WO2006069414A1 - Soudure de pipeline - Google Patents

Soudure de pipeline Download PDF

Info

Publication number
WO2006069414A1
WO2006069414A1 PCT/AU2005/001805 AU2005001805W WO2006069414A1 WO 2006069414 A1 WO2006069414 A1 WO 2006069414A1 AU 2005001805 W AU2005001805 W AU 2005001805W WO 2006069414 A1 WO2006069414 A1 WO 2006069414A1
Authority
WO
WIPO (PCT)
Prior art keywords
welding
fill
root
cap
pipeline
Prior art date
Application number
PCT/AU2005/001805
Other languages
English (en)
Inventor
Bob Cartwright
Russell Goodhew
Darren Cormell
Original Assignee
Clough Project Holdings Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2004907378A external-priority patent/AU2004907378A0/en
Application filed by Clough Project Holdings Pty Ltd filed Critical Clough Project Holdings Pty Ltd
Publication of WO2006069414A1 publication Critical patent/WO2006069414A1/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/02Seam welding; Backing means; Inserts
    • B23K9/028Seam welding; Backing means; Inserts for curved planar seams
    • B23K9/0282Seam welding; Backing means; Inserts for curved planar seams for welding tube sections
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/10Pipe-lines

Definitions

  • the invention relates to pipeline welding. More particularly, the invention relates to welding of pipe sections together to form a pipeline.
  • the invention has been devised particularly, although not solely, for welding of pipe sections together in the construction and laying of subsea pipelines in the oil and gas industry.
  • the pipe sections are typically welded together in stages at various welding stations on . the lay barge or vessel.
  • the welding operation often involves an automatic welding system, such as a bare wire system.
  • Automatic welding operations are particularly suitable for large pipeline installations as they allow the pipe sections to be welded together relatively quickly.
  • automatic welding operations are not particularly effective, and can also be relatively expensive, for small pipeline installations.
  • a method of welding two pipe sections together in the construction of a pipeline comprising applying a weld between the two pipe sections in stages involving root, hotpass, fill and cap stages, wherein the root stage is applied using a Surface Tension Transfer (STT) process.
  • STT Surface Tension Transfer
  • the STT process is used for the weld root as this process allows a weld deposit to be made at high speed that avoids root weld lack of fusion and the associated cracking that is likely to occur with other processes because of high heat dissipation.
  • the hotpass, fill and cap stages are performed using a semi-automatic welding process; typically, a gas-shielded flux-cored arc-welding process.
  • the fill may be applied in multiple phases, involving interlocked multiple layers.
  • the welding method according to the invention may be performed on a lay barge or vessel where the welding procedure is performed over four stations.
  • the root and hotpass stages are performed at the first station.
  • the fill stage is performed over two phases; a first phase performed at the second station and a second phase performed at the third station.
  • the cap stage is performed at the fourth station.
  • the welding method according to the invention can produce welds compliant with Standard DNV-OS-F 101-2000.
  • the method further includes inspection of the weld, the inspection being conducted in two stages, the first inspection stage being undertaken after completion of the root and the hot pass welding stages, and the second inspection being undertaken after completion of the weld (ie. after the cap welding stage).
  • the inspection process is performed using standard radiography testing.
  • a pipeline constructed by welding pipe sections together by a method according to the first aspect of the invention.
  • a pipeline comprising a plurality of pipe section welded one to another in end-to-end relation, the weld between adjacent pipe sections comprising a root, a hotpass, a fill and a cap, wherein the root is applied using a Surface Tension Transfer process.
  • a fourth aspect of the invention there is provided a method of welding two pipe sections together in the construction of a pipeline, the method comprising applying a weld between the two pipe sections in stages involving root, hotpass, fill and cap stages, wherein the root stage is applied using a gas- metal-arc welding (GMAW) process.
  • GMAW gas- metal-arc welding
  • a gas-metal-arc welding (GMAW) process is performed using an STT power source, such as that provided by Lincoln Electric Company.
  • apparatus for welding a plurality of pipe sections together in end-to-end relation to form a pipeline, the weld between adjacent pipe sections comprising a root, a hotpass, a fill and a cap, the apparatus comprising a first welding station for applying the root and hotpass, a second welding station for applying a first phase of the fill, a third welding station for applying a second phase of the fill, and a fourth welding station for applying the cap.
  • a lay barge or pipeline laying vessel equipped with apparatus for welding a plurality of pipe sections together in end-to-end relation to form a pipeline, the weld between adjacent pipe sections comprising a root, a hotpass, a fill and a cap, the apparatus comprising a first welding station for applying the root and hotpass, a second welding station for applying a first phase of the fill, a third welding station for applying a second phase of the fill, and a fourth welding station for applying the cap.
  • Figure 1 is a schematic fragmentary sectional view of adjacent ends of two pipe sections, with the ends beveled in preparation for welding of the two pipe sections together in accordance with the first embodiment;
  • Figure 2 is a schematic fragmentary sectional view of the adjacent ends of the two pipe sections welded together in accordance with the first embodiment
  • Figure 3 is a schematic view, on an enlarged scale, of the weld in accordance with the first embodiment between the two pipe sections.
  • the first embodiment shown in the drawings is directed to welding of pipe sections together to form a pipeline for the oil and gas industry.
  • the pipeline is for subsea application, and is constructed and laid using a lay barge or vessel of known kind. Pipe sections are welded one to another to progressively form the pipeline as it is laid onto the seabed.
  • the pipe sections 11 , 12 each comprise a clad pipe of known kind, having an outer pipe layer 15 and an inner pipe layer 17.
  • the outer pipe layer 15 is sometimes referred to as an outer pipe
  • the inner pipe layer 17 is sometimes referred to as a liner pipe.
  • the inner and outer pipe layers are of different materials. It is common, for example, for the outer pipe section material to be a high strength carbon steel and for the inner pipe section material to be a corrosion resistant alloy. Such pipes are also referred to as bi-metal pipes.
  • the outer pipe layer 15 is of high strength carbon steel such as X65
  • the inner pipe section 17 is of corrosion resistant alloy (CRA) such as 316L stainless steel.
  • CRA corrosion resistant alloy
  • the end of each inner pipe layer 17 terminates inwardly of the end of its corresponding outer pipe layer 15, with a weld layer 19 being provided to seal the ends of the inner and outer pipe layers.
  • the weld layer 19 comprises an "over-alloyed" stainless steel, such as 309 MoL.
  • the adjacent ends of the two pipe sections 11 , 12 are beveled so as to provide so-called "knife edges" 20, as shown in Figure 1 , to receive the weld 10.
  • the ends of the pipe sections 11, 12 are positioned in a slightly spaced apart relationship, which in this embodiment is about 4mm.
  • the weld 10 is applied in stages, comprising a comprising a root 21 , a hotpass 23, a fill 25 and a cap 27.
  • the root 21, hotpass 23 and fill 25 are formed using ER 2209 welding consumables.
  • the weld cap 27 requires an all positional welding consumable. ER2209 consumables, while suitable for the roof, hotpass and fill stages of the weld, were found to be unsuitable for the cap pass as a lack of surface tension in the molten weld pool (particularly in the "5 and 8 o'clock" positions) meant the weld molten pool became unstable. To alleviate this problem and maintain the integrity of the weld, an all positional 309 MoL Stainless Steel consumable is used for the capping pass to provide the weld cap 27.
  • the root 21 comprises a single "slug" of metal applied using a GMAW process, performed using a STT power source, such as that provided by Lincoln Electric Company, which is a high-frequency, current controlled machine wherein power to the arc is based on instantaneous arc requirements.
  • a STT power source such as that provided by Lincoln Electric Company, which is a high-frequency, current controlled machine wherein power to the arc is based on instantaneous arc requirements.
  • the hotpass 23, fill 25 and cap 27 are applied using a semi-automatic welding process, specifically a gas-shielded flux-cored arc-welding process.
  • the hotpass 23 is a single pass.
  • the fill 25 is applied in multiple phases, involving interlocked multiple layers.
  • the welding procedure is performed over welding four stations on the lay barge or vessel.
  • the root 21 and hotpass 23 are applied at the first station.
  • This provides a bond between the two pipe sections 11 , 12 of sufficient strength to allow the two pipe sections to then be advanced so that their ends register at the second station at which a first phase of the fill 25 is applied.
  • Two pipe sections 11 , 12 are then advanced so that their ends register at the third station where the second phase of the fill 25 is applied.
  • the two pipe sections 11 , 12 are then advanced again so that their ends register at the fourth station where the cap 27 is applied.
  • the weld 10 is complete. From the fourth welding station, the pipeline progresses to a laying station from which it is progressively laid onto the seabed.
  • the welding procedure further includes inspection of the weld.
  • the inspection is conducted in two stages. The first inspection stage is undertaken after completion of the root and the hot pass at the first station. The second inspection stage is undertaken after completion of the weld (ie. after application of the cap at the fourth station).
  • the inspection process is performed using standard radiography testing.
  • the operation producing the weld 10 is a semi-automatic, manually based procedure. It is particularly appropriate for installation of pipelines, such as for example small pipelines, where the cost of automatic welding systems are not warranted.
  • the weld 10 is compliant with Standard DNV-OS-F101-2000 and is suitable for "hot pipe” applications as well as ambient temperature applications.
  • the second embodiment is directed to a weld between adjacent ends of carbon steel pipe. Such a weld is similar to the weld illustrated schematically in Figure 3 and so corresponding reference numerals are used to identify similar parts.
  • carbon steel consumables are used to match the carbon steel pipe.
  • the root 21 comprises a single "slug" of metal applied using a GMAW process which involves a solid wire consumable with CO 2 gas shield.
  • the GMAW process ⁇ is performed using a STT power source, such as a Lincoln Ultramag S6.
  • the hotpass 23, fill 25 and cap 27 are applied using a semi-automatic welding process, specifically a gas-shielded flux-cored arc-welding process.
  • this process may be performed using a Lincoln Pipeliner G70M, using an arc welding wire of 1.2mm diameter and a gas shield comprising a mixture of Argon and CO 2 (typically about 80% Argon/20% CO 2 ).
  • Such a weld would only require inspection at completion. In other words, it does not require inspection in two stages as proposed for the weld according to the first embodiment.
  • the scope of the invention is not limited to the scope of the embodiments described.
  • the invention is not, for example, limited in application to clad pipe of the type described in the first embodiment, having a weld layer sealing the ends of the inner and outer pipe layers.
  • the invention is applicable to welding of other types of clad pipes, including mechanically lined and metallurgically lined clad pipe.
  • the invention is in fact applicable to welding of pipe sections generally, with the particular consumables selected for use being dependent upon the pipe materials.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

L'invention concerne la construction d'un pipeline (en particulier, mais pas uniquement, pour des applications sous-marines) consistant à souder ensemble des sections de conduite pour former le pipeline. Le soudage (10) entre des sections de conduite adjacentes (11, 12) est réalisé par étapes, impliquant une passe de racine (21), une passe à chaud (23), une passe de remplissage (25) et une passe de finition (27). La passe de racine (21) est réalisée à l'aide d'un processus de transfert de tension de surface (STT). La passe à chaud (23), la passe de remplissage (25) et la passe de finition (27) sont réalisées à l'aide d'un processus de soudage semi-automatique tel qu'un soudage à l'arc au fil fourré sous protection gazeuse.
PCT/AU2005/001805 2004-12-31 2005-11-30 Soudure de pipeline WO2006069414A1 (fr)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AU2004907378 2004-12-31
AU2004907378A AU2004907378A0 (en) 2004-12-31 Pipeline Welding
AU2005903528 2005-07-04
AU2005903528A AU2005903528A0 (en) 2005-07-04 Pipeline Welding

Publications (1)

Publication Number Publication Date
WO2006069414A1 true WO2006069414A1 (fr) 2006-07-06

Family

ID=36614414

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2005/001805 WO2006069414A1 (fr) 2004-12-31 2005-11-30 Soudure de pipeline

Country Status (1)

Country Link
WO (1) WO2006069414A1 (fr)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101417364B (zh) * 2008-11-20 2011-11-30 新疆石油工程建设有限责任公司 金属粉芯焊丝管道根焊半自动焊接方法
US9339886B2 (en) 2009-12-01 2016-05-17 Saipem S.P.A. Method of and a welding station for laying a pipeline, with pipe section welded together by internal and external welding
CN106903399A (zh) * 2017-03-16 2017-06-30 中国石油天然气集团公司 X80以上钢级的高强度管道半自动焊接方法
CN107906268A (zh) * 2017-10-27 2018-04-13 合肥紫金钢管股份有限公司 一种户外建筑施工用高强度耐候性直缝埋弧焊钢管
US11655930B2 (en) 2019-09-06 2023-05-23 Saudi Arabian Oil Company Reducing the risk of corrosion in pipelines
CN117432870A (zh) * 2023-12-20 2024-01-23 江苏河海新能源股份有限公司 热水保温管及其对接焊接方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1446440A (en) * 1972-12-07 1976-08-18 Kaiser Aluminium Chem Corp Welding together of metal products
JPS5575892A (en) * 1978-12-01 1980-06-07 Kubota Ltd Site automatic welding method of circumferential butt welding
JPS5916675A (ja) * 1982-07-21 1984-01-27 Hitachi Ltd 多層溶接法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1446440A (en) * 1972-12-07 1976-08-18 Kaiser Aluminium Chem Corp Welding together of metal products
JPS5575892A (en) * 1978-12-01 1980-06-07 Kubota Ltd Site automatic welding method of circumferential butt welding
JPS5916675A (ja) * 1982-07-21 1984-01-27 Hitachi Ltd 多層溶接法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
DAVIES A.C.: "The Science and Practice of Welding", vol. 2, part 9TH ED 1989, CAMBRIDGE UNIVERSITY PRESS, pages: 42 - 43 *
PATENT ABSTRACTS OF JAPAN *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101417364B (zh) * 2008-11-20 2011-11-30 新疆石油工程建设有限责任公司 金属粉芯焊丝管道根焊半自动焊接方法
US9339886B2 (en) 2009-12-01 2016-05-17 Saipem S.P.A. Method of and a welding station for laying a pipeline, with pipe section welded together by internal and external welding
EP3213851B1 (fr) * 2009-12-01 2021-04-14 Saipem S.p.A. Procédé de dépose d'un pipeline, avec des sections du pipeline connectees ensemble par soudage interne et externe
CN106903399A (zh) * 2017-03-16 2017-06-30 中国石油天然气集团公司 X80以上钢级的高强度管道半自动焊接方法
CN106903399B (zh) * 2017-03-16 2019-07-23 中国石油天然气集团公司 X80以上钢级的高强度管道半自动焊接方法
CN107906268A (zh) * 2017-10-27 2018-04-13 合肥紫金钢管股份有限公司 一种户外建筑施工用高强度耐候性直缝埋弧焊钢管
CN107906268B (zh) * 2017-10-27 2019-09-27 合肥紫金钢管股份有限公司 一种户外建筑施工用高强度耐候性直缝埋弧焊钢管
US11655930B2 (en) 2019-09-06 2023-05-23 Saudi Arabian Oil Company Reducing the risk of corrosion in pipelines
US11655929B2 (en) 2019-09-06 2023-05-23 Saudi Arabian Oil Company Reducing the risk of corrosion in pipelines
CN117432870A (zh) * 2023-12-20 2024-01-23 江苏河海新能源股份有限公司 热水保温管及其对接焊接方法

Similar Documents

Publication Publication Date Title
EP3213851B1 (fr) Procédé de dépose d'un pipeline, avec des sections du pipeline connectees ensemble par soudage interne et externe
US20130136540A1 (en) Welding method of a first to a second tubular, the tubulars comprising a corrosion resistant alloy on an internal face thereof
WO2006069414A1 (fr) Soudure de pipeline
JP5006321B2 (ja) 溶接結合を製作する方法、ならびに溶接結合を補修する方法
US20090065556A1 (en) Method to reduce shrinkage driven distortion when welding on pressure piping and vessel materials
CN103624376A (zh) 端部带转接环的两根双金属复合管端部对焊方法
CN112122750B (zh) 一种无缝钢管的环缝对接焊方法
CN106903399A (zh) X80以上钢级的高强度管道半自动焊接方法
US20220090711A1 (en) System and method for manufacturing pipes
US11655930B2 (en) Reducing the risk of corrosion in pipelines
AU2005100993A4 (en) Pipeline Welding
US20220063019A1 (en) Improvements in the welding of pipes
NO20170106A1 (en) Bi-metallic mechanically lined pipe with metallurgical bonding at its ends; method of manufacturing such bi-metallic lined pipe
Gonçalves e Silva et al. Double-Sided welding as an alternative for joining internally clad pipes
US20050173495A1 (en) Method of protecting against corrosion at high temperature
JPH067934A (ja) 二重管の管端シール溶接方法
US20050092813A1 (en) Flux assisted gas tungsten arc welding utilizing consumable inserts for ultra low profile welding applications
JPH11291044A (ja) チタンクラッド鋼被覆鋼管杭の製造方法
JPH03207575A (ja) 二重管の周継手溶接法
Riffel et al. An Efficient Alternative for Joining Internally Clad Pipes Using Innovative Welding Techniques and Equipment
Dorling et al. Pipeline Welding from the Perspective of Safety and Integrity
Bowers et al. A New Approach to the Girth Welding of Clad Pipelines
Mitchell Repair welding in the power industry using cored wires
Thompson et al. Automatic Welding Procedures for CRA Pipelines
JPH0318475A (ja) 二重管の周継手溶接法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 05810608

Country of ref document: EP

Kind code of ref document: A1

WWW Wipo information: withdrawn in national office

Ref document number: 5810608

Country of ref document: EP