WO2003069087A1 - Structure en dome et son procede de construction - Google Patents

Structure en dome et son procede de construction Download PDF

Info

Publication number
WO2003069087A1
WO2003069087A1 PCT/NO2002/000392 NO0200392W WO03069087A1 WO 2003069087 A1 WO2003069087 A1 WO 2003069087A1 NO 0200392 W NO0200392 W NO 0200392W WO 03069087 A1 WO03069087 A1 WO 03069087A1
Authority
WO
WIPO (PCT)
Prior art keywords
dome shaped
trusses
layer
supported
tank
Prior art date
Application number
PCT/NO2002/000392
Other languages
English (en)
Inventor
Anton Gjørven
Harald Skaseth
Otto Skovholt
Original Assignee
Statoil Asa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Statoil Asa filed Critical Statoil Asa
Priority to AU2002343262A priority Critical patent/AU2002343262A1/en
Publication of WO2003069087A1 publication Critical patent/WO2003069087A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/04Containers for fluids or gases; Supports therefor mainly of metal
    • E04H7/06Containers for fluids or gases; Supports therefor mainly of metal with vertical axis
    • E04H7/065Containers for fluids or gases; Supports therefor mainly of metal with vertical axis roof constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/08Vaulted roofs
    • E04B7/10Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C3/00Vessels not under pressure
    • F17C3/02Vessels not under pressure with provision for thermal insulation
    • F17C3/022Land-based bulk storage containers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/01Shape
    • F17C2201/0104Shape cylindrical
    • F17C2201/0109Shape cylindrical with exteriorly curved end-piece
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/01Shape
    • F17C2201/0104Shape cylindrical
    • F17C2201/0119Shape cylindrical with flat end-piece
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/05Size
    • F17C2201/052Size large (>1000 m3)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/01Reinforcing or suspension means
    • F17C2203/011Reinforcing means
    • F17C2203/012Reinforcing means on or in the wall, e.g. ribs
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/01Reinforcing or suspension means
    • F17C2203/011Reinforcing means
    • F17C2203/013Reinforcing means in the vessel, e.g. columns
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/03Thermal insulations
    • F17C2203/0304Thermal insulations by solid means
    • F17C2203/0354Wood
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/03Thermal insulations
    • F17C2203/0304Thermal insulations by solid means
    • F17C2203/0358Thermal insulations by solid means in form of panels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/06Materials for walls or layers thereof; Properties or structures of walls or their materials
    • F17C2203/0602Wall structures; Special features thereof
    • F17C2203/0612Wall structures
    • F17C2203/0626Multiple walls
    • F17C2203/0631Three or more walls
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/06Materials for walls or layers thereof; Properties or structures of walls or their materials
    • F17C2203/0634Materials for walls or layers thereof
    • F17C2203/0636Metals
    • F17C2203/0639Steels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/06Materials for walls or layers thereof; Properties or structures of walls or their materials
    • F17C2203/0634Materials for walls or layers thereof
    • F17C2203/0636Metals
    • F17C2203/0646Aluminium
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/06Materials for walls or layers thereof; Properties or structures of walls or their materials
    • F17C2203/0634Materials for walls or layers thereof
    • F17C2203/0678Concrete
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2209/00Vessel construction, in particular methods of manufacturing
    • F17C2209/21Shaping processes
    • F17C2209/2109Moulding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2209/00Vessel construction, in particular methods of manufacturing
    • F17C2209/22Assembling processes
    • F17C2209/221Welding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2209/00Vessel construction, in particular methods of manufacturing
    • F17C2209/22Assembling processes
    • F17C2209/227Assembling processes by adhesive means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/035Propane butane, e.g. LPG, GPL
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/01Improving mechanical properties or manufacturing
    • F17C2260/011Improving strength
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0134Applications for fluid transport or storage placed above the ground
    • F17C2270/0136Terminals
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/05Applications for industrial use

Definitions

  • the invention relates to a dome shaped roof for a cryogenic tank having a very large diameter, commonly larger than 50 metre, and to a method for constructing such roof using formwork which structurally supports the roofing during the construction phase and which may be removed subsequent to construction.
  • a steel dome supporting structure consisting of 88 ribs resting on a ring beam and supported centrally by means of a temporary arranged ring structure was erected and covered by steel plates or panels.
  • the steel dome supporting structure was erected on the bottom of the tank in parallel with concreting the upper part of the inner wall.
  • the steel dome was lifted to its permanent position subsequent to completion of construction of the concrete wall forming the outer, secondary tank.
  • the cupola or doom constructed inside of the primary tank according to Reguera has, however, a smaller diameter than the ring beam on to which it is to be supported, on top of the cylindrical secondary tank wall.
  • the Japanese patent discloses an inner, cylindrical primary tank wall which is not capable of supporting the dome, and an outer, cylindrical secondary tank wall supporting the tank wall.
  • a circumferentially arranged knuckle plate, forming the lower circumferential part of a dome is erected around the top of the outer secondary tank.
  • the circumferentially arranged knuckle plate has an inner diameter which corresponds to the diameter the primary tank, as for the Reguera tank.
  • a centre portion forming a fundamental roof block for the dome is constructed.
  • the fundamental roof block serves as a bridge across the inner diameter of the knuckle plate.
  • the fundamental roof block is formed by erecting two mutual opposite, radial roof elements on opposite side of a circular mid-section and erecting the fundamental roof block unit to span a meridional arc across the knuckle plate. Then corresponding radial roof elements are then erected between the knuckle plate and the basic roof block until the entire dome is constructed. The dome is then covered with plates resting on the radial roof elements.
  • a drawback with the JP 4302799 solution is the need for the circumferential knuckle plate, covering the space between the outer (secondary) tank and the inner (primary) tank.
  • a further disadvantage with this prior art solution is the necessity of constructing the fundamental roof block unit inside the primary tank or outside the primary tank and then lifting it so as to span across the circumferential structural section, requiring a large lifting capacity at the construction site.
  • a central "work platform" for use during assembly of the fundamental roof block for the outer secondary tank is known from the Japanese patent specification. In order to form a suspended insulating roof for the primary tank, such central work platform will also be used to assemble parts while the fundamental roof block rests on the ground.
  • An alternative method for constructing a dome is to construct a circumferential plate for the dome as described above, and then construct a dome calotte on the bottom of the primary tank using standard scaffolding, covering the entire primary tank floor, and the pump the dome calotte upwards until it may be assembled with the circumferential plate.
  • Such dome has again the disad- vantage that it requires separate construction of a dome calotte and a circumferential plate. It is desirable to build the dome substantially as one monolithic element, avoiding formation of one circumferential knuckle plate, as the construction of such plate is time consuming.
  • JP 5280222 describes a balloon like membrane extending across the top of a vertical cylindrical tank wall. The membrane is pressurized so as to give the membrane the required dome shape.
  • a layer of concrete is then poured on top of the membrane.
  • the method according to JP 5280222 avoids the use of a conventional form work.
  • the circumferential parts of the poured concrete are thicker than the layer of concrete poured at the central part of the dome.
  • Wind from any direction during the construction phase may change the shape of the dome causing deviation from the required spherical shape.
  • Japanese patent application JP 2001-81866 describes a method for constructing a cupola shaped or a dome shaped roof for a stadium.
  • the method comprises construction of a ring shaped body where pre-cast concrete elements are arranged sequentially around the circumferential direction of the upper end of a lower structure to form a ring-like connecting body. Tensile force is introduced both in the circumferential direction and diametrical direction. Only a circumferential part of the dome is constructed by using the method described above. A central membrane part of the roof is constructed on top of several working platforms or support towers and thereafter jacked up and assembled with the circumferentially constructed concrete shell. As for the previous described prior art, the disadvantages of constructing the dome in to parts, also having different material properties, are considered detrimental. Summary of the Invention
  • a solution solving the problems described above is to construct a dome shaped, insulated roof structure for a vertical, cylindrical tank having a large diameter, where the dome shaped roof structure rests on a vertical, cylindrical wall and where the dome shaped roof structure comprises a trusswork comprising a plurality of radially arranged trusses made of wood, each truss having an upper chord and a lower chord, the former having a total shape which corresponds to the intended shape of the dome, while latter preferably being horizontal; the trusses, which preferably are prefabricated, are interconnected by means of beams extending in lateral direction with respect to the longitudinal direction of the trusses; a first tight structure formed by metal cover made of thin metal plates, supported by the upper chord of the trusses and on the interconnecting beams; and a concrete layer, preferably pre-stressed or post- tensioned, poured on top of said first tight cover.
  • the storage tank comprises an inner primary tank and an outer secondary tank supporting a dome shaped or cupola shaped roof resting on an upper, secondary tank ring beam arranged on top of a vertical, cylindrical secondary tank wall of the secondary tank, wherein the dome shaped roof comprises a first, lower, dome shaped layer of formwork elements arranged on a dome shaped temporary trusswork of meridionally arranged, upwardly convex arced girders, wherein each consecutive pair of girders spans over a circle sector of the dome shaped roof; each girder is supported at its meridional outer end by means of the secondary tank ring beam; each girder is supported near its meridional inner end by means of a temporary support tower; a second layer of concrete is cast in-situ on top of the layer of formwork elements, the second layer being more than self-
  • the invention relates to a temporary, structural support for construction of the dome shaped roof, having large diameter, on a horizontal ring beam.
  • the temporary support comprises at least a temporary support tower for formwork, resting on a supporting foundation.
  • the tower is arranged centrally inside the tank and is intended to support a dome shaped, temporary formwork of radially arranged girders, the upper chord of which having an upwardly convex arc and where each consecutive pair of beams spanning across a circle sector of the secondary ring beam.
  • Each girder is supported at its outer radial end by the ring beam.
  • the girders are removed when the concrete layer has cured and is self-supported.
  • the supporting girders remain in an installed position below the self- supported, cured concrete roof, suspended from said roof.
  • the supporting girders are structurally supporting the concrete roof only during the concreting phase until the concrete roof has become self-supported, whereupon the supporting girders only serve as support for the insulation.
  • the invention comprises also a corresponding method for constructing a dome shaped roof for a tank having very large diameter, the tank being intended for storage of cryogenic condensed gases of propane, methane, nitrogen, etc.
  • the embodiment is characterized in that trusses are arranged in a radial orientation, each truss being supported by a temporary support tower centrally arranged within the cylindrical tank, while the opposite ends of the trusses are supported by the cylindrical tank wall.
  • Transverse beams are arranged between the radial girders, interconnecting two adjacent girders, the upper surface of the upper chord of the girders and the corresponding surface of the transverse beams being given a shape which correspond to the required dome shape.
  • a tight membrane formed of thin plates is arranged on top of the girders and the transverse beams .
  • a reinforced layer of concrete is cast in-situ on top of the thin plated layer, whereby the thin plated membrane functions as formwork for the concrete layer.
  • the temporarily arranged support tower is removed when the concrete has cured and has become self-supported.
  • one or more temporary support towers are erected within a vertical, circular, cylindrical primary tank side wall, whereupon a plurality of radially arranged girders, forming a dome shaped trusswork extending between an upper end of the temporary tower and above the side wall, and also supported at their radially outer ends, are installed between the temporary tower and the top of the ring beam on top of the tank wall.
  • Each consecutive pair of girders spans across a sector of the ring beam.
  • a first layer of formwork elements are then installed and fixed to the girders and beams, covering the entire dome except for a small opening at the top of the dome shaped trusswork, whereupon a second layer of concrete are concreted on the formwork elements.
  • the second layer of concrete is cured and becomes a more than self-supported concrete layer fixed to the first layer of formwork elements.
  • a third layer of concrete is then concreted on top of the second layer of concrete, the third layer being supported at least partly by the cured second
  • One of the advantages according to the invention is the possibility of constructing a monolithic dome on the outer secondary tank, wherein the dome has a diameter larger than the diameter of the inner primary tank, thereby avoiding that the lower part of the dome is constructed separately from the central main part of the dome. Hence, both weight and required construction time is reduced. Further, such method provides a more homogenous, monolithically reinforced concrete dome without joints. It is thus feasible to construct a cryogenic tank dome having larger diameter than previously possible.
  • a further advantage according to the invention is the feasibility of dismantling and removal of at least the support tower, and possibly also the support girders, after the reinforced concrete has been cured.
  • the structural part of the formwork represented by the girders and the support tower, may be re-utilized for constructing a dome at another site comprising several storage tanks.
  • the structural steel support elements of the formwork may also easily be transported to remote sites for construction of a storage tank dome.
  • Figure 1 shows a vertical section through a cryogenic tank according to the invention, having an inner primary tank comprising a cylindrical, reinforced concrete wall, and an outer secondary tank also having a cylindrical, reinforced concrete wall.
  • the section illustrates a dome or cupola shaped formwork according to the invention, the structural part of which comprising steel braced girders supported centrally by a supporting column which may be dismantled together with the steel girders and removed subsequent to casting of the reinforced concrete dome.
  • the structural parts of the form work are removed through a relative small opening in the concrete dome.
  • Figure 2 illustrates a section through a part of the dome shaped structural elements of the formwork along one steel girder, and through a first prefabricated concrete shuttering plate used as formwork for a second layer of reinforced concrete cast in-situ, a gastight membrane and a third layer of reinforced concrete, also cast in-situ.
  • Figure 3 is an isometric sketch and a vertical section of a cryogenic tank according to the invention at a late stage in the construction process. A self- supporting concrete dome has been concreted on top of the secondary tank wall, and an insulated roof is suspended from the dome.
  • Figure 4 is a section through the upper part of the primary tank wall and the secondary wall, supporting the steel girders in the girders forming the dome shaped formwork, shown in an isometric perspective.
  • Figure 5 is a top view of the dome shaped structural trusswork showing a limited number of formwork plates .
  • Figure 6 is an isometric view of the formwork system seen separated from the cylindrical tank walls within which it is erected during the construction period. All parts shown on the Figures will be removed from the tank at the end of the construction period, subsequent to casting of a reinforced concrete dome.
  • Figure 7 shows in perspective a vertical section through a storage tank according to the invention with the dome shaped roof structure in place.
  • Figure 8 shows in perspective view the storage tank according to the invention prior to concreting the dome shaped roof structure.
  • Figure 9 shows in perspective a vertical section of an upper part of the storage tank and the trusses, resting on the tank wall.
  • FIG. 1 shows a section through a cryogenic tank dome constructed according to the present invention.
  • the tank is a vertical, cylindrical tank having a large diameter, for storage of cryogenic condensed gases, such as propane, methane, nitrogen or the like.
  • the preferred embodiment comprises an inner primary tank for storage of the condensed gas.
  • the primary tank has a cylindrical, reinforced concrete wall.
  • the tank comprises also an outer cylindrical, reinforced secondary tank formed by a cylindrical, reinforced concrete wall.
  • the section shown in Figure 1 illustrates a dome shaped or cupola shaped layer 5 of formwork made of formwork plate elements 6.
  • the formwork layer 5 is supported by a structural part comprising steel girders 10, supported according to the preferred embodiment mainly in the middle by means of a centrally arranged supporting tower 12.
  • the supporting tower may be dismantled together with the steel girders 10 and removed subsequent to casting and curing of the reinforced dome.
  • the structural steel elements in the formwork will be removed through a relative small opening 51 at the top of the concrete dome.
  • the dome is according to the invention constructed in the following way:
  • the tank comprises an inner primary tank 1 and an outer secondary tank 2, supporting a dome shaped or cupola shaped roof 3.
  • the dome shaped roof 3 rests on a horizontal, upper secondary tank ring-shaped beam 42 constructed on a vertical, cylindrical secondary tank wall 4 on the secondary tank 2.
  • the dome shaped roof 3 is made of a first, lower dome shaped layer 5 formed by formwork elements 6 placed on dome shaped, temporary supporting trusses 8.
  • the trusses 8 are made of eri- dionally arranged beams 10 being upwardly, convexly curved. Each consecutive pair of beams 10 spans a circle sector of the dome shaped roof 3.
  • Each girder 10 is supported at a meridional outer end by the ring beam 42 on the secondary tank.
  • Each girder 10 is further supported near its meridional inner end by a temporary supporting tower 12, which according to the preferred embodiment is erected on the bottom slab of the primary tank 1.
  • the layer of formwork elements 6 is then installed and optionally fastened on the girders 10.
  • a second layer 14 of concrete is cast in-situ on top of the layer 5 of formwork elements 6.
  • the second concrete layer 14 becomes more or less self-supported when the concrete has cured.
  • the layer 14 is preferably fixed to the formwork elements 6.
  • the second, cured concrete layer is designed to be more or less self-supported so that it may support a consecutive, preferably thicker layer 18 of concrete to be cast in-situ.
  • the third concrete layer 18 is cast in-situ on top of the second concrete layer 14.
  • the third concrete layer 18 is supported at least partly by the second, cured concrete layer 14 and the first layer 5.
  • the third layer 18 may be partly supported, during casting and curing by the dome shaped trusses 8, supported by the temporarily arranged support tower 12.
  • the temporary support tower 12 may be lowered slightly in order to mobilize the load bearing capacity of the second concrete layer 14, causing the layer to yield a few millimetres or centimetres during casting of the third layer 18.
  • the dome comprises a gastight membrane 16 arranged between the second concrete layer 14 and the third concrete layer 18, ref. Figure 2.
  • the gastight membrane 16 is applied to the second concrete layer 14 prior to casting of the third concrete layer 18.
  • the gastight membrane may comprise asphalt.
  • Figure 2 illustrate that the tank according to a preferred embodiment of the invention, may comprise pre- fabricated formwork elements 6 in the lower, dome shaped layer 5, and may be provided with spherical surface and made of reinforced concrete.
  • the formwork elements 6 may be plane and be so small compared with the spherical radius of the dome that the deviation from the ideal spherical form is acceptable.
  • the temporary support tower 12 supports a temporary, central, inner ring beam 122, supporting the meridional inner ends of the beams 10.
  • Figure 2 illustrates further the reinforcement of the concrete layers.
  • the second concrete layer 14 may be reinforced by meridional reinforcement bars 142 and also by circumferentially arranged reinforcement bars 144.
  • the third concrete layer may be reinforced by meridional reinforcement bars 182 and circumferentially arranged reinforcement bars 184.
  • the horizontal, upper secondary tank wall ring beam 42 and the outer, vertical, cylindrical secondary tank wall of the outer secondary tank 2 may be made of reinforced concrete.
  • the inner primary tank 1 comprises a cylindrical primary tank wall 41 also made of reinforced concrete.
  • the two cylindrical side walls 4, 41 may be constructed in a parallel slipforming process.
  • the inner primary tank 1 may comprise a horizontal primary bottom plate made of reinforced concrete.
  • the bottom plate may comprise a steel plated wooden floor 15 supported by a grid of wooden beams placed on the ground, the beams resting on a secondary bottom plate or foundation 22 formed by concrete, preferably made as a monolithic structure with a foundation ring beam 23 for the secondary tank, supporting the outer cylindrical side wall 4 of the secondary tank 2.
  • the primary tank 1 of the tank according to the invention comprises a primary bottom plate 15 and primary tank side walls 41, separated from the secondary tank 2, thereby providing a space between the cylindrical walls and a distance between the two bottom plates which at least is filled with insulating layers 44, 44B.
  • the preferred embodiment of the tank according to the invention is provided with a number of structural prestressing suspension tendons 52 arranged in such manner that they are extending vertically down, e.g. from prestressing anchors 53 placed in the third concrete layer 18 of the dome shaped roof 3.
  • Such anchors may be of the active or the passive type.
  • An active anchor is shown in Figure 2.
  • the suspension tendons may be used to suspend a primary tank roof 60.
  • the roof 60 comprises horizontal roof truss 62 for the primary tank which partly rest on the inner, upper primary tank ring beam 21 on top of the cylindrical primary tank side wall 41.
  • the truss 62 according to the preferred embodiment is covered by corrugated plates 64 of aluminium, supporting a layer of insulation 66 for the roof in the primary tank.
  • a number of anchors 53 for tendons are arranged in the third concrete layer 18 in order to support the insulating roof 60 in the primary tank.
  • Each anchor 53 is intended to lock the tendons in a position where the tendons are hanging vertically down from and through the dome shaped roof 3.
  • the anchors 53 may be replaced by one or more large anchor rings 53b made of steel and embedded in the third concrete layer 18, concentrically around the upper opening 51, the anchor rings being used to support the vertically, downwards extending suspension tendons 52.
  • the tank according to the preferred embodiment of the invention comprises a central opening 51 through the first dome shaped layer 5, the second concrete layer 14 and the third concrete layer 18.
  • the purpose of the opening 51 is to allow removal of the temporary structural parts of the formwork, such as the girders 10 and the temporary support tower 12 subsequent to casting of the concrete layers 14, 18.
  • Required pipelines, power supply cables, maintenance tools and measuring instruments may also easily be introduced through the central opening 51, thereby limiting the number of lead-ins through the dome which may weaken the structural integrity of the dome.
  • a possible lead-in of pipelines etc. arranged through the inner primary and secondary cylindrical wall 41,4 may also reduce the integrity and the strength of the tank walls.
  • a further aspect with the invention is related to a formwork having a temporary structural support for casting of the dome shaped or cupola shaped concrete tank roof 3 with large diameter.
  • the structural part of the formwork is illustrated in the Figures 5 and 6.
  • the dome is preferably supported by the horizontal ring beam 42 arranged at top end of the outer secondary tank wall 4, as illustrated in Figure 4.
  • the dome may' be constructed directly on top of the secondary tank wall 4, without using a ring beam.
  • the formwork remains supported by a structural support system comprising at least one tempo- rary support tower 12 erected on a supporting foundation, such as the bottom plate 15.
  • the support tower 12 is arranged internally of the ring beam 12.
  • the tower 12 has a central, temporary inner ring beam 122 designed to support a dome shaped temporary trusswork 8 made of meridionally arranged convexly curved beams 10. Each consecutive pair of beams 10 spans across a circular sector of the secondary ring beam 42 and the temporary, inner ring beam 122. Each of the beams 10 is at its meridional outer end (meridional in relation to the top of the dome structure) supported by the largest ring beam 42.
  • the first, lower, dome shaped layer 5 of formwork elements 6 are placed on top of and anchored to the beams 10 in the dome shaped, temporary trusses 8, as indicated in Figure 5 by means of a circumferential sector ring consisting of five consecutive formwork elements 6 followed by three adjacent formwork elements 6 arranged inside and above the outer, lower sector ring. In this manner the entire dome trusswork 8 is covered by formwork elements prior to in- situ casting of the second concrete layer 14.
  • the second concrete layer 14 is cast in-situ on top of the layer 5 of formwork elements 6. According to a preferred embodiment of the invention the second concrete layer 14 is more than self-supported when cured and is fixed to the formwork elements 6.
  • the second concrete layer 14 serves as formwork for the third, upper layer 18 in-situ cast on top of the second concrete layer 14.
  • the third layer 18 is at least partly supported by the cured second layer 14 and the first layer 5.
  • the third layer 18 may, however, also partly (indirectly) be supported during casting and curing by the temporary, dome shaped trusswork 8, supported by the temporary support tower 12. As explained above lowering of the support tower 12 by a predetermined distance during casting of the first layer 5, may bring about the load bearing capacity of the second concrete layer 14 which then is allowed to yield a few millimetre or centimetre during casting of the third layer 18.
  • each girder 20 in the temporary, structural trusswork 8 supporting the first concrete layer 5 comprises two upper, curved girder elements Ilia, 111b, arranged to extend between the ring beam 42 and the support tower 12.
  • the two girder elements 11a, lib extend in its operative position parallel and are evenly distanced apart.
  • the operative position of the girders 10 is illustrated in Figure 4.
  • Each of the girder elements Ilia, 111b of the girder 10 defines an upper convex curve. They are interlinked by means of a number of smaller, angular struts 113.
  • the upper girder elements Ilia, 111b are also separately connected with a lower girder element 112 by means of a number of angular struts 115, as illustrated in Figures 1, 2, 4 and 4b.
  • the upper girder elements Ilia, 111b are formed as a circular curve, upwards convex in their erected position.
  • a cross-section of the girder shown in Figure 4b shows two upper girder elements Ilia, 111b forming the corner in a base line of a isosceles triangle where the lower girder element 112 defines the third corner of the triangle.
  • the temporary support tower 12 is erected in the middle of the tank, i.e. centrally with respect to the upper ring beam 42 on the secondary tank and centrally on the base plate 15 of the primary tank.
  • two, three or more support towers may be used, thus reducing the free girder span.
  • Such arrangement will, however, increase the required period of construction and disassembling the formwork.
  • Such solution will also require a more complicated dome shaped formwork 8.
  • the formwork supported by the girders 10 according to the invention is thus supported at its meridional inner end by a central, temporary inner ring beam 122 having a small diameter compared to the diameter of the upper secondary ring beam 42.
  • the temporary, inner ring beam 122 is designed to support the inner ends of the girders 10 and is supported by inclined struts 122b, arranged near the top of the temporary support tower 12, see Figure 1 showing a vertical section and Figure 6 showing an isometric view.
  • the preferred embodiment of the formwork elements 6 when assembled, constitute the formwork in the form of a dome shaped layer 5.
  • the formwork may be formed of prefabricated units and may provide a spherical surface. This may easily be achieved by constructing a formwork with a partly spherical surface, e.g. at the construction site, giving the formwork a length and a width which are larger than the largest required element 6 for casting each element 6.
  • the shape of consecutive meridional types of formwork elements 6 depends on several parameters such as the radius of the dome from near the middle of the tank, the meridional distance from the top of the tank and the arc of the ring beam to be spanned.
  • An element 6 may span across more than two girders 10 in the region close to the top of the dome shaped trusswork 8 as illustrated in Figure 5.
  • the formwork elements 6 are preferably made of prefabricated concrete. Alternatively, the formwork elements 6 may be made of steel.
  • the temporary support tower 12 may be provided with jacks 102 enabling lowering or elevation of the tower 12.
  • the jacks are indicated in Figure 6 and may be of any suitable type.
  • the jacks may comprise hydraulic pistons or any mechanical lifting means.
  • a preferred method for constructing a preferred embodiment for construction of the dome shaped roof 3 for a tank having very large diameter, for storage of condensate gas such as propane, methane, nitrogen etc, may comprise of the following steps:
  • a temporary tower 12 is erected inside a vertical, circular cylindrical primary tank side wall 4, the tower 12 extending above said wall 4.
  • Two or more towers may be used if the tank diameter is too large for one central tower, but such solution is not so advantageous due to increased construction time, price and complexity.
  • the side wall 4 supports an upper, secondary tank ring beam 42 having a circumferential reinforcement in order cater for lateral forces imposed by the dome and the previously described steel beams during the construction period; and also forces imposed by the dome subsequent to the curing phase.
  • a cylindrical, temporary inner ring beam 122 is preferably supported by struts or beams 122b in the vicinity of the upper end of the temporary tower 12.
  • Meridionally arranged beams 10, forming a dome shaped trusswork 8 are then lifted to its operational position, extending between the inner ring beam 122 on the temporary tower 12.
  • the beams rest at their meridional outer ends on the secondary tank ring beam 42, each consecutive pair of beams 10 spanning over a sector of the secondary tank ring beam 42.
  • the first formwork layer 5 consisting of formwork elements 6 is then placed on the beams 10 and fixed.
  • the formwork elements 6 cover mainly the entire area apart from a relatively small part of the dome shaped trusswork 8, leaving a central opening 51 at the top of the dome shaped trusswork 8. The purpose of this opening 51 will be described above.
  • a second concrete layer 14, illustrated in Figure 2 is cast on top of the formwork layer 5. This is the first concrete layer to be cast in-situ, but constitutes the second concrete layer 14.
  • the second concrete layer 14 is cured. According to a preferred embodiment the second concrete layer 14 is more than self-supported, either alone or together with the first formwork layer 5 of formwork elements 6.
  • a third concrete layer 14 is cast in-situ on top of the second concrete layer 14.
  • said third layer 18 is supported at least partly by the cured second layer 14, as further described below.
  • the tower 12 is lowered by means of the jacks 102, thereby lowering the trusswork 8 of girders 10 a predetermined distance below the formwork layer 5. Release of the supporting force below the formwork elements 6 will mobilize the load bearing capacity of the cured second layer 14. Such load bearing capacity must be dimensioned to be at least sufficient to carry the weight of the third concrete layer 18 to be cast in-situ; and the weight of the second layer 14 itself and also the weight of the first formwork layer 5.
  • the trusswork 8 of girders 10 will then come in contact with the first formwork layer 5.
  • the trusswork 8 will then partly support the concrete layers when the first formwork layer 5 and cured second layer slightly yield as a consequence of casting of the third concrete layer 18.
  • all girders 10 in the dome shaped trusswork 18 are dismantled and all girders 10 are removed through the central opening 51.
  • the temporary support tower 12 may also be dismantled and lifted out through the opening 51.
  • FIG. 7 shows in perspective a vertical view of a completed tank 200 according to the invention, showing the phase where a concrete roof forming the roof structure 205 of the tank 200, is concreted, but not yet self-supported.
  • the tank 200 comprises an outer secondary tank 201 and an internal concentric storage tank having vertical wall(s) 202.
  • radially arranged trusses 203 extend between a centrally arranged, supporting tower 204 and the top of the tank walls 201, 202.
  • the tower 204 is temporarily arranged inside the tank 202, supporting the trusses 203 and the dome shaped roof structure 205.
  • the trusses have a radial orientation.
  • the trusses 203 comprise an upper chord which is given an upper surface adapted to the required shape of the dome.
  • the trusses 203 are further interconnected, at least between the respective top chords.
  • the top surfaces of such interconnecting beams are given a shape adapted to the dome shape of the roof (not shown) .
  • the purpose of the interconnecting beams is to interconnect the trusses and to form a safe support for thin steel plates to be placed on top and between the trusses and beams and welded together, thereby forming a fluid tight membrane which additionally also serves as formwork for a reinforced concrete layer forming the structural part of the dome.
  • the trusses are provided with lower chords being substantial horizontal.
  • Figure 8 shows in perspective a horizontal view of a storage tank 200 prior to mounting the plates and rein- forcing and concreting the dome shaped roof structure 205.
  • Figure 8 shows the orientation of the radially arranged trusses 203. The interconnecting girders are not shown.
  • Figure 9 shows in perspective a vertical section of parts of the upper part of the storage tank 202 and the trusses 203. As shown in Figure 9 each truss may be provided with one or more intermediate chords and intermediate diagonal braces 207 and/or vertical columns or struts 208.
  • Insulating material may be placed between at least the lower chords of the trusses.
  • the insulation material may be suspended from the trusses, e.g. from the lower chords 208 e.g. by means of tendons or the like, as shown in Figure 3.
  • both the secondary tank 201 and the inner tank 202 are firstly constructed up to the level of support for the dome shaped roof structure 205.
  • the space between the inner and the secondary tank is insulated in parallel.
  • the inner, temporary tower 204 is then erected whereupon the trusses are mounted with one end resting on the tower 204 and the other end resting on top of the completed tank wall(s).
  • the interconnecting beams, interconnecting each truss 205 with the next truss, are then mounted.
  • each upper chord is given an upper surface adapted to the intended dome shape of the roof structure.
  • the upper surface of each interconnecting beam is given a shape corresponding to the intended shape of the roof structure.
  • the plates forming the fluid tight membrane in the roof structure and additionally serving as formwork during concreting are then installed and inter-welded.
  • the plates may also be given as shape corresponding to the intended shape of the roof structure.
  • Reinforcement is placed on top of the welded plates whereupon the roof structure is concreted and optionally prestressed or post-tensioned.
  • the temporary tower 204 is dismantled, e.g. as described above, while the trusses 203 remain suspended from the self-supported roof structure. In this operational phase the trusses have no longer any structural function, supporting the concrete roof structure. The trusses are, however, used for support and/or suspension of the insulation.
  • an opening is left in the roof structure for removal of the tower 204 upon completion of the concreting process of the concrete roof.
  • the opening is then closed by casting the remaining part.
  • dome shape is meant a roof shape which may be formed by plane plates forming an angle between each other, or formed by single curved plates or double curved plates .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Electromagnetism (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

L'invention concerne un réservoir vertical cylindrique de grand diamètre destiné à stocker un gaz cryogénique condensé, tel que le méthane. Ledit réservoir comprend un premier réservoir intérieur (1), un réservoir extérieur secondaire (2) et un toit en dôme (3) reposant sur une poutre annulaire (42) construit sur la partie supérieure de la paroi latérale (4) du réservoir secondaire. Le réservoir comprend un toit en dôme (3) formé d'une première couche inférieure (5) en dôme composée d'éléments de coffrage reposant sur un treillis temporaire (8) en dôme formé de poutres (10) incurvées, convexes et orientées selon un méridien et recouvrant un secteur circulaire du toit. Chaque poutre (10) repose au niveau de son extrémité extérieure sur une poutre annulaire (42) et est supportée à proximité de son extrémité intérieure au moyen d'une colonne de support (12) temporaire. Une deuxième couche de béton (14) est déposée in situ sur la partie supérieure des éléments de coffrage (6), cette deuxième couche étant auto-portante après exécution d'un procédé de durcissement. Une troisième couche de béton (13) est déposée in situ sur la partie supérieure de la deuxième couche (14) de béton et est au moins partiellement supportée par la deuxième couche durcie auto-portante et par la première couche (5) et les poutres en dôme (8) supportées par la poutre annulaire et la colonne de support (12) temporaire.
PCT/NO2002/000392 2002-02-13 2002-10-29 Structure en dome et son procede de construction WO2003069087A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2002343262A AU2002343262A1 (en) 2002-02-13 2002-10-29 Dome shaped structure and method for constructing such structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20020735A NO316093B1 (no) 2002-02-13 2002-02-13 Anordning og fremgangsmate for stoping av et domformet tak pa en kryogen tank, samt forskalingssystem til bruk i forbindelse med stoping av slike tak
NO20020735 2002-02-13

Publications (1)

Publication Number Publication Date
WO2003069087A1 true WO2003069087A1 (fr) 2003-08-21

Family

ID=19913327

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2002/000392 WO2003069087A1 (fr) 2002-02-13 2002-10-29 Structure en dome et son procede de construction

Country Status (3)

Country Link
AU (1) AU2002343262A1 (fr)
NO (1) NO316093B1 (fr)
WO (1) WO2003069087A1 (fr)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2466965A (en) * 2009-01-15 2010-07-21 Cappelen Skovholt As Liquefied gas storage tank with curved sidewall
CN103015781A (zh) * 2012-12-05 2013-04-03 中国化学工程第十三建设有限公司 一种双壁储罐内罐带外罐顶提升安装方法
CN103949789A (zh) * 2014-05-04 2014-07-30 中国化学工程第三建设有限公司 煤气化非标罐的制作安装方法、非标罐筒体的平移装置及平移方法
JP2014240553A (ja) * 2013-06-11 2014-12-25 株式会社Ihi 貯蔵タンクの施工方法
CN104456062A (zh) * 2014-11-27 2015-03-25 中国海洋石油总公司 设有支撑柱的lng储罐
JP2015203181A (ja) * 2014-04-10 2015-11-16 大成建設株式会社 曲面形状屋根の構築方法
CN108678258A (zh) * 2018-06-20 2018-10-19 中国建筑局(集团)有限公司 大跨度半球形钢筋混凝土穹顶结构及其施工方法
CN110043095A (zh) * 2019-04-23 2019-07-23 中海石油气电集团有限责任公司 穹顶浇筑期间储罐内分级增压保压控制方法及lng储罐
CN110230393A (zh) * 2019-06-18 2019-09-13 中建三局第二建设工程有限责任公司 一种大型混凝土罐穹顶可爬升高支模支撑体系及安装方法
JP2020159097A (ja) * 2019-03-27 2020-10-01 株式会社Ihiプラント 組立架台
JP2021523070A (ja) * 2018-05-11 2021-09-02 ギャズトランスポルト エ テクニギャズ 密閉断熱タンクを組み立てる方法
CN113931661A (zh) * 2021-11-02 2022-01-14 中铁二十四局集团有限公司 一种适用于大跨度洞室穹顶二次衬砌模板装置及施工方法
CN114687496A (zh) * 2022-01-10 2022-07-01 中铁二局集团有限公司 现浇球形屋面结构施工方法
CN115075393A (zh) * 2022-07-21 2022-09-20 中核能源科技有限公司 一种基于主次组合结构的穹顶框架
CN115125995A (zh) * 2022-06-13 2022-09-30 中电建南方建设投资有限公司 一种装配式车站的出入口环框施工方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882401A (zh) * 2017-11-22 2018-04-06 临沂矿业集团菏泽煤电有限公司 一种煤仓仓体下部的耐磨结构及施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB975604A (en) * 1962-01-26 1964-11-18 Dow Corning Roof for a building
US3286415A (en) * 1962-08-22 1966-11-22 Norman E Schlenker Reinforced shell construction
GB1227033A (fr) * 1967-06-21 1971-03-31
JPH02292432A (ja) * 1989-05-08 1990-12-03 Shimizu Corp ドーム構造物の建方法
JPH0431524A (ja) * 1990-05-28 1992-02-03 Shimizu Corp ドーム架構の架設工法
JPH09256535A (ja) * 1996-03-19 1997-09-30 Tomoe Corp ドーム型屋根の構築方法
WO2002048602A1 (fr) * 2000-12-15 2002-06-20 Ove Arup Partnership Limited Cuve de stockage de gaz d'hydrocarbures liquefie, comprenant des parois de beton non revetu

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB975604A (en) * 1962-01-26 1964-11-18 Dow Corning Roof for a building
US3286415A (en) * 1962-08-22 1966-11-22 Norman E Schlenker Reinforced shell construction
GB1227033A (fr) * 1967-06-21 1971-03-31
JPH02292432A (ja) * 1989-05-08 1990-12-03 Shimizu Corp ドーム構造物の建方法
JPH0431524A (ja) * 1990-05-28 1992-02-03 Shimizu Corp ドーム架構の架設工法
JPH09256535A (ja) * 1996-03-19 1997-09-30 Tomoe Corp ドーム型屋根の構築方法
WO2002048602A1 (fr) * 2000-12-15 2002-06-20 Ove Arup Partnership Limited Cuve de stockage de gaz d'hydrocarbures liquefie, comprenant des parois de beton non revetu

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
DATABASE WPI Week 199749, Derwent World Patents Index; AN 1997-533535, XP002960906 *
PATENT ABSTRACTS OF JAPAN vol. 15, no. 65 (M - 1082) 15 February 1991 (1991-02-15) *
PATENT ABSTRACTS OF JAPAN vol. 16, no. 206 (M - 1248) 15 May 1992 (1992-05-15) *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2466965A (en) * 2009-01-15 2010-07-21 Cappelen Skovholt As Liquefied gas storage tank with curved sidewall
US8857650B2 (en) 2009-01-15 2014-10-14 Iglo Contractors As Cryogenic liquid storage tank
CN103015781A (zh) * 2012-12-05 2013-04-03 中国化学工程第十三建设有限公司 一种双壁储罐内罐带外罐顶提升安装方法
JP2014240553A (ja) * 2013-06-11 2014-12-25 株式会社Ihi 貯蔵タンクの施工方法
JP2015203181A (ja) * 2014-04-10 2015-11-16 大成建設株式会社 曲面形状屋根の構築方法
CN103949789A (zh) * 2014-05-04 2014-07-30 中国化学工程第三建设有限公司 煤气化非标罐的制作安装方法、非标罐筒体的平移装置及平移方法
CN104456062A (zh) * 2014-11-27 2015-03-25 中国海洋石油总公司 设有支撑柱的lng储罐
JP2021523070A (ja) * 2018-05-11 2021-09-02 ギャズトランスポルト エ テクニギャズ 密閉断熱タンクを組み立てる方法
CN108678258A (zh) * 2018-06-20 2018-10-19 中国建筑局(集团)有限公司 大跨度半球形钢筋混凝土穹顶结构及其施工方法
CN108678258B (zh) * 2018-06-20 2024-04-19 中国建筑一局(集团)有限公司 大跨度半球形钢筋混凝土穹顶结构及其施工方法
JP2020159097A (ja) * 2019-03-27 2020-10-01 株式会社Ihiプラント 組立架台
JP7267805B2 (ja) 2019-03-27 2023-05-02 株式会社Ihiプラント 組立架台
CN110043095B (zh) * 2019-04-23 2024-02-09 中海石油气电集团有限责任公司 穹顶浇筑期间储罐内分级增压保压控制方法及lng储罐
CN110043095A (zh) * 2019-04-23 2019-07-23 中海石油气电集团有限责任公司 穹顶浇筑期间储罐内分级增压保压控制方法及lng储罐
CN110230393A (zh) * 2019-06-18 2019-09-13 中建三局第二建设工程有限责任公司 一种大型混凝土罐穹顶可爬升高支模支撑体系及安装方法
CN110230393B (zh) * 2019-06-18 2024-04-05 中建三局第二建设工程有限责任公司 一种大型混凝土罐穹顶可爬升高支模支撑体系及安装方法
CN113931661A (zh) * 2021-11-02 2022-01-14 中铁二十四局集团有限公司 一种适用于大跨度洞室穹顶二次衬砌模板装置及施工方法
CN113931661B (zh) * 2021-11-02 2023-10-27 中铁二十四局集团有限公司 一种适用于大跨度洞室穹顶二次衬砌模板装置及施工方法
CN114687496A (zh) * 2022-01-10 2022-07-01 中铁二局集团有限公司 现浇球形屋面结构施工方法
CN115125995A (zh) * 2022-06-13 2022-09-30 中电建南方建设投资有限公司 一种装配式车站的出入口环框施工方法
CN115125995B (zh) * 2022-06-13 2024-05-10 中电建南方建设投资有限公司 一种装配式车站的出入口环框施工方法
CN115075393A (zh) * 2022-07-21 2022-09-20 中核能源科技有限公司 一种基于主次组合结构的穹顶框架
CN115075393B (zh) * 2022-07-21 2024-05-31 中核能源科技有限公司 一种基于主次组合结构的穹顶框架

Also Published As

Publication number Publication date
NO20020735L (no) 2003-08-14
NO316093B1 (no) 2003-12-08
AU2002343262A1 (en) 2003-09-04
NO20020735D0 (no) 2002-02-13

Similar Documents

Publication Publication Date Title
AU2008320532B2 (en) Segmented concrete tower for wind power generators and method of erection thereof
WO2003069087A1 (fr) Structure en dome et son procede de construction
US9163613B2 (en) Support structure for a wind turbine and procedure to erect the support structure
US8555600B2 (en) Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more
US20120047830A1 (en) Fatigue resistant foundation
US8713892B2 (en) Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower
CN211714003U (zh) 中心筒、塔筒基础和塔筒
WO2016132166A1 (fr) Procédé de construction de fondation comprenant un monopieu d'acier et une partie en béton, et fondation associée pour travail de construction
CN113215956A (zh) 预制装配化空心钢管混凝土拱桥及其施工方法
US4261147A (en) Hyperbolic natural draft cooling tower construction
CN109653517B (zh) 一种多向卸荷系统及用该系统拼装钢连廊的施工方法
CN112459316B (zh) 一种用于螺旋递升式幕墙支撑的竖向长悬挑桁架结构及应用
CN111305627B (zh) 混凝土罐室施工方法
US4154029A (en) Steel concrete container and a process for erecting the same
CN110700109A (zh) 一种大桥钢管劲性骨架混凝土拱圈施工工艺
CN215670948U (zh) 一种用于穹顶结构施工的钢索桁架装置
US4282696A (en) Method for fabricating and erecting unitary structural elements
CN114875769A (zh) 预制装配化中空夹层钢管混凝土拱桥及其施工方法
JP4126474B2 (ja) コンクリート製ドーム屋根
CN220246640U (zh) 一种半装配式斜腿刚构桥结构
US20230220698A1 (en) Elevated tank tower
CN220952925U (zh) 一种基于预制和现浇的叠合桥墩
JP3376388B2 (ja) プレキャストパネルを用いた屋根の構築方法
CN220746989U (zh) 一种塔柱基础及格构式风电塔架
CN116537435A (zh) 一种环形弦支穹顶网壳钢结构及其施工方法

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LU MC NL PT SE SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP