WO2013142541A2 - Hydraulic accumulator pre-charge pressure detection - Google Patents

Hydraulic accumulator pre-charge pressure detection Download PDF

Info

Publication number
WO2013142541A2
WO2013142541A2 PCT/US2013/033040 US2013033040W WO2013142541A2 WO 2013142541 A2 WO2013142541 A2 WO 2013142541A2 US 2013033040 W US2013033040 W US 2013033040W WO 2013142541 A2 WO2013142541 A2 WO 2013142541A2
Authority
WO
WIPO (PCT)
Prior art keywords
pressure
hydraulic accumulator
fluid
chamber
rate
Prior art date
Application number
PCT/US2013/033040
Other languages
French (fr)
Other versions
WO2013142541A3 (en
Inventor
Dayao Chen
Pengfei Ma
Tonglin Shang
Bryan J HILLMAN
Original Assignee
Caterpillar Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US13/427,095 external-priority patent/US9366269B2/en
Priority claimed from US13/427,072 external-priority patent/US8833143B2/en
Application filed by Caterpillar Inc. filed Critical Caterpillar Inc.
Priority to CN201380015083.5A priority Critical patent/CN104204544B/en
Priority to DE112013001599.4T priority patent/DE112013001599T5/en
Publication of WO2013142541A2 publication Critical patent/WO2013142541A2/en
Publication of WO2013142541A3 publication Critical patent/WO2013142541A3/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B1/00Installations or systems with accumulators; Supply reservoir or sump assemblies
    • F15B1/02Installations or systems with accumulators
    • F15B1/04Accumulators
    • F15B1/08Accumulators using a gas cushion; Gas charging devices; Indicators or floats therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B19/00Testing; Calibrating; Fault detection or monitoring; Simulation or modelling of fluid-pressure systems or apparatus not otherwise provided for
    • F15B19/005Fault detection or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2201/00Accumulators
    • F15B2201/30Accumulator separating means
    • F15B2201/31Accumulator separating means having rigid separating means, e.g. pistons
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2201/00Accumulators
    • F15B2201/50Monitoring, detection and testing means for accumulators
    • F15B2201/505Testing of accumulators, e.g. for testing tightness
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2201/00Accumulators
    • F15B2201/50Monitoring, detection and testing means for accumulators
    • F15B2201/51Pressure detection

Definitions

  • the present disclosure relates to hydraulic accumulators and more particularly to determining pre-charge pressure of the hydraulic accumulator.
  • Pre-charge pressure of a hydraulic accumulator needs to be periodically checked after installation in a hydraulic system to ensure operational health of the accumulator.
  • Typical solutions for detecting the accumulator health involve connecting a gas pressure gauge and/or a modular kit to a gas valve of the hydraulic accumulator, when the machine is stopped and the fluid in the hydraulic accumulator is not pressurized.
  • the gas pressure gauge provides a reading of the pre-charge pressure.
  • the hydraulic accumulator is either re-charged or completely overhauled or replaced.
  • typical solutions required physically connecting the hydraulic accumulator to the pressure gauge.
  • the accumulator can be located on a machine such that it is difficult to access and couple the gas pressure gauge.
  • German Patent Number DE102005052640 relates to a method involving determination of a difference in accumulator volume using a flow regulator with constant adjustable flow rate and an actuating valve with preset response time. The method also involves determination of pressure values before and after the fluid withdrawal from a hydraulic accumulator using a pressure sensor based on its recalled calculated accumulator volume at an empty state.
  • a system including a hydraulic accumulator, a pressure sensor, a fluid source and a data processor can be provided.
  • the hydraulic accumulator can include a first chamber, a second chamber, and a separator disposed therebetween.
  • the hydraulic accumulator can have an associated pre-charge pressure.
  • the pressure sensor can be configured to determine fluid pressure associated with the first fluid chamber.
  • the fluid source can be connected with the first fluid chamber of the hydraulic accumulator.
  • the data processor can be configured to receive pressure readings from the pressure sensor.
  • the data processor is configured to, in response to fluid being provided to the first chamber of the hydraulic accumulator, determine a first rate of pressure change, a second rate of pressure change different than the first rate, and a transition pressure between the first and second rates.
  • the data processor may determine an approximate pre-charge pressure of the hydraulic accumulator based on the transition pressure.
  • a method for determining an approximate pre- charge of a hydraulic accumulator reduces a first chamber of a hydraulic accumulator to a minimum volume state.
  • the hydraulic accumulator has a second chamber separated from the first chamber by a separator.
  • the method provides a pressurized fluid to the first chamber, wherein a pressure of the fluid in the first fluid chamber changes at a first rate and transitions to a second rate at a transition pressure.
  • the method determines an approximate pre-charge pressure of the hydraulic accumulator based on the transition pressure.
  • FIG. 1 is a block diagram of an exemplary system having a hydraulic accumulator and a data processor, according to one embodiment of the disclosure
  • FIG. 2 is a block diagram of the system of FIG.l including a comparator;
  • FIG. 3 is a diagrammatic view of the hydraulic accumulator in an minimum volume state;
  • FIG. 4 is a diagrammatic view of the hydraulic accumulator at an intermediate state
  • FIG. 5 is a process of determining an approximate pre-charge pressure of the hydraulic accumulator
  • FIG. 6 is a graphical view of change in fluid pressure with respect to time during charging and discharging of the hydraulic accumulator.
  • FIG. 7 is a graphical view of the change in fluid pressure with respect to time showing a peak pressure attained by the fluid pressure.
  • FIGS. 1 - 2 illustrate an exemplary system 100 including a hydraulic accumulator 102, a pressure sensor 104, a fluid source 106 and a data processor 108, according to one embodiment of the present disclosure.
  • the system 100 may be embodied in any machine such as excavators, wheel loaders, tractors and other machinery.
  • the hydraulic accumulator 102 may be a piston- based accumulator or a bladder-based accumulator.
  • One or more valves may be associated with the system 100 to selectively control charging and discharging of the accumulator. For example, one or more valves may be open to permit charging and/or discharging of the accumulator, whereas one or more valves (same or different) may be closed to permit charging and/or discharging.
  • the hydraulic accumulator 102 may include a first fluid chamber 302, such as a working fluid or oil chamber, a second fluid chamber 304, such as a compressible fluid or gas chamber, and a separator 306 disposed between the chambers 302, 304.
  • the first fluid chamber 302 may be configured to be filled with a first fluid.
  • the first fluid may include oil, lubricating fluid, or any other fluid associated with hydraulic machinery.
  • the second fluid chamber 304 of the hydraulic accumulator 102 may be filled with a gas or any other compressible fluid via a gas valve 308.
  • the gas may be nitrogen.
  • the separator 306 of the hydraulic accumulator 102 may be configured to separate the first fluid and second fluid chambers 302, 304 to keep the fluid contained therein substantially isolated from one another.
  • the hydraulic accumulator 102 may include a first end cap 310 associated with the second fluid chamber 304 and a second end cap 312 associated with the first fluid chamber 302.
  • the separator 306 may be a piston having one or more seals 314 to reduce the risk of fluid from one chamber entering into the other chamber.
  • the piston-like separator 306 is movable within the hydraulic accumulator 102 to reduce or increase the volume of the respective fluid chambers. Additional seals 315 may be provided in the first end cap 310 and the second end cap 312 of the hydraulic accumulator 102.
  • the separator 306 may be flexible membrane or an expandable separator being movable between an expanded configuration and a compressible configuration.
  • the hydraulic accumulator 102 is sized to have a pre-charge pressure capacity to pressurize accumulated fluid within the first fluid chamber 302, e.g., for energy recovery, which is sequentially released from the first fluid chamber 302 at the pressure associated with the charged pressure of the second fluid chamber 304.
  • the pre-charge pressure can be determined by the pressure capacity and difference between the first and second fluid chambers 302, 304.
  • the pressure sensor 104 may be connected upstream or downstream of the first fluid chamber 302 of the hydraulic accumulator 102.
  • the pressure sensor 104 may be configured to monitor and provide to the data processor 108 pressure readings of the fluid in the first fluid chamber 302 during charging and discharging of the hydraulic accumulator 102. In one embodiment, the pressure readings may either be provided continuously or after predetermined intervals of time.
  • the pressure sensor 104 can be a fluid or oil pressure sensor.
  • the first fluid chamber 302 of the hydraulic accumulator 102 can be connected to the fluid source 106, such as a fixed or variable displacement hydraulic pump.
  • the first fluid chamber 302 of the hydraulic accumulator 102 is configured to receive and deliver fluid at a flow rate during accumulator charging and discharging modes, respectively. Parameters related to the pump such as flow rate, flow direction, and the like may vary. It should be understood that any other device which may regulate a flow of the fluid may also be utilized.
  • One or more valves may be associated with the first fluid chamber 302 such that after discharging of the hydraulic accumulator 102, the valve is configured to prevent charging at specified periods.
  • the data processor 108 may be connected to the pressure sensor 104.
  • the data processor 108 may be configured to receive and process the pressure readings taken by the pressure sensor 104. Moreover, the data processor 108 may determine an approximate pre-charge pressure of the hydraulic accumulator 102. Also, the data processor 108 may be configured to determine or estimate frictional forces associated with the separator 306 of the hydraulic accumulator 102. For example, determination of such frictional forces may be useful to determine the effectiveness of the seals 314 of a piston-based accumulator.
  • the data processor 108 may include a comparator 202 to diagnose a health of the hydraulic accumulator 102.
  • the comparator 202 may compare at least one of the pre-charge pressure, the frictional forces with a pre-determined threshold range of pre-charge pressure and the frictional forces associated with the hydraulic accumulator 102 to diagnose the health of the hydraulic accumulator 102.
  • the comparator 202 may be an independent or separate module connected to the data processor 108 by known methods.
  • the data processor 108 and/or comparator 202 may include a processor unit, input and output ports, an electronic storage medium for executable programs and threshold values, random access memory, a data bus, and the like.
  • the functionality of the data processor 108 and/or comparator 202 may further include other activities not described herein.
  • the data processor 108 and/or the comparator 202 may retrieve or store the pressure readings in a database 110.
  • the database 110 may store historical data values related to the threshold range of pre-charge pressure and frictional forces of the hydraulic accumulator 102.
  • the database 110 may utilize data structures, index files, or any other data storage and retrieval technique, without any limitation. It should be understood that the exemplary system 100 may include other components not described herein.
  • FIG. 5 illustrates a process for determining the pre-charge pressure of the hydraulic accumulator 102.
  • FIGS. 6 - 7 are graphical views of the changes in the fluid pressure with respect to time, as monitored by the pressure sensor 104 which is connected to the hydraulic accumulator 102 during charging and discharging of the hydraulic accumulator 102.
  • Fluid pressure may be driven to a minimum rate or zero such as, e.g., by withdrawing the fluid from the first fluid chamber 302 (that is, discharging fluid from the first fluid chamber 302) such that the hydraulic accumulator 102 is in an minimum volume state as shown in FIG.3.
  • the separator 306 of the hydraulic accumulator 102 may be in contact with walls of the first fluid chamber 302.
  • the first fluid chamber 302 may be reduced to a minimum or zero volume state, while the second fluid chamber 304 may be at a maximum volume state.
  • the pressure readings of the fluid pressure of the first fluid chamber 302 at a minimum or zero volume may be monitored by the pressure sensor 104.
  • the pre-charge pressure of the hydraulic accumulator 102 is defined as the pressure of the inert gas or compressible fluid filled in the second fluid chamber 304 when the hydraulic accumulator 102 is in the minimum volume state. As seen the accompanied graphs, the fluid pressure recorded by the pressure sensor 104 at the minimum volume state is zero. Subsequently, at step 504, the hydraulic accumulator 102 may be charged by providing the fluid to the first fluid chamber 302.
  • FIG. 4 illustrates an intermediate state of the hydraulic accumulator 102 during the charging or discharging cycle. During charging, the fluid is provided to the first fluid chamber 302 by the fluid source 106, at the pre-determined flow rate via a port 316 located near the first fluid chamber 302.
  • the pump may be driven to minimum or low flow such as, e.g., about 30 1pm or less. Substantially faster rates can be more difficult to measure and control due to temperature increase and other factors.
  • the pressure readings of the fluid pressure may be simultaneously monitored by the pressure sensor 104.
  • the separator 306 As the fluid is filled in the first fluid chamber 302, the separator 306 is pushed towards the second fluid chamber 304 of the hydraulic accumulator 102. For a certain interval of time, the pressure of the fluid may continue to remain zero or minimal until the frictional forces associated with the separator 306 are overcome and the separator 306 begins to move away from the second end cap 312.
  • the volume associated with the first fluid chamber 302 increases as the fluid fills into the first fluid chamber 302, causing a corresponding decrease in the volume associated with the compressible fluid filled in the second fluid chamber 304.
  • the pressure of the fluid may change at a first rate and then transition to a second rate (see FIGS. 6 - 7). It may be observed that the first rate of change in the fluid pressure with time is greater than the second rate of change in the fluid pressure with time, as seen in the rapid change to the first rate and subsequent gradual transitioning to the second rate in the accompanied graphs.
  • a reading of a first transition pressure may be monitored and recorded by the data processor 108.
  • the first transition pressure of the fluid is the pressure at which the transitioning from the first to the second rate occurs.
  • the first transition pressure is shown as Point A in the accompanied graphs.
  • the first transition pressure may be stored in the database 110 for retrieval.
  • the associated pre-charge pressure of the hydraulic accumulator 102 may be the difference of a pressure of the fluid within the first fluid chamber 302 during the minimum volume state of the first fluid chamber 302 and the transition pressure.
  • a peak pressure of the fluid (shown as Point B in FIG. 7) during the charging of the hydraulic accumulator 102, may be monitored and recorded by the data processor 108.
  • the peak pressure of the fluid is greater than the recorded first transition pressure.
  • the peak pressure may also be stored in the database 110.
  • the peak pressure of the fluid may be corresponding to the a required pressure of the fluid needed to initiate a change in the minimum volume state of the hydraulic accumulator 102, to overcome any frictional forces associated with moving the separator 306 towards the second fluid chamber 304.
  • the fluid pressure may have to rise much higher to the peak pressure in order to overcome frictional forces and push the separator 306 towards the second fluid chamber 304. After the separator 306 begins to move, the fluid pressure may drop to the first transition pressure, as shown in FIG. 7.
  • the discharging of the hydraulic accumulator 102 may begin after a pre-determined pressure at the second rate is reached. Moreover, in one embodiment, the discharging may begin when a difference in pressure between the pre-determined pressure and the associated pre-charge pressure is 2 MPa.
  • a difference between the fluid pressure (associated with the first fluid chamber 302) and a gas pressure (associated with the second fluid chamber 304) may exist such that the fluid pressure may be slightly higher than the gas pressure at any instant.
  • the hydraulic accumulator 102 may be discharged by withdrawing the fluid from the first fluid chamber 302.
  • the fluid may be withdrawn at a pre-determined flow rate via the port 316.
  • the pre-determined flow rate may be about 30 1pm or less.
  • the rate of withdrawal of the fluid during discharging may be the same as the rate of filling of the fluid during charging of the hydraulic accumulator 102.
  • the behavior of the fluid pressure may be as depicted in the FIGS. 6-7.
  • the pressure of the fluid may change at a third rate and then transition to a fourth rate.
  • the third rate of change in the fluid pressure with time is slower or gradual as compared to a greater or rapid fourth rate of change with time.
  • the data processor 108 may further monitor a second transition pressure (shown as Point C in FIGS. 6-7) at which the fluid pressure transitions from the third rate to the fourth rate.
  • the second transition pressure may be stored in the database 110 by the data processor 108. It should be understood that during the discharging of the hydraulic accumulator 102, the difference between the fluid pressure and the gas pressure may be negligible. Also, after the hydraulic accumulator 102 is discharged, the fluid pressure may drop to zero while the gas pressure reaches the pre-charge pressure.
  • the data processor 108 may determine an approximate pre-charge pressure of the hydraulic accumulator 102 based on the monitored transition pressure. In one embodiment, the determination may be based on the second transition pressure. In another embodiment, the determination of the approximate pre-charge pressure of the hydraulic accumulator 102 may be based on a co-relation of the first and second transition pressures.
  • the co-relation may include any mathematical function of the first and second transition pressure readings or the derivation of the approximate pre- charge pressure based on statistical analysis of the first and second transition pressure readings.
  • the data processor 108 may calculate an average of the first and second transition pressures to determine the approximate pre-charge pressure of the hydraulic accumulator 102.
  • the determined approximate pre- charge pressure may be substantially equivalent to the pressure of the hydraulic accumulator 102 at the minimum volume state.
  • the rate of change of the gas pressure with time during charging and discharging of the hydraulic accumulator 102 may be proportional to the comparatively slower rate of change the fluid pressure with time recorded by the pressure sensor 104. The slower rates may be easier to read and control.
  • the data processor 108 may determine the frictional forces associated with the separator 306, based on the monitored first, second, third and fourth rates.
  • the monitored first and second transition pressures, and the monitored first, second, third and fourth rates may be used to predict failure of the hydraulic accumulator 102.
  • the data processor 108 may also determine the dynamic response of the hydraulic accumulator 102.
  • the data processor 108 may retrieve from the database 110 and compare the peak pressure with the first transition pressure. Based on the comparison, the data processor 108 may determine the dynamic response of the hydraulic accumulator 102. In one embodiment, the difference in the peak pressure and the first transition pressure may be computed as the dynamic response of the hydraulic accumulator 102.
  • the comparator 202 may facilitate diagnosis of the health of the hydraulic accumulator 102.
  • the comparator 202 may retrieve from the database 110 one or more historical readings of the pre-charge pressure and/or the frictional forces associated with the hydraulic accumulator 102.
  • the historical readings may be readings determined by the data processor 108 or pre-determined threshold readings stored in the database 110.
  • the first transition pressure, peak pressure and the second transition pressure monitored may be compared to previous readings retrieved from the database 110, to determine a change in pre-charge pressure.
  • the seal effectiveness may also be determined based on the comparison.
  • the comparator 202 may also be adapted to notify an operator if at least one of the determined pre-charge pressure and the frictional forces is not within the pre-determined threshold range. It should be understood that the notification may be provided to indicate that the determined approximate pre- charge pressure and/or the frictional forces of the hydraulic accumulator 102 may either be lower or higher than acceptable performance.
  • the notification provided by the comparator 202 may be a visual feedback like an alert message, an audio feedback like a warning alarm, or any other type of feedback. Based on the notification, one or more remedial actions such as re-charging of the hydraulic accumulator 102, overhauling of the hydraulic accumulator 102 or replacement of the seals 314 in case of the piston- based accumulator may be performed.
  • the hydraulic accumulator 102 may lose the pre-charge pressure due to a variety of reasons. For example, reasons may be component failure such as, e.g., piston seal failure in the piston-based accumulator or bladder failure in the bladder-based accumulator. Further, gain in pre-charge pressure can be attributed by leakage of fluid into the second fluid chamber 304. Accordingly, if the pre-charge pressure is too high or too low, then the hydraulic accumulator 102 may require servicing or overhauling. Hence, the health of the hydraulic accumulator 102 may require to be checked once every few months or at least once a year after installation in a machine.
  • reasons may be component failure such as, e.g., piston seal failure in the piston-based accumulator or bladder failure in the bladder-based accumulator.
  • gain in pre-charge pressure can be attributed by leakage of fluid into the second fluid chamber 304. Accordingly, if the pre-charge pressure is too high or too low, then the hydraulic accumulator 102 may require servicing or overhauling. Hence,
  • Typical solutions included connecting a pressure gauge and/or a modular kit to the gas valve 308 of the hydraulic accumulator 102.
  • the systems and methods described herein may relate to an automated process for monitoring and diagnosing the health of the hydraulic accumulator 102, without requiring physical connection to the gas valve 308, i.e., without use of a gas gauge or sensor.
  • the systems and methods described herein may determine and approximate pre-charge pressure and/or frictional values associated with the separator 306 of the hydraulic accumulator 102 to improve diagnosis of the accumulator health.
  • the diagnosis of the health and the determination of the approximate pre-charge pressure and/or the frictional values may be performed in real time by monitoring the pressure readings provided by the pressure sensor 104, and subsequently performing the necessary processing of the readings required for the determination.
  • the data processor 108 may determine the approximate pre-charge of the hydraulic accumulator 102 based on the monitored transition pressure. In one embodiment, the dynamic response of the hydraulic accumulator 102 may be determined based on the difference between the peak pressure and the first transition pressure.
  • the comparator 202 may determine if the approximate pre-charge pressure determined by the data processor 108 lies within the pre-determined threshold range. If the approximate pre-charge pressure is either too high or too low, that is, outside the range, then the operator may be suitably notified. Based on the notification, one or more remedial actions such as re-charging of the hydraulic accumulator 102 or replacement of the seal may be performed.
  • the systems and methods described herein may determine the seal effectiveness of the separator 306. If the determined frictional values of the separator 306 lie within the pre-determined threshold range it may be indicative that the seals of the hydraulic accumulator 102 are in an acceptable condition and the seals 314 may be retained. For example, loss in pre-charge pressure can be due to component failure such as piston seal failure or bladder failure such that fluid leakage occurs from the second fluid chamber to the first fluid chamber. Gain in pre-charge pressure can be due to fluid leakage from the first fluid chamber into the second fluid chamber. The fnctional values may also be compared to the previous threshold range to determine if current values are acceptable or not. Relatively high frictional values may be indicative of a failure of the hydraulic accumulator 102 in the future. Hence, the disclosure may assist in the determining if the frictional values of the hydraulic accumulator 102 are higher than desired at early stage before failure.

Abstract

A system (100) including a hydraulic accumulator (102), a pressure sensor (104), a fluid source (106) and a data processor (108) to detect a pre- charge pressure is provided. The hydraulic accumulator (102) includes first and second chambers (302, 304) and a separator (306) therebetween. The hydraulic accumulator (102) has an associated pre-charge pressure. The pressure sensor (104) coupled to the first chamber (302). The data processor (108) is configured to receive pressure readings from the pressure sensor (104). The data processor (108) is configured to determine a first and second rate of pressure changes, and a transition pressure between the first and second rates. The approximate pre- charge pressure is determined based on the transition pressure.

Description

Description
Hydraulic Accumulator Pre-charge Pressure Detection Technical Field
The present disclosure relates to hydraulic accumulators and more particularly to determining pre-charge pressure of the hydraulic accumulator.
Background
Pre-charge pressure of a hydraulic accumulator needs to be periodically checked after installation in a hydraulic system to ensure operational health of the accumulator. Typical solutions for detecting the accumulator health involve connecting a gas pressure gauge and/or a modular kit to a gas valve of the hydraulic accumulator, when the machine is stopped and the fluid in the hydraulic accumulator is not pressurized. The gas pressure gauge provides a reading of the pre-charge pressure. Depending on such readings, the hydraulic accumulator is either re-charged or completely overhauled or replaced. Hence, typical solutions required physically connecting the hydraulic accumulator to the pressure gauge. However, the accumulator can be located on a machine such that it is difficult to access and couple the gas pressure gauge.
In one example, German Patent Number DE102005052640 relates to a method involving determination of a difference in accumulator volume using a flow regulator with constant adjustable flow rate and an actuating valve with preset response time. The method also involves determination of pressure values before and after the fluid withdrawal from a hydraulic accumulator using a pressure sensor based on its recalled calculated accumulator volume at an empty state. Summary of the Disclosure
In one aspect of the present disclosure, a system including a hydraulic accumulator, a pressure sensor, a fluid source and a data processor can be provided. The hydraulic accumulator can include a first chamber, a second chamber, and a separator disposed therebetween. The hydraulic accumulator can have an associated pre-charge pressure. The pressure sensor can be configured to determine fluid pressure associated with the first fluid chamber. The fluid source can be connected with the first fluid chamber of the hydraulic accumulator. The data processor can be configured to receive pressure readings from the pressure sensor. The data processor is configured to, in response to fluid being provided to the first chamber of the hydraulic accumulator, determine a first rate of pressure change, a second rate of pressure change different than the first rate, and a transition pressure between the first and second rates. The data processor may determine an approximate pre-charge pressure of the hydraulic accumulator based on the transition pressure.
In another aspect, a method for determining an approximate pre- charge of a hydraulic accumulator. In one step, the method reduces a first chamber of a hydraulic accumulator to a minimum volume state. The hydraulic accumulator has a second chamber separated from the first chamber by a separator. In another step, the method provides a pressurized fluid to the first chamber, wherein a pressure of the fluid in the first fluid chamber changes at a first rate and transitions to a second rate at a transition pressure. Subsequently, in yet another step, the method determines an approximate pre-charge pressure of the hydraulic accumulator based on the transition pressure.
Other features and aspects of this disclosure will be apparent from the following description and the accompanying drawings.
Brief Description of the Drawings
FIG. 1 is a block diagram of an exemplary system having a hydraulic accumulator and a data processor, according to one embodiment of the disclosure;
FIG. 2 is a block diagram of the system of FIG.l including a comparator; FIG. 3 is a diagrammatic view of the hydraulic accumulator in an minimum volume state;
FIG. 4 is a diagrammatic view of the hydraulic accumulator at an intermediate state;
FIG. 5 is a process of determining an approximate pre-charge pressure of the hydraulic accumulator;
FIG. 6 is a graphical view of change in fluid pressure with respect to time during charging and discharging of the hydraulic accumulator; and
FIG. 7 is a graphical view of the change in fluid pressure with respect to time showing a peak pressure attained by the fluid pressure.
Detailed Description
FIGS. 1 - 2 illustrate an exemplary system 100 including a hydraulic accumulator 102, a pressure sensor 104, a fluid source 106 and a data processor 108, according to one embodiment of the present disclosure. The system 100 may be embodied in any machine such as excavators, wheel loaders, tractors and other machinery. The hydraulic accumulator 102 may be a piston- based accumulator or a bladder-based accumulator. One or more valves (not shown) may be associated with the system 100 to selectively control charging and discharging of the accumulator. For example, one or more valves may be open to permit charging and/or discharging of the accumulator, whereas one or more valves (same or different) may be closed to permit charging and/or discharging.
As shown in FIGS. 3 - 4, the hydraulic accumulator 102 may include a first fluid chamber 302, such as a working fluid or oil chamber, a second fluid chamber 304, such as a compressible fluid or gas chamber, and a separator 306 disposed between the chambers 302, 304. The first fluid chamber 302 may be configured to be filled with a first fluid. In one embodiment, the first fluid may include oil, lubricating fluid, or any other fluid associated with hydraulic machinery. The second fluid chamber 304 of the hydraulic accumulator 102 may be filled with a gas or any other compressible fluid via a gas valve 308. In one embodiment, the gas may be nitrogen. The separator 306 of the hydraulic accumulator 102 may be configured to separate the first fluid and second fluid chambers 302, 304 to keep the fluid contained therein substantially isolated from one another.
The hydraulic accumulator 102 may include a first end cap 310 associated with the second fluid chamber 304 and a second end cap 312 associated with the first fluid chamber 302. The separator 306 may be a piston having one or more seals 314 to reduce the risk of fluid from one chamber entering into the other chamber. The piston-like separator 306 is movable within the hydraulic accumulator 102 to reduce or increase the volume of the respective fluid chambers. Additional seals 315 may be provided in the first end cap 310 and the second end cap 312 of the hydraulic accumulator 102. Similarly, in case of a bladder-based accumulator, the separator 306 may be flexible membrane or an expandable separator being movable between an expanded configuration and a compressible configuration. The hydraulic accumulator 102 is sized to have a pre-charge pressure capacity to pressurize accumulated fluid within the first fluid chamber 302, e.g., for energy recovery, which is sequentially released from the first fluid chamber 302 at the pressure associated with the charged pressure of the second fluid chamber 304. The pre-charge pressure can be determined by the pressure capacity and difference between the first and second fluid chambers 302, 304.
To determine the pressure associated with the hydraulic accumulator 102, the pressure sensor 104 may be connected upstream or downstream of the first fluid chamber 302 of the hydraulic accumulator 102. The pressure sensor 104 may be configured to monitor and provide to the data processor 108 pressure readings of the fluid in the first fluid chamber 302 during charging and discharging of the hydraulic accumulator 102. In one embodiment, the pressure readings may either be provided continuously or after predetermined intervals of time. In one example, the pressure sensor 104 can be a fluid or oil pressure sensor. The first fluid chamber 302 of the hydraulic accumulator 102 can be connected to the fluid source 106, such as a fixed or variable displacement hydraulic pump. The first fluid chamber 302 of the hydraulic accumulator 102 is configured to receive and deliver fluid at a flow rate during accumulator charging and discharging modes, respectively. Parameters related to the pump such as flow rate, flow direction, and the like may vary. It should be understood that any other device which may regulate a flow of the fluid may also be utilized. One or more valves may be associated with the first fluid chamber 302 such that after discharging of the hydraulic accumulator 102, the valve is configured to prevent charging at specified periods.
As shown in FIGS. 1 - 2, the data processor 108 may be connected to the pressure sensor 104. The data processor 108 may be configured to receive and process the pressure readings taken by the pressure sensor 104. Moreover, the data processor 108 may determine an approximate pre-charge pressure of the hydraulic accumulator 102. Also, the data processor 108 may be configured to determine or estimate frictional forces associated with the separator 306 of the hydraulic accumulator 102. For example, determination of such frictional forces may be useful to determine the effectiveness of the seals 314 of a piston-based accumulator.
In one embodiment, as shown in FIG.2, the data processor 108 may include a comparator 202 to diagnose a health of the hydraulic accumulator 102. The comparator 202 may compare at least one of the pre-charge pressure, the frictional forces with a pre-determined threshold range of pre-charge pressure and the frictional forces associated with the hydraulic accumulator 102 to diagnose the health of the hydraulic accumulator 102. In another embodiment, the comparator 202 may be an independent or separate module connected to the data processor 108 by known methods.
The data processor 108 and/or comparator 202 may include a processor unit, input and output ports, an electronic storage medium for executable programs and threshold values, random access memory, a data bus, and the like. The functionality of the data processor 108 and/or comparator 202 may further include other activities not described herein.
Also, the data processor 108 and/or the comparator 202 may retrieve or store the pressure readings in a database 110. The database 110 may store historical data values related to the threshold range of pre-charge pressure and frictional forces of the hydraulic accumulator 102. The database 110 may utilize data structures, index files, or any other data storage and retrieval technique, without any limitation. It should be understood that the exemplary system 100 may include other components not described herein.
FIG. 5 illustrates a process for determining the pre-charge pressure of the hydraulic accumulator 102. FIGS. 6 - 7 are graphical views of the changes in the fluid pressure with respect to time, as monitored by the pressure sensor 104 which is connected to the hydraulic accumulator 102 during charging and discharging of the hydraulic accumulator 102.
Initially, the first fluid chamber 302 of the hydraulic accumulator
102 is connected to the fluid source 106. Fluid pressure may be driven to a minimum rate or zero such as, e.g., by withdrawing the fluid from the first fluid chamber 302 (that is, discharging fluid from the first fluid chamber 302) such that the hydraulic accumulator 102 is in an minimum volume state as shown in FIG.3. In the piston-based accumulator, at the minimum volume state, the separator 306 of the hydraulic accumulator 102 may be in contact with walls of the first fluid chamber 302. Hence, as shown in step 502, the first fluid chamber 302 may be reduced to a minimum or zero volume state, while the second fluid chamber 304 may be at a maximum volume state. Here, the pressure readings of the fluid pressure of the first fluid chamber 302 at a minimum or zero volume may be monitored by the pressure sensor 104.
The pre-charge pressure of the hydraulic accumulator 102 is defined as the pressure of the inert gas or compressible fluid filled in the second fluid chamber 304 when the hydraulic accumulator 102 is in the minimum volume state. As seen the accompanied graphs, the fluid pressure recorded by the pressure sensor 104 at the minimum volume state is zero. Subsequently, at step 504, the hydraulic accumulator 102 may be charged by providing the fluid to the first fluid chamber 302. FIG. 4 illustrates an intermediate state of the hydraulic accumulator 102 during the charging or discharging cycle. During charging, the fluid is provided to the first fluid chamber 302 by the fluid source 106, at the pre-determined flow rate via a port 316 located near the first fluid chamber 302. In one embodiment, the pump may be driven to minimum or low flow such as, e.g., about 30 1pm or less. Substantially faster rates can be more difficult to measure and control due to temperature increase and other factors. The pressure readings of the fluid pressure may be simultaneously monitored by the pressure sensor 104.
As the fluid is filled in the first fluid chamber 302, the separator 306 is pushed towards the second fluid chamber 304 of the hydraulic accumulator 102. For a certain interval of time, the pressure of the fluid may continue to remain zero or minimal until the frictional forces associated with the separator 306 are overcome and the separator 306 begins to move away from the second end cap 312.
When the separator 306 starts moving, the volume associated with the first fluid chamber 302 increases as the fluid fills into the first fluid chamber 302, causing a corresponding decrease in the volume associated with the compressible fluid filled in the second fluid chamber 304. At this time, the pressure of the fluid may change at a first rate and then transition to a second rate (see FIGS. 6 - 7). It may be observed that the first rate of change in the fluid pressure with time is greater than the second rate of change in the fluid pressure with time, as seen in the rapid change to the first rate and subsequent gradual transitioning to the second rate in the accompanied graphs.
Moreover, a reading of a first transition pressure may be monitored and recorded by the data processor 108. The first transition pressure of the fluid is the pressure at which the transitioning from the first to the second rate occurs. The first transition pressure is shown as Point A in the accompanied graphs. In one embodiment, the first transition pressure may be stored in the database 110 for retrieval. It should be noted that the associated pre-charge pressure of the hydraulic accumulator 102 may be the difference of a pressure of the fluid within the first fluid chamber 302 during the minimum volume state of the first fluid chamber 302 and the transition pressure.
In another embodiment, a peak pressure of the fluid (shown as Point B in FIG. 7) during the charging of the hydraulic accumulator 102, may be monitored and recorded by the data processor 108. The peak pressure of the fluid is greater than the recorded first transition pressure. The peak pressure may also be stored in the database 110.
The peak pressure of the fluid may be corresponding to the a required pressure of the fluid needed to initiate a change in the minimum volume state of the hydraulic accumulator 102, to overcome any frictional forces associated with moving the separator 306 towards the second fluid chamber 304. A person of ordinary skill in the art will appreciate that during charging of the hydraulic accumulator 102 from the minimum volume state, the fluid pressure may have to rise much higher to the peak pressure in order to overcome frictional forces and push the separator 306 towards the second fluid chamber 304. After the separator 306 begins to move, the fluid pressure may drop to the first transition pressure, as shown in FIG. 7.
The discharging of the hydraulic accumulator 102 may begin after a pre-determined pressure at the second rate is reached. Moreover, in one embodiment, the discharging may begin when a difference in pressure between the pre-determined pressure and the associated pre-charge pressure is 2 MPa. A person of ordinary skill in the art will appreciate that during charging of the hydraulic accumulator 102, a difference between the fluid pressure (associated with the first fluid chamber 302) and a gas pressure (associated with the second fluid chamber 304) may exist such that the fluid pressure may be slightly higher than the gas pressure at any instant.
The hydraulic accumulator 102 may be discharged by withdrawing the fluid from the first fluid chamber 302. The fluid may be withdrawn at a pre-determined flow rate via the port 316. In one embodiment, the pre-determined flow rate may be about 30 1pm or less. In another embodiment, the rate of withdrawal of the fluid during discharging may be the same as the rate of filling of the fluid during charging of the hydraulic accumulator 102.
During discharging of the hydraulic accumulator 102, based on the readings provided by the pressure sensor 104, the behavior of the fluid pressure may be as depicted in the FIGS. 6-7. The pressure of the fluid may change at a third rate and then transition to a fourth rate. As is clear from the FIGS. 6-7, the third rate of change in the fluid pressure with time is slower or gradual as compared to a greater or rapid fourth rate of change with time.
The data processor 108 may further monitor a second transition pressure (shown as Point C in FIGS. 6-7) at which the fluid pressure transitions from the third rate to the fourth rate. The second transition pressure may be stored in the database 110 by the data processor 108. It should be understood that during the discharging of the hydraulic accumulator 102, the difference between the fluid pressure and the gas pressure may be negligible. Also, after the hydraulic accumulator 102 is discharged, the fluid pressure may drop to zero while the gas pressure reaches the pre-charge pressure.
Subsequently, at step 506, the data processor 108 may determine an approximate pre-charge pressure of the hydraulic accumulator 102 based on the monitored transition pressure. In one embodiment, the determination may be based on the second transition pressure. In another embodiment, the determination of the approximate pre-charge pressure of the hydraulic accumulator 102 may be based on a co-relation of the first and second transition pressures.
The co-relation may include any mathematical function of the first and second transition pressure readings or the derivation of the approximate pre- charge pressure based on statistical analysis of the first and second transition pressure readings. In one embodiment, the data processor 108 may calculate an average of the first and second transition pressures to determine the approximate pre-charge pressure of the hydraulic accumulator 102.
It should be understood that the determined approximate pre- charge pressure may be substantially equivalent to the pressure of the hydraulic accumulator 102 at the minimum volume state. The rate of change of the gas pressure with time during charging and discharging of the hydraulic accumulator 102 may be proportional to the comparatively slower rate of change the fluid pressure with time recorded by the pressure sensor 104. The slower rates may be easier to read and control.
Additionally, the data processor 108 may determine the frictional forces associated with the separator 306, based on the monitored first, second, third and fourth rates. In yet another embodiment, the monitored first and second transition pressures, and the monitored first, second, third and fourth rates may be used to predict failure of the hydraulic accumulator 102.
Further, the data processor 108 may also determine the dynamic response of the hydraulic accumulator 102. The data processor 108 may retrieve from the database 110 and compare the peak pressure with the first transition pressure. Based on the comparison, the data processor 108 may determine the dynamic response of the hydraulic accumulator 102. In one embodiment, the difference in the peak pressure and the first transition pressure may be computed as the dynamic response of the hydraulic accumulator 102.
Further, the comparator 202 may facilitate diagnosis of the health of the hydraulic accumulator 102. The comparator 202 may retrieve from the database 110 one or more historical readings of the pre-charge pressure and/or the frictional forces associated with the hydraulic accumulator 102. In one embodiment, the historical readings may be readings determined by the data processor 108 or pre-determined threshold readings stored in the database 110. In another embodiment, the first transition pressure, peak pressure and the second transition pressure monitored may be compared to previous readings retrieved from the database 110, to determine a change in pre-charge pressure. For the piston based accumulator, the seal effectiveness may also be determined based on the comparison.
The comparator 202 may also be adapted to notify an operator if at least one of the determined pre-charge pressure and the frictional forces is not within the pre-determined threshold range. It should be understood that the notification may be provided to indicate that the determined approximate pre- charge pressure and/or the frictional forces of the hydraulic accumulator 102 may either be lower or higher than acceptable performance.
Moreover, the notification provided by the comparator 202 may be a visual feedback like an alert message, an audio feedback like a warning alarm, or any other type of feedback. Based on the notification, one or more remedial actions such as re-charging of the hydraulic accumulator 102, overhauling of the hydraulic accumulator 102 or replacement of the seals 314 in case of the piston- based accumulator may be performed. Industrial Applicability
On usage, the hydraulic accumulator 102 may lose the pre-charge pressure due to a variety of reasons. For example, reasons may be component failure such as, e.g., piston seal failure in the piston-based accumulator or bladder failure in the bladder-based accumulator. Further, gain in pre-charge pressure can be attributed by leakage of fluid into the second fluid chamber 304. Accordingly, if the pre-charge pressure is too high or too low, then the hydraulic accumulator 102 may require servicing or overhauling. Hence, the health of the hydraulic accumulator 102 may require to be checked once every few months or at least once a year after installation in a machine.
Typical solutions included connecting a pressure gauge and/or a modular kit to the gas valve 308 of the hydraulic accumulator 102.
However, establishing this physical connection of the pressure gauge to the gas valve 308 is problematic when the hydraulic accumulator 102 is installed in the machine due to reduced accessibility. Also, sometimes manual analysis of the readings may be required in order to determine whether the hydraulic accumulator 102 is functioning properly. This may result in an increased cost associated with measuring of the pre-charge using these typical solutions. The systems and methods described herein may relate to an automated process for monitoring and diagnosing the health of the hydraulic accumulator 102, without requiring physical connection to the gas valve 308, i.e., without use of a gas gauge or sensor. The systems and methods described herein may determine and approximate pre-charge pressure and/or frictional values associated with the separator 306 of the hydraulic accumulator 102 to improve diagnosis of the accumulator health.
The diagnosis of the health and the determination of the approximate pre-charge pressure and/or the frictional values may be performed in real time by monitoring the pressure readings provided by the pressure sensor 104, and subsequently performing the necessary processing of the readings required for the determination.
The data processor 108 may determine the approximate pre-charge of the hydraulic accumulator 102 based on the monitored transition pressure. In one embodiment, the dynamic response of the hydraulic accumulator 102 may be determined based on the difference between the peak pressure and the first transition pressure.
Also, in another embodiment, the comparator 202 may determine if the approximate pre-charge pressure determined by the data processor 108 lies within the pre-determined threshold range. If the approximate pre-charge pressure is either too high or too low, that is, outside the range, then the operator may be suitably notified. Based on the notification, one or more remedial actions such as re-charging of the hydraulic accumulator 102 or replacement of the seal may be performed.
In case of the piston-based accumulator, the systems and methods described herein may determine the seal effectiveness of the separator 306. If the determined frictional values of the separator 306 lie within the pre-determined threshold range it may be indicative that the seals of the hydraulic accumulator 102 are in an acceptable condition and the seals 314 may be retained. For example, loss in pre-charge pressure can be due to component failure such as piston seal failure or bladder failure such that fluid leakage occurs from the second fluid chamber to the first fluid chamber. Gain in pre-charge pressure can be due to fluid leakage from the first fluid chamber into the second fluid chamber. The fnctional values may also be compared to the previous threshold range to determine if current values are acceptable or not. Relatively high frictional values may be indicative of a failure of the hydraulic accumulator 102 in the future. Hence, the disclosure may assist in the determining if the frictional values of the hydraulic accumulator 102 are higher than desired at early stage before failure.
While aspects of the present disclosure have been particularly shown and described with reference to the embodiments above, it will be understood by those skilled in the art that various additional embodiments may be contemplated by the modification of the disclosed machines, systems and methods without departing from the spirit and scope of what is disclosed. Such embodiments should be understood to fall within the scope of the present disclosure as determined based upon the claims and any equivalents thereof.

Claims

Claims
A system (100) comprising:
a hydraulic accumulator (102) having a first chamber (302), a second chamber (304), and a separator (306) therebetween, the hydraulic accumulator (102) being capable of an associated pre-charge pressure; a pressure sensor (104) fluidly coupled to the first chamber (302); a fluid source (106) to provide fluid to the first chamber (302); and a data processor (108) configured to receive pressure readings from the pressure sensor (104), the data processor (108) configured to:
in response to fluid being provided to the first chamber of the hydraulic accumulator, determine a first rate of pressure change, a second rate of pressure change different than the first rate, and a transition pressure between the first and second rates; and
determine an approximate pre-charge pressure of the hydraulic accumulator (102) based on the transition pressure.
The system (100) of claim 1, wherein the data processor (108) includes a comparator (202) to compare at least one of the determined pre charge pressure with a pre-determined threshold range of pre-charge pressures associated with the hydraulic accumulator (102) to diagnose the health of the hydraulic accumulator.
The system (100) of claim 1, wherein the associated pre-charge pressure is the difference of a pressure of fluid within the first chamber (302) during a minimum volume state of the first chamber (302) and the transition pressure.
The system (100) of claim 1, wherein the fluid source (106) includes a pump configured to provide a pressurized fluid to the first chamber (302).
The system (100) of claim 1, wherein the data processor (108) is configured to co-relate more than one pressure readings of the fluid in the first chamber (302) to determine an approximate pre-charge pressure of the hydraulic accumulator (102).
The system (100) of claim 5, wherein the data processor (108) is further configured to monitor a rate of change of pressure, with respect to a time interval, of the fluid to determine frictional forces associated with the separator (306) of the hydraulic accumulator (102).
A method comprising:
reducing a first chamber (302) of a hydraulic accumulator (102) to a minimum volume state, the hydraulic accumulator (102) having a second chamber (304) separated from the first chamber by a separator (306);
providing a pressurized fluid to the first chamber (302), wherein a pressure of the fluid in the first chamber (302) changes at a first rate and transitions to a second rate at a transition pressure; and
determining an approximate pre-charge pressure of the hydraulic accumulator (102) based on the transition pressure.
The method of claim 7 further comprising:
discharging the fluid from the first chamber (302), wherein a pressure of the fluid in the first chamber (302) changes at a third rate and transitions to a fourth rate at a second transition pressure, wherein said transition pressure is a first transition pressure; and
determining an approximate pre-charge pressure of the hydraulic accumulator (102) based on the second transition pressure.
9. The method of claim 10 further comprising
monitoring the first rate, the second rate, the third rate, and the fourth rate; and
determining frictional forces associated with the hydraulic accumulator (102) based on the first, second, third and fourth rates.
10. The method of claim 10, further comprising comparing the determined pre-charge pressure of the hydraulic accumulator (102) based on the transition pressure with a pre-determined threshold range of pre-charge pressures to diagnose the health of the hydraulic accumulator (102).
PCT/US2013/033040 2012-03-22 2013-03-20 Hydraulic accumulator pre-charge pressure detection WO2013142541A2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201380015083.5A CN104204544B (en) 2012-03-22 2013-03-20 Hydraulic accumulator Preliminary pressure-filled detects
DE112013001599.4T DE112013001599T5 (en) 2012-03-22 2013-03-20 Hydraulic accumulator prefill pressure detection

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US13/427,072 2012-03-22
US13/427,095 US9366269B2 (en) 2012-03-22 2012-03-22 Hydraulic accumulator health diagnosis
US13/427,072 US8833143B2 (en) 2012-03-22 2012-03-22 Hydraulic accumulator pre-charge pressure detection
US13/427,095 2012-03-22

Publications (2)

Publication Number Publication Date
WO2013142541A2 true WO2013142541A2 (en) 2013-09-26
WO2013142541A3 WO2013142541A3 (en) 2013-11-14

Family

ID=49223450

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2013/033040 WO2013142541A2 (en) 2012-03-22 2013-03-20 Hydraulic accumulator pre-charge pressure detection

Country Status (3)

Country Link
CN (1) CN104204544B (en)
DE (1) DE112013001599T5 (en)
WO (1) WO2013142541A2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2520407A (en) * 2013-10-03 2015-05-20 Caterpillar Sarl Hydraulic accumulator pre-charge pressure detection for hydraulic braking system
GB2528322A (en) * 2014-07-18 2016-01-20 Airbus Operations Ltd Determining integrity of braking control system
GB2528321A (en) * 2014-07-18 2016-01-20 Airbus Operations Ltd Determining integrity of braking control system
US11293545B2 (en) 2016-08-03 2022-04-05 Audi Ag Hydraulic system for an automatic transmission of a motor vehicle

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104897351B (en) * 2015-05-22 2017-06-30 合肥通用机械研究院 Method and system for testing air tightness of welding diaphragm type energy storage pressure container
DE102016214370B3 (en) * 2016-08-03 2017-12-14 Audi Ag Hydraulic system for an automatic transmission of a motor vehicle
CN108361243A (en) * 2018-02-27 2018-08-03 龙工(福建)液压有限公司 A kind of hydraulic cylinder detection method
AT522380B1 (en) * 2019-03-20 2021-05-15 Engel Austria Gmbh Hydraulic system for a molding machine
CN113418663A (en) * 2020-12-31 2021-09-21 湖南江河机电自动化设备股份有限公司 Hydraulic turbine governor hydraulic system leakage detection method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0652211B2 (en) * 1987-09-14 1994-07-06 宣行 杉村 Accumulator gas filling pressure measurement method
JPH07139501A (en) * 1993-11-12 1995-05-30 Nok Corp Inspection method of pressure vessel
JP2001013044A (en) * 1999-06-28 2001-01-19 Nok Corp Machine and method for inspection of pressure vessel
JP2004156943A (en) * 2002-11-05 2004-06-03 Nok Corp Measuring instrument and measuring method for charged pressure
US20110264339A1 (en) * 2010-04-23 2011-10-27 Gm Global Technology Operations, Inc. Accumulator working volume management and adaptation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3662333A (en) * 1970-09-08 1972-05-09 Bendix Corp Hydraulic accumulator charge detector and indicating system
US20120273076A1 (en) * 2011-04-28 2012-11-01 Robert Bosch Gmbh Compact hydraulic accumulator

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0652211B2 (en) * 1987-09-14 1994-07-06 宣行 杉村 Accumulator gas filling pressure measurement method
JPH07139501A (en) * 1993-11-12 1995-05-30 Nok Corp Inspection method of pressure vessel
JP2001013044A (en) * 1999-06-28 2001-01-19 Nok Corp Machine and method for inspection of pressure vessel
JP2004156943A (en) * 2002-11-05 2004-06-03 Nok Corp Measuring instrument and measuring method for charged pressure
US20110264339A1 (en) * 2010-04-23 2011-10-27 Gm Global Technology Operations, Inc. Accumulator working volume management and adaptation

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2520407A (en) * 2013-10-03 2015-05-20 Caterpillar Sarl Hydraulic accumulator pre-charge pressure detection for hydraulic braking system
US9358966B2 (en) 2013-10-03 2016-06-07 Caterpillar Sarl Hydraulic accumulator pre-charge pressure detection for hydraulic braking system
GB2528322A (en) * 2014-07-18 2016-01-20 Airbus Operations Ltd Determining integrity of braking control system
GB2528321A (en) * 2014-07-18 2016-01-20 Airbus Operations Ltd Determining integrity of braking control system
US9580058B2 (en) 2014-07-18 2017-02-28 Airbus Operations Limited Determining integrity of braking control system
US9969378B2 (en) 2014-07-18 2018-05-15 Airbus Operations Limited Determining integrity of braking control system
GB2528322B (en) * 2014-07-18 2020-08-05 Airbus Operations Ltd Determining integrity of braking control system
US11293545B2 (en) 2016-08-03 2022-04-05 Audi Ag Hydraulic system for an automatic transmission of a motor vehicle

Also Published As

Publication number Publication date
WO2013142541A3 (en) 2013-11-14
DE112013001599T5 (en) 2014-12-31
CN104204544A (en) 2014-12-10
CN104204544B (en) 2016-05-11

Similar Documents

Publication Publication Date Title
US8833143B2 (en) Hydraulic accumulator pre-charge pressure detection
US9358966B2 (en) Hydraulic accumulator pre-charge pressure detection for hydraulic braking system
US9366269B2 (en) Hydraulic accumulator health diagnosis
WO2013142541A2 (en) Hydraulic accumulator pre-charge pressure detection
RU2603944C2 (en) Device for controlling condensate trap with diagnostics and method of controlling operation of condensate trap
US9969378B2 (en) Determining integrity of braking control system
CN108035941A (en) Accumulator Preliminary pressure-filled exception on-line detecting system and method based on big data
EP3455685B1 (en) Method and system for monitoring health of a hydraulic fluid subsystem
US11747065B2 (en) Refrigerant leak detection system and method
JP5692542B2 (en) Fluid circuit control using estimated sensor values.
CN112879389A (en) Abnormal leakage detection system of hydraulic system
US11339810B2 (en) Fluid leakage detection system
US10520384B2 (en) Accumulator pressure monitoring system
JP4088149B2 (en) Abnormality monitoring method for hydraulic system
KR20220163249A (en) A Failure Detection Apparatus for a Hydraulic System
JP4188670B2 (en) Measuring method of hydraulic supply system
JP2008133848A (en) System for measuring quantity of liquid accumulated in accumulator
KR101377802B1 (en) Monitoring device for hydraulic system
KR20160053617A (en) Apparatus and Method for detecting leak
JP6366091B2 (en) Misalignment detection apparatus, method, and program
GB2392500A (en) Method of operating a fluid contaminant sensor

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201380015083.5

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13764304

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 112013001599

Country of ref document: DE

Ref document number: 1120130015994

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13764304

Country of ref document: EP

Kind code of ref document: A2