WO2014058310A1 - Élément de canalisation, système de vidange de tuyau d'évacuation et procédé de déconnexion provisoire d'un tuyau de sortie d'un bâtiment d'un collecteur d'égout - Google Patents
Élément de canalisation, système de vidange de tuyau d'évacuation et procédé de déconnexion provisoire d'un tuyau de sortie d'un bâtiment d'un collecteur d'égout Download PDFInfo
- Publication number
- WO2014058310A1 WO2014058310A1 PCT/NL2013/050710 NL2013050710W WO2014058310A1 WO 2014058310 A1 WO2014058310 A1 WO 2014058310A1 NL 2013050710 W NL2013050710 W NL 2013050710W WO 2014058310 A1 WO2014058310 A1 WO 2014058310A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- duct element
- duct
- drainpipe
- top section
- intermediate structure
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
Definitions
- the invention relates to a duct element, a drain pipe emptying system and method for temporarily disconnecting an outlet pipe of a building from a sewer main.
- WO201 1/010915A1 discloses a collecting watertight bottom section to be placed under the drainpipe.
- the watertight bottom section functions as a collecting container after a clogged drainpipe has been drilled through, into which the contaminated drainage water running from the drainpipe can flow without contaminating the surrounding area or the soil. The soil remains dry, it is not contaminated and the environment is thus burdened less.
- a top section can be place on top of the collecting section, and the contaminated drainage water can be pumped from the collecting section into a temporary or non-temporary facility.
- the collecting watertight bottom section and top section could be used for temporarily disconnecting an outlet pipe of a building from a sewer main.
- the bottom section should be installed stable with respect to the existing drainpipe to provide a watertight coupling.
- the bottom section and top section could sink in the soil due to its weight inclusive the collected sewage water. This could result in damage of the drainpipe which has to carry part of the weight.
- the sewer main could be used again, the drainpipe which is partially removed somewhere in the bottom section, has to be repaired. At this moment, a person has to work in the bottom section and there is a risk that he will become in contact with the sewerage water in the bottom section. After the pipe has been repaired, the bottom section has to be removed, which could be time consuming.
- a duct element having the features of claim 1.
- Advantageous embodiments and further ways of carrying out the invention may be attained by the measures mentioned in the dependent claims.
- a duct element for use in a sewage system comprises an inlet structure, an outlet structure and an intermediate structure.
- the inlet structure is configured to couple the duct element with a first drainpipe of the sewage system.
- the outlet structure is configured to couple the duct element with a second drainpipe of a sewage system.
- the intermediate structure forms a duct between the inlet structure and the outlet structure, wherein the intermediate structure comprises an opening to provide access to the inlet structure and outlet structure.
- the intermediate structure comprises a space which enables the duct element to collect a minimum amount of sewage before sewage is collected in the inlet structure. The minimum amount enables a pumping device to drain sewage from the space and the sewage collected in the inlet structure.
- the space comprises a flat bottom in a plane.
- the inlet structure forms a duct having an upper side which in longitudinal direction of the duct is essentially parallel to the plane of the flat bottom
- the invention is based on the concept that the possibility to lose sewerage from the sewer system is reduced significantly when the outlet pipe of a building is permanently provided with a construction which could be used to store a minimum amount of sewerage such that a pump could fully discharge the drainpipe upstream the structure, i.e. in the direction of the sewage source, when said drainpipe is at least partially filled with sewerage water. In this way, there is no need to truncate the drainpipe or to make holes in the drainpipe, which have to be repaired after the sewer main could be used again. Normally, a drainpipe runs gradually downward so that no sewer water is collected in the pipe. A pump needs a minimum amount of water or water height to discharge the water present in a space.
- the duct element described above provides a structure which enables a pump to empty a drainpipe upstream the duct element. Even when the drainpipe is at least half filled with sewerage water a flow could be generated which completely discharges the drainpipe upstream the duct element. In this way, despite that sewerage is temporarily collected in the drainpipe, no waste is accumulated at the bottom of the drainpipe.
- the drainpipe upstream the duct element could be used as buffer to collect sewage water.
- the buffering capacity is a multitude of the buffering capacity of the intermediate structure. As a result of this, the number of times the pump has to be switch on could be relatively low.
- upstream and downstream relate to an arrangement of items or features relative to the propagation of fluid through the system. . It is obvious that in the context of the present application "watertight" closed also means that the opening is air-tight sealed.
- EP1925756A1 discloses a peephole.
- the peephole does not comprise the necessary space between the inlet structure and the outlet structure to collect the minimum amount of sewage to enable a pump to fully discharge the drainpipe upstream the structure.
- waste in the drainpipe will accumulate and will finally obstruct the drainpipe.
- EP1260641 A1 discloses a structure which is suitable to collect the minimum amount of waste water. However, if the opening to provide access to the intermediate structure and outlet are watertight closed, waste water will accumulate to a level which is below the flow profile of the upstream drainpipe.
- the upstream drainpipe could not be used as a buffer to collect sewerage. As a result of this, the quantity of water that could be drained each time the pump is switch on is very limited. Switching on the pump more frequently shortens the lifetime of the pump.
- Another advantage of the duct element is that it could be used to replace the commonly known access pipe part.
- An access pipe part enables one to inspect the drainpipe and could be used to unclog or clean the drainpipe.
- the inlet structure of the duct element has a flow profile and a substantially flat wall of the intermediate structure forming a bottom of the space is at least 5 cm lowered with respect to the flow profile of the inlet structure.
- the minimum depth of the bottom of the space relative to the flow profile of the inlet structure depends on the type of pump used to discharge the space. If there is not enough depth, the pump will suck air before the inlet structure is emptied, as a result of this the pump loses its pumping capacity and consequently solid particles in the sewage water could accumulate at the bottom of the upstream drainpipe. It has been found that for a commercially available submersible pump with crushing system a depth of 8 cm is sufficient to discharge the inlet structure and drainpipe coupled to the inlet structure.
- the outlet structure of the duct element comprises a flow profile which is aligned with the profile of the inlet structure.
- the intermediate structure is further configured to receive a detachable flow profile part which profile part provides the duct element a continuous flow profile from the inlet structure to the outlet structure.
- the inlet structure and the outlet structure have a duct diameter and the duct of the intermediate structure has a length which is longer than the duct diameter of the inlet structure. This features provides a space which is sufficient large to collect waste water and to pump the waste water out of the intermediate structure.
- the inlet structure and the outlet structure have a duct diameter in the range 100 - 250 mm.
- the minimum amount of sewage has a depth which is sufficient for a submersible pump to operate.
- a drain pipe emptying system for temporarily disconnecting an outlet pipe of a building from a sewer main.
- the system comprising a duct element according to the first aspect and a top section which closes watertight the opening of the intermediate structure of the duct element.
- the top section comprises a submersible pump, one or more sensor generating signals enabling a controller to control the submersible pump and a coupling structure to couple a discharge duct to the submersible pump.
- the system provides a compact and easy to install system to disconnect an outlet pipe of a building temporarily from a sewer main.
- An advantage of a detachable top section is that the top section could be reused. After detaching the top section, the opening of the duct element could easily be closed with a lid.
- the top section further comprises a valve construction configured to prevent sewer in the intermediate structure to enter the outlet structure.
- the top section and the intermediate structure of the duct part form a chamber wherein the submersible pump and one or more sensors are located.
- the top section further comprises a flushing device configured for cleaning the chamber.
- the submersible pump comprises a crushing system. This feature allows us to use a submersible pump with a smaller size and consequently to reduce the dimensions of the duct element and top section. As a result, less soil has to be removed to place the duct element.
- the controller is integrated in the top section. This feature provides a system which is easy to install as the system has only be connected to a power supply and a duct to drain the waste water pumped out of the duct element.
- a product comprising all technical features of the top section according to second aspect for use with a duct element according to the first aspect.
- a flow profile part which when placed in the space of the intermediate structure of a duct element according to the first aspect provides the duct element a continuous flow profile from the inlet structure to the outlet structure.
- a drainpipe of a building from a sewer main comprising:
- This method is very suitable when renovating a sewer system while the toilets and other waste water generating units of a building are continuously used.
- a drainpipe of a building from a sewer main wherein the drainpipe comprises a duct element according to first aspect comprises:
- the method further comprises:
- a flow profile part is placed in the space of the intermediate structure of the duct element resulting in a continuous flow profile through the duct element.
- upstream and downstream relate to an arrangement of items or features relative to the propagation of fluid through the system.
- Fig. 1 shows schematically a sectional view of a first embodiment of a duct element
- Fig. 2 shows schematically a side view of the first embodiment
- Fig. 3 shows schematically a sectional view of a flow profile part
- Fig. 4 shows schematically a view of a top section
- Fig. 5 shows schematically a view of a drain pipe emptying system
- Fig. 6 shows schematically a sectional view of a second embodiment of a duct element.
- Fig. 1 shows schematically a sectional view of a first embodiment of a duct element 2 according to the invention.
- the duct element 2 could be used in a sewage system or any other drainage system.
- the duct element could be arranged somewhere in the outlet pipe of a building draining fluid from the building to a sewer main.
- the arrows with reference numeral 5 indicate the flow direction of the fluid through the duct element 2.
- upstream and downstream in the present description relate to an arrangement of items or features relative to the propagation of fluid through a system or structure.
- the duct element 2 comprises an inlet structure 4, and outlet structure 6 and an intermediate structure 8.
- the duct element 2 could be made from a plastic material by an injection moulding process, such as polyvinyl chloride (PVC) and Polyethylene (PE).
- the inlet structure 4 is configured to couple the duct element with a first drainpipe of the sewage system upstream the duct element 2.
- the first drainpipe supplies fluid from the building to the duct element 2.
- the outlet structure 6 is configured to couple the duct element 2 with a second drainpipe of a sewage system.
- the second drainpipe is downstream the duct element and drains the fluid from the duct element 2 to the sewer main.
- the inlet structure 4 and the outlet structure 6 have different coupling structures.
- any suitable coupling structure to connect a drain pipe to the duct element could be used.
- the diameter of the inlet structure 4 and the outlet structure 6 could be in the range 100 - 250 mm.
- both structures 4, 6 have the substantially the same diameter.
- a watertight coupling between coupling structure of the duct element 2 and drainpipe might be obtained by gluing and by the use of one or more fittings.
- the intermediate structure 8 forms a duct between the inlet structure
- the inlet structure 4 and the outlet structure 6 protrude at opposite sides of the intermediate structure 8.
- the intermediate structure 8 is an open container formed by housing with an opening 8A.
- the opening 8A is closed watertight with a lid 3 in a conventional way.
- the opening 8A provides access to the inlet structure and outlet structure and enables one to inspect the conduits coupled to the duct element 2 and to clean or unclog the conduits.
- the intermediate structure 8 further comprises a space 8B.
- the space 8B is the part of the cavity formed by the housing of the intermediate structure 8 which has a level which is below the inlet structure 4. How the space 8B will be used in an application will be described below.
- a wall 8C of the intermediate structure forms a bottom 8C of the structure.
- the bottom 8C comprises a substantially flat area so that a submergible pumping device (not shown) could be positioned on the bottom 8C.
- Bottom 8C is in a virtual plane.
- the inlet structure 4 is a duct with a flow profile 4A.
- the lowest part of the flow profile 4A is in longitudinal direction of the duct basically parallel to the virtual plane.
- the inlet structure 4 is a duct having an upper side which in longitudinal direction of the duct is basically parallel to the virtual.
- the duct of the inlet structure has a circular cross section and a duct axis which is basically parallel to the virtual plane.
- the outlet structure 6 has a flow profile 6A.
- a detachable flow profile part 9 is positioned in the cavity of the intermediate structure 8.
- the detachable flow profile part 9 has a flow profile 9A.
- the detachable flow profile part 9 When the detachable flow profile part 9 is positioned in the cavity, the detachable flow profile part 9 provides the duct element 2 a continuous flow profile from the inlet structure 4 to the outlet structure 6.
- Continuous in the present context means that there is no significant change in height when fluid flows from the inlet flow profile 4A to the flow profile 9A of the flow profile part 9 and flows from the flow profile 9A of part 9 to the outlet flow profile 6A.
- the continuous profile defined by the inlet structure, detachable flow profile part and outlet structure is basically parallel to the virtual plane. In this way, the risk of clogging in the duct element 2 is reduced.
- Fig. 2 shows schematically a side view of the first embodiment seen from the side of the outlet structure 6.
- the profile of the detachable flow profile part 9 is indicated by the dashed line. It can be seen that the flow profile 6A of the outlet structure 6 is aligned with the flow profile 9A of part 9. Furthermore, the flow profile 4A of the inlet part 4 is aligned with the flow profiles 9A and 6A.
- Fig. 3 shows schematically a sectional view of the detachable flow profile part 9.
- the flow profile 9A is semi-circular.
- the wall of the flow profile 9A is extended at each side with a slanted wall 9B.
- the slanted walls 9B reduce the risk that waste material is collected in the cavity of the intermediate structure.
- Fig. 4 shows schematically a sectional view of a top section 40 that could be placed on the intermediate structure 8 of the duct element 2 and closes watertight the opening 8A of the intermediate structure 8.
- the top section 40 comprises housing 41 , a submersible pump 42, one or more sensors 44, a controller 46, a valve structure 47 and a flushing device 45.
- Fig. 5 shows schematically the situation wherein the top section 40 shown in Fig. 4 is positioned on the duct part 2 shown in Fig. 1.
- the combination forms a drain pipe emptying system 50 for temporarily disconnecting an outlet pipe of a building from a sewer main.
- the housing 41 of the top section 40 and the intermediate structure 8 of the duct part 2 form a chamber 52 wherein the submersible pump and one or more sensors are located.
- Figs. 4 and 5 do not show the means to affix the submersible pump 42 and sensor 44 in the housing 41.
- the submersible pump When the top section 40 is positioned on the duct element 2, the submersible pump is positioned on the bottom 8C of the intermediate structure 8.
- the depth of the space 8 depends on the pumping characteristics of the submersible pump 42 and should be at least the minimum level needed by the submersible pump 42 to start pumping. It has been found that the bottom 8C of the space (8B) should be at least 5 cm lower than the underside of the flow profile 4A of the inlet structure 4. It has been found that for a commercially available submersible pump with crushing system a depth of 8 cm is sufficient to discharge the inlet structure and drainpipe coupled to the inlet structure.
- An advantage of a submersible pump with crushing system is that the dimensions of the pump and he diameter of the duct to discharge the fluid could be smaller.
- the fluid pumped by the pump 42 is discharged via a duct which is outside the housing provided with a coupling 48 to couple a hose or any other discharge duct (not shown) to the outlet of the submersible pump 42.
- a sensor arrangement 44 is shown.
- This sensor arrangement is a hollow body in which fluid can enter.
- two or three sensor are positioned.
- the sensors generate signals which enable the controller 46 to control, i.e. switch on/off, the submersible pump 42.
- the two or three sensor measure the level of fluid in the chamber formed by the housing 41 of the top section 40 and the housing of the intermediate structure 8. It should be noted that other sensors could be used, for example a floating switch.
- the controller is an integral part of the top section.
- the controller 46 is in the housing of the top section 40. It might be possible that the controller is at distance from the housing and electrically connected to the pump 42 and one or more sensors 44 by wires.
- the controller 46 is further electrically coupled to a power supply (not shown).
- the power supply could be a mains or a battery.
- the valve construction 47 is configured to prevent sewer or fluid in the cavity of intermediate structure 8 to enter the outlet structure 6.
- the valve construction 47 comprises a rod 47B. At one end the rod 47B is coupled to the housing 41 by a hinge 47 A.
- a sealing member 47A is attached to the opposite side of the rod 47B.
- the sealing member 47A is at the level of the outlet structure 6 and configured to seal the opening of the outlet structure 6 when positioned in the opening.
- the sealing member 47A has a conical shaped body of a resilient material which material is resistant to the aggressive environment of a sewer system. An example of this material is rubber.
- the valve construction 47 further comprises a setting means 47D to move the sealing member 47A between an open and a closed position.
- Fig. 4 shows the valve construction 47 in the open position and Fig.
- the setting means 47D is a bolt wherein the end of the bot is rotatable coupled to the rod 47B.
- the bolt 47D By rotating the bolt 47D, the bolt will move along its rotation axis through the wall of the housing 41 and rotates the rod along the hinge 47C so that the sealing member 47A will move in/out the outlet structure 6 to closed/release the passage to the pipe attached to the outlet structure 6.
- the outlet structure comprises a closable opening. Through the opening, a balloon could be placed in the outlet structure to seal the outlet structure.
- a flushing device 45 is provided at the top side of the housing 41 of the top section 40.
- the flushing device 45 is configured to clean the interior of the chamber 52 formed by the housing of the top section 40 and the duct element 2.
- the flushing device 45 could be connected outside the housing 41 to a clean water supply.
- one or more nozzles are provided to clean the surfaces in the chamber 52.
- the duct element 2 and top section 40 are used when renovating the outlet pipe and the sewer main.
- the sewer coming from the building could not be discharged for a period via the existing sewer system.
- a drainpipe of a building is temporarily disconnected from a sewer main.
- the following method is performed. First, the drainpipe of outlet pipe is closed at a location between the building and the sewer main. This could be done in a commonly known way by drilling a hole in the pipe and placing a balloon in the pipe to seal the pipe. Subsequently, downstream the deal, another hole is made in the pipe and the pipe is cleaned by flushing clean water through the pipe.
- the intermediate structure After the drainpipe upstream the intermediate structure is opened by removing the previously placed balloon in the drainpipe upstream the duct element 4, the sewer already collected in the drainpipe during mounting the duct element and positioning the top section flows in the chamber of the intermediate structure 4.
- the space 8B of the intermediate structure enables the duct element to collect a minimum amount of sewage before sewage is collected in the inlet structure 4 and enables a pumping device 42 to drain sewage from the space 8B. This allows sewage present in the inlet structure 4 to flow in the space 8B.
- the controller By connecting the electronics of the top section to a power supply, the controller will receive signals from the one or more sensors which indicate the level of the sewage in the chamber.
- the pump will be switch on and starts discharging sewage from the chamber 52.
- the pump will be switched off.
- the chamber will then be filled again with sewage from the building.
- the level to switch the pump off is preferably below the level of the flow profile of the inlet structure.
- the outlet pipe up to the duct element is emptied regularly; as a result the outlet pipe will not clog by solid waste material, such as faeces, toilet paper, sanitary napkins.
- the combination of duct element and top section provided temporary means to bypass the connection with the sewer main by pumping the sewage to a temporary storage facility such as a mobile tank or another still working sewer main in the vicinity of the building.
- the following actions have to be performed to drain the sewage from the building to the sewer main.
- the hole drilled in the drainpipe of the outlet pipe upstream the duct element could be used to position a balloon to seal the drainpipe.
- the flushing device 45 is used to clean the interior of the watertight chamber formed by the duct element and the housing of the top section.
- the pump is still working and the sewage in the chamber will be diluted until the surfaces in the chamber are essentially clean.
- the duct downstream the intermediate structure is opened. This is done by moving the sealing element of the valve construction from the closed to the open position.
- the clean water can now flow away through the outlet structure and the duct attached to the sewer main.
- a person could remove the top section with minimal risk to be infected by the sewer material. Furthermore, there is no risk that the soil will be polluted by sewerage. Subsequently, the person has to position the detachable flow profile part in the space of the intermediate structure of the duct element, which results in continuous flow profile through the duct element. The person could now close the opening of the duct element by the lid and open the drainpipe upstream the intermediate structure by removing the balloon out of the drainpipe.
- the sewer system already comprises a duct element in which a detachable flow profile part is positioned.
- the drainpipe upstream the intermediate structure is closed by using the opening in the drainpipe upstream the duct element by positioning a balloon in the drainpipe.
- the lid is removed from the opening of the duct element.
- the lid which hermetically seals the opening of the intermediate structure, is provided with a first tube like access structure.
- the first tube like access structure forms a passage for a suction hose through the lid to the space of the intermediate structure.
- the first tube like access structure further comprises a sealing member which is closed when no suction hose is positioned in the passage.
- a first example of a sealing member is a tilting valve at the end of the passage directed to the space of the intermediate structure.
- a spring pushes the valve against end of the first tube like access structure.
- the valve will be opened and sewage in the intermediate structure could be sucked out the intermediate structure before removing the lid.
- a second example of a sealing member is a ball valve. The ball valve is opened after an active suction hose is positioned in the passage. After the ball valve is opened the active suction hose could be pushed in the space of the intermediated structure.
- the use of a lid with the first tube like access structure reduces the risk that a person comes in contact with the sewage as the sewage is mainly removed before the lid is removed from the opening of the intermediate structure.
- the lid comprise a second and/or a third tube like passage.
- the second and third tube like passage has a curvature that directs an inspection element or a cleaning nozzle at and end of a high pressure hose through the inlet structure and outlet structure.
- the second and third tube like passage are closed exterior by a removable closing member, for example a screw cap. After emptying the space in the intermediate structure, the second or third tube like passage could be opened without the risk that sewage is pushed though the passage. Subsequently, an inspection element or high pressure hose could be pushed through the sewage pipe attached to the inlet and/or outlet structure to inspect or to clean the attached sewer pipes. In this way, the sewer system could be inspected/cleaned without removing the lid from the intermediate structure. It should be noted that a lid having at least one of the three tube like passages could be used on existing inspection pipe elements.
- the duct element and surface of the flow profile part in the intermediate structure is cleaned. Then, the flow profile part is removed from the space of the intermediate structure and the top section is positioned on the opening of the duct element. Subsequently, the entry to the duct downstream the intermediate is closed by the valve construction, the drainpipe upstream the intermediate structure is opened again by removing the balloon.
- the top section is coupled to a duct to drain the sewage pumped out of the chamber formed by the housing of the top section and intermediate structure to a storage tank or a working sewer main in the vicinity of the building. Finally, the top section is electrically connected to a power supply.
- the inlet structure 4 and the outlet structure 6 have a duct diameter and the duct of the intermediate structure, i.e. the distance between the inlet structure and the outlet structure has a length which is longer than the duct diameter of the inlet structure. This is due to the size of the submersible pump. That's why an inspection chamber with sampling facility could not be used.
- a suction pump could be used to drain the sewage from the duct element.
- the submersible pump in the top section is replaced by a suction pipe with a suction nozzle which enables the pipe to suck sewerage out of the space of the intermediate structure. Sensors are still needed to activate and deactivate the vacuum pump to generate the vacuum to suck the sewage away.
- Fig. 6 shows a second embodiment of a duct element.
- This embodiment differs from the first embodiment in that the flow profile 6A' of the outlet structure 6' is aligned with the bottom 8C of the intermediate structure.
- the valve construction described above has to be adapted. This could be done by extending the rod and slightly modifying the shape of the sealing element.
- An advantage of this embodiment is that no detachable flow profile part is needed.
- a disadvantage is that is requires additional height difference between outlet of the building and sewer main to provide the required inclination of the duct. This height difference is not always available.
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
La présente invention concerne un élément de canalisation (2) conçu pour un réseau d'égout. Ledit élément comprend une structure d'admission (4) conçue pour accoupler l'élément de canalisation à un premier tuyau d'évacuation du réseau d'égout, une structure de sortie (6) conçue pour accoupler l'élément de canalisation à un second tuyau d'évacuation du réseau d'égout, et une structure intermédiaire (8) formant un conduit entre la structure d'admission (4) et la structure de sortie (6). La structure intermédiaire (8) comprend une ouverture (8A) fournissant un accès à la structure d'admission et à la structure de sortie. La structure intermédiaire comprend un espace (8B) qui permet à l'élément de canalisation de recueillir une quantité minimale d'eaux usées avant que les eaux usées ne soient recueillies dans la structure d'admission (4) et permettant à un dispositif de pompage (42) d'évacuer les eaux usées de l'espace (8B) de façon à permettre aux eaux usées présentes dans la structure d'admission (4) de s'écouler dans l'espace (8B).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13777157.2A EP2904163B1 (fr) | 2012-10-08 | 2013-10-07 | Élément de canalisation, système de vidange de tuyau d'évacuation et procédé de déconnexion provisoire d'un tuyau de sortie d'un bâtiment d'un collecteur d'égout |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL2009587A NL2009587C2 (en) | 2012-10-08 | 2012-10-08 | A duct element, a drain pipe emptying system and method for temporarily disconnecting an outlet pipe of a building from a sewer main. |
NL2009587 | 2012-10-08 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014058310A1 true WO2014058310A1 (fr) | 2014-04-17 |
Family
ID=47222251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/NL2013/050710 WO2014058310A1 (fr) | 2012-10-08 | 2013-10-07 | Élément de canalisation, système de vidange de tuyau d'évacuation et procédé de déconnexion provisoire d'un tuyau de sortie d'un bâtiment d'un collecteur d'égout |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2904163B1 (fr) |
NL (1) | NL2009587C2 (fr) |
WO (1) | WO2014058310A1 (fr) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2569217A1 (fr) * | 1984-08-18 | 1986-02-21 | Klein Schanzlin & Becker Ag | Installation elevatoire d'eaux usees |
DE10006043A1 (de) * | 2000-02-10 | 2001-08-30 | Subway Rohrsanierungs Gmbh | Vorrichtung zum Behandeln von in einer in einen zu sanierenden Kanal mündenden Rohrleitung anfallender Flüssigkeit |
EP1260641A1 (fr) * | 2001-05-07 | 2002-11-27 | Byung Moo Ahn | Raccord de tuyau pour prévention de mauvais odeur |
EP1925756A1 (fr) * | 2006-11-23 | 2008-05-28 | Wavin B.V. | Regard d'inspection pour réseau de canalisations, comprenant au moins un manchon de raccordement renfermant un élément de liaison pivotant |
US20120097263A1 (en) * | 2010-10-21 | 2012-04-26 | Boyer Mark L | Methods and apparatus for isolating a section of fluid line |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL2003255C2 (nl) * | 2009-07-21 | 2011-01-24 | Jos Scholman | Ontstop- en reparatie werkwijze van een verstopte afvoerleiding. |
-
2012
- 2012-10-08 NL NL2009587A patent/NL2009587C2/en not_active IP Right Cessation
-
2013
- 2013-10-07 EP EP13777157.2A patent/EP2904163B1/fr not_active Not-in-force
- 2013-10-07 WO PCT/NL2013/050710 patent/WO2014058310A1/fr active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2569217A1 (fr) * | 1984-08-18 | 1986-02-21 | Klein Schanzlin & Becker Ag | Installation elevatoire d'eaux usees |
DE10006043A1 (de) * | 2000-02-10 | 2001-08-30 | Subway Rohrsanierungs Gmbh | Vorrichtung zum Behandeln von in einer in einen zu sanierenden Kanal mündenden Rohrleitung anfallender Flüssigkeit |
EP1260641A1 (fr) * | 2001-05-07 | 2002-11-27 | Byung Moo Ahn | Raccord de tuyau pour prévention de mauvais odeur |
EP1925756A1 (fr) * | 2006-11-23 | 2008-05-28 | Wavin B.V. | Regard d'inspection pour réseau de canalisations, comprenant au moins un manchon de raccordement renfermant un élément de liaison pivotant |
US20120097263A1 (en) * | 2010-10-21 | 2012-04-26 | Boyer Mark L | Methods and apparatus for isolating a section of fluid line |
Also Published As
Publication number | Publication date |
---|---|
EP2904163B1 (fr) | 2018-04-04 |
EP2904163A1 (fr) | 2015-08-12 |
NL2009587C2 (en) | 2014-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4439323A (en) | Method of discharging septic tank filtered effluent | |
JP5378872B2 (ja) | 側溝用排水装置 | |
KR100961152B1 (ko) | 악취방지 빗물받이 | |
JPH0988175A (ja) | 下水管作業用循環排水装置 | |
JP4926175B2 (ja) | 水圧手動式トイレ用詰まり解消ポンプ | |
KR101911497B1 (ko) | 무전원 침수방지 장치 | |
US7614192B2 (en) | Building drainage system | |
JP2014000293A (ja) | 仮設トイレシステム | |
IL190648A (en) | Apparatus, method and kit for unclogging an obstruction in a pipe and a junction having a plurality of pipe stubs therefor | |
US9771712B1 (en) | Basement sewer drain recovery and discharge system | |
KR200469983Y1 (ko) | 배관용 진공 청소장치 | |
EP2904163B1 (fr) | Élément de canalisation, système de vidange de tuyau d'évacuation et procédé de déconnexion provisoire d'un tuyau de sortie d'un bâtiment d'un collecteur d'égout | |
JP5865611B2 (ja) | 排水装置及び排水システム | |
KR20110055964A (ko) | 무동력 관정 청소장치 | |
CN101785881B (zh) | 一种带自动清洗、排放功能的负压吸引装置 | |
JP6949759B2 (ja) | 仮設トイレ用配管設備 | |
CN108755914A (zh) | 分体漂浮式大流量防溢排堵地漏 | |
JP5643908B1 (ja) | 排水システム | |
KR200463865Y1 (ko) | 악취방지트랩 | |
KR100815206B1 (ko) | 남성용 순환식 변기 세정장치 | |
KR20150002691U (ko) | 빗물집수장치 | |
CN203848490U (zh) | 储水式电热水器 | |
CN215288471U (zh) | 一种一体式节水型负压马桶 | |
CN211816685U (zh) | 一种家用排水管道 | |
KR20050042437A (ko) | 하수관로의 물받이 배수트랩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13777157 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2013777157 Country of ref document: EP |