WO2014077600A1 - 빔 포빙을 이용하는 무선 통신 시스템에서 스케줄링 정보를 송수신하는 방법 및 장치 - Google Patents

빔 포빙을 이용하는 무선 통신 시스템에서 스케줄링 정보를 송수신하는 방법 및 장치 Download PDF

Info

Publication number
WO2014077600A1
WO2014077600A1 PCT/KR2013/010346 KR2013010346W WO2014077600A1 WO 2014077600 A1 WO2014077600 A1 WO 2014077600A1 KR 2013010346 W KR2013010346 W KR 2013010346W WO 2014077600 A1 WO2014077600 A1 WO 2014077600A1
Authority
WO
WIPO (PCT)
Prior art keywords
scheduling
base station
channel
terminal
scheduling channel
Prior art date
Application number
PCT/KR2013/010346
Other languages
English (en)
French (fr)
Inventor
정정수
손영문
장영빈
Original Assignee
삼성전자 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성전자 주식회사 filed Critical 삼성전자 주식회사
Priority to EP20185566.5A priority Critical patent/EP3742853B1/en
Priority to JP2015542950A priority patent/JP6266641B2/ja
Priority to CN201380070428.7A priority patent/CN104919874B/zh
Priority to US14/443,036 priority patent/US10237887B2/en
Priority to EP13855409.2A priority patent/EP2922356B1/en
Publication of WO2014077600A1 publication Critical patent/WO2014077600A1/ko
Priority to US16/357,242 priority patent/US10805948B2/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/30Monitoring; Testing of propagation channels
    • H04B17/309Measuring or estimating channel quality parameters
    • H04B17/318Received signal strength
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0032Distributed allocation, i.e. involving a plurality of allocating devices, each making partial allocation
    • H04L5/0035Resource allocation in a cooperative multipoint environment
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0446Resources in time domain, e.g. slots or frames
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/046Wireless resource allocation based on the type of the allocated resource the resource being in the space domain, e.g. beams
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/542Allocation or scheduling criteria for wireless resources based on quality criteria using measured or perceived quality
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/24Cell structures
    • H04W16/28Cell structures using beam steering

Definitions

  • the present invention relates to a method and apparatus for efficiently transmitting and receiving a scheduling and / or control signal (hereinafter, referred to as scheduling information) for a plurality of base stations in a wireless communication system.
  • scheduling information a scheduling and / or control signal
  • a method of providing a high data transmission rate includes a method of providing communication using a wider frequency band and a method of increasing frequency use efficiency.
  • 1 is a diagram illustrating a base station and a terminal for providing beamforming by using an array antenna.
  • the base station 110 uses a plurality of array antennas Array0 and Array1 for each cell (or sector) 101, 103, and 105 to transmit a downlink (Tx) beam 111.
  • the data can be transmitted by changing the direction of.
  • the terminal 130 may receive data while changing the direction of the reception (Rx) beam 131.
  • the base station 110 and the terminal 130 determine the direction of the transmission beam and the direction of the reception beam showing an optimal channel environment among the directions of the various transmission beams and the reception beams. Select to provide data services. This process is equally applicable to an uplink channel for transmitting data from the terminal 130 to the base station 110 as well as a downlink channel for transmitting data from the base station 110 to the terminal 130.
  • FIG 2 is a diagram illustrating an example in which a base station 110 transmits a signal through a transmission beam having a specific beam width in a system for performing communication using the beamforming technique.
  • the base station 110 is installed at a predetermined height 201 from the ground and has a predetermined beam width 203.
  • the beam width 203 of the base station may be defined for each of an elevation angel and an azimuth. 2 also illustrates that the transmission beam of the base station 110 is transmitted in a direction corresponding to a specific elevation angle 205.
  • the azimuth may be understood as an angle in a horizontal direction in which a transmission beam propagates.
  • FIG. 3 is a height 201 in which the base station 110 is installed in the base station 110 installed in the same manner as in FIG. 2 and has a height of 20 m, and the base station 110 has a 5 ° beam for each of an elevation angel and an azimuth.
  • the base station 110 has a 5 ° beam for each of an elevation angel and an azimuth.
  • the number of transmission beams that the base station 110 can transmit and the reception beam of the terminal receiving the transmission beam It is a figure which shows the number of, for example.
  • FIG. 3 when a single sector having 30 ° coverage and 200m coverage is constructed using 96 transmission beams having a 5 ° beam width for each of an elevation angel and an azimuth. It is shown.
  • the terminal 130 forms four reception beams RX1, RX2, RX3, and RX4 to receive the transmission beams transmitted by the base station 110.
  • the azimuth beam width of each reception beam is about 90 degrees.
  • a narrow transmission beam In the system using the beamforming, a narrow transmission beam generally has a high antenna gain, but it is difficult to guarantee communication performance when the transmission / reception beam is out of direction due to the narrow beam width. In addition, if the range of transmission and reception is limited and a reflector or an object that is difficult to transmit is interrupted between the transmission beam and the reception beam, communication may be momentarily interrupted. Such a problem is generally defined as a link fragility problem. As a general method for solving the link instability problem, a method in which one terminal maintains data transmission / reception channels with a plurality of base stations is used.
  • FIG. 4A illustrates an example in which a plurality of base stations maintain a data transmission / reception channel with a terminal in a general beam popping system.
  • the terminal 421 selects one or more neighboring base stations 411, 413, 415, and 417 based on the received signal strength (Cell-0, Cell-4, Cell-5, and Cell-11).
  • FIG. 1 is a diagram illustrating a case in which a single base station group (Serving base station group or Cloud cell) is grouped and a signal of base stations 411, 413, 415, and 417 belonging to the group is periodically measured to maintain a data transmission / reception channel. to be.
  • a single base station group Server base station group or Cloud cell
  • the beamforming system includes a base station 411 (Cell-0) having the strongest signal strength among neighboring base stations 411, 413, 415, and 417 of the terminal 421.
  • a serving base station may be selected and other base stations 413, 415, and 417 (Cell-4, Cell-5, and Cell-11) may be classified as scheduling candidate base stations.
  • the terminal 421 transmits and receives a control signal and data through the base station 411 (Cell-0) in a normal channel situation, and at the same time, the base station 413, 415, 417, which is a scheduling candidate base station (Cell-4, Cell).
  • the signal of the -5, Cell-11 is also periodically measured to maintain a data transmission / reception channel with the corresponding base stations 413, 415, and 417 (Cell-4, Cell-5, and Cell-11).
  • the beam forming system may allow the terminal 421 to be connected to other base stations 413, 415, and 417 belonging to a serving base station group. (Cell-4, Cell-5, Cell-11) can continue to send and receive data.
  • the terminal may generally generate only a limited number of transmit / receive beams at a specific transmit / receive time due to physical space constraints, performance constraints, and price constraints.
  • the terminal 421 forms only one reception beam at every transmission and reception time.
  • the terminal 421 transmits scheduling information for data transmission / reception using one formable reception beam to base stations 411, 413, 415, and 417 belonging to a serving base station group (Cell-0, Cell-4, Cell-5). , Cell-11).
  • the terminal 421 transmits scheduling information to the base stations 411, 413, 415, and 417 (Cell-0, Cell-4). , Cell-5, Cell-11) should receive the scheduling information transmitted at different times using one reception beam.
  • the scheduling information transmission time of each of the base stations 411, 413, 415, and 417 (Cell-0, Cell-4, Cell-5, and Cell-11) belonging to the serving base station group should be defined differently.
  • 421 should determine whether each base station has transmitted scheduling information at each time point. It is generally difficult to define the scheduling time point between the base stations so as not to cause a collision.
  • a specific base station belonging to a serving base station group may be designated and used as a base station for transmitting and receiving scheduling and / or control signals for a corresponding terminal.
  • a base station 411 (Cell-0) serving as a serving base station transmits and receives a scheduling and / or control signal for a corresponding terminal 421.
  • 4B is a diagram illustrating an example in which a terminal receives a data packet using a hybrid automatic retransmit request (HARQ) in a general beam popping system.
  • HARQ hybrid automatic retransmit request
  • the terminal 421 receives scheduling information from the serving base station 411 (Cell-0) in subframe 0, for example, and the serving base station indicated by the scheduling information in the corresponding subframe.
  • 411 Receive the data packet transmitted from (Cell-0).
  • the terminal 421 fails to decode the first data packet. Thereafter, the terminal 421 receives scheduling information from the serving base station 411 (Cell-0) in subframe 3 and receives the first composite retransmission packet from the base station 413 (Cell-5) indicated by the scheduling information. do. Referring to FIG. 4B (C), it is assumed that the terminal 421 also fails to decode the first composite retransmission packet received from the base station 413 (Cell-5). Thereafter, the terminal 421 receives scheduling information from the serving base station 411 (Cell-0) in subframe 7 and receives a second complex retransmission packet from the base station 417 (Cell-7) indicated by the scheduling information. do.
  • a specific base station belonging to a serving base station group is designated and used as a base station that transmits and receives a scheduling and / or control signal for a corresponding terminal
  • scheduling when the link between the base station and the terminal becomes unstable And / or transmission and reception of the control signal itself may be difficult and it may be difficult to continue data communication.
  • the scheduling and / or control signals must be transmitted and received through the serving base station. There is a problem that the performance of the channel is not optimized.
  • the present invention provides a method and apparatus for efficiently transmitting scheduling information through a plurality of base stations in a wireless communication system using beamforming.
  • the present invention also provides a method and apparatus for efficiently receiving scheduling information from a plurality of base stations by a terminal in a wireless communication system using beamforming.
  • a method for receiving scheduling information by a terminal includes: receiving scheduling information from a first base station through a first scheduling channel and cooperating with the first base station; Receiving scheduling information through at least one second scheduling channel using at least one receive beam from at least one second base station.
  • a terminal for receiving scheduling information in a wireless communication system using beamforming includes a receiver for receiving data from a first base station and at least one second base station through a wireless network, and the first base station. Receiving scheduling information through a first scheduling channel from the at least one second base station using at least one receiving beam from at least one second base station cooperating with the first base station; It includes a control unit for controlling.
  • a method for transmitting scheduling information by a base station includes: negotiating scheduling of the terminal with at least one base station cooperating with the base station; Transmitting scheduling information through a predetermined scheduling channel among a first scheduling channel and at least one second scheduling channel, wherein each channel of the first scheduling channel and the at least one second scheduling channel is the terminal. Is set for each reception beam of.
  • a base station for transmitting scheduling information in a wireless communication system using beamforming includes a transceiver for transmitting and receiving data through a wireless network and at least one base station cooperating with the base station for communication. An interface and negotiating scheduling with respect to the at least one base station and the terminal and transmitting scheduling information through a scheduling channel of a first scheduling channel and at least one second scheduling channel according to the negotiation result. And a control unit, wherein each channel of the first scheduling channel and the at least one second scheduling channel is configured for each reception beam of the terminal.
  • FIG. 1 is a diagram illustrating a general beamforming system including a base station and a terminal for providing beamforming using an array antenna;
  • FIG. 2 illustrates an example in which a base station transmits a signal through a transmission beam having a specific beam width in a general beamforming system
  • 3 is a diagram illustrating the number of transmission beams that a base station can transmit in a general beamforming system and the number of reception beams of a terminal receiving the same;
  • 4A illustrates an example in which a plurality of base stations maintains a data transmission / reception channel with a terminal in a general beamforming system
  • 4b illustrates an example in which a terminal receives a data packet using HARQ in a general beamforming system
  • FIG. 5 illustrates an example of a scheduling channel for each reception beam direction of a terminal in a wireless communication system using beamforming according to an embodiment of the present invention
  • FIG. 6 illustrates an example of a frame structure for transmitting and receiving a signal in a wireless communication system using beamforming according to an embodiment of the present invention
  • FIG. 7A and 7B are diagrams illustrating an auxiliary scheduling channel for each reception beam direction of a terminal according to an embodiment of the present invention using the frame structure of FIG. 6;
  • FIG. 8 is a diagram illustrating an example in which different base stations schedule data transmission to a terminal in a sub scheduling channel according to an embodiment of the present invention
  • FIG. 9 is a view showing an example in which a terminal receives a data packet using HARQ in a wireless communication system using beamforming according to an embodiment of the present invention.
  • FIG. 10 is a flowchart illustrating an operation of a terminal for receiving scheduling information through a sub scheduling channel for each reception beam according to an embodiment of the present invention
  • 11 is a flowchart illustrating an operation of a base station for transmitting scheduling information through a secondary scheduling channel for each reception beam proposed by the present invention
  • FIG. 12 is a view showing an example of a frame structure according to another embodiment of the present invention.
  • FIG. 13 is a flowchart illustrating an operation of receiving, by a terminal, scheduling information through a scheduling channel according to another embodiment of the present invention.
  • FIG. 14 is a flowchart illustrating an operation of transmitting, by a base station, scheduling information through a scheduling channel according to another embodiment of the present invention.
  • 16 is a block diagram showing a configuration of a base station according to an embodiment of the present invention.
  • 17 is a block diagram showing the configuration of a terminal according to an embodiment of the present invention.
  • An embodiment of the present invention proposes a method in which a plurality of base stations can efficiently transmit and receive a scheduling and / or control signal (hereinafter, referred to as scheduling information) for one terminal in a system using beamforming.
  • scheduling information a scheduling and / or control signal
  • the sub-scheduling and A method of establishing a control channel (hereinafter, referred to as a secondary scheduling channel) is proposed.
  • the sub-scheduling channel defined for each reception beam direction of the terminal may be transmitted and received using different time, frequency resources, and transmission / reception beams.
  • the scheduling and / or control channel corresponding to an optimal reception beam between the base station and the terminal may be scheduled and controlled. And / or a method of transmitting a control signal.
  • the scheduling and / or control signals are transmitted using a primary scheduling channel. If the base station is not a serving base station, scheduling and / or control is performed through an optimal (primary or secondary) scheduling and control channel.
  • scheduling information A method of transmitting a signal (hereinafter referred to as scheduling information) is proposed.
  • an embodiment of the present invention proposes a method of transmitting a not scheduled indication that a serving base station is not scheduled through a primary scheduling channel when the terminal is not scheduled from any base station at a specific scheduling time.
  • an embodiment of the present invention proposes a method for the terminal to effectively receive the scheduling and / or control signals transmitted from different base stations using the primary scheduling channel and the secondary scheduling channel defined for each receiving beam of the terminal.
  • an embodiment of the present invention proposes a method in which a UE receives a sub scheduling channel defined for each reception beam direction at different time or frequency resources using a reception beam corresponding to the channel.
  • an embodiment of the present invention proposes a method in which the terminal measures the optimal transmission and reception beams for each base station and periodically reports the information to each base station.
  • an embodiment of the present invention proposes a method of omitting reception of a sub scheduling channel when a specific sub scheduling channel of the terminal collides with a data transmission / reception area scheduled to the terminal in terms of time, frequency, and transmission / reception beams. .
  • the present invention proposes a method of omitting the reception of all sub-scheduling channels when the terminal receives the information (Not scheduled indication) that is not scheduled through the primary scheduling channel.
  • An embodiment of the present invention proposes a method in which a plurality of base stations transmit scheduling information to a terminal through a plurality of scheduling channels. Therefore, the primary scheduling channel and the secondary scheduling channel can be understood as meaning that distinguishes scheduling channels transmitted by different base stations. It can also be understood as a primary scheduling channel that plays a major role and a secondary scheduling channel that plays a secondary role according to the role of the scheduling channel. In the following description, transmitting and receiving a scheduling channel is described for convenience, which is understood to transmit and receive scheduling information through the scheduling channel.
  • the terms of the primary scheduling channel and the secondary scheduling channel described in the embodiment of the present invention are for convenience of description, and it should be noted that the terms do not limit the role of the scheduling channel.
  • FIG. 5 is a diagram illustrating a scheduling channel for each reception beam direction of a terminal in a wireless communication system using beamforming according to an embodiment of the present invention.
  • the terminal 521 has four reception beams (RX1 to RX4) 531, 533, 535, and 537 directions, and Sector 1, which is the closest to the base stations, is the terminal 521.
  • This is an example of the case of serving base station 511.
  • the terminal 521 receives the main scheduling channel transmitted by sector 1, which is the serving base station 511, using the reception beam (RX2) 533 that is optimal for sector 1.
  • the terminal 521 receives a sub scheduling channel defined for each reception beam direction by using each of the reception beams RX1 to RX4 531, 533, 535, and 537.
  • the secondary scheduling channel may not be defined separately for the reception beam (RX2) 533 in which the terminal 521 receives the primary scheduling channel.
  • the terminal 521 receives a scheduling and / or control signal transmitted by a base station other than the serving base station (eg, reference numeral 513 in the receiving beam RX2 direction of FIG. 5) through the resource region of the primary scheduling channel. Can be received using (RX2).
  • FIG. 6 is a diagram illustrating an example of a frame structure for transmitting and receiving a signal in a wireless communication system using beamforming according to an embodiment of the present invention.
  • one frame 601 is, for example, 5 ms long and consists of five sub-frames 603.
  • the length of the frame 601 and the number of the sub-frames 603 are merely examples and the embodiment of the present invention is not limited to the embodiment of FIG. 6.
  • Each sub-frame 603 includes a downlink transmission period (611, 613, 615) in which the base station transmits a signal toward the terminal, and an uplink transmission interval in which the terminal transmits a signal toward the base station. (621, 623, 625).
  • a portion of the downlink transmission intervals 611, 613, 615 are used as the scheduling regions 631, 633, 635 for transmitting scheduling information, and also downlink transmission intervals 611, 613, 615.
  • a portion of is used as reference signal regions 651, 653, 655 for transmitting downlink reference signals.
  • FIG. 7A and 7B are diagrams illustrating a sub scheduling channel for each reception beam direction according to an embodiment of the present invention using the frame structure of FIG. 6.
  • each sub-frame 703 includes a downlink transmission section 711 for transmitting signals from the base station to the terminal and an uplink transmission section 721 for transmitting signals from the terminal to the base station. Divided into. A portion of the downlink transmission period 721 is used as a reference signal area 751 for transmitting a downlink reference signal.
  • the primary / second scheduling channel and the region in which the primary / second scheduling channel is transmitted will be given the same reference numeral for convenience of description.
  • a scheduling channel that is, scheduling areas 631, 633, and 635
  • the embodiments of FIGS. 7A and 7B transmit and receive general control signals in addition to the scheduling channel. And the scheduling and / or control signal can be transmitted using the resource region.
  • the scheduling region 731 of FIG. 7A is a region in which a scheduling channel used by a serving base station to transmit scheduling information to a terminal in a frame structure is transmitted.
  • this channel (region) is defined as a primary scheduling channel.
  • the terminal receives the primary scheduling channel 731 using a reception beam that is optimal for the serving base station.
  • the optimal reception beam of the terminal for the serving base station is, for example, RX beam 253 3 in the embodiment of FIG. 5.
  • the terminal receives the main scheduling channel 731 by using the reception beam No. 533.
  • the sub scheduling channels 733, 735, and 737 are set for each reception beam direction of the terminal.
  • reference numeral 733 denotes an area in which a sub-scheduling channel for the reception beam 1 of the terminal is transmitted
  • reference numeral 735 denotes an area in which a sub-scheduling channel for the reception beam 3 of the terminal is transmitted
  • Reference numeral 737 denotes an area in which the sub scheduling channel for the reception beam 4 of the terminal is transmitted.
  • the terminal receives sub scheduling channels 733, 735, and 737 defined for each reception beam direction by using a reception beam corresponding to each scheduling channel, and is transmitted by different base stations around the terminal.
  • a scheduling and / or control signal can be effectively received.
  • 7A illustrates an example in which a sub scheduling channel is not separately defined for the reception beam RX2 in which the UE receives the main scheduling channel 731.
  • the terminal may receive a scheduling channel transmitted by a base station other than the serving base station through the resource region of the primary scheduling channel 731 using the reception beam RX2.
  • FIG. 7A illustrates an example in which sub-scheduling channels 733, 735, and 737 for each reception beam of a terminal are configured at different time points using the same frequency resource.
  • the sub-scheduling channels 733, 735, and 737 may be configured in different time points. It may be set on different frequency resources.
  • the secondary scheduling channel for each reception beam of the terminal may be set in consideration of the channel states of the serving base station group (or cloud cell) and the base station belonging to the serving base station group.
  • the secondary scheduling channel for each reception beam of the UE determines an optimal reception beam and its reception performance measured for each of the base stations (serving base station or scheduling candidate base stations) belonging to the serving base station group. Based on this, the secondary scheduling channel may be set more preferentially on time and frequency resources with respect to a reception beam in which scheduling information transmitted from a base station having better reception performance is received.
  • FIG. 7B is a diagram illustrating another example in which a sub-scheduling channel is set in consideration of channel states of base stations belonging to a serving base station group of the terminal with respect to a terminal existing at a location illustrated in FIG. 5.
  • the same reference numerals as in FIG. 7A are the same, and thus detailed descriptions thereof will be omitted.
  • the serving base station group of the terminal is composed of sector 1, sector 5, sector 9 and sector 12 which exist in the periphery of the terminal, and the strength of the signal received from each base station is sector 1, sector 9, sector 5, Assume that sector 12 is in order.
  • sector 1 has the strongest received signal strength when received using receive beam 2 (RX2) 533
  • sector 9 receives receive beam 4 (RX4) 537
  • sector 5 receives receive beam 3 (RX3) ( 535
  • Sector 12 assumes that the strength of the received signal is the strongest when received using the reception beam 1 (RX1) (531).
  • the base station 511 of sector 1 having the best signal reception performance may be selected as the serving base station for the terminal, and in this case, the base stations of the remaining sectors 5, 9, and 12 become scheduling candidate base stations.
  • the terminal receives the primary scheduling channel using the reception beam 2 (RX2) 533 that is optimal for the base station 511 of sector 1, which is the serving base station, and the remaining reception beam 1, reception beam 3, and reception beam.
  • a sub scheduling channel set for each reception beam is received using 4 (531, 535, 537).
  • the sub scheduling channel may be more preferentially set on the time and frequency resources for the reception beam in which the scheduling information transmitted from the base station having better reception performance is received.
  • the embodiment of FIG. 7B shows a sub-scheduling channel for reception beam 4 (RX4) 537, which is an optimal reception beam for sector 9 and sector 9 having the strongest reception signal in addition to the serving base station of the terminal, to another reception beam.
  • RX4 reception beam 4
  • An example of setting in the area of reference numeral 743 more preferentially in time than the secondary scheduling channel is shown.
  • the embodiment of FIG. 7B shows a subscheduling channel for the reception beam 3, which is an optimal reception beam for sectors 5 and 5, with a strong reception signal next to sector 9, and a subscheduling channel for the reception beam 4, followed by the region of reference numeral 745.
  • FIG. An example of setting the sub scheduling channel for the reception beam 1 in the area of the reference numeral 747 is shown.
  • the base station when the base station transmits a scheduling and / or control signal to the terminal, the base station corresponds to an optimal reception beam between the base station and the terminal.
  • the scheduling and / or control signal may be transmitted through the scheduling channel. If the base station is the serving base station of the terminal, the scheduling and / or control signal is transmitted using the primary scheduling channel, if the base station is not the serving base station, the scheduling and / or control signal is transmitted through the optimal (primary or secondary) scheduling channel can do.
  • the terminal may use scheduling and / or transmissions transmitted from different base stations by using a primary scheduling channel and a secondary scheduling channel defined for each reception beam of the terminal.
  • the control signal can be received.
  • the UE measures an optimal transmit / receive beam for each of the base stations belonging to the serving base station group and periodically reports the information to each base station.
  • the UE may skip reception of the corresponding sub-scheduling channel.
  • FIG. 8 is a diagram illustrating an example in which different base stations schedule data transmission to a terminal in a sub scheduling channel according to an embodiment of the present invention.
  • a sub scheduling channel is configured as in the example of FIG. 7B.
  • the terminal has received scheduling information for data transmission / reception from the serving base station through the main scheduling channel 831.
  • the scheduling information received through the primary scheduling channel 831 includes information 831a necessary to receive data in the region 833.
  • the terminal receives data from a serving base station in the area 833 according to the scheduling information received in the information 831a, and receives the reception beam 4 RX4 overlapping the area 833 (reference numeral 743 of FIG. 7B). Omit the reception of the secondary scheduling channel.
  • the terminal may continue to receive the secondary scheduling channel in the remaining resource region.
  • the terminal receives scheduling information for data transmission and reception from a base station other than the serving base station through the region 835 of the sub scheduling channel for the reception beam 3 (RX3) (see reference numeral 745 of FIG. 7B). can do. It is assumed that the scheduling information received in the area 835 includes scheduling information 835a necessary for receiving data in the area 837. In this case, the terminal receives data in the area 837 according to the scheduling information 835a received in the area 835, and omits reception of the sub scheduling channel overlapping with the area 837.
  • FIG. 9 illustrates an example in which a UE receives a data packet using HARQ in a beam popping system according to an embodiment of the present invention.
  • the UE uses a primary or secondary scheduling channel to transmit a data packet. Received from the base stations belonging to the serving base station group through the HARQ technique.
  • the terminal 921 performs scheduling information from the serving base station 911 (Cell-0) through a primary scheduling channel in a first subframe among a plurality of subframes constituting the frame. Receive the data packet according to the scheduling information.
  • the terminal 921 fails to decode the first data packet.
  • the terminal 921 receives scheduling information from the base station 913 (Cell-5) through the sub-scheduling channel as shown in FIG. 9B in the second subframe, and according to the scheduling information, the base station 913 ( Receive the first composite retransmission packet from Cell-5).
  • the base station 913 Receive the first composite retransmission packet from Cell-5.
  • the terminal 921 it is assumed that the terminal 921 also fails in decoding the first composite retransmission packet. Thereafter, the terminal 921 receives scheduling information from the base station 913 (Cell-7) through the sub-scheduling channel in the third subframe and according to the scheduling information, a second composite from the base station 913 (Cell-5). Receive a retransmission packet.
  • FIG. 10 is a flowchart illustrating an operation of a terminal receiving scheduling information through a sub scheduling channel for each reception beam according to an embodiment of the present invention.
  • the terminal first receives a primary scheduling channel from a serving base station in step 1001.
  • the UE receives the primary scheduling channel using an optimal reception beam in which the signal of the serving base station is most strongly received. Thereafter, the terminal performs operations of steps 1003 to 1009 for each reception beam of the terminal.
  • the terminal includes at least one of time, frequency, and transmit / receive beam resource information of a sub scheduling channel previously set for a reception beam i (where “i” is an index of each reception beam) (hereinafter, “sub scheduling channel”). Resources "), and in step 1005, it is determined whether a resource of the secondary scheduling channel collides with a data transmission / reception resource scheduled to the terminal.
  • the UE If the resource of the secondary scheduling channel for the reception beam i collides with the data transmission / reception resources scheduled for the terminal in step 1005, the UE skips the reception of the corresponding sub scheduling channel and the step 1003 for the next reception beam i + 1. Go to and repeat the subsequent operation.
  • the terminal uses the reception beam i in the resource of the sub scheduling channel determined in step 1003 in step 1007. Receive the secondary scheduling channel.
  • the terminal determines whether the reception operation is completed for all reception beams, and when the reception operation is completed for all reception beams, the reception operation of the scheduling channel ends.
  • step 1011 the process moves to step 1011 to perform the operations of steps 1003 to 1009 for the next reception beam i + 1.
  • the terminal has been described as performing the reception operation on all of the reception beams that can be received, but this is an exemplary embodiment.
  • the secondary scheduling channel is not received.
  • the reception operation of the secondary scheduling channel may be performed on at least one reception beam having a received signal strength equal to or greater than a predetermined value among all reception beams.
  • 11 is a flowchart illustrating an operation of a base station for transmitting scheduling information through a secondary scheduling channel for each reception beam proposed by the present invention.
  • FIG. 11 illustrates an operation performed for one terminal
  • the base station repeats the operation of FIG. 11 for all terminals including the base station as a scheduling candidate in the serving base station group.
  • a base station negotiates scheduling with other base stations included in a serving base station group of the terminal.
  • the negotiation may include a base station to transmit and receive data and scheduling information, data transmission and reception time, resources to be used for data transmission and reception, transmission and reception beams to be used for data transmission and reception, multi-antenna configuration information to be used for data transmission and reception, and the like.
  • the base station determines in step 1103 that the base station transmits scheduling information for the corresponding terminal as a result of the negotiation in step 1101, that is, when the scheduling for the corresponding terminal is determined, the base station serves the serving base station of the corresponding terminal in step 1105. Determine if it is.
  • the base station transmits scheduling information negotiated in step 1101 through a primary scheduling channel in step 1107.
  • the scheduling information may include at least one of data transmission / reception points, resource information for transmitting / receiving data, transmission / reception beam information, and multi-antenna configuration information used for data transmission / reception.
  • the base station determines whether the base station is not the serving base station of the terminal as a result of the determination in step 1105, among the sub-scheduling channels of the terminal in step 1109 corresponds to the optimal sub-scheduling channel that can best receive the signal of the base station
  • the terminal selects based on the reception signal measurement result of the serving base station group periodically reported, and identifies the resource region in which the selected sub scheduling channel is set.
  • the base station transmits scheduling information of the corresponding terminal negotiated in step 1101 in the selected sub scheduling channel and the resource region in which the channel is set.
  • the scheduling information may include at least one of data transmission / reception points, resource information for transmitting / receiving data, transmission / reception beam information, and multi-antenna configuration information used for data transmission / reception.
  • the terminal when the sub scheduling channel is configured for each reception beam of the terminal, when the base stations do not schedule the specific terminal at a specific time or do not transmit a control signal to the terminal, the terminal is unnecessary.
  • the present invention proposes a method of transmitting to the specific terminal an information indicating that the specific terminal is not scheduled through the primary scheduling channel of the serving base station.
  • another embodiment of the present invention proposes a method of omitting reception of all sub-scheduling channels when the UE receives not scheduled indication through the primary scheduling channel.
  • FIG. 12 is a diagram illustrating an example of a frame structure according to another embodiment of the present invention.
  • the basic structure of the frame 1201 shown in FIG. 12 is the same as that of the frame 701 described with reference to FIG. 7A. That is, one frame 1201 is, for example, 5 ms long and consists of five sub-frames 1203. Each sub-frame 1203 includes a downlink transmission section 1211 for transmitting a signal from a base station to a terminal and an uplink transmission section 1221 for transmitting a signal from a terminal to a base station. Divided into.
  • the scheduling area 1231 is an area in which a main scheduling channel used by the base station to transmit scheduling information to the UE is transmitted in a frame structure, and a part of the downlink transmission interval 1221 transmits a downlink reference signal. It is used as the reference signal region 1251 for the purpose.
  • FIG. 12 another embodiment of the present invention for transmitting and receiving information indicating not scheduled indication will be described.
  • the base stations do not schedule a specific terminal at a specific time or do not transmit a control signal to the specific terminal, serving of the specific terminal through the main scheduling channel 1231 of FIG. 12.
  • Not scheduled indication 1231a is transmitted to indicate that the base station has not scheduled the specific terminal.
  • the terminal receiving the information 1231a indicating that the scheduling has not been scheduled through the primary scheduling channel 1231 skips the operation of receiving the secondary scheduling channel in the corresponding subframe.
  • FIG. 13 is a flowchart illustrating an operation of receiving, by a terminal, scheduling information through a scheduling channel according to another embodiment of the present invention.
  • a terminal first receives a primary scheduling channel from a serving base station.
  • the UE receives the primary scheduling channel using an optimal reception beam in which the signal of the serving base station is most strongly received.
  • the UE determines whether it has received information that is not scheduled (ie, not scheduled indication) through the main scheduling channel. If the terminal receives the information that is not scheduled, the terminal then terminates the reception operation of the scheduling channel. If the terminal does not receive the unscheduled information, that is, if the terminal is normally scheduled, the terminal continues to perform the transmission / reception operation of the main / second scheduling channel described with reference to FIG. 9, for example, in step 1305.
  • FIG. 14 is a flowchart illustrating an operation of transmitting, by a base station, scheduling information through a scheduling channel according to another embodiment of the present invention.
  • the base station repeats the operation of FIG. 11 for all terminals that include the base station as a scheduling candidate in the serving base station group.
  • the base station negotiates scheduling with the base stations included in the serving base station group of the terminal in step 1401.
  • the negotiation may include a base station to transmit and receive data and scheduling information, data transmission and reception time, resources to be used for data transmission and reception, transmission and reception beams to be used for data transmission and reception, multi-antenna configuration information to be used for data transmission and reception, and the like.
  • the base station transmits and receives data and / or control signals for the corresponding terminal as a result of the negotiation in step 1403 in step 1403
  • the base station performs transmission and / or data channel transmission / reception of the main / sub scheduling channel in step 1409. .
  • the base station determines whether it is a serving base station of the terminal. If the base station is a serving base station of the terminal, in step 1407, the base station transmits information (ie, not scheduled indication) indicating that the terminal has not been scheduled through the primary scheduling channel.
  • information ie, not scheduled indication
  • the present invention proposes a method of joint transmission to a terminal through a sub-scheduling channel.
  • the joint reception and the joint decoding of the scheduling and / or control signal received from different base stations through the primary / second scheduling channel may be performed.
  • a joint decoding operation is proposed.
  • 15 is a diagram illustrating an example of a frame structure for jointly transmitting and receiving scheduling information according to another embodiment of the present invention.
  • the basic structure of the frame 1501 shown in FIG. 15 is the same as that of the frame 701 described with reference to FIG. 7A. That is, one frame 1501 is, for example, 5 ms long and consists of five sub-frames 1503. Each sub-frame 1503 has a downlink transmission period (1511) for transmitting a signal from the base station to the terminal and an uplink transmission period (uplink) 1521 for transmitting a signal from the terminal to the base station. Divided into.
  • the scheduling region 1531 is a region in which a main scheduling channel used by a base station to transmit scheduling information to a terminal is transmitted in a frame structure, and a part of the downlink transmission interval 1521 transmits a downlink reference signal. It is used as a reference signal region 1551 for.
  • the serving base station of the terminal when the base stations determine joint transmission for a scheduling channel of a specific terminal, transmits the scheduling and / or control signal of the terminal through a primary scheduling channel, and the serving base station Candidate base stations in the group jointly transmit the same scheduling and / or control signal through the (primary or secondary) scheduling channel corresponding to the optimal receive beam between the base station and the terminal.
  • the UE performs joint reception and joint decoding on scheduling and / or control signals received from different base stations through primary / second scheduling channels 1531, 1533, 1535, and 1537. Perform the action.
  • 16 is a block diagram showing the configuration of a base station according to an embodiment of the present invention.
  • a base station includes a scheduling unit and / or a control signal, a transmitter 1610 for transmitting data, and a receiver 1630 for receiving data transmitted from the terminal through a wireless network.
  • the base station of FIG. 16 transmits a scheduling and / or control signal to a terminal through a main / sub scheduling channel set up according to the embodiments of the present invention described with reference to FIGS. 5 to 15 and transmits data in a downlink period.
  • the controller 1650 controls an operation of the 1610 and controls a reception operation of the receiver 1630.
  • the controller 1650 negotiates scheduling for a terminal with at least one other base station belonging to a serving base station group, and transmits a primary scheduling channel when the base station is a serving base station and scheduling for the terminal is determined. If the base station belongs to the serving base station group but is not the serving base station and scheduling is determined for the terminal, the operation of transmitting the sub scheduling channel is controlled. Since detailed operations of the base station having the configuration of FIG. 16 are the same as those described with reference to FIGS. 5 to 15, a detailed description thereof will be omitted.
  • the base station includes a communication interface for scheduling negotiation with another base station.
  • 17 is a block diagram showing the configuration of a terminal according to an embodiment of the present invention.
  • a terminal includes a transmitter 1710 for transmitting data to a base station through a wireless network, a scheduling and / or control signal transmitted from the base station through a wireless network, and a receiver 1730 for receiving data. Include. Also, the terminal receives a scheduling and / or control signal from the base station through a main / sub scheduling channel set to correspond to the direction of each reception beam according to the embodiment of the present invention described with reference to FIGS.
  • the controller 1750 controls an operation of the receiver 1730 to receive data and controls an operation of the transmitter 1710 to transmit data in an uplink period.
  • the controller 1750 controls beamforming of each reception beam to receive a primary scheduling channel transmitted by the serving base station, and determines a resource of a secondary scheduling channel for each reception beam. Controls an operation of receiving a sub scheduling channel from which at least one other base station belonging to a serving base station group does not collide with a data transmission / reception resource. To this end, the controller 1750 determines a reception beam in a direction corresponding to the main scheduling channel and the sub scheduling channel based on the reception performance of each reception beam.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Radio Transmission System (AREA)

Abstract

본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 단말이 스케줄링 정보를 수신하는 방법은, 제1 기지국으로부터 제1 스케줄링 채널을 통해 스케줄링 정보를 수신하는 과정과, 상기 제1 기지국과 협력하는 적어도 하나의 제2 기지국으로부터 적어도 하나의 수신 빔을 이용하여 적어도 하나의 제2 스케줄링 채널을 통해 스케줄링 정보를 수신하는 과정을 포함한다.

Description

빔 포빙을 이용하는 무선 통신 시스템에서 스케줄링 정보를 송수신하는 방법 및 장치
본 발명은 무선 통신 시스템에서 복수의 기지국들이 단말에 대해 스케줄링(scheduling) 및/또는 제어 신호(control signal)(이하, 스케줄링 정보)를 효율적으로 송수신하는 방법 및 장치에 대한 것이다.
스마트폰 등과 같은 단말의 이용으로 인해 이동통신 사용자들이 사용하는 평균 데이터의 양은 기하급수적으로 증가하고 있으며, 이와 함께 더 높은 데이터 송신률에 대한 사용자들의 요구도 지속적으로 늘어나고 있다. 일반적으로 높은 데이터 송신률을 제공하는 방법으로는 더 넓은(Wide) 주파수 대역을 사용하여 통신을 제공하는 방법과 주파수 사용 효율을 높이는 방법이 있다.
그러나 후자의 방법으로 더 높은 평균 데이터 송신률을 제공하는 것은 매우 어려운데, 그 이유는 현 세대의 통신 기술들이 이미 이론적인 한계치에 가까운 주파수 사용 효율을 제공하고 있어서 기술 개량을 통해 그 이상으로 주파수 사용 효율을 높이는 것이 어렵기 때문이다. 따라서 데이터 송신률을 높이는 실현 가능한 방법은 더 넓은 주파수 대역을 통해 데이터 서비스를 제공하는 방향이라 할 수 있다. 이 때 고려해야 하는 것은 가용 주파수 대역이다.
현재의 주파수 분배 정책 상 1GHz 이상의 광대역 통신이 가능한 대역은 한정적이며, 현실적으로 선택 가능한 주파수 대역은 30GHz 이상의 밀리미터파(mmW) 대역 뿐이다. 이런 높은 주파수 대역에서는 종래의 셀룰러 시스템들이 사용하는 2GHz 대역과 달리 거리에 따른 신호 감쇄가 매우 심하게 발생한다. 이러한 신호감쇄로 인해 종래 셀룰러 시스템과 동일한 전력을 사용하는 기지국의 경우 서비스를 제공하는 커버리지가 상당히 감소하게 된다. 이에 따른 문제를 해결하기 위해서 송수신 전력을 좁은 공간에 집중하여 안테나의 송수신 효율을 높이는 빔포밍(Beam Forming) 기법이 널리 사용된다.
도 1은 어레이(Array) 안테나를 이용하여 빔포밍을 제공하는 기지국과 단말을 나타낸 도면이다.
도 1을 참조하면, 기지국(110)은 각 셀(Cell)(또는 섹터)(101, 103, 105)마다 복수의 어레이 안테나들(Array0, Array1)를 사용하여 하향 송신(Tx) 빔(111)의 방향을 바꿔가며 데이터를 송신할 수 있다. 또한 단말(130)도 수신(Rx) 빔(131)의 방향을 바꿔가며 데이터를 수신할 수 있다.
상기 빔포밍 기법을 사용하여 통신을 수행하는 시스템에서 기지국(110)과 단말(130)은 다양한 송신 빔의 방향과 수신 빔의 방향 중에서 최적의 채널 환경을 보여주는 송신 빔의 방향과 수신 빔의 방향을 선택하여 데이터 서비스를 제공한다. 이러한 과정은 기지국(110)에서 단말(130)로 데이터를 송신하는 하향 채널뿐 아니라 단말(130)에서 기지국(110)으로 데이터를 송신하는 상향 채널에도 동일하게 적용된다.
도 2는 상기 빔포밍 기법을 사용하여 통신을 수행하는 시스템에서 기지국(110)이 특정 빔 폭(beam width)을 가지는 송신 빔을 통해 신호를 전송하는 일 예를 나타낸 도면이다.
도 2에서 기지국(110)은 지면으로부터 일정 높이(201)의 위치에 설치되어 있으며 사전에 정해진 빔 폭(203)를 가지고 있는 것을 도시하고 있다. 기지국의 빔 폭(203)은 앙각(elevation angel)과 방위각(azimuth) 각각에 대해서 정의될 수 있다. 또한 도 2는 기지국(110)의 송신 빔이 특정 앙각(205)에 해당하는 방향으로 송신되는 것을 도시하고 있다. 그리고 도 2에는 도시되지 않았으나, 상기 방위각은 송신 빔이 전파되는 수평 방향의 각도로 이해될 수 있다.
도 3은 도 2와 같은 방식으로 설치된 기지국(110)에서 기지국(110)이 설치된 높이(201)가 35m이고, 기지국(110)이 앙각(elevation angel)과 방위각(azimuth) 각각에 대해 5°빔 폭을 가지는 송신 빔을 예컨대, 30°각도와 200m의 커버리지를 가지는 하나의 섹터(sector) 내에서 송신했을 때, 기지국(110)이 송신할 수 있는 송신 빔의 수와 이를 수신하는 단말의 수신 빔의 수를 예를 들어 나타내는 도면이다. 도 3의 예에서는 앙각(elevation angel)과 방위각(azimuth) 각각에 대해 5°빔 폭을 가지는 96개의 송신 빔을 이용하여 30°각도와 200m의 커버리지를 가지는 하나의 섹터(sector)를 구성하는 경우를 도시하고 있다.
빔 포밍 시스템에서 단말은 물리적인 공간의 제약과 성능 상의 제약, 가격의 제약 등으로 인해 일반적으로 기지국처럼 좁은 빔 폭을 가지는 많은 수의 송수신 빔을 형성하는 것이 어렵다. 상기 도 3의 예에서는 단말(130)이 4개의 수신 빔(RX1, RX2, RX3, RX4)을 형성하여 기지국(110)이 송신한 송신 빔을 수신하는 경우를 도시하고 있다. 이 경우 각 수신 빔의 방위각 빔 폭은 대략 90°정도를 나타내게 된다.
상기 빔 포밍을 사용하는 시스템에서 일반적으로 좁은 송신 빔의 경우 높은 안테나 이득(antenna gain)을 가지고 있으나 좁은 빔 폭으로 인해 송수신 빔의 방향이 어긋날 경우 통신 성능을 보장하기 어려운 단점이 있다. 또한 송수신 범위가 제한되어 송신 빔과 수신 빔 사이에 반사체나 투과가 어려운 물체가 끼어들 경우 순간적으로 통신이 단절되는 문제가 발생할 수 있다. 이와 같은 문제를 일반적으로 링크 불안정(link fragility) 문제라고 정의한다. 상기 링크 불안정 문제를 해결하는 일반적인 방법으로 하나의 단말이 복수의 기지국과 데이터 송수신 채널을 유지하는 방안이 사용된다.
도 4a는 일반적인 빔 포핑 시스템에서 복수의 기지국들이 단말과 데이터 송수신 채널을 유지하는 일 예를 나타낸 도면이다.
도 4a를 참조하면, 단말(421)이 수신 신호 세기를 기준으로 하나 이상의 주변 기지국들(411, 413, 415, 417)(Cell-0, Cell-4, Cell-5, Cell-11))을 하나의 서빙 기지국 그룹(Serving base station group 혹은 Cloud cell)으로 묶고, 그 그룹에 속하는 기지국들(411, 413, 415, 417)의 신호를 주기적으로 측정하여 데이터 송수신 채널을 유지하는 경우를 예시한 도면이다.
도 4a의 예에서 빔 포밍 시스템은 상기 단말(421)의 주변 기지국들(411, 413, 415, 417) 중에서 신호의 세기가 가장 강한 기지국(411)(Cell-0)를 상기 단말(421)의 서빙 기지국(Serving base station)으로 선택하고 그 이외의 기지국(413, 415, 417)(Cell-4, Cell-5, Cell-11)을 스케줄링 후보 기지국(scheduling candidate base station)으로 구분할 수 있다. 상기 단말(421)은 정상적인 채널 상황에서는 기지국(411)(Cell-0)를 통해 제어 신호와 데이터를 송수신하며, 그와 동시에 스케줄링 후보 기지국들인 기지국(413, 415, 417)(Cell-4, Cell-5, Cell-11)의 신호도 주기적으로 측정하여 해당 기지국들(413, 415, 417)(Cell-4, Cell-5, Cell-11)과 데이터 송수신 채널을 유지한다. 이와 같은 동작을 통해 빔 포밍 시스템은 상기 단말(411)과 기지국(411)(Cell-0) 사이의 링크가 불안정할 경우, 단말(421)은 서빙 기지국 그룹에 속하는 다른 기지국(413, 415, 417)(Cell-4, Cell-5, Cell-11)을 통해서 데이터 송수신을 계속할 수 있다.
빔 포밍 시스템에서 단말은 일반적으로 물리적인 공간의 제약과 성능 상의 제약, 가격의 제약 등으로 인해 특정 송수신 시점에 제한된 수의 송수신 빔만을 생성할 수 있다. 도 4a의 예는 단말(421)이 매 송수신 시점에서 하나의 수신 빔만을 형성하는 것을 가정하고 있다. 상기 단말(421)은 형성 가능한 하나의 수신 빔을 이용하여 데이터 송수신에 대한 스케줄링 정보를 서빙 기지국 그룹에 속하는 기지국들(411, 413, 415, 417)(Cell-0, Cell-4, Cell-5, Cell-11)로부터 수신하여야 한다.
만약 상기 서빙 기지국 그룹에 속하는 둘 이상의 기지국이 해당 단말(421)에게 스케줄링 정보를 송신할 경우, 상기 단말(421)은 그 기지국들(411, 413, 415, 417)(Cell-0, Cell-4, Cell-5, Cell-11)이 송신한 스케줄링 정보를 하나의 수신 빔을 이용하여 각각 서로 다른 시점에서 수신하여야 한다. 이를 위해서 서빙 기지국 그룹에 속하는 각 기지국들(411, 413, 415, 417)(Cell-0, Cell-4, Cell-5, Cell-11)의 스케줄링 정보 송신 시점은 서로 다르게 정의되어야 하며, 단말(421)은 각 시점마다 매 기지국들이 스케줄링 정보를 송신하였는지 판단하여야 한다. 이렇게 기지국들 사이의 스케줄링 시점을 충돌이 발생하지 않게 정의하는 것은 일반적으로 어려운 일이며, 또한 단말(421)이 서빙 기지국 그룹에 속하는 각 기지국 별로 스케줄링 정보를 수신할 경우, 단말(421)의 전력 소모가 매우 증가하는 문제가 발생한다. 이런 문제를 해결하기 위하여 서빙 기지국 그룹에 속하는 특정 기지국을 지정하여 해당 단말에 대한 스케줄링 및/또는 제어 신호를 송수신하는 기지국으로 사용할 수 있다. 도 4a의 예에서는 서빙 기지국인 기지국(411)(Cell-0)가 해당 단말(421)에 대한 스케줄링 및/또는 제어 신호를 송수신 하는 경우를 도시하고 있다.
도 4b는 일반적인 빔 포핑 시스템에서 단말이 복합 재전송(HARQ: Hybrid automatic retransmit request)를 이용하여 데이터 패킷을 수신하는 예를 나타낸 도면이다.
도 4b의 (A)를 참조하면, 상기 단말(421)은 예컨대, 서브프레임 0에서 서빙 기지국(411)(Cell-0)로부터 스케줄링 정보를 수신하여 해당 서브프레임에 상기 스케줄링 정보가 지시하는 서빙 기지국(411)(Cell-0)로부터 송신된 데이터 패킷을 수신한다.
도 4b의 (B)를 참조하면,상기 단말(421)이 첫 번째 데이터 패킷의 복호화에 실패한 경우를 가정한다. 이후 상기 단말(421)은 서브프레임 3에서 서빙 기지국(411)(Cell-0)로부터 스케줄링 정보를 수신하여 상기 스케줄링 정보가 지시하는 기지국(413)(Cell-5)로부터 첫 번째 복합 재전송 패킷을 수신한다. 도 4b의 (C)를 참조하면, 상기 단말(421)이 기지국(413)(Cell-5)로부터 수신한 첫 번째 복합 재전송 패킷의 복호화도 실패한 경우를 가정한다. 이후 상기 단말(421)은 서브프레임 7에서 서빙 기지국(411)(Cell-0)로부터 스케줄링 정보를 수신하여 상기 스케줄링 정보가 지시하는 기지국(417)(Cell-7)로부터 두 번째 복합 재전송 패킷을 수신한다.
도 4a 및 도 4b에서 도시한 것과 같이 서빙 기지국 그룹에 속하는 특정 기지국을 지정하여 해당 단말에 대한 스케줄링 및/또는 제어 신호를 송수신하는 기지국으로 사용할 경우, 해당 기지국과 단말 사이의 링크가 불안정해질 경우 스케줄링 및/또는 제어 신호 자체의 송수신이 힘들어져 데이터 통신을 지속하는 것이 어려워질 수 있다. 또한 서빙 기지국 그룹에 속하는 다른 기지국의 채널 상황이 스케줄링 및/또는 제어 신호를 송신하는 서빙 기지국보다 더 좋을 경우에도 서빙 기지국을 통해 스케줄링 및/또는 제어 신호를 송수신하여야 하므로 스케줄링 및/또는 제어 신호를 송수신하는 채널의 성능이 최적화되지 못하는 문제가 발생한다.
본 발명은 빔 포밍을 이용하는 무선 통신 시스템에서 복수의 기지국들을 통해 스케줄링 정보를 효율적으로 전송하는 방법 및 장치를 제공한다.
또한 본 발명은 빔 포밍을 이용하는 무선 통신 시스템에서 단말이 복수의 기지국들로부터 스케줄링 정보를 효율적으로 수신하는 방법 및 장치를 제공한다.
본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 단말이 스케줄링 정보를 수신하는 방법은, 제1 기지국으로부터 제1 스케줄링 채널을 통해 스케줄링 정보를 수신하는 과정과, 상기 제1 기지국과 협력하는 적어도 하나의 제2 기지국으로부터 적어도 하나의 수신 빔을 이용하여 적어도 하나의 제2 스케줄링 채널을 통해 스케줄링 정보를 수신하는 과정을 포함한다.
또한 본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 스케줄링 정보를 수신하는 단말은, 무선망을 통해 제1 기지국과 적어도 하나의 제2 기지국으로부터 데이터를 수신하는 수신부와, 상기 제1 기지국으로부터 제1 스케줄링 채널을 통해 스케줄링 정보를 수신하고, 상기 제1 기지국과 협력하는 적어도 하나의 제2 기지국으로부터 적어도 하나의 수신 빔을 이용하여 적어도 하나의 제2 스케줄링 채널을 통해 스케줄링 정보를 수신하는 동작을 제어하는 제어부를 포함한다.
또한 본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 기지국이 스케줄링 정보를 전송하는 방법은, 상기 기지국과 협력하는 적어도 하나의 기지국과 상기 단말에 대한 스케줄링을 협상하는 과정과, 상기 협상 결과에 따라 제1 스케줄링 채널과 적어도 하나의 제2 스케줄링 채널 중 정해진 스케줄링 채널을 통해 스케줄링 정보를 전송하는 과정을 포함하며, 상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널의 각 채널은 상기 단말의 수신빔 별로 설정된다.
또한 본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 스케줄링 정보를 전송하는 기지국은, 무선망을 통해 데이터를 송수신하는 송수신부와, 상기 기지국과 협력하는 적어도 하나의 기지국과 통신을 위한 통신 인터페이스와, 상기 적어도 하나의 기지국과 상기 단말에 대한 스케줄링을 협상하고, 상기 협상 결과에 따라 제1 스케줄링 채널과 적어도 하나의 제2 스케줄링 채널 중 정해진 스케줄링 채널을 통해 스케줄링 정보를 전송하는 동작을 제어하는 제어부를 포함하며, 상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널의 각 채널은 상기 단말의 수신빔 별로 설정된다.
도 1은 어레이(Array) 안테나를 이용하여 빔포밍을 제공하는 기지국과 단말을 포함하는 일반적인 빔 포밍 시스템을 나타낸 도면,
도 2는 일반적인 빔 포밍 시스템에서 기지국이 특정 빔 폭을 가지는 송신 빔을 통해 신호를 전송하는 일 예를 나타낸 도면,
도 3은 일반적인 빔 포밍 시스템에서 기지국이 송신할 수 있는 송신 빔의 수와 이를 수신하는 단말의 수신 빔의 수를 예를 들어 나타내는 도면,
도 4a는 일반적인 빔 포밍 시스템에서 복수의 기지국들이 단말과 데이터 송수신 채널을 유지하는 일 예를 나타낸 도면,
도 4b는 일반적인 빔 포밍 시스템에서 단말이 HARQ를 이용하여 데이터 패킷을 수신하는 예를 나타낸 도면,
도 5는 본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 단말의 수신 빔 방향 별 스케줄링 채널의 예를 나타낸 도면,
도 6은 본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 신호를 송수신하기 위한 프레임 구조의 일 예를 나타낸 도면,
도 7a 및 도 7b는 본 발명의 실시 예에 따른 단말의 수신 빔 방향 별 부 스케줄링 채널을 도 6의 프레임 구조를 이용하여 나타낸 도면,
도 8는 본 발명의 실시 예에 따라 부 스케줄링 채널에서 서로 다른 기지국이 단말에게 데이터 송신을 스케줄링 한 예를 나타낸 도면,
도 9는 본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 단말이 HARQ를 이용하여 데이터 패킷을 수신하는 예를 나타낸 도면,
도 10은 본 발명의 실시 예에 따라 수신 빔 별 부 스케줄링 채널을 통해 스케줄링 정보를 수신하는 단말의 동작을 나타낸 흐름도,
도 11은 본 발명에서 제안하는 수신 빔 별 부 스케줄링 채널을 통해 스케줄링 정보를 송신하는 기지국의 동작을 나타낸 흐름도,
도 12는 본 발명의 다른 실시 예에 따른 프레임 구조의 일 예를 나타낸 도면,
도 13은 본 발명의 다른 실시 예에 따라 단말이 스케줄링 채널을 통해 스케줄링 정보를 수신하는 동작을 나타낸 흐름도,
도 14는 본 발명의 다른 실시 예에 따라 기지국이 스케줄링 채널을 통해 스케줄링 정보를 송신하는 동작을 나타낸 흐름도,
도 15는 본 발명의 또 다른 실시 예에 따라 스케줄링 정보를 결합 송수신하기 위한 프레임 구조의 일 예를 나타낸 도면,
도 16은 본 발명의 실시 예에 따른 기지국의 구성을 나타낸 블록도,
도 17은 본 발명의 실시 예에 따른 단말의 구성을 나타낸 블록도.
이하 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 설명한다. 그리고, 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단된 경우 그 상세한 설명은 생략한다.
본 발명의 실시 예에서는 빔포밍을 사용하는 시스템에서 복수의 기지국이 하나의 단말에 대해 효율적으로 스케줄링 및/또는 제어 신호(이하, 스케줄링 정보)를 송수신 할 수 있는 방안을 제안한다. 이를 위해 본 발명의 실시 예에서는 특정 단말에 대해 서빙 기지국에서 스케줄링 및/또는 제어 신호를 송신하는 주 스케줄링 및/또는 제어 채널(이하, 주 스케줄링 채널)에 더하여, 단말의 수신 빔 방향 별로 부 스케줄링 및/또는 제어 채널(이하, 부 스케줄링 채널)을 설정하는 방법을 제안한다. 단말의 수신 빔 방향 별로 정의되는 상기 부 스케줄링 채널은 서로 다른 시간, 주파수 자원, 송수신 빔을 사용하여 송수신될 수 있다.
또한 본 발명의 실시 예에서는 특정 기지국이 상기 단말에게 스케줄링 및/또는 제어 신호를 송신할 때, 그 기지국과 단말 사이의 최적의 수신 빔에 해당하는 (주 혹은 부) 스케줄링 및 제어 채널을 통하여 스케줄링 및/또는 제어 신호를 송신하는 방법을 제안한다. 또한 상기 기지국이 상기 단말의 서빙 기지국일 경우 주 스케줄링 채널을 이용하여 스케줄링 및/또는 제어 신호를 송신하고, 서빙 기지국이 아닐 경우 최적의 (주 혹은 부) 스케줄링 및 제어 채널을 통해 스케줄링 및/또는 제어 신호(이하, 스케줄링 정보라 통칭한다.)를 송신하는 방법을 제안한다.
또한 본 발명의 실시 예에서는 상기 단말이 특정 스케줄링 시점에서 어떤 기지국으로부터도 스케줄링 되지 않았을 경우, 서빙 기지국이 주 스케줄링 채널을 통해 스케줄링 되지 않았다는 정보(Not scheduled indication)를 송신하는 방법을 제안한다.
또한 본 발명의 실시 예에서는 단말이 주 스케줄링 채널과 단말의 수신 빔 별로 정의된 부 스케줄링 채널을 이용하여 서로 다른 기지국이 송신한 스케줄링 및/또는 제어 신호를 효과적으로 수신하는 방법을 제안한다. 또한 본 발명의 실시 예에서는 단말이 수신 빔 방향 별로 정의된 부 스케줄링 채널을 그 채널에 대응되는 수신 빔을 이용하여 서로 다른 시간 혹은 주파수 자원에서 수신하는 방법을 제안한다. 또한 본 발명의 실시 예에서는 상기 단말이 각 기지국 별로 최적의 송수신 빔을 측정하고 그 정보를 주기적으로 각 기지국에게 보고하는 방법을 제안한다.
또한 본 발명의 실시 예에서는 상기 단말의 특정 부 스케줄링 채널이 상기 단말에게 스케줄링 된 데이터 송수신 영역과 시간, 주파수, 송수신 빔 측면에서 충돌이 발생한 경우, 해당 부 스케줄링 채널의 수신을 생략하는 방법을 제안한다. 또한 본 발명에서는 상기 단말이 주 스케줄링 채널을 통해 스케줄링 되지 않았다는 정보(Not scheduled indication)를 수신한 경우, 모든 부 스케줄링 채널의 수신을 생략하는 방법을 제안한다.
본 발명의 실시 예는 다수의 기지국들이 단말에게 다수의 스케줄링 채널을 통해 스케줄링 정보를 전송하는 방법을 제안한 것이다. 따라서 주 스케줄링 채널과 부 스케줄링 채널은 서로 다른 기지국이 전송하는 스케줄링 채널들을 구분하는 의미로 이해될 수 있다. 또한 스케줄링 채널의 역할에 따라 주된 역할을 하는 주 스케줄링 채널과 보조적인 역할을 하는 부 스케줄링 채널로도 이해될 수 있다. 이하 상세한 설명에서 스케줄링 채널을 송수신하는 것은 편의상 기술된 것이며, 이는 스케줄링 채널을 통해 스케줄링 정보를 송수신하는 것으로 이해된다.
즉 본 발명의 실시 예에서 기술하는 주 스케줄링 채널과 부 스케줄링 채널의 용어는 설명의 편의상 구분을 위한 것이며, 그 용어가 스케줄링 채널의 역할을 한정하는 것은 아님에 유의하여야 할 것이다.
도 5는 본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 단말의 수신 빔 방향 별 스케줄링 채널을 예를 들어 도시한 도면이다.
도 5의 예는 단말(521)이 4개의 수신 빔(RX1 ~ RX4)(531, 533, 535, 537)방향을 가지고 있으며, 기지국들 중 가장 가까운 섹터 1(Sector 1)이 상기 단말(521)의 서빙 기지국(511)인 경우의 예이다. 상기 단말(521)은 서빙 기지국(511)인 섹터 1이 송신하는 주 스케줄링 채널을 섹터 1에 대해 최적인 수신 빔(RX2)(533)를 이용하여 수신한다. 이에 더하여 상기 단말(521)은 수신 빔 방향 별로 정의된 부 스케줄링 채널을 각각의 수신 빔(RX1 ~ RX4)(531, 533, 535, 537)을 이용하여 수신한다. 상기 단말(521)이 주 스케줄링 채널을 수신하는 수신 빔(RX2)(533)에 대해서는 부 스케줄링 채널이 따로 정의되지 않을 수 있다. 이 경우 상기 단말(521)은 주 스케줄링 채널의 자원 영역을 통해 서빙 기지국 이외의 기지국(예컨대, 도 5의 수신 빔(RX2) 방향에서는 참조 번호 513)이 송신하는 스케줄링 및/또는 제어 신호를 수신 빔(RX2)를 이용하여 수신할 수 있다.
도 6은 본 발명의 실시 예에 따라 빔 포밍을 이용하는 무선 통신 시스템에서 신호를 송수신하기 위한 프레임 구조의 일 예를 나타낸 도면이다.
도 6을 참조하면, 하나의 프레임(frame)(601)은 예컨대, 5ms의 길이를 가지며 5개의 서브-프레임(sub-frame)(603)으로 구성되어 있다. 여기서 프레임(601)의 길이와 서브 프레임(603)의 개수는 일 예를 나타낸 것일 뿐 본 발명의 실시 예가 도 6의 실시 예에 한정되는 것은 아님에 유의하여야 할 것이다.
각각의 서브-프레임(603)은 기지국에서 단말을 향해 신호를 송신하는 하향 링크 송신 구간(Down Link)(611, 613, 615)과 단말에서 기지국을 향해 신호를 송신하는 상향 링크 송신 구간(Up Link)(621, 623, 625)으로 나뉘어진다. 도 6을 참조하면, 하향 링크 송신 구간(611, 613, 615)의 일부는 스케줄링 정보를 전송하기 위한 스케줄링 영역(631, 633, 635)으로 사용되고, 또한 하향 링크 송신 구간(611, 613, 615)의 일부는 하향 참조 신호(reference signal)를 송신하기 위한 참조신호 영역(651, 653, 655)으로 사용된다.
도 7a 및 도 7b는 본 발명의 실시 예에 따른 단말의 수신 빔 방향 별 부 스케줄링 채널을 도 6의 프레임 구조를 이용하여 설명한 도면이다.
도 7a 및 도 7b에 도시된 프레임(701)의 기본적인 구조는 도 6에서 설명한 프레임(601)의 구조와 동일하다. 즉 하나의 프레임(frame)(701)은 예컨대, 5ms의 길이를 가지며 5개의 서브-프레임(sub-frame)(703)으로 구성된다. 각각의 서브-프레임(703)은 기지국에서 단말을 향해 신호를 송신하는 하향 링크 송신 구간(Down Link)(711)과 단말에서 기지국을 향해 신호를 송신하는 상향 링크 송신 구간(Up Link)(721)으로 나뉘어진다. 그리고 하향 링크 송신 구간(721)의 일부는 하향 참조 신호(reference signal)를 송신하기 위한 참조신호 영역(751)으로 사용된다.
그리고 하기 실시 예들에서 주/부 스케줄링 채널과 그 주/부 스케쥴링 채널이 전송되는 영역은 설명의 편의를 위해 동일한 참조 번호를 부여하기로 한다.
도 6의 실시 예에서는 스케줄링 정보를 전송하기 위해 스케줄링 채널(즉 스케줄링 영역((631, 633, 635)) 만을 이용하였으나, 도 7a 및 도 7b의 실시 예는 스케줄링 채널 외에도 일반적인 제어 신호를 송수신 하는 채널과 그 자원 영역을 이용하여 스케줄링 및/또는 제어 신호를 전송할 수 있다.
도 7a의 스케줄링 영역(731)은 프레임 구조에서 서빙 기지국이 단말에게 스케줄링 정보를 전송하는데 사용하는 스케줄링 채널이 전송되는 영역으로 본 실시 예에서는 이 채널(영역)을 주 스케줄링 채널로 정의한다. 단말은 주 스케줄링 채널(731)을 서빙 기지국에 대해 최적인 수신 빔을 이용하여 수신한다. 도 7a의 실시 예에서 서빙 기지국에 대한 단말의 최적의 수신 빔은 설명의 편의를 위해 예컨대, 도 5의 실시 예에서 수신 빔 2번(RX beam 2)(533)임을 가정한다. 단말은 수신 빔 2번(533)을 이용하여 주 스케줄링 채널(731)을 수신한다. 또한 본 실시 예에서는 주 스케줄링 채널(701)에 더하여 단말의 수신 빔 방향 별로 부 스케줄링 채널(733, 735, 737)을 설정한다. 예컨대, 도 7a에서 참조 번호 733은 단말의 수신 빔 1번에 대한 부 스케줄링 채널이 전송되는 영역을 나타내며, 참조 번호 735는 단말의 수신 빔 3번에 대한 부 스케줄링 채널이 전송되는 영역을 나타내고, 참조 번호 737은 단말의 수신 빔 4번에 대한 부 스케줄링 채널이 전송되는 영역을 나타낸다.
상기 단말은 주 스케줄링 채널(731)에 더하여 각 수신 빔 방향 별로 정의된 부 스케줄링 채널(733, 735, 737)을 각 스케줄링 채널에 대응되는 수신 빔을 이용하여 수신하여 단말 주변의 서로 다른 기지국이 송신한 스케줄링 및/또는 제어 신호를 효과적으로 수신할 수 있다. 도 7a의 예는 상기 단말이 주 스케줄링 채널(731)을 수신하는 수신 빔 RX2에 대해서는 부 스케줄링 채널이 따로 정의되지 않은 경우의 예이다. 이 경우 상기 단말은 주 스케줄링 채널(731)의 자원 영역을 통해 서빙 기지국 이외의 기지국이 송신하는 스케줄링 채널을 수신 빔 RX2를 이용하여 수신할 수 있다. 도 7a는 단말의 수신 빔 별 부 스케줄링 채널들(733, 735, 737)이 동일한 주파수 자원을 이용하여 서로 다른 시점에 설정된 경우의 예를 도시하고 있으나 부 스케줄링 채널들(733, 735, 737)은 서로 다른 주파수 자원 상에서 설정될 수도 있다.
상기한 도 7a의 실시 예에서 단말의 수신 빔 별 부 스케줄링 채널은 단말의 주위에 존재하는 서빙 기지국 그룹(혹은 클라우드 셀)과 서빙 기지국 그룹에 속하는 기지국들의 채널 상태를 고려하여 설정될 수 있다. 구체적으로 본 발명에서 제안하는 방법에서 단말의 수신 빔 별 부 스케줄링 채널은 단말이 서빙 기지국 그룹에 속하는 기지국들(서빙 기지국 혹은 스케줄링 후보 기지국들) 각각에 대해 측정한 최적의 수신 빔과 그 수신 성능을 바탕으로, 더 수신 성능이 우수한 기지국으로부터 전송되는 스케줄링 정보가 수신되는 수신 빔에 대해 부 스케줄링 채널을 시간, 주파수 자원 상에서 더 우선적으로 설정할 수 있다.
도 7b는 도 5에서 예시한 위치에 존재하는 단말에 대해서, 수신 빔 방향 별로 부 스케줄링 채널을 상기 단말의 서빙 기지국 그룹에 속하는 기지국들의 채널 상태를 고려하여 설정한 또 다른 예를 도시한 도면이다. 도 7b에서 도 7a와 동일한 참조 번호에 대해서는 그 설명이 동일하므로 상세한 설명은 생략하기로 한다.
도 5의 예에서는 상기 단말의 서빙 기지국 그룹이 단말의 주변에 존재하는 섹터 1, 섹터 5, 섹터 9, 섹터 12로 구성되고 각 기지국으로부터 수신되는 신호의 세기는 섹터 1, 섹터 9, 섹터 5, 섹터 12의 순인 것을 가정한다. 또한 섹터 1은 수신 빔 2(RX2)(533)를 이용하여 수신 하였을 때 가장 수신 신호의 세기가 강하고, 섹터 9는 수신 빔 4(RX4)(537), 섹터 5는 수신 빔 3(RX3)(535), 섹터 12는 수신 빔 1(RX1)(531)을 이용하여 수신하였을 때, 수신 신호의 세기가 가장 강한 것을 가정한다. 상기 예에서는 단말에 대해 가장 신호 수신 성능이 우수한 섹터 1의 기지국(511)이 서빙 기지국으로 선택될 수 있고, 이 경우 나머지 섹터 5, 9, 12의 기지국들은 스케줄링 후보 기지국이 된다. 상기의 예에서 단말은 서빙 기지국인 섹터 1의 기지국(511)에 대해 최적인 수신 빔 2(RX2)(533)를 이용하여 주 스케줄링 채널을 수신하고, 나머지 수신 빔 1, 수신 빔 3, 수신 빔 4(531, 535, 537)를 이용하여 각 수신 빔 별로 설정된 부 스케줄링 채널을 수신한다. 상기 예에서 각 수신 빔 별로 부 스케줄링 채널을 설정할 때, 더 수신 성능이 우수한 기지국으로부터 전송되는 스케줄링 정보가 수신되는 수신 빔에 대해 부 스케줄링 채널을 시간, 주파수 자원 상에서 더 우선적으로 설정할 수 있다. 예를 들어 도 7b의 실시 예는 상기 단말의 서빙 기지국 외에 가장 수신 신호가 강한 섹터 9와 섹터 9에 대한 최적의 수신 빔인 수신 빔 4(RX4)(537)에 대한 부 스케줄링 채널을 다른 수신 빔에 대한 부 스케줄링 채널보다 시간적으로 더 우선적으로 참조 번호 743의 영역에 설정한 예를 도시하고 있다. 또한 도 7b의 실시 예는 섹터 9 다음으로 수신 신호가 강한 섹터 5와 섹터 5에 대한 최적의 수신 빔인 수신 빔 3에 대한 부 스케줄링 채널을 수신 빔 4에 대한 부 스케줄링 채널 다음으로 참조 번호 745의 영역에 설정하고, 마지막으로 수신 빔 1에 대한 부 스케줄링 채널을 참조번호 747의 영역에 설정한 예를 도시하고 있다.
본 발명에서 제안하는 방법에 따라 단말의 수신 빔 별로 부 스케줄링 채널을 설정할 경우, 기지국은 단말에게 스케줄링 및/또는 제어 신호를 송신할 때, 그 기지국과 단말 사이의 최적의 수신 빔에 해당하는 (주 혹은 부) 스케줄링 채널을 통하여 스케줄링 및/또는 제어 신호를 송신할 수 있다. 기지국이 단말의 서빙 기지국일 경우 주 스케줄링 채널을 이용하여 스케줄링 및/또는 제어 신호를 송신하고, 기지국이 서빙 기지국이 아닐 경우 최적의 (주 혹은 부) 스케줄링 채널을 통해 스케줄링 및/또는 제어 신호를 송신할 수 있다.
또한 본 발명에 제안하는 방법에 따라 단말의 수신 빔 별로 부 스케줄링 채널을 설정할 경우, 단말은 주 스케줄링 채널과 단말의 수신 빔 별로 정의된 부 스케줄링 채널을 이용하여 서로 다른 기지국이 송신한 스케줄링 및/또는 제어 신호를 수신할 수 있다. 본 발명에서 제안하는 방법에서 단말은 기지국의 부 스케줄링 채널 선택을 돕기 위하여 서빙 기지국 그룹에 속하는 기지국들 각각에 대해 최적의 송수신 빔을 측정하고 그 정보를 주기적으로 각 기지국에게 보고하여야 한다. 또한 본 발명에서 제안하는 방법에서 단말은 특정 부 스케줄링 채널이 상기 단말에게 스케줄링 된 데이터 송수신 영역과 시간, 주파수, 송수신 빔 측면에서 충돌이 발생한 경우, 해당 부 스케줄링 채널의 수신을 생략할 수 있다.
도 8는 본 발명의 실시 예에 따라 부 스케줄링 채널에서 서로 다른 기지국이 단말에게 데이터 송신을 스케줄링 한 예를 도시한 도면이다. 도 8의 실시 예에서 부 스케줄링 채널은 도 7b의 예와 같이 설정된 경우를 가정한다.
도 8을 참조하면, 단말은 주 스케줄링 채널(831)을 통해 서빙 기지국으로부터 데이터 송수신에 대한 스케줄링 정보를 수신하였다. 여기서 상기 주 스케줄링 채널(831)을 통해 수신되는 스케줄링 정보는 참조 번호 833의 영역에서 데이터를 수신하는데 필요한 정보(831a)를 포함하는 것을 가정한다. 상기 단말은 상기 정보(831a)에서 수신한 스케줄링 정보에 따라 상기 영역(833)에서 서빙 기지국으로부터 데이터를 수신하고, 상기 영역(833)과 겹친 수신 빔 4(RX4)(도 7b의 참조 번호 743 참조)에 대한 부 스케줄링 채널의 수신을 생략한다. 상기 영역(833)의 데이터를 수신한 이후 단말은 남은 자원 영역에서 부 스케줄링 채널의 수신을 계속 시도할 수 있다.
도 8의 예에서 상기 단말은 수신 빔 3(RX3)(도 7b의 참조 번호 745 참조)에 대한 부 스케줄링 채널의 영역(835)을 통해 서빙 기지국이 아닌 다른 기지국으로부터 데이터 송수신에 대한 스케줄링 정보를 수신할 수 있다. 상기 영역(835)에서 수신되는 상기 스케줄링 정보는 영역(837)에서 데이터를 수신하는데 필요한 스케줄링 정보(835a)를 포함하는 것을 가정한다. 이 경우 상기 단말은 영역(835)에서 수신한 스케줄링 정보(835a)에 따라 영역(837)에서 데이터를 수신하고, 상기 영역(837)과 중복되는 부 스케줄링 채널의 수신을 생략한다.
도 9는 본 발명의 실시 예에 따른 빔 포핑 시스템에서 단말이 HARQ를 이용하여 데이터 패킷을 수신하는 예를 나타낸 도면으로서, 도 9의 실시 예에서 단말은 주 혹은 부 스케줄링 채널을 이용하여 데이터 패킷을 HARQ 기법을 통해 서빙 기지국 그룹에 속하는 기지국들로부터 수신한다.
도 9의 (A)를 참조하면, 단말(921)은 예컨대, 프레임을 구성하는 다수의 서브 프레임들 중 제1 서브프레임에서 주 스케줄링 채널을 통해 서빙 기지국(911)(Cell-0)으로부터 스케줄링 정보를 수신하고, 상기 스케줄링 정보에 따라 데이터 패킷을 수신한다. 도 9의 예에서는 상기 단말(921)이 첫 번째 데이터 패킷의 복호화에 실패한 경우를 가정한다. 이후 상기 단말(921)은 제2 서브프레임에서 도 9의 (B)와 같이 기지국(913)(Cell-5)로부터 부 스케줄링 채널을 통해 스케줄링 정보를 수신하고 상기 스케줄링 정보에 따라 기지국(913)(Cell-5)로부터 첫 번째 복합 재전송 패킷을 수신한다. 도 9의 (C)의 예에서는 상기 단말(921)이 첫 번째 복합 재전송 패킷의 복호화도 실패한 경우를 가정한다. 이후 상기 단말(921)은 제3 서브프레임에서 기지국(913)(Cell-7)로부터 부 스케줄링 채널을 통해 스케줄링 정보를 수신하고 상기 스케줄링 정보에 따라 기지국(913)(Cell-5)로부터 두 번째 복합 재전송 패킷을 수신한다.
도 10은 본 발명의 실시 예에 따라 수신 빔 별 부 스케줄링 채널을 통해 스케줄링 정보를 수신하는 단말의 동작을 나타낸 흐름도이다.
도 10을 참조하면, 단말은 1001 단계에서 먼저 서빙 기지국으로부터 주 스케줄링 채널을 수신한다. 1003 단계에서 단말이 주 스케줄링 채널을 수신하는 데에는 서빙 기지국의 신호가 가장 강하게 수신된 최적의 수신 빔이 사용된다. 이후 단말은 하기 1003 단계 내지 1009 단계의 동작을 단말의 각 수신 빔 별로 수행한다.
구체적으로 상기 단말은 1003 단계에서 수신 빔 i(여기서 "i"는 각 수신 빔의 인덱스)에 대해 사전에 설정된 부 스케줄링 채널의 시간, 주파수, 송수신 빔 자원 정보 중 적어도 하나(이하, "부 스케줄링 채널의 자원")를 판단하고 1005 단계에서 상기 부 스케줄링 채널의 자원이 단말에게 스케줄링 된 데이터 송수신 자원과 충돌이 발생하는지 판단한다.
만약 상기 1005 단계에서 수신 빔 i에 대한 부 스케줄링 채널의 자원이 단말에게 스케줄링된 데이터 송수신 자원과 충돌하는 경우 단말은 해당 부 스케줄링 채널의 수신을 생략하고, 다음 수신 빔 i+1에 대해 상기 1003 단계로 이동하여 이후 동작을 반복한다. 상기 1005 단계에서 수신 빔 i에 대한 부 스케줄링 채널의 자원이 단말에게 스케줄링된 데이터 송수신 자원과 충돌하지 않은 경우, 상기 단말은 1007 단계에서 상기 1003 단계에서 판단한 부 스케줄링 채널의 자원에서 수신 빔 i를 이용해 부 스케줄링 채널을 수신한다. 이후 상기 단말은 1009 단계에서 모든 수신 빔들에 대해 상기한 수신 동작을 완료하였는 지 판단하고, 모든 수신 빔들에 대해 상기한 수신 동작이 완료된 경우 스케줄링 채널의 수신 동작을 종료한다.
한편 상기 1009 단계에서 모든 수신 빔들에 대해 부 스케줄링 채널의 수신 동작이 완료되지 않은 경우 상기 1011 단계로 이동하여 다음 수신 빔 i+1에 대해 상기 1003 단계 내지 1009 단계의 동작을 수행한다.
본 실시 예에서는 단말이 수신 가능한 모든 수신 빔들에 대해 상기 수신 동작을 수행하는 것으로 설명하였으나, 이는 일 실시 예를 나타낸 것이며, 다른 실시 예로 주 스케줄링 채널의 수신이 성공한 경우, 부 스케줄링 채널을 수신하지 않거나 또는 전체 수신 빔들 중에서 수신 신호 세기가 정해진 값 이상인 적어도 하나의 수신 빔에 대해 부 스케줄링 채널의 수신 동작이 수행되도록 실시하는 것도 가능할 것이다.
도 11은 본 발명에서 제안하는 수신 빔 별 부 스케줄링 채널을 통해 스케줄링 정보를 송신하는 기지국의 동작을 나타낸 흐름도이다.
먼저 도 11의 실시 예는 하나의 단말에 대해 수행되는 동작을 예시하고 있으나, 기지국은 해당 기지국을 스케줄링 후보로 서빙 기지국 그룹에 포함하는 모든 단말들에 대해 도 11의 동작을 반복하여 수행한다.
도 11을 참조하면, 1101 단계에서 기지국은 단말에 대해 그 단말의 서빙 기지국 그룹에 포함된 다른 기지국들과 스케줄링에 관한 협상을 수행한다. 상기 협상에는 데이터 및 스케줄링 정보를 송수신할 기지국, 데이터 송수신 시점, 데이터 송수신에 사용될 자원, 데이터 송수신에 사용될 송수신 빔, 데이터 송수신에 사용될 다중 안테나 설정 정보 등이 협상 대상으로 포함될 수 있다. 상기 기지국은 1103 단계에서 상기 1101 단계의 협상 결과, 해당 단말에 대한 스케줄링 정보를 상기 기지국에서 송신하기로 결정된 경우, 즉 해당 단말에 대한 스케줄링이 결정된 경우, 1105 단계에서 상기 기지국이 해당 단말의 서빙 기지국인지 판단한다. 만약 상기 기지국이 해당 단말의 서빙 기지국인 경우, 1107 단계에서 상기 기지국은 주 스케줄링 채널을 통해 상기 1101 단계에서 협상된 스케줄링 정보를 송신한다. 상기 스케줄링 정보에는 데이터의 송수신 시점, 데이터가 송수신 되는 자원 정보 및 송수신 빔 정보, 데이터 송수신에 사용되는 다중 안테나 설정 정보 중 적어도 하나가 포함될 수 있다.
한편 상기 기지국은 상기 1105 단계의 판단 결과 해당 단말의 서빙 기지국이 아닌 경우, 1109 단계에서 해당 단말의 부 스케줄링 채널들 중 해당 단말이 상기 기지국의 신호를 가장 잘 수신할 수 있는 최적 부 스케줄링 채널을 해당 단말이 주기적으로 보고한 서빙 기지국 그룹의 수신 신호 측정 결과를 바탕으로 선택하고, 선택된 부 스케줄링 채널이 설정된 자원 영역을 파악한다. 이후 상기 기지국은 1111 단계에서 상기 선택된 부 스케줄링 채널과 그 채널이 설정된 자원 영역에서 상기 1101 단계에서 협상된 해당 단말의 스케줄링 정보를 송신한다. 상기 스케줄링 정보에는 데이터의 송수신 시점, 데이터가 송수신 되는 자원 정보 및 송수신 빔 정보, 데이터 송수신에 사용되는 다중 안테나 설정 정보 중 적어도 하나가 포함될 수 있다.
본 발명의 다른 실시 예에서는 단말의 수신 빔 별로 부 스케줄링 채널이 설정되어 있는 상황에서, 기지국들이 특정 단말을 특정 시점에서 스케줄링 하지 않았거나 그 단말에 대해 제어 신호를 송신하지 않을 경우, 그 단말이 불필요하게 부 스케줄링 채널을 수신하는 부담을 줄이기 위해 상기 특정 단말이 서빙 기지국의 주 스케줄링 채널을 통해 스케줄링 되지 않았음을 지시하는 정보(Not scheduled indication)를 상기 특정 단말에게 송신하는 방법을 제안한다. 또한 본 발명의 다른 실시 예에서는 단말이 주 스케줄링 채널을 통해 스케줄링 되지 않았음을 지시하는 정보(Not scheduled indication)를 수신한 경우, 모든 부 스케줄링 채널의 수신을 생략하는 방법을 제안한다.
도 12는 본 발명의 다른 실시 예에 따른 프레임 구조의 일 예를 나타낸 도면이다.
도 12에 도시된 프레임(1201)의 기본적인 구조는 도 7a에서 설명한 프레임(701)의 구조와 동일하다. 즉 하나의 프레임(frame)(1201)은 예컨대, 5ms의 길이를 가지며 5개의 서브-프레임(sub-frame)(1203)으로 구성된다. 각각의 서브-프레임(1203)은 기지국에서 단말을 향해 신호를 송신하는 하향 링크 송신 구간(Down Link)(1211)과 단말에서 기지국을 향해 신호를 송신하는 상향 링크 송신 구간(Up Link)(1221)으로 나뉘어진다. 그리고 스케줄링 영역(1231)은 프레임 구조에서 기지국이 단말에게 스케줄링 정보를 전송하는데 사용하는 주 스케줄링 채널이 전송되는 영역이고, 하향 링크 송신 구간(1221)의 일부는 하향 참조 신호(reference signal)를 송신하기 위한 참조신호 영역(1251)으로 사용된다.
도 12를 참조하여 특정 단말이 스케줄링 되지 않았음을 지시하는 정보(Not scheduled indication)를 송수신하는 본 발명의 다른 실시 예를 설명하기로 한다. 본 다른 실시 예에서 제안하는 방법에서 기지국들이 특정 단말을 특정 시점에서 스케줄링 하지 않았거나 그 특정 단말에 대해 제어 신호를 송신하지 않을 경우, 도 12의 주 스케줄링 채널(1231)을 통해 상기 특정 단말의 서빙 기지국이 그 특정 단말을 스케줄링 하지 않았음을 지시하는 정보(Not scheduled indication)(1231a)를 송신한다. 주 스케줄링 채널(1231)을 통해 스케줄링 되지 않았음을 지시하는 정보(1231a)를 수신한 단말은 해당 서브 프레임에서 부 스케줄링 채널을 수신하는 동작을 생략한다.
도 13은 본 발명의 다른 실시 예에 따라 단말이 스케줄링 채널을 통해 스케줄링 정보를 수신하는 동작을 나타낸 흐름도이다.
도 13을 참조하면, 단말은 1301 단계에서 먼저 서빙 기지국으로부터 주 스케줄링 채널을 수신한다. 상기 1301 단계에서 단말이 주 스케줄링 채널을 수신하는 데에는 서빙 기지국의 신호가 가장 강하게 수신된 최적의 수신 빔이 사용된다. 이후 상기 단말은 1303 단계에서 주 스케줄링 채널을 통해 도 12에서 설명한 스케줄링 되지 않았다는 정보(즉 Not scheduled indication)를 수신하였는지 판단한다. 만약 상기 스케줄링 되지 않았다는 정보를 수신한 경우 상기 단말은 이후 스케줄링 채널의 수신 동작을 종료한다. 만약 상기 스케줄링 되지 않았다는 정보를 수신하지 않은 경우, 즉 상기 단말이 정상적으로 스케줄링되는 경우, 상기 단말은 1305 단계에서 예컨대, 도 9의 실시 예에서 설명한 주/부 스케줄링 채널의 송수신 동작을 계속해서 수행한다.
도 14는 본 발명의 다른 실시 예에 따라 기지국이 스케줄링 채널을 통해 스케줄링 정보를 송신하는 동작을 나타낸 흐름도이다.
먼저 도 14의 실시 예는 하나의 단말에 대해 수행되는 동작을 예시하고 있으나, 기지국은 해당 기지국을 스케줄링 후보로 서빙 기지국 그룹에 포함하는 모든 단말들에 대해 도 11의 동작을 반복하여 수행한다.
도 14를 참조하면, 상기 기지국은 1401 단계에서 단말에 대해 그 단말의 서빙 기지국 그룹에 포함된 기지국들과 스케줄링에 관한 협상을 수행한다. 상기 협상에는 데이터 및 스케줄링 정보를 송수신할 기지국, 데이터 송수신 시점, 데이터 송수신에 사용될 자원, 데이터 송수신에 사용될 송수신 빔, 데이터 송수신에 사용될 다중 안테나 설정 정보 등이 협상 대상으로 포함될 수 있다. 상기 기지국은 1403 단계에서 상기 1401 단계의 협상 결과, 해당 단말에 대한 데이터 및/또는 제어 신호의 송수신이 스케줄링 된 경우, 1409 단계에서 주/부 스케줄링 채널의 송신 및/또는 데이터 채널 송수신 동작을 수행한다. 만약 1403 단계의 판단 결과 해당 단말에 대한 데이터 송수신이 스케줄링 되지 않은 경우, 1405 단계에서 상기 기지국은 해당 단말의 서빙 기지국인지 판단한다. 만약 상기 기지국이 해당 단말의 서빙 기지국인 경우, 1407 단계에서 상기 기지국은 주 스케줄링 채널을 통해 해당 단말에게 스케줄링 되지 않았음을 지시하는 정보(즉 Not scheduled indication)를 송신한다.
본 발명의 또 다른 실시 예에서는 단말의 수신 빔 별로 부 스케줄링 채널이 설정되어 있는 상황에서, 기지국들이 특정 단말의 스케줄링 채널의 수신 성능을 향상시키기 위해 동일한 스케줄링 및/또는 제어 신호를 서로 다른 기지국들이 주/부 스케줄링 채널을 통해 단말에게 결합 송신(joint transmission)하는 방법을 제안한다. 또한 본 실시 예에서는 단말이 스케줄링 및/또는 제어 신호의 수신 성능을 향상시키기 위해 주/부 스케줄링 채널을 통해 서로 다른 기지국으로부터 수신된 스케줄링 및/또는 제어 신호를 결합 수신(joint reception) 및 결합 복호화(joint decoding)하는 동작을 제안한다.
도 15는 본 발명의 또 다른 실시 예에 따라 스케줄링 정보를 결합 송수신하기 위한 프레임 구조의 일 예를 나타낸 도면이다.
도 15에 도시된 프레임(1501)의 기본적인 구조는 도 7a에서 설명한 프레임(701)의 구조와 동일하다. 즉 하나의 프레임(frame)(1501)은 예컨대, 5ms의 길이를 가지며 5개의 서브-프레임(sub-frame)(1503)으로 구성된다. 각각의 서브-프레임(1503)은 기지국에서 단말을 향해 신호를 송신하는 하향 링크 송신 구간(Down Link)(1511)과 단말에서 기지국을 향해 신호를 송신하는 상향 링크 송신 구간(Up Link)(1521)으로 나뉘어진다. 그리고 스케줄링 영역(1531)은 프레임 구조에서 기지국이 단말에게 스케줄링 정보를 전송하는데 사용하는 주 스케줄링 채널이 전송되는 영역이고, 하향 링크 송신 구간(1521)의 일부는 하향 참조 신호(reference signal)를 송신하기 위한 참조신호 영역(1551)으로 사용된다.
도 15의 예에서 기지국들이 특정 단말의 스케줄링 채널에 대해 결합 송신(joint transmission)을 결정한 경우, 상기 단말의 서빙 기지국은 주 스케줄링 채널을 통해 상기 단말의 스케줄링 및/또는 제어 신호를 송신하고, 서빙 기지국 그룹의 후보 기지국들은 그 기지국과 단말 사이의 최적의 수신 빔에 해당하는 (주 혹은 부) 스케줄링 채널을 통하여 동일한 스케줄링 및/또는 제어 신호를 결합 송신한다. 도 15의 예에서 단말은 주/부 스케줄링 채널(1531, 1533, 1535, 1537)을 통해 서로 다른 기지국으로부터 수신된 스케줄링 및/또는 제어 신호를 결합 수신(joint reception) 및 결합 복호화(joint decoding)하는 동작을 수행한다.
도 16은 본 발명의 실시 예에 따른 기지국의 구성을 나타낸 블록도이다.
도 16을 참조하면, 기지국은 무선망을 통해 스케줄링 및/또는 제어 신호와, 데이터를 전송하는 송신부(1610)와, 무선망을 통해 상기 단말로부터 전송되는 데이터를 수신하는 수신부(1630)를 포함한다. 또한 도 16의 기지국은 도 5 내지 도 15에서 설명한 본 발명의 실시 예에 따라 설정된 주/부 스케줄링 채널을 통해 단말에게 스케줄링 및/또는 제어 신호를 전송하고, 하향 링크 구간에서 데이터를 전송하도록 상기 송신부(1610)의 동작을 제어하고, 상기 수신부(1630)의 수신 동작을 제어하는 제어부(1650)을 포함한다. 예컨대, 상기 제어부(1650)는 서빙 기지국 그룹에 속하는 적어도 하나의 다른 기지국과 단말에 대한 스케줄링을 협상하고, 상기 기지국이 서빙 기지국이고 상기 단말에 대한 스케줄링이 결정된 경우, 주 스케줄링 채널을 전송하고, 상기 기지국이 서빙 기지국 그룹에 속하나 서빙 기지국이 아니고 상기 단말에 대한 스케줄링이 결정된 경우, 부 스케줄링 채널을 전송하는 동작을 제어한다. 도 16의 구성을 갖는 기지국의 구체적인 동작은 도 5 내지 도 15에서 설명한 바와 같으므로 그 상세한 설명은 생략하기로 한다.
또한 도시되지는 않았으나 상기 기지국은 다른 기지국과 스케줄링 협상 등을 위한 통신 인터페이스를 포함한다.
도 17은 본 발명의 실시 예에 따른 단말의 구성을 나타낸 블록도이다.
도 17을 참조하면, 단말은 무선망을 통해 기지국으로 데이터를 전송하는 송신부(1710)와, 무선망을 통해 상기 기지국으로부터 전송되는 스케줄링 및/또는 제어 신호와, 데이터를 수신하는 수신부(1730)를 포함한다. 또한 단말은 상기 기지국으로부터 도 5 내지 도 15에서 설명한 본 발명의 실시 예에 따라 각 수신빔의 방향에 대응되게 설정된 주/부 스케줄링 채널을 통해 스케줄링 및/또는 제어 신호를 수신하고, 다운 링크 구간에서 데이터를 수신하도록 상기 수신부(1730)의 동작을 제어하고, 상향 링크 구간에서 데이터를 전송하도록 상기 송신부(1710)의 동작을 제어하는 제어부(1750)을 포함한다. 예컨대, 상기 제어부(1750)는 각 수신빔의 빔 형성을 제어하여 상기 서빙 기지국이 전송하는 주 스케줄링 채널을 수신하고, 각 수신 빔 별로 부 스케줄링 채널의 자원을 판단하며, 상기 판단 결과 상기 각 수신 빔 별로 데이터 송수신 자원과 충돌이 발생하지 않는 부 스케줄링 채널을 서빙 기지국 그룹에 속하는 적어도 하나의 다른 기지국으로부터 수신하는 동작을 제어한다. 이를 위해 상기 제어부(1750)는 각 수신빔의 수신 성능을 근거로 상기 주 스케줄링 채널 및 상기 부 스케줄링 채널에 대응되는 방향의 수신빔을 결정한다.
도 15의 구성을 갖는 단말의 구체적인 동작은 도 5 내지 도 15에서 설명한 바와 같으므로 그 상세한 설명은 생략하기로 한다.
한편 본 발명의 상세한 설명에서는 구체적인 실시 예에 관해 설명하였으나, 본 발명의 범위에서 벗어나지 않는 한도 내에서 여러 가지 변형이 가능함은 물론이다. 그러므로 본 발명의 범위는 설명된 실시 예에 국한되어 정해져서는 안되며 후술하는 특허 청구의 범위뿐만 아니라 이 특허 청구의 범위와 균등한 것들에 의해 정해져야 한다.

Claims (32)

  1. 빔 포밍을 이용하는 무선 통신 시스템에서 단말이 스케줄링 정보를 수신하는 방법에 있어서,
    제1 기지국으로부터 제1 스케줄링 채널을 통해 스케줄링 정보를 수신하는 과정; 및
    상기 제1 기지국과 협력하는 적어도 하나의 제2 기지국으로부터 적어도 하나의 수신 빔을 이용하여 적어도 하나의 제2 스케줄링 채널을 통해 스케줄링 정보를 수신하는 과정을 포함하는 스케줄링 정보를 수신하는 방법.
  2. 제 1 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널은 상기 적어도 하나의 수신빔의 수신 성능을 근거로 정해지는 스케줄링 정보를 수신하는 방법.
  3. 제 1 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널의 각 채널은 대응되는 방향의 수신빔을 이용하여 수신되는 스케줄링 정보를 수신하는 방법.
  4. 제 1 항에 있어서,
    상기 단말이 상기 적어도 하나의 제2 기지국의 신호 세기를 측정하여 각각 그 측정 결과를 해당 기지국으로 전송하는 과정을 더 포함하는 스케줄링 정보를 수신하는 방법.
  5. 제 1 항에 있어서,
    상기 단말의 데이터 송수신을 위한 자원과 상기 적어도 하나의 제2 스케줄링 채널 중 적어도 하나의 자원이 충돌하는 경우, 상기 충돌이 발생되는 제2 스케줄링 채널의 수신을 생략하는 과정을 더 포함하는 스케줄링 정보를 수신하는 방법.
  6. 제 1 항에 있어서,
    상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널 중 적어도 하나의 채널을 통해 상기 적어도 하나의 제2 기지국과 데이터 송수신을 위한 스케줄링 정보를 수신하는 과정을 더 포함하는 스케줄링 정보를 수신하는 방법.
  7. 제 1 항에 있어서,
    상기 제1 스케줄링 채널을 통해 수신된 정보와 상기 적어도 하나의 제2 스케줄링 채널을 통해 수신된 정보를 결합하여 복호화하는 과정을 더 포함하는 스케줄링 정보를 수신하는 방법.
  8. 제 1 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널은 해당 수신빔의 수신 성능에 따라 우선 순위가 정해지는 스케줄링 정보를 수신하는 방법.
  9. 제 1 항에 있어서,
    상기 단말의 주변 기지국들 간의 협상을 통해 상기 주변 기지국들 중에서 상기 제1 기지국과 상기 적어도 하나의 제2 기지국이 정해지는 스케줄링 정보를 수신하는 방법.
  10. 제 1 항에 있어서,
    상기 제1 스케줄링 채널로부터 상기 단말이 스케줄링 되지 않았음을 지시하는 정보를 수신하는 과정; 및
    상기 정보를 수신하는 경우, 상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널을 통한 스케줄링 정보의 수신 동작을 중단하는 스케줄링 정보를 수신하는 방법.
  11. 빔 포밍을 이용하는 무선 통신 시스템에서 스케줄링 정보를 수신하는 단말에 있어서,
    무선망을 통해 제1 기지국과 적어도 하나의 제2 기지국으로부터 데이터를 수신하는 수신부; 및
    상기 제1 기지국으로부터 제1 스케줄링 채널을 통해 스케줄링 정보를 수신하고, 상기 제1 기지국과 협력하는 적어도 하나의 제2 기지국으로부터 적어도 하나의 수신 빔을 이용하여 적어도 하나의 제2 스케줄링 채널을 통해 스케줄링 정보를 수신하는 동작을 제어하는 제어부를 포함하는 단말.
  12. 제 11 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널은 상기 적어도 하나의 수신빔의 수신 성능을 근거로 정해지는 단말.
  13. 제 11 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널의 각 채널은 대응되는 방향의 수신빔을 이용하여 수신되는 단말.
  14. 제 11 항에 있어서,
    무선망을 통해 데이터를 송신하는 송신부를 더 포함하며,
    상기 제어부는 상기 적어도 하나의 제2 기지국의 신호 세기를 각각 측정하여 그 측정 결과를 해당 기지국으로 전송하는 동작을 더 제어하는 단말.
  15. 제 11 항에 있어서,
    상기 제어부는 데이터 송수신을 위한 자원과 상기 적어도 하나의 제2 스케줄링 채널 중 적어도 하나의 자원이 충돌하는 경우, 상기 충돌이 발생되는 제2 스케줄링 채널의 수신을 생략하도록 더 제어하는 단말.
  16. 제 11 항에 있어서,
    상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널 중 적어도 하나의 채널을 통해 상기 적어도 하나의 제2 기지국과 데이터 송수신을 위한 스케줄링 정보를 수신하는 과정을 더 포함하는 단말.
  17. 제 11 항에 있어서,
    상기 제어부는 상기 제1 스케줄링 채널을 통해 수신된 정보와 상기 적어도 하나의 제2 스케줄링 채널을 통해 수신된 정보를 결합하여 복호화하는 동작을 더 제어하는 단말.
  18. 제 11 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널은 해당 수신빔의 수신 성능에 따라 우선 순위가 정해지는 단말.
  19. 제 11 항에 있어서,
    상기 단말의 주변 기지국들 간의 협상을 통해 상기 주변 기지국들 중에서 상기 제1 기지국과 상기 적어도 하나의 제2 기지국이 정해지는 단말.
  20. 제 11 항에 있어서,
    상기 제어부는 상기 제1 스케줄링 채널로부터 상기 단말이 스케줄링 되지 않았음을 지시하는 정보를 수신하는 경우, 상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널의 수신 동작을 중단하도록 더 제어하는 단말.
  21. 빔 포밍을 이용하는 무선 통신 시스템에서 기지국이 스케줄링 정보를 전송하는 방법에 있어서,
    상기 기지국과 협력하는 적어도 하나의 기지국과 상기 단말에 대한 스케줄링을 협상하는 과정; 및
    상기 협상 결과에 따라 제1 스케줄링 채널과 적어도 하나의 제2 스케줄링 채널 중 정해진 스케줄링 채널을 통해 스케줄링 정보를 전송하는 과정을 포함하며,
    상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널의 각 채널은 상기 단말의 수신빔 별로 설정되는 스케줄링 정보를 전송하는 방법.
  22. 제 21 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널은 상기 적어도 하나의 수신빔의 수신 성능을 근거로 정해지는 스케줄링 정보를 전송하는 방법.
  23. 제 21 항에 있어서,
    상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널의 각 채널은 상기 단말의 방향별 수신빔에 대응되는 스케줄링 정보를 전송하는 방법.
  24. 제 21 항에 있어서,
    상기 단말로부터 수신 신호 세기에 대한 측정 결과를 수신하는 과정을 더 포함하며,
    상기 측정 결과를 근거로 상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널 중 상기 기지국이 전송할 스케줄링 채널이 정해지는 스케줄링 정보를 전송하는 방법.
  25. 제 21 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널은 해당 수신빔의 수신 성능에 따라 우선 순위가 정해지는 스케줄링 정보를 전송하는 방법.
  26. 제 21 항에 있어서,
    상기 단말이 스케줄링되지 않을 경우, 상기 정해진 스케줄링 채널을 통해 상기 단말이 스케줄링 되지 않았음을 지시하는 정보를 전송하는 과정을 더 포함하는 스케줄링 정보를 전송하는 방법.
  27. 빔 포밍을 이용하는 무선 통신 시스템에서 스케줄링 정보를 전송하는 기지국에 있어서,
    무선망을 통해 데이터를 송수신하는 송수신부;
    상기 기지국과 협력하는 적어도 하나의 기지국과 통신을 위한 통신 인터페이스; 및
    상기 적어도 하나의 기지국과 상기 단말에 대한 스케줄링을 협상하고, 상기 협상 결과에 따라 제1 스케줄링 채널과 적어도 하나의 제2 스케줄링 채널 중 정해진 스케줄링 채널을 통해 스케줄링 정보를 전송하는 동작을 제어하는 제어부를 포함하며,
    상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널의 각 채널은 상기 단말의 수신빔 별로 설정되는 기지국.
  28. 제 27 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널은 상기 적어도 하나의 수신빔의 수신 성능을 근거로 정해지는 기지국.
  29. 제 27 항에 있어서,
    상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널의 각 채널은 상기 단말의 방향별 수신빔에 대응되는 기지국.
  30. 제 27 항에 있어서,
    상기 제어부는 상기 단말로부터 수신 신호 세기에 대한 측정 결과를 더 수신하며,
    상기 측정 결과를 근거로 상기 제1 스케줄링 채널과 상기 적어도 하나의 제2 스케줄링 채널 중 상기 기지국이 전송할 스케줄링 채널이 정해지는 기지국.
  31. 제 27 항에 있어서,
    상기 적어도 하나의 제2 스케줄링 채널은 해당 수신빔의 수신 성능에 따라 우선 순위가 정해지는 기지국.
  32. 제 27 항에 있어서,
    상기 제어부는 상기 단말이 스케줄링되지 않을 경우, 상기 정해진 스케줄링 채널을 통해 상기 단말이 스케줄링 되지 않았음을 지시하는 정보를 전송하는 동작을 더 제어하는 기지국.
PCT/KR2013/010346 2012-11-14 2013-11-14 빔 포빙을 이용하는 무선 통신 시스템에서 스케줄링 정보를 송수신하는 방법 및 장치 WO2014077600A1 (ko)

Priority Applications (6)

Application Number Priority Date Filing Date Title
EP20185566.5A EP3742853B1 (en) 2012-11-14 2013-11-14 Method and device for sending and receiving scheduling data in a wireless communication system using beamforming
JP2015542950A JP6266641B2 (ja) 2012-11-14 2013-11-14 ビームフォーミングを用いる無線通信システムにおけるスケジューリング情報を送受信する方法及び装置
CN201380070428.7A CN104919874B (zh) 2012-11-14 2013-11-14 用于在使用波束成形的无线通信系统中发送和接收调度数据的方法和设备
US14/443,036 US10237887B2 (en) 2012-11-14 2013-11-14 Method and device for sending and receiving scheduling data in a wireless communication system using beamforming
EP13855409.2A EP2922356B1 (en) 2012-11-14 2013-11-14 Method and device for sending and receiving scheduling data in a wireless communication system using beamforming
US16/357,242 US10805948B2 (en) 2012-11-14 2019-03-18 Method and device for sending and receiving scheduling data in a wireless communication system using beamforming

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020120128879A KR102024059B1 (ko) 2012-11-14 2012-11-14 빔 포밍을 이용하는 무선 통신 시스템에서 스케줄링 채널을 송수신하는 방법 및 장치
KR10-2012-0128879 2012-11-14

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US14/443,036 A-371-Of-International US10237887B2 (en) 2012-11-14 2013-11-14 Method and device for sending and receiving scheduling data in a wireless communication system using beamforming
US16/357,242 Continuation US10805948B2 (en) 2012-11-14 2019-03-18 Method and device for sending and receiving scheduling data in a wireless communication system using beamforming

Publications (1)

Publication Number Publication Date
WO2014077600A1 true WO2014077600A1 (ko) 2014-05-22

Family

ID=50731445

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2013/010346 WO2014077600A1 (ko) 2012-11-14 2013-11-14 빔 포빙을 이용하는 무선 통신 시스템에서 스케줄링 정보를 송수신하는 방법 및 장치

Country Status (6)

Country Link
US (2) US10237887B2 (ko)
EP (2) EP3742853B1 (ko)
JP (1) JP6266641B2 (ko)
KR (1) KR102024059B1 (ko)
CN (1) CN104919874B (ko)
WO (1) WO2014077600A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017520984A (ja) * 2014-06-02 2017-07-27 インテル アイピー コーポレイション 通信システム及び方法

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10327156B2 (en) * 2014-07-15 2019-06-18 Lg Electronics Inc. Resource allocation method and signal processing method of terminal
CN113098570A (zh) 2015-10-20 2021-07-09 松下电器(美国)知识产权公司 通信装置及通信方法
US10028303B2 (en) * 2015-10-26 2018-07-17 Intel IP Corporation Clear channel assessment (CCA) in wireless networks
CN107769829B (zh) * 2016-08-19 2022-08-26 中兴通讯股份有限公司 波束引导方法、波束间协作传输方法及装置
CN107770867A (zh) * 2016-08-19 2018-03-06 中兴通讯股份有限公司 无线接入点间协作控制方法及装置
JP7242161B2 (ja) * 2017-06-14 2023-03-20 ソニーグループ株式会社 通信装置、通信制御方法及びコンピュータプログラム
US10892814B2 (en) * 2018-12-07 2021-01-12 Charter Communications Operating, Llc Performing receive beamforming in a fifth generation millimeter wave system
US11855927B2 (en) 2020-11-18 2023-12-26 Electronics And Telecommunications Research Institute Method and apparatus for scheduling in communication system supporting ultra-high frequency and ultra-wide band
US11342973B1 (en) * 2021-10-19 2022-05-24 King Faisal University System and method for maintaining link communications in millimeter wave cellular networks

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090101760A (ko) * 2008-03-24 2009-09-29 엘지전자 주식회사 다중 셀 환경에서 다수의 기지국이 협력하여 데이터를송신하는 방법 및 이를 이용하여 데이터를 수신하는 방법
KR20100064334A (ko) * 2008-12-04 2010-06-14 엘지전자 주식회사 무선 통신 시스템에서 제어 정보 전송 방법
KR20100117522A (ko) * 2009-04-24 2010-11-03 한국전자통신연구원 셀룰라 무선 통신 시스템에서의 협력 통신 방법 및 이를 수행하는 단말기
KR20120011916A (ko) * 2010-07-27 2012-02-09 삼성전자주식회사 롱텀 채널 정보를 기반으로 다중 노드 간 서브밴드 별 협력 통신을 수행하는 방법 및 장치

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1096696A1 (en) 1999-10-28 2001-05-02 Telefonaktiebolaget L M Ericsson (Publ) A method and apparatus for uplink scheduling
US8942165B2 (en) * 2008-08-01 2015-01-27 Qualcomm Incorporated System and method for distributed multiple-input multiple-output (MIMO) in a wireless communication system
KR101634177B1 (ko) 2009-01-15 2016-06-28 엘지전자 주식회사 데이터 패킷의 처리 및 전송 방법
EP2638652A2 (en) * 2010-11-10 2013-09-18 Interdigital Patent Holdings, Inc. Method and apparatus for interference mitigation via successive cancellation in heterogeneous networks
US9002367B2 (en) * 2010-12-23 2015-04-07 Telefonaktiebolaget L M Ericsson (Publ) Downlink control for wireless heterogeneous telecommunications
US10638464B2 (en) * 2011-04-01 2020-04-28 Futurewei Technologies, Inc. System and method for transmission and reception of control channels in a communications system
US10411852B2 (en) * 2011-10-04 2019-09-10 Samsung Electronics Co., Ltd. Method and system for signaling and processing control information in a mobile broadband network environment
US9634740B2 (en) * 2012-01-30 2017-04-25 Nec Corporation Radio communication system and communication control method
KR101949890B1 (ko) 2012-04-02 2019-04-26 삼성전자주식회사 무선 통신 시스템에서 협력 서비스 제공 방법 및 장치
KR101791270B1 (ko) 2012-05-14 2017-11-20 삼성전자주식회사 이동통신 시스템에서 공동으로 신호를 송수신하는 통신 방법 및 장치
US20130331136A1 (en) * 2012-06-07 2013-12-12 Kai Yang Method And Apparatus For Coordinated Beamforming
US9615360B2 (en) * 2012-07-27 2017-04-04 Futurewei Technologies, Inc. System and method for multiple point communications
TWI611708B (zh) * 2012-08-28 2018-01-11 Idac控股公司 從主波束的通信鏈路交遞的方法及裝置
US8923880B2 (en) * 2012-09-28 2014-12-30 Intel Corporation Selective joinder of user equipment with wireless cell
CN104798321B (zh) * 2012-11-25 2018-01-30 Lg 电子株式会社 用于在无线通信系统中发送和接收数据的方法和装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090101760A (ko) * 2008-03-24 2009-09-29 엘지전자 주식회사 다중 셀 환경에서 다수의 기지국이 협력하여 데이터를송신하는 방법 및 이를 이용하여 데이터를 수신하는 방법
KR20100064334A (ko) * 2008-12-04 2010-06-14 엘지전자 주식회사 무선 통신 시스템에서 제어 정보 전송 방법
KR20100117522A (ko) * 2009-04-24 2010-11-03 한국전자통신연구원 셀룰라 무선 통신 시스템에서의 협력 통신 방법 및 이를 수행하는 단말기
KR20120011916A (ko) * 2010-07-27 2012-02-09 삼성전자주식회사 롱텀 채널 정보를 기반으로 다중 노드 간 서브밴드 별 협력 통신을 수행하는 방법 및 장치

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
MOTOROLA: "PDCCH Beamforming for LTE-A", R1-092173, 3GPP TSG RAN1#57, 4 May 2009 (2009-05-04), San Francisco, USA, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg_ran/WG1-RL1/TSGR1-57/Docs/R1-092173.zip> *
See also references of EP2922356A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017520984A (ja) * 2014-06-02 2017-07-27 インテル アイピー コーポレイション 通信システム及び方法

Also Published As

Publication number Publication date
CN104919874A (zh) 2015-09-16
CN104919874B (zh) 2018-11-23
EP2922356B1 (en) 2020-07-15
US20190215860A1 (en) 2019-07-11
JP6266641B2 (ja) 2018-01-24
EP2922356A1 (en) 2015-09-23
EP3742853B1 (en) 2021-09-15
JP2016501478A (ja) 2016-01-18
US10237887B2 (en) 2019-03-19
US20170006629A1 (en) 2017-01-05
KR102024059B1 (ko) 2019-09-24
KR20140062314A (ko) 2014-05-23
US10805948B2 (en) 2020-10-13
EP3742853A1 (en) 2020-11-25
EP2922356A4 (en) 2016-07-27

Similar Documents

Publication Publication Date Title
WO2014077600A1 (ko) 빔 포빙을 이용하는 무선 통신 시스템에서 스케줄링 정보를 송수신하는 방법 및 장치
WO2013176529A1 (en) Method and apparatus for transmitting and receiving reference signal in mobile communcation system using beamforming
WO2015156575A1 (ko) 빔포밍 기반 셀룰러 시스템의 상향링크 빔 추적 방법 및 장치
EP3985942B1 (en) Systems and methods for selecting an optimum communication route in a wireless network
WO2013125881A1 (en) Method and apparatus for transmitting and receiving signal in communication system
WO2014003503A1 (en) Method and apparatus for transmitting signal in beam forming-based communication system
WO2013112008A1 (en) Method and system for providing service in a wireless communication system
WO2013172637A1 (en) Communication method and apparatus for jointly transmitting and receiving signal in mobile communication system
WO2016163809A1 (ko) 단말간 직접 통신 방법 및 장치
WO2013028012A2 (en) Mobile terminal and communication method thereof, base station controller and control method thereof, and multi-cooperative transmission system using the same and method thereof
WO2014027868A1 (ko) 빔포밍을 이용한 시스템에서 시스템 액세스 방법 및 장치
WO2014007519A1 (en) Apparatus and method for operating resources in communication system
WO2014003499A1 (en) Method and apparatus for beamforming
WO2013122428A1 (en) Method and apparatus for providing service in wireless communication system in which multiple base stations cooperate with each other, and system therefor
WO2013133606A1 (ko) 무선 통신 시스템에서 상향링크 신호 송수신 방법 및 장치
JP2009536487A (ja) 無線ネットワークにおけるハンドオーバの最適化
WO2017010644A1 (ko) 하이브리드 빔포밍을 이용한 무선 통신 방법, 이를 위한 장치
US20130279461A1 (en) Super Scheduling Control Channel
WO2013137635A1 (ko) 단말의 상향 링크 송신 전력을 제어하는 방법 및 장치
WO2018137409A1 (zh) 一种上行移动性下的寻呼传输方法、通信站点及通信节点
WO2016085092A1 (en) Method and system for controlling transmission of code words during handover in a wireless network
WO2016112715A1 (zh) 一种辅服务小区的资源的控制、管理方法和装置
WO2009123420A2 (en) Method of allocating channel time, method of determining compatible links, and apparatus for processing data
US10104556B2 (en) Method and device for eliminating inter-system neighbor cell interference
JP2006516840A (ja) リレー通信装置、通信方法、および、該装置および方法によるモバイル通信システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13855409

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015542950

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14443036

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2013855409

Country of ref document: EP