WO2010125737A1 - 基地局装置、無線通信システム、基地局の制御方法、および無線通信システムの制御方法 - Google Patents

基地局装置、無線通信システム、基地局の制御方法、および無線通信システムの制御方法 Download PDF

Info

Publication number
WO2010125737A1
WO2010125737A1 PCT/JP2010/001869 JP2010001869W WO2010125737A1 WO 2010125737 A1 WO2010125737 A1 WO 2010125737A1 JP 2010001869 W JP2010001869 W JP 2010001869W WO 2010125737 A1 WO2010125737 A1 WO 2010125737A1
Authority
WO
WIPO (PCT)
Prior art keywords
mobile station
uplink signal
value
transmission power
base station
Prior art date
Application number
PCT/JP2010/001869
Other languages
English (en)
French (fr)
Inventor
小暮佑樹
信清貴宏
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to US13/258,911 priority Critical patent/US8848634B2/en
Priority to JP2011511273A priority patent/JP5077485B2/ja
Publication of WO2010125737A1 publication Critical patent/WO2010125737A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/36TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
    • H04W52/367Power values between minimum and maximum limits, e.g. dynamic range
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/28TPC being performed according to specific parameters using user profile, e.g. mobile speed, priority or network state, e.g. standby, idle or non transmission
    • H04W52/281TPC being performed according to specific parameters using user profile, e.g. mobile speed, priority or network state, e.g. standby, idle or non transmission taking into account user or data type priority

Definitions

  • the present invention relates to radio resource management used for transmitting an uplink signal from a mobile station to a base station.
  • LTE Long Term Evolution
  • 3GPP 3rd Generation Partnership Project
  • E-UTRAN EvolvedvolveUniversal Terrestrial Radio Access Network
  • the uplink radio resource allocation in LTE is performed by distributing a plurality of resource blocks (RB) to a plurality of mobile stations.
  • the resource block is a resource element obtained by dividing the frequency domain by 180 kHz (12 subcarriers, the subcarrier interval is 15kHz) and the time domain by 1 msec.
  • the resource block allocation control is called “scheduling”.
  • the scheduling of uplink radio resources is performed by the base station.
  • the base station measures the reception quality of the reference signal (SRS: Sounding Reference Signal) transmitted from the mobile station, and based on this reception quality, the uplink shared physical channel (PUSCH) used by each mobile station for transmitting user data : Determines the number of resource blocks, hopping pattern, radio modulation scheme (QPSK, 16QAM, or 64QAM), etc. to be allocated to Physical Uplink Shared Channel).
  • SRS Sounding Reference Signal
  • the transmission power of PUSCH depends on the maximum transmission power of the mobile station and the number of allocated resource blocks. For this reason, the base station notifies the mobile station of the maximum allowable transmission power P_EMAX in advance, and schedules uplink radio resources in consideration of the maximum transmission power P_EMAX notified to the mobile station. The mobile station receives the scheduling result by the base station and transmits an uplink signal using the resource block specified by the base station.
  • the transmission power when the mobile station transmits the PUSCH is determined based on the number of resource blocks (frequency band) allocated to the PUSCH, the size of the downlink path loss estimated by the mobile station, and the like. Further, the total transmission power of the mobile station is controlled so as not to exceed the maximum transmission power P_CMAX imposed on the mobile station.
  • the mobile station sets the smaller one of the allowable maximum transmission power P_EMAX received from the base station and the transmission power upper limit P_UMAX associated with the power class to which the mobile station belongs to the maximum transmission power P_CMAX.
  • Non-Patent Document 1 includes a comprehensive specification regarding the mobile station of the LTE system, and particularly includes the specification of the power class of the mobile station and the specification of the transmission power upper limit P_UMAX for each power class. Further, Non-Patent Document 1 selects the smaller value of the maximum transmission power ⁇ ⁇ P_EMAX allowed from the upper layer and the transmission power upper limit P_UMAX for each power class as the maximum transmission power P_CMAX actually set in the mobile station. It stipulates what should be done.
  • Non-Patent Document 2 includes provisions related to LTE physical layers, and specifically includes provisions related to uplink transmission power control such as a definition formula for determining PUSCH transmission power.
  • Non-Patent Document 3 includes provisions regarding the transmission timing of PHR (Power Headroom Report) transmitted from an LTE mobile station to a base station.
  • Power Headroom is calculated as the difference between the maximum transmission power P_CMAX actually set in the mobile station and the current transmission power of the mobile station. That is, “Power Headroom” means the “transmission power margin” of the mobile station with respect to the maximum transmission power P_CMAX.
  • Patent Document 1 discloses the following two points. (i) The mobile station notifies the base station of the transmission power margin (ie, power headroom); and (ii) The base station shall perform uplink radio resource scheduling in consideration of the transmission power margin notified from the mobile station.
  • the base station shall perform uplink radio resource scheduling in consideration of the transmission power margin notified from the mobile station.
  • Patent Document 2 discloses the following (i) to (v).
  • the mobile station transmits a transmission power upper limit value P_UMAX defined according to the power class to which the mobile station belongs to a radio network controller (RNC) that performs uplink radio resource management;
  • RNC radio network controller
  • the RNC selects the smaller of the maximum allowable transmission power P_EMAX allowed for the mobile station and the transmission power upper limit value P_UMAX received from the mobile station, so that the mobile station actually sets it.
  • the RNC Determining the maximum transmit power P_CMAX; (iii) The RNC notifies the base station of the determined maximum transmission power P_CMAX of the mobile station; (iv) The mobile station transmits a transmission power margin (ie, power headroom) to the base station; and (v) The base station shall calculate the current transmission power of the mobile station using the maximum transmission power P_CMAX of the mobile station received from the RNC and the transmission power margin received from the mobile station, and perform uplink radio resource scheduling. .
  • 3GPP TS 36.101 V8.4.0 "3rd Generation Partnership Project, Technical Specification, Group Radio Access, Network; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) radio transmission, January 2008, Release 8 (Release, 2008)
  • 3GPP TS 36.213 V8.5.0 "3rd Generation Partnership Project, Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Physical layer Procedures (Release 8), December 2008
  • 3GPP TS 36.321 V8.4.0 3rd Generation Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Control (MAC) Protocol (specification) (Release 2008)
  • the base station recognizes that there is a discrepancy between the maximum transmission power P_EMAX allowed by the base station for the mobile station and the maximum transmission power P_CMAX that the mobile station actually sets for itself. There is a problem that you can not. For example, if the maximum transmission power P_EMAX allowed by the base station for the mobile station is larger than the transmission power upper limit P_UMAX based on the power class of the mobile station, the maximum transmission power P_CMAX actually imposed on the mobile station is set to P_UMAX . Therefore, in this case, since the maximum transmission output of the mobile station is smaller than that assumed by the base station, the base station may not be able to efficiently schedule uplink radio resources. This is because the transmission rate of the uplink signal from the mobile station is smaller than the expectation of the base station, and some of the resource blocks allocated by the base station to the mobile station are not used. This is because it occurs.
  • the wireless communication system in which this problem is a concern is not limited to the LTE system. That is, a base station or base station controller configured to notify the mobile station of the maximum transmission power P_EMAX allowed and to schedule uplink radio resources using the maximum transmission power P_EMAX notified by the mobile station as an index. This is a wide problem in the wireless communication system used.
  • the transmission power upper limit value P_UMAX based on the power class is received from the mobile station, the maximum transmission power P_EMAX allowed for the mobile station and the transmission power upper limit value received from the mobile station.
  • the uplink maximum transmission power P_CMAX actually set by the mobile station can be estimated on the base station controller side. For this reason, it is possible to avoid a mismatch between the base station and the mobile station regarding the maximum transmission power of the mobile station.
  • the method of Patent Document 2 has a problem that it is necessary to add a function to the mobile station because it is necessary to report the transmission power upper limit value P_UMAX based on the power class from the mobile station to the RNC.
  • the present invention has been made on the basis of the above-described knowledge, and one of the objects of the present invention is to report to the mobile station the transmission power upper limit value P_UMAX associated with the power class to which the mobile station belongs. Without making it, the base station can detect the mismatch between the maximum transmission power P_CMAX of the uplink actually set by the mobile station and the maximum transmission power P_EMAX allowed by the base station .
  • a first aspect of the present invention is a base station apparatus that receives an uplink signal transmitted from a mobile station.
  • the base station apparatus includes reception quality of the uplink signal, a radio modulation scheme applied to the uplink signal, and notification information from the mobile station included in the uplink signal (however, the mobile station belongs to Used for carrying the uplink signal and the set value of the maximum transmission power that the mobile station actually imposes on itself based on at least one of them (excluding the transmission power upper limit value associated with the power class) It is configured to determine a discrepancy between an index value relating to the maximum transmission power of the mobile station used in the base station apparatus for scheduling of the radio resources to be performed.
  • a second aspect of the present invention is a wireless communication system including a mobile station and a base station.
  • the base station is configured to perform scheduling of radio resources used for transmission of uplink signals from mobile stations and to receive the uplink signals transmitted according to the scheduling. Further, the base station receives the uplink signal reception quality, a radio modulation scheme applied to the uplink signal, and notification information from the mobile station included in the uplink signal (provided that the mobile station Based on at least one of the transmission power upper limit values associated with the power class to which the mobile station belongs) and the setting value of the maximum transmission power that the mobile station actually imposes on itself, and used for the scheduling A discrepancy between the index value regarding the maximum transmission power of the mobile station is determined.
  • a control method for a base station apparatus that receives an uplink signal transmitted from a mobile station.
  • the radio modulation scheme applied to the reception quality of the uplink signal and the uplink signal , And notification information from the mobile station included in the uplink signal (excluding the transmission power upper limit value associated with the power class to which the mobile station belongs),
  • the set value of the maximum transmission power actually imposed on itself and the maximum transmission power of the mobile station used in the base station device for scheduling of radio resources used for carrying the uplink signal Including determining a discrepancy between the index values.
  • a fourth aspect of the present invention is a method for controlling a wireless communication system, which includes the following steps (a) to (c). (A) Notifying the mobile station of the scheduling result of radio resources used for carrying uplink signals; (B) based on the scheduling result, transmitting an uplink signal from the mobile station to the base station; and (c) reception quality of the uplink signal, radio modulation applied to the uplink signal.
  • the mobile station based on at least one of a scheme and notification information from the mobile station included in the uplink signal (excluding a transmission power upper limit value associated with a power class to which the mobile station belongs) Determining a mismatch in the base station between the set value of the maximum transmission power actually imposed on the mobile station and the index value relating to the maximum transmission power of the mobile station used for the scheduling.
  • the mobile station actually sets the transmission power upper limit value P_UMAX associated with the power class to which the mobile station belongs without causing the mobile station to report to the base station.
  • a mismatch between the maximum uplink transmission power P_CMAX and the maximum transmission power P_EMAX allowed by the base station for the mobile station can be detected in the base station.
  • FIG. 2 is a block diagram illustrating a configuration example of a base station illustrated in FIG. 1.
  • 10 is a flowchart showing an example of a procedure for determining a mismatch between a set value P_CMAX of a maximum transmission power of a mobile station and an index value P_RMAX for scheduling.
  • 10 is a flowchart showing an example of a procedure for determining a mismatch between a set value P_CMAX of a maximum transmission power of a mobile station and an index value P_RMAX for scheduling.
  • 10 is a flowchart showing an example of a procedure for determining a mismatch between a set value P_CMAX of a maximum transmission power of a mobile station and an index value P_RMAX for scheduling.
  • 10 is a flowchart showing an example of a procedure for determining a mismatch between a set value P_CMAX of a maximum transmission power of a mobile station and an index value P_RMAX for scheduling.
  • 10 is a flowchart showing an example of a procedure for determining a mismatch between a set value P_CMAX of a maximum transmission power of a mobile station and an index value P_RMAX for scheduling. It is a figure which shows the structural example of the base station concerning Embodiment 2 of invention. It is a flowchart which shows an example of the update procedure of the index value P_RMAX for scheduling. It is a graph which shows a mode that the index value P_RMAX for scheduling is updated.
  • FIG. 1 is a network diagram showing a configuration example of a wireless communication system 1 including a base station 10 according to the present embodiment.
  • the base station 10 is connected to the antenna 11 and performs wireless communication with the mobile station 13 located in the cover area 12.
  • the base station 10 performs allocation (scheduling) of radio resources used in the radio communication path (downlink and uplink) with the mobile station 13.
  • the base station 10 is connected to a core network (not shown), and relays traffic between the mobile station 13 and the core network.
  • LTE employs OFDMA (Orthogonal Frequency Division Multiplexing Access) for the downlink radio access method and SC-FDMA (Single-Carrier Frequency-Division Multiple Access) for the uplink radio access method.
  • OFDMA Orthogonal Frequency Division Multiplexing Access
  • SC-FDMA Single-Carrier Frequency-Division Multiple Access
  • a downlink shared physical channel (PDSCH: Physical Downlink Shared Channel), a downlink control physical channel (PDCCH: Physical Downlink Control Channel), and the like are used.
  • PDSCH is used for transferring user data.
  • the PDCCH is used to transfer control information such as user data information and transport format information mapped to the PDSCH and user data information and transport format information mapped to the uplink PUSCH.
  • PUCCH Physical-Uplink-Control-Channel
  • CQI Channel Quality Indicator
  • the base station 10 determines the number of resource blocks, hopping pattern, radio modulation scheme (QPSK, 16QAM, or 64QAM), etc., to be allocated to the PUSCH used by the mobile station 13 for transmitting user data.
  • the base station 10 uses the index value P_RMAX regarding the maximum transmission power of the mobile station 13 for uplink signal scheduling.
  • the initial value of the index value P_RMAX may be the maximum transmission power P_EMAX allowed by the base station 10 for the mobile station 13.
  • the maximum transmission power P_CMAX that the mobile station 13 actually imposes on itself may be smaller than the maximum transmission power P_EMAX allowed from the base station 10 in some cases.
  • the mobile station 13 sets the upper limit value P_UMAX of transmission power based on the power class to the maximum transmission power P_CMAX.
  • the base station 10 detects a mismatch between the index value P_RMAX used for scheduling of uplink radio resources and the set value P_CMAX of the maximum transmission power actually imposed on the mobile station 13 itself. It is configured as follows. Although details will be described later, the base station 10 receives the uplink signal reception quality, the radio modulation scheme applied to the uplink signal, and the notification information from the mobile station 13 included in the uplink signal (however, the mobile station The above mismatch detection is performed based on at least one of the transmission power upper limit values P_UMAX associated with the power class to which 13 belongs.
  • the notification information from the mobile station 13 is, for example, PHR (Power Headroom Report).
  • the mobile station 13 transmitting the PHR is stipulated in the LTE standard and does not add an extra function to the mobile station 13.
  • the reception quality of the uplink signal and the radio modulation scheme applied to the uplink signal can be measured autonomously at the base station 10 that has received the uplink signal, and therefore, the mobile station 13 has no need for the above mismatch detection. There is no need to add additional functions.
  • the uplink signal reception quality means (a) ⁇ uplink signal throughput, (b) ⁇ ⁇ uplink signal reception power at the base station 10, (c) ⁇ uplink signal reception SIR (Signal Interference Ratio), (d) ⁇ Uplink signal occupancy bandwidth, (e) ⁇ Number of resource blocks used to carry the uplink signal, (f) B BLER (Block Error Rate) obtained by decoding the uplink signal, etc. .
  • FIG. 2 is a block diagram illustrating a configuration example of the base station 10.
  • the wireless transmission / reception unit 101 up-converts a downlink signal in the baseband band supplied from the communication data processing unit 102 to an RF (Radio ⁇ ⁇ Frequency) band, performs signal amplification, and supplies the signal to the antenna 11.
  • the radio transmission / reception unit 101 supplies the communication data processing unit 102 with an uplink signal in the baseband obtained by performing signal amplification of the uplink signal received by the antenna 11 and frequency down-conversion to the baseband. .
  • the communication data processing unit 102 has layer 1 processing and layer 2 (MAC (Medium Access Control) / RLC (Radio Link Control)) processing functions.
  • the communication data processing unit 102 receives packet data to be transmitted on the downlink from the core network via the transmission path interface 103.
  • the communication data processing unit 102 divides and integrates received packet data, RLC layer transmission processing such as RLC retransmission control, MAC retransmission control, HARQ (Hybrid Automatic Repeat reQuest) control, transport format selection, channel coding, symbol Mapping and OFDM modulation are performed to generate a baseband downlink signal (baseband OSFM signal).
  • IFFT Inverse Fourier Transform
  • the communication data processing unit 102 performs OFDM demodulation, error correction decoding, MAC retransmission control, and RLC layer reception processing on the uplink signal received from the wireless transmission / reception unit 101 and is transmitted from the mobile station 13. Restore the data column.
  • FFT Fast Fourier Transform
  • the restored received data string is transferred to the core network via the transmission path interface 103.
  • the scheduling unit 104 performs scheduling of uplink radio resources and downlink radio resources.
  • Uplink radio resource scheduling is performed by the mobile station 13 according to the uplink interference wave level acquired by the radio transmission / reception unit 101, the reception quality (eg, SIR) of the uplink reference signal (SRS), the power offset, and the like.
  • the number of resource blocks to be allocated to and the transmission format are determined. Further, the transmission power of the uplink signal transmitted from the mobile station 13 is determined depending on the path loss, the number of transmission resource blocks, and the like. Therefore, the scheduling unit 104 considers the maximum transmission power index value P_RMAX of the mobile station 13 and the transmission power margin (remaining power) indicated by the PHR received from the mobile station 13, and allocates uplink radio resources. Do.
  • the initial value of the index value P_RMAX is “allowable maximum transmission power P_EMAX” determined by the base station 10 and notified to the mobile station 13.
  • the determination unit 105 determines a mismatch between the index value P_RMAX and the set value P_CMAX.
  • the index value P_RMAX is the maximum transmission power (that is, an assumed value) of the mobile station 13 that the scheduling unit 104 uses for scheduling of uplink radio resources.
  • the set value P_CMAX is the maximum transmission power that the mobile station 13 actually sets itself.
  • FIG. 3 is a flowchart showing a specific example of a mismatch detection procedure using PHR (Power Headroom Report).
  • the determination unit 105 calculates the expected value V1 of the transmission power margin of the mobile station 13 using the uplink radio resource scheduling result and the index value P_RMAX of the maximum transmission power.
  • Calculation of the predicted value V1 may be performed as follows. For example, the difference obtained by subtracting the predicted transmission power of the mobile station 13 from the index value P_RMAX from the number of resource blocks allocated to the mobile station 13 for uplink transmission may be set as the predicted value V1.
  • a value obtained by subtracting the total value of the measured value of the total received power in the frequency band assigned to the mobile station 13 for uplink transmission and the estimated value of the uplink path loss from the index value P_RMAX is an expected value. It may be V1.
  • the uplink path loss estimated value is the difference between the transmission power of the downlink reference signal (RS: Reference Signal) by the base station 10 and the reception power of the RS reported from the mobile station, or the reception result of the reference signal (SRS). It is sufficient to calculate using RS.
  • step S11 the determination unit 105 refers to the PHR received from the mobile station 13 and calculates the actual value V2 of the transmission power margin of the mobile station 13. Specifically, the value of the transmission power margin indicated by PHR may be the actual value V2.
  • Steps S12 and S13 the mismatch between the predicted value V1 and the predicted value V2 is determined. Specifically, in step S12, the determination unit 105 calculates the difference D by subtracting the actual value V2 from the predicted value V1. The determination unit 105 compares the difference D with a threshold value (step S13).
  • the threshold value is a positive value set in advance.
  • the determination unit 105 When the value of the difference D exceeds a preset threshold value (YES in step S13), the determination unit 105 is actually set in the mobile station 13 with the index value P_RMAX of the maximum transmission power for scheduling. It is determined that there is a mismatch between the maximum transmission power setting values P_CMAX (step S14).
  • the number of times the difference D exceeds a preset threshold value is counted, and when the count number exceeds a preset reference number, between the index value P_RMAX and the set value P_CMAX It may be determined that there is a mismatch.
  • An example of the determination procedure modified in this way is shown in FIG.
  • step S20 the value of the counter K is reset to zero.
  • step S21 the determination unit 105 calculates an expected value ⁇ ⁇ V1 of the transmission power margin of the mobile station 13. Step S21 is the same as step S10 described above.
  • step S22 it is determined whether a PHR is received from the mobile station 13. When the PHR is received (YES in step S22), the determination unit 105 calculates the actual value V2 of the transmission power margin of the mobile station 13 with reference to the PHR (step S23). Step S23 is the same as step S11 described above.
  • steps S24 and S25 it is determined whether or not a mismatch condition is satisfied between the predicted value V1 and the predicted value V2. Specifically, as in steps S12 and S13 described above, the determination unit 105 may calculate the difference D and perform threshold determination for the difference D.
  • step S25 If the value of the difference D exceeds a preset threshold value (YES in step S25), the determination unit 105 adds 1 to the value of the counter K. On the other hand, when the value of the difference D is equal to or smaller than the threshold value (NO in step S25), the determination unit 105 returns to step S20 and resets the value of the counter K to zero.
  • step S27 the determination unit 105 determines whether the value of the counter K has reached a preset upper limit value. If not, the determination unit 105 returns to step S21 and repeats the process. On the other hand, when the value of the counter K reaches the upper limit value (YES in S27), the determination unit 105 determines that there is a mismatch between the index value P_RMAX and the set value P_CMAX (step S28).
  • the mismatch determination procedure using the PHR can be modified in addition to those shown in FIGS.
  • the threshold value may be determined for the moving average of the difference D ⁇ .
  • the parameter that can be used here is not limited to the transmission power margin.
  • a path loss between the base station 10 and the mobile station 13 can be used. This is because LTE UEs use downlink path loss estimates for power headroom (ie, transmission power margin) calculations.
  • the following formula (1) is a power headroom definition formula defined in the LTE specification.
  • the subscript “i” means the i-th subframe number.
  • M PUSCH (i) indicates the PUSCH transmission bandwidth of the i-th subframe by the number of resource blocks allocated.
  • P O_PUSCH (i), ⁇ , ⁇ TF (i), and f (i) are values used to determine the PUSCH transmission power of the i-th subframe, and are stored in the cell formed by the base station 10. It is calculated by a specific value and a value specific to the mobile station 13.
  • the base station 10 can obtain the calculated value (PL_PHR) of the downlink path loss according to the following equation (2) using the power headroom value specified by the PHR received from the mobile station 13.
  • Equation (2) is obtained by converting Equation (1) with respect to PL.
  • PH (i) in the formula is the value of the power headroom notified by the PHR.
  • the base station 10 also subtracts the received power (RSRP: Reference Signal Received Power) of the downlink reference signal in the mobile station 13 from the transmission power of the downlink reference signal, as shown in Equation (3).
  • the calculated path loss (PL_RSRP) can be obtained.
  • the base station 10 may receive the RSRP measured by the mobile station 13. Further, the base station 10 may receive a reference signal received quality (RSRQ) from the mobile station 13 and obtain a path loss using the RSRQ.
  • RSRQ reference signal received quality
  • the base station 10 calculates a path loss value (PL_PHR) calculated using the received value of the PHR, and a path loss value (PL_RSRP) calculated using the transmission power of the downlink reference signal and the received power measured by the mobile station 13. May be determined by detecting a mismatch between the index value P_RMAX and the set value P_CMAX.
  • PL_PHR path loss value
  • PL_RSRP path loss value
  • FIG. 5 is a flowchart showing an example of a procedure for determining a mismatch between the index value P_RMAX and the set value P_CMAX by detecting a mismatch in the calculated value of path loss.
  • the counter K is reset to zero.
  • step S31 it is determined whether or not PHR is received from the mobile station 13.
  • the determination unit 105 calculates a path loss value (PL_PHR) using the PHR according to the above equation (2) (step S32).
  • step S33 the determination unit 105 calculates a path loss value (PL_RSRP) according to the above equation (3).
  • step S34 the determination unit 105 determines whether the two path loss values PL_PHRP and PL_RSRP satisfy a predetermined mismatch condition. This can be done by performing threshold determination for the difference between the two values, as in steps S12 and S13 described above. Steps S35 to S37 are the same as steps S26 to S28 described above, and a description thereof will be omitted here.
  • the determination unit 105 is obtained by analyzing the reception quality expected value V3 of the uplink signal expected from the scheduling result of the uplink radio resource and the uplink signal actually received from the mobile station 13. Compare the received quality measurement V4.
  • FIG. 6 is a flowchart showing a specific example of the mismatch detection procedure based on the reception quality of the uplink signal.
  • the determination unit 105 calculates an expected value V3 based on the scheduling result of the uplink radio resource.
  • the determination unit 105 acquires the measurement value V4 of the reception quality of the uplink signal.
  • the determination unit 105 is actually set in the mobile station 13 with the index value P_RMAXR of the maximum transmission power for scheduling. It is determined that there is a mismatch between the set value P_CMAX of the maximum transmission power being received (step S42).
  • reception quality of the uplink signal that can be referred to by the determination unit 105 include (a) uplink signal throughput, (b) ⁇ ⁇ uplink signal reception power at the base station 10, and (c) ⁇ ⁇ ⁇ uplink signal reception SIR. (Signal Interference Ratio), (d) ⁇ Uplink signal occupied bandwidth, (e) ⁇ Number of resource blocks used to carry the uplink signal, (f) B BLER obtained by decoding the uplink signal Block Error Rate).
  • the determination unit 105 determines a mismatch between the index value P_RMAX and the set value P_CMAX when the measured value of the throughput is smaller than a predetermined threshold value compared to the expected value. Good.
  • the determination unit 105 calculates the throughput (expected value V3) of the received data sequence restored from the uplink signal based on the number of resource blocks allocated for uplink transmission and the transport format (modulation method, etc.). do it. Further, the determination unit 105 may acquire the throughput (measured value V4) of the received data sequence restored from the uplink signal from the communication data processing unit 102.
  • the determination unit 105 determines a discrepancy between the index value P_RMAX and the set value P_CMAX when the measured value of the received power is smaller than the expected value by a predetermined threshold or more. do it.
  • the determination unit 105 calculates the received power (expected value V3) from the index value P_RMAX, the transmission power of the mobile station calculated based on the number of resource blocks allocated by scheduling, and the uplink path loss estimated value. Good. Further, the determination unit 105 may acquire the received power in the frequency band defined by the continuous resource block allocated to the mobile station 13 by scheduling from the radio transmission / reception unit 101.
  • reception SIR of uplink signal When referring to the reception SIR of the uplink signal, the determination unit 105 determines a mismatch between the index value P_RMAX and the set value P_CMAX when the measurement value of the reception SIR is smaller than a predetermined threshold value by a predetermined threshold or more. do it.
  • the determination unit 105 calculates the reception SIR (expected value V3) from the index value P_RMAX, the transmission power of the mobile station calculated based on the number of resource blocks allocated by scheduling, and the uplink path loss estimation value. Good. Further, the determination unit 105 may acquire the reception SIR in the frequency band defined by the continuous resource block assigned to the mobile station 13 by scheduling from the radio transmission / reception unit 101.
  • the determination unit 105 determines whether the index value P_RMAX and the set value P_CMAX are set when the number of used resource blocks of the received uplink signal is smaller than the expected value. What is necessary is just to determine the mismatch.
  • the determination unit 105 may set the number of resource blocks allocated by scheduling to the expected value V3.
  • the determination unit 105 may acquire the number of resource blocks (measured value V4) used in the received uplink signal from the communication data processing unit 102.
  • the determining unit 105 may determine a mismatch between the index value P_RMAX and the set value P_CMAX when the measured value of the BLER is greater than a predetermined threshold by a predetermined threshold or more.
  • the determination unit 105 may set the BLER target value used as the reference by the scheduling unit 104 as the expected value V3 in consideration of the radio wave environment and the like. Further, the determination unit 105 may acquire the BELR (measured value V4) obtained at the time of the error correction code from the communication data processing unit 102.
  • the modulation method having a larger distance between signal points on the constellation requires a smaller required CNR (Carrier-to-Noise-Ratio) (that is, it is more resistant to noise). Therefore, when the transmission power cannot be increased, the mobile station 13 adaptively changes the modulation scheme (for example, from 64QAM to 16QAM). For this reason, it is possible to determine the mismatch between the index value P_RMAX and the set value P_CMAX by referring to the radio modulation scheme employed for the uplink signal.
  • CNR Carrier-to-Noise-Ratio
  • FIG. 7 is a flowchart showing a specific example of the mismatch detection procedure based on the radio modulation scheme of the uplink signal.
  • the determination unit 105 compares the radio modulation scheme (referred to as scheme A) of the uplink signal specified by scheduling with the radio modulation scheme (referred to as scheme B) actually applied to the uplink signal. To do. Then, the determination unit 105 determines a mismatch between the index value P_RMAX and the set value P_CMAX when the method B is a method having a larger distance between signal points on the constellation than the method A (step S51).
  • the base station 10 does not receive the transmission power upper limit value P_UMAX associated with the power class to which the mobile station 13 belongs from the mobile station 13, and the index value P_RMAX and the set value P_CMAX. Discrepancies can be determined.
  • the base station 20 determines a mismatch between the index value P_RMAX and the set value P_CMAX, similarly to the base station 10 described above. Further, the base station 20 updates the index value P_RMAX so as to approach the setting value P_CMAX when a mismatch between the index value P_RMAX and the setting value P_CMAX is determined. Then, the base station 20 performs uplink radio resource scheduling using the updated index value P_RMAX.
  • FIG. 8 is a block diagram illustrating a configuration example of the base station 20.
  • the difference from the configuration example of the base station 10 shown in FIG. 2 is that the scheduling unit 204 updates the index value P_RMAX described above.
  • the other components except the scheduling unit 204 are the same as those shown in FIG.
  • FIG. 9 is a flowchart showing a series of procedures including the mismatch determination by the determination unit 105 and the subsequent update process. Steps S21 to S27 in FIG. 9 are the same as the corresponding steps shown in FIG. Note that another procedure (for example, the procedure shown in FIG. 3, 5, 6, or 7) may be adopted as the procedure of mismatch determination by the determination unit 105 in the present embodiment.
  • step S68 of FIG. 9 the scheduling unit 204 updates the index value P_RMAX of the maximum transmission power for scheduling in response to the mismatch detection in the determination unit 105.
  • the method of updating the index value P_RMAX includes: (a) to (e).
  • the index value P_RMAX is lowered step by step from the initial value P_EMAX by a certain value in response to the repeated determination of mismatch.
  • (C) Decrease the index value P_RMAX by the value of the difference D.
  • (D) The average value of the difference D over the duration in which the difference D exceeds the threshold is obtained, and the index value P_RMAX is lowered by the average value of the difference D. For example, an average value may be obtained among the calculated values of the difference D corresponding to the upper limit value of the counter K.
  • (E) The average value of the difference D over the duration in which the difference D exceeds the threshold is obtained, and the index value P_RMAX is lowered by a predetermined ratio of the average value of the difference D.
  • FIG. 10 is a graph showing how the index value P_RMAX is updated.
  • a graph indicated by a one-dot chain line in FIG. 10 represents an index value P_RMAX of the maximum transmission power for scheduling.
  • the initial value (time T0) of the index value P_RMAX is the allowable value P_EMAX notified from the base station 10 to the mobile station.
  • a graph indicated by a solid line in FIG. 10 represents an expected value V1 of the transmission power margin of the mobile station 13 calculated using the index value P_RMAX.
  • the graph indicated by the broken line in FIG. 10 represents the actual value V2 of the transmission power margin of the mobile station 13 indicated by PHR.
  • PHR is periodically reported from the mobile station 13 in the order of times T1, T2, T3, and T4, and the determination unit 105 performs threshold determination for the difference D every time PHR is received. Further, it is assumed that the upper limit value of the counter K is set to 3. In this case, the scheduling unit 204 updates the index value P_RMAX of the maximum transmission power in response to the difference D exceeding a predetermined threshold in any of the four determinations from the times T1 to T4. In the example of FIG. 10, the updated index value P_RMAX is generated by lowering the index value P_RMAX before the update by the value of the difference D.
  • the base station 20 receives, from the mobile station 13, the transmission power upper limit value P_UMAX associated with the power class to which the mobile station 13 belongs, like the base station 10 described above. Without any difference, the discrepancy between the index value P_RMAX and the set value P_CMAX can be determined.
  • the base station 20 updates the index value P_RMAX so as to approach the set value P_CMAX when a mismatch between the index value P_RMAX and the set value P_CMAX is determined.
  • the base station 20 updates the index value P_RMAX so as to approach the set value P_CMAX when a mismatch between the index value P_RMAX and the set value P_CMAX is determined.
  • the operations related to the detection of mismatch between the index value P_RMAX and the set value P_CMAX and the update of the index value P_RMAX described in the first and second embodiments of the invention are ASIC (Application Specific Specific Integrated Circuit), DSP (Digital Signal Processor), MPU (Micro Processing Processing). Unit) or CPU (Central Processing Unit) or a computer system including a combination thereof can be realized.
  • the computer system may be made to execute a program including a group of instructions related to the processing procedure shown in any of the flowcharts of FIGS. Note that these programs can be stored using various types of non-transitory computer readable media and supplied to a computer.
  • Non-transitory computer readable media include various types of tangible storage media (tangible storage medium).
  • non-transitory computer-readable media examples include magnetic recording media (eg flexible disks, magnetic tapes, hard disk drives), magneto-optical recording media (eg magneto-optical discs), CD-ROMs (Read Only Memory), CD-Rs, CD-R / W, semiconductor memory (for example, mask ROM, PROM (Programmable ROM), EPROM (Erasable ROM), flash ROM, RAM) are included.
  • the program may also be supplied to the computer by various types of temporary computer-readable media. Examples of transitory computer readable media include electrical signals, optical signals, and electromagnetic waves.
  • the temporary computer-readable medium can supply the program to the computer via a wired communication path such as an electric wire and an optical fiber, or a wireless communication path.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

 本発明は、移動局が属するパワークラスに対応付けられた送信電力上限値P_UMAXの基地局への報告を移動局に行わせることなく、移動局が実際に設定しているアップリンクの最大送信電力P_CMAXと基地局が移動局に対して許容した最大送信電力P_EMAXとの不一致を基地局において検出可能とすることを目的とする。基地局(10)は、移動局(13)が実際に自身に課している最大送信電力の設定値P_CMAXと、アップリンク信号の搬送に使用される無線リソースのスケジューリングのために基地局(10)において使用されている最大送信電力の指標値P_RMAXとの間の不一致を判定する。当該判定は、アップリンク信号の受信品質、アップリンク信号に適用されている無線変調方式、およびアップリンク信号に含まれる移動局(13)からの通知情報(ただし、移動局(13)が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて行われる。

Description

基地局装置、無線通信システム、基地局の制御方法、および無線通信システムの制御方法
 本発明は、移動局から基地局へのアップリンク信号の送信に使用される無線リソース管理に関する。
 LTE(Long Term Evolution)は、W-CDMAの後継として、3GPP(3rd Generation Partnership Project)で検討されているセルラ通信方式である。LTEネットワークは、E-UTRAN(Evolved Universal Terrestrial Radio Access Network)とも呼ばれる。
 LTEでのアップリンクの無線リソース割り当ては、複数のリソースブロック(RB:Resource Block)を複数の移動局に振り分けることにより行われる。リソースブロックは、周波数領域を180 kHz(12サブキャリア、サブキャリア間隔は15kHz)単位、時間領域を1 m秒単位で分割したリソース要素である。なお、リソースブロックの割り当て制御は、"スケジューリング"と呼ばれる。
 アップリンクの無線リソースのスケジューリングは、基地局によって行われる。基地局は、移動局から送信される参照信号(SRS:Sounding Reference Signal)の受信品質を計測し、この受信品質に基づいて、各移動局がユーザデータの送信に使用する上り共有物理チャネル(PUSCH:Physical Uplink Shared Channel)に割り当てるリソースブロック数、ホッピングパターン、無線変調方式(QPSK、16QAM又は64QAM)等を決定する。
 なお、PUSCHの送信電力は、移動局の最大送信電力とリソースブロックの割り当て数に依存する。このため、基地局は、許容される最大送信電力P_EMAXを予め移動局に対して通知するとともに、移動局に通知した最大送信電力P_EMAXを考慮してアップリンク無線リソースのスケジューリングを行う。移動局は、基地局によるスケジューリング結果を受信し、基地局によって指定されたリソースブロックを利用してアップリンク信号を送信する。
 また、移動局がPUSCHを送信する際の送信電力は、PUSCHに割り当てられたリソースブロック数(周波数帯域)、及び移動局によって推定されたダウンリンクのパスロスの大きさ等に基づいて決定される。また、移動局の総送信電力は、移動局に課された最大送信電力P_CMAXを超えないように制御される。移動局は、基地局から通知を受けた許容される最大送信電力P_EMAXと、移動局が属するパワークラスに対応付けられた送信電力上限値P_UMAXのうちいずれか小さいほうを最大送信電力P_CMAXに設定する。
 上述したLTEにおけるアップリンク無線リソースのスケジューリングと、アップリンク送信電力制御の詳細については、非特許文献1~3として列挙した3GPPの規格書を参照されたい。具体的には、非特許文献1は、LTEシステムの移動局に関する包括的な規定を含み、特に、移動局のパワークラスの規定、パワークラスごとの送信電力上限値P_UMAXの規定を含む。また、非特許文献1は、移動局に実際に設定される最大送信電力 P_CMAXとして、上位レイヤから許容される最大送信電力 P_EMAXと、パワークラスごとの送信電力上限値P_UMAXのうち小さい方の値が選択すべきことを規定している。
 非特許文献2は、LTEの物理レイヤに関する規定を含み、具体的には、PUSCHの送信電力を決定するための定義式などのアップリンクの送信電力制御に関する規定を含む。
 非特許文献3は、LTEの移動局から基地局に送信されるPHR(Power Headroom Report)の送信タイミングに関する規定を含む。"Power Headroom"は、移動局に実際に設定されている最大送信電力 P_CMAXと移動局の現在の送信電力との差として計算される。つまり、"Power Headroom"は、最大送信電力P_CMAX に対する移動局の"送信電力マージン"を意味する。
 また、特許文献1は、以下の2点を開示している。
(i) 移動局は、送信電力マージン(つまり、power headroom)を基地局に通知すること;及び
(ii) 基地局は、移動局から通知された送信電力マージンを考慮してアップリンク無線リソースのスケジューリングを行うこと。
 さらに、特許文献2は、以下の(i)~(v)を開示している。
(i) 移動局は、自身の属するパワークラスに従って規定される送信電力上限値P_UMAXを、アップリンクの無線リソース管理を行う無線ネットワーク制御装置(RNC:Radio Network Controller)に送信すること;
(ii) RNCは、移動局に対して許容している最大許容送信電力P_EMAXと、移動局から受信した送信電力上限値P_UMAXのうち小さい方を選択することによって、移動局が実際に設定している最大送信電力P_CMAXを判定すること;
(iii) RNCは、判定した移動局の最大送信電力P_CMAXを基地局に通知すること;
(iv) 移動局は、送信電力マージン(つまり、power headroom)を基地局に送信すること;及び
(v) 基地局は、RNCから受信した移動局の最大送信電力P_CMAXと移動局から受信した送信電力マージンを用いて移動局の現在の送信電力を計算し、アップリンク無線リソースのスケジューリングを行うこと。
国際公開第07/034552号パンフレット 特表2008-529444号公報
 LTEでは、基地局が移動局に対して許容した最大送信電力P_EMAXと、移動局が自身に実際に設定している最大送信電力P_CMAXとの間に不一致が発生していることを基地局が認識できないという問題がある。例えば、基地局が移動局に対して許容した最大送信電力P_EMAXが移動局のパワークラスに基づく送信電力上限値P_UMAXより大きい場合、移動局に実際に課される最大送信電力P_CMAXはP_UMAXにセットされる。よって、この場合、基地局の想定よりも移動局の最大送信出力が小さくなるため、基地局はアップリンク無線リソースのスケジューリングを効率的に行うことができないおそれがある。なぜなら、移動局からのアップリンク信号の送信レートが基地局の期待よりも小さくなることや、基地局が移動局に対して割り当てた複数のリソースブロックのうち一部が使用されないことなどの弊害が発生するためである。
 なお、この問題の発生が懸念される無線通信システムは、LTEシステムに限られない。すなわち、移動局に対して許容される最大送信電力P_EMAXを通知するとともに、自身が通知した最大送信出力P_EMAXを指標としてアップリンク無線リソースのスケジューリングを行うよう構成された基地局または基地局制御装置を使用する無線通信システムにおいて広く問題となる。
 なお、特許文献2に開示された方法によれば、パワークラスに基づく送信電力上限値P_UMAXを移動局から受信し、移動局に対して許容した最大送信電力P_EMAXと移動局から受信した送信電力上限値P_UMAXとの大小比較を行うことで、移動局が実際に設定しているアップリンクの最大送信電力P_CMAXを基地局制御装置側で推定することができる。このため、移動局の最大送信電力に関する基地局と移動局の間の不一致が生じることを回避できる。しかしながら、特許文献2の方法では、パワークラスに基づく送信電力上限値P_UMAXを移動局からRNCに報告する必要があるため、移動局への機能追加が必要になるという問題がある。
 本発明は上述した知見に基づいてなされたものであって、本発明の目的の1つは、移動局が属するパワークラスに対応付けられた送信電力上限値P_UMAXの基地局への報告を移動局に行わせることなく、移動局が実際に設定しているアップリンクの最大送信電力P_CMAXと基地局が移動局に対して許容した最大送信電力P_EMAXとの不一致を基地局において検出可能とすることである。
 本発明の第1の態様は、移動局から送信されるアップリンク信号の受信を行う基地局装置である。当該基地局装置は、前記アップリンク信号の受信品質、前記アップリンク信号に適用されている無線変調方式、および前記アップリンク信号に含まれる前記移動局からの通知情報(ただし、前記移動局が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて、前記移動局が実際に自身に課している最大送信電力の設定値と、前記アップリンク信号の搬送に使用される無線リソースのスケジューリングのために前記基地局装置において使用されている前記移動局の最大送信電力に関する指標値との間の不一致を判定するよう構成されている。
 本発明の第2の態様は、移動局及び基地局を含む無線通信システムである。当該基地局は、移動局からのアップリンク信号の送信に使用される無線リソースのスケジューリングを行うとともに、前記スケジューリングに従って送信される前記アップリンク信号を受信するよう構成されている。さらに、当該基地局は、前記アップリンク信号の受信品質、前記アップリンク信号に適用されている無線変調方式、および前記アップリンク信号に含まれる前記移動局からの通知情報(ただし、前記移動局が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて、前記移動局が実際に自身に課している最大送信電力の設定値と、前記スケジューリングのために使用されている前記移動局の最大送信電力に関する指標値との間の不一致を判定する。
 本発明の第3の態様は、移動局から送信されるアップリンク信号を受信する基地局装置の制御方法であり、前記アップリンク信号の受信品質、前記アップリンク信号に適用されている無線変調方式、および前記アップリンク信号に含まれる前記移動局からの通知情報(ただし、前記移動局が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて、前記移動局が実際に自身に課している最大送信電力の設定値と、前記アップリンク信号の搬送に使用される無線リソースのスケジューリングのために前記基地局装置において使用されている前記移動局の最大送信電力の指標値との間の不一致を判定することを含む。
 本発明の第4の態様は、無線通信システムの制御方法であって、当該方法は以下のステップ(a)~(c)を含む。
(a)アップリンク信号の搬送に使用される無線リソースのスケジューリング結果を基地局から移動局に通知すること;
(b)前記スケジューリングの結果に基づいて、前記移動局から前記基地局にアップリンク信号を送信すること;および
(c)前記アップリンク信号の受信品質、前記アップリンク信号に適用されている無線変調方式、および前記アップリンク信号に含まれる前記移動局からの通知情報(ただし、前記移動局が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて、前記移動局が実際に自身に課している最大送信電力の設定値と、前記スケジューリングのために使用されている前記移動局の最大送信電力に関する指標値の間の不一致を前記基地局において判定すること。
 上述した本発明の各態様によれば、移動局が属するパワークラスに対応付けられた送信電力上限値P_UMAXの基地局への報告を移動局に行わせることなく、移動局が実際に設定しているアップリンクの最大送信電力P_CMAXと基地局が移動局に対して許容した最大送信電力P_EMAXとの不一致を基地局において検出可能となる。
発明の実施の形態1にかかる無線通信システムの構成例を示す図である。 図1に示した基地局の構成例を示すブロック図である。 移動局の最大送信電力の設定値P_CMAXとスケジューリングのための指標値P_RMAXとの不一致判定手順の一例を示すフローチャートである。 移動局の最大送信電力の設定値P_CMAXとスケジューリングのための指標値P_RMAXとの不一致判定手順の一例を示すフローチャートである。 移動局の最大送信電力の設定値P_CMAXとスケジューリングのための指標値P_RMAXとの不一致判定手順の一例を示すフローチャートである。 移動局の最大送信電力の設定値P_CMAXとスケジューリングのための指標値P_RMAXとの不一致判定手順の一例を示すフローチャートである。 移動局の最大送信電力の設定値P_CMAXとスケジューリングのための指標値P_RMAXとの不一致判定手順の一例を示すフローチャートである。 発明の実施の形態2にかかる基地局の構成例を示す図である。 スケジューリングのための指標値P_RMAXの更新手順の一例を示すフローチャートである。 スケジューリングのための指標値P_RMAXが更新される様子を示すグラフである。
 以下では、本発明を適用した具体的な実施の形態について、図面を参照しながら詳細に説明する。各図面において、同一要素には同一の符号が付されており、説明の明確化のため、必要に応じて重複説明は省略される。
<発明の実施の形態1>
 本実施の形態では、LTE方式の基地局及び無線通信システムについて説明する。図1は、本実施の形態にかかる基地局10を含む無線通信システム1の構成例を示すネットワーク図である。基地局10は、アンテナ11と接続され、カバーエリア12内に位置する移動局13と無線通信を行う。基地局10は、移動局13との間の無線通信路(ダウンリンク及びアップリンク)で使用される無線リソースの割り当て(スケジューリング)を行う。また、基地局10は、コアネットワーク(不図示)に接続されており、移動局13とコアネットワークとの間でトラフィックを中継する。
 LTEは、ダウンリンクの無線アクセス方式にOFDMA(Orthogonal Frequency Division Multiplexing Access)を採用し、アップリンクの無線アクセス方式にSC-FDMA(Single-Carrier Frequency-Division Multiple. Access)を採用している。
 LTEのダウンリンクでは、下り共有物理チャネル(PDSCH:Physical Downlink Shared Channel)、および下り制御物理チャネル(PDCCH:Physical Downlink Control Channel)等が用いられる。PDSCHは、ユーザデータの転送に使用される。PDCCHは、PDSCHにマッピングされるユーザデータ情報及びトランスポートフォーマット情報、上りのPUSCHにマッピングされるユーザデータ情報およびトランスポートフォーマット情報などの制御情報の転送に使用される。
 また、LTEのアップリンクでは、上述したユーザデータ送信用のPUSCH、上り制御物理チャネル(PUCCH:Physical Uplink Control Channel)等が用いられる。PUCCHは、移動局が計測したダウンリンクの品質情報(CQI:Channel Quality Indicator)などの転送に使用される。
 アップリンク信号のスケジューリングにおいて、基地局10は、移動局13がユーザデータの送信に使用するPUSCHに割り当てるリソースブロック数、ホッピングパターン、無線変調方式(QPSK、16QAM又は64QAM)等を決定する。基地局10は、移動局13の最大送信電力に関する指標値 P_RMAXをアップリンク信号のスケジューリングに使用する。指標値 P_RMAXの初期値は、基地局10が移動局13に対して許容した最大送信電力P_EMAXとすればよい。ただし、上述したように、移動局13が実際に自身に課す最大送信電力P_CMAXは、基地局10から許容された最大送信電力P_EMAXより小さい場合がある。例えば、移動局13のパワークラスに基づく送信電力の上限値P_UMAXがP_EMAXより小さい場合、移動局13は、パワークラスに基づく送信電力の上限値P_UMAXを最大送信電力P_CMAXに設定する。
 このため、本実施の形態にかかる基地局10は、アップリンク無線リソースのスケジューリングに使用する指標値P_RMAXと、移動局13が実際に自身に課す最大送信電力の設定値P_CMAXとの不一致を検出するよう構成されている。詳細については後述するが、基地局10は、アップリンク信号の受信品質、アップリンク信号に適用されている無線変調方式、およびアップリンク信号に含まれる移動局13からの通知情報(ただし、移動局13が属するパワークラスに対応付けられた送信電力上限値P_UMAXを除く)のうち少なくとも1つに基づいて、上記の不一致検出を行う。移動局13からの通知情報は、例えば、PHR(Power Headroom Report)である。
 特筆すべき点は、移動局13がPHRを送信することは、LTEの規格において規定されており、移動局13に余分な機能を追加することにはならないことである。また、アップリンク信号の受信品質、及びアップリンク信号に適用されている無線変調方式は、アップリンク信号を受信した基地局10において自律的に測定できるため、上記の不一致検出に関して移動局13に余分な機能を追加する必要はない。なお、アップリンク信号の受信品質とは、(a) アップリンク信号のスループット、(b) アップリンク信号の基地局10における受信電力、(c) アップリンク信号の受信SIR(Signal to Interference Ratio)、 (d) アップリンク信号の占有帯域幅、 (e) アップリンク信号の搬送に使用されているリソースブロック数、 (f) アップリンク信号をデコードすることにより得られるBLER(Block Error Rate)等である。
 以下では、基地局10の構成例と、指標値P_RMAX及び設定値P_CMAXの間の不一致検出手順のいくつかの具体例について説明する。
 図2は、基地局10の構成例を示すブロック図である。図2において、無線送受信部101は、通信データ処理部102から供給されるベースバンド帯域のダウンリンク信号をRF(Radio Frequency)帯域へアップコンバートし、信号増幅を行った後にアンテナ11へ供する。また、無線送受信部101は、アンテナ11によって受信されたアップリンク信号の信号増幅、ベースバンド帯域への周波数ダウンコンバートを行って得られるベースバンド帯域のアップリンク信号を通信データ処理部102に供給する。
 通信データ処理部102は、レイヤ1処理およびレイヤ2(MAC(Medium Access Control)/RLC(Radio Link Control))処理機能を有する。通信データ処理部102は、伝送路インタフェース103を介してコアネットワークから、ダウンリンクに送信すべきパケットデータを受信する。通信データ処理部102は、受信したパケットデータの分割・統合、RLC再送制御などのRLCレイヤの送信処理、MAC再送制御、HARQ(Hybrid Automatic Repeat reQuest)制御、トランスポートフォーマット選択、チャネル符号化、シンボルマッピング、OFDM変調を行って、ベースバンド帯域のダウンリンク信号(ベースバンドOSFM信号)を生成する。OFDM変調には、一般的に、IFFT(Inverse Fast Fourier Transform)処理が使用される。
 また、通信データ処理部102は、無線送受信部101から受信したアップリンク信号に対して、OFDM復調、誤り訂正復号、MAC再送制御、およびRLCレイヤの受信処理を行って、移動局13から送信されたデータ列を復元する。OFDM復調には、一般的に、FFT(Fast Fourier Transform)処理が使用される。復元された受信データ列は、伝送路インタフェース103を介してコアネットワークに転送される。
 スケジューリング部104は、アップリンク無線リソース及びダウンリンク無線リソースのスケジューリングを行う。アップリンク無線リソースのスケジューリングは、無線送受信部101で取得されるアップリンクの干渉波レベル、上り参照信号(SRS:Sounding Reference Signal)の受信品質(例えば SIR)、及び電力オフセット等に従って、移動局13に割り当てるリソースブロック数および送信フォーマットを決定する。また、移動局13から送信されるアップリンク信号の送信電力は、パスロスや送信リソースブロック数などに依存して決まる。このため、スケジューリング部104は、移動局13の最大送信電力の指標値P_RMAX、および移動局13から受信したPHRによって示される送信電力マージン(残電力)を考慮して、アップリンク無線リソースの割り当てを行う。指標値P_RMAXの初期値は、基地局10が決定して移動局13に通知した"許容される最大送信電力P_EMAX"である。
 判定部105は、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定する。上述したように、指標値P_RMAXは、スケジューリング部104がアップリンク無線リソースのスケジューリングに使用する、移動局13の最大送信電力(つまり想定値)である。一方、設定値P_CMAXは、移動局13が実際に自身に設定している最大送信電力である。
 続いて以下では、判定部105における指標値P_RMAX及び設定値P_CMAXの間の不一致判定のいくつかの例について説明する。始めに、移動局13から通知されるPHR(Power Headroom Report)を用いて不一致検出を行う例を説明する。図3は、PHR(Power Headroom Report)を用いた不一致検出手順の具体例を示すフローチャートである。
 ステップS10では、判定部105は、アップリンク無線リソースのスケジューリング結果と最大送信電力の指標値P_RMAXを用いて、移動局13の送信電力マージンの予想値 V1 を計算する。予想値V1の計算は、以下のように行えばよい。例えば、移動局13にアップリンク送信用に割り当てたリソースブロック数から予想される移動局13の送信電力を指標値P_RMAXから減算して得られる差分を予想値V1とすればよい。また、移動局13に対してアップリンク送信用に割り当てた周波数帯域での総受信電力の計測値及びアップリンクのパスロスの推定値の合計値を指標値P_RMAXから減算して得られる値を予想値V1としてもよい。なお、アップリンクのパスロス推定値は、基地局10による下り参照信号(RS: Reference Signal)の送信電力と移動局から報告されるRSの受信電力の差分、または、参照信号(SRS)の受信結果を用いて計算すればよい。
 ステップS11では、判定部105は、移動局13から受信したPHR を参照し、移動局13の送信電力マージンの現実値 V2 を計算する。具体的には、PHRで示される送信電力マージンの値を現実値V2 とすればよい。
 ステップS12及びS13では、予想値V1と予想値V2の不一致判定を行う。具体的には、ステップS12では、判定部105は、予想値V1から現実値V2を減算することにより、差分Dを計算する。判定部105は、差分Dを閾値と比較する(ステップS13)。閾値は、予め設定される正の値である。
 そして、差分Dの値が予め設定された閾値を超える場合(ステップS13でYES)、判定部105は、スケジューリングのための最大送信電力の指標値P_RMAX と、移動局13に実際に設定されている最大送信電力の設定値P_CMAXの間に不一致があることを判定する(ステップS14)。
 なお、誤判定を抑制するために、差分Dが予め設定された閾値を超えた回数をカウントし、カウント数が予め設定された基準回数を超えた場合に、指標値P_RMAX と設定値P_CMAXの間に不一致があることを判定してもよい。このように変形された判定手順の一例を図4に示す。
 ステップS20では、カウンタKの値がゼロとなるようにリセットする。ステップS21では、判定部105は、移動局13の送信電力マージンの予想値 V1 を計算する。ステップS21は、上述したステップS10と同様である。ステップS22では、移動局13からPHRを受信しているか否かを判定する。PHRを受信した場合(ステップS22でYES)、判定部105は、PHRを参照して移動局13の送信電力マージンの現実値 V2 を計算する(ステップS23)。ステップS23は、上述したステップS11と同様である。ステップS24及びS25では、予想値V1及び予想値V2の間に不一致条件が成立するか否かを判定する。具体的には、上述したステップS12及びS13と同様に、判定部105は、差分Dを計算し、差分Dに対する閾値判定を行えばよい。
 差分Dの値が予め設定された閾値を超える場合(ステップS25でYES)、判定部105は、カウンタKの値を1だけ加算する。一方、差分Dの値が閾値以下である場合(ステップS25でNO)、判定部105は、ステップS20に戻り、カウンタKの値をゼロにリセットする。
 ステップS27では、判定部105は、カウンタKの値が予め設定された上限値に到達しているかを判定し、到達していなければステップS21に戻って処理を繰り返す。一方、カウンタKの値が上限値となった場合(S27でYES)、判定部105は、指標値P_RMAX と設定値P_CMAXの間に不一致があることを判定する(ステップS28)。
 つまり、図4のフローチャートに示す判定手順によれば、差分Dが閾値を超える状態が、予め定められた期間継続した場合に、指標値P_RMAX と設定値P_CMAXの間に不一致があることを判定できる。なお、PHRを用いた不一致判定手順は、図3及び4以外にも変形が可能である。例えば、差分D の移動平均に対する閾値判定を行うよう変形してもよい。
 また、図4及び5では、移動局13の送信電力マージンの予想値V1とPHRを元に得られる現実値V2との不一致を検出することで、指標値P_RMAX と設定値P_CMAXの間の不一致を判定する手順について示した。しかしながら、ここで利用できるパラメータは送信電力マージンに限られない。例えば、基地局10と移動局13の間のパスロスを用いることができる。なぜなら、LTEのUEは、パワーヘッドルーム(つまり、送信電力マージン)の計算に、ダウンリンクのパスロスの推定値を用いるためである。以下の(1)式は、LTEの仕様書に規定されているパワーヘッドルームの定義式である。
Figure JPOXMLDOC01-appb-M000001
 (1)式において、添え字"i"は、i番目のサブフレーム番号を意味している。MPUSCH ( i ) は、 i番目のサブフレームのPUSCHの送信帯域幅をリソースブロックの割り当て数で示したものである。また、PO_PUSCH ( i ) 、α、ΔTF ( i )、及び f ( i ) は、i番目のサブフレームのPUSCH送信電力の決定に使用される値であり、基地局10が形成するセルに特有の値と、移動局13に特有の値によって計算される。なお、パワーヘッドルームの定義式の詳細については、非特許文献2(3GPP TS 36.213 V8.5.0)の第5.1節"Uplink Power Control"を参照するとよい。
 よって、基地局10は、移動局13から受信したPHRで指定されたパワーヘッドルームの値を用いて以下の(2)式に従ってダウンリンクのパスロスの計算値(PL_PHR)を得ることができる。(2)式は、(1)式をPLに関して変換することにより得られる。
(2)式中のPH(i)は、PHRによって通知されたパワーヘッドルームの値である。
Figure JPOXMLDOC01-appb-M000002
 さらに、基地局10は、(3)式に示すように、ダウンリンク参照信号の送信電力から移動局13におけるダウンリンク参照信号の受信電力(RSRP:Reference Signal Received Power)を減算することによっても、パスロスの計算値(PL_RSRP)を得ることができる。基地局10は、移動局13によって測定されたRSRPを受信すればよい。また、基地局10は、移動局13からRSRQ(Reference Signal Received Quality)を受信し、RSRQを用いてパスロスを求めてもよい。
Figure JPOXMLDOC01-appb-M000003
 基地局10は、PHRの受信値を用いて計算されるパスロス値(PL_PHR)と、ダウンリンク参照信号の送信電力と移動局13によって計測される受信電力を用いて計算されるパスロス値(PL_RSRP)との不一致を検出することによって、指標値P_RMAX と設定値P_CMAXの間の不一致を判定してもよい。
 図5は、パスロスの計算値の不一致を検出することで、指標値P_RMAX と設定値P_CMAXの間の不一致を判定する手順の一例を示すフローチャートである。ステップS30では、カウンタKの値がゼロとなるようにリセットする。ステップS31では、移動局13からPHRを受信しているか否かを判定する。PHRを受信した場合(ステップS31でYES)、判定部105は、上記の(2)式に従って、PHRを用いてパスロス値(PL_PHR)を計算する(ステップS32)。ステップS33では、上記の(3)式に従って、判定部105は、パスロス値(PL_RSRP)を計算する。
 ステップS34では、判定部105は、2つのパスロス値PL_PHR 及びPL_RSRPが所定の不一致条件を満足するかを判定する。これは、上述したステップS12及びS13と同様に、2つの値の差分に対する閾値判定を行えばよい。ステップS35~S37は、上述したステップS26~S28と同様であるため、ここでは説明を省略する。
 続いて、アップリンク信号の受信品質に基づいて設定値P_CMAXと指標値P_RMAXの不一致を判定する手順について説明する。具体的には、判定部105は、アップリンク無線リソースのスケジューリング結果から予想されるアップリンク信号の受信品質予想値V3 と、移動局13から実際に受信したアップリンク信号を解析することで得られる受信品質の計測値V4 を比較する。
 図6は、アップリンク信号の受信品質に基づく不一致検出手順の具体例を示すフローチャートである。ステップS40では、判定部105は、アップリンク無線リソースのスケジューリング結果をもとに、予想値V3 を計算する。ステップS41では、判定部105は、アップリンク信号の受信品質の計測値V4 を取得する。そして、計測値V4で示される受信品質が予想値V3で示される受信品質より低い場合に、判定部105は、スケジューリングのための最大送信電力の指標値P_RMAX と、移動局13に実際に設定されている最大送信電力の設定値P_CMAXの間に不一致があることを判定する(ステップS42)。
 判定部105が参照可能なアップリンク信号の受信品質の具体例は、(a) アップリンク信号のスループット、(b) アップリンク信号の基地局10における受信電力、(c) アップリンク信号の受信SIR(Signal to Interference Ratio)、(d) アップリンク信号の占有帯域幅、 (e) アップリンク信号の搬送に使用されているリソースブロック数、 (f) アップリンク信号をデコードすることにより得られるBLER(Block Error Rate)等である。
<具体例(a):アップリンク信号のスループット>
 アップリンク信号のスループットを参照する場合、判定部105は、スループットの計測値が予想値に比べて予め定められた閾値以上小さい場合に、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定すればよい。
 この場合、判定部105は、アップリンク送信用に割り当てたリソースブロック数およびトランスポートフォーマット(変調方式など)を元に、アップリンク信号から復元される受信データ列のスループット(予想値V3)を計算すればよい。また、判定部105は、アップリンク信号から復元される受信データ列のスループット(計測値V4)を通信データ処理部102から取得すればよい。
<具体例(b):アップリンク信号の受信電力>
 アップリンク信号の受信電力を参照する場合、判定部105は、受信電力の計測値が予想値に比べて予め定められた閾値以上小さい場合に、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定すればよい。
 この場合、判定部105は、指標値P_RMAX、スケジューリングによって割り当てたリソースブロック数を元に計算した移動局の送信電力、及びアップリンクのパスロス推定値から、受信電力(予想値V3)を計算すればよい。また、判定部105は、スケジューリングによって移動局13に割り当てた連続するリソースブロックによって規定される周波数帯域での受信電力を無線送受信部101から取得すればよい。
<具体例(c):アップリンク信号の受信SIR>
 アップリンク信号の受信SIRを参照する場合、判定部105は、受信SIRの計測値が予想値に比べて予め定められた閾値以上小さい場合に、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定すればよい。
 この場合、判定部105は、指標値P_RMAX、スケジューリングによって割り当てたリソースブロック数を元に計算した移動局の送信電力、及びアップリンクのパスロス推定値から、受信SIR(予想値V3)を計算すればよい。また、判定部105は、スケジューリングによって移動局13に割り当てられた連続するリソースブロックによって規定される周波数帯域での受信SIRを無線送受信部101から取得すればよい。
<具体例(d)及び(e):アップリンク信号の占有帯域幅(リソースブロック数)>
 アップリンク信号の占有帯域幅(リソースブロック数)を参照する場合、判定部105は、受信したアップリンク信号の使用リソースブロック数が予想値に比べて小さい場合に、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定すればよい。
 この場合、判定部105は、スケジューリングによって割り当てたリソースブロック数を予想値V3とすればよい。また、判定部105は、受信したアップリンク信号で使用されているリソースブロック数(計測値V4)を通信データ処理部102から取得すればよい。
<具体例(f):アップリンク信号のブロック誤り率(BLER)>
 BLERを参照する場合、判定部105は、BLERの計測値が予想値に比べて予め定められた閾値以上大きい場合に、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定すればよい。
 この場合、判定部105は、電波環境などを考慮してスケジューリング部104が基準としているBLERの目標値を予想値V3とすればよい。また、判定部105は、誤り訂正符号時に得られるBELR(計測値V4)を通信データ処理部102から取得すればよい。
 続いて、アップリンク信号で採用されている無線変調方式に基づいて設定値P_CMAXと指標値P_RMAXの不一致を判定する手順について説明する。コンスタレーション上における信号点間距離の大きい変調方式ほど、所要CNR(Carrier to Noise Ratio)が小さくて済む(つまり雑音に強い)。よって、移動局13は、送信電力を上げられない場合に、適応的に変調方式を変化(例えば64QAMから16QAMに)させる。このため、アップリンク信号に採用されている無線変調方式を参照することで、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定できる。
 図7は、アップリンク信号の無線変調方式に基づく不一致検出手順の具体例を示すフローチャートである。ステップS50では、判定部105は、スケジューリングで指定したアップリンク信号の無線変調方式(方式Aと呼ぶ)と、アップリンク信号に実際に適用されている無線変調方式(方式Bと呼ぶ)とを比較する。そして、判定部105は、方式Bが方式Aに比べてコンスタレーション上における信号点間距離の大きい方式である場合に、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定する(ステップS51)。
 上述したように、本実施の形態にかかる基地局10は、移動局13が属するパワークラスに対応付けられた送信電力上限値P_UMAXを移動局13から受信することなく、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定できる。
<発明の実施の形態2>
 本実施の形態にかかる基地局20は、上述した基地局10と同様に、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定する。さらに、基地局20は、指標値P_RMAX及び設定値P_CMAXの間の不一致が判定された場合に、設定値P_CMAXに近づくように指標値P_RMAXを更新する。そして、基地局20は、更新された指標値P_RMAXを用いてアップリンク無線リソースのスケジューリングを行う。
 図8は、基地局20の構成例を示すブロック図である。図2に示した基地局10の構成例との相違は、上述した指標値P_RMAXの更新をスケジューリング部204が行う点である。なお、スケジューリング部204を除く他の構成要素は、図2に示したものと同様であるため、ここでは重複説明を省略する。
 続いて以下では、指標値P_RMAXの更新動作の具体例について説明する。図9は、判定部105による不一致判定とこれに引き続く更新処理を含む一連の手順を示したフローチャートである。図9中のステップS21~S27は、図4に示した対応するステップと同様である。なお、本実施の形態における判定部105による不一致判定の手順として他の手順(例えば図3、5、6又は7に示した手順)を採用してもよい。
 図9のステップS68では、スケジューリング部204は、判定部105における不一致検出に応答して、スケジューリング用の最大送信電力の指標値P_RMAXを更新する。指標値P_RMAXの更新方法には、様々なバリエーションが考えられる。以下の(a)~(e)に一例を列挙する。
(a)指標値P_RMAXを、LTEの標準規格に定められている移動局の複数のパワークラスに対応した複数の送信電力値のうち電力の大きい値から電力の小さい値に段階的に変更する。
(b)不一致が繰り返し判定されることに応じて、指標値P_RMAXを、初期値P_EMAXから一定値ずつ段階的に下げる。
(c)差分Dの値だけ指標値P_RMAXを下げる。
(d)差分D が閾値を超える状態の継続期間にわたる差分Dの平均値を求め、差分Dの平均値だけ指標値P_RMAXを下げる。例えば、カウンタKの上限値の数分の差分Dの計算値の間で平均値を求めればよい。
(e)差分D が閾値を超える状態の継続期間にわたる差分Dの平均値を求め、差分Dの平均値の所定の割合だけ指標値P_RMAXを下げる。
 図10は、指標値P_RMAXが更新される様子を示すグラフである。図10中に一点鎖線で示すグラフは、スケジューリング用の最大送信電力の指標値P_RMAXを表している。上述したように、指標値P_RMAXの初期値(時刻T0)は、基地局10が移動局に対して通知した許容値P_EMAXである。図10中に実線で示すグラフは、指標値P_RMAXを用いて計算される、移動局13の送信電力マージンの予想値V1を表している。最後に、図10中に破線で示すグラフは、PHRによって示される移動局13の送信電力のマージンの現実値V2を表している。
 図10の例では、時刻T1、T2、T3、T4の順序で定期的に移動局13からPHRが報告され、判定部105は、PHRの受信の度に差分Dに対する閾値判定を行う。また、カウンタKの上限値が3にセットされているとする。この場合、時刻T1~T4の4回の判定のいずれにおいても差分Dが所定の閾値を超えたことに応じて、スケジューリング部204は、最大送信電力の指標値P_RMAXを更新する。図10の例では、更新後の指標値P_RMAXは、更新前の指標値P_RMAXを差分Dの値だけ低下させることによって生成される。
 以上に述べたように、本実施の形態にかかる基地局20は、上述した基地局10と同様に、移動局13が属するパワークラスに対応付けられた送信電力上限値P_UMAXを移動局13から受信することなく、指標値P_RMAX及び設定値P_CMAXの間の不一致を判定できる。
 さらに、基地局20は、指標値P_RMAX及び設定値P_CMAXの間の不一致が判定された場合に、設定値P_CMAXに近づくように指標値P_RMAXを更新する。これにより、移動局13に実際に設定されている最大送信電力P_CMAXにより近い指標値P_RMAXを用いてアップリンク無線リソースのスケジューリングを行うことができる。よって、無駄なリソース割り当てが抑制され、効率的なスケジューリングを実現できる。
<その他の実施の形態>
 上述した発明の実施の形態1及び2では、LTE方式の基地局及び無線通信システムについて説明した。しかしながら、発明の実施の形態1及び2で述べた、指標値P_RMAXと設定値P_CMAXの不一致検出および指標値P_RMAXの更新を行うための構成及び動作は、LTE方式に以外にも適用可能である。
 発明の実施の形態1及び2で述べた指標値P_RMAXと設定値P_CMAXの不一致検出および指標値P_RMAXの更新に関する動作は、ASIC(Application Specific Integrated Circuit)、DSP(Digital Signal Processor)、MPU(Micro Processing Unit)若しくはCPU(Central Processing Unit)又はこれらの組み合わせを含むコンピュータ・システムを用いて実現することができる。具体的には、図3~7又は9のいずれかのフローチャートに示される処理手順に関する命令群を含むプログラムをコンピュータ・システムに実行させればよい。なお、これらのプログラムは、様々なタイプの非一時的なコンピュータ可読媒体(non-transitory computer readable medium)を用いて格納され、コンピュータに供給することができる。非一時的なコンピュータ可読媒体は、様々なタイプの実体のある記録媒体(tangible storage medium)を含む。非一時的なコンピュータ可読媒体の例は、磁気記録媒体(例えばフレキシブルディスク、磁気テープ、ハードディスクドライブ)、光磁気記録媒体(例えば光磁気ディスク)、CD-ROM(Read Only Memory)、CD-R、CD-R/W、半導体メモリ(例えば、マスクROM、PROM(Programmable ROM)、EPROM(Erasable PROM)、フラッシュROM、RAM)を含む。また、プログラムは、様々なタイプの一時的なコンピュータ可読媒体(transitory computer readable medium)によってコンピュータに供給されてもよい。一時的なコンピュータ可読媒体の例は、電気信号、光信号、及び電磁波を含む。一時的なコンピュータ可読媒体は、電線及び光ファイバ等の有線通信路、又は無線通信路を介して、プログラムをコンピュータに供給できる。
 さらに、本発明は上述した実施の形態のみに限定されるものではなく、既に述べた本発明の要旨を逸脱しない範囲において種々の変更が可能であることは勿論である。
 この出願は、2009年4月28日に出願された日本出願特願2009-108960を基礎とする優先権を主張し、その開示の全てをここに取り込む。
1 無線通信システム
10、20 基地局
11 アンテナ
12 カバーエリア
13 移動局
101 無線送受信部
102 通信データ処理部
103 伝送路インタフェース
104、204 スケジューリング部
105 判定部

Claims (18)

  1.  移動局から送信されるアップリンク信号を受信する基地局装置であって、
     前記アップリンク信号の受信品質、前記アップリンク信号に適用されている無線変調方式、および前記アップリンク信号に含まれる前記移動局からの通知情報(ただし、前記移動局が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて、前記移動局が実際に自身に課している最大送信電力の設定値と、前記アップリンク信号の搬送に使用される無線リソースのスケジューリングのために前記基地局装置において使用されている前記移動局の最大送信電力に関する指標値との間の不一致を判定する判定手段を備える、基地局装置。
  2.  前記不一致の判定に応じて、前記設定値に近づくように前記指標値を更新するとともに、更新された前記指標値を用いて前記スケジューリングを行うスケジューリング手段をさらに備える、請求項1に記載の基地局装置。
  3.  前記通知情報は、前記設定値と前記移動局の送信電力との差分によって定義される送信電力マージン値に関する情報を含む、請求項1又は2に記載の基地局装置。
  4.  前記スケジューリング手段は、前記移動局に割り当てた前記無線リソース及び更新前の前記指標値に基づいて算出された前記移動局の送信電力マージンの予想値と、前記通知情報によって示される前記送信電力マージン値との差分に応じて、更新後の前記指標値を決定する、請求項2に従属する請求項3に記載の基地局装置。
  5.  前記判定手段は、前記スケジューリングの結果から予想される前記アップリンク信号の受信品質予想値と、受信された前記アップリンク信号を解析することで得られる受信品質の計測値とを比較することによって、前記不一致を判定する、請求項1~4のいずれか1項に記載の基地局装置。
  6.  前記アップリンク信号の受信品質は、(a) 前記アップリンク信号のスループット、(b) 前記アップリンク信号の前記基地局における受信電力、(c) 前記アップリンク信号の受信SIR(Signal to Interference Ratio)、(d) 前記アップリンク信号の占有帯域幅、 (e) 前記アップリンク信号の搬送に使用されている無線リソース要素数、 (f) 前記アップリンク信号をデコードすることにより得られる誤り率、のうち少なくとも1つを含む、請求項5に記載の基地局装置。
  7.  前記判定手段は、前記スケジューリングにおいて前記アップリンク信号に対して指定された無線変調方式と、受信された前記アップリンク信号に実際に適用されている無線変調方式とを比較することによって、前記不一致を判定する、請求項1~6のいずれか1項に記載の基地局装置。
  8.  前記スケジューリング手段は、前記不一致が繰り返し判定されることに応じて、前記指標値を、複数のパワークラスに対応した複数の送信電力値のうち電力の大きい値から電力の小さい値に段階的に変更する、請求項1~3及び5~7のうちいずれか1項に記載の基地局装置。
  9.  移動局と、
     前記移動局からのアップリンク信号の送信に使用される無線リソースのスケジューリングを行うとともに、前記スケジューリングに従って送信される前記アップリンク信号を受信するよう構成された基地局とを備え、
     前記基地局は、
     前記アップリンク信号の受信品質、前記アップリンク信号に適用されている無線変調方式、および前記アップリンク信号に含まれる前記移動局からの通知情報(ただし、前記移動局が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて、前記移動局が実際に自身に課している最大送信電力の設定値と、前記スケジューリングのために使用されている前記移動局の最大送信電力に関する指標値との間の不一致を判定する判定手段を備える、
    無線通信システム。
  10.  前記基地局は、前記不一致の判定に応じて、前記設定値に近づくように前記指標値を更新するとともに、更新された前記指標値を用いて前記スケジューリングを行うスケジューリング手段をさらに備える、請求項9に記載の無線通信システム。
  11.  前記通知情報は、前記設定値と前記移動局の送信電力との差分によって定義される送信電力マージン値に関する情報を含む、請求項9又は10に記載の無線通信システム。
  12.  前記スケジューリング手段は、前記移動局に割り当てた前記無線リソース及び更新前の前記指標値に基づいて算出された前記移動局の送信電力マージンの予想値と、前記通知情報によって示される前記送信電力マージン値との差分に応じて、更新後の前記指標値を決定する、請求項10に従属する請求項11に記載の無線通信システム。
  13.  前記判定手段は、前記スケジューリングの結果から予想される前記アップリンク信号の受信品質予想値と、受信された前記アップリンク信号を解析することで得られる受信品質の計測値とを比較することによって、前記不一致を判定する、請求項9~12のいずれか1項に記載の無線通信システム。
  14.  前記アップリンク信号の受信品質は、(a) 前記アップリンク信号のスループット、(b) 前記アップリンク信号の前記基地局における受信電力、(c) 前記アップリンク信号の受信SIR(Signal to Interference Ratio)、(d) 前記アップリンク信号の占有帯域幅、 (e) 前記アップリンク信号の搬送に使用されている無線リソース要素数、 (f) 前記アップリンク信号をデコードすることにより得られる誤り率、のうち少なくとも1つを含む、請求項13に記載の無線通信システム。
  15.  前記判定手段は、前記スケジューリングにおいて前記アップリンク信号に対して指定された無線変調方式と、受信された前記アップリンク信号に実際に適用されている無線変調方式とを比較することによって、前記不一致を判定する、請求項9~14のいずれか1項に記載の無線通信システム。
  16.  前記スケジューリング手段は、前記不一致が繰り返し判定されることに応じて、前記指標値を、複数のパワークラスに対応した複数の送信電力値のうち電力の大きい値から電力の小さい値に段階的に変更する、請求項9~11及び13~15のうちいずれか1項に記載の無線通信システム。
  17.  移動局から送信されるアップリンク信号を受信する基地局装置の制御方法であって、
     前記アップリンク信号の受信品質、前記アップリンク信号に適用されている無線変調方式、および前記アップリンク信号に含まれる前記移動局からの通知情報(ただし、前記移動局が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて、前記移動局が実際に自身に課している最大送信電力の設定値と、前記アップリンク信号の搬送に使用される無線リソースのスケジューリングのために前記基地局装置において使用されている前記移動局の最大送信電力の指標値との間の不一致を判定すること、
    を備える基地局装置の制御方法。
  18.  アップリンク信号の搬送に使用される無線リソースのスケジューリング結果を基地局から移動局に通知すること;
     前記スケジューリングの結果に基づいて、前記移動局から前記基地局にアップリンク信号を送信すること;および
     前記アップリンク信号の受信品質、前記アップリンク信号に適用されている無線変調方式、および前記アップリンク信号に含まれる前記移動局からの通知情報(ただし、前記移動局が属するパワークラスに対応付けられた送信電力上限値を除く)のうち少なくとも1つに基づいて、前記移動局が実際に自身に課している最大送信電力の設定値と、前記スケジューリングのために使用されている前記移動局の最大送信電力に関する指標値の間の不一致を前記基地局において判定すること、
    を備える、無線通信システムの制御方法。
PCT/JP2010/001869 2009-04-28 2010-03-16 基地局装置、無線通信システム、基地局の制御方法、および無線通信システムの制御方法 WO2010125737A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US13/258,911 US8848634B2 (en) 2009-04-28 2010-03-16 Base station apparatus, radio communication system, control method of base station, and control method of radio communication system
JP2011511273A JP5077485B2 (ja) 2009-04-28 2010-03-16 基地局装置、無線通信システム、基地局の制御方法、および無線通信システムの制御方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-108960 2009-04-28
JP2009108960 2009-04-28

Publications (1)

Publication Number Publication Date
WO2010125737A1 true WO2010125737A1 (ja) 2010-11-04

Family

ID=43031897

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/001869 WO2010125737A1 (ja) 2009-04-28 2010-03-16 基地局装置、無線通信システム、基地局の制御方法、および無線通信システムの制御方法

Country Status (3)

Country Link
US (1) US8848634B2 (ja)
JP (1) JP5077485B2 (ja)
WO (1) WO2010125737A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012244213A (ja) * 2011-05-16 2012-12-10 Kyocera Corp 無線基地局及び通信制御方法
WO2014182108A1 (ko) * 2013-05-10 2014-11-13 주식회사 팬택 무선 통신 시스템에서 최대송신전력 설정 및 시그널링 방법 및 장치
US10652830B2 (en) 2013-05-10 2020-05-12 Pantech Inc. Method and apparatus for establishing and signaling maximum transmission power in wireless communication system

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090077647A (ko) 2008-01-11 2009-07-15 삼성전자주식회사 이동통신 시스템에서 단말의 가용 전력 정보를 전송하는방법 및 장치
US8315661B2 (en) * 2009-12-31 2012-11-20 Cellco Partnership Enhanced power headroom reporting
RU2556877C2 (ru) 2010-06-21 2015-07-20 Панасоник Интеллекчуал Проперти Корпорэйшн оф Америка Терминальное устройство и его способ связи
US9113422B2 (en) * 2010-06-28 2015-08-18 Samsung Electronics Co., Ltd. Method and apparatus for reporting maximum transmission power in wireless communication
KR101740366B1 (ko) 2010-06-28 2017-05-29 삼성전자주식회사 이동 통신 시스템에서 역방향 최대 전송 전력을 보고하는 방법 및 장치
KR101762610B1 (ko) 2010-11-05 2017-08-04 삼성전자주식회사 이동 통신 시스템에서 역방향 스케줄링 및 그를 위한 정보 전송 방법 및 장치
JP6003632B2 (ja) * 2012-12-27 2016-10-05 富士通株式会社 移動局装置及び通信方法
US9867187B2 (en) 2014-08-04 2018-01-09 Qualcomm Incorporated Techniques for configuring uplink channel transmissions using shared radio frequency spectrum band
US10361830B2 (en) * 2015-05-18 2019-07-23 Lg Electronics Inc. Method and apparatus for designing uplink reference signal according to repeating pattern considering cell coverage in wireless communication system
KR102606781B1 (ko) * 2016-09-02 2023-11-27 삼성전자 주식회사 무선 통신 시스템에서 효율적인 데이터 송수신 방법 및 장치
CN112567704A (zh) * 2018-08-21 2021-03-26 株式会社Ntt都科摩 用户装置以及发送功率控制方法
US10412691B1 (en) * 2018-12-06 2019-09-10 Sprint Spectrum, L.P. Use of power headroom as basis to control configuration of MU-MIMO service

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004215276A (ja) * 2003-01-04 2004-07-29 Samsung Electronics Co Ltd 向上された逆方向専用チャンネルサービスを支援する端末機のデータレートを決定する方法
JP2006527547A (ja) * 2003-06-09 2006-11-30 ソマ ネットワークス インコーポレイテッド 使用可能な上り送信電力を管理するためのシステム及び方法
JP2008529444A (ja) * 2005-03-29 2008-07-31 サムスン エレクトロニクス カンパニー リミテッド 移動通信システムにおけるアップリンクパケット転送のスケジューリングのために基地局へ最大端末送信器電力情報をシグナリングする方法及び装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040083617A (ko) * 2003-03-24 2004-10-06 삼성전자주식회사 향상된 역방향 전용전송채널을 서비스하는 비동기 방식의부호분할다중접속 이동통신시스템에서 소프트 핸드오버영역에 위치하는 이동단말이 역방향 데이터를 재전송하는방법 및 시스템
KR100742127B1 (ko) * 2004-06-25 2007-07-24 삼성전자주식회사 직교 주파수 분할 다중 접속 이동통신시스템에서 상향링크 랜덤 접속 채널을 송수신하기 위한 장치 및 방법
EP1928114B9 (en) 2005-09-22 2017-07-19 Research In Motion Limited Communication system for notifying power headroom information
WO2008041291A1 (en) * 2006-09-29 2008-04-10 Fujitsu Limited Base station device
US8570957B2 (en) * 2008-03-26 2013-10-29 Nokia Siemens Networks Oy Extension of power headroom reporting and trigger conditions
JP5003818B2 (ja) * 2008-03-31 2012-08-15 富士通株式会社 受信装置、送信装置、受信方法および送信方法
US8233427B2 (en) * 2008-06-23 2012-07-31 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for generating channel quality estimates

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004215276A (ja) * 2003-01-04 2004-07-29 Samsung Electronics Co Ltd 向上された逆方向専用チャンネルサービスを支援する端末機のデータレートを決定する方法
JP2006527547A (ja) * 2003-06-09 2006-11-30 ソマ ネットワークス インコーポレイテッド 使用可能な上り送信電力を管理するためのシステム及び方法
JP2008529444A (ja) * 2005-03-29 2008-07-31 サムスン エレクトロニクス カンパニー リミテッド 移動通信システムにおけるアップリンクパケット転送のスケジューリングのために基地局へ最大端末送信器電力情報をシグナリングする方法及び装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012244213A (ja) * 2011-05-16 2012-12-10 Kyocera Corp 無線基地局及び通信制御方法
WO2014182108A1 (ko) * 2013-05-10 2014-11-13 주식회사 팬택 무선 통신 시스템에서 최대송신전력 설정 및 시그널링 방법 및 장치
US10652830B2 (en) 2013-05-10 2020-05-12 Pantech Inc. Method and apparatus for establishing and signaling maximum transmission power in wireless communication system

Also Published As

Publication number Publication date
JP5077485B2 (ja) 2012-11-21
JPWO2010125737A1 (ja) 2012-10-25
US20120039205A1 (en) 2012-02-16
US8848634B2 (en) 2014-09-30

Similar Documents

Publication Publication Date Title
JP5077485B2 (ja) 基地局装置、無線通信システム、基地局の制御方法、および無線通信システムの制御方法
US8072918B2 (en) Network-based inter-cell power control for multi-channel wireless networks
JP6573669B2 (ja) ワイヤレス通信におけるハイブリッド自動再送/要求(harq)信頼性の改善
JP5922185B2 (ja) サービングセクタ干渉ブロードキャスト及び対応する逆方向リンクトラヒック電力制御
JP5189111B2 (ja) 無線基地局装置、無線通信システム及び無線通信方法
EP2868020B1 (en) Method and base station for link adaptation of pdcch in a radio communication system
JP4672063B2 (ja) 移動局、通信制御方法及び移動通信システム
US20130100842A1 (en) Transmission power control method, mobile terminal apparatus and radio base station apparatus
US9961690B2 (en) Method and base station for selecting a transport format
JP2010503344A5 (ja)
KR20140140591A (ko) 업링크 전력 제어 방법, 장치 및 시스템
WO2008097792A2 (en) Method and apparatus for uplink power control in a communication system
JP5080607B2 (ja) 無線基地局装置及び送信電力制御方法
JP6687038B2 (ja) 通信システム
WO2012104970A1 (ja) 無線通信システム、基地局、移動局、及び無線通信方法
EP3304995A1 (en) First communication device, second communication device and methods therein for sending and decoding, respectively, downlink information
US20150072720A1 (en) Method and apparatus for efficiently controlling uplink control signal of user equipment in wireless communication system
US20150312871A1 (en) Mobile communication system and mobile communication method
JP6174564B2 (ja) 送信装置、受信装置及び送信電力制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10769439

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011511273

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 13258911

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10769439

Country of ref document: EP

Kind code of ref document: A1