WO2014119420A1 - 機器管理システム、機器管理装置及び機器管理方法 - Google Patents
機器管理システム、機器管理装置及び機器管理方法 Download PDFInfo
- Publication number
- WO2014119420A1 WO2014119420A1 PCT/JP2014/051059 JP2014051059W WO2014119420A1 WO 2014119420 A1 WO2014119420 A1 WO 2014119420A1 JP 2014051059 W JP2014051059 W JP 2014051059W WO 2014119420 A1 WO2014119420 A1 WO 2014119420A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- predetermined
- measurement value
- control unit
- value
- reference value
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00034—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/80—Services using short range communication, e.g. near-field communication [NFC], radio-frequency identification [RFID] or low energy communication
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
Definitions
- the present invention relates to a device management system, a device management apparatus, and a device management method for managing devices provided to grid power consumers.
- HEMS Home Energy Management System
- the device management apparatus monitors a numerical value (for example, power consumption) indicating the operation state of the device and determines whether there is an abnormality in the device.
- a numerical value for example, power consumption
- the device management apparatus uses the power consumption of the device described in the manufacturer's catalog as a reference value, and based on the comparison result between the measured power consumption value and the reference value, whether there is an abnormality in the device (For example, Patent Document 1).
- the measured value of the power consumption of the device may deviate from the reference value described in the catalog or the like.
- the device management apparatus uses a reference value described in a catalog or the like, there is a possibility that an abnormality of the device cannot be accurately detected.
- an object of the present invention is to provide a device management system, a device management apparatus, and a device management method that can accurately detect a device abnormality.
- the device management system includes a device management apparatus that manages devices provided to consumers.
- the device management apparatus includes a first measurement value indicating an operation state of the device at a first timing, and at least one second measurement indicating an operation state of the device at a timing prior to the first timing.
- a first control unit for acquiring a value; The first control unit uses the second measurement value to calculate a first reference value indicating a reference of the operation state of the device, and the first control unit calculates the first measurement value. And whether or not the device is abnormal is determined based on a comparison result between the first reference value and the first reference value.
- the first control unit calculates the first reference value for each operating condition of the device, and the first measured value causes the device to operate under a predetermined operating condition.
- the first control unit based on a comparison result between the first measurement value and the first reference value corresponding to the predetermined operating condition, Determine if there is an equipment malfunction.
- the information processing apparatus further includes a higher-level management device that manages a plurality of device management devices, wherein the higher-level management device performs a second operation on each of the plurality of devices managed by any of the plurality of device management devices.
- a second control unit that acquires a third measurement value indicating an operation state at a timing and at least one fourth measurement value indicating an operation state at a timing prior to the second timing;
- the second control unit uses the fourth measurement value for a device having the same device type among the plurality of devices, and a second reference value indicating a reference of an operation state for each device type of the plurality of devices.
- the second control unit calculates the third measurement value for a predetermined device included in the plurality of devices and the second reference value corresponding to the device type of the predetermined device. Based on comparison results It determines the presence or absence of abnormality of the predetermined device.
- the second control unit calculates the second reference value for each operating condition of the plurality of devices, and the third measurement value for the predetermined device is the predetermined value.
- the second control unit determines that the third measurement value for the predetermined device and the device type of the predetermined device Based on the comparison result with the second reference value corresponding to the predetermined operating condition, the presence / absence of abnormality of the predetermined device is determined.
- the second control unit calculates the second reference value for each operating condition of the plurality of devices and for each installation environment of the plurality of devices, and When the third measurement value is a value measured when the predetermined device is operated according to a predetermined operation condition in a predetermined installation environment, the second control unit Based on the comparison result between the third measurement value and the second reference value corresponding to the device type of the predetermined device, the predetermined operating condition, and the predetermined installation environment, an abnormality of the predetermined device The presence or absence of is determined.
- the third measured value for the predetermined device is a value measured when the predetermined device is operated according to the predetermined operating condition in the predetermined installation environment.
- the second control unit includes the second measurement value corresponding to the third measurement value of the predetermined device, the device type of the predetermined device, the predetermined operating condition, and the predetermined installation environment. When the difference from the value exceeds the threshold value, it is determined that the predetermined device has an abnormality.
- the device management apparatus manages devices provided to consumers.
- the device management apparatus acquires a first measurement value indicating the operation state of the device at a predetermined timing and at least one second measurement value indicating the operation state of the device at a timing prior to the predetermined timing.
- a first control unit is provided.
- the first control unit uses the second measurement value to calculate a first reference value indicating a reference of the operation state of the device, and the first control unit calculates the first measurement value. And whether or not the device is abnormal is determined based on a comparison result between the first reference value and the first reference value.
- the device management method is a device management method in a device management apparatus that manages devices provided to consumers.
- the device management method acquires a first measurement value indicating an operation state of the device at a predetermined timing and at least one second measurement value indicating an operation state of the device at a timing prior to the predetermined timing.
- a step of calculating a first reference value indicating a reference of an operating state of the device using the second measured value, and a comparison result between the first measured value and the first reference value And determining whether or not there is an abnormality in the device.
- the present invention it is possible to provide a device management system, a device management apparatus, and a device management method that can accurately detect a device abnormality.
- FIG. 1 is a diagram illustrating a device management system according to the present embodiment.
- FIG. 2 is a block diagram showing the EMS according to the present embodiment.
- FIG. 3 is a diagram illustrating a table stored in the storage unit of the EMS according to the present embodiment.
- FIG. 4 is a sequence diagram showing a device management method according to the present embodiment.
- FIG. 5 is a block diagram showing a CEMS according to the first modification.
- FIG. 6 is a diagram illustrating a table stored in the storage unit of the CEMS according to the first modification.
- FIG. 7 is a sequence diagram illustrating a device management method according to the first modification.
- FIG. 8 is a diagram illustrating a table stored in the storage unit of the CEMS according to the second modification.
- FIG. 9 is a diagram illustrating a table stored in the storage unit of the CEMS according to the third modification.
- the device management system includes a device management apparatus that manages devices provided to consumers.
- the device management apparatus acquires a first measurement value indicating an operation state of the device at a predetermined timing and at least one second measurement value indicating an operation state of the device at a timing before the predetermined timing.
- a first control unit is provided.
- the first control unit uses the second measurement value to calculate a first reference value indicating a reference of the operation state of the device, and the first control unit calculates the first measurement value. And whether or not the device is abnormal is determined based on a comparison result between the first reference value and the first reference value.
- the device management system uses the first reference value calculated using the measured value indicating the operation state of the device as a basis for determining whether there is an abnormality in the device. Thereby, the device management system according to the embodiment can accurately detect the abnormality of the device.
- FIG. 1 is a diagram showing a device management system 100 according to the present embodiment.
- the device management system 100 includes a customer 10, a CEMS 20, and a network server 40.
- the consumer 10 receives power supply from the grid 50. Further, the customer 10, the CEMS 20, and the network server 40 are connected by a network 60.
- the customer 10 includes the device 11 and the EMS 30.
- the device 11 includes a distributed power source that outputs generated or accumulated power and a load that consumes the power.
- the distributed power source includes, for example, a PV (solar power generation) device, a fuel cell device such as a SOFC (Solid Oxide Fuel Cell) or PEFC (Polymer Electrolyte Fuel Cell), and a storage battery device.
- the load includes, for example, devices such as a refrigerator, a freezer, lighting, and an air conditioner.
- the EMS 30 is an example of a device management apparatus (Energy Management System) that manages the device 11. There may be one device 11 or a plurality of devices 11. The configuration of the EMS 30 will be described later.
- the customer 10 may be a detached house, a store such as a convenience store or a supermarket, a commercial facility such as a building, or a factory.
- a customer group 10A, a customer group 10B, and a customer group 10C are configured by a plurality of consumers 10.
- the consumer group 10A, the consumer group 10B, and the consumer group 10C are classified geographically, for example.
- the consumer group 10A, the consumer group 10B, and the consumer group 10C may be, for example, an apartment house such as a condominium.
- the CEMS 20 controls interconnection between the plurality of customers 10 and the system 50.
- the CEMS 20 may be referred to as a CEMS (Cluster / Community Energy Management System) in order to manage a plurality of consumers 10. Specifically, the CEMS 20 disconnects between the plurality of customers 10 and the grid 50 at the time of a power failure or the like. On the other hand, the CEMS 20 interconnects the plurality of customers 10 and the grid 50 at the time of power recovery or the like.
- CEMS Cluster / Community Energy Management System
- CEMS 20A and CEMS 20B are provided as CEMS 20.
- the CEMS 20A controls, for example, interconnection between the customer 10 included in the customer group 10A and the grid 50.
- the CEMS 20B controls interconnection between the customer 10 included in the customer group 10B and the grid 50.
- the EMS 30 provided in the customer 10 included in the customer group 10C is connected to the customer 10 and the grid 50. Control the system.
- the network server 40 comprehensively manages the customers 10 included in the customer group 10A, the customer group 10B, and the customer group 10C.
- the network server 40 stores information on the customer 10 acquired from the CEMS 20 or the HEMS 30.
- the system 50 supplies the electric power generated by the power plant to the customer 10 through the substation and the transmission line.
- the network 60 is connected to each device via a signal line.
- the network 60 is, for example, the Internet, a wide area network, a narrow area network, or a mobile phone network.
- FIG. 2 is a block diagram showing the EMS 30 according to the present embodiment.
- FIG. 3 is a diagram illustrating a table stored in the storage unit 33 of the EMS 30 according to the present embodiment.
- the EMS 30 includes a control unit 31, a communication unit 32, a storage unit 33, and a display unit 34.
- the control unit 31 controls the communication unit 32, the storage unit 33, and the display unit 34.
- the control unit 31 acquires information about the device 11.
- the information about the device 11 includes, for example, the identification number of the device 11.
- the control unit 31 uses a format that conforms to a communication protocol such as ECHONET Lite (registered trademark) or Zig Bee (registered trademark). You may acquire information about.
- the control unit 31 may request the device 11 to transmit information about the device 11.
- the control unit 31 acquires a measurement value (hereinafter, a measurement value) indicating the operation state of the device 11.
- the measurement value for the device 11 may be, for example, energy consumption (power consumption or the like) of the device 11 or may be power generated or discharged by the device 11.
- the control unit 31 may acquire a measurement value from the device 11 or may acquire a measurement value from a sensor or the like provided separately from the device 11.
- the control unit 31 may periodically acquire measurement values for the device 11. Alternatively, the control unit 31 may request the device 11 to transmit a measurement value.
- the communication unit 32 transmits and receives various signals to and from the device 11 through a signal line.
- the communication unit 32 receives information about the device 11.
- the control part 31 may control the apparatus 11 using the signal based on communication protocols, such as ECHONET Lite (trademark).
- the communication unit 32 may transmit information about the device 11 to the CEMS 20 via a signal line.
- the storage unit 33 stores information about the device 11 acquired by the control unit 31. Moreover, if the control part 31 acquires the measured value about the apparatus 11, the memory
- the storage unit 33 includes a table that stores information about the device 11.
- the storage unit 33 stores, for example, information about the device 11 (for example, an identification number) and a first reference value for the device 11 described later in association with each other.
- the display unit 34 visualizes and displays various information stored in the EMS 30 by an application.
- the display unit 34 may have an operation unit such as a touch panel. In such a case, the user may input information for controlling the device 11 via the operation unit.
- the control unit 31 acquires a first measurement value indicating the operation state of the device 11 at a predetermined timing and at least one second measurement value indicating the operation state of the device 11 at a timing earlier than the predetermined timing.
- the first measurement value is one of the measurement values for the device 11, and is preferably the latest measurement value at the time of determining whether the device 11 is abnormal.
- the second measurement value is, for example, all the measurement values acquired for the device 11 before the predetermined timing when the first measurement value is measured.
- the control unit 31 uses the second measurement value to calculate a first reference value indicating a reference for the operation state of the device. Specifically, the control unit 31 may calculate an average value of the second measurement values and use the calculated average value as the first reference value. Alternatively, the control unit 31 calculates the average value of the second measurement values after excluding the value determined as an outlier based on the average value and the standard deviation from the second measurement value, The calculated average value may be used as the first reference value. Alternatively, the control unit 31 may classify the second measurement value for each time zone and calculate the first reference value for each time zone. The storage unit 33 stores the first reference value in association with information about the device 11.
- the control unit 31 may calculate the first reference value every time the measurement value for the device 11 is acquired. Alternatively, the control unit 31 may periodically calculate the first reference value.
- control unit 31 compares the first measurement value with the first reference value.
- the control unit 31 determines whether there is an abnormality in the device 11 based on the comparison result between the first measurement value and the first reference value. For example, the control unit 31 determines that there is an abnormality in the device 11 when the difference between the measured value and the first reference value exceeds a threshold value.
- control unit 31 may display a message notifying the abnormality of the device 11 on the display unit 34.
- control unit 31 may transmit a device stop signal for stopping the operation of the device 11 to the device 11 via the communication unit 32.
- control unit 31 may acquire the operating conditions (for example, heating, temperature a1, air volume b1, etc.) of the device 11 together with the measurement value of the device 11.
- storage part 33 memorize
- control unit 31 When the control unit 31 acquires the operation condition of the device 11 together with the measurement value for the device 11, the control unit 31 calculates the first reference value for each operation condition.
- the storage unit 33 stores the first reference value in association with the information about the device 11 and the operation condition.
- FIG. 4 is a sequence diagram showing a device management method according to the present embodiment.
- the EMS 30 stores information about the device 11 (for example, device type).
- the information about the device 11 may be transmitted from the device 11 to the EMS 30 when the device 11 is newly connected to the EMS 30 via the signal line.
- the EMS 30 may request the device 11 to transmit information about the device.
- step S20 the EMS 30 acquires a measurement value for the device 11, and stores the acquired measurement value.
- the EMS 30 may acquire a measurement value from the device 11 or may acquire a measurement value from a sensor or the like provided separately from the device 11.
- the EMS 30 may periodically perform the process of step S20 (for example, every minute), or may perform the process of step S20 when the EMS 30 requests the device 11 to transmit a measurement value.
- step S30 the EMS 30 calculates a first reference value.
- the EMS 30 refers to the stored measurement value, shows the measurement value indicating the operation state of the device 11 at a predetermined timing as the first measurement value, and indicates the operation state of the device 11 at a timing before the predetermined timing. At least one measurement value is set as a second measurement value. The EMS 30 uses the second measurement value to calculate a first reference value indicating a reference for the operation state of the device.
- the process of step S30 may be performed continuously with step S20, or may be performed periodically (for example, every 15 minutes).
- step S40 the EMS 30 compares the first measurement value with the first reference value.
- step S50 the EMS 30 determines whether there is an abnormality in the device 11 based on the comparison result between the first measurement value and the first reference value. If the EMS 30 determines that the device 11 has an abnormality, the EMS 30 performs the process of step S60.
- step S60 the EMS 30 transmits, for example, a device stop signal for stopping the device 11 to the device 11.
- the EMS 30 may display a message notifying the user of the abnormality of the device 11.
- step S20 when the EMS 30 acquires the operation condition together with the measurement value for the device 11, the EMS 30 stores the measurement value for the device 11 for each operation condition.
- Step S30 EMS30 computes the 1st standard value about apparatus 11 for every operating condition.
- the EMS 30 calculates the first reference value using the measurement value for the device 11.
- the EMS 30 updates the first reference value by repeatedly performing the process of step S20. Accordingly, since the EMS 30 uses the first reference value in accordance with the usage status of the device 11 for determining whether there is an abnormality, the EMS 30 can accurately detect the abnormality of the device 11.
- FIG. 5 is a block diagram showing a CEMS 20 according to the first modification.
- FIG. 6 is a diagram illustrating a table stored in the storage unit 23 of the CEMS 20 according to the first modification.
- FIG. 7 is a sequence diagram illustrating a device management method according to the first modification.
- the CEMS 20 includes a control unit 21, a communication unit 22, and a storage unit 23.
- the control unit 21 controls the communication unit 22 and the storage unit 23.
- the control unit 21 acquires information about each of the plurality of devices 11 (hereinafter simply referred to as “device 11”) managed by any of the plurality of EMSs 30.
- Information about the device 11 includes a device type (for example, air conditioning 1).
- the control unit 21 acquires a measurement value indicating an operation state for the device 11 managed by any of the plurality of EMSs 30. Specifically, for the device 11, the control unit 21 obtains a third measurement value indicating an operation state at a predetermined timing and at least one fourth measurement value indicating an operation state at a timing before the predetermined timing. get.
- the third measurement value is one of the measurement values for the device 11, and is preferably the latest measurement value at the time of determining whether the device 11 is abnormal.
- the fourth measurement value is, for example, all the measurement values acquired for the device 11 before the predetermined timing at which the third measurement value is measured.
- the communication unit 22 transmits and receives various signals to and from the EMS 30 via a signal line.
- the communication unit 22 receives information about the device 11 from the EMS 30.
- the communication unit 22 may transmit and receive various signals to and from the network server 40 via the network 60.
- the storage unit 23 stores a measurement value for the device 11 acquired by the control unit 21. That is, when the control unit 21 acquires the measurement value for the device 11, the storage unit 23 stores the measurement value acquired by the control unit 21 together with the measurement value acquired by the control unit 21 in the past.
- the storage unit 23 includes a table that stores information about the device 11.
- the storage unit 23 stores the device type of the device 11 and a second reference value for the device 11 described later in association with each other.
- control unit 21 uses the fourth measurement value for a device having the same device type among the plurality of devices, and a second reference indicating a reference of the operation state for each device type of the plurality of devices. Calculate the value.
- the storage unit 23 stores the second reference value for the device 11 in association with the device type of the device 11.
- the control unit 21 compares the third measurement value for the predetermined device (device 11) included in the plurality of devices with the second reference value corresponding to the device type of the predetermined device. Based on the above, the presence / absence of abnormality of a predetermined device is determined. For example, when the difference between the third measurement value and the second reference value exceeds the threshold value for the device 11, the control unit 31 determines that the device 11 has an abnormality. When it is determined that the device 11 has an abnormality, the control unit 21 notifies the EMS 30 of the abnormality of the device 11.
- FIG. 7 is a sequence diagram illustrating a device management method according to the first modification.
- step S110 the EMS 30 stores information about the device 11.
- step S ⁇ b> 120 the CEMS 20 stores information about the device 11.
- the process of step S120 is performed continuously with the process of step S110, for example.
- step S130 the EMS 30 acquires a measurement value for the device 11, and stores the acquired measurement value.
- step S140 the CEMS 20 acquires a measurement value for the device 11, and stores the acquired measurement value.
- the process of step S140 is performed continuously with the process of step S130, for example.
- step S150 the CEMS 20 calculates a second reference value.
- the CEMS 20 refers to the stored measurement value, and for the device 11 managed by any of the plurality of EMSs 30, the measurement value indicating the operation state at a predetermined timing is set to be higher than the third measurement value and the predetermined timing. At least one measurement value indicating the operating state at the previous timing is set as a fourth measurement value.
- CEMS20 calculates the 2nd reference value which shows the standard of the operation state for every apparatus classification of a plurality of apparatus using the 4th measurement value about the apparatus with the same apparatus classification in a plurality of apparatuses.
- the process of step S150 may be performed continuously with the process of step S140, or may be performed periodically (for example, every 15 minutes).
- step S160 the CEMS 20 compares the third measurement value for the predetermined device included in the plurality of devices with the second reference value corresponding to the device type of the predetermined device.
- step S170 the CEMS 20 determines the presence / absence of abnormality of a predetermined device based on the comparison result in step S160.
- the CEMS 20 determines that there is an abnormality in the predetermined device, the CEMS 20 performs the process of step S180.
- step S180 the CEMS 20 transmits an abnormality detection notification for the predetermined device to the EMS 30 that manages the predetermined device.
- the EMS 30 that has received the abnormality detection notification transmits, for example, a device stop signal for stopping the device 11 to a predetermined device in step S190.
- EMS30 may display the message which notifies a user about the abnormalities about a predetermined apparatus.
- the CEMS 20 acquires measurement values for the devices 11 managed by each EMS 30 from the plurality of EMSs 30. Further, the CEMS 20 calculates the second reference value for each device type and uses it for determining the abnormality of the device 11.
- the CEMS 20 calculates the second reference value for each device type using the measurement values for the device 11 acquired from the plurality of EMSs 30.
- the consumer group (for example, the consumer group 10A and the consumer group 10B) managed by the CEMS 20 is, for example, a geographically classified consumer group or a set of apartments or the like It is a house. Therefore, even if the equipment 11 provided in the customer group managed by the same CEMS 20 is the equipment 11 managed by a different EMS 30, the installation environment (for example, the average temperature or the structure of the building) is similar. It is estimated that there are many cases to do. Therefore, the CEMS 20 calculates the second reference value using a large number of measurement values for devices having similar installation environments and the same device type. Since the CEMS 20 uses the second reference value calculated in this way as a basis for determining whether or not there is an abnormality in the device 11, it is possible to accurately determine the abnormality in the device 11.
- FIG. 8 is a diagram illustrating a table stored in the storage unit 23 of the CEMS 20 according to the second modification.
- the configuration of the CEMS 20 according to Modification 2 is the same as that of the CEMS 20 according to Modification 1 shown in FIG.
- control unit 21 acquires the operation conditions (for example, heating, temperature a1, air volume b1) of the device 11 together with the measurement value of the device 11.
- the storage unit 23 stores a measurement value for the device 11 acquired by the control unit 21. In the second modification, the storage unit 23 stores the measurement value for the device 11 for each device type and each operation condition of the device 11.
- the storage unit 23 includes a table that stores information about the device 11.
- the storage unit 23 stores the device type of the device 11, the operation condition, and the second reference value in association with each other.
- control unit 21 calculates the second reference value for each operating condition of a plurality of devices.
- the storage unit 23 stores the second reference value for the device 11 in association with the device type and the operating condition of the device 11.
- the control unit 21 when the third measurement value for the predetermined device is a value measured when the predetermined device is operated according to the predetermined operation condition, the control unit 21 performs the first measurement for the predetermined device. Based on the comparison result between the measured value 3 and the second reference value corresponding to the device type and the predetermined operation condition of the predetermined device, the presence / absence of abnormality of the predetermined device is determined.
- the CEMS 20 calculates the second reference value in consideration of the operating conditions in addition to the device type of the device 11. Accordingly, the CEMS 20 calculates the second reference value in accordance with the usage status of the device 11. Since the CEMS 20 uses the second reference value calculated in this way as a basis for determining whether or not there is an abnormality in the device 11, it is possible to accurately determine the abnormality in the device 11.
- FIG. 9 is a diagram illustrating a table stored in the storage unit 23 of the CEMS 20 according to the third modification.
- the configuration of the CEMS 20 according to the modification example 3 is the same as that of the CEMS according to the modification example 1 illustrated in FIG.
- the control unit 21 acquires information about the device 11.
- the information about the device 11 includes a device type and an installation environment (for example, a reinforced concrete structure) of the device 11.
- the storage unit 23 stores the measurement value for the device 11 for each device type, for each operation condition, and for each installation environment of the device 11.
- the storage unit 23 includes a table that stores information about the device 11.
- the storage unit 23 stores the device type of the device 11, the operation condition, the installation environment, and the second reference value in association with each other.
- control unit 21 calculates the second reference value for each operating condition and each installation environment of a plurality of devices.
- the storage unit 23 stores the second reference value for the device 11 in association with the device type, the operating condition, and the installation environment of the device 11.
- the control unit 21 Based on the comparison result between the third measurement value for the predetermined device and the second reference value corresponding to the device type, the predetermined operating condition, and the predetermined installation environment of the predetermined device, Determine presence or absence.
- the CEMS 20 calculates the second reference value in consideration of the installation environment in addition to the device type and the operation condition of the device 11. To do. Accordingly, the CEMS 20 calculates the second reference value in accordance with the usage status of the device 11. Since the CEMS 20 uses the second reference value calculated in this way as a basis for determining whether or not there is an abnormality in the device 11, it is possible to accurately determine the abnormality in the device 11.
- the EMS 30 may be a HEMS (Home Energy Management System), a SEMS (Store Energy Management System), or a BEMS (Building Energy Management System). There may be.
- HEMS Home Energy Management System
- SEMS Store Energy Management System
- BEMS Building Energy Management System
- the EMS 30 calculates the first reference value using the measured value (and the operating condition) for the device 11. For example, when the EMS 30 manages a plurality of devices having the same device type, the EMS 30 calculates the second reference value indicating the operation state reference for each device type and determines whether the device 11 is abnormal. Good.
- the CEMS 20 calculates the second reference value using the information about the device 11, the measurement value, and the like, and determines whether the device 11 is abnormal.
- the network server 40 may calculate the second reference value by using the information about the device 11, the measurement value, and the like, and determine whether the device 11 is abnormal.
- the present invention it is possible to provide a device management system, a device management apparatus, and a device management method that can accurately detect a device abnormality.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Telephonic Communication Services (AREA)
Abstract
EMS30は、所定タイミングにおける機器11の運転状態を示す第1の計測値と、所定タイミングよりも前のタイミングにおける機器11の運転状態を示す少なくとも1つの第2の計測値とを取得する制御部31を備える。制御部31は、第2の計測値を用いて、機器11の運転状態の基準を示す第1の基準値を算出し、第1の計測値と第1の基準値との比較結果に基づいて、機器11の異常の有無を判定する。
Description
本発明は、系統電力の需要家に設けられた機器を管理する機器管理システム、機器管理装置及び機器管理方法に関する。
近年、系統電力の需要家において、太陽光発電装置、蓄電池装置、及び燃料電池等の分散電源の導入が進んでいる。また、需要家に設けられた負荷及び分散電源(以下、「機器」という)を管理する機器管理装置が知られている。特に、住宅用の機器管理装置は、HEMS(Home Energy Management System)と称される。
機器管理装置は、機器の運転状態を示す数値(例えば、消費電力)を監視して、機器の異常の有無を判定する。具体的には、機器管理装置は、例えば、メーカーのカタログ等に記載された機器の消費電力を基準値として、消費電力の計測値と基準値との比較結果に基づいて、機器の異常の有無を判定する(例えば、特許文献1)。
しかしながら、機器の使い方はユーザによって異なるため、機器の消費電力の計測値が、カタログ等に記載された基準値と乖離している場合がある。このような場合、機器管理装置が、カタログ等に記載された基準値を用いると、機器の異常を的確に検出できない可能性がある。
そこで、本発明は、機器の異常を的確に検出できる機器管理システム、機器管理装置及び機器管理方法を提供することを目的とする。
第1の特徴に係る機器管理システムは、需要家に設けられた機器を管理する機器管理装置を備える。前記機器管理装置は、第1のタイミングにおける前記機器の運転状態を示す第1の計測値と、前記第1のタイミングよりも前のタイミングにおける前記機器の運転状態を示す少なくとも1つの第2の計測値とを取得する第1の制御部を備える。前記第1の制御部は、前記第2の計測値を用いて、前記機器の運転状態の基準を示す第1の基準値を算出し、前記第1の制御部は、前記第1の計測値と前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定する。
第1の特徴において、前記第1の制御部は、前記第1の基準値を、前記機器の運転条件毎に算出し、前記第1の計測値が、前記機器が所定の運転条件で運転する際に計測された値である場合に、前記第1の制御部は、前記第1の計測値と、前記所定の運転条件に対応する前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定する。
第1の特徴において、複数の機器管理装置を管理する上位管理装置をさらに備え、前記上位管理装置は、前記複数の機器管理装置の何れかによって管理される複数の機器の各々について、第2のタイミングにおける運転状態を示す第3の計測値と、前記第2のタイミングよりも前のタイミングにおける運転状態を示す少なくとも1つの第4の計測値とを取得する第2の制御部を備え、前記第2の制御部は、前記複数の機器の中で機器種別が同じ機器についての前記第4の計測値を用いて、前記複数の機器の機器種別毎の運転状態の基準を示す第2の基準値を算出し、前記第2の制御部は、前記複数の機器に含まれる所定の機器についての前記第3の計測値と、前記所定の機器の機器種別に対応する前記第2の基準値との比較結果に基づいて、前記所定の機器の異常の有無を判定する。
第1の特徴において、前記第2の制御部は、前記第2の基準値を、前記複数の機器の運転条件毎に算出し、前記所定の機器についての前記第3の計測値が、前記所定の機器が所定の運転条件に従って運転する際に計測された値である場合に、前記第2の制御部は、前記所定の機器についての前記第3の計測値と、前記所定の機器の機器種別及び前記所定の運転条件に対応する前記第2の基準値との比較結果に基づいて、前記所定の機器の異常の有無を判定する。
第1の特徴において、前記第2の制御部は、前記第2の基準値を、前記複数の機器の運転条件毎及び前記複数の機器の設置環境毎に算出し、前記所定の機器についての前記第3の計測値が、前記所定の機器が所定の設置環境において、所定の運転条件に従って運転する際に計測された値である場合に、前記第2の制御部は、前記所定の機器についての前記第3の計測値と、前記所定の機器の機器種別、前記所定の運転条件及び前記所定の設置環境に対応する前記第2の基準値との比較結果に基づいて、前記所定の機器の異常の有無を判定する。
第1の特徴において、前記所定の機器についての前記第3の計測値が、前記所定の機器が前記所定の設置環境において、前記所定の運転条件に従って運転する際に計測された値である場合に、前記第2の制御部は、前記所定の機器についての前記第3の計測値と、前記所定の機器の機器種別、前記所定の運転条件及び前記所定の設置環境に対応する前記第2の基準値との差が閾値を上回る場合に、前記所定の機器に異常があると判定する。
第2の特徴に係る機器管理装置は、需要家に設けられた機器を管理する。機器管理装置は、所定タイミングにおける前記機器の運転状態を示す第1の計測値と、前記所定タイミングよりも前のタイミングにおける前記機器の運転状態を示す少なくとも1つの第2の計測値とを取得する第1の制御部を備える。前記第1の制御部は、前記第2の計測値を用いて、前記機器の運転状態の基準を示す第1の基準値を算出し、前記第1の制御部は、前記第1の計測値と前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定する。
第3の特徴に係る機器管理方法は、需要家に設けられた機器を管理する機器管理装置における機器管理方法である。機器管理方法は、所定タイミングにおける前記機器の運転状態を示す第1の計測値と、前記所定タイミングよりも前のタイミングにおける前記機器の運転状態を示す少なくとも1つの第2の計測値とを取得するステップと、前記第2の計測値を用いて、前記機器の運転状態の基準を示す第1の基準値を算出するステップと、前記第1の計測値と前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定するステップとを備える。
本発明によれば、機器の異常を的確に検出できる機器管理システム、機器管理装置及び機器管理方法を提供することができる。
以下において、本発明の実施形態に係る機器管理システム、機器管理装置及び機器管理方法について、図面を参照しながら説明する。なお、以下の図面の記載において、同一又は類似の部分には、同一又は類似の符号を付している。
ただし、図面は模式的なものであり、各寸法の比率などは現実のものとは異なることに留意すべきである。従って、具体的な寸法などは以下の説明を参酌して判断すべきである。また、図面相互間においても互いの寸法の関係や比率が異なる部分が含まれていることは勿論である。
[実施形態の概要]
実施形態に係る機器管理システムは、需要家に設けられた機器を管理する機器管理装置を備える。前記機器管理装置は、所定タイミングにおける前記機器の運転状態を示す第1の計測値と、前記所定タイミングよりも前のタイミングにおける前記機器の運転状態を示す少なくとも1つの第2の計測値とを取得する第1の制御部を備える。前記第1の制御部は、前記第2の計測値を用いて、前記機器の運転状態の基準を示す第1の基準値を算出し、前記第1の制御部は、前記第1の計測値と前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定する。
実施形態に係る機器管理システムは、需要家に設けられた機器を管理する機器管理装置を備える。前記機器管理装置は、所定タイミングにおける前記機器の運転状態を示す第1の計測値と、前記所定タイミングよりも前のタイミングにおける前記機器の運転状態を示す少なくとも1つの第2の計測値とを取得する第1の制御部を備える。前記第1の制御部は、前記第2の計測値を用いて、前記機器の運転状態の基準を示す第1の基準値を算出し、前記第1の制御部は、前記第1の計測値と前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定する。
実施形態に係る機器管理システムは、機器の運転状態を示す計測値を用いて算出した第1の基準値を、機器の異常の有無を判定する際の基礎とする。これによって、実施形態に係る機器管理システムは、機器の異常を的確に検出することができる。
[本実施形態]
(機器管理システム)
以下において、本実施形態に係る機器管理システムについて説明する。図1は、本実施形態に係る機器管理システム100を示す図である。
(機器管理システム)
以下において、本実施形態に係る機器管理システムについて説明する。図1は、本実施形態に係る機器管理システム100を示す図である。
図1に示すように、機器管理システム100は、需要家10と、CEMS20と、ネットワークサーバ40とを有する。需要家10は、系統50から電力の供給を受ける。また、需要家10、CEMS20及びネットワークサーバ40は、ネットワーク60によって接続されている。
本実施形態では、需要家10は、機器11及びEMS30を有する。機器11は、発電又は蓄積した電力を出力する分散電源と、電力を消費する負荷とを含む。分散電源は、例えば、PV(太陽光発電)装置、SOFC(Solid Oxide Fuel Cell)又はPEFC(Polymer Electrolyte Fuel Cell)等の燃料電池装置、及び蓄電池装置などの装置を含む。負荷は、例えば、冷蔵庫、冷凍庫、照明及びエアコンなどの装置を含む。EMS30は、機器11を管理する機器管理装置(Energy Management System)の一例である。機器11は、1つであってもよく、複数であってもよい。EMS30の構成については、後述する。
需要家10は、一戸建ての住宅であってもよく、コンビニエンスストア又はスーパーマーケットなどの店舗であってもよく、ビルなどの商用施設であってもよく、工場であってもよい。
本実施形態では、複数の需要家10によって、需要家群10A、需要家群10B及び需要家群10Cが構成されている。需要家群10A、需要家群10B及び需要家群10Cは、例えば、地理的に分類される。需要家群10A、需要家群10B及び需要家群10Cは、例えば、マンションなどの集合住宅であってもよい。
CEMS20は、複数の需要家10と系統50との間の連系を制御する。CEMS20は、複数の需要家10を管理するため、CEMS(Cluster/Community Energy Management System)と称されることもある。具体的には、CEMS20は、停電時などにおいて、複数の需要家10と系統50との間を解列する。一方で、CEMS20は、復電時などにおいて、複数の需要家10と系統50との間を連系する。
本実施形態では、CEMS20として、CEMS20A及びCEMS20Bが設けられている。CEMS20Aは、例えば、需要家群10Aに含まれる需要家10と系統50との間の連系を制御する。CEMS20Bは、例えば、需要家群10Bに含まれる需要家10と系統50との間の連系を制御する。本実施形態では、需要家群10Cに対応するCEMSは設けられていないため、例えば、需要家群10Cに含まれる需要家10に設けられたEMS30が、需要家10と系統50との間の連系を制御する。
ネットワークサーバ40は、需要家群10A、需要家群10B及び需要家群10Cに含まれる需要家10を統括的に管理する。ネットワークサーバ40は、例えば、CEMS20又はHEMS30から取得した需要家10の情報を記憶する。
系統50は、発電所が発電した電力を、変電所及び送電線等を介して、需要家10に供給する。
ネットワーク60は、信号線を介して各装置に接続される。ネットワーク60は、例えば、インターネット、広域回線網、狭域回線網、又は携帯電話網などである。
(EMSの構成)
以下において、本実施形態に係るEMSについて説明する。図2は、本実施形態に係るEMS30を示すブロック図である。図3は、本実施形態に係るEMS30の記憶部33に記憶されるテーブルを示す図である。
以下において、本実施形態に係るEMSについて説明する。図2は、本実施形態に係るEMS30を示すブロック図である。図3は、本実施形態に係るEMS30の記憶部33に記憶されるテーブルを示す図である。
図2に示すように、EMS30は、制御部31と、通信部32と、記憶部33と、表示部34とを有する。
制御部31は、通信部32と、記憶部33と、表示部34とを制御する。
本実施形態では、制御部31は、機器11についての情報を取得する。機器11についての情報は、例えば、機器11の識別番号を含む。制御部31は、例えば、機器11が信号線を介して新たにEMS30と接続される際に、ECHONET Lite(登録商標)あるいはZig Bee(登録商標)等の通信プロトコルに準拠したフォーマットによって、機器11についての情報を取得してもよい。又は、制御部31は、機器11についての情報の送信を、機器11に対して要求してもよい。
本実施形態では、制御部31は、機器11の運転状態を示す計測値(以下、計測値)を取得する。機器11についての計測値は、例えば、機器11の消費エネルギー(消費電力等)であってもよく、又は、機器11が発電又は放電した電力であってもよい。制御部31は、機器11から計測値を取得してもよく、又は、機器11とは別に設けられたセンサ等から計測値を取得してもよい。制御部31は、機器11についての計測値を、定期的に取得してもよい。又は、制御部31は、機器11に対して計測値の送信を要求してもよい。
通信部32は、機器11との間で信号線を介して各種信号を送受信する。本実施形態では、通信部32は、機器11についての情報を受信する。また、制御部31は、ECHONET Lite(登録商標)等の通信プロトコルに準拠した信号を用いて、機器11を制御してもよい。また、通信部32は、機器11についての情報を、信号線を介してCEMS20に送信してもよい。
記憶部33は、制御部31が取得した機器11についての情報を記憶する。また、制御部31が機器11についての計測値を取得すると、記憶部33は、制御部31が取得した計測値を、過去に制御部31が取得した計測値と併せて記憶する。
図3に示すように、記憶部33は、機器11についての情報を記憶するテーブルを有する。記憶部33は、例えば、機器11についての情報(例えば、識別番号)と、後述する機器11についての第1の基準値とを、関連付けて記憶する。
表示部34は、EMS30に格納された各種情報を、アプリケーションによって可視化して表示する。表示部34は、タッチパネル等の操作部を有してもよい。このようなケースにおいては、ユーザは、機器11を制御するための情報を、操作部を介して入力してもよい。
(異常の有無の判定)
以下、本実施形態に係るEMSによる機器の異常の有無の判定について説明する。
以下、本実施形態に係るEMSによる機器の異常の有無の判定について説明する。
制御部31は、所定タイミングにおける機器11の運転状態を示す第1の計測値と、所定タイミングよりも前のタイミングにおける機器11の運転状態を示す少なくとも1つの第2の計測値とを取得する。具体的には、第1の計測値は、機器11についての計測値の中の1つであり、好ましくは、機器11の異常の有無を判定する時点において、最新の計測値である。第2の計測値は、例えば、第1の計測値が計測された所定タイミングよりも前に、機器11について取得された全ての計測値である。
制御部31は、第2の計測値を用いて、機器の運転状態の基準を示す第1の基準値を算出する。具体的には、制御部31は、第2の計測値の平均値を算出し、算出した平均値を第1の基準値として用いてもよい。又は、制御部31は、第2の計測値の中から、平均値及び標準偏差等に基づいて外れ値と判定された値を除外した上で、第2の計測値の平均値を算出し、算出した平均値を第1の基準値として用いてもよい。又は、制御部31は、第2の計測値を時間帯毎に分類し、第1の基準値を時間帯別に算出してもよい。記憶部33は、第1の基準値を、機器11についての情報と関連付けて記憶する。
制御部31は、機器11についての計測値を取得する度に、第1の基準値を算出してもよい。又は、制御部31は、定期的に第1の基準値を算出してもよい。
本実施形態では、制御部31は、第1の計測値と、第1の基準値とを比較する。制御部31は、第1の計測値と第1の基準値との比較結果に基づいて、機器11の異常の有無を判定する。例えば、制御部31は、計測値と第1の基準値との差が閾値を上回る場合に、機器11に異常があると判定する。
制御部31は、機器11に異常があると判定した場合、表示部34に、機器11の異常を通知するメッセージを表示してもよい。又は、制御部31は、機器11に異常があると判定した場合、機器11の運転を停止させるための機器停止信号を、通信部32を介して、機器11に送信してもよい。
本実施形態において、制御部31は、機器11についての計測値と併せて、機器11の運転条件(例えば、暖房、温度a1、風量b1等)を取得してもよい。このようなケースにおいて、記憶部33は、機器11についての計測値を運転条件毎に記憶する。
制御部31が、機器11についての計測値と併せて機器11の運転条件を取得する場合、制御部31は、第1の基準値を運転条件毎に算出する。記憶部33は、第1の基準値を、機器11についての情報と、運転条件とに関連付けて記憶する。
(機器管理方法)
以下において、本実施形態に係る機器管理方法について説明する。図4は、本実施形態に係る機器管理方法を示すシーケンス図である。
以下において、本実施形態に係る機器管理方法について説明する。図4は、本実施形態に係る機器管理方法を示すシーケンス図である。
ステップS10において、EMS30は、機器11についての情報(例えば、機器種別)を記憶する。ここで、機器11についての情報は、機器11が信号線を介して新たにEMS30と接続される際に、機器11からEMS30へと送信してもよい。又は、EMS30が機器11に対して、機器についての情報の送信を要求してもよい。
ステップS20において、EMS30は、機器11についての計測値を取得し、取得した計測値を記憶する。ここで、EMS30は、機器11から計測値を取得してもよく、又は、機器11とは別に設けられたセンサ等から計測値を取得してもよい。EMS30は、ステップS20の処理を定期的に行ってもよく(例えば、1分毎)、又は、EMS30が機器11に計測値の送信を要求した場合に、ステップS20の処理を行ってもよい。
ステップS30において、EMS30は、第1の基準値を算出する。具体的には、EMS30は、記憶した計測値を参照し、所定タイミングにおける機器11の運転状態を示す計測値を第1の計測値、所定タイミングよりも前のタイミングにおける機器11の運転状態を示す少なくとも1つの計測値を第2の計測値とする。EMS30は、第2の計測値を用いて、機器の運転状態の基準を示す第1の基準値を算出する。ステップS30の処理は、ステップS20と連続して行ってもよく、又は、定期的に行ってもよい(例えば、15分毎)。
ステップS40において、EMS30は、第1の計測値と、第1の基準値とを比較する。ステップS50において、EMS30は、第1の計測値と第1の基準値との比較結果に基づいて、機器11の異常の有無を判定する。EMS30は、機器11に異常があると判定した場合には、ステップS60の処理を行う。
ステップS60において、EMS30は、例えば、機器11を停止させるための機器停止信号を、機器11に送信する。又は、EMS30は、機器11の異常をユーザに通知するメッセージを表示してもよい。
ここで、ステップS20において、EMS30が、機器11についての計測値と併せて、運転条件を取得する場合には、EMS30は、機器11についての計測値を運転条件毎に記憶する。また、ステップS30において、EMS30は、機器11についての第1の基準値を運転条件毎に算出する。
以上説明したように、EMS30は、機器11についての計測値を用いて、第1の基準値を算出する。また、EMS30は、ステップS20の処理を繰り返し行うことにより、第1の基準値を更新する。従って、EMS30は、機器11の使用状況に即した第1の基準値を異常の有無の判定に用いるため、機器11の異常を的確に検出することができる。
[変形例1]
以下において、本実施形態の変形例1に係る機器管理システムについて、本実施形態に係る機器管理システムとの相違点を中心に説明する。図5は、変形例1に係るCEMS20を示すブロック図である。図6は、変形例1に係るCEMS20の記憶部23に記憶されるテーブルを示す図である。図7は、変形例1に係る機器管理方法を示すシーケンス図である。
以下において、本実施形態の変形例1に係る機器管理システムについて、本実施形態に係る機器管理システムとの相違点を中心に説明する。図5は、変形例1に係るCEMS20を示すブロック図である。図6は、変形例1に係るCEMS20の記憶部23に記憶されるテーブルを示す図である。図7は、変形例1に係る機器管理方法を示すシーケンス図である。
図5に示すように、CEMS20は、制御部21と、通信部22と、記憶部23とを有する。
制御部21は、通信部22及び記憶部23を制御する。
変形例1において、制御部21は、複数のEMS30の何れかによって管理される複数の機器11の各々(以下、単に「機器11」という)についての情報を取得する。機器11についての情報は、機器種別(例えば、空調1)を含む。
変形例1において、制御部21は、複数のEMS30の何れかによって管理される機器11について、運転状態を示す計測値を取得する。具体的には、制御部21は、機器11について、所定タイミングにおける運転状態を示す第3の計測値と、所定タイミングよりも前のタイミングにおける運転状態を示す少なくとも1つの第4の計測値とを取得する。第3の計測値は、機器11についての計測値の1つであり、好ましくは、機器11の異常の有無を判定する時点において、最新の計測値である。第4の計測値は、例えば、第3の計測値が計測された所定タイミングよりも前に、機器11について取得された全ての計測値である。
通信部22は、EMS30との間で信号線を介して各種信号を送受信する。本実施形態では、通信部22は、機器11についての情報をEMS30から受信する。また、通信部22は、ネットワークサーバ40との間でネットワーク60を介して各種信号を送受信してもよい。
記憶部23は、制御部21が取得した機器11についての計測値を記憶する。すなわち、制御部21が機器11についての計測値を取得すると、記憶部23は、制御部21が取得した計測値を、過去に制御部21が取得した計測値と併せて記憶する。
図6に示すように、記憶部23は、機器11についての情報を記憶するテーブルを有する。記憶部23は、機器11の機器種別と、後述する機器11についての第2の基準値とを、関連付けて記憶する。
変形例1において、制御部21は、複数の機器の中で機器種別が同じ機器についての第4の計測値を用いて、複数の機器の機器種別毎の運転状態の基準を示す第2の基準値を算出する。記憶部23は、機器11についての第2の基準値を、機器11の機器種別と関連付けて記憶する。
変形例1において、制御部21は、複数の機器に含まれる所定の機器(機器11)についての第3の計測値と、所定の機器の機器種別に対応する第2の基準値との比較結果に基づいて、所定の機器の異常の有無を判定する。例えば、制御部31は、機器11について、第3の計測値と第2の基準値との差が閾値を上回る場合には、機器11に異常があると判定する。制御部21は、機器11に異常があると判定した場合、EMS30に機器11の異常を通知する。
以下において、本実施形態の変形例1に係る機器管理方法について説明する。図7は、変形例1に係る機器管理方法を示すシーケンス図である。
ステップS110において、EMS30は、機器11についての情報を記憶する。次いで、ステップS120において、CEMS20は、機器11についての情報を記憶する。ステップS120の処理は、例えば、ステップS110の処理と連続して行われる。
ステップS130において、EMS30は、機器11についての計測値を取得し、取得した計測値を記憶する。次いで、ステップS140において、CEMS20は、機器11についての計測値を取得し、取得した計測値を記憶する。ステップS140の処理は、例えば、ステップS130の処理と連続して行われる。
ステップS150において、CEMS20は、第2の基準値を算出する。具体的には、CEMS20は、記憶した計測値を参照し、複数のEMS30の何れかによって管理される機器11について、所定タイミングにおける運転状態を示す計測値を第3の計測値、所定タイミングよりも前のタイミングにおける運転状態を示す少なくとも1つの計測値を第4の計測値とする。CEMS20は、複数の機器の中で機器種別が同じ機器についての第4の計測値を用いて、複数の機器の機器種別毎の運転状態の基準を示す第2の基準値を算出する。ステップS150の処理は、ステップS140の処理と連続して行ってもよく、又は、定期的に行ってもよい(例えば、15分毎)。
ステップS160において、CEMS20は、複数の機器に含まれる所定の機器についての第3の計測値と、所定の機器の機器種別に対応する第2の基準値とを比較する。ステップS170において、CEMS20は、ステップS160における比較結果に基づいて、所定の機器の異常の有無を判定する。CEMS20は、所定の機器に異常があると判定した場合には、ステップS180の処理を行う。
ステップS180において、CEMS20は、所定の機器についての異常検出通知を、所定の機器を管理するEMS30に送信する。異常検出通知を受信したEMS30は、ステップS190において、例えば、機器11を停止させるための機器停止信号を、所定の機器に送信する。又は、EMS30は、所定の機器についての異常をユーザに通知するメッセージを表示してもよい。
以上説明したように、本実施形態の変形例1に係る機器管理システムでは、CEMS20は、複数のEMS30から、各EMS30が管理する機器11についての計測値を取得する。また、CEMS20は、機器種別毎に、第2の基準値を算出し、機器11の異常判定に用いる。
CEMS20は、複数のEMS30から取得した機器11についての計測値を用いて、第2の基準値を機器種別毎に算出する。また、前述したように、CEMS20に管理される需要家群(例えば、需要家群10A及び需要家群10B)は、例えば、地理的に分類された需要家群であり、又は、マンションなどの集合住宅である。従って、同じCEMS20に管理される需要家群に設けられた機器11は、異なるEMS30に管理される機器11であっても、設置環境(例えば、平均気温、又は、建造物の構造等)が類似するケースが多いと推測される。従って、CEMS20は、設置環境が類似し、かつ、機器種別が同じ機器についての多数の計測値を用いて第2の基準値を算出する。CEMS20は、このように算出した第2の基準値を、機器11の異常の有無を判断する際の基礎とするため、機器11の異常を的確に判定することができる。
[変形例2]
以下において、本実施形態の変形例2に係る機器管理システムについて、本実施形態の変形例1に係る機器管理システムとの相違点を中心に説明する。図8は、変形例2に係るCEMS20の記憶部23に記憶されるテーブルを示す図である。変形例2に係るCEMS20の構成は、図5に示す変形例1に係るCEMS20と共通であるため、説明を省略する。
以下において、本実施形態の変形例2に係る機器管理システムについて、本実施形態の変形例1に係る機器管理システムとの相違点を中心に説明する。図8は、変形例2に係るCEMS20の記憶部23に記憶されるテーブルを示す図である。変形例2に係るCEMS20の構成は、図5に示す変形例1に係るCEMS20と共通であるため、説明を省略する。
変形例2において、制御部21は、機器11についての計測値と併せて、機器11の運転条件(例えば、暖房、温度a1、風量b1)を取得する。
記憶部23は、制御部21が取得した機器11についての計測値を記憶する。変形例2において、記憶部23は、機器11についての計測値を、機器11の機器種別毎及び運転条件毎に記憶する。
図8に示すように、記憶部23は、機器11についての情報を記憶するテーブルを有する。記憶部23は、機器11の機器種別と、運転条件と、第2の基準値とを、関連付けて記憶する。
変形例2において、制御部21は、第2の基準値を、複数の機器の運転条件毎に算出する。記憶部23は、機器11についての第2の基準値を、機器11の機器種別及び運転条件と関連付けて記憶する。
変形例2において、所定の機器についての第3の計測値が、所定の機器が所定の運転条件に従って運転する際に計測された値である場合に、制御部21は、所定の機器についての第3の計測値と、所定の機器の機器種別及び所定の運転条件に対応する第2の基準値との比較結果に基づいて、所定の機器の異常の有無を判定する。
以上説明したように、本実施形態の変形例2に係る機器管理システムでは、CEMS20は、機器11の機器種別に加えて、さらに運転条件を加味して、第2の基準値を算出する。従って、CEMS20は、より機器11の使用状況に即して第2の基準値を算出する。CEMS20は、このように算出した第2の基準値を、機器11の異常の有無を判断する際の基礎とするため、機器11の異常を的確に判定することができる。
[変形例3]
以下において、本実施形態の変形例3に係る機器管理システムについて、本実施形態の変形例2に係る機器管理システムとの相違点を中心に説明する。図9は、変形例3に係るCEMS20の記憶部23に記憶されるテーブルを示す図である。変形例3に係るCEMS20の構成は、図5に示す変形例1に係るCEMSと共通であるため、説明を省略する。
以下において、本実施形態の変形例3に係る機器管理システムについて、本実施形態の変形例2に係る機器管理システムとの相違点を中心に説明する。図9は、変形例3に係るCEMS20の記憶部23に記憶されるテーブルを示す図である。変形例3に係るCEMS20の構成は、図5に示す変形例1に係るCEMSと共通であるため、説明を省略する。
変形例3において、制御部21は、機器11についての情報を取得する。機器11についての情報は、機器種別と、機器11の設置環境(例えば、鉄筋コンクリート造等)とを含む。
変形例3において、記憶部23は、機器11についての計測値を、機器11の機器種別毎、運転条件毎、及び設置環境毎に記憶する。
図9に示すように、記憶部23は、機器11についての情報を記憶するテーブルを有する。記憶部23は、機器11の機器種別と、運転条件と、設置環境と、第2の基準値とを、関連付けて記憶する。
変形例3において、制御部21は、第2の基準値を、複数の機器の運転条件毎及び設置環境毎に算出する。記憶部23は、機器11についての第2の基準値を、機器11の機器種別、運転条件及び設置環境と関連付けて記憶する。
変形例3において、所定の機器についての第3の計測値が、所定の機器が所定の設置環境において、所定の運転条件に従って運転する際に計測された値である場合に、制御部21は、所定の機器についての第3の計測値と、所定の機器の機器種別、所定の運転条件及び所定の設置環境に対応する第2の基準値との比較結果に基づいて、所定の機器の異常の有無を判定する。
以上説明したように、本実施形態の変形例3に係る機器管理システムでは、CEMS20は、機器11の機器種別及び運転条件に加えて、さらに設置環境を加味して、第2の基準値を算出する。従って、CEMS20は、より機器11の使用状況に即して第2の基準値を算出する。CEMS20は、このように算出した第2の基準値を、機器11の異常の有無を判断する際の基礎とするため、機器11の異常を的確に判定することができる。
[その他の実施形態]
本発明は上述した実施形態によって説明したが、この開示の一部をなす論述及び図面は、この発明を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなろう。
本発明は上述した実施形態によって説明したが、この開示の一部をなす論述及び図面は、この発明を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなろう。
EMS30は、HEMS(Home Energy Management System)であってもよく、SEMS(Store Energy Management System)であってもよく、BEMS(Building Energy Management System)であってもよく、FEMS(Factory Energy Management System)であってもよい。
本実施形態では、EMS30は、機器11についての計測値(及び運転条件)を用いて、第1の基準値を算出した。例えば、EMS30が、機器種別が同じ複数の機器を管理する場合、EMS30は、機器種別毎の運転状態の基準を示す第2の基準値を算出し、機器11の異常の有無を判定してもよい。
本実施形態では、CEMS20が、機器11についての情報及び計測値等を用いて第2の基準値を算出し、機器11の異常の有無を判定した。これに代えて、ネットワークサーバ40が機器11についての情報及び計測値等を用いて第2の基準値を算出し、機器11の異常の有無を判定してもよい。
このように、本発明は、ここでは記載していない様々な実施の形態などを含むことは勿論である。また、上述した実施形態及び変更例は、組み合わせることが可能である。したがって、本発明の技術的範囲は、上述の説明から妥当な請求の範囲に係る発明特定事項によってのみ定められる。
なお、日本国特許出願第2013-014476号(2013年1月29日出願)の全内容が、参照により、本願に組み込まれている。
本発明によれば、機器の異常を的確に検出できる機器管理システム、機器管理装置及び機器管理方法を提供することができる。
Claims (8)
- 需要家に設けられた機器を管理する機器管理装置を備える機器管理システムであって、
前記機器管理装置は、第1のタイミングにおける前記機器の運転状態を示す第1の計測値と、前記第1のタイミングよりも前のタイミングにおける前記機器の運転状態を示す少なくとも1つの第2の計測値とを取得する第1の制御部を備え、
前記第1の制御部は、前記第2の計測値を用いて、前記機器の運転状態の基準を示す第1の基準値を算出し、
前記第1の制御部は、前記第1の計測値と前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定することを特徴とする機器管理システム。 - 前記第1の制御部は、前記第1の基準値を、前記機器の運転条件毎に算出し、
前記第1の計測値が、前記機器が所定の運転条件で運転する際に計測された値である場合に、前記第1の制御部は、前記第1の計測値と、前記所定の運転条件に対応する前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定することを特徴とする請求項1に記載の機器管理システム。 - 複数の機器管理装置を管理する上位管理装置をさらに備え、
前記上位管理装置は、前記複数の機器管理装置の何れかによって管理される複数の機器の各々について、第2のタイミングにおける運転状態を示す第3の計測値と、前記第2のタイミングよりも前のタイミングにおける運転状態を示す少なくとも1つの第4の計測値とを取得する第2の制御部を備え、
前記第2の制御部は、前記複数の機器の中で機器種別が同じ機器についての前記第4の計測値を用いて、前記複数の機器の機器種別毎の運転状態の基準を示す第2の基準値を算出し、
前記第2の制御部は、前記複数の機器に含まれる所定の機器についての前記第3の計測値と、前記所定の機器の機器種別に対応する前記第2の基準値との比較結果に基づいて、前記所定の機器の異常の有無を判定することを特徴とする請求項1に記載の機器管理システム。 - 前記第2の制御部は、前記第2の基準値を、前記複数の機器の運転条件毎に算出し、
前記所定の機器についての前記第3の計測値が、前記所定の機器が所定の運転条件に従って運転する際に計測された値である場合に、前記第2の制御部は、前記所定の機器についての前記第3の計測値と、前記所定の機器の機器種別及び前記所定の運転条件に対応する前記第2の基準値との比較結果に基づいて、前記所定の機器の異常の有無を判定することを特徴とする請求項3に記載の機器管理システム。 - 前記第2の制御部は、前記第2の基準値を、前記複数の機器の運転条件毎及び前記複数の機器の設置環境毎に算出し、
前記所定の機器についての前記第3の計測値が、前記所定の機器が所定の設置環境において、所定の運転条件に従って運転する際に計測された値である場合に、前記第2の制御部は、前記所定の機器についての前記第3の計測値と、前記所定の機器の機器種別、前記所定の運転条件及び前記所定の設置環境に対応する前記第2の基準値との比較結果に基づいて、前記所定の機器の異常の有無を判定することを特徴とする請求項3に記載の機器管理システム。 - 前記所定の機器についての前記第3の計測値が、前記所定の機器が前記所定の設置環境において、前記所定の運転条件に従って運転する際に計測された値である場合に、前記第2の制御部は、前記所定の機器についての前記第3の計測値と、前記所定の機器の機器種別、前記所定の運転条件及び前記所定の設置環境に対応する前記第2の基準値との差が閾値を上回る場合に、前記所定の機器に異常があると判定することを特徴とする請求項5に記載の機器管理システム。
- 需要家に設けられた機器を管理する機器管理装置であって、
所定タイミングにおける前記機器の運転状態を示す第1の計測値と、前記所定タイミングよりも前のタイミングにおける前記機器の運転状態を示す少なくとも1つの第2の計測値とを取得する第1の制御部を備え、
前記第1の制御部は、前記第2の計測値を用いて、前記機器の運転状態の基準を示す第1の基準値を算出し、
前記第1の制御部は、前記第1の計測値と前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定することを特徴とする機器管理装置。 - 需要家に設けられた機器を管理する機器管理装置における機器管理方法であって、
所定タイミングにおける前記機器の運転状態を示す第1の計測値と、前記所定タイミングよりも前のタイミングにおける前記機器の運転状態を示す少なくとも1つの第2の計測値とを取得するステップと、
前記第2の計測値を用いて、前記機器の運転状態の基準を示す第1の基準値を算出するステップと、
前記第1の計測値と前記第1の基準値との比較結果に基づいて、前記機器の異常の有無を判定するステップとを備えることを特徴とする機器管理方法。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP14745484.7A EP2953234A4 (en) | 2013-01-29 | 2014-01-21 | APPLICATION MANAGEMENT SYSTEM, APPLICATION MANAGEMENT DEVICE AND APPLICATION MANAGEMENT PROCEDURE |
US14/763,763 US10012966B2 (en) | 2013-01-29 | 2014-01-21 | Equipment management system, equipment management apparatus, and equipment management method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013-014476 | 2013-01-29 | ||
JP2013014476A JP2014147223A (ja) | 2013-01-29 | 2013-01-29 | 機器管理システム、機器管理装置及び機器管理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014119420A1 true WO2014119420A1 (ja) | 2014-08-07 |
Family
ID=51262135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2014/051059 WO2014119420A1 (ja) | 2013-01-29 | 2014-01-21 | 機器管理システム、機器管理装置及び機器管理方法 |
Country Status (4)
Country | Link |
---|---|
US (1) | US10012966B2 (ja) |
EP (1) | EP2953234A4 (ja) |
JP (2) | JP2014147223A (ja) |
WO (1) | WO2014119420A1 (ja) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017011963A (ja) * | 2015-06-25 | 2017-01-12 | 東芝ライテック株式会社 | 情報処理システム、情報処理方法、及びプログラム |
JP2017017776A (ja) * | 2015-06-26 | 2017-01-19 | 東芝ライテック株式会社 | 電力管理装置、電力管理システム、電力管理方法、及び、プログラム |
JP2017017777A (ja) * | 2015-06-26 | 2017-01-19 | 東芝ライテック株式会社 | 電力管理装置、電力管理システム、及び電力管理方法 |
JP6892748B2 (ja) * | 2016-11-04 | 2021-06-23 | 株式会社奥村組 | 掘削孔の精度管理方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012029536A (ja) * | 2010-07-27 | 2012-02-09 | Toyota Home Kk | 建物の機器制御システム |
JP2012134837A (ja) | 2010-12-22 | 2012-07-12 | Toyota Motor Corp | 住宅用電気機器メンテナンス管理装置及び住宅用電気機器メンテナンスシステム |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6636893B1 (en) * | 1998-09-24 | 2003-10-21 | Itron, Inc. | Web bridged energy management system and method |
US6178362B1 (en) * | 1998-09-24 | 2001-01-23 | Silicon Energy Corp. | Energy management system and method |
JP2005173668A (ja) * | 2003-12-08 | 2005-06-30 | Hitachi Ltd | 生活行動パターンの異常判定システム及びそのための装置 |
US8190395B2 (en) * | 2007-02-12 | 2012-05-29 | Locus Energy, Llc | Comparible diagnostics for renewable energy power systems |
US8172154B1 (en) * | 2007-02-22 | 2012-05-08 | Figley Donald A | Humidity monitoring and alarm system for unattended detection of building moisture management problems |
US8731724B2 (en) * | 2009-06-22 | 2014-05-20 | Johnson Controls Technology Company | Automated fault detection and diagnostics in a building management system |
US8788097B2 (en) * | 2009-06-22 | 2014-07-22 | Johnson Controls Technology Company | Systems and methods for using rule-based fault detection in a building management system |
US9606520B2 (en) * | 2009-06-22 | 2017-03-28 | Johnson Controls Technology Company | Automated fault detection and diagnostics in a building management system |
EP2477308A4 (en) | 2009-09-09 | 2013-12-04 | Panasonic Corp | POWER CONTROL SYSTEM |
US9475359B2 (en) * | 2009-10-06 | 2016-10-25 | Johnson Controls Technology Company | Systems and methods for displaying a hierarchical set of building management system information |
JP5838376B2 (ja) * | 2009-11-06 | 2016-01-06 | パナソニックIpマネジメント株式会社 | 電力監視装置 |
CN102484395A (zh) * | 2010-07-13 | 2012-05-30 | 松下电器产业株式会社 | 电气设备的管理装置及管理方法 |
US8335596B2 (en) * | 2010-07-16 | 2012-12-18 | Verizon Patent And Licensing Inc. | Remote energy management using persistent smart grid network context |
CN103503264B (zh) * | 2011-04-22 | 2016-04-06 | 京瓷株式会社 | 电力控制装置、控制系统及控制方法 |
US8843238B2 (en) * | 2011-09-30 | 2014-09-23 | Johnson Controls Technology Company | Systems and methods for controlling energy use in a building management system using energy budgets |
US9312698B2 (en) * | 2012-12-19 | 2016-04-12 | Robert Bosch Gmbh | System and method for energy distribution |
-
2013
- 2013-01-29 JP JP2013014476A patent/JP2014147223A/ja active Pending
-
2014
- 2014-01-21 US US14/763,763 patent/US10012966B2/en not_active Expired - Fee Related
- 2014-01-21 WO PCT/JP2014/051059 patent/WO2014119420A1/ja active Application Filing
- 2014-01-21 EP EP14745484.7A patent/EP2953234A4/en not_active Withdrawn
-
2018
- 2018-02-05 JP JP2018017994A patent/JP6495494B2/ja not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012029536A (ja) * | 2010-07-27 | 2012-02-09 | Toyota Home Kk | 建物の機器制御システム |
JP2012134837A (ja) | 2010-12-22 | 2012-07-12 | Toyota Motor Corp | 住宅用電気機器メンテナンス管理装置及び住宅用電気機器メンテナンスシステム |
Non-Patent Citations (1)
Title |
---|
See also references of EP2953234A4 |
Also Published As
Publication number | Publication date |
---|---|
US20150370231A1 (en) | 2015-12-24 |
EP2953234A4 (en) | 2016-07-27 |
JP2018085928A (ja) | 2018-05-31 |
EP2953234A1 (en) | 2015-12-09 |
JP6495494B2 (ja) | 2019-04-03 |
JP2014147223A (ja) | 2014-08-14 |
US10012966B2 (en) | 2018-07-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6495494B2 (ja) | 機器管理システム、上位管理装置及び機器管理方法 | |
US9645560B2 (en) | Power controller, control system, and control method | |
US9685822B2 (en) | Management apparatus and management method for electrical appliances | |
US8073558B2 (en) | Critical resource notification system and interface device | |
WO2012111373A1 (ja) | エネルギ消費監視システム、方法、及びコンピュータプログラム | |
EP2903215B1 (en) | Management method, control device, and communication processing device | |
WO2014051039A1 (ja) | 管理システム、管理方法及び機器 | |
EP3200315B1 (en) | Power management device, power management method, and power management system | |
JP5905760B2 (ja) | 制御装置、制御システム、及び制御方法 | |
US20160349734A1 (en) | Operation apparatus and operation method | |
US10084610B2 (en) | Control apparatus and control method | |
JP6263818B2 (ja) | コントローラ、およびそれを用いた機器状態判定システム | |
JP6331073B2 (ja) | 情報処理装置、および情報処理システム | |
JP2017135824A (ja) | 電力消費管理装置、電力消費管理システムおよび電力消費管理プログラム | |
JP5646048B2 (ja) | 系統側制御装置及び方法 | |
JP6199640B2 (ja) | 制御装置、制御システム、分電盤及び制御方法 | |
KR20120087344A (ko) | 체인점 관리 시스템 및 이의 원격 관리 방법 | |
JP6434097B2 (ja) | 制御装置、制御システム、分電盤及び制御方法 | |
US10754315B2 (en) | Management system and management method for transmitting a command including a code value for controlling an apparatus | |
JP6282869B2 (ja) | 表示装置及び表示方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14745484 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14763763 Country of ref document: US |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2014745484 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |