WO2010000745A2 - Bateau de forage pour opérations d'intervention de haute mer - Google Patents

Bateau de forage pour opérations d'intervention de haute mer Download PDF

Info

Publication number
WO2010000745A2
WO2010000745A2 PCT/EP2009/058199 EP2009058199W WO2010000745A2 WO 2010000745 A2 WO2010000745 A2 WO 2010000745A2 EP 2009058199 W EP2009058199 W EP 2009058199W WO 2010000745 A2 WO2010000745 A2 WO 2010000745A2
Authority
WO
WIPO (PCT)
Prior art keywords
ship
operations
deckspace
drill ship
crane
Prior art date
Application number
PCT/EP2009/058199
Other languages
English (en)
Other versions
WO2010000745A3 (fr
Inventor
Niels Elmbo
Thomas Danielsen
Original Assignee
A.P. Møller-Mærsk A/S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by A.P. Møller-Mærsk A/S filed Critical A.P. Møller-Mærsk A/S
Priority to EP09772445A priority Critical patent/EP2310256A2/fr
Priority to US13/001,897 priority patent/US20110180266A1/en
Publication of WO2010000745A2 publication Critical patent/WO2010000745A2/fr
Publication of WO2010000745A3 publication Critical patent/WO2010000745A3/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/03Pipe-laying vessels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting

Definitions

  • the drill ship is configured to operate in multi-tasking en- vironments for subsea oil and gas field development and maintenance, including various subsea operations up to 7,500 feet of water depth.
  • the drill ship includes capabilities for connected 16" riser well intervention and work over programs, heavy lift subsea construction programs, connected 16" riser small outer diameter tubing hanger completion programs, riserless tophole large outer-diameter drilling and casing batch programs, and connected riser remedial drilling and slim hole well construction.
  • the design of the drill ship incorporates elements to ensure safety of personnel and environmentally efficient and "green” operation and construction.
  • the ship exceeds the Mobile Offshore Drilling Unit (MODU) Passenger Vessel Intact and Damage Stability regulations.
  • MODU Mobile Offshore Drilling Unit
  • the design also incorporates concepts for protected temporary safe refuge muster concepts. Provisions on the ship are also made to form exhaust NOX emission reactors.
  • the design of the ship's hull incorporates a small force "hull form" which provides low fuel consumption within an environmental class. Furthermore, the hull is double-hull compliant and includes nitrogen-blanketed hull methanol and helifuel storage capability.
  • the deck of the ship includes automated deck tubular handling systems along with pipe racking systems and a riser handling system. Furthermore, knuckle-boom cranes are implemented on the deck for above-deck and subsea operations. Finally, a regulation-sized helipad is provided on the bow section of the ship.
  • the light displacement hull includes a variety of operational areas and systems, including a blowout preventer (BOP) handling system, a 13-5/8" subsea BOP, a 16" pressurized riser system, a box tower hoisting and lowering system with a top drive and an active heave compensated drawworks, the heavy-lift heave crane, and the medium duty deck crane.
  • BOP blowout preventer
  • the power systems on the ship include a plurality of 2,200 horsepower fluid pumps and 2,200 horsepower cement units.
  • FIG. 1 is a slide view of a first embodiment of the drill ship of the present invention
  • Fig. 2 is a rear perspective view of the drill ship of Fig. 1 ;
  • Fig. 3 is a right front side perspective view of the drill ship of Fig. 1 ;
  • Fig. 4 is a right front side perspective view of the drill ship of Fig. 1 ;
  • Fig. 5 is a perspective view overlooking the deck of the drill ship of Fig. 1 ;
  • Fig. 6 is a right side perspective view of the hull of the drill ship of Fig. 1 ;
  • Fig. 7 is a rear, right side perspective view of the drill ship of Fig. 1 , showing portions of the deck operational areas;
  • Fig. 8 is a rear perspective view of the aft deck operational areas
  • Fig. 8a is a top plan view of the aft deck area of the ship of Fig. 1 ;
  • Fig. 9 is a side perspective view of the drill ship of Fig. 1 ;
  • Fig. 10 is a cross-sectional plan view of a portion of the drill ship of Fig. I;
  • Fig. 11 is a cross-sectional plan view of a portion of the drill ship of Fig. I;
  • Fig. 12 is a cross-sectional plan view of a portion of the drill ship of Fig. 1 ;
  • Fig. 13 is a cross-sectional plan view of a portion of the drill ship of Fig. 1 ;
  • Fig. 14 is a cross-sectional plan view of a portion of the drill ship of Fig. 1 ;
  • Fig. 15 is a cross-sectional plan view of a portion of the drill ship of Fig. 1 ;
  • Fig. 16 is a cross-sectional plan view of a portion of the drill ship of Fig. 1 ;
  • Fig. 17 is a cross-sectional plan view of a portion of the drill ship of Fig. I;
  • Fig. 18 is a cross-sectional plan view of a portion of the drill ship of Fig. 1 ;
  • Fig. 19 is a perspective view of a portion of the deck of the drill ship of Fig. 1 ;
  • Fig. 20 is a top plan view of the drill floor for the ship of Fig. 1 ;
  • Fig. 21 is a side schematic view of a subsea BOP system with the embodiment of the drill ship of Fig. 1 ;
  • Fig. 22 is a perspective top view of the box tower hoisting and lowering system for use on the drill ship of Fig. 1 ;
  • Fig. 23 is a rear right-side perspective view of the heavy-lift active heave crane of the drill ship of Fig. 1 ;
  • Fig. 24 is an upper plan view of the rear portion of the deck of the drill ship of Fig. 1 ;
  • Fig. 25 is a perspective view of the medium duty deck crane for use on the drill ship of Fig. 1 ;
  • Fig. 26 is a cross-sectional view through the hull of the drill ship of Fig. 1 ;
  • Figs. 27 and Fig. 28 are schematic slender well construction examples for well operations using the drill ship of Fig. 1.
  • the drill ship 1 includes a hull 10, crew quarters struc- ture at section 7, a helipad 5 and a main deck 12. Positioned on the aft region of the deck 12 are the box tower hoisting and lowering system and top drive 26, a heavy-lift knuckle-boom seafloor active heave crane 50, a medium duty seafloor and deck crane 60, and an ROV installation with an integrated vessel control center 70.
  • directional thrusters 3 are positioned at various points in the hull, and the engines and power systems are housed within the hull as shown at 2. 4 azimuthing & 1 tunnel variable frequency thrusters are used. (20.3 MW combined thrusters rating), and capability to allow for loss of 1 Thruster in a Worst Case Compartment or Component Failure Mode which complies with requirements for redundant dynamic positioning capability.
  • the main hull 10 of the drill ship 1 is shown in the drawings at Figs. 1 -6.
  • the hull 10 is formed for light displacement moderate environment conditions. In the preferred embodiments, the hull is 120 meters in length, 32 meters in breadth with an 8 meter operating draft.
  • the drill ship has 23,000 metric tons of operating displacement, and utilizes 75% less shipyard steel fabrication weight than conventional newly-built drill ships. It is important to note that the hull includes a wide beam-to-length ratio to provide for improved deck oper- ability.
  • the connected standby meets the Hmax- 11.8m parameter.
  • the hull has a DP-3 stationkeeping with +15 knot transit rating.
  • the parameters for the hull are as follows:
  • the hull 10 of the drill ship 1 includes a wide deck area 12 for subsea operations.
  • the deck 12 includes an integrated system storage area 20 close to the control center 22 of the ship 1 as shown in Fig. 7.
  • Also shown in Fig. 7 is the helipad 5, crew quarters 7, a tubular storage area 24, the box tower 26, and a pipe racking and handling system 30. All of these integrated systems are rated for a water depth of up to 7,500 feet.
  • a perspective view of the deck 12 is shown in Fig. 8, which also shows the box tower hoisting and lowering system 26, the heavy-lift heave crane 50 and the light-duty deck crane 60.
  • the large ultra high capacity load rated open aft deck 12 is suitable for a wide range of configurations.
  • the loading on the ultra high capacity deck 12 is rated at 10-15 T/m2 (2,000-3,000 pounds/foot2). (Typically, on other types of global offshore drilling units, the load rating is only 500 pound s/foot2).
  • the high deck load rating allows a wide range of subsea well and subsea construction activities to be conducted including storage of subsea trees, assembly of coiled tubing or wireline intervention equipment, staging of subsea construction elements, storage of drilling equipment and many others.
  • the wide hull 10 allows for 1 ,050 m2 of usable unobstructed deck area.
  • the deck area in the aft region is also shown in the top plan view Fig. 8a.
  • both the port and starboard sides of the hull 10 are integrated with the Remote Operated Vehicle (ROV) portion of the hull 10 is integrated with the ROV installation 70.
  • the ROV installation 70 preferably in- eludes an integrated vessel control center, with a system designed for dual work-class ROV systems.
  • Various integrated control centers and systems are shown as indicated in Figs. 10 and 11.
  • the hull design in the wide-beam of the ship allows for relatively large and comfortable crew quarters 7, the configurations of which are shown for example in Figs. 12, 13 and 14.
  • the ship quarters 7 provides for 140- person quarters and project office facilities.
  • 100 single man cabins 81 are shown and 20 dual man cabins 82 are provided.
  • a plurality of mess areas 83 are provided along with a plurality of galleys 84 and storage com- partments 85 in the crew area.
  • the cross-sectional layouts of the crew areas in relation to the hull 10 of the ship 1 are shown in Figs. 17 and 18.
  • Tubular storage area 24 is provided for vertical storage of the tubulars in the midsection behind the op- erational control center 22 for the ship, as shown in Fig. 16.
  • a cross-sectional area, vertically through the hull 10 is shown at Fig. 15.
  • Various below-water facilities and operational areas in the lower decks, including engines 2, engine control rooms 91 , workshops 92 and various utility rooms 93 are shown in Figs. 15 and 16.
  • the ship of the present embodiment includes seven decks above the bottom floor base 95 of the hull 10 at its highest elevation as shown in Fig. 16.
  • the drill ship 1 includes a specialized and efficient handling system for the BOP as shown in Figs. 19 and 20.
  • the handling system 100 includes a hinged rig floor and unitized stack handling capabilities. Efficient workspace is provided by a driller control room 104 and vertical tensioning slip joint storage 106.
  • the Subsea BOP system utilized in the present embodiment is a 13-5/8", 10 ksi, NACE-compliant BOP stack.
  • the BOP stack will be a conventional wellhead connector, double ram, annual ram, LMRP configuration.
  • a cranerethevable BOP/LMRP system may be provided with an infield wet storage of the deployed riser.
  • 3, 4 or 5 ram stack options are available, dependent on the subsea test tree requirements in the program implemented.
  • the riser may be a 16" slender riser implementation.
  • An MUX control system is also provided with 3.38" ID kill-and-choke lines.
  • a riser boost line is also provided and the system includes an EMI-pressurized 500 psi gas buster riser rating (in lieu of a diverter).
  • the system includes a tensioning slip joint, all of which are shown in Fig. 21.
  • a box tower hoisting and lowering system with top drive and active heave compensation is provided at 26 as shown in Figs. 22 and the foregoing figures.
  • the box tower is a 400 metric ton multipurpose tower implemented for vertical lifting above the deck 12.
  • the system includes a 400 metric ton heave-compensated AC drawworks and a 350 metric ton top drive.
  • the tower includes a segmented traveling block sys- tern as shown. Heavy-Lift Crane
  • the deck 12 of a ship 1 is implemented with a heavy-lift knuckle- boom, seafloor active heave crane 50 as shown in Fig. 23 in the previous figures.
  • the crane 50 in the exemplary embodiment of the drill ship 1 is rated at 250 metric tons.
  • the crane 50 also includes a 250 metric ton rated single fall rated hook with capacity to 5,000 feet of water depth.
  • a 200 metric ton single fall rated hook is provided for a capacity to 7,500 feet of water depth. Higher load capacity can be accommodated into the crane design.
  • the crane includes a two-hour lowering speed to the rated depth at maximum loads.
  • Crane such as medium duty crane
  • the medium duty sea- floor and deck crane 60 is also provided on the deck 12 of the ship 1.
  • the crane is a knuckle-boom deck utility crane nominally rated at 50 metric tons, and in the preferred embodiment includes a 15 kip seafloor rating to a water depth of 7,500 feet.
  • the boom reach of the crane 60 covers the entire usable vessel deck area, including the aft deck 12.
  • the crane 60 preferably includes a pipe gripper arm for manipulating the tubulars from a tubu- lar storage area 24.
  • the ship 1 includes a plurality of fluid pump systems and cement units.
  • the present embodiment includes four 7,500 psi, 2,200 horsepower quintaplex fluid pumps with precision AC drives.
  • the system includes an option for a higher working pressure as well.
  • Below deck, charging pumps in the special piping system maximize the usable tank volume relative to a 2,200 horsepower cement unit.
  • the main system includes a 3,000 bbl NAF mud system including a 1 ,200 gpm fluid processing system.
  • the system also includes a 3,000 bbl completion brine system with 1 ,880 gpm, 2 micron filtration system. Additional base oil and brine capacity can be incorporated into the design.
  • the exemplary drill ship 1 of the present embodiment is capable of maintaining both large and slender casing schemes, the parameters of which are shown by the schematics of Figs. 27 and 28.
  • the large casing scheme is shown in Figure 27, including the hole construction for a 16" casing.
  • Fig. 28 shows the casing scheme for a slender 13-3/8" casing.
  • Subsea BOP a One Wellhead Connector, 13 5/8" x 18 3 A" b. Two 13 5/8" Double Ram BOP Units c. One 13 5/8" Annular Preventer d. One 13 5/8" Lower Marine Riser Package Connector

Abstract

L'invention concerne un bateau de forage servant à mettre en oeuvre des opérations sous-marines, y compris des opérations d'intervention, de maintenance et de reconditionnement. Le bateau comprend une coque qui présente un rapport largeur-longueur sensiblement élevé et comporte un espace de pont. Un système automatisé de manipulation de tubes et de colonnes montantes est monté sur l'espace de pont ainsi qu'un système de support de tubes. L'espace de pont comprend une grue de charges lourdes à compensation de pilonnement pour mettre en œuvre des opérations de fond de mer, et une grue moyenne montée sur l'espace de pont. Le bateau est conçu pour effectuer des opérations de construction sous-marine de charges lourdes, y compris des programmes d'intervention et de reconditionnement de puits de colonne montante de 16 pouces, des opérations de complétion de colonnes montantes reliées ainsi que des opérations de forage de trou de toit sans colonne montante et des opérations de tubage. Le bateau peut aussi mettre en œuvre un forage de renforcement de colonnes montantes reliées et une construction de puits de filiforage. Le bateau permet de maximiser l'efficacité environnementale à la fois lors de la construction et de l'utilisation, et assure un environnement de vie et de travail sûr et stable pour le personnel exploitant.
PCT/EP2009/058199 2008-06-30 2009-06-30 Bateau de forage pour opérations d'intervention de haute mer WO2010000745A2 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP09772445A EP2310256A2 (fr) 2008-06-30 2009-06-30 Bateau de forage pour opérations d'intervention de haute mer
US13/001,897 US20110180266A1 (en) 2008-06-30 2009-06-30 Drill ship for deep sea intervention operations

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US7713708P 2008-06-30 2008-06-30
US61/077,137 2008-06-30

Publications (2)

Publication Number Publication Date
WO2010000745A2 true WO2010000745A2 (fr) 2010-01-07
WO2010000745A3 WO2010000745A3 (fr) 2010-05-27

Family

ID=41466372

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2009/058199 WO2010000745A2 (fr) 2008-06-30 2009-06-30 Bateau de forage pour opérations d'intervention de haute mer

Country Status (3)

Country Link
US (1) US20110180266A1 (fr)
EP (1) EP2310256A2 (fr)
WO (1) WO2010000745A2 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016201531A1 (fr) * 2015-06-18 2016-12-22 Petróleo Brasileiro S.A. - Petrobras Système d'intervention et d'installation d'au moins un équipement d'élévation et d'écoulement de production à l'intérieur d'au moins un riser de production dans une unité de production flottante
CN109883841A (zh) * 2019-03-06 2019-06-14 中国海洋大学 一种滩浅海沉积物强度原位测试系统

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9657538B2 (en) 2012-11-19 2017-05-23 Key Energy Services, Llc Methods of mechanized and automated tripping of rods and tubulars
DK2961649T3 (en) * 2013-02-28 2018-01-02 Keppel Offshore & Marine Tech Ct Pte Ltd Integrated ship for heavy cargo and logistics
KR101544808B1 (ko) 2013-12-11 2015-08-17 대우조선해양 주식회사 드릴쉽
USD751970S1 (en) * 2014-04-24 2016-03-22 Fincantieri S.P.A. Drillship
BR112017013059A2 (pt) * 2014-12-22 2018-04-17 Helix Energy Solutions Group Inc navio monocasco de intervenção para poços
US11739599B2 (en) * 2020-10-21 2023-08-29 BKG Industries, LLC Proppant recovery unit
US11894788B2 (en) 2020-11-04 2024-02-06 Builtrite, LLC Variable frequency drive electric hydraulic material handler

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998022335A1 (fr) * 1996-11-22 1998-05-28 Ship Based System As Vaisseau polyvalent
WO2000005525A2 (fr) * 1998-07-22 2000-02-03 Saipem S.P.A. Navires et procedes associes de pose de pipelines sous-marins
WO2001074656A1 (fr) * 2000-04-04 2001-10-11 J. Ray Mcdermott, S.A. Navire de chantier polyvalent
US20040089215A1 (en) * 2002-08-30 2004-05-13 Joop Roodenburg Multipurpose tower for monohull
WO2007073146A1 (fr) * 2005-12-21 2007-06-28 Itrec B.V. Systeme de forage en mer

Family Cites Families (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3474858A (en) * 1956-12-10 1969-10-28 Shaffer Tool Works Method and apparatus for off shore drilling
US3266256A (en) * 1963-03-27 1966-08-16 Chevron Res Method for laying submarine pipe lines
US3616773A (en) * 1968-09-04 1971-11-02 Santa Fe Int Corp Twin hull variable draft drilling vessel
US3895677A (en) * 1974-01-18 1975-07-22 Dolphin International Riser pipe stacking method
US4108318A (en) * 1974-06-07 1978-08-22 Sedco, Inc. Of Dallas, Texas Apparatus for offshore handling and running of a BOP stack
US4091760A (en) * 1974-12-03 1978-05-30 Santa Fe International Corporation Method of operating twin hull variable draft vessel
US4040265A (en) * 1976-02-06 1977-08-09 Marine Engineering Systems, Inc. Mobile offshore platform
US4209066A (en) * 1978-11-17 1980-06-24 Watson Barry R Method and apparatus for running tubular goods into and out of a borehole
US4317174A (en) * 1980-02-28 1982-02-23 The Offshore Company Riser angle positioning system and process
US4547201A (en) * 1983-12-14 1985-10-15 International Coal Refining Co. SRC Residual fuel oils
US5479869A (en) * 1994-08-12 1996-01-02 Marine Spill Response Corporation Oil spill recovery shuttle barge system
US5676209A (en) * 1995-11-20 1997-10-14 Hydril Company Deep water riser assembly
JP3187726B2 (ja) * 1996-12-05 2001-07-11 日本海洋掘削株式会社 大水深掘削用複合型パイプ揚降装置
FR2762580B1 (fr) * 1997-04-29 1999-06-04 France Etat Moyens de manutention pour navire porte-conteneurs
NL1006287C2 (nl) * 1997-06-11 1998-12-14 Workships Contractors Bv Semi-afzinkbaar, mobiel boorvaartuig.
US6497535B1 (en) * 1998-07-28 2002-12-24 Kress Corporation Material distribution vessel and method for distributing material recovered in a dredging operation
US6352114B1 (en) * 1998-12-11 2002-03-05 Ocean Drilling Technology, L.L.C. Deep ocean riser positioning system and method of running casing
US7326020B2 (en) * 2000-02-24 2008-02-05 Mudhen, Llc Multi-purpose vessel and method for recovering, storing and/or offloading material in a dredging operation
US6298927B1 (en) * 2000-03-17 2001-10-09 Laibe Corporation Pipe storage and handling system for a drilling rig
EP1390585A4 (fr) * 2001-05-01 2007-08-29 Drillmar Inc Plate-forme a usages multiples avec tour a usages multiples et procede d'amarrage a une plate-forme semi-submersible
US6705414B2 (en) * 2002-02-22 2004-03-16 Globalsantafe Corporation Tubular transfer system
US6899046B2 (en) * 2002-11-26 2005-05-31 Exxonmobil Chemical Patents Inc. Shipping methanol for a methanol to olefin unit in non-methanol carriers
US7044685B2 (en) * 2003-02-28 2006-05-16 Modec International Llc Method of installation of a tension leg platform
US7087804B2 (en) * 2003-06-19 2006-08-08 Chevron U.S.A. Inc. Use of waste nitrogen from air separation units for blanketing cargo and ballast tanks
US7021402B2 (en) * 2003-12-15 2006-04-04 Itrec B.V. Method for using a multipurpose unit with multipurpose tower and a surface blow out preventer
BRPI0517081B1 (pt) * 2004-10-19 2017-02-07 National-Oilwell L P sistema para preparação fora de linha de acoplamentos de tubulações, método para preparação fora de linha de tubulações e método de manipular acoplamentos de tubulações em campo de petróleo
WO2007043856A1 (fr) * 2005-10-11 2007-04-19 Itrec B.V. Plate-forme en mer dotee d’un mat en porte-a-faux se prolongeant au-dela du pont
DE602007001152D1 (de) * 2006-01-11 2009-07-09 Weatherford Lamb Gestellausgleicher
US7703534B2 (en) * 2006-10-19 2010-04-27 Adel Sheshtawy Underwater seafloor drilling rig
CA2867382C (fr) * 2006-11-07 2015-12-29 Halliburton Energy Services, Inc. Procede de forage consistant en l'installantion d'un joint d'etancheite annulaire dans une chaine de colonne montante et d'un joint d'etancheite sur une chaine tubulaire
NO325441B1 (no) * 2007-02-12 2008-05-05 Norshore Drilling As Mobilt utstyr for stigerorlos boring, bronnintervensjon, undersjoisk konstruksjon fra et fartoy
KR101630630B1 (ko) * 2008-02-15 2016-06-24 아이티알이씨 비. 브이. 해양 시추용 선박
US8256520B2 (en) * 2009-01-14 2012-09-04 National Oilwell Varco L.P. Drill ship
US9038733B2 (en) * 2009-04-29 2015-05-26 Itrec B.V. Tubulars storage and handling system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998022335A1 (fr) * 1996-11-22 1998-05-28 Ship Based System As Vaisseau polyvalent
WO2000005525A2 (fr) * 1998-07-22 2000-02-03 Saipem S.P.A. Navires et procedes associes de pose de pipelines sous-marins
WO2001074656A1 (fr) * 2000-04-04 2001-10-11 J. Ray Mcdermott, S.A. Navire de chantier polyvalent
US20040089215A1 (en) * 2002-08-30 2004-05-13 Joop Roodenburg Multipurpose tower for monohull
WO2007073146A1 (fr) * 2005-12-21 2007-06-28 Itrec B.V. Systeme de forage en mer

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2310256A2 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016201531A1 (fr) * 2015-06-18 2016-12-22 Petróleo Brasileiro S.A. - Petrobras Système d'intervention et d'installation d'au moins un équipement d'élévation et d'écoulement de production à l'intérieur d'au moins un riser de production dans une unité de production flottante
CN109883841A (zh) * 2019-03-06 2019-06-14 中国海洋大学 一种滩浅海沉积物强度原位测试系统
CN109883841B (zh) * 2019-03-06 2024-01-02 中国海洋大学 一种滩浅海沉积物强度原位测试系统

Also Published As

Publication number Publication date
WO2010000745A3 (fr) 2010-05-27
EP2310256A2 (fr) 2011-04-20
US20110180266A1 (en) 2011-07-28

Similar Documents

Publication Publication Date Title
US20110180266A1 (en) Drill ship for deep sea intervention operations
CN100504023C (zh) 一种海上钻井系统
CN102756794B (zh) 水面以下储油的半潜式生产平台
US8807874B2 (en) Dry-tree semi-submersible production and drilling unit
CN104029798B (zh) 自安装采油平台
CN109835442A (zh) 超深水半潜式钻井平台
CN202743444U (zh) 一种水面以下储油的半潜式生产平台
US20130075102A1 (en) Mobile offshore drilling unit
US9731796B2 (en) Well intervention semisubmersible vessel
CN207466925U (zh) 超深水半潜式钻井平台
US20160177631A1 (en) Well intervention monohull vessel
CN107939311B (zh) 一种适合搭载于fpso的模块化小型修井系统
KR102196982B1 (ko) 드릴십
KR20180077562A (ko) 드릴쉽
KR102196988B1 (ko) 드릴십
KR102196981B1 (ko) 드릴십
KR102196984B1 (ko) 드릴십
KR102196978B1 (ko) 드릴십
KR102196985B1 (ko) 드릴십
KR102196980B1 (ko) 드릴십
Serck-Hanssen IMR in Subsea 7 for Statoil, past and future, the new IMR vessel “Seven Viking”
KR102196977B1 (ko) 드릴십
US20200115968A1 (en) Well intervention monohull vessel
KR102133071B1 (ko) 드릴십
WO2016165716A1 (fr) Engin de forage flottant

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2009772445

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 13001897

Country of ref document: US