WO2007048421A2 - Switch-fuse with control management for solar cells - Google Patents

Switch-fuse with control management for solar cells Download PDF

Info

Publication number
WO2007048421A2
WO2007048421A2 PCT/EP2005/011429 EP2005011429W WO2007048421A2 WO 2007048421 A2 WO2007048421 A2 WO 2007048421A2 EP 2005011429 W EP2005011429 W EP 2005011429W WO 2007048421 A2 WO2007048421 A2 WO 2007048421A2
Authority
WO
WIPO (PCT)
Prior art keywords
string
controller
voltage
circuit arrangement
arrangement according
Prior art date
Application number
PCT/EP2005/011429
Other languages
French (fr)
Other versions
WO2007048421A3 (en
Inventor
André RICHTER
Sylvère Leu
Original Assignee
Conergy Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Conergy Ag filed Critical Conergy Ag
Priority to EP11168783.6A priority Critical patent/EP2369709B1/en
Priority to EP05799316A priority patent/EP1946418A2/en
Priority to PCT/EP2005/011429 priority patent/WO2007048421A2/en
Publication of WO2007048421A2 publication Critical patent/WO2007048421A2/en
Publication of WO2007048421A3 publication Critical patent/WO2007048421A3/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H5/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal non-electric working conditions with or without subsequent reconnection
    • H02H5/10Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal non-electric working conditions with or without subsequent reconnection responsive to mechanical injury, e.g. rupture of line, breakage of earth connection
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B13/00Burglar, theft or intruder alarms
    • G08B13/02Mechanical actuation
    • G08B13/14Mechanical actuation by lifting or attempted removal of hand-portable articles
    • G08B13/1409Mechanical actuation by lifting or attempted removal of hand-portable articles for removal detection of electrical appliances by detecting their physical disconnection from an electrical system, e.g. using a switch incorporated in the plug connector
    • G08B13/1418Removal detected by failure in electrical connection between the appliance and a control centre, home control panel or a power supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S50/00Monitoring or testing of PV systems, e.g. load balancing or fault identification
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Definitions

  • the invention generally relates to solar modules and the control of such solar modules. More specifically, the invention relates to power and data management of such solar modules and the protection of such solar modules and a load con- nected to such solar modules against abnormalities in operation.
  • a solar power generator usually comprises a number of solar modules.
  • a solar module usually comprises a plurality of solar cells. The solar modules are connected in series to form a string of solar modules. The number of solar modules connected to form such a string is limited due to the maximum voltage which can be safely handled. Today, the maximum voltage supplied by a string is usually set to 1 kV.
  • a novel regulation is expected for the European Community and probably other countries to issue soon, defining certain safety regulations for solar power ⁇ en ⁇ rators connected to t h e public main ⁇ . This regulation vviii prescribe a safe separation of the solar generator from the mains to avoid interfer- ence.
  • the term "string” is used to define a string comprising a number of solar modules or a single solar module.
  • a further problem associated with such solar generators comprising a plurality of strings is to avoid a damage of one solar module, solar cell or string if another solar module, solar cell or string of the generator has a malfunction. Such malfunction may result in reverse currents which may heavily negatively affect the other solar modules, cells or strings of the generator.
  • DE 100 02 870 A1 describes an electrical circuit to limit the current in an electrical line.
  • the circuit comprises a vacuum switch controlled by an over-current detection logic which is coupled to the monitored electrical line.
  • This prior art system cannot provide protection against reverse currents and thus is not suitable for use in solar generators comprising a plurality of solar cells.
  • EP 1 014 403 A1 A further prior art system which may be used to limit the current flowing in an electrical line is disclosed in EP 1 014 403 A1.
  • This system is adapted to detect short circuit currents using a specific measuring and analyzing gnit.
  • this prior art system again does not provide any protection against reverse currents and thus is not suited to be used in solar generators comprising more than one solar module.
  • EP 1 538 645 A1 discloses another electrical circuit for disrupting an electrical line the circuit being improved to decrease the electrical arc occurring in mechanical switches when they are opened or closed in high-voltage systems.
  • the such disclosed prior art system has a number of drawbacks.
  • the system comprises electrical components connected in series to the power line effecting significant losses. Further, the system is not adapted to react in cases of reverse currents.
  • JP 200 2367 046 A describes an anti-theft device for a solar battery module comprising a cable for loop formation and an alarm control board connected with this loop.
  • This system has the drawback that an additional circuit is required to provide theft protection.
  • a further drawback lies in the fact, that the cable forming - A -
  • the loop may be bridged before interrupting it and thus a thief may overcome this system when being aware of its presence.
  • WO 2004/090993 A2 discloses another method to protect a photovoltaic panel against theft.
  • This prior art system has the drawback, that it is associated to a single string of solar modules and is able to detect the disconnection of this string. However, it is not possible to detect the disconnection of a single solar module from a string of modules. Further, the system is unsafe with regard to possible attempts to replace the stolen solar cell with a battery or the like.
  • a further drawback of this prior art system is that a distinct analysis of a string of solar cells is only possible using a complex op-analysis with an oscillating signal when the string is disconnected from the electricity network. However, it is undesirable to repeatedly disconnect the solar generator from the public mains for the purpose of theft protection.
  • Another problem associated in particular with large scale solar generators is the monitoring and controlling of the single strings forming the generator. It is necessary, for the purpose of maintenance and for providing a power output of the solar generator adapted to the actual need to provide an individual control of the strings and to achieve information about any malfunction in one of the strings.
  • a further important problem associated with the assembling of strings is the danger of reverse connection of strings which might occur in the course of initial installation, maintenance or replacement of a string. This may largely affect the function of the whole system as a string which is reverse connected may damage other strings of the generator.
  • the invention aims at providing a connection technique and circuit for solar gen- erators which overcomes one or more of the above-referenced problems.
  • the invention aims at providing a circuit which is capable to safely avoid any damage to the connected string, itself resulting from any externa! interference as well as to other strings which are connected to this string.
  • the invention aims at providing a circuit which is capable to safely avoid any negative effects in the public mains connected to a solar power generator due to malfunction of this solar power generator.
  • an electrical circuit arrangement for controlling the output of at least one first string, the electrical circuit arrangement comprising:
  • a first mechanical switch to selectively interrupt one of the connecting lines of the first string
  • a measuring device for measuring the voltage across the first string and/or the current flowing through the first string
  • a controller receiving a signal from the measuring device and controlling the first mechanical switch
  • controller is adapted to open the first mechanical switch if the voltage and/or the current is not within a predetermined range.
  • the invention provides an arrangement, wherein an advanced monitoring of a string is achieved and thus an improved control of the string can be carried out.
  • the controller according to the invention is capable to handle malfunction of the string which may result in a voltage or current lying outside of the usual range of values supplied by the string. By this, the system is capable to provide safety against excessive currents as well as reverse currents.
  • the mechanical switch may preferably be a relay.
  • the measurement of the current may be performed via a shunt or as magnetic flux measurement.
  • the voltage measurement may take place before and/or behind the mechanical switch or shunt.
  • a first preferred embodiment comprises a second mechanical switch in the other of the connecting lines of the string, wherein the controller is adapted to simultaneously control the first and second mechanical switch. This allows a complete disconnection of the string from the public mains and the remaining strings of the solar generator in case of any malfunction.
  • the controller is adapted to sequentially actuate the first and second mechanical switch shifted for a short time interval to reduce peak power.
  • the second switch 50ms after the first mechanical switch to reduce peak power of the involved logic components.
  • the limits of the predetermined range are programmable. This programming may take place in the controller itself or in a central power and data management control. It is a permanent problem of prior art technique that the safety limits have to be adapted to the specific individual properties of the individual solar generator arrangement which is installed. In the course of this, the maximum voltage limit must usually be set to the open-circuit voltage to protect the inverter from undue voltage. However this voltage limit will decrease significantly in actual operation of the solar generator and will usually only be reached at low temperature condition. Thus, according to the prior art, only a lower number of solar modules could be connected to an inverter having such a predetermined upper voltage limit than the inverter could handle at normal operation conditions.
  • Using a programmable upper voltage limit will allow a safe protection of the inverter and a much easier dimensioning of the components of the solar generator.
  • the respective strings may be separated by opening the switches or single solar modules out of this string may be separated and bridged to reduce the voltage to an acceptable level.
  • the output voltage may be doubled due to serial connection of the solar modules.
  • the ma ⁇ if"u m w o'tage limit may bs increased respectively.
  • programming the limits for the allowable currents provides the advantages, that the short cut current limits which are largely dependent from the incoming radiation may be programmed depending on the actual radiation. This will allow to provide a sensitive short cut protection in cases of high or low radiation.
  • a further advantage is the easy adjustment of the controller to various types of solar modules.
  • the reverse current allowable for a solar module depends on the type of module, e.g. polycrystalline solar modules may carry a reverse current which is round 4-times higher than solar modules based on thin film technique.
  • the circuit arrangement according to the invention may thus easily be adapted to different solar generators by programming the limits or may be re-programmed if single or all solar modules of the generator are replaced with new solar modules having a different technology.
  • the controller is adapted to program the limits using a real-time software programming, a predetermined firmware programming or a hardware programming using programmable hardware plugs or removable electronic components like hardware bridges, hardware switches or resistors.
  • the limits may either be programmed when dimensioning the solar generator, which may easily be achieved using hardware or software programming. Further, it may be required to change the limits due to later modifi- cations of the solar generator which may be achieved using hardware or software programming, too.
  • the controller comprises a direct switch to actuate the mechanical switch.
  • the controller is installed adjacent to the solar modules. In case of maintenance it is often preferred to manually deactivate or activate the mechanical switch in the connecting line.
  • a direct switch is preferably installed at the controller. This will allow to safely disconnect a solar module for maintenance or in case of a defect which is of partic-ut ⁇ r importance if the mechanical switches may be controlled from a distance. The direct switch will override this distance-control actuation in particular for off condition.
  • the measuring device is arranged to measure the current via a shunt at low impedance. By this, a precise measuring without significant electrical losses is achieved.
  • the measuring device is arranged to directly measure the output voltage of the string, i.e. to measure the voltage across the connecting lines between the string and the mechanical switch. This allows to directly detect any excessive voltage or reverse connection of the string.
  • the controller is adapted to open the mechanical switch if the direct output voltage exceeds a certain limit or the solar module is reverse-connected.
  • the mechanical switch will be opened immediately in case of such malfunction or will not be closed if already open.
  • the measuring device is adapted to measure the output voltage of the electric circuit including the string and the mechanical switch, i.e. the voltage across the connecting lines between the me- chanical switch and an inverter.
  • This may be achieved by providing an additional measuring device and will allow to detect a short circuit of the power output lines, in particular a common bus-bar used to connect a plurality of strings and thus will allow to protect the string against any negative influence coming from the output side as well as vice versa even in case that the mechanical switch is in open position.
  • This feature enables also a bus bar fusing in conjunction with the communication to all other controls to switch all strings off.
  • string comprises at least two solar modules connected.
  • the invention is particularly well-suited for large scale solar generators.
  • the controller is adapted to output a status signal signalizing at least one of the operational characteristics like output voltage or current of the string. This will allow to monitor the status of the string from a distance to achieve a safe operation of large scale solar generators comprising a plurality of such strings.
  • a further preferred embodiment of the invention comprises a plurality of solar strings and a central power and data management device connected to the con- trailer of each of the strings for managing the power and data of the strings.
  • This central power and data management device will allow to receive detailed information about the function or malfunction of single strings of the solar generator and thus will allow to optimize maintenance and replacement of defect solar modules in large scale generators. Further, this feature will also enables easy connection of monitoring systems.
  • a direct switch of the central power and management control device to actuate the mechanical switches of a number of strings. This will provide the advantages as discussed above for a number of strings for the purpose of maintenance.
  • the measuring device is adapted to measure the voltage of one or both of each of the connecting lines versus ground. This will improve the circuit arrangement in order to detect any ground loop occurring in the system and to allow to take the necessary steps when such ground loop is detected. It is preferred that the voltage of both connecting lines is measured versus ground so that any ground loops occurring on any side will be detected.
  • Another important preferred embodiment of the invention is characterized by a semiconductor switch arranged to shortcut the connecting lines of the string between the mechanical switch and the inverter and further characterized by a control device adapted to close the semiconductor switch for the time period of opening or closing of the mechanical switch.
  • a constant problem associated with mechanical switches used in high voltage circuits is the occurrence of an arc during opening and dosing of the switch This arc will inri ⁇ pp an e r os' ⁇ " process at each time of an opening or closing of the switch.
  • the magnitude of erosion will depend on the current flowing via the arc. A plurality of such erosion processes will damage the contacts of the switch significantly and may result in failure of the switch. Further, the arc effects a temperature increase and thus implies the risk of thermal damage or even inflammation of the switch.
  • the preferred embodiment overcomes these drawbacks in that during the process of opening or closing of the switch a semiconductor switch is closed which shortcuts the connecting lines of the string. Consequently the mechanical switch can be opened or closed at low current without the occurrence of a
  • the semiconductor switch may preferably be arranged between the connecting lines of the string itself or between the lines of a common bus-bar coupling a plurality of such strings. Shortcutting a string does not negatively effect the string or another string coupled with this string because of the characteristic of solar modules having a limited shortcut current and experiencing no damage when operated in short circuit.
  • the use of such a semiconductor switch provides improved characteristics if the mechanical switch is opened in a system comprising a plurality of strings as the reverse current resulting from the sum of the other strings will, mainly contribute to otherwise damage the mechanical switch by exceeding the maximum power to be switched.
  • the controller is adapted to provided a theft control for a string connected to the circuit arrangement, the theft control comprising: a control unit to measure the current flowing through at least one of the connecting lines with the mechanical switch in closed position, a logic unit detecting a sudden change of this current and outputting a signal to an alarm unit to signalise the disconnection of the string.
  • the theft protection according to the invention overcomes the drawbacks of prior art theft protection systems as a simple but safe control of the current is performed which may easily detect any irregular sudden change of this current induced by cutting a line or trying to provide a replacement generator in place of the solar module which is tried to be stolen.
  • the theft protection may easily be integrated into the controller controlling the mechanical switch or a central power and data management and thus may be included in the circuit arrangement for controlling the solar module or the string without significant additional costs.
  • the theft protection may be further improved by a pulse generator coupled to the connecting lines to send check pulses into the connecting lines with the mechani- cal switch in open position or in case current produced by the string is not sufficient for the protection, a measurement unit adapted to measure the resistance of the string during a check pulse, and a logic unit adapted to detect a change of this resistance and to output a signal to an alarm unit to signalise the disconnection of the string.
  • a pulse generator coupled to the connecting lines to send check pulses into the connecting lines with the mechani- cal switch in open position or in case current produced by the string is not sufficient for the protection
  • a measurement unit adapted to measure the resistance of the string during a check pulse
  • a logic unit adapted to detect a change of this resistance and to output a signal to an alarm unit to signalise the disconnection of the string.
  • the pulse generator and the measurement unit may be integrated into the controller controlling the mechanical switch and thus may be included in the circuit arrangement without significant additional costs.
  • An important advantage of this theft protection lies in the fact that even the removal of one single solar module from a string of solar modules may be detected as this will induce a change of resistance detectable by the logic unit.
  • the basic control unit may be a simplified direct acting circuitry for enabling the protection against major system malfunction as induced by reverse connection, overcurrent or reverse current. To enhance safety, the basic control unit is operated independently from the advanced digital control unit
  • the advanced control unit may be integrated in the power and data management control discussed above. It may comprise a microcontroller to provide and control information about the status of the string or module and to control the operation of the module in the normal operation mode.
  • the microcontroller may additionally control the opening of the mechanical switch if the voltage of the string is too low, provide the logical steps required for the theft protection function, include programmable thresholds of the current and/or voltage to define malfunction of the string or the corresponding programmable magnitudes of change for theft protection and may finally provide the general control of the string and process the measured values.
  • the microcontroller is an optional feature and without the microcontroller or in case of failure of the microcontroller an operation of the solar generator is possible with basic functionality. This will enhance the safety of operation.
  • the advanced digital control unit is preferably adapted
  • the circuit arrangement according to the invention may be further improved by a dc-insulating device coupled to the controller to transfer the data from the control- ler to a central power and data management control and/or to a controller of another string.
  • a dc-insulating device coupled to the controller to transfer the data from the control- ler to a central power and data management control and/or to a controller of another string. This will decouple the data transfer from any adverse influence resulting from the power transfer of the generator and will improve operational safety of the whole generator. Further, the risk of damage to the controller, the central power and data management and the other controllers is decreased for times of any malfunction of one single string.
  • the controller is connected via a common data bus to a central power and data management control and or to other controllers of a solar generator, the common data bus preferably comprising a first set of lines for data transfer, at least one second line for direct transfer of predetermined signals of primary relevance like a signal for opening of all mechanical switches (so called "clearing”) or a signal for signalizing an alarm status.
  • the at least one second line may preferably be directly connected to the controller to directly effect an actuation of the mechanical switches or to directly receive an alarm signal from the controller. This will establish a second security level for the whole generator, the level being independent from the data transfer lines of the bus.
  • a temperature sensor and/or a radiation sensor coupled to the controller to detect the temperature of the solar modules of the string and the incoming radiation, respectively. This will allow to detect a beginning malfunction and or critical operation conditions e.g. due to ageing or a local defect of a solar module or due to critical weather conditions, indicated by an increase or decrease of temperature and/or incoming radiation and thus allow to guard against complete failure of the module or even the whole string by separat- ing single modules or strings from the inverter.
  • the temperature and/or radiation sensor is in particular preferable in combination with programmable range limits vor the allowable voltage and current values. Providing the sensors and the programming option it is possible to define a specific maximum voltage limit depending on the actual temperature and/or to pro- gram a specific maximum current limit depending on the actual irradiation. This will provide a safe operation of the inverter and an improved efficiency of the whole solar generator.
  • FIG. 1 Another aspect of the invention is a photovoltaic power supply arrangement, comprising a plurality of strings wherein each of the strings comprises a number of solar modules connected in series and the strings are connected in parallel via a common bus bar connected to an inverter, characterized in that each of the strings comprises a circuit arrangement according to any of the preceding claims.
  • the circuit arrangement according to the invention is in particular advantageous in large scale solar generators to provide improved control mechanisms and to allow exact monitoring and quick and cost-effective management of the single strings of the whole generator.
  • the photovoltaic power supply arrangement may be further improved by providing a central over-voltage and lightning protection arranged between the common bus-bar and the inverter. By this, the sensitive electronic of the inverter is protected against damage resulting from over-voltage and lightning events in the solar modules.
  • the arrangement may comprise a semiconductor switch arranged to shortcut the two lines of the common bus bar and a control device adapted to close the semiconductor switch for the time period of opening or closing of the mechanical switch. This will avoid any reverse current flowing from the other strings of the generator to the mechanical switch of one particular string which is opened or closed and thus avoid damage to this mechanical switch due to electrical events.
  • each of the strings is controlled by a separate circuit arrangement
  • the improved logics of the electrical circuit according to the invention allows for safe theft protection even in such cases of a control of a plurality of strings by only one single circuit arrangement.
  • the electrical circuit may be split up in such a way that a mechanical switch is provided for each of the strings, whereas a central, single controller is provided to control the plurality of mechanical switches.
  • each circuit arrangement is provided to a central power and data management control and preferably to any other circuit arrangements. This will allow to selectively open or close the mechanical switches of the single strings to adapt the performance of the solar generator to present operation requirements.
  • the central power and data management may be used to switch off certain strings or modules for maintenance and to detect any malfunction of single strings.
  • the data is provided to the central power and data management control via a dc-insulating device.
  • a decoupling device is discussed above with reference to the circuit arrangement.
  • connection housing for connecting a string to a common bus bar, wherein the connecting housing sealingly encases at least one circuit arrangement as discussed above.
  • High dc-currents as generated in solar generators tend to induce significant corrosion of contact points in case of the presence of humidity in the environment of the contacts.
  • a further aspect of the invention is the use of the circuit arrangement discussed above for controlling the current flow of a string, for providing a theft protection of a string or for providing a central power and data management of a string.
  • An important advantage of the circuit arrangement is its specific suitability for solar generators and the possibility to provide a number of functions required in such solar generators.
  • the circuit arrangement may provide only one of these functions, as described above, but preferably it is used to provide a plurality of func- tions which may be integrated in the controller and thus be performed without significant additional costs.
  • a further aspect of the invention is a method according to claim 36.
  • the method is in particular well-suited to be performed using a circuit arrangement according to the invention or a photovoltaic power supply arrangement according to the invention.
  • the method may be further improved according to claims 37 through 50. These preferred embodiments of the method may preferably be executed using a circuit arrangement or photovoltaic power supply arrangement according to the inven- tion.
  • the over voltage level is monitored in real-time to open at least one mechanical switch in case of overvoltage to allow to set the magnitude of the nominal output voltage of the strings with a smaller safety margin to the maximum nominal input voltage of the inverter connected to the strings.
  • the nominal output voltage of all strings r modules of a solar generator has to be set far below the nominal input voltage of an inverter in order to keep safety in the rare cases of overvoltage due to extremely low environmental temperatures. This leads to ineffective dimensioning and thus increasing operational costs.
  • the preferred embodiment overcomes this problem as it allows to select an inverter- which nominal input voltage is close to or even equal to the nominal output voltage of all solar modules connected to it. This is achieved because it is possible to selectively disconnect single solar modules or strings in the rare cases of overvoltage.
  • Fig. 1 is a schematic circuit diagram of a preferred embodiment of the circuit arrangement according to the invention.
  • Fig. 2 is a schematic diagram of a solar panel forming a string comprising three solar module units
  • Fig. 3 is a schematic diagram of a string of two solar panels connected in series
  • Fig. 4 is a schematic diagram of two strings connected in parallel
  • Fig. 5 is a schematic diagram of three strings connected to a generator connection housing
  • Fig. 6 is a schematic diagram of three blocks according to Fig. 5 configured to form a photovoltaic power generator
  • Fig. 7 is a schematic diagram of two modules according to Fig. 6 forming a large scale photovoltaic power
  • Fig. 8 is a schematic diagram of two or more circuits according to the invention forming a wired OR for an alarm signal for a plurality of strings,
  • Fig. 9 is schematic diagram according to Fig.8 provided for a signal actuating the mechanical switches of a plurality of strings
  • Fig. 10 is schematic diagram of a first wiring scheme of a plurality of strings
  • Fig. 11 is schematic diagram of a second wiring scheme of a plurality of strings
  • Fig. 12 is schematic diagram of a third wiring scheme of a plurality of strings
  • Fig. 13 is schematic diagram of a controller comprising a basic control unit and an advanced control unit, DETAILED DESCRIPTION OF THE DRAWINGS
  • a photovoltaic power generator element 10 which may comprise a solar module or a plurality of solar modules connected in series to form a string and/or a plurality of modules or strings connected in parallel is connected via a positive connecting line 11 and a negative connecting line 12 with a common bus bar 20 comprising a positive bus line 21 and a negative bus line 22.
  • a mechanical switch 30 is arranged to selectively interrupt or provide a connection of the photovoltaic power generator via the connecting lines 11 ,12 to the common bus bar 20.
  • the mechanical switch comprises two switches 31 ,32, the former being arranged to selectively interrupt the positive connecting line 21 and the latter being arranged to selectively interrupt the negative connecting line 22.
  • the mechanical switch may be an electromagnetically actuated relay with one or two contacts or may alternatively be a bi-polar semiconductor switch.
  • a first voltmeter 100 is arranged between the mechanical switch 30 and the photovoltaic power generator element 10.
  • the first voltmeter 100 is adapted to measure the voltage across the positive and negative connecting lines. With the mechanical switch in the closed position the voltmeter 100 will measure the voltage across the positive and negative common bus line, i.e. the voltage produced in total by all photovoltaic power generator elements connected to the common bus bar 20. With the mechanical switch in the open position the first voltmeter 100 will measure the voltage provided by the photovoltaic power generator element 10.
  • a second voltmeter 110 is arranged between the mechanical switch 30 and the common bus bar 20 to measure the voltage across the positive and negative connecting lines 11 ,12. With the mechanical switch in the closed position the second voltmeter 110 will measure the same nominal voltage as the first voltmeter 100 excluding the switch losses. The switch losses can be analysed for switch quality monitoring. With the mechanical switch 30 in the open position the second voltmeter 110 will measure the voltage in the common bus bar, i.e. the voltage produced by those solar modules connected to the common bus bar except the solar generator element 10.
  • a third and fourth voltmeter 120,130 is arranged between the mechanical switch 30 and the solar generator element 10 to measure the voltage of the posi- tive and negative connecting lines versus ground, respectively.
  • a fifth and sixth voltmeter 140,150 is arranged adjacent to the second voltmeter 110 to measure the voltage of the positive and negative connecting lines versus ground, respectively, between the mechanical switch 30 and the common bus bar 20.
  • a first and second current meter 200, 210 is arranged to measure the current in the positive and negative connecting lines, respectively, between the solar module 10 and the mechanical switch 30.
  • a third and fourth current meter 220,230 is arranged to measure the current in the positive and negative connecting lines, respectively, between the mechanical switch 30 and the common bus bar 20.
  • a seventh and eighth voltmeter 160, 170 are arranged adjacent to the voltmeters 110, 100, respectively.
  • the voltmeters 160, 170 allow to precisily measure the voltage and to determine the measurement error induced by the resistance of the current meters.
  • the data acquired by the voltmeters 100-160 and the current meters 200-230 are transferred via a dc-insulating device 40,41 to a controller 60,61.
  • voltmeters 180, 190 are provided to directly measure the voltage drop across the switches 31 , 32.
  • the controller 60 comprises two control units 61 , 63 to monitor the voltages and currents measured by the voltmeters 100-190 and the current meters 200-230.
  • the control units 61 , 63 directly control the actuation of the mechanical switches 31 , 32 in order to open the switches in case of any irregularities shown by the measured values.
  • a central power and data management control 90 is connected with the control 60, 61 to receive information about the voltages and currents measured by the voltmeters 100-190 and the current meters 200-230 and about the actuation and status of the mechanical switch 30.
  • a direct switch 62 connected to the control unit 61 may be activated manually to open the switch 31.
  • a direct switch 64 connected to the control unit 63 may be activated manually to open the switch 32.
  • a direct switch 92 connected to the central power and management control 90 may be activated manually to open the switch 31 , 32 and the switches of any other strings connected to the common bus bar 20.
  • the direct switches 62, 64, 92 overrule any actuation command of the control units 61 , 63 and the central power and management control 90.
  • a theft detection unit 70 is connected to the positive and negative connecting line 11 ,12 between the solar generator 10 and the mechanical switch 30 to send a pulse signal through the solar element with the mechanical switch 30 in open or closed position.
  • the analysis of this pulse signal is performed by the installed voltmeters and current meters and the controller 60 but it is alternatively possible to use the theft detection unit 70 itself for this purpose or to analyze the pulse signal in the central power and data management control 90.
  • Element 71 prevents the string of floating and generation of high voltages induced by autocharging of the string itself.
  • a temperature sensor 97 and an irradiation sensor 98 is provided for measuring the environmental temperature and the irradiation in the vicinity of the solar modules.
  • the temperature and irradiation values measured by the respective sensors are transmitted to the controller 63.
  • the common bus bar 20 is connected to a semiconductor switch 80 which is arranged to temporarily short-cut the positive and negative common bus lines 21 ,22.
  • the semiconductor switch 80 is controlled by the power and data management control 90.
  • the power and data management control 90 is connected via a wide area data bus 91 with the controller 60, 61 , 63 and any other controller of additional strings 50 connected to the common bus bar 20.
  • An additional string, represented schematically by reference number 50 is coupled via connecting lines 51 ,52 to the common bus bar 20.
  • the string 50 is connected in parallel to the string formed by the solar generator element 10.
  • a common over-voltage and lightning protection unit 95 is provided, which is arranged to selectively separate the output connecting lines 23,24 connecting the common bus bar 20 with an inverter (not shown).
  • a temperature sensing element integrated in the over-voltage and lightning protection unit 95 reports via a data line 96 to the central power and data management control 90 for monitoring the quality and rest of lifetime of the surge protection element. With this information replacement can be made before failure of this element.
  • Fig. 1 The preferred embodiment shown in Fig. 1 works as follows:
  • the mechanical switch 30 is actuated immediately to open the switches 31 ,32.
  • the power and data management unit 90 actuates the semiconductor switch 80 to shortcut the common bus bar 20.
  • the current which may induce an arc when opening the switch 30 is reduced to the current produced by the solar generator element 10.
  • the semiconductor switch 80 is opened again.
  • the measured voltage and current values are transferrin to the contrc ⁇ er and to the central power and data management unit 90 to analyze the reason for failure and to take the necessary steps to overcome the problem.
  • the controller or the power and data management control actuates the mechanical switch 30 to close the switches 31 , 32 so that the solar generator element 10 is connected with the common bus bar 20 again.
  • the semiconductor switch 80 is closed shortly before closing the mechanical switch 30 and opened immediately after the mechanical switch 30 has reached its closed position.
  • the controller 50 sends a signal to the pole control units 60,61 to open the mechanical switch 30 to improve safety conditions and to reduce power consumption of the switch driver.
  • the theft detection unit 70 sends a pulse signal in time intervals of e.g. one minute to the connecting lines 11 ,12.
  • a high impedance measurement of the resistance of the solar generator element 10 is performed via the resistor 71 and a sudden change of this resistance will signalize the removal of the solar generator element 10.
  • the temperature sensing element (98) reports to the controller 96 for lifetime monitoring of the surge protection.
  • An irradiation 97 and temperature 98 sensing element transfers the actual environmental values in the data bus 91 or wide area data bus 91.
  • a dedicated voltage meter 180 or 190 across each switch is used for switch quality monitoring.
  • Fig. 2 shows a solar module 300 comprising three solar elements 310, 320, 330.
  • the solar elements 310-330 are connected in series.
  • Fig. 3 shows two solar modules 400,410.
  • Each of the modules 400, 410 comprises two solar elements 401 , 402 and 411 , 412 respectively.
  • the solar modules 400,410 are connected in series to form a string.
  • Fig. 4 shows two strings according to Fig. 3 which are connected in parallel.
  • Fig. 5 shows three strings 610,620,630 each comprising three solar modules.
  • the solar modules of each string are connected in series.
  • the strings are connected in parallel using a connecting housing 640 which is hermetically sealed against humidity.
  • the connecting housing 640 provides the sum of the current of the three strings 610-630 to an inverter 650.
  • Fig. 6 shows an arrangement of three connecting housings 700-720 according to Fig. 5, each of them connecting three strings of solar modules.
  • each of the connecting housings is supplied to a common bus bar 751 connected to an inverter 750. Additionally, each of the connecting housings is connected via a data line with a wide area data bus 761 to supply the data of each of the strings to a central power and data management unit 760.
  • Fig. 7 shows an arrangement example of a total of 18 strings. Each three of these strings are connected via a connecting housing 800-825 and each three of these connecting housings form an arrangement according to Fig. 6, so that two arrangements according to Fig. 6 are shown in Fig. 7.
  • the common bus bar 851 , 852 of each of the two arrangements shown in Fig. 7 is connected to a connection box 870, 875 collecting the current of three connecting housings, i.e. a total of nine strings.
  • the two connection boxes are connected to an upper bus bar providing the sum current of the two connection boxes to an inverter 850.
  • a wide area data bus 881 is provided which is con- nected with each of the connecting housings and supplies the data acquired for each of the strings to a central power and data management unit 880.
  • FIG. 8 three or more circuits 960, 961 , ...962 corresponding to the controller 60 of Fig. 1 are shown.
  • Each of the circuits include an optical coupling device 940 corresponding to the dc-insulating device 40, 41 of Fig. 1.
  • the circuits are power supplied by a common power supply 900.
  • the circuits are connected to form a wired OR so that an alarm signal induced by a single circuit will provide this signal to all other circuits and thus set these circuits in alarm mode, too.
  • Fig. 9 is schematic diagram showing a wiring scheme similar to Fig.8.
  • the output lines of an optical coupling device 1040 of each controller 1060 are connected to a comparator 1030.
  • the output of the comparator 1060a is connected with a mechanical switch 1030 corresponding to the switches 31 ,32 of Fig. 1.
  • a common power supply 1000 supplies all controllers 1060. In case that the power supply breaks down, the mechanical switch is actuated to open. Alternatively, a logical actuation may be initiated via the optical coupling device 1040.
  • a number of controllers 1260, 1261 , 1262 are connected to a central power and data management control 1290 via a parallel wiring scheme.
  • Each of the controllers 1260-1262 is connected to a mechanical switch 1230- -1232, respectively.
  • a number of controllers 1360, 1361 , 1362 are connected to a central power and data management control 1390 via a loop-through wiring scheme.
  • Each of the controllers 1360-1362 is connected to a mechanical switch 1330-1332, respectively.
  • Fig. 12 shows a schematic diagram of another wiring scheme for a plurality of strings.
  • Two controllers 1460, 1461 are connected to an intermediate power and data management control 1491 via a loop-through wiring scheme.
  • two controllers 1462, 1463 are connected to an intermediate power and data management control 1492.
  • the intermediate power and data management controls 1491 , 1492 are connected in parallel to a central power and data management control 1490
  • Fig. 13 is schematic diagram of a controller comprising a basic control unit 1560 and an advanced ⁇ ontroi suit i590.
  • I he basic control unit comprises a number of comparators 1560a-c having adjustable limits.
  • the advanced control unit com- prises an analog-digital converter 1590a and a microcontroller 1590b having programmable limits.
  • Both the basic and the advanced control unit are provided with the measured voltage and current values.
  • the outputs of the basic and advanced control units are connected via two transistors in such a way so that both control units may independently effect an actuation of a mechanical switch 1530 via a relay 1520.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Photovoltaic Devices (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

The invention relates to an electrical circuit arrangement for controlling the output of at least one string of a solar generator, the string comprising: a first mechanical switch (30, 31; 32) to selectively interrupt one (11) of the connecting lines (11, 12) of the string, a measuring device (100-190; 200-230) for measuring the voltage across the string and/or the current flowing through the string, and a controller (60, 61, 63) receiving a signal from the measuring device and controlling the mechanical switch, wherein the controller is adapted to open the mechanical switch if the voltage and/or the current is not within a predetermined range. The invention allows a advanced control of large-scale solar generators to provide more safety and efficiency of such solar generators.

Description

Switch-Fuse with control management for solar cells
The invention generally relates to solar modules and the control of such solar modules. More specifically, the invention relates to power and data management of such solar modules and the protection of such solar modules and a load con- nected to such solar modules against abnormalities in operation.
A solar power generator usually comprises a number of solar modules. A solar module usually comprises a plurality of solar cells. The solar modules are connected in series to form a string of solar modules. The number of solar modules connected to form such a string is limited due to the maximum voltage which can be safely handled. Today, the maximum voltage supplied by a string is usually set to 1 kV. A novel regulation is expected for the European Community and probably other countries to issue soon, defining certain safety regulations for solar power αenβrators connected to the public mainε. This regulation vviii prescribe a safe separation of the solar generator from the mains to avoid interfer- ence. In the following description and the attached claims, where it is not explicitly differentiated between "string" and "solar module", the term "string" is used to define a string comprising a number of solar modules or a single solar module.
Usually, a plurality of strings are connected in parallel to provide a maximum power output. Today, large scale solar power plants often provide 25OkWp and are constructed with power outputs of up to 10MWp.
Such large power dimensions require an improved power management of the solar generator. One problem associated with such large scale generators is to avoid interference of the public mains connected to the solar generator in case of any malfunction of the solar generator.
A further problem associated with such solar generators comprising a plurality of strings is to avoid a damage of one solar module, solar cell or string if another solar module, solar cell or string of the generator has a malfunction. Such malfunction may result in reverse currents which may heavily negatively affect the other solar modules, cells or strings of the generator.
The detection of malfunctions, even malfunctions of only small parts of solar systems is very important because of long term guaranties. E.g. in Germany solar plants are calculated for a minimum life time of 20 years.
Today, solar generators are protected against high currents in functional and reverse direction using melting fuses, electromagnetic or bimetal elements. However, bimetal elements and electromagnetic elements are not capable to provide a safe operation as they usually are mounted close to the solar generator and thus experience large temperature changes which negatively affect their safe operation. Melting fuses usually include a remarkable electrical resistance induc- ing significant electrical losses thus decreasing the efficiency of the solar generator. Melting fuses usually require a current which significantly exceeds the nominal value in order to safely react and separate the lines. In photovoltaic systems it is not guaranteed, that such excessive current overload will occur - usually the overload is present in the form of only a small difference between the nominal and factual current..
DE 100 02 870 A1 describes an electrical circuit to limit the current in an electrical line. The circuit comprises a vacuum switch controlled by an over-current detection logic which is coupled to the monitored electrical line. This prior art system cannot provide protection against reverse currents and thus is not suitable for use in solar generators comprising a plurality of solar cells.
A further prior art system which may be used to limit the current flowing in an electrical line is disclosed in EP 1 014 403 A1. This system is adapted to detect short circuit currents using a specific measuring and analyzing gnit. However, this prior art system again does not provide any protection against reverse currents and thus is not suited to be used in solar generators comprising more than one solar module.
EP 1 538 645 A1 discloses another electrical circuit for disrupting an electrical line the circuit being improved to decrease the electrical arc occurring in mechanical switches when they are opened or closed in high-voltage systems. The such disclosed prior art system has a number of drawbacks. The system comprises electrical components connected in series to the power line effecting significant losses. Further, the system is not adapted to react in cases of reverse currents.
Another emerging problem associated with solar generators is the matter of theft protection. Solar generators may be installed in places which are not supervised and this may attract thieves to steal single solar modules, strings or a number thereof.
JP 200 2367 046 A describes an anti-theft device for a solar battery module comprising a cable for loop formation and an alarm control board connected with this loop. This system has the drawback that an additional circuit is required to provide theft protection. A further drawback lies in the fact, that the cable forming - A -
the loop may be bridged before interrupting it and thus a thief may overcome this system when being aware of its presence.
WO 2004/090993 A2 discloses another method to protect a photovoltaic panel against theft. This prior art system has the drawback, that it is associated to a single string of solar modules and is able to detect the disconnection of this string. However, it is not possible to detect the disconnection of a single solar module from a string of modules. Further, the system is unsafe with regard to possible attempts to replace the stolen solar cell with a battery or the like. A further drawback of this prior art system is that a distinct analysis of a string of solar cells is only possible using a complex op-analysis with an oscillating signal when the string is disconnected from the electricity network. However, it is undesirable to repeatedly disconnect the solar generator from the public mains for the purpose of theft protection.
Another problem associated in particular with large scale solar generators is the monitoring and controlling of the single strings forming the generator. It is necessary, for the purpose of maintenance and for providing a power output of the solar generator adapted to the actual need to provide an individual control of the strings and to achieve information about any malfunction in one of the strings.
A further important problem associated with the assembling of strings is the danger of reverse connection of strings which might occur in the course of initial installation, maintenance or replacement of a string. This may largely affect the function of the whole system as a string which is reverse connected may damage other strings of the generator.
The invention aims at providing a connection technique and circuit for solar gen- erators which overcomes one or more of the above-referenced problems. In particular, the invention aims at providing a circuit which is capable to safely avoid any damage to the connected string, itself resulting from any externa! interference as well as to other strings which are connected to this string. Finally, the invention aims at providing a circuit which is capable to safely avoid any negative effects in the public mains connected to a solar power generator due to malfunction of this solar power generator.
According to the invention, an electrical circuit arrangement is provided for controlling the output of at least one first string, the electrical circuit arrangement comprising:
a first mechanical switch to selectively interrupt one of the connecting lines of the first string, a measuring device for measuring the voltage across the first string and/or the current flowing through the first string, and - a controller receiving a signal from the measuring device and controlling the first mechanical switch,
wherein the controller is adapted to open the first mechanical switch if the voltage and/or the current is not within a predetermined range.
The invention provides an arrangement, wherein an advanced monitoring of a string is achieved and thus an improved control of the string can be carried out. The controller according to the invention is capable to handle malfunction of the string which may result in a voltage or current lying outside of the usual range of values supplied by the string. By this, the system is capable to provide safety against excessive currents as well as reverse currents.
The mechanical switch may preferably be a relay. The measurement of the current may be performed via a shunt or as magnetic flux measurement. The voltage measurement may take place before and/or behind the mechanical switch or shunt.
A first preferred embodiment comprises a second mechanical switch in the other of the connecting lines of the string, wherein the controller is adapted to simultaneously control the first and second mechanical switch. This allows a complete disconnection of the string from the public mains and the remaining strings of the solar generator in case of any malfunction. Alternatively to the first preferred embodiment it may be advantageous in certain applications to provide a second mechanical switch in the other of the connecting lines of the string, wherein the controller is adapted to sequentially actuate the first and second mechanical switch shifted for a short time interval to reduce peak power. Typically one might actuate the second switch 50ms after the first mechanical switch to reduce peak power of the involved logic components.
In particular, it is preferred to sequentially actuate alls switches of an electrical circuit according to the invention or of a solar power plant comprising a plurality of such electrical circuits with a short delay of preferably 50ms.
In an important preferred embodiment the limits of the predetermined range are programmable. This programming may take place in the controller itself or in a central power and data management control. It is a permanent problem of prior art technique that the safety limits have to be adapted to the specific individual properties of the individual solar generator arrangement which is installed. In the course of this, the maximum voltage limit must usually be set to the open-circuit voltage to protect the inverter from undue voltage. However this voltage limit will decrease significantly in actual operation of the solar generator and will usually only be reached at low temperature condition. Thus, according to the prior art, only a lower number of solar modules could be connected to an inverter having such a predetermined upper voltage limit than the inverter could handle at normal operation conditions. Using a programmable upper voltage limit will allow a safe protection of the inverter and a much easier dimensioning of the components of the solar generator. In case of overvoltage the respective strings may be separated by opening the switches or single solar modules out of this string may be separated and bridged to reduce the voltage to an acceptable level.
Further, in case of reverse connection, the output voltage may be doubled due to serial connection of the solar modules. Thus, if protection against reverse connection only should be provided,, the maχif"um wo'tage limit may bs increased respectively. Finally, programming the limits for the allowable currents provides the advantages, that the short cut current limits which are largely dependent from the incoming radiation may be programmed depending on the actual radiation. This will allow to provide a sensitive short cut protection in cases of high or low radiation. A further advantage is the easy adjustment of the controller to various types of solar modules. The reverse current allowable for a solar module depends on the type of module, e.g. polycrystalline solar modules may carry a reverse current which is round 4-times higher than solar modules based on thin film technique. The circuit arrangement according to the invention may thus easily be adapted to different solar generators by programming the limits or may be re-programmed if single or all solar modules of the generator are replaced with new solar modules having a different technology.
Having programmable limits it is further preferred that the controller is adapted to program the limits using a real-time software programming, a predetermined firmware programming or a hardware programming using programmable hardware plugs or removable electronic components like hardware bridges, hardware switches or resistors. The limits may either be programmed when dimensioning the solar generator, which may easily be achieved using hardware or software programming. Further, it may be required to change the limits due to later modifi- cations of the solar generator which may be achieved using hardware or software programming, too. Finally, it is advantageous for various purposes to permanently adapt the limits to current operation conditions, e.g. temperature, irradiation. This may be done in realtime using software programming of the limits only.
It is further referred, that the controller comprises a direct switch to actuate the mechanical switch. Usually, the controller is installed adjacent to the solar modules. In case of maintenance it is often preferred to manually deactivate or activate the mechanical switch in the connecting line. For this purpose a direct switch is preferably installed at the controller. This will allow to safely disconnect a solar module for maintenance or in case of a defect which is of partic-utør importance if the mechanical switches may be controlled from a distance. The direct switch will override this distance-control actuation in particular for off condition. It is further preferred, that the measuring device is arranged to measure the current via a shunt at low impedance. By this, a precise measuring without significant electrical losses is achieved.
It is further preferred, that the measuring device is arranged to directly measure the output voltage of the string, i.e. to measure the voltage across the connecting lines between the string and the mechanical switch. This allows to directly detect any excessive voltage or reverse connection of the string.
To this extent it is preferred, that the controller is adapted to open the mechanical switch if the direct output voltage exceeds a certain limit or the solar module is reverse-connected. Thus, the mechanical switch will be opened immediately in case of such malfunction or will not be closed if already open.
According to a further preferred embodiment, the measuring device is adapted to measure the output voltage of the electric circuit including the string and the mechanical switch, i.e. the voltage across the connecting lines between the me- chanical switch and an inverter. This may be achieved by providing an additional measuring device and will allow to detect a short circuit of the power output lines, in particular a common bus-bar used to connect a plurality of strings and thus will allow to protect the string against any negative influence coming from the output side as well as vice versa even in case that the mechanical switch is in open position. This feature enables also a bus bar fusing in conjunction with the communication to all other controls to switch all strings off.
According to the invention it is particularly preferred that string comprises at least two solar modules connected. As discussed above, the invention is particularly well-suited for large scale solar generators.
It is further preferred, that the controller is adapted to output a status signal signalizing at least one of the operational characteristics like output voltage or current of the string. This will allow to monitor the status of the string from a distance to achieve a safe operation of large scale solar generators comprising a plurality of such strings.
A further preferred embodiment of the invention comprises a plurality of solar strings and a central power and data management device connected to the con- trailer of each of the strings for managing the power and data of the strings. This central power and data management device will allow to receive detailed information about the function or malfunction of single strings of the solar generator and thus will allow to optimize maintenance and replacement of defect solar modules in large scale generators. Further, this feature will also enables easy connection of monitoring systems.
Preferably, a direct switch of the central power and management control device to actuate the mechanical switches of a number of strings. This will provide the advantages as discussed above for a number of strings for the purpose of maintenance.
In another preferred embodiment the measuring device is adapted to measure the voltage of one or both of each of the connecting lines versus ground. This will improve the circuit arrangement in order to detect any ground loop occurring in the system and to allow to take the necessary steps when such ground loop is detected. It is preferred that the voltage of both connecting lines is measured versus ground so that any ground loops occurring on any side will be detected.
Another important preferred embodiment of the invention is characterized by a semiconductor switch arranged to shortcut the connecting lines of the string between the mechanical switch and the inverter and further characterized by a control device adapted to close the semiconductor switch for the time period of opening or closing of the mechanical switch. A constant problem associated with mechanical switches used in high voltage circuits is the occurrence of an arc during opening and dosing of the switch This arc will inriπpp an eros'θ" process at each time of an opening or closing of the switch. The magnitude of erosion will depend on the current flowing via the arc. A plurality of such erosion processes will damage the contacts of the switch significantly and may result in failure of the switch. Further, the arc effects a temperature increase and thus implies the risk of thermal damage or even inflammation of the switch. The preferred embodiment overcomes these drawbacks in that during the process of opening or closing of the switch a semiconductor switch is closed which shortcuts the connecting lines of the string. Consequently the mechanical switch can be opened or closed at low current without the occurrence of a significant arc.
The semiconductor switch may preferably be arranged between the connecting lines of the string itself or between the lines of a common bus-bar coupling a plurality of such strings. Shortcutting a string does not negatively effect the string or another string coupled with this string because of the characteristic of solar modules having a limited shortcut current and experiencing no damage when operated in short circuit. The use of such a semiconductor switch provides improved characteristics if the mechanical switch is opened in a system comprising a plurality of strings as the reverse current resulting from the sum of the other strings will, mainly contribute to otherwise damage the mechanical switch by exceeding the maximum power to be switched.
In another important preferred embodiment the controller is adapted to provided a theft control for a string connected to the circuit arrangement, the theft control comprising: a control unit to measure the current flowing through at least one of the connecting lines with the mechanical switch in closed position, a logic unit detecting a sudden change of this current and outputting a signal to an alarm unit to signalise the disconnection of the string.
As the risk of theft increases, efforts have to be made to protect solar modules against this. This may be achieved with a certain degree of protection by mechanical devices which aim at complicating the dismantlement of solar modules. Further, specific electrical theft protection arrangements are known whirh induce additional costs. The theft protection according to the invention overcomes the drawbacks of prior art theft protection systems as a simple but safe control of the current is performed which may easily detect any irregular sudden change of this current induced by cutting a line or trying to provide a replacement generator in place of the solar module which is tried to be stolen. The theft protection may easily be integrated into the controller controlling the mechanical switch or a central power and data management and thus may be included in the circuit arrangement for controlling the solar module or the string without significant additional costs.
The theft protection may be further improved by a pulse generator coupled to the connecting lines to send check pulses into the connecting lines with the mechani- cal switch in open position or in case current produced by the string is not sufficient for the protection, a measurement unit adapted to measure the resistance of the string during a check pulse, and a logic unit adapted to detect a change of this resistance and to output a signal to an alarm unit to signalise the disconnection of the string. This will allow to provide theft protection even at night, when no current produced by the solar module is flowing through the connecting lines or if the mechanical switch is in open position. The pulses may be sent at predetermined time intervals to permanently provide theft protection or may be manually induced by a person supervising the solar generator. Again, the pulse generator and the measurement unit may be integrated into the controller controlling the mechanical switch and thus may be included in the circuit arrangement without significant additional costs. An important advantage of this theft protection lies in the fact that even the removal of one single solar module from a string of solar modules may be detected as this will induce a change of resistance detectable by the logic unit.
In a further preferred embodiment the controller comprises:
an analogue basic control unit to open the mechanical switch in case of excessive or reverse current in the connecting line or reverse connection of the solar module, and an advanced digital controi unit (90) to provide advanced control character- istics. The basic control unit may be a simplified direct acting circuitry for enabling the protection against major system malfunction as induced by reverse connection, overcurrent or reverse current. To enhance safety, the basic control unit is operated independently from the advanced digital control unit
The advanced control unit may be integrated in the power and data management control discussed above. It may comprise a microcontroller to provide and control information about the status of the string or module and to control the operation of the module in the normal operation mode. The microcontroller may additionally control the opening of the mechanical switch if the voltage of the string is too low, provide the logical steps required for the theft protection function, include programmable thresholds of the current and/or voltage to define malfunction of the string or the corresponding programmable magnitudes of change for theft protection and may finally provide the general control of the string and process the measured values. The microcontroller is an optional feature and without the microcontroller or in case of failure of the microcontroller an operation of the solar generator is possible with basic functionality. This will enhance the safety of operation.
According to the above arrangement, the advanced digital control unit is preferably adapted
- to provide a status signal signalizing at least one of the operational characteristics of the string, to provide a programmable break limit to the basic control unit,
- to open the mechanical switch if the voltage output of the string is below a preferably programmable lower voltage limit, - to open the mechanical switch during night time, to open the mechanical switch in case of certain weather conditions like thunderstorm, and/or
- to provide the theft control as discussed above.
The circuit arrangement according to the invention may be further improved by a dc-insulating device coupled to the controller to transfer the data from the control- ler to a central power and data management control and/or to a controller of another string. This will decouple the data transfer from any adverse influence resulting from the power transfer of the generator and will improve operational safety of the whole generator. Further, the risk of damage to the controller, the central power and data management and the other controllers is decreased for times of any malfunction of one single string.
It is further preferred that the controller is connected via a common data bus to a central power and data management control and or to other controllers of a solar generator, the common data bus preferably comprising a first set of lines for data transfer, at least one second line for direct transfer of predetermined signals of primary relevance like a signal for opening of all mechanical switches (so called "clearing") or a signal for signalizing an alarm status.
The at least one second line may preferably be directly connected to the controller to directly effect an actuation of the mechanical switches or to directly receive an alarm signal from the controller. This will establish a second security level for the whole generator, the level being independent from the data transfer lines of the bus.
Finally it is preferred to provide a temperature sensor and/or a radiation sensor coupled to the controller to detect the temperature of the solar modules of the string and the incoming radiation, respectively. This will allow to detect a beginning malfunction and or critical operation conditions e.g. due to ageing or a local defect of a solar module or due to critical weather conditions, indicated by an increase or decrease of temperature and/or incoming radiation and thus allow to guard against complete failure of the module or even the whole string by separat- ing single modules or strings from the inverter.
The temperature and/or radiation sensor is in particular preferable in combination with programmable range limits vor the allowable voltage and current values. Providing the sensors and the programming option it is possible to define a specific maximum voltage limit depending on the actual temperature and/or to pro- gram a specific maximum current limit depending on the actual irradiation. This will provide a safe operation of the inverter and an improved efficiency of the whole solar generator.
Another aspect of the invention is a photovoltaic power supply arrangement, comprising a plurality of strings wherein each of the strings comprises a number of solar modules connected in series and the strings are connected in parallel via a common bus bar connected to an inverter, characterized in that each of the strings comprises a circuit arrangement according to any of the preceding claims. As discussed above, the circuit arrangement according to the invention is in particular advantageous in large scale solar generators to provide improved control mechanisms and to allow exact monitoring and quick and cost-effective management of the single strings of the whole generator.
It may be preferable in certain applications to provide a single central power and data management control to control a plurality of strings. This will decrease installation and operation costs.
The photovoltaic power supply arrangement may be further improved by providing a central over-voltage and lightning protection arranged between the common bus-bar and the inverter. By this, the sensitive electronic of the inverter is protected against damage resulting from over-voltage and lightning events in the solar modules.
As discussed above, the arrangement may comprise a semiconductor switch arranged to shortcut the two lines of the common bus bar and a control device adapted to close the semiconductor switch for the time period of opening or closing of the mechanical switch. This will avoid any reverse current flowing from the other strings of the generator to the mechanical switch of one particular string which is opened or closed and thus avoid damage to this mechanical switch due to electrical events.
Whereas it is preferred that each of the strings is controlled by a separate circuit arrangement, it may be preferable in certain applications to provide one single circuit arrangement controlling a plurality of strings. This will reduce costs of the solar generator as a whole. Further, the improved logics of the electrical circuit according to the invention allows for safe theft protection even in such cases of a control of a plurality of strings by only one single circuit arrangement. In such cases, the electrical circuit may be split up in such a way that a mechanical switch is provided for each of the strings, whereas a central, single controller is provided to control the plurality of mechanical switches.
It is further preferred that the data of each circuit arrangement is provided to a central power and data management control and preferably to any other circuit arrangements. This will allow to selectively open or close the mechanical switches of the single strings to adapt the performance of the solar generator to present operation requirements. The central power and data management may be used to switch off certain strings or modules for maintenance and to detect any malfunction of single strings.
It is preferred, that the data is provided to the central power and data management control via a dc-insulating device. The advantage of such a decoupling device is discussed above with reference to the circuit arrangement.
Yet another aspect of the invention is a connection housing for connecting a string to a common bus bar, wherein the connecting housing sealingly encases at least one circuit arrangement as discussed above. High dc-currents as generated in solar generators tend to induce significant corrosion of contact points in case of the presence of humidity in the environment of the contacts. Thus, it is preferred to encase the circuit arrangement in a sealed housing to avoid any access of humidity and to thus prevent corrosion of the contacts.
A further aspect of the invention is the use of the circuit arrangement discussed above for controlling the current flow of a string, for providing a theft protection of a string or for providing a central power and data management of a string. An important advantage of the circuit arrangement is its specific suitability for solar generators and the possibility to provide a number of functions required in such solar generators. The circuit arrangement may provide only one of these functions, as described above, but preferably it is used to provide a plurality of func- tions which may be integrated in the controller and thus be performed without significant additional costs.
Finally, a further aspect of the invention is a method according to claim 36. The method is in particular well-suited to be performed using a circuit arrangement according to the invention or a photovoltaic power supply arrangement according to the invention.
The method may be further improved according to claims 37 through 50. These preferred embodiments of the method may preferably be executed using a circuit arrangement or photovoltaic power supply arrangement according to the inven- tion.
With regard to specific details and advantages of the method according to the invention and its preferred embodiments it is referred to the corresponding description of the respective features of the circuit arrangement and photovoltaic power supply arrangement according to the invention which are preferable used for executing the inventive method.
In an important embodiment of the method according to the invention, the over voltage level is monitored in real-time to open at least one mechanical switch in case of overvoltage to allow to set the magnitude of the nominal output voltage of the strings with a smaller safety margin to the maximum nominal input voltage of the inverter connected to the strings. According to prior art techniques, the nominal output voltage of all strings r modules of a solar generator has to be set far below the nominal input voltage of an inverter in order to keep safety in the rare cases of overvoltage due to extremely low environmental temperatures. This leads to ineffective dimensioning and thus increasing operational costs. The preferred embodiment overcomes this problem as it allows to select an inverter- which nominal input voltage is close to or even equal to the nominal output voltage of all solar modules connected to it. This is achieved because it is possible to selectively disconnect single solar modules or strings in the rare cases of overvoltage. The invention will be fully understood when reading the following details description of preferred embodiments in connection with the accompanying figures.
BRIEF DESCRIPTION OF THE FIGURES
Fig. 1 is a schematic circuit diagram of a preferred embodiment of the circuit arrangement according to the invention,
Fig. 2 is a schematic diagram of a solar panel forming a string comprising three solar module units,
Fig. 3 is a schematic diagram of a string of two solar panels connected in series,
Fig. 4 is a schematic diagram of two strings connected in parallel,
Fig. 5 is a schematic diagram of three strings connected to a generator connection housing,
Fig. 6 is a schematic diagram of three blocks according to Fig. 5 configured to form a photovoltaic power generator,
Fig. 7 is a schematic diagram of two modules according to Fig. 6 forming a large scale photovoltaic power,
Fig. 8 is a schematic diagram of two or more circuits according to the invention forming a wired OR for an alarm signal for a plurality of strings,
Fig. 9 is schematic diagram according to Fig.8 provided for a signal actuating the mechanical switches of a plurality of strings,
Fig. 10 is schematic diagram of a first wiring scheme of a plurality of strings,
Fig. 11 is schematic diagram of a second wiring scheme of a plurality of strings,
Fig. 12 is schematic diagram of a third wiring scheme of a plurality of strings,
Fig. 13 is schematic diagram of a controller comprising a basic control unit and an advanced control unit, DETAILED DESCRIPTION OF THE DRAWINGS
In Fig. 1 a photovoltaic power generator element 10 which may comprise a solar module or a plurality of solar modules connected in series to form a string and/or a plurality of modules or strings connected in parallel is connected via a positive connecting line 11 and a negative connecting line 12 with a common bus bar 20 comprising a positive bus line 21 and a negative bus line 22.
A mechanical switch 30 is arranged to selectively interrupt or provide a connection of the photovoltaic power generator via the connecting lines 11 ,12 to the common bus bar 20. The mechanical switch comprises two switches 31 ,32, the former being arranged to selectively interrupt the positive connecting line 21 and the latter being arranged to selectively interrupt the negative connecting line 22. The mechanical switch may be an electromagnetically actuated relay with one or two contacts or may alternatively be a bi-polar semiconductor switch.
A first voltmeter 100 is arranged between the mechanical switch 30 and the photovoltaic power generator element 10. The first voltmeter 100 is adapted to measure the voltage across the positive and negative connecting lines. With the mechanical switch in the closed position the voltmeter 100 will measure the voltage across the positive and negative common bus line, i.e. the voltage produced in total by all photovoltaic power generator elements connected to the common bus bar 20. With the mechanical switch in the open position the first voltmeter 100 will measure the voltage provided by the photovoltaic power generator element 10.
A second voltmeter 110 is arranged between the mechanical switch 30 and the common bus bar 20 to measure the voltage across the positive and negative connecting lines 11 ,12. With the mechanical switch in the closed position the second voltmeter 110 will measure the same nominal voltage as the first voltmeter 100 excluding the switch losses. The switch losses can be analysed for switch quality monitoring. With the mechanical switch 30 in the open position the second voltmeter 110 will measure the voltage in the common bus bar, i.e. the voltage produced by those solar modules connected to the common bus bar except the solar generator element 10.
Further, a third and fourth voltmeter 120,130 is arranged between the mechanical switch 30 and the solar generator element 10 to measure the voltage of the posi- tive and negative connecting lines versus ground, respectively. In the same way, a fifth and sixth voltmeter 140,150 is arranged adjacent to the second voltmeter 110 to measure the voltage of the positive and negative connecting lines versus ground, respectively, between the mechanical switch 30 and the common bus bar 20.
A first and second current meter 200, 210 is arranged to measure the current in the positive and negative connecting lines, respectively, between the solar module 10 and the mechanical switch 30.
A third and fourth current meter 220,230 is arranged to measure the current in the positive and negative connecting lines, respectively, between the mechanical switch 30 and the common bus bar 20.
A seventh and eighth voltmeter 160, 170 are arranged adjacent to the voltmeters 110, 100, respectively. The voltmeters 160, 170 allow to precisily measure the voltage and to determine the measurement error induced by the resistance of the current meters. The data acquired by the voltmeters 100-160 and the current meters 200-230 are transferred via a dc-insulating device 40,41 to a controller 60,61.
Finally, voltmeters 180, 190 are provided to directly measure the voltage drop across the switches 31 , 32.
The controller 60 comprises two control units 61 , 63 to monitor the voltages and currents measured by the voltmeters 100-190 and the current meters 200-230. The control units 61 , 63 directly control the actuation of the mechanical switches 31 , 32 in order to open the switches in case of any irregularities shown by the measured values. A central power and data management control 90 is connected with the control 60, 61 to receive information about the voltages and currents measured by the voltmeters 100-190 and the current meters 200-230 and about the actuation and status of the mechanical switch 30.
A direct switch 62 connected to the control unit 61 may be activated manually to open the switch 31. In the same way, a direct switch 64 connected to the control unit 63 may be activated manually to open the switch 32. These direct switches allow to directly activate the switches 31 , 32 in case of maintenance of the solar generator element 10 to provide save separation of the solar generator element from the common bus bar 20.
Additionally, a direct switch 92 connected to the central power and management control 90 may be activated manually to open the switch 31 , 32 and the switches of any other strings connected to the common bus bar 20. The direct switches 62, 64, 92 overrule any actuation command of the control units 61 , 63 and the central power and management control 90.
A theft detection unit 70 is connected to the positive and negative connecting line 11 ,12 between the solar generator 10 and the mechanical switch 30 to send a pulse signal through the solar element with the mechanical switch 30 in open or closed position. In the preferred embodiment the analysis of this pulse signal is performed by the installed voltmeters and current meters and the controller 60 but it is alternatively possible to use the theft detection unit 70 itself for this purpose or to analyze the pulse signal in the central power and data management control 90. Element 71 prevents the string of floating and generation of high voltages induced by autocharging of the string itself.
A temperature sensor 97 and an irradiation sensor 98 is provided for measuring the environmental temperature and the irradiation in the vicinity of the solar modules. The temperature and irradiation values measured by the respective sensors are transmitted to the controller 63.
The common bus bar 20 is connected to a semiconductor switch 80 which is arranged to temporarily short-cut the positive and negative common bus lines 21 ,22. The semiconductor switch 80 is controlled by the power and data management control 90. The power and data management control 90 is connected via a wide area data bus 91 with the controller 60, 61 , 63 and any other controller of additional strings 50 connected to the common bus bar 20.
An additional string, represented schematically by reference number 50 is coupled via connecting lines 51 ,52 to the common bus bar 20. The string 50 is connected in parallel to the string formed by the solar generator element 10.
Finally, a common over-voltage and lightning protection unit 95 is provided, which is arranged to selectively separate the output connecting lines 23,24 connecting the common bus bar 20 with an inverter (not shown). A temperature sensing element integrated in the over-voltage and lightning protection unit 95 reports via a data line 96 to the central power and data management control 90 for monitoring the quality and rest of lifetime of the surge protection element. With this information replacement can be made before failure of this element.
The preferred embodiment shown in Fig. 1 works as follows:
In case the controller 60, 61 , 63 detects a sudden change of any voltage or current measured by the voltmeters and current meters, which change may result from a malfunction of a solar module of the solar generator element or any other component or from any shortcut within the circuit, the mechanical switch 30 is actuated immediately to open the switches 31 ,32.
Short before opening of the mechanical switch 30, the power and data management unit 90 actuates the semiconductor switch 80 to shortcut the common bus bar 20. Thus, the current which may induce an arc when opening the switch 30 is reduced to the current produced by the solar generator element 10. Immediately after the mechanical switch 30 has reached its open position the semiconductor switch 80 is opened again.
The measured voltage and current values are transferrin to the contrcϋer and to the central power and data management unit 90 to analyze the reason for failure and to take the necessary steps to overcome the problem. As soon as the prob- lem is automatically or manually analyzed to be of minor relevance or the steps to overcome the problem are finalized, the controller or the power and data management control actuates the mechanical switch 30 to close the switches 31 , 32 so that the solar generator element 10 is connected with the common bus bar 20 again. In the same way as before, the semiconductor switch 80 is closed shortly before closing the mechanical switch 30 and opened immediately after the mechanical switch 30 has reached its closed position.
At night time or in times of maintenance or if the output of the solar module 10 is below a minimum voltage the controller 50 sends a signal to the pole control units 60,61 to open the mechanical switch 30 to improve safety conditions and to reduce power consumption of the switch driver.
If the mechanical switch 30 is in open position or in case that the current flowing through the connecting lines 11 ,12 is not sufficient to provide a theft detection when using this current, the theft detection unit 70 sends a pulse signal in time intervals of e.g. one minute to the connecting lines 11 ,12. A high impedance measurement of the resistance of the solar generator element 10 is performed via the resistor 71 and a sudden change of this resistance will signalize the removal of the solar generator element 10.
The temperature sensing element (98) reports to the controller 96 for lifetime monitoring of the surge protection.
An irradiation 97 and temperature 98 sensing element transfers the actual environmental values in the data bus 91 or wide area data bus 91.
A dedicated voltage meter 180 or 190 across each switch is used for switch quality monitoring.
Fig. 2 shows a solar module 300 comprising three solar elements 310, 320, 330. The solar elements 310-330 are connected in series. Fig. 3 shows two solar modules 400,410. Each of the modules 400, 410 comprises two solar elements 401 , 402 and 411 , 412 respectively. The solar modules 400,410 are connected in series to form a string.
Fig. 4 shows two strings according to Fig. 3 which are connected in parallel.
Fig. 5 shows three strings 610,620,630 each comprising three solar modules. The solar modules of each string are connected in series. The strings are connected in parallel using a connecting housing 640 which is hermetically sealed against humidity. The connecting housing 640 provides the sum of the current of the three strings 610-630 to an inverter 650.
Fig. 6 shows an arrangement of three connecting housings 700-720 according to Fig. 5, each of them connecting three strings of solar modules.
The sum current of each of the connecting housings is supplied to a common bus bar 751 connected to an inverter 750. Additionally, each of the connecting housings is connected via a data line with a wide area data bus 761 to supply the data of each of the strings to a central power and data management unit 760.
Fig. 7 shows an arrangement example of a total of 18 strings. Each three of these strings are connected via a connecting housing 800-825 and each three of these connecting housings form an arrangement according to Fig. 6, so that two arrangements according to Fig. 6 are shown in Fig. 7.
The common bus bar 851 , 852 of each of the two arrangements shown in Fig. 7 is connected to a connection box 870, 875 collecting the current of three connecting housings, i.e. a total of nine strings. The two connection boxes are connected to an upper bus bar providing the sum current of the two connection boxes to an inverter 850. Additionally, a wide area data bus 881 is provided which is con- nected with each of the connecting housings and supplies the data acquired for each of the strings to a central power and data management unit 880.
Turning to Fig. 8 three or more circuits 960, 961 , ...962 corresponding to the controller 60 of Fig. 1 are shown. Each of the circuits include an optical coupling device 940 corresponding to the dc-insulating device 40, 41 of Fig. 1. The circuits are power supplied by a common power supply 900. The circuits are connected to form a wired OR so that an alarm signal induced by a single circuit will provide this signal to all other circuits and thus set these circuits in alarm mode, too.
Fig. 9 is schematic diagram showing a wiring scheme similar to Fig.8. The output lines of an optical coupling device 1040 of each controller 1060 are connected to a comparator 1030. The output of the comparator 1060a is connected with a mechanical switch 1030 corresponding to the switches 31 ,32 of Fig. 1. A common power supply 1000 supplies all controllers 1060. In case that the power supply breaks down, the mechanical switch is actuated to open. Alternatively, a logical actuation may be initiated via the optical coupling device 1040.
According to Fig. 10, a number of controllers 1260, 1261 , 1262 are connected to a central power and data management control 1290 via a parallel wiring scheme. Each of the controllers 1260-1262 is connected to a mechanical switch 1230- -1232, respectively.
According to Fig. 11 , a number of controllers 1360, 1361 , 1362 are connected to a central power and data management control 1390 via a loop-through wiring scheme. Each of the controllers 1360-1362 is connected to a mechanical switch 1330-1332, respectively.
Fig. 12 shows a schematic diagram of another wiring scheme for a plurality of strings. Two controllers 1460, 1461 are connected to an intermediate power and data management control 1491 via a loop-through wiring scheme. In the same way, two controllers 1462, 1463 are connected to an intermediate power and data management control 1492. The intermediate power and data management controls 1491 , 1492 are connected in parallel to a central power and data management control 1490
Fig. 13 is schematic diagram of a controller comprising a basic control unit 1560 and an advanced υontroi unii i590. I he basic control unit comprises a number of comparators 1560a-c having adjustable limits. The advanced control unit com- prises an analog-digital converter 1590a and a microcontroller 1590b having programmable limits. Both the basic and the advanced control unit are provided with the measured voltage and current values. The outputs of the basic and advanced control units are connected via two transistors in such a way so that both control units may independently effect an actuation of a mechanical switch 1530 via a relay 1520.

Claims

Claims
1. Electrical circuit arrangement for controlling the output of at least one first string (10), comprising: a first mechanical switch (30, 31 ; 32) to selectively interrupt one (11 ) of the connecting lines (11 , 12) of the first string, a measuring device (100-190; 200-230) for measuring the voltage across the first string and/or the current flowing through the first string, and a controller (60, 61 , 63) receiving a signal from the measuring de- vice and controlling the first mechanical switch characterized in that the controller is adapted to open the first mechanical switch if the voltage and/or the current is not within a predetermined range.
2. Circuit arrangement according to claim 1 , further comprising a second mechanical switch (32) in the other (12) of the con- necting lines of the first string, wherein the controller is adapted to simultaneously control the first and second mechanical switch.
3. Circuit arrangement according to claim 1 , further comprising a second mechanical switch (32) in the other (12) of the connecting lines of the first string, wherein the controller is adapted to sequentially actuate the first (31 ) and second (32) mechanical switch shifted for a short time interval to reduce peak power.
4. Circuit arrangement according to any of the preceding claims, wherein the controller is adapted to program the limits of the predetermined range.
5. Circuit arrangement according to any of the preceding claims, wherein the controller is adapted to proαram the limits using a real-time software programming, a predetermined firmware programming or a hardware program- ming using programmable hardware plugs or removable electronic components like hardware bridges, hardware switches or resistors.
6. Circuit arrangement according to any of the preceding claims, wherein the controller (61 , 63) comprises a direct switch (62, 64) to actuate the mechanical switch (30).
7. Circuit arrangement according to any of the preceding claims, wherein the measuring device (210-230) is arranged to measure the current via a shunt at low impedance.
8. Circuit arrangement according to any of the preceding claims, wherein the measuring device (100) is arranged to directly measure the output voltage of the string.
9. Circuit arrangement according any of the preceding claims, wherein the controller is adapted to open the mechanical switch if the direct output voltage exceeds a certain upper limit or a certain lower limit indicating that the string is reverse-connected.
10. Circuit arrangement according to any of the preceding claims, wherein the measuring device (110) is arranged to measure the output voltage of the electric circuit including the string and the mechanical switch.
11. Circuit arrangement according to any of the preceding claims, wherein the string comprises at least two solar modules connected in series.
12. Circuit arrangement according to any of the preceding claims, wherein the controller is adapted to output a status signal signalizing at least one of the operational characteristics of the string.
13. Circuit arrangement according to any of the preceding claims, further comprising a central power and management control (90) connected to the controller of at least one of the strings for managing the power and data management of the string(s).
14. Circuit arrangement according to the preceding claim, further comprising a direct switch (92) of the central power and management control device (90) to actuate the mechanical switches of a number of strings which controllers are connected to the central power and management control device.
15. Circuit arrangement according to any of the preceding claims, wherein the measuring device (120, 130; 140, 150) is adapted to measure the voltage of one or both of each of the connecting lines versus ground.
16. Circuit arrangement according to any of the preceding claims, further comprising a semiconductor switch (80) arranged to shortcut the connecting lines of the string on the side of the mechanical switch opposed to the string and further comprising a control device (90) adapted to close the semiconductor switch for the time period of opening or closing of the mechanical switch.
17. Circuit arrangement according to any of the preceding claims, wherein the controller (60) is adapted to provide a theft control for a string connected to the circuit arrangement, the theft control comprising: - a control unit to measure the current flowing through at least one of the connecting lines with the mechanical switch in closed position, a logic unit detecting a sudden change of this current and output- ting a signal to an alarm unit to signalise the disconnection of the string or a single solar module of the string.
18. Circuit arrangement according to the preceding claim, wherein the theft control further comprises a pulse generator (70) coupled to the connecting lines to send check pulses into the connecting lines, a measurement unit adapted to measure the resistance of the string during a check pulse, and wherein the logic unit is adapted to detect a change of this resistance and to output an alarm signal to an alarm unit to signalise the disconnection of the string or a single solar module.
19. Circuit arrangement according to any of the preceding claims, wherein the controller comprises: an analog basic control unit (60, 61 , 63) to open the mechanical switch in case of excessive or reverse current and/or voltage in the con- necting line or reverse connection of the solar module, and an advanced digital control unit (90) comprising a microcontroller to provide advanced control characteristics.
20. Circuit arrangement according to the preceding claim, wherein the advanced digital control unit (90) is adapted - to provide a status signal signalizing at least one of the operational characteristics of the solar module or the string of solar modules, to provide at least one programmable voltage or current limit,
- to open the mechanical switch if the voltage output of the string is below or above the at least one programmable voltage or current limit, to open the mechanical switch during night time,
- to open the mechanical switch in case of certain weather conditions like thunderstorm, and/or
- to provide the theft control according to claim 17 or 18.
21. Circuit arrangement according to any of the preceding claims, characterized by a dc-insulating device (40, 41) coupled to the controller (61 , 63) to transfer the data from the controller to a central power and data management control (90) and/or a controller of another string
22. Circuit arrangement according to any of the preceding claims, wherein the controller is connected via a common data bus (91 ) to a central power and data management control and or to other controllers of a solar generator, the common data bus preferably comprising a first set of lines for data transfer, at least one second line for direct transfer of predetermined signals of primary relevance like a signal for opening of all mechanical switches or a signal for signalizing an alarm status.
23. Circuit arrangement according to the preceding claim, wherein the at least one second line is directly connected to the controller (60, 61 ) to directly effect an actuation of the mechanical switches or to directly receive an alarm signal from the controller.
24. Circuit arrangement according to any of the preceding claims, characterized by a temperature sensor (97) and/or an irradiation sensor (98) coupled to the controller (60, 61 , 63) to detect the temperature of the solar modules of the string and the incoming radiation.
25. Photovoltaic power supply arrangement comprising a plurality of strings (610, 620, 630), each of the strings comprising a number of solar modules connected in series the strings connected in parallel via a common bus bar connected to an inverter, characterized in that each of the strings comprises a circuit arrangement (640) according to any of the preceding claims.
26. Photovoltaic power supply arrangement according to claim 25, characterized in that a single central power and data management control is provided to control a plurality of strings.
27. Photovoltaic power supply arrangement according to claim 2R or 26, further comprising a common overvoltage and lightning protection (95) arranged between the common bus bar (20) and the inverter.
28. Photovoltaic power supply arrangement according to any of the claim 25-27, further comprising a semiconductor switch (80) arranged to shortcut the two lines of common bus bar and a control device adapted to close the semiconductor switch for the time period of opening or closing of the mechanical switch.
29. Photovoltaic power supply arrangement according to any of the preceding claims 25-28, characterized in that a plurality of strings is controlled by one single circuit arrangement.
30. Photovoltaic power supply arrangement according to any of the preceding claims 25-29, characterized in that the data of each circuit arrangement (800-825) is provided to a central power and data management control (880) and preferably to the other circuit arrangements.
31. Photovoltaic power supply arrangement according to the preceding claim, characterized in that the data is provided via a dc-insulating device.
32. Connection housing for connecting a string to a common bus bar, wherein the connecting housing sealingly encases at least one circuit arrangement according to one of the preceding claims 1 - 24.
33. Use of a circuit arrangement according to one of the preceding claims 1
- 24 for controlling the current flow of a string.
34. Use of a circuit arrangement according to one of the preceding claims 1
- 24 for a theft control of a string.
35. Use of a circuit arrangement according to one of the preceding claims 1
- 24 for a central power and data management of a string.
36. Method for protecting a string against excessive currents comprising the steps: measuring the voltage across the string and/or the current flowing in at least one of the connecting lines of the string, - comparing this voltage and/or current with predetermined limit values via databus or programmed in a controller, outputting an alarm signal from the controller if the voltage and/or current is above or below the predetermined values, and opening a mechanical switch in at least one of the connecting lines in response to the alarm signal.
37. Method according to claim 36, wherein a semiconductor switch interconnecting the two connecting lines of the string is closed before opening the mechanical switch and the semiconductor switch is opened after the mechanical switch is opened.
38. Method for providing a theft protection of a string, comprising the steps: measuring the voltage across the string and/or the current flowing in at least one of the connecting lines of the string, providing the measured voltage and/or current to a controller, comparing this voltage and/or current with a predetermined value and/or a previous value in a controller, outputting a theft alarm signal from the controller if the change of the voltage and/or the current is greater than a predetermined magnitude of change.
39. Method according to claim 38, further comprising the steps: - sending a preferably pulsed signal to one of the connecting lines of the string, measuring the resistance of the string based on this signal, comparing the measured resistance with a predetermined lesis- tance value and/or a previously measured value in the controller, and outputting a theft alarm signal from the controller if the difference between the measured resistance and the predetermined resistance value and/or the previously measured value is greater than a predetermined magnitude of change.
40. Method for controlling a number of solar modules or a number of strings of solar modules, comprising the steps: measuring the voltage across each solar module or each string of solar modules, respectively and/or the current flowing in at least one of the connecting lines of each solar module or each string of solar modules, respectively, providing the measured voltage and/or current to a controller, performing a logical operation in the controller based on the measured voltage and/or current, outputting a signal from the controller in response to the result of the logical operation to a mechanical switch to interrupt at least one of the connecting lines of the string if certain predetermined conditions of operation are not fulfilled.
41. Method according to claim 40, wherein the values of the voltage and/or the current are stored in a storage de- vice.
42. Method according to claim 40 or 41 , wherein the values of the voltage and/or the current are transferred to a central control unit.
43. Method according to any of the preceding claims 36-42, wherein the voltage of one or both connecting lines of the string are measured versus ground.
44. Method according to any of the preceding claims 36-43, wherein the current in one or both connecting lines of the string is measured at low impedance via a shunt.
45. Method according to any of the the preceding claims 36-44, wherein in case that a shortcut of the common bus bar (20) is detected all switches are informed via a communication bus to switch off.
46. Method according to any of the preceding claims 36-45, wherein the irradiation onto at least one solar module is measured and the the over current level is set in relation to this measured irradiation.
47. Method according to any of the preceding claims 36-46, wherein the environmental temperature and/or the temperature of at least one solar module is measured and the over voltage level is set in relation to this (these) measured temperature(s).
48. Method according to any of the preceding claims 36-47, wherein the over voltage level is set to the maximum inverter voltage in order to prevent the inverter from excessive voltages.
49. Method according to the preceding claim 48, wherein the over voltage level is monitored in real-time to open at least one mechanical switch in case of overvoltage to allow to set the magnitude of the nominal output voltage of the strings with a smaller safety margin to the maximum nominal input voltage of the inverter connected to the strings.
50. Method according to any of the preceding claims 36-49, wherein the voltage drop across and the current through at least one mechanical switch (31 ; 32) is measured and analyzed to monitor the switch quality.
PCT/EP2005/011429 2005-10-24 2005-10-24 Switch-fuse with control management for solar cells WO2007048421A2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP11168783.6A EP2369709B1 (en) 2005-10-24 2005-10-24 Switch-Fuse with control management for solar cells
EP05799316A EP1946418A2 (en) 2005-10-24 2005-10-24 Switch-fuse with control management for solar cells
PCT/EP2005/011429 WO2007048421A2 (en) 2005-10-24 2005-10-24 Switch-fuse with control management for solar cells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/EP2005/011429 WO2007048421A2 (en) 2005-10-24 2005-10-24 Switch-fuse with control management for solar cells

Publications (2)

Publication Number Publication Date
WO2007048421A2 true WO2007048421A2 (en) 2007-05-03
WO2007048421A3 WO2007048421A3 (en) 2007-07-12

Family

ID=36606420

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2005/011429 WO2007048421A2 (en) 2005-10-24 2005-10-24 Switch-fuse with control management for solar cells

Country Status (2)

Country Link
EP (2) EP1946418A2 (en)
WO (1) WO2007048421A2 (en)

Cited By (91)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009026602A1 (en) 2007-08-29 2009-03-05 Fronius International Gmbh Method for theft recognition on a photovoltaic unit and inverter for a photovoltaic unit
WO2009059028A2 (en) 2007-11-02 2009-05-07 Tigo Energy, Inc., Apparatuses and methods to reduce safety risks associated with photovoltaic systems
EP2061088A2 (en) 2007-11-16 2009-05-20 Meta System S.p.A. Upgraded photovoltaic system
DE102008008505A1 (en) * 2008-02-11 2009-08-13 Siemens Aktiengesellschaft Photo voltaic-sub generator-junction box for photo voltaic-system, has electronic control unit connected with electronic circuit element to activate and deactivate associated photo voltaic-strand lines
FR2927733A1 (en) * 2008-02-19 2009-08-21 Photowatt Internat Soc Par Act INSTALLATION OF REMOTE CONTROLLED PHOTOVOLTAIC MODULES
EP2120268A2 (en) * 2008-05-12 2009-11-18 Ingeteam Energy, S.A. Electrical circuit for protecting photovoltaic systems
EP2133926A1 (en) * 2008-06-11 2009-12-16 SAVIO S.p.A. Antitheft device for photovoltaic panels
WO2010020385A2 (en) * 2008-08-22 2010-02-25 Eprotech Reimann E.K. Apparatus and method for monitoring individual photovoltaic modules of a photovoltaic system
US20100057266A1 (en) * 2008-08-29 2010-03-04 Mario Resadi Control and signalling device for photovoltaic modules
ITTO20080676A1 (en) * 2008-09-16 2010-03-17 Saet Impianti Speciali S R L ANTI-THEFT DEVICE FOR STRING OF PHOTOVOLTAIC PANELS AND PHOTOVOLTAIC PLANT INCLUDING THE ANTI-THEFT DEVICE
US20100207770A1 (en) * 2009-01-30 2010-08-19 Schott Solar Ag Alarm system for photovoltaic modules as well as method for protecting a photovoltaic installation from theft
EP2256819A1 (en) * 2009-05-25 2010-12-01 Yamaichi Electronics Deutschland GmbH Connection socket for a solar module and a solar panel
EP2282388A1 (en) * 2009-08-06 2011-02-09 SMA Solar Technology AG Device for feeding in electrical energy of a number of strings of photovoltaic modules in an electricity network
WO2011015476A2 (en) 2009-08-06 2011-02-10 Sma Solar Technology Ag Reverse current sensor
ITCN20090010A1 (en) * 2009-10-28 2011-04-29 Shd Di Bassignana Luigi & C Snc SOLAR CONTROL SYSTEM DIAGNOSTIC AND ANTI-THEFT CONTROL SYSTEM FOR SOLAR PANELS
ITVI20090266A1 (en) * 2009-10-30 2011-04-30 Pria Fabio Dalla SAFETY DEVICE, PARTICULARLY FOR PHOTOVOLTAIC PLANTS, AND PHOTOVOLTAIC SYSTEM MADE WITH SUCH DEVICE
FR2955210A1 (en) * 2010-01-12 2011-07-15 Thierry Arnaud Local control module for photovoltaic panel, has diode for allowing current circulation between serialization terminals when panel does not produce electricity, and source connected between ground terminal and series connection conductor
US20110260866A1 (en) * 2010-04-22 2011-10-27 Tigo Energy Enhanced System and Method for Theft Prevention in a Solar Power Array During Nonoperative Periods
WO2011151672A1 (en) * 2010-05-31 2011-12-08 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
WO2012022345A2 (en) 2010-08-03 2012-02-23 Newtos Ag Method for controlling individual photovoltaic modules in a photovoltaic installation, and control device
WO2012044646A1 (en) * 2010-09-28 2012-04-05 Xantrex Technology, Inc. Integrated photovoltaic source circuit combiner and protection subsystem
AT510512A1 (en) * 2010-09-30 2012-04-15 Fronius Int Gmbh INVERTER
ITVR20100227A1 (en) * 2010-11-29 2012-05-30 Metech Italia S R L SAFETY DEVICE FOR PHOTOVOLTAIC SYSTEMS
EP2463914A1 (en) * 2010-12-07 2012-06-13 HST Elektronik GmbH Safety device for photovoltaic assemblies
US8273979B2 (en) 2008-10-15 2012-09-25 Xandex, Inc. Time averaged modulated diode apparatus for photovoltaic application
US8570005B2 (en) 2011-09-12 2013-10-29 Solaredge Technologies Ltd. Direct current link circuit
US8587151B2 (en) 2006-12-06 2013-11-19 Solaredge, Ltd. Method for distributed power harvesting using DC power sources
US8599588B2 (en) 2007-12-05 2013-12-03 Solaredge Ltd. Parallel connected inverters
WO2014006003A1 (en) * 2012-07-02 2014-01-09 Sma Solar Technology Ag Method and device for determining and indicating a module technology of a photovoltaic generator
US8659188B2 (en) 2006-12-06 2014-02-25 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US8710699B2 (en) 2009-12-01 2014-04-29 Solaredge Technologies Ltd. Dual use photovoltaic system
US8766696B2 (en) 2010-01-27 2014-07-01 Solaredge Technologies Ltd. Fast voltage level shifter circuit
US8773092B2 (en) 2007-08-06 2014-07-08 Solaredge Technologies Ltd. Digital average input current control in power converter
US8957645B2 (en) 2008-03-24 2015-02-17 Solaredge Technologies Ltd. Zero voltage switching
US8988838B2 (en) 2012-01-30 2015-03-24 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US9006569B2 (en) 2009-05-22 2015-04-14 Solaredge Technologies Ltd. Electrically isolated heat dissipating junction box
EP2208236A4 (en) * 2007-10-15 2015-05-06 Ampt Llc High efficiency remotely controllable solar energy system
US9041339B2 (en) 2006-12-06 2015-05-26 Solaredge Technologies Ltd. Battery power delivery module
US9088178B2 (en) 2006-12-06 2015-07-21 Solaredge Technologies Ltd Distributed power harvesting systems using DC power sources
US9124139B2 (en) 2010-01-08 2015-09-01 Tigo Energy, Inc. Systems and methods for an identification protocol between a local controller coupled to control a solar module and a master controller
US9130401B2 (en) 2006-12-06 2015-09-08 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
EP2374190B1 (en) 2008-12-04 2015-10-14 Solaredge Technologies Ltd. System and method for protection in power installations
DE102014115601B3 (en) * 2014-10-27 2016-01-07 Sma Solar Technology Ag Combinerbox with motor overcurrent protection
US9235228B2 (en) 2012-03-05 2016-01-12 Solaredge Technologies Ltd. Direct current link circuit
US9318974B2 (en) 2014-03-26 2016-04-19 Solaredge Technologies Ltd. Multi-level inverter with flying capacitor topology
US9362743B2 (en) 2008-05-05 2016-06-07 Solaredge Technologies Ltd. Direct current power combiner
US9368964B2 (en) 2006-12-06 2016-06-14 Solaredge Technologies Ltd. Distributed power system using direct current power sources
WO2016107176A1 (en) * 2015-01-04 2016-07-07 华为技术有限公司 Photovoltaic system
US9401599B2 (en) 2010-12-09 2016-07-26 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
EP2256818B1 (en) * 2009-05-25 2016-08-17 Yamaichi Electronics Deutschland GmbH Connection socket, solar panel and method
JP2016174480A (en) * 2015-03-17 2016-09-29 日東工業株式会社 Lightning protection system of power conditioner
US9537445B2 (en) 2008-12-04 2017-01-03 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9543889B2 (en) 2006-12-06 2017-01-10 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9548619B2 (en) 2013-03-14 2017-01-17 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US9590526B2 (en) 2006-12-06 2017-03-07 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US9647442B2 (en) 2010-11-09 2017-05-09 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US9644993B2 (en) 2006-12-06 2017-05-09 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US9813021B2 (en) 2007-11-02 2017-11-07 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US9812984B2 (en) 2012-01-30 2017-11-07 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9819178B2 (en) 2013-03-15 2017-11-14 Solaredge Technologies Ltd. Bypass mechanism
US9831824B2 (en) 2007-12-05 2017-11-28 SolareEdge Technologies Ltd. Current sensing on a MOSFET
US9853565B2 (en) 2012-01-30 2017-12-26 Solaredge Technologies Ltd. Maximized power in a photovoltaic distributed power system
US9866098B2 (en) 2011-01-12 2018-01-09 Solaredge Technologies Ltd. Serially connected inverters
US9870016B2 (en) 2012-05-25 2018-01-16 Solaredge Technologies Ltd. Circuit for interconnected direct current power sources
US9869701B2 (en) 2009-05-26 2018-01-16 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US9941813B2 (en) 2013-03-14 2018-04-10 Solaredge Technologies Ltd. High frequency multi-level inverter
US9960731B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US10061957B2 (en) 2016-03-03 2018-08-28 Solaredge Technologies Ltd. Methods for mapping power generation installations
US10115841B2 (en) 2012-06-04 2018-10-30 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
US10230310B2 (en) 2016-04-05 2019-03-12 Solaredge Technologies Ltd Safety switch for photovoltaic systems
US10599113B2 (en) 2016-03-03 2020-03-24 Solaredge Technologies Ltd. Apparatus and method for determining an order of power devices in power generation systems
US10673222B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673229B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10931119B2 (en) 2012-01-11 2021-02-23 Solaredge Technologies Ltd. Photovoltaic module
US11018623B2 (en) 2016-04-05 2021-05-25 Solaredge Technologies Ltd. Safety switch for photovoltaic systems
US11081608B2 (en) 2016-03-03 2021-08-03 Solaredge Technologies Ltd. Apparatus and method for determining an order of power devices in power generation systems
US11177663B2 (en) 2016-04-05 2021-11-16 Solaredge Technologies Ltd. Chain of power devices
US11228278B2 (en) 2007-11-02 2022-01-18 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US11264947B2 (en) 2007-12-05 2022-03-01 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11296650B2 (en) 2006-12-06 2022-04-05 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US11309832B2 (en) 2006-12-06 2022-04-19 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11569659B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11687112B2 (en) 2006-12-06 2023-06-27 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11728768B2 (en) 2006-12-06 2023-08-15 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US11735910B2 (en) 2006-12-06 2023-08-22 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11855231B2 (en) 2006-12-06 2023-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11881814B2 (en) 2005-12-05 2024-01-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11888387B2 (en) 2006-12-06 2024-01-30 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11967653B2 (en) 2013-03-15 2024-04-23 Ampt, Llc Phased solar power supply system
US11967930B2 (en) 2009-09-03 2024-04-23 Tigo Energy, Inc. Systems and methods for an enhanced watchdog in solar module installations
US11996488B2 (en) 2010-12-09 2024-05-28 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3561881A1 (en) 2007-12-05 2019-10-30 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9291696B2 (en) 2007-12-05 2016-03-22 Solaredge Technologies Ltd. Photovoltaic system power tracking method
DE202011050696U1 (en) * 2011-07-12 2012-10-22 Sma Solar Technology Ag Safety device for photovoltaic (PV) generators
US10720777B2 (en) 2018-10-15 2020-07-21 Inventus Holdings, Llc DC integration of battery for expanding the DC:AC ratio limit of a PV inverter
CN116316417A (en) * 2020-12-31 2023-06-23 华为数字能源技术有限公司 Photovoltaic inverter and turn-off protection method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01177823A (en) * 1987-12-29 1989-07-14 Shikoku Electric Power Co Inc Protection of solar cell circuit
JPH07177652A (en) * 1993-12-17 1995-07-14 Canon Inc Solar beam power generation system and protective system therefor
JPH08251818A (en) * 1995-01-13 1996-09-27 Omron Corp Reverse-current preventive device, rectifying device and photovoltaic power generation system
JPH09182279A (en) * 1995-10-26 1997-07-11 Nitto Kogyo Kk Short circuit detector for photovoltaic power generation system
JP2000164906A (en) * 1998-11-26 2000-06-16 Fujitsu Denso Ltd Theft detection circuit for solar battery and solar battery distribution panel
JP2000284017A (en) * 1999-03-31 2000-10-13 Chudenko Corp Method and device for measuring output in solar-electric power generation
US20010023703A1 (en) * 2000-02-29 2001-09-27 Hiroshi Kondo Solar power generation apparatus and control method therefor

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19844977A1 (en) * 1998-09-30 2000-04-13 Siemens Solar Gmbh Protection system for a solar module
EP1014403A1 (en) 1998-12-21 2000-06-28 Asea Brown Boveri AG Current-limiting switch
JP2001068706A (en) * 1999-08-25 2001-03-16 Sanyo Electric Co Ltd Solar cell device
DE10002870A1 (en) 2000-01-24 2001-08-23 Abb Research Ltd Current limiting arrangement has switching point connected in rated current path in series with vacuum switch and provided with device for increasing spark voltage
JP2002367046A (en) 2001-06-11 2002-12-20 Nec Eng Ltd Antitheft device for solar battery module
FR2853469B1 (en) 2003-04-02 2008-08-22 Electricite De France SAFETY PHOTOVOLTAIC PANEL AGAINST FLIGHT
DE60303773T2 (en) 2003-12-05 2006-09-21 Société Technique pour l'Energie Atomique TECHNICATOME Hybrid circuit breaker

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01177823A (en) * 1987-12-29 1989-07-14 Shikoku Electric Power Co Inc Protection of solar cell circuit
JPH07177652A (en) * 1993-12-17 1995-07-14 Canon Inc Solar beam power generation system and protective system therefor
JPH08251818A (en) * 1995-01-13 1996-09-27 Omron Corp Reverse-current preventive device, rectifying device and photovoltaic power generation system
JPH09182279A (en) * 1995-10-26 1997-07-11 Nitto Kogyo Kk Short circuit detector for photovoltaic power generation system
JP2000164906A (en) * 1998-11-26 2000-06-16 Fujitsu Denso Ltd Theft detection circuit for solar battery and solar battery distribution panel
JP2000284017A (en) * 1999-03-31 2000-10-13 Chudenko Corp Method and device for measuring output in solar-electric power generation
US20010023703A1 (en) * 2000-02-29 2001-09-27 Hiroshi Kondo Solar power generation apparatus and control method therefor

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 2000, no. 20, 10 July 2001 (2001-07-10) & JP 2001 068706 A (SANYO ELECTRIC CO LTD), 16 March 2001 (2001-03-16) *
See also references of EP1946418A2 *

Cited By (235)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11881814B2 (en) 2005-12-05 2024-01-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11063440B2 (en) 2006-12-06 2021-07-13 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US11728768B2 (en) 2006-12-06 2023-08-15 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US11961922B2 (en) 2006-12-06 2024-04-16 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11962243B2 (en) 2006-12-06 2024-04-16 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US11888387B2 (en) 2006-12-06 2024-01-30 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11043820B2 (en) 2006-12-06 2021-06-22 Solaredge Technologies Ltd. Battery power delivery module
US11855231B2 (en) 2006-12-06 2023-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9368964B2 (en) 2006-12-06 2016-06-14 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11735910B2 (en) 2006-12-06 2023-08-22 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11031861B2 (en) 2006-12-06 2021-06-08 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US11687112B2 (en) 2006-12-06 2023-06-27 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9543889B2 (en) 2006-12-06 2017-01-10 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11682918B2 (en) 2006-12-06 2023-06-20 Solaredge Technologies Ltd. Battery power delivery module
US9088178B2 (en) 2006-12-06 2015-07-21 Solaredge Technologies Ltd Distributed power harvesting systems using DC power sources
US11658482B2 (en) 2006-12-06 2023-05-23 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9130401B2 (en) 2006-12-06 2015-09-08 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11598652B2 (en) 2006-12-06 2023-03-07 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11594882B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11594881B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9590526B2 (en) 2006-12-06 2017-03-07 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11594880B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9644993B2 (en) 2006-12-06 2017-05-09 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11579235B2 (en) 2006-12-06 2023-02-14 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11575261B2 (en) 2006-12-06 2023-02-07 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11575260B2 (en) 2006-12-06 2023-02-07 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11569659B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11569660B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11476799B2 (en) 2006-12-06 2022-10-18 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11309832B2 (en) 2006-12-06 2022-04-19 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11296650B2 (en) 2006-12-06 2022-04-05 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US9680304B2 (en) 2006-12-06 2017-06-13 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US11183922B2 (en) 2006-12-06 2021-11-23 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9853490B2 (en) 2006-12-06 2017-12-26 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11073543B2 (en) 2006-12-06 2021-07-27 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US9041339B2 (en) 2006-12-06 2015-05-26 Solaredge Technologies Ltd. Battery power delivery module
US9948233B2 (en) 2006-12-06 2018-04-17 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US8659188B2 (en) 2006-12-06 2014-02-25 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11002774B2 (en) 2006-12-06 2021-05-11 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US9960731B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US10673253B2 (en) 2006-12-06 2020-06-02 Solaredge Technologies Ltd. Battery power delivery module
US10637393B2 (en) 2006-12-06 2020-04-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9960667B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US10447150B2 (en) 2006-12-06 2019-10-15 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US8587151B2 (en) 2006-12-06 2013-11-19 Solaredge, Ltd. Method for distributed power harvesting using DC power sources
US9966766B2 (en) 2006-12-06 2018-05-08 Solaredge Technologies Ltd. Battery power delivery module
US10097007B2 (en) 2006-12-06 2018-10-09 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US10230245B2 (en) 2006-12-06 2019-03-12 Solaredge Technologies Ltd Battery power delivery module
US10116217B2 (en) 2007-08-06 2018-10-30 Solaredge Technologies Ltd. Digital average input current control in power converter
US8773092B2 (en) 2007-08-06 2014-07-08 Solaredge Technologies Ltd. Digital average input current control in power converter
US10516336B2 (en) 2007-08-06 2019-12-24 Solaredge Technologies Ltd. Digital average input current control in power converter
US11594968B2 (en) 2007-08-06 2023-02-28 Solaredge Technologies Ltd. Digital average input current control in power converter
US9673711B2 (en) 2007-08-06 2017-06-06 Solaredge Technologies Ltd. Digital average input current control in power converter
AT505731B1 (en) * 2007-08-29 2013-03-15 Fronius Int Gmbh METHOD FOR THE ALARM DETECTION OF A PHOTOVOLTAIC SYSTEM AND INVERTERS FOR A PHOTOVOLTAIC SYSTEM
WO2009026602A1 (en) 2007-08-29 2009-03-05 Fronius International Gmbh Method for theft recognition on a photovoltaic unit and inverter for a photovoltaic unit
US8466789B2 (en) 2007-08-29 2013-06-18 Fronius International Gmbh Method for theft recognition on a photovoltaic unit and inverter for a photovoltaic unit
EP3324505B1 (en) * 2007-10-15 2023-06-07 Ampt, Llc Systems for highly efficient solar power
EP2208236A4 (en) * 2007-10-15 2015-05-06 Ampt Llc High efficiency remotely controllable solar energy system
EP4243279A3 (en) * 2007-11-02 2023-10-04 Tigo Energy, Inc. Apparatuses and methods to reduce safety risks associated with photovoltaic systems
US9813021B2 (en) 2007-11-02 2017-11-07 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
EP2206159A4 (en) * 2007-11-02 2014-09-03 Tigo Energy Inc Apparatuses and methods to reduce safety risks associated with photovoltaic systems
US11228278B2 (en) 2007-11-02 2022-01-18 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
WO2009059028A2 (en) 2007-11-02 2009-05-07 Tigo Energy, Inc., Apparatuses and methods to reduce safety risks associated with photovoltaic systems
US10686403B2 (en) 2007-11-02 2020-06-16 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US11646695B2 (en) 2007-11-02 2023-05-09 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
US10256770B2 (en) 2007-11-02 2019-04-09 Tigo Energy, Inc. System and method for enhanced watch dog in solar panel installations
EP2206159A2 (en) * 2007-11-02 2010-07-14 Tigo Energy, Inc. Apparatuses and methods to reduce safety risks associated with photovoltaic systems
EP2061088A3 (en) * 2007-11-16 2011-02-16 Meta System S.p.A. Upgraded photovoltaic system
EP2061088A2 (en) 2007-11-16 2009-05-20 Meta System S.p.A. Upgraded photovoltaic system
US9853538B2 (en) 2007-12-04 2017-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11183969B2 (en) 2007-12-05 2021-11-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9407161B2 (en) 2007-12-05 2016-08-02 Solaredge Technologies Ltd. Parallel connected inverters
US10644589B2 (en) 2007-12-05 2020-05-05 Solaredge Technologies Ltd. Parallel connected inverters
US9831824B2 (en) 2007-12-05 2017-11-28 SolareEdge Technologies Ltd. Current sensing on a MOSFET
US8599588B2 (en) 2007-12-05 2013-12-03 Solaredge Ltd. Parallel connected inverters
US11693080B2 (en) 2007-12-05 2023-07-04 Solaredge Technologies Ltd. Parallel connected inverters
US11894806B2 (en) 2007-12-05 2024-02-06 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9979280B2 (en) 2007-12-05 2018-05-22 Solaredge Technologies Ltd. Parallel connected inverters
US10693415B2 (en) 2007-12-05 2020-06-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11264947B2 (en) 2007-12-05 2022-03-01 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11183923B2 (en) 2007-12-05 2021-11-23 Solaredge Technologies Ltd. Parallel connected inverters
DE102008008505A1 (en) * 2008-02-11 2009-08-13 Siemens Aktiengesellschaft Photo voltaic-sub generator-junction box for photo voltaic-system, has electronic control unit connected with electronic circuit element to activate and deactivate associated photo voltaic-strand lines
EP2093578A1 (en) * 2008-02-19 2009-08-26 Photowatt International Installation of remote controlled photovoltaic modules
FR2927733A1 (en) * 2008-02-19 2009-08-21 Photowatt Internat Soc Par Act INSTALLATION OF REMOTE CONTROLLED PHOTOVOLTAIC MODULES
US9876430B2 (en) 2008-03-24 2018-01-23 Solaredge Technologies Ltd. Zero voltage switching
US8957645B2 (en) 2008-03-24 2015-02-17 Solaredge Technologies Ltd. Zero voltage switching
US9362743B2 (en) 2008-05-05 2016-06-07 Solaredge Technologies Ltd. Direct current power combiner
US10468878B2 (en) 2008-05-05 2019-11-05 Solaredge Technologies Ltd. Direct current power combiner
US11424616B2 (en) 2008-05-05 2022-08-23 Solaredge Technologies Ltd. Direct current power combiner
US7969700B2 (en) 2008-05-12 2011-06-28 Ingeteam Energy, S.A. Electrical circuit for protecting photovoltaic systems
EP2120268A3 (en) * 2008-05-12 2014-08-06 Ingeteam Power Technology, S.A. Electrical circuit for protecting photovoltaic systems
EP2120268A2 (en) * 2008-05-12 2009-11-18 Ingeteam Energy, S.A. Electrical circuit for protecting photovoltaic systems
EP2136411A1 (en) * 2008-06-11 2009-12-23 SAVIO S.p.A. Antitheft and monitoring system for photovoltaic panels
EP2133926A1 (en) * 2008-06-11 2009-12-16 SAVIO S.p.A. Antitheft device for photovoltaic panels
CN101860273A (en) * 2008-06-11 2010-10-13 萨维奥股份有限公司 Antitheft and the surveillance that is used for photovoltaic panel
US20100253517A1 (en) * 2008-06-11 2010-10-07 Savio S.P.A. Antitheft and monitoring system for photovoltaic panels
WO2010020385A2 (en) * 2008-08-22 2010-02-25 Eprotech Reimann E.K. Apparatus and method for monitoring individual photovoltaic modules of a photovoltaic system
WO2010020385A3 (en) * 2008-08-22 2010-07-29 Eprotech Reimann E.K. Apparatus and method for monitoring individual photovoltaic modules of a photovoltaic system
US20100057266A1 (en) * 2008-08-29 2010-03-04 Mario Resadi Control and signalling device for photovoltaic modules
ITTO20080676A1 (en) * 2008-09-16 2010-03-17 Saet Impianti Speciali S R L ANTI-THEFT DEVICE FOR STRING OF PHOTOVOLTAIC PANELS AND PHOTOVOLTAIC PLANT INCLUDING THE ANTI-THEFT DEVICE
US8273979B2 (en) 2008-10-15 2012-09-25 Xandex, Inc. Time averaged modulated diode apparatus for photovoltaic application
US9537445B2 (en) 2008-12-04 2017-01-03 Solaredge Technologies Ltd. Testing of a photovoltaic panel
EP2374190B1 (en) 2008-12-04 2015-10-14 Solaredge Technologies Ltd. System and method for protection in power installations
EP2374190B2 (en) 2008-12-04 2023-03-15 Solaredge Technologies Ltd. System and method for protection in power installations
US10461687B2 (en) 2008-12-04 2019-10-29 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US20100207770A1 (en) * 2009-01-30 2010-08-19 Schott Solar Ag Alarm system for photovoltaic modules as well as method for protecting a photovoltaic installation from theft
EP2221785A1 (en) * 2009-01-30 2010-08-25 SCHOTT Solar AG Alarm system for photovoltaic module and method for protecting a photovoltaic assembly from being stolen
US10879840B2 (en) 2009-05-22 2020-12-29 Solaredge Technologies Ltd. Electrically isolated heat dissipating junction box
US11509263B2 (en) 2009-05-22 2022-11-22 Solaredge Technologies Ltd. Electrically isolated heat dissipating junction box
US11695371B2 (en) 2009-05-22 2023-07-04 Solaredge Technologies Ltd. Electrically isolated heat dissipating junction box
US10686402B2 (en) 2009-05-22 2020-06-16 Solaredge Technologies Ltd. Electrically isolated heat dissipating junction box
US9748896B2 (en) 2009-05-22 2017-08-29 Solaredge Technologies Ltd. Electrically isolated heat dissipating junction box
US10411644B2 (en) 2009-05-22 2019-09-10 Solaredge Technologies, Ltd. Electrically isolated heat dissipating junction box
US9006569B2 (en) 2009-05-22 2015-04-14 Solaredge Technologies Ltd. Electrically isolated heat dissipating junction box
US9748897B2 (en) 2009-05-22 2017-08-29 Solaredge Technologies Ltd. Electrically isolated heat dissipating junction box
EP2256819A1 (en) * 2009-05-25 2010-12-01 Yamaichi Electronics Deutschland GmbH Connection socket for a solar module and a solar panel
EP2256818B1 (en) * 2009-05-25 2016-08-17 Yamaichi Electronics Deutschland GmbH Connection socket, solar panel and method
US9869701B2 (en) 2009-05-26 2018-01-16 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US10969412B2 (en) 2009-05-26 2021-04-06 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US11867729B2 (en) 2009-05-26 2024-01-09 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
CN102484368A (en) * 2009-08-06 2012-05-30 艾思玛太阳能技术股份公司 Reverse current sensor
WO2011015476A2 (en) 2009-08-06 2011-02-10 Sma Solar Technology Ag Reverse current sensor
WO2011015587A3 (en) * 2009-08-06 2011-06-16 Sma Solar Technology Ag Device for supplying electrical energy from a plurality of strings of photovoltaic modules to a power grid
US8749934B2 (en) 2009-08-06 2014-06-10 Sma Solar Technology Ag Reverse current sensor
WO2011015587A2 (en) 2009-08-06 2011-02-10 Sma Solar Technology Ag Device for supplying electrical energy from a plurality of strings of photovoltaic modules to a power grid
EP2284973A1 (en) * 2009-08-06 2011-02-16 SMA Solar Technology AG Reverse current sensor for solar modules connected in parallel
WO2011015476A3 (en) * 2009-08-06 2012-02-02 Sma Solar Technology Ag Reverse current sensor
EP2282388A1 (en) * 2009-08-06 2011-02-09 SMA Solar Technology AG Device for feeding in electrical energy of a number of strings of photovoltaic modules in an electricity network
JP2013501495A (en) * 2009-08-06 2013-01-10 エスエムエー ソーラー テクノロジー アーゲー Reverse current sensor
CN102474097A (en) * 2009-08-06 2012-05-23 艾思玛太阳能技术股份公司 Device for supplying electrical energy from a plurality of strings of photovoltaic modules to a power grid
JP2013501497A (en) * 2009-08-06 2013-01-10 エスエムエー ソーラー テクノロジー アーゲー Apparatus for supplying electrical energy to a power grid from a multi-string photovoltaic module
CN102484368B (en) * 2009-08-06 2015-07-22 艾思玛太阳能技术股份公司 Reverse current sensor
US11967930B2 (en) 2009-09-03 2024-04-23 Tigo Energy, Inc. Systems and methods for an enhanced watchdog in solar module installations
ITCN20090010A1 (en) * 2009-10-28 2011-04-29 Shd Di Bassignana Luigi & C Snc SOLAR CONTROL SYSTEM DIAGNOSTIC AND ANTI-THEFT CONTROL SYSTEM FOR SOLAR PANELS
ITVI20090266A1 (en) * 2009-10-30 2011-04-30 Pria Fabio Dalla SAFETY DEVICE, PARTICULARLY FOR PHOTOVOLTAIC PLANTS, AND PHOTOVOLTAIC SYSTEM MADE WITH SUCH DEVICE
US10270255B2 (en) 2009-12-01 2019-04-23 Solaredge Technologies Ltd Dual use photovoltaic system
US11056889B2 (en) 2009-12-01 2021-07-06 Solaredge Technologies Ltd. Dual use photovoltaic system
US8710699B2 (en) 2009-12-01 2014-04-29 Solaredge Technologies Ltd. Dual use photovoltaic system
US9276410B2 (en) 2009-12-01 2016-03-01 Solaredge Technologies Ltd. Dual use photovoltaic system
US11735951B2 (en) 2009-12-01 2023-08-22 Solaredge Technologies Ltd. Dual use photovoltaic system
US9124139B2 (en) 2010-01-08 2015-09-01 Tigo Energy, Inc. Systems and methods for an identification protocol between a local controller coupled to control a solar module and a master controller
US10135385B2 (en) 2010-01-08 2018-11-20 Tigo Energy, Inc. Identification protocol between a local controller of a solar module and a master controller
US10749457B2 (en) 2010-01-08 2020-08-18 Tigo Energy, Inc. Systems and methods for an identification protocol between a local controller of a solar module and a master controller
FR2955210A1 (en) * 2010-01-12 2011-07-15 Thierry Arnaud Local control module for photovoltaic panel, has diode for allowing current circulation between serialization terminals when panel does not produce electricity, and source connected between ground terminal and series connection conductor
US9917587B2 (en) 2010-01-27 2018-03-13 Solaredge Technologies Ltd. Fast voltage level shifter circuit
US9231570B2 (en) 2010-01-27 2016-01-05 Solaredge Technologies Ltd. Fast voltage level shifter circuit
US9564882B2 (en) 2010-01-27 2017-02-07 Solaredge Technologies Ltd. Fast voltage level shifter circuit
US8766696B2 (en) 2010-01-27 2014-07-01 Solaredge Technologies Ltd. Fast voltage level shifter circuit
US20110260866A1 (en) * 2010-04-22 2011-10-27 Tigo Energy Enhanced System and Method for Theft Prevention in a Solar Power Array During Nonoperative Periods
US9007210B2 (en) * 2010-04-22 2015-04-14 Tigo Energy, Inc. Enhanced system and method for theft prevention in a solar power array during nonoperative periods
WO2011151672A1 (en) * 2010-05-31 2011-12-08 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US20130154380A1 (en) * 2010-08-03 2013-06-20 Newtos Ag Method for Controlling Individual Photovoltaic Modules of a Photovoltaic System
WO2012022345A2 (en) 2010-08-03 2012-02-23 Newtos Ag Method for controlling individual photovoltaic modules in a photovoltaic installation, and control device
CN103081269A (en) * 2010-08-03 2013-05-01 纽图斯股份公司 Method for controlling individual photovoltaic modules in a photovoltaic installation, and control device
WO2012022345A3 (en) * 2010-08-03 2012-06-14 Newtos Ag Method for controlling individual photovoltaic modules in a photovoltaic installation, and control device
US8482893B2 (en) 2010-09-28 2013-07-09 Xantrex Technology Inc. Integrated photovoltaic source circuit combiner and protection subsystem
CN103222144A (en) * 2010-09-28 2013-07-24 施耐德电气太阳能逆变器美国股份有限公司 Integrated photovoltaic source circuit combiner and protection subsystem
CN103222144B (en) * 2010-09-28 2016-01-20 施耐德电气太阳能逆变器美国股份有限公司 Integrated photovoltaic source circuit combiner and protected subsystem
WO2012044646A1 (en) * 2010-09-28 2012-04-05 Xantrex Technology, Inc. Integrated photovoltaic source circuit combiner and protection subsystem
AT510512B1 (en) * 2010-09-30 2015-08-15 Fronius Int Gmbh INVERTER
AT510512A1 (en) * 2010-09-30 2012-04-15 Fronius Int Gmbh INVERTER
US9190927B2 (en) 2010-09-30 2015-11-17 Fronius International Gmbh Inverter with a connector element formed by a connector block and a connector arranged on one side and a DC breaking element arranged inbetween
US9647442B2 (en) 2010-11-09 2017-05-09 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673229B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US11349432B2 (en) 2010-11-09 2022-05-31 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10931228B2 (en) 2010-11-09 2021-02-23 Solaredge Technologies Ftd. Arc detection and prevention in a power generation system
US11489330B2 (en) 2010-11-09 2022-11-01 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673222B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US11070051B2 (en) 2010-11-09 2021-07-20 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
WO2012073190A3 (en) * 2010-11-29 2012-07-26 Metech Italia S.R.L. Safety device for photovoltaic plants
ITVR20100227A1 (en) * 2010-11-29 2012-05-30 Metech Italia S R L SAFETY DEVICE FOR PHOTOVOLTAIC SYSTEMS
EP2463914A1 (en) * 2010-12-07 2012-06-13 HST Elektronik GmbH Safety device for photovoltaic assemblies
US9935458B2 (en) 2010-12-09 2018-04-03 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US11996488B2 (en) 2010-12-09 2024-05-28 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US9401599B2 (en) 2010-12-09 2016-07-26 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US11271394B2 (en) 2010-12-09 2022-03-08 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US9866098B2 (en) 2011-01-12 2018-01-09 Solaredge Technologies Ltd. Serially connected inverters
US11205946B2 (en) 2011-01-12 2021-12-21 Solaredge Technologies Ltd. Serially connected inverters
US10666125B2 (en) 2011-01-12 2020-05-26 Solaredge Technologies Ltd. Serially connected inverters
US8570005B2 (en) 2011-09-12 2013-10-29 Solaredge Technologies Ltd. Direct current link circuit
US10396662B2 (en) 2011-09-12 2019-08-27 Solaredge Technologies Ltd Direct current link circuit
US10931119B2 (en) 2012-01-11 2021-02-23 Solaredge Technologies Ltd. Photovoltaic module
US11979037B2 (en) 2012-01-11 2024-05-07 Solaredge Technologies Ltd. Photovoltaic module
US8988838B2 (en) 2012-01-30 2015-03-24 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US10608553B2 (en) 2012-01-30 2020-03-31 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US11929620B2 (en) 2012-01-30 2024-03-12 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9812984B2 (en) 2012-01-30 2017-11-07 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US11620885B2 (en) 2012-01-30 2023-04-04 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US11183968B2 (en) 2012-01-30 2021-11-23 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US9853565B2 (en) 2012-01-30 2017-12-26 Solaredge Technologies Ltd. Maximized power in a photovoltaic distributed power system
US10992238B2 (en) 2012-01-30 2021-04-27 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9923516B2 (en) 2012-01-30 2018-03-20 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US10381977B2 (en) 2012-01-30 2019-08-13 Solaredge Technologies Ltd Photovoltaic panel circuitry
US9639106B2 (en) 2012-03-05 2017-05-02 Solaredge Technologies Ltd. Direct current link circuit
US9235228B2 (en) 2012-03-05 2016-01-12 Solaredge Technologies Ltd. Direct current link circuit
US10007288B2 (en) 2012-03-05 2018-06-26 Solaredge Technologies Ltd. Direct current link circuit
US11740647B2 (en) 2012-05-25 2023-08-29 Solaredge Technologies Ltd. Circuit for interconnected direct current power sources
US11334104B2 (en) 2012-05-25 2022-05-17 Solaredge Technologies Ltd. Circuit for interconnected direct current power sources
US9870016B2 (en) 2012-05-25 2018-01-16 Solaredge Technologies Ltd. Circuit for interconnected direct current power sources
US10705551B2 (en) 2012-05-25 2020-07-07 Solaredge Technologies Ltd. Circuit for interconnected direct current power sources
US10115841B2 (en) 2012-06-04 2018-10-30 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
US11177768B2 (en) 2012-06-04 2021-11-16 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
WO2014006003A1 (en) * 2012-07-02 2014-01-09 Sma Solar Technology Ag Method and device for determining and indicating a module technology of a photovoltaic generator
US9941813B2 (en) 2013-03-14 2018-04-10 Solaredge Technologies Ltd. High frequency multi-level inverter
US11545912B2 (en) 2013-03-14 2023-01-03 Solaredge Technologies Ltd. High frequency multi-level inverter
US11742777B2 (en) 2013-03-14 2023-08-29 Solaredge Technologies Ltd. High frequency multi-level inverter
US10778025B2 (en) 2013-03-14 2020-09-15 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US9548619B2 (en) 2013-03-14 2017-01-17 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US11967653B2 (en) 2013-03-15 2024-04-23 Ampt, Llc Phased solar power supply system
US10651647B2 (en) 2013-03-15 2020-05-12 Solaredge Technologies Ltd. Bypass mechanism
US11424617B2 (en) 2013-03-15 2022-08-23 Solaredge Technologies Ltd. Bypass mechanism
US9819178B2 (en) 2013-03-15 2017-11-14 Solaredge Technologies Ltd. Bypass mechanism
US10886831B2 (en) 2014-03-26 2021-01-05 Solaredge Technologies Ltd. Multi-level inverter
US11296590B2 (en) 2014-03-26 2022-04-05 Solaredge Technologies Ltd. Multi-level inverter
US10886832B2 (en) 2014-03-26 2021-01-05 Solaredge Technologies Ltd. Multi-level inverter
US11632058B2 (en) 2014-03-26 2023-04-18 Solaredge Technologies Ltd. Multi-level inverter
US9318974B2 (en) 2014-03-26 2016-04-19 Solaredge Technologies Ltd. Multi-level inverter with flying capacitor topology
US11855552B2 (en) 2014-03-26 2023-12-26 Solaredge Technologies Ltd. Multi-level inverter
WO2016066429A1 (en) 2014-10-27 2016-05-06 Sma Solar Technology Ag Combiner box having motorized overcurrent protection
DE102014115601B3 (en) * 2014-10-27 2016-01-07 Sma Solar Technology Ag Combinerbox with motor overcurrent protection
US10084303B2 (en) 2014-10-27 2018-09-25 Sma Solar Technology Ag Combiner box having motorized overcurrent protection
EP3174196A4 (en) * 2015-01-04 2017-07-26 Huawei Technologies Co. Ltd. Photovoltaic system
WO2016107176A1 (en) * 2015-01-04 2016-07-07 华为技术有限公司 Photovoltaic system
JP2016174480A (en) * 2015-03-17 2016-09-29 日東工業株式会社 Lightning protection system of power conditioner
US11824131B2 (en) 2016-03-03 2023-11-21 Solaredge Technologies Ltd. Apparatus and method for determining an order of power devices in power generation systems
US10540530B2 (en) 2016-03-03 2020-01-21 Solaredge Technologies Ltd. Methods for mapping power generation installations
US10599113B2 (en) 2016-03-03 2020-03-24 Solaredge Technologies Ltd. Apparatus and method for determining an order of power devices in power generation systems
US10061957B2 (en) 2016-03-03 2018-08-28 Solaredge Technologies Ltd. Methods for mapping power generation installations
US11538951B2 (en) 2016-03-03 2022-12-27 Solaredge Technologies Ltd. Apparatus and method for determining an order of power devices in power generation systems
US11081608B2 (en) 2016-03-03 2021-08-03 Solaredge Technologies Ltd. Apparatus and method for determining an order of power devices in power generation systems
US11870250B2 (en) 2016-04-05 2024-01-09 Solaredge Technologies Ltd. Chain of power devices
US11018623B2 (en) 2016-04-05 2021-05-25 Solaredge Technologies Ltd. Safety switch for photovoltaic systems
US11201476B2 (en) 2016-04-05 2021-12-14 Solaredge Technologies Ltd. Photovoltaic power device and wiring
US10230310B2 (en) 2016-04-05 2019-03-12 Solaredge Technologies Ltd Safety switch for photovoltaic systems
US11177663B2 (en) 2016-04-05 2021-11-16 Solaredge Technologies Ltd. Chain of power devices

Also Published As

Publication number Publication date
WO2007048421A3 (en) 2007-07-12
EP2369709A3 (en) 2014-09-03
EP2369709B1 (en) 2016-05-04
EP1946418A2 (en) 2008-07-23
EP2369709A2 (en) 2011-09-28

Similar Documents

Publication Publication Date Title
EP2369709B1 (en) Switch-Fuse with control management for solar cells
US7161082B2 (en) Photovoltaic power generation systems and methods of controlling photovoltaic power generation systems
CN106663937A (en) Selective circuit breaker
CN106814313B (en) The intellectual faculties in breaker operator circuit
CN201278339Y (en) Load limiting intelligent circuit breaker
CN102474097A (en) Device for supplying electrical energy from a plurality of strings of photovoltaic modules to a power grid
CN104348143A (en) Method and system for detecting the accurate operation of an arc fault/transient detector
KR20200140963A (en) Combiner box for photovoltaic module with intelligent safety management
CN101782611A (en) On-line detector of surge protector
CA2365737A1 (en) Loop restoration scheme for distribution feeders
CN108181501A (en) A kind of current signal Acquisition Circuit with protective effect
KR20180024673A (en) Each channel surveillance device of photovoltaic power generation system
CN101944727A (en) Surge protector with detection device
CN109167342A (en) Lightning protection monitoring device
KR102155203B1 (en) High-voltage DC switch
KR102120048B1 (en) Solar Photovoltaic System
KR101532979B1 (en) System of protective control for substation facilities
CN202541351U (en) Stray current control system for DC (direct current) traction power supply
CN202440103U (en) Conveyer protective device
WO2001024345A1 (en) Supervision system
CN204391726U (en) A kind of Novel electric surge protector
US20050146815A1 (en) Electrical, transmission/substation/distribution shunt capacitor switching and control system with integrated, automatically resettable, overcurrent protection
CN113054624A (en) Special breaker for intelligent low-voltage surge protector and control method thereof
CN105262066A (en) DC intelligent protective unit
CN207518256U (en) Triple negative ground voltage protections

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase in:

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2005799316

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 2005799316

Country of ref document: EP