WO2013134886A1 - Hydraulic structure for water flow control - Google Patents
Hydraulic structure for water flow control Download PDFInfo
- Publication number
- WO2013134886A1 WO2013134886A1 PCT/CH2013/000042 CH2013000042W WO2013134886A1 WO 2013134886 A1 WO2013134886 A1 WO 2013134886A1 CH 2013000042 W CH2013000042 W CH 2013000042W WO 2013134886 A1 WO2013134886 A1 WO 2013134886A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- water
- flow
- hydraulic structure
- passage
- hydraulic
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
- E02B9/02—Water-ways
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/06—Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/02—Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/08—Fish passes or other means providing for migration of fish; Passages for rafts or boats
- E02B8/085—Devices allowing fish migration, e.g. fish traps
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
- E02B9/02—Water-ways
- E02B9/04—Free-flow canals or flumes; Intakes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/60—Ecological corridors or buffer zones
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Definitions
- the present invention relates to hydraulic structures according to the preamble of claim 1. It further relates to arrangements of more than one such structure.
- US-3 593 527 proposes a hydraulic structure by which flow features can be converted, e.g. from a deep, narrow channel to a wide, flat bed, in reducing scour and maintaining surface levels.
- the principle of the layout is called MEL (Minimal Loss Structure) .
- the present invention relates to a drop structure including a Minimum Energy Loss (MEL) structure as shown in U.S. Pat. No. 3,593,527 to bring down the water level and generate controlled vortexes by a sudden change of a flow form after the structure.
- MEL Minimum Energy Loss
- the energy line is brought down in a way where the majority of energy is dissipated in eddies on the water away from the structure itself and also away from natural ground.
- a series of relatively calm eddies occurs near the riverbanks and this builds up a relatively calm counter current which largely prevents riverbank erosion, and therefore the banks can be constructed with easily erodible and thus more nature-like materials .
- the structure as described above has the fully functionality in the high flows as it is, and is very useful in places where the peak flow energy of water is the main problem, i.e. Spillways flood channels or chutes with a relative high head.
- This present design enables flow at maximum designed flood level without any increase on the water surface level, at the structure. In fact, there is normally a decrease of such a level. This structure can function safely without dramatic flooding also with much higher (20%-50%) flows than
- V CslRS where v is the velocity of flow, R is the hydraulic radius, S is the slope of the energy line and C is a variant, depending on the channel boundary conditions and the state of the flow.
- Natural streams are invariably non-uniform. It is extremely difficult to measure or to define 'slope' .
- the cross section changes, often quickly, from point to point. It is often difficult to distinguish a change in section-form and boundary roughness.
- 'n' originally introduced as a constant, varies radically with stage and from section to section in the same stream. Chow sets out possible variations of n with stage.
- Figure 1 is a plot of n against stage for the major coastal rivers of Queensland. The basic figures were obtained from the Irrigation and Water Supply Commission. Presumably, they were measured with reasonable accuracy. As the ' n' is a straight multiplier, any computations using a particular n value must be grossly in error .
- the persistence of turbulence is inter alia a function of eddy size. Small eddies quickly disappear, but large eddies persist for a considerable time and hence distance. Thus small eddies generated at the boundary will dissipate quickly and will have a local effect only. Large eddies generated by form-change or cross section shape will persist downstream and will make the downstream reach apparently 'rough' . The size of eddies alone does not measure the rate of energy dissipation. The number of eddies is equally significant.
- This invention relates to the fact, that the energy
- dissipation can be made with a controlled change on a cross section, and therefore the energy is dissipated equal efficiently with various discharges and flow velocities, and always without big problems with the sedimentation or erosion. And therefore the bed load transportation can also be kept in balance in most of the flow situations.
- overflow dams are used, higher heads are needed to reach the same dissipation efficiency at high flows, and this can't of course be accepted because of the prevented fish migration.
- Such a structure for controlling the energy of liquid flow is characterized by a particular relation between head, depth, width and total flow at every cross section
- FIG. a plan of the structure
- FIG 2. a cross-section through the structure of Fig. 1; and FIG 3. a plan from an example of the principles of a
- Flow direction is from left to right.
- the principles are explained by three example calculations, which simultaneously show that there is always one unique solution to be found with each given data.
- the minimum length (L) for various heads and energy gradients must be found with detailed model tests.
- the impulse force of these vortexes must also be calculated or studied and be added to the loads of the structures and river bed. If the riverbed material is not stabile enough to carry this load, extra supporting structures 8 must be added.
- Example I but with a 33 % increase in flow.
- the water level 6 raises from 1.37 m to 1.65 m, that is 0.28 m, but in reality the raise will be even smaller because the water would flow with higher speed when the design is constructed as in example I.
- the water depth on the beginning of the drop will be as calculated from U.S. Pat 3,593,527, equation (3), and is 1.37 m.
- the flow velocity at the same point is to be
- the water depth on the beginning of drop is 1.65 m.
- the flow velocity at the same point is 4.0 m/s.
- the water must be dropped by 0.8 m so the velocity at the end of the drop must be 5.7 m/s and the water depth must be 3.25 m, and then again it can be calculated that (B) must be 5.44 m at the end of the drop.
- the discharge (Q) is at
- hydroelectric device e.g. a turbine
- Froude number is 1.2, the max. water depth is -0.57 m, and 6 3
- the main phase is the structure which builds these vertical vortexes. It can be dimensioned with only one particular flow. Flows smaller than this must be controlled with turbines and/or fish ladders, but it is also possible to build two or even more differently dimensioned structures side by side as a matrix to achieve this goal. If this structure itself is not optimized to the flooding situation, a part of the energy of this high flow can be controlled with a planned hydraulic jump and/or a combined drop
- the structure can give a more balanced bed load
- the structure is build up as a matrix of two or even more such structures set up side by side, and/or are overlapped, but only dimensioned differently and/or built to different heights to yield a wider ranging flow control than can be attained by only one of such a structure .
- the structure can be dimensioned so that the highest occurring flows build up a hydraulic jump after the structure, i.e. another phase of energy dissipation.
- the structure's height can be dimensioned so that if a greater than dimensioned flow occurs, the structure will function also as a conventional overflow weir providing still another phase of energy dissipation.
- a structure, wherein also the low flows where these vortexes can't function any more can be kept in
- the trash rack of turbines are taking the water near the water surface in normal flow conditions, and these racks are flushed with a relatively high water amount preventing the sediment and thus also the riverbed-life to be sucked into the turbines.
- the wall defining the water passage may be
- the wall defining the passage may be partly
- the edges for provoking the vertical vortices may be of a large range of angles. Most effectively, however, are angles of at least 90°. With this angles, and in particular with sharp angles, the vortices can build up more easily, in particular may extend on the back side of the wall. Sharper angles create more - In
- a very effective means is a blade like element, e.g. a steel blade, so that the angle even approaches 180°.
- h height of structure above the bed.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Marine Sciences & Fisheries (AREA)
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
- Revetment (AREA)
Abstract
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201380013750.6A CN104204358A (en) | 2012-03-14 | 2013-03-14 | Hydraulic structure for water flow control |
EP13712129.9A EP2825705A1 (en) | 2012-03-14 | 2013-03-14 | Hydraulic structure for water flow control |
US14/383,786 US20150110559A1 (en) | 2012-03-14 | 2013-03-14 | Hydraulic structure for water flow control |
AU2013232677A AU2013232677A1 (en) | 2012-03-14 | 2013-03-14 | Hydraulic structure for water flow control |
JP2014561245A JP2015513364A (en) | 2012-03-14 | 2013-03-14 | Hydraulic structures for water flow control |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH3682012 | 2012-03-14 | ||
CH368/12 | 2012-03-14 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013134886A1 true WO2013134886A1 (en) | 2013-09-19 |
Family
ID=47996954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CH2013/000042 WO2013134886A1 (en) | 2012-03-14 | 2013-03-14 | Hydraulic structure for water flow control |
Country Status (6)
Country | Link |
---|---|
US (1) | US20150110559A1 (en) |
EP (1) | EP2825705A1 (en) |
JP (1) | JP2015513364A (en) |
CN (1) | CN104204358A (en) |
AU (1) | AU2013232677A1 (en) |
WO (1) | WO2013134886A1 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774625A (en) * | 2014-01-22 | 2014-05-07 | 河海大学 | Tool ridge type narrow seam energy dissipater and energy dissipation method |
CN104404925A (en) * | 2014-10-08 | 2015-03-11 | 四川大学 | Porous inflow hedging energy dissipation structure of hydraulic structure |
RU2615337C1 (en) * | 2016-02-09 | 2017-04-04 | Михаил Иванович Голубенко | Flow mode control method in the opened channel |
CN108385603A (en) * | 2018-04-19 | 2018-08-10 | 长江水利委员会长江科学院 | Aerated flow slit-type energy dissipation hydraulic model test device and method |
CN109295938A (en) * | 2018-10-26 | 2019-02-01 | 杨凌职业技术学院 | A kind of flood discharging tunnel energy dissipating corrosion inhibitor structure |
CN110499719A (en) * | 2019-08-28 | 2019-11-26 | 四川建筑职业技术学院 | A kind of mud-rock flow erosion control rib sill structure and system |
RU2708529C1 (en) * | 2019-04-18 | 2019-12-09 | Михаил Иванович Голубенко | Water intake unit of irrigation system |
RU2736132C1 (en) * | 2020-05-12 | 2020-11-11 | Михаил Иванович Голубенко | Method of controlling flow mode in an open channel |
RU2748063C1 (en) * | 2020-10-09 | 2021-05-19 | Михаил Иванович Голубенко | Open channel flow control method |
RU2807696C2 (en) * | 2022-01-12 | 2023-11-21 | Вадим Михайлович Голубенко | Method for controlling flow mode in an open channel |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106351780A (en) * | 2015-05-06 | 2017-01-25 | 苏州汇诚智造工业设计有限公司 | Construction method of gear transmission water flow energy dissipation, power generation and sand setting device |
KR101872382B1 (en) * | 2017-02-20 | 2018-08-02 | 한국건설기술연구원 | Removal System for Ecological River Stream |
CN107938623A (en) * | 2017-12-28 | 2018-04-20 | 中国电建集团成都勘测设计研究院有限公司 | Water drainage energy dissipation system for mountain area ditch engineering of water treatment |
CN110032818B (en) * | 2019-04-19 | 2023-06-16 | 九易庄宸科技(集团)股份有限公司 | Borderless swimming pool water drop flow calculation method |
CN110268892B (en) * | 2019-06-28 | 2021-10-29 | 中国科学院烟台海岸带研究所 | Method for comprehensively treating spartina alterniflora by terrace type surrounding flooding and mowing |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1040576A (en) * | 1950-06-05 | 1953-10-16 | Neyrpic Ets | Improvements to the processes used for the correction of watercourses or the protection of beaches |
US3593527A (en) | 1969-04-21 | 1971-07-20 | Univ Queensland | Water flow control |
US3667234A (en) * | 1970-02-10 | 1972-06-06 | Tecnico Inc | Reducing and retarding volume and velocity of a liquid free-flowing in one direction |
US5857805A (en) * | 1994-05-05 | 1999-01-12 | Chappell; Derrald H. | Flow modification apparatus, system, and method |
US20080101867A1 (en) * | 2006-10-26 | 2008-05-01 | Mclaughlin Richard Evan | Water Diversion System And Method Having Hydraulic Chute, Screen Assembly And Wedge Wire Screen |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US545602A (en) * | 1895-09-03 | Device for cleaning out channels | ||
US4165467A (en) * | 1977-04-29 | 1979-08-21 | Atencio Francisco J G | Dam with transformable hydroelectric station |
JPS58218506A (en) * | 1982-06-12 | 1983-12-19 | Hokuriku Electric Power Co Inc:The | Reduction of flow speed of effluent water and block therefor |
SE501257C2 (en) * | 1993-05-26 | 1994-12-19 | Vattenfall Utveckling Ab | Device at bridge pillars |
NO300884B1 (en) * | 1995-12-06 | 1997-08-11 | Fred Olsen | Wave dampers for floating structures |
US7456514B2 (en) * | 2005-09-22 | 2008-11-25 | Verdant Power | Kinetic hydropower generation from slow-moving water flows |
US8303213B2 (en) * | 2010-02-04 | 2012-11-06 | American Wave Machines, Inc. | Wave generating apparatus and method |
JP3162086U (en) * | 2010-06-08 | 2010-08-19 | 株式会社新笠戸ドック | Assembled fishway |
CN101851911B (en) * | 2010-06-13 | 2011-11-30 | 四川大学 | Rectification facility arranged at tail end of outlet of dam spillway short-open-flow section |
CN102787589A (en) * | 2012-08-24 | 2012-11-21 | 上海市城市建设设计研究总院 | Energy dissipater in wading engineering |
-
2013
- 2013-03-14 US US14/383,786 patent/US20150110559A1/en not_active Abandoned
- 2013-03-14 AU AU2013232677A patent/AU2013232677A1/en not_active Abandoned
- 2013-03-14 WO PCT/CH2013/000042 patent/WO2013134886A1/en active Application Filing
- 2013-03-14 CN CN201380013750.6A patent/CN104204358A/en active Pending
- 2013-03-14 JP JP2014561245A patent/JP2015513364A/en active Pending
- 2013-03-14 EP EP13712129.9A patent/EP2825705A1/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1040576A (en) * | 1950-06-05 | 1953-10-16 | Neyrpic Ets | Improvements to the processes used for the correction of watercourses or the protection of beaches |
US3593527A (en) | 1969-04-21 | 1971-07-20 | Univ Queensland | Water flow control |
US3667234A (en) * | 1970-02-10 | 1972-06-06 | Tecnico Inc | Reducing and retarding volume and velocity of a liquid free-flowing in one direction |
US5857805A (en) * | 1994-05-05 | 1999-01-12 | Chappell; Derrald H. | Flow modification apparatus, system, and method |
US20080101867A1 (en) * | 2006-10-26 | 2008-05-01 | Mclaughlin Richard Evan | Water Diversion System And Method Having Hydraulic Chute, Screen Assembly And Wedge Wire Screen |
Non-Patent Citations (2)
Title |
---|
GORDON MCKAY: "Introduction", DESIGN OF MINIMUM ENERGY CULVERTS, October 1971 (1971-10-01) |
See also references of EP2825705A1 |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774625B (en) * | 2014-01-22 | 2015-11-18 | 河海大学 | Tooth bank formula slit-type energy dissipation and energy dissipating method |
CN103774625A (en) * | 2014-01-22 | 2014-05-07 | 河海大学 | Tool ridge type narrow seam energy dissipater and energy dissipation method |
CN104404925A (en) * | 2014-10-08 | 2015-03-11 | 四川大学 | Porous inflow hedging energy dissipation structure of hydraulic structure |
CN104404925B (en) * | 2014-10-08 | 2016-08-17 | 四川大学 | Hydraulic structure porous becomes a mandarin colliding energy dissipation structure |
RU2615337C1 (en) * | 2016-02-09 | 2017-04-04 | Михаил Иванович Голубенко | Flow mode control method in the opened channel |
CN108385603B (en) * | 2018-04-19 | 2024-01-19 | 长江水利委员会长江科学院 | Hydraulic model test device and method for aerated water flow narrow slit energy dissipater |
CN108385603A (en) * | 2018-04-19 | 2018-08-10 | 长江水利委员会长江科学院 | Aerated flow slit-type energy dissipation hydraulic model test device and method |
CN109295938A (en) * | 2018-10-26 | 2019-02-01 | 杨凌职业技术学院 | A kind of flood discharging tunnel energy dissipating corrosion inhibitor structure |
RU2708529C1 (en) * | 2019-04-18 | 2019-12-09 | Михаил Иванович Голубенко | Water intake unit of irrigation system |
CN110499719A (en) * | 2019-08-28 | 2019-11-26 | 四川建筑职业技术学院 | A kind of mud-rock flow erosion control rib sill structure and system |
RU2736132C1 (en) * | 2020-05-12 | 2020-11-11 | Михаил Иванович Голубенко | Method of controlling flow mode in an open channel |
RU2748063C1 (en) * | 2020-10-09 | 2021-05-19 | Михаил Иванович Голубенко | Open channel flow control method |
RU2807696C2 (en) * | 2022-01-12 | 2023-11-21 | Вадим Михайлович Голубенко | Method for controlling flow mode in an open channel |
Also Published As
Publication number | Publication date |
---|---|
JP2015513364A (en) | 2015-05-11 |
EP2825705A1 (en) | 2015-01-21 |
US20150110559A1 (en) | 2015-04-23 |
AU2013232677A1 (en) | 2014-09-25 |
CN104204358A (en) | 2014-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20150110559A1 (en) | Hydraulic structure for water flow control | |
Hager | Energy Dissipators: IAHR Hydraulic Structures Design Manuals 9 | |
Chanson | Hydraulics of skimming flows over stepped channels and spillways | |
Oertel | Processes of sediment exchange between tidal inlets, ebb deltas and barrier islands | |
CN105350502B (en) | Improve non-pressure tunnel to have to go to the toilet the method for curved segment high-velocity flow fluidised form | |
Noui et al. | Study of optimization of the Piano Key Weir | |
Erpicum et al. | Piano Key Weir design study at Raviege dam | |
André et al. | Energy dissipation and hydrodynamic forces of aerated flow over macro-roughness linings for overtopped embankment dams | |
Chanson | Characteristics of undular hydraulic jumps | |
Razzak Al-Husseini | Experimental study of increasing energy dissipation on stepped spillway | |
Eloubaidy et al. | Dissipation of hydraulic energy by curved baffle blocks | |
Tominaga et al. | Combination of permeable and impermeable spur dikes to reduce local scour and to create diverse river bed | |
Kashkoli et al. | Simultaneous study effect of guide pier and stepped chamber on hydraulic behavior of morning glory spill way | |
JP2005220610A (en) | Continuous flow type slit sand control dam | |
Lempérière et al. | General comments on labyrinth and Piano Keys Weirs–The future | |
Al-Shukur et al. | Flow characteristics and energy dissipation losses in different configurations of steps of stepped spillway | |
Al-Husseini | A Novel experimental work and study on flow and energy dissipation over stepped spillways | |
JP3185169B2 (en) | Discharge structure | |
Manso et al. | Improvement of embankment dam safety against overflow by downstream face concrete macro-roughness linings | |
Feleder | Hydraulics of selected hydraulic structures | |
Gharibvand et al. | An experimental study into hydraulic coefficient in trapezoidal labyrinth weir and piano key weir | |
Dizabadi | Hydraulic and dynamic assessment of triangular labyrinth weirs and wier-pool type fishways | |
Abeyratne et al. | THREE-DIMENSIONAL MODELLING OF FLOW IN A WEIR AND POOL TYPE FISHWAY WITH ORIFICES FOR DESIGN OPTIMZATION | |
JP2008008008A (en) | Water discharging facility | |
Joolaeian et al. | Assessment of scour phenomena in the weirs downstream and ways to retrofit and reduce scour |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13712129 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14383786 Country of ref document: US |
|
ENP | Entry into the national phase |
Ref document number: 2014561245 Country of ref document: JP Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: IDP00201405480 Country of ref document: ID |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2013232677 Country of ref document: AU Date of ref document: 20130314 Kind code of ref document: A |
|
REEP | Request for entry into the european phase |
Ref document number: 2013712129 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2013712129 Country of ref document: EP |