WO2013028100A1 - Device for unloading cars - Google Patents

Device for unloading cars Download PDF

Info

Publication number
WO2013028100A1
WO2013028100A1 PCT/RU2012/000247 RU2012000247W WO2013028100A1 WO 2013028100 A1 WO2013028100 A1 WO 2013028100A1 RU 2012000247 W RU2012000247 W RU 2012000247W WO 2013028100 A1 WO2013028100 A1 WO 2013028100A1
Authority
WO
WIPO (PCT)
Prior art keywords
additional
walls
wall
unloading
stops
Prior art date
Application number
PCT/RU2012/000247
Other languages
French (fr)
Russian (ru)
Inventor
Юрий Николаевич СЛЕПКО
Original Assignee
Slepko Yurij Nikolaevich
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Slepko Yurij Nikolaevich filed Critical Slepko Yurij Nikolaevich
Publication of WO2013028100A1 publication Critical patent/WO2013028100A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles
    • B65G67/24Unloading land vehicles

Definitions

  • the transshipment complex for wagons comprises a vehicle with a receiving tank and a pneumatic conveying system, including a pipeline with an intake pipe, and at least one means for attaching the intake pipe to the car.
  • the means for attaching the intake pipe to the car is made with the possibility of docking with the unloading hatch of the car and fixing the lid of the latter.
  • the means for attaching the intake pipe to the carriage includes a frame mounted on the discharge hatch of the carriage connected to a duct having a pipe configured to connect to the intake pipe.
  • a disadvantage of the known technical solution is low productivity.
  • a device for unloading cement from wagons comprises a hopper with a grate and estrus mounted under the railway tracks.
  • the chute is mounted on a trolley in a rectangular hole in it, with the possibility of movement along the axis of the railway track.
  • the chute is made of two half-holes articulated with a trolley.
  • Half-holes are made of a cross-member and of two side walls pivotally interconnected with the possibility of rotation by 90 °.
  • the side walls are equipped with cardan joints and are connected to levers that are pivotally connected to the beam and placed between an internal stop restricting rotation to 90 ° and an external stop allowing rotation until the wall is brought into horizontal position when the estrus is open.
  • Rocker arms are connected to pneumatic cylinders.
  • the trolley is fixed shutters with the ability to move along the guide corners together with a trolley.
  • the estrus is provided with a lid to close the hole formed after the estrus is brought into the open position.
  • the disadvantages of the prototype are the complexity and duration of installation and dismantling of the device.
  • the purpose of the proposed utility model is to reduce the complexity and time of installation and dismantling of the device, as well as reducing unloading time.
  • the goal is achieved due to the fact that in a device for unloading wagons containing a bottom, two side walls, two first additional walls, two second additional walls, four means for connecting the walls, the first stops and second stops, two side walls are attached to the bottom from its opposite edges with an inclination in opposite directions, while the bottom, two side walls, the first two additional walls are part of the elements forming the tank, and the tank is equipped with a loading hole, you two first fasteners and two second fasteners are filled, and the first fastener is formed by two first stops installed with a gap relative to each other, and attached to the bottom, the second fastener is formed by two second stops installed with a gap relative to each other and attached each to each side wall, each first additional wall is fixed between the first stops and second stops respectively of the first fastening element and the second fastening closest to each other element, each second additional wall is installed between the first additional walls and connected to each of them by means of connecting the walls, while it is located as a continuation of the
  • the drawing shows: sleeper 1, connecting element 2, rail 3, first additional wall 4, discharge hole 5, bottom 6, first fastening element 7, side wall 8, second fastening element 9, second additional wall 10, additional pipe 11, restrictive wall 12, the second device of the overlap 13, the first device of the overlap 14, the main material pipe 15.
  • the main elements of the device are the bottom 6 with side walls 8, the first additional walls 4, the second additional walls 10, the main material pipe 15, as well as the scraper conveyor or screw or belt conveyor or vacuum extraction device, equipped with a restriction wall 12 in the particular case with the first overlap device 14 and an additional pipe 11 with a second overlap device 13.
  • Cross tie 1 is an element of the railway track in the form of a massive wooden or reinforced concrete beam, on which the rails are fixed.
  • the sleepers 1 are transverse to the rails 3, i.e. perpendicular to them or in a position close to perpendicular. Sleepers 1 is located at some distance from each other, providing sufficient strength of the railroad tracks.
  • Rail 3 is an element of the railway track in the form of a narrow steel bar along which the train wheel rolls directly.
  • the rails 3 are parallel to each other with the formation of two extended guides for the wheels of trains.
  • the rails 3 are attached to the sleepers 1 using the connecting elements 2.
  • the connecting elements 2 are made with the possibility of fastening the rails 3 to the sleepers 1.
  • the bottom 6 is made so that the material (cargo) located on the bottom 6 can get into the discharge opening 5, for example, under the influence of the weight of the material (cargo) itself, while the bottom 6 is made inclined from its edges to the discharge opening 5.
  • the bottom 6 can be made in the form of a rectangular plate, while getting material (cargo) in the discharge opening 5 is provided by tightening it under the influence of air flow.
  • One of the sizes of the bottom 6 is made with the possibility of placing the bottom 6 between the rails 3 of the railway track.
  • the size of the bottom 6 in the direction perpendicular to the specified (i.e., in the direction of the axis of the railway tracks and rail 3) can be made of considerable length, for the possibility of serving several cars at the same time, or a length sufficient to serve one car with simultaneous emptying through all the lower hatches, or the length of the overlapping coverage area of only one pair of hatches of the car, with a small margin of error in the installation of the car.
  • the bottom 6 may be made integral or consisting of several parts. In each day 6, a discharge opening 5 is made.
  • discharge holes 5 in the bottom 6 can be made.
  • the discharge opening 5 is provided with a net to prevent material (cargo) or foreign impurities from entering the boundary wall 12 of the clods, which can damage any part of the device.
  • the bottom 6 along two opposite edges facing the rails 3 is connected to the side walls 8.
  • the bottom 6 along at least two other edges, as well as parallel to them at some distance from each other, is equipped with the first fastening elements 7 and the second fastening elements 9.
  • the side walls 8 are made along the entire length of the bottom 6.
  • the side walls 8 are located at an angle to the bottom 6, in the particular case of more than 90 °.
  • the height of the side walls 8 is made with the possibility of unhindered passage of trains of the railway section on which this device is installed.
  • the side walls 8 can be made separately from the bottom 6 and connected to it in any way possible, for example by means of a welded joint, bolt joint or any other, or the side walls 8 and the bottom 6 can be made integral.
  • the first fastening element 7 and the second fastening element 9 are configured to jointly hold the first additional wall 4 when it is installed in the device and to be released when it is removed from the device.
  • the first fastening element 7 and the second fastening element 9 are made with the possibility of installing the first additional wall 4 perpendicular to the bottom 6 or at an angle to the bottom 6 from one side wall 8 to the other side wall 8.
  • One bottom 6 may be provided with at least two first fasteners 7 and two second fasteners 9 located at the edges of the bottom 6, perpendicular to its connection with side walls 8.
  • the bottom 6, having a considerable length, is equipped with more than two first fasteners 7 and two second fasteners 9 located at the same distance from each other along the length of the bottom 6 between its edges, are perpendicular compound 6 and the bottom with the side walls 8.
  • first additional wall 4 is set in the next to each other the first fastening elements 7 and second 9 fastening elements.
  • the first fastener 7 is configured to hold the first additional wall 4 at the bottom 6.
  • the first fastener 7 is made up of two first stops.
  • the first stops are located with a gap relative to each other.
  • the first fastening element 7 is attached to the bottom 6.
  • the first stops in a particular case, are made in the form of angles, i.e. in the form of two shelves (rectangular plates), interconnected perpendicular to each other.
  • Each first stop is attached to the bottom 6 of one of the shelves, while its other shelf faces the other first stop of this first fastening element 7 and is parallel to the corresponding shelf of the other first stop.
  • parallel shelves are located at some distance from each other (with a gap) equal to the thickness of the first additional wall 4.
  • Each first stop of the first fastener 7 is located on a shelf perpendicular to the bottom 6, in the same plane as one of the second stops of the second fastener 9.
  • the second fastener 9 is configured to hold the first additional wall 4 at a distance (some height) from the bottom 6. Each second stop is attached to each side wall 8 at a certain distance from the bottom 6.
  • the second fastener 9 is made up of two second stops. The second unit is located with a gap relative to each other. Every second emphasis of the second fastening element 9 in a particular case is made in the form of a U-shaped element fixed by opposite ends to the side walls. In the particular case of the second stops are perpendicular to the bottom 6. The ends of the second stops made U-shaped can be attached to the bottom 6 and act as the first stops. Moreover, every second emphasis of the second fastening element 9 is located in the same plane with the corresponding shelf of the corresponding first stop of the first fastener 7. The second stops of the second fastener 9 are located at a certain distance (with a gap) from each other, approximately equal to the thickness of the first additional wall 4.
  • the first additional wall 4 is made in the form of a plate, in the particular case quadrangular.
  • the first additional wall 4 is made to limit the scattering of material (cargo) after installing the first additional wall 4 inside the device between the corresponding parts of the first fastening element 7 and the second fastening element 9, as well as providing the ability to remove the first additional wall 4 of the device.
  • the first additional wall 4 is made with the possibility of the formation of a cavity (capacity) between the bottom 6 with two side walls 8 and two first additional walls 4.
  • one of the edges of the first additional wall 4 has a size equal to the length of the bottom 6 between the side walls 8, and two the edges adjacent to the specified edge are located at angles to it equal to the angles between the bottom 6 and the side walls 8.
  • the height of the first additional wall 4 from the edge facing the bottom 5 to the opposite edge in the particular case is greater than in a honeycomb of the side walls 8.
  • the height of the first additional wall 4 is approximately equal to the height of the second additional wall 4 with the side wall 8 after installing the second additional wall 4 as an extension of the side wall 8.
  • the first additional wall 4 is made with the possibility of maintaining the relative position of the second additional walls 10 and preventing them from falling out of the device under the action of a mass of material (cargo) filling the cavity between the bottom 6, side walls 8, the first additional wall and 4 and the second additional walls 10.
  • the first additional wall 4 can be equipped with means for connecting the walls or means of hooking made in the form of hooks and located near two adjacent corners of the first additional wall 4 that are farthest from the bottom 6 and facing side of the second additional walls 10.
  • the second additional wall 10 is made in the form of a plate, in the particular case of a quadrangular.
  • the second additional wall 10 is made with the possibility of limiting the scattering of material (cargo) from the side of the rail 3 above the height of the side wall 8, providing the possibility of increasing the height of the side walls 8, as well as its installation between the first additional walls 4.
  • the second additional wall 10 is made with the possibility of fastening it to the first additional walls 4 and / or side walls 8.
  • the second additional walls 10 are equipped with means for connecting the walls (meshing means) made in the form of hooks and located near two adjacent corners of the second additional wall 10, farthest from the bottom 6 and facing the first additional walls 4.
  • each of the second additional wall 10 i.e., the size of the second additional wall 10 in the direction perpendicular to the bottom 6 is made larger than the distance from the edge of the corresponding first additional wall 4, for which the second additional wall 10 is hooked, to the nearest edge of the corresponding side wall 8.
  • the edge of the second additional wall 10 facing to the bottom 6 rests on the corresponding side wall 8 from the side of the cavity (capacity) formed between the bottom 6, two side walls 8, two first additional walls 4 and two second additional walls 10.
  • the first additional walls 4 and the second additional walls 10 formed a loading hole designed to fill this tank with cargo from the car.
  • the device is equipped with a scraper conveyor or screw or belt conveyor or vacuum extraction device designed to move the material (cargo) from the discharge opening 5 to the main material pipe 15 or receiving tank.
  • a vacuum sampling device is, for example, a pipeline with an air discharge device, for example a pump, in which under the influence of the air flow resulting from the pressure drop, material (cargo) is pumped from the discharge opening 5 to the main material wire 15.
  • a scraper conveyor or screw or a conveyor belt or vacuum pick-up device is installed with the possibility of material (cargo) falling on it from the discharge opening 5.
  • Scraper conveyor or auger or flax intramural conveyor or a vacuum sampling device provided with boundary wall 12.
  • the boundary wall 12 is made with the possibility of limiting the scattering of material (cargo), as well as the formation and limitation of the trajectory of movement of the material (cargo).
  • a pipe can be used, inside which a screw, a conveyor belt, a scraper conveyor are placed, or to which a pump or aeration device is connected to fluidize the material and form the desired ratio of air and material to move the material (load).
  • the conveyor belt itself can be used, or, for example, a tray or a pallet can be used.
  • the boundary wall 12 in the form of a pipe is connected at one end to the bottom 6 along the perimeter of the restrictive hole 12, and the opposite end to the main material pipe 15.
  • a first overlap device 14 is installed on it.
  • the first overlap device 14 is configured to allow the material (cargo) to be blocked from any discharge opening 5 to the main material pipe 15.
  • the additional pipe 11 is designed to saturate the air of the material (cargo) entering the boundary wall 12 and the formation of a fluidized bed of bulk material (cargo). Additional pipe 11 is intended for use in conjunction with a vacuum sampling device.
  • the additional pipe 11 is connected at one end to the restriction wall (pipe) 12 from the side of the end of the restriction wall (pipe) 12 connected to the discharge hole 5.
  • the additional pipe 11 is provided with a second shutoff device 13.
  • the second shutoff device 13 is configured to control the amount of air entering the additional pipe 11 and the boundary wall 12 by partially or completely overlapping the cross section of the additional pipe 11.
  • the main material pipe 15 is a material pipe connecting all scraper conveyors or screws or belt conveyors or vacuum extraction devices, as well as their bounding walls 12 and moving material (cargo) from them to the receiving container.
  • the main material pipe 15 can be made similar to the means of movement material (cargo), for example in the form of a scraper conveyor or screw or conveyor belt or vacuum extraction device with a boundary wall 12.
  • the utility model is implemented as follows.
  • the bottom 6 is made, side walls 8, first additional walls 4, second additional walls 10, first fasteners 7, second fasteners 9, main material pipe 15, scraper conveyor or auger or belt conveyor or vacuum extraction device with a restrictive wall 12, and if necessary, the first overlap device 14 and an additional pipe 11 with a second overlap device 13.
  • a discharge opening 5 is made, which is provided with a mesh.
  • the side walls 8, the first fasteners 7 and the second fasteners 9 are attached to the bottom 6 in the manner described above, for example by means of a welded joint.
  • a scraper conveyor or auger or a conveyor belt or a vacuum sampling device are placed in the boundary wall 12, for example, in the form of a pipe. If necessary, a hole is made in the inter-sleeper space (gravel or soil is loosened).
  • a bottom 6 is installed with the side walls 8.
  • the side walls 8 are located on the side of the rail 3, face the opposite to the sleepers 1 and limit the scattering of material (cargo) towards the rail 3.
  • the height of the side walls 8 is made with the possibility of unhindered movement of railway transport on rails 3.
  • one end of the scraper conveyor or screw or conveyor belt or vacuum extraction device and restrictive wall 12 is connected to the discharge opening 5 or placed under the discharge opening 5 with the possibility of material (cargo) getting on them.
  • the opposite end of the scraper conveyor or screw or belt conveyor or vacuum extraction device and the restriction wall 12 are connected or placed with the possibility of transferring the material (cargo) to the main material to the wire 15.
  • the main material pipe 15 is installed to allow movement of the material (cargo) from all installed scraper conveyors or screws or conveyor belts or vacuum sampling devices connected to the main pipe 15, to the receiving tank.
  • the first overlap device 14 is installed on the boundary wall 12.
  • an additional pipe 11 is placed under the rails 3 under the rails 3.
  • One end of the additional pipe 11 is connected to the restrictive wall 12 near the discharge opening 5.
  • the second device of the overlap 13 is connected to the compress pv.
  • a wagon with bottom discharge is fed to the installation site of the device.
  • the unloading hatches of the car are placed above the bottom 6 with unloading holes 5.
  • the first additional walls 4 are held by the first fastening elements 7 and the second fastening elements 9.
  • the second additional walls 10 are held, in the particular case by mutual engagement of means with unity walls formed on the first additional wall 4 and wall means a compound formed on the second additional wall 10 and also due to the abutment edges corresponding to the second additional wall 10 to the side wall 8.
  • the corresponding the first overlap devices 14 overlap the respective restriction walls 12 to restrict the passage of air to the idle, i.e. along the path with the least resistance. Also, the first overlapping devices 14 are used when impurities get into the material (cargo) of one of the cars, to block the ingress of contaminated material (cargo) into the receiving tank and the main pipe 15. Material (cargo) enters the main pipe 15 through which it moves to the receiving tank.
  • mechanical vibrators can be used that are mounted on the walls or bottom 6. These devices are used to accelerate and improve the spillage of the material.
  • the implementation of the device from the bottom with a discharge opening, side walls, first additional walls, second additional walls, scraper conveyor or auger or belt conveyor or vacuum extraction device reduces the complexity and time of installation and dismantling, and as a result, increases the overall performance of the process unloading the device at the expense of placing the container on the sleepers between the rails, and the scraper conveyor or screw or belt conveyor or vacuum extraction device under rails.

Landscapes

  • Engineering & Computer Science (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Loading Or Unloading Of Vehicles (AREA)

Abstract

The invention relates to unloading means for freight cars with bottom unloading elements. The device for unloading cars comprises a container with a bottom (6), two side walls (8) which are connected to the bottom at opposite edges thereof and are inclined in opposite directions, two first additional walls (4), two second additional walls (10), four wall connection means, and a loading opening. Fastening elements are connected to the bottom and to each side wall, each of said fastening elements being formed by two supports mounted with a gap with respect to one another. Each first additional wall is fixed between the supports of the fastening elements. Each second additional wall is mounted between the first additional walls, is connected to each of said first additional walls with the aid of the wall connection means, and is arranged as a continuation of the side wall corresponding thereto. The bottom is provided with an unloading opening (5), and either a screw conveyor or a belt conveyor or a drag conveyor or a vacuum evacuation device is led up to said unloading opening. The invention reduces the labour intensity involved in and the time taken for installing and dismantling the device.

Description

Устройство для разгрузки вагонов  Device for unloading wagons
Область техники Полезная модель относится к разгрузочным средствам для грузовых вагонов с донными разгрузочными элементами The technical field The utility model relates to unloading means for freight cars with bottom unloading elements
Предшествующий уровень техники Известен перегрузочный комплекс для вагонов (патент РФ N°97120).BACKGROUND OF THE INVENTION A transshipment complex for wagons is known (RF patent N ° 97120).
Перегрузочный комплекс для вагонов содержит транспортное средство с приемной емкостью и системой пневмотранспортирования, включающей в себя трубопровод с заборным патрубком, и по меньшей мере, одно средство для крепления заборного патрубка к вагону. Средство для крепления заборного патрубка к вагону выполнено с возможностью стыковки с разгрузочным люком вагона и закрепления крышкой последнего. Средство для крепления заборного патрубка к вагону включает в себя раму, устанавливаемую на разгрузочный люк вагона, соединенную с коробом, имеющим патрубок, выполненный с возможностью соединения с заборным патрубком. The transshipment complex for wagons comprises a vehicle with a receiving tank and a pneumatic conveying system, including a pipeline with an intake pipe, and at least one means for attaching the intake pipe to the car. The means for attaching the intake pipe to the car is made with the possibility of docking with the unloading hatch of the car and fixing the lid of the latter. The means for attaching the intake pipe to the carriage includes a frame mounted on the discharge hatch of the carriage connected to a duct having a pipe configured to connect to the intake pipe.
Недостатком известного технического решения является низкая производительность.  A disadvantage of the known technical solution is low productivity.
Наиболее близким техническим решением (прототип) является устройство для разгрузки цемента из вагона (патент РФ N°2298517). Устройство для разгрузки цемента из вагонов содержит смонтированный под железнодорожными путями бункер с решеткой и течку. Течка смонтирована на тележке в имеющемся в ней прямоугольном отверстии, с возможностью передвижения вдоль оси железнодорожного пути. Течка выполнена из двух полутечек, шарнирно соединенных с тележкой. Полутечки выполнены из поперечины и из двух боковых стенок, шарнирно соединенных между собой с возможностью поворота на 90°. Боковые стенки снабжены карданными шарнирами и соединены с рычагами, которые шарнирно соединены с коромыслом и размещены между внутренним упором, ограничивающим поворот до 90°, и наружным упором, допускающим поворот до приведения стенки в горизонтальное положение при раскрытом положении течки. Коромысла соединены с пневмоцилиндрами. К тележке закреплены заслонки с возможностью передвижения по направляющим уголкам вместе с тележкой. Течка снабжена крышкой для закрытия отверстия, образующегося после приведения течки в раскрытое положение. The closest technical solution (prototype) is a device for unloading cement from a car (RF patent N ° 2298517). A device for unloading cement from wagons comprises a hopper with a grate and estrus mounted under the railway tracks. The chute is mounted on a trolley in a rectangular hole in it, with the possibility of movement along the axis of the railway track. The chute is made of two half-holes articulated with a trolley. Half-holes are made of a cross-member and of two side walls pivotally interconnected with the possibility of rotation by 90 °. The side walls are equipped with cardan joints and are connected to levers that are pivotally connected to the beam and placed between an internal stop restricting rotation to 90 ° and an external stop allowing rotation until the wall is brought into horizontal position when the estrus is open. Rocker arms are connected to pneumatic cylinders. The trolley is fixed shutters with the ability to move along the guide corners together with a trolley. The estrus is provided with a lid to close the hole formed after the estrus is brought into the open position.
Недостатками прототипа являются трудоёмкость и продолжительность монтажа и демонтажа устройства.  The disadvantages of the prototype are the complexity and duration of installation and dismantling of the device.
Целью предлагаемой полезной модели является уменьшение трудоёмкости и времени монтажа и демонтажа устройства, а также сокращение времени разгрузки.  The purpose of the proposed utility model is to reduce the complexity and time of installation and dismantling of the device, as well as reducing unloading time.
Раскрытие изобретения Поставленная цель достигается за счёт того, что в устройстве для разгрузки вагонов, содержащем дно, две боковые стенки, две первые дополнительные стенки, две вторые дополнительные стенки, четыре средства соединения стенок, первые упоры и вторые упоры, две боковые стенки присоединены ко дну с противоположных его краёв с наклоном в противоположные стороны, при этом дно, две боковые стенки, две первые дополнительные стенки входят в состав элементов, образующих ёмкость, причём ёмкость снабжена загрузочным отверстием, выполнены два первых крепёжных элемента и два вторых крепёжных элемента, причём первый крепёжный элемент образован двумя первыми упорами, установленными с зазором друг относительно друга, и присоединён ко дну, второй крепёжный элемент образован двумя вторыми упорами, установленными с зазором друг относительно друга и прикреплёнными каждый к каждой боковой стенке, каждая первая дополнительная стенка закреплена между первыми упорами и вторыми упорами соответственно ближайших друг к другу первого крепёжного элемента и второго крепёжного элемента, каждая вторая дополнительная стенка установлена между первыми дополнительными стенками и соединена с каждой из них при помощи средства соединения стенок, при этом она расположена как продолжение соответствующей ей боковой стенки, вторые дополнительные стенки входят в состав элементов, образующих ёмкость, загрузочное отверстие образовано соответствующими краями двух первых дополнительных стенок и двух вторы дополнительных стенок в дне выполнено разгрузочное отверстие к которому подведено или шнековое устройство, или ленточный конвейер, или скребковый конвейер, или устройство вакуумного отбора. SUMMARY OF THE INVENTION The goal is achieved due to the fact that in a device for unloading wagons containing a bottom, two side walls, two first additional walls, two second additional walls, four means for connecting the walls, the first stops and second stops, two side walls are attached to the bottom from its opposite edges with an inclination in opposite directions, while the bottom, two side walls, the first two additional walls are part of the elements forming the tank, and the tank is equipped with a loading hole, you two first fasteners and two second fasteners are filled, and the first fastener is formed by two first stops installed with a gap relative to each other, and attached to the bottom, the second fastener is formed by two second stops installed with a gap relative to each other and attached each to each side wall, each first additional wall is fixed between the first stops and second stops respectively of the first fastening element and the second fastening closest to each other element, each second additional wall is installed between the first additional walls and connected to each of them by means of connecting the walls, while it is located as a continuation of the corresponding side wall, the second additional walls are part of the elements forming the tank, the loading hole is formed by the corresponding edges two first additional walls and two second secondary walls in the bottom there is a discharge opening to which either a screw device or a tape is connected A primary conveyor, or a scraper conveyor, or a vacuum extraction device.
Краткое описание чертежей Полезная модель поясняется чертежом, на котором показан внешний вид устройства. Brief Description of the Drawings A utility model is illustrated in the drawing, which shows the appearance of the device.
Вариант осуществления изобретения An embodiment of the invention
На чертеже обозначены: шпала 1, соединительный элемент 2, рельса 3, первая дополнительная стенка 4, разгрузочное отверстие 5, дно 6, первый крепёжный элемент 7, боковая стенка 8, второй крепежный элемент 9, вторая дополнительная стенка 10, дополнительный трубопровод 11, ограничительная стенка 12, второе устройство перекрытия 13, первое устройство перекрытия 14, магистральный материалопровод 15. The drawing shows: sleeper 1, connecting element 2, rail 3, first additional wall 4, discharge hole 5, bottom 6, first fastening element 7, side wall 8, second fastening element 9, second additional wall 10, additional pipe 11, restrictive wall 12, the second device of the overlap 13, the first device of the overlap 14, the main material pipe 15.
Основными элементами устройства являются дно 6 с боковыми стенками 8, первые дополнительные стенки 4, вторые дополнительные стенки 10, магистральный материалопровод 15, а также скребковый конвейер или шнек или ленточный конвейер или устройство вакуумного отбора, снабжённые ограничительной стенкой 12 в частном случае с первым устройством перекрытия 14 и дополнительный трубопровод 11 со вторым устройством перекрытия 13.  The main elements of the device are the bottom 6 with side walls 8, the first additional walls 4, the second additional walls 10, the main material pipe 15, as well as the scraper conveyor or screw or belt conveyor or vacuum extraction device, equipped with a restriction wall 12 in the particular case with the first overlap device 14 and an additional pipe 11 with a second overlap device 13.
Шпала 1 представляет собой элемент железнодорожного пути в виде массивного деревянного или железобетонного бруса, на котором закрепляются рельсы. Шпалы 1 расположены поперечно рельсам 3, т.е. перпендикулярно им или в положении близком к перпендикулярному. Шпалы 1 расположена на некотором расстоянии друг от друга, обеспечивающем достаточную прочность железнодорожного полотна.  Cross tie 1 is an element of the railway track in the form of a massive wooden or reinforced concrete beam, on which the rails are fixed. The sleepers 1 are transverse to the rails 3, i.e. perpendicular to them or in a position close to perpendicular. Sleepers 1 is located at some distance from each other, providing sufficient strength of the railroad tracks.
Рельс 3 представляет собой элемент железнодорожного пути в виде узкого стального бруса по которому непосредственно катится колесо поезда. Рельсы 3 расположены параллельно друг другу с образованием двух протяженных направляющих для колес поездов. Рельсы 3 прикреплены к шпалам 1 при помощи соединительных элементов 2. Соединительные элементы 2 выполнены с обеспечением возможности крепления рельсов 3 к шпалам 1.  Rail 3 is an element of the railway track in the form of a narrow steel bar along which the train wheel rolls directly. The rails 3 are parallel to each other with the formation of two extended guides for the wheels of trains. The rails 3 are attached to the sleepers 1 using the connecting elements 2. The connecting elements 2 are made with the possibility of fastening the rails 3 to the sleepers 1.
Дно 6 выполнено с обеспечением возможности попадания материала (груза), расположенного на дне 6 в разгрузочное отверстие 5, например под действием веса самого материала (груза), при этом дно 6 выполнено наклонным от его краёв к разгрузочному отверстию 5. В случае воздушного транспортирования материала (груза) от разгрузочного отверстия 5 до магистрального материалопровода 15 дно 6 может быть выполнено в виде пластины прямоугольной формы, при этом попадание материала (груза) в разгрузочное отверстие 5 обеспечивается затягиванием его под действием потока воздуха. Один из размеров дна 6 выполнен с обеспечением возможности размещения дна 6 между рельсами 3 железнодорожного пути. Размер дна 6 в направлении перпендикулярном указанному (т.е. в направлении оси железнодорожных путей и рельс 3) может быть выполнен значительной протяженности, для возможности обслуживания нескольких вагонов одновременно, или длиной, достаточной для обслуживания одного вагона с одновременным опорожнением через все нижние люки, или протяженностью перекрывающей зону действия только одной пары люков вагона, с небольшим запасом на погрешность установки вагона. Дно 6 может быть выполнено цельным или состоящим из нескольких частей. В каждом дне 6 выполнено разгрузочное отверстие 5. The bottom 6 is made so that the material (cargo) located on the bottom 6 can get into the discharge opening 5, for example, under the influence of the weight of the material (cargo) itself, while the bottom 6 is made inclined from its edges to the discharge opening 5. In the case of air transportation of the material (cargo) from the discharge opening 5 to the main material pipe 15, the bottom 6 can be made in the form of a rectangular plate, while getting material (cargo) in the discharge opening 5 is provided by tightening it under the influence of air flow. One of the sizes of the bottom 6 is made with the possibility of placing the bottom 6 between the rails 3 of the railway track. The size of the bottom 6 in the direction perpendicular to the specified (i.e., in the direction of the axis of the railway tracks and rail 3) can be made of considerable length, for the possibility of serving several cars at the same time, or a length sufficient to serve one car with simultaneous emptying through all the lower hatches, or the length of the overlapping coverage area of only one pair of hatches of the car, with a small margin of error in the installation of the car. The bottom 6 may be made integral or consisting of several parts. In each day 6, a discharge opening 5 is made.
Разгрузочных отверстий 5 в дне 6 может быть выполнено несколько. Разгрузочное отверстие 5 снабжено сеткой для предотвращения попадания в ограничительную стенку 12 комьев материала (груза) или посторонних примесей, которые могут повредить какие либо части устройства. Дно 6 по двум противоположным краям, обращенным к рельсам 3, соединено с боковыми стенками 8. Дно 6 по крайней мере по двум другим краям, а также параллельно им на некотором расстоянии друг от друга снабжено первыми крепёжными элементами 7 и вторыми крепёжными элементами 9.  Several discharge holes 5 in the bottom 6 can be made. The discharge opening 5 is provided with a net to prevent material (cargo) or foreign impurities from entering the boundary wall 12 of the clods, which can damage any part of the device. The bottom 6 along two opposite edges facing the rails 3 is connected to the side walls 8. The bottom 6 along at least two other edges, as well as parallel to them at some distance from each other, is equipped with the first fastening elements 7 and the second fastening elements 9.
Боковые стенки 8 предназначены для ограничения рассыпания материала Side walls 8 are designed to limit the spillage of material
(груза) за пределы железнодорожного полотна в направлении рельс 3. Боковые стенки 8 выполнены по всей длине дна 6. Боковые стенки 8 расположены под углом к дну 6, в частном случае более 90°. Высота боковых стенок 8 выполнена с обеспечением возможности беспрепятственного прохождения поездов участка железнодорожного пути, на котором установлено данное устройство. Боковые стенки 8 могут быть выполнены отдельно от дна 6 и соединены с ним любым доступным способом, например при помощи сварного соединения, болтового соединения или любого другого, или боковые стенки 8 и дно 6 могут быть выполнены заодно. (load) outside the railway track in the direction of the rail 3. The side walls 8 are made along the entire length of the bottom 6. The side walls 8 are located at an angle to the bottom 6, in the particular case of more than 90 °. The height of the side walls 8 is made with the possibility of unhindered passage of trains of the railway section on which this device is installed. The side walls 8 can be made separately from the bottom 6 and connected to it in any way possible, for example by means of a welded joint, bolt joint or any other, or the side walls 8 and the bottom 6 can be made integral.
Первый крепёжный элемент 7 и второй крепёжный элемент 9 выполнены с обеспечением возможности совместного удержания первой дополнительной стенки 4 при её установке в устройство и её освобождения при удалении её из устройства. Первый крепёжный элемент 7 и второй крепёжный элемент 9 выполнены с обеспечением возможности установки первой дополнительной стенки 4 перпендикулярно дну 6 или под углом к дну 6 от одной боковой стенки 8 к другой боковой стенке 8. Одно дно 6 может быть снабжено по крайней мере двумя первыми крепёжными элементами 7 и двумя вторыми крепёжными элементами 9, расположенными по краям дна 6, перпендикулярным его соединению с боковыми стенками 8. Дно 6, имеющее значительную протяженность, снабжено более чем двумя первыми крепёжными элементами 7 и двумя вторыми крепёжными элементами 9, расположенными на одинаковом расстоянии друг от друга по длине дна 6 между его краями, перпендикулярными соединению дна 6 с боковыми стенками 8. При этом первые дополнительные стенки 4 устанавливают в ближайшие друг к другу первые крепёжные элементы 7 и вторые крепёжные элементы 9. The first fastening element 7 and the second fastening element 9 are configured to jointly hold the first additional wall 4 when it is installed in the device and to be released when it is removed from the device. The first fastening element 7 and the second fastening element 9 are made with the possibility of installing the first additional wall 4 perpendicular to the bottom 6 or at an angle to the bottom 6 from one side wall 8 to the other side wall 8. One bottom 6 may be provided with at least two first fasteners 7 and two second fasteners 9 located at the edges of the bottom 6, perpendicular to its connection with side walls 8. The bottom 6, having a considerable length, is equipped with more than two first fasteners 7 and two second fasteners 9 located at the same distance from each other along the length of the bottom 6 between its edges, are perpendicular compound 6 and the bottom with the side walls 8. In this first additional wall 4 is set in the next to each other the first fastening elements 7 and second 9 fastening elements.
Первый крепёжный элемент 7 выполнен с обеспечением возможности удержания первой дополнительной стенки 4 у дна 6. Первый крепёжный элемент 7 выполнен состоящим из двух первых упоров. Первые упоры расположены с зазором друг относительно друга. Первый крепёжный элемент 7 присоединён к дну 6. Первые упоры, в частном случае, выполнены в виде уголков, т.е. в виде двух полочек (прямоугольных пластин), соединенных между собой перпендикулярно друг другу. Каждый первый упор присоединён к дну 6 одной из полочек, при этом другая его полочка обращена к другому первому упору данного первого крепёжного элемента 7 и расположена параллельно соответствующей полочке другого первого упора. При этом параллельные полочки расположены на некотором расстоянии друг от друга (с зазором), равном толщине первой дополнительной стенки 4. Каждый первый упор первого крепёжного элемента 7 расположен полочкой, перпендикулярной дну 6, в одной плоскости с одним из вторых упоров второго крепёжного элемента 9.  The first fastener 7 is configured to hold the first additional wall 4 at the bottom 6. The first fastener 7 is made up of two first stops. The first stops are located with a gap relative to each other. The first fastening element 7 is attached to the bottom 6. The first stops, in a particular case, are made in the form of angles, i.e. in the form of two shelves (rectangular plates), interconnected perpendicular to each other. Each first stop is attached to the bottom 6 of one of the shelves, while its other shelf faces the other first stop of this first fastening element 7 and is parallel to the corresponding shelf of the other first stop. In this case, parallel shelves are located at some distance from each other (with a gap) equal to the thickness of the first additional wall 4. Each first stop of the first fastener 7 is located on a shelf perpendicular to the bottom 6, in the same plane as one of the second stops of the second fastener 9.
Второй крепёжный элемент 9 выполнен с обеспечением возможности удержания первой дополнительной стенки 4 на расстоянии (некоторой высоте) от дна 6. Каждый второй упор присоединён к каждой боковой стенке 8 на некотором расстоянии от дна 6. Второй крепёжный элемент 9 выполнен состоящим из двух вторых упоров. Вторые упбры расположены с зазором друг относительно друга. Каждый второй упор второго крепёжного элемента 9 в частном случае выполнен в виде П-образного элемента, закреплённого противоположными концами к боковым стенкам. В частном случае вторые упоры расположены перпендикулярно дну 6. Концы вторых упоров, выполненных П-образными могут быть присоединены к дну 6 и выполнять роль первых упоров. При этом каждый второй упор второго крепёжного элемента 9 расположен в одной плоскости с соответствующей полочкой соответствующего первого упора первого крепёжного элемента 7. Вторые упоры второго крепёжного элемента 9 расположены на некотором расстоянии (с зазором) друг от друга, приблизительно равном толщине первой дополнительной стенки 4. The second fastener 9 is configured to hold the first additional wall 4 at a distance (some height) from the bottom 6. Each second stop is attached to each side wall 8 at a certain distance from the bottom 6. The second fastener 9 is made up of two second stops. The second unit is located with a gap relative to each other. Every second emphasis of the second fastening element 9 in a particular case is made in the form of a U-shaped element fixed by opposite ends to the side walls. In the particular case of the second stops are perpendicular to the bottom 6. The ends of the second stops made U-shaped can be attached to the bottom 6 and act as the first stops. Moreover, every second emphasis of the second fastening element 9 is located in the same plane with the corresponding shelf of the corresponding first stop of the first fastener 7. The second stops of the second fastener 9 are located at a certain distance (with a gap) from each other, approximately equal to the thickness of the first additional wall 4.
Первая дополнительная стенка 4 выполнена в виде пластины, в частном случае четырехугольной. Первая дополнительная стенка 4 выполнена с обеспечением ограничения рассыпания материала (груза) после установки первой дополнительной стенки 4 внутри устройства между соответствующими частями первого крепёжного элемента 7 и второго крепёжного элемента 9, а также с обеспечением возможности удаления первой дополнительной стенки 4 уз устройства. Первая дополнительная стенка 4 выполнена с обеспечением возможности образования полости (ёмкости) между дном 6 с двумя боковыми стенками 8 и двумя первыми дополнительными стенками 4. При этом один из краёв первой дополнительной стенки 4 имеет размер равный длине дна 6 между боковыми стенками 8, а два края, прилегающих к указанному краю, расположены под углами к нему, равными углам между дном 6 и боковыми стенками 8. Высота первой дополнительной стенки 4 от края, обращённого к дну 5, до противоположного края в частном случае выполнена больше, чем высота боковых стенок 8. При этом высота первой дополнительной стенки 4 выполнена приблизительно равной высоте второй дополнительной стенки 4 с боковой стенкой 8 после установки второй дополнительной стенки 4 как продолжения боковой стенки 8. Первая дополнительная стенка 4 выполнена с обеспечением возможности удержания взаимного расположения вторых дополнительных стенок 10 и предотвращения их выпадения из устройства под действием массы материала (груза), заполняющего полость между дном 6, боковыми стенками 8, первыми дополнительными стенками 4 и вторыми дополнительными стенками 10. В частном случае, например первая дополнительная стенка 4 может быть снабжена средствами соединения стенок или средствами зацепления, выполненными в виде крючков, и расположенными вблизи двух соседних углов первой дополнительной стенки 4 наиболее удалённых от дна 6 и обращённых в сторону вторых дополнительных стенок 10.  The first additional wall 4 is made in the form of a plate, in the particular case quadrangular. The first additional wall 4 is made to limit the scattering of material (cargo) after installing the first additional wall 4 inside the device between the corresponding parts of the first fastening element 7 and the second fastening element 9, as well as providing the ability to remove the first additional wall 4 of the device. The first additional wall 4 is made with the possibility of the formation of a cavity (capacity) between the bottom 6 with two side walls 8 and two first additional walls 4. In this case, one of the edges of the first additional wall 4 has a size equal to the length of the bottom 6 between the side walls 8, and two the edges adjacent to the specified edge are located at angles to it equal to the angles between the bottom 6 and the side walls 8. The height of the first additional wall 4 from the edge facing the bottom 5 to the opposite edge in the particular case is greater than in a honeycomb of the side walls 8. The height of the first additional wall 4 is approximately equal to the height of the second additional wall 4 with the side wall 8 after installing the second additional wall 4 as an extension of the side wall 8. The first additional wall 4 is made with the possibility of maintaining the relative position of the second additional walls 10 and preventing them from falling out of the device under the action of a mass of material (cargo) filling the cavity between the bottom 6, side walls 8, the first additional wall and 4 and the second additional walls 10. In the particular case, for example, the first additional wall 4 can be equipped with means for connecting the walls or means of hooking made in the form of hooks and located near two adjacent corners of the first additional wall 4 that are farthest from the bottom 6 and facing side of the second additional walls 10.
Вторая дополнительная стенка 10 выполнена в виде пластины, в частном случае четырехугольной. Вторая дополнительная стенка 10 выполнена с обеспечением возможности ограничения рассыпания материала (груза) со стороны рельс 3 выше высоты боковой стенки 8, обеспечением возможности увеличения высоты боковой стенки 8, а также её установки между первыми дополнительными стенками 4. Вторая дополнительная стенка 10 выполнена с обеспечением возможности крепления её к первым дополнительным стенкам 4 и/или боковым стенкам 8. В частном случае вторые дополнительные стенки 10 снабжены средствами соединения стенок (средствами зацепления), выполненными в виде крючков, и расположенными вблизи двух соседних углов второй дополнительной стенки 10, наиболее удалённых от дна 6 и обращенных к первым дополнительным стенкам 4. Данные средства соединения стенок выполнены с обеспечением возможности зацепления за края двух первых дополнительных стенок 4, противоположные соединению первых дополнительных стенок 4 с дном 6 или взаимного зацепления со средствами соединения, выполненными на первых дополнительных стенках 4. При этом высота каждой второй дополнительной стенки 10, т.е. размер второй дополнительной стенки 10 в направлении перпендикулярном дну 6, выполнен больше, чем расстояние от края соответствующей первой дополнительной стенки 4, за которую зацеплена вторая дополнительная стенка 10, до ближайшего края соответствующей боковой стенки 8. При этом край второй до олнительной стенки 10, обращенный к дну 6 опирается на соответствующую боковую стенку 8 со стороны полости (ёмкости), образованной между дном 6, двумя боковыми стенками 8, двумя первыми дополнительными стенками 4 и двумя вторыми дополнительными стенками 10. При этом первыми дополнительными стенками 4 и вторыми дополнительными стенками 10 образовано загрузочное отверстие, предназначенное для наполнения данной ёмкости грузом из вагона. The second additional wall 10 is made in the form of a plate, in the particular case of a quadrangular. The second additional wall 10 is made with the possibility of limiting the scattering of material (cargo) from the side of the rail 3 above the height of the side wall 8, providing the possibility of increasing the height of the side walls 8, as well as its installation between the first additional walls 4. The second additional wall 10 is made with the possibility of fastening it to the first additional walls 4 and / or side walls 8. In the particular case of the second additional walls 10 are equipped with means for connecting the walls (meshing means) made in the form of hooks and located near two adjacent corners of the second additional wall 10, farthest from the bottom 6 and facing the first additional walls 4. These means of connecting the walls made enes enable engagement with the edges of the two first additional wall 4, opposite the first additional compound with the bottom wall 4 or 6 with a compound of interlocking means provided on the first additional wall 4. The height of each of the second additional wall 10, i.e., the size of the second additional wall 10 in the direction perpendicular to the bottom 6 is made larger than the distance from the edge of the corresponding first additional wall 4, for which the second additional wall 10 is hooked, to the nearest edge of the corresponding side wall 8. The edge of the second additional wall 10 facing to the bottom 6 rests on the corresponding side wall 8 from the side of the cavity (capacity) formed between the bottom 6, two side walls 8, two first additional walls 4 and two second additional walls 10. In this case, the first additional walls 4 and the second additional walls 10 formed a loading hole designed to fill this tank with cargo from the car.
Устройство снабжено скребковым конвейером или шнеком или ленточным конвейером или устройством вакуумного отбора, предназначенными для перемещения материала (груза) от разгрузочного отверстия 5 до магистрального материалопровода 15 или приёмной ёмкости. Устройство вакуумного отбора представляет собой, например трубопровод с устройством разряжения воздуха, например насосом, в котором под действием потока воздуха, образующегося в следствии перепада давления, происходит перекачка материала (груза) от разгрузочного отверстия 5 к магистральному материало проводу 15. Скребковый конвейер или шнек или ленточный конвейер или устройство вакуумного отбора установлено с обеспечением возможности попадания на него материала (груза) из разгрузочного отверстия 5. Скребковый конвейер или шнек или ленточный конвейер или устройство вакуумного отбора снабжены ограничительной стенкой 12. Ограничительная стенка 12 выполнена с обеспечением возможности ограничения рассыпания материала (груза), а также формирования и ограничения траектории перемещения материала (груза). В качестве ограничительной стенки 12 может быть использована, например труба, внутри которой размещен шнек, транспортировочная лента, скребковый конвейер или к которой подсоединен насос или аэрирующее устройство для псевдоожижения материала и формирования нужного соотношения воздуха и материала для перемещения материала (груза). В качестве ограничительной стенки 12 может выступать, например сама транспортировочная лента, или может быть использован, например лоток или поддон. Ограничительная стенка 12 в виде трубы присоединена одним концом к дну 6 по периметру ограничительного отверстия 12, а противоположным концом к магистральному материалопроводу 15. The device is equipped with a scraper conveyor or screw or belt conveyor or vacuum extraction device designed to move the material (cargo) from the discharge opening 5 to the main material pipe 15 or receiving tank. A vacuum sampling device is, for example, a pipeline with an air discharge device, for example a pump, in which under the influence of the air flow resulting from the pressure drop, material (cargo) is pumped from the discharge opening 5 to the main material wire 15. A scraper conveyor or screw or a conveyor belt or vacuum pick-up device is installed with the possibility of material (cargo) falling on it from the discharge opening 5. Scraper conveyor or auger or flax intramural conveyor or a vacuum sampling device provided with boundary wall 12. The boundary wall 12 is made with the possibility of limiting the scattering of material (cargo), as well as the formation and limitation of the trajectory of movement of the material (cargo). As the restrictive wall 12, for example, a pipe can be used, inside which a screw, a conveyor belt, a scraper conveyor are placed, or to which a pump or aeration device is connected to fluidize the material and form the desired ratio of air and material to move the material (load). As the boundary wall 12, for example, the conveyor belt itself can be used, or, for example, a tray or a pallet can be used. The boundary wall 12 in the form of a pipe is connected at one end to the bottom 6 along the perimeter of the restrictive hole 12, and the opposite end to the main material pipe 15.
В случае использования в качестве ограничительной стенки 12 трубы, на ней устанавливается первое устройство перекрытия 14. Первое устройство перекрытия 14 выполнено с обеспечением возможности перекрытия поступления материала (груза) из какого либо разгрузочного отверстия 5 в магистральный материалопровод 15.  In the case of using a pipe as a restriction wall 12, a first overlap device 14 is installed on it. The first overlap device 14 is configured to allow the material (cargo) to be blocked from any discharge opening 5 to the main material pipe 15.
Дополнительный трубопровод 11 предназначен для насыщения воздухом материала (груза), поступающего в ограничительную стенку 12 и формирования псевдоожиженного слоя сыпучего материала (груза). Дополнительный трубопровод 11 предназначен для использования совместно с устройством вакуумного отбора. Дополнительный трубопровод 11 одним из концов подсоединён к ограничительной стенке (трубе) 12 со стороны конца ограничительной стенки (трубы) 12, присоединённого к разгрузочному отверстию 5. Дополнительный трубопровод 11 снабжён вторым устройством перекрытия 13. Второе устройство перекрытия 13 выполнено с обеспечением возможности регулирования количества воздуха, поступающего в дополнительный трубопровод 11 и ограничительную стенку 12 путём частичного или полного перекрытия поперечного сечения дополнительного трубопровода 11.  The additional pipe 11 is designed to saturate the air of the material (cargo) entering the boundary wall 12 and the formation of a fluidized bed of bulk material (cargo). Additional pipe 11 is intended for use in conjunction with a vacuum sampling device. The additional pipe 11 is connected at one end to the restriction wall (pipe) 12 from the side of the end of the restriction wall (pipe) 12 connected to the discharge hole 5. The additional pipe 11 is provided with a second shutoff device 13. The second shutoff device 13 is configured to control the amount of air entering the additional pipe 11 and the boundary wall 12 by partially or completely overlapping the cross section of the additional pipe 11.
Магистральный материалопровод 15 представляет собой материалопровод, соединяющий все скребковые конвейеры или шнеки или ленточный конвейеры или устройства вакуумного отбора, а также их ограничительные стенки 12 и перемещающий от них материал (груз) к приёмной ёмкости. Магистральный материалопровод 15 может быть выполнен аналогично средству перемещения материала (груза), например в виде скребкового конвейера или шнека или ленточного конвейера или устройства вакуумного отбора с ограничительной стенкой 12. The main material pipe 15 is a material pipe connecting all scraper conveyors or screws or belt conveyors or vacuum extraction devices, as well as their bounding walls 12 and moving material (cargo) from them to the receiving container. The main material pipe 15 can be made similar to the means of movement material (cargo), for example in the form of a scraper conveyor or screw or conveyor belt or vacuum extraction device with a boundary wall 12.
Промышленная применимость Industrial applicability
Полезная модель реализуется следующим образом. The utility model is implemented as follows.
Изготавливают дно 6, боковые стенки 8, первые дополнительные стенки 4, вторые дополнительные стенки 10, первые крепёжные элементы 7, вторые крепёжные элементы 9, магистральные материалопровод 15, скребковый конвейер или шнек или ленточный конвейер или устройство вакуумного отбора с ограничительной стенкой 12, а также при необходимости первое устройство перекрытия 14 и дополнительный трубопровод 11 со вторым устройством перекрытия 13. В дне 6 выполняют разгрузочное отверстие 5, которое снабжают сеткой. Боковые стенки 8, первые крепёжные элементы 7 и вторые крепёжные элементы 9 присоединяют к дну 6 описанным выше образом, например при помощи сварного соединения.  The bottom 6 is made, side walls 8, first additional walls 4, second additional walls 10, first fasteners 7, second fasteners 9, main material pipe 15, scraper conveyor or auger or belt conveyor or vacuum extraction device with a restrictive wall 12, and if necessary, the first overlap device 14 and an additional pipe 11 with a second overlap device 13. In the bottom 6, a discharge opening 5 is made, which is provided with a mesh. The side walls 8, the first fasteners 7 and the second fasteners 9 are attached to the bottom 6 in the manner described above, for example by means of a welded joint.
В межшпальном пространстве под рельсами 3 размещают скребковый конвейер или шнек или ленточный конвейер или устройство вакуумного отбора, размещённые в ограничительной стенке 12, например в виде трубы. При необходимости в межшпальном пространстве продельшают соответствующее отверстие (отсьшают гравий или грунт). На шпалы 1 между рельсами 3 устанавливают дно 6 с боковыми стенками 8. При этом боковые стенки 8 расположены со стороны рельс 3, обращены в сторону противоположную шпалам 1 и ограничивают рассыпание материала (груза) в сторону рельс 3. При этом высота боковых стенок 8 выполнена с обеспечением возможности беспрепятственного передвижение железнодорожного транспорта по рельсам 3.  In the inter-sleeper space under the rails 3, a scraper conveyor or auger or a conveyor belt or a vacuum sampling device are placed in the boundary wall 12, for example, in the form of a pipe. If necessary, a hole is made in the inter-sleeper space (gravel or soil is loosened). On the sleepers 1 between the rails 3, a bottom 6 is installed with the side walls 8. In this case, the side walls 8 are located on the side of the rail 3, face the opposite to the sleepers 1 and limit the scattering of material (cargo) towards the rail 3. The height of the side walls 8 is made with the possibility of unhindered movement of railway transport on rails 3.
При этом один конец скребкового конвейера или шнека или ленточного конвейера или устройства вакуумного отбора и ограничительной стенки 12 присоединяют к разгрузочному отверстию 5 или размещают под разгрузочным отверстием 5 с обеспечением возможности попадания на них материала (груза). Противоположный конец скребкового конвейера или шнека или ленточного конвейера или устройства вакуумного отбора и ограничительной стенки 12 присоединяют или размещают с обеспечением возможности передачи материала (груза) магистральному материал опроводу 15. Магистральный материалопровод 15 установлен с обеспечением перемещения материала (груза) со всех установленных скребковых конвейеров или шнеков или ленточных конвейеров или устройств вакуумного отбора, подсоединённых к магистральному материалопроводу 15, до приёмной ёмкости. При необходимости на ограничительную стенку 12 устанавливают первое устройство перекрытия 14. При использовании устройства вакуумного отбора в межшпальном пространстве под рельсами 3 размещают дополнительный трубопровод 11. Один конец дополнительного трубопровода 11 подсоединяют к ограничительной стенке 12 вблизи разгрузочного отверстия 5. На противоположном конце дополнительного трубопровода 11 устанавливают второе устройство перекрытия 13. При необходимости противоположный конец дополнительной] трубопровода 11 подсоединяют к компрессору. In this case, one end of the scraper conveyor or screw or conveyor belt or vacuum extraction device and restrictive wall 12 is connected to the discharge opening 5 or placed under the discharge opening 5 with the possibility of material (cargo) getting on them. The opposite end of the scraper conveyor or screw or belt conveyor or vacuum extraction device and the restriction wall 12 are connected or placed with the possibility of transferring the material (cargo) to the main material to the wire 15. The main material pipe 15 is installed to allow movement of the material (cargo) from all installed scraper conveyors or screws or conveyor belts or vacuum sampling devices connected to the main pipe 15, to the receiving tank. If necessary, the first overlap device 14 is installed on the boundary wall 12. When using a vacuum screening device, an additional pipe 11 is placed under the rails 3 under the rails 3. One end of the additional pipe 11 is connected to the restrictive wall 12 near the discharge opening 5. At the opposite end of the additional pipe 11, the second device of the overlap 13. If necessary, the opposite end of the additional] pipe 11 is connected to the compress pv.
На место установки устройства подаётся вагон с донной разгрузкой. При этом разгрузочные люки вагона располагают над дном 6 с разгрузочными отверстиями 5. При необходимости устанавливают первые дополнительные стенки 4, ограничивающие рассыпание материала (груза) в направлении вдоль рельс 3 и вторые дополнительные стенки 10, ограничивающие рассыпание материала (груза) на рельсы 3. При этом первые дополнительные стенки 4 удерживаются посредством первых крепёжных элементов 7 и вторых крепёжных элементов 9. Вторые дополнительные стенки 10 удерживаются, в частном случае при помощи взаимного зацепления средств соединения стенок, выполненных на первых дополнительных стенках 4, и средств соединения стенок, выполненных на вторых дополнительных стенках 10, а также за счёт упора соответствующих краёв вторых дополнительных стенок 10 на боковые стенки 8.  A wagon with bottom discharge is fed to the installation site of the device. In this case, the unloading hatches of the car are placed above the bottom 6 with unloading holes 5. If necessary, install the first additional walls 4, limiting the scattering of material (cargo) in the direction along the rail 3 and the second additional walls 10, limiting the scattering of material (cargo) on the rails 3. When this, the first additional walls 4 are held by the first fastening elements 7 and the second fastening elements 9. The second additional walls 10 are held, in the particular case by mutual engagement of means with unity walls formed on the first additional wall 4 and wall means a compound formed on the second additional wall 10 and also due to the abutment edges corresponding to the second additional wall 10 to the side wall 8.
Открывают разгрузочные люки вагона, из которых материал (груз) высыпается на дно 6. За счёт выполнения дна 6 с наклонными стенками от краёв дна 6 к разгрузочному отверстию 5 материал (груз) под действием собственного веса (силы тяжести) попадает через разгрузочное отверстие 5 на скребковый конвейер или шнек или ленточный конвейер или в ограничительную стенку (трубу) 12 устройства вакуумного отбора. В случае использования устройства вакуумного отбора возможно выполнение дна 6 плоским, при этом попадание материала (груза) в разгрузочное отверстие 5 обеспечивается затягиванием его под действием потока воздуха, образующегося в следствии перепада давления, создаваемого в ограничительной стенке 12 насосом. При этом за счёт выполнения на разгрузочном отверстии 5 сетки предотвращается попадание в устройство комьев материала (груза), которые могут повредить скребковый конвейер или шнек или ленточный конвейер или устройство вакуумного отбора. Материала (груза) посредством скребкового конвейера или шнека или ленточного конвейера или устройства вакуумного отбора перемещается в магистральный материалопровод 15. При этом в случае использования устройства вакуумного отбора открывают второе устройство перекрытия 13, установленное на дополнительном трубопроводе И для обеспечения насыщения материала (груза) воздухом и создания псевдоожиженного слоя материала (груза) для его дальнейшего транспортирования под давлением. Насыщение воздухом может происходить за сет поступления воздуха из окружающей среды под действием тяги насоса устройства вакуумного отбора или под действием нагнетания воздуха при помощи компрессора, подсоединённого к дополнительному трубопроводу 11. При необходимости, например при использовании для разгрузки не всех разгрузочных отверстий 5, при помощи соответствующих первых устройств перекрытия 14 перекрывают соответствующие ограничительные стенки 12 для ограничения прохождения воздуха в холостую, т.е. по пути с наименьшим сопротивлением. Также первые устройства перекрытия 14 применяют при попадании примесей в материал (груз) одного из вагонов, для блокировки попадания загрязнённого материала (груза) в приёмную ёмкость и магистральный материалопровод 15. Материала (груза) поступает в магистральный материалопровод 15 по которому перемещается в приёмную ёмкость. Open the unloading hatches of the car, from which the material (cargo) is poured onto the bottom 6. Due to the bottom 6 with inclined walls from the edges of the bottom 6 to the unloading hole 5, the material (cargo) gets under the influence of its own weight (gravity) through the unloading hole 5 on a scraper conveyor or auger or belt conveyor or into the boundary wall (pipe) 12 of the vacuum selection device. In the case of using a vacuum sampling device, it is possible to make the bottom 6 flat, while the ingress of material (cargo) into the discharge opening 5 is ensured by tightening it under the action of an air stream generated as a result of the pressure drop created in the boundary wall 12 by the pump. In this case, due to the implementation of the mesh at the discharge opening 5, the entry of material (cargo) into the clod device is prevented, which can damage the scraper conveyor or auger or belt conveyor or vacuum selection device. Material (cargo) by means of a scraper conveyor or auger or belt conveyor or the vacuum sampling device moves to the main material line 15. In this case, when using the vacuum sampling device, the second overlap device 13 is opened, installed on the additional pipeline And to ensure saturation of the material (cargo) with air and create a fluidized bed of material (cargo) for its further transportation under pressure . Air saturation can occur behind a set of air intake from the environment under the influence of a draft of the vacuum extraction device pump or under the effect of air injection using a compressor connected to an additional pipe 11. If necessary, for example, when not all discharge openings 5 are used for unloading, using the corresponding the first overlap devices 14 overlap the respective restriction walls 12 to restrict the passage of air to the idle, i.e. along the path with the least resistance. Also, the first overlapping devices 14 are used when impurities get into the material (cargo) of one of the cars, to block the ingress of contaminated material (cargo) into the receiving tank and the main pipe 15. Material (cargo) enters the main pipe 15 through which it moves to the receiving tank.
Для лучшего просыпания материала в разгрузочные отверстия 5 можно применять механические вибраторы, закрепляемые на стенках или дне 6. Данные устройства применяют для ускорения и улучшения процесса просыпания материала.  For better spillage of material into the discharge openings 5, mechanical vibrators can be used that are mounted on the walls or bottom 6. These devices are used to accelerate and improve the spillage of the material.
Таким образом, выполнение устройства из дна с разгрузочным отверстием, боковых стенок, первых дополнительных стенок, вторых дополнительных стенок, скребкового конвейера или шнека или ленточного конвейера или устройства вакуумного отбора обеспечивает уменьшение трудоёмкости и времени монтажа и демонтажа, и как следствие, повышение общей производительности процесса разгрузки устройства за счёт , размещения ёмкости на шпалах между рельсами, а скребкового конвейера или шнека или ленточного конвейера или устройства вакуумного отбора под рельсами.  Thus, the implementation of the device from the bottom with a discharge opening, side walls, first additional walls, second additional walls, scraper conveyor or auger or belt conveyor or vacuum extraction device reduces the complexity and time of installation and dismantling, and as a result, increases the overall performance of the process unloading the device at the expense of placing the container on the sleepers between the rails, and the scraper conveyor or screw or belt conveyor or vacuum extraction device under rails.

Claims

Формула полезной модели Utility Model Formula
Устройство для разгрузки вагонов, содержащее дно, две боковые стенки, две первые дополнительные стенки, две вторые дополнительные стенки, четыре средства соединения стенок, первые упоры и вторые упоры, две боковые стенки присоединены ко дну с противоположных его краёв с наклоном в противоположные стороны, при этом дно, две боковые стенки, две первые дополнительные стенки входят в состав элементов, образующих ёмкость, причём ёмкость снабжена загрузочным отверстием, отличающееся тем, что в нём выполнены два первых крепёжных элемента и два вторых крепёжных элемента, причём первый крепёжный элемент образован двумя первыми упорами, установленными с зазором друг относительно друга, и присоединён ко дну, второй крепёжный элемент образован двумя вторыми упорами, установленными с зазором друг относительно друга и прикреплёнными каждый к каждой боковой стенке, каждая первая дополнительная стенка закреплена между первыми упорами и вторыми упорами соответственно ближайших друг к другу первого крепёжного элемента и второго крепёжного элемента, каждая вторая дополнительная стенка установлена между первыми дополнительными стенками и соединена с каждой из них при помощи средства соединения стенок, при этом она расположена как продолжение соответствующей ей боковой стенки, вторые дополнительные стенки входят в состав элементов, образующих ёмкость, загрузочное отверстие образовано соответствующими краями двух первых дополнительных стенок и двух вторых дополнительных стенок в дне выполнено разгрузочное отверстие к которому подведено или шнековое устройство, или ленточный конвейер, или скребковый конвейер, или устройство вакуумного отбора. A device for unloading cars, containing a bottom, two side walls, two first additional walls, two second additional walls, four means of connecting the walls, the first stops and second stops, two side walls are attached to the bottom from its opposite edges with an inclination in opposite directions, with this bottom, two side walls, the first two additional walls are part of the elements forming the tank, and the tank is equipped with a loading hole, characterized in that it is made of the first two fasteners and two in fasteners, the first fastener being formed by two first stops installed with a gap relative to each other and attached to the bottom, the second fastener is formed by two second stops installed with a gap relative to each other and attached each to each side wall, each first additional the wall is fixed between the first stops and the second stops, respectively, of the first fastener and the second fastener closest to each other, each second additional wall and is installed between the first additional walls and connected to each of them by means of connecting the walls, while it is located as a continuation of the corresponding side wall, the second additional walls are part of the elements forming the tank, the loading hole is formed by the corresponding edges of the first two additional walls and two second additional walls in the bottom there is a discharge opening to which either a screw device, or a conveyor belt, or a scraper conveyor, or stroystvo vacuum selection.
PCT/RU2012/000247 2011-08-22 2012-04-06 Device for unloading cars WO2013028100A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
RU2011135018 2011-08-22
RU2011135018 2011-08-22

Publications (1)

Publication Number Publication Date
WO2013028100A1 true WO2013028100A1 (en) 2013-02-28

Family

ID=47746679

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/RU2012/000247 WO2013028100A1 (en) 2011-08-22 2012-04-06 Device for unloading cars

Country Status (1)

Country Link
WO (1) WO2013028100A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU563507A1 (en) * 1974-01-09 1977-06-30 Всесоюзный Научно-Исследовательский, Проектно-Конструкторский Угольный Институт (Книуи) Pit trucks tilter
SU918221A1 (en) * 1980-02-06 1982-04-07 Рязанская Проектно-Конструкторская И Технологическая Организация "Оргкровля" Device for discharging granular materials
GB2118915A (en) * 1982-04-23 1983-11-09 Ian Russell Fraser Conveyor for use with hopper wagon
FR2600050A1 (en) * 1986-06-13 1987-12-18 Ganet Albert Mobile belt-type handling plant for bulk products
JPH0418291A (en) * 1990-04-26 1992-01-22 Nissan Motor Co Ltd Container for transport
CA1333055C (en) * 1989-09-27 1994-11-15 John Watson Knock-down bulk storage container

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU563507A1 (en) * 1974-01-09 1977-06-30 Всесоюзный Научно-Исследовательский, Проектно-Конструкторский Угольный Институт (Книуи) Pit trucks tilter
SU918221A1 (en) * 1980-02-06 1982-04-07 Рязанская Проектно-Конструкторская И Технологическая Организация "Оргкровля" Device for discharging granular materials
GB2118915A (en) * 1982-04-23 1983-11-09 Ian Russell Fraser Conveyor for use with hopper wagon
FR2600050A1 (en) * 1986-06-13 1987-12-18 Ganet Albert Mobile belt-type handling plant for bulk products
CA1333055C (en) * 1989-09-27 1994-11-15 John Watson Knock-down bulk storage container
JPH0418291A (en) * 1990-04-26 1992-01-22 Nissan Motor Co Ltd Container for transport

Similar Documents

Publication Publication Date Title
US9463922B2 (en) Cargo shipping container with top-access roof cover
US9862393B2 (en) Open top hopper railcar with biased door seal and enlarged contoured end door
US9382080B2 (en) System, apparatus and method for preparing materials transported in open top conveyance
US20040065699A1 (en) Bulk material dispenser
US10449888B2 (en) Trailer for transport of fracking sand
US9963292B2 (en) Storage bin and method of use
US7752979B2 (en) Hopper car gate with enlarged discharge and increased capacity
US9580086B2 (en) Railcar cover systems
WO2020047988A1 (en) Side unloading hopper container for break bulk cargo
RU93761U1 (en) INDOOR WAGON HOPPER FOR CARRIAGE OF BULK CARGOES
RU111122U1 (en) DEVICE FOR UNLOADING WAGONS
CA2877719A1 (en) Covered hopper railcar for carrying flowable materials
WO2013028100A1 (en) Device for unloading cars
RU203169U1 (en) DEVICE FOR TRANSPORTATION OF LARGE CONTAINERS IN GREEN CARS AND OTHER OPEN ROLLING STOCK
US20070297883A1 (en) Bulk material unloading system and method
EP2739787B1 (en) Container, railway truck using such a container and process for loading or unloading aggregates from railway transport truck
US20050036860A1 (en) Apparatus and method for high throughput particulate matter from large capacity storage bins
WO2018068553A1 (en) Hopper car
AU2008217284B2 (en) Storage cart
US8821100B1 (en) Portable railcar unloading pit and method of using the same
JP7356632B2 (en) Indoor coal storage equipment and its operating method
WO2014166667A1 (en) Device for conveying material during track laying
RU147075U1 (en) INSTALLATION FOR RELOADING BULK MATERIAL FROM RAILWAY HOPPER CARS
RU163714U1 (en) MOBILE HOPPER
RU52837U1 (en) TECHNOLOGICAL COMPLEX OF UNLOADING-LOADING OF BULK MATERIALS

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12826394

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12826394

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DD 25/08/14)

122 Ep: pct application non-entry in european phase

Ref document number: 12826394

Country of ref document: EP

Kind code of ref document: A1