WO2012024919A1 - Procédé et dispositif de commande de charge dans une mesure de performance réseau d'équipement utilisateur - Google Patents
Procédé et dispositif de commande de charge dans une mesure de performance réseau d'équipement utilisateur Download PDFInfo
- Publication number
- WO2012024919A1 WO2012024919A1 PCT/CN2011/071455 CN2011071455W WO2012024919A1 WO 2012024919 A1 WO2012024919 A1 WO 2012024919A1 CN 2011071455 W CN2011071455 W CN 2011071455W WO 2012024919 A1 WO2012024919 A1 WO 2012024919A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- user equipment
- tracking control
- load
- control parameter
- measurement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/08—Testing, supervising or monitoring using real traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
Definitions
- the present invention relates to a user equipment tracking system in a mobile communication network, and more particularly to a load control method and apparatus for measuring data reporting when user equipment network performance measurement is performed using user tracking. Background technique
- the Immediate MDT mode requires that more than 50 UEs can simultaneously report data in real time.
- the measured data is not saved locally.
- the data is continuously reported to the eNodeB in the second-order cycle, and then reported to the TCE from the eNodeB.
- the user equipment network performance measurement reporting data cannot be specified at the time of activation. After the activation, the tracking control parameters of the user equipment network performance measurement cannot be modified, and the data reporting mode in the tracking control parameter cannot be modified, and the system load problem using the Immediate MDT reporting data cannot be solved. Summary of the invention
- a load control method for user equipment network performance measurement comprising:
- the OAM system sends the tracking control parameter of the decision to the user equipment to be activated by activating the measurement message; transmitting the tracking control parameter of the decision to the activated user equipment by changing the tracking control parameter message; the activation measurement message and the change tracking
- the control parameter message includes a report data mode attribute and/or a measurement period attribute.
- the method further includes:
- step of the OAM system changing the tracking control parameters of the user equipment according to the current system load includes:
- step of the OAM system changing the tracking control parameters of the user equipment according to the current system load includes:
- an execution module configured to change, according to the tracking control parameter of the decision module decision, a tracking control parameter of the user equipment that has been activated by the user equipment network performance measurement.
- the activation module sends the tracking control parameter of the decision to the user equipment to be activated by activating the measurement message; transmitting the tracking control parameter of the decision to the activated user equipment by changing the tracking control parameter message;
- the change tracking control parameter message includes a report data mode attribute and/or a measurement period attribute.
- execution module includes:
- the 0 AM system detects the current system load in real time, and decides to activate or change the tracking control parameters of the user equipment network performance measurement according to the current system load condition, and can control the system load by adding a reporting data mode to the tracking control parameter.
- the attribute instructs the user equipment to change the corresponding tracking control parameters to achieve the purpose of controlling the OAM system load.
- the invention realizes the load control of the OAM on the user equipment network performance measurement, and improves the efficiency and flexibility of the user equipment network performance measurement.
- FIG. 1 is a flow chart of a load control method for user equipment network performance measurement according to the present invention The specific steps are as follows:
- the operator can select the automatic or manual mode when activating the user equipment network performance measurement.
- the OAM system determines the tracking control parameter of the UE when the activation is performed according to the current system load, and the tracking data parameter is added to the reporting data mode attribute and/or
- the UE After receiving the activation measurement message, the UE performs the tracking measurement process according to the tracking control parameter, and reports the measurement data by using the reporting data mode and the measurement period specified in the tracking control parameter; in the manual mode, the tracking control parameter of the user equipment network performance measurement Set by the operator, the reporting data mode and/or the measurement period are also included in the tracking control parameter and sent to the UE.
- the tracking measurement process is performed according to the tracking control parameter, and the tracking control parameter is specified in the tracking control parameter.
- the reported data method and the measurement period report the measurement data.
- the OAM system determines that the current system load is overloaded, that is, the load exceeds the upper limit of the preset load threshold, the user equipment network performance measurement activation request for reporting the data in the Immediate MDT mode may be denied.
- Step 102 During the measurement process, the 0 AM system detects the current system load in real time. If the 0 AM system detects that the current system load exceeds the preset normal load threshold, and the OAM system cannot process the measurement data reported by the UE in time, step 103 is performed. Otherwise, step 104 is performed;
- the method of reporting the measured data from the activated user device is changed from the Immediate MDT mode to the Logged MDT mode, or the measurement period attribute is increased to reduce the amount of data reported by the user terminal to reduce the load on the OAM system.
- Step 104 When the OAM system detects that the current system load is lower than the lower limit of the normal load threshold, the UE may change the one or more activated user equipment network performance measurement by transmitting the change tracking control parameter message by using the automatic control mode or the manual control mode. Tracking control parameters, and specifying the reported data mode attribute value as Immediate MDT mode and/or specifying a smaller measurement period attribute value until the load of the OAM system is within the preset normal load threshold.
- Changing the method of reporting the measured data from the activated user device from the Logged MDT mode to the Immediate MDT mode or reducing the measurement period attribute can increase the data amount of the measurement data reported by the user terminal per unit time, thus increasing the load on the OAM system.
- the Evolved Packet Core (EPC) system is used as an example to send a change tracking control parameter message to the UE that activates the user equipment network performance measurement by the network element management system in step 103 and step 104, instructing the UE to change the report measurement data.
- the steps of the way are described in detail, as shown in Figure 2, the detailed steps are as follows: Step 201: The ⁇ system sends a tracking session update message to a Home Subscriber Server (HSS) through an Element Management System (EMS), where the message includes a tracking control parameter, and the tracking control parameter includes the reported data. Mode attribute.
- HSS Home Subscriber Server
- EMS Element Management System
- Step 202 The HSS updates the locally saved tracking session tracking control parameter.
- Step 205 The MME sends a tracking session update message to the eNodeB.
- the tracking session update success response is fed back to the eNodeB; otherwise, the tracking session update failure response or the timeout failure response message is fed back to the eNodeB.
- a second execution module configured to: when the current system load is lower than a preset load threshold lower limit, send a change tracking control parameter message to the one or more user devices that activate measurement according to the decision result of the decision module, indicating the user equipment Convert the reported data mode to Immediate MDT mode and / or reduce the measurement cycle until the load is within the preset normal load threshold.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
L'invention porte sur un procédé et un dispositif de commande de charge dans une mesure de performance réseau d'équipement utilisateur pour résoudre le problème de commande de charge d'opération, d'administration et de maintenance (OAM) dans la mesure de performance réseau d'équipement utilisateur. Dans l'invention, un système OAM détecte l'état de charge de système courant en temps réel, décide d'activer ou de modifier des paramètres de commande de trace dans la mesure de performance réseau d'équipement utilisateur selon la charge de système courante, et notifie, par ajout d'un attribut de manière de rapporter des données dans les paramètres de commande de trace, à l'équipement utilisateur de modifier la manière de rapporter des données de mesure. L'invention parvient à la commande de charge lorsque le système OAM réalise la mesure de performance réseau d'équipement utilisateur, et améliore la flexibilité et l'efficacité de la mesure de performance réseau d'équipement utilisateur.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010262533.9 | 2010-08-24 | ||
| CN201010262533.9A CN102378237B (zh) | 2010-08-24 | 2010-08-24 | 一种用户设备网络性能测量的负荷控制方法及装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2012024919A1 true WO2012024919A1 (fr) | 2012-03-01 |
Family
ID=45722848
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2011/071455 Ceased WO2012024919A1 (fr) | 2010-08-24 | 2011-03-02 | Procédé et dispositif de commande de charge dans une mesure de performance réseau d'équipement utilisateur |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN102378237B (fr) |
| WO (1) | WO2012024919A1 (fr) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2830348B1 (fr) | 2012-03-19 | 2019-05-15 | Huawei Technologies Co., Ltd. | Procédé et dispositif pour obtenir et rapporter un résultat de mesure d'éléments de mesure de couverture de liaison montante |
| US9781622B2 (en) | 2012-08-30 | 2017-10-03 | Nokia Technologies Oy | Decision making based on remote observation of node capabilities |
| CN104081874B (zh) * | 2012-12-26 | 2018-07-03 | 华为技术有限公司 | 传输数据的方法、节点和操作管理系统 |
| CN106302620A (zh) * | 2015-06-12 | 2017-01-04 | 中兴通讯股份有限公司 | 配置更新消息发送方法及装置 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100208707A1 (en) * | 2007-09-26 | 2010-08-19 | Nec Corporation | Radio communication system and method |
| CN101945423A (zh) * | 2009-07-07 | 2011-01-12 | 大唐移动通信设备有限公司 | 一种负荷上报方法、装置和系统 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101026504B (zh) * | 2006-02-24 | 2011-05-11 | 华为技术有限公司 | 一种网络性能测量方法 |
-
2010
- 2010-08-24 CN CN201010262533.9A patent/CN102378237B/zh not_active Expired - Fee Related
-
2011
- 2011-03-02 WO PCT/CN2011/071455 patent/WO2012024919A1/fr not_active Ceased
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100208707A1 (en) * | 2007-09-26 | 2010-08-19 | Nec Corporation | Radio communication system and method |
| CN101945423A (zh) * | 2009-07-07 | 2011-01-12 | 大唐移动通信设备有限公司 | 一种负荷上报方法、装置和系统 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102378237B (zh) | 2016-05-25 |
| CN102378237A (zh) | 2012-03-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9838920B2 (en) | Method, apparatus, and system for detecting a radio network problem | |
| CN102752788B (zh) | 检测失效小区的方法和设备 | |
| US9451477B2 (en) | Method and system for implementing drive test | |
| EP2615863A1 (fr) | Procédé, équipement et système de mesure d'expérience utilisateur | |
| US9591502B2 (en) | Method and equipment for feeding back minimization drive test log | |
| EP3148245B1 (fr) | Procédé de surveillance de liaison radio et équipement utilisateur (ue) | |
| CN101296459B (zh) | 一种测量控制方法、用户终端、网络侧设备及系统 | |
| US20140099940A1 (en) | Method and apparatus for efficiently controlling an mdt in a plurality of plmns | |
| US9585028B2 (en) | Measurement method, apparatus, and system for minimization of drive tests | |
| CN104469827B (zh) | 一种无线链路失败的处理方法及装置 | |
| WO2013143458A1 (fr) | Procédé pour la minimisation des essais de conduite et dispositif adapté pour obtenir un retard | |
| CN106376029A (zh) | 一种d2d中继测量的触发方法及用户设备、基站 | |
| WO2012019536A1 (fr) | Procédé et dispositif permettant de traiter des informations mdt | |
| CN103260176A (zh) | 最小化路测方法、网元及系统 | |
| WO2012024919A1 (fr) | Procédé et dispositif de commande de charge dans une mesure de performance réseau d'équipement utilisateur | |
| JPWO2021025062A5 (fr) | ||
| CN103535066B (zh) | 测量控制的方法和设备 | |
| CN104038955B (zh) | 一种移动通信系统中的故障检测及处理的方法及基站 | |
| CN102761984A (zh) | 一种资源释放方法 | |
| WO2012097597A1 (fr) | Procédé de traitement d'informations de cellules voisines, procédé d'émission de consigne de transfert, équipement d'utilisateur et station de base | |
| AU2014200751B2 (en) | Method, apparatus and system for detecting a radio network problem | |
| CN109936863A (zh) | 一种基于上行覆盖的srvcc切换方法及设备 | |
| CN103369563A (zh) | 一种最小化路测方法和实现该方法的终端 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11819294 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 11819294 Country of ref document: EP Kind code of ref document: A1 |