WO2013013525A1 - Device and method for dismounting agd pipe of reduction furnace - Google Patents

Device and method for dismounting agd pipe of reduction furnace Download PDF

Info

Publication number
WO2013013525A1
WO2013013525A1 PCT/CN2012/074880 CN2012074880W WO2013013525A1 WO 2013013525 A1 WO2013013525 A1 WO 2013013525A1 CN 2012074880 W CN2012074880 W CN 2012074880W WO 2013013525 A1 WO2013013525 A1 WO 2013013525A1
Authority
WO
WIPO (PCT)
Prior art keywords
agd
pipe
bracket
tube
reduction furnace
Prior art date
Application number
PCT/CN2012/074880
Other languages
French (fr)
Chinese (zh)
Inventor
张东华
刘洪亮
陈文进
樊少岩
赵增富
张磊
杨涛
姚剑
Original Assignee
上海宝冶集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海宝冶集团有限公司 filed Critical 上海宝冶集团有限公司
Publication of WO2013013525A1 publication Critical patent/WO2013013525A1/en
Priority to ZA2013/08699A priority Critical patent/ZA201308699B/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B13/00Making spongy iron or liquid steel, by direct processes
    • C21B13/02Making spongy iron or liquid steel, by direct processes in shaft furnaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/022Extracting or inserting relatively long parts

Definitions

  • the present invention relates to maintenance of a reduction furnace.
  • the present invention relates to a maintenance apparatus for a reduction furnace AGD pipeline; on the other hand, the present invention also designs a method for maintenance of a reduction furnace AGD pipeline.
  • AGD pipe an abbreviation for Areal Gas Distribution, ie gas area distribution.
  • the AGD pipeline (two pieces per furnace) has a total length of more than ten meters, a net weight of several tens of tons, and a maximum outer diameter of more than 1500mm.
  • the AGD pipe Since the AGD pipe needs to be installed in the middle of the C0REX furnace, it should be installed on the furnace frame +54. 8m platform. Through the reserved flange holes on both sides of the C0REX furnace, the whole furnace body should be penetrated. After the traversing is completed, the AGD pipe should be lifted up by lOOmm, the "long-distance bearing block" should be inserted into the bearing position, and then the AGD pipe should be dropped until it reaches the exact position and stays in the predetermined bearing. If you use the traditional installation method, the construction work is extremely difficult and has the following drawbacks:
  • the installation position of the AGD pipeline is in the middle of the C0REX furnace. During the pipe-passing process, it must be operated in the furnace. A large number of lifting and protection measures must be set up inside the furnace body, and there are major construction safety hazards.
  • AGD pipeline installation operations need to be carried out synchronously inside and outside the furnace. It is difficult to coordinate construction and unified command. AGD pipelines are easily damaged during installation.
  • the present invention is directed to solving the above drawbacks, and provides a reduction furnace AGD pipe disassembly apparatus and a disassembly method.
  • the device of the invention has sufficient strength and rigidity to make the disassembly and assembly process effectively and quickly outside the furnace body, avoiding and reducing a large number of lifting, driving, protection and construction measures, and satisfying the disassembly and repair of the normal production of the AGD pipe. Convenient functional requirements.
  • a reduction furnace AGD pipe dismounting device comprises a steel platform disposed on both sides of an AGD pipe installation position of the reduction furnace, which comprises: disposed on the steel platform:
  • a pipe slip device disposed adjacent to one side of the reduction furnace and comprising a frame type bracket body, the bracket body is provided with a moving jacking device, a fixed jacking device, and a front dismounting bracket and a rear Disassemble the bracket;
  • An oscillating telescopic arm is disposed on the other side of the reduction furnace, and the oscillating telescopic arm body faces the mounting hole of the reduction furnace AGD pipe.
  • the reduction furnace AGD pipe dismounting device the frame type bracket body comprises a near furnace section, a connecting section and a far furnace end, the near furnace end section is connected by a bolt flange connection section, and the far furnace section is hinged by the pin shaft in the connecting section
  • the upper side of the frame bracket body is mounted with two parallel roller-type heavy-duty linear guides that extend longitudinally through the entire bracket.
  • the reduction furnace AGD pipe dismounting device is mounted on the frame type bracket body and comprises a support base, and each of the four corners is provided with a jacking cylinder, and the top of the jacking cylinder body is connected to the side A web with a roller moves along a linear guide on the frame bracket body.
  • the reduction furnace AGD pipe dismounting device is mounted on the frame bracket body and includes a support base, and each of the four corners is provided with a jacking cylinder fixed on the frame bracket body .
  • the reduction furnace AGD pipe dismounting device the base of the front disassembly bracket spans two rails on the frame bracket body through six linear guide sliders, and includes a fixed base
  • the pipe support arm supported by the hydraulic cylinder on the seat.
  • the reduction furnace AGD pipe dismounting device further comprises a rear disassembly bracket used by the ADG pipe in position, the upper surface of the rear disassembly bracket is a flange structure, and the tail has a circular arc-shaped guide plate, the guide plate A roller is provided under the rolling connection with the track.
  • the reduction furnace AGD pipe dismounting device is a sleeve type box body comprising a fixed section and a moving section, wherein a fixed section is hingedly fixed on the steel platform, and the end of the moving section is oscillated
  • the cylinder is hinged to the AGD pipe, and the moving section and the built-in type are double-acting multi-stage telescopic cylinders in the movable section of the fixed end.
  • Step 1 Installation steps of the AGD pipe disassembly device: Install the disassembly device in the first AGD pipe installation position according to the mechanical drawings, align and level; install electrical equipment according to electrical drawings; install hydraulic equipment according to hydraulic drawings and Piping; Step 2: Rotate the frame bracket at the far furnace end by 90 degrees to prepare to lift the AGD tube.
  • Step 3 Install the rear disassembly bracket device to the front end of the AGD tube, completely lift the AGD tube above the rail, and frame the far furnace end. Rotate the bracket back to the original position and connect; lay the AGD tube flat on the rail; install the front disassembly bracket device to the tail of the AGD tube;
  • Step 4 the fixed jacking device raises and supports the front end of the AGD tube, removes the rear disassembly bracket device, replaces the intermediate flange, and the hydraulic telescopic arm protrudes, and connects the telescopic arm trunnion and the intermediate flange trunnion;
  • Step 5 according to the program hydraulic telescopic arm pulls the AGD tube, the pull is divided into 9 times, each time, each time the fixed lifting device supports the AGD tube, the moving jacking device is lowered, manually retracted, and then the moving jacking device Supporting the AGD tube, the fixed jacking device is lowered, which facilitates the lower or secondary pulling. Before the 8th pulling, the fixed jacking device is removed, and before the 9th pulling, the moving jacking device is removed;
  • Step 6 The front demolition bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are raised at the same time, the AGD tube is raised, placed in the AGD tube bearing seat, the front disassembly bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are simultaneously lowered, Place the AGD tube on the bearing housing, remove the connection between the front disassembly bracket device and the AGD tube, remove the connection between the intermediate flange and the telescopic arm and the AGD tube, and complete the installation of an AGD tube; Step 7, the hydraulic telescopic arm, front Remove the bracket device, the moving jacking device, the fixed jacking device, etc. from position 1, and install it to the second AGD pipe installation position, and then install another AGD pipe according to steps 2 to 6 above.
  • the disassembly device of the invention is convenient to operate, detachable, reusable, practical, safe and reliable.
  • the telescopic arm can actively drive the AGD tube into and out, without additional drive control and manual interference.
  • the pressure circuit and pressure gauge are provided in each circuit of the hydraulic system, and the pressure of the system can be detected and monitored at any time.
  • Each working cylinder has a built-in burst.
  • the valve is equipped with a zero-leakage safety overload protection valve. With the absolute encoder as the stepping quantity, the relevant pressure and position data are stored in the PLC by programming, which can be conveniently observed and operated on the touch screen at any time.
  • the method solves the disassembly and assembly problem of the AGD pipeline of the C0REX furnace, and can safely, smoothly, reliably, accurately and efficiently perform the assembly and disassembly work of the AGD tube.
  • the disassembly and assembly method of the invention satisfies the construction requirements of the whole process of disassembly and assembly of the AGD tube in the furnace, realizes the safe, stable, reliable, accurate and efficient construction target of the AGD tube, and can realize the AGD in the online disassembly and assembly shaft furnace. pipeline.
  • the invention shortens the disassembly and assembly time by more than the conventional method, and greatly reduces the construction measures and reduces the construction safety risk.
  • Figure 1 is a schematic view of the present invention
  • Figure 3 is a schematic view of the rear disassembly bracket device
  • Figure 4 is a schematic view of the front disassembly bracket device
  • Figure 5 is a schematic view of a moving, fixed jacking device
  • Figure 6 is a schematic view of the swinging telescopic boom and the base.
  • a reduction furnace AGD pipe disassembly device comprises a steel platform disposed on both sides of an AGD pipe installation position of the reduction furnace, which comprises: disposed on the steel platform:
  • the disassembly and disassembly device is disposed close to the side of the reduction furnace and comprises a frame type bracket body 2, wherein the bracket body 2 is provided with a moving jacking device 4, a fixed jacking device 3, and a front dismounting bracket.
  • the telescopic arm 5 is disposed on the other side of the reduction furnace, and the oscillating telescopic arm body faces the mounting hole of the reduction furnace AGD pipe.
  • the disassembly and disassembly device is composed of a frame type bracket body 2, a moving jacking device 4, a fixed jacking device 3, a front dismounting bracket device 1, a rear dismounting bracket device (not shown in Fig. 1), and the like.
  • the frame-type bracket body 2 (see Fig. 2) is divided into three sections, which are made of ordinary carbon steel and steel. The two ends of the furnace end are connected by bolt flanges, and the far end of the furnace is hingedly connected to the second section. When the AGD tube needs to enter and exit from the tapping field, the far end of the furnace can be rotated around the side pin to allow Out of the AGD tube outlet field to the nozzle channel.
  • the upper surface of the bracket body 2 is a flange structure, and the tail portion has a circular arc-shaped guide plate 6.
  • the rear-mounted detaching bracket device 7 (see Fig. 3) is used to guide the vertically hoisted AGD tube along the arc. The slippage falls to the horizontal position, and the AGD tube is placed on the stent body 2 in the longitudinal direction.
  • two parallel roller-type heavy-duty linear guides longitudinally penetrating the entire bracket are mounted on the inner side of the upper body of the bracket body 2, and the front dismounting bracket device 1 (see Fig. 4) is slid through six linear guide rails.
  • the block 13 spans the two guide rails, and the built-in hydraulic cylinder 11 supports one end of the AGD tube, and cooperates with the jacking device 12 to realize the horizontal movement of the AGD tube into and out of the shaft furnace along the linear guide rail under the traction of the disassembly and disassembly arm.
  • a set of moving jacking device 4 and a set of fixed jacking device 3 are provided, so that the two sets of jacking devices are alternately placed in a suitable position on the skirt legs of the AGD tube.
  • the moving jacking device 4 supports the longitudinal horizontal movement on the flange of the middle portion of the bracket body 2 through the four rollers 41 at the bottom, and the hand can be pushed when no-load;
  • the fixed jacking device 3 is very similar to the moving jacking device 4, only The difference is that it does not need to be moved and can be directly fixed on the bracket body 2. Considering the factors of design, manufacture, installation, cost, etc., we have made two sets of the same jacking device (see Figure 5).
  • the two sets of jacking devices are divided into two layers, the lower layer is the main support body with rollers 41, and four synchronous jacking cylinders 42 are built in; the upper layer is a porous (weight-reducing) light steel support 43, which can be disassembled by manpower. Handling. When the upper layer of the moving jacking device and the fixed jacking device are removed, both the front dismounting bracket device and the rear dismounting bracket device can pass over the moving top bracket.
  • the so-called oscillating telescopic boom 5 refers to a telescopic boom ⁇ sleeve type box body, a fixed hinge 51 is used for the middle part of the non-moving section, and a swinging cylinder hinge 52 is used for the forward end portion.
  • the overhanging head is hinged 53, and the built-in double-acting multi-stage telescopic cylinder drives the "stretching" and “retracting" of the telescopic arm, and the swing is controlled by the swinging hydraulic cylinder.
  • This structure is very similar to the boom of a crane.
  • a reduction furnace pipe disassembly method using the disassembly device which comprises:
  • Step 1 Installation steps of the AGD pipe disassembly device: Install the disassembly device in the first AGD pipe installation position according to the mechanical drawings, align and level; install electrical equipment according to electrical drawings; install hydraulic equipment according to hydraulic drawings and Piping;
  • Step 2 Rotate the frame bracket at the far furnace end by 90 degrees to prepare to lift the AGD tube.
  • Step 3 Install the rear disassembly bracket device to the front end of the AGD tube, completely lift the AGD tube above the rail, and frame the far furnace end. Rotate the bracket back to the original position and connect; lay the AGD tube flat on the rail; install the front disassembly bracket device to the tail of the AGD tube;
  • Step 4 the fixed jacking device is raised to support the front end of the AGD tube, the rear disassembly bracket device is removed, the intermediate flange is replaced, the hydraulic telescopic arm is extended, and the telescopic arm trunnion and the intermediate flange trunnion are coupled;
  • Step 5 according to the program hydraulic telescopic arm pulls the AGD tube, the pull is divided into 9 times, each time, each time the fixed lifting device supports the AGD tube, the moving jacking device is lowered, manually retracted, and then the moving jacking device Supporting the AGD tube, the fixed jacking device is lowered, which facilitates the lower or secondary pulling. Before the 8th pulling, the fixed jacking device is removed, and before the 9th pulling, the moving jacking device is removed;
  • Step 6 The front demolition bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are raised at the same time, the AGD tube is raised, placed in the AGD tube bearing seat, the front disassembly bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are simultaneously lowered, Place the AGD tube on the bearing housing, remove the connection between the front disassembly bracket device and the AGD tube, remove the connection between the intermediate flange and the telescopic arm and the AGD tube, and complete the installation of an AGD tube; Step 7, the hydraulic telescopic arm, front Remove the bracket device, the moving jacking device, the fixed jacking device, etc. from position 1, and install it to the second AGD pipe installation position, and then install another AGD pipe according to steps 2 to 6 above.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Supports For Pipes And Cables (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Tunnel Furnaces (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A device and a method for dismounting an AGD pipe of a reduction furnace. The dismounting device comprises: steel platforms disposed at two sides of an AGD pipe mounting location of a reduction furnace; a pipe sliding device disposed on the steel platform close to one side of the reduction furnace and comprising a frame-type bracket body (2), a moving jacking device (4), a fixed jacking device (3), a front disassembling bracket (1), and a rear disassembling bracket being disposed on the bracket body; and a swinging telescopic arm (5) disposed on the steel platform at the other side of the reduction furnace and facing a mounting hole of an AGD pipe of the reduction furnace. The AGD pipe is mounted through alternating jacking of the moving jacking device (4) and the fixed jacking device (3) and dragging of the swinging telescopic arm (5). The entire dismounting process is performed rapidly and efficiently outside a furnace body, thereby avoiding and reducing lots of lifting, driving, protection and construction measures. Therefore, the dismounting and maintenance are convenient.

Description

说明书 还原炉 AGD管道拆装装置及拆装方法  Specification reduction furnace AGD pipe disassembly device and disassembly method
技术领域 Technical field
本发明涉及还原炉维修, 特别的, 本发明涉及还原炉 AGD管道的维护设 备; 另一方面, 本发明还设计还原炉 AGD管道维护的方法。  The present invention relates to maintenance of a reduction furnace. In particular, the present invention relates to a maintenance apparatus for a reduction furnace AGD pipeline; on the other hand, the present invention also designs a method for maintenance of a reduction furnace AGD pipeline.
背景技术 Background technique
AGD管道, 为 Areal Gas Distribution 的缩写, 即煤气区域分布。 AGD 管道 (每座炉体两件)单件全长约十余米,净重数十吨,最大外径大于 1500mm。  AGD pipe, an abbreviation for Areal Gas Distribution, ie gas area distribution. The AGD pipeline (two pieces per furnace) has a total length of more than ten meters, a net weight of several tens of tons, and a maximum outer diameter of more than 1500mm.
由于 AGD管道需安装在 C0REX炉的中部, 在炉体框架 +54. 8m平台上进 行安装, 作业时需通过 C0REX炉两侧的预留法兰孔贯穿整个炉体。 穿越完成 后, 需将 AGD管道往上顶起 lOOmm, 将 "远距离轴承块 "插入轴承位置, 然 后落下 AGD管道, 直到其到达准确位置并稳定停留在预定的轴承上。如果釆 用传统的安装方法, 施工作业难度极大, 并且存在以下弊端:  Since the AGD pipe needs to be installed in the middle of the C0REX furnace, it should be installed on the furnace frame +54. 8m platform. Through the reserved flange holes on both sides of the C0REX furnace, the whole furnace body should be penetrated. After the traversing is completed, the AGD pipe should be lifted up by lOOmm, the "long-distance bearing block" should be inserted into the bearing position, and then the AGD pipe should be dropped until it reaches the exact position and stays in the predetermined bearing. If you use the traditional installation method, the construction work is extremely difficult and has the following drawbacks:
(1) AGD管道安装位置在 C0REX炉的中部,穿管过程中,必须在炉内作业, 在炉体内部需搭设大量的吊装及保护措施, 存在重大施工安全隐患。  (1) The installation position of the AGD pipeline is in the middle of the C0REX furnace. During the pipe-passing process, it must be operated in the furnace. A large number of lifting and protection measures must be set up inside the furnace body, and there are major construction safety hazards.
(2) AGD管道安装作业需在炉内、 外同步进行, 施工协调、 统一指挥难度 较大, AGD管道在安装过程中极易损伤。  (2) AGD pipeline installation operations need to be carried out synchronously inside and outside the furnace. It is difficult to coordinate construction and unified command. AGD pipelines are easily damaged during installation.
(3) AGD管道安装施工作业时间较长, 不利于 C0REX炉的在线安装和正常 生产时 AGD管道的检修维护。  (3) The long operation time of AGD pipeline installation and construction is not conducive to the on-line installation of C0REX furnace and the maintenance and repair of AGD pipeline during normal production.
发明内容 Summary of the invention
本发明旨在解决上述缺陷,提供一种还原炉 AGD管道拆装装置及拆装方 法。 本发明的装置有足够的强度和刚度、 使拆装全程在炉体外部有效、 快速 地进行, 避免和减少了大量的吊装、 驱动、 保护和施工措施, 满足了 AGD管 道正常生产时拆装检修方便的功能要求。  The present invention is directed to solving the above drawbacks, and provides a reduction furnace AGD pipe disassembly apparatus and a disassembly method. The device of the invention has sufficient strength and rigidity to make the disassembly and assembly process effectively and quickly outside the furnace body, avoiding and reducing a large number of lifting, driving, protection and construction measures, and satisfying the disassembly and repair of the normal production of the AGD pipe. Convenient functional requirements.
为解决上述问题, 一种还原炉 AGD管道拆装装置, 它包括设置在还原炉 的 AGD管道安装位置两侧钢平台, 它包括: 设置在钢平台上的:  In order to solve the above problems, a reduction furnace AGD pipe dismounting device comprises a steel platform disposed on both sides of an AGD pipe installation position of the reduction furnace, which comprises: disposed on the steel platform:
管道滑移装置, 它紧靠还原炉一侧设置, 并包括框架式支架本体, 支架 本体上设有移动顶升装置、 固定顶升装置, 以及一个前置拆卸支架和一个后 置拆卸支架; a pipe slip device disposed adjacent to one side of the reduction furnace and comprising a frame type bracket body, the bracket body is provided with a moving jacking device, a fixed jacking device, and a front dismounting bracket and a rear Disassemble the bracket;
一个摆动式伸缩臂, 它设置在还原炉的另一侧, 该摆动式伸缩臂本体正 对还原炉 AGD管道的安装孔。  An oscillating telescopic arm is disposed on the other side of the reduction furnace, and the oscillating telescopic arm body faces the mounting hole of the reduction furnace AGD pipe.
所述的还原炉 AGD管道拆装装置, 所述框架式支架本体包括近炉段, 连 接段和远炉端, 近炉端段由螺栓法兰连接连接段, 远炉段则由销轴铰接在连 接段上; 框架式支架本体的上层内侧安装有两条平行的, 纵向贯通整个支架 的滚柱式重载直线导轨,。  The reduction furnace AGD pipe dismounting device, the frame type bracket body comprises a near furnace section, a connecting section and a far furnace end, the near furnace end section is connected by a bolt flange connection section, and the far furnace section is hinged by the pin shaft in the connecting section The upper side of the frame bracket body is mounted with two parallel roller-type heavy-duty linear guides that extend longitudinally through the entire bracket.
所述的还原炉 AGD管道拆装装置,所述移动顶升装置架设在框架式支架 本体上, 并包括一个支撑座, 它的四角下方各自设有一个顶升油缸, 顶升油 缸本体侧面连接一个带有滚轮的连接板以沿着所述框式支架本体上的直线 导轨移动。  The reduction furnace AGD pipe dismounting device is mounted on the frame type bracket body and comprises a support base, and each of the four corners is provided with a jacking cylinder, and the top of the jacking cylinder body is connected to the side A web with a roller moves along a linear guide on the frame bracket body.
所述的还原炉 AGD管道拆装装置,所述固定顶升装置架设在框架式支架 本体上, 并包括一个支撑座, 它的四角下方各自设有一个固定在框架式支架 本体上的顶升油缸。  The reduction furnace AGD pipe dismounting device is mounted on the frame bracket body and includes a support base, and each of the four corners is provided with a jacking cylinder fixed on the frame bracket body .
所述的还原炉 AGD管道拆装装置,所述前置拆卸支架的基座通过六块直 线导轨滑块横跨在所述框架式支架本体上的两条导轨上,并包括一个由固定 在基座上的液压缸支撑的管道托臂。  The reduction furnace AGD pipe dismounting device, the base of the front disassembly bracket spans two rails on the frame bracket body through six linear guide sliders, and includes a fixed base The pipe support arm supported by the hydraulic cylinder on the seat.
所述的还原炉 AGD管道拆装装置,它还包括 ADG管道就位使用的后置拆 卸支架, 所述后置拆卸支架的上表面为翼缘结构, 尾部有圆弧形的导向板, 导向板下设有和所述轨道滚动连接的滚轮。  The reduction furnace AGD pipe dismounting device further comprises a rear disassembly bracket used by the ADG pipe in position, the upper surface of the rear disassembly bracket is a flange structure, and the tail has a circular arc-shaped guide plate, the guide plate A roller is provided under the rolling connection with the track.
所述的还原炉 AGD管道拆装装置,所述摆动式伸缩臂为包括固定段和运 动段的套筒式箱型体, 其固定段中部铰接固定在钢平台上, 运动段端部釆用 摆动式油缸铰接 AGD管道,而运动段和内藏式在固定端的运动段内的双作用 多级伸缩缸驱动连接。  The reduction furnace AGD pipe dismounting device is a sleeve type box body comprising a fixed section and a moving section, wherein a fixed section is hingedly fixed on the steel platform, and the end of the moving section is oscillated The cylinder is hinged to the AGD pipe, and the moving section and the built-in type are double-acting multi-stage telescopic cylinders in the movable section of the fixed end.
运用权利要求 1-7所述拆装装置的还原炉管道拆装方法, 其特征在于, 它包括:  A method of disassembling a reduction furnace pipe using the disassembly apparatus according to any one of claims 1 to 7, characterized in that it comprises:
步骤一, AGD管道拆装装置的安装步骤: 根据机械图纸在第一个 AGD管 道安装位置安装所述拆装装置, 找正、 调平; 根据电气图纸安装电气设备; 根据液压图纸安装液压设备并配管; 步骤二, 将远炉端的框架式支架旋转 90度, 准备起吊 AGD管; 步骤三, 把后置拆卸支架装置安装到 AGD管前端, 把 AGD管完全吊起在 轨道上方, 将远炉端的框架式支架旋转转回原始位、 联接; 把 AGD管在轨道 上放平; 把前置拆卸支架装置安装到 AGD管尾部; Step 1: Installation steps of the AGD pipe disassembly device: Install the disassembly device in the first AGD pipe installation position according to the mechanical drawings, align and level; install electrical equipment according to electrical drawings; install hydraulic equipment according to hydraulic drawings and Piping; Step 2: Rotate the frame bracket at the far furnace end by 90 degrees to prepare to lift the AGD tube. Step 3: Install the rear disassembly bracket device to the front end of the AGD tube, completely lift the AGD tube above the rail, and frame the far furnace end. Rotate the bracket back to the original position and connect; lay the AGD tube flat on the rail; install the front disassembly bracket device to the tail of the AGD tube;
步骤四, 固定顶升装置升起支撑 AGD管前端, 拆除后置拆卸支架装置, 换上中间法兰, 液压伸缩臂伸出, 联接伸缩臂耳轴与中间法兰耳轴;  Step 4, the fixed jacking device raises and supports the front end of the AGD tube, removes the rear disassembly bracket device, replaces the intermediate flange, and the hydraulic telescopic arm protrudes, and connects the telescopic arm trunnion and the intermediate flange trunnion;
步骤五, 按程序液压伸缩臂拉拽 AGD管, 拉拽共分 9次, 每次一段, 每 次结束固定顶升装置支撑 AGD管, 移动顶升装置下降、 手动退回, 再由移动 顶升装置支撑 AGD管, 固定顶升装置下降, 便于下段或次拉拽, 在第 8次拉 拽前, 去除固定顶升装置, 在第 9次拉拽前, 去除移动顶升装置;  Step 5, according to the program hydraulic telescopic arm pulls the AGD tube, the pull is divided into 9 times, each time, each time the fixed lifting device supports the AGD tube, the moving jacking device is lowered, manually retracted, and then the moving jacking device Supporting the AGD tube, the fixed jacking device is lowered, which facilitates the lower or secondary pulling. Before the 8th pulling, the fixed jacking device is removed, and before the 9th pulling, the moving jacking device is removed;
步骤六, 前置拆卸支架装置液压缸及伸缩臂调整液压缸同时升起, 把 AGD管升起, 放入 AGD管轴承座, 前置拆卸支架装置液压缸及伸缩臂调整液 压缸同时下降, 把 AGD管放在轴承座上, 拆除前置拆卸支架装置与 AGD管的 联接, 拆除中间法兰与伸缩臂及 AGD管的联接, 完成一根 AGD管安装; 步骤七, 把液压伸缩臂、 前置拆卸支架装置、 移动顶升装置、 固定顶升 装置等从位置 1拆除,安装到第二根 AGD管安装位置处,然后按上述步骤二〜 六进行另一根 AGD管的安装。  Step 6. The front demolition bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are raised at the same time, the AGD tube is raised, placed in the AGD tube bearing seat, the front disassembly bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are simultaneously lowered, Place the AGD tube on the bearing housing, remove the connection between the front disassembly bracket device and the AGD tube, remove the connection between the intermediate flange and the telescopic arm and the AGD tube, and complete the installation of an AGD tube; Step 7, the hydraulic telescopic arm, front Remove the bracket device, the moving jacking device, the fixed jacking device, etc. from position 1, and install it to the second AGD pipe installation position, and then install another AGD pipe according to steps 2 to 6 above.
本发明的拆装装置操作便捷, 可拆卸, 可重复利用, 实用性强, 且安全 可靠。 伸缩臂能主动带动 AGD管进和退, 不需额外的驱动控制及人工干涉; 液压系统各回路设有压力传感器和压力表, 可随时检测并监控系统的压力, 各工作油缸均有内置放爆裂阀, 并设有零泄漏安全过载保护阀; 以绝对值编 码器为步进量, 通过编程, 把相关的压力和位置数据分段储存在 PLC里面, 可以随时方便的在触摸屏上观察、 操作、 调整 AGD管的整个拆装过程, 确保 AGD管拆装过程的安全。 该方法解决了 C0REX炉 AGD管道的拆装难题, 可安 全、 平稳、 可靠、 准确、 高效的进行 AGD管拆装工作。  The disassembly device of the invention is convenient to operate, detachable, reusable, practical, safe and reliable. The telescopic arm can actively drive the AGD tube into and out, without additional drive control and manual interference. The pressure circuit and pressure gauge are provided in each circuit of the hydraulic system, and the pressure of the system can be detected and monitored at any time. Each working cylinder has a built-in burst. The valve is equipped with a zero-leakage safety overload protection valve. With the absolute encoder as the stepping quantity, the relevant pressure and position data are stored in the PLC by programming, which can be conveniently observed and operated on the touch screen at any time. Adjust the entire disassembly process of the AGD tube to ensure the safety of the assembly and disassembly process of the AGD tube. The method solves the disassembly and assembly problem of the AGD pipeline of the C0REX furnace, and can safely, smoothly, reliably, accurately and efficiently perform the assembly and disassembly work of the AGD tube.
本发明的拆装该方法满足了 AGD管的拆装全程在炉外作业的施工要求, 实现了 AGD管安全、 平稳、 可靠、 准确、 高效的施工目标, 可实现在线拆装 竖炉内的 AGD管道。本发明比常规方法缩短了多倍的拆装时间, 且大幅减少 了施工措施及降低了施工安全风险。 附图说明 The disassembly and assembly method of the invention satisfies the construction requirements of the whole process of disassembly and assembly of the AGD tube in the furnace, realizes the safe, stable, reliable, accurate and efficient construction target of the AGD tube, and can realize the AGD in the online disassembly and assembly shaft furnace. pipeline. The invention shortens the disassembly and assembly time by more than the conventional method, and greatly reduces the construction measures and reduces the construction safety risk. DRAWINGS
下面, 结合附图对本发明作进一步的说明:  Hereinafter, the present invention will be further described with reference to the accompanying drawings:
图 1为本发明新型示意图;  Figure 1 is a schematic view of the present invention;
图 2为所述框架式支架示意图;  2 is a schematic view of the frame type bracket;
图 3为后置拆卸支架装置示意图;  Figure 3 is a schematic view of the rear disassembly bracket device;
图 4为前置拆卸支架装置示意图;  Figure 4 is a schematic view of the front disassembly bracket device;
图 5为移动、 固定顶升装置示意图;  Figure 5 is a schematic view of a moving, fixed jacking device;
图 6为摆动式伸缩吊臂及底座示意图。  Figure 6 is a schematic view of the swinging telescopic boom and the base.
具体实施方式 detailed description
如图 1所示, 一种还原炉 AGD管道拆装装置, 它包括设置在还原炉的 AGD管道安装位置两侧钢平台, 它包括: 设置在钢平台上的:  As shown in Fig. 1, a reduction furnace AGD pipe disassembly device comprises a steel platform disposed on both sides of an AGD pipe installation position of the reduction furnace, which comprises: disposed on the steel platform:
拆装滑移装置, 它紧靠还原炉一侧设置, 并包括框架式支架本体 2, 支 架本体上 2设有移动顶升装置 4、 固定顶升装置 3, 以及一个前置拆卸支架 一个摆动式伸缩臂 5, 它设置在还原炉的另一侧, 该摆动式伸缩臂本体 正对还原炉 AGD管道的安装孔。  The disassembly and disassembly device is disposed close to the side of the reduction furnace and comprises a frame type bracket body 2, wherein the bracket body 2 is provided with a moving jacking device 4, a fixed jacking device 3, and a front dismounting bracket. The telescopic arm 5 is disposed on the other side of the reduction furnace, and the oscillating telescopic arm body faces the mounting hole of the reduction furnace AGD pipe.
1 拆装滑移装置  1 Disassembly and disassembly device
拆装滑移装置由框架式支架本体 2, 移动顶升装置 4、 固定顶升装置 3, 前置拆卸支架装置 1, 后置拆卸支架装置 (图 1中未能显示) 等组成。  The disassembly and disassembly device is composed of a frame type bracket body 2, a moving jacking device 4, a fixed jacking device 3, a front dismounting bracket device 1, a rear dismounting bracket device (not shown in Fig. 1), and the like.
1. 1框架式支架本体及前、 后置拆卸支架装置  1. 1 frame bracket body and front and rear disassembly bracket device
由于现场工况条件等因素, 把框架式支架本体 2 (见图 2 ) 结构分三段, 由普通碳钢和型钢悍接而成。近炉端的两端由螺栓法兰连接, 远炉端的则由 销轴铰式连接在第 II段上, 当 AGD管需从出铁场进出时, 远炉端可绕一侧销 轴转动, 以让出 AGD管出铁场得管口通道。  Due to factors such as on-site working conditions, the frame-type bracket body 2 (see Fig. 2) is divided into three sections, which are made of ordinary carbon steel and steel. The two ends of the furnace end are connected by bolt flanges, and the far end of the furnace is hingedly connected to the second section. When the AGD tube needs to enter and exit from the tapping field, the far end of the furnace can be rotated around the side pin to allow Out of the AGD tube outlet field to the nozzle channel.
支架本体 2上表面为翼缘结构, 尾部有圆弧形的导向板 6, 利用带滚轮 71的后置拆卸支架装置 7 (见图 3), 使竖直吊起的 AGD管沿圆弧导向缓慢 的滑移下落至水平位置, 让 AGD管正好纵向卧在支架本体 2上。  The upper surface of the bracket body 2 is a flange structure, and the tail portion has a circular arc-shaped guide plate 6. The rear-mounted detaching bracket device 7 (see Fig. 3) is used to guide the vertically hoisted AGD tube along the arc. The slippage falls to the horizontal position, and the AGD tube is placed on the stent body 2 in the longitudinal direction.
另外, 支架本体 2的上层内侧安装有两条平行的, 纵向贯通整个支架的 滚柱式重载直线导轨, 前置拆卸支架装置 1 (见图 4) 通过六块直线导轨滑 块 13横跨在两条导轨上, 其内置的液压缸 11托着 AGD管的一端, 配合顶升 装置 12, 在拆装伸缩臂的牵引下, 实现 AGD管沿直线导轨纵向水平进出竖 炉。 In addition, two parallel roller-type heavy-duty linear guides longitudinally penetrating the entire bracket are mounted on the inner side of the upper body of the bracket body 2, and the front dismounting bracket device 1 (see Fig. 4) is slid through six linear guide rails. The block 13 spans the two guide rails, and the built-in hydraulic cylinder 11 supports one end of the AGD tube, and cooperates with the jacking device 12 to realize the horizontal movement of the AGD tube into and out of the shaft furnace along the linear guide rail under the traction of the disassembly and disassembly arm.
1. 2 移动顶升装置 4、 固定顶升装置 3  1. 2 mobile jacking device 4. fixed jacking device 3
由于 AGD管表面有耐火材料, 不能直接托在 AGD管表面上, AGD管的运 动必须分步骤的进出竖炉。 为此, 在支架本体 2近炉侧, 设置了一套移动顶 升装置 4和一套固定顶升装置 3, 让两套顶升装置轮流顶在 AGD管能着力的 裙带支脚合适位置上。 移动顶升装置 4支架通过底部的四个滚轮 41可在支 架本体 2中部的翼缘上作纵向水平运动, 空载时手能推动; 固定顶升装置 3 与移动顶升装置 4非常相似, 唯一不同的是其不需要移动, 直接固定在支架 本体 2上即可, 考虑设计、 制作、 安装、 成本等因素, 我们做了两套同样的 顶升装置 (见图 5)。  Since the surface of the AGD tube has refractory material and cannot be directly attached to the surface of the AGD tube, the movement of the AGD tube must be carried out in and out of the shaft furnace in steps. To this end, on the near furnace side of the bracket body 2, a set of moving jacking device 4 and a set of fixed jacking device 3 are provided, so that the two sets of jacking devices are alternately placed in a suitable position on the skirt legs of the AGD tube. The moving jacking device 4 supports the longitudinal horizontal movement on the flange of the middle portion of the bracket body 2 through the four rollers 41 at the bottom, and the hand can be pushed when no-load; the fixed jacking device 3 is very similar to the moving jacking device 4, only The difference is that it does not need to be moved and can be directly fixed on the bracket body 2. Considering the factors of design, manufacture, installation, cost, etc., we have made two sets of the same jacking device (see Figure 5).
两套顶升装置均分两层, 下层为带滚轮 41 的主支撑体, 内置四个同步 顶升油缸 42 ; 上层为多孔 (减轻重量) 轻钢支座 43, 该支座可由人力现场 拆装搬运。 当移动顶升装置和固定顶升装置上层被拆除时, 前置拆卸支架装 置与后置拆卸支架装置均能越顶通过移动顶支架。  The two sets of jacking devices are divided into two layers, the lower layer is the main support body with rollers 41, and four synchronous jacking cylinders 42 are built in; the upper layer is a porous (weight-reducing) light steel support 43, which can be disassembled by manpower. Handling. When the upper layer of the moving jacking device and the fixed jacking device are removed, both the front dismounting bracket device and the rear dismounting bracket device can pass over the moving top bracket.
2 摆动式伸缩臂 (简称 "伸缩臂")  2 swinging telescopic arm (referred to as "retractable arm")
所谓的摆动式伸缩吊臂 5 (见图 6), 是指伸缩臂釆用套筒式箱型体, 非 运动段中部釆用固定式铰接 51, 前伸端部釆用摆动式油缸铰接 52, 而运动 段悬伸杆头釆用铰接 53, 由内藏式双作用多级伸缩缸驱动伸缩臂的 "伸" 与 "缩", 其摆动则由摆动液压缸控制。 这样的结构非常类似于吊车的吊臂。  The so-called oscillating telescopic boom 5 (see Fig. 6) refers to a telescopic boom 套筒 sleeve type box body, a fixed hinge 51 is used for the middle part of the non-moving section, and a swinging cylinder hinge 52 is used for the forward end portion. In the moving section, the overhanging head is hinged 53, and the built-in double-acting multi-stage telescopic cylinder drives the "stretching" and "retracting" of the telescopic arm, and the swing is controlled by the swinging hydraulic cylinder. This structure is very similar to the boom of a crane.
运用所述拆装装置的还原炉管道拆装方法, 它包括:  A reduction furnace pipe disassembly method using the disassembly device, which comprises:
步骤一, AGD管道拆装装置的安装步骤: 根据机械图纸在第一个 AGD管 道安装位置安装所述拆装装置, 找正、 调平; 根据电气图纸安装电气设备; 根据液压图纸安装液压设备并配管;  Step 1: Installation steps of the AGD pipe disassembly device: Install the disassembly device in the first AGD pipe installation position according to the mechanical drawings, align and level; install electrical equipment according to electrical drawings; install hydraulic equipment according to hydraulic drawings and Piping;
步骤二, 将远炉端的框架式支架旋转 90度, 准备起吊 AGD管; 步骤三, 把后置拆卸支架装置安装到 AGD管前端, 把 AGD管完全吊起在 轨道上方, 将远炉端的框架式支架旋转转回原始位、 联接; 把 AGD管在轨道 上放平; 把前置拆卸支架装置安装到 AGD管尾部; 步骤四, 固定顶升装置升起支撑 AGD管前端, 拆除后置拆卸支架装置, 换上中间法兰, 液压伸缩臂伸出, 联接伸缩臂耳轴与中间法兰耳轴; Step 2: Rotate the frame bracket at the far furnace end by 90 degrees to prepare to lift the AGD tube. Step 3: Install the rear disassembly bracket device to the front end of the AGD tube, completely lift the AGD tube above the rail, and frame the far furnace end. Rotate the bracket back to the original position and connect; lay the AGD tube flat on the rail; install the front disassembly bracket device to the tail of the AGD tube; Step 4, the fixed jacking device is raised to support the front end of the AGD tube, the rear disassembly bracket device is removed, the intermediate flange is replaced, the hydraulic telescopic arm is extended, and the telescopic arm trunnion and the intermediate flange trunnion are coupled;
步骤五, 按程序液压伸缩臂拉拽 AGD管, 拉拽共分 9次, 每次一段, 每 次结束固定顶升装置支撑 AGD管, 移动顶升装置下降、 手动退回, 再由移动 顶升装置支撑 AGD管, 固定顶升装置下降, 便于下段或次拉拽, 在第 8次拉 拽前, 去除固定顶升装置, 在第 9次拉拽前, 去除移动顶升装置;  Step 5, according to the program hydraulic telescopic arm pulls the AGD tube, the pull is divided into 9 times, each time, each time the fixed lifting device supports the AGD tube, the moving jacking device is lowered, manually retracted, and then the moving jacking device Supporting the AGD tube, the fixed jacking device is lowered, which facilitates the lower or secondary pulling. Before the 8th pulling, the fixed jacking device is removed, and before the 9th pulling, the moving jacking device is removed;
步骤六, 前置拆卸支架装置液压缸及伸缩臂调整液压缸同时升起, 把 AGD管升起, 放入 AGD管轴承座, 前置拆卸支架装置液压缸及伸缩臂调整液 压缸同时下降, 把 AGD管放在轴承座上, 拆除前置拆卸支架装置与 AGD管的 联接, 拆除中间法兰与伸缩臂及 AGD管的联接, 完成一根 AGD管安装; 步骤七, 把液压伸缩臂、 前置拆卸支架装置、 移动顶升装置、 固定顶升 装置等从位置 1拆除,安装到第二根 AGD管安装位置处,然后按上述步骤二〜 六进行另一根 AGD管的安装。  Step 6. The front demolition bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are raised at the same time, the AGD tube is raised, placed in the AGD tube bearing seat, the front disassembly bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are simultaneously lowered, Place the AGD tube on the bearing housing, remove the connection between the front disassembly bracket device and the AGD tube, remove the connection between the intermediate flange and the telescopic arm and the AGD tube, and complete the installation of an AGD tube; Step 7, the hydraulic telescopic arm, front Remove the bracket device, the moving jacking device, the fixed jacking device, etc. from position 1, and install it to the second AGD pipe installation position, and then install another AGD pipe according to steps 2 to 6 above.

Claims

权利要求 Rights request
1.一种还原炉 AGD管道拆装装置,它包括设置在还原炉的 AGD管道安装 位置两侧钢平台, 其特征在于, 它包括: 设置在钢平台上的: A reduction furnace AGD pipe disassembly apparatus comprising a steel platform disposed on both sides of an AGD pipe installation position of a reduction furnace, characterized in that it comprises: a steel platform:
管道滑移装置, 它紧靠还原炉一侧设置, 并包括框架式支架本体, 支架 本体上设有移动顶升装置、 固定顶升装置, 以及一个前置拆卸支架和一个后 置拆卸支架;  a pipe slip device disposed adjacent to the side of the reduction furnace and comprising a frame type bracket body, wherein the bracket body is provided with a moving jacking device, a fixed jacking device, and a front dismounting bracket and a rear dismounting bracket;
一个摆动式伸缩臂, 它设置在还原炉的另一侧, 该摆动式伸缩臂本体正 对还原炉 AGD管道的安装孔。  An oscillating telescopic arm is disposed on the other side of the reduction furnace, and the oscillating telescopic arm body faces the mounting hole of the reduction furnace AGD pipe.
2. 根据权利要求 1所述的还原炉 AGD管道拆装装置, 其特征在于, 所 述框架式支架本体包括近炉段, 连接段和远炉端, 近炉段由螺栓法兰连接连 接段, 远炉段则由销轴铰接在连接段上; 框架式支架本体的上层内侧安装有 两条平行的, 纵向贯通整个支架的滚柱式重载直线导轨。  2. The reduction furnace AGD pipe dismounting device according to claim 1, wherein the frame type bracket body comprises a near furnace section, a connecting section and a distal furnace end, and the near furnace section is connected by a bolt flange connection section, far The furnace section is hinged to the connecting section by a pin shaft; the upper side of the upper side of the frame bracket body is mounted with two parallel roller-type heavy-duty linear guides extending longitudinally through the entire bracket.
3.根据权利要求 1所述的还原炉 AGD管道拆装装置, 其特征在于, 所述 移动顶升装置架设在框架式支架本体上, 并包括一个支撑座, 它的四角下方 各自设有一个顶升油缸,顶升油缸本体侧面连接一个带有滚轮的连接板以沿 着所述框式支架本体上的直线导轨移动。  The reduction furnace AGD pipe dismounting device according to claim 1, wherein the moving jacking device is mounted on the frame bracket body and includes a support base, and each of the four corners is provided with a top The lift cylinder is connected to a side of the jack cylinder body with a connecting plate with a roller to move along the linear guide on the frame bracket body.
4.根据权利要求 1所述的还原炉 AGD管道拆装装置, 其特征在于, 所述 固定顶升装置架设在框架式支架本体上, 并包括一个支撑座, 它的四角下方 各自设有一个固定在框架式支架本体上的顶升油缸。  The reduction furnace AGD pipe dismounting device according to claim 1, wherein the fixed jacking device is mounted on the frame bracket body and includes a support base, and each of the four corners is provided with a fixing Jacking cylinder on the frame bracket body.
5. 根据权利要求 1所述的还原炉 AGD管道拆装装置, 其特征在于, 所 述前置拆卸支架的基座通过六块直线导轨滑块横跨在所述框架式支架本体 上的两条导轨上, 并包括一个由固定在基座上的液压缸支撑的管道托臂。  The reduction furnace AGD pipe dismounting device according to claim 1, wherein the base of the front disassembly bracket spans two of the frame bracket bodies through six linear guide sliders On the rail, and including a pipe support arm supported by a hydraulic cylinder fixed to the base.
6.根据权利要求 1所述的还原炉 AGD管道拆装装置, 其特征在于, 它还 包括 ADG管道就位使用的后置拆卸支架,所述后置拆卸支架的上表面为翼缘 结构, 尾部有圆弧形的导向板, 导向板下设有和所述轨道滚动连接的滚轮。  The reduction furnace AGD pipe dismounting device according to claim 1, further comprising a rear disassembly bracket for use in position of the ADG pipe, the upper surface of the rear disassembly bracket being a flange structure, a tail portion There is a circular arc-shaped guide plate, and a roller connected to the track is provided under the guide plate.
7. 根据权利要求 1所述的还原炉 AGD管道拆装装置, 其特征在于, 所 述摆动式伸缩臂为包括固定段和运动段的套筒式箱型体,其固定段中部铰接 固定在钢平台上, 运动段端部釆用摆动式油缸铰接 AGD管道, 而运动段和藏 在固定端的运动段内的内藏式双作用多级伸缩缸驱动连接。 The reduction furnace AGD pipe dismounting device according to claim 1, wherein the swinging telescopic arm is a sleeve type box body including a fixed section and a moving section, and the fixing section is hingedly fixed to the steel in the middle On the platform, the end of the moving section is hinged with an AGD pipe, and the moving section and the Tibetan A built-in double-acting multi-stage telescopic cylinder drive connection in the fixed section of the motion section.
8.根据运用权利要求 1-7所述拆装装置的还原炉管道拆装方法,其特征 在于, 它包括:  A method of disassembling a reduction furnace pipe according to the disassembly apparatus according to any one of claims 1 to 7, characterized in that it comprises:
步骤一, AGD管道拆装装置的安装步骤: 根据机械图纸在第一个 AGD管 道安装位置安装所述拆装装置, 找正、 调平; 根据电气图纸安装电气设备; 根据液压图纸安装液压设备并配管;  Step 1: Installation steps of the AGD pipe disassembly device: Install the disassembly device in the first AGD pipe installation position according to the mechanical drawings, align and level; install electrical equipment according to electrical drawings; install hydraulic equipment according to hydraulic drawings and Piping;
步骤二, 将远炉端的框架式支架旋转 90度, 准备起吊 AGD管; 步骤三, 把后置拆卸支架装置安装到 AGD管前端, 把 AGD管完全吊起在 轨道上方, 将远炉端的框架式支架旋转转回原始位、 联接; 把 AGD管在轨道 上放平; 把前置拆卸支架装置安装到 AGD管尾部;  Step 2: Rotate the frame bracket at the far furnace end by 90 degrees to prepare to lift the AGD tube. Step 3: Install the rear disassembly bracket device to the front end of the AGD tube, completely lift the AGD tube above the rail, and frame the far furnace end. Rotate the bracket back to the original position and connect; lay the AGD tube flat on the rail; install the front disassembly bracket device to the tail of the AGD tube;
步骤四, 固定顶升装置升起支撑 AGD管前端, 拆除后置拆卸支架装置, 换上中间法兰, 液压伸缩臂伸出, 联接伸缩臂耳轴与中间法兰耳轴;  Step 4, the fixed jacking device raises and supports the front end of the AGD tube, removes the rear disassembly bracket device, replaces the intermediate flange, and the hydraulic telescopic arm protrudes, and connects the telescopic arm trunnion and the intermediate flange trunnion;
步骤五, 按程序液压伸缩臂拉拽 AGD管, 拉拽共分 9次, 每次一段, 每 次结束固定顶升装置支撑 AGD管, 移动顶升装置下降、 手动退回, 再由移动 顶升装置支撑 AGD管, 固定顶升装置下降, 便于下段或次拉拽, 在第 8次拉 拽前, 去除固定顶升装置, 在第 9次拉拽前, 去除移动顶升装置;  Step 5, according to the program hydraulic telescopic arm pulls the AGD tube, the pull is divided into 9 times, each time, each time the fixed lifting device supports the AGD tube, the moving jacking device is lowered, manually retracted, and then the moving jacking device Supporting the AGD tube, the fixed jacking device is lowered, which facilitates the lower or secondary pulling. Before the 8th pulling, the fixed jacking device is removed, and before the 9th pulling, the moving jacking device is removed;
步骤六, 前置拆卸支架装置液压缸及伸缩臂调整液压缸同时升起, 把 AGD管升起, 放入 AGD管轴承座, 前置拆卸支架装置液压缸及伸缩臂调整液 压缸同时下降, 把 AGD管放在轴承座上, 拆除前置拆卸支架装置与 AGD管的 联接, 拆除中间法兰与伸缩臂及 AGD管的联接, 完成一根 AGD管安装; 步骤七, 把液压伸缩臂、 前置拆卸支架装置、 移动顶升装置、 固定顶升 装置等从位置 1拆除,安装到第二根 AGD管安装位置处,然后按上述步骤二〜 六进行另一根 AGD管的安装。  Step 6. The front demolition bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are raised at the same time, the AGD tube is raised, placed in the AGD tube bearing seat, the front disassembly bracket device hydraulic cylinder and the telescopic arm adjustment hydraulic cylinder are simultaneously lowered, Place the AGD tube on the bearing housing, remove the connection between the front disassembly bracket device and the AGD tube, remove the connection between the intermediate flange and the telescopic arm and the AGD tube, and complete the installation of an AGD tube; Step 7, the hydraulic telescopic arm, front Remove the bracket device, the moving jacking device, the fixed jacking device, etc. from position 1, and install it to the second AGD pipe installation position, and then install another AGD pipe according to steps 2 to 6 above.
PCT/CN2012/074880 2011-07-27 2012-04-28 Device and method for dismounting agd pipe of reduction furnace WO2013013525A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ZA2013/08699A ZA201308699B (en) 2011-07-27 2013-11-21 Device and method for mounting and dismounting agd pipeline of reducing furnace

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201110211486 2011-07-27
CN201110211486.X 2011-07-27

Publications (1)

Publication Number Publication Date
WO2013013525A1 true WO2013013525A1 (en) 2013-01-31

Family

ID=47408932

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/074880 WO2013013525A1 (en) 2011-07-27 2012-04-28 Device and method for dismounting agd pipe of reduction furnace

Country Status (3)

Country Link
CN (5) CN202639759U (en)
WO (1) WO2013013525A1 (en)
ZA (1) ZA201308699B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105499969A (en) * 2014-09-22 2016-04-20 上海航天精密机械研究所 Rotational tube feeding platform for precise cylindrical part
CN112045606A (en) * 2020-07-20 2020-12-08 中石化宁波工程有限公司 Convenient disassembly and assembly process for ethylene cracking furnace tube
CN114468332A (en) * 2022-02-14 2022-05-13 江苏丰尚智能科技有限公司 Forming die for extruder and material extrusion forming and disassembling and assembling method thereof

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104741910B (en) * 2013-12-31 2017-01-18 中核武汉核电运行技术股份有限公司 Mounting trolley for integral group-synchronizing stud tensioner
CN104191222B (en) * 2014-09-11 2016-09-28 郑州贝龙液压技术有限公司 Large-sized grinder lining-plate bolt and ring flange special demounting device
CN111113296B (en) * 2019-12-13 2021-04-23 北京动力机械研究所 Annular curved surface flow calibration tool

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2847468A1 (en) * 1978-11-02 1980-05-08 Kubota Ltd Pipe nesting and support mechanism - has support member with arm extending through it and lifting mechanism
US4409023A (en) * 1980-09-12 1983-10-11 Korf-Stahl Ag Process for directly making liquid pig-iron from coarse iron ore
US5032054A (en) * 1987-11-04 1991-07-16 Serv-Tech, Inc. Aerial bundle puller
CN1380212A (en) * 2002-04-30 2002-11-20 太原重型机械(集团)有限公司 Tunnel pipe transporting mounting vehicle
US20060081400A1 (en) * 2004-10-18 2006-04-20 Baer Richard D System and method for relocating extended length objects
CN2786051Y (en) * 2005-02-04 2006-06-07 贵阳铝镁设计研究院 Rod lifting conveyor
CN201276408Y (en) * 2009-01-20 2009-07-22 王玉雷 Precast beam mobile device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2847468A1 (en) * 1978-11-02 1980-05-08 Kubota Ltd Pipe nesting and support mechanism - has support member with arm extending through it and lifting mechanism
US4409023A (en) * 1980-09-12 1983-10-11 Korf-Stahl Ag Process for directly making liquid pig-iron from coarse iron ore
US5032054A (en) * 1987-11-04 1991-07-16 Serv-Tech, Inc. Aerial bundle puller
CN1380212A (en) * 2002-04-30 2002-11-20 太原重型机械(集团)有限公司 Tunnel pipe transporting mounting vehicle
US20060081400A1 (en) * 2004-10-18 2006-04-20 Baer Richard D System and method for relocating extended length objects
CN2786051Y (en) * 2005-02-04 2006-06-07 贵阳铝镁设计研究院 Rod lifting conveyor
CN201276408Y (en) * 2009-01-20 2009-07-22 王玉雷 Precast beam mobile device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
LUO, KAI ET AL.: "Technology of Controlling Gas Flow in COREX Shaft Furnace", IRONMAKING, vol. 30, no. 3, June 2001 (2001-06-01), pages 63 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105499969A (en) * 2014-09-22 2016-04-20 上海航天精密机械研究所 Rotational tube feeding platform for precise cylindrical part
CN105499969B (en) * 2014-09-22 2017-10-27 上海航天精密机械研究所 Accurate columnar member is rotated into a platform
CN112045606A (en) * 2020-07-20 2020-12-08 中石化宁波工程有限公司 Convenient disassembly and assembly process for ethylene cracking furnace tube
CN112045606B (en) * 2020-07-20 2022-02-15 中石化宁波工程有限公司 Convenient disassembly and assembly process for ethylene cracking furnace tube
CN114468332A (en) * 2022-02-14 2022-05-13 江苏丰尚智能科技有限公司 Forming die for extruder and material extrusion forming and disassembling and assembling method thereof
CN114468332B (en) * 2022-02-14 2023-12-05 江苏丰尚智能科技有限公司 Forming die for extruder and material extrusion forming and disassembling method thereof

Also Published As

Publication number Publication date
CN202639759U (en) 2013-01-02
CN202640257U (en) 2013-01-02
CN202639760U (en) 2013-01-02
ZA201308699B (en) 2015-03-25
CN202639761U (en) 2013-01-02
CN202639805U (en) 2013-01-02

Similar Documents

Publication Publication Date Title
WO2013013525A1 (en) Device and method for dismounting agd pipe of reduction furnace
US8439604B2 (en) Pipe support system and method for use in underground pipe ramming
CN111188641A (en) Shield tunnel steel pipe sheet lining reinforcing mechanical arm
CN201411900Y (en) Hydraulic die lifter for chimneys
CN101566005B (en) Chimney hydraulic mould lifting device
CN115596463A (en) Arch frame installation device for repairing operated tunnel defects
CN103063032A (en) Rotary kiln brick-laying machine and use method thereof
WO2024087901A1 (en) Cantilever casting and locomotion all-in-one machine
CN111350523B (en) Construction method and device for dismantling negative ring in limited space
CN108622806B (en) Hoisting tool and method for replacing thickness control device by using same
CN210001467U (en) Hoisting device used in limited space workshop
CN209114417U (en) Harbour integrated construction system based on stake top top pushing platform
CN215404322U (en) Blast furnace air pipe maintenance device
CN108194111A (en) A kind of umbrella arch splash guard, reinforced mesh are laid with ancillary equipment
CN210046270U (en) Pipe mould automatic correction translation device
JP4127940B2 (en) Method for carrying in / out of feed water heater in condenser and carrying in / out device for feed water heater in condenser
CN113152396A (en) Slip form trolley and construction method thereof
CN202350523U (en) Bricking machine for rotary kiln
CN105672910B (en) Oil pipe traction lifting Aided Machine
CN220151366U (en) Multimode walking type lining trolley
CN111188288A (en) Construction method for replacing key points of business line of high-speed railway
CN220851268U (en) Auxiliary via hole device of drainage pipeline inspection robot
CN212004129U (en) Movable belt conveyor wheel replacing support
CN220768069U (en) Portable bearing structure of superelevation breakwater template
CN218613783U (en) Auxiliary device for replacing fan-shaped plate of online drum

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12817957

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12817957

Country of ref document: EP

Kind code of ref document: A1