WO2014000226A1 - 网络路径控制方法、设备及系统 - Google Patents

网络路径控制方法、设备及系统 Download PDF

Info

Publication number
WO2014000226A1
WO2014000226A1 PCT/CN2012/077752 CN2012077752W WO2014000226A1 WO 2014000226 A1 WO2014000226 A1 WO 2014000226A1 CN 2012077752 W CN2012077752 W CN 2012077752W WO 2014000226 A1 WO2014000226 A1 WO 2014000226A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
control device
forwarding
path
forwarding information
Prior art date
Application number
PCT/CN2012/077752
Other languages
English (en)
French (fr)
Inventor
熊怡
吴小前
闫长江
胡杰晖
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to CN201280000633.1A priority Critical patent/CN102884762B/zh
Priority to JP2015518759A priority patent/JP6037251B2/ja
Priority to PCT/CN2012/077752 priority patent/WO2014000226A1/zh
Priority to EP12880266.7A priority patent/EP2869641A4/en
Publication of WO2014000226A1 publication Critical patent/WO2014000226A1/zh
Priority to US14/575,386 priority patent/US9755909B2/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • H04L41/122Discovery or management of network topologies of virtualised topologies, e.g. software-defined networks [SDN] or network function virtualisation [NFV]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W40/00Communication routing or communication path finding

Definitions

  • Embodiments of the present invention relate to communication technologies, and in particular, to a network path control method, device, and system. Background technique
  • Each router or switch typically has a control plane, a management plane, and a data plane. You can manage the router or switch through management.
  • the control plane runs various forwarding protocols, calculates the path, and generates forwarding entries. The forwarding entry is sent to the data plane.
  • the data plane forwards the packet according to the forwarding entry. .
  • the embodiment of the invention provides a network path control method, device and system, so as to achieve centralized control plane and improve manageability of the network.
  • the embodiment of the invention provides a network path control method, including:
  • the first control device generates path information for the first AP according to the network topology information, and generates first forwarding information for the first AP according to the obtained forwarding resource information of the first AP and the path information. Transmitting the first forwarding information to the first AP;
  • the first control device determines that the path information includes a second AP that is not managed by the first control device, and sends the path information to a second control device that manages the second AP, so that the The second control device generates the second forwarding information of the second AP according to the path information and the obtained forwarding resource information of the second AP, and sends the second forwarding information to the second AP. .
  • the embodiment of the invention provides a network path control method, including: The access point AP sends the forwarding resource information to the first control device and the second control device, respectively; the AP receives the first forwarding information sent by the first control device and the third forwarding information sent by the second control device;
  • the AP determines valid forwarding information according to the first forwarding information and the third forwarding information, and forwards the received packet according to the valid forwarding information.
  • the embodiment of the present invention provides a first control device, including:
  • a first processing unit configured to generate path information for the first AP according to the network topology information, and generate first forwarding information for the first AP according to the obtained forwarding resource information of the first AP and the path information. Sending the first forwarding information to the first AP;
  • a second processing unit configured to determine that the path information includes a second AP that is not managed by the first control device, and send the path information to a second control device that manages the second AP, so that The second control device generates second forwarding information of the second AP according to the path information and the obtained forwarding resource information of the second AP, and sends the second forwarding information to the second AP.
  • An embodiment of the present invention provides an access point, including:
  • a sending unit configured to send the forwarding resource information to the first control device and the second control device, respectively, where the second receiving unit is configured to receive the first forwarding information sent by the first control device and the second forwarding device Third forwarding information;
  • a forwarding unit configured to determine valid forwarding information according to the first forwarding information and the third forwarding information, and forward the received packet according to the valid forwarding information.
  • the embodiment of the invention provides a network path control system, including:
  • a first control device a second control device, a first access point AP, and a second AP;
  • the first control device is configured to generate path information for the first AP according to the network topology information, and generate, for the first AP, the first AP according to the obtained forwarding resource information of the first AP and the path information. Transmitting the information, sending the first forwarding information to the first AP, and determining that the path information includes a second AP that is not managed by the first control device, sending the path information to the management office a second control device of the second AP, so that the second control device generates second forwarding information of the second AP according to the path information and the obtained forwarding resource information of the second AP, where Sending the second forwarding information to the second AP;
  • the first AP is configured to send a transfer to the first control device and the second control device, respectively. Sending the resource information, receiving the first forwarding information sent by the first control device, and the third forwarding information sent by the second control device, and determining valid forwarding information according to the first forwarding information and the third forwarding information, And forwarding the received packet according to the valid forwarding information.
  • the first control device generates path information for the first AP according to the network topology information, and according to the obtained forwarding resource information of the first AP,
  • the path information is used to generate the first forwarding information for the first AP, and the first forwarding information is sent to the first AP, and the path information is included in the second AP that is not managed by the first control device, and the path information is sent to the management second.
  • the second control device of the AP so that the second control device generates the second forwarding information of the second AP according to the path information and the obtained forwarding resource information of the second AP, and sends the second forwarding information to the second AP.
  • the control plane of the first AP is centralized on the first control device, and the first control device performs path calculation for the first AP managed by the first control device, and generates the first forwarding information to be sent to the first control device.
  • An AP does not perform path calculation, and only forwards the packet according to the received first forwarding information.
  • FIG. 1 is a flowchart of a network path control method according to an embodiment of the present invention
  • FIG. 2 is a flowchart of another network path control method according to an embodiment of the present invention.
  • FIG. 3 is a flowchart of still another network path control method according to an embodiment of the present invention.
  • FIG. 4 is a schematic structural diagram of a first control device according to an embodiment of the present disclosure.
  • FIG. 5 is a schematic structural diagram of another first control device according to an embodiment of the present disclosure.
  • FIG. 6 is a schematic structural diagram of an access point according to an embodiment of the present disclosure.
  • FIG. 7 is a schematic structural diagram of a network path control system according to an embodiment of the present invention.
  • FIG. 8 is a schematic structural diagram of a network topology according to an embodiment of the present invention.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS In order to make the objects, technical solutions and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. It is to be understood that the described embodiments are a part of the embodiments of the invention, rather than all of the embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative efforts are within the scope of the present invention.
  • FIG. 1 is a flowchart of a network path control method according to an embodiment of the present invention.
  • the network path control method provided in this embodiment may be specifically applied to a route control process of multiple routers or switches in a network.
  • the network path control method provided in this embodiment specifically includes:
  • Step A10 The first control device generates path information for the first AP according to the network topology information, and generates first forwarding information for the first AP according to the obtained forwarding resource information of the first AP and the path information. Sending the first forwarding information to the first AP;
  • Step A20 The first control device determines that the path information includes a second AP that is not managed by the first control device, and sends the path information to a second control device that manages the second AP. And causing, by the second control device, the second forwarding information of the second AP to be generated according to the path information and the obtained forwarding resource information of the second AP, and sending the second forwarding information to the Second AP.
  • a plurality of routers or switches are disposed between the network devices that communicate with each other to implement forwarding of packets that are exchanged by the network device.
  • a Radio Access Network RAN
  • a plurality of routers or switches are provided to implement communication between the base station and the base station controller.
  • RAN Radio Access Network
  • this embodiment only introduces an application scenario.
  • the network path control method provided in this embodiment can also be applied to other application scenarios in which packet exchange is implemented by multiple routers or switches to implement communication between network devices.
  • At least one of the plurality of routers or switches in the network may be set as the first control device in advance, at least one of the plurality of routers or switches is set as the second control device, and the other router or switch is set as the AP. Which APs managed by the first control device are set, and which APs are managed by the second control device.
  • the router or the switch in the network is used as the first control device or the second control device, the first control device or the second control device implements the function of the data plane in addition to the functions of the control plane and the management plane.
  • the server may be added as the first control device or the second control device. When the server is used as the first control device or the second control device, the first control device or the second control device only needs to implement the control plane and the management plane.
  • Function does not need to implement the function of the data plane.
  • the function of the control plane is specifically to perform path calculation and generate forwarding information.
  • the function of the management plane is specifically the user management interface, and the function of the data plane is specifically issued according to the control plane. Forwarding information implements packet forwarding.
  • a configuration interface is configured on a router or a switch, and the router or the switch can set itself as the first control device according to the first configuration information input by the user through the configuration interface, and learn the AP managed by the first configuration information according to the first configuration information. What. The first control device can actively detect whether the AP to be managed is in the service, and establish a connection with the AP to implement management of the AP.
  • the AP is also configured with a configuration interface, and the AP can set itself as an AP according to the second configuration information input by the user through the configuration interface, and learn to manage the first control device according to the second configuration information.
  • the AP can actively detect whether the first control device of its own is in the service, and establish a connection with the first control device to implement control by the first control device.
  • the AP may also know the first control device existing in the network, and select which first control device is controlled by itself.
  • the AP selects a first control device, actively detects whether the first control device of the management device is in service, and establishes a connection with the first control device to implement control by the first control device.
  • the manner in which the first control device establishes a connection with the AP may also use an existing network protocol.
  • an IP address may be separately configured on the first control device and the AP, and a TCP/IP connection is established between the first control device and the AP.
  • the IP routing between the first control device and the AP can be implemented based on an Intermediate System to Intermediate System (ISIS) protocol.
  • the first control device and the AP may also be a Layer 2 network, and the connection is established by sending an ETH frame.
  • the first control device and the AP can be divided into a virtual local area network (VLAN) to establish a Layer 2 management network to implement communication between the first control device and the AP.
  • VLAN virtual local area network
  • the setting process of the second control device and the setting process of the AP managed by the second control device may refer to the specific description of the setting process of the first control device, and details are not described herein again.
  • the primary control device of a part of the APs is the first control device
  • the standby control device of the remaining APs is the first control device.
  • the AP that uses the first control device as the primary control device is referred to as the first AP in this embodiment
  • the AP that uses the first control device as the standby control device is referred to as the third AP in this embodiment.
  • the first control device performs path calculation for the first AP and generates forwarding information
  • the first control device generates a forwarding message only for the third AP.
  • the information is not calculated for the third AP.
  • the second control device can be set to manage the first
  • the standby control device of the AP also sets other control devices as the standby control device for managing the first AP.
  • the control device that manages the second AP should manage at least An AP that is simultaneously managed by the first control device.
  • the third AP also has a corresponding primary control device.
  • the first control device may be an primary control device of one AP, or may be an alternate control device of another AP.
  • the second control device may be an standby control device of one AP or an active control device of another AP. That is, multiple control devices can be set in the network, and the role of each control device can be set. For the same AP, one control device has only one role, and can be the primary control device or the standby control device.
  • An AP can have multiple active control devices or multiple standby control devices.
  • one AP has one primary control device to avoid a common path of the calculated path information.
  • the primary control device of the first AP is the first control device
  • the backup control device is the second control device.
  • the second control device can take over the work of the first control device.
  • the business can be continuously improved, and the reliability of the network can be improved.
  • the entire network service can be not interrupted when the first control device is upgraded.
  • ISSU In-Service Software Upgrade
  • the first control device may obtain the network topology information in advance, and may generate the path information for the first AP according to the network topology information, where the path information may specifically include the bidirectional path information between the first control device and the first AP, and/or Bidirectional path information between the second control device and the first AP.
  • the first control device may further obtain the forwarding resource information of the first AP in advance, where the forwarding resource information of the first AP is specifically used to indicate the forwarding resource that the first AP has, and the forwarding resource information may specifically include the label space of the first AP. , MAC (Media Access Control) address and port information, etc.
  • the method for obtaining the forwarding resource information of the first AP may be requested by the first control device to the first AP, or may be reported to the first control device by the first AP.
  • the first control device generates the first forwarding information for the first AP according to the forwarding resource information and the path information of the first AP, and the number of the first forwarding information may be multiple.
  • the first forwarding information may include information such as an inbound label, an ingress port, an outbound label, an egress port, and a label operation type.
  • the first forwarding information may include information such as a VLAN, an ingress port, a MAC address, an egress port, and a VLAN operation type.
  • the first control device sends the first forwarding information to the first AP, and when the first forwarding information sent to the first AP is multiple, the first AP may determine an effective forwarding information according to the multiple first forwarding information. And forwarding the packet according to the valid forwarding information.
  • the priority of the first forwarding information may be configured in advance on the first control device, and the first forwarding information is sent to the first AP in the first forwarding information, so that the first AP determines the effective forwarding information according to the priority. .
  • the first control device may also select a first forwarding information to send to the first AP.
  • the first control device may acquire the forwarding resource information of the third AP in advance, according to the path information and the third AP.
  • the forwarding resource information generates forwarding information of the third AP, and sends the forwarding information of the third AP to the third AP.
  • the method for obtaining the forwarding resource information of the third AP may be requested by the first control device to the third AP, or may be reported to the first control device by the third AP.
  • the path information generated by the first control device for the first AP includes the second AP that is not managed by the first control device
  • the path information is sent to the second control device that manages the second AP.
  • the second control device that manages the second AP may obtain the forwarding resource information of the second AP in advance, and the second control device may generate the second forwarding information of the second AP according to the received path information and the forwarding resource information of the second AP. And sending the second forwarding information to the second AP.
  • the method for obtaining the forwarding resource information of the second AP may be actively requested by the second control device to the second AP, or may be reported to the second control device by the second AP.
  • the standby control device of the at least one of the first APs managed by the first control device is the second control device, and the first control device may learn the second control device, and generate path information generated for the first AP. Synchronized to the second control device. The first control device synchronizes the path information to the second control device. When the first control device is faulty or upgraded, and the second control device takes over the work, the second control device can directly perform subsequent work according to the path information, thereby ensuring that the service is not Intermittent.
  • the first control device may also be configured to obtain the second control device of the first AP.
  • the first control device may obtain the information of the standby control device of the first AP that is controlled by the first control device according to the first configuration information.
  • the first AP may also learn the information of the standby control device according to the second configuration information, and report the information of the standby control device to the first control device, so that the first control device can learn the second control device.
  • the path that the first control device will generate for the first AP The information is sent to the second control device.
  • the first control device may be connected to the second control device through IP, or may be connected to the second control device through a Layer 2 connection.
  • the second control device may also be the primary control device of the other AP.
  • the second control device generates path information for the AP that is controlled by the second control device, and obtains the forwarding resource information of the AP that is controlled by the master device according to the path information.
  • the forwarding information of the AP corresponding to the master is generated and delivered.
  • the first control device generates the path information for the first AP according to the network topology information, and generates the first forwarding for the first AP according to the obtained forwarding resource information and path information of the first AP. And sending the first forwarding information to the first AP, and determining that the path information includes the second AP that is not managed by the first control device, sending the path information to the second control device that manages the second AP, so that the second The control device generates the second forwarding information of the second AP according to the path information and the obtained forwarding resource information of the second AP, and sends the second forwarding information to the second AP.
  • the control plane of the first AP is centralized on the first control device, and the first control device performs path calculation for the first AP managed by the first control device, and generates the first forwarding information to be sent to the first control device.
  • An AP does not perform path calculation, and only forwards the packet according to the received first forwarding information.
  • FIG. 2 is a flowchart of another network path control method according to an embodiment of the present invention.
  • the determining, by the first control device, that the path information includes the second AP that is not managed by the first control device may include:
  • the first control device determines that the path information does not belong to the first A second AP that controls device management.
  • the first control device may obtain the forwarding resource information of the AP that it manages in advance, and the path information generated by the first control device for the first AP includes the second AP, but the first control device does not have the second AP.
  • the resource information is forwarded, it can be known that the second AP does not belong to the first control device management.
  • the path information may include bidirectional path information between the first control device and the first AP and/or bidirectional between the second control device and the first AP. Path information.
  • the bidirectional path information between the first control device and the first AP may be used to implement a chain
  • the bidirectional path information between the second control device and the first AP may be used to implement node protection.
  • the method may further include:
  • Step A30 The first control device receives the forwarding resource information sent by the first AP.
  • the first AP may be configured to be controlled by the first control device according to the second configuration information, and send the forwarding resource information of the first AP to the first control device, where the first control device receives the forwarding resource sent by the first AP. information.
  • the first control device may also learn the first AP that it manages according to the first configuration information, and request the forwarding resource information of the first AP from the first AP, where the first AP sends the forwarding resource of the first AP to the first control device.
  • the first control device receives the forwarding resource information sent by the first AP.
  • the method may further include:
  • Step A40 The first control device requests the forwarding resource information from the first AP.
  • the first AP sends the forwarding resource information to the first control device and the second control device, respectively.
  • the forwarding resource information sent by the first AP should avoid resource conflicts. For example, the label space in the forwarding resource information does not overlap with the label space in the forwarding resource information sent by the first AP to the first control device.
  • the first control device generates forwarding information for the first AP
  • the second control device also generates forwarding information for the first AP
  • the first AP separately receives the forwarding information sent by the first control device and the second control device.
  • the forwarding information may carry the identifier of the control device that sends the forwarding information, and the AP may first select the forwarding information sent by a certain control device as the effective forwarding information according to its own policy or user configuration, and according to the effective forwarding information guide report Forwarding of the text.
  • the first control device may further receive the path information generated by the primary control device of the third AP and generated for the third AP.
  • the first control device may generate forwarding information for the third AP according to the path information and the third AP forwarding resource information.
  • FIG. 3 is a flowchart of still another network path control method according to an embodiment of the present invention.
  • the network path control method provided in this embodiment may be implemented in cooperation with the embodiment shown in FIG. The specific implementation process will not be described again.
  • the network path control method provided in this embodiment specifically includes: Step B10: The access point AP sends forwarding resource information to the first control device and the second control device, respectively.
  • Step B20 The AP receives the first forwarding information sent by the first control device and the third forwarding information sent by the second control device.
  • Step B30 The AP determines valid forwarding information according to the first forwarding information and the third forwarding information, and forwards the received packet according to the valid forwarding information.
  • the first control device and the second control device are control devices for managing the AP, respectively, and the first control device and the second control device generate forwarding information for the AP and send the information to the AP.
  • the first control device is the primary control device of the AP
  • the second control device may be the standby control device of the AP, where the first control device calculates a path for the AP and generates first forwarding information, where the second control device is The AP generates third forwarding information.
  • the AP determines the effective forwarding information in multiple manners. For example, the priority of the first forwarding information may be configured in the first control device, and the priority of the third forwarding information is configured in the second control device, and the priority is carried.
  • the information is forwarded to the first AP, so that the first AP determines valid forwarding information according to the priority.
  • the priority of each control device may be configured in the first AP in advance. When the first AP receives multiple forwarding information, the first AP determines the effective forwarding information according to the priority.
  • the first AP may also determine valid forwarding information according to a preset policy, for example, according to an IP address of the control device, the IP address has a high priority.
  • the AP sends the forwarding resource information to the first control device and the second control device, and receives the first forwarding information sent by the first control device and the third forwarding information sent by the second control device. Determining valid forwarding information according to the first forwarding information and the third forwarding information, and forwarding the received packet according to the effective forwarding information.
  • the control plane of the AP is centralized on the control device by the setting of the first control device and the second device, and the first control device and the second control device respectively generate forwarding information for the AP, and the AP only performs the forwarding information according to the received forwarding information. Forwarding of the message. It avoids the configuration maintenance of each AP in the network, simplifies the network structure, and improves the manageability of the network.
  • the first forwarding information includes a first priority of the first control device to the AP
  • the third forwarding information includes a third priority of the second control device to the AP.
  • the step B30, the determining, by the AP, the valid forwarding information according to the first forwarding information and the third forwarding information may include: When the first priority is higher than the third priority, the AP selects the first forwarding information as valid forwarding information.
  • the priority can be set according to the running status of each device in the network and the link status.
  • the AP can select the forwarding information according to the priority level to improve the reliability of forwarding information selection.
  • step B30 the determining, by the AP, the valid forwarding information according to the first forwarding information and the third forwarding information, specifically includes: the AP forwarding information and the first forwarding information according to a preset policy.
  • One of the third forwarding information is selected as the effective forwarding information.
  • the AP can also select forwarding information according to a preset policy to improve the flexibility of forwarding information selection.
  • step B10 the access point AP sends the forwarding resource information to the first control device and the second control device, which may include:
  • the AP sends the forwarding resource information to the first control device according to the received first forwarding resource information obtaining request sent by the first control device;
  • the AP sends the forwarding resource information to the second control device according to the received second forwarding resource information obtaining request sent by the second control device.
  • the AP may also actively forward the forwarding resource information to the first control device and the second control device.
  • FIG. 4 is a schematic structural diagram of a first control device according to an embodiment of the present invention.
  • the first control device 81 provided in this embodiment may implement various steps of the network path control method provided in the embodiment shown in FIG. 1, and details are not described herein again.
  • the first control device 81 provided in this embodiment includes a first processing unit 11 and a second processing unit 12.
  • the first processing unit 11 is configured to generate path information for the first AP 831 according to the network topology information, and generate first forwarding information for the first AP 831 according to the obtained forwarding resource information of the first AP 831 and the path information. Sending the first forwarding information to the first AP 831.
  • the second processing unit 12 is configured to determine that the path information includes the second AP 832 that is not managed by the first control device, and then send the path information to the second control device 82 that manages the second AP 832, to And causing, by the second control device 82, the second forwarding information of the second AP 832 to be generated according to the path information and the obtained forwarding resource information of the second AP 832, and sending the second forwarding information to the Second AP832.
  • the first control device 81 provided by this embodiment, the first processing unit 11 according to the network topology information Generating path information for the first AP 831, generating first forwarding information for the first AP 831, and transmitting the first forwarding information to the first AP 831 according to the obtained forwarding resource information of the first AP 831 and the path information.
  • the second processing unit 12 determines that the path information includes the second AP 832 that is not managed by the first control device, and sends the path information to the second control device 82 that manages the second AP 832.
  • the second control device 82 generates the second forwarding information of the second AP 832 according to the path information and the obtained forwarding resource information of the second AP 832, and sends the second forwarding information to the second AP832.
  • the control plane of the first AP 831 is concentrated on the first control device 81, and the first control device 81 performs path calculation for the first AP 831 managed by the first control device 81 and generates the first forwarding information.
  • the first AP 831 does not perform path calculation, and only forwards the packet according to the received first forwarding information.
  • the generation and delivery of the second forwarding information of the second AP 832 that is not managed by the first control device 81 is implemented by the cooperation of the second control device 82 and the first control device 81. It avoids the configuration maintenance of each AP in the network, simplifies the network structure, and improves the manageability of the network.
  • FIG. 5 is a schematic structural diagram of another first control device according to an embodiment of the present invention.
  • the second processing unit 12 is further configured to: when the path information includes the second AP 832 and the first control device 81 does not forward the second AP 832 In the case of the resource information, the first control device 81 determines that the path information includes the second AP 832 that is not managed by the first control device 81.
  • the path information includes the first control device 81 and the first
  • Bidirectional path information between the APs 831 and/or bidirectional path information between the second control device 82 and the first AP 831 are bidirectional path information between the APs 831 and/or bidirectional path information between the second control device 82 and the first AP 831.
  • the first control device 81 may further include a first receiving unit 13 , where the first receiving unit 13 is configured to receive the forwarding resource information sent by the first AP 831.
  • the first control device 81 may further include a requesting unit 14, a requesting unit.
  • FIG. 6 is a schematic structural diagram of an access point according to an embodiment of the present invention.
  • the access point AP 83 provided in this embodiment may implement various steps of the network path control method provided in the embodiment shown in FIG. 2 , and details are not described herein again.
  • the access point AP83 provided in this embodiment specifically includes a sending unit 21, a second receiving unit 22, and a forwarding unit 23.
  • the sending unit 21 is configured to respectively set to the first control The device 81 and the second control device 82 transmit forwarding resource information.
  • the second receiving unit 22 is configured to receive the first forwarding information sent by the first control device 81 and the third forwarding information sent by the second control device 82.
  • the forwarding unit 23 is configured to determine valid forwarding information according to the first forwarding information and the third forwarding information, and forward the received packet according to the valid forwarding information.
  • the access point AP83 and the sending unit 21 provided in this embodiment respectively send forwarding resource information to the first control device 81 and the second control device 82.
  • the second receiving unit 22 receives the first forwarding information sent by the first control device 81 and the third forwarding information sent by the second control device 82.
  • the forwarding unit 23 determines valid forwarding information according to the first forwarding information and the third forwarding information, and forwards the received packet according to the valid forwarding information.
  • the control plane of the AP 83 is centralized on the control device, and the first control device 81 and the second control device 82 respectively generate forwarding information for the AP 83, and the AP 83 only receives the information according to the Forwarding information for forwarding packets. It avoids the configuration maintenance of each AP83 in the network, simplifies the network structure and improves the manageability of the network.
  • the first forwarding information includes a first priority of the first control device 81 to the AP 83.
  • the third forwarding information includes a second control device 82 that is configured by the second control device 82.
  • the forwarding unit 23 is further configured to: when the first priority is higher than the third priority, the AP 83 selects the first forwarding information as valid forwarding information. One of the information and the third forwarding information is selected as the effective forwarding information.
  • the second receiving unit 22 is configured to send the forwarding resource information to the first control device 81 according to the received first forwarding resource information obtaining request sent by the first control device 81.
  • the forwarding resource information is sent to the second control device 82 according to the received second forwarding resource information obtaining request sent by the second control device 82.
  • FIG. 7 is a schematic structural diagram of a network path control system according to an embodiment of the present invention.
  • the network path control system provided in this embodiment specifically includes a first control device 81, a second control device 82, a first access point AP 831, and a second AP 832.
  • the first control device 81 is configured to generate path information for the first AP 831 according to the network topology information, and generate, for the first AP 831 according to the obtained forwarding resource information of the first AP 831 and the path information.
  • the first forwarding information Transmitting, by the first forwarding information, the first forwarding information to the first AP 831, and determining that the path information includes a second AP 832 that is not managed by the first control device 81, sending the path information to Management of the number
  • the second control device 82 of the second AP 832 so that the second control device 82 generates the second forwarding information of the second AP 832 according to the path information and the obtained forwarding resource information of the second AP 832.
  • the second forwarding information is sent to the second AP 832.
  • the first AP 831 is configured to send forwarding resource information to the first control device 81 and the second control device 82, and receive the first forwarding information sent by the first control device 81 and the second control device.
  • the third forwarding information that is sent by the terminal 82 determines the valid forwarding information according to the first forwarding information and the third forwarding information, and forwards the received packet according to the valid forwarding information.
  • the network path control system provided in this embodiment is configured to concentrate the control planes of the first AP 831 in the first control device 81 and the second control device 82 by the settings of the first control device 81 and the second control device 82.
  • the first control device 81 performs path calculation for the first AP 831 managed by the first control device, and generates the first forwarding information to be sent to the first AP 831.
  • the second control device 82 generates third forwarding information for the first AP 831 managed by the second control device 82.
  • the first AP 831 does not perform path calculation, and only determines valid forwarding information according to the received first forwarding information and the third forwarding information to guide packet forwarding.
  • the second control device 82 can cooperate with the first control device 81 to implement generation and delivery of the second forwarding information of the second AP 832 that is not managed by the first control device 81. It avoids the configuration maintenance of each AP in the network, simplifies the network structure, and improves the manageability of the network.
  • FIG. 8 is a schematic structural diagram of a network topology according to an embodiment of the present invention.
  • there are eight routers or switches and three of them are control devices, namely Master 1, Master 2, and Master 3, and the others are APs, which are API, AP2, AP3, and AP4. And AP5.
  • the master control device and the standby control device of the AP2 are respectively used as the master control device and the standby control device of the AP2.
  • the masterl is the standby control device of the API, and the master2 is the standby control device of the AP3.
  • the working process of the network path control system provided in this embodiment is detailed. Introduction.
  • the API sends the forwarding resource information to Master1, and AP3 sends the forwarding resource information to Master2, and AP2 sends the forwarding resource information to Master1 and Master2 respectively.
  • the masterl calculates path information for the AP2 according to the network topology information, and the path information may include, but is not limited to, the first path information and the second path information.
  • the first path information is ⁇ 2-> ⁇ 1-> Mastserl
  • the second path information is ⁇ 2 ->AP3->Master2.
  • the representation of the path information may also vary depending on the network protocol on which the network is based. For example, in LSP ( Label Switch Path) forwarding, the path information can be in the form of (AP2's LSRID) ->(API's LSRID) ->(Masterl's LSRID). Masterl synchronizes the above two path information to Master2.
  • the masterl generates forwarding information for the AP2 according to the first path information and the forwarding resource information of the AP2, and the masterl generates forwarding information for the API according to the first path information and the forwarding resource information of the API.
  • the master2 generates forwarding information for the AP2 according to the second path information and the forwarding resource information of the AP2, and the master2 generates forwarding information for the AP3 according to the second path information and the forwarding resource information of the AP3.
  • the master1 and the master2 respectively send the forwarding information corresponding to the AP2 to the AP2.
  • the masterl sends the forwarding information corresponding to the API to the API Master2, and sends the forwarding information corresponding to the AP3 to the AP3.
  • the AP2 can determine an effective forwarding according to the received forwarding information. Information, and the received message is forwarded according to the valid forwarding information.
  • the server as the control device is not used as a node in the path information.
  • the control plane when there are multiple control devices in the network, after the network component is virtualized, the control plane is no longer one, but multiple.
  • the entire virtualized network actually presents multiple virtual control planes, and each control device can be considered as a virtual control plane.
  • the AP node in the virtualized network can freely choose the control device for which the service is provided. Because the AP can freely choose the control device for which the service is provided, it can implement various complex networking modes such as phase switching ring networking, intersecting ring networking, and ring ring networking, and when the primary control device fails and is upgraded, The service on the active control device can be conveniently switched to the standby control device, so that the network service is not interrupted.
  • the first to third APs the first to third forwarding information are only used for the difference, and are not used for the sequence limitation.

Abstract

本发明实施例提供一种网络路径控制方法、设备及系统,该网络路径控制方法包括:第一控制设备根据网络拓扑信息为第一AP生成路径信息,根据获取到的第一AP的转发资源信息和路径信息,为第一AP生成第一转发信息,将第一转发信息发送给第一AP;第一控制设备判断路径信息中包含不属于第一控制设备管理的第二AP,则将路径信息发送给管理第二AP的第二控制设备,以使第二控制设备根据路径信息和获取到的第二AP的转发资源信息,生成第二AP的第二转发信息,将第二转发信息发送给第二AP。本发明实施例提供的网络路径控制方法、设备及系统,实现了控制面的集中,提高了网络的可管理性。

Description

网络路径控制方法、 设备及系统
技术领域 本发明实施例涉及通信技术, 尤其涉及一种网络路径控制方法、 设备及 系统。 背景技术
现有技术中, 网络设备之间的通信通常是通过多个路由器和 /或交换机对 报文进行转发实现的。 每个路由器或交换机通常具有控制面、 管理面和数据 面。 用户可以通过管理面对该路由器或交换机进行管理, 控制面运行各种转 发协议, 计算路径并生成转发表项, 将转发表项下发到数据面, 数据面根据 转发表项对报文进行转发。
由于网络中的每个路由器或交换机都进行上述三个面的操作, 当网络协 议更新时, 需要对每个路由器或交换机进行配置维护, 对于复杂网络, 网络 的可管理性差。 发明内容
本发明实施例提供一种网络路径控制方法、 设备及系统, 以实现控制 面的集中, 提高网络的可管理性。
本发明实施例提供一种网络路径控制方法, 包括:
第一控制设备根据网络拓朴信息为第一 AP生成路径信息, 根据获取到 的所述第一 AP的转发资源信息和所述路径信息,为所述第一 AP生成第一转 发信息, 将所述第一转发信息发送给所述第一 AP;
所述第一控制设备判断所述路径信息中包含不属于所述第一控制设备管 理的第二 AP, 则将所述路径信息发送给管理所述第二 AP的第二控制设备, 以使所述第二控制设备根据所述路径信息和获取到的所述第二 AP 的转发资 源信息, 生成所述第二 AP 的第二转发信息, 将所述第二转发信息发送给所 述第二 AP。
本发明实施例提供一种网络路径控制方法, 包括: 接入点 AP分别向第一控制设备和第二控制设备发送转发资源信息; 所述 AP接收所述第一控制设备发送的第一转发信息和所述第二控制设 备发送的第三转发信息;
所述 AP根据所述第一转发信息和所述第三转发信息确定有效转发信息, 并根据所述有效转发信息对接收到的报文进行转发。
本发明实施例提供第一控制设备, 包括:
第一处理单元, 用于根据网络拓朴信息为第一 AP生成路径信息, 根据 获取到的所述第一 AP的转发资源信息和所述路径信息,为所述第一 AP生成 第一转发信息, 将所述第一转发信息发送给所述第一 AP;
第二处理单元, 用于判断所述路径信息中包含不属于所述第一控制设备 管理的第二 AP,则将所述路径信息发送给管理所述第二 AP的第二控制设备, 以使所述第二控制设备根据所述路径信息和获取到的所述第二 AP 的转发资 源信息, 生成所述第二 AP 的第二转发信息, 将所述第二转发信息发送给所 述第二 AP。
本发明实施例提供一种接入点, 包括:
发送单元,用于分别向第一控制设备和第二控制设备发送转发资源信息; 第二接收单元, 用于接收所述第一控制设备发送的第一转发信息和所述 第二控制设备发送的第三转发信息;
转发单元, 用于根据所述第一转发信息和所述第三转发信息确定有效转 发信息, 并根据所述有效转发信息对接收到的报文进行转发。
本发明实施例提供一种网络路径控制系统, 包括:
第一控制设备、 第二控制设备、 第一接入点 AP和第二 AP;
所述第一控制设备用于根据网络拓朴信息为所述第一 AP生成路径信息, 根据获取到的所述第一 AP的转发资源信息和所述路径信息, 为所述第一 AP 生成第一转发信息, 将所述第一转发信息发送给所述第一 AP, 判断所述路径 信息中包含不属于所述第一控制设备管理的第二 AP,则将所述路径信息发送 给管理所述第二 AP 的第二控制设备, 以使所述第二控制设备根据所述路径 信息和获取到的所述第二 AP的转发资源信息,生成所述第二 AP的第二转发 信息, 将所述第二转发信息发送给所述第二 AP;
所述第一 AP用于分别向所述第一控制设备和所述第二控制设备发送转 发资源信息,接收所述第一控制设备发送的第一转发信息和所述第二控制设 备发送的第三转发信息,根据所述第一转发信息和所述第三转发信息确定有 效转发信息, 并根据所述有效转发信息对接收到的报文进行转发。
由上述技术方案可知, 本发明实施例提供的网络路径控制方法、 设备及 系统, 第一控制设备根据网络拓朴信息为第一 AP生成路径信息, 根据获取 到的第一 AP的转发资源信息和路径信息, 为第一 AP生成第一转发信息, 将第一转发信息发送给第一 AP, 判断路径信息中包含不属于第一控制设备 管理的第二 AP, 则将路径信息发送给管理第二 AP的第二控制设备, 以使 第二控制设备根据路径信息和获取到的第二 AP的转发资源信息, 生成第二 AP的第二转发信息, 将第二转发信息发送给第二 AP。 通过第一控制设备的 设置, 实现了将第一 AP的控制面集中在第一控制设备, 由第一控制设备为 其所管理的第一 AP进行路径计算并生成第一转发信息下发给第一 AP, 第 一 AP并不进行路径计算, 只根据接收到的第一转发信息进行报文的转发。 而且, 通过第二控制设备的设置, 与第一控制设备配合实现对不属于第一控 制设备管理的第二 AP的第二转发信息的生成与下发。 避免了对网络中每个 AP进行配置维护, 简化了网络结构, 提高了网络的可管理性。 附图说明
图 1为本发明实施例提供的一种网络路径控制方法流程图;
图 2为本发明实施例提供的另一种网络路径控制方法流程图;
图 3为本发明实施例提供的再一种网络路径控制方法流程图
图 4为本发明实施例提供的一种第一控制设备结构示意图;
图 5为本发明实施例提供的另一种第一控制设备结构示意图;
图 6为本发明实施例提供的接入点结构示意图;
图 7为本发明实施例提供的网络路径控制系统结构示意图;
图 8为本发明实施例提供的网络拓朴结构示意图。 具体实施方式 为使本发明实施例的目的、 技术方案和优点更加清楚, 下面将结合本 发明实施例中的附图, 对本发明实施例中的技术方案进行清楚、 完整地描 述, 显然, 所描述的实施例是本发明一部分实施例, 而不是全部的实施例。 基于本发明中的实施例, 本领域普通技术人员在没有作出创造性劳动前提 下所获得的所有其他实施例, 都属于本发明保护的范围。
图 1为本发明实施例提供的一种网络路径控制方法流程图。如图 1所示, 本实施例提供的网络路径控制方法具体可以应用于对网络中的多个路由器或 交换机的路由控制过程。 本实施例提供的网络路径控制方法具体包括:
步骤 A10、 第一控制设备根据网络拓朴信息为第一 AP生成路径信息, 根据获取到的所述第一 AP的转发资源信息和所述路径信息, 为所述第一 AP 生成第一转发信息, 将所述第一转发信息发送给所述第一 AP;
步骤 A20、 所述第一控制设备判断所述路径信息中包含不属于所述第一 控制设备管理的第二 AP, 则将所述路径信息发送给管理所述第二 AP的第二 控制设备,以使所述第二控制设备根据所述路径信息和获取到的所述第二 AP 的转发资源信息, 生成所述第二 AP 的第二转发信息, 将所述第二转发信息 发送给所述第二 AP。
具体地, 相互通信的网络设备之间设置有多个路由器或交换机, 以实现 对网络设备交互的报文的转发。 例如, 设置在基站和基站控制器之间的无线 接入网络(Radio Access Network, 简称 RAN ) 中, 设置有多个路由器或交 换机, 以实现基站和基站控制器之间的通信。 当然, 本实施例只是介绍了一 种应用场景, 本实施例提供的网络路径控制方法还可以应用到其他通过多个 路由器或交换机对报文交换实现网络设备间通信的应用场景。
可以预先将上述网络中的多个路由器或交换机中的至少一个设置为第一 控制设备, 将上述多个路由器或交换机中的至少一个设置为第二控制设备, 将其他的路由器或交换机设置为 AP,设置由第一控制设备管理的 AP为哪些, 由第二控制设备管理的 AP 为哪些。 当将网络中的路由器或交换机作为第一 控制设备或第二控制设备时, 该第一控制设备或第二控制设备除了要实现控 制面和管理面的功能, 还要实现数据面的功能。 还可以增设服务器作为该第 一控制设备或第二控制设备, 当将服务器作为第一控制设备或第二控制设备 时, 该第一控制设备或第二控制设备只需要实现控制面和管理面的功能, 不 需要实现数据面的功能。控制面的功能具体为进行路径计算和生成转发信息, 管理面的功能具体为用户的管理接口, 数据面的功能具体为根据控制面下发 的转发信息实现报文的转发。
上述设置过程的实现方式可以有多种:
一种实现方式中, 路由器或交换机上设置有配置接口, 路由器或交换机 可以根据用户通过配置接口输入的第一配置信息将自己设置成第一控制设 备, 并根据第一配置信息获知自己管理的 AP有哪些。 第一控制设备可以主 动检测需要管理的 AP是否在服务中, 并与 AP建立连接, 以实现对 AP的管 理。
另一种实现方式中, AP上也设置有配置接口, AP可以根据用户通过配 置接口输入的第二配置信息将自己设置为 AP,并根据第二配置信息获知管理 自己的第一控制设备。 AP 可主动检测管理自己的第一控制设备是否在服务 中, 并与第一控制设备建立连接, 以实现受控于该第一控制设备。
再一种实现方式中, AP还可以获知网络中存在的第一控制设备, 并自行 选择受控于哪个第一控制设备。 AP选择一个第一控制设备, 主动检测管理自 己的第一控制设备是否在服务中, 并与第一控制设备建立连接, 以实现受控 于该第一控制设备。
第一控制设备与 AP建立连接的方式也可以釆用现有的网络协议, 如, 可以在第一控制设备和 AP上分别配置 IP地址, 第一控制设备和 AP之间建 立 TCP/IP连接,第一控制设备和 AP之间的 IP路由可达可以基于中间系统到 中间系统 ( Intermediate System to Intermediate System, 简称 ISIS )协议来实 现。 第一控制设备和 AP之间还可以是二层网络, 通过发送 ETH帧来建立连 接。 可以将第一控制设备和 AP划分到同一个虚拟局域网 ( Virtual Local Area Network, 简称 VLAN ) 中, 建立一个二层管理网来实现第一控制设备和 AP 之间的通信。
第二控制设备的设置过程以及由第二控制设备管理的 AP 的设置过程具 体可以参照第一控制设备的设置过程的具体描述, 在此不再赘述。
由第一控制设备管理的 AP中,一部分 AP的主用控制设备为该第一控制 设备, 剩余的 AP 的备用控制设备为该第一控制设备。 为了描述方便, 将第 一控制设备作为主用控制设备的 AP在本实施例中称为第一 AP, 将第一控制 设备作为备用控制设备的 AP在本实施例中称为第三 AP。 第一控制设备为第 一 AP进行路径计算并生成转发信息,第一控制设备只为第三 AP生成转发信 息, 并不为该第三 AP进行路径计算。 可以将第二控制设备设置为管理第一
AP的备用控制设备,也将其他控制设备设置为管理第一 AP的备用控制设备。 优选地, 在网络部署时, 第一控制设备为第一 AP计算路径生成的路径信息 中包含有不属于该第一控制设备管理的第二 AP时,管理该第二 AP的控制设 备应管理至少一个同时由第一控制设备管理的 AP。 类似地, 第三 AP也具有 相应地主用控制设备。
在实际应用过程中, 第一控制设备可以为一个 AP 的主用控制设备, 也 可以为另一个 AP 的备用控制设备。 第二控制设备可以为一个 AP 的备用控 制设备, 也可以为另一个 AP 的主用控制设备。 即可以在网络中设置多个控 制设备, 并设置每个控制设备的角色, 对于同一 AP来说, 一个控制设备只 有一个角色, 可以为主用控制设备或为备用控制设备。 一个 AP 可以有多个 主用控制设备, 也可以有多个备用控制设备。 优选地, 一个 AP 的主用控制 设备为一个, 以避免计算出来的路径信息出现共路径的情况。
例如, 第一 AP 的主用控制设备为第一控制设备, 备用控制设备为第二 控制设备, 当第一控制设备出现故障或升级时, 可以由第二控制设备接替第 一控制设备的工作, 实现业务的不间断, 提高网络的可靠性, 即使第一控制 设备不支持不中断业务升级( In-Service Software Upgrade, 简称 ISSU )也可 以在第一控制设备升级的时候不中断整个网络业务。
第一控制设备可以预先获知网络拓朴信息 , 根据网络拓朴信息可以为第 一 AP生成路径信息,该路径信息中具体可以包括第一控制设备和第一 AP之 间的双向路径信息和 /或第二控制设备和第一 AP之间的双向路径信息。 第一 控制设备还可以预先获取第一 AP的转发资源信息,第一 AP的转发资源信息 具体用以指示该第一 AP所具有的转发资源情况, 转发资源信息具体可以包 括第一 AP 的标签空间、 MAC ( Media Access Control, 介质访问控制)地址 和端口信息等。 第一 AP 的转发资源信息的获取方式可以由第一控制设备主 动向第一 AP请求, 也可以由第一 AP主动上报给第一控制设备。 第一控制设 备根据第一 AP的转发资源信息和路径信息, 为第一 AP生成第一转发信息, 第一转发信息的数量具体可以为多个。 当网络中的报文转发为 MPLS ( Multi-Protocol Label Switching, 多协议标签交换)转发时, 第一转发信息 具体可以包括入标签、 入端口、 出标签、 出端口和标签操作类型等信息。 当 网络中的报文转发为二层转发时, 第一转发信息具体可以包括 VLAN、 入端 口、 MAC地址、 出端口和 VLAN操作类型等信息。
第一控制设备将该第一转发信息发送给第一 AP, 当发送给第一 AP的第 一转发信息为多个时, 第一 AP可以根据该多个第一转发信息确定一个有效 转发信息, 并根据该有效转发信息进行报文转发。 具体地, 可以预先在第一 控制设备配置第一转发信息的优先级, 并向优先级携带在第一转发信息中下 发给第一 AP, 以使第一 AP根据该优先级确定有效转发信息。 第一控制设备 也可以选择一个第一转发信息发送给第一 AP。
当第一控制设备为第一 AP生成的路径信息中包含属于该第一控制设备管 理的第三 AP时, 第一控制设备可以预先获取第三 AP的转发资源信息, 根据 路径信息和第三 AP的转发资源信息生成第三 AP的转发信息,并将该第三 AP 的转发信息发送给第三 AP。 第三 AP的转发资源信息的获取方式可以由第一 控制设备主动向第三 AP请求, 也可以由第三 AP主动上报给第一控制设备。
当第一控制设备为第一 AP生成的路径信息中包含不属于该第一控制设 备管理的第二 AP时, 将路径信息发送给管理该第二 AP的第二控制设备。 管 理该第二 AP的第二控制设备可以预先获取第二 AP的转发资源信息,第二控 制设备可以根据接收到的路径信息以及第二 AP 的转发资源信息, 生成第二 AP的第二转发信息, 并将第二转发信息发送给第二 AP。 第二 AP的转发资 源信息的获取方式可以由第二控制设备主动向第二 AP请求, 也可以由第二 AP主动上报给第二控制设备。
具体地, 第一控制设备所管理的第一 AP 中的至少一个的备用控制设备 为第二控制设备, 则第一控制设备可以获知该第二控制设备, 并将为第一 AP 生成的路径信息同步给第二控制设备。 第一控制设备将路径信息同步到第二 控制设备, 当第一控制设备故障或升级, 由第二控制设备接替工作时, 第二 控制设备可以根据路径信息直接进行后续工作, 保证了业务的不间断。
第一控制设备获知第一 AP 的第二控制设备的方式也可以有多种, 第一 控制设备可以根据第一配置信息获知其主控的第一 AP 的备用控制设备的信 息, 即可以确定第二控制设备。 第一 AP也可以根据第二配置信息获知其备 用控制设备的信息, 并将备用控制设备的信息上报给第一控制设备, 以使第 一控制设备可以获知第二控制设备。 第一控制设备将为第一 AP生成的路径 信息发送给第二控制设备。 第一控制设备可以通过 IP与第二控制设备连接, 也可以通过二层连接与第二控制设备连接。 第二控制设备还可以是其他 AP 的主用控制设备, 类似地, 第二控制设备为其主控的 AP生成路径信息, 并 根据该路径信息和获取到的其主控的 AP 的转发资源信息生成对应于主控的 AP的转发信息并下发。
本实施例提供的网络路径控制方法,第一控制设备根据网络拓朴信息为第 一 AP生成路径信息, 根据获取到的第一 AP的转发资源信息和路径信息, 为 第一 AP生成第一转发信息, 将第一转发信息发送给第一 AP, 判断路径信息 中包含不属于第一控制设备管理的第二 AP,则将路径信息发送给管理第二 AP 的第二控制设备, 以使第二控制设备根据路径信息和获取到的第二 AP的转发 资源信息, 生成第二 AP的第二转发信息, 将第二转发信息发送给第二 AP。 通过第一控制设备的设置, 实现了将第一 AP的控制面集中在第一控制设备, 由第一控制设备为其所管理的第一 AP进行路径计算并生成第一转发信息下发 给第一 AP, 第一 AP并不进行路径计算, 只根据接收到的第一转发信息进行 报文的转发。 而且, 通过第二控制设备的设置, 与第一控制设备配合实现对不 属于第一控制设备管理的第二 AP的第二转发信息的生成与下发。 避免了对网 络中每个 AP进行配置维护, 简化了网络结构, 提高了网络的可管理性。
图 2为本发明实施例提供的另一种网络路径控制方法流程图。 如图 2所 示, 在本实施例中, 步骤 A20中的, 所述第一控制设备判断所述路径信息中 包含不属于所述第一控制设备管理的第二 AP具体可以包括:
当所述路径信息中包含所述第二 AP且所述第一控制设备没有所述第二 AP的转发资源信息时,则所述第一控制设备判断所述路径信息中包含不属于 所述第一控制设备管理的第二 AP。
具体地, 第一控制设备可以预先获取其管理的 AP 的转发资源信息, 当 第一控制设备为第一 AP生成的路径信息中包含了第二 AP, 但第一控制设备 并没有该第二 AP的转发资源信息时,可以获知该第二 AP并不属于该第一控 制设备管理。
在本实施例中, 所^各径信息可以包括所述第一控制设备和所述第一 AP之 间的双向路径信息和 /或所述第二控制设备和所述第一 AP之间的双向路径信息。
具体地, 第一控制设备和第一 AP之间的双向路径信息可以用于实现链 路保护, 第二控制设备和第一 AP之间的双向路径信息可以用于实现节点保 护。
在本实施例中, 在步骤 A10, 第一控制设备根据网络拓朴信息为第一 AP 生成路径信息之前, 还可以包括:
步骤 A30、 所述第一控制设备接收所述第一 AP发送的所述转发资源信息。 具体地, 第一 AP 可以根据第二配置信息获知其受控于第一控制设备, 并向该第一控制设备发送第一 AP 的转发资源信息, 第一控制设备接收第一 AP发送的转发资源信息。第一控制设备也可以根据第一配置信息获知其管理 的第一 AP, 并向该第一 AP请求第一 AP的转发资源信息, 第一 AP向该第 一控制设备发送第一 AP的转发资源信息,第一控制设备接收第一 AP发送的 转发资源信息。
在本实施例中, 在所述第一控制设备接收所述第一 AP发送的所述转发 资源信息之前, 还可以包括:
步骤 A40、 所述第一控制设备向所述第一 AP请求所述转发资源信息。 在实际应用过程中, 当第一控制设备和第二控制设备分别为第一 AP 的 主用控制设备和备用控制设备时, 第一 AP分别向第一控制设备和第二控制 设备发送转发资源信息, 则第一 AP发送的转发资源信息应避免资源冲突。 以转发资源信息中的标签空间为例, 第一 AP 向第一控制设备发送的转发资 源信息中的标签空间与向第二控制设备发送的转发资源信息中的标签空间不 重叠。 第一控制设备会为第一 AP生成转发信息, 第二控制设备也会为第一 AP生成转发信息, 则第一 AP会分别接收到第一控制设备发送的转发信息和 第二控制设备发送的转发信息, 转发信息中可以携带有发送该转发信息的控 制设备的标识, AP可以根据自身策略或用户配置首先选择某个控制设备发送 的转发信息作为有效转发信息, 并根据该有效转发信息指导报文的转发。
当第一控制设备管理第三 AP, 但是只作为第三 AP的备用控制设备时, 第一控制设备还可以接收第三 AP的主用控制设备同步过来的、为第三 AP生 成的路径信息, 第一控制设备可以根据该路径信息以及第三 AP转发资源信 息为第三 AP生成转发信息。
图 3为本发明实施例提供的再一种网络路径控制方法流程图。 如图 3所 示, 本实施例提供的网络路径控制方法可以与图 1所示实施例配合实现, 其 具体实现过程不再赘述。 本实施例提供的网络路径控制方法具体包括: 步骤 B10、接入点 AP分别向第一控制设备和第二控制设备发送转发资源 信息;
步骤 B20、所述 AP接收所述第一控制设备发送的第一转发信息和所述第 二控制设备发送的第三转发信息;
步骤 B30、所述 AP根据所述第一转发信息和所述第三转发信息确定有效 转发信息, 并根据所述有效转发信息对接收到的报文进行转发。
具体地, 第一控制设备和第二控制设备分别为管理该 AP 的控制设备, 则第一控制设备和第二控制设备均为该 AP生成转发信息并发送给 AP。 当第 一控制设备为该 AP的主用控制设备时,第二控制设备可以为该 AP的备用控 制设备, 第一控制设备为该 AP计算路径并生成第一转发信息, 第二控制设 备为该 AP生成第三转发信息。 AP确定有效转发信息的方式可以有多种, 例 如, 可以预先在第一控制设备配置第一转发信息的优先级, 在第二控制设备 中配置第三转发信息的优先级, 并向优先级携带在转发信息中下发给第一 AP, 以使第一 AP根据该优先级确定有效转发信息。 也可以预先在第一 AP 中配置各个控制设备的优先级, 第一 AP接收到多个转发信息时, 根据优先 级确定有效转发信息。 第一 AP还可以根据预设策略来确定有效转发信息, 例如可以根据控制设备的 IP地址, IP地址大的优先级高。
本实施例提供的网络路径控制方法, AP分别向第一控制设备和第二控制 设备发送转发资源信息, 接收第一控制设备发送的第一转发信息和第二控制 设备发送的第三转发信息, 根据第一转发信息和第三转发信息确定有效转发 信息, 并根据有效转发信息对接收到的报文进行转发。 通过第一控制设备和 第二设备的设置, 实现了将 AP 的控制面集中在控制设备, 由第一控制设备 和第二控制设备分别为 AP生成转发信息, AP只根据接收到的转发信息进行 报文的转发。 避免了对网络中每个 AP进行配置维护, 简化了网络结构, 提 高了网络的可管理性。
在本实施例中, 所述第一转发信息包括所述第一控制设备对所述 AP 的 第一优先级; 所述第三转发信息包括所述第二控制设备对所述 AP 的第三优 先级; 步骤 B30,所述 AP根据所述第一转发信息和所述第三转发信息确定有 效转发信息具体可以包括: 当所述第一优先级高于所述第三优先级时, 所述 AP选择所述第一转发 信息为有效转发信息。
具体地, 优先级可以根据网络中各个设备的运行情况, 以及链路状况来 设置, 通过优先级的设置, AP可以根据优先级高低进行转发信息的选择, 以 提高转发信息选择的可靠性。
在本实施例中,步骤 B30,所述 AP根据所述第一转发信息和所述第三转 发信息确定有效转发信息具体包括: 所述 AP根据预设的策略从所述第一转 发信息和所述第三转发信息中选择其一作为有效转发信息。
AP还可以根据预设的策略进行转发信息的选择,以提高转发信息选择的 灵活性。
在本实施例中,步骤 B10,所述接入点 AP分别向第一控制设备和第二控 制设备发送转发资源信息, 具体可以包括:
所述 AP根据接收到的所述第一控制设备发送的第一转发资源信息获取 请求, 向所述第一控制设备发送所述转发资源信息;
所述 AP根据接收到的所述第二控制设备发送的第二转发资源信息获取 请求, 向所述第二控制设备发送所述转发资源信息。
在实际应用过程中, AP也可以主动向第一控制设备和第二控制设备上报 转发资源信息。
图 4为本发明实施例提供的一种第一控制设备结构示意图。如图 4所示, 本实施例提供的第一控制设备 81具体可以实现图 1所示实施例提供的网络路 径控制方法的各个步骤, 在此不再赘述。 本实施例提供的第一控制设备 81具 体包括第一处理单元 11和第二处理单元 12。 第一处理单元 11用于根据网络 拓朴信息为第一 AP831生成路径信息,根据获取到的所述第一 AP831的转发 资源信息和所述路径信息, 为所述第一 AP831生成第一转发信息, 将所述第 一转发信息发送给所述第一 AP831。第二处理单元 12用于判断所述路径信息 中包含不属于所述第一控制设备管理的第二 AP832, 则将所述路径信息发送 给管理所述第二 AP832的第二控制设备 82, 以使所述第二控制设备 82根据 所述路径信息和获取到的所述第二 AP832 的转发资源信息, 生成所述第二 AP832的第二转发信息, 将所述第二转发信息发送给所述第二 AP832。
本实施例提供的第一控制设备 81 , 第一处理单元 11根据网络拓朴信息 为第一 AP831生成路径信息,根据获取到的所述第一 AP831的转发资源信息 和所述路径信息, 为所述第一 AP831生成第一转发信息, 将所述第一转发信 息发送给所述第一 AP831。第二处理单元 12判断所述路径信息中包含不属于 所述第一控制设备管理的第二 AP832, 则将所述路径信息发送给管理所述第 二 AP832的第二控制设备 82, 以使所述第二控制设备 82根据所述路径信息 和获取到的所述第二 AP832的转发资源信息,生成所述第二 AP832的第二转 发信息, 将所述第二转发信息发送给所述第二 AP832。 通过第一控制设备 81 的设置, 实现了将第一 AP831的控制面集中在第一控制设备 81 , 由第一控制 设备 81为其所管理的第一 AP831进行路径计算并生成第一转发信息下发给 第一 AP831 , 第一 AP831并不进行路径计算, 只根据接收到的第一转发信息 进行报文的转发。 而且, 通过第二控制设备 82与第一控制设备 81的配合, 实现了对不属于第一控制设备 81管理的第二 AP832的第二转发信息的生成 与下发。 避免了对网络中每个 AP进行配置维护, 简化了网络结构, 提高了 网络的可管理性。
图 5为本发明实施例提供的另一种第一控制设备结构示意图。 如图 5所 示, 在本实施例中, 所述第二处理单元 12还用于当所述路径信息中包含所述 第二 AP832且所述第一控制设备 81没有所述第二 AP832的转发资源信息时, 则所述第一控制设备 81 判断所述路径信息中包含不属于所述第一控制设备 81管理的第二 AP832。
在本实施例中, 所述路径信息包括所述第一控制设备 81 和所述第一
AP831之间的双向路径信息和 /或所述第二控制设备 82和所述第一 AP831之 间的双向路径信息。
在本实施例中, 该第一控制设备 81还可以包括第一接收单元 13 , 所述 第一接收单元 13用于接收所述第一 AP831发送的所述转发资源信息。
在本实施例中, 该第一控制设备 81 还可以包括请求单元 14, 请求单元
14用于向所述第一 AP831请求所述转发资源信息。
图 6为本发明实施例提供的接入点结构示意图。 如图 6所示, 本实施例 提供的接入点 AP83具体可以实现图 2所示实施例提供的网络路径控制方法 的各个步骤, 在此不再赘述。 本实施例提供的接入点 AP83 具体包括发送单 元 21、 第二接收单元 22和转发单元 23。 发送单元 21用于分别向第一控制设 备 81和第二控制设备 82发送转发资源信息。第二接收单元 22用于接收所述 第一控制设备 81发送的第一转发信息和所述第二控制设备 82发送的第三转 发信息。转发单元 23用于根据所述第一转发信息和所述第三转发信息确定有 效转发信息, 并根据所述有效转发信息对接收到的报文进行转发。
本实施例提供的接入点 AP83 ,发送单元 21分别向第一控制设备 81和第 二控制设备 82发送转发资源信息。 第二接收单元 22接收所述第一控制设备 81发送的第一转发信息和所述第二控制设备 82发送的第三转发信息。 转发 单元 23根据所述第一转发信息和所述第三转发信息确定有效转发信息,并根 据所述有效转发信息对接收到的报文进行转发。通过第一控制设备 81和第二 设备 82的设置, 实现了将 AP83的控制面集中在控制设备, 由第一控制设备 81和第二控制设备 82分别为 AP83生成转发信息, AP83只根据接收到的转 发信息进行报文的转发。 避免了对网络中每个 AP83 进行配置维护, 简化了 网络结构, 提高了网络的可管理性。
在本实施例中,所述第一转发信息包括所述第一控制设备 81对所述 AP83 的第一优先级; 所述第三转发信息包括所述第二控制设备 82对所述 AP83的 第三优先级;所述转发单元 23还用于当所述第一优先级高于所述第三优先级 时, 所述 AP83选择所述第一转发信息为有效转发信息。 信息和所述第三转发信息中选择其一作为有效转发信息。
在本实施例中,所述第二接收单元 22用于根据接收到的所述第一控制设 备 81发送的第一转发资源信息获取请求, 向所述第一控制设备 81发送所述 转发资源信息,根据接收到的所述第二控制设备 82发送的第二转发资源信息 获取请求, 向所述第二控制设备 82发送所述转发资源信息。
图 7为本发明实施例提供的网络路径控制系统结构示意图。 如图所示, 本实施例提供的网络路径控制系统具体包括第一控制设备 81、 第二控制设备 82、 第一接入点 AP831和第二 AP832。 所述第一控制设备 81用于根据网络 拓朴信息为所述第一 AP831生成路径信息,根据获取到的所述第一 AP831的 转发资源信息和所述路径信息, 为所述第一 AP831生成第一转发信息, 将所 述第一转发信息发送给所述第一 AP831 , 判断所述路径信息中包含不属于所 述第一控制设备 81管理的第二 AP832,则将所述路径信息发送给管理所述第 二 AP832的第二控制设备 82, 以使所述第二控制设备 82根据所述路径信息 和获取到的所述第二 AP832的转发资源信息,生成所述第二 AP832的第二转 发信息, 将所述第二转发信息发送给所述第二 AP832。 所述第一 AP831用于 分别向所述第一控制设备 81和所述第二控制设备 82发送转发资源信息, 接 收所述第一控制设备 81发送的第一转发信息和所述第二控制设备 82发送的 第三转发信息, 根据所述第一转发信息和所述第三转发信息确定有效转发信 息, 并根据所述有效转发信息对接收到的报文进行转发。
本实施例提供的网络路径控制系统,通过第一控制设备 81和第二控制设 备 82的设置, 实现了将第一 AP831的控制面集中在第一控制设备 81和第二 控制设备 82中, 由第一控制设备 81为其所管理的第一 AP831进行路径计算 并生成第一转发信息下发给第一 AP831 , 第二控制设备 82 为其管理的第一 AP831生成第三转发信息。 第一 AP831并不进行路径计算, 只根据接收到的 第一转发信息和第三转发信息确定有效转发信息以指导报文的转发。 而且第 二控制设备 82可以与第一控制设备 81配合实现对不属于第一控制设备 81管 理的第二 AP832的第二转发信息的生成与下发。 避免了对网络中每个 AP进 行配置维护, 简化了网络结构, 提高了网络的可管理性。
图 8为本发明实施例提供的网络拓朴结构示意图。 在图 8所示网络拓朴 结构中, 存在 8 个路由器或交换器, 将其中三个设备为控制设备, 分别为 Master 1、 Master2和 Master3 , 其他为 AP, 分别为 API、 AP2、 AP3、 AP4和 AP5。以下以 Masterl和 Master2分别为 AP2的主用控制设备和备用控制设备, Masterl为 API的备用控制设备, Master2为 AP3的备用控制设备为例,对本 实施例提供的网络路径控制系统的工作过程做详细介绍。
API 将转发资源信息发送给 Masterl , AP3 将转发资源信息发送给 Master2 , AP2将转发资源信息分别发送给 Masterl和 Master2。
Masterl根据网络拓朴信息为 AP2计算路径信息, 路径信息可以包括但 并不限于第一路径信息和第二路径信息。 第一路径信息为 ΑΡ2->ΑΡ1-> Mastserl , 第二路径信息为 ΑΡ2 ->AP3-> Master2。 根据网络所基于的网络协 议不同, 路径信息的表现形式也可以不同。 例如, 在 LSP ( Label Switch Path, 标签交换路径)转发中, 路径信息的形式可以为 (AP2的 LSRID ) -> ( API 的 LSRID ) -> ( Masterl 的 LSRID ) 。 Masterl 将上述两条路径信息同步给 Master2。
Masterl根据第一路径信息和 AP2的转发资源信息为 AP2生成转发信息, Masterl 根据第一路径信息和 API 的转发资源信息为 API 生成转发信息。 Master2根据第二路径信息和 AP2 的转发资源信息为 AP2生成转发信息, Master2根据第二路径信息和 AP3 的转发资源信息为 AP3 生成转发信息。 Masterl和 Master2分别将对应于 AP2的转发信息发送给 AP2, Masterl将对 应于 API的转发信息发送给 API Master2将对应于 AP3的转发信息发送给 AP3 , AP2 可以根据接收到的转发信息确定一个有效转发信息, 并将接收到 的报文根据该有效转发信息进行转发。
当然, 还可以增设多个服务器以实现控制设备, 则在具体实现中, 作为 控制设备的服务器并不作为路径信息中的节点。
本实施例提供的网络路径控制系统, 当网络中存在多个控制设备时, 在 网络组成虚拟化后, 控制面不再是一个, 而是多个。 整个虚拟化网络实际上 对外呈现出多个虚拟控制面, 每个控制设备都可以认为是一个虚拟控制面。 虚拟化网络中的 AP节点可以自由的选择为其提供服务的控制设备。 由于 AP 可以自由的选择为其提供服务的控制设备, 可以实现相切换环组网、 相交环 组网、 环套环组网等多种复杂组网方式, 而且当主用控制设备故障和升级时, 可以方便的将该主用控制设备上的业务倒换到备用控制设备上, 实现了网络 业务的不中断。
值得注意的是, 上述实施例中的第一、 第二控制设备, 第一到第三 AP, 第一到第三转发信息仅用于区别, 并不用于顺序限定。
本领域普通技术人员可以理解: 实现上述方法实施例的全部或部分步骤可 以通过程序指令相关的硬件来完成,前述的程序可以存储于一计算机可读取存 储介质中, 该程序在执行时, 执行包括上述方法实施例的步骤; 而前述的存储 介质包括: ROM、 RAM, 磁碟或者光盘等各种可以存储程序代码的介质。
最后应说明的是: 以上各实施例仅用以说明本发明的技术方案, 而非对 其限制; 尽管参照前述各实施例对本发明进行了详细的说明, 本领域的普通 技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改, 或者对其中部分或者全部技术特征进行等同替换; 而这些修改或者替换, 并 不使相应技术方案的本质脱离本发明各实施例技术方案的范围。

Claims

权 利 要 求 书
1、 一种网络路径控制方法, 其特征在于, 包括:
第一控制设备根据网络拓朴信息为第一 AP生成路径信息, 根据获取到 的所述第一 AP的转发资源信息和所述路径信息,为所述第一 AP生成第一转 发信息, 将所述第一转发信息发送给所述第一 AP;
所述第一控制设备判断所述路径信息中包含不属于所述第一控制设备管 理的第二 AP, 则将所述路径信息发送给管理所述第二 AP的第二控制设备, 以使所述第二控制设备根据所述路径信息和获取到的所述第二 AP 的转发资 源信息, 生成所述第二 AP 的第二转发信息, 将所述第二转发信息发送给所 述第二 AP。
2、 根据权利要求 1所述的网络路径控制方法, 其特征在于, 所述第一控 制设备判断所述路径信息中包含不属于所述第一控制设备管理的第二 AP具 体包括:
当所述路径信息中包含所述第二 AP且所述第一控制设备没有所述第二 AP的转发资源信息时,则所述第一控制设备判断所述路径信息中包含不属于 所述第一控制设备管理的第二 AP。
3、 根据权利要求 1-2任一权利要求所述的网络路径控制方法, 其特征在 于: 所述路径信息包括所述第一控制设备和所述第一 AP之间的双向路径信 息和 /或所述第二控制设备和所述第一 AP之间的双向路径信息。
4、 根据权利要求 1-3任一权利要求所述的网络路径控制方法, 其特征在 于, 第一控制设备根据网络拓朴信息为第一 AP生成路径信息之前, 还包括: 所述第一控制设备接收所述第一 AP发送的所述转发资源信息。
5、 根据权利要求 4所述的网络路径控制方法, 其特征在于, 在所述第一 控制设备接收所述第一 AP发送的所述转发资源信息之前, 还包括:
所述第一控制设备向所述第一 AP请求所述转发资源信息。
6、 一种网络路径控制方法, 其特征在于, 包括:
接入点 AP分别向第一控制设备和第二控制设备发送转发资源信息; 所述 AP接收所述第一控制设备发送的第一转发信息和所述第二控制设 备发送的第三转发信息;
所述 AP根据所述第一转发信息和所述第三转发信息确定有效转发信息 , 并根据所述有效转发信息对接收到的报文进行转发。
7、 根据权利要求 6所述的网络路径控制方法, 其特征在于, 所述第一转 发信息包括所述第一控制设备对所述 AP 的第一优先级; 所述第三转发信息 包括所述第二控制设备对所述 AP的第三优先级;所述 AP根据所述第一转发 信息和所述第三转发信息确定有效转发信息具体包括:
当所述第一优先级高于所述第三优先级时, 所述 AP选择所述第一转发 信息为有效转发信息。
8、 根据权利要求 6所述的网络路径控制方法, 其特征在于, 所述 AP根 据所述第一转发信息和所述第三转发信息确定有效转发信息具体包括: 所述 AP根据预设的策略从所述第一转发信息和所述第三转发信息中选择其一作 为有效转发信息。
9、 根据权利要求 6-8任一权利要求所述的网络路径控制方法, 其特征在 于, 所述接入点 AP分别向第一控制设备和第二控制设备发送转发资源信息, 包括:
所述 AP根据接收到的所述第一控制设备发送的第一转发资源信息获取 请求, 向所述第一控制设备发送所述转发资源信息;
所述 AP根据接收到的所述第二控制设备发送的第二转发资源信息获取 请求, 向所述第二控制设备发送所述转发资源信息。
10、 一种第一控制设备, 其特征在于, 包括:
第一处理单元, 用于根据网络拓朴信息为第一 AP生成路径信息, 根据 获取到的所述第一 AP的转发资源信息和所述路径信息,为所述第一 AP生成 第一转发信息, 将所述第一转发信息发送给所述第一 AP;
第二处理单元, 用于判断所述路径信息中包含不属于所述第一控制设备 管理的第二 AP,则将所述路径信息发送给管理所述第二 AP的第二控制设备, 以使所述第二控制设备根据所述路径信息和获取到的所述第二 AP 的转发资 源信息, 生成所述第二 AP 的第二转发信息, 将所述第二转发信息发送给所 述第二 AP。
11、 根据权利要求 10所述的第一控制设备, 其特征在于: 所述第二处理 单元还用于当所述路径信息中包含所述第二 AP且所述第一控制设备没有所 述第二 AP 的转发资源信息时, 则所述第一控制设备判断所述路径信息中包 含不属于所述第一控制设备管理的第二 AP。
12、 根据权利要求 10-11 任一所述的第一控制设备, 其特征在于: 所述 路径信息包括所述第一控制设备和所述第一 AP之间的双向路径信息和 /或所 述第二控制设备和所述第一 AP之间的双向路径信息。
13、 根据权利要求 10-12任一所述的第一控制设备, 其特征在于, 还包 括:
第一接收单元, 用于接收所述第一 AP发送的所述转发资源信息。
14、 根据权利要求 13所述的第一控制设备, 其特征在于, 还包括: 请求单元, 用于向所述第一 AP请求所述转发资源信息。
15、 一种接入点, 其特征在于, 包括:
发送单元,用于分别向第一控制设备和第二控制设备发送转发资源信息; 第二接收单元, 用于接收所述第一控制设备发送的第一转发信息和所述 第二控制设备发送的第三转发信息;
转发单元, 用于根据所述第一转发信息和所述第三转发信息确定有效转 发信息, 并根据所述有效转发信息对接收到的报文进行转发。
16、 根据权利要求 15所述的接入点, 其特征在于: 所述第一转发信息包 括所述第一控制设备对所述 AP 的第一优先级; 所述第三转发信息包括所述 第二控制设备对所述 AP的第三优先级;
所述转发单元还用于当所述第一优先级高于所述第三优先级时 ,所述 AP 选择所述第一转发信息为有效转发信息。
17、 根据权利要求 15所述的接入点, 其特征在于: 所述转发单元还用于 根据预设的策略从所述第一转发信息和所述第三转发信息中选择其一作为有 效转发信息。
18、 根据权利要求 15-17任一所述的接入点, 其特征在于:
所述第二接收单元用于根据接收到的所述第一控制设备发送的第一转发 资源信息获取请求, 向所述第一控制设备发送所述转发资源信息, 根据接收 到的所述第二控制设备发送的第二转发资源信息获取请求, 向所述第二控制 设备发送所述转发资源信息。
19、 一种网络路径控制系统, 其特征在于, 包括:
第一控制设备、 第二控制设备、 第一接入点 AP和第二 AP; 所述第一控制设备用于根据网络拓朴信息为所述第一 AP生成路径信息, 根据获取到的所述第一 AP的转发资源信息和所述路径信息, 为所述第一 AP 生成第一转发信息, 将所述第一转发信息发送给所述第一 AP, 判断所述路径 信息中包含不属于所述第一控制设备管理的第二 AP,则将所述路径信息发送 给管理所述第二 AP 的第二控制设备, 以使所述第二控制设备根据所述路径 信息和获取到的所述第二 AP的转发资源信息,生成所述第二 AP的第二转发 信息, 将所述第二转发信息发送给所述第二 AP;
所述第一 AP用于分别向所述第一控制设备和所述第二控制设备发送转 发资源信息, 接收所述第一控制设备发送的第一转发信息和所述第二控制设 备发送的第三转发信息, 根据所述第一转发信息和所述第三转发信息确定有 效转发信息, 并根据所述有效转发信息对接收到的报文进行转发。
PCT/CN2012/077752 2012-06-28 2012-06-28 网络路径控制方法、设备及系统 WO2014000226A1 (zh)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201280000633.1A CN102884762B (zh) 2012-06-28 2012-06-28 网络路径控制方法、设备及系统
JP2015518759A JP6037251B2 (ja) 2012-06-28 2012-06-28 ネットワーク経路を制御するための方法、デバイス、及びシステム
PCT/CN2012/077752 WO2014000226A1 (zh) 2012-06-28 2012-06-28 网络路径控制方法、设备及系统
EP12880266.7A EP2869641A4 (en) 2012-06-28 2012-06-28 METHOD, DEVICE AND SYSTEM FOR ROUTING CONTROL IN A NETWORK
US14/575,386 US9755909B2 (en) 2012-06-28 2014-12-18 Method, device and system for controlling network path

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2012/077752 WO2014000226A1 (zh) 2012-06-28 2012-06-28 网络路径控制方法、设备及系统

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/575,386 Continuation US9755909B2 (en) 2012-06-28 2014-12-18 Method, device and system for controlling network path

Publications (1)

Publication Number Publication Date
WO2014000226A1 true WO2014000226A1 (zh) 2014-01-03

Family

ID=47484674

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/077752 WO2014000226A1 (zh) 2012-06-28 2012-06-28 网络路径控制方法、设备及系统

Country Status (5)

Country Link
US (1) US9755909B2 (zh)
EP (1) EP2869641A4 (zh)
JP (1) JP6037251B2 (zh)
CN (1) CN102884762B (zh)
WO (1) WO2014000226A1 (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104703126A (zh) * 2014-04-11 2015-06-10 上海智向信息科技有限公司 基于iBeacon的无线网络广播信息推送系统及其方法
CN104703298A (zh) * 2014-05-22 2015-06-10 上海智向信息科技有限公司 iBeacon设备组网系统及其构建方法、访问方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8782632B1 (en) * 2012-06-18 2014-07-15 Tellabs Operations, Inc. Methods and apparatus for performing in-service software upgrade for a network device using system virtualization
CN104579966B (zh) 2013-10-14 2018-08-17 华为技术有限公司 转发表项生成的方法、转发节点和控制器
EP3107351B1 (en) * 2014-03-05 2018-05-23 Huawei Technologies Co., Ltd. Data forwarding control method, controller and access point
CN104852837B (zh) * 2015-04-29 2020-12-22 海尔优家智能科技(北京)有限公司 一种家庭网络中多控制中心切换的方法、装置及控制中心
CN109314647A (zh) * 2016-12-09 2019-02-05 华为技术有限公司 一种管理系统、管理网元的方法及装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1859614A (zh) * 2005-12-28 2006-11-08 华为技术有限公司 一种无线传输的方法、装置和系统
CN101772109A (zh) * 2008-12-30 2010-07-07 上海贝尔阿尔卡特股份有限公司 一种支持不同子网间wlan漫游切换的方法、装置及系统
CN102065522A (zh) * 2001-04-18 2011-05-18 高通股份有限公司 无线数据通信的分布式基础结构

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6920171B2 (en) * 2000-12-14 2005-07-19 Motorola, Inc. Multiple access frequency hopping network with interference anticipation
US7225260B2 (en) * 2001-09-28 2007-05-29 Symbol Technologies, Inc. Software method for maintaining connectivity between applications during communications by mobile computer terminals operable in wireless networks
JP4257151B2 (ja) * 2003-02-28 2009-04-22 富士通株式会社 パケット制御システム、パケット制御装置、パケット中継装置およびパケット制御プログラム
JP3704134B2 (ja) * 2003-05-29 2005-10-05 日本電信電話株式会社 パケット転送装置、ネットワーク制御サーバ、およびパケット通信ネットワーク
CN101155134B (zh) * 2006-09-28 2011-08-10 华为技术有限公司 路径计算及网络拓扑方法、构架和系统
CN101453405A (zh) * 2007-11-30 2009-06-10 华为技术有限公司 建立路由的方法、系统和控制管理设备
CN101599893B (zh) * 2008-06-02 2012-07-04 华为技术有限公司 一种分域网络及获取分域网络的网络拓扑图的方法
US8121118B2 (en) * 2008-10-31 2012-02-21 At&T Intellectual Property I, L.P. Methods and apparatus to dynamically control connectivity within virtual private networks
CN101442442B (zh) * 2008-12-17 2011-01-19 华为技术有限公司 管理装置、控制装置、管理控制装置及路由器系统
US8687609B2 (en) * 2009-11-04 2014-04-01 Cisco Technology, Inc. Managing router advertisement messages to support roaming of wireless mobile client devices
JP5411817B2 (ja) * 2010-08-23 2014-02-12 日本電信電話株式会社 ネットワークシステムおよび経路制御方法
JP5440712B2 (ja) * 2010-11-22 2014-03-12 日本電気株式会社 通信システム、通信装置、制御装置、パケットフローの転送経路の制御方法及びプログラム
WO2011113394A2 (zh) * 2011-04-27 2011-09-22 华为技术有限公司 一种路由器、虚拟集群路由器系统及建立方法
US8848609B2 (en) * 2011-07-26 2014-09-30 Cisco Technology, Inc. Forwarding internet protocol version 6 link-local multicast to support roaming of wireless mobile client devices

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102065522A (zh) * 2001-04-18 2011-05-18 高通股份有限公司 无线数据通信的分布式基础结构
CN1859614A (zh) * 2005-12-28 2006-11-08 华为技术有限公司 一种无线传输的方法、装置和系统
CN101772109A (zh) * 2008-12-30 2010-07-07 上海贝尔阿尔卡特股份有限公司 一种支持不同子网间wlan漫游切换的方法、装置及系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2869641A4 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104703126A (zh) * 2014-04-11 2015-06-10 上海智向信息科技有限公司 基于iBeacon的无线网络广播信息推送系统及其方法
CN104703126B (zh) * 2014-04-11 2018-03-06 上海智向信息科技有限公司 基于iBeacon的无线网络广播信息推送系统及其方法
CN104703298A (zh) * 2014-05-22 2015-06-10 上海智向信息科技有限公司 iBeacon设备组网系统及其构建方法、访问方法

Also Published As

Publication number Publication date
JP2015527784A (ja) 2015-09-17
JP6037251B2 (ja) 2016-12-07
EP2869641A1 (en) 2015-05-06
EP2869641A4 (en) 2015-05-06
CN102884762A (zh) 2013-01-16
US9755909B2 (en) 2017-09-05
CN102884762B (zh) 2016-11-16
US20150146571A1 (en) 2015-05-28

Similar Documents

Publication Publication Date Title
US11316730B2 (en) Cross-stratum optimization protocol across an interface between the service stratum and the transport stratum
EP2878105B1 (en) System and method using rsvp hello suppression for graceful restart capable neighbors
US9571382B2 (en) Method, controller, and system for processing data packet
WO2014000226A1 (zh) 网络路径控制方法、设备及系统
WO2017137008A1 (zh) 一种虚拟网络设备及相关方法
EP3399703B1 (en) Method for implementing load balancing, apparatus, and network system
US20210289436A1 (en) Data Processing Method, Controller, and Forwarding Device
WO2019184752A1 (zh) 网络设备的管理方法、装置及系统
KR101953790B1 (ko) 클라우드 네트워킹 장치 및 방법
WO2014177970A1 (en) Enhancing a mobile backup channel to address a node failure in a wireline network
WO2016184368A1 (zh) 用于对用户的业务进行授权的方法、装置及系统
US10462048B2 (en) Virtual cluster establishment method and network device
WO2014071723A1 (zh) 无线局域网络传输控制方法、设备及系统
CN109768908B (zh) 一种vxlan的配置方法、设备及系统
WO2014047784A1 (zh) 报文转发路径确定方法及网络设备、控制设备
CN108011754B (zh) 转控分离系统、备份方法和装置
WO2014012207A1 (zh) 标记交换路径建立方法、数据转发方法及设备
JP2011160363A (ja) コンピュータシステム、コントローラ、スイッチ、及び通信方法
WO2012022169A1 (zh) 一种网络地址转换的管理方法及装置
EP3866408A1 (en) Method for determining df of multicast stream, device, and system
EP2892196B1 (en) Method, network node and system for implementing point-to-multipoint multicast
JP2019519146A (ja) ルーティング確立、パケット送信
WO2014183657A1 (zh) 一种确定下一跳、发布路由信息的方法和装置
WO2015070427A1 (zh) 维护关联ma设置方法、装置及系统
WO2014044088A1 (zh) L2tp网络的保护方法、装置及系统

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201280000633.1

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12880266

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2012880266

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2015518759

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE