WO2009045088A1 - Controlled permeability formwork liner on concrete - Google Patents

Controlled permeability formwork liner on concrete Download PDF

Info

Publication number
WO2009045088A1
WO2009045088A1 PCT/MY2008/000042 MY2008000042W WO2009045088A1 WO 2009045088 A1 WO2009045088 A1 WO 2009045088A1 MY 2008000042 W MY2008000042 W MY 2008000042W WO 2009045088 A1 WO2009045088 A1 WO 2009045088A1
Authority
WO
WIPO (PCT)
Prior art keywords
concrete
liner
cpf
need
formwork
Prior art date
Application number
PCT/MY2008/000042
Other languages
French (fr)
Inventor
Boon Ming Lee
Original Assignee
Boon Ming Lee
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Boon Ming Lee filed Critical Boon Ming Lee
Publication of WO2009045088A1 publication Critical patent/WO2009045088A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/10Forming or shuttering elements for general use with additional peculiarities such as surface shaping, insulating or heating, permeability to water or air
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/36Linings or coatings, e.g. removable, absorbent linings, permanent anti-stick coatings; Linings becoming a non-permanent layer of the moulded article
    • B28B7/368Absorbent linings

Definitions

  • FIG. 1 CPF Liner is available in rolls of width size ranging from 1.5 meter to beyond 3 meters. Always ensure the correct size used to match the intended form to avoid wastage.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A CPF liner is available in the form or sheet which comprises of 2 layers of 100% Polypropylene. When properly placed on the surface of formworks (either wood, steel or plastic) it can improve the quality of concrete, cast in such formworks. Especially the concrete cover of up to 25mm depth, being the 'fore-most' line of defense, has the distinction of best quality concrete, (irrespective of the mix design or type of cement used). The overall increase in cement content in this outer zone promotes optimum concrete properties such as all round strengths and impermeability, hence the long term durability, even in marine and other aggressive environments. Easy disposable or incinerated are some advantages provided by this material. The use of this CPF liner eliminates the need for release agents (oil or chemical form). Surface fair face concrete finish of near perfect quality is also produced, avoiding the need for added surface coatings or plastering, saving a lot of unnecessary workmanship.

Description

CONTROLLED PERMEABILITY FORMWORK LINER ON CONCRETE
Technical Field This invention relates to formwork lining material for improving quality of concrete through normal casting.
Background
Historically, the ancient people of Japan used bamboo mat as CPF, but the result was far from satisfactory. This modern invention relates to the use of PET (Polyethyleneterephthalate) or PP (Polypropylene) as raw materials for CPF, so as to maintain its microscopic pore size of less than 0.03mm.
Despite the many advancements in concrete technology, serious problems continue to plague the performance of so-called "good quality concrete" finished structure incorporating the use of conventional and traditional formwork i.e. timber, steel, plastic, etc. resulting in a greatly weakened and poor concrete finishes, gravely shortening the design life of the structure itself.
Through researches and experiments, the introduction of a controlled permeability liner during the process of placing and compaction of concrete, significantly improved the overall surface finishes, water tightness, long-term durability and life span of the structure.
Disclosure of Invention:
This innovation is utilizing a controlled flow and filtering technology vide a durable synthetic non-woven fabric, designed to promote all round quality control process of placing, compaction and workmanship during concrete casting. Also to produce the ultimate protective finished concrete cover of a completed structure, where the use of conventional and traditional formwork is unworkable.
This CPF liner is a non-woven fabric, synthetic liner installed in the formwork face to function as a filter media to retain cement particles and allowing the release of entrapped air without the detrimental build up of w/c ratio in the concrete surface zone. All other normal concreting practices are maintained, but no release agents shall be used.
In the process of concrete placing and compaction, the hydrostatic head forces any excess water and air through the controlled pore structure whilst cement fines are prevented from escaping. The liner fabric provides a drainage passage for clear water and air to be stored and subsequently drained.
The water retention capacity in the liner fabric (0.35L/m2) contributes significantly to the curing regime of the cast concrete surface - Fig. 2.
Description of Drawings and Best Mode for Carrying Out the Invention
In order that the invention may be more readily understood and put into practical effect, a preferred example of the invention will now be described with reference to the accompanying drawings, in which :
FIG. 1 illustrates a preferred example of a 5 step procedure on how CPF should be fixed onto a timber formwork.
FIG. 2 illustrates a standard concreting arrangement and how CPF works. (l)The timber formwork has already been lined tightly by (2) CPF and is ready in receiving (4) concrete to cast, where by set of rebars are installed in place earlier. By using (5) vibrator sufficiently, its vibrations will automatically pressurize the wet concrete against the static CPF, which in turn absorbs any exercise amount of (6) water and drain it down, while any excessive (7) air from the concrete mixture will be released up.
In this way, CPF controls and improves the quality of case concrete.
Attachment 1
Technical Data Sheet
Figure imgf000005_0001
FIG. 1 CPF Liner is available in rolls of width size ranging from 1.5 meter to beyond 3 meters. Always ensure the correct size used to match the intended form to avoid wastage.
Steps 1 It is important to note that CPF-liner is to be installed fully tensioned in all directions to prevent any unwanted waves on the concrete surface finish. CPF-liner shall be installed in the dry and warmth, lengthwise vertically against plywood form. Staple free end to edge of form (preferably away from concrete contact face) allowing at least 50mm all round perimeter overhand and a minimum 200mm at the roll cut end for tensioning purpose.
Step 2 Install Tensioning Clamp and begin tensioning process until no visual slacks is noticeable, then staple down the tensioned zone only.
Step 3&4 In the cross section edges, install tensioner clamps to both sides, pull one free end down and staple down. On the opposing end apply tension till no visual crease is noticeable, then staple down and staple finish the rest. Form the Tie Rod holes when the CPF-liner is fully tensioned and stapled down by using a sharp knife and stapler.
Step 5 Excess CPF-liner overhanging maybe tucked down the form edge and stapled or trimmed off.
Important a) Use a stainless steel knife/blade or Heavy Duty scissor for cutting CPF-liner to avoid feather edges. b) Use only industrial type stapler with staple size minimum 6mm or maximum 8mm. c) Tension clamps and vices shall be as recommended by the Manufacturer/Supplier. d) For Joints, simply overlap (100mm) and staple down or butt. e) For extended lengths or extended width applications consult Manufacturer/Supplier. f) For curved forms or non-plywood faced forms consult Manufacturer/Supplier for guidance.

Claims

CLAIMS:
1. A CPF (Controlled Permeability Formwork) liner comprising of 2 layers of porous materials with good permeability (See Attachment 1), characterized in that no part of the liner is included in or on the formwork.
2. The formwork liner of claim 1, characterized in that absorbs (6) excessive water during the concreting and drains it down.
3. The claim 1 also, characterized in that the liner absorbs and releases up (7) excessive air out from the (4) concrete.
4. The followings are extra claims that CPF Liner usage yield other important results:
• Uniformly fair face finish concrete surface in homogeneous deep coloration.
• Concrete surface with near zero blowholes and blemishes. • All round high surface strengths resistant to abrasion & dusting as a result of lowered w/c ratio and increase in cement content.
• Well cured surface finish of high alkalinity that is hostile to microorganism / fungus growth. • Homogenous increase in cement content up to 100kg / m3 in the 25mm hardened casing.
• For watertight concrete construction, eliminating the need of so called "membrane" or "integral" waterproofing systems.
• No need to use form release agents. • Provides ideal surfaces for coatings minus the need of additional preparatory works. Extended service life of the R.C. structure thereby reduces cost of maintenance.
PCT/MY2008/000042 2007-10-04 2008-05-14 Controlled permeability formwork liner on concrete WO2009045088A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
MYPI20071709 2007-10-04
MYPI20071709 2007-10-04

Publications (1)

Publication Number Publication Date
WO2009045088A1 true WO2009045088A1 (en) 2009-04-09

Family

ID=39689205

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/MY2008/000042 WO2009045088A1 (en) 2007-10-04 2008-05-14 Controlled permeability formwork liner on concrete

Country Status (1)

Country Link
WO (1) WO2009045088A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720349A (en) * 2011-03-29 2012-10-10 中国二十冶集团有限公司 Disposable template and formwork method for backfill foundation rapid formwork
JP2017186765A (en) * 2016-04-04 2017-10-12 株式会社Nsp Ks Sheet installation device
JP2018059349A (en) * 2016-10-06 2018-04-12 鹿島建設株式会社 Manufacturing method of concrete structure
CN108640607A (en) * 2018-06-01 2018-10-12 中国十七冶集团有限公司 A kind of high-durability clear-water concrete and its construction method
JP2018178524A (en) * 2017-04-12 2018-11-15 鹿島建設株式会社 Method of selecting fixing tape and method of fabricating concrete structure
CN110158944A (en) * 2019-06-05 2019-08-23 桂林理工大学 Clear-water concrete shear wall formwork and to draw component production method
JP2020066849A (en) * 2018-10-22 2020-04-30 鹿島建設株式会社 Method for manufacturing concrete structure
CN111763060A (en) * 2020-06-09 2020-10-13 中南大学 Concrete protective layer reinforcing material, composite template cloth and application of concrete protective layer reinforcement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998013179A1 (en) * 1996-09-27 1998-04-02 E.I. Du Pont De Nemours And Company Concrete form liner
DE19834983C1 (en) * 1998-08-03 1999-09-16 Fibertex As Concrete shuttering member with a bonded-on air and water absorbing fleece layer and manufacturing process for the shuttering member
WO2000054948A1 (en) * 1999-03-12 2000-09-21 Polyfelt Gesellschaft M.B.H. Concrete formwork
WO2000056509A1 (en) * 1999-03-24 2000-09-28 Kb-Produkter I Nybro Ab Protective fabric for casting concrete in a form

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998013179A1 (en) * 1996-09-27 1998-04-02 E.I. Du Pont De Nemours And Company Concrete form liner
DE19834983C1 (en) * 1998-08-03 1999-09-16 Fibertex As Concrete shuttering member with a bonded-on air and water absorbing fleece layer and manufacturing process for the shuttering member
WO2000054948A1 (en) * 1999-03-12 2000-09-21 Polyfelt Gesellschaft M.B.H. Concrete formwork
WO2000056509A1 (en) * 1999-03-24 2000-09-28 Kb-Produkter I Nybro Ab Protective fabric for casting concrete in a form

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
WILSON D: "CONTROLLED PERMEABILITY FORMWORK (CPF)", CONCRETE, CONCRETE SOCIETY, CAMBERLEY, GB, vol. 28, no. 2, 1 March 1994 (1994-03-01), pages 20 - 22, XP000439315, ISSN: 0010-5317 *
WILSON D: "DURABILITY PROBLEMS: IS FORMWORK THE CAUSE?", CONCRETE ENGINEERING INTERNATIONAL, CONCRETE SOCIETY, CAMBERLEY, GB, vol. 5, no. 2, 1 June 2001 (2001-06-01), pages 35 - 38, XP001104700, ISSN: 1742-352X *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720349A (en) * 2011-03-29 2012-10-10 中国二十冶集团有限公司 Disposable template and formwork method for backfill foundation rapid formwork
JP2017186765A (en) * 2016-04-04 2017-10-12 株式会社Nsp Ks Sheet installation device
JP2018059349A (en) * 2016-10-06 2018-04-12 鹿島建設株式会社 Manufacturing method of concrete structure
JP2018178524A (en) * 2017-04-12 2018-11-15 鹿島建設株式会社 Method of selecting fixing tape and method of fabricating concrete structure
CN108640607A (en) * 2018-06-01 2018-10-12 中国十七冶集团有限公司 A kind of high-durability clear-water concrete and its construction method
JP2020066849A (en) * 2018-10-22 2020-04-30 鹿島建設株式会社 Method for manufacturing concrete structure
JP7122218B2 (en) 2018-10-22 2022-08-19 鹿島建設株式会社 Manufacturing method of concrete structure
CN110158944A (en) * 2019-06-05 2019-08-23 桂林理工大学 Clear-water concrete shear wall formwork and to draw component production method
CN111763060A (en) * 2020-06-09 2020-10-13 中南大学 Concrete protective layer reinforcing material, composite template cloth and application of concrete protective layer reinforcement
CN111763060B (en) * 2020-06-09 2021-09-28 中南大学 Concrete protective layer reinforcing material, composite template cloth and application of concrete protective layer reinforcement

Similar Documents

Publication Publication Date Title
WO2009045088A1 (en) Controlled permeability formwork liner on concrete
US9649662B2 (en) Seamless reinforced concrete structural insulated panel
JP2022538796A (en) Reinforced Structural Insulation Panels with Corner Blocks
CA2145393C (en) Laminated fabric useful as a concrete form liner
CN204781524U (en) Sulphur oxygen magnesium steel bar truss board
CN109291240A (en) A kind of coarse aggregate Reactive Powder Concrete prefabricated bridge preparation process
US8297026B1 (en) Construction system and method having integrated plank and framing members
CN213359405U (en) Special split screw rod of heat preservation integration
CN108798058A (en) A kind of reinforcement of building technique
JP3165956U (en) Water-permeable formwork and panel for water-permeable formwork
JP5301200B2 (en) Three-dimensional mesh knitted composite covering plate
CN209099683U (en) A kind of heat-preserving wall
JP7300664B2 (en) Concrete curing method
CN111779272A (en) Special split screw rod of heat preservation integration
JP6426784B2 (en) Concrete formwork panel
TWI266821B (en) Bearing wall and a steel house utilizing the bearing wall
CN115745450B (en) Method for enhancing adhesion and interfacial water stability of solid waste of building and application thereof
CN111763060B (en) Concrete protective layer reinforcing material, composite template cloth and application of concrete protective layer reinforcement
JPH09221910A (en) Concrete form
WO1989009864A1 (en) A formwork panel
JP2514897B2 (en) Superabsorbent driving formwork
JP3758734B2 (en) Construction board for curved surface formation, curved surface structure, ground frame structure for curved surface, and construction method of curved surface structure
INSULATION SECTION 03 52 00 LIGHTWEIGHT CONCRETE ROOF INSULATION
CN102605895A (en) Ceiling board heat insulation mortar prefabricated block and installation and construction method of ceiling board heat insulation mortar prefabricated block
JPH0692692B2 (en) Cushion lining sheet for concrete formwork and weir and concrete formwork

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08753730

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08753730

Country of ref document: EP

Kind code of ref document: A1