WO2012024919A1 - Method and device for load control in user equipment network performance measurement - Google Patents

Method and device for load control in user equipment network performance measurement Download PDF

Info

Publication number
WO2012024919A1
WO2012024919A1 PCT/CN2011/071455 CN2011071455W WO2012024919A1 WO 2012024919 A1 WO2012024919 A1 WO 2012024919A1 CN 2011071455 W CN2011071455 W CN 2011071455W WO 2012024919 A1 WO2012024919 A1 WO 2012024919A1
Authority
WO
WIPO (PCT)
Prior art keywords
user equipment
tracking control
load
control parameter
measurement
Prior art date
Application number
PCT/CN2011/071455
Other languages
French (fr)
Chinese (zh)
Inventor
吴道立
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2012024919A1 publication Critical patent/WO2012024919A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks

Definitions

  • the present invention relates to a user equipment tracking system in a mobile communication network, and more particularly to a load control method and apparatus for measuring data reporting when user equipment network performance measurement is performed using user tracking. Background technique
  • the Immediate MDT mode requires that more than 50 UEs can simultaneously report data in real time.
  • the measured data is not saved locally.
  • the data is continuously reported to the eNodeB in the second-order cycle, and then reported to the TCE from the eNodeB.
  • the user equipment network performance measurement reporting data cannot be specified at the time of activation. After the activation, the tracking control parameters of the user equipment network performance measurement cannot be modified, and the data reporting mode in the tracking control parameter cannot be modified, and the system load problem using the Immediate MDT reporting data cannot be solved. Summary of the invention
  • a load control method for user equipment network performance measurement comprising:
  • the OAM system sends the tracking control parameter of the decision to the user equipment to be activated by activating the measurement message; transmitting the tracking control parameter of the decision to the activated user equipment by changing the tracking control parameter message; the activation measurement message and the change tracking
  • the control parameter message includes a report data mode attribute and/or a measurement period attribute.
  • the method further includes:
  • step of the OAM system changing the tracking control parameters of the user equipment according to the current system load includes:
  • step of the OAM system changing the tracking control parameters of the user equipment according to the current system load includes:
  • an execution module configured to change, according to the tracking control parameter of the decision module decision, a tracking control parameter of the user equipment that has been activated by the user equipment network performance measurement.
  • the activation module sends the tracking control parameter of the decision to the user equipment to be activated by activating the measurement message; transmitting the tracking control parameter of the decision to the activated user equipment by changing the tracking control parameter message;
  • the change tracking control parameter message includes a report data mode attribute and/or a measurement period attribute.
  • execution module includes:
  • the 0 AM system detects the current system load in real time, and decides to activate or change the tracking control parameters of the user equipment network performance measurement according to the current system load condition, and can control the system load by adding a reporting data mode to the tracking control parameter.
  • the attribute instructs the user equipment to change the corresponding tracking control parameters to achieve the purpose of controlling the OAM system load.
  • the invention realizes the load control of the OAM on the user equipment network performance measurement, and improves the efficiency and flexibility of the user equipment network performance measurement.
  • FIG. 1 is a flow chart of a load control method for user equipment network performance measurement according to the present invention The specific steps are as follows:
  • the operator can select the automatic or manual mode when activating the user equipment network performance measurement.
  • the OAM system determines the tracking control parameter of the UE when the activation is performed according to the current system load, and the tracking data parameter is added to the reporting data mode attribute and/or
  • the UE After receiving the activation measurement message, the UE performs the tracking measurement process according to the tracking control parameter, and reports the measurement data by using the reporting data mode and the measurement period specified in the tracking control parameter; in the manual mode, the tracking control parameter of the user equipment network performance measurement Set by the operator, the reporting data mode and/or the measurement period are also included in the tracking control parameter and sent to the UE.
  • the tracking measurement process is performed according to the tracking control parameter, and the tracking control parameter is specified in the tracking control parameter.
  • the reported data method and the measurement period report the measurement data.
  • the OAM system determines that the current system load is overloaded, that is, the load exceeds the upper limit of the preset load threshold, the user equipment network performance measurement activation request for reporting the data in the Immediate MDT mode may be denied.
  • Step 102 During the measurement process, the 0 AM system detects the current system load in real time. If the 0 AM system detects that the current system load exceeds the preset normal load threshold, and the OAM system cannot process the measurement data reported by the UE in time, step 103 is performed. Otherwise, step 104 is performed;
  • the method of reporting the measured data from the activated user device is changed from the Immediate MDT mode to the Logged MDT mode, or the measurement period attribute is increased to reduce the amount of data reported by the user terminal to reduce the load on the OAM system.
  • Step 104 When the OAM system detects that the current system load is lower than the lower limit of the normal load threshold, the UE may change the one or more activated user equipment network performance measurement by transmitting the change tracking control parameter message by using the automatic control mode or the manual control mode. Tracking control parameters, and specifying the reported data mode attribute value as Immediate MDT mode and/or specifying a smaller measurement period attribute value until the load of the OAM system is within the preset normal load threshold.
  • Changing the method of reporting the measured data from the activated user device from the Logged MDT mode to the Immediate MDT mode or reducing the measurement period attribute can increase the data amount of the measurement data reported by the user terminal per unit time, thus increasing the load on the OAM system.
  • the Evolved Packet Core (EPC) system is used as an example to send a change tracking control parameter message to the UE that activates the user equipment network performance measurement by the network element management system in step 103 and step 104, instructing the UE to change the report measurement data.
  • the steps of the way are described in detail, as shown in Figure 2, the detailed steps are as follows: Step 201: The ⁇ system sends a tracking session update message to a Home Subscriber Server (HSS) through an Element Management System (EMS), where the message includes a tracking control parameter, and the tracking control parameter includes the reported data. Mode attribute.
  • HSS Home Subscriber Server
  • EMS Element Management System
  • Step 202 The HSS updates the locally saved tracking session tracking control parameter.
  • Step 205 The MME sends a tracking session update message to the eNodeB.
  • the tracking session update success response is fed back to the eNodeB; otherwise, the tracking session update failure response or the timeout failure response message is fed back to the eNodeB.
  • a second execution module configured to: when the current system load is lower than a preset load threshold lower limit, send a change tracking control parameter message to the one or more user devices that activate measurement according to the decision result of the decision module, indicating the user equipment Convert the reported data mode to Immediate MDT mode and / or reduce the measurement cycle until the load is within the preset normal load threshold.

Abstract

The invention discloses a method and device for load control in user equipment network performance measurement to solve the problem of Operation Administration and Maintenance (OAM) load control in the user equipment network performance measurement. In the invention, an OAM system detects the current system load status in real time, decides to activate or change trace control parameters in the user equipment network performance measurement according to the current system load, and notifies, by adding a data report manner attribute in the trace control parameters, the user equipment to change the report manner of measurement data. The invention achieves the load control when the OAM system performs the user equipment network performance measurement, and improves the efficiency and flexibility of the user equipment network performance measurement.

Description

一种用户设备网络性能测量的负荷控制方法及装置 技术领域  Load control method and device for user equipment network performance measurement
本发明涉及移动通信网中用户设备跟踪系统, 尤其涉及一种使用用户 跟踪实现用户设备网络性能测量时测量数据上报的负荷控制方法及装置。 背景技术  The present invention relates to a user equipment tracking system in a mobile communication network, and more particularly to a load control method and apparatus for measuring data reporting when user equipment network performance measurement is performed using user tracking. Background technique
移动通讯网的网络覆盖优化使用路测 (Minimization of Drive Tests, MDT )是一个快速、 有效的方式。 完成 MDT可以使用用户设备网络性能 测量 ( UE based network performance measurements )实现, 用户设备网络性 能测量有两种数据上报方式: 日志( Logged MDT )方式和实时( Immediate MDT )方式。  Network coverage optimization for mobile communication networks is a fast and efficient way to use the Minimization of Drive Tests (MDT). The completion of the MDT can be implemented by using UE based network performance measurements. There are two types of data reporting methods for user equipment network performance measurement: Logged MDT and Real Time (MDT).
Logged MDT方式下, 用户设备 ( User Equipment ) 定时保存测量数据 到本地日志, 在下一个定时发送到基站(eNodeB ), 然后上报到跟踪数据收 集实体 ( Trace Connection Entity, TCE )。  In the Logged MDT mode, the User Equipment periodically saves the measurement data to the local log, sends it to the base station (eNodeB) at the next timing, and then reports it to the Trace Connection Entity (TCE).
Immediate MDT方式要求能支持 50个以上 UE同时实时上报数据, 测 量数据本地不保存, 以秒级为周期釆集数据持续上报到 eNodeB, 然后从 eNodeB上报到 TCE。  The Immediate MDT mode requires that more than 50 UEs can simultaneously report data in real time. The measured data is not saved locally. The data is continuously reported to the eNodeB in the second-order cycle, and then reported to the TCE from the eNodeB.
TCE 为用户跟踪系统的一个组件, 而用户跟踪系统又是操作管理维护 系统 ( Operation Administration and Maintenance, OAM )的组成部分。 虽然 Immediate MDT方式相比 Logged MDT方式对移动通讯网网络覆盖优化有 不能替代的作用,但是实时上报的数据量较大,对 OAM系统负荷影响较大。 在 OAM系统负荷可承受的条件下, 应该尽量使用 Immediate MDT方式上 报数据。  TCE is a component of the user tracking system, and the user tracking system is part of the Operation Administration and Maintenance (OAM). Although the MDT method has an irreplaceable effect on the network coverage optimization of the mobile communication network compared to the Logged MDT mode, the amount of data reported in real time is large, which has a great impact on the OAM system load. Under the condition that the OAM system can withstand the load, the data should be reported in the Immediate MDT mode.
在现有系统中还不能在激活时指定用户设备网络性能测量上报数据方 式, 在激活后也不能修改用户设备网络性能测量的跟踪控制参数, 也就不 能修改跟踪控制参数中的数据上报方式, 无法解决使用 Immediate MDT上 报数据方式的系统负荷问题。 发明内容 In the existing system, the user equipment network performance measurement reporting data cannot be specified at the time of activation. After the activation, the tracking control parameters of the user equipment network performance measurement cannot be modified, and the data reporting mode in the tracking control parameter cannot be modified, and the system load problem using the Immediate MDT reporting data cannot be solved. Summary of the invention
有鉴于此, 本发明的主要目的在于提供一种用户设备网络性能测量的 负荷控制方法及装置,用于解决用户设备网络性能测量中 OAM系统负荷控 制的问题。  In view of this, the main object of the present invention is to provide a load control method and apparatus for user equipment network performance measurement, which are used to solve the problem of OAM system load control in user equipment network performance measurement.
为达到上述目的, 本发明的技术方案是这样实现的:  In order to achieve the above object, the technical solution of the present invention is achieved as follows:
一种用户设备网络性能测量的负荷控制方法, 包括:  A load control method for user equipment network performance measurement, comprising:
在执行用户设备网络性能测量时, OAM 系统实时检测当前的系统负 荷,并根据所述 OAM系统当前负荷情况决策激活用户设备网络性能测量时 所使用的跟踪控制参数, 及决策在执行测量任务过程中是否需要变更用户 设备的跟踪控制参数。  When performing user equipment network performance measurement, the OAM system detects the current system load in real time, and determines the tracking control parameters used when the user equipment network performance measurement is activated according to the current load condition of the OAM system, and the decision is made during the execution of the measurement task. Whether to change the tracking control parameters of the user equipment.
进一步地, 所述方法还包括:  Further, the method further includes:
所述 OAM 系统通过激活测量消息将决策的跟踪控制参数发送给待激 活的用户设备; 通过变更跟踪控制参数消息将决策的跟踪控制参数发送给 已激活的用户设备; 所述激活测量消息和变更跟踪控制参数消息中包含上 报数据方式属性和 /或测量周期属性。  The OAM system sends the tracking control parameter of the decision to the user equipment to be activated by activating the measurement message; transmitting the tracking control parameter of the decision to the activated user equipment by changing the tracking control parameter message; the activation measurement message and the change tracking The control parameter message includes a report data mode attribute and/or a measurement period attribute.
进一步地, 所述方法还包括:  Further, the method further includes:
所述 OAM 系统判断当前系统负荷超负荷时, 拒绝实时 (Immediate MDT )上报数据方式的用户设备网络性能测量的激活请求。  The OAM system determines that the current system load is overloaded, and rejects the activation request of the user equipment network performance measurement in the real-time (Mm) MDT reporting data mode.
进一步地, OAM系统根据当前系统负荷变更用户设备的跟踪控制参数 的步骤包括:  Further, the step of the OAM system changing the tracking control parameters of the user equipment according to the current system load includes:
所述 OAM系统检测到当前系统负荷超过预设的正常负荷门限上限时, 向已激活测量的用户设备逐个发送变更跟踪控制参数消息, 指示用户设备 将上 ^艮数据方式变更为 Logged MDT方式和 /或增加测量周期, 直到负荷降 低到预设的正常负荷门限范围之内。 When the OAM system detects that the current system load exceeds a preset upper limit of the normal load threshold, the OAM system sends a change tracking control parameter message one by one to the activated user equipment to indicate the user equipment. Change the data mode to Logged MDT mode and/or increase the measurement period until the load falls within the preset normal load threshold.
进一步地, OAM系统根据当前系统负荷变更用户设备的跟踪控制参数 的步骤包括:  Further, the step of the OAM system changing the tracking control parameters of the user equipment according to the current system load includes:
所述 OAM系统检测到当前系统负荷低于预设的正常负荷门限下限时, 向一个或多个已激活测量的用户设备发送变更跟踪控制参数消息, 指示用 负荷处于预设的正常负荷门限范围之内。  When the OAM system detects that the current system load is lower than the preset normal load threshold lower limit, the OAM system sends a change tracking control parameter message to the one or more activated measurement user equipments, indicating that the load is within a preset normal load threshold range. Inside.
基于上述方法, 本发明还提出一种用户设备网络性能测量的负荷控制 装置, 该装置包括:  Based on the above method, the present invention also provides a load control device for measuring network performance of a user equipment, the device comprising:
监测模块, 用于实时检测 OAM系统当前负荷;  a monitoring module for detecting the current load of the OAM system in real time;
决策模块,用于根据 OAM系统当前负荷决策待激活或已被激活用户设 备网络性能测量的用户设备的跟踪控制参数;  a decision module, configured to determine, according to a current load of the OAM system, a tracking control parameter of the user equipment to be activated or that has been activated by the user equipment network performance measurement;
激活模块, 用于根据决策模块决策的跟踪控制参数激活用户设备网络 性能测量;  An activation module, configured to activate user equipment network performance measurement according to a tracking control parameter of the decision module decision;
执行模块, 用于根据决策模块决策的跟踪控制参数变更已被激活用户 设备网络性能测量的用户设备的跟踪控制参数。  And an execution module, configured to change, according to the tracking control parameter of the decision module decision, a tracking control parameter of the user equipment that has been activated by the user equipment network performance measurement.
进一步地, 所述激活模块通过激活测量消息将决策的跟踪控制参数发 送给待激活的用户设备; 通过变更跟踪控制参数消息将决策的跟踪控制参 数发送给已激活的用户设备; 所述激活测量消息和变更跟踪控制参数消息 中包含上报数据方式属性和 /或测量周期属性。  Further, the activation module sends the tracking control parameter of the decision to the user equipment to be activated by activating the measurement message; transmitting the tracking control parameter of the decision to the activated user equipment by changing the tracking control parameter message; And the change tracking control parameter message includes a report data mode attribute and/or a measurement period attribute.
进一步地,所述决策模块在 OAM系统负荷超负荷时,拒绝激活模块以 Immediate MDT方式激活用户设备网络性能测量的激活请求。  Further, the decision module rejects the activation request of the activation module of the user equipment network performance measurement by the MDT system when the OAM system is overloaded.
进一步地, 所述执行模块包括:  Further, the execution module includes:
第一执行模块, 用于在当前系统负荷超过预设负荷门限上限时, 依据 所述决策模块决策结果向已激活测量的用户设备逐个发送变更跟踪控制参 数消息, 指示用户设备将上报数据方式变更为 Logged MDT方式和 /或增加 测量周期, 直到负荷降低到预设的正常负荷门限范围内; a first execution module, configured to: when the current system load exceeds a preset load threshold upper limit, The decision module decision result sends a change tracking control parameter message to the activated user equipment, indicating that the user equipment changes the reporting data mode to the Logged MDT mode and/or increases the measurement period until the load is reduced to a preset normal load threshold. Within the scope;
第二执行模块, 用于在当前系统负荷低于预设的负荷门限下限时, 依 据所述决策模块的决策结果向一个或多个激活测量的用户设备, 发送变更 跟踪控制参数消息, 指示用户设备将上报数据方式转为 Immediate MDT方 式和 /或减小测量周期, 直到负荷处于预设的正常负荷门限范围内。  a second execution module, configured to: when the current system load is lower than a preset load threshold lower limit, send a change tracking control parameter message to the one or more user devices that activate measurement according to the decision result of the decision module, indicating the user equipment Convert the reported data mode to Immediate MDT mode and / or reduce the measurement cycle until the load is within the preset normal load threshold.
本发明中, 0 AM系统实时检测当前系统负荷, 并根据当前系统负荷情 况决策激活或变更用户设备网络性能测量的跟踪控制参数, 通过在跟踪控 制参数中增加上报数据方式等可对系统负荷进行控制的属性, 指令用户设 备更改相应的跟踪控制参数, 以达到控制 OAM系统负荷的目的。本发明实 现了 OAM对用户设备网络性能测量负荷控制,提高了用户设备网络性能测 量的效率和灵活性。 附图说明  In the present invention, the 0 AM system detects the current system load in real time, and decides to activate or change the tracking control parameters of the user equipment network performance measurement according to the current system load condition, and can control the system load by adding a reporting data mode to the tracking control parameter. The attribute, instructs the user equipment to change the corresponding tracking control parameters to achieve the purpose of controlling the OAM system load. The invention realizes the load control of the OAM on the user equipment network performance measurement, and improves the efficiency and flexibility of the user equipment network performance measurement. DRAWINGS
图 1为本发明用户设备网络性能测量的负荷控制方法的流程图; 图 2为本发明变更激活用户设备网络性能测量跟踪控制参数的流程图; 图 3为本发明用户设备网络性能测量的负荷控制装置的流程图。 具体实施方式  1 is a flowchart of a load control method for network performance measurement of a user equipment according to the present invention; FIG. 2 is a flowchart of changing a network performance measurement tracking control parameter of a user equipment according to the present invention; FIG. 3 is a load control method for network performance measurement of a user equipment according to the present invention; Flow chart of the device. detailed description
本发明基本思想为:在激活前由 OAM系统指定用户设备网络性能测量 时使用的跟踪控制参数,在激活后由 OAM系统根据当前负荷情况变更用户 设备的跟踪控制参数, 以解决 OAM负荷控制问题。  The basic idea of the present invention is: the tracking control parameter used by the OAM system to specify the network performance measurement of the user equipment before activation, and the OAM system changes the tracking control parameters of the user equipment according to the current load condition after activation to solve the OAM load control problem.
为使本发明的目的、 技术方案和优点更加清楚明白, 以下举实施例并 参照附图, 对本发明进一步详细说明。  The present invention will be further described in detail below with reference to the accompanying drawings.
图 1 为本发明提出的一种用户设备网络性能测量的负荷控制方法的流 程图, 具体步骤如下: FIG. 1 is a flow chart of a load control method for user equipment network performance measurement according to the present invention The specific steps are as follows:
步骤 101、 OAM系统配置跟踪任务, 通过手动方式或自动方式激活用 户设备网络性能测量;  Step 101: The OAM system configures a tracking task, and activates user equipment network performance measurement by manual mode or automatic mode;
操作员在激活用户设备网络性能测量时可以选择自动或手动方式, 在 自动方式下 OAM系统根据当前系统负荷决定激活时 UE的跟踪控制参数, 所述跟踪控制参数中增加上报数据方式属性和 /或测量周期, 发送给 UE的 激活测量消息 (例如 RRC Connection Reconfiguration消息) 包含跟踪控制 参数。 当 UE收到激活测量消息后, 根据跟踪控制参数执行跟踪测量过程, 釆用跟踪控制参数中指定的上报数据方式和测量周期上报测量数据; 在手 动方式下, 用户设备网络性能测量的跟踪控制参数由操作员设置, 上报数 据方式和 /或测量周期也包含在跟踪控制参数中发送给 UE, 当 UE收到激活 测量消息后, 根据跟踪控制参数执行跟踪测量过程, 并釆用跟踪控制参数 中指定的上报数据方式和测量周期上报测量数据。  The operator can select the automatic or manual mode when activating the user equipment network performance measurement. In the automatic mode, the OAM system determines the tracking control parameter of the UE when the activation is performed according to the current system load, and the tracking data parameter is added to the reporting data mode attribute and/or The measurement period, the activation measurement message (eg, RRC Connection Reconfiguration message) sent to the UE, includes the tracking control parameters. After receiving the activation measurement message, the UE performs the tracking measurement process according to the tracking control parameter, and reports the measurement data by using the reporting data mode and the measurement period specified in the tracking control parameter; in the manual mode, the tracking control parameter of the user equipment network performance measurement Set by the operator, the reporting data mode and/or the measurement period are also included in the tracking control parameter and sent to the UE. When the UE receives the activation measurement message, the tracking measurement process is performed according to the tracking control parameter, and the tracking control parameter is specified in the tracking control parameter. The reported data method and the measurement period report the measurement data.
进一步地, 当 OAM系统判断当前系统负荷超负荷时, 即负荷超过预设 的负荷门限上限时, 可以拒绝激活以 Immediate MDT方式上报数据的用户 设备网络性能测量激活请求。  Further, when the OAM system determines that the current system load is overloaded, that is, the load exceeds the upper limit of the preset load threshold, the user equipment network performance measurement activation request for reporting the data in the Immediate MDT mode may be denied.
步骤 102、在测量过程中 , 0 AM系统实时检测当前系统负荷, 若 0 AM 系统检测到当前系统负荷超过预设的正常负荷门限上限, OAM系统不能及 时处理 UE上报的测量数据, 则执行步骤 103; 否则执行步骤 104;  Step 102: During the measurement process, the 0 AM system detects the current system load in real time. If the 0 AM system detects that the current system load exceeds the preset normal load threshold, and the OAM system cannot process the measurement data reported by the UE in time, step 103 is performed. Otherwise, step 104 is performed;
步骤 103、 OAM系统通过网元管理系统(Element Management System, EMS )向 UE逐个发送变更跟踪控制参数消息,直到负荷降低到正常负荷门 限范围内 , 所述变更跟踪控制参数消息中携带上 ^艮数据方式属性和 /或测量 周期属性, 并指定上报数据方式属性值为 Logged MDT方式和 /或指定较大 的测量周期属性值;  Step 103: The OAM system sends a change tracking control parameter message to the UE one by one through the Element Management System (EMS) until the load falls within a normal load threshold, and the change tracking control parameter message carries the data. Mode attribute and/or measurement period attribute, and specify the reported data mode attribute value as Logged MDT mode and/or specify a larger measurement period attribute value;
所述变更跟踪控制参数消息可通过扩展的现有协议消息发送, 例如 RRC连接重配置消息 ( RRC Connection Reconfiguration )、 跟踪会话更新消 息等, 也可通过新增信令消息发送; 其中, 携带跟踪控制参数, 在跟踪控 制参数中增加上报数据方式属性和 /或测量周期属性。 The change tracking control parameter message can be sent through an extended existing protocol message, for example The RRC connection reconfiguration message (RRC Connection Reconfiguration), the tracking session update message, and the like may also be sent by adding a signaling message; wherein, the tracking control parameter is carried, and the reporting data mode attribute and/or the measurement period attribute are added in the tracking control parameter. .
将已激活用户设备上报测量数据的方式从 Immediate MDT方式变更为 Logged MDT方式,或增大测量周期属性都可使用户终端上报测量数据的数 据量减小, 以减轻 OAM系统的负荷。  The method of reporting the measured data from the activated user device is changed from the Immediate MDT mode to the Logged MDT mode, or the measurement period attribute is increased to reduce the amount of data reported by the user terminal to reduce the load on the OAM system.
步骤 104、 OAM系统检测到当前系统负荷低于正常负荷门限下限时, 可釆用自动控制方式或手动控制方式通过 EMS发送变更跟踪控制参数消息 变更一个或多个已激活用户设备网络性能测量的 UE的跟踪控制参数,并指 定上报数据方式属性值为 Immediate MDT方式和 /或指定较小的测量周期属 性值, 直到 OAM系统的负荷处于预设的正常负荷门限范围内。  Step 104: When the OAM system detects that the current system load is lower than the lower limit of the normal load threshold, the UE may change the one or more activated user equipment network performance measurement by transmitting the change tracking control parameter message by using the automatic control mode or the manual control mode. Tracking control parameters, and specifying the reported data mode attribute value as Immediate MDT mode and/or specifying a smaller measurement period attribute value until the load of the OAM system is within the preset normal load threshold.
釆用自动控制方式时可根据某种策略, 例如, 在预设时间内系统负荷 都保持低于正常负荷门限下限, 就自动向 UE发送变更跟踪控制参数消息, 例如变更已激活正在使用 Logged MDT方式上报测量数据的 UE的数据上报 方式, 4巴上" ^艮方式从 Logged MDT方式改为 Immediate MDT方式; 手动控 制方式下, 由操作员手动变更指定的一个或多个已激活用户设备网络性能 测量的 UE的数据上报方式,把上报方式从 Logged MDT方式改为 Immediate MDT方式。  When using the automatic control mode, according to a certain strategy, for example, the system load is kept below the normal load threshold lower limit within the preset time, and the change tracking control parameter message is automatically sent to the UE, for example, the change is activated and the Logged MDT mode is being used. The data reporting method of the UE that reports the measurement data is changed from the Logged MDT mode to the Immediate MDT mode on the 4 bar. In the manual control mode, the operator manually changes the specified one or more activated user equipment network performance measurements. The data reporting mode of the UE changes the reporting mode from the Logged MDT mode to the Immediate MDT mode.
将已激活用户设备上报测量数据的方式从 Logged MDT 方式变更为 Immediate MDT方式, 或减小测量周期属性都可使单位时间内用户终端上 报测量数据的数据量增大, 从而增加 OAM系统的负荷。  Changing the method of reporting the measured data from the activated user device from the Logged MDT mode to the Immediate MDT mode or reducing the measurement period attribute can increase the data amount of the measurement data reported by the user terminal per unit time, thus increasing the load on the OAM system.
下面以分组核心演进( Evolved Packet Core , EPC ) 系统为例, 对步骤 103和步骤 104中通过网元管理系统向激活用户设备网络性能测量的 UE发 送变更跟踪控制参数消息,指示 UE改变报测量数据的方式的步骤进行详细 描述, 如图 2所示, 详细步骤如下: 步骤 201 , ΟΑΜ系统通过网元管理系统( Element Management System, EMS )发送跟踪会话更新消息到归属用户服务器 ( Home Subscriber Server, HSS ), 该消息中包含跟踪控制参数, 且跟踪控制参数中包含上报数据方式 属性。 The Evolved Packet Core (EPC) system is used as an example to send a change tracking control parameter message to the UE that activates the user equipment network performance measurement by the network element management system in step 103 and step 104, instructing the UE to change the report measurement data. The steps of the way are described in detail, as shown in Figure 2, the detailed steps are as follows: Step 201: The ΟΑΜ system sends a tracking session update message to a Home Subscriber Server (HSS) through an Element Management System (EMS), where the message includes a tracking control parameter, and the tracking control parameter includes the reported data. Mode attribute.
步骤 202 , HSS更新本地保存的跟踪会话跟踪控制参数。  Step 202: The HSS updates the locally saved tracking session tracking control parameter.
步骤 203 , HSS 发送更新用户数据消息到控制面网元移动性管理实体 ( Mobility Manange Entity, MME ),该消息中包含被跟踪 UE的跟踪会话信 息以及跟踪控制参数信息。  Step 203: The HSS sends an update user data message to a Mobility Manange Entity (MME), where the message includes the tracking session information of the tracked UE and the tracking control parameter information.
步骤 204, MME更新本地保存的跟踪会话跟踪控制参数。  Step 204: The MME updates the locally saved tracking session tracking control parameter.
步骤 205 , MME发送跟踪会话更新消息到 eNodeB。  Step 205: The MME sends a tracking session update message to the eNodeB.
步骤 206, eNodeB更新本地保存的跟踪会话跟踪控制参数。  Step 206: The eNodeB updates the locally saved tracking session tracking control parameter.
步骤 207 , eNodeB发送跟踪会话更新消息到 UE。  Step 207: The eNodeB sends a tracking session update message to the UE.
步骤 208 , UE更新本地保存的跟踪会话跟踪控制参数, 根据跟踪控制 参数中的上报数据方式属性变更上报数据方式。  Step 208: The UE updates the locally saved tracking session tracking control parameter, and changes the reporting data mode according to the reported data mode attribute in the tracking control parameter.
步骤 209 , UE返回跟踪会话更新消息应答到 eNodeB;  Step 209, the UE returns a tracking session update message response to the eNodeB;
如果 UE变更上报数据方式成功, 则向 eNodeB反馈跟踪会话更新成功 应答; 否则向 eNodeB反馈跟踪会话更新失败应答或超时未收到应答消息。  If the UE changes the reporting data mode successfully, the tracking session update success response is fed back to the eNodeB; otherwise, the tracking session update failure response or the timeout failure response message is fed back to the eNodeB.
步骤 210 , eNodeB收到跟踪会话更新失败应答或超时未收到应答消息 时, 发送跟踪会话更新消息失败通知到跟踪数据收集实体(TCE )。  Step 210: When the eNodeB receives the tracking session update failure response or the timeout failure response message, the eNodeB sends a tracking session update message failure notification to the tracking data collection entity (TCE).
图 3为本发明提出的用户设备网络性能测量的负荷控制装置 300的结 构示意图, 该装置包括:  FIG. 3 is a schematic structural diagram of a load control apparatus 300 for measuring network performance of a user equipment according to the present invention. The apparatus includes:
监测模块 301 , 用于实时检测 OAM系统当前负荷;  The monitoring module 301 is configured to detect the current load of the OAM system in real time;
决策模块 302, 用于根据 OAM系统当前负荷决策待激活或已被激活用 户设备网络性能测量的用户设备的跟踪控制参数; 所述跟踪控制参数中包 含上报数据方式属性。 在 OAM系统负荷超过预设的正常负荷门限上限时, 所述决策模块可拒绝激活模块以 Immediate MDT方式激活用户设备网络性 能测量的激活请求, 以防止系统负荷进一步升高。 The decision module 302 is configured to: according to the current load of the OAM system, determine a tracking control parameter of the user equipment to be activated or has been activated to measure the performance of the user equipment network; and the tracking control parameter includes a reporting data mode attribute. When the OAM system load exceeds the preset upper limit of the normal load threshold, The decision module may reject the activation module to activate the activation request of the user equipment network performance measurement in the Immediate MDT manner to prevent the system load from further increasing.
激活模块 303 ,用于根据决策模块决策的跟踪控制参数激活用户设备网 络性能测量;  The activation module 303 is configured to activate user equipment network performance measurement according to the tracking control parameter of the decision module decision;
执行模块, 用于根据决策模块决策的跟踪控制参数变更已被激活用户 设备网络性能测量的用户设备的跟踪控制参数,以使 OAM系统的负荷处于 预设的正常负荷门限范围之内。  The execution module is configured to change, according to the tracking control parameter of the decision module decision, the tracking control parameter of the user equipment that has been activated by the user equipment network performance measurement, so that the load of the OAM system is within a preset normal load threshold.
所述激活模块通过激活测量消息将决策的跟踪控制参数发送给待激活 的用户设备; 通过变更跟踪控制参数消息将决策的跟踪控制参数发送给已 激活的用户设备; 所述激活测量消息和变更跟踪控制参数消息中包含上报 数据方式属性和 /或测量周期属性。  The activation module sends the tracking control parameter of the decision to the user equipment to be activated by activating the measurement message; transmitting the tracking control parameter of the decision to the activated user equipment by changing the tracking control parameter message; the activation measurement message and the change tracking The control parameter message includes a report data mode attribute and/or a measurement period attribute.
所述执行模块进一步包括: 第一执行模块 304、 第二执行模块 305; 第一执行模块, 用于在当前系统负荷超过预设负荷门限上限时, 依据 所述决策模块决策结果向已激活测量的用户设备逐个发送变更跟踪控制参 数消息, 指示用户设备将上报数据方式变更为 Logged MDT方式和 /或增加 测量周期, 直到负荷降低到预设的正常负荷门限范围内;  The execution module further includes: a first execution module 304, a second execution module 305, and a first execution module, configured to: when the current system load exceeds a preset load threshold upper limit, according to the decision result of the decision module to the activated measurement The user equipment sends a change tracking control parameter message one by one, instructing the user equipment to change the reporting data mode to the Logged MDT mode and/or increase the measurement period until the load falls within a preset normal load threshold range;
第二执行模块, 用于在当前系统负荷低于预设的负荷门限下限时, 依 据所述决策模块的决策结果向一个或多个激活测量的用户设备, 发送变更 跟踪控制参数消息, 指示用户设备将上报数据方式转为 Immediate MDT方 式和 /或减小测量周期, 直到负荷处于预设的正常负荷门限范围内。  a second execution module, configured to: when the current system load is lower than a preset load threshold lower limit, send a change tracking control parameter message to the one or more user devices that activate measurement according to the decision result of the decision module, indicating the user equipment Convert the reported data mode to Immediate MDT mode and / or reduce the measurement cycle until the load is within the preset normal load threshold.
以上所述, 仅为本发明的较佳实施例而已, 并非用于限定本发明的保 护范围。  The above is only the preferred embodiment of the present invention and is not intended to limit the scope of the present invention.

Claims

权利要求书 Claim
1、 一种用户设备网络性能测量的负荷控制方法, 其特征在于, 包括: 在执行用户设备网络性能测量时, 操作管理维护 (OAM ) 系统实时检 测当前的系统负荷,并根据所述 OAM系统当前负荷情况决策激活用户设备 网络性能测量时所使用的跟踪控制参数, 及决策在执行测量任务过程中是 否需要变更用户设备的跟踪控制参数。 A load control method for user equipment network performance measurement, comprising: performing an operation management and maintenance (OAM) system to detect a current system load in real time when performing user equipment network performance measurement, and according to the current OAM system The load situation decision activates the tracking control parameters used in the user equipment network performance measurement, and determines whether the tracking control parameters of the user equipment need to be changed during the execution of the measurement task.
2、 根据权利要求 1所述的方法, 其特征在于, 所述方法还包括: 所述 OAM 系统通过激活测量消息将决策的跟踪控制参数发送给待激 活的用户设备; 通过变更跟踪控制参数消息将决策的跟踪控制参数发送给 已激活的用户设备; 所述激活测量消息和变更跟踪控制参数消息中包含上 报数据方式属性和 /或测量周期属性。  The method according to claim 1, wherein the method further comprises: sending, by the activation measurement message, the tracking control parameter of the decision to the user equipment to be activated; and changing the tracking control parameter message by The tracking control parameter of the decision is sent to the activated user equipment; the activation measurement message and the change tracking control parameter message include a report data mode attribute and/or a measurement period attribute.
3、 根据权利要求 2所述的方法, 其特征在于, 所述方法还包括: 所述 OAM系统判断当前系统负荷超负荷时,拒绝釆用实时( Immediate The method according to claim 2, wherein the method further comprises: when the OAM system determines that the current system load is overloaded, rejecting the real-time use of the Immediate (Immediate)
MDT )上^艮数据方式的用户设备的网络性能测量的激活请求。 MDT) An activation request for network performance measurement of the user equipment on the data mode.
4、 根据权利要求 2所述的方法, 其特征在于, OAM系统根据当前系 统负荷变更用户设备的跟踪控制参数的步骤包括:  4. The method according to claim 2, wherein the step of changing the tracking control parameter of the user equipment according to the current system load by the OAM system comprises:
所述 OAM系统检测到当前系统负荷超过预设的正常负荷门限上限时, 向已激活测量的用户设备逐个发送变更跟踪控制参数消息, 指示用户设备 将上 数据方式变更为日志(Logged MDT )方式和 /或增加测量周期, 直到 负荷降低到预设的正常负荷门限范围之内。  When the OAM system detects that the current system load exceeds the preset upper limit of the normal load threshold, the OAM system sends a change tracking control parameter message to the activated user equipment, indicating that the user equipment changes the data mode to a log (Logged MDT) mode and / or increase the measurement cycle until the load falls within the preset normal load threshold.
5、 根据权利要求 2所述的方法, 其特征在于, OAM系统根据当前系 统负荷变更用户设备的跟踪控制参数的步骤包括:  The method according to claim 2, wherein the step of changing the tracking control parameter of the user equipment according to the current system load by the OAM system comprises:
所述 OAM系统检测到当前系统负荷低于预设的正常负荷门限下限时, 向一个或多个已激活测量的用户设备发送变更跟踪控制参数消息, 指示用 负荷处于预设的正常负荷门限范围之内。 When the OAM system detects that the current system load is lower than a preset lower limit of the normal load threshold, the OAM system sends a change tracking control parameter message to the one or more activated measurement user equipments, and the indication is used. The load is within the preset normal load threshold.
6、 一种用户设备网络性能测量的负荷控制装置, 其特征在于, 该装置 包括:  6. A load control device for measuring network performance of a user equipment, characterized in that the device comprises:
监测模块, 用于实时检测 OAM系统当前负荷;  a monitoring module for detecting the current load of the OAM system in real time;
决策模块,用于根据 OAM系统当前负荷决策待激活或已被激活用户设 备网络性能测量的用户设备的跟踪控制参数;  a decision module, configured to determine, according to a current load of the OAM system, a tracking control parameter of the user equipment to be activated or that has been activated by the user equipment network performance measurement;
激活模块, 用于根据决策模块决策的跟踪控制参数激活用户设备网络 性能测量;  An activation module, configured to activate user equipment network performance measurement according to a tracking control parameter of the decision module decision;
执行模块, 用于根据决策模块决策的跟踪控制参数变更已被激活用户 设备网络性能测量的用户设备的跟踪控制参数。  And an execution module, configured to change, according to the tracking control parameter of the decision module decision, a tracking control parameter of the user equipment that has been activated by the user equipment network performance measurement.
7、 根据权利要求 6所述的装置, 其特征在于, 所述激活模块通过激活 测量消息将决策的跟踪控制参数发送给待激活的用户设备; 通过变更跟踪 控制参数消息将决策的跟踪控制参数发送给已激活的用户设备; 所述激活 测量消息和变更跟踪控制参数消息中包含上报数据方式属性和 /或测量周期 属性。  The device according to claim 6, wherein the activation module sends the tracking control parameter of the decision to the user equipment to be activated by activating the measurement message; and sending the tracking control parameter of the decision by changing the tracking control parameter message For the activated user equipment; the activation measurement message and the change tracking control parameter message include a report data mode attribute and/or a measurement period attribute.
8、 根据权利要求 6所述的装置, 其特征在于,  8. Apparatus according to claim 6 wherein:
所述决策模块在 OAM系统负荷超负荷时, 拒绝激活模块以 Immediate MDT方式激活用户设备网络性能测量的激活请求。  The decision module refuses to activate the module to activate the activation request of the user equipment network performance measurement in the MDT mode when the OAM system is overloaded.
9、 根据权利要求 7所述的装置, 其特征在于, 所述执行模块包括: 第一执行模块, 用于在当前系统负荷超过预设负荷门限上限时, 依据 所述决策模块决策结果向已激活测量的用户设备逐个发送变更跟踪控制参 数消息, 指示用户设备将上报数据方式变更为 Logged MDT方式和 /或增加 测量周期, 直到负荷降低到预设的正常负荷门限范围内;  The device according to claim 7, wherein the execution module comprises: a first execution module, configured to: when the current system load exceeds a preset load threshold upper limit, according to the decision result of the decision module is activated The measured user equipment sends a change tracking control parameter message one by one, instructing the user equipment to change the reporting data mode to the Logged MDT mode and/or increase the measurement period until the load falls within a preset normal load threshold;
第二执行模块, 用于在当前系统负荷低于预设的负荷门限下限时, 依 据所述决策模块的决策结果向一个或多个激活测量的用户设备, 发送变更 跟踪控制参数消息, 指示用户设备将上报数据方式转为 Immediate MDT方 式和 /或减小测量周期, 直到负荷处于预设的正常负荷门限范围内。 a second execution module, configured to: when the current system load is lower than a preset load threshold lower limit, Sending a change tracking control parameter message to the one or more user equipments that activate the measurement according to the decision result of the decision module, instructing the user equipment to convert the reporting data mode to the Immediate MDT mode and/or reduce the measurement period until the load is in advance Set within the normal load threshold.
PCT/CN2011/071455 2010-08-24 2011-03-02 Method and device for load control in user equipment network performance measurement WO2012024919A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201010262533.9 2010-08-24
CN201010262533.9A CN102378237B (en) 2010-08-24 2010-08-24 A kind of duty control method of user equipment network performance measurement and device

Publications (1)

Publication Number Publication Date
WO2012024919A1 true WO2012024919A1 (en) 2012-03-01

Family

ID=45722848

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/071455 WO2012024919A1 (en) 2010-08-24 2011-03-02 Method and device for load control in user equipment network performance measurement

Country Status (2)

Country Link
CN (1) CN102378237B (en)
WO (1) WO2012024919A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103404192B (en) * 2012-03-19 2017-07-21 华为技术有限公司 The measurement result of up covering measurement item is obtained and report method, equipment
WO2014033499A1 (en) * 2012-08-30 2014-03-06 Nokia Corporation Decision making based on remote observation of node capabilities
CN104081874B (en) * 2012-12-26 2018-07-03 华为技术有限公司 Transmit method, node and the operational administrative system of data
CN106302620A (en) * 2015-06-12 2017-01-04 中兴通讯股份有限公司 Configuration update message sending method and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100208707A1 (en) * 2007-09-26 2010-08-19 Nec Corporation Radio communication system and method
CN101945423A (en) * 2009-07-07 2011-01-12 大唐移动通信设备有限公司 Method, device and system for reporting load

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101026504B (en) * 2006-02-24 2011-05-11 华为技术有限公司 Network performance measuring method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100208707A1 (en) * 2007-09-26 2010-08-19 Nec Corporation Radio communication system and method
CN101945423A (en) * 2009-07-07 2011-01-12 大唐移动通信设备有限公司 Method, device and system for reporting load

Also Published As

Publication number Publication date
CN102378237A (en) 2012-03-14
CN102378237B (en) 2016-05-25

Similar Documents

Publication Publication Date Title
US10986546B2 (en) Method, apparatus, and system for detecting a radio network problem
US9451477B2 (en) Method and system for implementing drive test
US9591502B2 (en) Method and equipment for feeding back minimization drive test log
EP3148245B1 (en) Radio link monitoring method and ue
WO2012142957A1 (en) Failed cell detection method and device
US20190082344A1 (en) Mobile communication method, user terminal, and processor
US9585028B2 (en) Measurement method, apparatus, and system for minimization of drive tests
US20140099940A1 (en) Method and apparatus for efficiently controlling an mdt in a plurality of plmns
WO2016180154A1 (en) Method and device for delayed minimization of drive test
CN107548097B (en) AP fault detection method and device and electronic equipment
CN102215511B (en) Method, system and equipment for reporting MDT (Mean Down Time) measuring result
WO2013143458A1 (en) Drive test minimization method and device for obtaining time delay
CN104954994A (en) Group communication service interruption processing method and group communication service interruption processing device
WO2015043471A1 (en) Method and device for processing radio link failure
WO2012019536A1 (en) Method and device for processing mdt information
EP2717614A2 (en) Method and apparatus for efficiently controlling an mdt in a plurality of plmns
CN103260176A (en) Minimized drive test method, network element and system
WO2012024919A1 (en) Method and device for load control in user equipment network performance measurement
EP3014919B1 (en) Optimisation of a cellular radio network
WO2018126719A1 (en) Network quality detection method and device
WO2013034092A1 (en) Method, device, and system for detecting enb malfunctions
WO2021253434A1 (en) Information processing method and apparatus, and communication device and storage medium
CN104038955B (en) A kind of method of fault detect and treatment in GSM and base station
WO2012097597A1 (en) Method of processing neighboring cell information, method of instructing handover, user equipment and base station
JPWO2021025062A5 (en)

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11819294

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11819294

Country of ref document: EP

Kind code of ref document: A1