Equipement pour repartir, aplanir et compacter une matiere particulaire dans des tranchees Download PDFInfo
- Publication number
- WO2005075752A1 WO2005075752A1 PCT/AU2005/000153 AU2005000153W WO2005075752A1 WO 2005075752 A1 WO2005075752 A1 WO 2005075752A1 AU 2005000153 W AU2005000153 W AU 2005000153W WO 2005075752 A1 WO2005075752 A1 WO 2005075752A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- trench
- fine particulate
- particulate material
- equipment
- side walls
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/026—Improving by compacting by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers
- E02D3/032—Trench rollers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/22—Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling
- E02F5/223—Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling for back-filling
Definitions
- the present invention relates to apparatus for use in embedding pipelines or similar elongate conduits or members in preformed trenches.
- TECHNICAL BACKGROUND It is conventional practice when laying a pipe line or the like underground to form a trench extending in the required direction and at the required depth. A fine particulate bedding material is then laid in the base of the trench. This bedding material may be said or similar delivered to the site or it might be fine particulate material prepared from the material excavated from the trench.
- the material may be dropped into the trench at spaced locations by a front end loader or the like with the material then being spread and levelled by various means such as manually by workmen with shovels or perhaps by dragging a chain along the base of the trench.
- the pipeline or similar
- the pipeline is laid thereon and subsequently further fine particulate material is placed around and over the pipeline (or similar).
- the trench is back filled with normal earth, rock etc previously excavated from the trench. It is desirable that the sand or similar particulate material be relatively evenly packed or distributed about the pipeline as any significant gaps, openings or cavities may cause undesirable loadings on the pipeline wall.
- the present invention therefore aims at providing apparatus usable in applications of the above discussed type that will, in a relatively simple and effective manner, distribute and level particulate material in the base of the trench and/or ensure the particulate material around and, if provided, above the pipeline (or the like), is uniformly packed such that significant gaps or cavities are not left in the material.
- apparatus for compacting fine particulate earth or sand material around an elongate member laid in a trench, said apparatus including at least one disc member having a plurality of teeth like formations around its periphery and mount means for said at least one disc member permitting said disc member to roll through said fine particulate material in said trench, said mount means including connection means enabling said apparatus to be connected to machinery for moving the apparatus along said trench.
- Preferred features of the aforesaid aspect may be as defined in claims 2 to 4 annexed hereto, the subject matter of these claims being included in the disclosure of this specification by this reference thereto.
- equipment for spreading and levelling fine particulate earth or sand material already deposited in the base region of a preformed trench said equipment including a pair of laterally spaced side walls supported by skid members adapted, in use, to be positioned on a base surface of the trench, each said skid member extending generally in line with the direction of the trench and being located adjacent a side wall of the trench, said equipment including cross brace means for maintaining spacing of said side walls during use, wall means closing a cross-sectional zone of said equipment between said side walls having a lower edge adapted to provide a level surface to said fine particulate material spread by said wall means, and connection means enabling said equipment to be connected to machinery for moving the equipment along said trench supported on the base of said trench.
- the present invention provides a method of laying and embedding a pipeline or similar elongate member in a trench, said method involving the steps of: (i) depositing fine particulate bedding material into the trench for use as bedding under the elongate member; (ii) placing first apparatus in the trench, said first apparatus having spaced side wall means supported by support means resting on a base of said trench with said side wall means located adjacent respective side walls of said trench, said first apparatus also including a transverse wall member having a lower edge spaced upwardly from the base of said trench; (iii) moving said first apparatus along said trench while said transverse wall member spreads said fine particulate material and the lower edge of said transverse wall means provides a level surface for said fine particulate material; (iv) laying said elongate member on said level surface of
- Fig 1 is a schematic transverse view of a compactor apparatus according to one aspect of the present invention in a position of use within a trench
- Fig 2 is a schematic side view of the compactor apparatus shown in Fig 1
- Fig 3 is a side view of preferred spreading and levelling apparatus according to a second aspect of the present invention
- Fig 3a is a plan view along line A-A of Fig 3
- Figs 4 and 5 are respectively front and rear views of the apparatus shown in Fig 3.
- equipment 10 for spreading and levelling fine particulate material, typically sand or the like, imported to the site of the trench 11 and deposited therein at spaced locations.
- the equipment 10 includes a pair of side walls 12, 13, each being supported on skid members 14 upturned at their forward ends 15 to facilitate sliding movement along the trench 11.
- the forward end of the side walls 12, 13 have upright members 16, 17 with plates 18 extending forwardly to enable pulling chains, bars or any other suitable means 19 to be connected thereto, selectably at adjustable heights.
- the pulling chains 19 may be connected to any suitable movable machinery to drag the equipment 10 along the trench 11 in the forward direction indicated by arrow 21 while the support skid members 14 remain on the base 22 of the trench.
- the moveable machinery might be a front end loader or similar that would be readily available
- he equipment 10 includes a generally open front face 20, two or more intermediate cross brace members 23, 24, each being selectably adjustable so as to vary the transverse distance between the side walls 12, 13 to enable adjustment for varying trench widths, and a rear wall member 25 that is also adjustable in width similarly to the cross brace members such that the equipment 10 might be varied in width to accommodate varying trench widths.
- the rear wall member 25 is also supported slidably in guides 26 at either side wall so as to be capable of adjustment in a vertical direction to raise or lower the bottom edge 27 of the wall member 25.
- This vertical adjustment might be achieved by a winch 28 and cable 29 secured to the wall member 25, however, once vertical adjustment has been achieved, the wall member 25 is conveniently fixed in the desired position by bolts or similar passed through openings 30.
- the lower edge 27 of the wall member 25 may have a generally centrally located downwardly formed protuberance 31 adapted to form a groove in the otherwise level surface 32 of the sand or similar fine particulate material squeezed beneath the edge 27 from the pile 33 of sand or similar fine particulate material pushed along the trench by the wall member 25 as the equipment 10 is dragged along the trench 11.
- a pipeline 40 or similar elongate member can be positioned along the trench lying in the central groove 34 in the particulate material.
- further sand or fine particulate surround material 41 and 42 might be positioned on either side of the pipeline 40 on top of the first laid bedding material such that the pipeline is held in its as laid position. It is, however, desirable to ensure that there are no significant cavities around the pipeline once the trench has been completely back filled to avoid undesirable loading on the pipeline. To avoid such cavities, apparatus 50, shown in Figures 1 and 2 is used.
- the apparatus 50 preferably includes a pair of disc members 51 , 52, each having teeth formations 53 around their periphery.
- the teeth formations 53 are square or rectangular in shape but other configurations are believed to also be useful.
- a central mount member 54 is provided which includes connection means 55, conveniently in the form of quick hitch ears or the like to enable interchange connection with the booms 56 of an excavator or front end loader.
- An adjustable length axle 57 passes through the central mount member 54 and is rotatable relative thereto, the disc members 51 , 52 being secured to the lateral ends of the axle 57. The adjustable length axle enables the spacing between the disc members 51 , 52 to be varied to adjust for variable width pipelines / trenches.
- each disc member 51 , 52 might include cut out openings 58 to limit weight of the apparatus.
- a connected excavator or front end loader might move the apparatus 50 along the trench with the disc members 51 , 52 rolling through the fine particulate material as illustrated to compact the material on either side of the pipeline. In this manner, any cavities that might exist are collapsed to provide a surround and bed of fine particulate material that is relatively uniform in density.
- the spreading and levelling apparatus 10 may be fabricated from metal sections and metal sheets or plates in any known manner.
- the compactor device 50 may be made from metal plate and metal fillings of suitable strength and endurance capabilities.
- the spreading and levelling apparatus 10 is, in use, dragged along the base of a preformed trench 11 after sand or other similar particulate material has been deposited there in spaced piles.
- the particulate material is levelled in the trench by the lower edge 27 of the rear wall 25 as the apparatus 10 moves along the trench.
- a location groove for the pipeline can be formed in the particulate material.
- the pipe line is then laid in the groove and subsequently further particulate material is deposited on the trench.
- the apparatus 10 is then moved along the trench again with the skids 14 moving on the first laid and levelled particulate material. This second pass of the apparatus 10 spreads and levels the particulate material on either side and preferably above the pipe line.
- the compactor device 50 can be utilised moving along the particulate material in the trench to compact the material around the pipeline thereby avoiding dangerous cavities adjacent the pipe line.
- the trench 11 may be back filled with previously excavated trench earth material in the usual manner.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Sewage (AREA)
- Road Paving Machines (AREA)
Abstract
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2005210681A AU2005210681B2 (en) | 2004-02-10 | 2005-02-08 | Apparatus for spreading. levelling and compacting particulate material in trenches |
US10/588,869 US20070292211A1 (en) | 2004-02-10 | 2005-02-08 | Apparatus for Spreading, Levelling and Compacting Particulate Material in Trenches |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2004900639A AU2004900639A0 (en) | 2004-02-10 | Apparatus for embedding pipelines and similar elongate members in trenches | |
AU2004900639 | 2004-02-10 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2005075752A1 true WO2005075752A1 (fr) | 2005-08-18 |
Family
ID=34831694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AU2005/000153 WO2005075752A1 (fr) | 2004-02-10 | 2005-02-08 | Equipement pour repartir, aplanir et compacter une matiere particulaire dans des tranchees |
Country Status (2)
Country | Link |
---|---|
US (1) | US20070292211A1 (fr) |
WO (1) | WO2005075752A1 (fr) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2957947B1 (fr) * | 2010-03-23 | 2013-03-22 | Sc Medinger R & D | Procede de compactage des sols, applications de ce procede et dispositifs pour sa mise en oeuvre |
US9689143B1 (en) * | 2014-12-18 | 2017-06-27 | Dennis Trussell | Poly pipe unrolling and placement device |
GB2545702B (en) * | 2015-12-22 | 2020-01-15 | Gately Pearse | Pipe laying apparatus |
ES2710545B2 (es) * | 2017-10-23 | 2019-10-23 | Ferrovial Agroman Sa | Sistema para compactar el terreno a los lados de una canaleta |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4289424A (en) * | 1980-01-07 | 1981-09-15 | Marvin E. Rue | Apparatus for laying conduit, cable and the like in or beneath fill material |
US4723870A (en) * | 1986-01-16 | 1988-02-09 | Martinez Morris P | Wheel assembly for soil compactor devices |
US4913581A (en) * | 1989-06-26 | 1990-04-03 | Vermeer Manufacturing Co. | Narrow trench tamper |
FR2653464A1 (fr) * | 1989-10-23 | 1991-04-26 | Markarian Yannick | Dispositif de compactage d'une tranchee etroite. |
US5479728A (en) * | 1994-03-08 | 1996-01-02 | The Charles Machine Works, Inc. | Apparatus for backfilling and tamping a trench |
WO1997044532A1 (fr) * | 1995-01-09 | 1997-11-27 | Omar Wiker | Procede de mise a niveau et de remplissage de tranchee et dispositif utilisable dans le cadre de cette operation |
AU1882702A (en) * | 2001-04-06 | 2002-10-10 | Mitchell Australasia Pty Ltd | Apparatus for processing trench bedding and pipeline surround material |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4714381A (en) * | 1985-05-02 | 1987-12-22 | G. Brent Hatch | Machine for laying conduit and methods for use thereof |
-
2005
- 2005-02-08 US US10/588,869 patent/US20070292211A1/en not_active Abandoned
- 2005-02-08 WO PCT/AU2005/000153 patent/WO2005075752A1/fr active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4289424A (en) * | 1980-01-07 | 1981-09-15 | Marvin E. Rue | Apparatus for laying conduit, cable and the like in or beneath fill material |
US4723870A (en) * | 1986-01-16 | 1988-02-09 | Martinez Morris P | Wheel assembly for soil compactor devices |
US4913581A (en) * | 1989-06-26 | 1990-04-03 | Vermeer Manufacturing Co. | Narrow trench tamper |
FR2653464A1 (fr) * | 1989-10-23 | 1991-04-26 | Markarian Yannick | Dispositif de compactage d'une tranchee etroite. |
US5479728A (en) * | 1994-03-08 | 1996-01-02 | The Charles Machine Works, Inc. | Apparatus for backfilling and tamping a trench |
WO1997044532A1 (fr) * | 1995-01-09 | 1997-11-27 | Omar Wiker | Procede de mise a niveau et de remplissage de tranchee et dispositif utilisable dans le cadre de cette operation |
AU1882702A (en) * | 2001-04-06 | 2002-10-10 | Mitchell Australasia Pty Ltd | Apparatus for processing trench bedding and pipeline surround material |
Also Published As
Publication number | Publication date |
---|---|
US20070292211A1 (en) | 2007-12-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4023288A (en) | Backhoe compactor/scraper apparatus and method | |
US3891342A (en) | Backhoe compactor/scraper apparatus | |
US3471953A (en) | Back-fill and tamping attachment for a self-propelled loader | |
CN107119522A (zh) | 新旧路基衔接的结构及施工方法 | |
US3664137A (en) | System for constructing drain lines | |
CN109056439A (zh) | 傍山高填方路基的多层次结构和施工方法 | |
US20070292211A1 (en) | Apparatus for Spreading, Levelling and Compacting Particulate Material in Trenches | |
US3831388A (en) | Method for laying pipe | |
US3605419A (en) | Method and apparatus for laying pipe | |
JP4835922B2 (ja) | 転圧機 | |
AU2005210681B2 (en) | Apparatus for spreading. levelling and compacting particulate material in trenches | |
CN106939605B (zh) | 一种护坡砌块的搬运设备和搬运方法 | |
US7500804B2 (en) | Compaction wheel system and method | |
US6273637B1 (en) | Dual wheel trench compactor | |
US6622403B2 (en) | Backfill and grading apparatus | |
DE102010022802B4 (de) | Verfahren und Vorrichtung zur Verbesserung der bodenmechanischen Eigenschaften von Böden im amphibischen Wasser-Land-Übergangsbereich von Gewässern, Bodensenken und Baugrundsanierungsgebieten | |
CN116043624A (zh) | 一种炭质泥岩路基填筑施工方法及施工装置 | |
US5452969A (en) | Apparatus for screening and spreading bedding material in a ditch | |
KR101049604B1 (ko) | 관로 되매움 및 다지기 장치 | |
CN209731993U (zh) | 一种用于蔬菜种植中的施肥装置 | |
US3182460A (en) | Apparatus for making permeable conduits in subterranean lines of drainage | |
AU2016273834A1 (en) | A sand box | |
CA2488615C (fr) | Caisse de criblage | |
GB2565806A (en) | Excavator bucket | |
US3377806A (en) | Construction in trench of pipelines and similar operations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
DPEN | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed from 20040101) | ||
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2005210681 Country of ref document: AU |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: DE |
|
ENP | Entry into the national phase |
Ref document number: 2005210681 Country of ref document: AU Date of ref document: 20050208 Kind code of ref document: A |
|
WWP | Wipo information: published in national office |
Ref document number: 2005210681 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1200601471 Country of ref document: VN |
|
122 | Ep: pct application non-entry in european phase | ||
WWE | Wipo information: entry into national phase |
Ref document number: 10588869 Country of ref document: US |
|
WWP | Wipo information: published in national office |
Ref document number: 10588869 Country of ref document: US |