WO2008069117A1 - セルラシステム、通信路品質測定方法、基地局および移動局 - Google Patents

セルラシステム、通信路品質測定方法、基地局および移動局 Download PDF

Info

Publication number
WO2008069117A1
WO2008069117A1 PCT/JP2007/073145 JP2007073145W WO2008069117A1 WO 2008069117 A1 WO2008069117 A1 WO 2008069117A1 JP 2007073145 W JP2007073145 W JP 2007073145W WO 2008069117 A1 WO2008069117 A1 WO 2008069117A1
Authority
WO
WIPO (PCT)
Prior art keywords
pilot signal
transmitting
mobile station
power
data transmission
Prior art date
Application number
PCT/JP2007/073145
Other languages
English (en)
French (fr)
Inventor
Nahoko Kuroda
Takahiro Nobukiyo
Original Assignee
Nec Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nec Corporation filed Critical Nec Corporation
Priority to US12/443,604 priority Critical patent/US8259603B2/en
Priority to EP07832842.4A priority patent/EP2096878A4/en
Priority to JP2008548254A priority patent/JP5126543B2/ja
Publication of WO2008069117A1 publication Critical patent/WO2008069117A1/ja

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/20Arrangements for detecting or preventing errors in the information received using signal quality detector
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/30Monitoring; Testing of propagation channels
    • H04B17/309Measuring or estimating channel quality parameters
    • H04B17/318Received signal strength
    • H04B17/327Received signal code power [RSCP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/30Monitoring; Testing of propagation channels
    • H04B17/309Measuring or estimating channel quality parameters
    • H04B17/345Interference values
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0002Systems modifying transmission characteristics according to link quality, e.g. power backoff by adapting the transmission rate
    • H04L1/0003Systems modifying transmission characteristics according to link quality, e.g. power backoff by adapting the transmission rate by switching between different modulation schemes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L25/00Baseband systems
    • H04L25/02Details ; arrangements for supplying electrical power along data transmission lines
    • H04L25/0202Channel estimation
    • H04L25/0224Channel estimation using sounding signals
    • H04L25/0226Channel estimation using sounding signals sounding signals per se
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L27/00Modulated-carrier systems
    • H04L27/0008Modulated-carrier systems arrangements for allowing a transmitter or receiver to use more than one type of modulation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L27/00Modulated-carrier systems
    • H04L27/0012Modulated-carrier systems arrangements for identifying the type of modulation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L25/00Baseband systems
    • H04L25/02Details ; arrangements for supplying electrical power along data transmission lines
    • H04L25/0202Channel estimation
    • H04L25/0224Channel estimation using sounding signals
    • H04L25/0228Channel estimation using sounding signals with direct estimation from sounding signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0048Allocation of pilot signals, i.e. of signals known to the receiver
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/08Access point devices
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/50Reducing energy consumption in communication networks in wire-line communication networks, e.g. low power modes or reduced link rate

Definitions

  • the present invention relates to a communication system, a communication method therefor, and a mobile station and a base station used therefor, and in particular, in uplink packet communication using a shared channel in a mobile communication system, measures channel quality of a plurality of different uplinks. This is related to the improvement of the channel quality measurement method.
  • the no-lot signal is also used for channel quality measurement for use in scheduling and adaptive modulation even when data is not transmitted. Therefore, as shown in the simplified diagram in FIG.
  • Neurolot Finored is studying multiplexing pilot signals from multiple mobile stations so that mobile stations that do not transmit data in that frame can also transmit pilot signals. Then, the mobile station transmits a pilot signal regardless of the presence / absence of data transmission in a predetermined cycle and radio resource specified in advance. As a result, the base station can measure the channel quality (SIR: Signal to Interference Ratio) with the mobile station that is not transmitting data. The base station uses such channel quality information to calculate scheduling indices and to determine MCS (Modulation and Coding Set) in adaptive modulation.
  • SIR Signal to Interference Ratio
  • the base station receives the pilot signal transmitted by the mobile station of its own cell and the pilot signal transmitted by the mobile station of the other cell at almost the same timing. It will be. Therefore, the pilot signal power transmitted by the mobile station connected to the adjacent cell is measured as interference in the SIR measured with the no-lot signal (see Fig. 2).
  • the pilot signal is transmitted at a predetermined cycle independently of the presence / absence of data transmission, other cell interference components of the SIR measured in the pilot field and the data field (hereinafter referred to as the data field) This is not the same as the other cell interference component received in the data field. In other words, the correlation between the SIR measured in the pilot field and the SIR in the data field is small.
  • Non-Patent Document 1 TR25.814 v7.0.0, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Physical Layer Aspects for Evolved UTRA (Release 7)
  • the present invention has been invented in view of the above problems, and an object thereof is to provide a technique for improving the SIR estimation accuracy of the data field and improving the performance of scheduling and adaptive modulation. is there.
  • the present invention for solving the above-mentioned problems is a cellular system comprising: a mobile station comprising means for transmitting a pilot signal linked to data transmission; and means for transmitting a pilot signal not linked to data transmission; Means for measuring interference power based on received power of a pilot signal field linked to the signal, means for measuring desired signal power based on received power of a pilot signal field not linked to data transmission, and the interference
  • a base station comprising: means for estimating channel quality of the mobile station based on power and the desired signal power.
  • the present invention for solving the above problems is a unit for transmitting data in a cellular system.
  • the mobile station comprising: means for transmitting a first pilot signal at a transmission time; and means for transmitting a second pilot signal different from the first pilot signal independently of the presence or absence of data transmission; Means for measuring interference power based on the received power in the signal field for transmitting the first pilot signal; means for measuring desired signal power based on the received power in the signal field for transmitting the second pilot signal; And a base station comprising: means for estimating channel quality of the mobile station based on the interference power and the desired signal power.
  • the present invention for solving the above problems is a method for measuring channel quality in a cellular system comprising a plurality of base stations and a plurality of mobile stations, wherein the mobile station uses a pilot signal linked to data transmission. And transmitting a pilot signal not linked to data transmission, wherein the base station measures interference power based on the received power of the pilot signal field linked to the data transmission.
  • a step of measuring a desired signal power based on a received power of a pilot signal field not linked to the data transmission, and a step of estimating a channel quality of the mobile station based on the interference power and the desired signal power It is characterized by that.
  • the present invention for solving the above problems is a channel quality measurement method in a cellular system comprising a plurality of base stations and a plurality of mobile stations, wherein the mobile station transmits data in a unit transmission time. Transmitting the first pilot signal; and transmitting a second pilot signal different from the first pilot signal independently of whether data is transmitted, wherein the base station is configured to transmit the first pilot signal. Measuring interference power based on received power in a signal field for transmitting a pilot signal; measuring desired signal power based on received power in a signal field for transmitting the second pilot signal; And estimating the channel quality of the mobile station based on the interference power and the desired signal power.
  • the present invention for solving the above problems is a base station in a cellular system having means for transmitting a pilot signal linked to data transmission by a mobile station and means for transmitting a pilot signal not linked to data transmission.
  • the present invention for solving the above-described problems is characterized in that the first pilot signal is transmitted independently of the means for transmitting the first pilot signal in a unit transmission time during which the mobile station transmits data, and whether or not data is transmitted.
  • a base station in a cellular system having means for transmitting different second pilot signals, said means for measuring interference power based on received power in a signal field for transmitting said first pilot signals; Means for measuring the desired signal power based on the received power in the signal field for transmitting the pilot signal, and means for estimating the channel quality of the mobile station based on the interference power and the desired signal power. It is characterized by that.
  • the present invention that solves the above problem is a mobile station in a cellular system, and includes means for transmitting a pilot signal linked to data transmission and means for transmitting a pilot signal not linked to data transmission. It is characterized by that.
  • the present invention for solving the above problems is a mobile station in a cellular system, wherein the means for transmitting a first pilot signal in a unit transmission time for transmitting data is independent of the presence or absence of data transmission. Means for transmitting a second pilot signal different from the first pilot signal.
  • the present invention for solving the above problems is a program for a base station in a cellular system, in which a mobile station has means for transmitting a pilot signal linked to data transmission and means for transmitting a pilot signal not linked to data transmission.
  • a process of estimating the channel quality of the mobile station on the basis of the interference power and the desired signal power.
  • the present invention for solving the above-described problem is characterized in that the first pilot signal is transmitted independently of the means for transmitting the first pilot signal in the unit transmission time during which the mobile station transmits data and the presence or absence of data transmission.
  • a cellular system having means for transmitting different second pilot signals And a process for measuring interference power based on the received power in the signal field for transmitting the first pilot signal and the received power in the signal field for transmitting the second pilot signal.
  • the information processing apparatus of the base station is configured to execute a process of measuring a desired signal power based on the interference power and a process of estimating the channel quality of the mobile station based on the desired signal power.
  • the present invention for solving the above problems is a program for a mobile station in a cellular system, and includes a process for transmitting a pilot signal linked to data transmission, and a process for transmitting a pilot signal not linked to data transmission. Is executed by the information processing device of the mobile station.
  • the present invention for solving the above problems is a program for a mobile station in a cellular system, wherein the process of transmitting a first pilot signal in a unit transmission time for transmitting data is independent of whether or not data is transmitted.
  • the information processing apparatus of a mobile station is made to perform the process which transmits the 2nd pilot signal different from the said 1st pilot signal.
  • SIR measurement can be performed in consideration of the effect of data transmission in neighboring cells. Therefore, the accuracy of scheduling and adaptive modulation performed based on this SIR is improved, and the uplink throughput is increased. P, effects such as reduction of transmission delay.
  • FIG. 1 is a diagram for explaining a pilot signal multiplexing method in the prior art.
  • FIG. 2 is a diagram for explaining a SIR measurement method in the prior art.
  • FIG. 3 is a diagram for explaining a configuration of a cellular system according to the first embodiment of the present invention.
  • FIG. 4 is a diagram for explaining an SIR measurement method according to the first embodiment of the present invention.
  • FIG. 5 is a diagram for explaining the configuration of a mobile station in the first embodiment of the present invention.
  • FIG. 6 is a diagram illustrating the configuration of a base station in the first embodiment of the present invention.
  • FIG. 7 is a diagram for explaining an operation flow of the mobile station in the first embodiment of the present invention.
  • FIG. 8 is a diagram for explaining a pilot multiplexing method according to the first embodiment of the present invention.
  • FIG. 9 is a diagram for explaining the operation flow of the base station in the first embodiment of the present invention.
  • FIG. 10 is a diagram for explaining another example of the pilot multiplexing method in the first embodiment of the present invention.
  • FIG. 11 is a diagram for explaining a pilot multiplexing method according to the second embodiment of the present invention.
  • FIG. 12 is a diagram for explaining another example of the pilot multiplexing method in the second embodiment of the present invention.
  • FIG. 3 is a diagram for explaining a system to which the present invention is applied.
  • a system to which the present invention is applied includes base stations 300 to 303 and mobile stations 310 to 314. It is assumed that the transmission / reception signal is transmitted / received using OFDMA for the uplink and FD MA for the uplink! Base stations 300 to 303 transmit a common pilot signal and an individual control signal, and mobile stations 310 to 314 transmit an individual pilot signal and individual data.
  • the downlink pilot signal is transmitted to all mobile stations in the cell, and the mobile station uses the common pilot signal to estimate the channel and uses it to demodulate the downlink control signal.
  • the downlink control signal includes radio resource allocation information for the mobile station to transmit data on the uplink, and an ACK / NACK signal for notifying whether or not the data transmitted by the mobile station has been correctly received. /!
  • a pilot field that is linked to data transmission and a pilot field that is not linked to data transmission are provided as fields for a force pilot signal that multiplexes and transmits pilot signals and data in a frame.
  • the frame timings of the base stations in the system are synchronized to some extent. Therefore, at the pilot field timing linked to data transmission, a mobile station that transmits data also transmits a pilot in an adjacent cell. Therefore, the received power in the pilot field linked to data transmission includes other cell interference power equivalent to that in the data field, and interference power measurement reflecting the presence / absence of data transmission in the adjacent cell can be performed. Therefore, the base station performs interference power measurement in the pilot field linked to data transmission, and performs measurement of the desired signal power of each mobile station in the pilot field not linked to data transmission, and calculates the SIR of each mobile station. To do. As a result, SIR can be measured taking into account the difference in the amount of interference depending on whether data is transmitted or received in neighboring cells, and more appropriate MCS selection and scheduling can be performed, improving system throughput and user throughput.
  • FIG. 4 shows a configuration diagram of uplink frames and a diagram for explaining reception of interference from other cells.
  • pilot field 1 There are two pilot fields in the frame.
  • pilot field 2 a plurality of mobile stations multiplex and transmit pilot signals using orthogonal radio resources
  • pilot field 2 transmits data in the frame.
  • code multiplexing may be performed by multiplying a different orthogonal code for each mobile station, or for each mobile station.
  • Frequency multiplexing may be performed by shifting the frequency band for transmitting the pilot.
  • the base station or base station control station notifies in advance using a downlink control signal so that different orthogonal codes or frequency bands are allocated to each mobile station in advance. This will be referred to as the “nolot field 1 resource allocation signal” hereinafter.
  • pilot signals of different mobile stations are frequency-multiplexed.
  • the resource allocation signal in the pilot field 1 includes the frequency band in the pilot field in which the mobile station transmits the pilot signal and the transmission timing information.
  • the pilot field assigned to mobile station 1 shows a case where the transmission start frame number is 1, the transmission cycle is 2 frames, and the subcarrier number is 0.
  • a transmission cycle of 2 frames means that transmission timing is given once every 2 frames.
  • the power to multiplex pilots of a plurality of mobile stations in pilot field 1 and transmit pilots of users who are transmitting data to pilot field 2 is not limited to this embodiment.
  • the pilot of the user who is transmitting data in pilot field 1 and the pilot of multiple mobile stations are multiplexed in pilot field 2.
  • the base station calculates the SIR of each mobile station, and selects a scheduling index or an appropriate MCS based on the calculated SIR! /. At this time, in order to calculate SIR, the desired signal power of each mobile station is measured in pilot field 1 and the interference power is measured in pilot field 2.
  • the average received power Pl (t, k) of the pilot signal received in the assigned frequency band is measured at the pilot transmission timing assigned to the target mobile station.
  • t is a subframe number and k is a mobile station number.
  • the interference power is calculated from the average value P2_all (t) of all received power of signals received in pilot field 2 of each frame, and the desired signal power P2_sgn (t of the mobile station transmitting the pilot signal in pilot field 2 ) Is subtracted. That is, SIR (t, k) of mobile station k is
  • the power assumed to calculate the SIR averaged over the entire system band is not limited to the scope of the present invention.
  • the system band may be divided into a plurality of subbands, and the SIR may be calculated for each.
  • the average power of Pl and P2 is the average power of the pilot signal received in the corresponding subband.
  • FIGS. 5 and 6 Next, the configurations of the mobile station and base station used in the present invention are shown in FIGS. 5 and 6, respectively.
  • the mobile station in the present embodiment performs a channel estimation from the separated pilot signal, a reception processing unit 501 that receives a signal of a predetermined frequency band in units of frames, a signal separation unit 502 that separates a pilot signal from the received signal It includes a channel estimation unit 503, a demodulation unit 504 that demodulates the received signal and the channel estimation value, a decoding unit 505, a MAC 506, a pilot signal generation unit 507, and a transmission processing unit 508.
  • MAC 506 accumulates data transmitted from an upper layer in a buffer, and transmits uplink transmission data based on an ACK / NACK signal and radio resource allocation information included in a control signal transmitted from a decoding unit. Control. Specifically, when a resource is allocated based on the radio resource allocation information, a data block having a size that can be transmitted with the allocated radio resource is generated and transmitted to the transmission processing unit 508. Then, after a predetermined time, if the above data block is correctly received at the base station, an ACK signal is received, and if it is not correctly received, a NACK signal is received. Following this, in the case of a NACK signal, the above-mentioned data block is retransmitted.
  • Pilot signal generation section 507 generates a pilot signal at the timing specified in the resource allocation information of piuit field 1 notified by the base station before or during communication, and sends it to transmission processing section 508. Also, the radio resource allocation information notified by the base station during communication Based on the information, a pilot signal to be transmitted in pilot field 2 is generated and transmitted to transmission processing section 508 in a frame for data transmission.
  • the base station in the present embodiment performs a channel estimation from the separated pilot signal, a reception processing unit 601 that receives a signal in a predetermined frequency band in units of frames, a signal separation unit 602 that separates a pilot signal from the received signal Channel estimation unit 603, desired signal power measurement unit 604 that measures desired signal power, interference power measurement unit 605 that measures interference power, and SIR is calculated from the measurement results of desired signal power and interference power, and is notified to the MAC.
  • the signal generation unit 611, the pilot signal generation unit 612, and the transmission processing unit 613 are included.
  • Desired wave power measurement section 604 measures the received power of each of pilot signals of a plurality of mobile stations multiplexed in pilot field 1 or pilot field 2.
  • a memory (not shown) in the desired wave power measurement unit 604, resource allocation information and pilot patterns for each mobile station are recorded, and the pilot transmission timing and subcarrier number of each mobile station are recorded.
  • the pilot power is calculated from the received signal and the pilot pattern by a commonly used method.
  • the calculated pilot power is sent to the SIR calculator.
  • the pilot pattern transmitted in the pilot field 2 is common regardless of the mobile station, and this pilot pattern is also recorded in the memory.
  • Desired wave power measurement section 604 calculates pilot power from a received signal in pilot field 2 and a pilot pattern in pilot field 2 by a generally used method.
  • the calculated pilot power is sent to interference power measuring section 605.
  • Interference power measuring section 605 measures the total received power of pilot field 2 and subtracts the pilot power value of pilot field 2 sent from desired wave power measuring section 604 to obtain the interference power. The calculated interference power is sent to the SIR calculation unit 606.
  • the SIR calculation unit 606 interferes with the desired signal power of each mobile station sent from the desired signal power measurement unit. Record the interference power sent from the power measurement unit 605 in the memory! /, And notify the MAC 610 of the value obtained by dividing the desired signal power of each mobile station by the interference power as the SIR.
  • FIGS. 7 and 8 are diagrams illustrating operation flows of the mobile station and the base station used in the present invention.
  • decoding section 505 of the mobile station Prior to data transmission / reception, decoding section 505 of the mobile station decodes the pilot field 1 resource allocation signal included in the control signal transmitted by the base station, and sends the decoded information to pilot signal generation section 507. (Step 701).
  • decoding section 505 in the mobile station decodes a control signal transmitted from the base station for each frame, and when detecting an uplink radio resource allocation notification,
  • the MAC 506 is notified (step 702).
  • pilot signal generation section 507 If the frame is designated as the pilot signal transmission timing by the pilot field 1 resource assignment signal, pilot signal generation section 507 generates a pilot signal (step 704).
  • pilot signal generation section 507 uses pilot field 2 pilot signals, and MAC 506 uses allocated resources.
  • a data block to be transmitted is generated (step 706).
  • the transmission processing unit 508 performs processing necessary for transmitting the signal generated and transmits the signal (step 708).
  • the mobile station While performing data transmission / reception, the mobile station repeats the operations of steps 702 to 708 for each frame.
  • the definition of “during data transmission / reception” is not limited to the case where data is continuously transmitted for each frame. For example, there are cases where data cannot be transmitted because resources are not allocated due to scheduling results, and there are cases where data generation is temporarily interrupted. In such a case, the operations in steps 702 to 708 should be continued. Good. Therefore, the data transmission / reception on the uplink is terminated and the operations in steps 702 to 708 are performed.
  • the base station may notify the mobile station via the downlink, and the mobile station may continue from 702 to 708 described above until the notification is received.
  • the mobile station periodically monitors the amount of data in a buffer (not shown) in the MAC, and if there is no data for a predetermined time or more, the base station stops data transmission with an uplink control signal.
  • a buffer not shown
  • the base station stops data transmission with an uplink control signal.
  • the above-described operation may be stopped.
  • the present invention can be applied regardless of the definition during data transmission / reception.
  • a control unit (not shown) in the base station allocates pilot field 1 resources to a mobile station that starts data transmission / reception, and transmits a downlink control signal to the corresponding mobile station.
  • a pilot field 1 resource allocation signal is transmitted (step 901).
  • MAC 610 performs scheduling based on the SIR and the like of each mobile station, and allocates uplink radio resources after a predetermined time to the mobile station. Then, a radio resource allocation signal is transmitted as a downlink control signal to the mobile station to which the radio resource is allocated (step 902).
  • Received power measuring section 604 measures the pilot signal received power of each of a plurality of mobile stations multiplexed in pilot field 1.
  • Interference power measuring section 605 calculates interference power I from the pilot signal multiplexed in pilot field 2 (step 904).
  • the interference power is the value obtained by subtracting the desired signal power of the mobile station that transmits pilot signals in pilot field 2 from the total received power in pilot field 2!
  • step 902 the process returns to step 902, and the MAC performs scheduling based on the notified SIR.
  • the base station repeats the above operation for each frame.
  • the power using D-FDMA that distributes the transmission band of one mobile station within a predetermined band is not limited to that.
  • L-FDMA Localized-FDMA
  • Figure 10 shows the pilot transmission method when L-FDMA is used.
  • the base station reduces the interference power at a timing substantially the same as the timing at which the mobile station transmitting data in the adjacent cell transmits the pilot. Can be measured.
  • pilot signals of mobile stations that are not transmitting data are transmitted at different timings, and therefore do not affect interference power measurements in neighboring cells. Therefore, the base station can measure the interference power considering the presence / absence of data transmission in the adjacent cell. Therefore, the SIR calculated based on this interference power has a high correlation with the SIR value in the data field. Therefore, by using this SIR measurement result for scheduling, resource allocation and adaptive modulation can be performed with values closer to the SIR during actual data transmission, and user multiplexing effects and adaptive modulation accuracy are improved. Accordingly, it is possible to improve uplink throughput and reduce transmission delay.
  • the pilot signal linked to the data transmission is distinguished from the pilot signal not linked to the data transmission by time-multiplexing in one frame. Then, these pilots are frequency-multiplexed.
  • a specific subcarrier number for example, subcarrier number 0, is specified in advance to transmit a pilot signal linked to data transmission. . Therefore, the mobile station to which data transmission resources are allocated in the frame transmits a pilot signal with subcarrier number 0.
  • Other mobile stations transmit pilot signals in frames and subcarrier numbers designated in advance by the base station, as in the first embodiment.
  • FIG. 11 shows the case where mobile station 1 is assigned subcarrier number 1 of each frame, and the other mobile stations are shown in the figure. In this figure, data transmission is assigned to mobile station 1 at frame number 3. Therefore, mobile station 1 transmits a pilot with subcarrier number 0 as a pilot signal linked to data transmission, and does not transmit a pilot signal with subcarrier number 1.
  • the interference power and the reception power of the mobile station transmitting data are measured at a subcarrier number defined in advance, that is, subcarrier number 0 in FIG. 11, and transmitted by another subcarrier. Transmit the data with the pilot signal and measure the received power of each of the relay, mobile station and mobile station. Then, the SIR of each mobile station is calculated from the measured interference power and received power.
  • the power using D-FDMA that distributes the transmission band of one mobile station within a predetermined band is not limited to that.
  • L-FDMA Localized-FDMA
  • Figure 12 shows the pilot transmission method when L-FDMA is used.
  • the second embodiment is equivalent to the pilot field 2 in the first embodiment that is frequency-multiplexed with the pilot field 1, and the configuration and operation flow of the mobile station 'base station are the same. I will omit it.
  • the base station has interference power at almost the same timing as the timing at which a mobile station transmitting data in an adjacent cell transmits a pilot. Can be measured.
  • pilot signals of mobile stations that are not transmitting data are transmitted at different timings, and thus do not affect interference power measurements in neighboring cells. Therefore, the base station can measure the interference power considering the presence / absence of data transmission in the adjacent cell. Therefore, the SIR calculated based on this interference power has a high correlation with the SIR value in the data field. Therefore, by using this SIR measurement result for scheduling, resource allocation and adaptive modulation can be performed closer to the actual SIR during data transmission, and the user multiplexing effect and adaptive modulation accuracy are improved. Accordingly, it is possible to improve uplink throughput and reduce transmission delay.
  • the base station can measure the interference power in consideration of the presence / absence of data transmission in an adjacent cell. Therefore, the SIR calculated based on this interference power has a high correlation with the SIR value in the data field. Therefore, this SIR measurement result
  • resource allocation and adaptive modulation can be performed with values closer to the SIR at the time of actual data transmission, and user multiplexing effects and adaptive modulation accuracy are improved. Therefore, the power S can be used to improve the uplink throughput and reduce the transmission delay.
  • each unit can be configured by an information processing apparatus that operates according to a program that is not limited to this.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Power Engineering (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

セルラシステムにおいて、データ送信に連動したパイロット信号を送信する手段と、データ送信に連動しないパイロット信号を送信する手段とを備える移動局と、データ送信に連動したパイロット信号フィールドの受信電力に基づいて干渉電力を測定する手段と、データ送信に連動しないパイロット信号フィールドの受信電力に基づいて希望波電力を測定する手段と、干渉電力と希望波電力とに基づいて移動局のチャネル品質を推定する手段とを備える基地局とを有することを特徴とするセルラシステムである。

Description

明 細 書
セルラシステム、通信路品質測定方法、基地局および移動局
技術分野
[0001] 本発明は通信システム及びその通信方法並びにそれに用いる移動局及び基地局 に関し、特に移動通信システムにおいて共用チャネルを使用する上りパケット通信の 際に、複数の異なる上り回線の通信路品質を測定するための通信路品質測定方法 の改良に関するものである。
背景技術
[0002] 3GPP (3rd Generation Partnership Project)において標準化作業が進められている E-UTRAシステムの上り回線では、非特許文献 1に記載されているように、ノ ィロット 信号とデータもしくは制御信号を単位送信時間であるフレーム内に時間多重すること が検討されている。尚、以下の説明において、 "データもしくは制御信号"を簡単のた め"データ"と記す。
[0003] ノ ィロット信号はデータの復調に必要なチャネル推定等に使用される他、データを 送信していない場合も、スケジューリングや適応変調に用いるためのチャネル品質測 定に使用される。従って、図 1に簡略図を示したように、パイロット信号用のフィールド
(以下、ノイロットフィーノレドと記す。)には、そのフレームでデータを送信しない移動 局もパイロット信号を送信できるよう、複数の移動局のパイロット信号を多重させること が検討されている。そして、移動局は事前に指定された所定の周期と無線リソースに おいて、データ送信有無によらずパイロット信号を送信する。これにより、基地局はデ ータを送信していない移動局との間のチャネル品質(SIR: Signal to Interference Rati o)も測定すること力 Sできる。基地局は、このようなチャネル品質情報をスケジユーリン グ指標の算出に用いたり、適応変調における MCS (Modulation and Coding Set)を決 定したりするために使用する。
[0004] 一方、 EUTRAシステムでは隣接する基地局同士の送信タイミングをゆるやかに同 期させる可能性がある。この場合、基地局は、自セルの移動局が送信するパイロット 信号と、他セルの移動局が送信するパイロット信号とをほぼ同じタイミングで受信する ことになる。従って、ノ ィロット信号で測定した SIRには、隣接セルに接続する移動局 が送信するパイロット信号電力が干渉として測定される(図 2参照)。
[0005] 前述したように、ノ イロット信号は、データ送信の有無とは独立に所定の周期で送 信されるため、パイロットフィールドで測定する SIRの他セル干渉成分と、データ用の フィールド(以下、データフィールドと記す。)で受信する他セル干渉成分とは一致し ない。すなわち、パイロットフィールドで測定した SIRとデータフィールドにおける SIRの 相関は小さくなる。
[0006] 非特許文献 1: TR25.814 v7.0.0, 3rd Generation Partnership Project; Technical Spec ification Group Radio Access Network; Physical Layer Aspects for Evolved UTRA ( Release 7)
発明の開示
発明が解決しょうとする課題
[0007] しかしながら、上述のような状況下でパイロット信号を用いて SIRを測定し、それに基 づいてスケジューリングや適応変調を行うと、送信可能なレートよりも低い伝送レート を選択する場合や、使用できるチャネルを使用しない場合などが生じ、無線リソース を有効活用できなレ、とレ、う問題が生じる。
[0008] そこで、本発明は上記課題に鑑みて発明されたものであって、その目的はデータフ ィールドの SIR推定精度を向上させ、スケジューリングや適応変調の性能を向上させ る技術を提供することにある。
課題を解決するための手段
[0009] 上記課題を解決する本発明は、セルラシステムにおいて、データ送信に連動した パイロット信号を送信する手段と、データ送信に連動しないパイロット信号を送信する 手段とを備える移動局と、前記データ送信に連動したパイロット信号フィールドの受 信電力に基づいて干渉電力を測定する手段と、前記データ送信に連動しないパイ口 ット信号フィールドの受信電力に基づいて希望波電力を測定する手段と、前記干渉 電力と前記希望波電力とに基づいて前記移動局のチャネル品質を推定する手段と を備える基地局とを有することを特徴とする。
[0010] 上記課題を解決する本発明は、セルラシステムにおいて、データを送信する単位 送信時間において第 1のパイロット信号を送信する手段と、データの送信有無とは独 立に前記第 1のパイロット信号と異なる第 2のパイロット信号を送信する手段とを備え る前記移動局と、前記第 1のパイロット信号を送信する信号フィールドにおける受信 電力に基づいて干渉電力を測定する手段と、前記第 2のパイロット信号を送信する信 号フィールドにおける受信電力に基づいて希望波電力を測定する手段と、前記干渉 電力と前記希望波電力とに基づいて前記移動局のチャネル品質を推定する手段と を備える基地局とを有することを特徴とする。
[0011] 上記課題を解決する本発明は、複数の基地局と複数の移動局とからなるセルラシ ステムにおける通信路品質測定方法であって、前記移動局が、データ送信に連動し たパイロット信号を送信するステップと、データ送信に連動しないパイロット信号を送 信するステップとを有し、前記基地局が、前記データ送信に連動したパイロット信号フ ィールドの受信電力に基づいて干渉電力を測定するステップと、前記データ送信に 連動しないパイロット信号フィールドの受信電力に基づいて希望波電力を測定するス テツプと、前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を 推定するステップとを有することを特徴とする。
[0012] 上記課題を解決する本発明は、複数の基地局と複数の移動局とからなるセルラシ ステムにおける通信路品質測定方法であって、前記移動局が、データを送信する単 位送信時間において第 1のパイロット信号を送信するステップと、データの送信有無 とは独立に前記第 1のパイロット信号と異なる第 2のパイロット信号を送信するステップ とを有し、前記基地局が、前記第 1のパイロット信号を送信する信号フィールドにおけ る受信電力に基づいて干渉電力を測定するステップと、前記第 2のパイロット信号を 送信する信号フィールドにおける受信電力に基づいて希望波電力を測定するステツ プと、前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推 定するステップとを有することを特徴とする。
[0013] 上記課題を解決する本発明は、移動局がデータ送信に連動したパイロット信号を 送信する手段とデータ送信に連動しないパイロット信号を送信する手段とを有するセ ルラシステムにおける基地局であって、前記データ送信に連動したパイロット信号フィ 一ルドの受信電力に基づいて干渉電力を測定する手段と、前記データ送信に連動 しないパイロット信号フィールドの受信電力に基づいて希望波電力を測定する手段と 、前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推定す る手段とを有することを特徴とする。
[0014] 上記課題を解決する本発明は、移動局がデータを送信する単位送信時間におい て第 1のパイロット信号を送信する手段とデータの送信有無とは独立に前記第 1のパ ィロット信号と異なる第 2のパイロット信号を送信する手段とを有するセルラシステムに おける基地局であって、前記第 1のパイロット信号を送信する信号フィールドにおける 受信電力に基づいて干渉電力を測定する手段と、前記第 2のパイロット信号を送信 する信号フィールドにおける受信電力に基づいて希望波電力を測定する手段と、前 記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推定する手 段とを有することを特徴とする。
[0015] 上記課題を解決する本発明は、セルラシステムにおける移動局であって、データ送 信に連動したパイロット信号を送信する手段と、データ送信に連動しないパイロット信 号を送信する手段とを有することを特徴とする。
[0016] 上記課題を解決する本発明は、セルラシステムにおける移動局であって、データを 送信する単位送信時間において第 1のパイロット信号を送信する手段と、データの送 信有無とは独立に前記第 1のパイロット信号と異なる第 2のパイロット信号を送信する 手段とを有することを特徴とする。
[0017] 上記課題を解決する本発明は、移動局がデータ送信に連動したパイロット信号を 送信する手段とデータ送信に連動しないパイロット信号を送信する手段とを有するセ ルラシステムにおける基地局のプログラムであって、前記データ送信に連動したパイ ロット信号フィールドの受信電力に基づいて干渉電力を測定する処理と、前記データ 送信に連動しないパイロット信号フィールドの受信電力に基づいて希望波電力を測 定する処理と、前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル 品質を推定する処理とを基地局の情報処理装置に実行させることを特徴とする。
[0018] 上記課題を解決する本発明は、移動局がデータを送信する単位送信時間におい て第 1のパイロット信号を送信する手段とデータの送信有無とは独立に前記第 1のパ ィロット信号と異なる第 2のパイロット信号を送信する手段とを有するセルラシステムに おける基地局のプログラムであって、前記第 1のパイロット信号を送信する信号フィー ルドにおける受信電力に基づいて干渉電力を測定する処理と、前記第 2のパイロット 信号を送信する信号フィールドにおける受信電力に基づいて希望波電力を測定する 処理と、前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を 推定する処理とを基地局の情報処理装置に実行させることを特徴とする。
[0019] 上記課題を解決する本発明は、セルラシステムにおける移動局のプログラムであつ て、データ送信に連動したパイロット信号を送信する処理と、データ送信に連動しな いパイロット信号を送信する処理とを移動局の情報処理装置に実行させることを特徴 とする。
[0020] 上記課題を解決する本発明は、セルラシステムにおける移動局のプログラムであつ て、データを送信する単位送信時間において第 1のパイロット信号を送信する処理と 、データの送信有無とは独立に前記第 1のパイロット信号と異なる第 2のパイロット信 号を送信する処理とを移動局の情報処理装置に実行させることを特徴とする。
発明の効果
[0021] 本発明によれば、隣接セルにおけるデータ送信の影響を考慮した SIR測定が行える ようになるため、この SIRに基づいて行うスケジューリングや適応変調の精度が向上し 、上り回線のスループットの増力 P、送信遅延の低減などの効果がある。
図面の簡単な説明
[0022] [図 1]図 1は従来技術におけるパイロット信号の多重方法を説明する図である。
[図 2]図 2は従来技術における SIR測定方法を説明する図である。
[図 3]図 3本発明の第 1の実施形態におけるセルラシステムの構成について説明する 図である。
[図 4]図 4は本発明の第 1の実施形態における SIR測定方法を説明する図である。
[図 5]図 5は本発明の第 1の実施形態における移動局の構成を説明する図である。
[図 6]図 6は本発明の第 1の実施形態における基地局の構成を説明する図である。
[図 7]図 7は本発明の第 1の実施形態における移動局の動作フローを説明する図で ある。
[図 8]図 8は本発明の第 1の実施形態におけるパイロット多重方法を説明する図であ 園 9]図 9は本発明の第 1の実施形態における基地局の動作フローを説明する図で ある。
園 10]図 10は本発明の第 1の実施形態におけるパイロット多重方法の他の例を説明 する図である。
園 11]図 11は本発明の第 2の実施形態におけるパイロット多重方法を説明する図で ある。
園 12]図 12は本発明の第 2の実施形態におけるパイロット多重方法の他の例を説明 する図である。
符号の説明
501、 601 受信処理部
502、 602 信号分離部
503、 603 チャネル推定部
504、 607 復調部
505、 608 復号部
506、 610 MAC
507、 612 パイロット信号生成部
508、 613 送信処理部
604 受信電力測定部
605 干渉電力測定部
606 SIR計算部
609 誤り判定部
611 制御信号生成部
発明を実施するための最良の形態
[0024] <第 1の実施の形態〉
本発明に係る第 1の実施の形態を説明する。
[0025] 図 3は、本発明が適用されるシステムを説明する為の図である。
[0026] 本発明が適用されるシステムは、基地局 300〜303と、移動局 310〜314からなり、下 り回線は OFDMA、上り回線は FD MAを用レ、て信号の送受信を行って!/、るものとする 。また、基地局 300〜303は共通パイロット信号と、個別制御信号を送信し、移動局 31 0〜314は個別パイロット信号と、個別データを送信する。
[0027] 下り回線のパイロット信号は、セル内の全移動局を対象として送信されており、移動 局は共通パイロット信号を用いてチャネルを推定し、下り回線の制御信号を復調する ために用いる。下り回線の制御信号には、移動局が上り回線でデータ送信するため の無線リソースの割り当て情報や、移動局が送信したデータが正しく受信できたか否 かを通知する ACK/NACK信号等が含まれて!/、る。
[0028] 上り回線では、パイロット信号とデータをフレーム内に多重して送信する力 ノ イロッ ト信号用のフィールドとして、データ送信に連動したパイロットフィールドと、データ送 信に連動しないパイロットフィールドとを設ける。
[0029] 従来技術でも説明したように、システム内の基地局のフレームタイミングはある程度 同期している。従って、データ送信に連動したパイロットフィールドのタイミングでは、 隣接するセルでもデータ送信をする移動局がパイロットを送信することになる。従って 、データ送信に連動したパイロットフィールドにおける受信電力は、データフィールド と同等な他セル干渉電力を含んでおり、隣接セルでのデータ送信の有無を反映した 干渉電力測定が行える。そこで、基地局は、干渉電力測定はデータ送信に連動した パイロットフィールドにて行い、各移動局の希望波電力測定はデータ送信に連動しな いパイロットフィールドにて行い、各移動局の SIRを計算するようにする。これにより、 隣接セルでのデータ送受信有無による干渉量の違いを考慮した SIRが測定でき、より 適切な MCS選択やスケジューリングを行えるようになり、システムスループットやユー ザスループットが向上する。
以下に、実施の形態について、図を用いて詳細に説明する。
[0030] 図 4に、上り回線のフレームの構成図と他セル干渉の受信に関して説明する図を示 す。
[0031] フレーム内には、パイロットフィールドが 2箇所あり、パイロットフィールド 1は複数の 移動局が直交した無線リソースを用いてパイロット信号を多重して送信し、パイロット フィールド 2は当該フレームにおいてデータを送信する移動局がパイロット信号を送 信する。
[0032] ここで、パイロットフィールド 1における複数の移動局のパイロット信号の多重方法は 、例えば、移動局ごとに異なる直交符号を乗算することでコード多重するようにしても よいし、移動局ごとにパイロットを送信する周波数帯域をずらして周波数多重するよう にしてもよい。いずれにしても、基地局または基地局制御局は、予め異なる直交コー ドまたは周波数帯域を各移動局に割当てるように、下り回線の制御信号を用いて通 知しておく。これを以後、ノ ィロットフィールド 1のリソース割当信号と呼ぶ。また、以後 の説明では、異なる移動局のパイロット信号は周波数多重するものとする。ノ イロット フィールド 1のリソース割当信号には、当該移動局がパイロット信号を送信するパイ口 ットフィールド内の周波数帯域と、送信するタイミング情報が含まれている。例えば、 図 8では、移動局 1に割当てられたパイロットフィールドは、送信開始フレーム番号が 1、送信サイクルが 2フレーム、サブキャリア番号 0の場合を示している。ここで、送信 サイクルが 2フレームとは、 2フレームに 1回送信タイミングが与えられることを意味す
[0033] 尚、ここではパイロットフィールド 1での多重には、帯域全体に各移動局の信号を分 配する Distributed FDMAを用いるものとし、分配するために細かく分割した周波数帯 域をサブキャリアと呼ぶ。
[0034] また、本実施の形態では、パイロットフィールド 1に複数移動局のパイロットを多重し 、パイロットフィールド 2にデータ送信しているユーザのパイロットを送信するものとす る力 本実施の形態はそれだけには限られず、パイロットフィールド 1にデータ送信し ているユーザのパイロット、 パイロットフィールド 2に複数移動局のパイロットを多重す るようにしてあよレヽ。
[0035] 基地局は、各移動局の SIRを計算し、計算した SIRに基づ!/、てスケジューリング指標 や適切な MCSを選択する。このとき、 SIRを計算するために、パイロットフィールド 1で 各移動局の希望波信号電力を、パイロットフィールド 2において干渉電力を測定する
希望波電力は、対象とする移動局に割当てたパイロット送信タイミングにおいて、割 当てられた周波数帯域で受信するパイロット信号の平均受信電力 Pl(t,k)を測定する 。ここで、 tはサブフレーム番号、 kは移動局番号とする。また、干渉電力は、各フレー ムのパイロットフィールド 2で受信する信号の全受信電力の平均値 P2_all(t)から、パイ ロットフィールド 2でパイロット信号送信している移動局の希望波電力 P2_sgn(t)を減じ た値とする。すなわち、移動局 kの SIR(t,k)は、
SIR(t,k) = Pl(t,k)/(P2— all(t) - P2— sgn(t))
ここで、 Pl, P2は真値表示とする。
[0036] 以上の計算では、システム帯域全体で平均した SIRを算出することを仮定した力 本 発明の範囲はそれだけには限られない。例えば、システム帯域を複数のサブバンド に分割し、各々に対して SIRを計算してもよい。この場合、 Pl, P2の平均電力は該当 するサブバンド内で受信したパイロット信号の平均電力とする。
[0037] 次に、本発明に用いられる移動局と基地局の構成を図 5、図 6に各々示す。
<移動局の構成〉
本実施の形態における移動局は、フレーム単位で所定周波数帯域の信号を受信 する受信処理部 501と、受信した信号からパイロット信号を分離する信号分離部 502と 、分離したパイロット信号からチャネル推定を行うチャネル推定部 503と、受信信号と チャネル推定値から復調を行う復調部 504と、復号部 505と、 MAC506と、パイロット信 号生成部 507と送信処理部 508とからなる。
[0038] MAC506は、上位レイヤから送られてくるデータをバッファに蓄積し、復号部から送 られる制御信号に含まれている ACK/NACK信号と無線リソース割当情報に基づいて 、上り回線の送信データの制御を行う。具体的には、無線リソース割当情報により、リ ソースを割当てられた場合は、割当られた無線リソースで送信可能なサイズのデータ ブロックを生成し、送信処理部 508へ送る。その後、所定時間の後に、前述のデータ ブロックが基地局において正しく受信された場合は ACK信号を、正しく受信されなか つた場合には NACK信号を受信する。これに従い、 NACK信号の場合は、前述のデ 一タブロックを再送する。
[0039] パイロット信号生成部 507は、通信開始前または通信中に基地局が通知するパイ口 ットフィールド 1のリソース割当情報において指定されたタイミングでパイロット信号を 生成し送信処理部 508に送る。また、通信中に基地局が通知する無線リソース割当情 報に基づ!/、て、データ送信を行うフレームではパイロットフィールド 2で送信するパイ ロット信号を生成し送信処理部 508へ送る。
[0040] 尚、ここでは本発明において必要な構成要素のみを示しており、その他の一般的な 移動局構成要素は省略してレ、る。
<基地局の構成〉
本実施の形態における基地局は、フレーム単位で所定周波数帯域の信号を受信 する受信処理部 601と、受信した信号からパイロット信号を分離する信号分離部 602と 、分離したパイロット信号からチャネル推定を行うチャネル推定部 603と、希望波電力 を測定する希望波電力測定部 604と、干渉電力を測定する干渉電力測定部 605と、 希望波電力と干渉電力の測定結果から SIRを計算し MACに通知する SIR計算部 606と 、復調部 607、復号部 608、データブロックに付加されている CRCから誤り検出する誤 り判定部 609、 SIR情報等に基づ!/、てスケジューリングなどを行う MAC610と、制御信 号生成部 611と、パイロット信号生成部 612と、送信処理部 613とからなる。
[0041] 希望波電力測定部 604は、パイロットフィールド 1、またはパイロットフィールド 2に多 重されている複数の移動局のパイロット信号の各々の受信電力を測定する。希望波 電力測定部 604にある図示しないメモリには、各移動局のパイロットフィールド 1のリソ ース割当情報と各々パイロットパターンが記録されており、各移動局のパイロット送信 タイミングとサブキャリア番号での受信信号とパイロットパターンから一般に用いられる 方法でパイロット電力を算出する。算出したパイロット電力は、 SIR計算部へ送る。また 、ノ ィロットフィールド 2で送信するパイロットパターンは移動局によらず共通とし、この パイロットパターンも前述のメモリに記録されている。希望波電力測定部 604は、パイ ロットフィールド 2の受信信号とパイロットフィールド 2のパイロットパターンとから一般的 に用いられる方法でパイロット電力を算出する。算出したパイロット電力は、干渉電力 測定部 605へ送る。
[0042] 干渉電力測定部 605は、パイロットフィールド 2の全受信電力を測定し、希望波電力 測定部 604から送られるパイロットフィールド 2のパイロット電力値を引き、これを干渉 電力とする。算出した干渉電力は、 SIR計算部 606に送る。
[0043] SIR計算部 606は、希望波電力測定部から送られる各移動局の希望波電力と干渉 電力測定部 605から送られる干渉電力を図示しな!/、メモリに記録し、各移動局の希望 波電力を干渉電力で除算した値を SIRとし MAC610に通知する。
[0044] 次に、本実施の形態における動作を説明する。
[0045] 本発明に用いられる移動局と基地局の動作フローを説明する図を図 7、図 8に各々 示す。
[0046] まず、移動局の動作について説明する。
[0047] データ送受信に先駆け、移動局の復号部 505は、基地局が送信する制御信号に含 まれるパイロットフィールド 1のリソース割当信号を復号し、復号後の情報をパイロット 信号生成部 507に送る(ステップ 701)。
[0048] データ送受信を開始すると、移動局における復号部 505は、フレーム毎に基地局が 送信する制御信号を復号し、上り回線無線リソースの割当通知を検出すると、これを
MAC506に通知する(ステップ 702)。
[0049] パイロットフィールド 1のリソース割当信号により当該フレームがパイロット信号の送 信タイミングと指定されて!/、る場合は、パイロット信号生成部 507はパイロット信号を生 成する(ステップ 704)。
[0050] 上り回線無線リソースの割当通知によりリソースが割当てられ、当該フレームで上り 回線データ送信を行う場合は、パイロット信号生成部 507はパイロットフィールド 2のパ ィロット信号を、 MAC506は割当られたリソースで送信するデータブロックを生成する( ステップ 706)。
[0051] そして、当該フレームで送信すべき信号がある場合、送信処理部 508において生成 した信号を送信するために必要な処理を施し送信する(ステップ 708)。
[0052] 移動局は、データ送受信を行っている間は、ステップ 702から 708の動作をフレーム 毎に繰り返し行う。
[0053] ここで、 "データ送受信を行っている間"の定義は、フレーム毎にデータを連続して 送信している場合だけには限らない。例えば、スケジューリング結果によりリソースが 割当てられなかったためにデータ送信できない場合や、データの発生が一時的に中 断している場合などもあり、このような場合はステップ 702から 708の動作を継続したほ うがよい。そこで、上り回線のデータ送受信を終了し上記ステップ 702から 708の動作 を停止させる場合は、基地局が当該移動局に対して下り回線で通知することにし、通 知を受け取るまでは移動局上述の 702から 708を継続するようにしてもよい。また、別 な方法としては、移動局が MAC内の図示しないバッファのデータ量を定期的にモニ タし、所定時間以上の間データがなければ、上り制御信号にてデータ送信停止を基 地局に通知し、上述の動作を停止するようにしてもよい。いずれにせよ、本発明はデ ータ送受信を行っている間の定義にはよらず適用可能である。
[0054] 続いて、基地局の動作を説明する。
[0055] データ送受信に先駆け、基地局における図示しない制御部は、データ送受信を開 始する移動局に対してパイロットフィールド 1のリソース割当を行い、該当する移動局 に対して下り回線の制御信号としてパイロットフィールド 1のリソース割当信号を送信 する(ステップ 901)。
[0056] MAC610は、各移動局の SIR等に基づいてスケジューリングを行い、所定時間後の 上り回線無線リソースを移動局に割当てる。そして、無線リソースを割当てた移動局 に対して、下り回線の制御信号として無線リソース割当信号を送信する(ステップ 902
)。
[0057] 受信電力測定部 604は、パイロットフィールド 1に多重されている複数の移動局のパ ィロット信号受信電力を各々測定する。ここで、移動局 kの希望波電力を P(k) (k=0, 1, 2,…, K)と標記し、 Kは当該基地局に上り回線でデータ送信している移動局数とす る(ステップ 903)。
[0058] 干渉電力測定部 605は、パイロットフィールド 2に多重されているパイロット信号から、 干渉電力 Iを算出する(ステップ 904)。干渉電力は上述のように、ノ ィロットフィールド 2の全受信電力から、パイロットフィールド 2でパイロット信号を送信して!/、る移動局の 希望波電力を減じた値とする。
[0059] SIR計算部 606は、干渉電力 Iと移動局 kの希望波電力 P(k)から、移動局 kの SIRを SIR (k) = P(k)/Iで計算し、 MACに通知する(ステップ 905)。
[0060] 以後はステップ 902に戻り、通知された SIRに基づいて MACがスケジューリングを行う
[0061] 基地局は以上の動作をフレーム毎に繰り返し行う。 [0062] 尚、ここでは、異なる移動局からのパイロット信号多重方法として、所定帯域内に 1 移動局の送信帯域を分散させる D-FDMAを用いた力 本発明の範囲はそれだけに は限らず、連続した帯域を 1移動局に割当てる L-FDMA (Localized-FDMA)を用いて もよい。図 10は、 L-FDMAを用いた場合のパイロット送信方法を示す。
[0063] 以上で説明したように、本実施の形態によると、基地局は隣接するセルにおいてデ ータ送信をしている移動局がパイロットを送信しているタイミングとほぼ同じタイミング で干渉電力を測定することができる。また、データ送信していない移動局のパイロット 信号は、異なるタイミングで送信されるため、隣接セルでの干渉電力測定には影響を 及ぼさない。従って、基地局は、隣接セルでのデータ送信の有無が考慮された干渉 電力を測定できるようになる。従って、この干渉電力に基づいて算出した SIRは、デー タフィールドにおける SIR値との相関が高くなる。そのため、この SIR測定結果をスケジ ユーリングに用いることで、より実際のデータ送信時の SIRに近い値でリソース割当や 適応変調を行えるようになり、ユーザ多重効果ならびに適応変調精度が向上する。 従って、上り回線のスループットを向上させたり、送信遅延を低減させたりすることが できる。
<第 2の実施の形態〉
第 2の実施の形態を説明する。
[0064] 第 1の実施の形態では、データ送信に連動したパイロット信号を、データ送信と連 動しないパイロット信号と、 1フレーム内に時間多重することで区別していた力 第 2の 実施の形態では、これらのパイロットを周波数多重するようにする。
[0065] 例えば、図 11に示すような D-FDMAを用いた場合、特定のサブキャリア番号、例え ばサブキャリア番号 0はデータ送信と連動したパイロット信号を送信するものと予め規 定しておく。従って、当該フレームにてデータ送信のリソースを割当てられた移動局 は、サブキャリア番号 0でパイロット信号を送信する。それ以外の移動局は、第 1の実 施の形態と同様に、予め基地局が指定したフレーム且つサブキャリア番号において パイロット信号を送信する。図 11では、移動局 1は、各フレームのサブキャリア番号 1 を割当てられてレ、る場合を示しており、それ以外の移動局に関しては図示してレ、なレ、 。また、この図では、フレーム番号 3において移動局 1にデータ送信が割当てられて おり、移動局 1はデータ送信と連動したパイロット信号としてサブキャリア番号 0でパイ ロットを送信し、サブキャリア番号 1ではパイロット信号は送信しない。
[0066] 基地局では、予め規定されているサブキャリア番号、すなわち、図 11ではサブキヤ リア番号 0において、干渉電力とデータ送信している移動局の受信電力を測定し、他 のサブキャリアで送信されるパイロット信号でデータ送信してレ、なレ、移動局の各々の 受信電力を測定する。そして、各移動局の SIRを測定した干渉電力と受信電力から計 算する。
[0067] 尚、ここでは、異なる移動局からのパイロット信号多重方法として、所定帯域内に 1 移動局の送信帯域を分散させる D-FDMAを用いた力 本発明の範囲はそれだけに は限らず、連続した帯域を 1移動局に割当てる L-FDMA (Localized-FDMA)を用いて もよい。図 12は、 L-FDMAを用いた場合のパイロット送信方法を示す。
[0068] 第 2の実施の形態は、第 1の実施の形態におけるパイロットフィールド 2がパイロット フィールド 1と周波数多重されたものと同等であり、移動局'基地局の構成、動作フロ 一は共通であるため省略する。
[0069] 以上で説明したように、第 1の実施の形態と同様、基地局は隣接するセルにおいて データ送信をしている移動局がパイロットを送信しているタイミングとほぼ同じタイミン グで干渉電力を測定することができる。また、データ送信していない移動局のパイロッ ト信号は、異なるタイミングで送信されるため、隣接セルでの干渉電力測定には影響 を及ぼさない。従って、基地局は、隣接セルでのデータ送信の有無が考慮された干 渉電力を測定できるようになる。従って、この干渉電力に基づいて算出した SIRは、デ ータフィールドにおける SIR値との相関が高くなる。そのため、この SIR測定結果をスケ ジユーリングに用いることで、より実際のデータ送信時の SIRに近い でリソース割当 や適応変調を行えるようになり、ユーザ多重効果ならびに適応変調精度が向上する 。従って、上り回線のスループットを向上させたり、送信遅延を低減させたりすることが できる。
[0070] このように、本発明によれば、基地局は、隣接セルでのデータ送信の有無が考慮さ れた干渉電力を測定できるようになる。従って、この干渉電力に基づいて算出した SI Rは、データフィールドにおける SIR値との相関が高くなる。そのため、この SIR測定結 果をスケジューリングに用いることで、より実際のデータ送信時の SIRに近い値でリソ ース割当や適応変調を行えるようになり、ユーザ多重効果ならびに適応変調精度が 向上する。従って、上り回線のスループットを向上させたり、送信遅延を低減させたり すること力 Sでさる。
[0071] 尚、上述した各実施の形態では、各部をハードウェアで構成した力 これに限ること なぐプログラムにより動作する情報処理装置により、各部を構成することも可能であ
[0072] 本出願は、 2006年 12月 5日に出願された日本出願特願 2006— 327811号を基 礎とする優先権を主張し、その開示の全てをここに取り込む。

Claims

請求の範囲
[1] セルラシステムにおいて、
データ送信に連動したパイロット信号を送信する手段と、
データ送信に連動しないパイロット信号を送信する手段と
を備える移動局と、
前記データ送信に連動したパイロット信号フィールドの受信電力に基づいて干渉電 力を測定する手段と、
前記データ送信に連動しないパイロット信号フィールドの受信電力に基づいて希望 波電力を測定する手段と、
前記干渉電力と前記希望波電力とに基づいて前記移動局のチャネル品質を推定 する手段と
を備える基地局と
を有することを特徴とするセルラシステム。
[2] セノレラシステムにおいて、
データを送信する単位送信時間において第 1のパイロット信号を送信する手段と、 データの送信有無とは独立に前記第 1のパイロット信号と異なる第 2のパイロット信 号を送信する手段と
を備える前記移動局と、
前記第 1のパイロット信号を送信する信号フィールドにおける受信電力に基づいて 干渉電力を測定する手段と、
前記第 2のパイロット信号を送信する信号フィールドにおける受信電力に基づいて 希望波電力を測定する手段と、
前記干渉電力と前記希望波電力とに基づいて前記移動局のチャネル品質を推定 する手段と
を備える基地局と
を有することを特徴とするセルラシステム。
[3] 前記データ送信に連動したパイロット信号と前記データ送信に連動しないパイロット 信号とを、単位送信時間内に時間多重することを特徴とする請求項 1又は請求項 2に 記載のセルラシステム。
[4] 前記データ送信に連動したパイロット信号と前記データ送信に連動しないパイロット 信号とを、単位送信時間内に周波数多重することを特徴とする請求項 1又は請求項 2に記載のセルラシステム。
[5] 前記干渉電力は、前記データ送信に連動したパイロット信号の信号フィールドにお ける全受信電力から、前記データ送信に連動したパイロット信号の受信電力を減じた ものとすることを特徴とする請求項 1から請求項 4のいずれかに記載のセルラシステム
[6] 複数の基地局と複数の移動局とからなるセルラシステムにおける通信路品質測定 方法であって、
前記移動局が、
データ送信に連動したパイロット信号を送信するステップと、
データ送信に連動しないパイロット信号を送信するステップと
を有し、
前記基地局が、
前記データ送信に連動したパイロット信号フィールドの受信電力に基づいて干渉 電力を測定するステップと、
前記データ送信に連動しないパイロット信号フィールドの受信電力に基づいて希 望波電力を測定するステップと、
前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推定 を有することを特徴とする通信路品質測定方法。
[7] 複数の基地局と複数の移動局とからなるセルラシステムにおける通信路品質測定 方法であって、
前記移動局が、
データを送信する単位送信時間において第 1のパイロット信号を送信するステツ プと、
データの送信有無とは独立に前記第 1のパイロット信号と異なる第 2のパイロット信 号を送信するステップと
を有し、
前記基地局が、
前記第 1のパイロット信号を送信する信号フィールドにおける受信電力に基づい て干渉電力を測定するステップと、
前記第 2のパイロット信号を送信する信号フィールドにおける受信電力に基づい て希望波電力を測定するステップと、
前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推定 を有することを特徴とする通信路品質測定方法。
[8] 移動局がデータ送信に連動したパイロット信号を送信する手段とデータ送信に連 動しないパイロット信号を送信する手段とを有するセルラシステムにおける基地局で あって、
前記データ送信に連動したパイロット信号フィールドの受信電力に基づいて干渉電 力を測定する手段と、
前記データ送信に連動しないパイロット信号フィールドの受信電力に基づいて希望 波電力を測定する手段と、
前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推定す る手段と
を有することを特徴とする基地局。
[9] 移動局がデータを送信する単位送信時間において第 1のパイロット信号を送信する 手段とデータの送信有無とは独立に前記第 1のパイロット信号と異なる第 2のパイロッ ト信号を送信する手段とを有するセルラシステムにおける基地局であって、
前記第 1のパイロット信号を送信する信号フィールドにおける受信電力に基づいて 干渉電力を測定する手段と、
前記第 2のパイロット信号を送信する信号フィールドにおける受信電力に基づいて 希望波電力を測定する手段と、
前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推定す る手段と
を有することを特徴とする基地局。
[10] セルラシステムにおける移動局であって、
データ送信に連動したパイロット信号を送信する手段と、
データ送信に連動しないパイロット信号を送信する手段と
を有することを特徴とする移動局。
[11] セノレラシステムにおける移動局であって、
データを送信する単位送信時間において第 1のパイロット信号を送信する手段と、 データの送信有無とは独立に前記第 1のパイロット信号と異なる第 2のパイロット信 号を送信する手段と
を有することを特徴とする移動局。
[12] 移動局がデータ送信に連動したパイロット信号を送信する手段とデータ送信に連 動しないパイロット信号を送信する手段とを有するセルラシステムにおける基地局の プログラムであって、
前記データ送信に連動したパイロット信号フィールドの受信電力に基づいて干渉電 力を測定する処理と、
前記データ送信に連動しないパイロット信号フィールドの受信電力に基づいて希望 波電力を測定する処理と、
前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推定す る処理と
を基地局の情報処理装置に実行させることを特徴とするプログラム。
[13] 移動局がデータを送信する単位送信時間において第 1のパイロット信号を送信する 手段とデータの送信有無とは独立に前記第 1のパイロット信号と異なる第 2のパイロッ ト信号を送信する手段とを有するセルラシステムにおける基地局のプログラムであつ て、
前記第 1のパイロット信号を送信する信号フィールドにおける受信電力に基づいて 干渉電力を測定する処理と、
前記第 2のパイロット信号を送信する信号フィールドにおける受信電力に基づいて 希望波電力を測定する処理と、
前記干渉電力と前記希望波電力に基づいて前記移動局のチャネル品質を推定す る処理と
を基地局の情報処理装置に実行させることを特徴とするプログラム。
[14] セルラシステムにおける移動局のプログラムであって、
データ送信に連動したパイロット信号を送信する処理と、
データ送信に連動しないパイロット信号を送信する処理と
を移動局の情報処理装置に実行させることを特徴とするプログラム。
[15] セルラシステムにおける移動局のプログラムであって、
データを送信する単位送信時間において第 1のパイロット信号を送信する処理と、 データの送信有無とは独立に前記第 1のパイロット信号と異なる第 2のパイロット信 号を送信する処理と
を移動局の情報処理装置に実行させることを特徴とするプログラム。
PCT/JP2007/073145 2006-12-05 2007-11-30 セルラシステム、通信路品質測定方法、基地局および移動局 WO2008069117A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US12/443,604 US8259603B2 (en) 2006-12-05 2007-11-30 Cellular system, communication path quality measuring method, base station, and mobile station
EP07832842.4A EP2096878A4 (en) 2006-12-05 2007-11-30 CELLULAR SYSTEM, COMMUNICATION PATH QUALITY MEASUREMENT METHOD, BASE STATION, AND MOBILE STATION
JP2008548254A JP5126543B2 (ja) 2006-12-05 2007-11-30 セルラシステム、通信路品質測定方法、基地局および移動局

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006327811 2006-12-05
JP2006-327811 2006-12-05

Publications (1)

Publication Number Publication Date
WO2008069117A1 true WO2008069117A1 (ja) 2008-06-12

Family

ID=39492014

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2007/073145 WO2008069117A1 (ja) 2006-12-05 2007-11-30 セルラシステム、通信路品質測定方法、基地局および移動局

Country Status (5)

Country Link
US (1) US8259603B2 (ja)
EP (1) EP2096878A4 (ja)
JP (1) JP5126543B2 (ja)
CN (1) CN101548501A (ja)
WO (1) WO2008069117A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013509839A (ja) * 2009-11-02 2013-03-14 ノキア シーメンス ネットワークス オサケユキチュア サウンディング基準信号構成

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100930047B1 (ko) * 2007-01-12 2009-12-08 삼성전자주식회사 다중 채널 무선통신 시스템에서 동적 채널 할당 장치 및방법
US9867203B2 (en) 2008-07-11 2018-01-09 Qualcomm Incorporated Synchronous TDM-based communication in dominant interference scenarios
KR101523590B1 (ko) * 2009-01-09 2015-05-29 한국전자통신연구원 통합 인터넷 프로토콜망의 코덱 모드 제어방법 및 단말기
CN101873601A (zh) 2009-04-27 2010-10-27 松下电器产业株式会社 在无线通信系统中设置参考信号的方法以及系统
US9609536B2 (en) * 2010-04-13 2017-03-28 Qualcomm Incorporated Measurement of received power and received quality in a wireless communication network
CN102036295B (zh) * 2010-12-02 2014-04-16 大唐移动通信设备有限公司 一种确定上下行配置的方法、系统和设备
BR112013020378B1 (pt) * 2011-02-11 2022-03-29 Hfi Innovation Inc Método de precaução de medição de rsrq de equipamento de usuário (ue) para coordenação de interferência e equipamento de usuário (ue)
CN102905352B (zh) * 2011-07-29 2015-11-25 华为技术有限公司 功率确定方法及基站
US10003377B1 (en) 2016-12-19 2018-06-19 Cisco Technology, Inc. Spread spectrum acoustic communication techniques
US10141973B1 (en) 2017-06-23 2018-11-27 Cisco Technology, Inc. Endpoint proximity pairing using acoustic spread spectrum token exchange and ranging information
US10404319B1 (en) 2018-07-09 2019-09-03 Cisco Technology, Inc. Fast correlation of prometheus orthonormal sets (PONS) for communications
US10396846B1 (en) 2018-10-12 2019-08-27 Cisco Technology, Inc. Adaptive decoding of spread spectrum signals using multiple correlator peaks
US10601459B1 (en) 2018-11-02 2020-03-24 Cisco Technology, Inc. Efficient handling of clock offset in spread spectrum decoders
CN114499651A (zh) * 2021-12-30 2022-05-13 中国电子科技集团公司第五十四研究所 信号传输方法、信号传输装置及电子设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000138629A (ja) * 1998-10-30 2000-05-16 Kokusai Electric Co Ltd 不要波の干渉量測定方法及び無線通信システム
WO2005074155A1 (en) * 2004-01-28 2005-08-11 Qualcomm Incorporated Interference estimation in a wireless communication system
JP2006295725A (ja) * 2005-04-13 2006-10-26 Ntt Docomo Inc 移動局、基地局および移動通信システム並びに通信制御方法
JP2006327811A (ja) 2005-05-30 2006-12-07 Mitsubishi Electric Corp 乗客コンベアの移動手摺速度検出装置

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997039545A1 (fr) * 1996-04-12 1997-10-23 Ntt Mobile Communications Network Inc. Procede et instrument permettant de mesurer le sir de reception et dispositif de commande de puissance d'emission
JP2970653B1 (ja) * 1998-05-27 1999-11-02 日本電気株式会社 スペクトラム拡散通信システムとその基地局
JP3545663B2 (ja) * 2000-01-14 2004-07-21 松下電器産業株式会社 Sir測定装置及びsir測定方法
AU2002210964A1 (en) * 2000-11-01 2002-05-15 Genista Corporation Special signaling for perceptual qos measurement
US7149204B2 (en) * 2001-06-20 2006-12-12 Matsushita Electric Industrial Co., Ltd. Base station device and channel assigning method
KR100915275B1 (ko) * 2001-11-05 2009-09-03 가부시키가이샤 히타치세이사쿠쇼 무선 통신 시스템 및 그 통신 제어 방법 및 무선 통신기
US7133688B2 (en) * 2002-04-05 2006-11-07 Lucent Technologies Inc. Method for improving uplink control channel efficiency in a wireless communication system
JP4181093B2 (ja) * 2004-07-16 2008-11-12 株式会社東芝 無線通信システム
US8098743B2 (en) 2004-08-11 2012-01-17 Nec Corporation Pilot signal transmission method and radio communication system for enabling measurement of reception quality with high accuracy
EP1643657B1 (en) * 2004-09-30 2008-05-14 NTT DoCoMo, Inc. Signal detector used in wireless communication system
WO2006092899A1 (ja) * 2005-02-28 2006-09-08 Mitsubishi Denki Kabushiki Kaisha 通信装置および通信方法
US8942639B2 (en) * 2005-03-15 2015-01-27 Qualcomm Incorporated Interference control in a wireless communication system
US7869421B2 (en) * 2006-07-14 2011-01-11 Qualcomm Incorporated Uplink access request in an OFDM communication environment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000138629A (ja) * 1998-10-30 2000-05-16 Kokusai Electric Co Ltd 不要波の干渉量測定方法及び無線通信システム
WO2005074155A1 (en) * 2004-01-28 2005-08-11 Qualcomm Incorporated Interference estimation in a wireless communication system
JP2006295725A (ja) * 2005-04-13 2006-10-26 Ntt Docomo Inc 移動局、基地局および移動通信システム並びに通信制御方法
JP2006327811A (ja) 2005-05-30 2006-12-07 Mitsubishi Electric Corp 乗客コンベアの移動手摺速度検出装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2096878A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013509839A (ja) * 2009-11-02 2013-03-14 ノキア シーメンス ネットワークス オサケユキチュア サウンディング基準信号構成
US8849292B2 (en) 2009-11-02 2014-09-30 Nokia Siemens Networks Oy Sounding reference signal configuration

Also Published As

Publication number Publication date
EP2096878A1 (en) 2009-09-02
US8259603B2 (en) 2012-09-04
JP5126543B2 (ja) 2013-01-23
US20100103828A1 (en) 2010-04-29
EP2096878A4 (en) 2013-11-27
CN101548501A (zh) 2009-09-30
JPWO2008069117A1 (ja) 2010-03-18

Similar Documents

Publication Publication Date Title
JP5126543B2 (ja) セルラシステム、通信路品質測定方法、基地局および移動局
JP5077525B2 (ja) 無線通信システムにおけるリファレンス信号多重方法および無線通信装置
JP5118215B2 (ja) 無線ネットワークにおける電波リンク品質の判別
KR101448014B1 (ko) 기지국 및 이동국
US8325655B2 (en) Multi-carrier HSDPA channel establishing method and the multi-carrier downlink packet data transmitting method
US7995536B2 (en) Multi-input multi-output (MIMO) for wireless transmitting and receiving stations
US8433328B2 (en) Base station apparatus, user apparatus, and method of allocating reference signal sequences
US8149772B2 (en) Channel quality information reporting method, base station apparatus, and communication terminal
US20080285477A1 (en) Radio Communication Method and System Capable of Reducing Inter-Cell Interference, and Its Mobile Station and Base Station
CN110012542B (zh) 一种被用于无线通信的用户设备、基站中的方法和装置
US20120033632A1 (en) Transmission apparatus and reception apparatus
US8265647B2 (en) Communication terminal and device
JP2009518966A (ja) Ofdmチャンネルのチャンネル割当てを行なうための方法およびシステム
EP2870806B1 (en) Methods and nodes for multiple user mimo scheduling and power control
EP2795825A1 (en) Method, apparatus and computer program for providing sounding reference signals for coordinated multipoint transmissions
US20150195842A1 (en) Methods and Nodes for Multiple User MIMO Scheduling
US20150208433A1 (en) Methods and Nodes for Multiple User MIMO Scheduling
US10798660B1 (en) Techniques for device-to-device frequency reuse in cellular networks
KR101466903B1 (ko) D2d 통신을 위한 통신단말의 송신전력정보 결정방법, d2d 통신을 위한 통신단말의 자원할당방법 및 d2d 통신시스템
JP2008529387A (ja) 無線通信におけるトレーニングシーケンスの変動する長さを使用する方法及び装置。
WO2012066669A1 (ja) 基地局装置、通信システム及び通信方法
JPWO2009016687A1 (ja) 移動無線通信システムにおけるパイロット配置方法及びこれを適用する送受信装置
WO2003075598A1 (fr) Dispositif de station de base et dispositif de terminal de communication
JP5330406B2 (ja) 無線資源の割当を容易にする方法および構成
US20130201969A1 (en) TDM Scheduling Method and Device for Scheduling Uplink Transmissions

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200780045005.4

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07832842

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 12443604

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2008548254

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2007832842

Country of ref document: EP