US20200115968A1 - Well intervention monohull vessel - Google Patents
Well intervention monohull vessel Download PDFInfo
- Publication number
- US20200115968A1 US20200115968A1 US16/713,679 US201916713679A US2020115968A1 US 20200115968 A1 US20200115968 A1 US 20200115968A1 US 201916713679 A US201916713679 A US 201916713679A US 2020115968 A1 US2020115968 A1 US 2020115968A1
- Authority
- US
- United States
- Prior art keywords
- vessel
- deck
- riser
- intervention
- moon pool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 claims abstract description 23
- 238000000034 method Methods 0.000 claims abstract description 11
- 230000003213 activating effect Effects 0.000 claims 1
- 238000005553 drilling Methods 0.000 description 22
- 238000013461 design Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000008030 elimination Effects 0.000 description 2
- 238000003379 elimination reaction Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 244000261422 Lysimachia clethroides Species 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 239000013505 freshwater Substances 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/002—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
- E21B19/004—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform
- E21B19/006—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform including heave compensators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/14—Hull parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/02—Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/008—Winding units, specially adapted for drilling operations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/02—Rod or cable suspensions
- E21B19/06—Elevators, i.e. rod- or tube-gripping devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/143—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0007—Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/14—Hull parts
- B63B2003/147—Moon-pools, e.g. for offshore drilling vessels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63H—MARINE PROPULSION OR STEERING
- B63H25/00—Steering; Slowing-down otherwise than by use of propulsive elements; Dynamic anchoring, i.e. positioning vessels by means of main or auxiliary propulsive elements
- B63H25/46—Steering or dynamic anchoring by jets or by rudders carrying jets
- B63H2025/465—Jets or thrusters substantially used for steering or dynamic anchoring only, with means for retracting, or otherwise moving to a rest position outside the water flow around the hull
Definitions
- the invention disclosed and taught herein relates generally to a system and method for use in floating offshore environments including drilling rigs.
- the embodiments described below relate generally to the design layout of equipment on an offshore well intervention monohull vessel specifically for the transport, deployment, and retrieval of well intervention subsea equipment.
- a typical layout of an exploratory drilling rig is to place a pyramid type drilling derrick at or near the center of the upper deck with an elevated drill floor, meaning the drill floor is above the deck of the vessel.
- This type of derrick is usually built of truss structures with the drilling equipment installed within its footprint boundary.
- a drilling riser would be installed through the rotary table on the drill floor and connected to the subsea well. It is essentially a conduit for running the drill string to the well bore below and allowing the return of mud flow through the riser annulus to the surface.
- the subsea BOP Stack Secondlow Out Preventer
- LMRP Lower Marine Riser Package
- the BOP stack is designed to have the mechanism to shear off the drill string and shut in the well for well control purpose.
- the LMRP provides the quick disconnect mechanism of the riser on the top of the BOP in the event the drilling vessel is required to move away from the well that is out of control.
- the typical size of a deep water drilling riser joint has about a 21 inch outer diameter, about 75 feet in length, and with over about 50 inch of diameter for the buoyancy material attached.
- the combined BOP stack and LMRP can reach over 60 feet tall and the combined weight over 300 metric tons depending on the number of rams being configured on the BOP.
- the equipment for assembling, handling, transporting, and positioning the massive BOP stack and the LMRP underneath the drill floor becomes the center issue in the drilling system design layout.
- an elevated drill floor above the deck of the vessel is normally required in the layout.
- Such an elevated drill floor is supported by the derrick substructures installed on top of the main deck of the vessel.
- a typical well intervention operation can be performed by means of different methods including slick line, electric line, and coiled tubing deployment through the riser.
- the corresponding well intervention riser has a smaller diameter in comparison with a drilling riser, usually in the range of 7 to about 8.5 inch outer diameter.
- the physical characteristics of the well and the composition of the well stream are usually known prior to the well intervention operation.
- the use of a full size drilling BOP stack and LMRP is considered as overkill for well intervention.
- Riser based monohull operations traditionally involve a drilling rig with an elevated drill floor above the deck of the vessel. This arrangement works well for drilling operations since the focus is on pipe handling efficiency.
- a preferred method for well intervention includes operating a flat flush deck monohull without an elevated drill floor above the deck of the vessel. This approach enables the user to handle pipes like a drilling rig but also to handle the subsea equipment and the surface well service equipment more efficiently than a drilling rig arrangement.
- One advantage of this approach is the ability to rig equipment up and rig equipment down quickly when intervening on a well.
- a drilling rig is on a well for months at a time so pipe handling efficiency is important whereas intervention operations take on average 10 to 15 days so equipment change out for different operations as well as pipe handling is the key to efficient operations due to the higher frequency of equipment change out.
- the combination of flat deck, i.e., no elevated substructure above the deck of a vessel, and a tower type open derrick structure combined with heavy lift crane capability provides a unique operating aspect to normal monohull operations for subsea well intervention work.
- the user is able to accommodate the heavy equipment associated with subsea well intervention operations (subsea trees and manifolds and surface coiled tubing reels and intervention lift frames).
- the flat, flush and open deck design permits ease of movement of equipment, compared to traditional drill ships.
- the equipment handling capabilities based around the use of the flat, flush, and open deck design further enhances well intervention operations through elimination of the riser tensioners for use with the intervention riser system when operations allow.
- riser tensioners are traditionally connected below the tension frame and elevated drill floor via a tension ring and multiple tension wires, the task of attaching these is both time consuming and of high risk.
- Eliminating the use of riser tensioners increases the safety and efficiency with which equipment rig up, handling, deployment, and rig down is accomplished by only having a sole point of contact with the derrick structure at the top of the derrick structure.
- the well riser tension is accomplished via a sole point land out having this sole point of riser tension contact with the top of the derrick structure.
- the combination of passive heave compensation to limit the vessel motion being imparted to the intervention riser system and the active heave compensation in line with the passive heave compensation provides the operational redundancy required during sole point land out having this sole point of riser tension contact with the top of the derrick structure eliminates the requirement for riser tensioners as an operating mode option.
- An additional feature is the ability to rig up, handle, and deploy and rig down well service equipment covering pressure control equipment, coiled tubing equipment and electric line and slick line.
- a self-standing skidding intervention lift frame of box construction enables access to the well service equipment once rigged up over the well.
- FIG. 1 shows a side, cross sectional view diagram of an embodiment of a conventional drill ship.
- FIG. 2 shows a side, cross sectional view diagram of an embodiment of a conventional drill ship.
- FIG. 3 shows a close-up, perspective view of a layout of a well intervention rig and the transport of an intervention riser system IRS from the assembly position to the well center in transverse direction.
- FIG. 4 shows a close-up, perspective view of a layout of a well intervention rig and the intervention lift frame in position above the moon pool.
- FIG. 5 shows an overhead plan view diagram of a well intervention monohull main deck layout embodiment.
- FIG. 6 shows a side, cross sectional view of a well intervention monohull embodiment.
- FIG. 6A shows a side, cross sectional view of the moon pool of a well intervention monohull embodiment.
- FIG. 7 shows a side, cross sectional view of a well intervention monohull embodiment.
- FIG. 8 shows a close-up, perspective view of the upper deck layout of a monohull embodiment.
- FIGS. 1 and 2 show cross sectional, side views of a conventional drilling ship 10 with an embodiment of an elevated drill floor 14 above the main deck 11 and the deployment of a blowout preventer BOP stack 16 and lower marine riser package LMRP 18 below the elevated drill floor 14 .
- the main deck 11 is visible with a derrick substructure 15 .
- Riser tensioners 13 are connected to a pyramid type truss derrick 12 .
- Riser racks 17 , a moon pool 19 , and pipe racks 20 are incorporated into this design.
- a monohull vessel 100 as shown in FIGS. 3-8 is designed to have a ship shape hull form.
- the functional requirements of the hull are to provide the proper buoyancy and structural integrity for supporting the whole unit, and to provide the space for the machinery such as thruster rooms, pump rooms, etc., and liquid storage for ballast water, fresh water, fuel, and oil field related liquids.
- the draft, dimensions, and geometry of the hull determine the motion characteristics of the unit in waves. Moreover, the breadth, water plane area together with the vertical center of gravity of the unit determine the stability of the unit.
- a monohull vessel 100 for offshore oil and gas operation can be described in five different sub-categories based on their primary functional requirements, namely: to perform exploratory drilling and well construction; to perform well intervention operation; to perform subsea installation and construction operations; to produce oil and gas; and to provide accommodation living quarters.
- the equipment layout of the design is determined by the mission and hence the functional requirements of the unit in question.
- An optimum design layout for a specific rig category may not be applicable to the other categories at all. For example, if a drilling ship in category one is used to perform well intervention operation, its operating efficiency may suffer due to its inherent equipment arrangement on the deck and the associated deployment procedure of subsea equipment to the sea floor. Conversion of a drill ship to a well intervention ship would lead to similar restrictions in operation.
- the monohull vessel 100 is shown starting in FIG. 3 .
- Subsea equipment such as an Intervention Riser System (IRS) 107 together with an Emergency Disconnect Package (EDP) 108 enable the well shut in capability and quick disconnect of the riser from the subsea well head to achieve optimum working efficiency for deployment and retrieval of the subsea well control equipment.
- the dimensional size of the IRS is substantially smaller and its weight is about 1 ⁇ 4 to about 1 ⁇ 3 of a BOP stack. Because of the reduction of equipment size and weight, the optimum layout of a well intervention monohull has a revolutionary change of the deck layout which leads to a substantial improvement of the operating efficiency in terms of assembly, handling, deployment, and retrieval of subsea equipment such as the IRS and riser system.
- the new concept allows the time to rig up the well intervention equipment such as slick line, electric line, or surface coiled tubing reels 104 shown in FIGS. 4-8 much faster than the use of a traditional enclosed pyramid drilling derrick 12 .
- the design concept features an open derrick 102 to be installed on a flat flush deck 101 shown in FIGS. 5 and 6 with a moon pool door 109 shown in FIG. 4 flush with the main deck of the vessel that is capable of serving as a drill floor and replacing the elevated drill floor 14 and derrick substructure 15 found on a conventional drill ship 10 .
- the layout of the deck with the use of an open derrick and a mechanized driven moon pool door 109 preferably has dual functions: it features a power slip for running subsea equipment at the well center; and it can be used as a transporter for moving subsea equipment such as the IRS 107 from its assemble location to the deployed position at the well center, as shown in FIGS. 3 and 4 .
- the initial rig up time and the time for running and retrieval time of the IRS 107 and the riser to and from the sea floor can be greatly reduced.
- the total time for servicing a well become a fraction of that if it is performed on an exploratory drilling ship.
- the coil tubing goose neck 110 is also shown in FIG. 4 .
- the present invention eliminates the requirement for riser tensioners 13 and the corresponding riser telescopic joint by being able to have a single point land out 106 shown in FIG. 3 from a Multi-Purpose Tower (MPT) or equivalent open derrick 102 .
- This sole point land out 106 has a sole point of riser tension contact with the top of the derrick structure 102 .
- the single point land out 106 allows riser tension from the MPT or equivalent derrick 102 to be applied to subsea equipment such as the IRS 107 or the EDP 108 without the need for a plurality of land outs contact points below the below the tension frame or riser tensioners 13 .
- the equipment handling capabilities based around the use of the flat, flush, and open deck design further enhances well intervention operations through elimination of the riser tensioners 13 for use with the intervention riser system when operations allow.
- riser tensioners 13 are traditionally connected with contacts below the tension frame and elevated drill floor via a tension ring and multiple tension wires, the task of attaching these is both time consuming and of high risk. Eliminating the use of riser tensioners 13 increases the safety and efficiency with which equipment rig up, handling, deployment, and rig down is accomplished by only having a sole point of contact with the derrick structure at the top of the derrick structure.
- tension is accomplished via a sole point land out 106 with the derrick structure 102 through maintaining the riser tension solely in contact with the MPT or equivalent derrick 102 at the top of the derrick structure 102 .
- This arrangement maintains the full load on the MPT or equivalent derrick 102 and negates the need for a plurality of contacts such as guidewire tensioners below the moon pool door 109 , which is also replacing the typical drill floor layout in this arrangement.
- no rotary table is needed as the moon pool door 109 is designed to have the same functionality as a drill floor and it offers the advantage of being able to slide subsea equipment and deck equipment into and out of the deployment.
- FIG. 4 shows the well intervention rig and the transport of the intervention lift frame 105 from the storage position to the well center via the deck 101 skidding capability for make up to the intervention riser system (IRS) 107 .
- the riser storage area 111 is also shown herein.
- FIG. 5 shows an overhead plan view diagram of the well intervention monohull vessel 100 where the moon pool door 109 moves in transverse direction of the deck 101 .
- the IRS stack 107 is transported by rails 116 via a pallet 117 on the deck 101 to the moon pool door 109 .
- the deck 101 of the well intervention monohull vessel 100 may have the pallet 117 on the aft side of the moon pool door 109 or forward of the moon pool 109 , and the pipe and riser storage area 111 on the aft side of the moon pool door 109 .
- FIG. 6 shows a cross sectional side view of the vessel 100 .
- the open derrick 102 is located on the deck 101 with the subsea trees 103 and the surface coiled tubing reels 104 present.
- the intervention lift frames 105 are shown disposed under the crane 115 .
- the sole point land out 106 this sole point of riser tension contact with the top of the derrick structure 102 over the moon pool door 109 is held in place by the drawworks 113 beside the raised platform 114 .
- FIG. 7 shows a cross sectional, side view of the vessel 100 with the open derrick 102 is located on the deck 101 with the surface coiled tubing reels 104 and intervention lift frames 105 disposed under the crane 115 .
- FIG. 8 shows a perspective view of a preferred embodiment of the well intervention monohull showing the single point land out 106 of the intervention riser system and intervention lift frame 105 in parking position.
- the surface coiled tubing reels 104 and the open derrick 102 are shown herein.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Earth Drilling (AREA)
Abstract
Description
- This nonprovisional application for patent is a continuation in part application, which claims priority to U.S. patent application Ser. No. 14,977,184, entitled “Well Intervention Monohull Vessel,” filed Dec. 22, 2015, which claims priority to U.S. Provisional Application Ser. No. 62/095,762, entitled “Well Intervention Monohull Vessel,” filed Dec. 22, 2014.
- Technical Field of Invention:
- The invention disclosed and taught herein relates generally to a system and method for use in floating offshore environments including drilling rigs. The embodiments described below relate generally to the design layout of equipment on an offshore well intervention monohull vessel specifically for the transport, deployment, and retrieval of well intervention subsea equipment.
- A typical layout of an exploratory drilling rig is to place a pyramid type drilling derrick at or near the center of the upper deck with an elevated drill floor, meaning the drill floor is above the deck of the vessel. This type of derrick is usually built of truss structures with the drilling equipment installed within its footprint boundary. A drilling riser would be installed through the rotary table on the drill floor and connected to the subsea well. It is essentially a conduit for running the drill string to the well bore below and allowing the return of mud flow through the riser annulus to the surface. At the bottom of the drilling riser, there is a safety device called the subsea BOP Stack (Blow Out Preventer) latched on the wellhead and the LMRP (Lower Marine Riser Package). The BOP stack is designed to have the mechanism to shear off the drill string and shut in the well for well control purpose. The LMRP provides the quick disconnect mechanism of the riser on the top of the BOP in the event the drilling vessel is required to move away from the well that is out of control. The typical size of a deep water drilling riser joint has about a 21 inch outer diameter, about 75 feet in length, and with over about 50 inch of diameter for the buoyancy material attached. For deep water application, the combined BOP stack and LMRP can reach over 60 feet tall and the combined weight over 300 metric tons depending on the number of rams being configured on the BOP. Accordingly, the equipment for assembling, handling, transporting, and positioning the massive BOP stack and the LMRP underneath the drill floor becomes the center issue in the drilling system design layout. In order to provide sufficient head room for this operation, an elevated drill floor above the deck of the vessel is normally required in the layout. Such an elevated drill floor is supported by the derrick substructures installed on top of the main deck of the vessel.
- A typical well intervention operation can be performed by means of different methods including slick line, electric line, and coiled tubing deployment through the riser. The corresponding well intervention riser has a smaller diameter in comparison with a drilling riser, usually in the range of 7 to about 8.5 inch outer diameter. Unlike the drilling of an exploratory or development well, the physical characteristics of the well and the composition of the well stream are usually known prior to the well intervention operation. The use of a full size drilling BOP stack and LMRP is considered as overkill for well intervention.
- During traditional rig operations with a large marine riser, there is a requirement to suspend this load from multiple tensioned wires below the drill floor as well as support the upper part from a hook. This plurality of tensioned wires method was necessary to suspend the load prior to landing out on the subsea well.
- Riser based monohull operations traditionally involve a drilling rig with an elevated drill floor above the deck of the vessel. This arrangement works well for drilling operations since the focus is on pipe handling efficiency. A preferred method for well intervention includes operating a flat flush deck monohull without an elevated drill floor above the deck of the vessel. This approach enables the user to handle pipes like a drilling rig but also to handle the subsea equipment and the surface well service equipment more efficiently than a drilling rig arrangement. One advantage of this approach is the ability to rig equipment up and rig equipment down quickly when intervening on a well. A drilling rig is on a well for months at a time so pipe handling efficiency is important whereas intervention operations take on
average 10 to 15 days so equipment change out for different operations as well as pipe handling is the key to efficient operations due to the higher frequency of equipment change out. - The combination of flat deck, i.e., no elevated substructure above the deck of a vessel, and a tower type open derrick structure combined with heavy lift crane capability provides a unique operating aspect to normal monohull operations for subsea well intervention work. The user is able to accommodate the heavy equipment associated with subsea well intervention operations (subsea trees and manifolds and surface coiled tubing reels and intervention lift frames). The flat, flush and open deck design permits ease of movement of equipment, compared to traditional drill ships.
- The equipment handling capabilities based around the use of the flat, flush, and open deck design further enhances well intervention operations through elimination of the riser tensioners for use with the intervention riser system when operations allow. As riser tensioners are traditionally connected below the tension frame and elevated drill floor via a tension ring and multiple tension wires, the task of attaching these is both time consuming and of high risk. Eliminating the use of riser tensioners increases the safety and efficiency with which equipment rig up, handling, deployment, and rig down is accomplished by only having a sole point of contact with the derrick structure at the top of the derrick structure. During operations with the intervention riser system, the well riser tension is accomplished via a sole point land out having this sole point of riser tension contact with the top of the derrick structure. The combination of passive heave compensation to limit the vessel motion being imparted to the intervention riser system and the active heave compensation in line with the passive heave compensation provides the operational redundancy required during sole point land out having this sole point of riser tension contact with the top of the derrick structure eliminates the requirement for riser tensioners as an operating mode option.
- An additional feature is the ability to rig up, handle, and deploy and rig down well service equipment covering pressure control equipment, coiled tubing equipment and electric line and slick line. A self-standing skidding intervention lift frame of box construction enables access to the well service equipment once rigged up over the well.
-
FIG. 1 shows a side, cross sectional view diagram of an embodiment of a conventional drill ship. -
FIG. 2 shows a side, cross sectional view diagram of an embodiment of a conventional drill ship. -
FIG. 3 shows a close-up, perspective view of a layout of a well intervention rig and the transport of an intervention riser system IRS from the assembly position to the well center in transverse direction. -
FIG. 4 shows a close-up, perspective view of a layout of a well intervention rig and the intervention lift frame in position above the moon pool. -
FIG. 5 shows an overhead plan view diagram of a well intervention monohull main deck layout embodiment. -
FIG. 6 shows a side, cross sectional view of a well intervention monohull embodiment. -
FIG. 6A shows a side, cross sectional view of the moon pool of a well intervention monohull embodiment. -
FIG. 7 shows a side, cross sectional view of a well intervention monohull embodiment. -
FIG. 8 shows a close-up, perspective view of the upper deck layout of a monohull embodiment. - The drawings described above and the written description of specific structures and functions below are presented for illustrative purposes and not to limit the scope of what has been invented or the scope of the appended claims. Nor are the drawings drawn to any particular scale or fabrication standards, or intended to serve as blueprints, manufacturing parts list, or the like. Rather, the drawings and written description are provided to teach any person skilled in the art to make and use the inventions for which patent protection is sought. Those skilled in the art will appreciate that not all features of a commercial embodiment of the inventions are described or shown for the sake of clarity and understanding.
- Persons of skill in this art will also appreciate that the development of an actual, real-world commercial embodiment incorporating aspects of the inventions will require numerous implementation specific decisions to achieve the developer's ultimate goal for the commercial embodiment. Such implementation specific decisions may include, and likely are not limited to, compliance with system related, business related, government related and other constraints, which may vary by specific implementation, location and from time to time. While a developer's efforts might be complex and time consuming in an absolute sense, such efforts would nevertheless be a routine undertaking for those of skill in this art having the benefit of this disclosure.
- It should also be understood that the embodiments disclosed and taught herein are susceptible to numerous and various modifications and alternative forms. Thus, the use of a singular term, such as, but not limited to, “a” and the like, is not intended as limiting of the number of items. Similarly, any relational terms, such as, but not limited to, “top,” “bottom,” “left,” “right,” “upper,” “lower,” “down,” “up,” “side,” and the like, used in the written description are for clarity in specific reference to the drawings and are not intended to limit the scope of the invention or the appended claims.
-
FIGS. 1 and 2 show cross sectional, side views of aconventional drilling ship 10 with an embodiment of anelevated drill floor 14 above the main deck 11 and the deployment of a blowout preventer BOP stack 16 and lower marine riser package LMRP 18 below theelevated drill floor 14. The main deck 11 is visible with aderrick substructure 15. Riser tensioners 13 are connected to a pyramidtype truss derrick 12. Riser racks 17, amoon pool 19, andpipe racks 20 are incorporated into this design. - In contrast, a
monohull vessel 100 as shown inFIGS. 3-8 is designed to have a ship shape hull form. The functional requirements of the hull are to provide the proper buoyancy and structural integrity for supporting the whole unit, and to provide the space for the machinery such as thruster rooms, pump rooms, etc., and liquid storage for ballast water, fresh water, fuel, and oil field related liquids. - The draft, dimensions, and geometry of the hull determine the motion characteristics of the unit in waves. Moreover, the breadth, water plane area together with the vertical center of gravity of the unit determine the stability of the unit.
- In general, a
monohull vessel 100 for offshore oil and gas operation can be described in five different sub-categories based on their primary functional requirements, namely: to perform exploratory drilling and well construction; to perform well intervention operation; to perform subsea installation and construction operations; to produce oil and gas; and to provide accommodation living quarters. - The equipment layout of the design is determined by the mission and hence the functional requirements of the unit in question. An optimum design layout for a specific rig category may not be applicable to the other categories at all. For example, if a drilling ship in category one is used to perform well intervention operation, its operating efficiency may suffer due to its inherent equipment arrangement on the deck and the associated deployment procedure of subsea equipment to the sea floor. Conversion of a drill ship to a well intervention ship would lead to similar restrictions in operation.
- The
monohull vessel 100 is shown starting inFIG. 3 . Subsea equipment such as an Intervention Riser System (IRS) 107 together with an Emergency Disconnect Package (EDP) 108 enable the well shut in capability and quick disconnect of the riser from the subsea well head to achieve optimum working efficiency for deployment and retrieval of the subsea well control equipment. The dimensional size of the IRS is substantially smaller and its weight is about ¼ to about ⅓ of a BOP stack. Because of the reduction of equipment size and weight, the optimum layout of a well intervention monohull has a revolutionary change of the deck layout which leads to a substantial improvement of the operating efficiency in terms of assembly, handling, deployment, and retrieval of subsea equipment such as the IRS and riser system. - By using a tower type
open derrick 102, the new concept allows the time to rig up the well intervention equipment such as slick line, electric line, or surface coiledtubing reels 104 shown inFIGS. 4-8 much faster than the use of a traditional enclosedpyramid drilling derrick 12. The design concept features anopen derrick 102 to be installed on a flatflush deck 101 shown inFIGS. 5 and 6 with amoon pool door 109 shown inFIG. 4 flush with the main deck of the vessel that is capable of serving as a drill floor and replacing theelevated drill floor 14 andderrick substructure 15 found on aconventional drill ship 10. - In a preferred embodiment, the layout of the deck with the use of an open derrick and a mechanized driven
moon pool door 109. Thismoon pool door 109 preferably has dual functions: it features a power slip for running subsea equipment at the well center; and it can be used as a transporter for moving subsea equipment such as theIRS 107 from its assemble location to the deployed position at the well center, as shown inFIGS. 3 and 4 . With this arrangement, the initial rig up time and the time for running and retrieval time of theIRS 107 and the riser to and from the sea floor can be greatly reduced. The total time for servicing a well become a fraction of that if it is performed on an exploratory drilling ship. The coiltubing goose neck 110 is also shown inFIG. 4 . - The present invention eliminates the requirement for
riser tensioners 13 and the corresponding riser telescopic joint by being able to have a single point land out 106 shown inFIG. 3 from a Multi-Purpose Tower (MPT) or equivalentopen derrick 102. This sole point land out 106 has a sole point of riser tension contact with the top of thederrick structure 102. The single point land out 106 allows riser tension from the MPT orequivalent derrick 102 to be applied to subsea equipment such as theIRS 107 or theEDP 108 without the need for a plurality of land outs contact points below the below the tension frame orriser tensioners 13. The equipment handling capabilities based around the use of the flat, flush, and open deck design further enhances well intervention operations through elimination of theriser tensioners 13 for use with the intervention riser system when operations allow. - As riser tensioners 13 are traditionally connected with contacts below the tension frame and elevated drill floor via a tension ring and multiple tension wires, the task of attaching these is both time consuming and of high risk. Eliminating the use of
riser tensioners 13 increases the safety and efficiency with which equipment rig up, handling, deployment, and rig down is accomplished by only having a sole point of contact with the derrick structure at the top of the derrick structure. - During operations with the intervention riser system attached to the well riser, tension is accomplished via a sole point land out 106 with the
derrick structure 102 through maintaining the riser tension solely in contact with the MPT orequivalent derrick 102 at the top of thederrick structure 102. This arrangement maintains the full load on the MPT orequivalent derrick 102 and negates the need for a plurality of contacts such as guidewire tensioners below themoon pool door 109, which is also replacing the typical drill floor layout in this arrangement. This makes the use of a telescopic joint for the riser optional. Additionally, no rotary table is needed as themoon pool door 109 is designed to have the same functionality as a drill floor and it offers the advantage of being able to slide subsea equipment and deck equipment into and out of the deployment. -
FIG. 4 shows the well intervention rig and the transport of theintervention lift frame 105 from the storage position to the well center via thedeck 101 skidding capability for make up to the intervention riser system (IRS) 107. Theriser storage area 111 is also shown herein. -
FIG. 5 shows an overhead plan view diagram of the wellintervention monohull vessel 100 where themoon pool door 109 moves in transverse direction of thedeck 101. In this layout arrangement, theIRS stack 107 is transported byrails 116 via apallet 117 on thedeck 101 to themoon pool door 109. Thedeck 101 of the wellintervention monohull vessel 100 may have thepallet 117 on the aft side of themoon pool door 109 or forward of themoon pool 109, and the pipe andriser storage area 111 on the aft side of themoon pool door 109. -
FIG. 6 shows a cross sectional side view of thevessel 100. Theopen derrick 102 is located on thedeck 101 with thesubsea trees 103 and the surface coiledtubing reels 104 present. The intervention lift frames 105 are shown disposed under thecrane 115. As shown inFIG. 6A , the sole point land out 106 this sole point of riser tension contact with the top of thederrick structure 102 over themoon pool door 109 is held in place by thedrawworks 113 beside the raisedplatform 114.FIG. 7 shows a cross sectional, side view of thevessel 100 with theopen derrick 102 is located on thedeck 101 with the surface coiledtubing reels 104 and intervention lift frames 105 disposed under thecrane 115. -
FIG. 8 shows a perspective view of a preferred embodiment of the well intervention monohull showing the single point land out 106 of the intervention riser system andintervention lift frame 105 in parking position. The surface coiledtubing reels 104 and theopen derrick 102 are shown herein. - While the invention has been described with reference to one or more particular embodiments, those skilled in the art will recognize that many changes may be made thereto without departing from the spirit and scope of the description. Each of these embodiments and obvious variations thereof is contemplated as falling within the spirit and scope of the claimed invention.
Claims (18)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/713,679 US20200115968A1 (en) | 2014-12-22 | 2019-12-13 | Well intervention monohull vessel |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201462095758P | 2014-12-22 | 2014-12-22 | |
US14/977,184 US20160177631A1 (en) | 2014-12-22 | 2015-12-21 | Well intervention monohull vessel |
US16/713,679 US20200115968A1 (en) | 2014-12-22 | 2019-12-13 | Well intervention monohull vessel |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/977,184 Continuation-In-Part US20160177631A1 (en) | 2014-12-22 | 2015-12-21 | Well intervention monohull vessel |
Publications (1)
Publication Number | Publication Date |
---|---|
US20200115968A1 true US20200115968A1 (en) | 2020-04-16 |
Family
ID=70161678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/713,679 Pending US20200115968A1 (en) | 2014-12-22 | 2019-12-13 | Well intervention monohull vessel |
Country Status (1)
Country | Link |
---|---|
US (1) | US20200115968A1 (en) |
-
2019
- 2019-12-13 US US16/713,679 patent/US20200115968A1/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6766860B2 (en) | Multi-activity offshore drilling facility having a support for tubular string | |
US6601649B2 (en) | Multipurpose unit with multipurpose tower and method for tendering with a semisubmersible | |
US7021402B2 (en) | Method for using a multipurpose unit with multipurpose tower and a surface blow out preventer | |
US9567041B2 (en) | Docking and drilling stations for running self-standing risers and conducting drilling, production and storage operations | |
US9068398B2 (en) | Deepwater completion installation and intervention system | |
CN102498259A (en) | Downhole intervention | |
US20110247827A1 (en) | Dual Drilling Activity Drilling Ship | |
US9731796B2 (en) | Well intervention semisubmersible vessel | |
EP2310256A2 (en) | Drill ship for deep sea intervention operations | |
AU2015369804B2 (en) | Well intervention monohull vessel | |
US20130075102A1 (en) | Mobile offshore drilling unit | |
US20200115968A1 (en) | Well intervention monohull vessel | |
OA18343A (en) | Well intervention monohull vessel. | |
KR101516207B1 (en) | Impact absorbing apparatus of mousehole | |
KR20180077562A (en) | Drillship | |
KR20150033763A (en) | Drillfloorless drill system | |
Brooks et al. | Drilling and production from a floating spar | |
KR20160022563A (en) | Marine Drilling System | |
Ahlstedt et al. | Flush drill floor | |
KR101403615B1 (en) | Offshore structure having moon pool for multiples of blow out preventer | |
KR20130021925A (en) | Drillship with lower deck for storing blowout preventer test equipment | |
Atteraas et al. | Underwater Technology: Offshore Petroleum | |
KR20180001769U (en) | Riser | |
KR20170121870A (en) | Drillship | |
GB2549258A (en) | Drillship |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STPP | Information on status: patent application and granting procedure in general |
Free format text: APPLICATION DISPATCHED FROM PREEXAM, NOT YET DOCKETED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCV | Information on status: appeal procedure |
Free format text: NOTICE OF APPEAL FILED |
|
STCV | Information on status: appeal procedure |
Free format text: APPEAL BRIEF (OR SUPPLEMENTAL BRIEF) ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCV | Information on status: appeal procedure |
Free format text: APPEAL BRIEF (OR SUPPLEMENTAL BRIEF) ENTERED AND FORWARDED TO EXAMINER |
|
STCV | Information on status: appeal procedure |
Free format text: EXAMINER'S ANSWER TO APPEAL BRIEF MAILED |
|
STCV | Information on status: appeal procedure |
Free format text: ON APPEAL -- AWAITING DECISION BY THE BOARD OF APPEALS |