrical distribution grid |
Country Status (14)
Country | Link |
---|---|
US (6) | US10097240B2 (en) |
EP (6) | EP3312971B1 (en) |
JP (3) | JP6301967B2 (en) |
KR (3) | KR20160006159A (en) |
CN (3) | CN105210253A (en) |
AU (4) | AU2014219244A1 (en) |
BR (3) | BR112015019850A2 (en) |
CA (3) | CA2901608A1 (en) |
CL (2) | CL2015002323A1 (en) |
CU (2) | CU20150087A7 (en) |
IL (3) | IL240610A0 (en) |
MX (4) | MX2015010689A (en) |
WO (3) | WO2014130366A1 (en) |
ZA (3) | ZA201506111B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104732021A (en) * | 2015-03-17 | 2015-06-24 | 国家电网公司 | Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation |
US11181568B2 (en) | 2016-07-14 | 2021-11-23 | HYDRO-QUéBEC | Detection of anomalies in an electrical network |
Families Citing this family (108)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2870452C (en) | 2011-04-15 | 2020-03-10 | Dominion Energy Technologies, Inc. | System and method for single and multi zonal optimization of utility services delivery and utilization |
US9059842B2 (en) | 2011-06-09 | 2015-06-16 | Astrolink International Llc | System and method for grid based cyber security |
WO2013020053A1 (en) | 2011-08-03 | 2013-02-07 | Power Tagging Technologies, Inc. | System and methods for synchronizing edge devices on channels without carrier sense |
US10097240B2 (en) | 2013-02-19 | 2018-10-09 | Astrolink International, Llc | System and method for inferring schematic and topological properties of an electrical distribution grid |
US9678520B2 (en) * | 2013-03-15 | 2017-06-13 | Dominion Resources, Inc. | Electric power system control with planning of energy demand and energy efficiency using AMI-based data analysis |
US9582020B2 (en) | 2013-03-15 | 2017-02-28 | Dominion Resources, Inc. | Maximizing of energy delivery system compatibility with voltage optimization using AMI-based data control and analysis |
US20200158759A1 (en) * | 2013-05-02 | 2020-05-21 | Awesense Wireless, Inc. | Voltage sensing systems and methods for a high-power line |
US9438312B2 (en) | 2013-06-06 | 2016-09-06 | Astrolink International Llc | System and method for inferring schematic relationships between load points and service transformers |
US10001514B2 (en) | 2013-06-13 | 2018-06-19 | Astrolink International Llc | System and method for detecting and localizing non-technical losses in an electrical power distribution grid |
AU2014277951B2 (en) * | 2013-06-13 | 2018-04-12 | Dominion Energy Technologies, Inc. | Inferring feeder and phase powering a transmitter |
US10191090B2 (en) * | 2013-11-12 | 2019-01-29 | Alstom Technology Ltd | Power transformers using optical current sensors |
US20150142197A1 (en) * | 2013-11-19 | 2015-05-21 | Intelligent Power & Energy Research Corporation (Iperc) | Automated identification of components connected in a power grid |
US10284011B2 (en) * | 2014-04-23 | 2019-05-07 | Nec Corporation | Electricity distribution system with dynamic cooperative microgrids for real-time operation |
US9369177B2 (en) * | 2014-05-01 | 2016-06-14 | Cisco Technology, Inc. | Path diversity with poly-phase links in a power line communication network |
US10074977B2 (en) * | 2014-07-17 | 2018-09-11 | 3M Innovative Properties Company | Systems and methods for coordinating signal injections to understand and maintain orthogonality among signal injections patterns in utility grids |
KR101619623B1 (en) * | 2014-10-20 | 2016-05-10 | 현대자동차주식회사 | System and method for reprogramming of vehicle controller |
CN107005273B (en) * | 2014-10-30 | 2021-01-01 | 艾斯通林克国际有限责任公司 | System and method for allocating time slots and resolving time slot conflicts in a power distribution grid |
WO2016070139A1 (en) * | 2014-10-30 | 2016-05-06 | Hansell Jerritt Harold | System, method and apparatus for grid location |
AU2015358448B2 (en) * | 2014-12-03 | 2019-10-03 | Dominion Energy Technologies, Inc. | Bi-directional communications on an electrical secondary networked distribution system |
US10682722B2 (en) * | 2014-12-18 | 2020-06-16 | Illinois Tool Works Inc. | Systems and methods for measuring characteristics of a welding cable with a low power transceiver |
US10449614B2 (en) | 2014-12-18 | 2019-10-22 | Illinois Tool Works Inc. | Systems and methods for solid state sensor measurements of welding cables |
WO2016115067A1 (en) * | 2015-01-12 | 2016-07-21 | Dominion Resources, Inc. | Systems and methods for power factor control and optimization |
US9497790B2 (en) * | 2015-03-03 | 2016-11-15 | Google Inc. | Simulation of near-field communications |
US11172273B2 (en) | 2015-08-10 | 2021-11-09 | Delta Energy & Communications, Inc. | Transformer monitor, communications and data collection device |
WO2017027682A1 (en) | 2015-08-11 | 2017-02-16 | Delta Energy & Communications, Inc. | Enhanced reality system for visualizing, evaluating, diagnosing, optimizing and servicing smart grids and incorporated components |
EP3133742B1 (en) * | 2015-08-21 | 2019-05-29 | Itron Global SARL | Determination of instantaneous impedance of an ac power line used as a transmission line |
WO2017041093A1 (en) | 2015-09-03 | 2017-03-09 | Delta Energy & Communications, Inc. | System and method for determination and remediation of energy diversion in a smart grid network |
CN105306546B (en) * | 2015-09-28 | 2019-05-03 | 北京奇虎科技有限公司 | A kind of method for visualizing and device of terminal location |
US11196621B2 (en) | 2015-10-02 | 2021-12-07 | Delta Energy & Communications, Inc. | Supplemental and alternative digital data delivery and receipt mesh net work realized through the placement of enhanced transformer mounted monitoring devices |
CN105203924A (en) * | 2015-10-10 | 2015-12-30 | 上海博英信息科技有限公司 | Electricity usage trend abnormity suspicion analysis method and anti-electric-larceny monitoring system |
WO2017070646A1 (en) | 2015-10-22 | 2017-04-27 | Delta Energy & Communications, Inc. | Data transfer facilitation across a distributed mesh network using light and optical based technology |
WO2017070648A1 (en) | 2015-10-22 | 2017-04-27 | Delta Energy & Communications, Inc. | Augmentation, expansion and self-healing of a geographically distributed mesh network using unmanned aerial vehicle technology |
US9998418B2 (en) * | 2015-11-11 | 2018-06-12 | International Business Machines Corporation | Intelligent message queue management |
US10680849B2 (en) * | 2015-11-24 | 2020-06-09 | Mitsubishi Electric Corporation | Built-in apparatus, communication method, and computer readable medium |
EP3405913A4 (en) * | 2016-01-22 | 2019-06-19 | Biarri Networks Pty Ltd | Method and system for designing an electricity distribution network |
CA3054546C (en) | 2016-02-24 | 2022-10-11 | Delta Energy & Communications, Inc. | Distributed 802.11s mesh network using transformer module hardware for the capture and transmission of data |
CN106130005B (en) * | 2016-05-13 | 2021-09-28 | 国家电网公司 | Geographical partition-based 220kV power grid partition boundary node processing method |
CN106026395A (en) * | 2016-06-20 | 2016-10-12 | 河北箱变电器有限公司 | Remote intelligent monitoring system of power system |
CN105939063A (en) * | 2016-07-06 | 2016-09-14 | 河北箱变电器有限公司 | Data transmission system for power equipment |
CN106026402A (en) * | 2016-07-06 | 2016-10-12 | 河北箱变电器有限公司 | Power device fault solution scheme system |
CN107589311A (en) * | 2016-07-08 | 2018-01-16 | 武汉瑞莱保能源技术有限公司 | System is supported in a kind of electromagnetic field testing service |
US10652633B2 (en) | 2016-08-15 | 2020-05-12 | Delta Energy & Communications, Inc. | Integrated solutions of Internet of Things and smart grid network pertaining to communication, data and asset serialization, and data modeling algorithms |
CN106383265B (en) * | 2016-08-26 | 2019-02-01 | 北京中宸泓昌科技有限公司 | A kind of area and the device and method for accessing phase automatic identification |
CN106297250A (en) * | 2016-10-10 | 2017-01-04 | 普天智能照明研究院有限公司 | A kind of remote family data acquisition system and energy consumption acquisition system |
CN106570781B (en) * | 2016-11-02 | 2020-03-17 | 国家电网公司 | Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure |
CN106788598B (en) * | 2016-12-16 | 2020-09-08 | 北京智芯微电子科技有限公司 | Networking method and device for power line communication |
US10163242B2 (en) * | 2017-01-31 | 2018-12-25 | Gordon Todd Jagerson, Jr. | Energy grid data platform |
CN106990287B (en) * | 2017-05-08 | 2019-07-19 | 集美大学 | A kind of Measurement of Harmonics in Power System device dispositions method |
CN106991259B (en) * | 2017-05-12 | 2021-02-12 | 国网上海市电力公司 | Reactor noise model selection method for controlling field boundary noise level of outdoor substation |
CN107147428B (en) * | 2017-05-23 | 2020-09-22 | 重庆物奇科技有限公司 | PLC network platform area identification method and carrier communication module |
CN107154627B (en) * | 2017-06-14 | 2019-09-24 | 电子科技大学 | A kind of small power station's group of planes Dynamic Equivalence suitable for bulk power grid analysis |
KR101999314B1 (en) * | 2017-07-06 | 2019-07-12 | 한국전력공사 | System, Method for collecting meter data, and Storage storing the method |
WO2019008218A1 (en) * | 2017-07-07 | 2019-01-10 | Parkkisähkö Oy | The recognition and selection of the phases of an electric vehicle charging device |
CN107332350A (en) * | 2017-08-14 | 2017-11-07 | 国网山东省电力公司济宁供电公司 | A kind of transformer station becomes electricity condition operation management system |
US20190065789A1 (en) * | 2017-08-29 | 2019-02-28 | Motorola Solutions, Inc. | Device and method for power source based device authentication |
CN109471961B (en) * | 2017-11-15 | 2021-01-19 | 许继电气股份有限公司 | Loop display method and device for secondary system of intelligent substation |
US10534024B2 (en) * | 2017-12-22 | 2020-01-14 | Schneider Electric USA, Inc. | Single pole low-cost expandable smart panel monitoring and control system |
US10541555B2 (en) | 2018-01-23 | 2020-01-21 | Consolidated Edison Company Of New York, Inc. | System and method of remote bridging a utility meter |
ES2823676T3 (en) * | 2018-02-27 | 2021-05-07 | Ariadna Instr S L | Method and system for detecting connectivities in an electric power distribution network |
US20220231507A1 (en) * | 2018-03-23 | 2022-07-21 | Electricity North West Property Limited | System for frequency regulation on a power distribution network |
NZ763369A (en) * | 2018-03-23 | 2024-01-26 | Electricity North West Property Ltd | System for frequency regulation on a power distribution network |
JP7126114B2 (en) * | 2018-03-30 | 2022-08-26 | パナソニックIpマネジメント株式会社 | Display system, display method |
CN108810855B (en) * | 2018-05-22 | 2020-10-02 | 南京邮电大学 | Clustering D2D resource allocation method based on energy constraint and interference limited area |
RU2698407C1 (en) * | 2018-06-05 | 2019-08-26 | Федеральное государственное казенное военное образовательное учреждение высшего образования "Михайловская военная артиллерийская академия" Министерства обороны Российской Федерации | Method of modeling processes of providing structural survivability of distributed communication networks of multilevel control systems in conditions of destructive effects |
CN108876144B (en) * | 2018-06-13 | 2021-08-17 | 国网山东省电力公司经济技术研究院 | Transformer substation pre-addressing method based on deep learning algorithm |
US10996247B2 (en) * | 2018-06-15 | 2021-05-04 | Landis+Gyr Innovations, Inc. | Volt-VAR device monitor |
CN109347094B (en) * | 2018-10-24 | 2020-10-09 | 珠海格力电器股份有限公司 | Converter, method and device for distributing electric energy by converter and electric energy distribution system |
US11451061B2 (en) * | 2018-11-02 | 2022-09-20 | Battelle Memorial Institute | Reconfiguration of power grids during abnormal conditions using reclosers and distributed energy resources |
CN109586290A (en) * | 2018-12-14 | 2019-04-05 | 中国电力科学研究院有限公司 | A kind of Active Control Method and system of large scale electric network electro-magnetic transient automatic modeling |
FR3093880A1 (en) * | 2019-03-13 | 2020-09-18 | Sagemcom Energy & Telecom Sas | basic remote meter for automated metering management of an electrical distribution service |
CN110224427B (en) * | 2019-03-14 | 2020-08-18 | 浙江工业大学 | Information physical system modeling method based on micro-grid energy control strategy |
CN110299763B (en) * | 2019-06-28 | 2020-11-13 | 云南电网有限责任公司临沧供电局 | Automatic low-voltage distribution area line topology identification system and method |
CN110365534B (en) * | 2019-07-15 | 2022-02-18 | 福建省万维新能源电力有限公司 | Automatic chopping and recovery method for intelligent substation communication system |
CN110458414A (en) * | 2019-07-16 | 2019-11-15 | 深圳供电局有限公司 | Urban distribution network grid division method and system |
CN110445515B (en) * | 2019-07-24 | 2021-10-29 | 浙江华云信息科技有限公司 | Station area phase identification method and system based on electric power wireless private network and carrier wave |
CN110635825A (en) * | 2019-08-27 | 2019-12-31 | 杭州世创电子技术股份有限公司 | Transformer area identification system and identification method thereof |
CN110661337B (en) * | 2019-09-09 | 2020-12-25 | 江苏伦肯智能科技有限公司 | Adopt CAN bus communication's feeder line automatic system |
CN110703004A (en) * | 2019-10-03 | 2020-01-17 | 广东石油化工学院 | PLC channel impulse noise detection method and system by utilizing dictionary classification |
CN110674158B (en) * | 2019-10-15 | 2022-02-15 | 广东电网有限责任公司 | Method and system for automatically updating local area for low-voltage user |
CN110865236B (en) * | 2019-11-05 | 2022-02-01 | 广东电网有限责任公司广州供电局 | User variable relation recognition capability test system, method, device and computer equipment |
CN110991740B (en) * | 2019-12-03 | 2023-12-15 | 海南电网有限责任公司 | Power grid planning method and system based on operation simulation and intelligent agent technology |
MX2019015169A (en) * | 2019-12-13 | 2021-06-14 | Prolec S A De C V | Apparatus and method for identifying a failure in windings of a distribution transformer. |
CN111698051B (en) * | 2020-06-09 | 2022-05-20 | 山东科汇电力自动化股份有限公司 | Time synchronization method for low-voltage distribution network |
CN113822005B (en) * | 2020-06-20 | 2023-07-25 | 高山 | Method for copying and supervising entity power grid open circuit node by computer |
CN111950848B (en) * | 2020-07-09 | 2022-08-16 | 国网江西省电力有限公司电力科学研究院 | Sequence component-based distribution room low voltage identification and reason diagnosis method |
US11589195B2 (en) | 2020-08-20 | 2023-02-21 | Ip Co, Llc | Asset tracking systems and methods |
CN112054596B (en) * | 2020-09-09 | 2021-12-14 | 国网信通亿力科技有限责任公司 | System and method for acquiring running data of power distribution network in real time |
TWI747703B (en) * | 2021-01-08 | 2021-11-21 | 聯合再生能源股份有限公司 | Charge and discharge control system and method thereof |
CN114786214A (en) * | 2021-01-22 | 2022-07-22 | 达发科技股份有限公司 | Data packet retransmission method and device for wireless peer and readable storage medium |
CN112926951B (en) * | 2021-03-26 | 2023-01-24 | 广东电网有限责任公司佛山供电局 | Equipment transaction identification method and device |
CN113242274B (en) * | 2021-04-08 | 2022-04-22 | 北京交通大学 | Information grading return method for railway disaster prevention monitoring system |
CN113300408B (en) * | 2021-04-30 | 2023-10-27 | 北京天诚同创电气有限公司 | Synchronous control method and system for micro-grid group |
CN113191656B (en) * | 2021-05-13 | 2022-08-02 | 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 | Low-voltage distribution network equipment load and topology linkage method based on data correlation analysis |
CN113408202B (en) * | 2021-06-18 | 2022-04-08 | 国网湖南省电力有限公司 | Flow baseline model construction method for transformer substation core industrial control service |
CN113659714B (en) * | 2021-08-05 | 2023-06-23 | 国网山东省电力公司营销服务中心(计量中心) | Automatic identification method and system for topological relation of transformer area |
CN114123179B (en) * | 2021-08-10 | 2024-05-28 | 北京智芯微电子科技有限公司 | Identification method, system, device, medium and chip equipment of low-voltage station area topology |
CN113991839B (en) * | 2021-10-15 | 2023-11-14 | 许继集团有限公司 | Device and method for improving remote control opening reliability |
CN113904919B (en) * | 2021-10-30 | 2024-04-19 | 国家电网有限公司西北分部 | Safe and stable control system channel fault positioning method |
CN114124728B (en) * | 2021-11-11 | 2024-06-25 | 国网四川省电力公司经济技术研究院 | Vulnerability coupling link identification method between power grid control system and power primary equipment |
TWI792772B (en) * | 2021-12-16 | 2023-02-11 | 台達電子工業股份有限公司 | Energy storage system and method of controlling power thereof |
CN114285170B (en) * | 2021-12-28 | 2024-04-30 | 广东电网有限责任公司 | Low-voltage topology identification method, device and storage medium |
CN114564963B (en) * | 2022-01-20 | 2024-08-30 | 浙江大学 | Retransmission method for semantic communication |
CN115513944B (en) * | 2022-10-21 | 2024-09-03 | 国网四川省电力公司经济技术研究院 | Power grid robustness improving method based on unbalanced coupling link removal strategy |
WO2024141231A1 (en) * | 2022-12-28 | 2024-07-04 | Gridspertise S.R.L. | Enhanced control of an electric substation in electrical network monitoring and control equipment |
CN116526680B (en) * | 2023-05-31 | 2023-09-19 | 威海双联电气有限公司 | Control method and device for high-low voltage power distribution cabinet cluster |
CN117134353B (en) * | 2023-10-26 | 2024-01-23 | 国网江苏省电力有限公司苏州供电分公司 | Virtual area dynamic switching-based power distribution network fault recovery method and system |
CN117895509B (en) * | 2024-03-14 | 2024-05-10 | 国网山东省电力公司经济技术研究院 | Multi-energy coupling type power distribution network scheduling method and system |
CN117895977B (en) * | 2024-03-18 | 2024-05-28 | 青岛鼎信通讯科技有限公司 | Characteristic current information bit identification method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6373399B1 (en) * | 1990-02-15 | 2002-04-16 | Itron, Inc. | Wide area communications network for remote data generating stations |
US20050017848A1 (en) * | 2003-07-24 | 2005-01-27 | Hunt Technologies, Inc. | Endpoint receiver system |
US20080312851A1 (en) * | 2004-10-20 | 2008-12-18 | Electro Industries/Gauge Tech. | Portable Power Quality Analyzer with Networking Capabilities |
US20120265355A1 (en) * | 2011-04-15 | 2012-10-18 | Power Tagging Technologies, Inc. | System and method for single and multizonal optimization of utility services delivery and utilization |
US20120310558A1 (en) * | 2011-05-31 | 2012-12-06 | Cisco Technology, Inc. | Layered and distributed grid-specific network services |
US20130034086A1 (en) * | 2011-08-03 | 2013-02-07 | Power Tagging Technologies, Inc. | System and methods for synchronizing edge devices on channels without carrier sense |
Family Cites Families (287)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3733586A (en) | 1972-03-14 | 1973-05-15 | Gen Public Utilities | Meter interrogation system having strobe logic control |
US3911415A (en) | 1973-12-18 | 1975-10-07 | Westinghouse Electric Corp | Distribution network power line carrier communication system |
US3944723A (en) | 1974-12-05 | 1976-03-16 | General Electric Company | Station for power line access data system |
US3942170A (en) | 1975-01-31 | 1976-03-02 | Westinghouse Electric Corporation | Distribution network powerline carrier communication system |
CH618553A5 (en) | 1977-08-25 | 1980-07-31 | Landis & Gyr Ag | |
US4200770A (en) | 1977-09-06 | 1980-04-29 | Stanford University | Cryptographic apparatus and method |
FR2468240B1 (en) | 1979-10-24 | 1986-02-21 | Enertec | REMOTE CONTROL RELAY |
US4568934A (en) | 1981-06-09 | 1986-02-04 | Adec, Inc. | Computer controlled energy monitoring system |
US4580276A (en) | 1983-08-05 | 1986-04-01 | Consultant's Choice Inc. | System and method for transporting data |
US4633463A (en) | 1984-03-28 | 1986-12-30 | Canadian Marconi Corporation | Radio communication system |
US4668934A (en) | 1984-10-22 | 1987-05-26 | Westinghouse Electric Corp. | Receiver apparatus for three-phase power line carrier communications |
US4681790A (en) | 1986-02-03 | 1987-07-21 | Minnesota Mining And Manufacturing Company | Treating composition containing fluorochemical compound mixture and textiles treated therewith |
JPH01106652A (en) | 1987-10-20 | 1989-04-24 | Fujitsu Ltd | Data collection system |
US4918422A (en) | 1988-04-25 | 1990-04-17 | Emerson Electric Co. | Method and apparatus for extracting inbound information generated line-to-line in a multi-phase electric distribution system |
US5032833A (en) | 1989-04-27 | 1991-07-16 | Schlumberger Industries, Inc. | Adaptive network routing for power line communications |
US6144292A (en) | 1992-10-22 | 2000-11-07 | Norweb Plc | Powerline communications network employing TDMA, FDMA and/or CDMA |
EP0692116B1 (en) | 1993-04-02 | 2002-07-17 | Echelon Corporation | Power line communications analyzer |
GB2278699B (en) | 1993-05-17 | 1997-09-24 | Logica Uk Ltd | Domestic meter |
GB9313198D0 (en) | 1993-06-25 | 1993-08-11 | Remote Metering Systems Ltd | Mains phase determination |
GB9313199D0 (en) | 1993-06-25 | 1993-08-11 | Remote Metering Systems Ltd | Digital data transmission networks |
US5818725A (en) | 1993-08-11 | 1998-10-06 | First Pacific Networks | System for utility demand monitoring and control |
US5463624A (en) | 1994-04-15 | 1995-10-31 | Dsc Communications Corporation | Bus arbitration method for telecommunications switching |
US7188003B2 (en) | 1994-12-30 | 2007-03-06 | Power Measurement Ltd. | System and method for securing energy management systems |
US6961641B1 (en) | 1994-12-30 | 2005-11-01 | Power Measurement Ltd. | Intra-device communications architecture for managing electrical power distribution and consumption |
US7761910B2 (en) | 1994-12-30 | 2010-07-20 | Power Measurement Ltd. | System and method for assigning an identity to an intelligent electronic device |
US6366062B2 (en) | 1997-12-08 | 2002-04-02 | Microplanet, Inc. | Method and apparatus for electronic power control |
DE19545893C2 (en) | 1995-12-08 | 2003-09-25 | Rohde & Schwarz | System for automatically establishing a radio connection for data transmission between two or more transmitter-receiver stations |
GB9616543D0 (en) | 1996-08-06 | 1996-09-25 | Northern Telecom Ltd | Power line communications |
US6778099B1 (en) | 1998-05-01 | 2004-08-17 | Elster Electricity, Llc | Wireless area network communications module for utility meters |
US6212560B1 (en) | 1998-05-08 | 2001-04-03 | Compaq Computer Corporation | Dynamic proxy server |
US6788702B1 (en) | 1999-10-15 | 2004-09-07 | Nokia Wireless Routers, Inc. | Protocol for neighborhood-established transmission scheduling |
EP1156624B1 (en) | 1999-12-20 | 2006-04-19 | Kabushiki Kaisha Toshiba | Monitor and control module in a digital signal transmission apparatus |
US6535797B1 (en) | 2000-02-01 | 2003-03-18 | Spectrum Engineering Corporation | Electrical distribution system and method of monitoring and/or controlling same |
JP3722663B2 (en) | 2000-02-29 | 2005-11-30 | 株式会社タニタ | Biometric device |
JP4529056B2 (en) | 2000-03-21 | 2010-08-25 | ソニー株式会社 | Information processing apparatus and method, recording medium, and information processing system |
AUPQ672300A0 (en) | 2000-04-05 | 2000-05-04 | Nu-Lec Industries Pty Limited | Isolating circuit breaker and circuit protection arrangement |
US6998962B2 (en) | 2000-04-14 | 2006-02-14 | Current Technologies, Llc | Power line communication apparatus and method of using the same |
EP1830535B1 (en) | 2000-04-18 | 2011-06-15 | Aware, Inc. | Multicarrier system with a plurality of SNR margins |
FR2808149B1 (en) | 2000-04-19 | 2003-01-31 | Electricite De France | METHOD AND DEVICE FOR ENABLING CONTROL OF AN ELECTRIC APPARATUS CONNECTED TO A NETWORK |
US6690655B1 (en) | 2000-10-19 | 2004-02-10 | Motorola, Inc. | Low-powered communication system and method of operation |
US20020069299A1 (en) | 2000-12-01 | 2002-06-06 | Rosener Douglas K. | Method for synchronizing clocks |
US20020089927A1 (en) | 2001-01-11 | 2002-07-11 | Fischer Michael A. | System and method for synchronizing data trasnmission across a variable delay interface |
US6673479B2 (en) | 2001-03-15 | 2004-01-06 | Hydrogenics Corporation | System and method for enabling the real time buying and selling of electricity generated by fuel cell powered vehicles |
US7194528B1 (en) * | 2001-05-18 | 2007-03-20 | Current Grid, Llc | Method and apparatus for processing inbound data within a powerline based communication system |
US7346463B2 (en) | 2001-08-09 | 2008-03-18 | Hunt Technologies, Llc | System for controlling electrically-powered devices in an electrical network |
US20030036810A1 (en) | 2001-08-15 | 2003-02-20 | Petite Thomas D. | System and method for controlling generation over an integrated wireless network |
US6975212B2 (en) | 2001-10-02 | 2005-12-13 | Telkonet Communications, Inc. | Method and apparatus for attaching power line communications to customer premises |
US6747994B2 (en) | 2001-10-17 | 2004-06-08 | Qualcomm, Incorporated | Selecting optimal transmit formats for transmissions over allocated time durations |
US8489063B2 (en) | 2001-10-24 | 2013-07-16 | Sipco, Llc | Systems and methods for providing emergency messages to a mobile device |
US6603290B2 (en) | 2001-11-26 | 2003-08-05 | Visteon Global Technologies, Inc. | Anti-islanding detection scheme for distributed power generation |
US7053756B2 (en) | 2001-12-21 | 2006-05-30 | Current Technologies, Llc | Facilitating communication of data signals on electric power systems |
JP2003258689A (en) | 2002-02-27 | 2003-09-12 | Sumitomo Electric Ind Ltd | Power-line carrier communication system and modem for power-line carrier communication |
JP2003259696A (en) | 2002-02-28 | 2003-09-12 | Jfe Engineering Kk | Generation control method and program thereof |
GB0204884D0 (en) | 2002-03-01 | 2002-04-17 | Honeywell Normalair Garrett | Gas supply apparatus |
US7535913B2 (en) | 2002-03-06 | 2009-05-19 | Nvidia Corporation | Gigabit ethernet adapter supporting the iSCSI and IPSEC protocols |
US7069117B2 (en) | 2002-04-01 | 2006-06-27 | Programmable Control Services, Inc. | Electrical power distribution control systems and processes |
JP2003339120A (en) | 2002-05-17 | 2003-11-28 | Sumitomo Electric Ind Ltd | Utilization method and receiving system for secondary battery |
JP2004015840A (en) | 2002-06-03 | 2004-01-15 | Mitsubishi Electric Corp | Distribution system exploration system and distribution system exploration arrangement |
US20040218688A1 (en) * | 2002-06-21 | 2004-11-04 | John Santhoff | Ultra-wideband communication through a power grid |
AU2003276972A1 (en) | 2002-09-25 | 2004-04-19 | Enikia Llc | Method and system for timing controlled signal transmission in a point to multipoint power line communications system |
JP3827082B2 (en) | 2002-10-24 | 2006-09-27 | 株式会社中川研究所 | Broadcast system, light bulb, lighting device |
US7058524B2 (en) | 2002-10-25 | 2006-06-06 | Hudson Bay Wireless, Llc | Electrical power metering system |
US7076378B1 (en) * | 2002-11-13 | 2006-07-11 | Current Technologies, Llc | Device and method for providing power line characteristics and diagnostics |
US20060152344A1 (en) | 2002-12-07 | 2006-07-13 | Mowery Richard A Jr | Powerline Communication Network Handoff |
US6947409B2 (en) | 2003-03-17 | 2005-09-20 | Sony Corporation | Bandwidth management of virtual networks on a shared network |
MXPA05013137A (en) | 2003-06-05 | 2006-08-23 | Enfo Broadcast As | A method and a system for automatic management of demand for non-durables. |
US7299503B2 (en) | 2003-06-26 | 2007-11-20 | International Business Machines Corporation | Apparatus and method for location specific authentication using powerline networking |
US7321291B2 (en) | 2004-10-26 | 2008-01-22 | Current Technologies, Llc | Power line communications system and method of operating the same |
US20060291575A1 (en) * | 2003-07-03 | 2006-12-28 | Berkman William H | Power Line Communication System and Method |
US7412338B2 (en) | 2004-03-18 | 2008-08-12 | Power Measurement Ltd. | Radio frequency device within an energy sensor system |
US7251570B2 (en) | 2003-07-18 | 2007-07-31 | Power Measurement Ltd. | Data integrity in a mesh network |
US7450638B2 (en) | 2003-07-21 | 2008-11-11 | Sony Corporation | Power-line communication based surveillance system |
US7236765B2 (en) * | 2003-07-24 | 2007-06-26 | Hunt Technologies, Inc. | Data communication over power lines |
US8008804B2 (en) | 2003-08-15 | 2011-08-30 | Beacon Power Corporation | Methods, systems and apparatus for regulating frequency of generated power using flywheel energy storage systems with varying load and/or power generation |
US7092693B2 (en) | 2003-08-29 | 2006-08-15 | Sony Corporation | Ultra-wide band wireless / power-line communication system for delivering audio/video content |
US20050063422A1 (en) * | 2003-09-19 | 2005-03-24 | Sashi Lazar | Communication protocol over power line communication networks |
US8170524B2 (en) * | 2003-12-16 | 2012-05-01 | Pulse Utilities International Limited | Power line communication system and an intelligent meter |
US7552437B2 (en) | 2004-01-14 | 2009-06-23 | International Business Machines Corporation | Maintaining application operations within a suboptimal grid environment |
JP4161921B2 (en) | 2004-03-04 | 2008-10-08 | カシオ計算機株式会社 | OFDM signal demodulating device and OFDM signal demodulating method |
US20050207079A1 (en) * | 2004-03-17 | 2005-09-22 | Tiller David S | System and apparatus for a multifunctional powerline carrier device with data management and power surge protector |
US7660345B2 (en) | 2004-06-18 | 2010-02-09 | Aboundi, Inc. | Transceiver apparatus and method having ethernet-over-power and power-over-ethernet capability |
US7403547B2 (en) | 2004-07-15 | 2008-07-22 | Arris International, Inc. | Method and system for synchronizing separated edge QAM devices located remotely from a CMTS |
KR100590486B1 (en) | 2004-07-29 | 2006-06-19 | 에스케이 텔레콤주식회사 | Method and System for Generating Switching Timing Signal for Separating Transmitting and Receiving Signal in Optical Repeater of Mobile Telecommunication Network Using TDD and ODFM Modulation |
US7362212B2 (en) | 2004-09-24 | 2008-04-22 | Battelle Memorial Institute | Communication methods, systems, apparatus, and devices involving RF tag registration |
US8194722B2 (en) | 2004-10-11 | 2012-06-05 | Broadcom Corporation | Various methods and apparatuses for impulse noise mitigation |
US7583202B2 (en) | 2004-10-19 | 2009-09-01 | Echelon Corporation | Method and apparatus for an electric meter |
US7808128B1 (en) | 2004-11-12 | 2010-10-05 | Dgi Creations, Llc | Remote monitoring of control decisions for network protectors |
JP4591823B2 (en) | 2005-03-15 | 2010-12-01 | 東京電力株式会社 | Power supply system |
KR100970391B1 (en) | 2005-04-19 | 2010-07-15 | 삼성전자주식회사 | Method for Making Tag in Broadcast Encryption System |
US7571028B2 (en) | 2005-04-19 | 2009-08-04 | Genscape Intangible Holding, Inc. | Method and system for AC power grid monitoring |
KR100706330B1 (en) | 2005-08-18 | 2007-04-13 | (주)테크윙 | Test handler |
US7830248B2 (en) | 2005-08-29 | 2010-11-09 | Arkados, Inc. | Networking and multimedia adapter for power outlets |
US7426190B2 (en) | 2005-09-30 | 2008-09-16 | Robert Bosch Gmbh | System and method for a communication protocol for wireless sensor systems including systems with high priority asynchronous message and low priority synchronous message |
US7554320B2 (en) | 2005-10-28 | 2009-06-30 | Electro Industries/Gauge Tech. | Intelligent electronic device for providing broadband internet access |
US20070101438A1 (en) | 2005-10-28 | 2007-05-03 | Gunasekaran Govindarajan | Location-based authentication |
US20070100506A1 (en) | 2005-10-31 | 2007-05-03 | Ralph Teichmann | System and method for controlling power flow of electric power generation system |
JP5078119B2 (en) | 2005-12-06 | 2012-11-21 | トヨタ自動車株式会社 | Charger |
US7323968B2 (en) | 2005-12-09 | 2008-01-29 | Sony Corporation | Cross-phase adapter for powerline communications (PLC) network |
US7876717B2 (en) | 2005-12-09 | 2011-01-25 | Sony Corporation | System and method for providing access in powerline communications (PLC) network |
US20070162550A1 (en) | 2006-01-06 | 2007-07-12 | Outland Research, Llc | Vehicle-to-vehicle instant messaging with locative addressing |
GB2424107B (en) | 2006-01-19 | 2007-03-14 | Kevin Jones | Security System |
US20080012724A1 (en) * | 2006-01-30 | 2008-01-17 | Corcoran Kevin F | Power line communications module and method |
KR100904437B1 (en) | 2006-02-23 | 2009-06-24 | 엘지전자 주식회사 | Method and apparatus for processing an audio signal |
EP2010984A4 (en) | 2006-03-08 | 2010-05-05 | Aclara Power Line Systems Inc | Intelligent fault detector system and method |
US7701330B2 (en) | 2006-03-16 | 2010-04-20 | Sony Corporation | Power line communication network security system |
US8519566B2 (en) | 2006-03-28 | 2013-08-27 | Wireless Environment, Llc | Remote switch sensing in lighting devices |
US8829799B2 (en) | 2006-03-28 | 2014-09-09 | Wireless Environment, Llc | Autonomous grid shifting lighting device |
US7986246B2 (en) | 2006-03-31 | 2011-07-26 | Itron, Inc. | Integrated data collection, anomaly detection and investigation, such as integrated mobile utility meter reading, theft detection and investigation system |
US7280931B1 (en) | 2006-05-18 | 2007-10-09 | International Business Machines Corporation | Method and system for calibrating an electrical device |
US20070271383A1 (en) | 2006-05-18 | 2007-11-22 | International Business Machines Corporation | Method and system for managing an electrical device over a power delivery network |
US20090210197A1 (en) | 2006-05-23 | 2009-08-20 | Intelemetrix Ltd | Data accessing system and method |
US20070297425A1 (en) | 2006-06-23 | 2007-12-27 | George Chirco | Systems and methods for establishing a network over a substation dc/ac circuit |
US7747739B2 (en) | 2006-08-10 | 2010-06-29 | Gridpoint, Inc. | Connection locator in a power aggregation system for distributed electric resources |
EP1901145A2 (en) | 2006-08-23 | 2008-03-19 | MicroNet Sensorik GmbH | Field device and method of operating the same |
EP2800285B1 (en) | 2006-08-24 | 2019-10-02 | Sony Deutschland Gmbh | Method for transmitting a signal on a power line network, transmitting unit, receiving unit and system |
US7870600B2 (en) | 2006-08-25 | 2011-01-11 | Cisco Technology, Inc. | Apparatus and method for secure configuration of shared powerline devices |
US7826538B1 (en) | 2006-08-31 | 2010-11-02 | Dgi Creations, Llc | Remote determination of network transmitter identity and output strength |
US20080077336A1 (en) | 2006-09-25 | 2008-03-27 | Roosevelt Fernandes | Power line universal monitor |
JP2008098812A (en) | 2006-10-10 | 2008-04-24 | National Institute Of Advanced Industrial & Technology | Ofdm transmission method and ofdm transmitter |
US7795877B2 (en) | 2006-11-02 | 2010-09-14 | Current Technologies, Llc | Power line communication and power distribution parameter measurement system and method |
JP2008124859A (en) | 2006-11-14 | 2008-05-29 | Funai Electric Co Ltd | Communication system |
US7957322B2 (en) | 2007-02-02 | 2011-06-07 | Silver Sring Networks, Inc. | Flow-through provisioning in utility AMR/AMI networks |
US20080209481A1 (en) | 2007-02-26 | 2008-08-28 | Alcatel-Lucent | Directly access attached video on demand delivery |
US9282001B2 (en) | 2007-03-05 | 2016-03-08 | Grid Net, Inc. | Policy based utility networking |
CA2681103C (en) | 2007-03-14 | 2015-06-30 | Zonit Structured Solutions, Llc | Smart nema outlets and associated networks |
US7319280B1 (en) | 2007-04-24 | 2008-01-15 | Telkonet, Inc. | Power line coupler adapted for use with multiple communication systems using different frequency spectra |
US8023976B2 (en) | 2007-05-03 | 2011-09-20 | Samsung Electronics Co., Ltd. | Method and system for accurate clock synchronization for communication networks |
KR20100023841A (en) | 2007-06-05 | 2010-03-04 | 파나소닉 주식회사 | Power line communication device and power line communication method |
US7940039B2 (en) | 2007-07-13 | 2011-05-10 | De Buda Eric | Transformer meter and system for using same |
EP2387161B1 (en) | 2007-07-23 | 2020-01-22 | Sony Corporation | Method for transmitting a signal between a transmitter and a receiver in a power line network, transmitter, receiver, power line communication modem and powerline communication system |
US20090027190A1 (en) | 2007-07-25 | 2009-01-29 | Power Monitors, Inc. | Method and apparatus for a low-power radio broadcast alert for monitoring systems |
EP3065303B1 (en) | 2007-08-22 | 2019-01-02 | Sony Corporation | Method for transmitting a signal via a power line network, transmitter, receiver, power line communication modem and power line communication system |
US20090088907A1 (en) | 2007-10-01 | 2009-04-02 | Gridpoint, Inc. | Modular electrical grid interface device |
US20090125351A1 (en) * | 2007-11-08 | 2009-05-14 | Davis Jr Robert G | System and Method for Establishing Communications with an Electronic Meter |
KR100911726B1 (en) | 2007-11-23 | 2009-08-10 | 한국전기연구원 | coupling apparatus for medium voltage power line communication built-in impedance matching transformer and control circuit of phase selection |
CA2705094A1 (en) | 2007-11-25 | 2009-05-28 | Trilliant Networks, Inc. | System and method for false alert filtering of event messages within a network |
CA2647578A1 (en) | 2007-12-20 | 2009-06-20 | Tollgrade Communications, Inc. | Power distribution monitoring system and method |
US20090187344A1 (en) | 2008-01-19 | 2009-07-23 | Brancaccio Daniel S | System, Method, and Computer Program Product for Analyzing Power Grid Data |
US20090219932A1 (en) * | 2008-02-04 | 2009-09-03 | Stmicroelectronics, Inc. | Multi-stream data transport and methods of use |
US8148854B2 (en) | 2008-03-20 | 2012-04-03 | Cooper Technologies Company | Managing SSL fixtures over PLC networks |
CN101251951B (en) * | 2008-04-03 | 2010-06-30 | 中国电力科学研究院 | Power distribution network industrial frequency communicating method and system |
US20130031201A1 (en) | 2008-04-03 | 2013-01-31 | Electro Industries/Gauge Tech | Intelligent electronic device communication solutions for network topologies |
US20090265042A1 (en) | 2008-04-17 | 2009-10-22 | Mollenkopf James D | System and Method for Providing Voltage Regulation in a Power Distribution System |
EP2110959B1 (en) | 2008-04-18 | 2018-03-21 | Thierry Schuffenecker | Communication method for elements that form an electricity distribution network and devices for implementing the method |
US8121741B2 (en) | 2008-05-09 | 2012-02-21 | International Business Machines Corporation | Intelligent monitoring of an electrical utility grid |
JP5562326B2 (en) | 2008-06-06 | 2014-07-30 | パワー タギング テクノロジーズ | Intelligent power system and method of use thereof |
KR20100004605A (en) * | 2008-07-04 | 2010-01-13 | 한국전자통신연구원 | Method for selecting node in network system and system thereof |
US9830670B2 (en) | 2008-07-10 | 2017-11-28 | Apple Inc. | Intelligent power monitoring |
US8159210B2 (en) | 2008-07-11 | 2012-04-17 | Kinects Solutions, Inc. | System for automatically detecting power system configuration |
BRPI0917008A2 (en) | 2008-08-08 | 2016-02-16 | Powermax Global Llc | secure long distance data communications over power lines for meter reading and other communications services |
EP2157732B2 (en) | 2008-08-18 | 2021-10-20 | ABB Power Grids Switzerland AG | Configuration of a process control system |
CN102165710B (en) | 2008-08-28 | 2014-12-10 | 阿克拉拉输电线系统股份有限公司 | A general method for low-frequency data transmission on a power line |
US8207726B2 (en) | 2008-09-05 | 2012-06-26 | Silver Spring Networks, Inc. | Determining electric grid endpoint phase connectivity |
US8019483B2 (en) | 2008-10-01 | 2011-09-13 | Current Communications Services, Llc | System and method for managing the distributed generation of power by a plurality of electric vehicles |
DE102008058264A1 (en) | 2008-11-19 | 2010-07-08 | IAD Gesellschaft für Informatik, Automatisierung und Datenverarbeitung mbH | Measuring device, in particular energy counter and method for detecting tampering |
US8570023B2 (en) | 2008-12-03 | 2013-10-29 | Sensus Usa Inc. | System and method for phase load discovery |
KR101014795B1 (en) | 2008-12-04 | 2011-02-16 | 인하대학교 산학협력단 | Method for preventing collision of reader, driving method of rfid reader having the method and rfid reader for performing the method |
WO2010075559A1 (en) | 2008-12-23 | 2010-07-01 | Actelis Networks Ltd. | System and method for digital subscriber loop crosstalk cancellation |
US8143879B2 (en) | 2008-12-30 | 2012-03-27 | General Electric Company | Meter phase identification |
CN101770007A (en) | 2008-12-31 | 2010-07-07 | 深圳市科陆电子科技股份有限公司 | Electric energy meter test system and method thereof |
CA2749770C (en) | 2009-01-14 | 2021-07-20 | Integral Analytics, Inc. | Optimization of microgrid energy use and distribution |
US7917807B2 (en) | 2009-01-15 | 2011-03-29 | International Business Machines Corporation | Power system communication management and recovery |
US8310341B2 (en) * | 2009-04-20 | 2012-11-13 | Itron, Inc. | Endpoint classification and command processing |
EP2394394B1 (en) | 2009-02-06 | 2016-12-07 | Broadcom Corporation | Network measurements and diagnostics |
US20100217549A1 (en) | 2009-02-26 | 2010-08-26 | Galvin Brian R | System and method for fractional smart metering |
US20100217550A1 (en) | 2009-02-26 | 2010-08-26 | Jason Crabtree | System and method for electric grid utilization and optimization |
EP2430699A4 (en) | 2009-03-06 | 2015-03-25 | Amperion Inc | Station communications over electrical transmission lines |
GB0905241D0 (en) | 2009-03-26 | 2009-05-13 | Hughes Electronics Ltd | Ethernet over power systems |
US20100262393A1 (en) | 2009-04-08 | 2010-10-14 | Manu Sharma | System and Method for Determining a Phase Conductor Supplying Power to a Device |
DE112010003256T5 (en) | 2009-04-09 | 2013-01-31 | E3 Greentech Enterprises, Inc. | System and method for energy consumption management |
CN102549880B (en) * | 2009-05-07 | 2016-01-20 | 道明尼资源公司 | Utilize the voltage saving that senior meter contact facility and transformer station's lumped voltage control |
JP5293395B2 (en) | 2009-05-13 | 2013-09-18 | ソニー株式会社 | Communication apparatus and broadcast wave detection method in communication apparatus |
US8639922B2 (en) * | 2009-06-01 | 2014-01-28 | Dhananjay S. Phatak | System, method, and apparata for secure communications using an electrical grid network |
CN102484503A (en) | 2009-06-05 | 2012-05-30 | 立维腾制造有限公司 | Smart grid over power line communication network |
US8013570B2 (en) | 2009-07-23 | 2011-09-06 | Coulomb Technologies, Inc. | Electrical circuit sharing for electric vehicle charging stations |
US8265197B2 (en) | 2009-08-03 | 2012-09-11 | Texas Instruments Incorporated | OFDM transmission methods in three phase modes |
JP2013501450A (en) * | 2009-08-06 | 2013-01-10 | 韓国標準科学研究院 | Time broadcasting information transmitting / receiving device using power line and transmitting / receiving method thereof |
CA2770199A1 (en) | 2009-08-06 | 2011-02-10 | Rh Innovation Pty Ltd | Operator interface for automation systems |
US8396902B2 (en) | 2009-08-13 | 2013-03-12 | Research In Motion Limited | Method and apparatus for modifying a scheduling database |
US20110043340A1 (en) | 2009-08-19 | 2011-02-24 | Texas Instruments Incorporated | Concatenated Repetition Code with Convolutional Code |
JP5326107B2 (en) | 2009-09-29 | 2013-10-30 | 双葉電子工業株式会社 | Radio control transmitter and communication method in radio control transmitter |
US8401709B2 (en) | 2009-11-03 | 2013-03-19 | Spirae, Inc. | Dynamic distributed power grid control system |
US8773108B2 (en) * | 2009-11-10 | 2014-07-08 | Power Monitors, Inc. | System, method, and apparatus for a safe powerline communications instrumentation front-end |
EP2504903B1 (en) | 2009-11-24 | 2018-08-29 | Silver Spring Networks, Inc. | Powerline carrier "zero-crossing" transformer mapping with asymmetric rf return path |
EP2506392A4 (en) | 2009-11-26 | 2014-02-19 | Toshiba Kk | Energy management apparatus and energy management system |
US8050879B2 (en) | 2009-12-02 | 2011-11-01 | General Electric Company | Phase identification system and method |
US8626462B2 (en) | 2009-12-02 | 2014-01-07 | General Electric Company | Phase identification system and method |
US8099479B2 (en) | 2009-12-15 | 2012-01-17 | Intel Corporation | Distributed mesh network |
CA2731433C (en) | 2010-02-09 | 2018-05-15 | Open Access Technology International, Inc. | Systems and methods for demand response and distributed energy resource management |
JP5501796B2 (en) | 2010-02-24 | 2014-05-28 | 富士通株式会社 | Distribution network estimation apparatus and distribution network estimation method |
US9392565B2 (en) | 2010-03-05 | 2016-07-12 | Samsung Electronics Co., Ltd. | Method and system for accurate clock synchronization through interaction between communication layers and sub-layers for communication systems |
GB2479922B (en) * | 2010-04-29 | 2014-05-21 | Toshiba Res Europ Ltd | Data transmission apparatus and method |
US8924033B2 (en) * | 2010-05-12 | 2014-12-30 | Alstom Grid Inc. | Generalized grid security framework |
US20110285382A1 (en) * | 2010-05-18 | 2011-11-24 | General Electric Company | Power meter phase identification |
EP2579417B1 (en) | 2010-05-25 | 2021-04-28 | Mitsubishi Electric Corporation | Electric power information management system, and electric power information management method |
US8521337B1 (en) | 2010-07-20 | 2013-08-27 | Calm Energy Inc. | Systems and methods for operating electrical supply |
US8423637B2 (en) | 2010-08-06 | 2013-04-16 | Silver Spring Networks, Inc. | System, method and program for detecting anomalous events in a utility network |
JP6039555B2 (en) | 2010-08-10 | 2016-12-07 | センサス ユーエスエー インク.Sensus Usa Inc. | Electric utility meter with load identification data processor |
EP2604002A4 (en) | 2010-08-12 | 2016-09-07 | Abb Research Ltd | A communication method and apparatus of network management system |
US8886212B2 (en) | 2010-08-24 | 2014-11-11 | Blackberry Limited | Mobile tracking |
US9258627B2 (en) | 2010-09-10 | 2016-02-09 | Southern Company Services, Inc. | Locating utility metering devices |
WO2012037055A1 (en) | 2010-09-13 | 2012-03-22 | Trilliant Networks | Process for detecting energy theft |
US9276638B2 (en) * | 2010-09-22 | 2016-03-01 | Texas Instruments Incorporated | Coupling circuits for power line communication devices |
US8836510B2 (en) | 2010-09-29 | 2014-09-16 | Certicom Corp. | Systems and methods for managing lost devices |
US8941387B2 (en) | 2010-10-12 | 2015-01-27 | Howard University | Apparatus and method for fault detection and location determination |
JP2012113670A (en) | 2010-11-29 | 2012-06-14 | Renesas Electronics Corp | Smart meter and meter reading system |
WO2012078652A1 (en) | 2010-12-06 | 2012-06-14 | Sentient Energy, Inc. | Power conductor monitoring device and method of calibration |
US20120155557A1 (en) | 2010-12-17 | 2012-06-21 | General Electric Company | System and method for power grid communication |
US9100102B2 (en) * | 2011-01-11 | 2015-08-04 | Texas Instruments Incorporated | Method to use a preamble with band extension in power line communications |
GB2478505B (en) | 2011-01-17 | 2012-02-15 | Ido Schwartzman | Method and system for secure firmware updates in programmable devices |
US8519843B2 (en) | 2011-01-27 | 2013-08-27 | International Business Machines Corporation | Power distribution device communications platform |
US8743716B2 (en) * | 2011-02-04 | 2014-06-03 | General Electric Company | Systems, methods, and apparatus for identifying invalid nodes within a mesh network |
US8995461B2 (en) | 2011-02-08 | 2015-03-31 | Texas Instruments Incorporated | Channel selection in power line communications |
US20120236879A1 (en) | 2011-02-22 | 2012-09-20 | Vladimir Oksman | Coexistence in communication system |
US8644166B2 (en) | 2011-06-03 | 2014-02-04 | Asoka Usa Corporation | Sensor having an integrated Zigbee® device for communication with Zigbee® enabled appliances to control and monitor Zigbee® enabled appliances |
US20120232915A1 (en) | 2011-03-11 | 2012-09-13 | Seth Bromberger | System and method for monitoring a utility meter network |
US20120242499A1 (en) | 2011-03-22 | 2012-09-27 | General Electric Company | Network interface controller for a utility meter |
US8818742B2 (en) | 2011-03-25 | 2014-08-26 | General Electric Company | Systems, methods, and apparatus for detecting theft and status of electrical power |
EP2512005B1 (en) | 2011-04-15 | 2017-02-15 | Raychem International | Remote control and operation of LV distribution networks |
US20120262355A1 (en) | 2011-04-18 | 2012-10-18 | Ziming He | High gain low profile multi-band antenna for wireless communications |
US20120268291A1 (en) | 2011-04-19 | 2012-10-25 | John Christopher Boot | Systems and method for transmitting data in an advanced metering infrastructure |
US20120275084A1 (en) | 2011-04-29 | 2012-11-01 | Eaton Corporation | Communications distribution systems, apparatus and methods using power line carrier communications |
US9024471B2 (en) | 2011-05-02 | 2015-05-05 | Stmicroelectronics, Inc. | System and method for an intelligent power controller |
US20120284392A1 (en) | 2011-05-03 | 2012-11-08 | General Electric Company | Mesh data network data management system, node, and computer program product |
US8639992B2 (en) | 2011-05-16 | 2014-01-28 | GlobalFoundries, Inc. | Soft error rate detector |
EP2525503B1 (en) | 2011-05-16 | 2018-03-07 | Sony Corporation | Power line communication modem, power line communication system, power line communication method |
US9641026B2 (en) | 2011-06-08 | 2017-05-02 | Alstom Technology Ltd. | Enhanced communication infrastructure for hierarchical intelligent power distribution grid |
US20120316696A1 (en) | 2011-06-08 | 2012-12-13 | Alstom Grid | Multi-level topologytopography for electrical distribution grid control |
US9059842B2 (en) * | 2011-06-09 | 2015-06-16 | Astrolink International Llc | System and method for grid based cyber security |
US9255949B2 (en) | 2011-06-10 | 2016-02-09 | Quadlogic Controls Corporation | Local transformer level grid management systems and methods |
US8699586B2 (en) * | 2011-06-10 | 2014-04-15 | Didier Boivin | Powerline control interface in CENELEC (EU) A-D bands frequency and amplitude modulation transmitter |
US9172274B2 (en) | 2011-06-16 | 2015-10-27 | General Electric Company | System, method, and apparatus for operating a power distribution system |
CN102227090B (en) | 2011-06-27 | 2013-08-21 | 山西省电力公司临汾供电分公司 | Intelligent FA (feeder automation) system of 10kV-carrier communication |
US9118219B2 (en) | 2011-07-07 | 2015-08-25 | Landis+Gyr Innovations, Inc. | Methods and systems for determining an association between nodes and phases via a smart grid |
US20130013232A1 (en) | 2011-07-08 | 2013-01-10 | Nawal Kishor Parwal | System and method for use in electric power distribution systems |
CN103650442B (en) * | 2011-07-14 | 2017-07-11 | 领特德国有限公司 | For single-input single-output and the detection frame of multiple-input and multiple-output |
US8712711B2 (en) | 2011-07-21 | 2014-04-29 | Cisco Technology, Inc. | Identification of electrical grid phase information for end-points in a grid network |
WO2013030937A1 (en) | 2011-08-29 | 2013-03-07 | 株式会社日立製作所 | Regional electric power control system and regional electric power control method |
EP2566125A1 (en) | 2011-08-30 | 2013-03-06 | Nagravision S.A. | System and method to securely report and monitor utility consumptions within a communication network |
US8872667B2 (en) | 2011-09-13 | 2014-10-28 | International Business Machines Corporation | Fault isolation and service restoration in an electric grid |
US10275840B2 (en) | 2011-10-04 | 2019-04-30 | Electro Industries/Gauge Tech | Systems and methods for collecting, analyzing, billing, and reporting data from intelligent electronic devices |
CN102508950B (en) * | 2011-10-14 | 2013-12-11 | 广东电网公司电力科学研究院 | Regional dispatching automatic system and method for communication between regional dispatching automatic system and remote monitoring diagnosis centre |
IN2014CN02741A (en) | 2011-10-14 | 2015-07-03 | Carbontrack Pty Ltd | |
BRPI1105842B1 (en) | 2011-11-03 | 2016-04-26 | Inácio Loiola Pereira Campos | secondary distribution network control, measurement and monitoring system and process with detection of fraud and theft of electricity |
CN102509159B (en) * | 2011-11-09 | 2015-06-24 | 中国电力科学研究院 | Electrical-information-acquisition-system-based theoretical line loss estimation method for distribution network |
US8995280B2 (en) * | 2011-11-11 | 2015-03-31 | Stmicroelectronics, Inc. | System and method for an energy efficient network adapter |
JP5530996B2 (en) | 2011-11-15 | 2014-06-25 | 株式会社日立製作所 | Distribution network communication system, communication path setting apparatus and method |
US9418045B2 (en) | 2011-12-12 | 2016-08-16 | Mbh Consulting Ltd. | Systems, apparatus and methods for quantifying and identifying diversion of electrical energy |
US8983784B2 (en) | 2011-12-16 | 2015-03-17 | Base N Corporation | Smartgrid energy-usage-data storage and presentation systems, devices, protocol, and processes including a storage distribution process and protocol |
US8711995B2 (en) | 2011-12-22 | 2014-04-29 | Landis+ Gyr Technologies, LLC | Powerline communication receiver |
US8737555B2 (en) * | 2011-12-22 | 2014-05-27 | Landis+Gyr Technologies, Llc | Digital signal processing for PLC communications having communication frequencies |
US20130194975A1 (en) | 2012-01-26 | 2013-08-01 | Texas Instruments Incorporated | Switch Table Update using Demotion Command in PRIME |
US9112381B2 (en) | 2012-01-31 | 2015-08-18 | The Boeing Company | Method and apparatus for managing the distribution of electrical energy in a power distribution grid |
CN102593750A (en) * | 2012-02-20 | 2012-07-18 | 萧山供电局 | Distribution line inspection system |
US20130257452A1 (en) | 2012-03-29 | 2013-10-03 | Electronic Technology, Inc. | Systems for monitoring data from points along voltage transmission lines |
US10938207B2 (en) | 2012-04-13 | 2021-03-02 | Virtual Electric Inc. | Method and apparatus to form a virtual power generation collective from a distributed network of local generation facilities |
US20120266209A1 (en) | 2012-06-11 | 2012-10-18 | David Jeffrey Gooding | Method of Secure Electric Power Grid Operations Using Common Cyber Security Services |
WO2014006662A1 (en) | 2012-07-06 | 2014-01-09 | Mitsubishi Heavy Industries, Ltd. | Method for diagnosing an electric device |
WO2014019055A1 (en) | 2012-07-31 | 2014-02-06 | British Columbia Hydro And Power Authority | Method for identifying a system anomaly in a power distribution system |
US20140062719A1 (en) | 2012-08-29 | 2014-03-06 | Qualcomm Incorporated | Using smart meters as reliable crowd-sourcing agents |
KR20150074046A (en) | 2012-10-17 | 2015-07-01 | 이카노스 커뮤니케이션스, 인크. | Method and apparatus for sensing noise signals in a wireline communications environment |
TWI461013B (en) | 2012-10-30 | 2014-11-11 | Inst Information Industry | Data processing apparatus and data processing method thereof for use in power line communications |
US10354520B2 (en) | 2012-12-17 | 2019-07-16 | Itron, Inc. | Power line communication over disconnected service lines |
US20140167735A1 (en) | 2012-12-19 | 2014-06-19 | Elster Solutions, Llc | Identifying phase connections in an electric distribution system |
CN105027456B (en) * | 2012-12-21 | 2017-07-28 | 萨格姆康姆能源和电信公司 | Method and apparatus for determining the phase that receiver apparatus is connected in polyphase electric power supply system |
US20140191568A1 (en) | 2013-01-04 | 2014-07-10 | Mojo Mobility, Inc. | System and method for powering or charging multiple receivers wirelessly with a power transmitter |
US10097240B2 (en) * | 2013-02-19 | 2018-10-09 | Astrolink International, Llc | System and method for inferring schematic and topological properties of an electrical distribution grid |
US9945889B2 (en) | 2013-02-19 | 2018-04-17 | Mitsubishi Electric Research Laboratories, Inc. | Method for detecting power theft in a power distribution system |
US9917442B2 (en) | 2013-03-13 | 2018-03-13 | Prolucid Technologies Inc. | Distributed micro-grid controller |
US9785173B2 (en) | 2013-03-15 | 2017-10-10 | General Electric Company | Wireless communication systems and methods for intelligent electronic devices |
US9342288B2 (en) | 2013-05-31 | 2016-05-17 | Itron, Inc. | Surfacing cross platform applications |
US9438312B2 (en) | 2013-06-06 | 2016-09-06 | Astrolink International Llc | System and method for inferring schematic relationships between load points and service transformers |
CN104243143B (en) | 2013-06-08 | 2017-03-29 | 科大国盾量子技术股份有限公司 | A kind of mobile secret communication method based on quantum key distribution network |
AU2014277951B2 (en) | 2013-06-13 | 2018-04-12 | Dominion Energy Technologies, Inc. | Inferring feeder and phase powering a transmitter |
US10001514B2 (en) | 2013-06-13 | 2018-06-19 | Astrolink International Llc | System and method for detecting and localizing non-technical losses in an electrical power distribution grid |
JP6122746B2 (en) | 2013-09-20 | 2017-04-26 | 株式会社東芝 | Power conversion device, device detection method and program |
CA2926423C (en) | 2013-10-07 | 2022-05-24 | Google Inc. | Automated crowdsourced power outage identification and staggering of hvac system restarts |
KR101761207B1 (en) | 2013-12-19 | 2017-07-25 | 엘에스산전 주식회사 | Apparatus for power line communication |
US11079417B2 (en) | 2014-02-25 | 2021-08-03 | Itron, Inc. | Detection of electric power diversion |
US9866012B2 (en) | 2014-05-02 | 2018-01-09 | Maple Microsystems Inc. | Method and system for reporting faults and control in an electrical power grid |
EP3748469A1 (en) | 2014-06-23 | 2020-12-09 | Gridbridge, Inc. | Highly flexible, electrical distribution grid edge energy manager and router |
WO2016011007A1 (en) | 2014-07-17 | 2016-01-21 | 3M Innovative Properties Company | Systems and methods for maximizing expected utility of signal injection test patterns in utility grids |
CN107005273B (en) | 2014-10-30 | 2021-01-01 | 艾斯通林克国际有限责任公司 | System and method for allocating time slots and resolving time slot conflicts in a power distribution grid |
WO2016070139A1 (en) | 2014-10-30 | 2016-05-06 | Hansell Jerritt Harold | System, method and apparatus for grid location |
AU2015358448B2 (en) | 2014-12-03 | 2019-10-03 | Dominion Energy Technologies, Inc. | Bi-directional communications on an electrical secondary networked distribution system |
US10330812B1 (en) | 2015-03-16 | 2019-06-25 | Elintrix | Identifying schematic and topological properties of an electrical grid through analysis of directional relationships of electrical currents |
ES2596662B1 (en) | 2015-07-07 | 2017-05-12 | Estabanell Y Pahisa Energia, S.A. | ELECTRICAL DISTRIBUTION NETWORK |
-
2013
- 2013-04-26 US US13/871,944 patent/US10097240B2/en not_active Expired - Fee Related
- 2013-05-06 US US13/888,102 patent/US20140236365A1/en not_active Abandoned
- 2013-05-16 US US13/896,029 patent/US20140233620A1/en not_active Abandoned
-
2014
- 2014-02-14 BR BR112015019850A patent/BR112015019850A2/en not_active IP Right Cessation
- 2014-02-14 KR KR1020157025872A patent/KR20160006159A/en not_active Application Discontinuation
- 2014-02-14 WO PCT/US2014/016540 patent/WO2014130366A1/en active Application Filing
- 2014-02-14 MX MX2015010689A patent/MX2015010689A/en unknown
- 2014-02-14 AU AU2014219244A patent/AU2014219244A1/en not_active Abandoned
- 2014-02-14 KR KR1020157025873A patent/KR20160006160A/en not_active Application Discontinuation
- 2014-02-14 EP EP17203296.3A patent/EP3312971B1/en active Active
- 2014-02-14 BR BR112015019857A patent/BR112015019857A2/en not_active IP Right Cessation
- 2014-02-14 CN CN201480009549.5A patent/CN105210253A/en active Pending
- 2014-02-14 EP EP14754714.5A patent/EP2959560A4/en not_active Withdrawn
- 2014-02-14 JP JP2015558888A patent/JP6301967B2/en not_active Expired - Fee Related
- 2014-02-14 MX MX2018001137A patent/MX359835B/en unknown
- 2014-02-14 CN CN201480009551.2A patent/CN105229886A/en active Pending
- 2014-02-14 AU AU2014219247A patent/AU2014219247B2/en not_active Ceased
- 2014-02-14 JP JP2015558889A patent/JP2016519555A/en active Pending
- 2014-02-14 CN CN201480009550.8A patent/CN105229969A/en active Pending
- 2014-02-14 WO PCT/US2014/016535 patent/WO2014130363A1/en active Application Filing
- 2014-02-14 EP EP17173049.2A patent/EP3229201B1/en not_active Not-in-force
- 2014-02-14 EP EP14754343.3A patent/EP2959559B1/en not_active Not-in-force
- 2014-02-14 EP EP14754339.1A patent/EP2959640B1/en not_active Not-in-force
- 2014-02-14 EP EP18152637.7A patent/EP3327938B1/en active Active
- 2014-02-14 KR KR1020157025874A patent/KR20160006161A/en not_active Application Discontinuation
- 2014-02-14 BR BR112015019855A patent/BR112015019855A2/en not_active IP Right Cessation
- 2014-02-14 MX MX2015010681A patent/MX353771B/en active IP Right Grant
- 2014-02-14 CA CA2901608A patent/CA2901608A1/en not_active Abandoned
- 2014-02-14 AU AU2014219246A patent/AU2014219246B2/en not_active Ceased
- 2014-02-14 CA CA2901607A patent/CA2901607A1/en not_active Abandoned
- 2014-02-14 MX MX2015010688A patent/MX2015010688A/en unknown
- 2014-02-14 JP JP2015558887A patent/JP2016512678A/en active Pending
- 2014-02-14 WO PCT/US2014/016538 patent/WO2014130365A1/en active Application Filing
- 2014-02-14 CA CA2909483A patent/CA2909483A1/en not_active Abandoned
-
2015
- 2015-08-17 IL IL240610A patent/IL240610A0/en unknown
- 2015-08-17 IL IL240609A patent/IL240609A0/en unknown
- 2015-08-17 IL IL240608A patent/IL240608A0/en unknown
- 2015-08-19 CL CL2015002323A patent/CL2015002323A1/en unknown
- 2015-08-19 CU CUP2015000087A patent/CU20150087A7/en unknown
- 2015-08-19 CL CL2015002322A patent/CL2015002322A1/en unknown
- 2015-08-19 CU CUP2015000088A patent/CU20150088A7/en unknown
- 2015-08-21 ZA ZA2015/06111A patent/ZA201506111B/en unknown
- 2015-08-21 ZA ZA2015/06202A patent/ZA201506202B/en unknown
- 2015-08-21 ZA ZA2015/06112A patent/ZA201506112B/en unknown
-
2016
- 2016-03-23 US US15/078,646 patent/US10541724B2/en not_active Expired - Fee Related
- 2016-06-09 US US15/177,930 patent/US10554257B2/en not_active Expired - Fee Related
-
2017
- 2017-12-21 AU AU2017279752A patent/AU2017279752B2/en not_active Ceased
-
2020
- 2020-02-03 US US16/780,175 patent/US20200186193A1/en not_active Abandoned
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6373399B1 (en) * | 1990-02-15 | 2002-04-16 | Itron, Inc. | Wide area communications network for remote data generating stations |
US20050017848A1 (en) * | 2003-07-24 | 2005-01-27 | Hunt Technologies, Inc. | Endpoint receiver system |
US20080312851A1 (en) * | 2004-10-20 | 2008-12-18 | Electro Industries/Gauge Tech. | Portable Power Quality Analyzer with Networking Capabilities |
US20120265355A1 (en) * | 2011-04-15 | 2012-10-18 | Power Tagging Technologies, Inc. | System and method for single and multizonal optimization of utility services delivery and utilization |
US20120310558A1 (en) * | 2011-05-31 | 2012-12-06 | Cisco Technology, Inc. | Layered and distributed grid-specific network services |
US20130034086A1 (en) * | 2011-08-03 | 2013-02-07 | Power Tagging Technologies, Inc. | System and methods for synchronizing edge devices on channels without carrier sense |
Non-Patent Citations (2)
Title |
---|
ALBERTO SENDIN ET AL.: "Enhanced Operation of Electricity Distribution Grids Through Smart Metering PLC Network Monitoring, Analysis and Grid Conditioning", ENERGIES, SWITZERLAND, vol. 6, no. 1, 2013, pages 539 - 556, XP055245801, DOI: doi:10.3390/en6010539 |
See also references of EP2959559A4 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104732021A (en) * | 2015-03-17 | 2015-06-24 | 国家电网公司 | Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation |
CN104732021B (en) * | 2015-03-17 | 2017-05-17 | 国家电网公司 | Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation |
US11181568B2 (en) | 2016-07-14 | 2021-11-23 | HYDRO-QUéBEC | Detection of anomalies in an electrical network |
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20200186193A1 (en) | System and method for inferring schematic and topological properties of an electrical distribution grid | |
US10079765B2 (en) | System and methods for assigning slots and resolving slot conflicts in an electrical distribution grid | |
US20160124421A1 (en) | System, method, and apparatus for grid location |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201480009551.2 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14754343 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2909483 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 240610 Country of ref document: IL |
|
WWE | Wipo information: entry into national phase |
Ref document number: P1033/2015 Country of ref document: AE Ref document number: MX/A/2015/010689 Country of ref document: MX |
|
ENP | Entry into the national phase |
Ref document number: 2015558889 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2014219247 Country of ref document: AU Date of ref document: 20140214 Kind code of ref document: A |
|
REEP | Request for entry into the european phase |
Ref document number: 2014754343 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2014754343 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 20157025873 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: NC2017/0010584 Country of ref document: CO Ref document number: 15222367 Country of ref document: CO |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112015019855 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112015019855 Country of ref document: BR Kind code of ref document: A2 Effective date: 20150818 |