WO2012113235A1 - 一种电力系统新建变电站降损率的计算方法 - Google Patents

一种电力系统新建变电站降损率的计算方法 Download PDF

Info

Publication number
WO2012113235A1
WO2012113235A1 PCT/CN2011/080827 CN2011080827W WO2012113235A1 WO 2012113235 A1 WO2012113235 A1 WO 2012113235A1 CN 2011080827 W CN2011080827 W CN 2011080827W WO 2012113235 A1 WO2012113235 A1 WO 2012113235A1
Authority
WO
WIPO (PCT)
Prior art keywords
model
data
new
substation
loss
Prior art date
Application number
PCT/CN2011/080827
Other languages
English (en)
French (fr)
Inventor
王晓蔚
范辉
王鹏
Original Assignee
河北省电力研究院
国家电网公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 河北省电力研究院, 国家电网公司 filed Critical 河北省电力研究院
Publication of WO2012113235A1 publication Critical patent/WO2012113235A1/zh

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • the invention relates to the technical field of power system parameter detection, in particular to a method for calculating a loss reduction rate of a newly constructed substation of a power system.
  • the power system investment benefit evaluation indicators include the main power grid new construction and transformation investment income indicators.
  • the main grid (110/220kV) new and transformation investment indicators include individual project investment income indicators, individual project investment benefit assessment scope: from project to production year At the end of the year, the power transmission and transformation project has been completed for one year.
  • the assessment data is the operational data for the first anniversary since the project is put into operation.
  • Theoretical reduction rate of new substation theoretical calculation of regional line loss of electricity / regional power supply (calculated according to the project production schedule).
  • the power system has a large workload for the construction and renovation of the main network (110/220kV) every year. According to the assessment requirements, the theoretical calculation period is one month from the completion of the engineering load change. If the new reduction rate of each substation is manually calculated, it is necessary to calculate the power generation and load for one month, and the workload is very large.
  • the technical problem to be solved by the present invention is to provide a calculation method for the loss reduction rate of a new substation of a power system, and provide an auxiliary decision-making basis for power grid loss management and grid planning investment; and greatly reduce the workload of related personnel.
  • Embodiments of the present invention provide a method for calculating a loss reduction rate of a new substation of a power system, and the method includes the following steps:
  • Determining the operation plan from the determined grid computing model and the grid data model loading the determined grid computing model to the research state one, loading the historical section running data to the research state one, setting the historical section An operation scheme for running the data model; determining a load transfer scheme; the research state 1 is a state in which the network loss system is conveniently set for calculation, and is used for storing data;
  • the network loss rate in the selected time period is calculated by the operation scheme.
  • the operation scheme includes an operating state setting, adjusting a resistance or a reactance value of the line, adjusting an active or reactive power of the generator, and a load transfer setting, where the operating state setting includes commissioning and exiting of the line.
  • the network loss rate in the selected time period is calculated by the operation scheme, specifically:
  • the calculated loss reduction rate of the newly constructed substation is specifically:
  • the difference between the network loss before and after the engineering change is calculated, which is the theoretical calculation of the line loss of the area.
  • the theoretical calculation of the ratio of the line loss and the regional power supply is the theoretical loss rate of the new substation.
  • the calculated loss reduction rate of the newly constructed substation is specifically:
  • the difference between the network loss before and after the engineering change is the theoretical calculation of the line loss of the area.
  • the ratio of the theoretical value of the line loss and the regional power supply is the theoretical loss of the new substation. Rate.
  • the network loss rate in the selected time period is calculated by the operation scheme; and further comprising: outputting the calculation result to the interface, and storing the calculation result.
  • the present invention has the following advantages:
  • the beneficial effect of the invention is that the method can be used for analyzing and calculating the loss-reduction benefit of the production project, and providing an auxiliary decision-making basis for the grid network loss management and the grid planning investment; and greatly reducing the workload of the relevant personnel.
  • Embodiment 1 is a flow chart of Embodiment 1 of a theoretical reduction rate of a new substation provided by the present invention
  • FIG. 2 is a main interface diagram corresponding to a calculation flow provided by the present invention.
  • Figure 3 is a flow chart of finding a new substation provided by the present invention.
  • Figure 4 is an interface diagram corresponding to Figure 3;
  • FIG. 5 is a flowchart of calculating a network loss rate in a selected time period according to the present invention
  • FIG. 6 is an interface diagram of an operation scheme provided by the present invention.
  • FIG. 7 is a diagram of a load transfer interface provided by the present invention.
  • FIG. 1 the figure is a flow chart of the theoretical loss reduction rate of a new substation provided by the present invention.
  • S101 Determine a grid computing model and a grid data model to be studied; wherein, the grid computing model is divided into: a new model and an old model; the grid data model is divided into: old data and new data.
  • the old data and the new model are the old operational data model before the substation is put into operation and the new grid computing model after the substation is put into operation;
  • the new data and the old model are the new operational data model after the substation is put into operation and the old grid calculation model before the substation is put into operation.
  • S102 determining, by the S101, the grid computing model and the grid data model determining an operation scheme: loading the grid computing model determined by S101 (the new grid computing model or the old grid computing model) to the research state one, loading the historical section running data to the research state First, set the operation plan of the historical section running data model; determine the load transfer plan.
  • the operation scheme includes an operating state setting, adjusting a resistance or a reactance value of the line, adjusting an active or reactive power of the generator, and a load transfer setting, where the operating state setting includes commissioning and exiting of the line.
  • the research state 1 is a state in which the network loss system is conveniently set for calculation, and is used for storing data.
  • the calculation plan of the new model, the time of loading the calculation model is the time after the new substation is put into operation, and the time of loading the data model is the time before the new substation is put into operation.
  • the calculation plan of the new data is the time before the new substation is put into operation
  • the time of loading the data model is the time after the new substation is put into operation
  • the selection period includes a plurality of sections, each section corresponds to a section of time, and the historical section operation data of the section corresponding to each time is loaded. For example, if the selection time period is one hour and every 15 minutes is a section, there are four sections in the selection period.
  • the E format measurement mapping file stores the measurement data (such as voltage and current) in the power system into a file in a certain format.
  • the beneficial effect of the calculation method for the new substation loss reduction rate of the power system is that the method can be used for analyzing and calculating the loss reduction benefit of the production project, and providing an auxiliary decision basis for the grid network loss management and the grid planning investment; Greatly reduced the workload of the relevant personnel.
  • the provincial adjustment refers to the dispatching center of the provincial power company;
  • the local adjustment refers to the dispatching center of the subordinate city power company in the province.
  • the area where the theoretical loss reduction rate is calculated is the 220kV network of the power system and the llOkV network within the power supply range.
  • the theoretical calculation cycle is one month from the completion of the engineering load cut.
  • the theoretical calculation data base is the data acquisition and monitoring control system (SCADA, Supervisory Control And Data Acquisition), which is the trend data recorded by the SCADA system.
  • SCADA Supervisory Control And Data Acquisition
  • the calculated density is 1 section every 15 minutes.
  • the line loss and the area supply are theoretical integration data.
  • the calculation method adopts the comparison method. According to the original operation mode (no new substation) and the modified operation mode (with new substation), the network loss is calculated and the difference is calculated, which is the theoretical calculation of the regional line loss quantity change value. Calculating the ratio of the change in the regional line loss and the regional power supply is the theoretical loss reduction rate of the new substation.
  • FIG. 3 the figure is a flowchart of finding a new substation provided by the present invention.
  • S302 Download all the sections in the selected time period from the server according to the selection period.
  • S303 Compare with all the sections in the selected time period based on the starting time section to determine whether there is a new substation. If yes, execute S304; otherwise, execute S305;
  • S305 Whether all sections are compared; if yes, the process ends; if not, returns to S303.
  • FIG. 4 the figure is an interface diagram for finding a new substation provided by the present invention.
  • the calculation plan of the new model is the time after the new substation is put into operation
  • the time of loading the data model is the time before the new substation is put into operation
  • the calculation plan of the new data is the time before the new substation is put into operation
  • the time of loading the data model is the time after the new substation is put into operation
  • the transformers and lines of the new substation are removed, the load of the new substation is transferred to the adjacent substation, and the data section is restored to the state before the engineering change, and the network loss is calculated.
  • the difference between the two is the theoretical calculation of the change in the line loss of the area.
  • the ratio of the theoretical value of the line loss and the regional power supply is the theoretical loss rate of the new substation.
  • the transformers and lines of the new substation are added.
  • the load transfer around the new substation is transferred to the new substation to calculate the network loss.
  • the figure is a flow chart of calculating the network loss rate of the grid computing model during the selected time period provided by the present invention.
  • Fig. 5 is a diagram showing the calculation method of the loss reduction rate provided by the present invention from the combination of the client and the server, respectively.
  • S501a loading the grid computing model to be researched into the research state one, setting an operation scheme of the grid computing model
  • S502a loading the historical section data model to the research state one, setting an operation plan of the historical section
  • S503a submitting the operation plan of the power grid calculation model and the operation plan of the historical section to the server;
  • S504a sequentially performing an operation scheme of each section in the selected time period
  • S502b loading the cross-section data model according to the section time to study state 1, generating an E-format measurement mapping file, and obtaining a corresponding value of the transfer load in the research state 1;
  • FIG. 6 the figure is an interface diagram of an operation scheme provided by the present invention.
  • the operating plan includes adding a new line, cutting off a transformer, and so on. It is possible to build a new substation or cut off a substation.
  • FIG. 7 is a load transfer interface diagram provided by the present invention.

Abstract

一种电力系统新建变电站降损率的计算方法,包括:确定要研究的电网计算模型和电网数据模型;其中,电网计算模型分为:新模型和老模型两种;电网数据模型分为:老数据和新数据两种;由确定的所述电网计算模型和电网数据模型确定操作方案:装载确定的电网计算模型到研究态一,装载历史断面运行数据到研究态一,设置该历史断面运行数据模型的操作方案;确定负荷转移方案;所述研究态一分别是网损系统为了计算方便设置的一个状态,用于存储数据;由所述操作方案计算选择时间段内的网损率。应用本方法可对投产项目的降损效益进行分析计算,为电网网损管理和电网规划投资提供辅助决策依据;同时大大减轻了工作人员的工作量。

Description

一种电力系统新建变电站降损率的计算方法
本申请要求于 2011 年 2 月 23 日提交中国专利局、 申请号为 201110042935.2、 发明名称为"电力系统新建变电站降损率的计算方法"的中国 专利申请的优先权, 其全部内容通过引用结合在本申请中。
技术领域
本发明涉及电力系统参数检测技术领域,特别涉及一种电力系统新建变电 站降损率的计算方法。
背景技术
电力系统投资效益考核指标包括主电网新建与改造投资收益指标,主电网 ( 110/220kV )新建与改造投资的指标内容包括单项工程投资收益指标, 单项 工程投资效益考核范围: 从工程投产至考核年年底运行已满 1 年的输变电工 程。 考核依据数据为自工程投运日起, 1周年内的运行数据。 新建变电站的理 论降损率 =理论计算区域线损电量变化值 /区域供电量 (按项目投产时序计 算)。
电力系统每年主网 ( 110/220kV )新建与改造的工作量很大。 按照考核要 求, 理论计算周期为工程负荷切改完成日起 1个月,如果对每个变电站新建引 起的降损率进行手工计算, 则需要统计一个月的发电、 负荷情况, 工作量非常 大。
发明内容
本发明所要解决的技术问题是提供一种电力系统新建变电站降损率的计 算方法, 为电网网损管理和电网规划投资提供辅助决策依据; 同时大大减轻了 相关人员的工作量。
本发明实施例提供一种电力系统新建变电站降损率的计算方法,所述方法 包括如下步骤:
确定要研究的电网计算模型和电网数据模型; 其中, 电网计算模型分为: 新模型和老模型两种; 电网数据模型分为: 老数据和新数据两种;
由确定的所述电网计算模型和电网数据模型确定操作方案:装载确定的电 网计算模型到研究态一, 装载历史断面运行数据到研究态一,设置该历史断面 运行数据模型的操作方案; 确定负荷转移方案; 所述研究态一分别是网损系统 为了计算方便设置的一个状态, 用于存储数据;
由所述操作方案计算选择时间段内的网损率。
优选地, 所述操作方案包括运行状态设置、 调节线路的电阻或电抗值、 调 节发电机的有功或无功、 负荷转移设置, 所述运行状态设置包括线路的投运、 退出。
优选地, 由所述操作方案计算选择时间段内的网损率, 具体为:
根据装载历史断面运行数据的断面时间装载该历史断面运行数据到研究 态一,生成 E格式量测映射文件,并获取研究态一操作方案中要转移的负荷值; 把 E格式量测映射文件映射到研究态一的电网计算模型中,对研究态一的电网 计算模型进行计算;所述 E格式量测映射文件,是指将电力系统中的量测数据 按预定格式存放成一个文件。
优选地, 当研究的电网计算模型为新模型, 确定的电网数据模型为老数据 时, 计算新建变电站的降损率具体为:
下载工程切改完成之后的新模型数据断面, 计算网络损耗的情况; 根据新模型中变电站的变化信息, 切除新建变电站的变压器和线路, 将新 建变电站的负荷转移到相邻变电站,将数据断面恢复成工程切改前的状态, 计 算网络损耗的情况;
求工程切改前后的网络损耗的差值, 即为理论计算区域线损电量变化值; 理论计算区域线损电量变化值与区域供电量的比值为新建变电站的理论降损 率。
优选地, 当研究的电网计算模型为老模型, 确定的电网数据模型为新数据 时, 计算新建变电站的降损率具体为:
下载工程切改之前的老模型数据断面, 计算网络损耗的情况;
根据老模型中变电站的变化信息, 增加新建变电站的变压器和线路, 按照 新数据中新建变电站所带负荷的大小,将新建变电站周围的负荷转移等值负荷 到新建变电站, 计算网络损耗的情况;
求工程切改前后的网络损耗的差值, 即为理论计算区域线损电量变化值; 理论计算区域线损电量变化值与区域供电量的比值为新建变电站的理论降损 率。
优选地,在所述确定要研究的电网计算模型和电网数据模型;之前还包括: 查找新建变电站; 具体为:
根据选择时间段, 从服务器下载该选择时间段内的所有断面;
以起始时间断面为基准, 与该选择时间段内的所有断面进行比较, 判断是 否有新建变电站。
优选地,在所述由所述操作方案计算选择时间段内的网损率; 之后还包括: 输出所述计算结果到界面, 并存储计算结果。
与现有技术相比, 本发明具有以下优点:
本发明的有益效果是应用本方法可对投产项目的降损效益进行分析计算, 为电网网损管理和电网规划投资提供辅助决策依据;同时大大减轻了相关人员 的工作量。
附图说明
图 1为本发明提供的新建变电站理论降损率的实施例一流程图;
图 2为本发明提供的计算流程对应的主界面图;
图 3本发明提供的查找新建变电站的流程图;
图 4为图 3对应的界面图;
图 5为本发明提供的计算选择时间段内网损率的流程图;
图 6为本发明提供的操作方案设置界面图;
图 7为本发明提供的负荷转移界面图。
具体实施方式
为使本发明的上述目的、 特征和优点能够更加明显易懂, 下面结合附图对 本发明的具体实施方式做详细的说明。
参见图 1 , 该图为本发明提供的新建变电站理论降损率的流程图。
S101 : 确定要研究的电网计算模型和电网数据模型; 其中, 电网计算模型 分为: 新模型和老模型两种; 电网数据模型分为: 老数据和新数据两种。
当电网计算模型采用新模型时, 需要利用老数据来计算网损率。 当电网计 算模型采用老模型时, 需要利用新数据来计算网损率。 老数据、新模型即取变电站投运之前的老运行数据模型和变电站投运之后 的新电网计算模型;
新数据、老模型即取变电站投运之后的新运行数据模型和变电站投运之前 的老电网计算模型。
S102: 由 S101确定的所述电网计算模型和电网数据模型确定操作方案: 装载 S101确定的电网计算模型 (新电网计算模型或老电网计算模型)到研究 态一, 装载历史断面运行数据到研究态一,设置该历史断面运行数据模型的操 作方案; 确定负荷转移方案。
所述操作方案包括运行状态设置、 调节线路的电阻或电抗值、 调节发电机 的有功或无功、 负荷转移设置, 所述运行状态设置包括线路的投运、 退出。
所述研究态一是网损系统为了计算方便设置的一个状态, 用于存储数据。 对于老数据、新模型的计算方案, 装载计算模型时间为新建变电站投运之后的 时间, 装载数据模型的时间为新建变电站投运之前的时间。
对于老模型、新数据的计算方案, 装载计算模型时间为新建变电站投运之 前的时间, 装载数据模型的时间为新建变电站投运之后的时间。
S103: 由所述操作方案计算选择时间段内的网损率;
根据装载历史断面运行数据的断面时间装载该历史断面运行数据到研究 态一,生成 E格式量测映射文件,并获取研究态一操作方案中要转移的负荷值; 把 E格式量测映射文件映射到研究态一的电网计算模型中,对研究态一的电网 计算模型进行计算, 并保存计算结果。
需要说明的是, 所述选择时间段内包括多个断面, 每个断面对应一个时间 的断面, 对每个时间对应的断面的历史断面运行数据进行装载。 例如, 选择时 间段为一个小时, 每 15分钟为一个断面, 则该选择时间段内有四个断面。
其中, E格式量测映射文件, 将电力系统中的量测数据 (如电压、 电流) 按一定格式存放成一个文件。
本发明实施例提供的电力系统新建变电站降损率的计算方法的有益效果 是应用本方法可对投产项目的降损效益进行分析计算,为电网网损管理和电网 规划投资提供辅助决策依据; 同时大大减轻了相关人员的工作量。
下面结合实例应用介绍本发明实施例的具体工作原理。 采用 61970 XML/CIM/CIS 标准, 以及国网公司企业标准《电网运行数据 交换规范》, 通过获取省调及地调的 EMS 系统是调度中心的能量管理系统 ( Energy Management System ) 的电网运行数据, 进行理论降损率的计算。 即 对变电站投运前后的网损进行分析计算, 两者取差值, 即为理论计算区域线损 电量变化值,理论计算区域线损电量变化值与区域供电量的比值即为新建变电 站的理论降损率。
其中, 省调指的是省级电力公司调度中心; 地调指的是该省的下属市电力 公司调度中心。
计算理论降损率的区域为电力系统 220kV网络及供电范围内的 llOkV网 络。理论计算周期为工程负荷切改完成日起 1个月。理论计算数据基础为数据 采集与监视控制系统 (SCADA, Supervisory Control And Data Acquisition), 即 SCADA系统记录的潮流数据。 计算密度为每 15分钟 1个断面。 线损电量及 区域供电量均为理论积分数据。计算方法采用有无对比法, 分别按原运行方式 (无新建变电站)和切改后的运行方式(有新建变电站)计算网络损耗, 求差 值, 即为理论计算区域线损电量变化值, 理论计算区域线损电量变化值与区域 供电量的比值即为新建变电站的理论降损率。
下面具体介绍本发明提供的两种计算新建变电站理论降损率的方案,首先 介绍第一种方案: 新模型、 老数据;
为了计算电力系统主网 ( 110kV/220kV )新建与改造投资的理论降损率, 需要下载工程切改完成之后的新电网模型数据断面,计算网络损耗的情况,再 根据新电网模型中变电站的变化信息,切除新建变电站的变压器和线路,将新 建变电站的负荷转移到相邻变电站,将数据断面恢复成工程切改前的状态, 计 算网络损耗的情况, 求两者的差值, 即为理论计算区域线损电量变化值, 理论 计算区域线损电量变化值与区域供电量的比值即为新建变电站的理论降损率 (即为新模型、 老数据)。
下面介绍第二种方案: 老模型、 新数据;
为了计算电力系统主网 ( 110kV/220kV )新建与改造投资的理论降损率, 需要下载工程切改之前的老电网模型数据断面,计算网络损耗的情况,再根据 老电网模型中变电站的变化信息,增加新建变电站的变压器和线路,按照新数 据中新建变电站所带负荷的大小,将新建变电站周围的负荷转移等值负荷到新 建变电站, 计算网络损耗的情况, 求两者的差值, 即为理论计算区域线损电量 变化值,理论计算区域线损电量变化值与区域供电量的比值即为新建变电站的 理论降损率(即为老模型、 新数据)。
参见图 2, 该图 1对应的主界面图。
参见图 3 , 该图为本发明提供的查找新建变电站的流程图。
本实施例的包括如下步骤:
S301 : 设置要计算的选择时间段;
例如, 设置选择时间段为 1个小时。
S302: 根据所述选择时间段, 从服务器下载该选择时间段内的所有断面。 S303: 以起始时间断面为基准, 与该选择时间段内的所有断面进行比较, 判断是否有新建变电站。 如果有, 则执行 S304; 反之执行 S305;
S304: 将新建变电站模型添加到电网模型中;
S305: 所有断面是否比较完; 如果是, 则结束流程; 如果否, 返回 S303。 参见图 4, 该图为本发明提供的查找新建变电站的界面图。
下面介绍本发明提供的方法的实施例二, 包括以下步骤:
( 1 )查找新建变电站;
具体可以根据图 3查找新建变电站的投运时刻。
( 2 )确定计算新建变电站降损率的计算方案;
对于老数据、新模型的计算方案, 装载计算模型时间为新建变电站投运之 后的时间, 装载数据模型的时间为新建变电站投运之前的时间。
对于老模型、新数据的计算方案, 装载计算模型时间为新建变电站投运之 前的时间, 装载数据模型的时间为新建变电站投运之后的时间。
( 3 )确定计算模型和数据模型的操作方案;
对于老数据、新模型的计算方案, 装载要进行研究分析的新电网模型到研 究态一, 设置该电网模型的操作方案。 装载历史断面数据到研究态一, 设置该 断面的操作方案。 确定负荷转移方案。 对于老模型、新数据的计算方案, 装载要进行研究分析的老电网模型到研 究态一, 设置该电网模型的操作方案。 装载历史断面数据到研究态一, 设置该 断面的操作方案。 确定负荷转移方案。
( 4 )计算新建变电站的降损率;
对于老数据、新模型的计算方案, 需要下载工程切改完成之后的新模型数 据断面, 计算网络损耗的情况。 再根据新电网模型中变电站的变化信息, 切除 新建变电站的变压器和线路,将新建变电站的负荷转移到相邻变电站,将数据 断面恢复成工程切改前的状态, 计算网络损耗的情况, 求两者的差值, 即为理 论计算区域线损电量变化值,理论计算区域线损电量变化值与区域供电量的比 值即为新建变电站的理论降损率。
对于老模型、新数据的计算方案, 需要下载工程切改之前的老模型数据断 面, 计算网络损耗的情况。 再根据老电网模型中变电站的变化信息, 增加新建 变电站的变压器和线路,按照新数据中新建变电站所带负荷的大小,将新建变 电站周围的负荷转移等值负荷到新建变电站,计算网络损耗的情况, 求两者的 差值, 即为理论计算区域线损电量变化值, 理论计算区域线损电量变化值与区 域供电量的比值即为新建变电站的理论降损率。
参见图 5 , 该图为本发明提供的计算选择时间段内电网计算模型的网损率 的流程图。
图 5 是分别从客户端和服务端结合来介绍本发明提供的降损率的计算方 法。
首先介绍客户端的步骤:
S501a: 装载需要研究的电网计算模型到研究态一, 设置该电网计算模型 的操作方案;
S502a: 装载历史断面数据模型到研究态一, 设置该历史断面的操作方案; S503a: 提交所述电网计算模型的操作方案和历史断面的操作方案到服务 端;
S504a: 依次执行选择时间段内的各个断面的操作方案;
S505a: 所述选择时间段内的操作方案是否执行完, 如果是, 则结束流程; 反之返回 S504a。 下面介绍服务端的步骤:
S501b: 从客户端 S503a获得提交的操作方案;
S502b: 根据断面时间装载该断面数据模型到研究态一, 生成 E格式量测 映射文件, 并获取研究态一中需要转移负荷的相应值;
S503b: 将所述 E格式量测映射文件映射到需要研究的模型中, 并执行研 究态一的操作方案;
S504b: 对研究模型进行计算, 并保存计算结果。
参见图 6, 该图为本发明提供的操作方案设置界面图。
操作方案包括, 新加一条线路, 切除一个变压器等等。 可以实现新建一个 变电站或切除一个变电站。
参见图 7, 该图为本发明提供的负荷转移界面图。
变电站切除后, 该变电站所带的负荷要转移到相邻的变电站上, 需要一个 负荷转移界面。 以上所述, 仅是本发明的较佳实施例而已, 并非对本发明作任 何形式上的限制。 虽然本发明已以较佳实施例揭露如上, 然而并非用以限定本 发明。 任何熟悉本领域的技术人员, 在不脱离本发明技术方案范围情况下, 都 可利用上述揭示的方法和技术内容对本发明技术方案做出许多可能的变动和 修饰, 或修改为等同变化的等效实施例。 因此, 凡是未脱离本发明技术方案的 修饰, 均仍属于本发明技术方案保护的范围内。

Claims

权 利 要 求
1、 一种电力系统新建变电站降损率的计算方法, 其特征在于, 所述方法 包括如下步骤:
确定要研究的电网计算模型和电网数据模型; 其中, 电网计算模型分为: 新模型和老模型两种; 电网数据模型分为: 老数据和新数据两种;
由确定的所述电网计算模型和电网数据模型确定操作方案:装载确定的电 网计算模型到研究态一, 装载历史断面运行数据到研究态一,设置该历史断面 运行数据模型的操作方案; 确定负荷转移方案; 所述研究态一分别是网损系统 为了计算方便设置的一个状态, 用于存储数据;
由所述操作方案计算选择时间段内的网损率。
2、 根据权利要求 1所述的电力系统新建变电站降损率的计算方法, 其特 征在于, 所述操作方案包括运行状态设置、 调节线路的电阻或电抗值、 调节发 电机的有功或无功、 负荷转移设置,所述运行状态设置包括线路的投运、退出。
3、 根据权利要求 1所述的电力系统新建变电站降损率的计算方法, 其特 征在于, 由所述操作方案计算选择时间段内的网损率, 具体为:
根据装载历史断面运行数据的断面时间装载该历史断面运行数据到研究 态一,生成 E格式量测映射文件,并获取研究态一操作方案中要转移的负荷值; 把 E格式量测映射文件映射到研究态一的电网计算模型中,对研究态一的电网 计算模型进行计算;所述 E格式量测映射文件,是指将电力系统中的量测数据 按预定格式存放成一个文件。
4、 根据权利要求 1所述的电力系统新建变电站降损率的计算方法, 其特 征在于, 当研究的电网计算模型为新模型, 确定的电网数据模型为老数据时, 计算新建变电站的降损率具体为:
下载工程切改完成之后的新模型数据断面, 计算网络损耗的情况; 根据新模型中变电站的变化信息, 切除新建变电站的变压器和线路, 将新 建变电站的负荷转移到相邻变电站,将数据断面恢复成工程切改前的状态, 计 算网络损耗的情况;
求工程切改前后的网络损耗的差值, 即为理论计算区域线损电量变化值; 理论计算区域线损电量变化值与区域供电量的比值为新建变电站的理论降损 率。
5、 根据权利要求 1所述的电力系统新建变电站降损率的计算方法, 其特 征在于, 当研究的电网计算模型为老模型, 确定的电网数据模型为新数据时, 计算新建变电站的降损率具体为:
下载工程切改之前的老模型数据断面, 计算网络损耗的情况;
根据老模型中变电站的变化信息, 增加新建变电站的变压器和线路, 按照 新数据中新建变电站所带负荷的大小,将新建变电站周围的负荷转移等值负荷 到新建变电站, 计算网络损耗的情况;
求工程切改前后的网络损耗的差值, 即为理论计算区域线损电量变化值; 理论计算区域线损电量变化值与区域供电量的比值为新建变电站的理论降损 率。
6、 根据权利要求 1所述的电力系统新建变电站降损率的计算方法, 其特 征在于, 在所述确定要研究的电网计算模型和电网数据模型; 之前还包括: 查 找新建变电站; 具体为:
根据选择时间段, 从服务器下载该选择时间段内的所有断面;
以起始时间断面为基准, 与该选择时间段内的所有断面进行比较, 判断是 否有新建变电站。
7、 根据权利要求 1所述的电力系统新建变电站降损率的计算方法, 其特 征在于, 在所述由所述操作方案计算选择时间段内的网损率; 之后还包括: 输 出所述计算结果到界面, 并存储计算结果。
PCT/CN2011/080827 2011-02-23 2011-10-17 一种电力系统新建变电站降损率的计算方法 WO2012113235A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201110042935.2A CN102651049B (zh) 2011-02-23 2011-02-23 电力系统新建变电站降损率的计算方法
CN201110042935.2 2011-02-23

Publications (1)

Publication Number Publication Date
WO2012113235A1 true WO2012113235A1 (zh) 2012-08-30

Family

ID=46693057

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/080827 WO2012113235A1 (zh) 2011-02-23 2011-10-17 一种电力系统新建变电站降损率的计算方法

Country Status (2)

Country Link
CN (1) CN102651049B (zh)
WO (1) WO2012113235A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104635017A (zh) * 2015-02-11 2015-05-20 中国科学院空间科学与应用研究中心 一种计算中低纬度地区电网中的地磁感应电流的方法

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103793585B (zh) * 2012-10-24 2017-06-06 天津市电力公司 一种提高理论线损计算完整性和准确性的方法
CN103325069B (zh) * 2013-05-31 2016-06-15 国家电网公司 基于数据库嵌套触发器的理论网损电量自动计量方法
CN103336171A (zh) * 2013-06-29 2013-10-02 国家电网公司 电量系统的线损分析平台
CN104459247A (zh) * 2013-09-13 2015-03-25 国家电网公司 不具备自动分相功能智能电表的分相线损管理方法
CN105631570A (zh) * 2014-11-04 2016-06-01 国家电网公司 一种电力系统低压电网降损率的计算方法
CN104732340B (zh) * 2015-03-12 2019-11-05 国家电网公司 一种基于年度时标的规划电网辅助决策方法
CN109193643B (zh) * 2018-10-15 2021-09-21 国网能源研究院有限公司 一种计算配用电系统网损和可靠性的方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101714234A (zh) * 2009-10-23 2010-05-26 西北电网有限公司 一种电网线损监测分析系统
CN101860025A (zh) * 2010-05-27 2010-10-13 国电南瑞科技股份有限公司 基于预测-校正技术的电网未来运行方式网损计算方法
CN201629574U (zh) * 2010-01-13 2010-11-10 山东电力集团公司 开放式电网损耗实时分析系统
CN101937490A (zh) * 2010-08-27 2011-01-05 河北省电力研究院 一种规划态电网网损分析计算方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005269731A (ja) * 2004-03-17 2005-09-29 Tokyo Electric Power Co Inc:The 雷事故件数予測装置、雷事故件数予測方法、耐雷設備予測装置、耐雷設備予測方法
CN101788788A (zh) * 2010-01-05 2010-07-28 华北电力大学 基于电网状态识别的多目标机组组合智能优化系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101714234A (zh) * 2009-10-23 2010-05-26 西北电网有限公司 一种电网线损监测分析系统
CN201629574U (zh) * 2010-01-13 2010-11-10 山东电力集团公司 开放式电网损耗实时分析系统
CN101860025A (zh) * 2010-05-27 2010-10-13 国电南瑞科技股份有限公司 基于预测-校正技术的电网未来运行方式网损计算方法
CN101937490A (zh) * 2010-08-27 2011-01-05 河北省电力研究院 一种规划态电网网损分析计算方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104635017A (zh) * 2015-02-11 2015-05-20 中国科学院空间科学与应用研究中心 一种计算中低纬度地区电网中的地磁感应电流的方法

Also Published As

Publication number Publication date
CN102651049B (zh) 2015-05-06
CN102651049A (zh) 2012-08-29

Similar Documents

Publication Publication Date Title
WO2012113235A1 (zh) 一种电力系统新建变电站降损率的计算方法
WO2015039464A1 (zh) 一种基于时间尺度的全局优化调度策略库
CN108122068A (zh) 一种配电网风险规划方法及系统
CN104600695A (zh) 基于在线状态估计和实时调度计划的趋势潮流计算方法
CN103514501A (zh) 地区电网经济运行与节能综合管理系统
CN106451761B (zh) 一种基于动态数据驱动的大面积停电自动监测分析系统
CN102723721A (zh) 基于个体最优位置自适应变异扰动粒子群算法的电力系统无功优化方法
CN103150600A (zh) 一种电网安全分析系统
Angioni et al. Design and implementation of a substation automation unit
CN112260331B (zh) 特高压交直流电网仿真平台及构建方法
CN103093391A (zh) 城市配电网设置方法
CN105046360A (zh) 基于峰谷时段用电负荷权重管理系统及峰谷时段管理方法
CN103679289A (zh) 基于多元回归外推法的电力负荷预测方法
CN104299043A (zh) 极限学习机超短期负荷预测方法
CN111784030A (zh) 一种基于空间相关性的分布式光伏功率预测方法及装置
CN102738791B (zh) 一种基于拓扑比较的在线静态安全分析方法
RU2754484C9 (ru) Способ и устройство для обеспечения баланса потребления электроэнергии
CN104158206A (zh) 一种计及风电不确定性的电网安全稳定控制方法
CN102542512A (zh) 一种电网企业海量实时平台内部数据移动方法
Mehboob et al. Day-ahead dispatch of PEV loads in a residential distribution system
Schmitt et al. A dynamic load control strategy for an efficient building demand response
CN107171334B (zh) 事件驱动型切负荷与矫正性线路投切协调控制方法及系统
Muhanji et al. Transforming the Grid's Architecture: Enterprise Control, the Energy Internet of Things, and Heterofunctional Graph Theory
Béguery et al. Microgrid energy management optimization-a common platform for research, development and design tools
CN103066594A (zh) 基于省地县三级电网拓扑的电网风险预控方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11859637

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase