WO2014011028A1 - Method for stabilizing soil - Google Patents

Method for stabilizing soil Download PDF

Info

Publication number
WO2014011028A1
WO2014011028A1 PCT/MY2013/000129 MY2013000129W WO2014011028A1 WO 2014011028 A1 WO2014011028 A1 WO 2014011028A1 MY 2013000129 W MY2013000129 W MY 2013000129W WO 2014011028 A1 WO2014011028 A1 WO 2014011028A1
Authority
WO
WIPO (PCT)
Prior art keywords
anchor
hole
arm
bulging end
locking pin
Prior art date
Application number
PCT/MY2013/000129
Other languages
French (fr)
Inventor
Asri Bin Saidin Md
Jamaludin Bin Md Noor Mohd
Original Assignee
Mediz Bina Enterprise
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mediz Bina Enterprise filed Critical Mediz Bina Enterprise
Priority to CN201380040655.5A priority Critical patent/CN104541000A/en
Publication of WO2014011028A1 publication Critical patent/WO2014011028A1/en
Priority to HK15107394.0A priority patent/HK1206802A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles

Definitions

  • the present invention generally relates to a method for stabilizing soil, in particular to an anchor system having a bore with a bulging end to increase stability of unstable grounds.
  • ground anchor has been used for centuries to stabilize unstable grounds such as hill slopes, river banks and terrains.
  • the ground anchor is planted deep into a hard and stable soil structure and is connected to a reinforcement or retaining wall on the ground surface by a tie rod.
  • the ground anchor provides the required stabilizing force that is transmitted to the soil at a suitable distance behind the reinforcement or retaining wall on the ground surface like those found along highways and hill slope either to contain the earth prevent landslides or as a reinforcement for landslide prone slopes.
  • SUBSTITUTE SHEET type of anchor system is the frequent failure due to the expandable anchor bursting and damaging the soil structure around it making the surrounding soil weak that will lead to malfunctioning of the anchor system.
  • the present invention seeks to provide a method for stabilizing soil in an attempt of overcoming the shortcoming of the above practice.
  • the present invention is especially important, though not specifically for stabilizing soil in hill slope, river bank and terrain for preventing land movement that may lead to landslide.
  • This and other object of the present invention is accomplish by providing, A method for stabilizing unstable grounds having a predetermined soil density and consistency, said method comprising the steps of:
  • said anchor (2) having at least one anchor arm (24), said
  • said hole (1) being provided with a bulging end (11) at inner side to accommodate said anchor arm (24) when expanded.
  • the present invention relates to a method for stabilizing unstable grounds having a predetermined soil density and consistency.
  • the method comprises forming a hole (1) to a predetermined depth in ground to be reinforced, preparing a bulging end (11), inserting a specific type of anchor and grouting the hole (1). Before boring process, calculation is carried out to determine the depth of the hole required to obtain the needed strength depending on the soil condition and hardness.
  • the hole (1) is then formed using eccentric reamer drill or any other suitable equipment. At the end of the hole (1), a bulging end (11) is formed using the same eccentric reamer.
  • the hole (1) has a mouth (12) adapted for giving access for installing an anchor (2) and a bulging end (11) adapted for receiving the expanded anchor arm (24).
  • the anchor (2) is of the V-arm flip anchor having an anchor arm (24) kept in close position under normal condition by a locking pin (26).
  • the anchor (2) is installed in the hole (1) by inserting through the hole (1) until it reaches the bulging end (11) at a predetermined depth.
  • the locking pin (26) is then release by pulling a cord (not shown) to unlock the locking pin (26). This will free the anchor arm (23) and set the anchor arm (24) expanded to lock with the adjacent ground of the bulging end (11). After this grouting may be applied and
  • FIG. 1 showing the hole for anchor apparatus according to one embodiment of the present invention.
  • FIG. 2 showing the V-arm flip type anchor used in the present invention.
  • FIG. 3 showing the V-arm flip type anchor installed in the hole.
  • FIG. 1 showing the hole for the anchor apparatus according to one embodiment of the present invention.
  • a hole (1) having a bulging end (11) and a mouth (12) is drilled to the predetermined depth using drilling hammer or any other suitable method.
  • the predetermined depth is calculated depending on the hardness, density and consistency of the soil.
  • a bulging end (11) is prepared using an eccentric reamer.
  • the anchor (2) comprises of an anchor body (21) having an anchor head (22) at one end and an anchor tail (23) at another end.
  • the anchor body (21) is provided with a pair of anchor arms (24) adapted to engage the anchor (2) to adjacent soil. In its original position the pair of anchor arms (24)arms is kept in a closed
  • the locking pin (26) is provided a release means for releasing the locking pin (26) and thus engaging the anchor (2) to adjacent soil.
  • Any release means may be employed but in the present case a simple loop is provided so that a wire rope may be fastened to the loop before driving the anchor (2).
  • the dimension of the anchor head (22) is 99 mm across in closed position and having a length of 300 mm.
  • drilling of the hole (1) is done using an eccentric reamer type of rotary drilling hammer (3) as in FIG. 3 like the ODEX' eccentric reamer.
  • This type of eccentric reamer is able to drill a hole and create a bulging end or bulb end at the end of the hole (1).
  • the drilling is done using preferably a pilot bit (31) having a diameter of 10 mm.
  • the resultant diameter of the hole is preferably 125 mm.
  • the hole is for a predetermined depth, preferably extending 3 meters beyond the passive zone of the soil structure.
  • FIG. 3 showing the V-arm flip type anchor installed in the hole.
  • To install the anchor (2) is driven into the hole (1) using a reinforcement bar attached to its tail (23). It was noted that most failures of anchorage is attributed to the loss of this anchorage friction with potential effect of sliding surfaces commonly known as the active zone.
  • the locking pin (26) Upon reaching the bulging end (11) of the hole (1), the locking pin (26) is released from the burrow (28) and opens up thus engaging adjacent soil.
  • the hole (1) is now ready for grouting.
  • the dimension of the anchor (2) in this open position is preferably 265 mm across and with a length of 300 mm.
  • the grouting material is filled through a grouting hose (not shown) until the material overflows by emerging from the orifice (not shown) of the plate (15).
  • SUBSTITUTE SHEET plate (15) is tightened at least 28 days after the filling of the grouting material. For soil with SPT less than 30 blows, the grouting material is filled at least 2 meters from the bulging end (11). After 14 to 28 days, the required tension is applied followed by completely filling up the hole (1) until the material overflows by emerging from the orifice (not shown) of the capping plate (15).
  • the capping plate (15) is preferably having a dimension of 0.6 m to 0.8 m square. In both cases the grouting hose (not shown) is pulled out and the grouting material debris is cleaned and the anchor head (22) is sealed with concrete.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to a method for stabilizing unstable grounds having a predetermined soil density and consistency. The method comprises forming a hole (1) to a predetermined depth in ground to be reinforced, preparing a bulging end (1 1), inserting a specific type of anchor and grouting the hole (1). The hole (1) has a mouth (11) adapted for giving access for installing the anchor (2) and a bulging end (1 1 ) adapted for receiving the expanded anchor arm (24). The anchor (2) is of the V-arm flip anchor having an anchor arm (24) kept in close position under normal condition by a locking pin (26). The anchor (2) is installed in the hole (1) by inserting through the hole (1) until it reaches the bulging end (1 1) at a predetermined depth. The locking pin (26) is then release by pulling a cord (not shown) to unlock the locking pin (26). This will free the anchor arm (24) and set the anchor arm (24) expanded to lock with the adjacent ground of the bulging end (11). After this grouting may be applied and later having the mouth (1 1) of the hole (1) closed with a capping plate (15).

Description

METHOD FOR STABILIZING SOIL
1. TECHNICAL FIELD OF THE INVENTION
The present invention generally relates to a method for stabilizing soil, in particular to an anchor system having a bore with a bulging end to increase stability of unstable grounds.
2. BACKGROUND OF THE INVENTION
It is well known that ground anchor has been used for centuries to stabilize unstable grounds such as hill slopes, river banks and terrains. Basically the ground anchor is planted deep into a hard and stable soil structure and is connected to a reinforcement or retaining wall on the ground surface by a tie rod. The ground anchor provides the required stabilizing force that is transmitted to the soil at a suitable distance behind the reinforcement or retaining wall on the ground surface like those found along highways and hill slope either to contain the earth prevent landslides or as a reinforcement for landslide prone slopes.
To reinforce such soil, a study on the soil density and consistency are made so as to determine the required depth and the type of anchor which must be planted into the soil. Depending on the type of soil, the choice of anchor is significantly important especially if the anchor is to be permanently installed to withstand varying and increasing load for many years. Another factor of concern is the grouting material and process. The choice of grouting material is also another important factor as it has to suit the chosen anchor system in order for the system to perform well for many years.
There is already a practice of a soil reinforcement using an expandable anchor planted into the ground. A hole is dug in the ground to be reinforced and the anchor is planted into the ground through the hole. The anchor is then expanded to lock against the soil adjacent and the hole is grouted to complete the anchorage. The disadvantage of this
SUBSTITUTE SHEET type of anchor system is the frequent failure due to the expandable anchor bursting and damaging the soil structure around it making the surrounding soil weak that will lead to malfunctioning of the anchor system.
There is another practice of using an anchor in conjunction with a hole having a bulging end. However, this is mainly used for anchoring vertical column meant for increasing load bearing capacity. The bulging end is used to increase load bearing area to increase the load bearing capacity of the column. This type of anchor system has a considerably high not only compressive loading but also tensile loading capacity. This property has not been fully utilized in soil engineering work such as soil stabilization and erosion control.
Therefore, the present invention seeks to provide a method for stabilizing soil in an attempt of overcoming the shortcoming of the above practice. The present invention is especially important, though not specifically for stabilizing soil in hill slope, river bank and terrain for preventing land movement that may lead to landslide.
3. OBJECT OF THE INVENTION
It is therefore a primary object of present invention to provide a method for stabilizing soil which is efficiently applicable for all types of soil, thus is economical.
This and other object of the present invention is accomplish by providing, A method for stabilizing unstable grounds having a predetermined soil density and consistency, said method comprising the steps of:
forming a hole (1) to a predetermined depth in ground to be reinforced;
said hole having a mouth (12);
installing an anchor (2) in said hole (1);
said anchor (2) having at least one anchor arm (24), said
SUBSTITUTE SHEET anchor arm (24) being locked by a locking pin (26) in close position in normal condition;
installing a capping plate (15) to cover said mouth (11) of said hole
(1);
releasing said locking pin (26) to expand said anchor (2); and grouting said hole (1) with a grouting material,
characterised by
said hole (1) being provided with a bulging end (11) at inner side to accommodate said anchor arm (24) when expanded.
4. SUMMARY OF THE INVENTION
The present invention relates to a method for stabilizing unstable grounds having a predetermined soil density and consistency. In the broadest aspect of the present invention, the method comprises forming a hole (1) to a predetermined depth in ground to be reinforced, preparing a bulging end (11), inserting a specific type of anchor and grouting the hole (1). Before boring process, calculation is carried out to determine the depth of the hole required to obtain the needed strength depending on the soil condition and hardness. The hole (1) is then formed using eccentric reamer drill or any other suitable equipment. At the end of the hole (1), a bulging end (11) is formed using the same eccentric reamer. The hole (1) has a mouth (12) adapted for giving access for installing an anchor (2) and a bulging end (11) adapted for receiving the expanded anchor arm (24). The anchor (2) is of the V-arm flip anchor having an anchor arm (24) kept in close position under normal condition by a locking pin (26). The anchor (2) is installed in the hole (1) by inserting through the hole (1) until it reaches the bulging end (11) at a predetermined depth. The locking pin (26) is then release by pulling a cord (not shown) to unlock the locking pin (26). This will free the anchor arm (23) and set the anchor arm (24) expanded to lock with the adjacent ground of the bulging end (11). After this grouting may be applied and
SUBSTITUTE SHEET later having the mouth (12) of the hole (1) closed with a capping plate (15).
5. BRIEF DESCRIPTION OF THE DRAWINGS
There are shown by way of examples the drawings of preferred embodiment of the present invention,
FIG. 1 showing the hole for anchor apparatus according to one embodiment of the present invention.
FIG. 2 showing the V-arm flip type anchor used in the present invention.
FIG. 3 showing the V-arm flip type anchor installed in the hole.
. DETAILED DESCRIPTION OF THE DRAWINGS
Referring now to FIG. 1 showing the hole for the anchor apparatus according to one embodiment of the present invention. Along hill slope, river banks or terrain where reinforcement is to be installed, a hole (1) having a bulging end (11) and a mouth (12) is drilled to the predetermined depth using drilling hammer or any other suitable method. The predetermined depth is calculated depending on the hardness, density and consistency of the soil. Upon reaching the required depth a bulging end (11) is prepared using an eccentric reamer.
Referring now to FIG. 2 showing the V-arm flip type anchor used in the present invention. The anchor (2) comprises of an anchor body (21) having an anchor head (22) at one end and an anchor tail (23) at another end. The anchor body (21) is provided with a pair of anchor arms (24) adapted to engage the anchor (2) to adjacent soil. In its original position the pair of anchor arms (24)arms is kept in a closed
SUBSTITUTE SHEET position by a locking pin (26) with ends resting within a burrow (28) on each arm (24). The locking pin (26) is provided a release means for releasing the locking pin (26) and thus engaging the anchor (2) to adjacent soil. Any release means may be employed but in the present case a simple loop is provided so that a wire rope may be fastened to the loop before driving the anchor (2). Preferably, the dimension of the anchor head (22) is 99 mm across in closed position and having a length of 300 mm.
Due to the structure of this type of soil for example rocks, gravels or the like, drilling of the hole (1) is done using an eccentric reamer type of rotary drilling hammer (3) as in FIG. 3 like the ODEX' eccentric reamer. This type of eccentric reamer is able to drill a hole and create a bulging end or bulb end at the end of the hole (1). The drilling is done using preferably a pilot bit (31) having a diameter of 10 mm. The resultant diameter of the hole is preferably 125 mm. The hole is for a predetermined depth, preferably extending 3 meters beyond the passive zone of the soil structure.
Referring now to FIG. 3 showing the V-arm flip type anchor installed in the hole. To install the anchor (2) is driven into the hole (1) using a reinforcement bar attached to its tail (23). It was noted that most failures of anchorage is attributed to the loss of this anchorage friction with potential effect of sliding surfaces commonly known as the active zone. Upon reaching the bulging end (11) of the hole (1), the locking pin (26) is released from the burrow (28) and opens up thus engaging adjacent soil. The hole (1) is now ready for grouting. The dimension of the anchor (2) in this open position is preferably 265 mm across and with a length of 300 mm.
For soil with SPT greater than 30 blows, the grouting material is filled through a grouting hose (not shown) until the material overflows by emerging from the orifice (not shown) of the plate (15). The capping
SUBSTITUTE SHEET plate (15) is tightened at least 28 days after the filling of the grouting material. For soil with SPT less than 30 blows, the grouting material is filled at least 2 meters from the bulging end (11). After 14 to 28 days, the required tension is applied followed by completely filling up the hole (1) until the material overflows by emerging from the orifice (not shown) of the capping plate (15). The capping plate (15) is preferably having a dimension of 0.6 m to 0.8 m square. In both cases the grouting hose (not shown) is pulled out and the grouting material debris is cleaned and the anchor head (22) is sealed with concrete.
While the preferred embodiment of present invention has been described, it should be noted that various changes, adaptations and modifications may be made thereto. It should be understood, therefore, that the invention is not limited to details of the illustrated invention shown in the figures and that variations in such minor details will be apparent to one skilled in the art.
SUBSTITUTE SHEET

Claims

WHAT IS CLAIMED IS:
1. A method for stabilizing unstable grounds having a predetermined soil density and consistency, said method comprising the steps of:
forming a hole (1) to a predetermined depth in ground to be reinforced;
said hole having a mouth (11);
installing an anchor (2) in said hole (1);
said anchor (2) having at least one anchor arm (24), said anchor arm (24) being locked by a locking pin (26) in close position in normal condition;
installing a capping plate (15) to cover said mouth (12) of said hole (1);
releasing said locking pin (26) to expand said anchor (2); and grouting said hole (1) with a grouting material,
characterised by
said hole (1) being provided with a bulging end (11) at inner side to accommodate said anchor arm (24) when expanded.
2. A method as claimed in Claim 1 , further characterised by said bulging end (11) is formed at last stage of preparation of said hole (1).
3. A method as claimed in Claim 1 , further characterised by said last stage preparation of said hole (11) is carried out using an eccentric reamer.
SUBSTITUTE SHEET
4. A method as claimed in Claim 3, further characterised by eccentric reamer has a pilot bit of 110 mm.
5. A method as claimed in Claim 1 , further characterised by hole (1) having a diameter of around 25 mm.
6. A method as claimed in Claim 1 , further characterised by said bulging end (11) having a diameter of around 265 mm.
7. A method as claimed in Claim 1 , further characterised by said anchor (2) having a width of 265 mm in open position.
SUBSTITUTE SHEET
PCT/MY2013/000129 2012-07-12 2013-07-12 Method for stabilizing soil WO2014011028A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201380040655.5A CN104541000A (en) 2012-07-12 2013-07-12 Method for stabilizing soil
HK15107394.0A HK1206802A1 (en) 2012-07-12 2015-08-03 Method for stabilizing soil

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
MYPI2012003164 2012-07-12
MYPI2012003164 2012-07-12

Publications (1)

Publication Number Publication Date
WO2014011028A1 true WO2014011028A1 (en) 2014-01-16

Family

ID=49916366

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/MY2013/000129 WO2014011028A1 (en) 2012-07-12 2013-07-12 Method for stabilizing soil

Country Status (3)

Country Link
CN (1) CN104541000A (en)
HK (1) HK1206802A1 (en)
WO (1) WO2014011028A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5150549A (en) * 1992-01-03 1992-09-29 Chen Chin Lung Anchor pile and concrete protection wall construction using said anchor pile
JPH05339941A (en) * 1992-06-05 1993-12-21 Sumitomo Metal Ind Ltd Pile expansion bottom reinforcing device
JP2002105956A (en) * 2000-09-30 2002-04-10 Tadao Kinoshita Charging of mc type widening bottom pipe anchor into ground
KR20120002276A (en) * 2010-06-30 2012-01-05 김홍민 Retaining structure and the construction method and expansion digging unit for it and anchor devices
KR20120019677A (en) * 2010-08-26 2012-03-07 이항열 Ground expansion anchor and constructure using the same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2645888B2 (en) * 1989-04-20 1997-08-25 黒沢建設株式会社 Underground anchor installation method
CN1095781A (en) * 1993-05-27 1994-11-30 卢锡焕 In order to promote the spacing ground anchor side grouting construction method of anchoring force
CN1298940C (en) * 2003-02-25 2007-02-07 张百全 Anchoring method and end-bearing anchor
CN201406798Y (en) * 2009-03-17 2010-02-17 武汉武大巨成加固实业有限公司 Block-wedge type self-locking inner anchor head

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5150549A (en) * 1992-01-03 1992-09-29 Chen Chin Lung Anchor pile and concrete protection wall construction using said anchor pile
JPH05339941A (en) * 1992-06-05 1993-12-21 Sumitomo Metal Ind Ltd Pile expansion bottom reinforcing device
JP2002105956A (en) * 2000-09-30 2002-04-10 Tadao Kinoshita Charging of mc type widening bottom pipe anchor into ground
KR20120002276A (en) * 2010-06-30 2012-01-05 김홍민 Retaining structure and the construction method and expansion digging unit for it and anchor devices
KR20120019677A (en) * 2010-08-26 2012-03-07 이항열 Ground expansion anchor and constructure using the same

Also Published As

Publication number Publication date
CN104541000A (en) 2015-04-22
HK1206802A1 (en) 2016-01-15

Similar Documents

Publication Publication Date Title
CN100535263C (en) Construction method for vertical prestressed anchor rope friction pile slope-sliding prevention and treatment
US7600948B2 (en) Micropile retaining wall
US7708502B2 (en) System and method for stabilizing landslides and steep slopes
US9435094B2 (en) Ground stabilisation system, a support and a method of stabilising ground
JP2015014180A (en) Underground anchor, and antiseismic reinforcement method of artificial slope using the same
CN104790408A (en) Irregular foundation pit construction method
CN104895073A (en) Anchor rope construction system capable of being disassembled for many times and construction method thereof
CN105019431B (en) Crush and complete alternate steep dip stratified rock masses Large Diameter Super-long Bored Piles construction method
US4718791A (en) High capacity tieback installation method
KR100870410B1 (en) Soilr nailing device for slope reinforcement use
WO2017139828A1 (en) Improved caisson emplacement system and method
KR100710867B1 (en) Method of upward type base reinforced a substitute for horizontal drainage and that of structure
KR100576053B1 (en) Soil nailing by extended packer grouting and construction method
JP2016089528A (en) Shear reinforcement method for concrete structure
KR200381571Y1 (en) Structure of upward type base reinforced a substitute for horizontal drainage
PT788572E (en) PROCESS FOR THE CALCULATION OF BUILDINGS
KR100823980B1 (en) Drain combination paker type pressurization grouting equipment and the upward method using the same
KR200381572Y1 (en) Paker can pressure with milk grouting
US3468131A (en) Retaining structures placed into the ground and their procedures of execution
WO2014011028A1 (en) Method for stabilizing soil
EP2354323B1 (en) Structures intended to consolidate and retain the grounds undergoing a movement
JP2001207437A (en) Reinforcing method for lower ground of existing structure
KR100895770B1 (en) Inner member additional reinforcement assembly for preventing ground collapse and its construction method to be used therefor
KR100556668B1 (en) Structure of a slop reinforced of carrying out by physical environment
KR100710866B1 (en) Pressure Grouting Method using Milk Grouting and Paker

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13817312

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13817312

Country of ref document: EP

Kind code of ref document: A1