WO2013173230A1 - Power monitoring system and method - Google Patents
Power monitoring system and method Download PDFInfo
- Publication number
- WO2013173230A1 WO2013173230A1 PCT/US2013/040781 US2013040781W WO2013173230A1 WO 2013173230 A1 WO2013173230 A1 WO 2013173230A1 US 2013040781 W US2013040781 W US 2013040781W WO 2013173230 A1 WO2013173230 A1 WO 2013173230A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- transformer
- power
- data
- voltage
- current
- Prior art date
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 25
- 238000000034 method Methods 0.000 title claims description 24
- 238000012806 monitoring device Methods 0.000 claims abstract description 140
- 239000004020 conductor Substances 0.000 claims abstract description 85
- 238000004891 communication Methods 0.000 claims description 15
- 230000005540 biological transmission Effects 0.000 description 57
- 230000005611 electricity Effects 0.000 description 46
- 238000013480 data collection Methods 0.000 description 42
- 238000005259 measurement Methods 0.000 description 28
- 230000000875 corresponding effect Effects 0.000 description 15
- 238000010586 diagram Methods 0.000 description 12
- 238000004364 calculation method Methods 0.000 description 8
- 230000007935 neutral effect Effects 0.000 description 8
- 238000004458 analytical method Methods 0.000 description 7
- 238000012545 processing Methods 0.000 description 6
- 230000007423 decrease Effects 0.000 description 5
- 238000001514 detection method Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 230000008878 coupling Effects 0.000 description 4
- 238000010168 coupling process Methods 0.000 description 4
- 238000005859 coupling reaction Methods 0.000 description 4
- 230000000007 visual effect Effects 0.000 description 3
- 238000004590 computer program Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 230000004931 aggregating effect Effects 0.000 description 1
- 230000010267 cellular communication Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 238000013479 data entry Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000002803 fossil fuel Substances 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000011179 visual inspection Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R15/00—Details of measuring arrangements of the types provided for in groups G01R17/00 - G01R29/00, G01R33/00 - G01R33/26 or G01R35/00
- G01R15/14—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks
- G01R15/18—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using inductive devices, e.g. transformers
- G01R15/186—Adaptations providing voltage or current isolation, e.g. for high-voltage or high-current networks using inductive devices, e.g. transformers using current transformers with a core consisting of two or more parts, e.g. clamp-on type
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
- G01R21/06—Arrangements for measuring electric power or power factor by measuring current and voltage
Definitions
- Consumer premises may include multiple-family residences (e.g., apartment buildings, retirement homes), single-family residences, office buildings, event complexes (e.g., coliseums or multi-purpose indoor arenas, hotels, sports complexes), shopping complexes, or any other type of building or area to which power is delivered.
- multiple-family residences e.g., apartment buildings, retirement homes
- single-family residences e.g., single-family residences
- office buildings e.g., event complexes (e.g., coliseums or multi-purpose indoor arenas, hotels, sports complexes), shopping complexes, or any other type of building or area to which power is delivered.
- event complexes e.g., coliseums or multi-purpose indoor arenas, hotels, sports complexes
- shopping complexes e.g., or any other type of building or area to which power is delivered.
- the power delivered to the consumer premises is typically generated at a power station.
- a power station is any type of facility that generates power by converting mechanical power of a generator into electrical power.
- Energy to operate the generator may be derived from a number of different types of energy sources, including fossil fuels (e.g., coal, oil, natural gas), nuclear, solar, wind, wave, or hydroelectric. Further, the power station typically generates alternating current (AC) power.
- AC alternating current
- the AC power generated at the power station is typically increased (the voltage is "stepped up") and transmitted via transmission lines typically to one or more transmission substations.
- the transmission substations are interconnected with a plurality of distribution substations to which the transmission substations transmit the AC power.
- the distribution substations typically decrease the voltage of the AC power received (the voltage is “stepped down") and transmit the reduced voltage AC power to distribution transformers that are electrically connected to a plurality of consumer premises.
- the reduced voltage AC power is delivered to a plurality of consumer premises.
- Such a web or network of interconnected power components, transmission lines, and distribution lines is often times referred to as a power grid.
- measureable power is generated, transmitted, and distributed.
- measurements of power received and/or distributed may indicate information related to the power grid. For example, if power distributed at the endpoints on the grid is considerably less than the power received at, for example, distribution transformers, then there may be a system issue that is impeding delivery of power or power may be being diverted through malice.
- Such power data collection at any of the described points in the power grid and analysis of such data may further aid power suppliers in generating, transmitting, and distributing power to consumer premises.
- FIG. 1 is a diagram depicting an exemplary power transmission and distribution system in accordance with an embodiment of the present disclosure.
- FIG. 2A is a diagram depicting a transformer and meter power usage data collection system in accordance with an embodiment of the present disclosure.
- FIG. 2B is a diagram depicting a line power usage data collection system in accordance with an embodiment of the present disclosure.
- FIG. 3 is a drawing of a general purpose transformer monitoring device, such as is depicted by FIG. 2A.
- FIG. 4 is a block diagram depicting an exemplary operations computing device, such as is depicted in FIG. 2A.
- FIG. 5 is a block diagram depicting an exemplary transformer monitoring device, such as is depicted in FIG. 2A.
- FIG. 6 is a drawing of a transformer can in accordance with an embodiment of the present disclosure.
- FIG. 7 is a drawing showing a satellite unit of the transformer monitoring device depicted in FIG. 3 being installed on the transformer can depicted in FIG. 6.
- FIG. 8 is a drawing showing the satellite unit of the transformer monitoring device depicted in FIG. 3 installed on the transformer can depicted in FIG. 6.
- FIG. 9 is a drawing showing a main unit of the transformer monitoring device depicted in FIG. 3 installed on the transformer can depicted in FIG. 6.
- FIG. 10 is a drawing showing a main unit of the transformer monitoring device depicted in FIG. 8 installed on the transformer can depicted in FIG. 6.
- FIG. 11 is a diagram depicting a method of monitoring power in accordance with the system such as is depicted in FIG. 1 for a wye transformer configuration.
- FIG. 12 is a diagram depicting a method of monitoring power in accordance with the system such as is depicted in FIG. 1 for a delta transformer configuration.
- FIG. 13 is a diagram depicting a method of monitoring power in accordance with the system such as is depicted in FIG. 1 for an open delta transformer configuration.
- FIG. 14 is a flowchart depicting exemplary architecture and functionality of the power transmission and distribution system such as is depicted in FIG. 1.
- FIG. 1 is a block diagram illustrating a power transmission and distribution system 100 for delivering electrical power to one or more consumer premises 106-111.
- the one or more consumer premises 106-111 may be business consumer premises, residential consumer premises, or any other type of consumer premise.
- a consumer premise is any structure or area to which power is delivered.
- the power transmission and distribution system 100 comprises at least one transmission network 118, at least one distribution network 119, and the consumer premises 106-111 (described hereinabove) interconnected via a plurality of power lines lOla-lOlj.
- the power transmission and distribution system 100 is an electric "grid" for delivering electricity generated by a power station 10 to the one or more consumer premises 106-111 via the transmission network 118 and the distribution network 119.
- the power lines 101a and 101b are exemplary transmission lines, while power lines 101c, lOld, are exemplary distribution lines.
- the transmission lines 101a and 101b transmit electricity at high voltage (HOkV or above) and often via overhead power lines.
- the AC power is transmitted over the distribution lines at lower voltage (e.g., 25kV or less).
- the power transmission described uses three-phase alternating current (AC).
- AC three-phase alternating current
- other types of power and/or power transmission may be used in other embodiments.
- the transmission network 118 comprises one or more transmission substation 102 (only one is shown for simplicity).
- the power station 10 is electrically coupled to the transmission substation 102 via the power lines 101a, and the transmission substation 102 is electrically connected to the distribution network 119 via the power lines 101b.
- the power station 10 (transformers not shown located at the power station 10) increases the voltage of the power generated prior to transmission over the transmission lines 101a to the transmission substation 102.
- three wires are shown making up the power lines 101a indicating that the power transmitted to the transmission substation 102 is three-phase AC power.
- other types of power may be transmitted in other embodiments.
- the transmission network 118 depicted in FIG. 1 comprises only two sets of transmission lines 101a and 101b (three lines each for three-phase power transmissions as indicated hereinabove) and one transmission substation 102.
- the configuration of FIG. 1 is merely an exemplary configuration.
- the transmission network 118 may comprise additional transmission substations interconnected via a plurality of additional transmission lines.
- the configuration of the transmission network 118 may depend upon the distance that the voltage-increased electricity may need to travel to reach the desired distribution network 119.
- the distribution network 119 transmits electricity from the transmission network 118 to the consumer premises 106-111.
- the distribution network transmits electricity from the transmission network 118 to the consumer premises 106-111.
- FIG. 119 comprises a distribution substation transformer 103 and one or more distribution transformers 104 and 121.
- the configuration shown in FIG. 1 comprising the distribution substation transformer 103 and two distribution transformers 104 and 121 and showing the distribution substation transformer 103 physically separated from the two distribution transformers 104 and 121 is an exemplary configuration. Other configurations are possible in other embodiments.
- the distribution substation transformer 103 and the distribution transformer 104 may be housed or combined together in other configurations of the distribution network 119 (as well as distribution substation transformer 103 and distribution transformer 121).
- one or more transformers may be used to condition the electricity, i.e., transform the voltage of the electricity, to an acceptable voltage level for delivery to the consumer premises 106-111.
- the distribution substation transformer 103 and the distribution transformer 104 may "step down," i.e., decrease the voltage of the electricity received from the transmission network 118, before the distribution substation transformer 103 and the distribution transformers 104, 121 transmit the electricity to its intended destinations, e.g., the consumer premises 106-111.
- the power station 10 is electrically coupled to the transmission substation 102 via the power lines 101a.
- the power station 10 generates electricity and transmits the generated electricity via the power lines 101a to the transmission substation 102.
- the power station 10 Prior to transmission, the power station 10 increases the voltage of the electricity so that it may be transmitted over greater distances efficiently without loss that affects the quality of the electricity delivered.
- the voltage of the electricity may need to be increased in order to minimize energy losses as the electricity is being transmitted on the power lines 101b.
- the transmission substation 102 forwards the electricity to the distribution substation transformer 103 of the distribution network 119.
- the distribution substation transformer 103 decreases the voltage of the electricity to a range that is useable by the distribution transformers 104, 121.
- the distribution transformers 104, 121 may further decrease the voltage of the electricity received to a range that is useable by the respective electrical systems (not shown) of the consumer premises 106-111.
- the distribution transformers 104, 121 are electrically coupled to distribution transformer data collection system 105.
- the distribution transformer data collection system 105 of the present disclosure comprises one or more electrical devices (the number of devices based upon the number of transformers being monitored) (not shown) that measure operational data via one or more electrical interfaces with the distribution transformers 104, 121.
- Exemplary operational data includes data related to electricity that is being delivered to or transmitted from the distribution transformers 104, 121, e.g., power measurements, energy measurements, voltage measurements, current measurements, etc.
- the distribution transformers 104, 121 are electrically coupled to distribution transformer data collection system 105.
- the distribution transformer data collection system 105 of the present disclosure comprises one or more electrical devices (the number of devices based upon the number of transformers being monitored) (not shown) that measure operational data via one or more electrical interfaces with the distribution transformers 104, 121.
- Exemplary operational data includes data related to electricity that is being delivered to or transmitted from the distribution transformers 104, 121, e.g.,
- transformer data collection system 105 may collect operational data related to the environment in which the distribution transformers 104, 121 are situated, e.g.,
- distribution transformer data collection system 105 electrically interfaces with power lines 101c, lOld (e.g., a set of three power lines, if the power is three-phase) that are providing electricity to the distribution transformers 104, 121.
- the distribution transformer data collection system 105 collects the data, which represents the amount of electricity that is being delivered to the distribution transformers 104, 121.
- the distribution transformer data collection system 105 electrically interfaces with the power lines lOle-lOlj (i.e., the power lines delivering power to the consumer premises 106-111 or any other power lines of the distribution transformer that transmits power down the power grid toward the consumer premises 106-111).
- each consumer premise 106-111 comprises an electrical system (not shown) for delivering electricity received from the distribution transformers 104, 121 to one or more electrical ports (not shown) of the consumer premise 106-111.
- the electrical ports may be internal or external ports.
- each consumer premise 106-111 interfaces with a corresponding consumer premise's electrical meter 112-117, respectively.
- Each electrical meter 112-117 measures the amount of electricity consumed by the consumer premises' electrical system to which it is coupled.
- a power company e.g., a utility company or a metering company
- readings taken from the meters 112-117 reflect the actual amount of power consumed by the respective consumer premise electrical system.
- the meters 112-117 store data indicative of the power consumed by the consumers.
- the meters 112-117 may be queried using any number of methods in order to retrieve and store data indicative of the amount of power being consumed by the meter's respective consumer premise electrical system.
- utility personnel may physically go to the consumer premises 106-111 and read the consumer premise's respective meter 112-117.
- the personnel may enter data indicative of the readings into an electronic system, e.g., a hand-held device, a personal computer (PC), or a laptop computer.
- the data entered may be transmitted to an analysis repository.
- meter data retrieval may be electronic and automated.
- the meters 112-117 may be communicatively coupled to a network [not shown), e.g., a wireless network, and periodically the meters 112-117 may automatically transmit data to a repository, described herein with reference to FIG. 2A.
- meter data i.e., data indicative of readings taken by the meters 112-117
- transformer data i.e., data indicative of readings taken by the transformer data collection system 105
- meter data i.e., data indicative of readings taken by the meters 112-117
- transformer data i.e., data indicative of readings taken by the transformer data collection system 105
- the power transmission and distribution system 100 further comprises a line data collection system (LDCS) 290.
- the LDCS 290 collects line data from the transmission lines lOlb-lOld.
- the line data is data indicative of
- Such data may be compared, for example, to meter data (collected at consumer premises 106-111 described further herein) and/or the
- transformer data (collected at the distribution transformers 104, 121 described further herein) in order to determine losses of electricity along the power grid, electricity usage, power need, or power consumption metrics of the power grid.
- data collected may be used to determine whether electricity theft is occurring or has occurred between a transmission substation and a distribution substation or a distribution substation and a distribution transformer (i.e., the distribution transformer that transmits power to the consumer premise).
- the LDCS 290 is coupled to the transmission lines 101b, 101c, and lOld, respectively, thus coupling to medium voltage (MV) power lines.
- the LDCS 290 measures and collects operational data, as described hereinabove.
- the LDCS may transmit operational data, such as, for example, power, energy, voltage, and/or current, related to the MV power lines 101b, 101c, and lOld.
- FIG. 2A depicts the transformer data collection system 105 in accordance with an embodiment of the present disclosure and a plurality of meter data collection devices 986- 991.
- the transformer data collection system 105 comprises one or more transformer monitoring devices 243, 244 (FIG. 1). Note that only two transformer monitoring devices 243, 244 are shown in FIG. 2A but additional transformer monitoring devices may be used in other embodiments, one or a plurality transformer monitoring devices for each distribution transformer 104, 121 (FIG. 1) being monitored, which is described in more detail herein.
- the transformer monitoring devices 243, 244 are coupled to secondary side of the distribution transformers, 104, 121 respectively.
- measurements taken by the transformer monitoring devices 243, 244 are taken, in effect, at the distribution transformers 104, 121 between the
- the transformer monitoring devices 243, 244, the meter data collection devices 986-991, and an operations computing device 287 may communicate via a network 280.
- the network 280 may be any type of network over which devices may transmit data, including, but not limited to, a wireless network, a wide area network, a large area network, or any type of network known in the art or future-developed.
- the meter data 935-940 and the transformer data 240, 241 may be transmitted via a direct connection to the operations computing device 287 or manually transferred to the operations computing device 287.
- the meter data collection devices 986-991 may be directly connected to the operations computing device 287 via a direction connection, such as for example a T-carrier 1 (Tl) line.
- the meter data 935-940 may be collected on by a portable electronic device (not shown) that is then connected to the operations computing device 287 for transfer of the meter data collected to the operations computing device 287.
- meter data 935-940 may be collected manually through visual inspection by utility personnel and provided to the operations computing device 287 in a particular format, e.g., comma separated values (CSV).
- CSV comma separated values
- the meter data collection devices 986-991 may be the meters 112-117 (FIG. 1) themselves, and the meters 112-117 may be equipped with network communication equipment (not shown] and logic (not shown) configured to retrieve readings, store readings, and transmit readings taken by the meters 112-117 to the operations computing device 287.
- the transformer monitoring devices 243, 244 are electrically coupled to the distribution transformers 104, 121, respectively. In one embodiment, the devices 243, 244 are electrically coupled to the distribution transformers 104, 121, respectively, on a secondary side of the distribution transformers 104, 121.
- the transformer monitoring devices 243, 244 each comprise one or more sensors (not shown) that interface with one or more power lines (not shown) connecting the distribution transformers 104, 121 to the consumer premises 106-111 (FIG. 1).
- the one or more sensors of the transformer monitoring devices 243, 244 senses electrical
- the transformer monitoring devices 243, 244 sense such electrical characteristics, translate the sensed characteristics into transformer data 240, 241 indicative of electrical characteristics, such as, for example power, and transmit transformer data 240, 241 to the operations computing device 287 via the network 280.
- the operations computing device 287 stores the transformer data 240, 241 received.
- transformer monitoring device 243 for monitoring transformer 104 (FIG. 1) and transformer monitoring device 244 for monitoring transformer 121 (FIG. 1).
- transformer monitoring device 244 for monitoring transformer 121
- the meter data collection devices 986-991 are communicatively coupled to the network 280. During operation, each meter data collection device 986-991 senses electrical characteristics of the electricity, e.g., voltage and/or current, that is transmitted by the distribution transformers 104, 121. Each meter data collection device 986-991 translates the sensed characteristics into meter data 935-940, respectively. The meter data 935-940 is data indicative of electrical characteristics, such as, for example power consumed in addition to specific voltage and/or current measurements. Further, each meter data collection device 986-991 transmits the meter data 935-940, respectively, to the operations computing device 287 via the network 280.
- electrical characteristics of the electricity e.g., voltage and/or current
- the operations computing device 287 Upon receipt, the operations computing device 287 stores the meter data 935-940 received from the meter data collection devices 986-991 indexed (or keyed) with a unique identifier corresponding to the meter data collection device 986-991 that transmits the meter data 935-940.
- each meter data collection device 986-991 may comprise Automatic Meter Reading (AMR) technology, i.e., logic (not shown) and/or hardware, or Automatic Metering Infrastructure (AMI) technology, e.g., logic (not shown) and/or hardware for collecting and transmitting data to a central repository, (or more central repositories,) e.g., the operations computing device 287.
- AMR Automatic Meter Reading
- AMD Automatic Metering Infrastructure
- each device 986-991 collects data indicative of electricity consumption by its respective consumer premise power system and various other diagnostics information.
- the meter logic of each meter data collection device 986-991 transmits the data to the operations computing device 287 via the network 280, as described hereinabove. Note that the AMR technology
- implementation may include hardware such as, for example, handheld devices, mobile devices and network devices based on telephony platforms (wired and wireless), radio frequency (RF), or power line communications (PLC).
- hardware such as, for example, handheld devices, mobile devices and network devices based on telephony platforms (wired and wireless), radio frequency (RF), or power line communications (PLC).
- RF radio frequency
- PLC power line communications
- the operations computing device 287 compares aggregate meter data of those meters corresponding to a single transformer with the transformer data 240, 241 received from the transformer that provided the transformer data 240, 241.
- meter data collection devices 986-988 are coupled to meters 112-114 (FIG. 1) and transmit meter data 935-937, respectively, and distribution transformer 104 is coupled to transformer monitoring device 243.
- the meters 112-114 meter electricity provided by the distribution transformer 104 and consumed by the electrical system of the respective consumer premise 106-108. Therefore, the operations computing device 287 aggregates (e.g., sums) data contained in meter data 935-937 (e.g., power usage recorded by each meter 112-114) and compares the aggregate with the transformer data 240 provided by transformer monitoring device 243.
- the operations computing device 287 may determine that power (or electricity) theft is occurring between the distribution transformer 104 and the consumer premises 106-108 to which the distribution transformer 104, is connected.
- the operations computing device 287 may store data indicating theft of electricity. In another embodiment, the operations computing device 287 may be monitored by a user (not shown), and the operations computing device 287 may initiate a visual or audible warning that power (or electricity) theft is occurring. This process is described further herein.
- the operations computing device 287 identifies, stores, and analyzes meter data 935-940 based on a particular unique identifier associated with the meter 112-117 to which the meter data collection devices 986-991 are coupled. Further, the operations computing device 287 identifies, stores, and analyzes transformer data 240, 241 based on a unique identifier associated with the distribution transformers 104, 121 that transmitted the transformer data 240, 241 to the operations computing device 287.
- both the meter data collection devices 986-991 and the transformer monitoring devices 243, 244 are populated internally with a unique identifier (i.e., a unique identifier identifying the meter data collection device 986-991 and a unique identifier identifying the transformer monitoring device 243, 244). Further, each meter data collection device 986-991 may be populated with the unique identifier of the transformer 104, 121 to which the meter data collection device 986-991 is connected.
- the operations computing device 287 can determine which distribution transformer 104 or 121 services the particular consumer premises 106-111. As an example, during setup of a portion of the grid (i.e., power transmission and distribution system 100) that comprises the distribution transformers 104, 121 and the meters 112-117, the operations computing device 287 may receive set up data from the distribution transformers 104, 121 and the meter data collection devices 986-991 identifying the device from which it was sent and a unique identifier identifying the component to which the meter data collection device 986-990 is connected.
- the distribution transformer 104 or 121 services the particular consumer premises 106-111.
- the operations computing device 287 may receive set up data from the distribution transformers 104, 121 and the meter data collection devices 986-991 identifying the device from which it was sent and a unique identifier identifying the component to which the meter data collection device 986-990 is connected.
- FIG. 2B depicts the line data collection system 290 in accordance with an embodiment of the present disclosure.
- the line data collection system 290 comprises a plurality of line monitoring devices 270-272 and the operations computing device 287. Each line monitoring device 270-272 communicates with the operations computing device 287 via the network 280.
- each line monitoring device 270-272 is electrically coupled to the transmission lines 101b, 101c, and lOld, respectively.
- each line monitoring device 270-272 comprises one or more sensors (not shown) that interface with the transmission lines 101b, 101c, and lOld connecting the transmission substation 102 downstream to the distribution substation transformer 103 or connecting the distribution substation transformerl03 downstream to the distribution transformers 104, 121.
- the one or more sensors of the line monitoring devices 270-272 sense electrical characteristics, e.g., voltage and/or current, present as current flows through transmission lines 101b, 101c, and lOld, respectively. Periodically, each line monitoring device 270-272 senses such electrical characteristics, translates the sensed characteristics into line data 273-275, respectively, indicative of such characteristics, and transmits the line data 273-275 to the operations computing device 287 via the network 280. Upon receipt, the operations computing device 287 stores the line data 273-275 received from the line monitoring devices 270-272.
- electrical characteristics e.g., voltage and/or current
- FIG. 3 depicts an embodiment of a general purpose transformer monitoring device 1000 that may be used as the transformer monitoring devices 243, 244 depicted in FIG. 2A and/or line monitoring devices 270-272 [FIG. 2B).
- the transformer monitoring device 1000 may be installed on conductor cables (not shown) and used to collect data indicative of voltage and/or current from the conductor cables to which it is coupled.
- the general purpose transformer monitoring device 1000 comprises a satellite unit 1021 that is electrically coupled to a main unit 1001 via a cable 1011.
- the general purpose transformer monitoring device 1000 may be used in a number of different methods in order to collect voltage and/or current data (i.e., transformer data 240, 241 (FIG. 2A) from the distribution transformers 104, 121 (FIG. 1) and from the power lines lOlb-lOlj.
- the satellite unit 1021 and/or the main unit 1001 is installed around a conductor cable or connectors of conductor cables (also known as a "bushing").
- the satellite unit 1021 of the general purpose transformer monitoring device 1000 comprises two sections 1088 and 1089 that are hingedly coupled at hinge 1040.
- the sections 1088 and 1089 When installed and in a closed position (as shown in FIG. 3), the sections 1088 and 1089 connect together via a latch 1006 and the conductor cable runs through an opening 1019 formed by coupling the sections 1088 and 1089.
- the satellite unit 1021 further comprises a sensing unit housing 1005 that houses a current detection device (not shown) for sensing current flowing through the conductor cable around which the sections 1088 and 1089 are installed.
- the current detection device comprises an implementation of one or more coreless current sensor as described in U.S. Patent No. 7,940,039, which is incorporated herein by reference.
- the main unit 1001 comprises sections 1016 and 1017 that are hingedly coupled at hinge 1015. When installed and in a closed position (as shown in FIG. 3), the sections 1016 and 1017 connect together via a latch 1002 and a conductor cable runs through an opening 1020 formed by coupling the sections 1016 and 1017.
- the main unit 1001 comprises a sensing unit housing section 1018 that houses a current detection device (not shown) for sensing current flowing through the conductor cable around which the sections 1016 and 1017 are installed.
- the current detection device comprises an implementation of one or more Ragowski coils as described in U.S. Patent No. 7,940,039, which is incorporated herein by reference.
- the main unit section 1017 comprises an extended boxlike housing section 1012.
- the housing section 1012 resides one or more printed circuit boards (PCB) (not shown), semiconductor chips (not shown), and/or other electronics (not shown) for performing operations related to the general purpose transformer monitoring device 1000.
- PCB printed circuit boards
- the housing section 1012 is a substantially rectangular housing; however, differently sized and differently shaped housings may be used in other embodiments.
- the main unit 1001 further comprises one or more cables 1004, 1007.
- the cables 1004, 1007 may be coupled to a conductor cable or corresponding bus bars (not shown) and ground or reference voltage conductor (not shown), respectively, for the corresponding conductor cable, which will be described further herein.
- methods in accordance with an embodiment of the present disclosure use the described monitoring device 1000 for collecting current and/or voltage data.
- the monitoring device 1000 described is portable and easily connected and/or coupled to an electrical conductor and/or transformer posts. Due to the noninvasive method of installing the satellite unit and main unit around a conductor and connecting the leads 1004, 1007 to connection points, an operator (or utility personnel) need not de-energize a transformer 104, 121 for connection or coupling thereto. Further, no piercing (or other invasive technique) of the electrical line is needed during deployment to the power grid. Thus, the monitoring device 1000 is easy to install. Thus, deployment to the power grid is easy to effectuate.
- the satellite unit 1021 and/or the main unit 1001 collects data indicative of current through a conductor cable.
- the satellite unit 1021 transmits its collected data via the cable 1011 to the main unit 1001.
- the cables 1004, 1007 may be used to collect data indicative of voltage corresponding to a conductor cable about which the satellite unit is installed.
- the data indicative of the current and voltage sensed corresponding to the conductor may be used to calculate power usage.
- the general purpose transformer monitoring device 1000 may be used to collect voltage and current data from a three phase system (if multiple general purpose transformer monitoring devices 100 are used) or a single phase system.
- the single phase system has two conductor cables and a neutral cable.
- electricity supplied to a typical home in the United States has two conductor cables (or hot cables) and a neutral cable.
- the voltage across the conductor cables in such an example is 240 Volts (the total voltage supplied) and the voltage across one of the conductor cables and the neutral is 120 Volts.
- Such an example is typically viewed as a single phase system.
- a neutral cable In a three phase system, there are typically three conductor cables and a neutral cable (sometimes there may not be a neutral cable). In one system, voltage measured in each conductor cable is 120° out of phase from the voltage in the other two conductor cables. Multiple general purpose transformer monitoring devices 1000 can obtain current readings from each conductor cable and voltage readings between each of the conductor cables and the neutral (or obtain voltage readings between each of the conductor cables). Such readings may then be used to calculate power usage.
- the main unit 1001 of the general purpose transformer monitoring device 1000 further comprises one or more light emitting diodes (LEDs) 1003.
- the LEDs may be used by logic (not shown but referred to herein with reference to FIG. 4 as analytic logic 308) to indicate status, operations, or other functions performed by the general purpose transformer monitoring device 1000.
- FIG. 4 depicts an exemplary embodiment of the operations computing device
- the operations computing device 287 comprises analytic logic 308, meter data 390, transformer data 391, line data 392, and configuration data 312 all stored in memory 300.
- the analytics logic 308 generally controls the functionality of the operations computing device 287, as will be described in more detail hereafter. It should be noted that the analytics logic 308 can be implemented in software, hardware, firmware or any combination thereof. In an exemplary embodiment illustrated in FIG. 4, the analytics logic 308 is implemented in software and stored in memory 300.
- the analytics logic 308 when implemented in software, can be stored and transported on any computer-readable medium for use by or in connection with an instruction execution apparatus that can fetch and execute instructions.
- a "computer-readable medium” can be any means that can contain or store a computer program for use by or in connection with an instruction execution apparatus.
- the exemplary embodiment of the operations computing device 287 depicted by FIG.4 comprises at least one conventional processing element 302, such as a digital signal processor (DSP) or a central processing unit (CPU), that communicates to and drives the other elements within the operations computing device 287 via a local interface 301, which can include at least one bus. Further, the processing element 302 is configured to execute instructions of software, such as the analytics logic 308.
- DSP digital signal processor
- CPU central processing unit
- An input interface 303 for example, a keyboard, keypad, or mouse, can be used to input data from a user of the operations computing device 287
- an output interface 304 for example, a printer or display screen ⁇ e.g., a liquid crystal display (LCD)
- a network interface 305 such as a modem, enables the operations computing device 287 to communicate via the network 280 (FIG. 2A) to other devices in communication with the network 280.
- the meter data 390, the transformer data 391, the line data 392, and the configuration data 312 are stored in memory 300.
- the meter data 390 is data indicative of power usage measurements and/or other electrical characteristics obtained from each of the meters 112-117 (FIG. 1).
- the meter data 390 is an aggregate representation of the meter data 935-940 (FIG. 2A) received from the meter data collection devices 986-991 (FIG. 2A).
- the analytics logic 308 receives the meter data 935-940 and stores the meter data 935-940 (as meter data 390) such that the meter data 935-940 may be retrieved based upon the transformer 104 or 121 (FIG. 1) to which the meter data's corresponding meter 112-117 is coupled.
- meter data 390 is dynamic and is collected periodically by the meter data collection devices 986-991 from the meters 112-117.
- the meter data 390 may include, but is not limited to, data indicative of current measurements, voltage measurements, and/or power calculations over a period of time per meter 112-117 and/or per transformer 104 or 121.
- the analytic logic 308 may use the collected meter data 390 to determine whether the amount of electricity supplied by the corresponding transformer 104 or 121 is substantially equal to the electricity that is received at the consumer premises 106-111.
- each entry of the meter data 935-940 in the meter data 390 is associated with an identifier (not shown) identifying the meter 112-117 (FIG. 1) from which the meter data 935-940 is collected.
- identifier may be randomly generated at the meter 112-117 via logic (not shown) executed on the meter 112-117.
- data indicative of the identifier generated by the logic at the meter 112-117 may be communicated, or otherwise transmitted, to the transformer monitoring device 243 or 244 to which the meter is coupled.
- the transformer monitoring devices 243, 244 transmit transformer data 240, 241
- each transformer monitoring device 243, 244 can also transmit its unique meter identifier (and/or the unique identifier of the meter that sent the transformer monitoring device 243, 244 the meter data).
- the analytics logic 308 may store the received transformer data 240, 241 (as transformer data 391) and the unique identifier of the transformer monitoring device 243, 244 and/or the meter unique identifier such that the transformer data 391 may be searched on the unique identifiers when performing calculations. In addition, the analytics logic 308 may store the unique identifiers of the transformer monitoring devices 243, 244
- the analytics logic 308 can use the configuration data 312 when performing operations, such as aggregating particular meter data entries in meter data 390 to compare to transformer data 391.
- the transformer data 391 is data indicative of aggregated power usage measurements obtained from the distribution transformers 104, 121. Such data is dynamic and is collected periodically.
- the transformer data 240, 241 comprises data indicative of current measurements, voltage measurements, and/or power calculations over a period of time that indicates the amount of aggregate power provided to the consumer premises 106-111.
- the transformer data 391 comprises data indicative of the aggregate power that is being sent to a "group," i.e., two or more consumer premises being monitored by the transformer monitoring devices 243, 244, although the transformer data 391 can comprise power data that is being sent to only one consumer premises being monitoried by the transformer monitoring device.
- the analytic logic 308 may receive data identifying the unique identifier for one or more transformers 104, 121.
- data indicative of the unique identifier of the transformers 104, 121 may be provided to the meters 112-117 and/or to the operations computing device 287, as described hereinabove.
- the operations computing device 287 may store the unique identifiers (i.e., the unique identifier for the transformers) in configuration data 312 such that each meter 112-117 is correlated in memory with a unique identifier identifying the distribution transformer from which the consumer premises 106-111 associated with the meter 112-117 receives power.
- unique identifiers i.e., the unique identifier for the transformers
- the line data 273-275 is data indicative of power usage measurements obtained from the line data collection system 290 along transmission lines lOlb-lOld in the system 100. Such data is dynamic and is collected periodically.
- the line data 273- 274 comprises data indicative of current measurements, voltage measurements, and/or power calculations over a period of time that indicates the amount of aggregate power provided to the distribution substation transformer 103 and the distribution transformers 104, 121.
- the line data 392 comprises data indicative of the aggregate power that is being sent to a "group," i.e., one or more distribution substation transformers 103.
- the analytic logic 308 receives meter data 935-940 via the network interface 305 from the network 280 (FIG. 2 ⁇ and stores the meter data 935-940 as meter data 390 in memory 300.
- the meter data 390 is stored such that it may be retrieved corresponding to the distribution transformer 104, 121 supplying the consumer premise 106- 111 to which the meter data corresponds. Note there are various methods that may be employed for storing such data including using unique identifiers, as described hereinabove, or configuration data 312, also described hereinabove.
- the analytic logic 308 may perform a variety of functions to further analyze the power transmission and distribution system 100 (FIG. 1). As an example, and as discussed hereinabove, the analytic logic 308 may use the collected transformer data 391, line data 392, and/or meter data 390 to determine whether electricity theft is occurring along the transmission lines 101a, 101b or the distribution lines lOlc-lOlj. In this regard, the analytic logic 308 may compare the aggregate power consumed by the group of consumer premises (e.g., consumer premises 106-108 or 109-111) and compare the calculated aggregate with the actual power supplied by the corresponding distribution transformer 104 or 121.
- the group of consumer premises e.g., consumer premises 106-108 or 109-111
- analytic logic 308 may compare the power transmitted to the distribution substation transformer 103 and the aggregate power received by the distribution transformers 104, 121, or the analytic logic 308 may compare the power transmitted to the transmission substation 102 and the aggregate power received by one or more distribution substation transformers 103.
- the analytics logic 308 may notify a user of the operations computing device 287 that there may be a problem. In addition, the analytics logic 308 can pinpoint a location in the power transmission and distribution system 100 where theft may be occurring. In this regard, the analytic logic 308 may have a visual or audible alert to the user, which can include a map of the system 100 and a visual identifier locating the problem. [0092] As indicated hereinabove, the analytics logic 308 may perform a variety of operations and analysis based upon the data received. As an example, the analytic logic 308 may perform a system capacity contribution analysis.
- the analytic logic 308 may determine when one or more of the consumer premises 106-111 have coincident peak power usage (and/or requirements).
- the analytics logic 308 determines, based upon this data, priorities associated with the plurality of consumer premises 106-111, e.g. what consumer premises requires a particular peak load and at what time. Loads required by the consumer premises 106-111 may necessarily affect system capacity charges; thus, the priority may be used to determine which consumer premises 106-111 may benefit from demand management.
- the analytic logic 308 may use the meter data 390 (FIG. 4), the transformer data 391, the line data 392, and the configuration data 312 (collectively referred to as "operations computing device data") to determine asset loading. For example, analyses may be performed for substation and feeder loading, transformer loading, feeder section loading, line section loading, and cable loading.
- the operations computing device data may be used to produce detailed voltage calculations and analysis of the system 100 and/or technical loss calculations for the components of the system 100, and to compare voltages experienced at each distribution transformer with the distribution transformer manufacturer minimum/maximum voltage ratings and identify such distribution transformer (s) which are operating outside of the manufacturer's suggested voltages range thereby helping to isolate power sag and power swell instances, and identify distribution transformer sizing and longevity information.
- a utility company may install load control devices (not shown).
- the analytics logic 308 may use the operations computing device data to identify one or more locations of load control devices.
- FIG. 5 depicts an exemplary embodiment of the transformer monitoring device 1000 depicted in FIG. 3.
- the transformer monitoring device 1000 comprises control logic 2003, voltage data 2001, current data 2002, and power data 2020 stored in memory 2000.
- the control logic 2003 controls the functionality of the operations transformer monitoring device 1000, as will be described in more detail hereafter. It should be noted that the control logic 2003 can be implemented in software, hardware, firmware or any combination thereof. In an exemplary embodiment illustrated in FIG. 5, the control logic 2003 is implemented in software and stored in memory 2000.
- control logic 2003 when implemented in software, can be stored and transported on any computer-readable medium for use by or in connection with an instruction execution apparatus that can fetch and execute instructions.
- a "computer-readable medium” can be any means that can contain or store a computer program for use by or in connection with an instruction execution apparatus.
- the exemplary embodiment of the transformer monitoring device 1000 depicted by FIG. 5 comprises at least one conventional processing element 2004, such as a digital signal processor (DSP) or a central processing unit (CPU), that communicates to and drives the other elements within the transformer monitoring device 1000 via a local interface 2005, which can include at least one bus. Further, the processing element 2004 is configured to execute instructions of software, such as the control logic 2003.
- DSP digital signal processor
- CPU central processing unit
- An input interface 2006 for example, a keyboard, keypad, or mouse, can be used to input data from a user of the transformer monitoring device 1000, and an output interface 2007, for example, a printer or display screen [e.g., a liquid crystal display (LCD)), can be used to output data to the user.
- a network interface 2008 such as a modem or wireless transceiver, enables the transformer monitoring device 1000 to communicate with the network 280 (FIG. 2A).
- the transformer monitoring device 1000 further comprises a communication interface 2050.
- the communication interface 2050 is any type of interface that when accessed enables power data 2020, voltage data 2001, current data 2002, or any other data collected or calculated by the transformer monitoring device 100 to be
- the communication interface may be a serial bus interface that enables a device that communicates serially to retrieve the identified data from the transformer monitoring device 1000.
- the communication interface 2050 may be a universal serial bus (USB) that enables a device configured for USB communication to retrieve the identified data from the transformer monitoring device 1000.
- Other communication interfaces 2050 may use other methods and/or devices for communication including radio frequency (RF) communication, cellular communication, power line communication, and WiFi communications.
- the transformer monitoring device 1000 further comprises one or more voltage data collection devices 2009 and one or more current data collection devices 2010.
- the transformer monitoring device 1000 comprises the voltage data collection device 2009 that may include the cables 1004, 1007 (FIG.
- control logic 2003 receives data via the cables 1004, 1007 indicative of the voltages at the nodes and stores the data as voltage data 2001.
- the control logic 2003 performs operations on and with the voltage data 2001, including periodically transmitting the voltage data 2001 to, for example, the operations computing device 287 (FIG. 2A).
- the transformer monitoring device 1000 comprises the current sensors (not shown) contained in the sensing unit housing 1005 (FIG. 3) and the sensing unit housing section 1018 (FIG. 3), which are described hereinabove.
- the current sensors sense current traveling through conductor cables (or neutral cables) around which the sensing unit housings 1005, 1018 are coupled.
- the control logic 2003 receives data indicative of current from the satellite sensing unit 1021 (FIG. 3) via the cable 1011 and data indicative of the current from the current sensor of the main unit 1001 contained in the sensing unit housing section 1018.
- the control logic 2003 stores the data indicative of the currents sensed as the current data 2002.
- the control logic 2003 performs operations on and with the current data 2002, including periodically transmitting the voltage data 2001 to, for example, the operations computing device 287 (FIG. 2A).
- control logic 2003 may perform calculations with the voltage data 2001 and the current data 2002 prior to transmitting the voltage data 2001 and the current data 2002 to the operations computing device 287.
- control logic 2003 may calculate power usage using the voltage data 2001 and current data 2002 over time and periodically store resulting values as power data 2020.
- control logic 2003 may transmit data to the operations computing device 287 via the cables via a power line communication (PLC) method. In other embodiments, the control logic 2003 may transmit the data via the network 280 (FIG. 2A) wirelessly or otherwise.
- PLC power line communication
- FIGS. 6-10 depict one exemplary practical application, use, and operation of the transformer monitoring device 1000 shown in the drawing in FIG. 3.
- FIG. 6 is a transformer can 1022, which houses a transformer (not shown), mounted on a utility pole 1036.
- One or more cables 1024-1026 carry current from the transformer can 1022 to a destination (not shown), e.g., consumer premises 106-111 (FIG. 1).
- the cables 1024-1026 are connected to the transformer can at nodes 1064-1066.
- Each node 1064-1066 comprises a conductive connector (part of which is sometimes referred to as a bus bar).
- FIG. 7 depicts the satellite unit 1021 of the transformer monitoring device 1000 being placed on one of the nodes 1064-1066 (FIG. 6), i.e., in an open position.
- a technician e.g., an employee of a utility company (not shown), decouples the latch 1006 (FIG. 3), made up by decoupled sections 1006a and 1006b, and places the sections 1088 and 1089 around a portion of the node 1064-1066 such that the sensor unit (not shown) interfaces with the node and senses a current flowing through the node.
- FIG. 8 depicts the satellite unit 1021 of the transformer monitoring device 1000 latched around the node 1064- 1066 in a closed position.
- FIG.9 depicts the main unit 1001 of the transformer monitoring device 1000 being placed on one of the nodes 1064-1066, i.e., in an open position.
- the technician decouples the latch 1002, made up by decoupled sections 1002a and 1002b, and places the sections 1016 and 1017 around a portion of the node 1064-1066 such that the sensor unit (not shown) interfaces with the node and senses a current flowing through the node.
- FIG. 10 is a drawing of the transformer monitoring device 1000 latched around the node 1064-1066.
- FIG. 10 depicts the main unit 1001 of the transformer monitoring device 1000 latched around the node 1064-1066 and in a closed position.
- the cables 1004, 1007 (FIG. 3) of the main unit 1001 may be connected to one of the nodes 1064-1066 about which the respective satellite unit 1021 is coupled and one of the nodes 1064-1066 about which the main unit 1001 is coupled.
- the cable 1004 comprises a plurality of separate and distinct cables. One cable is connected to the node about which the satellite unit 1021 is coupled, and one cable is connected to the node about which the main unit 1001 is coupled.
- the current detection device contained in the sensing unit housings 1005, 1018 sense current from the respective nodes to which they are coupled. Further, the connections made by the cables 1004, 1007 to the nodes and reference conductor sense the voltage at the respective nodes, i.e., the node around which the main unit is coupled and the node around which the satellite unit is coupled.
- the analytic logic 308 receives current data for each node and voltage data from each node based upon the current sensors and the voltage connections.
- the analytics logic 308 uses the collected data to calculate power over a period of time, which the analytic logic 308 transmits to the operations computing device 287 (FIG. 2A).
- the analytic logic 308 may transmit the voltage data and the current data directly to the operations computing device 287 without performing any calculations.
- FIGS. 11-13 further illustrate methods that may be employed using the monitoring device 1000 FIG. 3 in a system 100 (FIG. 1).
- the monitoring device 1000 may be coupled to a conductor cable (not shown) or a bushing (not shown) that attaches the conductor cable to a transformer can 1022 (FIG. 6).
- the transformer monitoring device 1000 obtains a current and voltage reading associated with the conductor cable to which it is coupled, as described hereinabove, and the main unit 1001 (FIG. 3) uses the current reading and the voltage reading to calculate power usage.
- a transformer monitoring device 1000 (FIG. 3) comprises two current sensing devices, including one contained in housing 1005 (FIG. 3) and one contained in the housing 1018 (FIG. 3] of the satellite unit 1021 (FIG. 3) and the main unit 1001 (FIG. 3], respectively.
- FIG. 11 is a diagram depicting a distribution transformer 1200 for distributing three-phase power, which is indicative of a "wye" configuration.
- three-phase power comprises three conductors providing AC power such that the AC voltage waveform on each conductor is 120° apart relative to each other, where 360° is approximately one sixtieth of a second.
- three-phase power is transmitted on three conductor cables and is delivered to distribution substation transformer 103 (FIG. 1) and distribution transformer 104 (FIG. 1) on three conductor cables.
- the receiving distribution transformer 104 has three winding pairs (one for each phase input voltage received) to transform the voltage of the power received to a level of voltage needed for delivery to the consumers 106-108 (FIG. 1].
- each transformer connection is identified as a phase, e.g., Phase A/transformer 1201, Phase B/ transformer 1202, and Phase C/ transformer 1203.
- 1000b, and 1000c are employed to obtain data (e.g., voltage and current data) used to calculate the power at the distribution transformer 1200.
- data e.g., voltage and current data
- At least one of current sensing devices 1217 of monitoring device 1000a is used to collect current data for Phase A.
- the sensing device 1217 of the monitoring device 1000a used to collect current data may be housed in the satellite unit 1021 (FIG. 3) or the main unit 1001 (FIG. 3).
- the voltage lead 1004a of the monitoring device 1000a is connected across the Phase A conductor cable and common 1204 in order to obtain voltage data.
- both current sensing devices in the satellite unit 1021 and the main unit 1001 (current sensing device 1217) may be coupled around the Phase A conductor cable.
- a current sensing device 1218 of monitoring device 1000b is used to collect current data for Phase B.
- the sensing device 1218 of the monitoring device 1000b used to collect current data may be housed in the satellite unit 1021 (FIG. 3) or the main unit 1001 (FIG. 3).
- the voltage lead 1004b of the monitoring device 1000b is connected across the Phase B conductor cable and common 1204 in order to obtain voltage data.
- both current sensing device in the satellite unit 1021 and the main unit 1001 (current sensing device 1218) may be coupled around the Phase B conductor cable.
- a current sensing device 1219 of monitoring device 1000c is used to collect voltage and current data for Phase C.
- the sensing device 1219 of the monitoring device 1000c that is used to collect current data may be housed in the satellite unit 1021 (FIG. 3) or the main unit 1001 (FIG. 3).
- the voltage lead 1004c of the monitoring device 1000c is connected across the Phase C conductor cable and common 1204 in order to obtain voltage data.
- both current sensing devices in the satellite unit 1021 and the main unit 1001 (current sensing device 1219) may be coupled around the Phase C conductor cable.
- control logic 2003 (FIG. 5) of the monitoring devices lOOOa-lOOOc use current measurements and voltage measurements to calculate total power.
- the power calculated from the measurements made by the transformer monitoring devices 1000a, 1000b, and 1000c may be used in various applications to provide information related to the power transmission and distribution system 100 (FIG. 1).
- FIG. 12 is a diagram depicting a distribution transformer 1300 for distributing three-phase power, which is indicative of a delta configuration.
- Such distribution transformer 1300 may be used as the distribution transformer 104 (FIG. 1).
- the distribution transformer 1300 (similar to the distribution transformer 1200 (FIG. 11)) has three single phase transformers to transform the voltage of the power received on three conductor cables (i.e., three-phase power) to a level of voltage needed for delivery to the consumers 106-108 (FIG. 1).
- the distribution transformer 1300 comprises three single-phase
- each transformer connection is identified as a phase, e.g., Phase A/transformer 1301-transformer 1303, Phase B/ transformer 1302-transformer 1301, and Phase C/ transformer 1303-transformer 1302.
- transformer monitoring device lOOOd is coupled about one of three incoming conductor cables, identified in FIG. 12 as Phase B
- transformer monitoring device lOOOe is coupled about another one of the three incoming conductor cables, identified in FIG. 12 as Phase C.
- the monitoring devices lOOOd and lOOOe are employed to obtain data (e.g., voltage and current data) used to calculate the power at the distribution transformer 1300.
- a current sensing device 1318 of monitoring device lOOOd is used to collect current data for Phase B.
- monitoring device lOOOd used to collect current data may be housed in the satellite unit 1021 (FIG. 3) or the main unit 1001 (FIG. 3).
- the voltage leads 1004d of the monitoring device lOOOd are connected across the Phase B conductor cable and the Phase A conductor cable which measures a voltage differential.
- both current sensing devices in the satellite unit 1021 and the main unit 1001 may be coupled around the Phase B conductor cable.
- Phase A may be arbitrarily designated as a "common” such that power may be calculated based on the voltage differentials between the current-sensed conductor cables and the designated “common,” which in the present embodiment is Phase A.
- a current sensing device 1319 of monitoring device lOOOe is used to collect current data for Phase C.
- the sensing device 1319 of the monitoring device lOOOe used to collect current data may be housed in the satellite unit 1021 (FIG, 3) or the main unit 1001 (FIG. 3).
- the voltage leads 1004e of the monitoring device lOOOe are connected across the Phase C conductor cable and Phase A conductor cable.
- both current sensing devices in the satellite unit 1021 and the main unit 1001 (current sensing device 1319) may be coupled around the Phase C conductor cable.
- control logic 2003 (FIG. 5) of the monitoring devices lOOOd and lOOOe use current measurements and voltage measurements to calculate total power.
- the power calculated from the measurements made by the transformer monitoring devices lOOOf and lOOOg may be used in various applications to provide information related to the power transmission and distribution system 100 (FIG. 1).
- FIG. 13 is a diagram depicting a distribution transformer 1400 for distributing power, which is indicative of an open delta configuration.
- the distribution transformer 1400 has two single phase transformers to transform the voltage received to a level of voltage needed for delivery to the consumers 106-108 (FIG. 1).
- the distribution transformer 1400 comprises two single-phase transformers 1401-1402.
- two transformer monitoring devices lOOOf and lOOOg are employed to obtain voltage and current data, which are used to calculate power at the distribution transformer 1400.
- Transformer monitoring device lOOOf is coupled about one of three conductor cables identified in FIG. 13 as Phase A and transformer monitoring device lOOOg is coupled about another one of the conductor cables identified in FIG. 13 as Phase B.
- the monitoring devices lOOOf and lOOOg are employed to obtain data (e.g., voltage and current data) used to calculate the power at the distribution transformer 1400.
- At least one of the current sensing devices 1418 or 1419 of monitoring device lOOOf is used to collect voltage and current data for Phase A. While both sensing devices are shown coupled about Phase A, both are not necessarily needed in other embodiments.
- a sensing device of the monitoring device lOOOf used to collect current data may be housed in the satellite unit 1021 (FIG. 3) or the main unit 1001 (FIG. 3).
- the voltage leads 1004f of the monitoring device lOOOf are connected across the Phase A conductor cable and ground. Note that in one embodiment both current sensing devices in the satellite unit 1021 and the main unit 1001 may be coupled around the Phase A conductor cable, as shown.
- current sensing device 1420 housed in the main unit 1001 (FIG. 3) of monitoring device lOOOg and current sensing device 1421 housed in the satellite unit 1021 (FIG. 3) of monitoring device lOOOg is used to collect current data for Phase B.
- the voltage lead 1004g of the monitoring device lOOOg is connected across the voltage outputs of the secondary of transformer 1402.
- control logic 2003 (FIG. 5) of the transformer monitoring devices lOOOf and lOOOg uses current measurements and voltage measurements to calculate total power. As described hereinabove, the power calculated from the
- measurements made by the transformer monitoring devices lOOOf and lOOOg may be used in various applications to provide information related to the power transmission and distribution system 100 (FIG. 1).
- FIG. 14 is a flowchart depicting exemplary architecture and functionality of the system 100 depicted in FIG. 1.
- step 1500 electrically interfacing a first transformer monitoring device 1000 (FIG. 3) to a first electrical conductor of a transformer at a first location on a power grid, and in step 1501 measuring a first current through the first electrical conductor and a first voltage associated with the first electrical conductor.
- step 1502 electrically interfacing a second transformer monitoring device 1000 with a second electrical conductor electrically connected to the transformer, and in step 1503 measuring a second current through the second electrical conductor and a second voltage associated with the second electrical conductor.
- step 1504 calculating values indicative of power corresponding to the transformer based upon the first current and the first voltage and the second current and the second voltage.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Priority Applications (8)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2912412A CA2912412C (en) | 2012-05-13 | 2013-05-13 | Power monitoring system and method |
IN2306MUN2014 IN2014MN02306A (enrdf_load_stackoverflow) | 2012-05-13 | 2013-05-13 | |
AU2013263083A AU2013263083A1 (en) | 2012-05-13 | 2013-05-13 | Power monitoring system and method |
CN201380037263.3A CN104620115A (zh) | 2012-05-13 | 2013-05-13 | 电力监控系统和方法 |
MX2014013796A MX2014013796A (es) | 2012-05-13 | 2013-05-13 | Sistema y metodo de monitoreo de potencia. |
JP2015512722A JP6290868B2 (ja) | 2012-05-13 | 2013-05-13 | 電力監視システムおよび電力監視方法 |
BR112014028312-5A BR112014028312A2 (pt) | 2012-05-13 | 2013-05-13 | sistema e método de monitoramento de energia |
PH12014502532A PH12014502532A1 (en) | 2012-05-13 | 2014-11-13 | Power monitoring system and method |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261646350P | 2012-05-13 | 2012-05-13 | |
US61/646,350 | 2012-05-13 | ||
US201261660119P | 2012-06-15 | 2012-06-15 | |
US61/660,119 | 2012-06-15 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013173230A1 true WO2013173230A1 (en) | 2013-11-21 |
Family
ID=49584187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2013/040781 WO2013173230A1 (en) | 2012-05-13 | 2013-05-13 | Power monitoring system and method |
Country Status (10)
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017027274A1 (en) * | 2015-08-10 | 2017-02-16 | Delta Energy & Communications, Llc. | Transformer monitor, communications and data collection device |
US9961572B2 (en) | 2015-10-22 | 2018-05-01 | Delta Energy & Communications, Inc. | Augmentation, expansion and self-healing of a geographically distributed mesh network using unmanned aerial vehicle (UAV) technology |
US10055869B2 (en) | 2015-08-11 | 2018-08-21 | Delta Energy & Communications, Inc. | Enhanced reality system for visualizing, evaluating, diagnosing, optimizing and servicing smart grids and incorporated components |
US10055966B2 (en) | 2015-09-03 | 2018-08-21 | Delta Energy & Communications, Inc. | System and method for determination and remediation of energy diversion in a smart grid network |
US10476597B2 (en) | 2015-10-22 | 2019-11-12 | Delta Energy & Communications, Inc. | Data transfer facilitation across a distributed mesh network using light and optical based technology |
US10652633B2 (en) | 2016-08-15 | 2020-05-12 | Delta Energy & Communications, Inc. | Integrated solutions of Internet of Things and smart grid network pertaining to communication, data and asset serialization, and data modeling algorithms |
US10791020B2 (en) | 2016-02-24 | 2020-09-29 | Delta Energy & Communications, Inc. | Distributed 802.11S mesh network using transformer module hardware for the capture and transmission of data |
US11196621B2 (en) | 2015-10-02 | 2021-12-07 | Delta Energy & Communications, Inc. | Supplemental and alternative digital data delivery and receipt mesh net work realized through the placement of enhanced transformer mounted monitoring devices |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105322538B (zh) * | 2015-11-10 | 2019-04-05 | 江苏小康电力科技有限公司 | 一种安全电力供电系统 |
CN105322537A (zh) * | 2015-11-10 | 2016-02-10 | 成都九十度工业产品设计有限公司 | 一种防盗电电力系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4151460A (en) * | 1977-09-30 | 1979-04-24 | Westinghouse Electric Corp. | High resistance ground fault detector and locator for polyphase electrical systems |
US4635055A (en) * | 1983-04-13 | 1987-01-06 | Niagara Mohawk Power Corporation | Apparatus for measuring the temperature and other parameters of an electic power conductor |
US20050156587A1 (en) * | 2004-01-16 | 2005-07-21 | Fieldmetrics Inc. | Current sensor |
US20090066317A1 (en) * | 2007-07-13 | 2009-03-12 | De Buda Eric | Transformer Meter and System for Using Same |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4689752A (en) * | 1983-04-13 | 1987-08-25 | Niagara Mohawk Power Corporation | System and apparatus for monitoring and control of a bulk electric power delivery system |
JPH11287836A (ja) * | 1998-04-02 | 1999-10-19 | Ntt Power And Building Facilities Inc | 電源回路の複合型計測装置 |
JP2000258484A (ja) * | 1999-03-10 | 2000-09-22 | Hioki Ee Corp | 電力測定器における結線状態検出装置 |
JP2009008580A (ja) * | 2007-06-29 | 2009-01-15 | Chugoku Electric Power Co Inc:The | ハンディ電力計および3相電力測定方法 |
CN201156681Y (zh) * | 2008-01-28 | 2008-11-26 | 苏善伟 | 智能配电系统 |
CN101359006A (zh) * | 2008-09-28 | 2009-02-04 | 天津市腾马电表有限公司 | 智能型用电监测装置 |
CN101902077A (zh) * | 2010-07-13 | 2010-12-01 | 杭州交联电气工程有限公司 | 变电站运行数据监测及报警系统 |
CN202145224U (zh) * | 2011-06-28 | 2012-02-15 | 江苏卡欧宜能电气有限公司 | 配变电量参数监测仪 |
-
2013
- 2013-05-13 CA CA2912412A patent/CA2912412C/en active Active
- 2013-05-13 MX MX2014013796A patent/MX2014013796A/es not_active Application Discontinuation
- 2013-05-13 IN IN2306MUN2014 patent/IN2014MN02306A/en unknown
- 2013-05-13 AU AU2013263083A patent/AU2013263083A1/en not_active Abandoned
- 2013-05-13 JP JP2015512722A patent/JP6290868B2/ja active Active
- 2013-05-13 WO PCT/US2013/040781 patent/WO2013173230A1/en active Application Filing
- 2013-05-13 CN CN201380037263.3A patent/CN104620115A/zh active Pending
- 2013-05-13 BR BR112014028312-5A patent/BR112014028312A2/pt not_active Application Discontinuation
-
2014
- 2014-11-13 PH PH12014502532A patent/PH12014502532A1/en unknown
- 2014-12-11 CO CO14272544A patent/CO7230344A2/es unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4151460A (en) * | 1977-09-30 | 1979-04-24 | Westinghouse Electric Corp. | High resistance ground fault detector and locator for polyphase electrical systems |
US4635055A (en) * | 1983-04-13 | 1987-01-06 | Niagara Mohawk Power Corporation | Apparatus for measuring the temperature and other parameters of an electic power conductor |
US20050156587A1 (en) * | 2004-01-16 | 2005-07-21 | Fieldmetrics Inc. | Current sensor |
US20090066317A1 (en) * | 2007-07-13 | 2009-03-12 | De Buda Eric | Transformer Meter and System for Using Same |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017027274A1 (en) * | 2015-08-10 | 2017-02-16 | Delta Energy & Communications, Llc. | Transformer monitor, communications and data collection device |
US20170048598A1 (en) * | 2015-08-10 | 2017-02-16 | Delta Energy & Communications, LLC | Transformer monitor, communications and data collection device |
US11172273B2 (en) | 2015-08-10 | 2021-11-09 | Delta Energy & Communications, Inc. | Transformer monitor, communications and data collection device |
US10055869B2 (en) | 2015-08-11 | 2018-08-21 | Delta Energy & Communications, Inc. | Enhanced reality system for visualizing, evaluating, diagnosing, optimizing and servicing smart grids and incorporated components |
US10055966B2 (en) | 2015-09-03 | 2018-08-21 | Delta Energy & Communications, Inc. | System and method for determination and remediation of energy diversion in a smart grid network |
US11196621B2 (en) | 2015-10-02 | 2021-12-07 | Delta Energy & Communications, Inc. | Supplemental and alternative digital data delivery and receipt mesh net work realized through the placement of enhanced transformer mounted monitoring devices |
US9961572B2 (en) | 2015-10-22 | 2018-05-01 | Delta Energy & Communications, Inc. | Augmentation, expansion and self-healing of a geographically distributed mesh network using unmanned aerial vehicle (UAV) technology |
US10476597B2 (en) | 2015-10-22 | 2019-11-12 | Delta Energy & Communications, Inc. | Data transfer facilitation across a distributed mesh network using light and optical based technology |
US10791020B2 (en) | 2016-02-24 | 2020-09-29 | Delta Energy & Communications, Inc. | Distributed 802.11S mesh network using transformer module hardware for the capture and transmission of data |
US10652633B2 (en) | 2016-08-15 | 2020-05-12 | Delta Energy & Communications, Inc. | Integrated solutions of Internet of Things and smart grid network pertaining to communication, data and asset serialization, and data modeling algorithms |
Also Published As
Publication number | Publication date |
---|---|
PH12014502532A1 (en) | 2015-01-12 |
BR112014028312A2 (pt) | 2020-10-27 |
JP2015519032A (ja) | 2015-07-06 |
IN2014MN02306A (enrdf_load_stackoverflow) | 2015-08-07 |
JP6290868B2 (ja) | 2018-03-07 |
CO7230344A2 (es) | 2015-03-31 |
AU2013263083A1 (en) | 2014-11-27 |
CN104620115A (zh) | 2015-05-13 |
CA2912412A1 (en) | 2013-11-21 |
CA2912412C (en) | 2022-06-28 |
MX2014013796A (es) | 2015-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9575101B2 (en) | Power monitoring systems and methods | |
US20130335062A1 (en) | Power Monitoring System and Method | |
US9500716B2 (en) | Power monitoring systems and methods | |
CA2912412C (en) | Power monitoring system and method | |
US10209288B2 (en) | Transformer monitoring and data analysis systems and methods | |
US12019125B2 (en) | Monitoring and data analysis systems and methods | |
US11946982B2 (en) | Fire mitigation and downed conductor detection systems and methods | |
US20130335061A1 (en) | Systems and Methods for Monitoring Underground Power Lines | |
US10852362B2 (en) | Transformer monitoring and data analysis systems and methods | |
US20190101411A1 (en) | Resource meter system and method | |
US20170292999A1 (en) | Transformer monitoring and data analysis systems and methods | |
JP6527857B2 (ja) | 配電グリッドにおける非技術的損失 | |
US8368386B2 (en) | Meter socket connection methods and systems for local generators or monitoring connections | |
US10585125B2 (en) | Devices, systems and methods for data transmission over a communication media using modular connectors | |
WO2018193272A1 (en) | System and apparatus for monitoring electricity supply system | |
US20240345181A1 (en) | Fire mitigation and downed conductor detection systems and methods | |
US11243268B2 (en) | Systems and methods for monitoring transformers and performing actions based on the monitoring | |
US20060103548A1 (en) | Current sensing bar | |
WO2019067638A1 (en) | SYSTEM AND METHOD FOR MEASURING RESOURCES | |
US11255882B2 (en) | Monitoring an energy parameter in a distribution station | |
CA2908307C (en) | Power monitoring systems and methods | |
CA3113745A1 (en) | Fire mitigation and downed conductor detection systems and methods | |
RO134712A0 (ro) | Sistem inteligent smart grid, metodă şi aparat pentru măsurarea şi monitorizarea on-line a pierderilor de putere şi energie în sistemele de transport şi distribuţie a energiei electrice | |
MX2007002149A (en) | Electric power measuring concentrator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13790367 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2014/013796 Country of ref document: MX |
|
ENP | Entry into the national phase |
Ref document number: 2015512722 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2013263083 Country of ref document: AU Date of ref document: 20130513 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14272544 Country of ref document: CO |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 13790367 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2912412 Country of ref document: CA |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112014028312 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112014028312 Country of ref document: BR Kind code of ref document: A2 Effective date: 20141113 |