WO2009076716A1 - Structure de protection supérieure - Google Patents

Structure de protection supérieure Download PDF

Info

Publication number
WO2009076716A1
WO2009076716A1 PCT/AU2008/001857 AU2008001857W WO2009076716A1 WO 2009076716 A1 WO2009076716 A1 WO 2009076716A1 AU 2008001857 W AU2008001857 W AU 2008001857W WO 2009076716 A1 WO2009076716 A1 WO 2009076716A1
Authority
WO
WIPO (PCT)
Prior art keywords
walkway
modular structural
protective structure
overhead protective
overhead
Prior art date
Application number
PCT/AU2008/001857
Other languages
English (en)
Inventor
Christopher Leslie Jones
Original Assignee
Christopher Leslie Jones
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2007906924A external-priority patent/AU2007906924A0/en
Priority claimed from AU2008207557A external-priority patent/AU2008207557A1/en
Application filed by Christopher Leslie Jones filed Critical Christopher Leslie Jones
Publication of WO2009076716A1 publication Critical patent/WO2009076716A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3209Temporary tunnels specially adapted against falling objects

Definitions

  • the present invention relates to a temporary overhead protective structure (OPS) that provides safety to the public. More particularly, though not exclusively, the invention relates to a temporary structure that provides overhead protection for pedestrians from falling objects while walking on a footpath that adjoins a construction site, a demolition site, or adjoining a building or other structure that may require maintenance work.
  • OPS overhead protective structure
  • Temporary overhead protective structures are commonly found in a city environment where many pedestrians require access to footpaths. There are various methods currently being used for erecting overhead temporary protective structures. The traditional types in Australia include the use of scaffolding, modular steel structures, timber structures, site- specific structural steel structures with timber decking; all with a protective deck above ground level to separate the construction site from the public space.
  • the overhead protective structure capacity may be used to support construction materials and portable amenity buildings. Where there are separate amenity buildings loaded onto the deck, there are two decks or floors, that is, the amenity building floor and the supporting safety deck or floor.
  • the current amenities are usually prefabricated buildings with only a thin corrugated metal roof with the walls of lightweight metal or timber framing.
  • Time is critical to build or erect the overhead protective structures and to then connect amenities.
  • Some systems require a significant amount of special fabrication or many parts are to be connected at night during limited time periods to avoid traffic and when the least number of pedestrians are present.
  • the amenity-prefabricated buildings are usually delivered on another similar separate occasion and lifted into position after the overhead protective structure has been inspected and certified by an engineer.
  • Final connection for amenities and use is usually days or even weeks after the initial overhead protective structure is initially erected.
  • the present invention seeks to provide an alternative temporary overhead protective structure that overcomes or substantially ameliorates at least one of the above disadvantages.
  • the present invention provides an overhead protective structure for providing protection to pedestrians located on a walkway adjacent a construction site, the overhead protective structure including: a modular structural element including a base surface, side wall portions and a roof element, a plurality of support members that supports the modular structural element above the walkway at a height which allows pedestrians to pass underneath the modular structural element, and, a fence element located along the side of the walkway adjacent the construction site.
  • the modular structural element is in the form of a shipping container.
  • the structure includes support members located on the side of the walkway adjacent the construction site and support members located on the other side of the walkway wherein the fence element is coupled to the support members located on the side adjacent the construction site.
  • the support members are adjustable in height such that the support members can support the modular structural element at a level horizontal height even when the walkway surface or other ground surface is not level.
  • the support members include a male coupling element adapted to cooperate with an existing female coupling element located on the base surface of the shipping container.
  • the male coupling element engages the female coupling element of the shipping container by placing the male coupling member in the corresponding female coupling member and rotating the male coupling member which thereby engages within a flange located within the female coupling member.
  • the structure further includes one or more brace members that are coupled at one end to the base of the modular structural element and coupled at the other end part way down the one or more support members.
  • more than one overhead protective structure is joined together in a modular fashion whereby the modular structural members include open end portions that form a continuous corridor suspended above the walkway.
  • at least one overhead protective structure that includes a modular structural member including one open end portion and one closed end portion thereby closing the continuous corridor at one end.
  • the modular structural member includes amenities within its side wall portions.
  • the amenities are located in the modular structural member before the structural member forms part of the overhead protective structure.
  • the overhead protective structure further includes a suspended and/or cantilevered walkway located at substantially the same level as the base surface of the modular structural member, the suspended walkway extending on either the construction site side, and/or the walkway side of the modular structural member and running in the same direction as the walkway.
  • the present invention provides a method of erecting an overhead protective structure for providing protection to pedestrians located on a walkway adjacent the construction site, the method including the following steps: suspending a modular structural member including a base surface, side wall portions and a roof element above the walkway; securing the modular structural member onto a plurality of support members that maintain the modular structural member suspended above the walkway; and, securing a fence element to the support members along the side of the walkway adjacent the construction site.
  • Figure 1 is a part side elevation of an embodiment of the present invention
  • Figure 2 is an end view of an embodiment of the present invention
  • Figure 3 is a cross section of an embodiment of the present invention
  • Figure 4 is a close up cross sectional view of the bottom corner of one element of an embodiment of the present invention.
  • Figure 5 is a plan view of the site fence element fixed to an embodiment of the present invention
  • Figure 6 is a plan view of the site fence element fixed to an embodiment of the present invention.
  • Figure 7 an alternate method of fixing the cantilever walkway to an embodiment of the present invention.
  • the overhead protective structure of the present invention makes use of existing shipping containers and their significant structural properties to provide the basis of the overhead protective structure.
  • the shipping containers have a known structural integrity, it is possible to pre install any amenities within the containers prior to the overhead structure being delivered to a prospective building site and thereby avoid the need for a site inspection by structural engineers necessary when constructing typical overhead structures. This factor significantly reduces the amount of time required before work can effectively start on a construction site.
  • the support members includes a male coupling component in the form of an egg shaped head on top of the support.
  • This egg shaped head is a corresponding shape to a locking component typically used on trucks conveying shipping containers for cargo purposes, and therefore provides use of the pre-existing corresponding female coupling component on the shipping container within the assembly of the overhead protective structure.
  • the shaft usually swivels in a mounting at four corner of a truck. When the container is lowered, the male components are turned like a key 90 degrees to lock into the female housing at each corner of container. The male components are often connected together with a tight cable all round so the locking is done all round while standing at one point.
  • the male coupling component of the support member is welded on to the top of the support member. Therefore in order to lock the support member in coupling arrangement with the female component located on the shipping container, the male component is inserted therein and rotated 90 degrees into locking configuration.
  • the structure of the modular structural member can be fully fitted-out with worker amenities prior to delivery on site to be erected as part of the overhead protective structure.
  • the amenities may include toilets, showers, first aid room, site office, worker lunchroom, meeting room, etc.
  • Some elements may be open decks and not be enclosed so that construction materials can be loaded and stored on an open deck above the overhead protective structure protecting.
  • Figure 1 is a part side-elevation of the temporary overhead protective structure in accordance with one embodiment of the present invention.
  • Item 1 included in the figures is a pavement, footpath, walkway or similar firm ground support for the structure.
  • the footpath or walkway is adjoining a demolition, construction or building maintenance site (not shown).
  • Item 2 referred to in the figures is a modular structural unit which in this embodiment is a shipping container.
  • some of the shipping containers do not include end walls such that the containers joined end on end form a continuous corridor.
  • Item 3 is a support member in the form of an extendible post that may be twist-locked into standard locking points of said item 2.
  • Item 3 may be bolt fixed to item 6 when delivered to site.
  • Item 3 and usually item 5 are ideally equally spaced on the site side and may be clustered kerb side to provide more open appearance.
  • the adjustable nature of the support members provides that the overhead protective structure may still be erected and provide a level overhead structure even if the walkway or footpath is uneven. Where the footpath or walkway, item 1, is sloping such as on an incline or hill, it may be necessary to step adjoining shipping containers, item 2, as depicted in Figure 1, thus providing a step within the continuous corridor between two adjacent shipping containers, item 2.
  • the height of the support members, item 3 or 5 is sufficient such that the shipping containers are elevated to a height above the walkway or footpath, item 1, such that pedestrians can comfortably walk underneath the shipping containers, item 2.
  • the height of the support members is at least 2.0 meters and preferably at least 2.4 meters.
  • Item 4 is a connection item that usually facilitates the twist-lock motion of item 3 to lock on to item 2.
  • this fixing method is an adaptation of a standard shipping container locking-device.
  • Item 5 is a further support member in the form of an extra extendible post that is usually provided with an angle cleat that is fixed on site to the bottom edge of the shipping container, item 2. These are often used so the structure can be designed to allow for any one post to be removed and the structure still remains stable under reduced design loads.
  • Item 6 is a brace member in the form of a commonly known knee brace structure and may be attached to increase lateral load capacity of the overhead protection structure by bolt fixing to the underside floor of the shipping container, item 2.
  • Item 6 is knee-bracing that is usually in the form of a steel angle that is delivered to site bolt fixed to item 3 and may be item 5, then bolted to item 2.
  • Item 7 is a coupler usually in the form of a profiled steel strap, a backing plate and bolts for clamping adjoining posts together, locking the system together even if the decks of the adjoining shipping containers, item 2, are stepped as shown in figure 1.
  • the coupler, item 7 provides additional rigidity to the overall structure.
  • Item 8 is a counterweight, sometimes used to stabilize the structure from overturning under wind and other forces that may act on the overhead protection structure.
  • FIG. 2 there is shown an end view of said system showing knee- bracing between the support members, item 3, and the underside of the shipping container item 2 in an orthogonal direction.
  • FIG. 9 there is shown a cross section through the middle of the shipping container item 2 and between support members 3 showing an attached cantilevered walkway.
  • Item 9 is a set of beams that support the walkway which in this embodiment are attached to the underside of item 2.
  • Item 10 is a handrail that is site attached to item 9.
  • FIG 4 there is shown a close up cross sectional view of the bottom corner of said shipping container, item 2, at completion of erection (not including view of cantilevered walkway).
  • the components of the fence element, item 15 and item 16, in the form of a site fence are shown below the corner of item 2.
  • FIG. 5 there is shown a plan view of the site fence preferred fixing method to said item 3 and item 5 prior to locking thereon.
  • Figure 6 is a plan view of the site fence preferred fixing method to item 3 and item 5 after locking on, usually by tightening a bolt.
  • Item 1 1 shown in these figures is an angle on each side of post, item 3 or 5, each with a welded end cleat for a bolted connection to item 13.
  • Item 11 may be a short length at each item 14 fixing-point or an angle may extend down to ground to provide added support for fence during site installation.
  • Item 12 is a bolt that allows rotation of fence girt fixing mechanism and clamps the site fence to items 3 and 5 when tightened.
  • Item 13 is a double angle that is single bolted to said end cleats.
  • the single bolt allows item 13 to rotate to align with item 14 so item 14 does not need to be level or perpendicular to items 3 and 5.
  • Item 14 is usually a z-purlin, also known as a girt, that may be overlapped for site adjustment of length. Self-tapping screws may be used to fix sections together at splice.
  • Item 15 is a panel that is usually structural plywood and is usually fixed to item 14 using self tapping screws.
  • Item 16 is similar to item 15, except on opposite side of item 3 and item 5, near top of same.
  • Item 17 is a pressed metal sheet, profiled to close off gap between items 15 and 16, sloped to avoid rubbish accumulation and screw fixed to above said items.
  • Item 18 is a handrail located on the roof of the shipping container, item 2, which may be used to confine falling objects and to be a safety barrier for workers.
  • FIG. 7 there is depicted an alternate method of fixing the cantilever walkway to the safety structure, referred to as a "strutted deck" wherein item 19 is a knee-brace that supports the walkway and exerts lateral forces on to item 3 and item 5 which are usually equally spaced adjoining the site.
  • Item 20 is a tie member usually locked into the shipping container locking device at item 3 and a similar manufactured connection at midspan of item 2.
  • a method of erecting the overhead protective structure is described as follows:
  • the cantilever walkway beams with or without the decking may be attached prior to lifting each container into position.
  • the container When the container is lifted into position, it is held in suspension until all posts supporting the unit are twist-locked or cleat-bolted into position. This is followed by post knee-bracing being fixed and the posts extended to reach ground level.
  • post knee-bracing being fixed and the posts extended to reach ground level.
  • One of the elements of the system is the use of shipping containers which are widespread, robust and can be rapidly fixed into position.
  • the shipping containers can be fitted-out with amenities, critical for workers and at the same time provide protection to the public on the footpath below.
  • the present invention saves on the amount of specialised component parts and fabrication required for an overhead protective structure for public on the footpath.
  • a separate deck is now not normally required in locations where amenities are provided.
  • the posts and knee-bracing or a portal frame
  • fabrication as well as the optional cantilevered walkway, the optional site fence and other component parts to make the system more versatile.
  • the amenities are housed within the modular structural units with known structural integrity. This allows the connection of services to occur at almost same time as the structural assembly of the overhead protective structure. Accordingly, the present invention should reduce the number of truck deliveries and / or delivery times compared to existing methods to complete the safety structure and install amenities. Therefore this should lead to faster completion of the required protective structure, delivering 'days earlier' occupation and use of site office, first aid room and amenities by workers.
  • advertising banners may be easily fixed to the side of the 2.4m high shipping container sides.
  • the more robust corrugated facade finish of the container sides can be clad with structural plywood or steel plate to provide a more aesthetic finish to the overhead protective structure.
  • the shipping containers and associated robust elements of the present invention are able to provide improved overhead protection to workers in the elevated amenities located within the modular structural elements of the present invention.
  • the system has independently adjustable support members in the form of posts for uneven ground and can be stepped for sites adjoining steep road gradients.
  • modified elements can provide open decks for storage of construction materials, or made with reduced deck-width to accommodate trees, light poles, etc.
  • a set of handrails can relatively easily be fitted to roof of container to confine falling objects bouncing off roof of amenities, not usually currently provided.
  • the modular structural elements in the form of shipping containers that are now supported on posts eliminate problems created by merely stacking shipping containers placed directly on the ground because: there is less number of truck deliveries required; this eliminates the problems of required ramps; this eliminates the problems of levelling the containers when on the usual sloping footpaths, often sloping in two directions; this eliminates the problem of blocked access lids to utility services.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

La structure de l'invention permet d'assurer la protection des piétons se trouvant sur une allée piétonne adjacente à un chantier de construction. Ladite structure de protection supérieure comprend : un élément structurel modulaire comprenant une surface de base, des parties formant parois latérales et un élément de toiture. Ladite structure comprend aussi une pluralité d'éléments de support qui supportent l'élément structurel modulaire au-dessus de l'allée piétonne à une hauteur qui permet aux piétons de passer sous l'élément structurel modulaire, et un élément de clôture disposé le long du côté de l'allée piétonne adjacente au chantier de construction.
PCT/AU2008/001857 2007-12-17 2008-12-17 Structure de protection supérieure WO2009076716A1 (fr)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
AU2007906924A AU2007906924A0 (en) 2007-12-17 Temporary protective structure
AU2007906924 2007-12-17
AU2008904043 2008-08-07
AU2008904043A AU2008904043A0 (en) 2008-08-07 Temporary protective structure
AU2008207557A AU2008207557A1 (en) 2007-12-17 2008-08-26 Temporary Protective Structure
AU2008207557 2008-08-26

Related Child Applications (1)

Application Number Title Priority Date Filing Date
AU2010203042A Division AU2010203042A1 (en) 2007-12-17 2010-07-16 Overhead protective structure

Publications (1)

Publication Number Publication Date
WO2009076716A1 true WO2009076716A1 (fr) 2009-06-25

Family

ID=40795116

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2008/001857 WO2009076716A1 (fr) 2007-12-17 2008-12-17 Structure de protection supérieure

Country Status (1)

Country Link
WO (1) WO2009076716A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545000A (zh) * 2015-12-31 2016-05-04 中建三局装饰有限公司 用于室内装饰装修改造工程的可移动升降式封闭通道围挡
WO2017124153A1 (fr) * 2016-01-22 2017-07-27 4 Ken Pty Ltd Ensemble d'entreposage
AU2016102095B4 (en) * 2015-12-08 2018-05-10 United Rentals Australia Pty Ltd Modular gantry structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416482A1 (de) * 1984-05-04 1985-11-07 Mader & Conrads oHG, 5190 Stolberg Zerlegbarer ueberdachter gehsteig
US4858726A (en) * 1984-09-20 1989-08-22 Preston John C Scaffolding module and method erecting same
AU645345B2 (en) * 1990-08-15 1994-01-13 John Clement Preston Hoardings for a construction site

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416482A1 (de) * 1984-05-04 1985-11-07 Mader & Conrads oHG, 5190 Stolberg Zerlegbarer ueberdachter gehsteig
US4858726A (en) * 1984-09-20 1989-08-22 Preston John C Scaffolding module and method erecting same
AU645345B2 (en) * 1990-08-15 1994-01-13 John Clement Preston Hoardings for a construction site

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2016102095B4 (en) * 2015-12-08 2018-05-10 United Rentals Australia Pty Ltd Modular gantry structure
CN105545000A (zh) * 2015-12-31 2016-05-04 中建三局装饰有限公司 用于室内装饰装修改造工程的可移动升降式封闭通道围挡
WO2017124153A1 (fr) * 2016-01-22 2017-07-27 4 Ken Pty Ltd Ensemble d'entreposage

Similar Documents

Publication Publication Date Title
US20210180341A1 (en) Scaffolding
US3832811A (en) Relocatable building module
US5950373A (en) Transportable structure kit
US5638917A (en) Scaffold bracket for roof structure installation
US20100293875A1 (en) Stairway for Use on Building Sites
US10309092B2 (en) High-rise architectural structure and maintenance method therefor
US5388663A (en) Portable walkway systems
US20210324642A1 (en) Method of erecting a multi-storey structure and facade
US7836656B2 (en) Tower module, system and method
US3927518A (en) Site assembled multi-story stair
WO2009076716A1 (fr) Structure de protection supérieure
US5924264A (en) Concrete footing and foundation wall system for accurate on-site fittings to manufactured buildings
AU2008207557A1 (en) Temporary Protective Structure
NL2030839B1 (nl) Bouwsysteem met houten prefab modulen.
AU2010203042A1 (en) Overhead protective structure
NZ580120A (en) A hoarding constructed from a shipping container
GB2273310A (en) Improvements relating to buildings
AU2006202497B2 (en) A Scaffolding Assembly
AU2013207597B2 (en) A modular temporary car park assembly
NL1043999B1 (en) Aluminium frame building, build element and method therefor
AU2003204102B2 (en) Temporary Flooring Support and System
WO2012108779A1 (fr) Bâtiment et procédé de construction d'un bâtiment
NL1043997B1 (en) Aluminium frame building, build element and method therefor
CN213171372U (zh) 一种轻型拼装式垂直运输装置
NL1044001B1 (en) Aluminium frame building, build element and method therefor

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08861718

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08861718

Country of ref document: EP

Kind code of ref document: A1