WO2014130366A1 - A system and method for inferring schematic and topological properties of an electrical distribution grid - Google Patents

A system and method for inferring schematic and topological properties of an electrical distribution grid Download PDF

Info

Publication number
WO2014130366A1
WO2014130366A1 PCT/US2014/016540 US2014016540W WO2014130366A1 WO 2014130366 A1 WO2014130366 A1 WO 2014130366A1 US 2014016540 W US2014016540 W US 2014016540W WO 2014130366 A1 WO2014130366 A1 WO 2014130366A1
Authority
WO
WIPO (PCT)
Prior art keywords
message
substation
data
grid
remote
Prior art date
Application number
PCT/US2014/016540
Other languages
French (fr)
Inventor
Jerritt Hansell
Henrik F. Bernheim
Yu Liao
Marcia Reid MARTIN
Andrew Louis ABENDSCHEIN
Original Assignee
Power Tagging Technologies, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to EP17173049.2A priority Critical patent/EP3229201B1/en
Application filed by Power Tagging Technologies, Inc. filed Critical Power Tagging Technologies, Inc.
Priority to MX2015010689A priority patent/MX2015010689A/en
Priority to BR112015019855A priority patent/BR112015019855A2/en
Priority to KR1020157025873A priority patent/KR20160006160A/en
Priority to AU2014219247A priority patent/AU2014219247B2/en
Priority to JP2015558889A priority patent/JP2016519555A/en
Priority to EP14754343.3A priority patent/EP2959559B1/en
Priority to CN201480009551.2A priority patent/CN105229886A/en
Priority to CA2909483A priority patent/CA2909483A1/en
Publication of WO2014130366A1 publication Critical patent/WO2014130366A1/en
Priority to IL240610A priority patent/IL240610A0/en
Priority to CUP2015000087A priority patent/CU20150087A7/en
Priority to ZA2015/06111A priority patent/ZA201506111B/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B3/00Line transmission systems
    • H04B3/54Systems for transmission via power distribution lines
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/18Indicating phase sequence; Indicating synchronism
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00007Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B3/00Line transmission systems
    • H04B3/54Systems for transmission via power distribution lines
    • H04B3/542Systems for transmission via power distribution lines the information being in digital form
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B3/00Line transmission systems
    • H04B3/54Systems for transmission via power distribution lines
    • H04B3/546Combination of signalling, telemetering, protection
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/0823Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability
    • H04L41/083Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability for increasing network speed
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0823Errors, e.g. transmission errors
    • H04L43/0847Transmission error
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B2203/00Indexing scheme relating to line transmission systems
    • H04B2203/54Aspects of powerline communications not already covered by H04B3/54 and its subgroups
    • H04B2203/5429Applications for powerline communications
    • H04B2203/5433Remote metering
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B2203/00Indexing scheme relating to line transmission systems
    • H04B2203/54Aspects of powerline communications not already covered by H04B3/54 and its subgroups
    • H04B2203/5462Systems for power line communications
    • H04B2203/5466Systems for power line communications using three phases conductors
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0009Systems modifying transmission characteristics according to link quality, e.g. power backoff by adapting the channel coding
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1867Arrangements specially adapted for the transmitter end
    • H04L1/188Time-out mechanisms
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission

Definitions

  • the present invention is directed toward employing the electrical distribution grid as a short and long-range transmission medium and data-bearing network, and further toward the use of signals and messages on the network for the purpose of inferring schematic and topological properties of the distribution grid, which vary over time.
  • the power grid is generally considered to be composed of two logical regions, the Transmission Grid(s) and the Distribution Grid(s).
  • the Transmission Grid originates at large generation points such as hydroelectric dams, nuclear reactors, wind farms, and coal-fired or gas-fired power plants. Power from the generation point is transmitted as high- voltage alternating current (AC) over a loosely connected network of long, high- voltage lines to points where demand for power exists, such as factories, farms, and population centers.
  • AC high- voltage alternating current
  • Distribution Substations contain one or more Substation Transformers, which step down the voltage from high transmission line levels (typically 130kV to 700kV) to the medium voltage levels (typically from 4kV to about 35kV) at which power is distributed to consumers within a distribution service area.
  • Substation Transformers At the edge of the Distribution Grid are a number of Service Transformers, which transform the medium voltage of the distribution grid to the low voltages (in the US, typically 120V, 208V, 240V, 277V, or 480V). Other voltages in addition to some of these can be used elsewhere in the world.
  • a tier of one or more transformers lying schematically between the Substation Transformers and the Service Transformers, create intermediate voltage reductions between the Substation and the Service Transformers.
  • Each Service Transformer powers one or more metered loads.
  • a load can be a dwelling, a commercial or industrial building, an element of municipal infrastructure such as a series of street lamps, or agricultural apparatus such as irrigation systems.
  • a typical distribution grid includes other elements used to balance and regulate the flow of power. Examples of such elements are capacitor banks, voltage regulators, switches, and reclosers.
  • Figure 1 illustrates a typical segment of the power grid.
  • Distribution grids have been designed and deployed in a variety of topological configurations. In the United States, distribution grid types are typically characterized as radial, loop, or networked. Other emerging cases are the campus grid and the microgrid. Additional topologies, not described, are used elsewhere in the world.
  • Figure 2a is a topological schematic of a typical radial grid.
  • a substation has one or more substation transformers.
  • Each substation transformer has one or more substation busses.
  • One or more three-phase feeders "radiate" outward from each substation bus, with single-phase, double-phase, or three-phase lateral lines branching off from the feeders, and tap-off points (or simply "taps") in turn branching from the laterals.
  • Radial grids are inexpensive to design and build because they are simple, but they are most vulnerable to outages because they lack redundant power paths, so that any break causes at least one load to lose power.
  • FIG. 2b is a topological schematic of a typical loop distribution grid.
  • a power source such as a bus of a substation transformer. If the loop is undamaged, then power is available at all loads if either substation transformer is operational. If there is a break in the loop, then power is available at all loads assuming that both transformers are operational. In normal circumstances, a system of switches is used to ensure that only one substation transformer at a time is delivering power to each segment of the grid.
  • Figure 2c is a topological schematic of a typical networked grid. This topology has maximum redundancy. In addition to employing multiple power sources, all the service transformers are linked to one another on the secondary side in a mesh
  • Networked grids are most expensive to build and maintain, and are typically used in major urban areas such as Manhattan or Washington, DC where high- value, high- criticality loads are concentrated together.
  • FIG. 2d shows a microgrid or campus network.
  • Microgrids are not traditional in electrical distribution technology, but are emerging as a response to increased focus on energy conservation and on distributed generation of energy from renewable sources. Many variations are possible.
  • This type of grid is typically attached to, but severable from, a wider distribution grid, and may contain its own power sources such as windmills, solar panels, or rechargeable storage batteries as well as loads.
  • the entire network may employ low- voltage lines.
  • a distribution substation receives high-voltage power from the transmission grid into one or more large power transformers.
  • a distribution transformer may incorporate a type of regulator called a load-tap changer, which alters the voltage the transformer delivers to a power distribution bus (the substation bus) by including or excluding some turns of the secondary winding circuit of the transformer, thereby changing the ratio of input to output voltage.
  • One or more feeders depend from the substation bus. If too many feeders are required, additional transformers and busses are used.
  • CTs current transformers
  • SCAD A Supervisory Control and Data Acquisition
  • the distribution grid contains numerous other devices intended to regulate, isolate, stabilize, and divert the flow of power. These devices include switches, reclosers, capacitor banks (usually for power factor correction), and secondary voltage regulators. All these devices affect the behavior of the distribution grid when considered as a data-bearing network, as do the various loads and secondary power sources on the grid. Devices that have abrupt state changes will introduce impulse noise on the grid, as can loads turning on and off. Some devices, such as transformers and capacitor banks, filter and attenuate signals at certain frequencies.
  • the service transformer is the outermost element of the distribution grid before the power is actually delivered to a consumer.
  • the meter is attached at the point where the power from the service transformer is delivered to the consumer.
  • Service transformers can be three-phase, dual-phase, or single phase, as can meters.
  • reading meters was one of the largest operational costs incurred by electrical utilities.
  • Original electric meters were analog devices with an optical read-out that had to be manually examined monthly to drive the utility billing process.
  • mechanisms for digitizing meter data and automating its collection began to be deployed. These mechanisms evolved from walk-by or drive-by systems where the meter would broadcast its current reading using a short-range radio signal, which was received by a device carried by the meter reader. These early systems were known as Automated Meter Reading systems or AMRs.
  • AMRs Automated Meter Reading systems
  • AMRs Automated Meter Reading systems
  • AMIs can collect and store readings frequently, typically as often as every 15 minutes, and can report them nearly that often. They can read any meter on demand provided that this feature is used sparingly, and can connect or disconnect any meter on demand as well.
  • AMI meters can pass signals to consumer devices for the purpose of energy conservation, demand management, and variable-rate billing. Because the AMI network is separate from the power distribution grid, AMI meters are neither aware of nor sensitive to changes in the grid topology or certain conditions on the grid. Nonetheless, the introduction of AMI is generally considered to be the beginning of the Smart Grid.
  • the grid is a noisy environment.
  • state changes in loads on the grid as well as control and regulation artifacts on the grid itself cause impulse noise on the power line.
  • Normal operation of loads like electrical motors, simple variations in the overall load, and ambient RF noise (chiefly from lightening and other weather-related causes) add up to significant Gaussian noise.
  • the measured noise floor at a typical substation in the United States sits at about 80-90dB below the maximum amplitude of the 60 Hz fundamental.
  • the complex impedance of the grid varies across both the frequency and time domains.
  • Capacitor banks sited at points along the grid for the purpose of optimizing the power factor can cause signal attenuation.
  • transformers act as low-pass filters, dramatically attenuating signals above a certain frequency.
  • the threshold frequency is not the same on every distribution grid, because different arrangements and types of transformers are employed and because the transformers themselves are not deliberately tuned to filter at a specified frequency. All these variables impact the frequency response of the medium.
  • injecting modulated current signals on the grid may cause interference between the injected signals themselves.
  • One problematic phenomenon is crosstalk, where a signal injected on one power line is detectable on another line. When crosstalk occurs on two or more phases of the same feeder, it can be caused by inductive and capacitive coupling, as the phase lines run alongside one another for most of the length of the feeder. Crosstalk may also be due to multiple phase windings on the same transformer core. Feeder-to-feeder crosstalk has also been measured, and may be caused by reflection of the injected signal off the power bus at the substation. Given the complexity, diversity, and age of the distribution grids in the United States and the world, less is known about these phenomena than might be expected.
  • ANSI/IEEE standard 519 requires that no noise be added to the odd harmonics of the fundamental at or below the eleventh harmonic.
  • PRIME uses orthogonal frequency-division multiplexing (OFDM) at the physical layer, with 512 differential phase-shift keyed channels (DPSK). PRIME achieves data rates as high as 128.6kbps, but is most reliable at 21.4kbps. Its frequency range is 42-89 kHz.
  • OFDM orthogonal frequency-division multiplexing
  • DPSK differential phase-shift keyed channels
  • G3 uses a similar physical-layer combination of OFDM and DPSK, offering 256 channels between 35 and 91k Hz with a data rate of 33.4kbps. Both G3 and PRIME are still sharply attenuated by transformers, though in most cases a receiver located on the medium-voltage side of a service transformer can successfully read meter transmissions from low-voltage sites served by that transformer, provided that the receiver is sited close enough to the service transformer. For these reasons, Smart Grid technologies based on these protocols are common in Europe and Asia. PLC protocols are also well-adapted to short-range power- line applications such as arbitrating the charging of electric vehicles.
  • Audio Frequency Ripple Control (AFRC) systems are used mostly in rural areas for load management: to turn off high-consumption devices such as electric heaters and air conditioners during peak load times, or to control use of other constrained resources, such as automated farm irrigation systems.
  • An AFRC transmitter sits on the high-voltage side of a substation or transmission transformer and may service multiple substations. AFRC data rates vary from 2 to 10 bits per second, and the maximum message length is about 100 bits. After such a transmission, the transmitter requires a long idle period before it can transmit again, with a maximum duty cycle on the order of 10%.
  • AFRC systems cause obvious flicker, but not at a dangerous frequency. Because they are typically used in areas of low population density and transmissions are infrequent, the side effects are tolerated. AFRC is a broadcast technology operable from high voltage to low voltage and thus cannot be used for collecting meter data or other data about edge conditions, because that requires transmitting from low voltage to higher voltage.
  • Aclara®'s TWACS® technology operates by injecting pulses onto the power line when the fundamental power carrier crosses the zero point - twice per 50Hz or 60Hz cycle. This method operates either from substation to edge or edge to substation, and uses a polling protocol to avoid having one edge transmission interfere with another. It is slow because it is tied to the fundamental, and because of the polling architecture. It has been criticized by consumer groups for the amount of impulse and broadband noise it introduces onto the grid.
  • Landis+Gyr employs a low-cost, low-frequency edge transmitter originally developed by Hunt technologies, intended to operate in conjunction with AFRC to provide two-way communication over long distances on the grid.
  • the data transmission method using this transmitter is cheap and reliable, but limited. It induces sympathetic current oscillations by connecting variable impedance to the power line.
  • the data rate is low because the transmitter is dependent on a voltage relative to the power carrier, so that only a few pulses can be injected per 50Hz or 60Hz cycle. To achieve enough redundancy for detection at the receiver, the same signal must be repeated for several cycles, resulting in a data rate measurable in cycles per bit rather than bits per cycle.
  • the method is also very noisy, in that each pulse resonates across a broad frequency band.
  • Grid Map This information, together with the geospatial locations of the same assets, is called the Grid Map.
  • Utilities typically maintain two maps or models of the Grid.
  • a Physical Network Model aggregates the geospatial location of the assets on the grid.
  • PNMs thanks to modern GPS technology, are reasonably accurate with respect to point assets such as substations, capacitor banks, transformers, and even individual meters. Inaccuracies stem from failure to update the maps when repairs or changes are made. For example, a service transformer may move from one side of a street to the other as a result of street widening. Longitudinal assets, especially buried cables, are less well represented in the PNM.
  • the PNM can contain as-designed data, but since in many places the cable was laid before global positioning technology had matured, the designs were based on ground-level survey, and the original maps may or may not have been updated to reflect changes. Subsequent surface changes complicate the problem of verifying the geographic path taken by medium-voltage distribution lines.
  • the second model is the Logical Network Model, or LNM.
  • LNMs describe how grid components are connected, without reference to their geospatial location.
  • the LNM changes frequently. During the course of repairs, the way transformers attach to taps and laterals, and meters attach to transformers, may be altered. Such changes affect both the LNM and the PNM.
  • changes are recorded manually by field agents. The manual reports may or may not be updated in the LNM and PNM, and when updates are made the time lag between maintenance occurring and its being recorded is variable. Additionally, many grid components, especially regulators, switches and reclosers, change state automatically.
  • Examples of significant but not reliably known aspects of the (actual) Grid Map are the feeder and phase by which each meter is currently powered, the relative load on each phase of each feeder, especially on subordinate branches (laterals) of the grid, the actual voltage supplied to each meter, the power factor along the edges of the grid, whether all the power drawn at a transformer is metered, and the state of switch sets, especially after a weather event that has caused outages. If this information were reliably known, utilities could conserve energy, much of the savings from which would pass on to consumers, save maintenance costs, prolong the life of equipment in the field, improve the efficiency and life of utility and consumer equipment, avoid outages, and reduce recovery times after unavoidable outages.
  • Smart meters can measure and record current, voltage and power factor (or phase angle) at the meter, but because they have limitations on how much data they can store and how much data capacity is available for transmission, utilities may choose not to program the meters to report these data.
  • the other data elements described cannot be detected by most modern AMI systems.
  • the goal of a well-instrumented fine-grained conservation voltage regulation system might be to reduce the typical effective voltage at a single- phase meter to 114vAC as measured from one leg of the typical 240vAC service to neutral.
  • 114vAC effective at the meter is as low as it is reasonable to go without risking under-powering some outlets in the building, (i.e. not less than HOvAC at any outlet) due to additional losses which are typical inside the home or office.
  • PRIME uses FDMA with DPSK.
  • CDMA Code Division Multiple Access
  • WCDMA Wideband Code Division Multiple Access
  • CDMA2000 Code Division Multiple Access
  • Multiple access means that more than one transmitter can use the same channel (here, a power line) without the signal from one transmitter destructively interfering with the signal of another transmitter.
  • each transmitter which uses the same band is assigned a distinct reference code or chip.
  • the transmitted signal equals the exclusive OR (XOR) of the chip with the data signal. If the chips (treated as binary vectors) are mathematically orthogonal, then the receiver can separate out the several data signals from the additive received waveform.
  • a requirement of standard CDMA as used in a wireless application is that there is a dynamic feedback loop from receiver to transmitter to ensure that the power of the several signals received from the different transmitters is the same or nearly the same at the receiver.
  • the feedback loop permits the transmitters to rapidly and dynamically adjust their
  • Frequency Division Multiple Access means that multiple channels in a medium are created by having different transmitters use different frequencies (or different frequency bands). A signal injected on the power line creates harmonic signals of different amplitudes. If the frequency-division bands are incorrectly chosen, then the harmonics from different bands can coincide and create false signals that interfere destructively with the intended signals. The obvious means of eliminating this effect is to place the channels far apart on the frequency spectrum. This, however, reduces the overall data bearing capability of the medium by "wasting" spectrum.
  • a third channel access method is Time Division Multiple Access, or TDMA.
  • TDMA Time Division Multiple Access
  • the channel is divided cyclically over time, with each transmitter sharing the channel assigned a specific time slot in the cycle where that transmitter uniquely has permission to transmit.
  • TDMA requires that all the transmitters have system clocks which are synchronized with one another within a close enough tolerance that one channel accessor does not overlap its transmission with that of another channel accessor.
  • the present invention includes a system comprising at least one intelligent edge transmitter called a Remote Hub Edge Transmitter, each small enough to reside inside a Smart Meter.
  • a Smart Meter that contains a Remote Hub Edge Transmitter is called a Remote Hub GLA Smart Meter, or simply a Remote Hub.
  • the Remote Hub transmits by injecting a modulated current into a power main that supplies an electric meter.
  • the system also includes at least one receiver sited at at least one electrical distribution substation operable to receive transmissions from the intelligent transmitters. No additions or alterations to the distribution grid between the Smart Meters and the substation are required to allow the receiver to reliably detect and decode transmissions from the edge transmitters.
  • the system further comprises one Computing Platform for each substation that contains at least one receiver, the Computing Platform having access to a conventional high speed network such as the Internet for transmitting data acquired from the at least one receivers to a data center at which the received data is used by a Concentrating Computer System, or Concentrator, to update other utility systems such as, but not limited to, the LNM and PNM.
  • a Concentrating Computer System or Concentrator
  • the Computing Platform and the Concentrator may be the same server, with the data center sited inside the service area of the microgrid.
  • the system may additionally comprise Smart Meters or other devices, such as field-deployed switches and voltage regulators, which are not Remote Hubs, augmented by intelligent platforms operable to employ short-range PLC transmissions using a well-known protocol such as G3 or PRIME to communicate with at least one Remote Hub.
  • Smart Meters or other devices such as field-deployed switches and voltage regulators, which are not Remote Hubs, augmented by intelligent platforms operable to employ short-range PLC transmissions using a well-known protocol such as G3 or PRIME to communicate with at least one Remote Hub.
  • Such augmented devices which are not Remote Hubs are designated as Subordinate Remotes, and any augmented device, without regard for whether it is a Subordinate Remote or a Remote Hub, may be referred to generally as a Remote.
  • Each Remote Hub manages only Remotes powered by the same service transformer as the Remote Hub.
  • a short range on-grid network consisting of a collection of Remotes comprising at least one Remote Hub and zero or more Subordinate Remotes is called a Transformer Area Network
  • Subordinate Remotes, Remote Hubs, the Substation Receiver, and the associated Computing Platform and Concentrator all contain stored programs on non-volatile computer-readable memory on which are stored instructions for operating a Grid Location AwareTM (GLA) network.
  • the Subordinate Remotes, Remote Hubs, the Substation Receiver, and the associated Computing Platform and Concentrator also contain processing units (CPUs) which execute the stored instructions allowing each node in the network to implement methods for organizing the on-grid network and transmitting and receiving messages on the network in order to permit other methods embodied as stored programs and executing on the at least one Substation Receiver, Computing Platform and Concentrator to detect and infer schematic grid location attributes of the network and publish the detected and inferred attributes to other application systems including geospatial information systems maintaining the logical and physical network model.
  • CPUs processing units
  • One method implemented by the Remote Hubs and the Substation Receiver provides for channelizing and modulating current signals transmitted from the at least one Remote Hub in the service area of an electrical distribution substation such that the signals are received at the Substation Receiver and the Substation Receiver is able to infer the electrical phase of the specific feeder upon which the signal was transmitted.
  • the signal is transmitted on a broad band of the frequency spectrum called a channel, but the frequency bands of channels are selected so that the frequency is lower than the low- pass threshold of the service transformer that powers the Edge Transmitter.
  • modulation techniques have been used in this context, including frequency spread modulation, Binary Phase-Shift Keying (BPSK), and Quadrature Phase-Shift Keying (QPSK).
  • an Edge Transmitter is capable of encoding at least 80 bits per second of post-FEC (forward error correction) data in a burst transmission at low but adequate current so that the signal is not so significantly attenuated by intermediate transformers, capacitors, long lines, underground wiring, and the like to prevent reception by the Substation Receiver.
  • post-FEC forward error correction
  • an Edge Transmitter may be capable of encoding at lower bit rates. Encoding at lower bit rates improves reliability, but limits the amount of data transmitted.
  • the method requires little power to inject the signal, so that the signals as modulated do not radiate energy in the RF spectrum or cause flicker or hum on devices in proximity to the transmissions or exhibit any of the other undesirable characteristics of prior art methods of on-grid messaging.
  • the method works on all the grid topologies described herein above, and can support a sufficient number of Remote Hubs per substation transformer that even the largest substations can be fully covered by the resulting Grid Location AwareTM network.
  • the Substation Receiver may also implement a variety of methods of sampling the ambient waveforms at a multiplicity of frequency bands on the power lines, filtering out the high-energy harmonics of the fundamental power wave, detecting the signal on one or more of a plurality of power lines (comprising each of the three phase lines of each feeder emanating from each bus of a given substation transformer), inferring the phase and feeder combination on which the signal was transmitted based upon a comparative analysis of each of the power lines, ranking them based on the signal quality, error performance, and/or amplitude versus frequency at a multiplicity of points throughout the spectrum of interest.
  • the Substation Receiver When the Substation Receiver has completely processed a transmission, it packages the decoded transmission together with any additional information about the message inferred by the receiver logic, such as the phase and feeder on which the message was transmitted, the channel on which the message was transmitted, and an indication of the parameters of the modulation method used for that transmission.
  • the Substation Receiver forwards the entire message package to the substation Computing Platform using a normal TCP/IP-based protocol such as HTTP.
  • Another aspect of the invention is a method of identifying which frequency bands are the best data carriers at each substation transformer, defining at least one data- bearing channel on the candidate frequency bands, optionally defining a series of time slots on each channel in which edge devices may transmit, selecting a modulation technique, and, if frequency spreading is the chosen modulation technique, defining a set of at least one orthogonal codes or "chips" per channel to be used for modulating transmissions.
  • the combined channelization model is then employed by the method to provision the collection of GLA Smart Meters, including both Remote Hubs and Subordinate Remotes, supplied with power by a substation to assign to each of the at least one Remote Hubs a policy describing on which frequency-based data-bearing channel(s) the Remote Hub may transmit, and under what circumstances the Remote Hub must transmit.
  • the policy describes multiple aspects of the channels, including modulation method, frequency bands, chip selection algorithm if chips are used, and message preamble pattern. Frequency-based channels and chips must be assigned in such a way that transmissions are not destructive when segments of the grid are, for example, switched from one substation transformer to another.
  • the provisioning scheme anticipates and minimizes the problem of crosstalk, and provides means for logic on the Substation Receivers, the substation Computing Platforms and the Concentrator to hierarchically process the messages received from each Remote Hub and use them to infer the state of stateful non-edge features of the grid, such as switches, reclosers, and breaks in the power lines.
  • Other properties of the transmission are determined dynamically by firmware and instrumentation on the Remote Hub.
  • the power used when transmitting may be related to the impedance of the line as measured immediately prior to transmitting.
  • a number of techniques may be employed for managing channel quality, depending on the availability of Substation-to-Edge broadcast capability from adjacent networks, such as an AMI, AMR, and/or radio broadcast transmitter.
  • Software on the Substation Receivers and Computing Platform may monitor aspects of the channel quality and take measures to ensure that messages from the Remote Hubs experience an acceptably high success rate.
  • an acceptably high success rate may be ensured by rotating the responsibilities of the several channels, except that at least one non-structured channel is not rotated but remains dedicated to provisioning and alerting.
  • the network may be provisioned to have Remote Hubs alternate between transmitting on the better channel and the other channel. This reduces the overall probability of a given Remote Hub experiencing an unacceptably high message failure rate.
  • channel management may be to alter the definition of a channel so that the channel has a wider frequency spread, and/or uses more FEC bits per burst. Still another option is to move a channel to a different place in the spectrum, either permanently, or at different times of the day based on an observed cycle in impedance, impulse noise, or some other characteristic of the channel relevant to message success rate. None of these mechanisms require a fast feedback loop between the Edge Transmitters and the substations, as is the rule with some modulation techniques such as CDMA. Rather, the apparatus at the substation conducts a time-duration analysis of the behavior of the network, and then broadcasts new provisioning policy based on the analysis. Many characteristics of the network may be taken into account when making a policy change, such as observed patterns of crosstalk, variations in impedance, harmonic mixing, and the like. A policy change may impact multiple substations which may be interconnected by switching systems or other forms of redundancy.
  • Yet another aspect of the invention is a method employed by the stored programs at each of the at least one Remote Hubs to integrate the Edge-to-Substation GLA network with adjacent networks, such as the AMI (regardless of the AMI architecture) and the higher-frequency PLC based Transformer Area Network, as well as with the native intelligence of the Smart Meter platforms themselves.
  • the Remote Hub whose high-frequency PLC protocol stack (e.g. PRIME) enables it to act as the master node in the TAN, carries out the TAN-management activities.
  • TAN management activities include, but are not limited to, polling the PLC protocol stack to detect newly discovered Subordinate Remotes.
  • the Remote Hub also polls the local native Smart Meter intelligence to obtain local data such as current, voltage, and phase angle, and polls the reachable population of Subordinate Remotes to obtain similar data from the native Smart Meter intelligence at the Subordinate Remotes.
  • the Remote Hub stores, compresses, and/or processes the gathered data according to the policies and application algorithms on the Remote Hub until the operable policy dictates that the gathered data and/or derived results of the gathered data may be transmitted to the Substation Receiver by the Edge Transmitter module of the Remote Hub.
  • the Remote Hub is further responsible for using its provisioned policy and discovered TAN configuration data to determine when it is appropriate to format, encode, and transmit an alert message on an edge-to-substation channel.
  • Such messages may include pairing messages, which report the discovery of a new Subordinate Remote, pairing alerts, which report the loss of communication with a known Subordinate Remote, other alerts which report changes in the TAN or at meters (such as power surges, sags, and spikes), and scheduled data reports which transmit the data collected from the native Smart Meter intelligence in the TAN to the apparatus at the substation.
  • channels are not time-slotted, and Remote Hubs may transmit only exception reports or computed data reports on a randomized posting schedule in which an adequate number of transmissions are performed to provide an acceptable probability of achieving at least one successful transmission at the desired rate.
  • the Remote Hub may require a method of synchronizing its system clock to a known tolerance with other Remote Hubs in the same service area.
  • Each Remote Hub may poll the local meter or AMI network to obtain the AMI network time, which the Remote Hub uses to determine when scheduled transmissions must occur, and to obtain data blocks received via the AMI which are intended for the Grid Location AwareTM intelligence on the Remote Hub or on the Subordinate Hubs.
  • data blocks may include firmware updates and changes in network policy or provisioning which will affect the subsequent behavior of the Subordinate Remote.
  • the Remote Hub distributes firmware updates and policy changes to the Subordinate Remotes as necessary via the local PLC channel of the TAN. Additionally, Remote Hubs may synchronize based on a wireless broadcast signal.
  • Remote Hubs and/or Subordinate Remotes may contain a Global Positioning System (GPS) receiver.
  • GPS Global Positioning System
  • the GPS signal may be used for synchronizing the Remote Hubs in addition to providing means to associate the logical network model with the physical network model.
  • Concentrator maintain two master data tables which can be initially extracted from the utility's PNM and/or LNM, or which can be entirely accumulated from reports from the Remote Hubs. These data tables are the Inventory, which is a table of all the Remote Hubs and Subordinate Remotes which have been detected, and the Grid Map, which is a schematic representation of the grid's topology and state, similar to an LNM.
  • the Grid Map and Inventory at substation Computing Platforms may be partial, representing only the portion of the grid accessible to the substation at least at certain times.
  • the Grid Map and Inventory at the Concentrator generally represent the entire utility service area, although gaps in the Grid Map may exist if instrumentation of the service area with Remote Hubs and Subordinate Remotes is incomplete.
  • the Computing Platform at a substation When the Computing Platform at a substation receives any message from a Subordinate Remote, it compares the data in the message and the message enhancements inferred by the Substation Receiver with the data in the Inventory and Grid Map. The logic and policy on the Computing Platform are used to determine if the local copy of the Grid Map and Inventory need to be updated, and whether the update must be sent on to the Concentrator to update the master Grid Map and Inventory. If the policy in effect at the Computing Platform so dictates, the data collected from the edge is also forwarded to the Concentrator. The Concentrator in turn carries out policies dictating which events and scheduled reports must be published out to other data center applications.
  • Figure 1 is a simplified illustration of the power path from a generation point to a distribution substation to a consumer, showing the high voltage, medium voltage, and low voltage regions of the distribution grid and depicting some of the major features of an electrical distribution grid.
  • Figure 2a is a simplified fragment of a radial-architecture distribution grid showing the lack of cycles in the grid topology.
  • Figure 2b is a simplified fragment of a looped-architecture distribution grid depicting two substations each able to deliver power to the service transformer delivering low-voltage power to the group of residences shown.
  • the substation at left is currently powering the residential group.
  • Figure 2c is a simplified fragment of a networked architecture distribution grid.
  • the four feeders shown could originate at a single substation (typical) or at multiple substations.
  • the rectangular grid connects service transformers peer-to-peer on the low- voltage side so that all feeders deliver power to the loads below the substations concurrently.
  • Figure 2d is an exemplary simplified fragment of a campus network.
  • a three- phase transformer powers a 480 Volt Bus from which depend a number of three-phase laterals which run through the campus powering individual electrical outlets. Adding low-voltage generation points to the bus and providing means to isolate the bus from the distribution line converts the campus network into a self-sufficient micro grid.
  • Figure 3 is a high-level software deployment model of a Grid Location AwareTM network including back office features, substation apparatus, and transformer area networks (one expanded) including intelligence at remote hubs and subordinate remotes.
  • FIG 4 is a simplified block diagram of the substation apparatus in a Grid Location AwareTM network, illustrating how the Grid Location Aware(tm) network apparatus couples to the existing SCADA lines in the substation and how the data from the Substation Receiver is backhauled to a data center.
  • FIG. 5 is a block diagram of the multi-threaded software architecture in the
  • Substation Receiver showing how Edge-to-Substation signals are acquired, channelized, detected, demodulated, decoded, and stored for processing and backhaul.
  • Figure 6 is an elevation of a Remote Hub GLA Smart Meter.
  • Figure 7a is a top view of an accurate 3-dimensional model of one embodiment of the Edge Transmitter module of the Remote Hub GLA Smart Meter for a Form 2S residential meter.
  • Figure 7b is a bottom view of the same model of the Edge Transmitter module.
  • Figure 7c is a schematic block diagram of the electronic components of the Edge Transmitter module of the Remote Hub GLA.
  • Figure 7d is a detail of the isolation circuit of the Remote Hub.
  • Figure 8 is an elevation of a Subordinate Remote GLA Smart Meter.
  • Figure 9 is a schematic block diagram of the electronic components of the PLC communication module of a Subordinate Remote.
  • Figure 10a is a graph (not to scale) of a snapshot of the AC waveforms on a distribution grid at a meter connection point. The power fundamental and its odd harmonics are highlighted, and three CDMA-like broadband frequency-divided Edge-to- Substation channels are shown, one extended over time to illustrate time divisions.
  • Figure 10b provides a time-domain view of three Edge-to-Substation channels showing two scheduled and one unscheduled channel.
  • Figure 10c illustrates a typical structure of a single Edge-to-Substation message burst in one embodiment of the invention.
  • Figure lOd illustrates an alternative structure of an Edge-to-Substation message burst in another embodiment of the invention.
  • Figure lOe illustrates how using multiple chips on the same frequency band may prevent collisions.
  • Figure 11 illustrates communication paths local to the Transformer Area Network, both within a GLA Smart Meter and between the Remote Hub and a Subordinate Hub. Note that in Figure 11 the elevations of the Remotes depict embodiments where a secondary communication module is not employed.
  • Figure 12a illustrates a three-phase service transformer with three TANs.
  • Figure 12b illustrates a three-phase service transformer with one TAN and Proxy Remotes.
  • the present invention comprises a system and methods for constructing and operating an on-grid data collection network in such a way as to integrate the network with other adjacent networks and devices present at the edge, substations, and features of an electrical distribution network, wherein the other networks and devices may include Smart Meters and the AMI and a conventional network such as the Internet.
  • the system and methods further integrate the data collected by the on-grid data collection network at a data center and may publish the collected data to other applications.
  • the system and methods may also employ the capabilities of the integrated networks to infer otherwise unknown static and transient attributes of the electrical distribution grid and report them via the integrated networks for the purpose of improving the physical and logical network models of the Smart Grid. This leads to the ability of the models to support Smart Grid applications such as conservation voltage reduction, volt/Var optimization, load balancing, fault isolation, and recovery management.
  • FIG. 3 is a logical block diagram of the intelligent platforms of one embodiment of the invention showing where the different intelligence resides with respect to a converged network comprising a conventional wide area network such as the Internet, an Advanced Metering Infrastructure, the medium voltage electrical distribution grid, and the at least one Transformer Area Network connected at the edge of the medium voltage electrical distribution grid via at least one service transformer.
  • Figure 3 shows that the system may be divided into three regions or tiers.
  • the edge tier 301 comprises at least one Transformer Area Network (TAN) 302.
  • Each TAN comprises a Service Transformer 303, at least one Remote Hub 304, and zero or more Subordinate Hubs 305.
  • the Remote Hub communicates with the Subordinate Hubs via a standard short range, PLC protocol, such as PRIME.
  • the Remote Hubs 305 may be operable to transmit current-modulated signals.
  • the installation procedure may provide a mechanism to allow a newly installed Remote of either type to detect whether Remote Hub is already present on the local TAN.
  • the invention does not require the installation of communication devices or other modifications between the edge tier and the substation tier. However, if it is desirable to collect data from a feature of the medium- voltage grid such as a capacitor bank, a variation of the Remote Hub device may be installed there.
  • the substation tier 306 comprises at least one Substation Receiver 307 operable to receive transmissions from the Remote Hubs in the edge tier without recourse to any signal amplifiers, bypass mechanisms, or bridges installed on the medium voltage infrastructure of the electrical distribution grid.
  • Receiver(s) connect via a local area network to a Computing Platform 308 containing non-volatile computer-readable memory and a CPU for storing and executing the software 309 which maintains the Inventory and Grid Map databases and carries out the tasks of provisioning and managing the converged data network. Additionally the Computing Platform stores and executes software 310 which processes the Inventory and Grid Map data in combination with messages received from the Substation Receiver 307 to infer information about the state of the Grid over and above what the Substation Receiver alone can detect based only on incoming transmissions.
  • the computer-based components of the Substation Receiver and the Computing Platform components are hosted on the same server.
  • the communications protocol such as HTTP used to transfer data between the
  • Substation Receiver and the Computing Platform software components need not change, even though there is no physical local area network required.
  • Computing Platform 308 connects to a conventional wide area network 311, such as the Internet, for the purpose of communicating with a Concentrator 312 in the data center tier 313.
  • a conventional wide area network 311 such as the Internet
  • the servers may be configured in a redundant cluster to ensure continuous operation of the system.
  • the Concentrator 312 hosts software with an analogous architecture to the software in the substation(s), comprising a network and data management component 314 providing software services to one or more applications 315 for Grid Location Awareness.
  • the applications use conventional network-based messaging protocols such as but not limited to JMS, SOAP, and REST to publish information to subscriber applications such as a Geospatial Information System 316.
  • the data and network management component 314 may integrate with AMI head-end 317 for the purpose of causing the AMI network to broadcast data blocks to the Remote Hubs in the edge tier 301.
  • Data and network management component 314 may integrate with AMI head end 317 using a standard protocol and/or a proprietary interface defined by the AMI vendor.
  • Substation-to-Edge broadcast capability and/or time synchronization from the substations to the Remote Hubs may be provided by medium-voltage PLC transmitters attached to the feeders at the substation rather than using an AMI for this purpose.
  • a separate radio transmitter broadcasting messages originating at the substation may be employed.
  • the radio transmitter does not need to be physically located at the substation as long as there is a low-latency network connection from the Computing Platform at the substation to the transmitter.
  • the same radio transmitter may serve as the Substation-to-Edge channel for a multiplicity of substations.
  • synchronization of the Remote Hub clocks may be provided as described in US Patent Application No.
  • FIG. 4 details how in one embodiment the Substation Receiver 401, here shown co-hosted on a single server with the other software components of the Computing Platform, monitors the feeder lines 402 on the low- voltage side of the substation transformer 403 by attaching secondary current sensors 404 to the SCADA loops 405 already in place.
  • the secondary current sensors provide inputs to the Substation Receiver.
  • This coupling method allows a Substation Receiver to be installed on a substation transformer without disrupting the operation of the substation.
  • Other coupling methods such as hot-stick clamp-on current transformers are well known in the art, and may be equivalently employed in lieu of the secondary coupling to SCADA loops method described herein.
  • Some substations may lack SCADA loops, or they may be inaccessible due to physical placement or due to utility regulations.
  • Figure 5 details the software architecture and method used by one embodiment of Substation Receiver logic 501 to capture, detect, differentiate, and decode the multiplicity of signals being received from the Remote Hubs at the edge of the portion of the distribution grid supplied by the substation transformer associated with this Substation Receiver.
  • Inputs from the GLA CT lines 504 arrive at data acquisition module (DAQ) 502 in real-time as raw digitized signals where they are then buffered and recorded on ramdisk 503.
  • DAQ data acquisition module
  • Channelizer 505 reads the raw signals and reorganizes them by frequency band of interest into channelized signals stored on ramdisk 506.
  • Preamble Detector 507 samples the channelized signals received on every feeder-phase attempting to recognize the one or more preamble patterns which precede every transmission.
  • the Preamble Detector looks for all legitimate preambles, thereby allowing for the receipt of transmissions that are outside their allocated time slots or which were transmitted on a non-slotted channel.
  • the Preamble Detector may also use its knowledge of the channel time slots in order to minimize the amount of channelized recordings it must sample.
  • the Preamble Detector finds a preamble, it determines and marks the point or points in the data stream at which the Demodulator 509 should start processing. Multiple copies of the same message may be detected due to crosstalk.
  • Preamble Detector 507 provides the marker information and Channelized signal data to the Demodulator through ramdisk 508.
  • Demodulator 509 reads all copies of the messages from ramdisk 506, uses the frequency bands and possibly time slots in which the messages were found and the known policies of the Remote Hubs to determine how to decode the message.
  • Policy elements may include the modulation technique in use on the channel, the time based access policy in use, and, if frequency- spread modulation is used, which chips could have been used in modulation. Sometimes there may be more than one possible choice of chip. If the demodulator attempts to apply the wrong chip, this will be indicated by a demodulation error and/or FEC failure.
  • This parallelized embodiment of the receiver logic permits multiple processor cores to operate on each message stream, with the modules early in the data flow operating on later transmissions, while modules late in the data flow operate on earlier transmissions.
  • Data Manager 514 may be responsible for
  • the Data Manager also can copy data from the ramdisks to a large archive disk 513 for later study and post-processing. By the time the messages have been demodulated and written to ramdisk 510, they have been enhanced with enough information to identify the transmitter and infer the feeder and phase on which the message was transmitted, as described in more detail below.
  • the message bundle for each feeder-phase on which the message was received may include, but is not limited to, the signal amplitude at characteristic frequencies within the frequency band, the signal quality as determined by Demodulator figure of merit measurements, the time the signal was received, and the chip, if any, with which the message was encoded.
  • These message bundles are passed to the Network Management and Grid Location Awareness software via interface 511. These software components, not shown in Figure 5, but shown as 309 and 310
  • the software components 309 and 310 on the Computing Platform 308 decode the demodulated, error-corrected message received from the Substation Receiver at the semantic level.
  • the semantic decoding may include decryption and a CRC check on the decrypted message. This helps preclude the introduction of false data, for example due to tampering with the firmware on the Remote Hubs, or installation of a meter from a different service area on the network for malicious purposes.
  • the data payload in the message may yield additional grid awareness information.
  • a pairing message indicates that a new meter has been installed successfully, or that a known meter is now connected to a different service transformer or a different phase of a multi-phase transformer.
  • Scheduled data messages may provide information about voltage levels, demand, and power factor at the edge, as well as any other data or results computed from data available from the instruments at the Remotes, limited only by the data-bearing capacity of the channels. Even the failure of a scheduled message to arrive is informative, indicating that there may be an outage. Any copy of the message may be used to extract data, not only the copy from the feeder and phase on which the message was determined to have been transmitted. Sometimes the main copy may contain bit errors while crossover copies do not.
  • Computing Platform 308 may analyze the archived raw and enhanced signal quality data in order to determine whether beneficial changes in channel management ought to be made. When such changes are identified, Computing Platform 308 may forward recommendations to the Concentrator to ensure that the impact of all contemplated policy changes is understood at every substation that may be affected before the policy is put into effect.
  • FIG. 6 shows an elevation of a single-phase form 2s GLA Smart Meter 601 which is operable to act as a Remote Hub in a Grid Location Aware network.
  • Form 2s is standard format for a residential single -phase meter in the United States.
  • Other embodiments of the Remote Hub device may integrate with three-phase meters, or not be associated with a meter at all, but plug into a 120V or 240V or other voltage outlet located at a building, especially in a microgrid setting where the edge of the network is defined with a higher resolution than in a typical utility service area.
  • the Remote Hub device may be integrated with other devices and instruments on the distribution grid, such as voltage regulators, capacitor banks, step-down transformers, and the like.
  • a typical Smart Meter has a layered design of circuit boards conformal to the meter housing, such as a cylindrical transparent dome constructed of glass or Lucite.
  • the dome may be approximately 1.5" taller than usual to accommodate the height of the Edge Transmitter module 604.
  • the height of the meter housing varies from one manufacturer and model to another and does not place the meter in violation of the form standard.
  • Nearest the top of the housing is the Calculation and Display Board 602, which is part of every Smart Meter.
  • the display features on the Calculation and Display board such as indicator lights and a digital readout may be accessed by other components in the housing via interface 606.
  • the Communications module 603 contains the AMI transceiver circuitry and intelligence.
  • the components of the Communications module 603 are contained on the Calculation and Display Board, but other smart meters can accommodate multiple types of Communications Modules by placing the communication components on a separate board as shown. Both configurations are common. If on a separate board, Communications Module 603 communicates with logic on the Calculation and Display board 602 via an interface and cable 606. Other types of component- to-component interfaces are possible internal to the Smart Meter.
  • the Edge Transmitter module 604 contains the long-range GLA edge transmitter and also the short-range PLC transceiver for the TAN communications. Module 604 also has a CPU/microcontroller with nonvolatile memory that hosts and executes the stored programs of the Remote Hub control logic, controlling the Edge Transmitter and the PLC transceiver, and the interface 606 to the other logic boards 602 and 603.
  • FIGs 7a, 7b, and 7c show top, bottom, and schematic views of one embodiment of the Edge Transmitter module.
  • the Edge Transmitter Module communicates with other components of the meter 701 via UART (Universal Asynchronous Receiver/Transmitter) 712. Power is delivered to power supply 703 from AC mains 702. Power supply 703 provides appropriate low voltage DC power to computing unit 717, Amplifier Circuit 705, and Class D Amplifier 707.
  • Computing unit 717 is a microcontroller processing unit with on-board volatile and non-volatile memory, and is used for both short range and long range digital signal processing and protocols 704, scaling and filtering 713, and to drive amplifiers 707 and 705.
  • PLC Amplifier Circuit 705 and PLC Coupling Circuit 706 are adjusted so that the medium-frequency signal emitted does not propagate outside the TAN, relying on the service transformer' s filtering properties at this frequency, as described in more detail below.
  • the coupling circuit 708 for long range transmissions is much more powerful, requiring a special isolation circuit 711 which prevents coupling circuit 708 from resonating with other long- range transmissions and grid noise at the frequencies to which it is sensitive, when the Remote Hub is not transmitting on a long-range channel.
  • the main components of the coupling circuit 708 are transformer 709 and capacitor 710.
  • the Edge Transmitter module may contain a GPS receiver, such as GPS receiver 718 shown in Figure 7c.
  • the Edge Transmitter module may have access to the GPS signal from a GPS receiver located on another component of the Remote Hub, such as the Calculation and Display board, or on a mobile computing device used by an Installer.
  • the Remote Hub may use the GPS signal to record its geospatial coordinates, and/or for synchronizing transmissions on a slotted channel so as not to collide with transmissions from other Remote Hubs.
  • a Remote Hub may be programmed to report its geospatial coordinates, or a function of its geospatial coordinates, on an Edge-to-Substation channel or to permit them to be read by a mobile computing device.
  • FIGs 7a and 7b illustrate how the components of Figure 7a may be arranged to conform to the shape of a form 2S electrical meter.
  • transformer 709 and capacitor 710 may be large components. Shown here removed from the assembly to reveal the transformer, flux shield 715 normally covers transformer 709 to prevent magnetic flux from the large transformer from interfering with the metrology unit below it.
  • the components of Power Supply 703 occupy a region of the Remote Hub module at the upper left, and the components of Class D amplifier 707 are shown at the upper right.
  • a single microcontroller 717 contains circuitry, a processor, and nonvolatile memory for firmware protocol stacks and network management logic 704, 705, and 713 (from Figure 7c).
  • PLC coupling circuit 706, isolation circuit 711, and an amplifier capacitor 716 for the long-range edge transmitter are components at the lower right.
  • Connector 712 is the connector for interfacing with the other logic boards in the meter housing.
  • Figure 7d details the isolation circuit 711.
  • This circuit provides the ability to disconnect the coupling circuit of the Edge-to-Substation transmitter from the power line. It is desirable that the Remote Hub be isolated from the power line except when it is transmitting. This is because the coupling circuit represents a substantial load when connected to the power line.
  • the isolation circuit consists of a Triac 718 and a relay 719. The purpose of the Triac is to allow connecting to the power line at the time of a zero crossing of the line voltage. This prevents the generation of large transients that can damage components in the Remote Hub. Additionally, making the connection with the Triac removes the concern of arcing on the relay contacts that reduces the life of the relay.
  • the sequence of events when a Remote Hub interacts with the power line is:
  • the Triac is closed at a zero crossing of the power line
  • the desired action (generally a transmission) is performed
  • the Triac is opened at a zero crossing of the power line.
  • Figure 8 is an elevation of a standard Smart Meter 801 with a standard
  • Meter 801 becomes a Subordinate Remote GLA Smart Meter with the addition of PLC
  • All three modules (if three are present) communicate via an interface, here, a serial interface or UART 805.
  • Other embodiments may employ a different, functionally equivalent internal inter-component interface.
  • FIG 9 is a schematic diagram of the PLC communications components on the Communications Module of one embodiment of a Subordinate Remote.
  • the communications module of a Subordinate Remote comprises the basic meter 901, power input from AC mains 902, interface to the basic meter 907, power supply 903, microcontroller unit 904, amplifier circuit 905, and PLC coupling circuit 906.
  • the transmitter may be tuned to ensure that the signals are sufficiently attenuated by the service transformer not to be received above the service transformer or below adjacent service transformers.
  • Subordinate Remote may also contain a GPS receiver.
  • a Subordinate Remote may be programmed with its geospatial coordinates by means of a GPS receiver in a mobile device used by an Installer.
  • a Subordinate Remote which knows its geospatial coordinates may report them over a Transformer Area Network to a Remote Hub. This allows the Remote Hub to compute extended geospatial information such as the area and extent of the TAN.
  • the Remote Hub may report this extended geospatial information on an Edge-to-Substation channel, or the information may be read from the Remote Hub by a mobile device used by an Installer or other field engineer.
  • Figure 10a illustrates both the characteristics of the low end of the frequency spectrum on a feeder-phase line of a typical distribution grid and the method employed by a Remote Hub's Edge Transmitter to inject current modulated signals onto the grid in such a way to allow all the TANs served by one substation transformer to be able to transmit scheduled Grid Location Awareness reports at least twice in each 24 hour period, and to additionally transmit alerts as necessary, without creating any of the difficulties described herein above which have been observed with prior art methods of on-grid transmissions.
  • Important characteristics of the spectrum are the 50Hz or 60Hz power fundamental 1001, its harmonics 1002, and the noise floor 1003. It should be noted that from time to time a spike of impulse noise may exceed the usual noise floor.
  • Transmitter occupy a broad candidate spectrum lying between the 50 or 60 Hz power fundamental and the low-pass threshold of the service transmitters on the host power grid.
  • the candidate spectrum for a particular substation is determined by measurement and set by policy and subject to regulatory constraints. Measurements determine which band or bands of the candidate spectrum are reliably received at each substation transformer. If a usable band is wider than the bandwidth needed for a reliable transmission, then the channel band may be defined to be variable. In such cases, the Remote Hub conducts measurements, described herein below, prior to transmitting to determine at present conditions which part of the wider channel is currently most favorable for transmitting. Conversely, at the Substation Receiver, the preamble detector samples the entire wide usable band, determining the actual band used by the transmitter based on where the preamble was detected.
  • Figure 10a shows three frequency bands 1004, 1005, and 1006 which have been defined as channels for the long range Edge Transmitters
  • the number of bands used as channels is not limited to three, nor are three channels always required. Transmissions on each channel are spread across a defined frequency band as shown using a broadband modulation technique such as the ones identified herein above. Additionally,
  • transmission bursts may be constrained to occur in time slots such as 1007. Details of the slotting protocols are explained herein below.
  • a typical frequency based channel of the present invention may span a wide enough area of the spectrum that several harmonics of the power fundamental occur within the channel. Because it is important to keep the amplitude of the injected, modulated current as near as possible to the noise floor and to minimize the amount of power used to transmit, in some embodiments of the present invention no signal is added to the spectrum at harmonics of the power fundamental.
  • a shaping filter may be beneficially applied by the Edge Transmitter to avoid injecting current over the harmonics. This technique is also beneficial at the Substation Receiver, which may apply comb filtering so that the preamble detector and demodulator are not required to process the signal on the harmonics. This saves valuable processor capacity in the compute-intensive demodulation process.
  • each frequency band (such as 1004, 1005, and 1006) which is used as a channel is assigned at least one patterned code, or chip.
  • the rate of frequency variation of the chip is much higher than the rate of variation of the data signal.
  • the actual frequency- spread transmission injected as current on the channel is the exclusive or (XOR) of the channel's chip and the data signal.
  • Adjacent and nearby channels are assigned mathematically orthogonal chips.
  • the amplitude of the frequency spread current signals is as close as possible to the noise floor of the power line. This is beneficial in eliminating the problems associated with prior art PLC methods.
  • the different encoding chips used causes the receiver to interpret the "stray" signal as noise, allowing the receiver to still extract the correct signal. Additionally, and regardless of the modulation technique, any harmonics from one channel which extend into adjacent channels will also be interpreted as noise.
  • the result of this combination of channel access restrictions and modulation techniques is one or more low-frequency, high-quality current-modulated channels which can bear (in individual bursts) a raw data rate of 120 bits per second or more, or, by example, 80 bps after forward error correction, using interleaving techniques to distribute data bits and FEC bits to minimize the probability of loss of related bits due to impulse noise.
  • Time- duration testing on a radial distribution grid transmitting an average distance of 3.5 miles line of sight from the substation, yielded a frame error rate of 1.6e-6 using an FEC rate of 2/3 with frequency spread modulation. It is recognized that the method and apparatus described may additionally be operated at lower data rates than cited.
  • Figure 10b illustrates one method of organizing a group of three reliable channels to support grid mapping. All three channels are organized into time slots 1007, within which Remote Hubs are provisioned to transmit around a 5-second burst 1008 with around 1 second of silence prior to the burst and around 1 second of silence after the burst. This yields an inter-burst interval 1009 averaging 2 seconds long. Different time intervals may also be used.
  • the reason for the long inter-burst interval in the illustrated embodiment is that the mechanism for synchronizing the transmitter clocks may be an AMI network, and the AMI synchronization mechanism, being typically based on a mesh or cellular wireless architecture, is no more precise than plus or minus one second.
  • each data-bearing frequency- spread channel is assigned a plurality of chips instead of one. For example, if the number of chips per channel is two, then transmissions on even-numbered time slots use one chip, and transmissions on odd-numbered time slots use another, mathematically orthogonal chip. Using multiple chips may allow data-bearing capacity of the channel to be increased by reducing the inter-burst interval, as overlaps of adjacent transmissions may still be decoded.
  • the ordinal number of a time slot is determined with respect to a Master Frame Origin, which may be defined as beginning at midnight local time of each day, or may be established by a variety of methods as described in US Patent Application No. 13/566,481 already referenced and incorporated herein.
  • channels 1011 in Figure 10b have a scheduled organization. This means that each Remote Hub is assigned specific time slots in which it may transmit on the channel. A third channel 1012 is still organized into slots, but any Remote Hub with an exceptional condition to report may attempt to transmit in any time slot, provided that it has not alerted recently. Specifically, channel 1012 is organized by the method known as slotted aloha. Alerts, when received at the substation, are typically acknowledged via a Substation-to-Edge channel such as a wireless AMI network. If available, other methods for acknowledging alerts may be employed. If no mechanism for
  • each alert can simply be transmitted multiple times, with a randomly selected number of slots having elapsed between the
  • the rate of message failure will be the frame error rate of the channel (already disclosed to be very low) plus the rate of collisions.
  • the rate of collisions in turn depends on the offered load, which is based on the probability that more than one Remote Hub will attempt to transmit in a given slot.
  • the optimum number of unacknowledged retransmissions to maximize message success rate is likely to be a small number such as two or three, because with higher transmission rates channel saturation may occur.
  • the organization of an unscheduled channel may also use an un-slotted protocol similar to pure aloha, wherein the channel is not divided into time slots, but wherein a transmitter may attempt to transmit at any time, given that it has not already transmitted within a predefined recent interval.
  • alerts may preferably be retransmitted only if not acknowledged within a predetermined period of elapsed time, or they may routinely be transmitted a multiplicity of times if acknowledging alerts is impossible or undesirable.
  • the number and organization of channels described is by example only. On some substations, only one reliable channel may be available. When only one channel is used, either because of conditions or by design, a plurality of time slots may be reserved for alerting, while other time slots are scheduled. On some substations, a plurality of reliable channels will be identifiable. The number of scheduled channels needed depends on the number of Remote Hubs and the number of scheduled messages each Remote Hub must send in a 24-hour period. In one embodiment, two channels are sufficient to permit 12,000 hubs to transmit twice daily.
  • Figure 10b shows four alerts transmitted in the time interval shown. Two of the alerts 1010 have a high probability of being detected at the substation receiver. The alerts 1013 have collided in Figure 10b and will not be received correctly.
  • Figure lOe conversely, illustrates how the use of chips selected by means of the modulus of the time slot prevents some collisions.
  • message 1014 transmitted in an even- numbered slot of random slotted channel 1012, has overlapped with message 1015, transmitted on the same channel in the subsequent odd-numbered slot. Both messages are decipherable at the substation because they were encoded using orthogonal chips. This is in contrast with the situation in Figure 10b, where the intent of the two
  • transmitters of messages 1013 was clearly to attempt to transmit in the same slot. These messages would still collide even if multiple chips were in use.
  • an unscheduled, unslotted channel might use frequency spread modulation and be assigned a plurality of orthogonal chips.
  • a transmitter offering a message would select a chip from the plurality of chips at random, thereby reducing the probability that the message would collide with another transmission on the same channel at an overlapping time.
  • Figure 10c illustrates the detailed organization of a typical single transmission burst, whether it occurs on a scheduled channel or a slotted alerting channel according to one embodiment.
  • the message is comprised of preamble 1014, interleaved data bits 1015 and FEC bits 1016.
  • the preamble is the same for all messages on the channel.
  • the FEC rate is not drawn to scale, and may be varied as needed from substation to substation based on the quality of the available channels. In some grid locations and/or with some modulations, FEC may not be required.
  • Figure 10c without further elaboration may appear to imply that the bandwidth is the same for all transmissions in the same channel, and that the pattern used for preamble detection is also suitable for use by a Substation Receiver when sampling and comparing signals on several inputs representing different phases of different feeders to infer the line on which the signal was actually transmitted. Some embodiments of the invention may require greater bandwidth for preamble detection than the data-bearing segment of a message requires. Additionally, in some embodiments, the grid location of a Remote Hub transmitter may be better inferred from a special transmission, called a probe
  • the probe transmission may consist of known modulated signal, or it may consist of pure tones.
  • the pure tones may be transmitted as a sequence of single tones, or one or more groups of pure tones may be transmitted simultaneously.
  • the frequency range of the probe transmission may be different from that of the other message sections.
  • Figure lOd illustrates this bandwidth variation, showing one bandwidth for the preamble 1018, another bandwidth for data-bearing message 1019, and a third bandwidth for GLA trailer 1020.
  • GLA trailer 1020 is not present in all embodiments of the invention, because the probe transmission may be present within preamble 1018.
  • the probe transmission may precede the preamble rather than following the message.
  • the segments of a message may be transmitted in any order as long as the order is known by the receiver.
  • Figure 11 shows a Remote Hub 1101 and a Subordinate Remote 1102 illustrating the local communication paths within a TAN according to one aspect of the invention.
  • This figure shows an embodiment where the Communications Module is not separate from the Calculation and Display Module.
  • the Remote Hub 1101 may poll each known Subordinate Remote, via a PLC protocol such as PRIME or G3 using request path 1103. (To allow for the use of different PLC protocols, the specific language of these standards is not used herein.
  • a polled Subordinate Remote 1102 retrieves the requested data from the Smart Meter and formats it into a response which is transmitted as a response 1104.
  • the Remote Hub's Edge Transmitter Module communicates with the Communications Module and Calculation and Display Board components via UART 1107, using a simple request/response protocol 1105 which may vary from one Smart Meter vendor to another.
  • Data path 1106 illustrates that both the Remote Hub and the Subordinate Remote are members of the AMI and will be transmitting meter data to the AMI head end in addition to performing TAN-related activities.
  • the Remote Hub in its role as TAN manager, may make use of the AMI or other alternative, integrated channels in ways that Subordinate Remotes may not. Only the Remote Hub is capable of sending out messages on the Edge-to-Substation channel. A Remote Hub may also send messages on alternative, integrated outgoing channels such as the AMI. The Remote Hub may additionally receive data blocks from a Substation-to-Edge channel, whether the Substation-to-Edge channel is provided by the AMI or other means. Such data blocks may contain, but are not limited to, alert acknowledgements, firmware update broadcasts, and policy changes. Meter clock synchronization messages are part of the native AMI protocol, but the Remote Hub may obtain the synchronized clock time from the
  • Remote Hub 1101 has the capability to function in multiple operating modes.
  • the Remote Hub may function as a Subordinate Remote.
  • the Remote Hub may also function as a hybrid of Remote Hub and Subordinate Remote, called a Proxy Hub.
  • Proxy Hub When a Remote Hub 1101 is first installed, it monitors the PLC frequencies on the TAN for a period of time sufficient to determine whether another Remote Hub is already present.
  • the wait time consists of a fixed period of time plus an additional period of time computed by a randomization function when the device is powered on.
  • the fixed period of time is sufficient to ensure that a Remote Hub operating in the master mode would have executed its discovery algorithm, which would be detected by the newly installed Remote Hub if another Remote Hub is operating within range.
  • "within range” means powered by the same service transformer, but exceptions occur. The means of handling the exceptions are described herein below.
  • Remote Hub 1101 indicates by means of a light or digital display on the face of the Smart Meter that another Remote Hub is present. At this point, an installer may elect to leave redundant Remote Hub 1101 in place, or replace it with a Subordinate Remote unit. If left in place as a "spare," Remote Hub 1101 continues to function as a Subordinate Remote, and the first Remote Hub continues to act as the Remote Hub and master node in the TAN. If no other Remote Hub is present, Remote Hub 1101 begins to operate as a master PLC node on the TAN, discovering and storing a list of any Subordinate Remotes 1102 in the same TAN. A Remote Hub may also enter a third mode, Proxy Hub, as described below.
  • Remote Hub 1101 obtains the network system time if available, for example by querying the AMI logic in the Smart Meter, and formats, encodes, and transmits a provisioning request on an Edge-to-Substation channel reserved for provisioning requests and alerts.
  • Provisioning request it may cause a provisioning response to be sent, either via the AMI, or via an available on-grid or wireless Substation-to-Edge channel.
  • Provisioning data may also be supplied to a Remote Hub by means of a handheld device or drive-by transmitter employed by the installer.
  • the handheld device uses a personal-area wired or wireless protocol, such as Bluetooth, infrared, USB, or RS232 to program the Remote Hub.
  • the Remote Hub may be provisioned via handheld without knowledge of the inferred grid location of the Remote Hub.
  • the same short-range protocol in a handheld or drive-by device, may be used to distribute firmware or policy updates to Remote Hubs that lack a permanent Substation-to-Edge channel. It is sometimes desirable to activate a policy or program change simultaneously on a collection of Remote Hubs. If the Remote Hubs must be updated by means of a personal-area protocol, the programming device converts the desired future activation time to a relative wait time as each Remote Hub is programmed, so that even though the Remote Hubs were programmed at different times, they will activate the updated programming at approximately the same future time.
  • Remote Hubs may be manufactured with a default policy, or pre-loaded with a default policy after manufacturing but before installation, so that if no policy is provided at or subsequent to installation, the Remote Hub still has a rule for operating.
  • the provisioning data provides the Remote Hub with the information it needs to manage the TAN, including the location of, and organization of, other channels on the Edge-to-Substation network, and the ordinal or sequence number of slots on scheduled channels on which this Remote Hub has permission to transmit.
  • the Remote Hub discovers Subordinate Remotes, it transmits pairing messages on the Edge- to-Substation channel to inform the Computing Platform that it is in communication with the newly discovered Subordinate Remotes. Pairing messages may be transmitted on an alerting channel or on a scheduled channel depending on a policy established by the network.
  • the resulting pairing message indicates this.
  • Including the presence of "spare" Remote Hubs in the Grid Map may provide a cost savings and more rapid recovery, in that if the master Remote Hub should fail, the TAN may be reconstructed by allowing the spare Remote Hub to assume the master role.
  • the master Remote Hub may cache its policy
  • the PLC transceivers in the Remotes may be able to discover Subordinate Remotes and Remote Hubs on other phases of the same service transformer, or even on adjacent or nearby service transformers.
  • the detectable remotes may be partitioned wherever possible so that each TAN comprises exactly one master Remote Hub and all Subordinate Remotes, or Remote Hubs acting as Subordinate Remotes, on the same phase of the same service transformer, and no Remotes of any type which are on a different phase or a different service transformer.
  • a Remote Hub's PLC protocol stack executes its discovery process, which involves transmitting a beacon tone or message that causes other nodes in the vicinity to respond. The first time this is executed, a standard initial power level is used. The TAN management layer of the Remote Hub, operating above the PLC protocol stack, obtains the list of discovered Remotes of any type. The Edge Transmitter of the Remote Hub is then employed to send a pilot signal at sufficiently low amplitude and high frequency that the pilot signal will not be detectable on the high- voltage side of the service transformer. (This pilot tone is not the same as a PLC discovery beacon.) The pilot signal begins on a zero crossing of the power fundamental of the phase on which the transmitter resides.
  • Remotes which detect the pilot signal test to determine if the received signal began on the zero crossing of the phase on which the receiving Remote resides. If so, the receiving Remote sends a positive response on the PLC channel and records the identity of the Hub Remote that sent the pilot tone.
  • Another Remote Hub on the same phase as the pilot transmitter enters Subordinate Remote mode and will be considered a spare.
  • Subordinate Remotes on other phases do not respond to the pilot tone.
  • a Remote Hub that detects the pilot tone but is on a different phase sends a negative response.
  • the transmitting Remote Hub uses the responses to update its inventory of TAN devices discovered automatically by the PLC discovery process, recording the list of Subordinate Remotes and spares on its home phase, and the list of Remote Hubs on other phases of the same service transformer.
  • the first Remote Hub that transmitted the pilot tone examines the list of negative responders, that is, of Remote Hubs on a different phase. It selects one such second Remote Hub and orders it via the PLC protocol to transmit a pilot tone of its own.
  • the first Remote Hub still the master node of at least all the nodes on the service transformer, collects the resulting positive and negative responses and updates its inventory and partitioning data.
  • any spare Remote Hubs on the same phase as the second Remote Hub have also entered Subordinate Remote mode, and the first Remote Hub now has a complete partitioning of Remote Hubs according to phases, the Remote Hubs on the third phase, if present, being the intersection of the Remote Hubs sending negative responses to the first Remote Hub with the Remote Hubs sending negative responses to the second Remote Hub.
  • the first Remote Hub now selects a third Remote Hub from the third phase, and orders it via the PLC protocol to transmit a pilot tone and return the list of negative and positive responses it received.
  • a positive response will have been received from every Subordinate Remote on the service transformer, the phase and mode of every device on the service transformer is known, and a potential master Remote Hub for each single-phase TAN has been identified. Additionally, any node which responded to the original PLC discovery process from outside the transformer area has been identified.
  • the first Remote Hub sets its PLC transmission amplitude to a very low level and polls each remote. This first amplitude should be so low that no remotes respond.
  • the first Remote Hub increases its transmission amplitude until, ideally, all remotes on the same phase and no remotes on another phase respond.
  • the first Remote Hub records this low threshold level and then continues to increase the amplitude until a remote on another phase responds.
  • the first Remote Hub records this as its high threshold level.
  • the first Remote Hub commands the second Remote Hub via PLC to attempt to take on the role of PLC master node for its phase, sending in the command the low and high threshold amplitudes. This is called the partitioning command.
  • the second Remote Hub sets the PLC transmission amplitude to the low threshold amplitude, and restarts its PLC stack as a master node, conducting a PLC discovery process of its own. If the second Remote Hub discovers all the Subordinate Remotes and spares on its own phase and no nodes on any other phase, then has become the master of a single-phase TAN and the partitioning step has succeeded. Otherwise, it raises its PLC transmission amplitude and repeats the process until the partitioning step succeeds.
  • the partitioning command has failed.
  • the second Remote Hub signals the failure of the partitioning command to the first Remote Hub by using its Edge Transmitter to transmit a status beacon detectable by the First Remote Hub, since the first and second Remote Hubs can no longer communicate via PLC.
  • the first Remote Hub detects no failure beacon from the second Remote Hub, and a third phase is present, the first Remote Hub sends a partitioning command to the third Remote Hub, which carries out the partitioning step as described.
  • the first Remote Hub When the first Remote Hub has partitioned the other phases present without having received a failure beacon, then it carries out the partitioning step itself. If the first Remote Hub's partitioning step succeeds, then the service transformer is successfully partitioned into three single-phase TANs, as shown in Figure 12a.
  • the second and third Remote Hubs may employ a failure beacon and a success beacon. Use of the success beacon may shorten the time required to complete the partitioning steps.
  • FIG 12a is a simplified schematic drawing of a three-phase service transformer and the meters that it supplies with power.
  • This service area contains three TANs 1204, 1205, and 1206, one for each phase of the service transformer.
  • Each TAN contains a Remote Hub 1202 and zero or more Subordinate Remotes 1203. Any Subordinate Remote may actually be a spare Remote Hub.
  • Figure 12a illustrates a proper partitioning of the Remotes powered by a three-phase transformer following the discovery and partitioning algorithm described herein above.
  • the first Remote Hub initiates a PLC discovery process. If any Remotes are discovered which are on a different service transformer, the first Remote Hub lowers the PLC transmission amplitude, superseding the old value of the "initial" amplitude, and restarts the discovery process, repeating this until all and only the Remotes known to be on the service transformer are discovered. If a new Remote never before detected is found, the pilot beacon method above is used to determine the phase of the new Remote and whether it is on the same service transformer as the first Remote.
  • the first Remote Hub transmits a distress alert on an Edge-to-Substation channel and organizes the TAN at the highest amplitude which does not discover any nodes outside the service transformer, even if some nodes on the service transformer are unresponsive.
  • Remote Hub 1202 carries out all the TAN management activities, such as polling the Subordinate Remotes, distributing updates, and computing derived results, for the Remotes, including Proxy Hubs, on all phases present.
  • the first Remote Hub 1202 formats the appropriate message and sends it to the Proxy Hub over the TAN.
  • the Proxy Hub then retransmits the message on the Edge- to-Substation channel. In this way, Edge-to-Substation transmissions are always transmitted on the correct phase, even though the TAN master is on a different phase.
  • the Remote-hub may pre-modulate and store certain messages which do not contain variable data and may be sent repeatedly.
  • Examples of pre -recordable messages include messages sent on the provisioning channel, such as the provisioning request and standard alerts on conditions such as sags, over- voltages, and the like. This strategy saves computing power at the Remote Hub.
  • policy changes such as changes in chip, channel placement, baud rate, FEC rate, and bandwidth occur, pre-modulated recordings may need to be discarded and re-computed. This may be done during idle periods when the Edge Transmitter's microcontroller CPU is not busy with preparing scheduled messages. To accommodate this, such policy changes may be announced in advance to take effect at a known future time as opposed to becoming effective immediately.
  • a Remote Hub may not be integrated into a GLA Smart Meter, but instead may be associated with another feature of a medium voltage distribution grid, such as a capacitor bank, step-down transformer, voltage regulator, storage battery, local generator, or switch set.
  • the Remote Hub may be integrated with local or remotely controlled SCADA systems associated with the feature.
  • the SCADA system may provide an Edge-to-Substation channel for provisioning Remote Hubs used in this manner, or the Edge-to-Substation channel associated with Remote Hubs in Smart Meters may also be operable to communicate with such feature-based Remote Hubs.
  • Such Remote Hubs may incorporate a version of a Substation Receiver and be operable to send Pairing Messages associating the grid feature with other Remote Hubs electrically and schematically subordinate to the grid feature.
  • a Remote Hub may also be embodied as a standalone device plugged into an electrical outlet.
  • a form of Substation Receiver may additionally be associated with such medium voltage grid features, or any intermediate point on the medium voltage distribution grid.
  • Such an intermediate Receiver may collect information regarding which Transformer Area Networks are impacted by an associated medium-voltage grid feature.
  • the combination of such a secondary Receiver and Remote Hub may be employed to control intermediate grid features, such as using a switch or relay to isolate a microgrid or balance the load on a plurality of substations, or to alter the set-point on a voltage regulator.
  • a Remote Hub may carry out line measurements to determine locally optimum conditions for transmitting.
  • the Remote Hub always has the option to vary the amplitude of the injected signal, and may additionally have the option to vary the frequency band of the data bearing segment of the transmission.
  • the Remote Hub transmits a sequence or simultaneous combination of pure tones. These tones may be independent of an actual message transmission, or they may be incorporated in the message preamble. Recall that the bandwidth of the preamble may be different than the bandwidth of the data-bearing segment of the transmission. If there is an opportunity to choose the frequency band of the data bearing segment, then the tones must span the entire available spectrum.
  • the tones When the tones are transmitted, the current generated at the requested voltage is measured. The relationship between the requested voltage and the generated current is calculated at each frequency. The result will be proportional to the line impedance of the grid at the Remote Hub for each frequency.
  • the Remote Hub may from time to time send feedback from the
  • Substation Receiver about the messages as received. This may allow the Remote Hub to refine and calibrate its measurement process. Outcomes of this feedback may include changing the slot assignments and/or modulation methods of individual Remote Hubs and/or an entire channel to improve message success rate.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Artificial Intelligence (AREA)
  • Health & Medical Sciences (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Quality & Reliability (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

A system and method for inferring schematic and topological properties of an electrical distribution grid is provided. The system may include Remote Hubs, Subordinate Remotes, a Substation Receiver, and an associated Computing Platform and Concentrator. At least one intelligent edge transmitter, called a Remote Hub Edge Transmitter, may transmit messages on the electrical distribution grid by injecting a modulated current into a power main that supplies an electric meter. The Subordinate Remotes, Remote Hubs, the Substation Receiver, and the associated Computing Platform and Concentrator may contain processing units which execute stored instructions allowing each node in the network to implement methods for organizing the on-grid network and transmitting and receiving messages on the network. The Substation Receiver, Computing Platform and Concentrator may detect and infer schematic grid location attributes of the network and publish the detected and inferred attributes to other application systems including geospatial information systems maintaining the logical and physical network model.

Description

A SYSTEM AND METHOD FOR INFERRING SCHEMATIC AND TOPOLOGICAL PROPERTIES OF AN ELECTRICAL DISTRIBUTION GRID
RELATED APPLICATIONS
[0001 ] This application claims priority to U.S. Provisional Application No. 61/766,551, filed on February 19, 2013, and U.S. Provisional Application No. 61/779,222, filed on March 13, 2013, the contents of which are incorporated herein by reference.
FIELD OF THE INVENTION
[0002] The present invention is directed toward employing the electrical distribution grid as a short and long-range transmission medium and data-bearing network, and further toward the use of signals and messages on the network for the purpose of inferring schematic and topological properties of the distribution grid, which vary over time.
BACKGROUND OF THE INVENTION
[0003] The power grid is generally considered to be composed of two logical regions, the Transmission Grid(s) and the Distribution Grid(s). The Transmission Grid originates at large generation points such as hydroelectric dams, nuclear reactors, wind farms, and coal-fired or gas-fired power plants. Power from the generation point is transmitted as high- voltage alternating current (AC) over a loosely connected network of long, high- voltage lines to points where demand for power exists, such as factories, farms, and population centers. At the edges of the Transmission Grid there is a collection of
Distribution Substations. Distribution Substations contain one or more Substation Transformers, which step down the voltage from high transmission line levels (typically 130kV to 700kV) to the medium voltage levels (typically from 4kV to about 35kV) at which power is distributed to consumers within a distribution service area. At the edge of the Distribution Grid are a number of Service Transformers, which transform the medium voltage of the distribution grid to the low voltages (in the US, typically 120V, 208V, 240V, 277V, or 480V). Other voltages in addition to some of these can be used elsewhere in the world. In some cases, a tier of one or more transformers, called step- down transformers, lying schematically between the Substation Transformers and the Service Transformers, create intermediate voltage reductions between the Substation and the Service Transformers. Each Service Transformer powers one or more metered loads. A load can be a dwelling, a commercial or industrial building, an element of municipal infrastructure such as a series of street lamps, or agricultural apparatus such as irrigation systems. A typical distribution grid includes other elements used to balance and regulate the flow of power. Examples of such elements are capacitor banks, voltage regulators, switches, and reclosers. Figure 1 illustrates a typical segment of the power grid.
[0004] Distribution grids have been designed and deployed in a variety of topological configurations. In the United States, distribution grid types are typically characterized as radial, loop, or networked. Other emerging cases are the campus grid and the microgrid. Additional topologies, not described, are used elsewhere in the world.
[0005] Figure 2a is a topological schematic of a typical radial grid. In a radial grid, a substation has one or more substation transformers. Each substation transformer has one or more substation busses. One or more three-phase feeders "radiate" outward from each substation bus, with single-phase, double-phase, or three-phase lateral lines branching off from the feeders, and tap-off points (or simply "taps") in turn branching from the laterals. Radial grids are inexpensive to design and build because they are simple, but they are most vulnerable to outages because they lack redundant power paths, so that any break causes at least one load to lose power.
[0006] Figure 2b is a topological schematic of a typical loop distribution grid. In a loop grid, each end of select feeders is attached to a power source such as a bus of a substation transformer. If the loop is undamaged, then power is available at all loads if either substation transformer is operational. If there is a break in the loop, then power is available at all loads assuming that both transformers are operational. In normal circumstances, a system of switches is used to ensure that only one substation transformer at a time is delivering power to each segment of the grid.
[0007] Figure 2c is a topological schematic of a typical networked grid. This topology has maximum redundancy. In addition to employing multiple power sources, all the service transformers are linked to one another on the secondary side in a mesh
arrangement. Multiple breaks in connectivity are required to cause a power outage at any point. Networked grids are most expensive to build and maintain, and are typically used in major urban areas such as Manhattan or Washington, DC where high- value, high- criticality loads are concentrated together.
[0008] Figure 2d shows a microgrid or campus network. Microgrids are not traditional in electrical distribution technology, but are emerging as a response to increased focus on energy conservation and on distributed generation of energy from renewable sources. Many variations are possible. This type of grid is typically attached to, but severable from, a wider distribution grid, and may contain its own power sources such as windmills, solar panels, or rechargeable storage batteries as well as loads. The entire network may employ low- voltage lines.
[0009] A distribution substation receives high-voltage power from the transmission grid into one or more large power transformers. A distribution transformer may incorporate a type of regulator called a load-tap changer, which alters the voltage the transformer delivers to a power distribution bus (the substation bus) by including or excluding some turns of the secondary winding circuit of the transformer, thereby changing the ratio of input to output voltage. One or more feeders depend from the substation bus. If too many feeders are required, additional transformers and busses are used.
[0010] In order to monitor and control the components of the grid, current transformers (CTs) or other current sensors such as Hall-effect sensors are attached to power-bearing conductors within the substation. The CTs output a low current on a looped conductor which is accurately proportional to the current delivered at the high voltage conductor being monitored. These low-current outputs are suitable for connecting to data acquisition subsystems associated with Supervisory Control and Data Acquisition (SCAD A) systems in the substation. Primary monitoring CTs are designed and built into the substation, because changing or adding CTs to the high-voltage components is impossible or dangerous while current is flowing. On the other hand, additional CTs may be safely added to the low-current SCADA loops as needed without impacting power delivery.
[0011 ] In addition to the power lines themselves, the distribution grid contains numerous other devices intended to regulate, isolate, stabilize, and divert the flow of power. These devices include switches, reclosers, capacitor banks (usually for power factor correction), and secondary voltage regulators. All these devices affect the behavior of the distribution grid when considered as a data-bearing network, as do the various loads and secondary power sources on the grid. Devices that have abrupt state changes will introduce impulse noise on the grid, as can loads turning on and off. Some devices, such as transformers and capacitor banks, filter and attenuate signals at certain frequencies.
[0012] Other than the wires connecting a consumer load and the associated meter to a service transformer, the service transformer is the outermost element of the distribution grid before the power is actually delivered to a consumer. The meter is attached at the point where the power from the service transformer is delivered to the consumer. Service transformers can be three-phase, dual-phase, or single phase, as can meters.
[0013] Traditionally, reading meters was one of the largest operational costs incurred by electrical utilities. Original electric meters were analog devices with an optical read-out that had to be manually examined monthly to drive the utility billing process. Beginning in the 1970s, mechanisms for digitizing meter data and automating its collection began to be deployed. These mechanisms evolved from walk-by or drive-by systems where the meter would broadcast its current reading using a short-range radio signal, which was received by a device carried by the meter reader. These early systems were known as Automated Meter Reading systems or AMRs. Later, a variety of purpose-built data collection networks, employing a combination of short-range RF repeaters in a mesh configuration with collection points equipped with broadband backhaul means for transporting aggregated readings began to be deployed.
[0014] These networks were capable of two-way communication between the "metering head-end" at a utility service center and the meters at the edge of this data collection network, which is generally called the Advanced Metering Infrastructure or AMI. AMIs can collect and store readings frequently, typically as often as every 15 minutes, and can report them nearly that often. They can read any meter on demand provided that this feature is used sparingly, and can connect or disconnect any meter on demand as well. AMI meters can pass signals to consumer devices for the purpose of energy conservation, demand management, and variable-rate billing. Because the AMI network is separate from the power distribution grid, AMI meters are neither aware of nor sensitive to changes in the grid topology or certain conditions on the grid. Nonetheless, the introduction of AMI is generally considered to be the beginning of the Smart Grid. [0015] Many characteristics of the electrical distribution infrastructure have limited the success of efforts to use the grid itself as a communications medium. First, the grid is a noisy environment. As already noted, state changes in loads on the grid as well as control and regulation artifacts on the grid itself cause impulse noise on the power line. Normal operation of loads like electrical motors, simple variations in the overall load, and ambient RF noise (chiefly from lightening and other weather-related causes) add up to significant Gaussian noise. The measured noise floor at a typical substation in the United States sits at about 80-90dB below the maximum amplitude of the 60 Hz fundamental. The complex impedance of the grid varies across both the frequency and time domains. This may lead to loss of signal at a receiver sited at a higher voltage point on the grid when impedance increases, or alternately force the transmitter to use more energy than would be necessary on the average. Capacitor banks sited at points along the grid for the purpose of optimizing the power factor can cause signal attenuation. Most significantly, transformers act as low-pass filters, dramatically attenuating signals above a certain frequency. The threshold frequency is not the same on every distribution grid, because different arrangements and types of transformers are employed and because the transformers themselves are not deliberately tuned to filter at a specified frequency. All these variables impact the frequency response of the medium.
[0016] Additionally, injecting modulated current signals on the grid may cause interference between the injected signals themselves. One problematic phenomenon is crosstalk, where a signal injected on one power line is detectable on another line. When crosstalk occurs on two or more phases of the same feeder, it can be caused by inductive and capacitive coupling, as the phase lines run alongside one another for most of the length of the feeder. Crosstalk may also be due to multiple phase windings on the same transformer core. Feeder-to-feeder crosstalk has also been measured, and may be caused by reflection of the injected signal off the power bus at the substation. Given the complexity, diversity, and age of the distribution grids in the United States and the world, less is known about these phenomena than might be expected.
[0017] Finally, using the distribution grid as a communications medium often has side effects which interfere with the primary purpose of the grid, which of course is delivering clean, reliable power to consumers. If devices under power resonate with an injected current, a phenomenon called flicker results. LED, CFL, incandescent and fluorescent lighting visibly flickers in response to certain frequencies. This is annoying and sometimes dangerous, as visual flicker has been demonstrated to cause both seizures and vertigo. Other types of devices, such as fans and speakers, also resonate at certain frequencies, causing an audible hum. ANSI/IEEE standard 519 requires any device (whether intended as a communication device or not) that injects current on the grid to avoid doing so at certain frequencies and amplitudes to avoid causing flicker.
Specifically, ANSI/IEEE standard 519 requires that no noise be added to the odd harmonics of the fundamental at or below the eleventh harmonic.
[0018] Despite the many engineering difficulties inherent in using the power grid as a communications medium, it has remained attractive to electrical utilities because the utility already owns the infrastructure, and it is present at all the points where the utility needs to collect data. Further, the regulatory and cost structure of publicly owned utilities (POUs) strongly favors them using owned assets (which can be profitably purchased and maintained via service rate increases) as opposed to paying operating expenses to a third- party communications provider such as a telephone or cable provider.
[0019] High-frequency transmissions (above lMHz) are attractive because theoretically high data rates can be achieved. Such schemes, called BPL for Broadband over Power Lines, offer a potential theoretical bandwidth sufficient to deliver internet access to consumers via a gateway located in their electrical meter. In the early years of the twenty- first century, the Federal Communications Commission (FCC) in the U.S.
actively promoted the concept of "Access BPL" as a means of delivering high-speed Internet access to rural American families. Long-range transmission of BPL signals, however, is impractical and expensive, because every transformer between the transmitter and the receiver must be fitted with a bypass or repeater mechanism, or the low-pass filtering characteristics of the transformer will block the signal. In the United States, where the number of consumers per service transformer tends to be very small - in rural areas often only one - the cost to implement BPL becomes prohibitive. Additionally, RF interference caused by BPL transmission has created opposition from aviation, commercial radio, amateur radio, and other sectors. The FCC has attempted to be supportive of BPL technology, but new compromise rules requiring BPL installations to be capable of notching out (avoiding) frequencies where interference is reported have increased the complexity of managing a BPL service. Several attempts at deploying BPL consumer services have been abandoned.
[0020] Under the umbrella name Power Line Communication or PLC, some medium- frequency power line protocols have been used with success for Smart Grid applications, especially in Europe (and other locales with European-style grid architectures), where the number of consumers per service transformer is much larger than in the United States. The two most commonly used medium-frequency PLC initiatives are PRIME and G3, both promoted by commercial alliances based in Europe. PRIME uses orthogonal frequency-division multiplexing (OFDM) at the physical layer, with 512 differential phase-shift keyed channels (DPSK). PRIME achieves data rates as high as 128.6kbps, but is most reliable at 21.4kbps. Its frequency range is 42-89 kHz. G3 uses a similar physical-layer combination of OFDM and DPSK, offering 256 channels between 35 and 91k Hz with a data rate of 33.4kbps. Both G3 and PRIME are still sharply attenuated by transformers, though in most cases a receiver located on the medium-voltage side of a service transformer can successfully read meter transmissions from low-voltage sites served by that transformer, provided that the receiver is sited close enough to the service transformer. For these reasons, Smart Grid technologies based on these protocols are common in Europe and Asia. PLC protocols are also well-adapted to short-range power- line applications such as arbitrating the charging of electric vehicles.
[0021 ] At the other end of the spectrum are ultra-low frequency systems, chiefly used for control systems because they have little data-bearing capacity. Audio Frequency Ripple Control (AFRC) systems are used mostly in rural areas for load management: to turn off high-consumption devices such as electric heaters and air conditioners during peak load times, or to control use of other constrained resources, such as automated farm irrigation systems. An AFRC transmitter sits on the high-voltage side of a substation or transmission transformer and may service multiple substations. AFRC data rates vary from 2 to 10 bits per second, and the maximum message length is about 100 bits. After such a transmission, the transmitter requires a long idle period before it can transmit again, with a maximum duty cycle on the order of 10%. AFRC systems cause obvious flicker, but not at a dangerous frequency. Because they are typically used in areas of low population density and transmissions are infrequent, the side effects are tolerated. AFRC is a broadcast technology operable from high voltage to low voltage and thus cannot be used for collecting meter data or other data about edge conditions, because that requires transmitting from low voltage to higher voltage.
[0022] Aclara®'s TWACS® technology operates by injecting pulses onto the power line when the fundamental power carrier crosses the zero point - twice per 50Hz or 60Hz cycle. This method operates either from substation to edge or edge to substation, and uses a polling protocol to avoid having one edge transmission interfere with another. It is slow because it is tied to the fundamental, and because of the polling architecture. It has been criticized by consumer groups for the amount of impulse and broadband noise it introduces onto the grid.
[0023] Landis+Gyr employs a low-cost, low-frequency edge transmitter originally developed by Hunt technologies, intended to operate in conjunction with AFRC to provide two-way communication over long distances on the grid. The data transmission method using this transmitter is cheap and reliable, but limited. It induces sympathetic current oscillations by connecting variable impedance to the power line. The data rate is low because the transmitter is dependent on a voltage relative to the power carrier, so that only a few pulses can be injected per 50Hz or 60Hz cycle. To achieve enough redundancy for detection at the receiver, the same signal must be repeated for several cycles, resulting in a data rate measurable in cycles per bit rather than bits per cycle. The method is also very noisy, in that each pulse resonates across a broad frequency band.
[0024] Despite their limitations, low-frequency systems such as those from Aclara and Landis+Gyr have achieved market penetration in rural areas where wireless systems are cost-prohibitive.
[0025] The problems with, and limitations of, the high, medium, and low-frequency PLC methods as discussed above have led in the 21st century to rapid development of custom built wireless networks for AMI data collection in the U.S. High-frequency on-grid methods have proven to be too expensive, not sufficiently reliable, and too fraught with error and uncertainty to be commercially viable. Low-frequency methods can be implemented with low-cost edge-to-substation transmitters, but these lack the data- bearing capacity required by modern AMI, and on-grid low-frequency substation-to-edge transmitters like AFRC are large, expensive, and have undesirable side effects which limit their use in urban settings. One possible option would be to use high-frequency substation-to-edge transmitters in conjunction with low-frequency edge-to -sub station transmitters. However, in the U.S. market forces have led to the rapid penetration of wireless AMI systems, especially in urban and suburban areas.
[0026] Cost constraints and availability of unregulated spectrum have dictated the use of mesh architectures at the edge of the AMI networks, with neighborhood concentrators that collect data from the meters and use traditional infrastructure (fiber or cellular) for backhaul to data centers. Mesh architecture means that although the RF transceivers used have individually high data rates, the edge networks are easily saturated. Most of the available data bearing capacity in these networks is used just for reporting meter interval data, with limited capacity reserved for firmware updates and control packets for applications such as demand management.
[0027] Two major factors limit the utility of the existing AMI infrastructures. The first is, of course, the capacity limitations of the mesh. The second, and more significant, is the fact that the AMI network is not congruent with the electrical grid. It is capable of providing little information about the operational state of the grid. This is unnecessary for meter reading, but more sophisticated Smart Grid applications for energy
conservation, asset protection, load balancing, fault isolation, and recovery management require accurate information about the schematic relationship of grid assets, load and conditions on the several segments of the grid, and the current state of bi-modal and multi-modal assets. This information, together with the geospatial locations of the same assets, is called the Grid Map.
[0028] Utilities typically maintain two maps or models of the Grid. A Physical Network Model (PNM) aggregates the geospatial location of the assets on the grid. PNMs, thanks to modern GPS technology, are reasonably accurate with respect to point assets such as substations, capacitor banks, transformers, and even individual meters. Inaccuracies stem from failure to update the maps when repairs or changes are made. For example, a service transformer may move from one side of a street to the other as a result of street widening. Longitudinal assets, especially buried cables, are less well represented in the PNM. The PNM can contain as-designed data, but since in many places the cable was laid before global positioning technology had matured, the designs were based on ground-level survey, and the original maps may or may not have been updated to reflect changes. Subsequent surface changes complicate the problem of verifying the geographic path taken by medium-voltage distribution lines.
[0029] The second model is the Logical Network Model, or LNM. LNMs describe how grid components are connected, without reference to their geospatial location. The LNM changes frequently. During the course of repairs, the way transformers attach to taps and laterals, and meters attach to transformers, may be altered. Such changes affect both the LNM and the PNM. In many utilities, such changes are recorded manually by field agents. The manual reports may or may not be updated in the LNM and PNM, and when updates are made the time lag between maintenance occurring and its being recorded is variable. Additionally, many grid components, especially regulators, switches and reclosers, change state automatically. Unless these components are instrumented with communications back to a data center rather than simply being subject to local control systems, such dynamic changes are not reflected in the LNM. They do, however, affect the power path, the load and environmental stress on other components of the distribution grid, and the service level to consumers.
[0030] Examples of significant but not reliably known aspects of the (actual) Grid Map are the feeder and phase by which each meter is currently powered, the relative load on each phase of each feeder, especially on subordinate branches (laterals) of the grid, the actual voltage supplied to each meter, the power factor along the edges of the grid, whether all the power drawn at a transformer is metered, and the state of switch sets, especially after a weather event that has caused outages. If this information were reliably known, utilities could conserve energy, much of the savings from which would pass on to consumers, save maintenance costs, prolong the life of equipment in the field, improve the efficiency and life of utility and consumer equipment, avoid outages, and reduce recovery times after unavoidable outages.
[0031 ] The problem of automated, dynamic grid mapping is not solved by wireless Smart Meters. Smart meters can measure and record current, voltage and power factor (or phase angle) at the meter, but because they have limitations on how much data they can store and how much data capacity is available for transmission, utilities may choose not to program the meters to report these data. The other data elements described cannot be detected by most modern AMI systems. U.S Patent 7,948,255 to Coolidge, et al.
discloses instruments for phase detection. However, the instruments in Coolidge are intended to be used by field engineers rather than incorporated into the Smart Grid.
[0032] The consensus among utilities is that the volatility of the LNM is such that using field engineers to measure and monitor changing attributes of the grid map is not a cost effective or workable solution. For example, conservation voltage regulation efforts were undertaken in the 1990s based on static measurements, and subsequently abandoned because the measurements became outdated too quickly. Today, utilities habitually oversupply consumers, delivering an average effective voltage of 122vAC to a 15 or 20 amp-rated circuit in a residence to ensure that fluctuations in load, power losses in the home wiring, etc. do not result in some consumers' service falling below 1 lOvAC effective at individual outlets inside the building, which is generally the optimum for home appliances and the like. The goal of a well-instrumented fine-grained conservation voltage regulation system might be to reduce the typical effective voltage at a single- phase meter to 114vAC as measured from one leg of the typical 240vAC service to neutral. 114vAC effective at the meter is as low as it is reasonable to go without risking under-powering some outlets in the building, (i.e. not less than HOvAC at any outlet) due to additional losses which are typical inside the home or office.
[0033] Since electrical devices consume more energy when powered at the high end of their rated range, this practice of over-delivering impacts consumers' electric bills directly, as well as forcing generation-poor utilities to buy power, increasing their costs. Ultimately, the practice results in more fossil fuel being consumed than necessary.
[0034] Cost constraints also dictate that placing SCADA instrumentation at every medium-voltage field asset is impractical. The "touch points" on the distribution grid are, for better or worse, largely the meters at the edge and the instrumentation in the substations. This dictates that techniques for power line communication be revisited, because signals traveling on the power line can be used both to infer and to report grid mapping information not detectable by means of wireless AMI. The ubiquitous presence of wireless AMI for reporting meter data can be considered as a benefit in the search for effective grid-mapping technology, in that it frees the limited data-bearing capacity of low-frequency on-grid transmission methods to support grid mapping systems instead. It is, however, needful to identify a transmission method that is low cost at the edge, coexists with the AMR or AMI, and does not trigger any of the above-noted pitfalls of on-grid transmission: requirements for intermediate devices such as repeaters between the edge and the substation; unacceptable flicker; RF interference; impulse noise; etc.
Finally, the transmission must require very little power, because the energy expended driving the transmitters reduces the energy conservation benefits obtained.
[0035] As discussed above, some existing PLC methods have adapted radio modulation techniques and channel access methods to the medium of the electrical distribution grid. For example, PRIME uses FDMA with DPSK.
In addition, Code Division Multiple Access (CDMA) is a channel access method most famously used in cellular telephony standards cdmaOne, WCDMA, and CDMA2000. CDMA spreads its signal across a range or band of frequencies, as do other similar technologies; hence the term broadband. Multiple access means that more than one transmitter can use the same channel (here, a power line) without the signal from one transmitter destructively interfering with the signal of another transmitter. In CDMA, each transmitter which uses the same band is assigned a distinct reference code or chip. The transmitted signal equals the exclusive OR (XOR) of the chip with the data signal. If the chips (treated as binary vectors) are mathematically orthogonal, then the receiver can separate out the several data signals from the additive received waveform. A requirement of standard CDMA as used in a wireless application is that there is a dynamic feedback loop from receiver to transmitter to ensure that the power of the several signals received from the different transmitters is the same or nearly the same at the receiver. The feedback loop permits the transmitters to rapidly and dynamically adjust their
transmission power to maintain the balance.
[0036] Frequency Division Multiple Access (FDMA) means that multiple channels in a medium are created by having different transmitters use different frequencies (or different frequency bands). A signal injected on the power line creates harmonic signals of different amplitudes. If the frequency-division bands are incorrectly chosen, then the harmonics from different bands can coincide and create false signals that interfere destructively with the intended signals. The obvious means of eliminating this effect is to place the channels far apart on the frequency spectrum. This, however, reduces the overall data bearing capability of the medium by "wasting" spectrum.
[0037] A third channel access method is Time Division Multiple Access, or TDMA. In TDMA, the channel is divided cyclically over time, with each transmitter sharing the channel assigned a specific time slot in the cycle where that transmitter uniquely has permission to transmit. TDMA requires that all the transmitters have system clocks which are synchronized with one another within a close enough tolerance that one channel accessor does not overlap its transmission with that of another channel accessor.
SUMMARY OF THE INVENTION
[0038] The present invention includes a system comprising at least one intelligent edge transmitter called a Remote Hub Edge Transmitter, each small enough to reside inside a Smart Meter. A Smart Meter that contains a Remote Hub Edge Transmitter is called a Remote Hub GLA Smart Meter, or simply a Remote Hub. The Remote Hub transmits by injecting a modulated current into a power main that supplies an electric meter. The system also includes at least one receiver sited at at least one electrical distribution substation operable to receive transmissions from the intelligent transmitters. No additions or alterations to the distribution grid between the Smart Meters and the substation are required to allow the receiver to reliably detect and decode transmissions from the edge transmitters. The system further comprises one Computing Platform for each substation that contains at least one receiver, the Computing Platform having access to a conventional high speed network such as the Internet for transmitting data acquired from the at least one receivers to a data center at which the received data is used by a Concentrating Computer System, or Concentrator, to update other utility systems such as, but not limited to, the LNM and PNM. In some microgrid deployments the Computing Platform and the Concentrator may be the same server, with the data center sited inside the service area of the microgrid. The system may additionally comprise Smart Meters or other devices, such as field-deployed switches and voltage regulators, which are not Remote Hubs, augmented by intelligent platforms operable to employ short-range PLC transmissions using a well-known protocol such as G3 or PRIME to communicate with at least one Remote Hub. Such augmented devices which are not Remote Hubs are designated as Subordinate Remotes, and any augmented device, without regard for whether it is a Subordinate Remote or a Remote Hub, may be referred to generally as a Remote. Each Remote Hub manages only Remotes powered by the same service transformer as the Remote Hub. A short range on-grid network consisting of a collection of Remotes comprising at least one Remote Hub and zero or more Subordinate Remotes is called a Transformer Area Network or TAN.
[0039] Subordinate Remotes, Remote Hubs, the Substation Receiver, and the associated Computing Platform and Concentrator all contain stored programs on non-volatile computer-readable memory on which are stored instructions for operating a Grid Location Aware™ (GLA) network. The Subordinate Remotes, Remote Hubs, the Substation Receiver, and the associated Computing Platform and Concentrator also contain processing units (CPUs) which execute the stored instructions allowing each node in the network to implement methods for organizing the on-grid network and transmitting and receiving messages on the network in order to permit other methods embodied as stored programs and executing on the at least one Substation Receiver, Computing Platform and Concentrator to detect and infer schematic grid location attributes of the network and publish the detected and inferred attributes to other application systems including geospatial information systems maintaining the logical and physical network model.
[0040] One method implemented by the Remote Hubs and the Substation Receiver provides for channelizing and modulating current signals transmitted from the at least one Remote Hub in the service area of an electrical distribution substation such that the signals are received at the Substation Receiver and the Substation Receiver is able to infer the electrical phase of the specific feeder upon which the signal was transmitted. The signal is transmitted on a broad band of the frequency spectrum called a channel, but the frequency bands of channels are selected so that the frequency is lower than the low- pass threshold of the service transformer that powers the Edge Transmitter. Several modulation techniques have been used in this context, including frequency spread modulation, Binary Phase-Shift Keying (BPSK), and Quadrature Phase-Shift Keying (QPSK). Higher-order modes of phase-shift keying (mPSK) may be used. However, BPSK and QPSK may be preferred embodiments along with frequency spreading, because higher-order PSKs require more power at the transmitter in order to achieve the same signal strength at the receiver. According to some embodiments of the methods, an Edge Transmitter is capable of encoding at least 80 bits per second of post-FEC (forward error correction) data in a burst transmission at low but adequate current so that the signal is not so significantly attenuated by intermediate transformers, capacitors, long lines, underground wiring, and the like to prevent reception by the Substation Receiver. In other embodiments, an Edge Transmitter may be capable of encoding at lower bit rates. Encoding at lower bit rates improves reliability, but limits the amount of data transmitted. In order to obtain the same post-FEC message success rate while transmitting at at least 80 bps, different modulation types may require different Forward Error Correction rates. The method requires little power to inject the signal, so that the signals as modulated do not radiate energy in the RF spectrum or cause flicker or hum on devices in proximity to the transmissions or exhibit any of the other undesirable characteristics of prior art methods of on-grid messaging. The method works on all the grid topologies described herein above, and can support a sufficient number of Remote Hubs per substation transformer that even the largest substations can be fully covered by the resulting Grid Location Aware™ network.
[0041 ] The Substation Receiver may also implement a variety of methods of sampling the ambient waveforms at a multiplicity of frequency bands on the power lines, filtering out the high-energy harmonics of the fundamental power wave, detecting the signal on one or more of a plurality of power lines (comprising each of the three phase lines of each feeder emanating from each bus of a given substation transformer), inferring the phase and feeder combination on which the signal was transmitted based upon a comparative analysis of each of the power lines, ranking them based on the signal quality, error performance, and/or amplitude versus frequency at a multiplicity of points throughout the spectrum of interest. When the Substation Receiver has completely processed a transmission, it packages the decoded transmission together with any additional information about the message inferred by the receiver logic, such as the phase and feeder on which the message was transmitted, the channel on which the message was transmitted, and an indication of the parameters of the modulation method used for that transmission. The Substation Receiver forwards the entire message package to the substation Computing Platform using a normal TCP/IP-based protocol such as HTTP. [0042] Another aspect of the invention is a method of identifying which frequency bands are the best data carriers at each substation transformer, defining at least one data- bearing channel on the candidate frequency bands, optionally defining a series of time slots on each channel in which edge devices may transmit, selecting a modulation technique, and, if frequency spreading is the chosen modulation technique, defining a set of at least one orthogonal codes or "chips" per channel to be used for modulating transmissions. The combined channelization model is then employed by the method to provision the collection of GLA Smart Meters, including both Remote Hubs and Subordinate Remotes, supplied with power by a substation to assign to each of the at least one Remote Hubs a policy describing on which frequency-based data-bearing channel(s) the Remote Hub may transmit, and under what circumstances the Remote Hub must transmit. The policy describes multiple aspects of the channels, including modulation method, frequency bands, chip selection algorithm if chips are used, and message preamble pattern. Frequency-based channels and chips must be assigned in such a way that transmissions are not destructive when segments of the grid are, for example, switched from one substation transformer to another. The provisioning scheme anticipates and minimizes the problem of crosstalk, and provides means for logic on the Substation Receivers, the substation Computing Platforms and the Concentrator to hierarchically process the messages received from each Remote Hub and use them to infer the state of stateful non-edge features of the grid, such as switches, reclosers, and breaks in the power lines. Other properties of the transmission are determined dynamically by firmware and instrumentation on the Remote Hub. For example, the power used when transmitting may be related to the impedance of the line as measured immediately prior to transmitting.
[0043] In some embodiments of the invention, a number of techniques may be employed for managing channel quality, depending on the availability of Substation-to-Edge broadcast capability from adjacent networks, such as an AMI, AMR, and/or radio broadcast transmitter. Software on the Substation Receivers and Computing Platform may monitor aspects of the channel quality and take measures to ensure that messages from the Remote Hubs experience an acceptably high success rate. According to one aspect of the invention, an acceptably high success rate may be ensured by rotating the responsibilities of the several channels, except that at least one non-structured channel is not rotated but remains dedicated to provisioning and alerting. For example, if two data bearing channels have been identified, and one data bearing channel demonstrates a higher success rate than the other, then the network may be provisioned to have Remote Hubs alternate between transmitting on the better channel and the other channel. This reduces the overall probability of a given Remote Hub experiencing an unacceptably high message failure rate.
[0044] Other options for channel management may be to alter the definition of a channel so that the channel has a wider frequency spread, and/or uses more FEC bits per burst. Still another option is to move a channel to a different place in the spectrum, either permanently, or at different times of the day based on an observed cycle in impedance, impulse noise, or some other characteristic of the channel relevant to message success rate. None of these mechanisms require a fast feedback loop between the Edge Transmitters and the substations, as is the rule with some modulation techniques such as CDMA. Rather, the apparatus at the substation conducts a time-duration analysis of the behavior of the network, and then broadcasts new provisioning policy based on the analysis. Many characteristics of the network may be taken into account when making a policy change, such as observed patterns of crosstalk, variations in impedance, harmonic mixing, and the like. A policy change may impact multiple substations which may be interconnected by switching systems or other forms of redundancy.
[0045] Yet another aspect of the invention is a method employed by the stored programs at each of the at least one Remote Hubs to integrate the Edge-to-Substation GLA network with adjacent networks, such as the AMI (regardless of the AMI architecture) and the higher-frequency PLC based Transformer Area Network, as well as with the native intelligence of the Smart Meter platforms themselves. In this method, the Remote Hub, whose high-frequency PLC protocol stack (e.g. PRIME) enables it to act as the master node in the TAN, carries out the TAN-management activities. TAN management activities include, but are not limited to, polling the PLC protocol stack to detect newly discovered Subordinate Remotes. The Remote Hub also polls the local native Smart Meter intelligence to obtain local data such as current, voltage, and phase angle, and polls the reachable population of Subordinate Remotes to obtain similar data from the native Smart Meter intelligence at the Subordinate Remotes. The Remote Hub stores, compresses, and/or processes the gathered data according to the policies and application algorithms on the Remote Hub until the operable policy dictates that the gathered data and/or derived results of the gathered data may be transmitted to the Substation Receiver by the Edge Transmitter module of the Remote Hub. The Remote Hub is further responsible for using its provisioned policy and discovered TAN configuration data to determine when it is appropriate to format, encode, and transmit an alert message on an edge-to-substation channel. Such messages may include pairing messages, which report the discovery of a new Subordinate Remote, pairing alerts, which report the loss of communication with a known Subordinate Remote, other alerts which report changes in the TAN or at meters (such as power surges, sags, and spikes), and scheduled data reports which transmit the data collected from the native Smart Meter intelligence in the TAN to the apparatus at the substation. In some embodiments of the invention, channels are not time-slotted, and Remote Hubs may transmit only exception reports or computed data reports on a randomized posting schedule in which an adequate number of transmissions are performed to provide an acceptable probability of achieving at least one successful transmission at the desired rate.
[0046] If slotted channels and/or time- scheduled transmission policies are used, the Remote Hub may require a method of synchronizing its system clock to a known tolerance with other Remote Hubs in the same service area. Each Remote Hub may poll the local meter or AMI network to obtain the AMI network time, which the Remote Hub uses to determine when scheduled transmissions must occur, and to obtain data blocks received via the AMI which are intended for the Grid Location Aware™ intelligence on the Remote Hub or on the Subordinate Hubs. Such data blocks may include firmware updates and changes in network policy or provisioning which will affect the subsequent behavior of the Subordinate Remote. The Remote Hub distributes firmware updates and policy changes to the Subordinate Remotes as necessary via the local PLC channel of the TAN. Additionally, Remote Hubs may synchronize based on a wireless broadcast signal. If no synchronization method is available, channel access may not be based on time slots at all. This reduces the data-bearing capability of the network but does not impact the ability of the system to provide grid-location data. In some embodiments, Remote Hubs and/or Subordinate Remotes may contain a Global Positioning System (GPS) receiver. The GPS signal may be used for synchronizing the Remote Hubs in addition to providing means to associate the logical network model with the physical network model.
[0047] In still another aspect of the invention, the Computing Platforms and the
Concentrator maintain two master data tables which can be initially extracted from the utility's PNM and/or LNM, or which can be entirely accumulated from reports from the Remote Hubs. These data tables are the Inventory, which is a table of all the Remote Hubs and Subordinate Remotes which have been detected, and the Grid Map, which is a schematic representation of the grid's topology and state, similar to an LNM. The Grid Map and Inventory at substation Computing Platforms may be partial, representing only the portion of the grid accessible to the substation at least at certain times. The Grid Map and Inventory at the Concentrator generally represent the entire utility service area, although gaps in the Grid Map may exist if instrumentation of the service area with Remote Hubs and Subordinate Remotes is incomplete. When the Computing Platform at a substation receives any message from a Subordinate Remote, it compares the data in the message and the message enhancements inferred by the Substation Receiver with the data in the Inventory and Grid Map. The logic and policy on the Computing Platform are used to determine if the local copy of the Grid Map and Inventory need to be updated, and whether the update must be sent on to the Concentrator to update the master Grid Map and Inventory. If the policy in effect at the Computing Platform so dictates, the data collected from the edge is also forwarded to the Concentrator. The Concentrator in turn carries out policies dictating which events and scheduled reports must be published out to other data center applications.
BRIEF DESCRIPTION OF THE DRAWINGS
[0048] The accompanying drawings, which are incorporated in and form a part of the specification, illustrate the embodiments of the present invention and, together with the description, serve to explain the principles of the invention.
[0049] Figure 1 is a simplified illustration of the power path from a generation point to a distribution substation to a consumer, showing the high voltage, medium voltage, and low voltage regions of the distribution grid and depicting some of the major features of an electrical distribution grid. [0050] Figure 2a is a simplified fragment of a radial-architecture distribution grid showing the lack of cycles in the grid topology.
[0051 ] Figure 2b is a simplified fragment of a looped-architecture distribution grid depicting two substations each able to deliver power to the service transformer delivering low-voltage power to the group of residences shown. The substation at left is currently powering the residential group.
[0052] Figure 2c is a simplified fragment of a networked architecture distribution grid. The four feeders shown could originate at a single substation (typical) or at multiple substations. The rectangular grid connects service transformers peer-to-peer on the low- voltage side so that all feeders deliver power to the loads below the substations concurrently.
[0053] Figure 2d is an exemplary simplified fragment of a campus network. A three- phase transformer powers a 480 Volt Bus from which depend a number of three-phase laterals which run through the campus powering individual electrical outlets. Adding low-voltage generation points to the bus and providing means to isolate the bus from the distribution line converts the campus network into a self-sufficient micro grid.
[0054] Figure 3 is a high-level software deployment model of a Grid Location Aware™ network including back office features, substation apparatus, and transformer area networks (one expanded) including intelligence at remote hubs and subordinate remotes.
[0055] Figure 4 is a simplified block diagram of the substation apparatus in a Grid Location Aware™ network, illustrating how the Grid Location Aware(tm) network apparatus couples to the existing SCADA lines in the substation and how the data from the Substation Receiver is backhauled to a data center.
[0056] Figure 5 is a block diagram of the multi-threaded software architecture in the
Substation Receiver showing how Edge-to-Substation signals are acquired, channelized, detected, demodulated, decoded, and stored for processing and backhaul.
[0057] Figure 6 is an elevation of a Remote Hub GLA Smart Meter.
[0058] Figure 7a is a top view of an accurate 3-dimensional model of one embodiment of the Edge Transmitter module of the Remote Hub GLA Smart Meter for a Form 2S residential meter.
[0059] Figure 7b is a bottom view of the same model of the Edge Transmitter module. [0060] Figure 7c is a schematic block diagram of the electronic components of the Edge Transmitter module of the Remote Hub GLA.
[0061 ] Figure 7d is a detail of the isolation circuit of the Remote Hub.
[0062] Figure 8 is an elevation of a Subordinate Remote GLA Smart Meter.
[0063] Figure 9 is a schematic block diagram of the electronic components of the PLC communication module of a Subordinate Remote.
[0064] Figure 10a is a graph (not to scale) of a snapshot of the AC waveforms on a distribution grid at a meter connection point. The power fundamental and its odd harmonics are highlighted, and three CDMA-like broadband frequency-divided Edge-to- Substation channels are shown, one extended over time to illustrate time divisions.
[0065] Figure 10b provides a time-domain view of three Edge-to-Substation channels showing two scheduled and one unscheduled channel.
[0066] Figure 10c illustrates a typical structure of a single Edge-to-Substation message burst in one embodiment of the invention.
[0067] Figure lOd illustrates an alternative structure of an Edge-to-Substation message burst in another embodiment of the invention.
[0068] Figure lOe illustrates how using multiple chips on the same frequency band may prevent collisions.
[0069] Figure 11 illustrates communication paths local to the Transformer Area Network, both within a GLA Smart Meter and between the Remote Hub and a Subordinate Hub. Note that in Figure 11 the elevations of the Remotes depict embodiments where a secondary communication module is not employed.
[0070] Figure 12a illustrates a three-phase service transformer with three TANs.
[0071 ] Figure 12b illustrates a three-phase service transformer with one TAN and Proxy Remotes.
DETAILED DESCRIPTION OF THE INVENTION
[0072] The present invention comprises a system and methods for constructing and operating an on-grid data collection network in such a way as to integrate the network with other adjacent networks and devices present at the edge, substations, and features of an electrical distribution network, wherein the other networks and devices may include Smart Meters and the AMI and a conventional network such as the Internet. The system and methods further integrate the data collected by the on-grid data collection network at a data center and may publish the collected data to other applications. The system and methods may also employ the capabilities of the integrated networks to infer otherwise unknown static and transient attributes of the electrical distribution grid and report them via the integrated networks for the purpose of improving the physical and logical network models of the Smart Grid. This leads to the ability of the models to support Smart Grid applications such as conservation voltage reduction, volt/Var optimization, load balancing, fault isolation, and recovery management.
[0073] Figure 3 is a logical block diagram of the intelligent platforms of one embodiment of the invention showing where the different intelligence resides with respect to a converged network comprising a conventional wide area network such as the Internet, an Advanced Metering Infrastructure, the medium voltage electrical distribution grid, and the at least one Transformer Area Network connected at the edge of the medium voltage electrical distribution grid via at least one service transformer. Figure 3 shows that the system may be divided into three regions or tiers. The edge tier 301 comprises at least one Transformer Area Network (TAN) 302. Each TAN comprises a Service Transformer 303, at least one Remote Hub 304, and zero or more Subordinate Hubs 305. When Subordinate Hubs 305 are present, the Remote Hub communicates with the Subordinate Hubs via a standard short range, PLC protocol, such as PRIME. The Remote Hubs 305 may be operable to transmit current-modulated signals. To avoid having multiple Remote Hubs unintentionally installed on a TAN, the installation procedure may provide a mechanism to allow a newly installed Remote of either type to detect whether Remote Hub is already present on the local TAN. The invention does not require the installation of communication devices or other modifications between the edge tier and the substation tier. However, if it is desirable to collect data from a feature of the medium- voltage grid such as a capacitor bank, a variation of the Remote Hub device may be installed there. Such a Remote Hub is technically still at the Edge Tier, since it is powered by a low- voltage outlet located at the feature, and not directly from the medium- voltage line(s) upon which the grid feature is installed. [0074] Still referring to Figure 3, the substation tier 306 comprises at least one Substation Receiver 307 operable to receive transmissions from the Remote Hubs in the edge tier without recourse to any signal amplifiers, bypass mechanisms, or bridges installed on the medium voltage infrastructure of the electrical distribution grid. The Substation
Receiver(s) connect via a local area network to a Computing Platform 308 containing non-volatile computer-readable memory and a CPU for storing and executing the software 309 which maintains the Inventory and Grid Map databases and carries out the tasks of provisioning and managing the converged data network. Additionally the Computing Platform stores and executes software 310 which processes the Inventory and Grid Map data in combination with messages received from the Substation Receiver 307 to infer information about the state of the Grid over and above what the Substation Receiver alone can detect based only on incoming transmissions. In some embodiments of the invention, the computer-based components of the Substation Receiver and the Computing Platform components are hosted on the same server. In such embodiments, the communications protocol (such as HTTP) used to transfer data between the
Substation Receiver and the Computing Platform software components need not change, even though there is no physical local area network required. Computing Platform 308 connects to a conventional wide area network 311, such as the Internet, for the purpose of communicating with a Concentrator 312 in the data center tier 313. In some
embodiments of the invention, and regardless of whether the Computing Platform and Substation Receiver are the same server or separate servers, the servers may be configured in a redundant cluster to ensure continuous operation of the system.
[0075] Referring again to Figure 3, the Concentrator 312 hosts software with an analogous architecture to the software in the substation(s), comprising a network and data management component 314 providing software services to one or more applications 315 for Grid Location Awareness. The applications use conventional network-based messaging protocols such as but not limited to JMS, SOAP, and REST to publish information to subscriber applications such as a Geospatial Information System 316. The data and network management component 314 may integrate with AMI head-end 317 for the purpose of causing the AMI network to broadcast data blocks to the Remote Hubs in the edge tier 301. Data and network management component 314 may integrate with AMI head end 317 using a standard protocol and/or a proprietary interface defined by the AMI vendor.
[0076] Other embodiments of the invention may include the convergence of alternative ancillary network components. For example, Substation-to-Edge broadcast capability and/or time synchronization from the substations to the Remote Hubs may be provided by medium-voltage PLC transmitters attached to the feeders at the substation rather than using an AMI for this purpose. Likewise, a separate radio transmitter broadcasting messages originating at the substation may be employed. The radio transmitter does not need to be physically located at the substation as long as there is a low-latency network connection from the Computing Platform at the substation to the transmitter. The same radio transmitter may serve as the Substation-to-Edge channel for a multiplicity of substations. When the Substation-to-Edge channel is not an AMI, synchronization of the Remote Hub clocks may be provided as described in US Patent Application No.
13/566,481, titled System and Methods for Synchronizing Edge Devices on Channels without Carrier Sense, which is incorporated herein by reference. In embodiments of the invention where channels are not slotted, clock synchronization is unnecessary.
[0077] Figure 4 details how in one embodiment the Substation Receiver 401, here shown co-hosted on a single server with the other software components of the Computing Platform, monitors the feeder lines 402 on the low- voltage side of the substation transformer 403 by attaching secondary current sensors 404 to the SCADA loops 405 already in place. The secondary current sensors provide inputs to the Substation Receiver. This coupling method allows a Substation Receiver to be installed on a substation transformer without disrupting the operation of the substation. Other coupling methods such as hot-stick clamp-on current transformers are well known in the art, and may be equivalently employed in lieu of the secondary coupling to SCADA loops method described herein. Some substations may lack SCADA loops, or they may be inaccessible due to physical placement or due to utility regulations.
[0078] Figure 5 details the software architecture and method used by one embodiment of Substation Receiver logic 501 to capture, detect, differentiate, and decode the multiplicity of signals being received from the Remote Hubs at the edge of the portion of the distribution grid supplied by the substation transformer associated with this Substation Receiver. Inputs from the GLA CT lines 504 arrive at data acquisition module (DAQ) 502 in real-time as raw digitized signals where they are then buffered and recorded on ramdisk 503. Operating in parallel with the DAQ process, Channelizer 505 reads the raw signals and reorganizes them by frequency band of interest into channelized signals stored on ramdisk 506. Operating in parallel with the Channelizer, Preamble Detector 507 samples the channelized signals received on every feeder-phase attempting to recognize the one or more preamble patterns which precede every transmission. In one embodiment, the Preamble Detector looks for all legitimate preambles, thereby allowing for the receipt of transmissions that are outside their allocated time slots or which were transmitted on a non-slotted channel. The Preamble Detector may also use its knowledge of the channel time slots in order to minimize the amount of channelized recordings it must sample. In one embodiment, when the Preamble Detector finds a preamble, it determines and marks the point or points in the data stream at which the Demodulator 509 should start processing. Multiple copies of the same message may be detected due to crosstalk. All copies are retained for demodulation. Preamble Detector 507 provides the marker information and Channelized signal data to the Demodulator through ramdisk 508. Operating in parallel with the Preamble Detector, Demodulator 509 reads all copies of the messages from ramdisk 506, uses the frequency bands and possibly time slots in which the messages were found and the known policies of the Remote Hubs to determine how to decode the message. Policy elements may include the modulation technique in use on the channel, the time based access policy in use, and, if frequency- spread modulation is used, which chips could have been used in modulation. Sometimes there may be more than one possible choice of chip. If the demodulator attempts to apply the wrong chip, this will be indicated by a demodulation error and/or FEC failure. This parallelized embodiment of the receiver logic permits multiple processor cores to operate on each message stream, with the modules early in the data flow operating on later transmissions, while modules late in the data flow operate on earlier transmissions.
[0079] Still referring to Figure 5, Data Manager 514 may be responsible for
synchronizing the several processes' access to the data stored on the ramdisks 503, 506, 508, and 510, so that each process at a given time is operating on completed data that was output by its predecessor process rather than attempting to access stale or volatile buffers. The Data Manager also can copy data from the ramdisks to a large archive disk 513 for later study and post-processing. By the time the messages have been demodulated and written to ramdisk 510, they have been enhanced with enough information to identify the transmitter and infer the feeder and phase on which the message was transmitted, as described in more detail below. The message bundle for each feeder-phase on which the message was received may include, but is not limited to, the signal amplitude at characteristic frequencies within the frequency band, the signal quality as determined by Demodulator figure of merit measurements, the time the signal was received, and the chip, if any, with which the message was encoded. These message bundles are passed to the Network Management and Grid Location Awareness software via interface 511. These software components, not shown in Figure 5, but shown as 309 and 310
respectively in Figure 3, use the provisioning policies of the edge transmitters together with the message properties and the message content to determine which Remote Hub edge transmitter sent the message, and compare the signal characteristics of the copies of the message received on each different feeder-phase input where it was detectable in order to establish on which feeder and phase the message was actually transmitted. This conclusion is compared with the information in the grid map to determine if a change in grid topology or state has occurred. This allows the Grid Location Awareness algorithm to infer not only the phase of a meter where the phase was previously unknown, but also changes in switch states in loop or networked configurations and schematic alterations in any type of grid resulting from repairs and maintenance.
[0080] Referring once again to Figure 3, the software components 309 and 310 on the Computing Platform 308 decode the demodulated, error-corrected message received from the Substation Receiver at the semantic level. The semantic decoding may include decryption and a CRC check on the decrypted message. This helps preclude the introduction of false data, for example due to tampering with the firmware on the Remote Hubs, or installation of a meter from a different service area on the network for malicious purposes. Once the message has passed this level of decoding, the data payload in the message may yield additional grid awareness information. A pairing message indicates that a new meter has been installed successfully, or that a known meter is now connected to a different service transformer or a different phase of a multi-phase transformer. Scheduled data messages may provide information about voltage levels, demand, and power factor at the edge, as well as any other data or results computed from data available from the instruments at the Remotes, limited only by the data-bearing capacity of the channels. Even the failure of a scheduled message to arrive is informative, indicating that there may be an outage. Any copy of the message may be used to extract data, not only the copy from the feeder and phase on which the message was determined to have been transmitted. Sometimes the main copy may contain bit errors while crossover copies do not.
[0081 ] When all the information has been extracted from a message bundle at the substation, the software components on the Computing Platform apply a policy to determine what data to forward to the Concentrator 312 via conventional network 311 for further processing and publication. In addition to carrying out data management policies, Computing Platform 308 may analyze the archived raw and enhanced signal quality data in order to determine whether beneficial changes in channel management ought to be made. When such changes are identified, Computing Platform 308 may forward recommendations to the Concentrator to ensure that the impact of all contemplated policy changes is understood at every substation that may be affected before the policy is put into effect.
[0082] Considering now the devices at the edge of the network, Figure 6 shows an elevation of a single-phase form 2s GLA Smart Meter 601 which is operable to act as a Remote Hub in a Grid Location Aware network. Form 2s is standard format for a residential single -phase meter in the United States. Other embodiments of the Remote Hub device may integrate with three-phase meters, or not be associated with a meter at all, but plug into a 120V or 240V or other voltage outlet located at a building, especially in a microgrid setting where the edge of the network is defined with a higher resolution than in a typical utility service area. In still other embodiments, the Remote Hub device may be integrated with other devices and instruments on the distribution grid, such as voltage regulators, capacitor banks, step-down transformers, and the like.
[0083] A typical Smart Meter has a layered design of circuit boards conformal to the meter housing, such as a cylindrical transparent dome constructed of glass or Lucite. In the depicted embodiment, the dome may be approximately 1.5" taller than usual to accommodate the height of the Edge Transmitter module 604. However, the height of the meter housing varies from one manufacturer and model to another and does not place the meter in violation of the form standard. Nearest the top of the housing is the Calculation and Display Board 602, which is part of every Smart Meter. Typically, the display features on the Calculation and Display board such as indicator lights and a digital readout may be accessed by other components in the housing via interface 606. The Communications module 603 contains the AMI transceiver circuitry and intelligence. In some Smart Meters the components of the Communications module 603 are contained on the Calculation and Display Board, but other smart meters can accommodate multiple types of Communications Modules by placing the communication components on a separate board as shown. Both configurations are common. If on a separate board, Communications Module 603 communicates with logic on the Calculation and Display board 602 via an interface and cable 606. Other types of component- to-component interfaces are possible internal to the Smart Meter. The Edge Transmitter module 604 contains the long-range GLA edge transmitter and also the short-range PLC transceiver for the TAN communications. Module 604 also has a CPU/microcontroller with nonvolatile memory that hosts and executes the stored programs of the Remote Hub control logic, controlling the Edge Transmitter and the PLC transceiver, and the interface 606 to the other logic boards 602 and 603.
[0084] Figures 7a, 7b, and 7c show top, bottom, and schematic views of one embodiment of the Edge Transmitter module. Referring primarily to Figure 7c, the Edge Transmitter Module communicates with other components of the meter 701 via UART (Universal Asynchronous Receiver/Transmitter) 712. Power is delivered to power supply 703 from AC mains 702. Power supply 703 provides appropriate low voltage DC power to computing unit 717, Amplifier Circuit 705, and Class D Amplifier 707. Computing unit 717 is a microcontroller processing unit with on-board volatile and non-volatile memory, and is used for both short range and long range digital signal processing and protocols 704, scaling and filtering 713, and to drive amplifiers 707 and 705. PLC Amplifier Circuit 705 and PLC Coupling Circuit 706 are adjusted so that the medium-frequency signal emitted does not propagate outside the TAN, relying on the service transformer' s filtering properties at this frequency, as described in more detail below. The coupling circuit 708 for long range transmissions is much more powerful, requiring a special isolation circuit 711 which prevents coupling circuit 708 from resonating with other long- range transmissions and grid noise at the frequencies to which it is sensitive, when the Remote Hub is not transmitting on a long-range channel. The main components of the coupling circuit 708 are transformer 709 and capacitor 710. According to some embodiments, the Edge Transmitter module may contain a GPS receiver, such as GPS receiver 718 shown in Figure 7c. Alternately, the Edge Transmitter module may have access to the GPS signal from a GPS receiver located on another component of the Remote Hub, such as the Calculation and Display board, or on a mobile computing device used by an Installer. The Remote Hub may use the GPS signal to record its geospatial coordinates, and/or for synchronizing transmissions on a slotted channel so as not to collide with transmissions from other Remote Hubs. Additionally, a Remote Hub may be programmed to report its geospatial coordinates, or a function of its geospatial coordinates, on an Edge-to-Substation channel or to permit them to be read by a mobile computing device.
[0085] Figures 7a and 7b illustrate how the components of Figure 7a may be arranged to conform to the shape of a form 2S electrical meter. As is apparent from Figure 7b, transformer 709 and capacitor 710 may be large components. Shown here removed from the assembly to reveal the transformer, flux shield 715 normally covers transformer 709 to prevent magnetic flux from the large transformer from interfering with the metrology unit below it. Referring to Figure 7 a, the components of Power Supply 703 occupy a region of the Remote Hub module at the upper left, and the components of Class D amplifier 707 are shown at the upper right. In this embodiment, a single microcontroller 717 contains circuitry, a processor, and nonvolatile memory for firmware protocol stacks and network management logic 704, 705, and 713 (from Figure 7c). The large
components at the lower right are PLC coupling circuit 706, isolation circuit 711, and an amplifier capacitor 716 for the long-range edge transmitter. Connector 712 is the connector for interfacing with the other logic boards in the meter housing.
[0086] Figure 7d details the isolation circuit 711. This circuit provides the ability to disconnect the coupling circuit of the Edge-to-Substation transmitter from the power line. It is desirable that the Remote Hub be isolated from the power line except when it is transmitting. This is because the coupling circuit represents a substantial load when connected to the power line. The isolation circuit consists of a Triac 718 and a relay 719. The purpose of the Triac is to allow connecting to the power line at the time of a zero crossing of the line voltage. This prevents the generation of large transients that can damage components in the Remote Hub. Additionally, making the connection with the Triac removes the concern of arcing on the relay contacts that reduces the life of the relay. The sequence of events when a Remote Hub interacts with the power line is:
a. The Triac is closed at a zero crossing of the power line
b. The relay is closed
c. The desired action (generally a transmission) is performed
d. The relay is opened
e. The Triac is opened at a zero crossing of the power line.
[0087] Figure 8 is an elevation of a standard Smart Meter 801 with a standard
Calculation and Display Board 802 and a standard metrology unit 804. Meter 801 becomes a Subordinate Remote GLA Smart Meter with the addition of PLC
communication capabilities on the Communications Module 803. The PLC
communications components are small enough that they can share space on module 803 with the AMI communications circuitry if preferred. All three modules (if three are present) communicate via an interface, here, a serial interface or UART 805. Other embodiments may employ a different, functionally equivalent internal inter-component interface.
[0088] Figure 9 is a schematic diagram of the PLC communications components on the Communications Module of one embodiment of a Subordinate Remote. By analogy with similar components on the Edge Transmitter Model in Figure 7c, the communications module of a Subordinate Remote comprises the basic meter 901, power input from AC mains 902, interface to the basic meter 907, power supply 903, microcontroller unit 904, amplifier circuit 905, and PLC coupling circuit 906. The transmitter may be tuned to ensure that the signals are sufficiently attenuated by the service transformer not to be received above the service transformer or below adjacent service transformers. A
Subordinate Remote may also contain a GPS receiver. Alternately, a Subordinate Remote may be programmed with its geospatial coordinates by means of a GPS receiver in a mobile device used by an Installer. A Subordinate Remote which knows its geospatial coordinates may report them over a Transformer Area Network to a Remote Hub. This allows the Remote Hub to compute extended geospatial information such as the area and extent of the TAN. The Remote Hub may report this extended geospatial information on an Edge-to-Substation channel, or the information may be read from the Remote Hub by a mobile device used by an Installer or other field engineer.
[0089] Figure 10a illustrates both the characteristics of the low end of the frequency spectrum on a feeder-phase line of a typical distribution grid and the method employed by a Remote Hub's Edge Transmitter to inject current modulated signals onto the grid in such a way to allow all the TANs served by one substation transformer to be able to transmit scheduled Grid Location Awareness reports at least twice in each 24 hour period, and to additionally transmit alerts as necessary, without creating any of the difficulties described herein above which have been observed with prior art methods of on-grid transmissions. Important characteristics of the spectrum are the 50Hz or 60Hz power fundamental 1001, its harmonics 1002, and the noise floor 1003. It should be noted that from time to time a spike of impulse noise may exceed the usual noise floor. The defined channel or channels for modulated signals transmitted by an Edge
Transmitter occupy a broad candidate spectrum lying between the 50 or 60 Hz power fundamental and the low-pass threshold of the service transmitters on the host power grid. The candidate spectrum for a particular substation is determined by measurement and set by policy and subject to regulatory constraints. Measurements determine which band or bands of the candidate spectrum are reliably received at each substation transformer. If a usable band is wider than the bandwidth needed for a reliable transmission, then the channel band may be defined to be variable. In such cases, the Remote Hub conducts measurements, described herein below, prior to transmitting to determine at present conditions which part of the wider channel is currently most favorable for transmitting. Conversely, at the Substation Receiver, the preamble detector samples the entire wide usable band, determining the actual band used by the transmitter based on where the preamble was detected.
[0090] Figure 10a shows three frequency bands 1004, 1005, and 1006 which have been defined as channels for the long range Edge Transmitters The number of bands used as channels is not limited to three, nor are three channels always required. Transmissions on each channel are spread across a defined frequency band as shown using a broadband modulation technique such as the ones identified herein above. Additionally,
transmission bursts may be constrained to occur in time slots such as 1007. Details of the slotting protocols are explained herein below.
[0091 ] Still referring to figure 10a, a typical frequency based channel of the present invention may span a wide enough area of the spectrum that several harmonics of the power fundamental occur within the channel. Because it is important to keep the amplitude of the injected, modulated current as near as possible to the noise floor and to minimize the amount of power used to transmit, in some embodiments of the present invention no signal is added to the spectrum at harmonics of the power fundamental. A shaping filter may be beneficially applied by the Edge Transmitter to avoid injecting current over the harmonics. This technique is also beneficial at the Substation Receiver, which may apply comb filtering so that the preamble detector and demodulator are not required to process the signal on the harmonics. This saves valuable processor capacity in the compute-intensive demodulation process.
[0092] When the modulation technique used is frequency spreading, each frequency band (such as 1004, 1005, and 1006) which is used as a channel is assigned at least one patterned code, or chip. The rate of frequency variation of the chip is much higher than the rate of variation of the data signal. The actual frequency- spread transmission injected as current on the channel is the exclusive or (XOR) of the channel's chip and the data signal. Adjacent and nearby channels are assigned mathematically orthogonal chips. The amplitude of the frequency spread current signals is as close as possible to the noise floor of the power line. This is beneficial in eliminating the problems associated with prior art PLC methods. For example, if a transmission on one channel is "folded over" into another channel due to crosstalk, the different encoding chips used causes the receiver to interpret the "stray" signal as noise, allowing the receiver to still extract the correct signal. Additionally, and regardless of the modulation technique, any harmonics from one channel which extend into adjacent channels will also be interpreted as noise. The result of this combination of channel access restrictions and modulation techniques is one or more low-frequency, high-quality current-modulated channels which can bear (in individual bursts) a raw data rate of 120 bits per second or more, or, by example, 80 bps after forward error correction, using interleaving techniques to distribute data bits and FEC bits to minimize the probability of loss of related bits due to impulse noise. Time- duration testing on a radial distribution grid, transmitting an average distance of 3.5 miles line of sight from the substation, yielded a frame error rate of 1.6e-6 using an FEC rate of 2/3 with frequency spread modulation. It is recognized that the method and apparatus described may additionally be operated at lower data rates than cited.
[0093] Figure 10b illustrates one method of organizing a group of three reliable channels to support grid mapping. All three channels are organized into time slots 1007, within which Remote Hubs are provisioned to transmit around a 5-second burst 1008 with around 1 second of silence prior to the burst and around 1 second of silence after the burst. This yields an inter-burst interval 1009 averaging 2 seconds long. Different time intervals may also be used. The reason for the long inter-burst interval in the illustrated embodiment is that the mechanism for synchronizing the transmitter clocks may be an AMI network, and the AMI synchronization mechanism, being typically based on a mesh or cellular wireless architecture, is no more precise than plus or minus one second.
Collisions (overlapping transmissions) on the same channel must be prevented because they will destructively interfere with one another if they were modulated using phase- shift keying or the same chip. In one embodiment of the invention, each data-bearing frequency- spread channel is assigned a plurality of chips instead of one. For example, if the number of chips per channel is two, then transmissions on even-numbered time slots use one chip, and transmissions on odd-numbered time slots use another, mathematically orthogonal chip. Using multiple chips may allow data-bearing capacity of the channel to be increased by reducing the inter-burst interval, as overlaps of adjacent transmissions may still be decoded. The ordinal number of a time slot is determined with respect to a Master Frame Origin, which may be defined as beginning at midnight local time of each day, or may be established by a variety of methods as described in US Patent Application No. 13/566,481 already referenced and incorporated herein.
[0094] Two of the channels 1011 in Figure 10b have a scheduled organization. This means that each Remote Hub is assigned specific time slots in which it may transmit on the channel. A third channel 1012 is still organized into slots, but any Remote Hub with an exceptional condition to report may attempt to transmit in any time slot, provided that it has not alerted recently. Specifically, channel 1012 is organized by the method known as slotted aloha. Alerts, when received at the substation, are typically acknowledged via a Substation-to-Edge channel such as a wireless AMI network. If available, other methods for acknowledging alerts may be employed. If no mechanism for
acknowledging alerts is available, then each alert can simply be transmitted multiple times, with a randomly selected number of slots having elapsed between the
transmissions. This, however, reduces the data bearing capacity of the alerting channel 1012, because in standard slotted aloha, alerts are retransmitted only if they are not acknowledged. The rate of message failure will be the frame error rate of the channel (already disclosed to be very low) plus the rate of collisions. The rate of collisions in turn depends on the offered load, which is based on the probability that more than one Remote Hub will attempt to transmit in a given slot. The optimum number of unacknowledged retransmissions to maximize message success rate is likely to be a small number such as two or three, because with higher transmission rates channel saturation may occur.
[0095] The organization of an unscheduled channel may also use an un-slotted protocol similar to pure aloha, wherein the channel is not divided into time slots, but wherein a transmitter may attempt to transmit at any time, given that it has not already transmitted within a predefined recent interval. In this organization, alerts may preferably be retransmitted only if not acknowledged within a predetermined period of elapsed time, or they may routinely be transmitted a multiplicity of times if acknowledging alerts is impossible or undesirable.
[0096] The number and organization of channels described is by example only. On some substations, only one reliable channel may be available. When only one channel is used, either because of conditions or by design, a plurality of time slots may be reserved for alerting, while other time slots are scheduled. On some substations, a plurality of reliable channels will be identifiable. The number of scheduled channels needed depends on the number of Remote Hubs and the number of scheduled messages each Remote Hub must send in a 24-hour period. In one embodiment, two channels are sufficient to permit 12,000 hubs to transmit twice daily. If (as is usual) the substation transformer supplies many fewer than 12,000 hubs, fewer channels than are available are required for scheduled messages, alert thresholds may be lowered, and more than one channel may be dedicated to alerts to accommodate the higher offered load. Figure 10b shows four alerts transmitted in the time interval shown. Two of the alerts 1010 have a high probability of being detected at the substation receiver. The alerts 1013 have collided in Figure 10b and will not be received correctly. Figure lOe, conversely, illustrates how the use of chips selected by means of the modulus of the time slot prevents some collisions. Here, because of poor synchronization of clocks, message 1014, transmitted in an even- numbered slot of random slotted channel 1012, has overlapped with message 1015, transmitted on the same channel in the subsequent odd-numbered slot. Both messages are decipherable at the substation because they were encoded using orthogonal chips. This is in contrast with the situation in Figure 10b, where the intent of the two
transmitters of messages 1013 was clearly to attempt to transmit in the same slot. These messages would still collide even if multiple chips were in use. In yet another embodiment of the invention, an unscheduled, unslotted channel might use frequency spread modulation and be assigned a plurality of orthogonal chips. A transmitter offering a message would select a chip from the plurality of chips at random, thereby reducing the probability that the message would collide with another transmission on the same channel at an overlapping time.
[0097] Figure 10c illustrates the detailed organization of a typical single transmission burst, whether it occurs on a scheduled channel or a slotted alerting channel according to one embodiment. Within Time Slot 1007 and burst 1008, the message is comprised of preamble 1014, interleaved data bits 1015 and FEC bits 1016. The preamble is the same for all messages on the channel. The FEC rate is not drawn to scale, and may be varied as needed from substation to substation based on the quality of the available channels. In some grid locations and/or with some modulations, FEC may not be required. Figure 10c without further elaboration may appear to imply that the bandwidth is the same for all transmissions in the same channel, and that the pattern used for preamble detection is also suitable for use by a Substation Receiver when sampling and comparing signals on several inputs representing different phases of different feeders to infer the line on which the signal was actually transmitted. Some embodiments of the invention may require greater bandwidth for preamble detection than the data-bearing segment of a message requires. Additionally, in some embodiments, the grid location of a Remote Hub transmitter may be better inferred from a special transmission, called a probe
transmission, again measured at the substation on all phases of all feeders monitored by a Substation Receiver. The probe transmission may consist of known modulated signal, or it may consist of pure tones. The pure tones may be transmitted as a sequence of single tones, or one or more groups of pure tones may be transmitted simultaneously. The frequency range of the probe transmission may be different from that of the other message sections. Figure lOd illustrates this bandwidth variation, showing one bandwidth for the preamble 1018, another bandwidth for data-bearing message 1019, and a third bandwidth for GLA trailer 1020. GLA trailer 1020 is not present in all embodiments of the invention, because the probe transmission may be present within preamble 1018. In another embodiment, the probe transmission may precede the preamble rather than following the message. Generally, the segments of a message may be transmitted in any order as long as the order is known by the receiver.
[0098] Figure 11 shows a Remote Hub 1101 and a Subordinate Remote 1102 illustrating the local communication paths within a TAN according to one aspect of the invention. This figure shows an embodiment where the Communications Module is not separate from the Calculation and Display Module. The Remote Hub 1101 may poll each known Subordinate Remote, via a PLC protocol such as PRIME or G3 using request path 1103. (To allow for the use of different PLC protocols, the specific language of these standards is not used herein. By way of example, if the PLC protocol in an embodiment of the invention were PRIME, then the Remote Hub would be a PRIME base node and all other nodes would be service nodes.) A polled Subordinate Remote 1102 retrieves the requested data from the Smart Meter and formats it into a response which is transmitted as a response 1104. The Remote Hub's Edge Transmitter Module communicates with the Communications Module and Calculation and Display Board components via UART 1107, using a simple request/response protocol 1105 which may vary from one Smart Meter vendor to another. Data path 1106 illustrates that both the Remote Hub and the Subordinate Remote are members of the AMI and will be transmitting meter data to the AMI head end in addition to performing TAN-related activities. The Remote Hub, in its role as TAN manager, may make use of the AMI or other alternative, integrated channels in ways that Subordinate Remotes may not. Only the Remote Hub is capable of sending out messages on the Edge-to-Substation channel. A Remote Hub may also send messages on alternative, integrated outgoing channels such as the AMI. The Remote Hub may additionally receive data blocks from a Substation-to-Edge channel, whether the Substation-to-Edge channel is provided by the AMI or other means. Such data blocks may contain, but are not limited to, alert acknowledgements, firmware update broadcasts, and policy changes. Meter clock synchronization messages are part of the native AMI protocol, but the Remote Hub may obtain the synchronized clock time from the
Calculation and Display module when an AMI is present.
[0099] Remote Hub 1101 has the capability to function in multiple operating modes. The Remote Hub may function as a Subordinate Remote. The Remote Hub may also function as a hybrid of Remote Hub and Subordinate Remote, called a Proxy Hub. When a Remote Hub 1101 is first installed, it monitors the PLC frequencies on the TAN for a period of time sufficient to determine whether another Remote Hub is already present. The wait time consists of a fixed period of time plus an additional period of time computed by a randomization function when the device is powered on. The fixed period of time is sufficient to ensure that a Remote Hub operating in the master mode would have executed its discovery algorithm, which would be detected by the newly installed Remote Hub if another Remote Hub is operating within range. Typically, "within range" means powered by the same service transformer, but exceptions occur. The means of handling the exceptions are described herein below.
[00100] If a first Remote Hub is already present, Remote Hub 1101 indicates by means of a light or digital display on the face of the Smart Meter that another Remote Hub is present. At this point, an installer may elect to leave redundant Remote Hub 1101 in place, or replace it with a Subordinate Remote unit. If left in place as a "spare," Remote Hub 1101 continues to function as a Subordinate Remote, and the first Remote Hub continues to act as the Remote Hub and master node in the TAN. If no other Remote Hub is present, Remote Hub 1101 begins to operate as a master PLC node on the TAN, discovering and storing a list of any Subordinate Remotes 1102 in the same TAN. A Remote Hub may also enter a third mode, Proxy Hub, as described below. As soon as it takes on the master or hub role, Remote Hub 1101 obtains the network system time if available, for example by querying the AMI logic in the Smart Meter, and formats, encodes, and transmits a provisioning request on an Edge-to-Substation channel reserved for provisioning requests and alerts. When a Substation Receiver detects the
provisioning request, it may cause a provisioning response to be sent, either via the AMI, or via an available on-grid or wireless Substation-to-Edge channel. Provisioning data may also be supplied to a Remote Hub by means of a handheld device or drive-by transmitter employed by the installer. The handheld device uses a personal-area wired or wireless protocol, such as Bluetooth, infrared, USB, or RS232 to program the Remote Hub. In embodiments of the invention where the Substation-to-Edge channel is absent or very constrained, the Remote Hub may be provisioned via handheld without knowledge of the inferred grid location of the Remote Hub. The same short-range protocol, in a handheld or drive-by device, may be used to distribute firmware or policy updates to Remote Hubs that lack a permanent Substation-to-Edge channel. It is sometimes desirable to activate a policy or program change simultaneously on a collection of Remote Hubs. If the Remote Hubs must be updated by means of a personal-area protocol, the programming device converts the desired future activation time to a relative wait time as each Remote Hub is programmed, so that even though the Remote Hubs were programmed at different times, they will activate the updated programming at approximately the same future time.
Remote Hubs may be manufactured with a default policy, or pre-loaded with a default policy after manufacturing but before installation, so that if no policy is provided at or subsequent to installation, the Remote Hub still has a rule for operating.
[00101 ] The provisioning data provides the Remote Hub with the information it needs to manage the TAN, including the location of, and organization of, other channels on the Edge-to-Substation network, and the ordinal or sequence number of slots on scheduled channels on which this Remote Hub has permission to transmit. When the Remote Hub discovers Subordinate Remotes, it transmits pairing messages on the Edge- to-Substation channel to inform the Computing Platform that it is in communication with the newly discovered Subordinate Remotes. Pairing messages may be transmitted on an alerting channel or on a scheduled channel depending on a policy established by the network. When a Remote Hub acting in the master role has discovered another Remote Hub on the same transformer and phase operating in the subordinate role, the resulting pairing message indicates this. Including the presence of "spare" Remote Hubs in the Grid Map may provide a cost savings and more rapid recovery, in that if the master Remote Hub should fail, the TAN may be reconstructed by allowing the spare Remote Hub to assume the master role. The master Remote Hub may cache its policy
information on a spare Remote Hub, if present, in order to allow the failover to occur even without re-provisioning the TAN.
[00102] Hereinafter are disclosed methods for properly partitioning Remote devices into TAN groupings. PLC transmission power is controlled in order to keep the signal that gets through the Service Transformer low enough to avoid interference with other TANs. Specifically, unless special accommodations in configuration are made as described herein below, a Remote Hub must poll and collect data from only Subordinate Remotes on the same phase of the same service transformer as the Remote Hub.
However, at certain sites on some grids, it may happen that at PLC standard power and frequencies, the PLC transceivers in the Remotes may be able to discover Subordinate Remotes and Remote Hubs on other phases of the same service transformer, or even on adjacent or nearby service transformers. In this aspect of the invention, the detectable remotes may be partitioned wherever possible so that each TAN comprises exactly one master Remote Hub and all Subordinate Remotes, or Remote Hubs acting as Subordinate Remotes, on the same phase of the same service transformer, and no Remotes of any type which are on a different phase or a different service transformer.
[00103] In one embodiment of the invention, a Remote Hub's PLC protocol stack executes its discovery process, which involves transmitting a beacon tone or message that causes other nodes in the vicinity to respond. The first time this is executed, a standard initial power level is used. The TAN management layer of the Remote Hub, operating above the PLC protocol stack, obtains the list of discovered Remotes of any type. The Edge Transmitter of the Remote Hub is then employed to send a pilot signal at sufficiently low amplitude and high frequency that the pilot signal will not be detectable on the high- voltage side of the service transformer. (This pilot tone is not the same as a PLC discovery beacon.) The pilot signal begins on a zero crossing of the power fundamental of the phase on which the transmitter resides. Other Remotes (of any type) which detect the pilot signal test to determine if the received signal began on the zero crossing of the phase on which the receiving Remote resides. If so, the receiving Remote sends a positive response on the PLC channel and records the identity of the Hub Remote that sent the pilot tone. Another Remote Hub on the same phase as the pilot transmitter enters Subordinate Remote mode and will be considered a spare. Subordinate Remotes on other phases do not respond to the pilot tone. A Remote Hub that detects the pilot tone but is on a different phase sends a negative response. The transmitting Remote Hub uses the responses to update its inventory of TAN devices discovered automatically by the PLC discovery process, recording the list of Subordinate Remotes and spares on its home phase, and the list of Remote Hubs on other phases of the same service transformer. Remote Hubs which sent neither a negative nor a positive response are presumed to be on another service transformer. If this case exists, the value of the "initial" power level (amplitude) for the PLC discovery beacon is reduced, so that next time the full discovery process is executed, it will be less likely that any Remotes on other service transformers will respond.
[00104] Next, the first Remote Hub that transmitted the pilot tone examines the list of negative responders, that is, of Remote Hubs on a different phase. It selects one such second Remote Hub and orders it via the PLC protocol to transmit a pilot tone of its own. The first Remote Hub, still the master node of at least all the nodes on the service transformer, collects the resulting positive and negative responses and updates its inventory and partitioning data. At this point, any spare Remote Hubs on the same phase as the second Remote Hub have also entered Subordinate Remote mode, and the first Remote Hub now has a complete partitioning of Remote Hubs according to phases, the Remote Hubs on the third phase, if present, being the intersection of the Remote Hubs sending negative responses to the first Remote Hub with the Remote Hubs sending negative responses to the second Remote Hub.
[00105] If a third phase is present, the first Remote Hub now selects a third Remote Hub from the third phase, and orders it via the PLC protocol to transmit a pilot tone and return the list of negative and positive responses it received. At this point, a positive response will have been received from every Subordinate Remote on the service transformer, the phase and mode of every device on the service transformer is known, and a potential master Remote Hub for each single-phase TAN has been identified. Additionally, any node which responded to the original PLC discovery process from outside the transformer area has been identified.
[00106] Now the first Remote Hub sets its PLC transmission amplitude to a very low level and polls each remote. This first amplitude should be so low that no remotes respond. The first Remote Hub increases its transmission amplitude until, ideally, all remotes on the same phase and no remotes on another phase respond. The first Remote Hub records this low threshold level and then continues to increase the amplitude until a remote on another phase responds. The first Remote Hub records this as its high threshold level.
[00107] Now the first Remote Hub commands the second Remote Hub via PLC to attempt to take on the role of PLC master node for its phase, sending in the command the low and high threshold amplitudes. This is called the partitioning command. The second Remote Hub sets the PLC transmission amplitude to the low threshold amplitude, and restarts its PLC stack as a master node, conducting a PLC discovery process of its own. If the second Remote Hub discovers all the Subordinate Remotes and spares on its own phase and no nodes on any other phase, then has become the master of a single-phase TAN and the partitioning step has succeeded. Otherwise, it raises its PLC transmission amplitude and repeats the process until the partitioning step succeeds. If the second Remote Hub reaches the High Threshold amplitude without having discovered all the Remotes on its phase, or if at any amplitude a Remote from a different phase is discovered when no lower amplitude discovers all the Remotes on the same phase, then the partitioning command has failed. The second Remote Hub signals the failure of the partitioning command to the first Remote Hub by using its Edge Transmitter to transmit a status beacon detectable by the First Remote Hub, since the first and second Remote Hubs can no longer communicate via PLC.
[00108] If the first Remote Hub detects no failure beacon from the second Remote Hub, and a third phase is present, the first Remote Hub sends a partitioning command to the third Remote Hub, which carries out the partitioning step as described.
[00109] When the first Remote Hub has partitioned the other phases present without having received a failure beacon, then it carries out the partitioning step itself. If the first Remote Hub's partitioning step succeeds, then the service transformer is successfully partitioned into three single-phase TANs, as shown in Figure 12a. In another embodiment of the invention, the second and third Remote Hubs may employ a failure beacon and a success beacon. Use of the success beacon may shorten the time required to complete the partitioning steps.
[00110] Referring now to Figure 12a, which is a simplified schematic drawing of a three-phase service transformer and the meters that it supplies with power. This service area contains three TANs 1204, 1205, and 1206, one for each phase of the service transformer. Each TAN contains a Remote Hub 1202 and zero or more Subordinate Remotes 1203. Any Subordinate Remote may actually be a spare Remote Hub. Figure 12a illustrates a proper partitioning of the Remotes powered by a three-phase transformer following the discovery and partitioning algorithm described herein above.
[00111 ] As is clear from the above description of a discovery and partitioning algorithm, it is possible that for some multi-phase transformers there is no set of PLC transmission frequencies that will yield a clean partitioning of the Remotes on the service transformer into single-phase TANs. When the partitioning algorithm fails at any step, the first Remote Hub attempts to form a multi-phase TAN which includes all Remotes on all phases of the service transformer, but no Remotes which are not on the service transformer. Refer now to Figure 12b, which illustrates a multi-phase TAN. Recall that the first Remote Hub already has an inventory of all Remotes on any phase of the service transformer, and that it further is aware which node on each phase are Remote Hubs. Beginning with the previously recorded "initial" PLC transmission amplitude, the first Remote Hub initiates a PLC discovery process. If any Remotes are discovered which are on a different service transformer, the first Remote Hub lowers the PLC transmission amplitude, superseding the old value of the "initial" amplitude, and restarts the discovery process, repeating this until all and only the Remotes known to be on the service transformer are discovered. If a new Remote never before detected is found, the pilot beacon method above is used to determine the phase of the new Remote and whether it is on the same service transformer as the first Remote. If no transmission amplitude can be found that discovers all and only Remotes on the same service transformer as the first Remote Hub, the first Remote Hub transmits a distress alert on an Edge-to-Substation channel and organizes the TAN at the highest amplitude which does not discover any nodes outside the service transformer, even if some nodes on the service transformer are unresponsive.
[00112] For Grid Location Awareness and the energy management applications that depend on the Grid Map to be effective, probe transmissions must originate from each phase of the Service Transformer. To accomplish this, the first Remote Hub, Master 1202 in Figure 12b, sends commands to the second (and third, if present) Remote Hubs 1208, causing them to operate as Proxy Hubs. A Proxy Hub behaves like a Subordinate Remote on the TAN, except that it is responsive to certain commands from its master Remote Hub that allow the Remote Hub to control the Proxy Hub's Edge Transmitter. Remote Hub 1202 stores the Edge-to-Substation provisioning policies that would normally be carried out by the Proxy Hubs 1208. Remote Hub 1202 carries out all the TAN management activities, such as polling the Subordinate Remotes, distributing updates, and computing derived results, for the Remotes, including Proxy Hubs, on all phases present. When it is time for a Proxy Hub to send an Edge-to-Substation transmission, the first Remote Hub 1202 formats the appropriate message and sends it to the Proxy Hub over the TAN. The Proxy Hub then retransmits the message on the Edge- to-Substation channel. In this way, Edge-to-Substation transmissions are always transmitted on the correct phase, even though the TAN master is on a different phase.
[00113] The partitioning and discovery methods disclosed above are designed to accommodate a standards-based PLC protocol stack such as PRIME. Use of alternative short-range PLC protocol stacks may require minor modifications to the methods. More straightforward methods may also be used in cases where customizations to the lower layers of the protocol stack are allowable.
[00114] Another aspect of a Remote Hub' s channel management capability is that the Remote-hub may pre-modulate and store certain messages which do not contain variable data and may be sent repeatedly. Examples of pre -recordable messages include messages sent on the provisioning channel, such as the provisioning request and standard alerts on conditions such as sags, over- voltages, and the like. This strategy saves computing power at the Remote Hub. When policy changes such as changes in chip, channel placement, baud rate, FEC rate, and bandwidth occur, pre-modulated recordings may need to be discarded and re-computed. This may be done during idle periods when the Edge Transmitter's microcontroller CPU is not busy with preparing scheduled messages. To accommodate this, such policy changes may be announced in advance to take effect at a known future time as opposed to becoming effective immediately.
[00115] In some embodiments a Remote Hub may not be integrated into a GLA Smart Meter, but instead may be associated with another feature of a medium voltage distribution grid, such as a capacitor bank, step-down transformer, voltage regulator, storage battery, local generator, or switch set. The Remote Hub may be integrated with local or remotely controlled SCADA systems associated with the feature. The SCADA system may provide an Edge-to-Substation channel for provisioning Remote Hubs used in this manner, or the Edge-to-Substation channel associated with Remote Hubs in Smart Meters may also be operable to communicate with such feature-based Remote Hubs. Such Remote Hubs may incorporate a version of a Substation Receiver and be operable to send Pairing Messages associating the grid feature with other Remote Hubs electrically and schematically subordinate to the grid feature. A Remote Hub may also be embodied as a standalone device plugged into an electrical outlet. A form of Substation Receiver may additionally be associated with such medium voltage grid features, or any intermediate point on the medium voltage distribution grid. Such an intermediate Receiver may collect information regarding which Transformer Area Networks are impacted by an associated medium-voltage grid feature. The combination of such a secondary Receiver and Remote Hub may be employed to control intermediate grid features, such as using a switch or relay to isolate a microgrid or balance the load on a plurality of substations, or to alter the set-point on a voltage regulator.
[00116] In a further aspect of the invention, a Remote Hub may carry out line measurements to determine locally optimum conditions for transmitting. The Remote Hub always has the option to vary the amplitude of the injected signal, and may additionally have the option to vary the frequency band of the data bearing segment of the transmission.
[00117] To conduct the measurements, the Remote Hub transmits a sequence or simultaneous combination of pure tones. These tones may be independent of an actual message transmission, or they may be incorporated in the message preamble. Recall that the bandwidth of the preamble may be different than the bandwidth of the data-bearing segment of the transmission. If there is an opportunity to choose the frequency band of the data bearing segment, then the tones must span the entire available spectrum. When the tones are transmitted, the current generated at the requested voltage is measured. The relationship between the requested voltage and the generated current is calculated at each frequency. The result will be proportional to the line impedance of the grid at the Remote Hub for each frequency. This allows the Remote Hub to determine both how much drive voltage is required to generate the desired current at each frequency in the available frequency band, and, if there is a choice of frequency bands to use, to select the frequency range that requires the least voltage to achieve the desired current. In some embodiments where a Substation-to-Edge channel is available and has sufficient capacity, the Computing Platform may from time to time send feedback from the
Substation Receiver about the messages as received. This may allow the Remote Hub to refine and calibrate its measurement process. Outcomes of this feedback may include changing the slot assignments and/or modulation methods of individual Remote Hubs and/or an entire channel to improve message success rate.
[00118] The foregoing description of the invention has been presented for purposes of illustration and description and is not intended to be exhaustive or to limit the invention to the precise forms disclosed. Obviously many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical application to thereby enable others skilled in the art to best utilize the invention in various
embodiments and with various modifications as are suited to the particular use contemplated. It is intended that the scope of the invention be defined by the claims appended hereto.

Claims

Claims
1. A system for sending and receiving messages on an electrical distribution grid from the low-voltage periphery of said grid to an electrical distribution substation without requiring intervening apparatus to repeat or amplify the signal and wherein said grid is used as a long-range data-bearing network, the system comprising:
a. a converged network comprising at least one conventional network and at least one medium voltage electrical distribution grid, wherein the at least one medium voltage electrical distribution grid comprises at least one distribution substation containing at least one distribution transformer, and at least one low-voltage network comprising a service transformer supplying power to at least one consumer;
b. a data center comprising a database containing a Grid Map and an Inventory and stored programs, attached to the conventional network;
c. at least one Computing Platform for each of the at least one distribution substations containing at least one substation transformers, the Computing Platform comprising a database containing a subset of the Grid Map and a subset of the Inventory and stored programs;
d. at least one Substation Receiver hosted on or in communication with the at least one Computing Platform; and
e. at least one Transformer Area Network supplied with power by the at least one distribution substation transformer, each Transformer Area Network comprising at least one Remote Hub sited on the low-voltage side of the service transformer, wherein the Remote Hub is configured to transmit messages that are received and decoded by the Substation Receiver, without the use of repeaters, bridges, or other apparatus between the Substation Receiver and the at least one Remote Hub.
2. The system of claim 1, wherein a Transformer Area Network contains one or more
Subordinate Remotes on the low voltage side of said service transformer, wherein the one or more subordinate remotes are operable to respond to discovery commands and data collection requests from the at least one Remote Hub via an on-grid protocol.
3. The system of claim 1, further comprising providing a Substation-to-Edge channel by an Advanced Metering Infrastructure.
4. The system of claim 1, further comprising providing a Substation-to-Edge channel by at least one on-grid transmitter configured to transmit from medium or high voltage to low voltage.
5. The system of claim 1, wherein the Data Center further comprises a Head End of an Advanced Metering Infrastructure attached to the conventional network, and a
Concentrator configured to provide data blocks to the Head End for broadcast over the Advanced Metering Infrastructure and received by the Remote Hubs.
6. The system of claim 1, wherein the Transformer Area Network is bounded by a single- phase service transformer.
7. The system of claim 1, wherein the service transformer is a multi-phase service
transformer, and wherein the service area of the multi-phase service transformer contains one Transformer Area Network for each phase of the multi-phase service transformer.
8. The system of claim 1, wherein the service transformer is a multi-phase service
transformer, and wherein the service area of the multi-phase service transformer contains a single Transformer Area Network, with a master Remote Hub on one phase of the service transformer, and a Proxy Hub on each phase of said transformer not having the master Remote Hub.
9. The system of claim 1, wherein a Remote Hub is programmable by a portable computing device and a local interface.
10. The system of claim 1, wherein data can be collected from a Remote Hub by a portable computing device and a local interface.
11. The system of claim 1, wherein at least one additional Substation Receiver is sited at an intermediate point on the medium voltage distribution grid between the at least one Transformer Area Network and the at least one substation transformer.
12. A method for inferring schematic and topological properties of an electrical distribution grid which vary over time, comprising transmitting messages from a Remote Hub connected at low voltage on a single phase main in a Transformer Area Network to an electrical distribution substation without requiring intervening apparatus to repeat or amplify the signal, the method comprising the steps of:
a. identifying at least one frequency band in the candidate spectrum to form at least one transmission channel on the distribution grid; b. loading the Remote Hub with information defining a policy for allowing said Remote Hub to transmit on the at least one channel;
c. obtaining a data payload;
d. creating a message from the data payload and including information in the
message to be transmitted to facilitate detection of the message and inference of the grid location of the transmitter; and
e. transmitting the message onto the power line by injecting a modulated current signal into the at least one channel.
13. The method of claim 12, wherein the data payload comprises a bit stream, and wherein forward error correction bits are computed on the data payload and appended to the bit stream.
14. The method of claim 12, wherein the data payload comprises a bit stream, and wherein forward error correction bits are computed on the data payload and interleaved with the data bits of the bit stream in a pattern.
15. The method of claim 12, wherein the message contains a preamble, a data payload, and a probe transmission for establishing grid location.
16. The method of claim 15, wherein the probe transmission is contained in the preamble.
17. The method of claim 15, wherein the probe transmission is separate from the preamble.
18. The method of claim 15, wherein bandwidth of the preamble is the same as that of the data payload.
19. The method of claim 15, wherein bandwidth of the preamble is different than the data payload.
20. The method of claim 15, wherein the probe transmission comprises a sequence of at least one broadband modulated signal.
21. The method of claim 15, wherein the probe transmission comprises a sequence of at least one sweeping group comprising at least one tone.
22. The method of claim 12, further comprising providing a provisioning request in the data payload.
23. The method of claim 12, further comprising describing discovery of a new Subordinate Remote in the data payload.
24. The method of claim 12, wherein the data payload contains at least one computed result derived from data measured at the Remote Hub.
25. The method of claim 12, wherein the data payload contains at least one computed result derived from data measured on at least one Subordinate Remote.
26. The method of claim 12, further comprising including at least one report of an
exceptional condition detected in a Transformer Area Network in the data payload.
27. The method of claim 12, further comprising including a retransmission of a previous data payload in the data payload.
28. The method of claim 12, wherein the at least one transmission channel is not divided into time slots and may be accessed by the Remote Hub at randomly selected times.
29. The method of claim 12, further comprising providing a plurality of Remote Hubs and synchronizing system clocks of all Remote Hubs within the plurality of Remote Hubs able to receive power from the same distribution substation.
30. The method of claim 29, wherein the at least one transmission channel is a slotted
channel divided by provisioning into time slots of predetermined lengths.
31. The method of claim 30, wherein at least one of the time slots of the slotted channel is reserved for scheduled transmissions and assigned to the Remote Hub by provisioning.
32. The method of claim 30, wherein at least one of the time slots of the slotted channel is reserved for random transmissions and may be accessed by the Remote Hub.
33. The method of claim 12, wherein at least one channel is not divided into time slots.
34. The method of claim 12, wherein the Remote Hub waits for a policy-based fixed interval of time plus a randomly selected interval of time, and then retransmits said message.
35. The method of claim 12, wherein the Remote Hub waits for a policy-based fixed interval of time plus a randomly selected interval of time, and then retransmits said message only if an acknowledgement of the message on a Substation-to-Edge channel has not been received.
36. The method of claim 32, wherein the Remote Hub waits for a policy-based fixed interval of time plus a randomly selected interval of time, and then retransmits said message in the then next available time slot reserved for random messages.
37. The method of claim32, wherein the Remote Hub waits for a policy-based fixed interval of time plus a randomly selected interval of time, and then retransmits said message in the then next available time slot reserved for random messages only if an acknowledgement of the message on a Substation-to-Edge channel has not been received.
38. The method of claim 12, wherein the modulated current signal is modulated by a
combination of more than one modulation technique.
39. The method of claim 12, wherein the modulated current signal is modulated by a spread frequency method, and further comprising assigning at least one chip to the at least one channel for the purpose of modulating transmissions.
40. The method of claim39, further comprising selecting the chip at random from a plurality of mathematically orthogonal chips assigned to the at least one channel for the purpose of modulating transmissions.
41. The method of claim 39, further comprising selecting the chip from a plurality of
mathematically orthogonal chips assigned to the at least one channel by the ordinal of the time slot in which the message is to be transmitted.
42. The method of claim 39, wherein the message is modulated onto the channel by
computing the exclusive OR of the chip and the message string.
43. The method of claim 39, further comprising a plurality of Remote Hubs each uniquely assigned one of a set of mutually orthogonal chips.
44. The method of claim 12, further comprising using a shaping filter in the transmission of the message to avoid injecting energy on harmonics of a power fundamental signal.
45. The method of claiml2, further comprising storing a message until the information
defining a policy permits transmission.
46. The method of claim 12, further comprising closing an isolation circuit prior to
transmitting so that current may flow from an Edge Transmitter in the Remote Hub onto the power line.
47. The method of claim 46, wherein closing said isolation circuit further comprises closing a Triac at a zero crossing of the power line fundamental, then closing a relay.
48. The method of claim 46, further comprising opening said isolation circuit after the
transmission message has been completely transmitted.
49. The method of claim 48, wherein opening said isolation circuit further comprises the steps of opening the relay, then opening the Triac at a zero crossing of the power line fundamental.
50. The method of claim 12, wherein the information defining a policy is provided to the Remote Hub during manufacture.
51. The method of claim 12, wherein the information defining a policy is transmitted to the Remote Hub over a Substation-to-Edge channel.
52. The method of claim 12, wherein the information defining a policy is transmitted to the Remote Hub from a hand-held device over a local interface.
53. The method of claim 12,wherein the information defining a policy is transmitted to the Remote Hub from a drive-by transmitter over a local interface.
54. A method for receiving a message transmitted from a Remote Hub situated on the low voltage side of a service transformer on one of at least one frequency band channel known to both the Remote Hub and a Substation Receiver, the method comprising:
a. connecting the Substation Receiver to a bus of at least one substation transformer, wherein the Substation Receiver is connected by attaching current sensors to each of the three phases of at least one feeder attached to the bus;
b. monitoring the output of each current sensor and digitizing waveforms detected thereon;
c. detecting at least one message preamble in the digitized waveforms from at least one current sensor;
d. extracting a message from the digitized waveforms based on the detection of the at least one message preamble;
e. demodulating the message and forwarding the demodulated message to a
Computing Platform;
f. determining information about the grid location of the transmitter of the received signals; and
g. extracting data from the message to derive additional information about the
transmitter and any associated devices.
55. The method of claim 54, wherein a copy of at least one message is detected on at least one of the current sensors.
56. The method of claim 55, further comprising associating each detected copy of a message with at least one measurement of the properties of the copy.
57. The method of claim 56, wherein the at least one measurement describes a signal quality of the copy.
58. The method of claim 56, wherein the at least one measurement describes a bit error rate of the copy.
59. The method of claim 56, wherein the at least one measurement describes an amplitude versus frequency of the copy.
60. The method of claim 56, wherein the measurements associated with each detected copy of the message are forwarded to the Computing Platform.
61. The method of claim 55, further comprising associating other properties of the detected message with each copy of said message and forwarding the copies and associated properties to the Computing Platform.
62. The method of claim 61, further comprising forwarding the time said message was
received to the Computing Platform.
63. The method of claim 61, further comprising forwarding an identity of the current sensor on which each copy of said message was received to the Computing Platform.
64. The method of claim 54, further comprising processing data regarding the message to infer the feeder and phase on which the message was transmitted by a Remote Hub.
65. The method of claim 54, further comprising applying a comb filter to the digitized
waveforms to remove harmonics of the power fundamental.
66. The method of claim 54, wherein an entire candidate spectrum is sampled in order to detect preambles.
67. The method of claim 54, wherein only selected frequency bands are sampled in order to detect preambles.
68. The method of claim 63, wherein the Computing Platform identifies the transmitter of a message from a combination of the properties of a received message and the data content of the message.
69. The method of claim 63, further comprising the Computing Platform searching an
Inventory of transformers for the transmitter.
70. The method of claim 69, further comprising the Computing Platform adding the
transmitter to the Inventory when the transmitter is not located in the search of the Inventory.
71. The method of claim 70, further comprising the Computing Platform adding the transmitter and the grid location of said transmitter to a Grid Map.
72. The method of claim 69, further comprising the Computing Platform locating the
transmitter in the Inventory.
73. The method of claim 72, further comprising the Computing Platform retrieving a
previously stored grid location of the transmitter from a Grid Map.
74. The method of claim 73, further comprising the Computing Platform comparing the
inferred grid location of the received message with a retrieved previous grid location of the transmitter.
75. The method of claim 74, further comprising the Computing Platform updating the Grid Map with the new grid location of the transmitter.
76. The method of claim 61, further comprising the Computing Platform forwarding
information regarding a received message over a conventional network to a Concentrator.
77. The method of claim 76, further comprising the Concentrator using said forwarded
information to update its Inventory.
78. The method of claim 76, further comprising the Concentrator using said forwarded
information to update its Grid Map.
79. The method of claim 76, further comprising the Concentrator determining whether to send said forwarded information over a conventional network to at least one other application.
80. The method of claim 54, further comprising archiving the digitized output of each current sensor for later analysis.
81. The method of claim 54, further comprising processing and enhancing the extracted
message, data, and additional information, and archiving the processed and enhanced information and data for later analysis.
82. The method of claim 54, wherein the steps of the procedure are divided into a plurality of sequenced and parallel processes to make use of multiple available processor cores to detect and process sequences of transmissions arriving on multiple frequency bands on multiple inputs, comprising the steps of:
a. writing the digitized signals with a timestamp from each monitored phase of each monitored feeder to a protected memory buffer; b. reading the digitized signals and dividing the signals into at least one channel according to the provisioning of the distribution grid to create channelized data, c. discarding data which is not part of any defined channel;
d. writing the channelized data into a protected memory buffer;
e. reading the channelized data from the protected memory buffer and sampling the data to detect at least one preamble pattern which indicates the beginning of a message;
f. creating a record marking the locations in the channel data of each copy of the starting point of a transmission;
g. conveying said record containing the marked locations to a demodulator;
h. demodulating each copy of the transmission to create a demodulated message; i. applying an error correction method;
j. writing the demodulated message and measured and inferred information about the message onto a protected memory buffer; and
k. signaling the completion of each step so as to allow data representing the outcome of said step to become available to a processor executing the next step in the process.
83. The method of claim 54, wherein said current sensors are attached to Supervisory Control and Data Acquisition loops already present on each phase of the at least one feeder attached to the bus of a substation transformer.
84. The method of claim 54, wherein said current sensors are coupled directly to main lines of each phase of the at least one feeder.
85. The method of claim 54, wherein a demodulator attempts to demodulate the message using each possible value of a chip which a transmitter is permitted by policy to use.
86. The method of claim 54, wherein detecting at least one preamble comprises only
scanning for possible preambles during a fixed section of a time slot.
87. The method of claim 54, wherein detecting at least one preamble comprises continuously scanning for possible preambles.
88. The method of claim 54, wherein a second Substation Receiver is placed at an
intermediate point on the medium voltage distribution grid.
89. The method of claim 88, further comprising said second Substation Receiver collecting data to determine the set of Transformer Area Networks which receive power from the Substation Transformer by way of the intermediate point.
90. The method of claim 88, wherein a Remote Hub is in communication with the second Substation Receiver.
91. The method of claim 90, wherein the Remote Hub and the second Substation Receiver are employed to exert local control on a portion of the electrical distribution grid.
92. The system of claim 1, wherein the Remote Hub has a Global Positioning System
receiver.
93. The system of claim 1, wherein at least one Subordinate Remote has a Global Positioning System receiver.
94. The method of claim 12, wherein the data payload includes the geospatial coordinates of the Remote Hub.
95. The method of claim 12, wherein the data payload includes a computed function of the geospatial coordinates of the Remote Hub.
96. The method of claim 29, wherein synchronizing system clocks comprises using a Global Positioning System signal.
PCT/US2014/016540 2013-02-19 2014-02-14 A system and method for inferring schematic and topological properties of an electrical distribution grid WO2014130366A1 (en)

Priority Applications (12)

Application Number Priority Date Filing Date Title
JP2015558889A JP2016519555A (en) 2013-02-19 2014-02-14 System and method for inferring schematic and topological characteristics of a distribution grid
MX2015010689A MX2015010689A (en) 2013-02-19 2014-02-14 A system and method for inferring schematic and topological properties of an electrical distribution grid.
BR112015019855A BR112015019855A2 (en) 2013-02-19 2014-02-14 SYSTEM FOR SENDING AND RECEIVING MESSAGES IN AN ELECTRICAL DISTRIBUTION NETWORK, AND METHOD FOR INFERRING SCHEMATIC AND TOPOLOGICAL PROPERTIES OF AN ELECTRICAL DISTRIBUTION NETWORK
KR1020157025873A KR20160006160A (en) 2013-02-19 2014-02-14 A system and method for inferring schematic and topological properties of an electrical distribution grid
AU2014219247A AU2014219247B2 (en) 2013-02-19 2014-02-14 A system and method for inferring schematic and topological properties of an electrical distribution grid
EP17173049.2A EP3229201B1 (en) 2013-02-19 2014-02-14 A system and method for inferring schematic and topological properties of an electrical distribution grid
EP14754343.3A EP2959559B1 (en) 2013-02-19 2014-02-14 A system and method for inferring schematic and topological properties of an electrical distribution grid
CN201480009551.2A CN105229886A (en) 2013-02-19 2014-02-14 About the system and method for the principle and topological performance of inferring electrical power distribution electrical network
CA2909483A CA2909483A1 (en) 2013-02-19 2014-02-14 A system and method for inferring schematic and topological properties of an electrical distribution grid
IL240610A IL240610A0 (en) 2013-02-19 2015-08-17 A system and method for inferring schematic and topological properties of an electrical distribution grid
CUP2015000087A CU20150087A7 (en) 2013-02-19 2015-08-19 A SYSTEM AND METHOD FOR INFRING SCHEMATIC AND TOPOLOGICAL PROPERTIES OF AN ELECTRIC DISTRIBUTION GRILLE
ZA2015/06111A ZA201506111B (en) 2013-02-19 2015-08-21 A system and method for inferring schematic and topological properties of an electrical distribution grid

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
US201361766551P 2013-02-19 2013-02-19
US61/766,551 2013-02-19
US201361779222P 2013-03-13 2013-03-13
US61/779,222 2013-03-13
US13/871,944 2013-04-26
US13/871,944 US10097240B2 (en) 2013-02-19 2013-04-26 System and method for inferring schematic and topological properties of an electrical distribution grid

Publications (1)

Publication Number Publication Date
WO2014130366A1 true WO2014130366A1 (en) 2014-08-28

Family

ID=51351139

Family Applications (3)

Application Number Title Priority Date Filing Date
PCT/US2014/016540 WO2014130366A1 (en) 2013-02-19 2014-02-14 A system and method for inferring schematic and topological properties of an electrical distribution grid
PCT/US2014/016535 WO2014130363A1 (en) 2013-02-19 2014-02-14 Methods for discovering, partitioning, organizing, and administering communication devices in a transformer area network
PCT/US2014/016538 WO2014130365A1 (en) 2013-02-19 2014-02-14 Methods for analyzing and optimizing the performance of a data collection network of an electrical distribution grid

Family Applications After (2)

Application Number Title Priority Date Filing Date
PCT/US2014/016535 WO2014130363A1 (en) 2013-02-19 2014-02-14 Methods for discovering, partitioning, organizing, and administering communication devices in a transformer area network
PCT/US2014/016538 WO2014130365A1 (en) 2013-02-19 2014-02-14 Methods for analyzing and optimizing the performance of a data collection network of an electrical distribution grid

Country Status (14)

Country Link
US (6) US10097240B2 (en)
EP (6) EP3312971B1 (en)
JP (3) JP6301967B2 (en)
KR (3) KR20160006159A (en)
CN (3) CN105210253A (en)
AU (4) AU2014219244A1 (en)
BR (3) BR112015019850A2 (en)
CA (3) CA2901608A1 (en)
CL (2) CL2015002323A1 (en)
CU (2) CU20150087A7 (en)
IL (3) IL240610A0 (en)
MX (4) MX2015010689A (en)
WO (3) WO2014130366A1 (en)
ZA (3) ZA201506111B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732021A (en) * 2015-03-17 2015-06-24 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation
US11181568B2 (en) 2016-07-14 2021-11-23 HYDRO-QUéBEC Detection of anomalies in an electrical network

Families Citing this family (108)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2870452C (en) 2011-04-15 2020-03-10 Dominion Energy Technologies, Inc. System and method for single and multi zonal optimization of utility services delivery and utilization
US9059842B2 (en) 2011-06-09 2015-06-16 Astrolink International Llc System and method for grid based cyber security
WO2013020053A1 (en) 2011-08-03 2013-02-07 Power Tagging Technologies, Inc. System and methods for synchronizing edge devices on channels without carrier sense
US10097240B2 (en) 2013-02-19 2018-10-09 Astrolink International, Llc System and method for inferring schematic and topological properties of an electrical distribution grid
US9678520B2 (en) * 2013-03-15 2017-06-13 Dominion Resources, Inc. Electric power system control with planning of energy demand and energy efficiency using AMI-based data analysis
US9582020B2 (en) 2013-03-15 2017-02-28 Dominion Resources, Inc. Maximizing of energy delivery system compatibility with voltage optimization using AMI-based data control and analysis
US20200158759A1 (en) * 2013-05-02 2020-05-21 Awesense Wireless, Inc. Voltage sensing systems and methods for a high-power line
US9438312B2 (en) 2013-06-06 2016-09-06 Astrolink International Llc System and method for inferring schematic relationships between load points and service transformers
US10001514B2 (en) 2013-06-13 2018-06-19 Astrolink International Llc System and method for detecting and localizing non-technical losses in an electrical power distribution grid
AU2014277951B2 (en) * 2013-06-13 2018-04-12 Dominion Energy Technologies, Inc. Inferring feeder and phase powering a transmitter
US10191090B2 (en) * 2013-11-12 2019-01-29 Alstom Technology Ltd Power transformers using optical current sensors
US20150142197A1 (en) * 2013-11-19 2015-05-21 Intelligent Power & Energy Research Corporation (Iperc) Automated identification of components connected in a power grid
US10284011B2 (en) * 2014-04-23 2019-05-07 Nec Corporation Electricity distribution system with dynamic cooperative microgrids for real-time operation
US9369177B2 (en) * 2014-05-01 2016-06-14 Cisco Technology, Inc. Path diversity with poly-phase links in a power line communication network
US10074977B2 (en) * 2014-07-17 2018-09-11 3M Innovative Properties Company Systems and methods for coordinating signal injections to understand and maintain orthogonality among signal injections patterns in utility grids
KR101619623B1 (en) * 2014-10-20 2016-05-10 현대자동차주식회사 System and method for reprogramming of vehicle controller
CN107005273B (en) * 2014-10-30 2021-01-01 艾斯通林克国际有限责任公司 System and method for allocating time slots and resolving time slot conflicts in a power distribution grid
WO2016070139A1 (en) * 2014-10-30 2016-05-06 Hansell Jerritt Harold System, method and apparatus for grid location
AU2015358448B2 (en) * 2014-12-03 2019-10-03 Dominion Energy Technologies, Inc. Bi-directional communications on an electrical secondary networked distribution system
US10682722B2 (en) * 2014-12-18 2020-06-16 Illinois Tool Works Inc. Systems and methods for measuring characteristics of a welding cable with a low power transceiver
US10449614B2 (en) 2014-12-18 2019-10-22 Illinois Tool Works Inc. Systems and methods for solid state sensor measurements of welding cables
WO2016115067A1 (en) * 2015-01-12 2016-07-21 Dominion Resources, Inc. Systems and methods for power factor control and optimization
US9497790B2 (en) * 2015-03-03 2016-11-15 Google Inc. Simulation of near-field communications
US11172273B2 (en) 2015-08-10 2021-11-09 Delta Energy & Communications, Inc. Transformer monitor, communications and data collection device
WO2017027682A1 (en) 2015-08-11 2017-02-16 Delta Energy & Communications, Inc. Enhanced reality system for visualizing, evaluating, diagnosing, optimizing and servicing smart grids and incorporated components
EP3133742B1 (en) * 2015-08-21 2019-05-29 Itron Global SARL Determination of instantaneous impedance of an ac power line used as a transmission line
WO2017041093A1 (en) 2015-09-03 2017-03-09 Delta Energy & Communications, Inc. System and method for determination and remediation of energy diversion in a smart grid network
CN105306546B (en) * 2015-09-28 2019-05-03 北京奇虎科技有限公司 A kind of method for visualizing and device of terminal location
US11196621B2 (en) 2015-10-02 2021-12-07 Delta Energy & Communications, Inc. Supplemental and alternative digital data delivery and receipt mesh net work realized through the placement of enhanced transformer mounted monitoring devices
CN105203924A (en) * 2015-10-10 2015-12-30 上海博英信息科技有限公司 Electricity usage trend abnormity suspicion analysis method and anti-electric-larceny monitoring system
WO2017070646A1 (en) 2015-10-22 2017-04-27 Delta Energy & Communications, Inc. Data transfer facilitation across a distributed mesh network using light and optical based technology
WO2017070648A1 (en) 2015-10-22 2017-04-27 Delta Energy & Communications, Inc. Augmentation, expansion and self-healing of a geographically distributed mesh network using unmanned aerial vehicle technology
US9998418B2 (en) * 2015-11-11 2018-06-12 International Business Machines Corporation Intelligent message queue management
US10680849B2 (en) * 2015-11-24 2020-06-09 Mitsubishi Electric Corporation Built-in apparatus, communication method, and computer readable medium
EP3405913A4 (en) * 2016-01-22 2019-06-19 Biarri Networks Pty Ltd Method and system for designing an electricity distribution network
CA3054546C (en) 2016-02-24 2022-10-11 Delta Energy & Communications, Inc. Distributed 802.11s mesh network using transformer module hardware for the capture and transmission of data
CN106130005B (en) * 2016-05-13 2021-09-28 国家电网公司 Geographical partition-based 220kV power grid partition boundary node processing method
CN106026395A (en) * 2016-06-20 2016-10-12 河北箱变电器有限公司 Remote intelligent monitoring system of power system
CN105939063A (en) * 2016-07-06 2016-09-14 河北箱变电器有限公司 Data transmission system for power equipment
CN106026402A (en) * 2016-07-06 2016-10-12 河北箱变电器有限公司 Power device fault solution scheme system
CN107589311A (en) * 2016-07-08 2018-01-16 武汉瑞莱保能源技术有限公司 System is supported in a kind of electromagnetic field testing service
US10652633B2 (en) 2016-08-15 2020-05-12 Delta Energy & Communications, Inc. Integrated solutions of Internet of Things and smart grid network pertaining to communication, data and asset serialization, and data modeling algorithms
CN106383265B (en) * 2016-08-26 2019-02-01 北京中宸泓昌科技有限公司 A kind of area and the device and method for accessing phase automatic identification
CN106297250A (en) * 2016-10-10 2017-01-04 普天智能照明研究院有限公司 A kind of remote family data acquisition system and energy consumption acquisition system
CN106570781B (en) * 2016-11-02 2020-03-17 国家电网公司 Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN106788598B (en) * 2016-12-16 2020-09-08 北京智芯微电子科技有限公司 Networking method and device for power line communication
US10163242B2 (en) * 2017-01-31 2018-12-25 Gordon Todd Jagerson, Jr. Energy grid data platform
CN106990287B (en) * 2017-05-08 2019-07-19 集美大学 A kind of Measurement of Harmonics in Power System device dispositions method
CN106991259B (en) * 2017-05-12 2021-02-12 国网上海市电力公司 Reactor noise model selection method for controlling field boundary noise level of outdoor substation
CN107147428B (en) * 2017-05-23 2020-09-22 重庆物奇科技有限公司 PLC network platform area identification method and carrier communication module
CN107154627B (en) * 2017-06-14 2019-09-24 电子科技大学 A kind of small power station's group of planes Dynamic Equivalence suitable for bulk power grid analysis
KR101999314B1 (en) * 2017-07-06 2019-07-12 한국전력공사 System, Method for collecting meter data, and Storage storing the method
WO2019008218A1 (en) * 2017-07-07 2019-01-10 Parkkisähkö Oy The recognition and selection of the phases of an electric vehicle charging device
CN107332350A (en) * 2017-08-14 2017-11-07 国网山东省电力公司济宁供电公司 A kind of transformer station becomes electricity condition operation management system
US20190065789A1 (en) * 2017-08-29 2019-02-28 Motorola Solutions, Inc. Device and method for power source based device authentication
CN109471961B (en) * 2017-11-15 2021-01-19 许继电气股份有限公司 Loop display method and device for secondary system of intelligent substation
US10534024B2 (en) * 2017-12-22 2020-01-14 Schneider Electric USA, Inc. Single pole low-cost expandable smart panel monitoring and control system
US10541555B2 (en) 2018-01-23 2020-01-21 Consolidated Edison Company Of New York, Inc. System and method of remote bridging a utility meter
ES2823676T3 (en) * 2018-02-27 2021-05-07 Ariadna Instr S L Method and system for detecting connectivities in an electric power distribution network
US20220231507A1 (en) * 2018-03-23 2022-07-21 Electricity North West Property Limited System for frequency regulation on a power distribution network
NZ763369A (en) * 2018-03-23 2024-01-26 Electricity North West Property Ltd System for frequency regulation on a power distribution network
JP7126114B2 (en) * 2018-03-30 2022-08-26 パナソニックIpマネジメント株式会社 Display system, display method
CN108810855B (en) * 2018-05-22 2020-10-02 南京邮电大学 Clustering D2D resource allocation method based on energy constraint and interference limited area
RU2698407C1 (en) * 2018-06-05 2019-08-26 Федеральное государственное казенное военное образовательное учреждение высшего образования "Михайловская военная артиллерийская академия" Министерства обороны Российской Федерации Method of modeling processes of providing structural survivability of distributed communication networks of multilevel control systems in conditions of destructive effects
CN108876144B (en) * 2018-06-13 2021-08-17 国网山东省电力公司经济技术研究院 Transformer substation pre-addressing method based on deep learning algorithm
US10996247B2 (en) * 2018-06-15 2021-05-04 Landis+Gyr Innovations, Inc. Volt-VAR device monitor
CN109347094B (en) * 2018-10-24 2020-10-09 珠海格力电器股份有限公司 Converter, method and device for distributing electric energy by converter and electric energy distribution system
US11451061B2 (en) * 2018-11-02 2022-09-20 Battelle Memorial Institute Reconfiguration of power grids during abnormal conditions using reclosers and distributed energy resources
CN109586290A (en) * 2018-12-14 2019-04-05 中国电力科学研究院有限公司 A kind of Active Control Method and system of large scale electric network electro-magnetic transient automatic modeling
FR3093880A1 (en) * 2019-03-13 2020-09-18 Sagemcom Energy & Telecom Sas basic remote meter for automated metering management of an electrical distribution service
CN110224427B (en) * 2019-03-14 2020-08-18 浙江工业大学 Information physical system modeling method based on micro-grid energy control strategy
CN110299763B (en) * 2019-06-28 2020-11-13 云南电网有限责任公司临沧供电局 Automatic low-voltage distribution area line topology identification system and method
CN110365534B (en) * 2019-07-15 2022-02-18 福建省万维新能源电力有限公司 Automatic chopping and recovery method for intelligent substation communication system
CN110458414A (en) * 2019-07-16 2019-11-15 深圳供电局有限公司 Urban distribution network grid division method and system
CN110445515B (en) * 2019-07-24 2021-10-29 浙江华云信息科技有限公司 Station area phase identification method and system based on electric power wireless private network and carrier wave
CN110635825A (en) * 2019-08-27 2019-12-31 杭州世创电子技术股份有限公司 Transformer area identification system and identification method thereof
CN110661337B (en) * 2019-09-09 2020-12-25 江苏伦肯智能科技有限公司 Adopt CAN bus communication's feeder line automatic system
CN110703004A (en) * 2019-10-03 2020-01-17 广东石油化工学院 PLC channel impulse noise detection method and system by utilizing dictionary classification
CN110674158B (en) * 2019-10-15 2022-02-15 广东电网有限责任公司 Method and system for automatically updating local area for low-voltage user
CN110865236B (en) * 2019-11-05 2022-02-01 广东电网有限责任公司广州供电局 User variable relation recognition capability test system, method, device and computer equipment
CN110991740B (en) * 2019-12-03 2023-12-15 海南电网有限责任公司 Power grid planning method and system based on operation simulation and intelligent agent technology
MX2019015169A (en) * 2019-12-13 2021-06-14 Prolec S A De C V Apparatus and method for identifying a failure in windings of a distribution transformer.
CN111698051B (en) * 2020-06-09 2022-05-20 山东科汇电力自动化股份有限公司 Time synchronization method for low-voltage distribution network
CN113822005B (en) * 2020-06-20 2023-07-25 高山 Method for copying and supervising entity power grid open circuit node by computer
CN111950848B (en) * 2020-07-09 2022-08-16 国网江西省电力有限公司电力科学研究院 Sequence component-based distribution room low voltage identification and reason diagnosis method
US11589195B2 (en) 2020-08-20 2023-02-21 Ip Co, Llc Asset tracking systems and methods
CN112054596B (en) * 2020-09-09 2021-12-14 国网信通亿力科技有限责任公司 System and method for acquiring running data of power distribution network in real time
TWI747703B (en) * 2021-01-08 2021-11-21 聯合再生能源股份有限公司 Charge and discharge control system and method thereof
CN114786214A (en) * 2021-01-22 2022-07-22 达发科技股份有限公司 Data packet retransmission method and device for wireless peer and readable storage medium
CN112926951B (en) * 2021-03-26 2023-01-24 广东电网有限责任公司佛山供电局 Equipment transaction identification method and device
CN113242274B (en) * 2021-04-08 2022-04-22 北京交通大学 Information grading return method for railway disaster prevention monitoring system
CN113300408B (en) * 2021-04-30 2023-10-27 北京天诚同创电气有限公司 Synchronous control method and system for micro-grid group
CN113191656B (en) * 2021-05-13 2022-08-02 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Low-voltage distribution network equipment load and topology linkage method based on data correlation analysis
CN113408202B (en) * 2021-06-18 2022-04-08 国网湖南省电力有限公司 Flow baseline model construction method for transformer substation core industrial control service
CN113659714B (en) * 2021-08-05 2023-06-23 国网山东省电力公司营销服务中心(计量中心) Automatic identification method and system for topological relation of transformer area
CN114123179B (en) * 2021-08-10 2024-05-28 北京智芯微电子科技有限公司 Identification method, system, device, medium and chip equipment of low-voltage station area topology
CN113991839B (en) * 2021-10-15 2023-11-14 许继集团有限公司 Device and method for improving remote control opening reliability
CN113904919B (en) * 2021-10-30 2024-04-19 国家电网有限公司西北分部 Safe and stable control system channel fault positioning method
CN114124728B (en) * 2021-11-11 2024-06-25 国网四川省电力公司经济技术研究院 Vulnerability coupling link identification method between power grid control system and power primary equipment
TWI792772B (en) * 2021-12-16 2023-02-11 台達電子工業股份有限公司 Energy storage system and method of controlling power thereof
CN114285170B (en) * 2021-12-28 2024-04-30 广东电网有限责任公司 Low-voltage topology identification method, device and storage medium
CN114564963B (en) * 2022-01-20 2024-08-30 浙江大学 Retransmission method for semantic communication
CN115513944B (en) * 2022-10-21 2024-09-03 国网四川省电力公司经济技术研究院 Power grid robustness improving method based on unbalanced coupling link removal strategy
WO2024141231A1 (en) * 2022-12-28 2024-07-04 Gridspertise S.R.L. Enhanced control of an electric substation in electrical network monitoring and control equipment
CN116526680B (en) * 2023-05-31 2023-09-19 威海双联电气有限公司 Control method and device for high-low voltage power distribution cabinet cluster
CN117134353B (en) * 2023-10-26 2024-01-23 国网江苏省电力有限公司苏州供电分公司 Virtual area dynamic switching-based power distribution network fault recovery method and system
CN117895509B (en) * 2024-03-14 2024-05-10 国网山东省电力公司经济技术研究院 Multi-energy coupling type power distribution network scheduling method and system
CN117895977B (en) * 2024-03-18 2024-05-28 青岛鼎信通讯科技有限公司 Characteristic current information bit identification method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6373399B1 (en) * 1990-02-15 2002-04-16 Itron, Inc. Wide area communications network for remote data generating stations
US20050017848A1 (en) * 2003-07-24 2005-01-27 Hunt Technologies, Inc. Endpoint receiver system
US20080312851A1 (en) * 2004-10-20 2008-12-18 Electro Industries/Gauge Tech. Portable Power Quality Analyzer with Networking Capabilities
US20120265355A1 (en) * 2011-04-15 2012-10-18 Power Tagging Technologies, Inc. System and method for single and multizonal optimization of utility services delivery and utilization
US20120310558A1 (en) * 2011-05-31 2012-12-06 Cisco Technology, Inc. Layered and distributed grid-specific network services
US20130034086A1 (en) * 2011-08-03 2013-02-07 Power Tagging Technologies, Inc. System and methods for synchronizing edge devices on channels without carrier sense

Family Cites Families (287)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3733586A (en) 1972-03-14 1973-05-15 Gen Public Utilities Meter interrogation system having strobe logic control
US3911415A (en) 1973-12-18 1975-10-07 Westinghouse Electric Corp Distribution network power line carrier communication system
US3944723A (en) 1974-12-05 1976-03-16 General Electric Company Station for power line access data system
US3942170A (en) 1975-01-31 1976-03-02 Westinghouse Electric Corporation Distribution network powerline carrier communication system
CH618553A5 (en) 1977-08-25 1980-07-31 Landis & Gyr Ag
US4200770A (en) 1977-09-06 1980-04-29 Stanford University Cryptographic apparatus and method
FR2468240B1 (en) 1979-10-24 1986-02-21 Enertec REMOTE CONTROL RELAY
US4568934A (en) 1981-06-09 1986-02-04 Adec, Inc. Computer controlled energy monitoring system
US4580276A (en) 1983-08-05 1986-04-01 Consultant's Choice Inc. System and method for transporting data
US4633463A (en) 1984-03-28 1986-12-30 Canadian Marconi Corporation Radio communication system
US4668934A (en) 1984-10-22 1987-05-26 Westinghouse Electric Corp. Receiver apparatus for three-phase power line carrier communications
US4681790A (en) 1986-02-03 1987-07-21 Minnesota Mining And Manufacturing Company Treating composition containing fluorochemical compound mixture and textiles treated therewith
JPH01106652A (en) 1987-10-20 1989-04-24 Fujitsu Ltd Data collection system
US4918422A (en) 1988-04-25 1990-04-17 Emerson Electric Co. Method and apparatus for extracting inbound information generated line-to-line in a multi-phase electric distribution system
US5032833A (en) 1989-04-27 1991-07-16 Schlumberger Industries, Inc. Adaptive network routing for power line communications
US6144292A (en) 1992-10-22 2000-11-07 Norweb Plc Powerline communications network employing TDMA, FDMA and/or CDMA
EP0692116B1 (en) 1993-04-02 2002-07-17 Echelon Corporation Power line communications analyzer
GB2278699B (en) 1993-05-17 1997-09-24 Logica Uk Ltd Domestic meter
GB9313198D0 (en) 1993-06-25 1993-08-11 Remote Metering Systems Ltd Mains phase determination
GB9313199D0 (en) 1993-06-25 1993-08-11 Remote Metering Systems Ltd Digital data transmission networks
US5818725A (en) 1993-08-11 1998-10-06 First Pacific Networks System for utility demand monitoring and control
US5463624A (en) 1994-04-15 1995-10-31 Dsc Communications Corporation Bus arbitration method for telecommunications switching
US7188003B2 (en) 1994-12-30 2007-03-06 Power Measurement Ltd. System and method for securing energy management systems
US6961641B1 (en) 1994-12-30 2005-11-01 Power Measurement Ltd. Intra-device communications architecture for managing electrical power distribution and consumption
US7761910B2 (en) 1994-12-30 2010-07-20 Power Measurement Ltd. System and method for assigning an identity to an intelligent electronic device
US6366062B2 (en) 1997-12-08 2002-04-02 Microplanet, Inc. Method and apparatus for electronic power control
DE19545893C2 (en) 1995-12-08 2003-09-25 Rohde & Schwarz System for automatically establishing a radio connection for data transmission between two or more transmitter-receiver stations
GB9616543D0 (en) 1996-08-06 1996-09-25 Northern Telecom Ltd Power line communications
US6778099B1 (en) 1998-05-01 2004-08-17 Elster Electricity, Llc Wireless area network communications module for utility meters
US6212560B1 (en) 1998-05-08 2001-04-03 Compaq Computer Corporation Dynamic proxy server
US6788702B1 (en) 1999-10-15 2004-09-07 Nokia Wireless Routers, Inc. Protocol for neighborhood-established transmission scheduling
EP1156624B1 (en) 1999-12-20 2006-04-19 Kabushiki Kaisha Toshiba Monitor and control module in a digital signal transmission apparatus
US6535797B1 (en) 2000-02-01 2003-03-18 Spectrum Engineering Corporation Electrical distribution system and method of monitoring and/or controlling same
JP3722663B2 (en) 2000-02-29 2005-11-30 株式会社タニタ Biometric device
JP4529056B2 (en) 2000-03-21 2010-08-25 ソニー株式会社 Information processing apparatus and method, recording medium, and information processing system
AUPQ672300A0 (en) 2000-04-05 2000-05-04 Nu-Lec Industries Pty Limited Isolating circuit breaker and circuit protection arrangement
US6998962B2 (en) 2000-04-14 2006-02-14 Current Technologies, Llc Power line communication apparatus and method of using the same
EP1830535B1 (en) 2000-04-18 2011-06-15 Aware, Inc. Multicarrier system with a plurality of SNR margins
FR2808149B1 (en) 2000-04-19 2003-01-31 Electricite De France METHOD AND DEVICE FOR ENABLING CONTROL OF AN ELECTRIC APPARATUS CONNECTED TO A NETWORK
US6690655B1 (en) 2000-10-19 2004-02-10 Motorola, Inc. Low-powered communication system and method of operation
US20020069299A1 (en) 2000-12-01 2002-06-06 Rosener Douglas K. Method for synchronizing clocks
US20020089927A1 (en) 2001-01-11 2002-07-11 Fischer Michael A. System and method for synchronizing data trasnmission across a variable delay interface
US6673479B2 (en) 2001-03-15 2004-01-06 Hydrogenics Corporation System and method for enabling the real time buying and selling of electricity generated by fuel cell powered vehicles
US7194528B1 (en) * 2001-05-18 2007-03-20 Current Grid, Llc Method and apparatus for processing inbound data within a powerline based communication system
US7346463B2 (en) 2001-08-09 2008-03-18 Hunt Technologies, Llc System for controlling electrically-powered devices in an electrical network
US20030036810A1 (en) 2001-08-15 2003-02-20 Petite Thomas D. System and method for controlling generation over an integrated wireless network
US6975212B2 (en) 2001-10-02 2005-12-13 Telkonet Communications, Inc. Method and apparatus for attaching power line communications to customer premises
US6747994B2 (en) 2001-10-17 2004-06-08 Qualcomm, Incorporated Selecting optimal transmit formats for transmissions over allocated time durations
US8489063B2 (en) 2001-10-24 2013-07-16 Sipco, Llc Systems and methods for providing emergency messages to a mobile device
US6603290B2 (en) 2001-11-26 2003-08-05 Visteon Global Technologies, Inc. Anti-islanding detection scheme for distributed power generation
US7053756B2 (en) 2001-12-21 2006-05-30 Current Technologies, Llc Facilitating communication of data signals on electric power systems
JP2003258689A (en) 2002-02-27 2003-09-12 Sumitomo Electric Ind Ltd Power-line carrier communication system and modem for power-line carrier communication
JP2003259696A (en) 2002-02-28 2003-09-12 Jfe Engineering Kk Generation control method and program thereof
GB0204884D0 (en) 2002-03-01 2002-04-17 Honeywell Normalair Garrett Gas supply apparatus
US7535913B2 (en) 2002-03-06 2009-05-19 Nvidia Corporation Gigabit ethernet adapter supporting the iSCSI and IPSEC protocols
US7069117B2 (en) 2002-04-01 2006-06-27 Programmable Control Services, Inc. Electrical power distribution control systems and processes
JP2003339120A (en) 2002-05-17 2003-11-28 Sumitomo Electric Ind Ltd Utilization method and receiving system for secondary battery
JP2004015840A (en) 2002-06-03 2004-01-15 Mitsubishi Electric Corp Distribution system exploration system and distribution system exploration arrangement
US20040218688A1 (en) * 2002-06-21 2004-11-04 John Santhoff Ultra-wideband communication through a power grid
AU2003276972A1 (en) 2002-09-25 2004-04-19 Enikia Llc Method and system for timing controlled signal transmission in a point to multipoint power line communications system
JP3827082B2 (en) 2002-10-24 2006-09-27 株式会社中川研究所 Broadcast system, light bulb, lighting device
US7058524B2 (en) 2002-10-25 2006-06-06 Hudson Bay Wireless, Llc Electrical power metering system
US7076378B1 (en) * 2002-11-13 2006-07-11 Current Technologies, Llc Device and method for providing power line characteristics and diagnostics
US20060152344A1 (en) 2002-12-07 2006-07-13 Mowery Richard A Jr Powerline Communication Network Handoff
US6947409B2 (en) 2003-03-17 2005-09-20 Sony Corporation Bandwidth management of virtual networks on a shared network
MXPA05013137A (en) 2003-06-05 2006-08-23 Enfo Broadcast As A method and a system for automatic management of demand for non-durables.
US7299503B2 (en) 2003-06-26 2007-11-20 International Business Machines Corporation Apparatus and method for location specific authentication using powerline networking
US7321291B2 (en) 2004-10-26 2008-01-22 Current Technologies, Llc Power line communications system and method of operating the same
US20060291575A1 (en) * 2003-07-03 2006-12-28 Berkman William H Power Line Communication System and Method
US7412338B2 (en) 2004-03-18 2008-08-12 Power Measurement Ltd. Radio frequency device within an energy sensor system
US7251570B2 (en) 2003-07-18 2007-07-31 Power Measurement Ltd. Data integrity in a mesh network
US7450638B2 (en) 2003-07-21 2008-11-11 Sony Corporation Power-line communication based surveillance system
US7236765B2 (en) * 2003-07-24 2007-06-26 Hunt Technologies, Inc. Data communication over power lines
US8008804B2 (en) 2003-08-15 2011-08-30 Beacon Power Corporation Methods, systems and apparatus for regulating frequency of generated power using flywheel energy storage systems with varying load and/or power generation
US7092693B2 (en) 2003-08-29 2006-08-15 Sony Corporation Ultra-wide band wireless / power-line communication system for delivering audio/video content
US20050063422A1 (en) * 2003-09-19 2005-03-24 Sashi Lazar Communication protocol over power line communication networks
US8170524B2 (en) * 2003-12-16 2012-05-01 Pulse Utilities International Limited Power line communication system and an intelligent meter
US7552437B2 (en) 2004-01-14 2009-06-23 International Business Machines Corporation Maintaining application operations within a suboptimal grid environment
JP4161921B2 (en) 2004-03-04 2008-10-08 カシオ計算機株式会社 OFDM signal demodulating device and OFDM signal demodulating method
US20050207079A1 (en) * 2004-03-17 2005-09-22 Tiller David S System and apparatus for a multifunctional powerline carrier device with data management and power surge protector
US7660345B2 (en) 2004-06-18 2010-02-09 Aboundi, Inc. Transceiver apparatus and method having ethernet-over-power and power-over-ethernet capability
US7403547B2 (en) 2004-07-15 2008-07-22 Arris International, Inc. Method and system for synchronizing separated edge QAM devices located remotely from a CMTS
KR100590486B1 (en) 2004-07-29 2006-06-19 에스케이 텔레콤주식회사 Method and System for Generating Switching Timing Signal for Separating Transmitting and Receiving Signal in Optical Repeater of Mobile Telecommunication Network Using TDD and ODFM Modulation
US7362212B2 (en) 2004-09-24 2008-04-22 Battelle Memorial Institute Communication methods, systems, apparatus, and devices involving RF tag registration
US8194722B2 (en) 2004-10-11 2012-06-05 Broadcom Corporation Various methods and apparatuses for impulse noise mitigation
US7583202B2 (en) 2004-10-19 2009-09-01 Echelon Corporation Method and apparatus for an electric meter
US7808128B1 (en) 2004-11-12 2010-10-05 Dgi Creations, Llc Remote monitoring of control decisions for network protectors
JP4591823B2 (en) 2005-03-15 2010-12-01 東京電力株式会社 Power supply system
KR100970391B1 (en) 2005-04-19 2010-07-15 삼성전자주식회사 Method for Making Tag in Broadcast Encryption System
US7571028B2 (en) 2005-04-19 2009-08-04 Genscape Intangible Holding, Inc. Method and system for AC power grid monitoring
KR100706330B1 (en) 2005-08-18 2007-04-13 (주)테크윙 Test handler
US7830248B2 (en) 2005-08-29 2010-11-09 Arkados, Inc. Networking and multimedia adapter for power outlets
US7426190B2 (en) 2005-09-30 2008-09-16 Robert Bosch Gmbh System and method for a communication protocol for wireless sensor systems including systems with high priority asynchronous message and low priority synchronous message
US7554320B2 (en) 2005-10-28 2009-06-30 Electro Industries/Gauge Tech. Intelligent electronic device for providing broadband internet access
US20070101438A1 (en) 2005-10-28 2007-05-03 Gunasekaran Govindarajan Location-based authentication
US20070100506A1 (en) 2005-10-31 2007-05-03 Ralph Teichmann System and method for controlling power flow of electric power generation system
JP5078119B2 (en) 2005-12-06 2012-11-21 トヨタ自動車株式会社 Charger
US7323968B2 (en) 2005-12-09 2008-01-29 Sony Corporation Cross-phase adapter for powerline communications (PLC) network
US7876717B2 (en) 2005-12-09 2011-01-25 Sony Corporation System and method for providing access in powerline communications (PLC) network
US20070162550A1 (en) 2006-01-06 2007-07-12 Outland Research, Llc Vehicle-to-vehicle instant messaging with locative addressing
GB2424107B (en) 2006-01-19 2007-03-14 Kevin Jones Security System
US20080012724A1 (en) * 2006-01-30 2008-01-17 Corcoran Kevin F Power line communications module and method
KR100904437B1 (en) 2006-02-23 2009-06-24 엘지전자 주식회사 Method and apparatus for processing an audio signal
EP2010984A4 (en) 2006-03-08 2010-05-05 Aclara Power Line Systems Inc Intelligent fault detector system and method
US7701330B2 (en) 2006-03-16 2010-04-20 Sony Corporation Power line communication network security system
US8519566B2 (en) 2006-03-28 2013-08-27 Wireless Environment, Llc Remote switch sensing in lighting devices
US8829799B2 (en) 2006-03-28 2014-09-09 Wireless Environment, Llc Autonomous grid shifting lighting device
US7986246B2 (en) 2006-03-31 2011-07-26 Itron, Inc. Integrated data collection, anomaly detection and investigation, such as integrated mobile utility meter reading, theft detection and investigation system
US7280931B1 (en) 2006-05-18 2007-10-09 International Business Machines Corporation Method and system for calibrating an electrical device
US20070271383A1 (en) 2006-05-18 2007-11-22 International Business Machines Corporation Method and system for managing an electrical device over a power delivery network
US20090210197A1 (en) 2006-05-23 2009-08-20 Intelemetrix Ltd Data accessing system and method
US20070297425A1 (en) 2006-06-23 2007-12-27 George Chirco Systems and methods for establishing a network over a substation dc/ac circuit
US7747739B2 (en) 2006-08-10 2010-06-29 Gridpoint, Inc. Connection locator in a power aggregation system for distributed electric resources
EP1901145A2 (en) 2006-08-23 2008-03-19 MicroNet Sensorik GmbH Field device and method of operating the same
EP2800285B1 (en) 2006-08-24 2019-10-02 Sony Deutschland Gmbh Method for transmitting a signal on a power line network, transmitting unit, receiving unit and system
US7870600B2 (en) 2006-08-25 2011-01-11 Cisco Technology, Inc. Apparatus and method for secure configuration of shared powerline devices
US7826538B1 (en) 2006-08-31 2010-11-02 Dgi Creations, Llc Remote determination of network transmitter identity and output strength
US20080077336A1 (en) 2006-09-25 2008-03-27 Roosevelt Fernandes Power line universal monitor
JP2008098812A (en) 2006-10-10 2008-04-24 National Institute Of Advanced Industrial & Technology Ofdm transmission method and ofdm transmitter
US7795877B2 (en) 2006-11-02 2010-09-14 Current Technologies, Llc Power line communication and power distribution parameter measurement system and method
JP2008124859A (en) 2006-11-14 2008-05-29 Funai Electric Co Ltd Communication system
US7957322B2 (en) 2007-02-02 2011-06-07 Silver Sring Networks, Inc. Flow-through provisioning in utility AMR/AMI networks
US20080209481A1 (en) 2007-02-26 2008-08-28 Alcatel-Lucent Directly access attached video on demand delivery
US9282001B2 (en) 2007-03-05 2016-03-08 Grid Net, Inc. Policy based utility networking
CA2681103C (en) 2007-03-14 2015-06-30 Zonit Structured Solutions, Llc Smart nema outlets and associated networks
US7319280B1 (en) 2007-04-24 2008-01-15 Telkonet, Inc. Power line coupler adapted for use with multiple communication systems using different frequency spectra
US8023976B2 (en) 2007-05-03 2011-09-20 Samsung Electronics Co., Ltd. Method and system for accurate clock synchronization for communication networks
KR20100023841A (en) 2007-06-05 2010-03-04 파나소닉 주식회사 Power line communication device and power line communication method
US7940039B2 (en) 2007-07-13 2011-05-10 De Buda Eric Transformer meter and system for using same
EP2387161B1 (en) 2007-07-23 2020-01-22 Sony Corporation Method for transmitting a signal between a transmitter and a receiver in a power line network, transmitter, receiver, power line communication modem and powerline communication system
US20090027190A1 (en) 2007-07-25 2009-01-29 Power Monitors, Inc. Method and apparatus for a low-power radio broadcast alert for monitoring systems
EP3065303B1 (en) 2007-08-22 2019-01-02 Sony Corporation Method for transmitting a signal via a power line network, transmitter, receiver, power line communication modem and power line communication system
US20090088907A1 (en) 2007-10-01 2009-04-02 Gridpoint, Inc. Modular electrical grid interface device
US20090125351A1 (en) * 2007-11-08 2009-05-14 Davis Jr Robert G System and Method for Establishing Communications with an Electronic Meter
KR100911726B1 (en) 2007-11-23 2009-08-10 한국전기연구원 coupling apparatus for medium voltage power line communication built-in impedance matching transformer and control circuit of phase selection
CA2705094A1 (en) 2007-11-25 2009-05-28 Trilliant Networks, Inc. System and method for false alert filtering of event messages within a network
CA2647578A1 (en) 2007-12-20 2009-06-20 Tollgrade Communications, Inc. Power distribution monitoring system and method
US20090187344A1 (en) 2008-01-19 2009-07-23 Brancaccio Daniel S System, Method, and Computer Program Product for Analyzing Power Grid Data
US20090219932A1 (en) * 2008-02-04 2009-09-03 Stmicroelectronics, Inc. Multi-stream data transport and methods of use
US8148854B2 (en) 2008-03-20 2012-04-03 Cooper Technologies Company Managing SSL fixtures over PLC networks
CN101251951B (en) * 2008-04-03 2010-06-30 中国电力科学研究院 Power distribution network industrial frequency communicating method and system
US20130031201A1 (en) 2008-04-03 2013-01-31 Electro Industries/Gauge Tech Intelligent electronic device communication solutions for network topologies
US20090265042A1 (en) 2008-04-17 2009-10-22 Mollenkopf James D System and Method for Providing Voltage Regulation in a Power Distribution System
EP2110959B1 (en) 2008-04-18 2018-03-21 Thierry Schuffenecker Communication method for elements that form an electricity distribution network and devices for implementing the method
US8121741B2 (en) 2008-05-09 2012-02-21 International Business Machines Corporation Intelligent monitoring of an electrical utility grid
JP5562326B2 (en) 2008-06-06 2014-07-30 パワー タギング テクノロジーズ Intelligent power system and method of use thereof
KR20100004605A (en) * 2008-07-04 2010-01-13 한국전자통신연구원 Method for selecting node in network system and system thereof
US9830670B2 (en) 2008-07-10 2017-11-28 Apple Inc. Intelligent power monitoring
US8159210B2 (en) 2008-07-11 2012-04-17 Kinects Solutions, Inc. System for automatically detecting power system configuration
BRPI0917008A2 (en) 2008-08-08 2016-02-16 Powermax Global Llc secure long distance data communications over power lines for meter reading and other communications services
EP2157732B2 (en) 2008-08-18 2021-10-20 ABB Power Grids Switzerland AG Configuration of a process control system
CN102165710B (en) 2008-08-28 2014-12-10 阿克拉拉输电线系统股份有限公司 A general method for low-frequency data transmission on a power line
US8207726B2 (en) 2008-09-05 2012-06-26 Silver Spring Networks, Inc. Determining electric grid endpoint phase connectivity
US8019483B2 (en) 2008-10-01 2011-09-13 Current Communications Services, Llc System and method for managing the distributed generation of power by a plurality of electric vehicles
DE102008058264A1 (en) 2008-11-19 2010-07-08 IAD Gesellschaft für Informatik, Automatisierung und Datenverarbeitung mbH Measuring device, in particular energy counter and method for detecting tampering
US8570023B2 (en) 2008-12-03 2013-10-29 Sensus Usa Inc. System and method for phase load discovery
KR101014795B1 (en) 2008-12-04 2011-02-16 인하대학교 산학협력단 Method for preventing collision of reader, driving method of rfid reader having the method and rfid reader for performing the method
WO2010075559A1 (en) 2008-12-23 2010-07-01 Actelis Networks Ltd. System and method for digital subscriber loop crosstalk cancellation
US8143879B2 (en) 2008-12-30 2012-03-27 General Electric Company Meter phase identification
CN101770007A (en) 2008-12-31 2010-07-07 深圳市科陆电子科技股份有限公司 Electric energy meter test system and method thereof
CA2749770C (en) 2009-01-14 2021-07-20 Integral Analytics, Inc. Optimization of microgrid energy use and distribution
US7917807B2 (en) 2009-01-15 2011-03-29 International Business Machines Corporation Power system communication management and recovery
US8310341B2 (en) * 2009-04-20 2012-11-13 Itron, Inc. Endpoint classification and command processing
EP2394394B1 (en) 2009-02-06 2016-12-07 Broadcom Corporation Network measurements and diagnostics
US20100217549A1 (en) 2009-02-26 2010-08-26 Galvin Brian R System and method for fractional smart metering
US20100217550A1 (en) 2009-02-26 2010-08-26 Jason Crabtree System and method for electric grid utilization and optimization
EP2430699A4 (en) 2009-03-06 2015-03-25 Amperion Inc Station communications over electrical transmission lines
GB0905241D0 (en) 2009-03-26 2009-05-13 Hughes Electronics Ltd Ethernet over power systems
US20100262393A1 (en) 2009-04-08 2010-10-14 Manu Sharma System and Method for Determining a Phase Conductor Supplying Power to a Device
DE112010003256T5 (en) 2009-04-09 2013-01-31 E3 Greentech Enterprises, Inc. System and method for energy consumption management
CN102549880B (en) * 2009-05-07 2016-01-20 道明尼资源公司 Utilize the voltage saving that senior meter contact facility and transformer station's lumped voltage control
JP5293395B2 (en) 2009-05-13 2013-09-18 ソニー株式会社 Communication apparatus and broadcast wave detection method in communication apparatus
US8639922B2 (en) * 2009-06-01 2014-01-28 Dhananjay S. Phatak System, method, and apparata for secure communications using an electrical grid network
CN102484503A (en) 2009-06-05 2012-05-30 立维腾制造有限公司 Smart grid over power line communication network
US8013570B2 (en) 2009-07-23 2011-09-06 Coulomb Technologies, Inc. Electrical circuit sharing for electric vehicle charging stations
US8265197B2 (en) 2009-08-03 2012-09-11 Texas Instruments Incorporated OFDM transmission methods in three phase modes
JP2013501450A (en) * 2009-08-06 2013-01-10 韓国標準科学研究院 Time broadcasting information transmitting / receiving device using power line and transmitting / receiving method thereof
CA2770199A1 (en) 2009-08-06 2011-02-10 Rh Innovation Pty Ltd Operator interface for automation systems
US8396902B2 (en) 2009-08-13 2013-03-12 Research In Motion Limited Method and apparatus for modifying a scheduling database
US20110043340A1 (en) 2009-08-19 2011-02-24 Texas Instruments Incorporated Concatenated Repetition Code with Convolutional Code
JP5326107B2 (en) 2009-09-29 2013-10-30 双葉電子工業株式会社 Radio control transmitter and communication method in radio control transmitter
US8401709B2 (en) 2009-11-03 2013-03-19 Spirae, Inc. Dynamic distributed power grid control system
US8773108B2 (en) * 2009-11-10 2014-07-08 Power Monitors, Inc. System, method, and apparatus for a safe powerline communications instrumentation front-end
EP2504903B1 (en) 2009-11-24 2018-08-29 Silver Spring Networks, Inc. Powerline carrier "zero-crossing" transformer mapping with asymmetric rf return path
EP2506392A4 (en) 2009-11-26 2014-02-19 Toshiba Kk Energy management apparatus and energy management system
US8050879B2 (en) 2009-12-02 2011-11-01 General Electric Company Phase identification system and method
US8626462B2 (en) 2009-12-02 2014-01-07 General Electric Company Phase identification system and method
US8099479B2 (en) 2009-12-15 2012-01-17 Intel Corporation Distributed mesh network
CA2731433C (en) 2010-02-09 2018-05-15 Open Access Technology International, Inc. Systems and methods for demand response and distributed energy resource management
JP5501796B2 (en) 2010-02-24 2014-05-28 富士通株式会社 Distribution network estimation apparatus and distribution network estimation method
US9392565B2 (en) 2010-03-05 2016-07-12 Samsung Electronics Co., Ltd. Method and system for accurate clock synchronization through interaction between communication layers and sub-layers for communication systems
GB2479922B (en) * 2010-04-29 2014-05-21 Toshiba Res Europ Ltd Data transmission apparatus and method
US8924033B2 (en) * 2010-05-12 2014-12-30 Alstom Grid Inc. Generalized grid security framework
US20110285382A1 (en) * 2010-05-18 2011-11-24 General Electric Company Power meter phase identification
EP2579417B1 (en) 2010-05-25 2021-04-28 Mitsubishi Electric Corporation Electric power information management system, and electric power information management method
US8521337B1 (en) 2010-07-20 2013-08-27 Calm Energy Inc. Systems and methods for operating electrical supply
US8423637B2 (en) 2010-08-06 2013-04-16 Silver Spring Networks, Inc. System, method and program for detecting anomalous events in a utility network
JP6039555B2 (en) 2010-08-10 2016-12-07 センサス ユーエスエー インク.Sensus Usa Inc. Electric utility meter with load identification data processor
EP2604002A4 (en) 2010-08-12 2016-09-07 Abb Research Ltd A communication method and apparatus of network management system
US8886212B2 (en) 2010-08-24 2014-11-11 Blackberry Limited Mobile tracking
US9258627B2 (en) 2010-09-10 2016-02-09 Southern Company Services, Inc. Locating utility metering devices
WO2012037055A1 (en) 2010-09-13 2012-03-22 Trilliant Networks Process for detecting energy theft
US9276638B2 (en) * 2010-09-22 2016-03-01 Texas Instruments Incorporated Coupling circuits for power line communication devices
US8836510B2 (en) 2010-09-29 2014-09-16 Certicom Corp. Systems and methods for managing lost devices
US8941387B2 (en) 2010-10-12 2015-01-27 Howard University Apparatus and method for fault detection and location determination
JP2012113670A (en) 2010-11-29 2012-06-14 Renesas Electronics Corp Smart meter and meter reading system
WO2012078652A1 (en) 2010-12-06 2012-06-14 Sentient Energy, Inc. Power conductor monitoring device and method of calibration
US20120155557A1 (en) 2010-12-17 2012-06-21 General Electric Company System and method for power grid communication
US9100102B2 (en) * 2011-01-11 2015-08-04 Texas Instruments Incorporated Method to use a preamble with band extension in power line communications
GB2478505B (en) 2011-01-17 2012-02-15 Ido Schwartzman Method and system for secure firmware updates in programmable devices
US8519843B2 (en) 2011-01-27 2013-08-27 International Business Machines Corporation Power distribution device communications platform
US8743716B2 (en) * 2011-02-04 2014-06-03 General Electric Company Systems, methods, and apparatus for identifying invalid nodes within a mesh network
US8995461B2 (en) 2011-02-08 2015-03-31 Texas Instruments Incorporated Channel selection in power line communications
US20120236879A1 (en) 2011-02-22 2012-09-20 Vladimir Oksman Coexistence in communication system
US8644166B2 (en) 2011-06-03 2014-02-04 Asoka Usa Corporation Sensor having an integrated Zigbee® device for communication with Zigbee® enabled appliances to control and monitor Zigbee® enabled appliances
US20120232915A1 (en) 2011-03-11 2012-09-13 Seth Bromberger System and method for monitoring a utility meter network
US20120242499A1 (en) 2011-03-22 2012-09-27 General Electric Company Network interface controller for a utility meter
US8818742B2 (en) 2011-03-25 2014-08-26 General Electric Company Systems, methods, and apparatus for detecting theft and status of electrical power
EP2512005B1 (en) 2011-04-15 2017-02-15 Raychem International Remote control and operation of LV distribution networks
US20120262355A1 (en) 2011-04-18 2012-10-18 Ziming He High gain low profile multi-band antenna for wireless communications
US20120268291A1 (en) 2011-04-19 2012-10-25 John Christopher Boot Systems and method for transmitting data in an advanced metering infrastructure
US20120275084A1 (en) 2011-04-29 2012-11-01 Eaton Corporation Communications distribution systems, apparatus and methods using power line carrier communications
US9024471B2 (en) 2011-05-02 2015-05-05 Stmicroelectronics, Inc. System and method for an intelligent power controller
US20120284392A1 (en) 2011-05-03 2012-11-08 General Electric Company Mesh data network data management system, node, and computer program product
US8639992B2 (en) 2011-05-16 2014-01-28 GlobalFoundries, Inc. Soft error rate detector
EP2525503B1 (en) 2011-05-16 2018-03-07 Sony Corporation Power line communication modem, power line communication system, power line communication method
US9641026B2 (en) 2011-06-08 2017-05-02 Alstom Technology Ltd. Enhanced communication infrastructure for hierarchical intelligent power distribution grid
US20120316696A1 (en) 2011-06-08 2012-12-13 Alstom Grid Multi-level topologytopography for electrical distribution grid control
US9059842B2 (en) * 2011-06-09 2015-06-16 Astrolink International Llc System and method for grid based cyber security
US9255949B2 (en) 2011-06-10 2016-02-09 Quadlogic Controls Corporation Local transformer level grid management systems and methods
US8699586B2 (en) * 2011-06-10 2014-04-15 Didier Boivin Powerline control interface in CENELEC (EU) A-D bands frequency and amplitude modulation transmitter
US9172274B2 (en) 2011-06-16 2015-10-27 General Electric Company System, method, and apparatus for operating a power distribution system
CN102227090B (en) 2011-06-27 2013-08-21 山西省电力公司临汾供电分公司 Intelligent FA (feeder automation) system of 10kV-carrier communication
US9118219B2 (en) 2011-07-07 2015-08-25 Landis+Gyr Innovations, Inc. Methods and systems for determining an association between nodes and phases via a smart grid
US20130013232A1 (en) 2011-07-08 2013-01-10 Nawal Kishor Parwal System and method for use in electric power distribution systems
CN103650442B (en) * 2011-07-14 2017-07-11 领特德国有限公司 For single-input single-output and the detection frame of multiple-input and multiple-output
US8712711B2 (en) 2011-07-21 2014-04-29 Cisco Technology, Inc. Identification of electrical grid phase information for end-points in a grid network
WO2013030937A1 (en) 2011-08-29 2013-03-07 株式会社日立製作所 Regional electric power control system and regional electric power control method
EP2566125A1 (en) 2011-08-30 2013-03-06 Nagravision S.A. System and method to securely report and monitor utility consumptions within a communication network
US8872667B2 (en) 2011-09-13 2014-10-28 International Business Machines Corporation Fault isolation and service restoration in an electric grid
US10275840B2 (en) 2011-10-04 2019-04-30 Electro Industries/Gauge Tech Systems and methods for collecting, analyzing, billing, and reporting data from intelligent electronic devices
CN102508950B (en) * 2011-10-14 2013-12-11 广东电网公司电力科学研究院 Regional dispatching automatic system and method for communication between regional dispatching automatic system and remote monitoring diagnosis centre
IN2014CN02741A (en) 2011-10-14 2015-07-03 Carbontrack Pty Ltd
BRPI1105842B1 (en) 2011-11-03 2016-04-26 Inácio Loiola Pereira Campos secondary distribution network control, measurement and monitoring system and process with detection of fraud and theft of electricity
CN102509159B (en) * 2011-11-09 2015-06-24 中国电力科学研究院 Electrical-information-acquisition-system-based theoretical line loss estimation method for distribution network
US8995280B2 (en) * 2011-11-11 2015-03-31 Stmicroelectronics, Inc. System and method for an energy efficient network adapter
JP5530996B2 (en) 2011-11-15 2014-06-25 株式会社日立製作所 Distribution network communication system, communication path setting apparatus and method
US9418045B2 (en) 2011-12-12 2016-08-16 Mbh Consulting Ltd. Systems, apparatus and methods for quantifying and identifying diversion of electrical energy
US8983784B2 (en) 2011-12-16 2015-03-17 Base N Corporation Smartgrid energy-usage-data storage and presentation systems, devices, protocol, and processes including a storage distribution process and protocol
US8711995B2 (en) 2011-12-22 2014-04-29 Landis+ Gyr Technologies, LLC Powerline communication receiver
US8737555B2 (en) * 2011-12-22 2014-05-27 Landis+Gyr Technologies, Llc Digital signal processing for PLC communications having communication frequencies
US20130194975A1 (en) 2012-01-26 2013-08-01 Texas Instruments Incorporated Switch Table Update using Demotion Command in PRIME
US9112381B2 (en) 2012-01-31 2015-08-18 The Boeing Company Method and apparatus for managing the distribution of electrical energy in a power distribution grid
CN102593750A (en) * 2012-02-20 2012-07-18 萧山供电局 Distribution line inspection system
US20130257452A1 (en) 2012-03-29 2013-10-03 Electronic Technology, Inc. Systems for monitoring data from points along voltage transmission lines
US10938207B2 (en) 2012-04-13 2021-03-02 Virtual Electric Inc. Method and apparatus to form a virtual power generation collective from a distributed network of local generation facilities
US20120266209A1 (en) 2012-06-11 2012-10-18 David Jeffrey Gooding Method of Secure Electric Power Grid Operations Using Common Cyber Security Services
WO2014006662A1 (en) 2012-07-06 2014-01-09 Mitsubishi Heavy Industries, Ltd. Method for diagnosing an electric device
WO2014019055A1 (en) 2012-07-31 2014-02-06 British Columbia Hydro And Power Authority Method for identifying a system anomaly in a power distribution system
US20140062719A1 (en) 2012-08-29 2014-03-06 Qualcomm Incorporated Using smart meters as reliable crowd-sourcing agents
KR20150074046A (en) 2012-10-17 2015-07-01 이카노스 커뮤니케이션스, 인크. Method and apparatus for sensing noise signals in a wireline communications environment
TWI461013B (en) 2012-10-30 2014-11-11 Inst Information Industry Data processing apparatus and data processing method thereof for use in power line communications
US10354520B2 (en) 2012-12-17 2019-07-16 Itron, Inc. Power line communication over disconnected service lines
US20140167735A1 (en) 2012-12-19 2014-06-19 Elster Solutions, Llc Identifying phase connections in an electric distribution system
CN105027456B (en) * 2012-12-21 2017-07-28 萨格姆康姆能源和电信公司 Method and apparatus for determining the phase that receiver apparatus is connected in polyphase electric power supply system
US20140191568A1 (en) 2013-01-04 2014-07-10 Mojo Mobility, Inc. System and method for powering or charging multiple receivers wirelessly with a power transmitter
US10097240B2 (en) * 2013-02-19 2018-10-09 Astrolink International, Llc System and method for inferring schematic and topological properties of an electrical distribution grid
US9945889B2 (en) 2013-02-19 2018-04-17 Mitsubishi Electric Research Laboratories, Inc. Method for detecting power theft in a power distribution system
US9917442B2 (en) 2013-03-13 2018-03-13 Prolucid Technologies Inc. Distributed micro-grid controller
US9785173B2 (en) 2013-03-15 2017-10-10 General Electric Company Wireless communication systems and methods for intelligent electronic devices
US9342288B2 (en) 2013-05-31 2016-05-17 Itron, Inc. Surfacing cross platform applications
US9438312B2 (en) 2013-06-06 2016-09-06 Astrolink International Llc System and method for inferring schematic relationships between load points and service transformers
CN104243143B (en) 2013-06-08 2017-03-29 科大国盾量子技术股份有限公司 A kind of mobile secret communication method based on quantum key distribution network
AU2014277951B2 (en) 2013-06-13 2018-04-12 Dominion Energy Technologies, Inc. Inferring feeder and phase powering a transmitter
US10001514B2 (en) 2013-06-13 2018-06-19 Astrolink International Llc System and method for detecting and localizing non-technical losses in an electrical power distribution grid
JP6122746B2 (en) 2013-09-20 2017-04-26 株式会社東芝 Power conversion device, device detection method and program
CA2926423C (en) 2013-10-07 2022-05-24 Google Inc. Automated crowdsourced power outage identification and staggering of hvac system restarts
KR101761207B1 (en) 2013-12-19 2017-07-25 엘에스산전 주식회사 Apparatus for power line communication
US11079417B2 (en) 2014-02-25 2021-08-03 Itron, Inc. Detection of electric power diversion
US9866012B2 (en) 2014-05-02 2018-01-09 Maple Microsystems Inc. Method and system for reporting faults and control in an electrical power grid
EP3748469A1 (en) 2014-06-23 2020-12-09 Gridbridge, Inc. Highly flexible, electrical distribution grid edge energy manager and router
WO2016011007A1 (en) 2014-07-17 2016-01-21 3M Innovative Properties Company Systems and methods for maximizing expected utility of signal injection test patterns in utility grids
CN107005273B (en) 2014-10-30 2021-01-01 艾斯通林克国际有限责任公司 System and method for allocating time slots and resolving time slot conflicts in a power distribution grid
WO2016070139A1 (en) 2014-10-30 2016-05-06 Hansell Jerritt Harold System, method and apparatus for grid location
AU2015358448B2 (en) 2014-12-03 2019-10-03 Dominion Energy Technologies, Inc. Bi-directional communications on an electrical secondary networked distribution system
US10330812B1 (en) 2015-03-16 2019-06-25 Elintrix Identifying schematic and topological properties of an electrical grid through analysis of directional relationships of electrical currents
ES2596662B1 (en) 2015-07-07 2017-05-12 Estabanell Y Pahisa Energia, S.A. ELECTRICAL DISTRIBUTION NETWORK

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6373399B1 (en) * 1990-02-15 2002-04-16 Itron, Inc. Wide area communications network for remote data generating stations
US20050017848A1 (en) * 2003-07-24 2005-01-27 Hunt Technologies, Inc. Endpoint receiver system
US20080312851A1 (en) * 2004-10-20 2008-12-18 Electro Industries/Gauge Tech. Portable Power Quality Analyzer with Networking Capabilities
US20120265355A1 (en) * 2011-04-15 2012-10-18 Power Tagging Technologies, Inc. System and method for single and multizonal optimization of utility services delivery and utilization
US20120310558A1 (en) * 2011-05-31 2012-12-06 Cisco Technology, Inc. Layered and distributed grid-specific network services
US20130034086A1 (en) * 2011-08-03 2013-02-07 Power Tagging Technologies, Inc. System and methods for synchronizing edge devices on channels without carrier sense

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ALBERTO SENDIN ET AL.: "Enhanced Operation of Electricity Distribution Grids Through Smart Metering PLC Network Monitoring, Analysis and Grid Conditioning", ENERGIES, SWITZERLAND, vol. 6, no. 1, 2013, pages 539 - 556, XP055245801, DOI: doi:10.3390/en6010539
See also references of EP2959559A4

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732021A (en) * 2015-03-17 2015-06-24 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation
CN104732021B (en) * 2015-03-17 2017-05-17 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation
US11181568B2 (en) 2016-07-14 2021-11-23 HYDRO-QUéBEC Detection of anomalies in an electrical network

Also Published As

Publication number Publication date
CU20150088A7 (en) 2016-02-29
MX359835B (en) 2018-10-12
CN105229886A (en) 2016-01-06
CN105229969A (en) 2016-01-06
WO2014130363A1 (en) 2014-08-28
ZA201506202B (en) 2017-11-29
CN105210253A (en) 2015-12-30
EP3327938B1 (en) 2019-05-15
AU2014219246B2 (en) 2017-12-14
KR20160006160A (en) 2016-01-18
EP2959640A4 (en) 2017-02-15
MX353771B (en) 2018-01-29
EP3327938A1 (en) 2018-05-30
CL2015002323A1 (en) 2016-06-10
EP3229201A1 (en) 2017-10-11
MX2015010681A (en) 2016-04-04
CA2909483A1 (en) 2014-08-28
JP2016519555A (en) 2016-06-30
EP2959559A4 (en) 2016-06-22
AU2014219247B2 (en) 2018-04-26
EP2959640A1 (en) 2015-12-30
US20200186193A1 (en) 2020-06-11
CA2901607A1 (en) 2014-08-28
EP3229201B1 (en) 2018-12-26
ZA201506111B (en) 2017-03-29
EP2959560A1 (en) 2015-12-30
CA2901608A1 (en) 2014-08-28
EP2959560A4 (en) 2017-02-15
MX2015010689A (en) 2016-06-15
US20160285511A1 (en) 2016-09-29
BR112015019850A2 (en) 2017-08-22
US10554257B2 (en) 2020-02-04
IL240610A0 (en) 2015-10-29
KR20160006161A (en) 2016-01-18
US20160204991A1 (en) 2016-07-14
CL2015002322A1 (en) 2016-06-10
AU2014219244A1 (en) 2015-09-10
US10097240B2 (en) 2018-10-09
AU2014219246A1 (en) 2015-09-10
US20140236365A1 (en) 2014-08-21
JP2016512678A (en) 2016-04-28
CU20150087A7 (en) 2016-01-29
BR112015019857A2 (en) 2017-08-22
EP2959559B1 (en) 2017-08-23
IL240608A0 (en) 2015-10-29
WO2014130365A1 (en) 2014-08-28
AU2017279752B2 (en) 2019-05-02
EP3312971B1 (en) 2019-04-10
EP2959559A1 (en) 2015-12-30
US20140233662A1 (en) 2014-08-21
EP3312971A1 (en) 2018-04-25
KR20160006159A (en) 2016-01-18
MX2015010688A (en) 2016-06-14
US10541724B2 (en) 2020-01-21
ZA201506112B (en) 2017-03-29
IL240609A0 (en) 2015-10-29
EP2959640B1 (en) 2018-04-11
JP2016512019A (en) 2016-04-21
BR112015019855A2 (en) 2017-08-22
US20140233620A1 (en) 2014-08-21
AU2017279752A1 (en) 2018-01-25
JP6301967B2 (en) 2018-03-28
AU2014219247A1 (en) 2015-09-10

Similar Documents

Publication Publication Date Title
US20200186193A1 (en) System and method for inferring schematic and topological properties of an electrical distribution grid
US10079765B2 (en) System and methods for assigning slots and resolving slot conflicts in an electrical distribution grid
US20160124421A1 (en) System, method, and apparatus for grid location

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201480009551.2

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14754343

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2909483

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 240610

Country of ref document: IL

WWE Wipo information: entry into national phase

Ref document number: P1033/2015

Country of ref document: AE

Ref document number: MX/A/2015/010689

Country of ref document: MX

ENP Entry into the national phase

Ref document number: 2015558889

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2014219247

Country of ref document: AU

Date of ref document: 20140214

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2014754343

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2014754343

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20157025873

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: NC2017/0010584

Country of ref document: CO

Ref document number: 15222367

Country of ref document: CO

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112015019855

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112015019855

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20150818